Cities Index.
Amendment No. 3 to MOU

Norwalk City Council
October 21, 2025

Document
Amendment No. 3 to MOU
Meeting
October 21, 2025
Body
Norwalk City Council
Pages
19
Original file
321 KB
Text extracted from the city's file for reading and search. Open the original on norwalk.primegov.com. That file is the official record.

LSGR
July 2025

Page 1 ends

THIRD AMENDMENT TO THE MEMORANDUM OF UNDERSTANDING

BETWEEN THE LOS ANGELES GATEWAY REGION INTEGRATED REGIONAL

WATER MANAGEMENT JOINT POWERS AUTHORITY AND

THE CITIES OF ARTESIA, BELLFLOWER, CERRITOS, DIAMOND BAR, DOWNEY,

HAWAIIAN GARDENS, LA MIRADA, LAKEWOOD, NORWALK, PICO RIVERA, SANTA

FE SPRINGS, WHITTIER, LONG BEACH, AND THE LOS ANGELES COUNTY FLOOD

CONTROL DISTRICT
FOR

ADMINISTRATION AND COST SHARING TO PREPARE AND IMPLEMENT A

WATERSHED MANAGEMENT PROGRAM AND COORDINATED INTEGRATED

MONITORING PROGRAM AS REQUIRED BY THE REGIONAL WATER QUALITY

CONTROL BOARD, LOS ANGELES REGION, NATIONAL POLLUTANT DISCHARGE

ELIMINATION SYSTEM MUNICIPAL SEPARATE STORM SEWER SYSTEM PERMIT ORDER NO. R4-2021-0105 MUNICIPAL SEPARATE STORM SEWER SYSTEM

This THIRD AMENDMENT to the memorandum of understanding (“MOU”) is made and entered into as of the date of the last signature set forth below, by and between the Los Angeles Gateway Region Integrated Regional Water Management Joint Powers Authority (“GWMA”), a California Joint Powers Authority, and the Cities of Artesia, Bellflower, Cerritos, Diamond Bar, Downey, Hawaiian Gardens, La Mirada, Lakewood, Norwalk, Pico Rivera, Santa Fe Springs, Whittier, Long Beach (“Cities”), and the Los Angeles County Flood Control District (“LACFCD”):

1. Recitals. This THIRD AMENDMENT is made with respect to the following facts and purposes:

A. For the purposes of this Third Amendment, the term “Watershed Permittees” shall mean the Cities of Artesia, Bellflower, Cerritos, Diamond Bar, Downey, Hawaiian Gardens, La Mirada, Lakewood, Norwalk, Pico Rivera, Santa Fe Springs, Whittier, Long Beach, and the Los Angeles County Flood Control District; and

B. The Watershed Permittees and GWMA are collectively referred to as the “Parties”; and

C. On August 1, 2013, the Parties entered into a Memorandum of Understanding between the Los Angeles Gateway Region Integrated Regional Water Management Joint Powers Authority and the Cities of Artesia, Bellflower, Cerritos, Diamond Bar, Downey, Hawaiian Gardens, La Mirada, Lakewood, Norwalk, Pico Rivera, Santa Fe Springs, Whittier, Long Beach, and the Los Angeles County Flood Control District for Administration and Cost Sharing to Prepare a Watershed Management Program (“WMP”) and Coordinated Integrated Monitoring Program (“CIMP”), collectively the “Plans,” as required by the Regional Water Quality Control Board, Los Angeles Region (“Regional Board”), National Pollutant Discharge LSGR
July 2025

Page 2 ends

Elimination System Municipal Separate Storm Sewer System Permit, Order No. R4- 2012-0175 Municipal Separate Storm Sewer System (“MS4 Permit”); and

D. The Watershed Permittees prepared and submitted the Plans to the Regional Board in compliance with certain provisions of the MS4 Permit; and

E. In 2021, the Regional Board re-adopted the MS4 Permit by Order No.

R4-2021-0105. This version of the MS4 Permit included similar WMP and CIMP provisions; and

F. The Watershed Permittees are implementing the Plans in accordance with the MS4 Permit; and

G. The Parties have determined that authorizing GWMA to continue its retention of a consultant to implement the Plans will be beneficial to the Parties; and

H. The Parties entered into the First Amendment to the MOU in order to:
(1) add implementation of the Plans to the scope and purpose of the MOU; and (2) provide a separate cost-share formula for the implementation of the Plans, subject to annual budget approval, in accordance with each Party’s cost share allocations; and

I. On July 9, 2020, the Parties entered into the Second Amendment to the MOU in order to: (1) extend the MOU’s term through September 30, 2025; (2) clarify that funding collected through this MOU may be used for the regional BMP projects agreed to by the Watershed Permittees; (3) incorporate GWMA’s administrative cost recovery program into the MOU; and (4) provide a consolidated cost-share formula for implementation of the Plans and any other approved expenditures, subject to annual budget approval; and

J. The Parties now desire to amend the MOU to extend the MOU’s term through September 30, 2030.

NOW, THEREFORE, the Parties agree that the following provisions of the MOU shall be amended as follows:

2. Section 1 of the MOU entitled “Recitals” is hereby amended by adding thereto Recitals A-I of Section 1 of this Third Amendment, which are set forth above and incorporated herein as though set forth in full.

3. Section 6 of the MOU entitled “Term” is hereby amended to read as follows:

“Section 6. Term. This MOU shall remain and continue in effect until September 30, 2030, unless sooner terminated as provided herein.”

LSGR
July 2025

Page 3 ends

4. Exhibit “B” (“Annual Average Cost Sharing Formula beginning FY July 1, 2025”) attached hereto and incorporated herein as though set forth in full shall replace “Exhibit “B (“Cost Sharing Formula”) previously adopted under the Second Amendment.

5. Except for the changes specifically set forth herein, all other terms and conditions of the MOU and the First and Second Amendments shall remain in full force and effect.

[SIGNATURE PAGES FOLLOW]
LSGR
July 2025

Page 4 ends

IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:

DATE: _____________________ LOS ANGELES GATEWAY REGION

INTEGRATED REGIONAL WATER

MANAGEMENT JOINT POWERS

AUTHORITY

_______________________________________
Adriana Figueroa
GWMA Chair

_______________________________________
Nicholas R. Ghirelli
General Counsel

LSGR
July 2025

Page 5 ends

IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:

DATE: _______________ CITY OF ARTESIA
City Manager
18747 Clarkdale Avenue
Artesia, CA 90701

_____________________________
_____________________________
City Manager

ATTEST: APPROVED AS TO FORM:

_______________________________ ______________________________ _______________________________ ______________________________ City Clerk City Attorney

LSGR
July 2025

Page 6 ends

IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:

DATE: _______________ CITY OF BELLFLOWER
City Manager
City of Bellflower
16600 Civic Center Drive
Bellflower, CA 90706

_____________________________
_____________________________
City Manager

ATTEST: APPROVED AS TO FORM:

_____________________________ ______________________________ ______________________________ ______________________________ City Clerk City Attorney

LSGR
July 2025

Page 7 ends

IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:

DATE: _______________ CITY OF CERRITOS
City Manager
P.O. Box 3130
Cerritos, CA 90703-3130

_______________________________
_______________________________
City Manager

ATTEST: APPROVED AS TO FORM:

______________________________ ______________________________ ______________________________ ______________________________ City Clerk City Attorney

LSGR
July 2025

Page 8 ends

IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:

DATE: _______________ CITY OF DIAMOND BAR
City Manager
21810 Copley Drive
Diamond Bar, CA 91765

______________________________
______________________________
City Manager

ATTEST: APPROVED AS TO FORM:

_________________________ ______________________________ _________________________ ______________________________ City Clerk City Attorney

LSGR
July 2025

Page 9 ends

IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:

DATE: _______________ CITY OF DOWNEY
City Manager
11111 Brookshire Avenue
Downey, CA 90241

_____________________________
_____________________________
City Manager

ATTEST: APPROVED AS TO FORM:

_____________________________ ______________________________ _____________________________ ______________________________ City Clerk City Attorney

LSGR
July 2025

Page 10 ends

IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:

DATE: ______________ CITY OF HAWAIIAN GARDENS
City Manager
21815 Pioneer Blvd
Hawaiian Gardens, CA 90716

________________________________
________________________________
City Manager

ATTEST: APPROVED AS TO FORM:

__________________________ ______________________________ __________________________ ______________________________ City Clerk City Attorney

LSGR
July 2025

Page 11 ends

IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:

DATE: ____________ CITY OF LA MIRADA
City Manager
13700 La Mirada Blvd
La Mirada, CA 90638

_______________________________
_______________________________
City Manager

ATTEST: APPROVED AS TO FORM:

______________________________ ______________________________ ______________________________ ______________________________ City Clerk City Attorney

LSGR
July 2025

Page 12 ends

IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:

DATE: _______________ CITY OF LAKEWOOD
City Manager
5050 Clark Avenue
Lakewood, CA 90712

_______________________________
_______________________________
City Manager

ATTEST: APPROVED AS TO FORM:

_________________________ ______________________________ _________________________ ______________________________ City Clerk City Attorney

LSGR
July 2025

Page 13 ends

IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:

DATE: ______________ CITY OF LONG BEACH
City Manager
333 West Ocean Boulevard, 13th Floor
Long Beach, CA 90802

_______________________________
_______________________________
City Manager

ATTEST: APPROVED AS TO FORM:

______________________________ ______________________________ ______________________________ ______________________________ City Clerk City Attorney

______________________________
Deputy City Attorney

LSGR
July 2025

Page 14 ends

IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:

DATE: _______________ CITY OF NORWALK
City Manager
12700 Norwalk Blvd
Norwalk, CA 90650

________________________________
________________________________
City Manager

ATTEST: APPROVED AS TO FORM:

__________________________ ______________________________ __________________________ ______________________________ City Clerk City Attorney

LSGR
July 2025

Page 15 ends

IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:

DATE: _______________ CITY OF PICO RIVERA
City Manager
6615 Passons Boulevard
Pico Rivera, CA 90660

________________________________
________________________________
City Manager

ATTEST: APPROVED AS TO FORM:

____________________________ ________________________________ ____________________________ ________________________________ City Clerk City Attorney

LSGR
July 2025

Page 16 ends

IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:

DATE: _______________ CITY OF SANTA FE SPRINGS
City Manager
11710 Telegraph Road
Santa Fe Springs, CA 90670

_______________________________
_______________________________
City Manager

ATTEST: APPROVED AS TO FORM:

_________________________ ______________________________ _________________________ ______________________________ City Clerk City Attorney

LSGR
July 2025

Page 17 ends

IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:

DATE: _______________ CITY OF WHITTIER
City Manager
13230 Penn Street
Whittier, CA 90602

_______________________________
_______________________________
City Manager

ATTEST: APPROVED AS TO FORM:

______________________________ _______________________________ ______________________________ _______________________________ City Clerk-Treasurer City Attorney

LSGR
July 2025

Page 18 ends

IN WITNESS WHEREOF, the Parties hereto have caused this THIRD AMENDMENT to be executed on their behalf, respectively, as follows:

DATE: _____________ LOS ANGELES COUNTY FLOOD

CONTROL DISTRICT
County of Los Angeles
Department of Public Works

By: _______________________________
Chief Engineer

APPROVED AS TO FORM:

________________________________
Dawyn R Harrison
County Counsel

________________________________
Deputy

Exhibit B
Annual Average Cost Sharing Formula beginning FY July 1, 2025

Page 19 ends

Agency Area
(sq. mile)
Cost Share
Percentage
90% of Average Cost
(after Deducting
LACFCD’s Cost)
Proportioned Based
on Area
10% of Average
Cost (after
Deducting
LACFCD’s Cost)
Proportioned
Equally
Total Average
Annual Cost*
Artesia 1.62 1.85% $12,777.67 $5,903.29 $18,680.96
Bellflower 1.90 2.17% $14,987.86 $5,903.29 $20,891.15
Cerritos 8.82 10.09% $69,690.10 $5,903.29 $75,593.39
Diamond Bar 14.89 17.03% $117,623.63 $5,903.29 $123,526.92 Downey 6.62 7.57% $52,284.84 $5,903.29 $58,188.13
Hawaiian Gardens 0.96 1.10% $7,597.53 $5,903.29 $13,500.82 La Mirada 7.84 8.97% $61,954.43 $5,903.29 $67,857.72
Lakewood 2.02 2.31% $15,954.82 $5,903.29 $21,858.11
Long Beach 3.34 3.82% $26,384.16 $5,903.29 $32,287.45
Norwalk 9.76 11.16% $77,080.43 $5,903.29 $82,983.72
Pico Rivera 6.14 7.02% $48,486.08 $5,903.29 $54,389.36
Santa Fe Springs 8.88 10.15% $70,104.51 $5,903.29 $76,007.80 Whittier 14.66 16.76% $115,758.78 $5,903.29 $121,662.07 LACFCD (5% of total) -- $34,135.40 -- $34,135.40
Total 87.45 100.00% $724,820.24 $76,742.76 $801,563.00
* Does not include GWMA Administrative Fee and Indirect Administrative Fee (approved by GWMA Board annually).

Notes:
• The LSGR Watershed Group will determine and approve a budget each year for the following fiscal year necessary to comply with the MS4 permit(s).
• The average Watershed budget for the next four years is anticipated to range between $656,984.85 and $795,297.45, (Average = $726,141.15) depending on the potential for a new regional MS4 Permit to go in effect, plus GWMA administrative fees. The current MS4 Permit is scheduled to expire on September 11, 2026. The watershed budgets may be higher if reassessments of the Watershed Management Program (WMP), the Coordinated Integrated Monitoring Program (CIMP), and the Reasonable Assurance Analysis (RAA) are required for the new Permit.
• Other agencies may participate upon approval of cost sharing agreements by the L SGR Watershed Committee and GWMA. Future participants shall be assessed a late entry cost as if they had been a participant from the beginning of the Metals TMDL MOU, as of March 1, 2012, unless otherwise determined by the LSGR Watershed Committee.
• Watershed Permittees and the cost share are subject to modifications due to, but not limited to, changes in the number of participating agencies, refinements in mapping, and changes in boundaries.

• LACFCD’s annual contribution shall not exceed $100,000 unless otherwise amended.

← All documents from this meeting