Cities Index.
Agenda packet

Norwalk City Council
October 20, 2026

Document
Agenda packet
Meeting
October 20, 2026
Body
Norwalk City Council
Pages
7
Original file
16.6 MB
Text extracted from the city's file for reading and search. Open the original on norwalk.primegov.com. That file is the official record.

AGENDA

CITY COUNCIL
OCTOBER 20, 2026

TO WATCH THE MEETING AND PROVIDE LIVE COMMENTS ON AGENDA ITEMS OR

UNDER PUBLIC COMMENT DURING THE MEETING, JOIN THE ZOOM WEBINAR BY CALLING: 408/638-0968 OR USING THE ZOOM APP WITH THE FOLLOWING LINK:
https://us06web.zoom.us/j/84988537476.

CLOSED SESSION MEETING
5:00 PM

REGULAR MEETING
6:00 PM

NORWALK CITY HALL/COUNCIL CHAMBERS
Jennifer Perez, Mayor
Margarita L. Rios, Vice Mayor
Tony Ayala, Councilmember
Rick Ramirez, Councilmember
Ana Valencia, Councilmember

Americans with Disabilities Act: In compliance with the ADA, if you need special assistance to participate in a City meeting or other services offered by this City, please contact the City Clerk’s department, (562) 929-5720. Assisted listening devices are available at this meeting. Ask the City Clerk if you desire to use this device. Upon request, the agenda and documents in the agenda packet can be made available in appropriate alternative formats to persons with a disability. Notification of at least 48 hours prior to the meeting or time when services are needed will assist the City staff in assuring that reasonable arrangements can be made to provide accessibility to the meeting or service.

Public Comment: Individuals may speak on any item or under Public Comment. Speaker cards are provided at the back of the chambers and should be completed and turned into the Sergeant of Arms prior to the beginning of the item or the Public Comment period. (See Public Comment section for Rules of Decorum for all speakers)
Note: Any writings and/or documents provided to a majority of the City Council regarding any item on this agenda after it has been posted will also be made available for public inspection. Writings and/or documents are available for inspection in the City Clerk’s Department, during regular business hours, 8:00 a.m. to 6:00 p.m., Monday – Thursday and 8:00 a.m. to 5:00 p.m., every other Friday; telephone (562) 929-5720. To request copies of documents, records requests may be made by completing a public records request using the City’s public portal at:
https://www.norwalk.org/departments_services/city_clerk/public_records.php.

City Council, October 20, 2026 Page 2 of 6
CLOSED SESSION MEETING – 5:00 PM

CALL TO ORDER
Mayor Perez

ROLL CALL
Theresa Devoy, CMC
City Clerk

ORAL COMMUNICATIONS FOR CLOSED SESSION MATTERS

CLOSED SESSION
I. CONFERENCE WITH REAL PROPERTY NEGOTIATOR PURSUANT TO GOVERNMENT CODE §54956.8: Property - Assessor Parcel Number 8045-008-902 (Norwalk Transit Village); Negotiating Parties: Jesus M. Gomez, City Manager, on behalf of the City and State of California; Under Negotiation; Price and Terms of Payment.

II. CONFERENCE WITH LEGAL COUNSEL – ANTICIPATED LITIGATION PURSUANT TO GOVERNMENT CODE §54956.9(d)(2) – Significant exposure to litigation in one case.

RECESS
REGULAR MEETING – 6:00 PM

CALL TO ORDER
Mayor Perez

INVOCATION
Pastor Dr. Joy Clement Daniel
Rock of the Nations

FLAG SALUTE
Jonah Kai Nunez
Eastwood Elementary

ROLL CALL
Theresa Devoy, CMC
City Clerk

CLOSED SESSION REPORT

CITY COUNCIL COMMENTS
City Council, October 20, 2026 Page 3 of 6
a. Report of City Council Travel

CITY MANAGER COMMENTS

1. Flag Donation by Barbara Serrata.

2. Presentation of check to the American Cancer Society.

3. Update on City-wide Preparedness for El Nino.

4. Safe Shopping During the Holidays.

5. Bi-Weekly Review.

CONSENT CALENDAR
Consent calendar items are considered routine matters which may be enacted by one motion and roll call vote.

Any item may be removed from the consent calendar and considered separately by City Council.

1. WAIVE READING IN FULL OF ALL ORDINANCES ON THE AGENDA Staff recommends City Council waive reading in full of all ordinances on the agenda and declare that said titles which appear on the public agenda shall be determined to have been read by title and further reading waived.

2. MEETING MINUTES
Staff recommend City Council approve the minutes of the meeting of October 6, 2026. 825-04

3. PAYROLL FOR THE PERIOD SEPTEMBER 13, 2026 – SEPTEMBER 26, 2026 Staff recommends City Council approve gross payroll wages in the amount of $1,418,078.53; the payroll register with check numbers 38946 – 38959 and the voucher numbers 364649 – 365198 in the total net amount of $1,054,740.08.

4. COMMERCIAL DEMANDS
Staff recommend City Council approve the warrant register period September 22, 2026 – October 5, 2026, in the total amount of $5,102,275.65. 640

5. PLANNING COMMISSION SYNOPSIS - OCTOBER 14, 2026
No action is required.

6. ORDINANCE NO. 26-1769 – ADJUSTMENT TO CITY COUNCIL SALARY Staff recommend City Council accept for second reading by title only and adopt Ordinance No. 26-1769,

AN ORDINANCE OF THE CITY OF NORWALK ADJUSTING SALARIES FOR MEMBERS OF THE CITY COUNCIL.

7. CONTRACT AMENDMENT NO. 6 – TERM EXTENSION ADVANCED RESERVATION DIAL-A-RIDE /

SUBSCRIPTION SERVICES
Staff recommend City Council approve Amendment No. 6 to extend the First Transit, Inc. agreement from January 1, 2027 through June 30, 2027, for a total agreement cost of $603,421; and authorize the City Manager to execute the Amendment and future amendments, provided there is funding in the budget and it is within the City Manager’s signing authority, on behalf of the City, in a form approved by the City Attorney.

City Council, October 20, 2026 Page 4 of 6

8. CONTRACT AMENDMENT NO. 4 – TERM EXTENSION FOR PARATRANSIT DEMAND RESPONSE

USER SIDE SUBSIDY TRANSPORTATION PROGRAM
Staff recommend City Council approve Amendment No. 4 with Administrative Services Co-Op DBA Fiesta Taxi Cooperative, Inc. for Paratransit User Side Subsidy Transportation Program from January 1, 2027 through June 30, 2027 for a total agreement cost of $27,500; and authorize the City Manager to execute the agreement and future amendments, provided there is funding in the budget and it is within the City Manager’s signing authority, on behalf of the City, in a form approved by the City Attorney

9. CONTRACT AMENDMENT NO. 1 – TERM EXTENSION MICROTRANSIT/ON DEMAND PILOT

TRANSIT SERVICES
Staff recommend City Council approve Amendment No. 1 to extend Nomad, LLC’s agreement from January 13, 2027 through June 30, 2027, for a total agreement cost of $993,844; and authorize the City Manager to execute the Amendment and future amendments, provided there is funding in the budget and it is within the City Manager’s signature authority, on behalf of the City, in a form approved by the City Attorney.

10. APPROVAL OF TRACT MAP NO. 85156, FOR CONDOMINIUM SUBDIVISION LOCATED AT 12722 WOODS AVENUE, ENGINEER’S REPORT NO. 26-39
Staff recommend City Council approve Tract Map No. 85156, conditioned on the execution of the improvement guarantee required by Norwalk Municipal Code §16.03.160, and accept the dedications offered on the map.

11. RESOLUTION NO. 26-61 - BUDGET AMENDMENT AND AMENDMENT NO. 4 FOR PROJECT NO. 7865 PROJECT MANAGEMENT, CONSTRUCTION MANAGEMENT, AND INSPECTION SERVICES

FOR TRANSPORTATION / PUBLIC SERVICES FACILITY PHASE III IMPROVEMENTS Staff recommends City Council adopt Resolution No. 26-61, A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NORWALK AUTHORIZING AN AMENDMENT TO THE FISCAL YEAR 2026/2027

ADOPTED BUDGET TO TRANSFER TRANSPORTATION RESERVE FUNDS FOR CONSTRUCTION

MANAGEMENT SERVICES TO SUPPORT TRANSPORTATION/PUBLIC SERVICES FACILITY AND TENANT IMPROVEMENTS AT 12650 IMPERIAL HIGHWAY PROJECT NO. 7865, in the amount of $325,022; and authorize the City Manager to execute an amendment with PSOMAS increasing the total contract amount from $836,739.09 to $1,161,176.11 for construction management services, and any future amendments provided there is funding in the budget, and it is within the City Manager’s signing authority, on behalf of the City, in a form approved by the City Attorney.

APPOINTMENTS

12. ADVISORY BODY APPOINTMENTS
Staff recommend City Council make appointments to fill the vacancies on the various Advisory Bodies for two-year terms expiring on December 31, 2026.

ORDINANCE AND RESOLUTIONS

13. PROJECT NO. 7859 – AWARD OF CONTRACT – CONSTRUCTION SERVICES FOR BUILDINGS DEMOLITION LOCATED AT NORWALK TRANSIT VILLAGE, 13200 BLOOMFIELD AVENUE / RESOLUTION NO. 26-62 BUDGET AMENDMENT, ENGINEER'S REPORT NO. 26-17 Staff recommend City Council:
a. adopt Resolution No. 26-62, A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NORWALK, AUTHORIZING AN AMENDMENT TO THE FISCAL YEAR 2025/26 ADOPTED BUDGET TO APPROPRIATE $1,386,000 OF LOW AND MODERATE INCOME HOUSING ASSET FUNDS AND $2,079,000 OF FORMER REDEVELOPMENT AGENCY NON-HOUSING

BOND PROCEEDS FOR THE BUILDINGS DEMOLITION LOCATED AT THE NORWALK TRANSIT VILLAGE PROPERTY LOCATED AT 13200 BLOOMFIELD AVENUE, NORWALK, CA 90650, CITY PROJECT NO. 7859.

City Council, October 20, 2026 Page 5 of 6
b. award a contract to Precision Environmental in the amount of $2,639,950 with a 25% contingency in the amount of $659,988 for construction services for Project No. 7859; and authorize the City Manager to execute the contract with any amendments within the contingency, on behalf of the City, in a form approved by the City Attorney.

14. RESOLUTION NO. 26-63 - BUDGET AMENDMENT FOR AUTHORIZATION TO ACQUIRE AND EQUIP

A VERSATILE PUBLIC SAFETY VAN
Staff recommend City Council:
a. adopt RESOLUTION NO. 26-63, A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NORWALK AUTHORIZING AN AMENDMENT TO THE FISCAL YEAR 2026/27 ADOPTED

BUDGET TO APPROPRIATE FUNDS FOR AUTHORIZATION TO ACQURE AND EQUIP A VERSATILE PUBLIC SAFETY VAN, in the amount of $249,719; and b. approve the acquisition and custom building of one high visibility community safety van for the Department of Public Safety at a total project cost not to exceed $249,719, including the cost of the van at $81,039; and
c. authorize the City Manager, or designee, to execute the necessary purchase and installation agreements and any amendments in accordance with the City’s purchasing requirements, provided there is funding in the budget and it is within the City Manager’s signing authority, on behalf of the City, in forms approved by the City Attorney; d. authorize the City Manager to surplus the recreational vehicle.

15. RESOLUTION NO. 26-64 - BUDGET AMENDMENT FOR ACCEPTANCE OF GRANT FUNDS FOR SECURITY SERVICES AT THE WEINGART ROSE - PROJECT HOMEKEY LOCATED AT 10646

ROSECRANS AVENUE
Staff recommend City Council:
a. adopt Resolution No. 26-64, A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NORWALK AUTHORIZING AN AMENDMENT TO THE FISCAL YEAR 2026/27 ADOPTED

BUDGET TO ACCEPT GRANT FUNDS FOR SERCURITY SERVICES AT THE WEINGART ROSE – PROJECT HOMEKEY, in the amount of $200,000; and
b. authorize the City Manager to utilize the services of Absolute International Security to provide security for the area surrounding the Weingart Rose property located at 10646 Rosecrans Avenue.

REPORTS

16. PROJECT NO. 7527 - TERMINATION OF CONSTRUCTION CONTRACT SERVICES FOR THE

REHABILITATION FOR SEWAGE LIFT STATION AT HARVARD DRIVE AND GRIDLEY ROAD Staff recommend City Council approve terminating the contract with Christensen Brothers General Engineering, Inc.; instruct staff to issue a formal Notice of Termination in accordance with the terms of the contract; and authorize the City Manager to execute a new contract with Mike Bubalo Construction Co., Inc. to complete Project No. 7527.

17. AMERICAN RESCUE PLAN ACT PROJECTS STATUS UPDATE
Receive and File.

18. RESOLUTION NO. 26-59 - BUDGET AMENDMENT FOR AMERICAN RESCUE PLAN ACT FUNDED

PROJECTS
Staff recommend City Council:
a. adopt Resolution No. 26-59, A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NORWALK AUTHORIZING AN AMENDMENT TO THE FISCAL YEAR 2026/27 ADOPTED

BUDGET TO TRANSFER FUNDS FOR AMERICAN RESCUE PLAN ACT FUNDED PROJECTS, in the amount of $489,634; and
b. authorize the City Manager to execute Amendment No. 1 to the Inter-agency Memorandum of City Council, October 20, 2026 Page 6 of 6
Understanding between the City and the Community Development Department, on behalf of the City, in a form approved by the City Attorney; and
c. authorize the City Manager to execute Amendment No. 1 to the agreement with Viatron Systems Inc. decreasing the agreement by $340,000; and
d. authorize the City Manager to execute Amendment No. 2 to the Inter-agency Memorandum of Understanding between the City and the Public Safety Department, on behalf of the City, in a form approved by the City Attorney; and
e. authorize the City Manager to execute Amendment No. 1 to the agreement with IBE Digital increasing the agreement by $394,693, and additional amendments, provided there is funding in the budget and it is within the City Manager’s signing authority, on behalf of the City, in a form approved by the City Attorney.

PUBLIC COMMENT
The public is encouraged to address City Council on any matter listed on the agenda or on any other matter within its jurisdiction subject to the rules of decorum described in Section 2.08.020 of the Norwalk Municipal Code. If you wish to address City Council, please complete a speaker card and hand the card to the Sergeant at Arms. City Council will hear public comment on items listed on the agenda during discussion of the matter and prior to a vote and on matters not listed on the agenda during the Public Comment period.

Pursuant to provisions of the Brown Act, no action may be taken on a matter unless it is listed on the agenda, or unless certain emergency or special circumstances exist. The City Council may direct staff to investigate and/or schedule certain matters for consideration at a future City Council meeting.

Please adhere to the following procedures when addressing the City Council: Comments are limited to 3 minutes or less and should be directed to City Council as a whole. Individuals are not permitted to extend, transfer, speak on behalf of others, or yield their time to other speakers. Please refrain from any disruptive conduct.

ADJOURNMENT
I hereby certify under penalty of perjury under the laws of the State of California that the foregoing agenda was posted on the City Hall bulletin board not less than 72 hours prior to the meeting. Dated October 16, 2026.

Theresa Devoy, CMC
City Clerk
20261006
825-04

MINUTES OF THE CLOSED SESSION AND REGULAR MEETINGS

NORWALK CITY COUNCIL

NORWALK, CALIFORNIA
OCTOBER 6, 2026

CLOSED SESSION MEETING
Mayor Perez called the meeting to order at 5:00 p.m. in the Council Chambers, Norwalk City Hall, 12700 Norwalk Boulevard, Norwalk, California. Responding to roll call were Councilmembers Ayala and Ramirez, Vice Mayor Rios, and Mayor Perez.

Councilmember Valencia arrived after roll call. Also present were Jesus M. Gomez, City Manager; Arnold M. Alvarez-Glasman, City Attorney; and Theresa Devoy, City Clerk.

ORAL COMMUNICATIONS FOR CLOSED SESSION MATTERS
There were no persons wishing to address City Council on the matters to be discussed in closed session.

CLOSED SESSION
City Council immediately convened to closed session for discussion on the following matters:

I. CONFERENCE WITH LEGAL COUNSEL – EXISTING LITIGATION PURSUANT TO GOVERNMENT CODE §54956.9(d)(1) – West Coast Arborists, Inc. vs. City of Norwalk, et al. Los Angeles Superior Court Case No. 26STCP03027.

II. CONFERENCE WITH REAL PROPERTY NEGOTIATOR PURSUANT TO GOVERNMENT CODE §54956.8: Property Acquisition for the following properties:
11554 Tina Street, 11541 & 11548 Beaty Avenue, 11822 Jersey Avenue, 11835 & 11913 Dollison Drive, and 11610 Allard Street; Negotiating Parties: Jesus M.

Gomez, City Manager, on behalf of the City and the California Department of Transportation; Under Negotiation: Price and Terms of Payment.

III. CONFERENCE WITH REAL PROPERTY NEGOTIATOR PURSUANT TO GOVERNMENT CODE §54956.8: Property - Assessor Parcel Numbers 8047-007- 192 and 8047-007-193; Negotiating Parties: Jesus M. Gomez, City Manager, on behalf of the City and Golden State Water; Under Negotiation; Price and Terms of Payment.

RECESS
City Council recessed at 5:23 p.m. pending the commencement of the regular meeting.

Minutes of the Closed Session and Regular Meetings
Norwalk City Council
October 6, 2026
2 REGULAR MEETING
Mayor Perez called the meeting to order at 6:03 p.m. in the Council Chambers, Norwalk City Hall, 12700 Norwalk Boulevard, Norwalk, California. City Council was present in its entirety with Councilmembers Ayala, Ramirez, and Valencia, Vice Mayor Rios, and Mayor Perez responding to roll call. Also present were Jesus M. Gomez, City Manager; Arnold M. Alvarez-Glasman, City Attorney; and Theresa Devoy, City Clerk.

The invocation was delivered by Pastor Jeff Johnston, Faith Church Norwalk; followed by the flag salute, led by Blake Evan Nunez, Hutchinson Middle School.

CLOSED SESSION REPORT
The City Attorney indicated there was no reportable action taken on the matters discussed in closed session.

CITY COUNCIL COMMENTS
Councilmember Valencia reported on her attendance at the Whittier Young Men’s Christian Association Awards Night and the Southeast Water Coalition Meeting; invited all to attend the Norwalk Lions Club Quarter Mania Oct 10, at Saint Francis Episcopal Church, and highlighted the upcoming Norwalk Santa Fe Springs Soroptimist Gala and Scholarship Dinner December 6. Councilmember Ayala thanked Caren Spilsbury and the Norwalk Chamber of Commerce for a successful Paint the Town Pink event; and announced an upcoming Blood Pressure Screening October 20, at the Senior Center.

Vice Mayor Rios thanked the Manager at Starbucks for hosting Norwalk’s Paint the Town Pink event; reported on her attendance at the League of California Cities Conference, the Relay for Life Walk, and shared the Teen Alliance Program participants won the “Spirit Stick Award”; highlighted Target’s Grand Reopening; shared that the Ribbon Cutting for Loaded Café and My Panecito would be held October 13; indicated a tentative date for the opening of Five Below as October 30. Mayor Perez shared that the City newsletters and the Norwalk Now were distributed; invited all to attend the Arturo Sanchez Halloween Parade, October 17, and the State and Taste of the City, October 16, at the Norwalk Arts and Sports Complex; reported on her attendance at the 25th Annual Celebration Long Beach Latino Leaders Awards Gala, the 100th Anniversary of the Norwalk Sheriff’s Station, the Regional Mayor’s Summit, where they discussed the importance of communication and coordination with neighboring cities during emergencies, and participated in a California Contract Cities Meeting in partnership with Los Angeles County Sheriff’s Department and the District Attorney’s Office to address street takeovers.

Minutes of the Closed Session and Regular Meetings
Norwalk City Council
October 6, 2026
3 SPECIAL PRESENTATIONS
City Council proclaimed October as Breast Cancer Awareness Month in the City of Norwalk with Nancy Gutzmer from the American Cancer Society accepting the proclamation and speaking to thank the city for its continued support.

City Council proclaimed October 4 to October 10, 2026 as Code Enforcement Officer Week in the City of Norwalk.

City Council recognized the Norwalk Lion’s Club as they Celebrate their 80th Anniversary.

CITY MANAGER COMMENTS
Caren Spilsbury provided the Chamber of Commerce quarterly update. Ozzie Ramos, Deputy City Manager, provided an E-Bikes and Traffic Safety Update. Videos were shared highlighting Hispanic Heritage month and the “Bi-Weekly Review”.

CONSENT CALENDAR
Consent calendar items are considered routine matters which may be enacted by one motion and roll call vote. Vice Mayor Rios requested Item No. 6 be pulled for a separate report and vote. Councilmember Valencia moved and Councilmember Ayala seconded to approve the consent calendar Item Nos. 1 through 5 as recommended. MOTION CARRIED BY THE FOLLOWING ROLL CALL VOTE:

AYES: Councilmembers Ayala, Ramirez, and Valencia, Vice Mayor Rios and Mayor Perez*
NOES: None
ABSENT: None
WAIVE READING IN FULL OF ALL ORDINANCES ON THE AGENDA - City Council waived reading in full of all ordinances on the agenda and declared that said titles which appear on the public agenda shall be determined to have been read by title and further reading waived.

MEETING MINUTES
City Council approved the minutes of the meetings of September 15, 2026. 825-04 Minutes of the Closed Session and Regular Meetings
Norwalk City Council
October 6, 2026
4 PAYROLL FOR THE PERIOD AUGUST 30, 2026 – SEPTEMBER 12, 2026 City Council approved gross payroll wages in the amount of $1,377,371.42; the payroll register with Check Nos. 38927 – 38945 and the Voucher Nos. 364124 – 364648 in the total net amount of $1,029,558.44. 630

COMMERCIAL DEMANDS
City Council approved the warrant register period September 8, 2026 through September 21, 2026, in the total amount of $6,028,075.14. 640
*Mayor Perez abstained from taking action on Warrant Nos. 147, 230, and 319.

PLANNING COMMISSION SYNOPSIS - SEPTEMBER 23, 2026
No action taken. 260-02
*The following item was pulled for a separate report and vote. Mayor Perez left the dais due to a conflict of interest.

RESOLUTION NO. 26-59 - BUDGET AMENDMENT FOR AMERICAN RESCUE PLAN

ACT FUNDED PROJECTS
Following a report by Jennifer Hernandez, Administrative Services Supervisor; City Council discussion ensued discussing the various American Rescue Plan Act projects and involving City Council in the allocation of funding. Councilmember Valencia moved and Councilmember Ramirez seconded to continue the item to the next City Council meeting of October 20, 2026.

MOTION CARRIED BY THE FOLLOWING ROLL CALL VOTE:

AYES: Councilmembers Ayala, Ramirez, and Valencia, and Vice Mayor Rios NOES: None
ABSENT: Mayor Perez 622-01/610

APPOINTMENTS

ADVISORY BODY APPOINTMENTS
There were no appointments made. 200
Minutes of the Closed Session and Regular Meetings
Norwalk City Council
October 6, 2026
5 ORDINANCES AND RESOLUTIONS
ORDINANCE NO. 26-1769 - SALARY ADJUSTMENT FOR COUNCILMEMBERS

UPON COMMENCEMENT OF NEW TERMS OF OFFICE
Following a brief report provided by Mr. Gomez, Councilmember Ramirez moved and Councilmember Valencia seconded to introduce by title only Ordinance No. 26-1769, AN

ORDINANCE OF THE CITY OF NORWALK ADJUSTING SALARIES FOR MEMBERS OF THE CITY COUNCIL, and schedule for adoption. MOTION CARRIED BY THE FOLLOWING ROLL CALL VOTE:

AYES: Councilmembers Ramirez and Valencia, and Vice Mayor Rios NOES: Councilmember Ayala and Mayor Perez
ABSENT: None 825-11

REPORTS
PROJECT NO. 7873 – CITY HALL RECEPTION IMPROVEMENT PROJECT – AWARD

OF CONTRACT AND AUTHORIZATION TO PURCHASE NEW FURNISHINGS, FIXTURES AND EQUIPMENT, RESOLUTION NO. 26-60 – BUDGET AMENDMENT, ENGINEER'S REPORT NO. 26-38
Albert Mendoza, Director of Public Services/City Engineer provided a report.

Councilmember Ramirez moved and Mayor Perez seconded to:
a. adopt Resolution No. 26-60, A RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF NORWALK AUTHORIZING AN AMENDMENT TO THE FISCAL YEAR 2026/27 ADOPTED BUDGET TO APPROPRIATE FUNDS FOR PROJECT NO. 7873 – CITY HALL RECEPTION IMPROVEMENT PROJECT, in the amount of $1,008,000; and
b. award a contract to KYA Services, LLC, utilizing California Multiple Award Schedule Contract No. 4-20-78-0089C in the amount of $1,198,894 with a 25% contingency in the amount of $299,724 for the City Hall Reception Improvement Project; and
c. award a contract to KYA Services, LLC and its subsidiary, TLS Choice, LLC, utilizing CivicBuys through Arvin Union School District Contract No. 000-6964, for the procurement and installation of furniture, furnishings, security screening equipment, and related improvements in the amount of $240,157, with a 15% contingency in the amount of $36,024; and
d. approve Amendment No. 4 with VCA Code to provide additional design support services, in the amount of $35,000 with a 15% contingency in the amount of $5,250; and
e. authorize the City Manager to execute the contracts with KYA Services, LLC and Amendment No. 4 with VCA Code along with contingency amounts if needed up Minutes of the Closed Session and Regular Meetings
Norwalk City Council
October 6, 2026
6 to the amounts listed in the report, and any related documents, on behalf of the City, in forms approved by the City Attorney.

MOTION CARRIED BY THE FOLLOWING ROLL CALL VOTE:

AYES: Councilmembers Ayala, Ramirez, and Valencia, Vice Mayor Rios and Mayor Perez
NOES: None
ABSENT: None 622-01/1005-04-7873/610

PUBLIC COMMENT
Addressing City Council were Monica Martinez-Johnson and Priscilla Mendoza.

ADJOURNMENT
There being no further business to come before City Council, the meeting was adjourned at 8:28 p.m.
____________________________

THERESA DEVOY, CMC

CITY CLERK
ATTEST:
____________________________

JENNIFER PEREZ
MAYOR
City Council Agenda Report
October 20, 2026
TO: Honorable City Council
FROM: Jesus M. Gomez, City Manager
BY: Jana Stuard, Director of Finance/City Treasurer
Karmin Hernandez Persi, Financial Analyst
SUBJECT: PAYROLL FOR THE PERIOD SEPTEMBER 13, 2026 – SEPTEMBER 26, 2026 Background:

The City’s cost of gross wages for the payroll period of September 13, 2026 – September 26, 2026, totals $1,418,078.53.

Fiscal Impact:

Cost is included in Fiscal Year 2026/27 budget.

Citizens Advised:

N/A
Strategic Plan 2023 Implementation:

N/A
Recommended Action:

Staff recommends City Council approve gross payroll wages in the amount of $1,418,078.53; the payroll register with check numbers 38946 – 38959 and the voucher numbers 364649 – 365198 in the total net amount of $1,054,740.08.

Attachments:

N/A

CITY OF NORWALK

FINAL WARRANT REGISTER
September 22, 2026 through October 5, 2026
Item
Count Vendor Name Description Check Number Check Total
1 ADVANTEC CONSULTING ENGINEERS INC PROFESSIONAL SERVICES/JULY-AUGUST 209646 $5,566.28 2 AEG SOLUTIONS INC PRINTER SUPPLIES 209647 $165.86
3 SULLY MILLER CONTRACTING CO HOT MIX MATERIALS 209648 $376.21 4 CALIF CONTRACT CITIES ASSN (CCCA) FY27 MEMBERSHIP FEE 209649 $7,500.00 5 DISTRICT LODGE 947, IAMAW EMPLOYEE UNION DUES 209650 $6,267.67 6 CARAHSOFT TECHNOLOGY CORPORATION EMPLOYEE VERIFICATION/AUGUST 2026 209651 $343.64 7 CORELOGIC INC GOODS AND SERVICES/JULY 2026 209652 $364.44 8 DEWEY SERVICES INCORPORATED PEST CONTROL/SEPTEMBER 2026 209653 $118.00 9 NORWALK REALTY INC PARKING LOT MAINTENANCE/SEPTEMBER 209654 $461.93 10 FRANCHISE TAX BOARD PAYROLL DEDUCTIONS 09/12/26 209655 $778.08 11 THE GOODYEAR TIRE & RUBBER CO BUS TIRE LEASE 209656 $291.48 12 JESUS GOMEZ DINNER MEETING REIMBURSEMENT 209657 $527.34 13 LOS ANGELES COUNTY SHERIFF'S DEPT WAGES WITHHELD 09/18/2026 209658 $61.49 14 LIBERTY UTILITIES CORP UTILITIES/CITY WIDE/AUGUST 2026 209659 $23,040.78 15 UNIFORM DEPOT INC PUBLIC SAFETY UNIFORMS 209660 $619.08 16 NORWALK SHERIFF'S STATION UNIT FUND RE-ISSUE CHECK #209642 209661 $150.00 17 ONWARD ENGINEERING BUS STOP IMPROVEMENT PROJECT 209662 $13,822.50 18 PUMP SYSTEMS UNLIMITED INC WATER WELL SPACE TEST 209663 $3,250.00 19 ROADLINE PRODUCTS INC USA TRAFFIC MARKING MATERIAL 209664 $546.98 20 S&J SUPPLY COMPANY MISCELLANEOUS SUPPLIES 209665 $377.99 21 SANGBO HAN RE-ISSUE CHECK #208399 209666 $250.00
22 SOUTHERN CALIF EDISON COMPANY UTILITIES/CITY WIDE/AUGUST 2026 209667 $11,540.39 23 SOUTHSTAR DCCM CONTRACT MANAGEMENT/JULY 2026 209668 $384.00 24 ST LINUS CHURCH CONTRIBUTION/JENNIFER PEREZ 209669 $1,500.00 25 TESCO CONTROLS LLC TESCOFLEX PEDESTALS 209670 $21,298.88 26 TRANSTECH ENGINEERS INC CONSTRUCTION INSPECTION/JULY 2026 209671 $97,099.95 27 TRI WEST MECHANICAL INC HVAC REPLACEMENT 209672 $22,790.00 28 UNIFIRST CORPORATION BUILDING MAINTENANCE UNIFORMS 209673 $1,336.19 29 ARGO ENTERPRISES INC FIRST AID SUPPLIES 209674 $402.67 30 PHASE II SYSTEMS, A CA CORP EMPLOYEE RETIREMENT/SEPTEMBER 2026 209675 $48,178.27 31 WEST COAST ARBORISTS INC TREE REMOVAL/MAY 2026 209676 $2,541.40 32 DOMINIQUE HARRIS CHILD CARE STAGE 1/AUGUST 2026 209677 $885.44 33 MARTINEZ FAMILY CHILD CARE SERVICES CHILD CARE STAGE 1/AUGUST 2026 209678 $2,560.50 34 MARIA C TRUJILLO CHILD CARE STAGE 1/AUGUST 2026 209679 $851.10 35 MARTHA JUANA HERRERA CHILD CARE STAGE 1/AUGUST 2026 209680 $1,456.31 36 NEW HARVEST CHRISTIAN FELLOWSHIP CHILD CARE STAGE 1/AUGUST 2026 209681 $3,372.00 37 YAHILANI MIA GARCIA CHILD CARE STAGE 1/AUGUST 2026 209682 $645.07 38 ANDRIA DANIELLE MATA CHILD CARE STAGE 3/AUGUST 2026 209683 $1,334.10

Page 1 of 7 ends

Item
Count Vendor Name Description Check Number Check Total
39 ASHLEY MARIE LEVARIO CHILD CARE STAGE 2/AUGUST 2026 209684 $1,906.42 40 CAROLINE K MORENO CHILD CARE/AUGUST 2026 209685 $673.45 41 CHRISTINE MICHELLE SANDOVAL CHILD CARE/AUGUST 2026 209686 $667.05 42 EFREN DURAN CHILD CARE/AUGUST 2026 209687 $912.03
43 EVA LINDA MORENO CHILD CARE/AUGUST 2026 209688 $1,623.96 44 FELICIA CROCKETT CHILD CARE STAGE 2/AUGUST 2026 209689 $718.20 45 MARIA E MALDONADO CAMPOS CHILD CARE/AUGUST 2026 209690 $1,792.17 46 MARTIN LOBATOS CHILD CARE STAGE 2/AUGUST 2026 209691 $782.26 47 NADINE MCGUIRE CHILD CARE STAGE 3/AUGUST 2026 209692 $4,180.19 48 NEW HARVEST CHRISTIAN FELLOWSHIP CHILD CARE STAGE 2/AUGUST 2026 209693 $1,488.00 49 RAQUEL SILVA CHILD CARE/AUGUST 2026 209694 $667.05
50 ADRIANNA ELIZARRARAS PARK DEPOSIT REFUND 209695 $500.00 51 ALEXIS LUCERO NASC SECURITY DEPOSIT REFUND 209696 $500.00 52 ALL AMERICAN ASPHALT CONSTRUCTION/SEPTEMBER-DECEMBER 209697 $1,463,351.46 53 AUTO CHLOR SYSTEM CLEANING SUPPLIES 209698 $819.36
54 ADVANCED AVANT GARDE CORPORATION ADMINISTRATIVE SERVICES/AUGUST 2026 209699 $2,000.00 55 NORWALK HIGH SCHOOL CONTRIBUTION/JENNIFER PEREZ 209700 $250.00 56 BEST BUY TIRE PROS SUPPLY AND DELIVERY OF TIRES 209701 $436.55 57 IGNACIO RUBIO MONTES PADDING FOR FIELDS 209702 $3,869.75 58 CATALINA G FIGUEROA RE-ISSUE CHECK #206254 209703 $2,077.89 59 CHRIS FABIAN MACIAS RE-ISSUE CHECK #205044 209704 $200.00 60 CLAUDIA ALVAREZ NASC SECURITY DEPOSIT REFUND 209705 $500.00 61 COMMERCIAL PEST SERVICES PEST CONTROL/AUGUST 2026 209706 $303.00 62 CORODATA RECORDS MANAGEMENT INC RECORD STORAGE/AUGUST 2026 209707 $339.62 63 CUMMINS INC SUPPLY OF OEM PARTS 209708 $989.53
64 SOUTHERN CALIF SECURITY CENTERS INC DOOR REPAIRS 209709 $1,157.76 65 HONEYCOTT INC BEE REMOVAL SERVICES 209710 $272.50
66 DEWEY SERVICES INCORPORATED PEST CONTROL/SEPTEMBER 2026 209711 $450.00 67 GILLIG LLC OEM GILLIG PARTS 209712 $1,209.64
68 GUILLERMO ZELAYA NASC SECURITY DEPOSIT REFUND 209713 $500.00 69 H&H AUTO PARTS WHOLESALE AUTO PARTS 209714 $1,215.73 70 JOSE LUIS VELASQUEZ JR DJ SERVICE HALLOWEEN DANCE 209715 $400.00 71 LINO ENRIQUEZ NASC RESERVATION FORFEIT 209716 $828.00 72 MAIDSTONE PROPERTY INVESTMENT LLC CONSULTING SERVICES REFUND 209717 $4,728.75 73 MINER LTD MAINTENANCE REPAIRS 209718 $2,152.00
74 NADA BUS INC TRANSPORTATION TO SUMMER CONCERT 209719 $2,880.00 75 JOE'S SWEEPING INC BUS STOP MAINTENANCE/SEPTEMBER 2026 209720 $138,869.82 76 NORWALK LIONS CLUB OF CALIFORNIA CONTRIBUTION/ANA VALENCIA 209721 $300.00

Page 2 of 7 ends

CITY OF NORWALK

FINAL WARRANT REGISTER
September 22, 2026 through October 5, 2026
Item
Count Vendor Name Description Check Number Check Total
77 NORWALK PRINTERS INC TRANSIT FORMS 209722 $2,760.29
78 OSBALDO RAMOS RE-ISSUE CHECK #206069 209723 $130.21
79 PSOMAS PROFESSIONAL SERVICES/JULY 2026 209724 $2,880.00 80 RONALD CARGUS NASC RESERVATION FORFEIT 209725 $360.00 81 ROSELYN REYES MINIACHIS DEPOSIT REFUND 209726 $180.00 82 RYAN SANCHEZ LAS VEGAS UAV EXPO REIMBURSEMENT 209727 $369.97 83 SOFIA ULLOA NASC SECURITY DEPOSIT REFUND 209728 $500.00 84 SUNWEST ENGINEERING CONSTRUCTORS UNDERGROUND STORAGE TANK 209729 $300.00 85 RENTOKIL NORTH AMERICA INC PEST CONTROL SERVICES 209730 $250.00 86 THE DOWNEY PATRIOT INC LEGAL NOTICE IO#26-46 209731 $765.75 87 TRILLIUM INVESTMENTS LLC RENEWABLE FUEL SERVICES 209732 $12,971.76 88 VALERIA GASTELUM NASC SECURITY DEPOSIT REFUND 209733 $1,000.00 89 WAXIE'S ENTERPRISES LLC CLEANING SUPPLIES/FACILITIES 209734 $15,253.46 90 WEST COAST ARBORISTS INC TREE TRIMMING SERVICES/JULY 2026 209735 $1,421.20 91 WILLDAN ENGINEERING DESIGN SERVICES/JULY 2026 209736 $23,819.50 92 AGILE OCCUPATIONAL MEDICINE PC POST OFFER SERVICES 209737 $100.00 93 ANNA VALDEZ FLAG FOOTBALL REFUND 209738 $41.00
94 BANK OF NEW YORK MELLON TRUST CO ADMINISTRATIVE FEE 209739 $1,325.00 95 BRENNAN ESTIMATING SERVICES AQUATICS ANNUAL MONITORING 209740 $480.00 96 CS TRANSIT LEASING INC FENCE RENT 09/17-10/14/2026 209741 $635.28 97 CAROLINA ENSUNCHO YOUTH SPORTS REFUND 209742 $86.00
98 CIVILTEC ENGINEERING INC PROFESSIONAL SERVICES/AUGUST 2026 209743 $2,300.00 99 CLAUDIO TORRES TEEN GREEN T-SHIRTS 209744 $1,583.47
100 FREDY JOVANI J SANTIAGO AUDIO/VIDEO SERVICES/SEPTEMBER 2026 209745 $600.00 101 DOOR 1 SYSTEMS DOOR AND HINGE SERVICES 209746 $350.00 102 EDGESOFT INC GIS INTEGRATION 209747 $22,125.00
103 EL CLASIFICADO ADVERTISEMENT CAMPAIGN FOR SB1383 209748 $10,000.00 104 FIDELITY NATIONAL TITLE INSURANCE PRELIMINARY REPORTS 209749 $1,000.00 105 FRANKIE MOREL HISPANIC HERITAGE PERFORMANCE 209750 $200.00 106 ICC CODIFICATION INC NORWALK MAPLINK 209751 $13,840.50 107 GREENCYCLE PARKS LANDSCAPE SERVICES 209752 $1,882.58 108 COUNTY OF LA DEPT OF PUBLIC WORKS INDUSTRIAL WASTE/SEWER/AUGUST 2026 209753 $5,086.88 109 NORWALK PRINTERS INC BUSINESS CARDS/CITY WIDE 209754 $1,226.56 110 OPTIMA FUNERAL HOME INC FUNERAL ASSISTANCE/SOCIAL SERVICES 209755 $500.00 111 PARKWOOD LANDSCAPE MAINTENANCE
INC LANDSCAPE MAINTENANCE/JULY 2026 209757 $112,803.60
112 PIONEER APT LP RENTAL ASSISTANCE/JULY-SEPTEMBER 209758 $7,500.00 113 ROADLINE PRODUCTS INC USA NON-ILLUMINATED SIGNS 209759 $2,161.38

Page 3 of 7 ends

CITY OF NORWALK

FINAL WARRANT REGISTER
September 22, 2026 through October 5, 2026
Item
Count Vendor Name Description Check Number Check Total
114 RUDY GARCIA LAS VEGAS UAV EXPO REIMBURSEMENT 209760 $360.00 115 SCOTT FAZEKAS & ASSOCIATES PLAN CHECK SERVICES/AUGUST 2026 209761 $3,174.95 116 SO CALIF SCHOOL BAND & ORCHESTRA HALLOWEEN PARADE JUDGES 209762 $2,800.00 117 SHOWCARD SIGN CO INC NON OEM DECALS 209763 $672.50
118 PARKING CONCEPTS INC PARKING MANAGEMENT/AUGUST 2026 209764 $56,454.15 119 TRI WEST MECHANICAL INC CITY HALL HVAC REPAIRS 209765 $6,870.00 120 TY LIN INTERNATIONAL CONSTRUCTION MANAGEMENT/AUGUST 209766 $141,842.24 121 UNIFIRST CORPORATION BUILDING MAINTENANCE UNIFORMS 209767 $617.90 122 THE CODE GROUP INC DESIGN SERVICES/SEPTEMBER 2026 209768 $59,610.00 123 WATERLINE TECHNOLOGIES INC SUPPLIES AND CHEMICALS 209769 $2,726.58 124 WAXIE'S ENTERPRISES LLC CLEANING SUPPLIES/FACILITIES 209770 $5,186.52 125 WILLDAN ENGINEERING PLAN REVIEW/AUGUST 2026 209771 $1,350.00 126 ADMINISTRATIVE SERVICES CO-OP PARATRANSIT TAXI SERVICES 209772 $5,287.03 127 ALTEC INC ONSITE & OFFSITE REPAIRS 209773 $3,751.34 128 ASSI SECURITY INC CITY HALL SECURITY CARD MAINTENANCE 209774 $250.00 129 ALO CONSULTATION AND HARBOR
REGIONA NASC SECURITY DEPOSIT REFUND 209775 $500.00
130 AURELIO M GARCIA NASC SECURITY DEPOSIT REFUND 209776 $500.00 131 BANK OF NEW YORK MELLON TRUST CO TRUSTEE FEE 209777 $1,500.00 132 SUSAN BECNEL BUS DRIVER UNIFORMS 209778 $470.83
133 BEST BUY TIRE PROS SUPPLY AND DELIVERY OF NEW TIRES 209779 $459.34 134 BRIAN GUZMAN NASC SECURITY DEPOSIT REFUND 209780 $1,000.00 135 CINTAS CORPORATION NO 2 VEHICLE MAINTENANCE UNIFORMS 209781 $499.22 136 CJ CONCRETE CONSTRUCTION INC CITYWIDE SIDEWALKS/CONCRETE 209782 $274,064.55 137 CLAUDIA GODINEZ NASC SECURITY DEPOSIT REFUND 209783 $500.00 138 CORNUCOPIA SERVICES CONTRIBUTION/TONY AYALA 209784 $1,500.00 139 CUMMINS INC SUPPLY OF OEM PARTS 209785 $1,675.64
140 DUTHIE ELECTRIC SERVICE
CORPORATION GENERATOR REPAIRS 209786 $1,115.00
141 BAJANS AND FRIENDS FOR HEALTH AND CONTRIBUTION/ANA VALENCIA 209787 $1,800.00 142 ELENA CEJA NASC SECURITY DEPOSIT REFUND 209788 $500.00 143 ELIZABETH COVARRUBIAS NASC SECURITY DEPOSIT REFUND 209789 $500.00 144 ERIC MOYA CITATION REFUND 209790 $2,000.00
145 GILLIG LLC OEM GILLIG PARTS 209791 $2,659.84
146 GOLDEN STATE WATER COMPANY UTILITIES/CITY WIDE/SEPTEMBER 2026 209792 $25,932.31 147 THE GOODYEAR TIRE & RUBBER CO BUS TIRE LEASE 209793 $7,807.89 148 ARTURO SANCHEZ SR CONTRIBUTION/JENNIFER PEREZ 209794 $500.00 149 MIKE CABRERA CORPORATION NORWALK NOW PRINT/OCTOBER 2026 209795 $5,832.00

Page 4 of 7 ends

CITY OF NORWALK

FINAL WARRANT REGISTER
September 22, 2026 through October 5, 2026
Item
Count Vendor Name Description Check Number Check Total
150 JASON TUCKER PARK DEPOSIT REFUND 209796 $500.00
151 JENNIFER PEREZ NASC SECURITY DEPOSIT REFUND 209797 $250.00 152 LIBERTY UTILITIES CORP UTILITIES/CITY WIDE/AUGUST 2026 209798 $20,340.47 153 MOHAMMAD A MARVASTI MINOR REPAIRS AND SMOG TESTING 209799 $240.00 154 MARCELLE GREENIDGE PARK DEPOSIT REFUND 209800 $500.00 155 MCMASTER-CARR SUPPLY COMPANY MISCELLANEOUS PARTS 209801 $95.72 156 MDH NETWORK INC NASC SECURITY DEPOSIT REFUND 209802 $500.00 157 MICHAEL SLEVIN CITATION REFUND 209803 $162.00
158 NICK ROBLES NASC SECURITY DEPOSIT REFUND 209804 $500.00 159 NORWALK CHAMBER OF COMMERCE CONTRIBUTION/JENNIFER PEREZ 209805 $1,000.00 160 NORWALK PRINTERS INC BUSINESS CARDS/ADMINISTRATION 209806 $224.76 161 PRADEEP PANNER SELVAM PARK DEPOSIT REFUND 209807 $500.00 162 ROBERT THEODORE DRIESLEIN PTTP MAGNETS 209808 $727.05 163 PRISCILLA MARTINEZ CONTRIBUTION/ANA VALENCIA 209809 $300.00 164 RICARDO MARROQUINLARIN CITATION REFUND 209810 $45.00 165 SOUTHERN CALIF EDISON COMPANY UTILITIES/CITY WIDE/SEPTEMBER 2026 209811 $197.46 166 SOUTHERN CALIFORNIA GAS COMPANY UTILITIES/CITY WIDE/SEPTEMBER 2026 209812 $1,319.05 167 THE DOWNEY PATRIOT INC PUBLIC HEARING NOTICE IO#26-50 209813 $977.25 168 TOVEY SHULTZ CONSTRUCTION INC CONSTRUCTION SERVICES 209814 $7,560.95 169 CITY OF CERRITOS PURCHASE OF WATER/AUGUST 2026 V26164 $44,058.24 170 CUMMING MANAGEMENT GROUP INC PROFESSIONAL SERVICES/AUGUST 2026 V26165 $2,100.00 171 I COPY INC COPY CHARGES/SEPTEMBER 2026 V26166 $16,921.25 172 KOSMONT & ASSOCIATES INC ECONOMIC DEVELOPMENT/AUGUST 2026 V26167 $7,764.90 173 LUCILA SOTO HERNANDEZ HOMEMAKING GRANT V26168 $126.00 174 MICHAEL BAKER INTERNATIONAL INC CONSULTANT SERVICES/AUGUST 2026 V26169 $7,800.00 175 NANCY GALICIA HOMEMAKING GRANT V26170 $126.00
176 VIA TRANSPORTATION INC MICROTRANSIT ON DEMAND SERVICE V26171 $159,052.07 177 CENTRALSQUARE TECHNOLOGIES LLC FINANCIAL SYSTEM APPLICATION V26172 $206,048.30 178 KNOLLER MONTESSORI LLC CHILD CARE STAGE 1/AUGUST 2026 V26173 $1,439.26 179 CLAUDIA L ANZUETO CHILD CARE STAGE 1/AUGUST 2026 V26174 $940.85 180 JOYFUL LITTLE LEARNERS FAMILY CHILD CARE STAGE 1/AUGUST 2026 V26175 $1,289.16 181 DEBORAH ANNA CONEY REED CHILD CARE STAGE 1/AUGUST 2026 V26176 $548.99 182 JACKELINE CHAVEZ MORENO CHILD CARE STAGE 1/AUGUST 2026 V26177 $667.05 183 JUAN JOSE LEMUS CHILD CARE STAGE 1/AUGUST 2026 V26178 $605.21 184 JULIE ANN BOUTTE CHILD CARE STAGE 1/AUGUST 2026 V26179 $1,334.10 185 KASSANDRA RAELYNN SERRANO CHILD CARE STAGE 1/AUGUST 2026 V26180 $1,558.12 186 LAKENDRA GWEN RUDOLPH CHILD CARE STAGE 1/AUGUST 2026 V26181 $1,456.31 187 LOPEZ FAMILY HOME CHILD CARE INC CHILD CARE STAGE 1/AUGUST 2026 V26182 $2,628.15

Page 5 of 7 ends

CITY OF NORWALK

FINAL WARRANT REGISTER
September 22, 2026 through October 5, 2026
Item
Count Vendor Name Description Check Number Check Total
188 MELISHA RENEE BINNS CHILD CARE STAGE 1/AUGUST 2026 V26183 $1,815.63 189 TOYLAND FAMILY DAY CARE INC CHILD CARE STAGE 1/AUGUST 2026 V26184 $235.06 190 VILMA SOLEDAD FIGUEROA CHILD CARE STAGE 1/AUGUST 2026 V26185 $2,018.33 191 MARJANI WILLIAMS CHILD CARE STAGE 1/AUGUST 2026 V26186 $4,202.80 192 KNOLLER MONTESSORI LLC CHILD CARE STAGE 2/AUGUST 2026 V26187 $8,524.01 193 BRIANNA MARIE GARSIA CHILD CARE/AUGUST 2026 V26188 $713.94 194 CARMEN MONTES CHILD CARE STAGE 3/AUGUST 2026 V26189 $971.13 195 CYNTHIA MONIQUE HARRISON CHILD CARE STAGE 3/AUGUST 2026 V26190 $641.48 196 DESIREE CARCANO CHILD CARE STAGE 2/AUGUST 2026 V26191 $361.95 197 ERIKA BARAJAS DIAZ CHILD CARE/AUGUST 2026 V26192 $2,945.90 198 GISHANI M RANAWEERA CHILD CARE/AUGUST 2026 V26193 $1,216.18 199 GUADALUPE ARELLANO CHILD CARE STAGE 2/AUGUST 2026 V26194 $2,364.72 200 IMELDA RIVERA CHILD CARE/AUGUST 2026 V26195 $851.10 201 KARLA YAMILETH ALFARO CHILD CARE/AUGUST 2026 V26196 $2,910.04 202 LOPEZ FAMILY HOME CHILD CARE INC CHILD CARE STAGE 2/AUGUST 2026 V26197 $2,907.97 203 MARIA ERIKA MADRIGAL CEJA CHILD CARE STAGE 3/AUGUST 2026 V26198 $1,097.98 204 MARIA EXENIA ALVAREZ CHILD CARE STAGE 3/AUGUST 2026 V26199 $667.05 205 MARISOL ORTEGA HERNANDEZ CHILD CARE STAGE 3/AUGUST 2026 V26200 $1,456.31 206 SUNNY LOPEZ RENDON CHILD CARE/AUGUST 2026 V26201 $1,937.85 207 TAYLOR GENEVA SALHUS CHILD CARE STAGE 3/AUGUST 2026 V26202 $1,297.42 208 THE LORDS CHILDREN MISSION CHILD CARE STAGE 3/AUGUST 2026 V26203 $1,171.53 209 TRACY BERNADETTE ZARAGOZA
MARTINEZ CHILD CARE/AUGUST 2026 V26204 $1,210.42
210 MARJANI WILLIAMS CHILD CARE STAGE 2/AUGUST 2026 V26205 $3,427.10 211 ALICIA MENDOZA TALAVERA HOMEMAKING GRANT V26206 $126.00 212 FIRST TRANSIT INC DIAL-A-RIDE RESERVATIONS V26207 $92,072.85 213 GLOBAL URBAN STRATEGIES INC FIRST TIME HOME BUYER/JUNE 2026 V26208 $315.00 214 I COPY INC COPY CHARGES/SEPTEMBER 2026 V26209 $81,206.30 215 MARIO ENRIQUE MERA MANAGEMENT SERVICES/SEPTEMBER 2026 V26210 $7,877.43 216 REYES CONSTRUCTION INC CONSTRUCTION SERVICES V26211 $754,248.25 217 AMERICAN FIDELITY ASSURANCE
COMPANY FLEXIBLE SPENDING/AUGUST 2026 V26212 $36,923.07 218 ALEGEUS EMPLOYEE FLEXIBLE SPENDING/AUGUST V26213 $8,931.60 219 CALIFORNIA PUBLIC EMPLOYEES PERS CONTRIBUTION/SEPTEMBER 2026 V26214 $188,372.14 220 CALIFORNIA STATE DISBURSEMENT UNIT CHILD SUPPORT/SEPTEMBER 2026 V26215 $2,367.92 221 EMPLOYMENT DEVELOPMENT DEPT STATE TAXES/SEPTEMBER 2026 V26216 $44,179.52 222 EMPOWER/MASS MUTUAL DEFERRED COMPENSATION/SEPTEMBER V26217 $36,073.30 223 UNITED STATES TREASURY-IRS PAYROLL TAX/SEPTEMBER 2026 V26218 $133,666.15

Page 6 of 7 ends

CITY OF NORWALK

FINAL WARRANT REGISTER
September 22, 2026 through October 5, 2026
Item
Count Vendor Name Description Check Number Check Total
224 AMERICAN FAMILY LIFE ASSURANCE CO EMPLOYEE INSURANCE/SEPTEMBER 2026 V26219 $1,517.82 225 AMERICAN FIDELITY ASSURANCE
COMPANY FLEXIBLE SPENDING/SEPTEMBER 2026 V26220 $36,534.87 226 DELTA DENTAL OF CALIFORNIA BENEFITS ADJUSTMENT/SEPTEMBER 2026 V26221 $19,508.65 227 DELTACARE USA DENTAL INSURANCE/SEPTEMBER 2026 V26222 $1,638.43 228 PAYMENTUS WATER BILLING AUGUST 2026 V26223 $481.00
229 STANDARD INSURANCE COMPANY STANDARD INSURANCE/SEPTEMBER 2026 V26224 $15,956.32 230 STANDARD INSURANCE COMPANY RV BASIC LIFE INSURANCE/SEPTEMBER 2026 V26225 $5,333.55 231 US BANK NATIONAL ASSOCIATION ND CAL CARD PAYMENT V26226 $230,752.46 232 VISION SERVICE PLAN (CA) HOURLY EMPLOYEE VISION INSURANCE V26227 $4,236.78 233 BUREAU VERITAS NORTH AMERICA INC CONSULTANT SERVICES/JULY 2026 V26228 $3,070.00 234 CSG CONSULTANTS INC PROFESSIONAL SERVICES/AUGUST 2026 V26229 $29,500.00 235 CHARTER COMMUNICATIONS HOLDINGS
LLC INTERNET SERVICES/SEPTEMBER 2026 V26231 $22,003.23
236 CYNTHIA J LUJAN PAINT AND SIP WORKSHOP/OCTOBER V26232 $300.00 237 I COPY INC COPY CHARGES/CITY CLERK/SEPTEMBER V26233 $263.04 238 MARIO ENRIQUE MERA MANAGEMENT SERVICES/SEPTEMBER 2026 V26234 $6,843.02

Page 7 of 7 ends

CITY OF NORWALK

FINAL WARRANT REGISTER
September 22, 2026 through October 5, 2026
*****Total Warrants**** $5,102,275.65
Notes:

Voided Check(s): 209756, V26230
I hereby certify that the claim of demand covered by the above listed warrants have been audited as to accuracy and the funds are available for payment.

Jana Stuard, Finance Director
Digitally signed by Jana Stuard
Date: 2026.10.06 14:56:08 -07'00'
City Council Agenda Report
October 20, 2026
TO: Honorable City Council
FROM: Jesus M. Gomez, City Manager
BY: Alex Hamilton, Deputy City Manager
SUBJECT: PLANNING COMMISSION SYNOPSIS - OCTOBER 14, 2026 Background:

At its meeting of October 14, 2026, the Planning Commission reviewed the following applications and took action as outlined below and in the attached Synopsis.

Planning Commission Action Final
• Finding the City’s Lease of a portion of 12105 Pioneer Boulevard (APN No. 8016-029- 005), to be in conformity with the General Plan
• Finding the City’s Acquisition of 10921 Firestone Boulevard (APN No. 8020-025-800) to be in conformity with the General Plan
Planning Commission Action Not Final
• Zoning Text Amendment No. 2026-03
• Zoning Text Amendment No. 2026-04
• General Plan Amendment No. 2026-01
Fiscal Impact:

N/A
Citizens Advised:

N/A
City Council October 20, 2026
Planning Commission Synopsis Page No. 2
Strategic Plan 2023 Implementation:

N/A
Recommended Action:

No action is required.

Attachments:

Planning Commission Synopsis
Planning Commission Synopsis, October 14, 2026 Page 1 of 4

SYNOPSIS

PLANNING COMMISSION
OCTOBER 14, 2026

SPECIAL MEETING
6:00 P.M.

NORWALK CITY HALL/COUNCIL CHAMBERS
Kim Apodaca, Chair
Rosa Barragan, Vice Chair
Linda Lopez, Planning Commissioner
Chris Macias, Planning Commissioner
Lisa Vernola-Salas, Planning Commissioner
Public Comment: The public is encouraged to address the Planning Commission on any matter listed on the agenda or on any other matter within its jurisdiction subject to the rules and proceedings described in Section 2.16.060 of the Norwalk Municipal Code. If you wish to address the Planning Commission, please complete the card that is provided at the rear entrance to Council Chambers and hand the card to the Secretary. The Planning Commission will hear public comment on items listed on the agenda during discussion of the matter and prior to a vote. The Planning Commission will hear public comment on matters not listed on the agenda during the Oral Communications period.

Pursuant to provisions of the Brown Act, no action may be taken on a matter unless it is listed on the agenda, or unless certain emergency or special circumstances exist. The Planning Commission may direct staff to investigate and/or schedule certain matters for consideration at a future Planning Commission meeting.

Please adhere to the following procedures when addressing the Planning Commission:
 Comments should be limited to 3 minutes or less.
 Comments should be directed to the Planning Commission as a whole and not directed to individual Planning Commission members.

Americans with Disabilities Act: In compliance with the ADA, if you need special assistance to participate in a City meeting or other services offered by this City, please contact the Community Development Department, (562) 929-5744. Assisted listening devices are available at this meeting. Ask the Secretary if you desire to use this device. Upon request, the agenda and documents in the agenda packet can be made available in appropriate alternative formats to persons with a disability. Notification of at least 48 hours prior to the meeting or time when services are needed will assist the City staff in assuring that reasonable arrangements can be made to provide accessibility to the meeting or service.

Note: Any writings and/or documents provided to a majority of the Planning Commission regarding any item on this agenda after it has been posted will also be made available for public inspection.

Writings and/or documents are available for inspection in the Community Development Department, City Hall, 12700 Norwalk Boulevard during regular business hours, 8:00 a.m. to 6:00 p.m., Monday to Thursday and 8:00 a.m. to 5:00 p.m., every other Friday; telephone (562) 929-5744. You may also contact the City Clerk via e-mail at [email protected] Planning Commission Synopsis, October 14, 2026 Page 2 of 4 CALL TO ORDER 6:00 P.M.

FLAG SALUTE Commissioner Lopez
ROLL CALL OF MEMBERS Commissioner Lopez, Commissioner Macias, Commissioner Vernola-Salas, Vice Chair Barragan, and Chair Apodaca.

1. MEETING MINUTES – Staff recommends that the Planning Commission approve the minutes of the Regular Adjourned Planning Commission Meeting of September 23, 2026.

Planning Commission Action: Approved.

PUBLIC HEARING

2. ZONING TEXT AMENDMENT (ZTA) NO. 2026-03
A City-initiated request to add Sections 17.03.400 through 17.03.470 under new Article V - Objective Design Standards to Title 17 (“Zoning”) of the Norwalk Municipal Code to implement Housing Element Program 3.3 by establishing objective design standards for attached multifamily and townhome residential developments.

Environmental: The project is exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines §15061(b)(3) (Common Sense Exemption), in that it can be seen with certainty that there is no possibility that the proposed objective design standards will have a significant effect on the environment. The multi-family residential densities will not be changed, building heights will not be increased, and the objective design standard amendments will not result in any environmental impacts. Future development projects subject to the proposed ordinance would be reviewed for potential environmental impacts.

Staff Recommendation:

That the Planning Commission:
(1) Consider and find that Zoning Text Amendment No. 2026-03 is exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15061(b)(3) (Common Sense Exemption), where it can be seen with certainty there is no possibility that the activity in question may have significant effect on the environment; and (2) Adopt Resolution No. 26-17 to recommend approval to City Council for Zoning Text Amendment No. 2026-03.

Planning Commission Action: Approved staff’s recommendation, as revised, by a vote of 5-0.

3. ZONING TEXT AMENDMENT (ZTA) NO. 2026-04
For the Planning Commission to consider and make a recommendation to City Council to amend Title 17 (the Zoning Code) of the Norwalk Municipal Code to:
(1) Update the Accessory Dwelling Unit Ordinance to be in compliance with state law; (2) To allow Low Barrier Navigation Centers (LBNC) in the multi-family and mixed-use zones and to correct LBNC land use inconsistencies in the M-1, M-2, and I zones, in accordance with Program 3.5 (Special Needs Housing) of the 2021-2029 Housing Element and Government Code Section 65660; and
(3) Update land use and development criteria for Special Needs Housing in accordance with Program 2.1 (Special Needs Housing) of the 2021-2029 Housing Element.

Environmental: ZTA No. 2026-04 is exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines §15061(b)(3), (Common Sense Exemption), where it can be seen with certainty there is no possibility that the activity in question may have a significant effect on the environment.

Planning Commission Synopsis, October 14, 2026 Page 3 of 4 Staff Recommendation:

That the Planning Commission:
(1) Consider and find that Zoning Text Amendment No. 2026-04 is exempt from the California Environmental Quality Act pursuant to CEQA Guidelines §15061)(b)(3) (Common Sense Exemption), where it can be seen with certainty there is no possibility that the activity in question may have significant effect on the environment; and (2) Adopt Resolution No. 26-18 to recommend approval to the City Council for Zoning Text Amendment (ZTA) No. 2026-04.

Planning Commission Action: Approved staff’s recommendation subject to revised conditions by a vote of 5-0.

4. GENERAL PLAN AMENDMENT (GPA) NO. 2026-01
For the Planning Commission to consider and make a recommendation to City Council to amend the 2021-2029 Housing Element (“HE”) in accordance with the obligations set forth in Section 22.a.iv of the Stipulated Final Judgment and Order (Case No. 24STCP03551) filed on September 5, 2025. This is to ensure continuous certification of Norwalk’s HE, which was recertified by the California Department of Housing and Community Development (HCD) on September 19, 2025.

Environmental: The project is exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines §15061(b)(3) (Common Sense Exemption), where it can be seen with certainty there is no possibility that the activity in question may have significant effect on the environment. The Housing Element is a policy document and therefore, no development is being proposed as part of this project. The amendment to the Housing Element to comply with the Settlement Agreement would not result in physical environmental impacts.

Staff Recommendation:

That the Planning Commission:
(1) Consider and find that the project is exempt from the California Environmental Quality Act pursuant to CEQA Guidelines §15061(b)(3) (Common Sense Exemption), where it can be seen with certainty there is no possibility that the activity in question may have significant effect on the environment; and
(2) Adopt Resolution No. 26-19 to recommend approval to the City Council for General Plan Amendment No. 2026-01.

Planning Commission Action: Approved staff’s recommendation by a vote of 5-0.

REPORTS

5. FINDING THE CITY’S LEASE OF A PORTION OF 12105 PIONEER BOULEVARD (APN NO. 8016-029-005), TO BE IN CONFORMITY WITH THE GENERAL PLAN.

Environmental: The Finding of Conformity is exempt from the California Environmental Quality Act (“CEQA”) Guidelines Section 15061(b)(3) (Common Sense Exemption), which states that an activity is covered by the common sense exemption that CEQA only applies to projects that have the potential for causing a significant effect on the environment. Where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA review. The adoption of the Finding of Conformity is limited to legal findings and will not result in a physical change in the environment and none of the exceptions under CEQA Guidelines Section 15300.2 apply.

Planning Commission Synopsis, October 14, 2026 Page 4 of 4 Staff Recommendation:

That the Planning Commission:
(1) Consider and find that the project is exempt from the California Environmental Quality Act pursuant to Section 15061(b)(3) (Common Sense Exemption); and (2) Adopt Resolution No. 26-20 finding that the City of Norwalk leasing of a portion of 12105 Pioneer Boulevard (APN No. 8016-029-005) to be in conformity with the General Plan.

Planning Commission Action: Approved staff’s recommendation by a vote of 5-0.

6. FINDING THE CITY OF NORWALK ACQUISITION OF 10921 FIRESTONE BOULEVARD (APN NO. 8020-025-800), TO BE IN CONFORMITY WITH THE GENERAL PLAN Environmental: The Finding of Conformity is exempt from the California Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines Section 15061(b)(3) (Common Sense Exemption), which states that an activity is covered by the common-sense exemption that CEQA only applies to projects that have the potential for causing a significant effect on the environment. Where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA review.

Staff Recommendation:

That the Planning Commission:

1. Adopt Resolution No. 26-21 finding that the City of Norwalk’s acquisition of 10921 Firestone Boulevard (APN No. 8020-025-800) in the City of Norwalk (the “Subject Property”) to be in conformity with the General Plan; and

2. Consider and find that the project is exempt from the California Environmental Quality Act pursuant to Section 15061 (b) (3) the “Common Sense Exemption” in this case it can be seen with certainty that this land acquisition (activity) will not have a significant effect on the environment.

Planning Commission Action: Approved staff’s recommendation by a vote of 5-0.

ORAL COMMUNICATIONS
The City’s new Director of Community Development, Brad Johnson, shared his career background information with the Planning Commission, and stated that he is looking forward to working with the Commission.

The Planning Commissioners welcomed Mr. Johnson.

Deputy City Manager Hamilton expressed his respect and admiration for the Planning Commissioners for their knowledge and dedication, and he commented on a few projects that are coming to Norwalk, including Dutch Bros.

ADJOURNMENT 7:00 P.M.

City Council Agenda Report
October 20, 2026
TO: Honorable City Council
FROM: Jesus M. Gomez, City Manager
BY: Theresa Devoy, City Clerk
SUBJECT: ORDINANCE NO. 26-1769 – ADJUSTMENT TO CITY COUNCIL SALARY Background:

The City Council, at its October 6, 2026 meeting, introduced Ordinance No. 26-1769, which will adjust City Council’s salary to $1,900 per month as provided for in Government Code §36516. This ordinance is now being presented for second reading and adoption. If adopted this evening, Ordinance No. 26-1769 will become effective on November 8, but the change will not become effective until after the swearing in of new Councilmembers on December 8, 2026.

Fiscal Impact:

There will be an increase of approximately $28,441 for the remainder of this fiscal year, and $56,885 annually from the general fund.

Citizens Advised:

The ordinance will be published as required by Government Code §36933.

Strategic Plan 2023 Implementation:

N/A
Recommended Action:

Staff recommend City Council accept for second reading by title only and adopt Ordinance No. 26-1769, AN ORDINANCE OF THE CITY OF NORWALK ADJUSTING SALARIES FOR MEMBERS OF THE CITY COUNCIL.

City Council October 20, 2026
Ordinance No., 26.1769 – City Council Salary
Adjustment
Page No. 2
Attachments:

Ordinance No. 26-1769
ORDINANCE NO. 26-1769

AN ORDINANCE OF THE CITY OF NORWALK ADJUSTING SALARIES

FOR MEMBERS OF THE CITY COUNCIL
WHEREAS, California Government Code §36516 was amended effective January 1, 2024 establishing increased salary limits for city council members based on population; and
WHEREAS, the legislature established amounts based on population and Norwalk falls into the 75,000-150,000 population category, which allows salary up to and including $1,900 per month to be paid to each council member; and WHEREAS, pursuant to California Government Code §36516, the salary of council members may be increased beyond the $1,900 amount by an ordinance or by an amendment to an ordinance, but only if the amount of the increase does not exceed the greater of either of the following:
• An amount equal to 5 percent for each calendar year from the operative date of the last adjustment of the salary in effect when the ordinance or amendment is enacted.
• An amount equal to inflation since January 1, 2024, based upon the California Consumer Price Index, which shall not exceed 10 percent for each calendar year; WHEREAS, the proposed amount of the adjustment does not exceed the $1,900 allowed under Government Code §36516; and
WHEREAS, no ordinance shall be enacted or amended to provide automatic future increases in salary;
WHEREAS, the Norwalk City Council has not received an increase in salary since 2007.

THE CITY COUNCIL OF THE CITY OF NORWALK DOES HEREBY ORDAIN AS FOLLOWS:

Section 1. Pursuant to the authority of California Government Code §36516, to provide that, commencing on the date that the ballots for the November 3, 2026, municipal election are certified and council members are sworn into office, all members of the City Council shall receive a base salary of $1,900 per month.

Section 2. This Ordinance shall take effect 30 days after its final passage by the City Council, but salary increases will not be effective until certification of the November 3, 2026 election.

Ordinance No. 26-1769 Page 2 of 2
Section 3. The City Clerk shall certify to the passage of this Ordinance.

PASSED, APPROVED, AND ADOPTED this 20th day of October 2026. ______________________________

JENNIFER PEREZ
MAYOR
ATTEST:
______________________________

THERESA DEVOY

CITY CLERK
City Council Agenda Report
October 20, 2026
TO: Honorable City Council
FROM: Jesus M. Gomez, City Manager
BY: James C. Parker, Executive Director of Regional Transportation Theresa Clark, Transit Administration Officer
Janet Welde, Special Projects Coordinator
SUBJECT: CONTRACT AMENDMENT NO. 6 – TERM EXTENSION ADVANCED

RESERVATION DIAL-A-RIDE / SUBSCRIPTION SERVICES
Background:

On February 17, 2026, City Council approved Contract No. 5 with Transdev North America, Inc. (DBA First Transit, Inc.), to extend their contract term through December 31, 2026 for Advanced Reservation Dial-A-Ride (DAR) and Subscription Services for Norwalk Transit System (NTS). NTS subsequently released a Request for Proposal (RFP) 27-879 on September 17, 2026, to solicit these services once the current contract period ends.

Due to the complexity of the RFP Scope of Services, there is a need to provide potential bidders a longer procurement and on-boarding process for a seamless transition period if the incumbent contractor is not selected. NTS does not anticipate awarding a new contract prior to the current expiration date of December 31, 2026.

Therefore, NTS is requesting an additional term extension with First Transit, Inc. for the period of January 1, 2027, through June 30, 2027, to ensure continuity of Advanced Reservation DialA-Ride and Subscription Services during the procurement and transition process. First Transit, Inc. has agreed to maintain its current pricing through June 30, 2027.

Fiscal Impact:

The cost for the additional six months of the contract totals $603,421, which is included in the Fiscal Year 2026/27 Transportation Department adopted budget. There is no impact to the general fund.

City Council October 20, 2026
First Transit, Inc. Amendment No.6 Page No. 2
Citizens Advised:

N/A
Strategic Plan 2023 Implementation:

N/A
Recommended Action:

Staff recommend City Council approve Amendment No. 6 to extend the First Transit, Inc. agreement from January 1, 2027 through June 30, 2027, for a total agreement cost of $603,421; and authorize the City Manager to execute the Amendment and future amendments, provided there is funding in the budget and it is within the City Manager’s signing authority, on behalf of the City, in a form approved by the City Attorney.

Attachments:

N/A
City Council Agenda Report
October 20, 2026
TO: Honorable City Council
FROM: Jesus M. Gomez, City Manager
BY: James C. Parker, Executive Director of Regional Transportation Theresa Clark, Transit Administration Officer
Janet Welde, Special Projects Coordinator
SUBJECT: CONTRACT AMENDMENT NO. 4 – TERM EXTENSION FOR PARATRANSIT

DEMAND RESPONSE USER SIDE SUBSIDY TRANSPORTATION PROGRAM Background:

On May 26, 2026, City Council approved Contract No.3 Administrative Services Co-Op DBA Fiesta Taxi Cooperative, Inc. (Fiesta), to extend their contract term through December 31, 2026 for Paratransit User Side Subsidy Transportation Program for Norwalk Transit System (NTS). NTS subsequently released a Request for Proposal (RFP) 27-879 on September 17, 2026 to solicit these services once the current contract ends.

Due to the complexity of the RFP Scope of Services, there is a need to provide potential bidders a longer procurement and on-boarding process for a seamless transition period if the incumbent contractor is not selected. NTS does not anticipate awarding a new contract prior to the current expiration date of December 31, 2026.

Therefore, NTS is requesting an additional term extension with Fiesta for the period of January 1, 2027, through June 30, 2027, to ensure continuity of Paratransit User Side Subsidy Transportation Program during the procurement and transition process. Fiesta has agreed to maintain its current pricing through June 30, 2027.

Fiscal Impact:

The cost for the additional six months of the contract totals $27,500, which is included in the Fiscal Year 2026/27 Transportation Department adopted budget. There is no impact to the general fund.

City Council October 20, 2026
Fiesta Taxi, Inc. Contract Amendment No. 4 Page No. 2
Citizens Advised:

N/A
Strategic Plan 2023 Implementation:

N/A
Recommended Action:

Staff recommend City Council approve Amendment No. 4 with Administrative Services Co-Op DBA Fiesta Taxi Cooperative, Inc. for Paratransit User Side Subsidy Transportation Program from January 1, 2027 through June 30, 2027 for a total agreement cost of $27,500; and authorize the City Manager to execute the agreement and future amendments, provided there is funding in the budget and it is within the City Manager’s signing authority, on behalf of the City, in a form approved by the City Attorney
Attachments:

N/A
City Council Agenda Report
October 20, 2026
TO: Honorable City Council
FROM: Jesus M. Gomez, City Manager
BY: James C. Parker, Executive Director of Regional Transportation Theresa Clark, Transit Administration Officer
Janet Welde, Special Projects Coordinator
SUBJECT: CONTRACT AMENDMENT NO. 1 – TERM EXTENSION MICROTRANSIT/ON

DEMAND PILOT TRANSIT SERVICES
Background:

On October 7, 2025, City Council approved an Agreement with Nomad, LLC, a wholly owned subsidiary of VIA Transportation, Inc. to provide Microtransit/On-Demand Pilot Transit Services for Norwalk Transit System (NTS) from January 12, 2026, through January 12, 2027. NTS subsequently released a Request for Proposal (RFP) 27-879 on September 17, 2026, to solicit these services once the current contract ends.

Due to the complexity of the RFP Scope of Services, there is a need to provide potential bidders a longer procurement and on-boarding process for a seamless transition period if the incumbent contractor is not selected. NTS does not anticipate awarding a new contract prior to the current expiration date of January 12, 2027.

Therefore, NTS is requesting an additional term extension with Nomad, LLC. for the period of January 13, 2027, through June 30, 2027, to ensure continuity of Microtransit/On-Demand Pilot Transit Services during the procurement and transition process. Nomad, LLC agrees to a sixmonth term extension with a 3% price increase.

The table below illustrates the breakdown of cost for the Microtransit Services:

City Council October 20, 2026
Nomad, LLC Amendment No. 1 Page No. 2
Fiscal Impact:

The cost for the additional six months of the contract totals $993,844 is included in the Fiscal Year 2026/27 Transportation Department adopted budget. There is no impact to the general fund.

Citizens Advised:

N/A
Strategic Plan 2023 Implementation:

N/A
Recommended Action:

Staff recommend City Council approve Amendment No. 1 to extend Nomad, LLC’s agreement from January 13, 2027 through June 30, 2027, for a total agreement cost of $993,844; and authorize the City Manager to execute the Amendment and future amendments, provided there is funding in the budget and it is within the City Manager’s signature authority, on behalf of the City, in a form approved by the City Attorney.

Attachments:

N/A
City Council Agenda Report
October 20, 2026
TO: Honorable City Council
FROM: Jesus M. Gomez, City Manager
BY: Alex Hamilton, Deputy City Manager
Albert Mendoza, P.E., Director of Public Services/City Engineer Randall Hillman, Associate Engineer
Gabriel Salazar, Senior Planner
SUBJECT: APPROVAL OF TRACT MAP NO. 85156, FOR CONDOMINIUM SUBDIVISION LOCATED AT 12722 WOODS AVENUE, ENGINEER’S REPORT NO. 26-39 Background:

On April 22, 2026, the Norwalk Planning Commission approved Tentative Tract Map No. 85156 for a condominium subdivision at 12722 Woods Avenue (Assessor Parcel Number 8048-012- 014 and 8048-011-035), filed by ADC Norwalk 3, LLC. The development consists of 61 threestory townhomes on an approximate 2.52-acre site.

The final tract map has been reviewed and found to be technically correct, and in conformance with the approved tentative map and applicable state laws. An easement for access and utility purposes as designated on the map are dedicated.

To comply with requirements of Norwalk Municipal Code (NMC) §16.03.160, any required public improvements that have not been constructed at the time of approval of the final map shall be guaranteed by execution of a suitable agreement in a form approved by the City Attorney. As the required public improvements such as new utility connections and reconstruction of sidewalk/curb and gutter have not yet been reconstructed, it is recommended that approval of this map be contingent on the execution of such an agreement to ensure funding for their installation.

Additionally, park land dedication fees must be collected for this project pursuant to NMC §16.03.090. The City Council may accept a park land dedication or a payment may be made in lieu thereof, or a combination of both. In this case, the developer will pay the in-lieu fee. The fee is based on a formula involving the assessed value of the property, the average value per square City Council October 20, 2026
Tract Map No. 85156 – 12722 Woods Avenue Page No. 2
foot, multi-family unit number and dedication per unit. The dedication amount shall be consistent with the formula described in NMC §16.03.090.

The Los Angeles County Assessor’s parcel size information was used for the calculation of the parkland dedication fee. The total lot size for both parcels is 109,540 square feet (approximately

2.52 acres). APN 8048-012-014 totals approximately 51,300 square feet in area and APN 8048- 011-035 totals approximately 58,240 square feet.

Based on the current assessed fair market value, the City’s calculation of the Parkland Dedication Fees is listed as follows:

Fair Market Value Per Square Feet (PSF): $58.20/PSF
Multiplied by: Parkland Dedication Requirement: 133.73 Square Feet per Dwelling Unit Multiplied by: Number of Dwelling Units: 61 dwelling units Total: $474,769
In summary, the City will accept a parkland in lieu fee payment in the amount of $474,769 based on the calculation and payable to the City of Norwalk after the Final Map has been approved by the City.

The Project will also be subject to the Art in Public Places Program requirement pursuant to NMC §15.44.030 which may be in the form of artwork or an in-lieu payment contribution. The AIPP requirement equates to one percent of the building total valuation.

Fiscal Impact:

The Parkland Dedication in Lieu Fee payment is in the amount of $474,769.

Citizens Advised:

N/A
Strategic Plan 2023 Implementation:

The recommended action will further the City’s Strategic Plan Goal 3 to create and sustain a resilient and economically prosperous City.

Recommended Action:

Staff recommend City Council approve Tract Map No. 85156, conditioned on the execution of the improvement guarantee required by Norwalk Municipal Code §16.03.160, and accept the dedications offered on the map.

City Council October 20, 2026
Tract Map No. 85156 – 12722 Woods Avenue Page No. 3
Attachments:

1. Final Tract Map No. 85156

2. Location Map
Attachment No. 1

Location and Vicinity Map
12722 Woods Avenue
APNs: 8048-012-014 and 8048-011-035
Attachment No. 2
City Council Agenda Report
October 20, 2026
TO: Honorable City Council
FROM: Jesus M. Gomez, City Manager
BY: James C. Parker, Executive Director of Regional Transportation Theresa Clark, Transit Administration Officer
Janet Welde, Special Projects Coordinator
SUBJECT: RESOLUTION NO. 26-61 - BUDGET AMENDMENT AND AMENDMENT NO. 4 FOR PROJECT NO. 7865 PROJECT MANAGEMENT, CONSTRUCTION

MANAGEMENT, AND INSPECTION SERVICES FOR TRANSPORTATION /

PUBLIC SERVICES FACILITY PHASE III IMPROVEMENTS
Background:

On February 20, 2024, City Council approved an Agreement with PSOMAS for Project Management, Construction Management, and Inspection Services for the Tenant Improvements at the Transportation/Public Services Facility, Project No. 7865. PSOMAS was retained to provide these services effective February 21, 2024 through February 28, 2025. Due to the fact that these Tenant Improvements constituted a Public Works Project the acquisition for construction services contractor and finalizing Architectural and Engineering (A&E) services necessitated extending the Commencement date for those services to February 25, 2025.

Also, the project has experienced several unforeseen conditions during construction, including discovery of roof drains that were not connected to the storm drain system, existing mold, a vent pipe that was not identified in the as-built drawings, and additional water intrusion impacting the new locker room addition.

As a result, PSOMAS has been required to provide additional construction management and inspection services to maintain effective oversight, address issues as they arise, and support the completion of the remaining construction activities. The extended construction schedule has increased the level and duration of services required beyond the original Agreement term and project budget.

City Council October 20, 2026
PSOMAS Contract Amendment No. 4 Page No. 2
Fiscal Impact:

Norwalk Transit System is requesting to amend the Agreement with PSOMAS for additional compensation. Staff recommends City Council adopt Resolution No. 26-61, authorizing an increase in the Transportation Project Budget in the amount of $325,022 utilizing Transit Reserves. There is no impact to the general fund.

Citizens Advised:

N/A
Strategic Plan 2023 Implementation:

N/A
Recommended Action:

Staff recommends City Council adopt Resolution No. 26-61, A RESOLUTION OF THE CITY

COUNCIL OF THE CITY OF NORWALK AUTHORIZING AN AMENDMENT TO THE FISCAL YEAR 2026/2027 ADOPTED BUDGET TO TRANSFER TRANSPORTATION RESERVE

FUNDS FOR CONSTRUCTION MANAGEMENT SERVICES TO SUPPORT

TRANSPORTATION/PUBLIC SERVICES FACILITY AND TENANT IMPROVEMENTS AT 12650 IMPERIAL HIGHWAY PROJECT NO. 7865, in the amount of $325,022; and authorize the City Manager to execute an amendment with PSOMAS increasing the total contract amount from $836,739.09 to $1,161,176.11 for construction management services, and any future amendments provided there is funding in the budget, and it is within the City Manager’s signing authority, on behalf of the City, in a form approved by the City Attorney.

Attachments:

Resolution No. 26-61
RESOLUTION NO. 26-61

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NORWALK AUTHORIZING AN AMENDMENT TO THE FISCAL YEAR 2026/27

ADOPTED BUDGET TO TRANSFER TRANSPORTATION RESERVE

FUNDS FOR CONSTRUCTION MANAGEMENT SERVICES TO

SUPPORT TRANSPORTATION/PUBLIC SERVICES FACILITY AND
TENANT IMPROVEMENTS AT 12650 IMPERIAL HIGHWAY- PROJECT
NO. 7865
WHEREAS, City Council and the City’s Department of Transportation are committed to providing efficient transportation services and maintaining facilities that support operational growth and expansion;
WHEREAS, the approved interior and exterior modifications at the Transportation/Public Services Facility are estimated to be completed in December 2026; WHEREAS, the improvements at the Transportation/Public Services Facility included reconfigured workspaces, relocated offices, expanded locker rooms and an updated customer service area; and
WHEREAS, an amendment to PSOMAS’s agreement, in the amount of $325,022, is required for construction management and inspection services necessary to complete the Transportation/Public Services Facility and Tenant Improvements, which will be funded through use of Transit retaining earnings;

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF NORWALK HEREBY DETERMINES, FINDS, AND RESOLVES AS FOLLOWS:

Section 1. The City Manager is authorized to make the following appropriation and prepare the necessary budget amendment for the following account:

Account Number Increase Decrease
To: 713-70-7865-2080 $325,022
To: 713-45-4503-3994 $325,022
To: 710-45-4503-3994 $325,022
To: 710-0470 $325,022
Section 2. The Mayor, or presiding officer, is hereby authorized to affix her signature to this Resolution signifying its adoption by the City Council of the City of Norwalk and the City Clerk, or her duly appointed assistant, is directed to attest thereto.

APPROVED AND ADOPTED this 20th day of October 2026.
_____________________________

JENNIFER PEREZ
MAYOR
ATTEST:

THERESA DEVOY, CMC

CITY CLERK
City Council Agenda Report
October 20, 2026
TO: Honorable City Council
FROM: Jesus M. Gomez, City Manager
BY: Theresa Devoy, City Clerk
SUBJECT: ADVISORY BODY APPOINTMENTS
Background:

With the exception of the Planning Commission (which is commensurate with the appointing Councilmember’s term) and five members of the Art in Public Places Commission (which is established in the Norwalk Municipal Code), Advisory Body terms are for two years following a City election. Advisory Body terms are from January 1, odd years to December 31, of even years.

There are vacancies on several Advisory Bodies: Art in Public Places (2), Community Promotion (1), Historical Heritage (5), International Friendship (1), Public Safety (2), Social Services (1), and Youth Advisory Board (9). The age range for the Youth Advisory Board is between 13 to 18 years of age, and the application process includes other requirements.

Two of the vacancies on the Art in Public Places Committee are appointed based on Norwalk Municipal Code §15.44.060 and require consensus of the entire City Council. Any Councilmember may nominate an individual who falls into one of the two categories:

Business/Community College Representative and at-large Community Representative.

Fiscal Impact:

N/A
Citizens Advised:

Citizens are notified of Advisory Body vacancies through posting of vacancy notices and the Advisory Body term list, both of which are posted on the City’s website and at City Hall.

City Council October 20, 2026
Advisory Body Appointments Page No. 2
Strategic Plan 2023 Implementation:

N/A
Recommended Action:

Staff recommend City Council make appointments to fill the vacancies on the various Advisory Bodies for two-year terms expiring on December 31, 2026.

Attachments:

Advisory Body List
COMMISSIONER TERMS As of 10/20/2026
C:\PGCompilerServiceRelease\temp\norwalk\16321\5146\1.docx Page 1 “Vacancies “at-a-glance”

AYALA PEREZ RAMIREZ RIOS VALENCIA
Historical Heritage
Youth (2)
Historical Heritage
Youth (2)
Community Promotion
Historical Heritage (2)
International
Friendship
Public Safety
Youth (2)
Historical Heritage
Public Safety
Social Services
Youth
Youth (2)
Members of all City boards, commissions or committees shall be for at least six months prior to appointment, residents of the City of Norwalk, business owners in the City of Norwalk, or property owners in the City of Norwalk.

Commissioner Advisory Body Appointee Present Term
Vega, Luis Art In Public Places Committee Outside Auth w/Expertise in Art Indefinite Vacant Art in Public Places Committee Community Rep Indefinite Vacant Art in Public Places Committee Bus./Community College Rep Indefinite Vernola-Salas, Lisa Art in Public Places Committee Planning Appointee 6/10/26-12/12/28 Vacant Art in Public Places Committee P&R Appointee -12/31/26 Apodaca, Kim Art in Public Places Committee Perez 1/21/25-12/31/26 Armendarez, Vanessa Art in Public Places Committee Rios 8/19/25-12/31/26 LeGaspi, Natalie Art in Public Places Committee Ayala 4/1/25-12/31/26 Solis, Pilar Art in Public Places Committee Valencia 1/21/25-12/31/26 Struzinsky, Martha Art in Public Places Committee Ramirez 9/1/26-12/31/26 Vacant Community Promotion Commission Ramirez -12/31/26 Ang, David Community Promotion Commission Valencia 1/21/25-12/31/26 Garcia, Steve Community Promotion Commission Ayala 3/18/25-12/31/26 Lopez, Natalie Community Promotion Commission Perez 8/5/25-12/31/26 Sanchez Jr, Arturo Community Promotion Commission Rios 2/4/25-12/31/26 Vacant Historical Heritage Commission Ayala -12/31/26
Vacant Historical Heritage Commission Perez -12/31/26
Vacant Historical Heritage Commission Ramirez -12/31/26 Vacant Historical Heritage Commission Ramirez -12/31/26 Vacant Historical Heritage Commission Rios -12/31/26
Ayala, Karen Historical Heritage Commission Valencia 8/18/26-12/31/26 Corona, Gina Historical Heritage Commission Perez 9/16/25-12/31/26 Greenidge, Marcelle Historical Heritage Commission Valencia 1/21/25-12/31/26 Mendoza, Priscilla Historical Heritage Commission Rios 6/16/26-12/31/26 Valenzuela, Laura Historical Heritage Commission Ayala 3/17/26-12/31/26 Vacant International Friendship Commission Ramirez -12/31/26 Carbajal, Maria International Friendship Commission Valencia -12/31/26 Flores, Sylvia International Friendship Commission Ayala 1/21/25-12/31/26 Gomez, Guadalupe International Friendship Commission Rios 10/7/25-12/31/26 Solis, Analisa International Friendship Commission Perez 1/21/25-12/31/26 Armendarez, Anthony Parks & Recreation Commission Rios 2/4/25-12/31/26 Carbajal, Maria Parks & Recreation Commission Valencia 8/4/26-12/31/26 Hernandez, Alejandra Parks & Recreation Commission Rios 2/4/25-12/31/26 Juan, Victor Parks & Recreation Commission Ayala 8/18/26-12/31/26 COMMISSIONER TERMS As of 10/20/2026
C:\PGCompilerServiceRelease\temp\norwalk\16321\5146\1.docx Page 2 Commissioner Advisory Body Appointee Present Term
King, David Parks & Recreation Commission Perez 1/21/25-12/31/26 Martinez, Briana Parks & Recreation Commission Ayala 8/18/26-12/31/26 Moreno, Antoinette Parks & Recreation Commission Ramirez 3/3/26-12/31/26 Tindall, Brian Parks & Recreation Commission Perez 7/7/26-12/31/26 Valenzuela, Don Parks & Recreation Commission Valencia 1/21/25-12/31/26 Yanez, Monique Parks & Recreation Commission Ramirez 2/18/25-12/31/26 Apodaca, Kimberly Planning Commission Perez 12/13/22-12/08/26 Barragan, Rosa Planning Commission Rios 12/10/24-12/12/28 Lopez, Linda Planning Commission Ayala 12/13/22-12/08/26 Macias, Chris Planning Commission Valencia 1/21/24-12/12/28 Salas-Vernola, Lisa Planning Commission Ramirez 12/10/24-12/12/28 Vacant Public Safety Commission Ramirez -12/31/26
Vacant Public Safety Commission Rios -12/31/26
Apodaca, Kim Public Safety Commission Perez 1/21/25-12/31/26 Greenidge, Marcelle Public Safety Commission Valencia 1/21/25-12/31/26 Hoskins, Patricia Public Safety Commission Valencia 1/21/25-12/31/26 LeGaspi, Richard Public Safety Commission Ayala 1/21/25-12/31/26 Moreno, Esther Public Safety Commission Perez 6/2/26-12/31/26 Peña, Petra Public Safety Commission Ramirez 3/3/26-12/31/26 Rosoff, Michael Public Safety Commission Rios 1/21/25-12/31/26 Valenzuela, Laura Public Safety Commission Ayala 8/18/26-12/31/26 Phyllis, Barth Senior Citizens Commission Perez 4/7/26-12/31/26 Brizuela, Elmer Senior Citizens Commission Ramirez 11/4/25-12/31/26 Contreras, Rachel Senior Citizens Commission Rios 3/4/25-12/31/26 Tasker, Angela Senior Citizens Commission Ayala 1/21/25-12/31/26 Valenzuela, Laura Senior Citizens Commission Valencia 1/21/25-12/31/26 Vacant Social Services Commission Rios -12/31/26
Acosta, Scherise Social Services Commission Ramirez 1/21/25-12/31/26 Barth, Phyllis Social Services Commission Perez 1/21/25-12/31/26 Casillas, Millie Social Services Commission Ramirez 3/3/26-12/31/26 Cerezo, Angeles Honorato Social Services Commission Rios 4/1/25-12/31/26 Greenidge, Marcelle Social Services Commission Perez 1/21/25-12/31/26 LeGaspi, Natalie Social Services Commission Valencia 4/15/25-12/31/26 LeGaspi, Richard Social Services Commission Valencia 1/21/25-12/31/26 Reyes-Castro, Elfega Arely Social Services Commission Ayala 1/21/25-12/31/26 Tasker, Angela Social Services Commission Ayala 1/21/25-12/31/26 Obi, Brandon Youth Advisory Board Rios 3/18/25-12/31/26 Vacant Youth Advisory Board Ayala -12/31/26
Vacant Youth Advisory Board Ayala -12/31/26
Vacant Youth Advisory Board Perez -12/31/26
Vacant Youth Advisory Board Perez -12/31/26
Vacant Youth Advisory Board Ramirez -12/31/26
Vacant Youth Advisory Board Ramirez -12/31/26
Vacant Youth Advisory Board Rios -12/31/26
Vacant Youth Advisory Board Valencia -12/31/26
Vacant Youth Advisory Board Valencia -12/31/26
City Council Agenda Report
October 20, 2026
TO: Honorable City Council
FROM: Jesus M. Gomez, City Manager
BY: Alex Hamilton, Deputy City Manager
Albert Mendoza, P.E., Director of Public Services/City Engineer Jana Stuard, Director of Finance/City Treasurer
Mario Mera, Engineering Division Manager
SUBJECT: PROJECT NO. 7859 – AWARD OF CONTRACT – CONSTRUCTION SERVICES

FOR BUILDINGS DEMOLITION LOCATED AT NORWALK TRANSIT VILLAGE, 13200 BLOOMFIELD AVENUE / RESOLUTION NO. 26-62 BUDGET
AMENDMENT, ENGINEER'S REPORT NO. 26-17
Background:

On November 19, 2024, City Council adopted the Norwalk Transit Village Specific Plan, certified the Final Environmental Impact Report, approved the Mitigation and Monitoring and Reporting Program (“MMRP”), and adopted a Statement of Overriding Considerations in connection with the NTV through City Council Resolution No. 24-58 (SCH No. 2022070103). The Norwalk Transit Village (“NTV”) Specific Plan envisions opportunities for new economic development within the former Southern California Youth Correctional Reception Center and Clinic 30+ acre site located at 13200 Bloomfield Avenue (“Subject Site”).

On December 3, 2024, City Council adopted Resolution No. 24-61 approving the Purchase and Sales Agreement (“PSA”) by and between the State of California (“State”) and the City of Norwalk (“City”) for the Subject Site.

On December 17, 2024, City Council adopted Resolution No. 24-62 declaring the Subject Site exempt surplus land pursuant to Government Code §§54221(F)(1) and approving a Disposition and Development Agreement (“DDA”), by and between the City and Lewis Land Developers, LLC (“Developer”).

On April 15, 2025, City Council adopted Development Agreement (“DA”) by and between the City and the Developer. The DA is intended to coordinate and facilitate the successful and timely completion of the public and private improvements identified in the NTV Specific Plan. The City City Council October 20, 2026
Project No. 7859 – Award of Contract and
Adopt Resolution No. 26-62
Page No. 2
Council also determined that DA No. 2025-0001 was within the scope of the Final Environmental Impact Report (“FEIR”) prepared for the Norwalk Transit Village Specific Plan Project and that no further environmental review was required.

On July 24, 2025, the City closed escrow for the Subject Site. Pursuant to the DDA, the City is responsible for demolishing and clearing the existing structures and preparing the site prior to turnover to the Developer. Because the demolition includes abatement and remediation activities, completion of the overall site preparation is anticipated to occur by mid-2027.

Following completion of the demolition, abatement, and remediation activities, the prepared site will be turned over to the Developer, who will commence site improvement activities pursuant to the DA and in accordance with the NTV Specific Plan.

On February 6, 2026, City staff solicited construction bids for the building demolition at Subject Site. The scope of work includes demolition of all existing buildings, structures, foundations, paved surfaces and hardscapes, chain-link fencing, underground utility piping, irrigation lines, and conduits.

On February 20, 2026, a mandatory pre-bid meeting was held to ensure prospective bidders had an opportunity to review the project scope, assess existing site conditions, and understand the contract requirements. On February 23, 2026, the City also conducted a non-mandatory site meeting to provide prospective bidders access to previously locked buildings and allow them to further evaluate existing interior conditions.

On March 19, 2026, the City received nine bids, which were publicly opened. Seven bids were found to be non-responsive. Due to the size and complexity of the Subject Site, as well as limited historical information available regarding the property while it was under State control, the City developed a bid evaluation methodology designed to address potential unforeseen conditions during construction. The bid schedule included thirty (30) base bid items comprising the Contract Amount, thirty-three (33) unit price items, and a daily overhead rate. This methodology allows the City to evaluate not only the lowest base bid, but also the potential costs associated with additional work and extended project duration resulting from unforeseen conditions encountered during demolition, abatement, and remediation activities. The responsive bids are presented below:

Rank Contractor Contract
Amount
Unit Price
Total
Overhead Daily
Rate Total
Total Sum
Bid
1 Precision Works, Inc. dba
Precision Environmental $2,639,950 $455,360 $9,000 $3,104,310 2 Resource Environmental,
Inc. $2,877,000 $572,500 $3,000 $3,452,500
Staff conducted a comprehensive bid analysis, including verification of each bidder’s State contractor’s license, Department of Industrial Relations registration, State and federal debarment status, and references. Based on this review, staff recommend awarding the contract to City Council October 20, 2026
Project No. 7859 – Award of Contract and
Adopt Resolution No. 26-62
Page No. 3
Precision Environmental, the lowest responsive and responsible bidder.

Following the issuance of the Notice to Proceed, the project is anticipated to commence in late October 2026 and continue through mid-2027.

The City originally intended to award of the demolition contract at the City Council meeting of May 7, 2026. However, staff subsequently continued the item due to ongoing coordination with the California Department of Toxic Substances Control (“DTSC”) regarding appropriate measures and requirements to be incorporated into the Soil Management Plan. Staff has since received sufficient feedback and direction from DTSC to provide the necessary framework for the demolition contractor to proceed with the demolition, abatement, and remediation activities.

This coordination will allow the contractor to proceed with the Project while maintaining compliance with applicable regulatory requirements and site-specific environmental conditions.

On June 2, 2026, the City received a formal protest from Resource Environmental Inc., the second lowest apparent bidder, alleging procedural and analytical deficiencies in the City’s public bidding and procurement process. This bid protest is included as Attachment 1. City staff and the City Attorney’s Office reviewed the issues raised in the protest and determined that the allegations are without merit. Following a thorough review of the maters identified in the protest, staff maintain its recommendation that City Council award the contract to Precision Environmental. The City’s response to the bid protest is included as Attachment 2 and is incorporated as part of the record. Precision Environmental, as the apparent low bidder, has also submitted a response addressing the allegations raised by Resource Environmental in its bid protest, as is Precision Environmental’s right. Precision Environmental’s response is included as Attachment 3 and is incorporated as part of the record.

Fiscal Impact:

The following is an estimated cost breakdown of the total project costs:

Construction Cost: $ 2,639,950
Contingency (25%): $ 659,988
Subtotal: $ 3,299,938
Administration (5%): $ 164,997
Total Estimated Cost: $ 3,464,935
There is no fiscal impact to the General Fund. A budget amendment is necessary to appropriate available Low-and Moderate-Income Asset Bond Proceeds in the amount of $1,386,000 and Former Redevelopment Agency Non-Housing Bond Proceeds in the amount of $2,079,000 is needed for the construction services associated with the Project.

Pursuant to the DDA, the Developer will be responsible for the payment of all third-party costs associated with the demolition and remediation activities at the Subject Site. The Developer will also be responsible for providing evidence of the site cleanup satisfactory to the City, the Developer, and applicable State regulatory agencies.

City Council October 20, 2026
Project No. 7859 – Award of Contract and
Adopt Resolution No. 26-62
Page No. 4
Following completion of the demolition, abatement and remediation activities, and satisfaction of the applicable site cleanup requirements, the City anticipates completing such activities and transfer of the prepared site to the Developer in mid-2027.

Environmental Assessment:

The proposed City Council action to award the demolition contract for Project No. 7859, including the associated abatement, demolition, and remediation activities at the Subject Site was evaluated as part of the FEIR. Applicable mitigation measures were incorporated into the City Council adopted MMRP. As such, no further CEQA review is required at this time.

Citizens Advised:

N/A
Strategic Plan 2023 Implementation:

The recommended actions will further the City’s 2023 Strategic Plan, Goal 2 Work in Partnership with Our Community to Achieve Safe and Livable Neighborhoods, Object 1, Re-invest in existing and aging infrastructure.

Recommended Action:

Staff recommend City Council:
a. adopt Resolution No. 26-62, A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NORWALK, AUTHORIZING AN AMENDMENT TO THE FISCAL YEAR 2025/26 ADOPTED BUDGET TO APPROPRIATE $1,386,000 OF LOW AND MODERATE INCOME HOUSING ASSET FUNDS AND $2,079,000 OF FORMER REDEVELOPMENT

AGENCY NON-HOUSING BOND PROCEEDS FOR THE BUILDINGS DEMOLITION LOCATED AT THE NORWALK TRANSIT VILLAGE PROPERTY LOCATED AT 13200 BLOOMFIELD AVENUE, NORWALK, CA 90650, CITY PROJECT NO. 7859. b. award a contract to Precision Environmental in the amount of $2,639,950 with a 25% contingency in the amount of $659,988 for construction services for Project No. 7859; and authorize the City Manager to execute the contract with any amendments within the contingency, on behalf of the City, in a form approved by the City Attorney.

Attachments:

1. Resource Environmental Protest Letter

2. City Response to Bid Protest Letter

3. Precision Environmental Letter

4. Resolution No. 26-62
Resource Environmental Services, LLC
13100 Alondra Blvd, Suite 108, Cerritos, CA 90703
Office: (562) 468-7000 | Fax: (562) 468-0600 | Email: [email protected] www.ResourceEnvironmental.com
CA CSLB #864417 | CA DIR Registration #1000003121 | Laborers Local 300 AZ ROC #337736 | NV SCB #0090223
June 2, 2026
(Sent via Email — URGENT, TIME-SENSITIVE)
City of Norwalk
Attn: Jesus Gomez, City Manager
12700 Norwalk Blvd
Norwalk, CA 90650
RE: BID PROTEST — Buildings Demolition Located at California Youth Authority Transit Village, 13200 Bloomfield Avenue, Norwalk, CA 90650; IFB No. 26-846 / City Project No. 7859 Dear Mr. Gomez:

Resource Environmental Services, LLC (“Resource”) submits this formal protest against the bid of Precision Works, Inc. dba Precision Environmental (“Precision”) for the above-captioned project. Precision’s apparent low bid of $3,114,300 is materially nonresponsive due to multiple independent violations of the Public Contract Code, the Subletting and Subcontracting Fair Practices Act (PCC § 4100 et seq.), the Labor Code, the Health and Safety Code, and the City’s own Invitation for Bids (“IFB”). These defects are not waivable under controlling California case law because they affect material bid elements, prevent equal bid comparison, allow post-bid subcontractor allocation or clarification, interfere with the IFB’s self-performance requirement, and preserve clerical-mistake and bid-relief arguments under PCC § 5103 that would allow Precision to accept the award if convenient or seek relief if the defects become unfavorable. California law does not permit a public entity to waive defects that create that kind of unfair competitive advantage. Under Norwalk Municipal Code Chapter 3.17 and PCC § 20162, the only lawful disposition on this record is to reject Precision’s bid as nonresponsive, find Precision nonresponsible, and award the Contract to Resource as the next lowest responsive and responsible bidder.

URGENT — ACTION REQUESTED BEFORE JUNE 2, 2026 COUNCIL MEETING. Resource has just become aware that the City of Norwalk has placed the proposed award of this Contract to Precision on the City Council’s agenda for the regular meeting of June 2, 2026. Resource has not previously been afforded an opportunity to be heard on the multiple, dispositive defects identified below. A Council vote awarding the Contract to Precision before this protest is resolved would convert a curable procurement issue into an executed public works contract subject to invalidation, with the cost-recovery consequences identified in Section X. Resource respectfully requests that the City Manager, City Attorney, and City Council treat this letter as a timely protest filed before any final Council action on the proposed award; that the proposed Precision award item be pulled or deferred from the June 2, 2026 agenda pending written resolution of this protest; and that no resolution awarding the Contract to Precision be adopted until the matters set out in this letter have been heard on the record.

Attachment No. 1
Resource Environmental Services, LLC
13100 Alondra Blvd, Suite 108, Cerritos, CA 90703
Office: (562) 468-7000 | Fax: (562) 468-0600 | Email: [email protected] www.ResourceEnvironmental.com
CA CSLB #864417 | CA DIR Registration #1000003121 | Laborers Local 300 AZ ROC #337736 | NV SCB #0090223
I. SUMMARY OF GOVERNING LAW
California Public Contract Code requires a public agency to award a public works contract “to the lowest responsible bidder.” (PCC § 20162.) The lowest-responsible-bidder rule is a strict statutory mandate that admits of no “relative superiority” basis for award to anyone other than the lowest responsive and responsible bidder. (City of InglewoodL.A. County Civic Center Authority v. Superior Court (1972) 7 Cal.3d 861, 867-868.) Norwalk Municipal Code Chapter

3.17 implements the same local mandate. NMC § 3.17.030(C)(4) provides that “The City Council shall award the bid to the lowest responsive and responsible bidder, or reject all bids pursuant to Public Contract Code Section 22038, or its successor statute.” The same subsection adds that “[t]he City Council may waive any irregularities or informalities in any bid or bidding” — a waiver power that, as discussed below, does not reach material defects.

A bid is responsive if it promises to do what the bidding instructions require, while a bidder is responsible if it can in fact perform the contract as promised. (Taylor Bus Service, Inc. v. San Diego Bd. of Education (1987) 195 Cal.App.3d 1331, 1341; MCM Construction, Inc. v. City and County of San Francisco (1998) 66 Cal.App.4th 359, 368.) Responsiveness is decided on the four corners of the bid as submitted, not by post-bid investigation or explanation. (Great West Contractors, Inc. v. Irvine Unified School Dist. (2010) 187 Cal.App.4th 1425, 1454.) A bid that deviates materially from the bidding requirements must be rejected as nonresponsive. (Valley Crest Landscape, Inc. v. City Council (1996) 41 Cal.App.4th 1432, 1438.) The test for materiality is whether the defect “affect[s] the amount of the bid or give[s] a bidder an advantage or benefit not allowed other bidders.” (Ghilotti Construction Co. v. City of Richmond (1996) 45 Cal.App.4th 897, 904.) Competitive bidding statutes exist “to eliminate favoritism, fraud and corruption; avoid misuse of public funds; and stimulate advantageous marketplace competition.” (Domar Electric, Inc. v. City of Los Angeles (1994) 9 Cal.4th 161, 173.) To give those policies effect, bidding requirements must be strictly construed and applied. (Konica Business Machines U.S.A. v. Regents of University of California (1988) 206 Cal.App.3d 449, 456.)
The Subletting and Subcontracting Fair Practices Act exists to prevent bid shopping and bid peddling and to protect both the public and listed subcontractors from post-bid manipulation. (Southern California Acoustics Co. v. C.V.

Holder, Inc. (1969) 71 Cal.2d 719, 726-727.) It requires the prime to list each subcontractor performing more than one-half of one percent of bid, with name, location, CSLB license number, DIR registration, and the portion of work each will perform, and to list only one subcontractor for each portion. (PCC § 4104(a)-(b).) Where the prime fails to specify a subcontractor for a portion of work, or specifies more than one subcontractor for the same portion, the prime is deemed to have agreed that it is fully qualified to perform that portion and shall perform it itself. (PCC § 4106; R.J. Land & Associates Construction Co. v. Kiewit-Shea (1999) 69 Cal.App.4th 416, 420-421.) The Act allows only two narrow cure paths: (i) under PCC § 4104(a)(2), an “inadvertent error” in a listed subcontractor’s CSLB license number or DIR registration number may be corrected within 24 hours after bid opening if the corrected number corresponds to the listed name and location; and (ii) under PCC § 4107.5, an inadvertent clerical error in subcontractor designation may be cured if the prime gives written notice within two working days of bid opening.

Bids in this matter were opened on March 9, 2026. The 24-hour window expired on March 10, 2026; the twoworking-day window expired shortly after. Precision invoked neither. The Court of Appeal applied the listing law strictly in DeSilva Gates Construction, LP v. Department of Transportation (2015) 242 Cal.App.4th 1409, 1424-1427, holding that a defective subcontractor designation on a Caltrans bid could not be cured after bid opening and that the agency’s attempt to waive the irregularity was an abuse of discretion.

Resource Environmental Services, LLC
13100 Alondra Blvd, Suite 108, Cerritos, CA 90703
Office: (562) 468-7000 | Fax: (562) 468-0600 | Email: [email protected] www.ResourceEnvironmental.com
CA CSLB #864417 | CA DIR Registration #1000003121 | Laborers Local 300 AZ ROC #337736 | NV SCB #0090223
Labor Code §§ 1725.5 and 1771.1 separately bar a public agency from listing any subcontractor on a public works bid unless that subcontractor is currently registered with DIR. The IFB at page 4 expressly incorporates this rule.

Hazardous waste transportation is restricted by Health and Safety Code § 25163 to transporters registered with the Department of Toxic Substances Control. The unifying principle is fairness to all bidders. Every bidder competed for this Contract under the same rules. Every bidder bore the same risk that material defects in its bid would result in nonresponsiveness. Treating Precision differently than the City has historically treated other bidders, including bidders on this very project, is precisely the favoritism the competitive bidding statutes were enacted to prevent.

II. THE DEFECTS BELOW ARE NONWAIVABLE UNDER VALLEY CREST AND PCC § 5103 Although the City may waive minor irregularities or informalities under NMC § 3.17.030(C)(4), California law does not permit waiver of material bid defects. A defect is material where it affects price, scope, bidder obligations, subcontractor listings, self-performance obligations, or gives a bidder a benefit or option not available to other bidders. Under Valley Crest, Ghilotti, Menefee v. County of Fresno (1985) 163 Cal.App.3d 1175, 1182, and M.F.

Kemper Construction Co. v. City of Los Angeles (1951) 37 Cal.2d 696, 700-703, a defect is nonwaivable where it affects a material bid element or gives the bidder a post-bid opportunity to claim clerical mistake under § 5103, withdraw without forfeiting its bid bond, seek bid relief, or reshape its bid after opening. Under Bay Cities Paving, R.J. Land, Southern California Acoustics, and DeSilva Gates (each discussed above and below), subcontractor listing defects that allow post-bid allocation, correction, substitution, or manipulation are not mere informalities and cannot be waived. Precision’s defects meet these standards several times over.

The unifying test below is therefore not whether the IFB declares a particular defect nonresponsive, but whether the defect (i) violates a mandatory statutory or IFB term and is therefore material on its face, (ii) leaves Precision with a post-bid option to claim mistake under § 5103 and back out, or (iii) requires post-bid allocation or clarification of a material bid element. If any of these is true, the defect is material and nonwaivable. The City’s waiver power under NMC § 3.17.030(C)(4) reaches “irregularities or informalities” only — it does not authorize the City to waive material defects or to retroactively expand the narrow statutory cure windows in PCC §§ 4104(a)(2) and 4107.5, both of which expired in March 2026 without Precision invoking them.

III. JDK DEMO/GRADING — DEFECTIVE PORTION-OF-WORK DESIGNATION AND THE SUB-VS-SELF-PERFORM CONFLICT (PCC §§ 4104, 4106)
Precision’s Subcontractor Designation Form lists JDK Demo (“JDK”) at 30% of Total Bid for “Demo/Grading.” The defect is not merely that Precision used a broad trade label. The defect is that Precision’s trade description, percentage, bid schedule, and 50% self-performance commitment cannot be reconciled without allowing Precision to decide after bid opening which portions of Demo/Grading belong to JDK and which portions Precision claims to self-perform. That post-bid allocation is a material advantage and is not waivable under controlling California case law. Precision cannot list JDK as the subcontractor for Demo/Grading and then use undefined portions of the same Demo/Grading scope as Precision self-performance to satisfy the 50% requirement. A prime either lists a subcontractor for a defined portion or self-performs that portion. It cannot reserve the same undefined portion for both. (See Bay Cities Paving, supra, 56 Cal.App.3d at 365-366; R.J. Land, supra, 69 Cal.App.4th at p. 420.) Resource Environmental Services, LLC
13100 Alondra Blvd, Suite 108, Cerritos, CA 90703
Office: (562) 468-7000 | Fax: (562) 468-0600 | Email: [email protected] www.ResourceEnvironmental.com
CA CSLB #864417 | CA DIR Registration #1000003121 | Laborers Local 300 AZ ROC #337736 | NV SCB #0090223
The numbers make the conflict concrete. Precision’s Total Bid is $3,114,300. The IFB Subcontractor Designation Form requires the Contractor to perform with its own organization at least 50% of the Total Bid. That floor is $1,557,150 — not 50% of the $2,639,950 lump-sum base bid, because the Form’s “Total Bid” baseline includes Schedule 1 lump sum items, Schedule 2 unit price items, and Schedule 3 extended overhead. Every bidder, including Resource, was required to allocate scope and self-performance to that Total Bid floor at bid opening. Precision should not get a special rule that lets it list JDK for “Demo/Grading,” keep JDK at 30%, and then count the unallocated demolition shortfall as Precision self-performance because that happens to satisfy the 50% test.

The demolition, removal, and grading scope JDK is identified to perform totals approximately $1,387,450 in Precision’s own pricing: Item 13 (fencing removal) $32,500; Item 14 (remove all buildings) $812,000; Item 15 (remove structures, sheds, annexes) $57,000; Item 16 (remove above-ground utilities and structures) $85,000; Item 17 (remove foundations, paving, hardscape) $25,000; Item 18 (crush and grind concrete, asphalt, brick) $105,000; and Items 22-30 (retaining walls, underground utilities, irrigation, trees, vegetation, rough grading) $270,950. JDK is listed at 30% of Total Bid, approximately $934,290. The demolition-and-grading scope exceeds JDK’s listed allocation by approximately $453,160. That $453,160 gap is not just arithmetic. It is the defect. Precision cannot use that gap as a flexible post-bid bucket to decide what JDK performs and what Precision supposedly self-performs.

Each post-bid theory Precision might offer to explain the conflict is independently disqualifying. If Precision says the unallocated demolition was intended to be self-performed, then Precision’s bid did not properly identify JDK’s “portion of work” under § 4104 — JDK’s actual portion was always smaller than 30%, and the bid form materially overstated JDK’s scope. If Precision says JDK’s 30% should be clarified upward after bid opening, that is a material post-bid correction of a § 4104 listing element, outside the now-expired § 4107.5 cure window. If Precision says JDK’s 30% was a clerical mistake, that is the § 5103 clerical-error theory that triggers the Valley Crest escape route.

There is no scenario in which Precision can both keep JDK listed at 30% for “Demo/Grading” and lawfully count an undefined portion of the same scope as Precision self-performance.

The bid’s 50% self-performance commitment does not, properly understood, satisfy the IFB. The Form facially appears satisfied only because Precision is counting unallocated demolition work that its own bid structure shows was intended to be performed by JDK, not identified as Precision self-performed work. Strip that scope out, and Precision falls below the 50% floor. Leave it in, and Precision is making a self-perform commitment its own bid structure does not support. Either result is a material bid-element problem Precision can resolve after bid opening in whichever direction is most favorable to Precision. That is the post-bid optionality Valley Crest forbids.

Resource Environmental Services, LLC
13100 Alondra Blvd, Suite 108, Cerritos, CA 90703
Office: (562) 468-7000 | Fax: (562) 468-0600 | Email: [email protected] www.ResourceEnvironmental.com
CA CSLB #864417 | CA DIR Registration #1000003121 | Laborers Local 300 AZ ROC #337736 | NV SCB #0090223
IV. DUPLICATE “TRANSPORTER” DESIGNATIONS — ECTI AND LOS MORALES (PCC §§ 4104, 4106) Precision listed two subcontractors for the identical, undifferentiated portion of work labeled “Transporter”: ECTI Environmental Contractors Transportation Inc. (“ECTI”) at 1.5%, and Los Morales Trucking (“Los Morales”) at 2%.

The form contains no scope distinction between them. The bid does not say which transporter handles which waste stream, which hauling scope, or which schedule items. This is not just a paperwork problem; it is a post-bid allocation problem. The only way to determine which transporter does what is to allow Precision to decide after bid opening, and that is exactly what § 4104 forbids. The defect does not depend on whether Precision is DTSC-registered. The defect is the duplicate, undifferentiated listing itself, and the post-bid allocation it requires. In Bay Cities Paving, supra, 56 Cal.App.3d at 365-366, the prime listed itself and a subcontractor on the same line for the same scope and the Court of Appeal held that designating two entities for the same work without apportionment frustrates the purpose of the listing law and violates the Act. The same principle bars listing two subs for the same undifferentiated portion: the Subletting Act requires one subcontractor per portion or self-performance — not both, and not two with no apportionment.

Each post-bid theory Precision might offer to explain the duplicate listing is independently disqualifying. If Precision later says ECTI was intended for regulated waste and Los Morales was intended for ordinary hauling (or vice versa), that is a post-bid explanation of a material § 4104 listing element — outside the now-expired § 4107.5 cure window. If Precision says one of the two listings was a clerical error, that is the § 5103 clerical-error theory triggering the Valley Crest escape route. Either way, the City cannot allow Precision to fix or allocate transporter scopes after bid opening.

Section 4106 compounds the defect. Where two subcontractors are listed for the same undifferentiated portion, the listings are improperly specified, and the prime is statutorily deemed to self-perform that scope. Precision’s bid affirmatively represented that the hauling would be performed by listed subcontractors. The bid contains no fleet inventory, no equipment list, and no operator roster supporting Precision’s capacity to self-perform high-volume regulated hauling on this project. The City cannot reconcile the two positions post-bid without either (a) requiring Precision to self-perform hauling its bid did not propose to self-perform, or (b) allowing Precision to allocate or substitute among hauling subs post-bid — the very post-bid sub allocation § 4104 was enacted to prevent. (Cal-Air Conditioning, Inc. v. Auburn Union School Dist. (1993) 21 Cal.App.4th 655, 668.) V. UNIT #33 WORDS-VERSUS-FIGURES DISCREPANCY (PCC § 5103) Unit #33 of the Bid Sheets (Schedule 2) is for “Abatement / Remove Haz-Mat Underground Storage Tank (UST), including all necessary relevant work, permits, notices and processing through DTSC, LA County Fire, LA County Environmental Programs Division, and other required Agencies.” Precision filled in Unit #33 as “$5,000” in figures but “FIVE DOLLARS” in words. The IFB provides at B-22 (Discrepancies in Bids) that “[i]n case of discrepancies in the amount of bid words shall govern over figures.” Applying the IFB’s words-govern rule to Unit #33 (priced for 2 units in the evaluated Total Sum Bid) reduces Schedule 2 by $9,990. The corrected Total Bid is $3,104,310. Precision is still the apparent low bidder.

Resource Environmental Services, LLC
13100 Alondra Blvd, Suite 108, Cerritos, CA 90703
Office: (562) 468-7000 | Fax: (562) 468-0600 | Email: [email protected] www.ResourceEnvironmental.com
CA CSLB #864417 | CA DIR Registration #1000003121 | Laborers Local 300 AZ ROC #337736 | NV SCB #0090223
The bid order is not the point. The defect is that Precision submitted two irreconcilable prices for the same item, and the B-22 “words govern” rule is a mandatory rule the City is bound to apply as written. (Pozar v. Department of Transportation (1983) 145 Cal.App.3d 269, 271-273.) Whichever way the City reads Unit #33, Precision retains a unilateral post-bid option that no other bidder enjoys: a clerical-mistake or bid-relief argument under § 5103 the moment the item becomes commercially unfavorable, and that is the post-bid optionality Valley Crest forbids.

The $5-per-unit reading is commercially impossible. No contractor performs DTSC-supervised UST abatement, LA County Fire coordination, LA County Environmental Programs Division processing, and related agency work for $5 per tank. The $5,000 figure may also be materially understated for the required UST work, but the more important point is that Precision submitted two irreconcilable prices for the same item. If Precision intended $5,000, then “FIVE DOLLARS” is a bid-filling mistake. If Precision intended “FIVE DOLLARS,” then the Total Sum Bid is wrong. Either way, Precision preserved a clerical-mistake and bid-relief argument under § 5103, which is the post-bid optionality Valley Crest forbids. Any attempt by Precision to escape Unit #33 via § 5103 must also satisfy strict procedural compliance. (A & A Electric, Inc. v. City of King (1976) 54 Cal.App.3d 457, 461-462.) The bid therefore does not, on its face, promise to do what the Bid Documents require, and this is also a responsibility problem under Section X: JDK, the listed demolition and earthwork subcontractor that would actually operate the excavator on a UST pull, carries CSLB license #1048561 with C-12 and C-21 classifications, which do not show the Class A General Engineering or Hazardous Substance Removal (HAZ) certification required for that work. (Ghilotti, supra, 45 Cal.App.4th at p. 904; Taylor Bus, supra, 195 Cal.App.3d at pp. 1341-1342.)
VI. ECTI LISTED OVER THE LISTING THRESHOLD WITHOUT DIR REGISTRATION (PCC § 4104; LABOR CODE §§ 1725.5, 1771.1)
ECTI is listed by Precision at 1.5% of Total Bid, above the one-half of one percent threshold that triggers § 4104. The DIR Contractor Registration Number field for ECTI on Precision’s Designation Form reads “N/A.” Responsiveness is decided on the four corners of the bid as submitted (Great West, supra, 187 Cal.App.4th at p. 1454), and Precision’s bid affirmatively states “N/A” rather than supplying a DIR number. The IFB at page 4 expressly incorporates the statutory bar at Labor Code §§ 1725.5 and 1771.1: “no contractor or subcontractor shall be qualified to bid on, be listed in a bid proposal subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered and qualified to perform public work pursuant to Section 1725.5.”
Precision plainly understood the DIR registration column was substantive: it supplied DIR numbers for the other subs it listed on the form (JDK, Fenceworks, BMP, TRE Lighting & Electric, BC Traffic Specialist, and Los Morales Trucking) and affirmatively entered “N/A” for ECTI rather than leaving the field blank. The 24-hour cure window under PCC § 4104(a)(2) for an “inadvertent error” in a listed DIR number ran on March 10, 2026 without Precision invoking it. “N/A” is not on its face an “inadvertent error” within the meaning of the statute. If “N/A” was accurate, Precision listed a statutorily ineligible subcontractor over the listing threshold. If “N/A” was a clerical mistake, then Precision faces both a § 4104(a)(2) post-bid cure problem (expired) and a § 5103 clerical-error theory that triggers the Valley Crest escape route. Either path is independently disqualifying.

Resource Environmental Services, LLC
13100 Alondra Blvd, Suite 108, Cerritos, CA 90703
Office: (562) 468-7000 | Fax: (562) 468-0600 | Email: [email protected] www.ResourceEnvironmental.com
CA CSLB #864417 | CA DIR Registration #1000003121 | Laborers Local 300 AZ ROC #337736 | NV SCB #0090223
VII. REGULATED HAZARDOUS WASTE HAULING — § 4106 SELF-PERFORM DEFAULT AND CAPACITY GAP The project carries substantial regulated hazardous waste streams. Precision’s own bid prices them at Items 10 (Universal Waste Removal and Hauling Plan), 12 (Pre-Demolition Haz-Mat Abatement, including AQMD Procedure 5), and 19-21 (Hazardous Soil remedial excavation at the Former Automotive Repair Area, Grounds Storage Building, and Former UST Location, each requiring DTSC processing) — together approximately $927,000, plus Unit #33 and the Hazardous Materials unit-price items under Schedule 2.

Because Precision listed two subcontractors for the same undifferentiated transporter scope (Section IV), § 4106 deems Precision to self-perform that hauling. Precision’s bid does not show the equipment to self-perform regulated hauling at this scale: no high-side end-dump trucks for bulk demolition haul-off, no DTSC-manifested bin or vacuum units for the three hazardous-soil hot spots, and no separately permitted UST transport for tank cradles and contaminated residuals. The arithmetic is also off: at 3.5% of $3,114,300 (combined ECTI + Los Morales) the listed transporter scope is approximately $108,950, materially below the cost of regulated-waste manifesting, transport, and tipping fees alone for this site, before any structural demolition haul-off. JDK, which would be doing the excavation work that feeds the haul-off, carries C-12 and C-21 classifications that do not show the Class A General Engineering or Hazardous Substance Removal (HAZ) certification required for hazardous substance excavation work.

The capacity gap is both a § 4104/§ 4106 listing problem and a responsibility problem under Section X.

VIII. DEFECTIVE REFERENCES FORM — REQUIRED BID DOCUMENT (IFB B-1, B-19) The IFB requires bidders to submit a completed References Form listing public agency projects in excess of $500,000 the bidder is currently working on or has worked on in the past three years (IFB at B-25), and the Checklist for Bidders at B-1 lists the References Form as a mandatory bid submittal item. Whether the References Form defect is material — and therefore nonresponsive under Valley Crest and Ghilotti — turns on whether the form was a gatekeeping evaluation tool the City used to compare bidders, and on whether Precision’s submission deprived the City of the information the form was designed to elicit. The answer to both is yes.

Precision’s References Form does not identify a single discrete public agency project. Instead, it lists generic blanket entries such as “Abatement, Restoration, and Demolition Services / Various awarded jobs,” paired with on-call style agency relationships such as the County of San Bernardino and the Ventura County Office of Education / Hueneme Elementary School District. The Project Name fields do not identify project numbers, sites, task orders, individual scopes, contract amounts, or final values. The form does not allow the City to compare Precision’s actual publicagency project experience against the IFB threshold or against other bidders’ submissions. The problem is not formatting. It is that Precision did not give the City the project-specific public agency experience information the form requested.

Resource Environmental Services, LLC
13100 Alondra Blvd, Suite 108, Cerritos, CA 90703
Office: (562) 468-7000 | Fax: (562) 468-0600 | Email: [email protected] www.ResourceEnvironmental.com
CA CSLB #864417 | CA DIR Registration #1000003121 | Laborers Local 300 AZ ROC #337736 | NV SCB #0090223
Precision compounds the problem by listing Wawanesa Insurance — a private property and casualty insurance company — as a “project” reference. Wawanesa is not a public agency. Listing a private insurer to populate a form that, by its own terms, requires “public agency projects” is a facial failure to comply with the bid requirement. The City cannot allow Precision to supplement its References Form post-bid to identify qualifying public agency projects it should have listed at bid opening: that would permit Precision to cure a required bid document after seeing the competitive results. By contrast, Resource’s References Form identifies specific public-agency public-works projects above the threshold, with project names, contracting agencies, contract amounts, and contacts, allowing direct comparison. The same defect supports both nonresponsiveness (the bid did not satisfy a required submission) and nonresponsibility (the bid did not show the experience the form was designed to surface) — and Section X relies on both.

IX. SIGNING-AUTHORITY CONFLICT — CALIFORNIA SECRETARY OF STATE FILING The Checklist for Bidders at IFB B-1 requires “Evidence satisfactory to the City indicating the capacity of the person(s) signing the Bid to bind the Bidder.” Precision’s bid was signed by Jonathan Clark in the capacity of “CFO.” In support, Precision attached an Incumbency Certificate dated on or about March 4, 2026, executed by Robert Ruiz as “Sole Shareholder/Owner & CEO” of Precision Works, Inc., reciting that “Jonathan Clark currently serves as the Company’s Chief Financial Officer (CFO).”
That recital is squarely contradicted by Precision’s own most recent publicly filed corporate document. Precision Works, Inc.’s California Secretary of State Statement of Information filed on February 5, 2025 (File No.

BA20250263921; Entity No. 1342945) identifies the corporation’s three officers as Robert Ruiz (Chief Executive Officer), Jehremy Michael Foster (Secretary), and Salvatore Anthony Scarpato (Chief Financial Officer). Jonathan Clark is not listed as CFO. He is not listed as Secretary. He is not listed as a Director. He does not appear in the “Additional Officers” section (which is marked “None Entered”). (See Exhibit E.) Resource does not contend the Incumbency Certificate is automatically invalid. The point is narrower: the City cannot ignore the authority conflict in a required bid submission, and the City cannot allow post-bid supplementation of authority documentation to cure that conflict without giving Precision yet another post-bid cure opportunity not afforded to other bidders. Either Robert Ruiz attested to inaccurate officer information when he signed the Statement of Information in February 2025, or Robert Ruiz attested to inaccurate officer information when he signed the Incumbency Certificate in March 2026. The City cannot rely on the latter to override the former without resolving the conflict on the record.

X. RESPONSIBILITY — INDEPENDENT HARD BAR TO AWARD
Norwalk Municipal Code Chapter 3.17 commits the City Council to award only to the “lowest responsive and responsible bidder, or reject all bids.” A responsible bidder is one that can perform the contract as promised. (Taylor Bus, supra, 195 Cal.App.3d at p. 1341.) Even if any of the foregoing defects could survive the responsiveness analysis — and none can — Precision cannot survive the responsibility analysis on the same record.

Resource Environmental Services, LLC
13100 Alondra Blvd, Suite 108, Cerritos, CA 90703
Office: (562) 468-7000 | Fax: (562) 468-0600 | Email: [email protected] www.ResourceEnvironmental.com
CA CSLB #864417 | CA DIR Registration #1000003121 | Laborers Local 300 AZ ROC #337736 | NV SCB #0090223
Precision’s own bid creates the responsibility concerns. Precision listed JDK for “Demo/Grading” because Precision is not self-performing demolition; the listing is the admission. Precision listed two transporter subs for the same scope because Precision was not self-performing hauling either. The defects identified in Sections III, IV, VI, and VII then force Precision into a self-performance position its bid affirmatively disclaimed: § 4106’s self-perform default deems Precision to self-perform the unallocated demolition shortfall (~$453,160), the duplicate-listed transporter scope, and any other portion not properly identified to a single sub. The City must therefore ask whether Precision actually has the experience, equipment, licensing structure, manpower, and project history to perform that work itself.

Precision’s References Form, as set out in Section VIII, does not show comparable self-performed experience. The references do not identify a single discrete public-agency project of full-site heavy demolition, hazardous-soil remediation, regulated hauling, underground utility removal, crushing and grinding, and grading. Heavy structural demolition of multi-building, multi-acre sites with regulated hazardous-soil hot spots, DTSC oversight, LA County Fire permitting, and crushing-and-grinding operations is not an extension of asbestos abatement and restoration work; it is a different trade with different equipment, license coverage, and project track record. Precision’s bid does not show that track record on its face. Resource is unaware of any project of comparable scope and complexity that Precision has self-performed for a public agency in California within the three-year IFB look-back window, or for that matter at any point. The City cannot use post-bid responsibility evidence to retroactively cure facial § 4104 listing defects, but the absence of comparable self-performed experience is itself an independent ground for finding Precision nonresponsible.

The Inglewood Civic Center rule is clear that the City has no “relative superiority” basis to award to a nonresponsive or nonresponsible bidder regardless of price. (Inglewood Civic Center, supra, 7 Cal.3d at pp. 867-868; Williams Construction v. Clovis Unified School Dist. (2007) 146 Cal.App.4th 757, 766.) Awarding the Contract on this record may also expose the City and Precision to avoidable post-execution invalidation and cost-recovery disputes. The cleaner course is to reject Precision’s bid now, before any contract is executed.

XI. PREJUDICE TO RESOURCE, STANDING, AND THE PENDING COUNCIL ACTION Resource has standing to pursue this protest and is directly prejudiced by the prospect of an award to Precision. As the next lowest responsive and responsible bidder, Resource is the bidder to whom NMC Chapter 3.17 and PCC § 20162 require award if Precision’s bid is rejected. California courts have long recognized the standing of the secondlowest bidder to challenge a proposed award to a nonresponsive low bidder, both to vindicate the competitive bidding statutes and to protect the second-lowest bidder’s own statutory expectation of award. (Inglewood Civic Center, supra, 7 Cal.3d at pp. 867-870.) Resource has expended significant pre-bid pursuit cost, tendered a fully responsive bid, and is the party whose legitimate expectation under the City’s own award rule is displaced if the City permits Precision to keep an award it cannot lawfully hold.

The proposed award is not yet final. The City Council retains discretion under NMC Chapter 3.17 and PCC § 20162 to pull the item, reject Precision’s bid, and award to Resource. The decision before Council on June 2 is therefore a discretionary act, not the ratification of an existing contract. Adopting a resolution awarding the Contract to Precision before this protest is heard would foreclose the procedural protections the competitive bidding statutes were enacted to provide and would expose the City and Precision to the post-execution invalidation consequences set out in Section X, including the cost-recovery bar under PCC § 5110.

Resource Environmental Services, LLC
13100 Alondra Blvd, Suite 108, Cerritos, CA 90703
Office: (562) 468-7000 | Fax: (562) 468-0600 | Email: [email protected] www.ResourceEnvironmental.com
CA CSLB #864417 | CA DIR Registration #1000003121 | Laborers Local 300 AZ ROC #337736 | NV SCB #0090223
The fairness point is also a practical point. Resource understands that, on this same procurement, multiple other bidders were found nonresponsive. Those bidders were not allowed to cure or explain away their bid defects after bid opening. Precision should not receive a different standard. If the City rejected other bidders for defects that were the same as, less serious than, or arguably comparable to Precision’s defects, the City cannot lawfully waive Precision’s multiple material statutory and bid-form defects without creating the appearance of favoritism and unequal treatment. Competitive bidding laws exist “to eliminate favoritism, fraud and corruption; avoid misuse of public funds; and stimulate advantageous marketplace competition.” (Domar Electric, supra, 9 Cal.4th at p. 173.) Applying a stricter standard to other bidders while waiving Precision’s defects would create exactly the appearance of favoritism those laws are intended to prevent. The City should therefore apply the same standard to Precision that it applied to the other rejected bidders.

XII. REQUESTED RELIEF
For the reasons set out above, Resource respectfully requests that the City of Norwalk:

1. Defer or pull the proposed Precision award item from the June 2, 2026 City Council agenda (and from any subsequent agenda) pending written resolution of this protest, so that the responsiveness and responsibility questions identified above are heard on the record before any final Council action;

2. Reject Precision’s bid as nonresponsive for the violations of PCC §§ 4104 and 4106 (Sections III and IV), the Unit #33 words/figures discrepancy (Section V), the missing ECTI DIR registration (Section VI), the regulated-hauling listing defect (Section VII), the defective References Form (Section VIII), and the signing-authority conflict (Section IX), each of which is independently sufficient;

3. Find Precision nonresponsible for the reasons set out in Section X; and

4. Award the Contract to Resource as the next lowest responsive and responsible bidder, as NMC Chapter 3.17 and PCC § 20162 require.

The City should not reject all bids and rebid the project. The bids opened on March 9, 2026 are now public record.

Every bidder, including Precision, has seen Resource’s pricing, Precision’s pricing, and the line-item structure of every other bid. Rebidding the project under those conditions would hand every bidder — most importantly Precision — exactly the kind of second-look advantage Valley Crest and Menefee forbid: the ability to recalibrate after seeing the competition’s numbers, with no offsetting penalty. (Valley Crest, supra, 41 Cal.App.4th at p. 1442 [“two bites at the apple”]; Menefee, supra, 163 Cal.App.3d at p. 1182.) Rebidding would also penalize Resource for having submitted a responsive bid the first time. The lawful course on this record is to reject Precision’s bid as nonresponsive (and nonresponsible) and award to Resource, not to scrap the procurement and restart it.

Resource will appear at the June 2, 2026 City Council meeting this evening to be heard on this protest and to ensure the Council has the dispositive defects identified above squarely before it before any award is considered. Resource respectfully asks that no award be made to Precision pending resolution of this protest, and is prepared to address any questions the City Manager, City Attorney, or City Council may have on the record this evening or in writing.

Resource Environmental Services, LLC
13100 Alondra Blvd, Suite 108, Cerritos, CA 90703
Office: (562) 468-7000 | Fax: (562) 468-0600 | Email: [email protected] www.ResourceEnvironmental.com
CA CSLB #864417 | CA DIR Registration #1000003121 | Laborers Local 300 AZ ROC #337736 | NV SCB #0090223
Reservation of Rights. Nothing in this letter shall be construed as a waiver, election, or limitation of any right, claim, defense, or remedy available to Resource. Resource expressly reserves the right to pursue any and all legal, equitable, and administrative remedies available, including but not limited to (i) a petition for writ of mandate under Code of Civil Procedure §§ 1085 and 1094.5 to compel the City to act in accordance with NMC Chapter 3.17, PCC § 20162, and the other authorities cited above; (ii) temporary restraining order, preliminary injunction, and permanent injunctive relief to prevent the execution of, or to unwind, any award of the Contract to Precision; (iii) declaratory relief; (iv) damages, including without limitation bid preparation and pursuit costs and any other damages permitted by law; (v) attorneys’ fees and costs to the extent available; (vi) any further administrative remedies provided under the IFB, NMC Chapter 3.17, and the Public Contract Code; and (vii) any other legal or equitable remedy this matter may warrant. Resource further reserves all rights as against Precision arising from any conduct outside this procurement that may bear on Precision’s responsibility or on the validity of its bid. This reservation is in addition to, and not in lieu of, the relief specifically requested above.

Sincerely,
Chase Tinsley
Vice President, Operations
Resource Environmental Services, LLC
[email protected]
Enclosures:

Exhibit A Precision Works, Inc. Designation of Subcontractors (IFB pages B-31, both pages) Exhibit B Precision Works, Inc. Bid Sheets — Lump Sum Items 13 through 30; Unit Price Item #33 Exhibit C Precision Works, Inc. References Form and Public/Private Sector Reference pages Exhibit D Precision Works, Inc. Incumbency Certificate (Robert Ruiz to Jonathan Clark) Exhibit E Precision Works, Inc. California Secretary of State Statement of Information filed 02/05/2025 Exhibit F Relevant IFB excerpts (Checklist for Bidders B-1; Subcontractor Designation Form B-31; References Form B-25; Questionnaire B-19; DIR registration language)
cc: City Clerk (via Email); City Attorney (via Email); Honorable Mayor and Members of the City Council (via Email); RES Counsel (via Email); RES Leadership (via Email)

DESIGNATION OF SUBCONTRACTORS
[Public Contract Code Section 4104]
List all Subcontractors who will perform Work or labor or render service to the Contractor in or about the construction of the Work or improvement, or a Subcontractor licensed by the State of California who, under subcontract to the Contractor, specially fabricates and installs a portion of the Work or improvement according to detailed drawings contained in the Plans and Specifications, in an amount in excess of one-half percent {0.5%) of the Contractor's total Bid or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one-half percent (0.5%) of the Contractor's total Bid or $10,000, whichever is greater. If all Subcontractors do not fit on this page, attach another page listing all information for all other Subcontractors.

Section 3-2 of Standard Specifications for Public Works Construction:

The Contractor shall perform, with its own organization, Contract work amounting to at least 50 percent of the Contract Price except that any designated "Specialty Items" may be performed by subcontractor and the amount of any such "Specialty Items" so performed will be deducted from the Contract Price before computing the amount required to be performed by the Contractor with its own organization. "Specialty Items" will be identified by the Agency in the Bid or in the Special Provisions.

Name under which CSLB License DIR Contractor Type of Work Percentage of Total Subcontractor is Number(s) and Registration Address and Phone Number (e.g., Electrical} Bid (e.g., 10%f Licensed Class(es) Number and Registered
1048561 JDK DEMO 2000007108
C12 and C21
1701 S GROVE AVE ONTARIO CA
Demo/Grading 30%
Fenceworks Rental 1071302 1001192521 Temp Fence 1.6% Systems LLC C-13 FENCING 905122 100001168 SWPPP 1% BMP Solutions
1022223 1000062381 Electrical .5%
Signa Guard & Patrol Security Service 122405 N/A orona, CA 92882 Security 3%
• The percentage of the total Bid shall represent the "portion of the work" for the purposes of Public Contract Code Section 4104{b ).

IFB NO. 26-846 CITY PROJECT NO. 7859
B-31

DESIGNATION OF SUBCONTRACTORS
[Public Contract Code Section 4104)
List all Subcontractors who will perform Work or labor or render service to the Contractor in or about the construction of the Work or improvement, or a Subcontractor licensed by the State of California who, under subcontract to the Contractor, specially fabricates and installs a portion of the Work or improvement according to detailed drawings contained in the Plans and Specifications, in an amount in excess of one-half percent (0.5%) of the Contractor's total Bid or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one-half percent (0.5%) of the Contractor's total Bid or $10,000, whichever is greater. If all Subcontractors do not fit on this page, attach another page listing all information for all other Subcontractors.

Section 3-2 of Standard Specifications for Public Works Construction:

The Contractor shall perform, with its own organization, Contract work amounting to at least 50 percent of the Contract Price except that any designated "Specialty Items" may be performed by subcontractor and the amount of any such "Specialty Items" so performed will be deducted from the Contract Price before computing the amount required to be performed by the Contractor with its own organization. "Specialty Items" will be identified by the Agency in the Bid or in the Special Provisions.

Name under which CSLB License
Subcontractor is Number(s) and
Licensed Class(es)
and Registered
BC Traffic Specialist 877686
A,C61,C31,C32
Allee Testing &
Engineering, Inc. NIA
nvIronentta
Contractors N/A
Los Morales N/A Trucking
DIR Contractor
Registration
Number
1000407561
NIA
N/A
1000044619
Address and Phone Number
. .. . . .. . . 7922 000
6035
92504
953
Blvd A
Whittier Ca. 90607
...

Type of Work
(e.g., Electrical)
Traffic Control
MMRP Consultant
Transporter
Transporter
Percentage of Total
Bid (e.g., 10%)"
1%
.8%

1.5%
2%
• The percentage of the total Bid shall represent the "portion of the work" for the purposes of Public Contract Code Section 41 04(b ).

IFB NO. 26-846 CITY PROJECT NO. 7859
B-31
N/A
City of Norwalk City Project No.: 7859

BID SHEETS FOR

CITY OF NORWALK

BUILDINGS DEMOLITION LOCATED AT CALIFORNIA YOUTH AUTHORITY TRANSIT VILLAGE: 13200 BLOOMFIELD AVENUE, NORWALK CA 90650
CITY PROJECT NO. 7859
Bidder's Name: Precision Works, Inc. OBA Precision Environmental To the Honorable Mayor and Members of the City Council:

In compliance with the Notice Inviting Bids, the undersigned hereby agrees to execute the Contract to furnish all labor, materials, equipment and supplies for the Project in accordance with the Contract Documents and to perform all work in the manner and time prescribed therein to the satisfaction and under the direction of the City Engineer.

The undersigned bidder declares that this proposal is based upon carefully examination of the work site, plans, specifications, instructions to bidders, and all other Contract Documents. If this proposal is accepted for award, bidder agrees to enter into a contract with City at the unit prices or lump-sum prices set forth in the following bid schedule. Bidder understands that failure to enter into a contract and furnish bonds in the manner and time prescribed will result in forfeiture to City of the guarantee accompanying this proposal.

The undersigned bidder certifies that this proposal is made in good faith, without collusion or connection with any other person or persons bidding on the work.

The undersigned bidder understands that the City Council reserves the right to accept or reject any or all proposals, or to waive any irregularities in any proposal in the interests of City.

The lowest bid price shall be determined by adding the following items:

BID
(1) Lump Sum Base Bid Amount Schedule 1 (Bid Items #1-30) + (2) Unit Price Items Bid Amount Schedule 2 (Unit Price #1-32 multiplied by 500 units) + (Unit Price #33 multiplied by 2 units +
(3) Total Extended Overhead Daily Rate Bid Amount Schedule 3 (Extended Overhead Daily Rate Bid multiplied by 30 days)
= Total Sum Bid
Revised per Addendum 6, B-4
BIDDER SHALL COMPLETE AND SUBMIT ALL DOCUMENTS AND PAGES IN SECTION " BID" City of Norwalk City Project No.: 7859
REVISED LUMP SUM BASE BID SCHEDULE (1) (PER ADDENDUM 6):

ITEM LUMP SUM ITEM DESCRIPTION LUMP SUM FIGURE NO.

NTP 1 Scope of Work: Provide a project baseline
schedule with master list of submittals, traffic
con 5,000 trol plans, equipment rental rates sheet, AQMD $ coordination/Procedure 5 plan, and all material

1. submittals within 10 working days of the Notice to
Proceed.

ITEM NO. 1 LUMP SUM IN WORDS
'Je e there Five Thousand
Mobilization and demobilization. (This amount $ 97,000 shall not exceed 5% of the total contract)

2. ITEM NO. 2 LUMP SUM IN WORDS
ninety-seven thousand
Install temporary 8ft high chain link fence with
privacy screen around the perimeter of the work site
throughout construction until the project is accepted
by the City. $ 40,000

3. The work shall include installing and maintaining
the sandbags on all posts.

ITEM NO. 3 LUMP SUM IN WORDS
forty thousand
Provide Site Security
Existing site security is provided by Signa Security.

Please contact:

Signa Guard & Patrol Service
Sam Yaqubi, Operations Manager $ 70,000
Email: [email protected]

4. Phone: (818) 230-7079
Contractor shall contact the provider listed above if
interested in maintaining continuity of site security
services.

ITEM NO. 4 LUMP SUM IN WORDS
seventy thousand
BID Revised per Addendum 6, B-5
BIDDER SHALL COMPLETE AND SUBMIT ALL DOCUMENTS AND PAGES IN SECTION ··BID · City of Norwalk City Project No.: 7859
ITEM LUMP SUM ITEM DESCRIPTION LUMP SUM FIGURE NO.

Contractor shall provide a temporary trailer with
meeting space for weekly progress meetings
accommodating 10 project members and desk
space with a plans desk for the City inspector
The Contractor shall also provide and maintain $ 40,000

5. adequate temporary power, temporary restrooms,
lighting, heating/cooling, and utility connections
necessary for normal office operations throughout
the duration of construction
ITEM NO. 5 LUMP SUM IN WORDS
forty thousand
Contractor shall provide erosion control and dust
control measures in accordance with CASQA
standards. A Stormwater Pollution Prevention Plan
(SWPPP) shall be prepared, implemented, and
mainta 25,000 ined by the Contractor for the duration of the $

6. project
Provide QSD and QSP on the project and submit a
SWPPP plan for review and approval
ITEM NO. 6 LUMP SUM IN WORDS
twenty-five thousand
Implement Environmental Impact Report (EIR)
mitigation measures.
$ 20,000

7. Including Mitigation Monitoring and Reporting
Program (MMRP)
ITEM NO. 7 LUMP SUM IN WORDS
twenty thousand
Traffic Control. $ 5,000

8. ITEM NO. 8 LUMP SUM IN WORDS
five thousand
Phasing Plan. $

9. The phasing plan shall clearly identify the
sequence of construction activities, work limits for 3,500 each phase, traffic control measures, access to
adjacent properties, and utility coordination
throughout the project.

BID Revised per Addendum 6, 8 -6
BIDDER SHALL COMPLETE AND SUBMIT ALL DOCUMENTS AND PAGES IN SECTION " BID" City of Norwalk City Project No.: 7859
ITEM
NO.

10. 11.

12. BID

LUMP SUM ITEM DESCRIPTION LUMP SUM FIGURE
ITEM NO. 9 LUMP SUM IN WORDS three thousand five hundred T pe e fyts@ tl ,pe--t ,=j t here
Removal of all universal waste material including
HaulinQ Plan.

ITEM NO. 10 LUMP SUM IN WORDS
four thousand
Temporary power and water.

Temporary power must be coordinated with
Southern California Edison (SCE).
$
There is an existing 12 kV line at the Bloomfield Ave $ structure
Water must be coordinated with Liberty Utilities
(Park Water), Golden State Water Company
(GSWC), and/or Central Basin Municipal Water
District (CBMW).

ITEM NO. 11 LUMP SUM IN WORDS
twenty thousand
Pre-Demolition: Haz-Mat Abatement, including all
necessary relevant work, Procedure 5, and notices
and processing through AQMD, and other required
Agencies.

For abatement scope of work and requirements,
see Hazardous Materials Reports representation of
hazardous materials on-site requiring abatement.

Final complete Hazardous Materials Report to be $
issued no later than 5 calendar days prior to bid
opening date.

The selected contractor will be responsible for
developing, submitting, and receiving approval
from AQMD on the Procedure 5 Cleanup Plan. The
plan must be developed and submitted by a
Certified Asbestos Consultant (CAC).

ITEM NO. 12 LUMP SUM IN WORDS
seven hundred seventy three thousand
4,000
20,000
773,000
Revised per Addendum 6, B-7
BIDDER SHALL COMPLETE AND SUBMIT ALL DOCUMENTS AND PAGES IN SECTION " BID'" City of Norwalk City Project No.: 7859
ITEM LUMP SUM ITEM DESCRIPTION LUMP SUM FIGURE NO.

Remove all existing chain link and wrought iron
fencing
$ 32,500

13. For additional information and scope, see Project
Plans and as-built drawings.

ITEM NO.13 LUMP SUM IN WORDS
thirty two thousand five hundred
Remove all existing buildings
For additional information and scope, see Project $ 812,000

14. Plans and as-built drawinas.

ITEM NO. 14 LUMP SUM IN WORDS
eight hundred twelve thousand
Remove all above ground structures, sheds, and
annexes
$ 57,000

15. For additional information and scope, see Project
Plans and as-built drawings.

ITEM NO.15 LUMP SUM IN WORDS
fifty seven thousand
Remove all above ground Utilities and Utilities
Structures
$ 85,000

16. For additional information and scope, see Project
Plans and as-built drawinas.

ITEM NO. 16 LUMP SUM IN WORDS
eighty five thousand
Remove all foundations, paved surfaces &
Hardscapes. Note: demolition of foundations at the
Former Automotive Repair Area I Westernmost
Building, Grounds Storage Building, and Former
UST location shall be phased to first allow for the
removal of hazardous soils according to the Rincon $ 25,000

17. "Targeted Excavations" report. See also Items 18-
20, herein.

For additional information and scope, see Project
Plans and as-built drawinos.

ITEM NO. 17 LUMP SUM IN WORDS
twenty five thousand
BID Revised per Addendum 6, B-8
BIDDER SHALL COMPLETE AND SUBMIT ALL DOCUMENTS AND PAGES IN SECTION " BID" City of Norwalk
ITEM
NO.

18. 19.

20. 21 .

BID

LUMP SUM ITEM DESCRIPTION
Crush and grind all concrete, asphalt, and brick
onsite to a 3-inch minus specification. Stockpile
crushed and grinded concrete, asphalt and brick
including storage and wind/rain protection
throughout project for turnover to Owner. $
Note the noise limitations and sound abatement
requirements for this task in the Final
Environmental Impact Report (FEIR).

ITEM NO. 18 LUMP SUM IN WORDS
one hundred five thousand
Remove Hazardous soil: remedial excavation per
Rincon report titled "20251016_Norwalk_CYAdemo _ESA-ReportOfFindings_ OCT2025" at Former Automotive Repair Area / Westernmost
Building including all necessary relevant work, and $
notices and processing through DTSC and other
required Agencies
For soil abatement scope of work and
reauirements, see Hazardous Materials Reports
ITEM NO. 19 LUMP SUM IN WORDS
eighty two thousand five hundred
Remove Hazardous soil: remedial excavation per
Rincon report titled "20251016_Norwalk_CYAdemo_ESA-ReportOfFindings_OCT2025n at Grounds Storage Building including all necessary
relevant work, and notices and processing through $
DTSC and other required Agencies
For soil abatement scope of work and
reauirements, see Hazardous Materials Reports
ITEM NO. 20 LUMP SUM IN WORDS
fifteen thousand
Remove Hazardous soil: remedial excavation per
Rincon report titled "20251016_Norwalk_CYAdemo _ ESA-ReportOfFindings _ OCT2025" at Former UST Location including all necessary
relevant work, and notices and processing through $
DTSC and other required Agencies
For soil abatement scope of work and
requirements, see Hazardous Materials Reports
City Project No.: 7859

LUMP SUM FIGURE
105,000
82,500
15,000
52,500
Revised per Addendum 6, B-9
BIDDER SHALL COMPLETE AND SUBMIT ALL DOCUMENTS AND PAGES IN SECTION " BID" City of Norwalk City Project No.: 7859
ITEM LUMP SUM ITEM DESCRIPTION LUMP SUM FIGURE NO.

ITEM NO. 21 LUMP SUM IN WORDS
fifty two thousand five hundred
Remove all existing retaining walls
For additional information and scope, see Project $ 12,000

22. Plans and as-built drawinas.

ITEM NO. 22 LUMP SUM IN WORDS
twelve thousand
Removal and disposal of all underground sewer
lines, including all cleanouts, valves, manholes,
and structures based on as-built drawings
provided. Including capping of pipe as required. $ 14,500

23. rException: Existina Citv of Norwalk Sewer Pipe]
ITEM NO. 23 LUMP SUM IN WORDS
fourteen thousand five hundred
Removal and disposal of all underground domestic
water, steam, and stormwater lines, including all
valves, manholes, and structures based on asbuilt drawings provided. Including capping of pipe near service entrance locations as required. $ 8,400

24. [Exception: Existing Los Angeles County Flood
Control RCP Storm Drain Pipe and Drainage Inlet
Structurel
ITEM NO. 24 LUMP SUM IN WORDS
eight thousand four hundred
Removal and disposal of underground all gas lines
based on as-built drawings provided. Including $ 10,500 capping of pipe near service entrance locations as

25. reauired.

ITEM NO. 25 LUMP SUM IN WORDS
ten thousand five hundred
Removal and disposal of all underground electrical

26. utilities, pull boxes, manholes, and duct banks
based on as-built drawings provided. Including $ 24,000 capping and filling of conduit and duct banks near
service entrance locations as required.

BID Revised per Addendum 6, B-10
BIDDER SHALL COMPLETE AND SUBMIT ALL DOCUMENTS AND PAGES IN SECTION --BID'" City of Norwalk City Project No.: 7859
ITEM LUMP SUM ITEM DESCRIPTION LUMP SUM FIGURE NO.

ITEM NO. 26 LUMP SUM IN WORDS
twenty four thousand
,pe te t 1e ·0
Removal and disposal of all irrigation lines,
including pull boxes, valves, boxes, and structures
based on as-built drawings provided. Including $

27. capping of pipe near service entrance locations as 11 ,250 required.

ITEM NO. 27 LUMP SUM IN WORDS
eleven thousand two hundred fifty
Tree Removal, including stumps and all root balls $ 23,000 based on as-built drawings provided.

28. ITEM NO. 28 LUMP SUM IN WORDS
twenty three thousand
,l\eatemeAt I Remei.ie ~~ Mat YAeei:gre1::1Re
SteFage +aRk {YS+), iR6l1::1eiRg all R86866af¥
Felei.iaRt weFk, peFFRits, Retises aRe presessiRg
U1F01::1gl=t Q+SG, bA G01::1Aly i;:iFe, b/1, G01::1Rly
ERi.iiF8RFR8Alal f2F8QFaFRS Di¥isi8A, aAO etl=ter
~ !=11::1i~geRsies eased eA as 01::1ilt eFaWiAgs
$
reF sail aeateFReAt soope ef weFk aAe 29. i:eql:liFemeAts, see l=l~ar801::1s MateFials Re~erts 20,000 Remove all vertical vegetation, ivy, and other
landscaping growth along perimeter CMU fencing
to remain
ITEM NO. 29 LUMP SUM IN WORDS
twenty thousand
Soil Rough Grading at all open trenches,
foundations, and open pits based on underground
work in as-built drawings provided. Rough grading
can be performed by sloping and/or benching the $ 147,300 open areas and providing adequate safety

30. protection in accordance with OSHA standards.

Adequate drainage must be provided for open
areas to prevent the accumulation of rainwater.

ITEM NO. 30 LUMP SUM IN WORDS
one hundred forty seven thousand three hundred
BID Revised per Addendum 6, B-11
BIDDER SHALL COMPLETE AND SUBMIT ALL DOCUMENTS AND PAGES IN SECTION "810" City of Norwalk City Project No.: 7859
Sum all Lump Sum Base Bid Schedule Items in order to calculate the Total Lump Sum Base Bid
TOT AL LUMP SUM BASE BID AMOUNT FIGURE $ 2,639,950

TOT AL LUMP SUM BASE BID AMOUNT IN WORDS
Two million six hundred thirty nine thousand nine hundred fifty BID Revised per Addendum 6, 8-12
BIDDER SHALL COMPLETE AND SUBMIT ALL DOCUMENTS AND PAGES IN SECTION " BID" City of Norwalk City Project No.: 7859
ITEM NO. UNIT PRICE ITEM DESCRIPTION UNIT UNIT PRJCE FIGURE Abatement I Remove Haz-Mat Underground
Storage Tank (USD, including all necessary
relevant work, permits, notices and EA $ 5,000 processing through DTSC, LA County Fire, UNIT#33 LA County Environmental Programs Division,
and other reauired Agencies
UNIT #33 UNIT PRICE IN WORDS

FIVE DOLLARS
All Unit Price Items multiplied by 500 units in order to calculate Total Unit Price Items Bid, Except for Unit #33, apply 2 units to this item only
TOT AL UNIT PRICE ITEMS BID AMOUNT FIGURE $ 465,350

TOTAL UNIT PRICE ITEMS BID AMOUNT IN WORDS
FOUR HUNDRED SIXTY five THOUSAND three HUNDRED FIFTY DOLLARS Note: The unit price bid quantities (500 units) are used only for the evaluation of bids and are not meant to indicate estimated quantities of the actual work. The Contractor shall rely on Project Plans and as-built drawings provided to estimate actual quantities for the Work. Unit price is an amount incorporated in the Agreement, applicable during the duration of the Work as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Sum by Change Order, if the scope of Work or estimated quantities of Work required by the Contract Documents are increased or decreased. Unit prices include all necessary material, plus cost for delivery, installation, insurance, applicable taxes, overhead, and profit.

BID Revised per Addendum 6, B-18
BIDDER SHALL COMPLETE AND SUBMIT ALL DOCUMENTS AND PAGES IN SECTION • BID' City of Norwalk City Project No.: 7859
REVISED EXTENDED OVERHEAD DAILY RA TE BID SCHEDULE (3) (PER ADDENDUM 6):

ITEM NO. EXTENDED OVERHEAD DAILY RA TE DAILY RA TE FIGURE DESCRIPTION The daily rate for the sum of the Contractor's
DAILY field office and home office overhead $ 300.00
RATE applicable to this project, for each day of
compensable delay will be
Extended Overhead Daily Rate multiplied by 30 days in order to calculate Total Extended Overhead Daily Rate Bid

TOT AL EXTENDED OVERHEAD DAILY RA TE BID
AMOUNT $ 9,000 FIGURE

TOTAL EXTENDED OVERHEAD DAILY RA TE BID AMOUNT IN WORDS

NINE THOUSAND DOLLARS
Note: Delays may be adjusted or not occur. Therefore, regardless of total days delay percentage compared to daily rate bid multiplier (30) days, the Daily Rate provided above by the Bidder shall be applied to the final number of days when payment is calculated for delays. No adjustment in the daily rates will be allowed.

Signatu~~ Title: CFO Date: 3/t, / ::u:,-;)..L
BID Revised per Addendum 6, B-19

BIDDER SHALL COMPLETE AND SUBMIT ALL DOCUMENTS AND PAGES IN SECTION BID''

REFERENCES FORM
For all public agency projects in excess of $500,000 that you are currently working on or have worked on in the past three (3) years, provide the following information:
(Attach additional sheets if necessary)
Project 1 Name/Number Abatement, Restoration, and Demolition Services Project Description Abatement, Restoration, and Demolition Services Various awarded jobs Approximate Construction Dates From: March 2, 2025 To: Present -------
Agency Name: Los Angeles County Development Authority (LACDA) Contact Person: Bandelio Delgado-Salas 7922 000
Telephone:========----
Address: 700 West Main Street Alhambra, CA 91801
Original Contract Amount: $_1_,0_0_0_,0_0_0 ___ _ Final Contract Amount: $1,000,000 If final amount is different from original amount, please explain (change orders, extra work, etc.).

N/A
Did you or any Subcontractor, file any claims against the Agency? Circle one: Yes ~
Did the Agency file any claims against you? Circle one: Yes ~ If you answered yes to either of the above two questions, please explain and indicate outcome of claims.

N/A
Project 2 Name/Number Abatement, Restoration, and Demolition Services Project Description Abatement, Restoration, and Demolition Services Various awarded jobs Approximate Construction Date From: March 30,2023 To: Present -------
Agency Name: San Bernardino County
Contact Person: Angelita Sanchez Telephone:
7922 000
Address: 385 N. Arrowhead Ave. 1st Floor, San Bernardino, CA.

Original Contract Amount: $1,400,000.00 Final Contract Amount: $1,400,000.00 IFB NO.26-846 CITY PROJECT NO. 7859
B-26
If final amount is different from original amount, please explain ( change orders, extra work, etc.).

N/A
Did you or any Subcontractor, file any claims against the Agency? Circle one: Yes (No)
Did the Agency file any claims against you? Circle one: Yes @ If you answered yes to either of the above two questions, please explain and indicate outcome of claims.

N/A
Project 3 Name/Number Abatement, Restoration, and Demolition Services Project Description Abatement, Restoration, and Demolition Services Various awarded jobs Approximate Construction Dates From: June 5,2021 To: Present Agency Name: Ventura County Office of Education
7922 000 Contact Person: _J_oe_ H_it_o_n _ _______ Telephone: ========---- Address: 205 N. Ventura Rd. Pt. Hueneme, CA.

Original Contract Amount: $ 2,300,00.00 Final Contract Amount: $2,300,000.00 If final amount is different from original amount, please explain (change orders, extra work, etc.).

N/A
Did you or any Subcontractor, file any claims against the Agency? Circle one: Yes @
Did the Agency file any claims against you? Circle one: Yes mJ If you answered yes to either of the above two questions, please explain and indicate outcome of claims.

N/A
IFB N0.26-846 CITY PROJECT NO. 7859
B-27
Project 4 Name/Number Abatem1;1nt, Restoration, and Demolition Services Project Description Abatement, Restoration, and Demolition Services Various awarded jobs Approximate Construction Dates From: 2021 To: Present ------ Agency Name: Wawanesa Insurance
7922 000 Contact Person: _M_i_c_ha_e_l_S_m_it_h ______ Telephone: ========'---- Address: PO Box 82867 San Diego CA. 92138-9492
Original Contract Amount: $ 1,000,000.00 Final Contract Amount: $1,000,000.00 If final amount is different from original amount, please explain (change orders, extra work, etc.).

N/A
Did you or any Subcontractor, file any claims against the Agency? Circle one: Yes mJ
Did the Agency file any claims against you? Circle one: Yes ~ If you answered yes to either of the above two questions, please explain and indicate outcome of claims.

N/A
Project 5 Name/Number Abatement, Restoration, and Demolition Services Project Description Abatement, Restoration, and Demolition Services Various awarded jobs Approximate Construction Dates From: May 2023
Agency Name: Santa Ana Unified School District
Contact Person: Gabriel Camberos Telephone:

Address: 750 N. Fairview Street, Bldg. C Santa Ana, CA. 92703 To: Present
7922 000
Original Contract Amount: $ 1,000,000.00 Final Contract Amount: $1 ,000,000.00 If final amount is different from original amount, please explain (change orders, extra work, etc.).

N/A
IFB NO.26-846 CITY PROJECT NO. 7859
B-28
Did you or any Subcontractor, file any claims against the Agency? Circle one: Yes ~
Did the Agency file any claims against you? Circle one: Yes ~ If you answered yes to either of the above two questions, please explain and indicate outcome of claims.

N/A
Project 6 Name/Number Abatement, Restoration, and Demolition Services Project Description Abatement, Restoration, and Demolition Services Various awarded jobs Approximate Construction Dates From: June 2023
Agency Name: Azusa Unified School District
Contact Person: Jesse Gonzalez
Address: 546 S Citrus Avenue, Azusa, CA. 91702
Telephone:

To: Present
7922 000
Original Contract Amount: $1 ,000,000.00 Final Contract Amount: $ 1,000,000.00 If final amount is different from original amount, please explain (change orders, extra work, etc.).

N/A
Did you or any Subco~ctor, file any claims against the Agency? Circle one: Yes lligJ
Did the Agency file any claims against you? Circle one: Yes ~ If you answered yes to either of the above two questions, please explain and indicate outcome of claims.

N/A
IFB N0.26-846 CITY PROJECT NO. 7859
8-29
RESUME
Attach to this Bid the experience resume of the person who will be designated as General Construction Superintendent or on-site Construction Manager for the Project.

Note: The City reserves the right, at its sole discretion, to require the Contractor to replace project management or field supervisory staff due to unsatisfactory performance, failure to comply with contract requirements, lack of cooperation with City staff, safety concerns, or any other conduct determined by the City to be detrimental to the successful completion of the Project. Removal of management and supervisory staff shall require City approval.

IFB N0.26-846 CITY PROJECT NO. 7859
B-30
Precision Environmental References
Hello Team,
Precision Environmental is a trusted provider of comprehensive environmental abatement, demolition, restoration, and reconstruction services throughout California and Arizona. Our team brings decades of experience delivering safe, compliant, and high-quality results for public agencies, property management firms, insurance carriers, general contractors, and private clients. We specialize in a ful l portfolio of services designed to support every phase of environmental remediation and property recovery, including:
• Asbestos Abatement
• Lead Abatement
• Structural Demolition
• Rec:onstruc:tion Build-Bac:k
• Water Damage Restoration
• Fire Damage Restoration
• Mold Remediation
Our ability to self-perform all core services ensures precise control over quality, safety, scheduling, and communication. Every technician is trained, certified, and equipped to manage complex and sensitive projects in occupied spaces, commercial environments, industrial settings, and multi-family communities. Whether addressing hazardous materials, emergency losses, or planned capital improvements, our team operates with efficiency, professionalism, and respect for the client's operational needs.

Precision Environmental has earned a strong reputation for reliability and consistency. We understand the importance of transparency, thorough documentation, and tight coordination-especially in environments with strict regulatory oversight. Our team communicates proactively from the initial assessment through final clearance, ensuring clients are informed, supported, and confident in each step of the process.

The references included in this document represent clients who have relied on Precision Environmental for critical services across California and Arizona. These partners can speak to our commitment to compliance, our responsiveness during emergencies, our problem-solving approach, and our ability to complete projects on time and within scope. From hazardous material abatement to structural demolition and full build-back restoration, our work has consistently met the highest standards of safety and performance.

By selecting Precision Environmental, clients gain a partner dedicated to excellence, accountability, and results. Our long-term relationships and repeat engagements reflect our team's integrity, technical expertise, and unwavering focus on protecting client assets and ensuring safe project outcomes. We look forward to earning your trust and demonstrating the same level of dependability demonstrated across hundreds of projects throughout California and Arizona.
n .. R- State of Colifomio
~ Department of
P!fP!!:$1"!1-Q"'fi"'•• Industrial Relations (i) .
.
. '
OSHA Oc_.,.cl-l S•fety
end Mnhh. AIIIN!llm.tlon
Precision Environmental I References - Public Sector
San Bernardino County
Angelita Sanchez, Code Enforcement Officer Ill
Land Use Services Department
385 N. Arrowhead Ave. 1st Floor, San Bernardino, CA 92415 7922 000
Ventura County Office of Education
Hueneme Elementary School District
Joe Hiton, Sr. Director FOT
205 N. Ventura Rd., Pt. Hueneme, CA 93041
7922 000
Los Angeles County Development Authority (LACDA)
Approved Services: ABATEMENT & REMEDIATION
• Asbestos Abatement
• Lead Abatement
• Mold Abatement
• Demolition
Bandelio Delgado-Salas, Senior Contract Manager
700 West Main Street Alhambra, CA 91801
7922 000
Ventura Unified School District
Facilities Services Department
Henry Robledo - Planning & Compliance
359 S. Victoria Ave. Ventura, CA 93003
7922 000
Los Angeles County Public Works
MASTER AGREEMENT NO. (RFSQ) #104569 - Facilities Ancillary Services Approved Services: ABATEMENT & REM ED IA TION
• Asbestos Abatement
• Lead Abatement
• Mold Abatement
Tatiana Menendez, C.P.M. Administrative Services Manager II 1100 N. Eastern Ave., Los Angeles, CA 90063
7922 000
Precision Environmental I References - Private Sector
Irvine Company
Chris Pel land, Project Director
110 Innovation Drive. INine, CA 92617
7922 000
California Institute of the Arts
Alfredo Miranda, AVP Facilities Construction
24700 McBean Pkwy Valencia, CA 91355
7922 000
Wawanesa Insurance
Michael Smith, Homeowner Supervisor
PO Box 82867, San Diego, CA, 92138-9492
7922 000
CBG Building Co.

Sarah Tull, Sr. Project Executive
3655 Nobel Dr. Ste #480 San Diego, CA 92122
7922 000
The Roberts Companies
Vince Tessmer, Facilities Portfolio Manager
2886 Colorado Ave. Santa Monica, CA 90404
7922 000
CONAM Property Management
Anthony Rosa, Regional Maintenance Director Southern California 3990 Ruffin Road, #100, San Diego, CA 92123
7922 000

INCUMBENCY CERTIFICATE

AUTHORIZED SIGNER CERTIFICATION
Precision Works, Inc.

A California Corporation
Date: ~ Y._/2..(JU, (MM-DD-YYYY)
I, Robert Ruiz, as the sole shareholder and Owner/CEO of Precision Works, Inc. (the "Company"), hereby certify as follows:

1. Jonathan Clark currently serves as the Company's Chief Financial Officer (CFO).

2. Jonathan Clark, in his capacity as CFO, is authorized to sign and deliver on behalf of the Company non-collusion affidavits, non-collusion declarations, bid documents, contract affidavits, certifications, acknowledgments, and related compliance forms.

3. This certification may be relied upon by public agencies, private owners, contractors, subcontractors, vendors, and other third parties requiring evidence of signing authority.

4. This certificate remains effective unless and until revoked in writing by the Company.

Executed by the undersigned as of the date written above.

CERTIFIED BY:

Signature
Robert Ruiz
: ~
Sole Shareholder/ Owner & CEO
Precision Works, Inc.

Date: ~!:t..._1 '2o2. ld

INCUMBENCY CERTIFICATE

AUTHORIZED SIGNER CERTIFICATION
Precision Works, Inc.

A California Corporation
Date: ~~12()~ (MM-DD-YYYY)
I, Robert Ruiz, as the sole shareholder and Owner/CEO of Precision Works, Inc. (the , "Company"), hereby certify as follows:

1. Jonathan Clark currently serves as the Company's Chief Financial Officer (CFO).

2. Jonathan Clark, in his capacity as CFO, is authorized to sign and deliver on behalf of the Company non-collusion affidavits, non-collusion declarations, bid documents, contract affidavits, certifications, acknowledgments, and related compliance forms.

3. This certification may be relied upon by public agencies, private owners, contractors, subcontractors, vendors, and other third parties requiring evidence of signing authority.

4. This certificate remains effective unless and until revoked in writing by the Company.

Executed by the undersigned as of the date written above.

Signature: ~ __
~ERTIFIED BY: = ~ --.--
Robert Ruiz
Sole Shareholder / Owner & CEO
Precision Works, Inc.

Date: ~!i.__12-Q2((1

CALIFORNIA ALL-PURPOSE ACKNOWLEDGEMENT
A Notary Public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.· State of California
County of Ventura }
On L1.M2.CM O'-/ . Zoc.(.p , before me, \~,/4:T G,f.JtJJN , Notary Public, ' ' personally appeared f2_o~ e):2..... T /.2,.{) \ t A,u D JotJ/Jdl.1.klJ (k/...,+tzJ,L-- who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENAL TY OF PERJURY under the laws of State of California that the foregoing paragraph is true and correct.
..

VIOLET GLYNN ,.. Notary Publtc - Callfoml1
I] V1ntur1 County . Commission 112525228 ... J o c o !/ £:':· :P!ts j,u"]8.;0J: f WITNESS my hand and official seal.

PLACE NOTARY SEAL ABOVE
Though the information below is not required by law, it may prove valuable to persons relying n the document and could prevent fraudulent removal and reattachment of this form to another document.

Description of attached document
Title or type of document: h,\at.l CO) 11 >'6\0 N J)'<::Cl.A"2..A1'\o ~ fo ~ Document Date:._---'O=-~ /-=QY_._f-' / z.. -=--o-=;-z_. =..... 0z ______ Number of Pages: __ --'---- / I Signer(s) Other than Named Above:. ____________________ _

IFB NO.26-846 CITY PROJECT NO. 7859
NIB-2
All questions or requests for interpretation regarding this solicitation must be submitted through the Q&A section of the City of Norwalk PlanetBids online bid portal. Bidders are not to contact City personnel with questions or clarifications concerning this solicitation. Any City response relevant to this solicitation provided through any means other than the City of Norwalk PlanetBids online bid portal is unauthorized and will be considered invalid.

REGISTRATION WITH THE DEPARTMENT OF INDUSTRIAL RELATIONS. In accordance with Labor Code Sections 1725.5 and 1771.1, no contractor or subcontractor shall be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered and qualified to perform public work pursuant to Section 1725.5 [with limited exceptions for bid purposes only under Labor Code Section 1771.1(a)].

PREVAILING WAGES. In accordance with Labor Code Section 1770 et seq., the Project is a “public work.” The selected Bidder (Contractor) and any Subcontractors shall pay wages in accordance with the determination of the Director of the Department of Industrial Relations (“DIR”) regarding the prevailing rate of per diem wages. Copies of those rates are on file with the Director of Public Works, and are available to any interested party upon request. The Contractor shall post a copy of the DIR’s determination of the prevailing rate of per diem wages at each job site. This Project is subject to compliance monitoring and enforcement by the DIR.

BONDS. Bidders must submit to the City Clerk a cash deposit, cashier’s check, certified check, or Bidder’s Bond issued by a Surety insurer, made payable to the City of Norwalk and in an amount not less than ten percent (10%) of the total Lump Sum Bid submitted by no later than 11:00am on March 9, 2026. Personal or company checks are not acceptable. Bidder must indicate on the outside of the envelope the solicitation name and solicitation number. Failure to provide cashier’s check, certified check, or Bidder’s Bond will deem the bid as Non-Responsive.

Submission with electronic copy of the bonds by the due date and follow-up with print submission is acceptable.

City of Norwalk
Attn: City Clerk
12700 Norwalk Blvd., Room 10
Norwalk, CA 90650
Phone: (562) 929-5720
A scanned copy of the cashier’s check, certified check, or Bid Bond shall be submitted along with the electronic bid through the City of Norwalk PlanetBids online bid portal. Upon Contract award, the Contractor shall provide faithful performance and payment Bonds, each in a sum equal to the Contract Price. All Bonds must be issued by a California admitted Surety insurer using the forms set forth in the Contract Documents, or in any other form approved by the City Attorney. Failure to enter into the Contract with the City, including the submission of all required Bonds and insurance coverages, within fifteen (15) Days after the date of the mailing of written notice of contract award to the Bidder, shall subject the Bid security to forfeiture to the extent provided by law.

LICENSES. Each Bidder shall possess a valid Class A – General Engineering or Class B – General Building or Class C-21 Building / Moving / Demolition Contractor’s license issued by the California State Contractors License Board at the time of the Bid submission. Contractor must employ an asbestos abatement and soil abatement contractor for the asbestos abatement and soil abatement activities that has a California C22 Contractor’s License in good standing with the IFB NO.26-846 CITY PROJECT NO. 7859
IB-1

CITY OF NORWALK

INSTRUCTIONS TO BIDDERS
FORM OF BID. Bids shall be made on the Bid forms found herein. Bidders shall include all forms and fill in all blank spaces, including inserting “N/A” (for not applicable) where necessary.

DELIVERY OF BIDS. Bids must be submitted through the City of Norwalk PlanetBids online bid portal to be eligible for this solicitation. Mailed, faxed, or hand delivered bids will NOT be accepted.

AMENDED BIDS. Unauthorized conditions, limitations or provisos attached to a Bid may cause the Bid to be deemed incomplete and non-responsive.

WITHDRAWAL OF BID. A Bid may be withdrawn without prejudice upon written request by the Bidder filed with the City Clerk before the Bid submission deadline. Bids must remain valid and shall not be subject to withdrawal for sixty (60) Days after the Bid opening date.

BIDDER’S SECURITY. Bidders must submit to the City Clerk a cash deposit, cashier’s check, certified check or Bidder’s Bond issued by a Surety insurer, made payable to the City of Norwalk and in an amount not less than ten percent (10%) of the total Bid. The cash, check or Bid Bond shall be given as a guarantee that, if selected, the Bidder will execute the Contract in conformity with the Contract Documents, and will provide the evidence of insurance and furnish the specified Bonds, within fifteen (15) Days after the date of delivery of the Contract Documents to the Bidder.

In case of the Bidder’s refusal or failure to do so, the City may award the Contract to the next lowest responsible bidder, and the cash, check, or Bond (as applicable) of the lowest Bidder shall be forfeited to the City to the extent permitted by law. No Bid Bond will be accepted unless it conforms substantially to the form provided in these Contract Documents.

QUANTITIES APPROXIMATE. Any quantities shown in the Bid form or elsewhere herein shall be considered as approximations listed to serve as a general indication of the amount of Work or materials to be performed or furnished, and as basis for the Bid comparison. The City does not guarantee that the actual amounts required will correspond with those shown. As deemed necessary or convenient, the City may increase or decrease the amount of any item or portion of Work or material to be performed or furnished or omit any such item or portion, in accordance with the Contract Documents.

ADDENDA. The City Engineer may, from time to time, issue Addenda to the Contract Documents. Bidders are responsible for ensuring that they have received any and all Addenda.

Each Bidder is responsible for verifying that it has received all Addenda issued, if any. Bidders must acknowledge receipt of all Addenda, if any, in their bids. Failure to acknowledge receipt of all Addenda may cause a Bid to be deemed incomplete and non-responsive.

DISCREPANCIES IN BIDS. Each bidder shall set forth as to each item of Work, in clearly legible words and figures, a unit or line item Bid amount for the item in the respective spaces provided for this purpose.

In case of discrepancy between the unit price and the extended amount set forth for the item, the unit price shall prevail. In case of discrepancy between words and figures, the words shall prevail.

IFB NO.26-846 CITY PROJECT NO. 7859
B-1

CITY OF NORWALK

CHECKLIST FOR BIDDERS
The following information is required of all Bidders at the time of Bid submission:
____ Completed and Signed Bid Cover Form
____ Completed and Signed Bid Sheets
____ Completed, Signed and Notarized Questionnaire
____ Completed References Form
____ Resume of General Construction Superintendent/On-Site Construction Manager ____ Completed Subcontractor Designation Form
____ Completed and Signed Industrial Safety Record Form ____ Completed, Signed and Notarized Bid Bond or Other Security Form ____ Signed and Notarized Noncollusion Declaration Form ____ Evidence satisfactory to the City indicating the capacity of the person(s) signing the Bid to bind the Bidder
____ Levine Act Statement
Failure of the Bidder to provide all required information in a complete and accurate manner may cause the Bid to be considered non-responsive.

IFB NO.26-846 CITY PROJECT NO. 7859
B-19

LUMP SUM BID ADDITIVE ALTERNATE SCHEDULE A
ITEM
NO.

ADDITIVE ALTERNATE LUMP SCHEDULE A

SUM ITEM DESCRIPTION

LUMP SUM FIGURE

1. Remove concrete, asphalt and brick off-site
instead of crushing and protecting onsite. This
item includes proper hauling, recycling, and
disposal of all materials.
$
ITEM NO. 1 ADDITIVE ALTERNATE SCHEDULE A LUMP SUM IN WORDS Signature: __________________________________ Title: ___________ Date: ______ IFB NO.26-846 CITY PROJECT NO. 7859
B-21
Full compensation for the items listed to the
right as Items A, B, and C are considered as
inclusive in each Bid Item listed above in the
Total Sum Bid Schedules 1, 2, 3, and A as
applicable, and no additional and/or separate
compensation will be allowed.

A. NPDES, WWECP, and Best Management
Practices (BMPs), Public Convenience,
Public Notifications and Safety
B. Construction Staking by Land Surveyor
C. Clearing and Grubbing
In the case of discrepancies in the amount of bid words shall govern over figures.

The bid prices shall include any and all costs, including labor, materials, appurtenant expenses, taxes, royalties and any and all other incidental costs to complete the project, in compliance with the Bid and Contract Documents and all applicable codes and standards.

All other work items not specifically listed in the bid schedule, but necessary to complete the work per bid and contract documents and all applicable codes and standards are assumed to be included in the bid prices.

A bid is required for the entire work, so that the quantities set forth in the Bid Schedule are to calculate total bid amount, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed.

TOTAL SUM BID PRICE IN FIGURE: $_______________________________________ TOTAL SUM BID PRICE IN WORDS:
____________________________________________________________________________ Signature: __________________________________ Title: ___________ Date: ______ Signature: __________________________________ Title: ___________ Date: ______ IFB NO.26-846 CITY PROJECT NO. 7859
B-25
Upon request of the City, the Bidder shall furnish evidence showing a notarized financial statement, financial data, construction experience, or other additional information.

Failure to provide truthful answers to the questions above or in the following References Form may result in the Bid being deemed non-responsive.

The Bidder certifies under penalty of perjury under the laws of the State of California that the information provided above is true and correct.

Notary Public
Subscribed and sworn to me:

Signature:

This ____ day of _____________, 20
Title:

Signature:
(SEAL)
Company
Signature:

Title:

Date:

Signature:

Title:

Date:

IFB NO. 26-846 CITY PROJECT NO. 7859
B-31

DESIGNATION OF SUBCONTRACTORS
[Public Contract Code Section 4104]
List all Subcontractors who will perform Work or labor or render service to the Contractor in or about the construction of the Work or improvement, or a Subcontractor licensed by the State of California who, under subcontract to the Contractor, specially fabricates and installs a portion of the Work or improvement according to detailed drawings contained in the Plans and Specifications, in an amount in excess of one-half percent (0.5%) of the Contractor’s total Bid or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one-half percent (0.5%) of the Contractor’s total Bid or $10,000, whichever is greater. If all Subcontractors do not fit on this page, attach another page listing all information for all other Subcontractors.

Section 3-2 of Standard Specifications for Public Works Construction:

The Contractor shall perform, with its own organization, Contract work amounting to at least 50 percent of the Contract Price except that any designated “Specialty Items” may be performed by subcontractor and the amount of any such “Specialty Items” so performed will be deducted from the Contract Price before computing the amount required to be performed by the Contractor with its own organization. “Specialty Items” will be identified by the Agency in the Bid or in the Special Provisions.

Name under which
Subcontractor is
Licensed
and Registered
CSLB License
Number(s) and
Class(es)
DIR Contractor
Registration
Number
Address and Phone Number Type of Work
(e.g., Electrical)
Percentage of Total
Bid (e.g., 10%)*
* The percentage of the total Bid shall represent the “portion of the work” for the purposes of Public Contract Code Section 4104(b).

Attachment No. 2

Precision Environmental
4350 Transport St #109, Ventura, CA 93003
Email: [email protected]
Website: Precisionenv.com
Phone: 800-375-7786
DIR# 1000046051 - CSLB No. 480595
DOSH #1082 - SPCB PR7589 - NAT-21238-3

FORMAL RESPONSE TO BID
PROTEST - IFB No. 26-846 / City
Project No. 7859
City of Norwalk
Attn: Alex Hamilton, Deputy City Manager
12700 Norwalk Blvd Norwalk, CA 90650
Subject: Formal Response to Bid Protest – Precision Works, Inc. dba Precision Environmental PROJECT: Buildings Demolition Located at California Youth Authority Transit Village, 13200 Bloomfield Avenue, Norwalk, CA 90650; IFB No. 26-846 / City Project No. 7859
Dear Mr. Hamilton and City of Norwalk Purchasing Division:

Precision Works, Inc. dba Precision Environmental ("Precision Works") respectfully submits this formal response to the bid protest filed by Resource Environmental, Inc. ("REI") dated June 2, 2026 (received June 6, 2026).

Preliminary Matter: Consistent with applicable bid protest procedures, Precision Works respectfully requests that the City first determine whether REI's protest and supporting materials fully comply with all procedural requirements. This should be considered alongside the substantive issues below.

Precision Works fully complied with all requirements of the bidding process. This includes attendance at the mandatory pre-bid site visit, timely submission of all required forms and documentation, provision of the required bid bond, and accurate listing of subcontractors per the solicitation.

Prior to bid submission, Precision Works and its listed subcontractors thoroughly reviewed the bid documents, plans, specifications, and project requirements. Our bid was submitted in good faith and in strict accordance with the Instructions to Bidders, Contract Documents, and all applicable laws.

REI's protest is based largely on mistaken assumptions and speculative, hypothetical scenarios regarding post-bid modifications or allocations. Those assumptions are incorrect. Precision Works is not seeking to modify its bid, substitute subcontractors, revise pricing or scopes, claim self-performance in lieu of listed work, or cure any alleged defect. We stand firmly by our bid exactly as submitted and are fully prepared to perform the Project in accordance with the bid documents, subcontractor listings, and all statutory requirements.

Note on REI's Pattern: The City should be aware that REI has a practice of filing detailed but ultimately meritless bid protests against Precision Works and other low bidders on public demolition projects, often relying on hypothetical issues and strained interpretations of subcontractor listing and self-performance rules. Most recently, on the City of Commerce's Deconstruction of Commerce Refuse-to-Energy Facility (CREA) project (IFB 2026-BID1005), REI filed a similar protest on May 12, 2026. After review, City of Commerce staff (with City Attorney concurrence) and the City Council rejected REI's protest in full, determined Precision Works to be the lowest responsive and responsible bidder, and awarded the contract to Precision Works via Resolution No. 26-__ (June 23, 2026). REI's arguments here mirror those rejected in Commerce and should receive the same disposition. Accordingly, Precision Works maintains that its bid is both responsive and responsible and fully satisfies all requirements for contract award.

Attachment No. 3
Precision Environmental
4350 Transport St #109, Ventura, CA 93003
Email: [email protected]
Website: Precisionenv.com
Phone: 800-375-7786
DIR# 1000046051 - CSLB No. 480595
DOSH #1082 - SPCB PR7589 - NAT-21238-3
I. Precision Works' Bid is Fully Responsive
A. 50% Self-Performance Requirement (ITB § 33 & Form)
Precision Works fully complies. Our subcontractor listing form identifies subcontractors totaling approximately $1,276,863 (41.4% of the Total Bid). The remaining balance of approximately $1,837,437 (58.6%) will be self-performed with our own forces.

This self-performed work is fully authorized under our active CSLB licenses, including Class B (General Building) and C-21 (Building Moving and Demolition). The C-21 license specifically authorizes demolition, removal of structures, grading, and related work—precisely the scope required here. Our active DIR registration further supports lawful performance. The ITB does not require a line-by-line breakdown of self-performed work beyond the subcontractor listing. REI’s speculation regarding our capabilities and licensing is without merit.

B. Subcontractor Listing – JDK Demo (Pub. Contract Code §§ 4100–4114) On the subcontractor listing form, JDK Demo, Inc. is clearly listed for a defined and limited portion of the work:
“demolition, underground demolition and grading” at the specified amount/percentage, as permitted by the bid form. The balance of the demolition and deconstruction scope is properly reserved for self-performance under our C-21 license.

There is no overlap, ambiguity, or post-bid flexibility. The listing satisfies all requirements because JDK’s portion was clearly defined at bid opening. No bid shopping, improper substitution, or other violations of the Subletting and Subcontracting Fair Practices Act are occurring or intended.

Precision Works properly identified JDK Demo as the subcontractor for the designated portion of demolition and grading work to be subcontracted. The subcontractor designation does not represent that JDK will perform every demolition- or grading-related activity. Nor does it prohibit Precision Works from self-performing other work within those general trades using its own qualified workforce. Nothing in the bid documents required Precision Works to allocate every individual bid item exclusively between subcontracted and self-performed work at bid opening.

REI’s contention that Precision may later choose which work JDK performs (creating a “squeeze” or post-bid allocation) is entirely speculative and unsupported by the bid documents or law. Precision Works is not seeking to alter its subcontractor designation, increase or decrease JDK’s listed participation, substitute subcontractors, or modify its bid after opening. Our bid, as submitted, clearly identifies the subcontracted portion and demonstrates compliance with all applicable requirements.

C. Clerical Issues (Line Item 33 and ECTI DIR Registration) REI mischaracterizes minor, non-material clerical matters as defects.

The discrepancy in Line Item 33 was an obvious typographical error ($5.00 instead of $5,000.00). The bid documents expressly provide that, in the event of a discrepancy between words and figures, the amount written in words governs.

This is a classic minor irregularity waivable under Norwalk Municipal Code § 3.17.030(C)(4) and does not affect responsiveness or provide any competitive advantage.

FORMAL RESPONSE TO BID
PROTEST - IFB No. 26-846 / City
Project No. 7859
Precision Environmental
4350 Transport St #109, Ventura, CA 93003
Email: [email protected]
Website: Precisionenv.com
Phone: 800-375-7786
DIR# 1000046051 - CSLB No. 480595
DOSH #1082 - SPCB PR7589 - NAT-21238-3
The “N/A” entry for ECTI’s DIR number was an inadvertent clerical oversight. ECTI was properly registered with DIR at the time of bid submission, and its role is limited to transportation/hauling (not core construction work requiring listing under the threshold). Precision Works listed another qualified transportation subcontractor with full DIR details, confirming intent to comply. This does not violate Labor Code §§ 1725.5 or 1771.1 or render the bid nonresponsive.

These are not material variances affecting price, scope, or fairness. They do not trigger post-bid optionality under PCC § 5103 in a manner that advantages Precision Works.

II. Precision Works is a Responsible Bidder
Precision Works possesses the experience, equipment, personnel, financial capacity, bonding capacity, and licensing to successfully complete the Project. Founded in 1982, Precision Works has a long and successful history of performing comparable demolition, environmental remediation, and abatement projects for public agencies throughout California.

REI’s allegations regarding experience disclosure misread the solicitation, which required disclosure of public agency projects in excess of $500,000 that we are currently working on or have worked on in the past three years. We complied fully. We welcome any responsibility review or hearing and are prepared to provide detailed project references, safety records, financial statements, bonding documentation, and evidence of successful performance on similar work.

III. Conclusion
Precision Works submitted a clear, responsive, and highly competitive bid that fully complies with the Instructions to Bidders, Contract Documents, California law, and Norwalk Municipal Code.

The legal authorities cited by REI address situations involving material post-bid modifications or unfair advantages. Those authorities have no application here, as Precision Works has neither requested nor contemplated any such actions. The City’s evaluation must be based on the bid actually submitted—not on REI’s hypothetical scenarios.

For these reasons, Precision Works respectfully requests that the City reject REI’s protest, confirm Precision Works as the lowest responsive and responsible bidder (or, at minimum, properly evaluate all lower bids before considering REI), and proceed with contract award. We remain ready to execute the contract and furnish all required bonds and documentation immediately upon notice of award.

Christopher Ruiz
Vice President
Email: [email protected]
Cell: (949) 706-4234
Precision Works, Inc. dba Precision Environmental
Chris Ruiz
Chris Ruiz
Vice President

FORMAL RESPONSE TO BID
PROTEST - IFB No. 26-846 / City
Project No. 7859
Attachment No. 4
RESOLUTION NO. 26-62

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NORWALK, AUTHORIZING AN AMENDMENT TO THE FISCAL YEAR 2025/26 ADOPTED BUDGET TO APPROPRIATE $1,386,000 OF LOW AND MODERATE INCOME HOUSING ASSET FUNDS AND $2,079,000 OF FORMER REDEVELOPMENT

AGENCY NON-HOUSING BOND PROCEEDS FOR THE BUILDINGS

DEMOLITION LOCATED AT THE NORWALK TRANSIT VILLAGE PROPERTY LOCATED AT 13200 BLOOMFIELD AVENUE, NORWALK, CA 90650, CITY PROJECT NO. 7859
WHEREAS, the Fiscal Year (FY) 2025/26 Budget includes Project No. 7859, to be funded with available Low and Moderate Income Asset funds and Former Redevelopment Agency Non-Housing Bond Proceeds leaving a $3,464,935 shortage; and WHEREAS, on January 21, 2025, City Council adopted Ordinance No. 24-1754, to establish Specific Plan Area No. 17, the Norwalk Transit Village Specific Plan; and WHEREAS, on July 28, 2025, the City purchased the property from the State of California acting by and through the Department of General Services; and WHEREAS, on October 7, 2025, the City awarded a contract and budget for Construction Management Services, Maintenance and Security Services; and WHEREAS, the cost for construction services is estimated to be $3,465,000; and WHEREAS, there are ongoing services for the project and untapped revenue streams that the City wishes to use and continue funding in relation to specialized construction services; and

WHEREAS, unallocated bond proceeds for Low and Moderate Income Asset funds and Former Redevelopment Agency Non-Housing funds are available; and WHEREAS, City Council desires to appropriate an additional $1,386,000 of Low and Moderate Income Asset funds and $2,079,000 of Former Redevelopment Agency NonHousing funds for construction services, associated with improving, increasing, and preserving the City’s supply of housing for persons and families of low or moderate income and redevelopment project in City’s Economic Development Node No. 6

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF NORWALK HEREBY DETERMINES, FINDS, AND RESOLVES AS FOLLOWS:

Section 1. On November 19, 2024, City Council adopted the Norwalk Transit Village Specific Plan (NTV) and certified the Final EIR (FEIR) and approved a Mitigation and Monitoring and Reporting Program (MMRP) and adopted a Statement of Overriding Considerations in connection with the NTV through City Council Resolution No. 24-58 (SCH No. 2022070103), which analyzed the demolition and remediation work. As such, no further CEQA review is required at this time.

Resolution No. 26-62 Page 2 of 2
Section 2. The City Manager is authorized to make the following appropriation and prepare the necessary budget amendment for the following account:

Account Number Increase Decrease
Expenditures: 435-70-7859-2080 $2,079,000
436-70-7859-2080 $1,386,000
Fund Balance: 435-0480 $2,079,000
436-0480 $1,386,000
Section 3. The Mayor, or presiding officer, is hereby authorized to affix her signature to this Resolution signifying its adoption by the City Council of the City of Norwalk and the City Clerk, or her duly appointed assistant, is directed to attest thereto.

APPROVED AND ADOPTED on this 20th day of October 2026.

JENNIFER PEREZ
MAYOR
ATTEST:

THERESA DEVOY, CMC

CITY CLERK
City Council Agenda Report
October 20, 2026
TO: Honorable City Council
FROM: Jesus M. Gomez, City Manager
BY: Ozzie Ramos, Deputy City Manager
Rita Ruiz, Director of Public Safety
Amber Bulosan, Management Analyst
SUBJECT: RESOLUTION NO. 26-63 - BUDGET AMENDMENT FOR AUTHORIZATION TO

ACQUIRE AND EQUIP A VERSATILE PUBLIC SAFETY VAN
Background:

Since the 1990s, the City has demonstrated a commitment to neighborhood policing through the deployment of mobile law enforcement centers. In 2002, the Department of Public Safety purchased a recreational vehicle (“RV”) to deploy at Neighborhood and Business Watch meetings to increase a public safety and community engagement throughout the City,. Though useful, the RV’s maintenance and difficulty in maneuverability has created the need for a vehicle that would provide efficiency and accessibility for Public Safety personnel, law enforcement and the community. Deployment of the RV is limited due to its size and parking limitations. Currently, the RV is unable to be navigated in certain parts of the City, specifically areas that are narrow and impacted with limited street parking, like the one-ways. Because of its large size, the RV requires a spotter to follow behind to ensure safe driving and maneuvering.

Additionally, after inspection by the City’s fleet maintenance division, a determination was made that there are significant issues with the RV, parts are no longer readily available, and it is not cost-effective to continue to attempt to maintain the RV. The recommendation is that the RV needs to be replaced.

Therefore, Public Safety is proposing the investment of a Sprinter Cargo Van. The Public Safety van will be equipped with internal workspaces, secure storage, and upgraded technology. A dedicated, clearly marked, Public Safety van will provide efficient transport of equipment, establish a visible point of contact, and coordinate operations throughout the City. Specialized teams, like CSP, HOPE, and the Office of Emergency Management will then utilize the vehicle as a mobile command center that is mission ready for immediate on-scene coordination, City Council October 20, 2026
Resolution 26-63 - Budget Amendment for Purchase
of Versatile Public Safety Van
Page No. 2
authorized operations and special events. It would provide the capability to engage with the community, respond to coordinated quality of life issues and crime through a modernized approach with advanced technology, and rapid deployment capabilities will further the City’s commitment to neighborhood policing.

Logistically, using a Sprinter Cargo van allows for feasible mobility in all parts of the City; A smaller van will allow access to these areas. Staff will be able to park the van in high volume shopping and business centers with limited negative impact to parking for patrons and the community. Not only will the Sprinter van be easier to navigate, but it will also allow Public Safety to operate officially in dynamic environments. Rather than transporting pop-up tents and tables, the van will be equipped with workstations that will allow personnel to work safely and efficiently, while also providing a compact meeting room for them to speak privately with residents The van will not only offer a presence of high visibility, which can assist in crime deterrence, but it will support critical department operations. As a mobile command center, the versatility of the vehicle will support public safety, planning, and communication. The unit will be deployed strategically during planned evening events, partner operations, City events, or in the event of an emergency, the van can be used as an extension of a citywide activation of the EOC and will provide a visible Public Safety presence for staff to organize equipment and coordinate information.

Anticipated uses of the van include, but are not limited to, the following:
• CSP outreach meetings and events at schools, shopping centers, and community events; • Neighborhood Watch and Business Watch Meetings;
• HOPE team overnight details and clean-ups with agency partners and LASD; • City events;
• Emergency operations;
• Drone operations requiring a mobile command location; • And other Public Safety activities
The van can serve as a mobile command post, deploying drones to hazardous areas, emergencies, disasters, and substandard structures to provide live aerial video and real-time situational awareness. This enables personnel to assess conditions, coordinate operations, conduct safety briefings, and evaluate critical infrastructure from anywhere in the City. Drone support can also assist law enforcement with street takeovers, missing persons, and other incidents, as well as provide aerial support during City events and authorized operations. By deploying the van anywhere throughout the City, staff can safely evaluate situations without putting themselves and others at risk. Responsive drone deployment within the mobile command center will serve as an additional resource among the other versatile uses of the van.

A Mobile Data Computer (“MDC”) will also be included in the van to enhance operational efficiency and strengthen coordination with the Sheriff’s Department. The MDC will provide authorized personnel with secure, real-time access to critical law information, including the ability to verify the status of suspicious vehicles and identify potential public safety concerns. This City Council October 20, 2026
Resolution 26-63 - Budget Amendment for Purchase
of Versatile Public Safety Van
Page No. 3
capability will improve situational awareness, support timely, and informed decision-making, while enhancing coordinated responses during neighborhood patrols, special operations, community events, and emergencies. This technology is the basis of the Department’s operational functionality during deployment. By including an MDC, the vehicle’s mission is strengthened through its ability to serve as a mobile command center and community resource in support of public safety operations.

Fiscal Impact:

The upfront cost of the beginning of the custom build mobile van is estimated at $89,680, which includes the lease of a Mobile Data Computer (MDC) and 50% of the estimated cost of the outfitting of the van. After the initial expense, Public Safety will pay an estimated $34,428.60 annual 5-year lease for the van and remaining 50% of the outfitting over the span of 5-years with tax and fees included for the lease. The total estimated cost of the vehicle and equipment is $249,719. The following planning allocation illustrates the proposed maximum cost; individual amounts are not vendor quotes and may change as specifications and procurement are completed:

UPFRONT COST ANNUAL LEASE TOTAL PURCHASE
Van $ 17,828.64 $ 81,039.00
Custom Build $ 79,000.00 $ 16,599.96 $ 158,000.00
MDC $ 10,680.00 $ 10,680.00
Total $ 89,680.00 $ 34,428.60 $ 249,719.00
The preliminary project estimate is anticipated to be expensed from the City’s Equipment Replacement Fund. Ongoing fuel, maintenance, insurance, connectivity, and replacement costs would be addressed through the Department’s operating budget and future budget requests as needed.

Staff would bring this back to City Council if the final project cost exceeds the approved amount or if further action is required under the City’s purchasing rules.

Citizens Advised:

N/A
Strategic Plan 2023 Implementation:

The recommended action will further the City’s Strategic Plan Goal 2: Work in Partnership with Our Community to Achieve Safe and Livable Neighborhoods: Objective 1: Re-invest in existing and aging infrastructure.

City Council October 20, 2026
Resolution 26-63 - Budget Amendment for Purchase
of Versatile Public Safety Van
Page No. 4
Recommended Action:

Staff recommend City Council:
a. adopt RESOLUTION NO. 26-63, A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NORWALK AUTHORIZING AN AMENDMENT TO THE FISCAL YEAR 2026/27

ADOPTED BUDGET TO APPROPRIATE FUNDS FOR AUTHORIZATION TO ACQURE AND EQUIP A VERSATILE PUBLIC SAFETY VAN, in the amount of $249,719; and b. approve the acquisition and custom building of one high visibility community safety van for the Department of Public Safety at a total project cost not to exceed $249,719, including the cost of the van at $81,039; and
c. authorize the City Manager, or designee, to execute the necessary purchase and installation agreements and any amendments in accordance with the City’s purchasing requirements, provided there is funding in the budget and it is within the City Manager’s signing authority, on behalf of the City, in forms approved by the City Attorney; d. authorize the City Manager to surplus the recreational vehicle.

Attachments:

Resolution No. 26-63
RESOLUTION NO. 26-63

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NORWALK AUTHORIZING AN AMENDMENT TO THE FISCAL YEAR 2026/27

ADOPTED BUDGET TO APPROPRIATE FUNDS FOR

AUTHORIZATION TO ACQUIRE AND EQUIP A VERSATILE PUBLIC

SAFETY VAN
WHEREAS, City Council has determined there is a need to purchase and fully equip a Sprinter Cargo Van to replace the current Public Safety recreational vehicle to serve as a highly visible and versatile command post for the Public Safety Department during City events, community engagement events, emergency operations, and authorized operations with agency partners for an estimated total cost of $249,719; and WHEREAS, City Council desires to appropriate the additional $249,719 needed to fund the purchase from available Equipment Replacement Fund.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF NORWALK HEREBY DETERMINES, FINDS, AND RESOLVES AS FOLLOWS:

Section 1. The City Manager is authorized to make the following appropriation and prepare the necessary budget amendment for the following account:

Account Number Increase Decrease
From: 746-0480 $249,719
To: 746-20-2112-2152 $170,719
746-20-2112-3820 $79,000
Section 2. The Mayor, or presiding officer, is hereby authorized to affix her signature to this Resolution signifying its adoption by the City Council of the City of Norwalk and the City Clerk, or her duly appointed assistant, is directed to attest thereto.

APPROVED AND ADOPTED on this 20th day of October 2026.

JENNIFER PEREZ
MAYOR
ATTEST:

THERESA DEVOY, CMC

CITY CLERK
City Council Agenda Report
October 20, 2026
TO: Honorable City Council
FROM: Jesus M. Gomez, City Manager
BY: Ozzie Ramos, Deputy City Manager
Amber Bulosan, Management Analyst
SUBJECT: RESOLUTION NO. 26-64 - BUDGET AMENDMENT FOR ACCEPTANCE OF

GRANT FUNDS FOR SECURITY SERVICES AT THE WEINGART ROSE - PROJECT HOMEKEY LOCATED AT 10646 ROSECRANS AVENUE
Background:

Since the opening of Weingart Rose in October 2025, the City and Sheriff Department combined have documented over 418 calls for service at this location. Located at 10646 Rosecrans Avenue, the Weingart Rose is a permanent supportive housing development that was placed by Los Angeles County (“County”). The County purchased the Motel 6 that previously occupied the site through the State-funded Project Homekey initiative, to support individuals transitioning out of homelessness. Weingart Rose offers case management, health and wellness support, life skills training, and long-term stability resources for all 54 occupants at the facility. The Weingart Center provides private security for its various properties, but its security model does not allow patrols beyond its facilities, leaving the shopping center it is in unprotected and vulnerable to unwanted concerns.

The Public Safety Department has received over 250 calls, most of which are quality-of-life concerns involving loitering by unsheltered individuals, suspected narcotics use and sales, theft, panhandling, trespassing, and inoperable or stolen vehicles requiring law enforcement response. The additional 168 calls for service were received by the Los Angeles County Sheriff’s Department ranging for narcotics to loitering at the property. Recently, the 7-Eleven convenience store, formerly located on the same property, closed, citing a drop in revenue and sales because of these issues.

The City meets weekly with the County and Weingart Rose to address these issues and has identified a lack of security and support services for unsheltered individuals loitering on the property. Because Weingart Rose is a County-initiated housing project operated by a nonprofit City Council October 20, 2026
Resolution No. 26-64 - Budget Amendment
Acceptance of Grant Funds for Security Services
Page No. 2
agency, the roles and responsibilities for security and addressing quality of life concerns in the surrounding area should be clearly defined.

The City has applied for a grant through the Los Angeles County Board of Supervisors in the amount of $200,000. The County has committed that these grant funds will be used to provide additional security services to safeguard the businesses affected by the unwanted activity attracted to the business park.

The City intends to use private security to address quality of life issues outside the Weingart Rose property, to provide public safety services for reported concerns at the property and in the surrounding area. To support this action, the City will deploy Absolute International Security (“Absolute”) to provide the on-site security services. The City completed a Request for Proposals process and awarded a contract to Absolute in December 2025 to provide security services at City facilities. Utilizing Absolute will enable the City to address residents’ and businesses’ concerns through the contract to supplement public safety operations. The City is not assuming responsibility for operating or managing the County’s housing program.

The City would manage the security contract and address illegal activity and quality of life concerns in the parking lot and surrounding areas. Before implementation, staff will coordinate with the County and Weingart Rose Project Operator to establish clear responsibilities, service boundaries, reporting procedures, and performance measures.

Fiscal Impact:

Available grant funds through Los Angeles County amount to a total of $200,000. There will be no fiscal impact to the City’s General Fund.

Citizens Advised:

N/A
Strategic Plan 2023 Implementation:

The recommended action will further the City’s Strategic Plan Goal 2: Work in Partnership with Our Community to Achieve Safe and Livable Neighborhoods.

Recommended Action:

Staff recommend City Council:
a. adopt Resolution No. 26-64, A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NORWALK AUTHORIZING AN AMENDMENT TO THE FISCAL YEAR 2026/27

ADOPTED BUDGET TO ACCEPT GRANT FUNDS FOR SERCURITY SERVICES AT THE WEINGART ROSE – PROJECT HOMEKEY, in the amount of $200,000; and City Council October 20, 2026
Resolution No. 26-64 - Budget Amendment
Acceptance of Grant Funds for Security Services
Page No. 3
b. authorize the City Manager to utilize the services of Absolute International Security to provide security for the area surrounding the Weingart Rose property located at 10646 Rosecrans Avenue.

Attachments:

Resolution No. 26-64
RESOLUTION NO. 26-64

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NORWALK AUTHORIZING AN AMENDMENT TO THE FISCAL YEAR 2026/27 ADOPTED

BUDGET TO ACCEPT GRANT FUNDS FOR SERCURITY SERVICES SURROUNDING THE WEINGART ROSE – PROJECT HOMEKEY
WHEREAS, the City Council has determined there is a need to provide on-site security support in the area surrounding the Weingart Rose property located at 10646 Rosecrans Avenue to deter criminal activity and safeguard public safety for the residents and the businesses; WHEREAS, the City applied for available grant funding through the Los Angeles County Board of Supervisors in the amount of $200,000;
WHEREAS, the City Council desires to accept grant funds once received and amend the Fiscal Year 2026/27 budget to appropriate $200,000 from the Homeless Prevention Fund to provide on-site security at 10646 Rosecrans Ave.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF NORWALK HEREBY DETERMINES, FINDS, AND RESOLVES AS FOLLOWS:

Section 1. The City Manager is authorized to make the following appropriation and prepare the necessary budget amendment for the following account:

Account Number Increase Credit
From: 209-63-0000-4488 $200,000
To: 209-63-6306-2080 $200,000
Section 2. The Mayor, or presiding officer, is hereby authorized to affix her signature to this Resolution signifying its adoption by the City Council of the City of Norwalk and the City Clerk, or her duly appointed assistant, is directed to attest thereto.

APPROVED AND ADOPTED on this 20th day of October 2026.

JENNIFER PEREZ
MAYOR
ATTEST:

THERESA DEVOY, CMC

CITY CLERK
City Council Agenda Report
October 20, 2026
TO: Honorable City Council
FROM: Jesus M. Gomez, City Manager
BY: Albert Mendoza, P.E., Director of Public Services/City Engineer Jacqueline Koontz, P.E., Senior Civil Engineer
Christopher Enriquez, Management Analyst
SUBJECT: PROJECT NO. 7527 - TERMINATION OF CONSTRUCTION CONTRACT

SERVICES FOR THE REHABILITATION FOR SEWAGE LIFT STATION AT

HARVARD DRIVE AND GRIDLEY ROAD
Background:

On July 15, 2025, the City awarded a contract for an amount of $320,923.28 to Christensen Brothers General Engineering Inc. (”Christensen”) for Project No. 7527 Rehabilitation Project for Sewage Lift Station at Harvard Drive and Gridley Road (originally Project No. 7524). The purpose of this project is to rehabilitate the existing sewer lift station at this intersection. The scope of work includes the installation of a temporary sewer bypass; removal and replacement of plug valves, swing check valves, two submersible pumps, slide rail assemblies, ductile iron piping; construction of a new meter vault; and installation of a magnetic flow meter. The project was initially scheduled to be completed prior to June 2026.

During the course of the contract, staff determined that Christensen was in default of its obligations due to failure to procure equipment in a timely manner and commence construction in accordance with the project schedule.

Events Timeline:
• July 15, 2025: The City awarded a contract to Christensen. • August 26, 2025: The City executed the contract.
• November 4, 2025: The City issued an Administrative Notice to Proceed. • July 1, 2026: The City issued a Notice to Proceed for Construction. • July 8, 2026: The City was notified the contractor was unable to complete Project No. 7527.
• August 12, 2026: The Notice to Cure was issued to the contractor.

City Council October 20, 2026
Termination of Construction Contract Page No. 2
Pursuant to Section 17.2 of the contract, staff is requesting authorization to terminate the contract for Default. Upon approval, a formal Notice of Termination will be issued in accordance with the terms of the contract.

The contractor's inability to complete the work leaves the area vulnerable to a sanitary sewer overflow in the event of a simultaneous failure of both pumps. Such an overflow could discharge contaminated water into the area and the storm drain system, creating potential health violations and damage to private property.

On September 21, 2026, Governor Gavin Newsom issued a proclamation of a state of emergency in preparation for potential severe weather and flooding associated with the predicted El Niño event. On October 9, 2026, the State Water Resources Control Board issued a letter directing Sanitary Sewer Systems General Order enrollees to take steps to minimize sanitary sewer system spills during the upcoming severe storms. Specifically, enrollees must maintain an up-to-date emergency response plan and complete preventative maintenance, including reducing inflow and infiltration, fixing structural vulnerabilities, and ensuring adequate system capacity. To mitigate the risk of a sanitary sewer overflow, this project will be completed on an emergency work basis with another contractor.

Upon City Council approval of the contract termination, staff will execute a new contract with Mike Bubalo Construction Co., Inc. to complete the remaining work under the same scope as originally defined in Project. No. 7527. Mike Bubalo Construction Co., Inc. was selected as a responsible contractor based on verified, satisfactory performance on comparable projects within the City, including Project No. 7606, and for its experienced personnel.

Fiscal Impact:

Sufficient funding is available in the Sewer Enterprise FY 26/27 adopted budget and no additional funding is requested at this time.

Citizens Advised:

N/A
Strategic Plan 2023 Implementation:

N/A
Recommended Action:

Staff recommend City Council approve terminating the contract with Christensen Brothers General Engineering, Inc.; instruct staff to issue a formal Notice of Termination in accordance with the terms of the contract; and authorize the City Manager to execute a new contract with Mike Bubalo Construction Co., Inc. to complete Project No. 7527.

City Council October 20, 2026
Termination of Construction Contract Page No. 3
Attachments:

N/A
City Council Agenda Report
October 20, 2026
TO: Honorable City Council
FROM: Jesus M. Gomez, City Manager
BY: Jana Stuard, Director of Finance/City Treasurer
Jennifer Hernandez, Administrative Services Supervisor
SUBJECT: AMERICAN RESCUE PLAN ACT PROJECTS STATUS UPDATE Background:

On March 10, 2021, President Biden signed the American Rescue Plan Act (“ARPA”), which established the State and Local Fiscal Recovery Funds (“SLFRF”) program to provide financial assistance to state and local governments in response to the COVID-19 public health emergency. Under U.S. Department of the Treasury requirements, ARPA funds were required to be obligated by December 31, 2024, and must be expended by December 31, 2026. Any funds remaining unspent after the expenditure deadline must be returned to the U.S. Department of the Treasury.

The City of Norwalk received $28,046,746 in ARPA funding based on the applicable federal allocation formula. The U.S. Department of the Treasury established requirements governing the eligible uses and administration of these funds.

On August 17, 2021, the City Council approved the City's ARPA spending plan, allocating funding to eligible projects addressing community needs and operational priorities. Table 1 summarizes key City Council actions related to ARPA funding.

Table 1: ARPA Actions
Date Action Result
July 26, 2021
Presentation of the ARPA spending
plan to the Fiscal Ad Hoc
Committee.

The plan was refined to prioritize
infrastructure and capital
investments.

August 3, 2021 Presentation of the draft ARPA
spending plan to the City Council.

The City Council directed staff to
remove potential redundancies
with other community programs
City Council October 20, 2026
ARPA Status Update Page No. 2
Date Action Result
August 17, 2021
Consideration of the ARPA
spending plan incorporating City
Council recommendations.

Approval of ARPA Spending
plan
November 16,
2021
Consideration of Resolution No. 21-
69 authorizing premium pay for
eligible essential workers.

The resolution and
corresponding premium
payments were approved.

May 3, 2022
Consideration of Resolution No. 22-
23 approving electronic bid
management software.

The resolution and
implementation of the software
were approved.

October 4, 2022
Consideration of Resolution No. 22-
54 approving web-based timecard
software.

The resolution and
implementation of the software
were approved.

December 3, 2024
Consideration of Resolution No. 24-
60 approving interagency
Memorandum of Understanding
(MOU) templates to obligate
remaining ARPA funds.

The resolution was approved,
authorizing the execution of
three interagency MOUs to
obligate the remaining funds
within the required timeframe.

December 17,
2024
Consideration of an agreement for
The Walk to commit ARPA funding
for development.

ARPA funding was approved for
the project.

June 16, 2026
Consideration of Resolution No. 26-
37 to re-obligate ARPA funding to
existing projects.

The resolution was approved,
reallocating funding to existing
ARPA projects to facilitate timely
expenditures.

October 6, 2026
Consideration of Resolution 26-59
to re-obligate ARPA funding to
existing projects.

The City Council directed staff to
continue the item and provide an
ARPA status report.

Annually
Consideration of the annual budget,
including ARPA project listings and
status.

Approval of annual budget.

Staff continue to implement the approved projects and monitor expenditures for compliance with federal requirements. Of the City's 24 ARPA projects, 15 are complete and nine remain active.

As shown in Table 2 on the following page, total expenditures across completed and active projects are $26.4 million, representing approximately 94% of the City's total ARPA allocation.

Two completed projects have remaining balances totaling $489,634. These funds may be considered for re-obligation and reallocated to other eligible ARPA projects, subject to applicable federal requirements and City Council approval.

City Council October 20, 2026
ARPA Status Update Page No. 3
Table 2: ARPA Projects as of October 2026
ARPA
Project # Project Name Project Budget Project Expenditures Project
Balance
Completed ARPA Projects
1 1.21219 COVID Testing 23,519 23,519 -
2 1.45219 Modernize Ventilation Citywide 16,625 16,625 - 3 2.361219 Aid to Impacted Industries Signage 182,600 32,966 149,634 4 2.366219 Heart of Norwalk Revitalization 583,893 583,893 - 5 3.1219 HOPE Team 1,326,053 1,326,053 -
6 3.3219 HOPE Team Operations 150,644 150,644 -
7 4.1219 ARPA - Premium Pay 459,719 459,719 -
8 6.1219 Revenue Replacement 10,000,000 10,000,000 -
9 1.7C1219 Public Communication Efforts 280,000 280,000 - 10 1.7C3219 Enhanced Communication Staffing 177,840 177,840 - 11 1.7C4219 Website Enhancements 50,000 50,000 -
12 7.1T1219 Scan & Digitize Plans 470,000 130,000 340,000 13 7.1T2219 Agenda Management 71,224 71,224 -
14 7.1T3219 Electronic Bid Management 64,416 64,416 -
15 7.1T4219 Digital Timecard System 309,267 309,267 -
Subtotal Completed ARPA Projects $14,165,800 $13,676,166 *$489,634 *Project savings available for re-obligation
Active ARPA Projects
16 1.7C8219
Security & Safety Improvement
Project (Dispatch/Security Upgrades, and
Front Reception upgrade project @ City Hall)
742,000 366,739 375,261
17 7.1T5219 Software Upgrades 1,061,219 1,061,218 1
18 7.1T6219 Technology Upgrades 1,116,181 1,061,304 54,877 Subtotal Active ARPA Projects 2,919,400 2,489,261 430,139 Active ARPA Projects (With no Additional Funding Need)
19 1.46219 Energy Project (Syserco Project) 1,895,682 1,876,822 18,860 20 1.7C2219 Security Technology Equipment 1,661,957 1,208,291 453,666 21 1.7C5219 Cable Program Equipment Upgrade 382,632 370,403 12,229 22 1.7C6219 Emergency Operations Center
Upgrade 466,200 461,280 4,920
23 2.15219 Affordable Housing Project 3,884,155 3,872,075 12,080 24 7.1A219 Administrative Staff & Other
Expenditures 2,670,920 2,486,261 184,659
Subtotal Active ARPA Projects
(With no Additional Funding Need) $13,880,946 $12,764,393 $1,116,553 TOTAL ARPA $28,046,746 $26,440,559 $1,606,187
Active projects are anticipated for completion by the expenditure deadline of December 31, 2026 Nine ARPA projects remain active and are anticipated for completion by the December 31, 2026 expenditure deadline. These projects support energy improvements, security technology, cable City Council October 20, 2026
ARPA Status Update Page No. 4
program equipment, emergency operations center upgrades, City Hall security improvements, affordable housing, administrative expenditures, software upgrades, and technology upgrades.

Of the nine active projects, the following three are eligible to receive reallocated funding:
• Project No. 1.7C8219 – Security & Safety Improvement Project • Project No. 7.1T5219 – Software Upgrades
• Project No. 7.1T6219 – Technology Hardware Upgrades
At its October 6, 2026, meeting, City Council considered a staff recommendation to re-obligate remaining funds from completed ARPA projects to selected active projects. The City Council continued the item and requested an updated report detailing project status and available balances to support its consideration of funding allocations.

This report provides the requested update on completed and active ARPA projects, including their budgets, expenditures, and remaining balances. Included in Attachment 1 is a comprehensive list of ARPA projects including their scope. With the December 31, 2026, federal expenditure deadline approaching, the City must evaluate eligible expenditures that can be completed and paid by the deadline.

Fiscal Impact:

There is $489,634 available in ARPA project savings for re-obligation to other active and eligible ARPA projects.

Citizens Advised:

N/A
Strategic Plan 2023 Implementation:

The recommended action will further the City’s Strategic Plan Goal 3: Partner with our stakeholders to create and sustain a resilient and economically prosperous City with opportunity for everyone.

Recommended Action:

Receive and File.

Attachments:

ARPA Project Listing
Line
#
ARPA Project Name Lead Department Project Scope Status Project Budget Project Expenditures
Current Project
Balance
Projected Balance
as of December 31,
2026
1 1.21219 - COVID TESTING Human Resources COVID testing for City employees Completed $ 23,519 $ 23,519 $ - $ - 2 1.45219 - MODERNIZE VENTILATION CW Public Services Design of replacement and upgrades to ventilation systems citywide Completed $ 16,625 $ 16,625.42 $ - $ - 3 1.7C1219 - PUBLIC COMMUNICATION Communications Outreach software and services Completed $ 280,000 $ 280,000 $ - $ - 4 1.7C3219 - ENHANCED COMMICATIONS Communications Communications Staff augmentation Completed $ 177,840 $ 177,840 $ - $ - 5 1.7C4219 - WEBSITE ENHANCEMENTS Communications Software and services for the City's new website Completed $ 50,000 $ 50,000 $ - $ -
6 2.361219 - AID TO IMPACTED IND-SIGNS Community Development Wayfinding signage Completed $ 182,600 $ 32,966 $ 149,634 $ 149,634 7 2.366219 - HEART OF NORWALK REVITALI Community Development A specific plan for development of the commercial sector Completed $ 583,893 $ 583,893 $ - $ - 8 3.1219 - HOPE TEAM Public Safety All payroll costs associated with the City's H.O.P.E. Team Completed $ 1,326,053 $ 1,326,053 $ - $ - 9 3.3219 - HOPE TEAM OPERATIONS Public Safety All operational costs associated with the City's H.O.P.E. Team Completed $ 150,644 $ 150,644 $ - $ - 10 4.1219 - ARPA- PREMIUM PAY Citywide Premium pay for eligible essential employees Completed $ 459,719 $ 459,719 $ -

ARPA PROJECT STATUS
As of October 2026
1 Attachment No., 1
Line
#
ARPA Project Name Lead Department Project Scope Status Project Budget Project Expenditures
Current Project
Balance
Projected Balance
as of December 31,
2026

ARPA PROJECT STATUS
As of October 2026
11 6.1219 - REVENUE REPLACEMENT Finance
$10M of ARPA funds appropriated into the
City's General Fund for use towards Public
Safety initiatives
Completed $ 10,000,000 10,000,000 $ - $ - $
12 7.1T1219 - SCAN & DIGITIZE PLAN S Community Development Scanning services of large city files Completed $ 130,000 470,000 $ 340,000 $ 340,000 $ 13 7.1T2219 - AGENDA MANAGEMENT City Clerk Implementation of Agenda Management Software Completed $ 71,224 71,224 $ - $ - $
14 7.1T3219 - ELECTRONIC BID MANGEMENT Finance Implementation of Online Bidding software Completed $ 64,416 64,416 $ - $ - $ 15 7.1T4219 - DIGITAL TIMECARDS SYSTEM Finance Implementation of electronic timekeeping software Completed $ 309,267 309,267 $ - $ - $
16 1.46219 - ENERGY PROJECT Public Services Syserco Energy Upgrades (ventilation portion) In Progress $ 1,876,822 1,895,682 $ 18,860 $ - $ 17 1.7C2219 - SECURITY TECH EQUIPT Administration Installation of cameras at City Parks In Progress $ 1,208,291 1,661,957 $ 453,666 $ - $ 18 1.7C5219 - CABLE PRG EQPT Communications Upgrades to the City's Cable TV infrastructure In Progress $ 370,403 382,632 $ 12,229 $ - $ 19 1.7C6219 - EOC UPGRADE Public Safety Upgrades to the City's EOC In Progress $ 461,280 466,200 $ 4,920 $ - $ 20 1.7C8219 - SECURITY & SAFETY IMPR. Public Safety Security Upgrades at City Hall entrance In Progress $ 366,739 742,000 $ 375,261 $ - $ 2 Line
#
ARPA Project Name Lead Department Project Scope Status Project Budget Project Expenditures
Current Project
Balance
Projected Balance
as of December 31,
2026

ARPA PROJECT STATUS
As of October 2026
21 2.15219 - AFFORDABLE HOUSING COG Community Development Concept and vision study for homeless facility project In Progress $ 3,872,075 3,884,155 $ 12,080 $ - $ 22 7.1A219 - ADMIN STAFF & OTHER EXP
Admin/Public
Services/Community
Development/ Finance
Staffing of four (4) Full-time staff through
December 2026 In Progress $ 2,486,261 2,670,920 $ 184,659 $ - $ 23 7.1T5219 - SOFTWARE UPGRADES Administration Services for software upgrades to Citywide (Microsoft 365) In Progress $ 1,061,218 1,061,219 $ 1 $ - $ 24 7.1T6219 - TECH HARDWARE UPGRADES Administration Services for hardware upgrades Citywide In Progress $ 1,061,304 1,116,181 $ 54,877 $ - $ TOTAL $ 26,440,558 28,046,746 $ 1,606,187 $ 489,634 $
3 City Council Agenda Report
October 20, 2026
TO: Honorable City Council
FROM: Jesus M. Gomez, City Manager
BY: Alexander Hamilton, Deputy City Manager
Jana Stuard, Director of Finance/City Treasurer
Michael Johnson, IT Manager
Jennifer Hernandez, Administrative Services Supervisor
SUBJECT: RESOLUTION NO. 26-59 - BUDGET AMENDMENT FOR AMERICAN RESCUE

PLAN ACT FUNDED PROJECTS
Background:

The City of Norwalk received $28,046,746 in ARPA funding and obligated the full allocation by December 31, 2024, with a required expenditure deadline of December 31, 2026, in accordance with federal requirements.

Staff have continued implementing the ARPA-funded projects and monitoring expenditures to ensure compliance with applicable requirements. Of the City's 24 ARPA projects, 15 have been completed and nine remain active. To date, $26.4 million has been expended, representing 94% of its total ARPA allocation. The remaining active projects are anticipated to be completed by December 31, 2026.

Two projects were completed under budget with a combined remaining balance of $489,634.

These funds are available for consideration for re-obligation to other eligible active ARPA projects, subject to applicable federal requirements and City Council approval. The two projects are listed below:
• Project No. 2.361219 - Aid to Impacted Industries Signage: $149,634 remaining due to ongoing construction affecting the planned signage improvements around the Norwalk Entertainment Center.
• Project No. 7.1T1219 - Scan & Digitize Plans: $340,000 in anticipated savings from the digitization of City records.

City Council October 6, 2026
Resolution No. 26-59 ARPA Budget Amendment Page No. 2
Proposed Re-Obligation:

Unspent funds from completed ARPA projects may be reallocated to other active ARPA projects, subject to applicable federal requirements and City Council approval. Of the nine active projects, five are nearly completed utilizing the full project budget with no need of additional funding.

The reallocation of available ARPA funding among active projects is at the discretion of the City Council. In an effort to leverage available ARPA funding, staff recommend reallocating the available $489,634 to the following projects to support eligible project costs and facilitate the timely expenditure of ARPA funds ahead of the federal deadline:
• Project No. 1.7C8219 – Security & Safety Improvement Project • Project No. 7.1T5219 – Software Upgrades
• Project No. 7.1T6219 – Technology Hardware Upgrades
Project 1.7C8219 - Security & Safety Improvement:

Project No. 1.7C8219 – Security & Safety Improvement Project was timely obligated by the December 31, 2024 obligation deadline through an Inter-Agency MOU with the Public Safety Department approved by the City Council in December 2024 and subsequently amended in June 2026. The project was established to provide security upgrades at City Hall.

Staff is proposing to re-obligate $175,859 to Project No. 1.7C8219, consisting of $149,634 from Project No. 2.361219 - Aid to Impacted Industry Signage and $26,225 from Project No. 7.1T1219 Scan & Digitize Plans. The additional funding will support completion of the planned security and safety improvements and facilitate the timely expenditure of ARPA funds.

If approved, an amendment to the Inter-Agency MOU with the Public Safety Department will be required to reflect the revised ARPA project budget.

From To
Project Amount Project Amount

2.361219 - Aid to Impacted
Industries/Signage 149,634 149,634

7.1T1219 - Scan & Digitize
Plans 26,255

1.7C8219 - Security &
Safety Improvements 26,225
TOTAL 175,859 TOTAL 175,859

7.1T5219 - Software Upgrades:

Project No. 7.1T5219 Software Upgrades was timely obligated by the December 31, 2024 obligation deadline through an agreement with IBE Digital. The project was established to support software upgrades and related services for Citywide technology systems, including procurement and the implementation of Microsoft 365 and accompanying annual Microsoft licensing costs.

City Council October 6, 2026
Resolution No. 26-59 ARPA Budget Amendment Page No. 3
Staff is proposing to re-obligate $234,274 in remaining ARPA funding from Project No. 7.1T1219 Scan & Digitize Plans. The additional funding will support ongoing software renewal costs, upgrades and related services associated with the City's Citywide technology systems to ensure timely renewal of expiring software.

From To
Project Amount Project Amount

7.1T1219 - Scan &
Digitize Plans 234,274 7.1T5219 - Software Upgrade 234,274 TOTAL 234,274 TOTAL 234,274

7.1T6219 - Technology Hardware Upgrades:

Project No. 7.1T6219 Technology Hardware Upgrades was timely obligated by the December 31, 2024 obligation deadline through an agreement with IBE Digital. The project was established to support Citywide technology hardware upgrades and related services.

Staff is proposing to re-obligate $79,501 in remaining ARPA funding from Project No. 7.1T1219 Scan & Digitize Plans. The additional funding will support hardware purchases to support ongoing hardware upgrade needs.

From To
Project Amount Project Amount

7.1T1219 - Scan &
Digitize Plans 79,501 7.1T6219 – Technology Hardware Upgrade 79,501 TOTAL 79,501 TOTAL 79,501
Projects No. 7.1T5219 - Software Upgrades and No. 7.1T6219 - Technology Hardware Upgrades are separate ARPA projects included under the City's existing agreement with IBE Digital, which was approved by City Council in July 2023.

Project No. 7.1T6219 currently has $80,919 in ARPA funding that has not yet been incorporated into the IBE Digital agreement. If approved, Amendment No. 1 to the agreement will increase the agreement by $394,694, consisting of $234,274 in re-obligated funding for Project No. 7.1T5219, $79,501 in re-obligated funding for Project No. 7.1T6219, and $80,919 in existing Project No.

7.1T6219 funding. The proposed amendment of $394,694 would support the purchase of software and hardware upgrades as summarized on Table 3. Detailed items included in the proposed amendment are included in Attachment 2 and Attachment 3.

City Council October 6, 2026
Resolution No. 26-59 ARPA Budget Amendment Page No. 4
Table 3: Breakdown of Proposed Software/Hardware Upgrade Costs Item Cost
Software Upgrades
Microsoft Windows Licensing $193,814
Microsoft Server Software Licensing $26,940
Professional Services $13,520
Software Subtotal: $234,274
Technology Hardware Upgrades
Hardware Purchases $128,706
Tax on Hardware (10.5%) $13,514
Professional Services $18,200
Technology Hardware Subtotal: $160,420
TOTAL SOFTWARE/HARDWARE COST $394,694
The proposed re-obligation and contract amendment with IBE Digital will allow the City to leverage available ARPA funding to support eligible citywide software and technology hardware costs.

Utilizing ARPA funds for these costs will facilitate the full expenditure of the City’s ARPA allocation while minimizing the impact to the General Fund for ongoing software renewals, upgrades and technology hardware needs.

Fiscal Impact:

Approval of the proposed re-obligations will facilitate the timely expenditure of available funding with the ARPA expenditure deadline and have no fiscal impact on the City’s General Fund.

Citizens Advised:

N/A
Strategic Plan 2023 Implementation:

The recommended action will further the City’s Strategic Plan Goal 3: Partner with our stakeholders to create and sustain a resilient and economically prosperous City with opportunity for everyone.

Recommended Action:

Staff recommend City Council:
a. adopt Resolution No. 26-59, A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NORWALK AUTHORIZING AN AMENDMENT TO THE FISCAL YEAR 2026/27 ADOPTED

BUDGET TO TRANSFER FUNDS FOR AMERICAN RESCUE PLAN ACT FUNDED PROJECTS, in the amount of $489,634; and
b. authorize the City Manager to execute Amendment No. 1 to the Inter-agency Memorandum of Understanding between the City and the Community Development Department, on behalf of the City, in a form approved by the City Attorney; and City Council October 6, 2026
Resolution No. 26-59 ARPA Budget Amendment Page No. 5
c. authorize the City Manager to execute Amendment No. 1 to the agreement with Viatron Systems Inc. decreasing the agreement by $340,000; and
d. authorize the City Manager to execute Amendment No. 2 to the Inter-agency Memorandum of Understanding between the City and the Public Safety Department, on behalf of the City, in a form approved by the City Attorney; and
e. authorize the City Manager to execute Amendment No. 1 to the agreement with IBE Digital increasing the agreement by $394,693, and additional amendments, provided there is funding in the budget and it is within the City Manager’s signing authority, on behalf of the City, in a form approved by the City Attorney.

Attachments:

1. Resolution No. 26-59

2. IBE – Software Upgrades Proposal

3. IBE – Technology Hardware Upgrades Proposal
RESOLUTION NO. 26-59

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NORWALK AUTHORIZING AN AMENDMENT TO THE FISCAL YEAR 2026/27

ADOPTED BUDGET TO TRANSFER FUNDS FOR AMERICAN RESCUE

PLAN ACT FUNDED PROJECTS
WHEREAS, on March 10, 2021, the American Rescue Plan Act (“ARPA”) was enacted, providing State and Local Fiscal Recovery Funds (“SLFRF”) to state and local governments in response to the COVID-19 public health emergency, and the City of Norwalk was allocated $28,046,746 in ARPA funding, all of which was timely obligated toward eligible uses in accordance with U.S. Department of the Treasury requirements; and
WHEREAS, the City Council desires to transfer $149,634 from ARPA Project No.

2.361219 - Aid to Impacted Industry Signage and $26,225 from ARPA Project No.

7.1T1219 - Scan & Digitize Plans to ARPA Project No. 1.7C8219 - Security & Safety Improvement Project to support security and safety improvements at City Hall; and WHEREAS, the City Council desires to transfer $234,274 from ARPA Project No.

7.1T1219 - Scan & Digitize Plans to ARPA Project No. 7.1T5219 - Software Upgrades to support software renewal costs, upgrades, and related services for Citywide technology systems; and
WHEREAS, the City Council desires to transfer $79,501 from ARPA Project No.

7.1T1219 – Scan & Digitize Plans to ARPA Project No. 7.1T6219 – Technology Hardware Upgrades to support Citywide technology hardware upgrades and related services; and WHEREAS, the proposed transfers will reallocate existing ARPA funds among active eligible projects, facilitate the timely expenditure of ARPA funds, and reduce the need for certain technology-related costs to be supported by the General Fund.

WHEREAS, SLFRF funds that were timely obligated but are no longer needed for the originally obligated eligible activity to be reclassified to another eligible project, subject to applicable federal requirements; and
WHEREAS, the City Council desires to ensure full utilization of its ARPA allocation prior to federal expenditure deadlines and maintain compliance with all applicable requirements; and
WHEREAS, he proposed transfers total $489,634 and will allow the City to utilize available ARPA funds for active eligible projects and facilitate the timely expenditure of ARPA funds.

Attachment No. 1
Resolution No. 26-59 Page 2 of 2

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF NORWALK HEREBY DETERMINES, FINDS, AND RESOLVES AS FOLLOWS:

Section 1. The City Manager is authorized to make the following transfer and prepare the necessary budget amendment for the following account:

Account Number/Project # Increase Decrease
From: 219-61-6101-2075/2.361219 $149,634
219-61-6101-2075/7.1T1219 $26,225
To: 219-70-7873-2075/1.7C8219 $175,859
From: 219-61-6101-2075/7.1T1219 $234,274
To: 219-10-1205-2089/7.1T5219 $234,274
From: 219-61-6101-2075/7.1T1219 $79,501
To: 219-10-1205-3860/7.1T6219 $79,501
Section 2. The Mayor, or presiding officer, is hereby authorized to affix her signature to this Resolution signifying its adoption by the City Council of the City of Norwalk and the City Clerk, or her duly appointed assistant, is directed to attest thereto.

APPROVED AND ADOPTED on this 20th day of October 2026.

JENNIFER PEREZ
MAYOR
ATTEST:

THERESA DEVOY, CMC

CITY CLERK
1 562.921.0202
[email protected] ibedigital.com 11266 Monarch St. B, Garden Grove, CA
City of Norwalk
ADFS Decommission, FOIA SSO Migration
to Entra & Exchange Decommission
To: Mike Johnson
City of Norwalk
From: Ma1 Abshire
IBE Digital
[email protected]
(562) 921-0202
Date: September 17, 2026
Attachment No. 2
2 562.921.0202
[email protected] ibedigital.com 11266 Monarch St. B, Garden Grove, CA
Table of Contents

1. Overview ............................................................................................................................ 3

2. Scope of Work..................................................................................................................... 3

3. Assump7ons and Dependencies.......................................................................................... 5

4. Out of Scope ....................................................................................................................... 5

5. Commercial Terms............................................................................................................... 6

6. Investment.......................................................................................................................... 7

7. Terms and Condi7ons.......................................................................................................... 7

8. Authoriza7on and Signatures............................................................................................ 10 3 562.921.0202
[email protected] ibedigital.com 11266 Monarch St. B, Garden Grove, CA

1. Overview
This Statement of Work (SOW) establishes the scope, deliverables, and commercial terms for IBE Digital's engagement with the City of Norwalk (hereinaEer the Client) to consolidate the City's idenFty and messaging footprint onto MicrosoE cloud services. The engagement covers migraFng single sign-on (SSO) for the FOIA applicaFon from AcFve Directory FederaFon Services (ADFS) to MicrosoE Entra ID, decommissioning the on-premises ADFS environment, and decommissioning the City's on-premises Exchange server.

The work removes two legacy on-premises components, the ADFS federaFon service and the on-premises Exchange server, aEer their funcFons have been moved to MicrosoE Entra ID and Exchange Online respecFvely. This reduces the City's on-premises aNack surface, eliminates the maintenance and cerFficate-renewal burden associated with ADFS and Exchange, and consolidates authenFcaFon and mail on MicrosoE's managed cloud services.

All work will be performed in coordinaFon with City of Norwalk IT staff and sequenced into controlled maintenance windows to minimize risk to authenFcaFon and mail services.

The City of Norwalk currently operates an on-premises ADFS environment that provides federated authenFcaFon, including SSO for the FOIA applicaFon, and MicrosoE Entra Connect synchronizes idenFty from on-premises AcFve Directory to MicrosoE Entra ID. The City also operates an on-premises Exchange server that previously hosted the City's mailboxes in a hybrid configuraFon.

With the City's mailboxes migrated to Exchange Online and the FOIA applicaFon to be repointed to MicrosoE Entra ID for SSO, the on-premises ADFS and Exchange servers are candidates for decommission. MicrosoE Entra Connect will remain in place as the idenFty synchronizaFon mechanism between on-premises AcFve Directory and MicrosoE Entra ID.

2. Scope of Work
IBE Digital will perform the following work, sequenced to preserve authenFcaFon and mail availability throughout the engagement and scheduled with City IT staff.

Phase 1: FOIA Applica1on SSO Migra1on to Microso9 Entra ID • Review the current FOIA applicaFon SSO configuraFon in ADFS, including the relyingparty trust, claim rules, and the authenFcaFon protocol in use 4 562.921.0202
[email protected] ibedigital.com 11266 Monarch St. B, Garden Grove, CA
• Create and configure the corresponding enterprise applicaFon in MicrosoE Entra ID, reproducing the required sign-on seTngs, claims or aNribute mappings, and user or group assignments
• Coordinate with the FOIA applicaFon owner or vendor as needed to update the applicaFon's idenFty provider seTngs to trust MicrosoE Entra ID • Test SSO to the FOIA applicaFon through MicrosoE Entra ID with pilot users prior to cutover
• Cut over FOIA SSO to MicrosoE Entra ID and confirm successful authenFcaFon for users Phase 2: ADFS Decommission
• Confirm that no remaining relying-party trusts or applicaFons depend on ADFS prior to decommission
• Convert the affected MicrosoE 365 or Entra domains from federated authenFcaFon to MicrosoE Entra managed authenFcaFon, using the idenFty synchronized by MicrosoE Entra Connect
• Validate user authenFcaFon to MicrosoE 365 and Entra-integrated applicaFons following the conversion
• Decommission the ADFS server or servers and the associated Web ApplicaFon Proxy if present, including cleanup of related DNS records and cerFficates Phase 3: On-Premises Exchange Decommission
• Confirm all mailboxes, shared mailboxes, and public folders have been migrated to Exchange Online and that no mail flow depends on the on-premises Exchange server • Retain a supported Exchange management capability on-premises for the management of directory-synchronized mail aNributes, consistent with MicrosoE guidance for environments where MicrosoE Entra Connect remains in place • Perform a proper Exchange uninstallaFon of the on-premises Exchange server rather than a forced removal
• Clean up the associated AcFve Directory, DNS, connector, and cerFficate entries related to the decommissioned Exchange server
Phase 4: Valida1on and Handoff
• Confirm authenFcaFon to MicrosoE 365, the FOIA applicaFon, and other Entraintegrated services following all cutover and decommission acFviFes • Confirm mail flow and Exchange Online operaFon following the on-premises Exchange decommission
5 562.921.0202
[email protected] ibedigital.com 11266 Monarch St. B, Garden Grove, CA
• Update IBE Digital's documentaFon with the revised idenFty and mail configuraFon for ongoing managed-services reference
• Deliver a project compleFon sign-off confirming scope compleFon

3. Assumptions and Dependencies
This SOW is predicated on the following assumpFons. Material deviaFon from these assumpFons may require a Change Order to adjust scope and/or fees. • The City of Norwalk will provide IBE Digital with administraFve access to AcFve Directory, MicrosoE Entra ID, the ADFS environment, the on-premises Exchange server, and the FOIA applicaFon's idenFty provider configuraFon prior to project kickoff • The City's mailboxes, shared mailboxes, and public folders have been migrated to Exchange Online prior to the on-premises Exchange decommission; any mailboxes remaining on-premises will be addressed via Change Order • MicrosoE Entra Connect is in place and healthy, with password hash synchronizaFon or pass-through authenFcaFon available to provide cloud authenFcaFon once ADFS federaFon is removed
• The FOIA applicaFon supports MicrosoE Entra ID as an idenFty provider using a standard federaFon protocol (SAML or OpenID Connect); an applicaFon that cannot support Entra ID directly will be addressed via Change Order
• The FOIA applicaFon owner or vendor will be available to update the applicaFon's idenFty provider seTngs and to assist with tesFng during the engagement • The City will maintain current, validated backups of the ADFS and Exchange servers and of AcFve Directory prior to the decommission acFviFes
• IBE Digital will have the ability to schedule maintenance windows with City IT staff for the authenFcaFon cutover and the decommission acFviFes
• All work will be performed remotely unless on-site presence is mutually agreed upon; on-site travel Fme is not included in the esFmate

4. Out of Scope
The following items are explicitly excluded from this Statement of Work and may be engaged as separate projects or Change Orders as needed:
• MigraFon of the SSO configuraFon for applicaFons other than the FOIA applicaFon • MigraFon of mailboxes from the on-premises Exchange server to Exchange Online, which is assumed complete prior to this engagement
6 562.921.0202
[email protected] ibedigital.com 11266 Monarch St. B, Garden Grove, CA
• Removal or reconfiguraFon of MicrosoE Entra Connect, which remains in place as the idenFty synchronizaFon mechanism
• ApplicaFon-side development or reconfiguraFon of the FOIA applicaFon beyond updaFng its idenFty provider seTngs
• Changes to condiFonal access, mulFfactor authenFcaFon, or other Entra ID security policies beyond those required to complete the FOIA SSO migraFon • Decommission of any server other than the ADFS and on-premises Exchange servers named in this SOW

5. Commercial Terms
Engagement Type
This engagement is delivered on a fixed-fee basis for the scope of work defined in this SOW. The fixed fee covers all professional labor required to complete the scope of work.

Invoicing
• IBE Digital will invoice the fixed professional services fee per the schedule agreed with the City.
• Invoices are due Net 30 from date of invoice.
• Any approved Change Orders will be invoiced separately from the base SOW.

Change Order Process
Scope addiFons or material changes to the assumpFons will require a wriNen Change Order executed by both parFes prior to IBE Digital commiTng to the addiFonal work. 7 562.921.0202
[email protected] ibedigital.com 11266 Monarch St. B, Garden Grove, CA

6. Investment
The fixed professional services fee for the scope defined in this Statement of Work is set out below.

Professional Services $13,520.00
Fixed fee for the services described in Sec2on 2
Total Project Investment $13,520.00
Sourcewell Contract # 112124-KON

7. Terms and Conditions
By execuFng this Statement of Work, Client agrees to purchase the services designated above and further agrees that the services shall be subject to the following Terms and CondiFons of Service.

1. Fees and Payment: Client agrees to pay all fees specified in this SOW. Payment terms are net 30 days from date of invoice. Client shall be responsible for all applicable taxes arising from the services. IBE Digital may suspend service if Client has failed to pay any undisputed invoice within fiEeen (15) days of the due date. Undisputed invoices not paid by the due date may be subject to a monthly service charge which is the lesser of one and one-half percent (1.5%) per month or the highest rate allowed by law.

2. Limited Warranty: (a) IBE Digital warrants for a period of thirty (30) days following delivery (the "Warranty Period") that all services shall be performed in a professional manner in accordance with generally applicable industry standards. IBE Digital sole liability (and Client's exclusive remedy) for any breach of this warranty shall be for IBE Digital to re-perform any deficient services, or, if IBE Digital is unable to remedy such deficiency within thirty (30) days, to void the invoice for the deficient services. IBE Digital shall have no obligaFon with respect to a warranty claim: (i) if noFfied of such claim aEer the Warranty Period or (ii) if the claim is the result of third-party hardware or soEware failures, or the acFons of Client or a third party. (b) 8 562.921.0202
[email protected] ibedigital.com 11266 Monarch St. B, Garden Grove, CA
THIS SECTION 2 IS A LIMITED WARRANTY AND SETS FORTH THE ONLY WARRANTIES MADE BY IBE DIGITAL. IBE DIGITAL MAKES NO OTHER WARRANTIES, CONDITIONS OR UNDERTAKINGS,

EXPRESS OR IMPLIED, STATUTORY OR OTHERWISE, INCLUDING BUT NOT LIMITED TO

WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE OR NONINFRINGEMENT. ALL SOFTWARE AND HARDWARE PROVIDED OR INSTALLED BY IBE DIGITAL HEREUNDER ARE SUBJECT EXCLUSIVELY TO THE RESPECTIVE MANUFACTURER'S WARRANTY.

3. COMPENSATION FOR HIRING OTHER PARTY'S EMPLOYEES: During the term of this SOW and for a period of twelve (12) months following the terminaFon or expiraFon of this SOW, Client agrees not to directly or indirectly solicit for employment, hire, engage, or retain (whether as an employee, independent contractor, consultant, or otherwise) any employee or contractor of IBE Digital who was involved in providing services to Client under this SOW. In the event Client hires, engages, or otherwise retains the services of any such employee or contractor of IBE Digital, whether directly or indirectly (including through a third-party staffing firm or contractor), Client agrees to pay IBE Digital, as reasonable compensaFon for the loss of such personnel and associated recruitment and training costs, a fee of One Hundred Thousand Dollars ($100,000) for each such employee or contractor. This provision shall apply to any employee or contractor of IBE Digital who provided services to Client during the twelve (12) months preceding such hiring or engagement.

4. LIMITATION OF LIABILITY: (A) NEITHER PARTY SHALL BE LIABLE TO THE OTHER FOR ANY

INDIRECT, INCIDENTAL, SPECIAL, OR CONSEQUENTIAL DAMAGES (INCLUDING, WITHOUT

LIMITATION, DAMAGES FOR INTERRUPTION OF SERVICES, LOSS OF BUSINESS, LOSS OF PROFITS,

LOSS OF REVENUE, LOSS OF DATA, OR LOSS OR INCREASED EXPENSE OF USE), WHETHER IN AN

ACTION IN CONTRACT, WARRANTY, TORT (INCLUDING, WITHOUT LIMITATION, NEGLIGENCE), OR

STRICT LIABILITY, EVEN IF THE PARTIES HAVE BEEN ADVISED OF THE POSSIBILITY OF SUCH LIABILITIES. IBE DIGITAL SHALL NOT BE RESPONSIBLE FOR PROBLEMS THAT OCCUR AS A RESULT OF THE USE OF ANY THIRD-PARTY SOFTWARE OR HARDWARE. (B). EXCEPT FOR GROSS

NEGLIGENCE OR WILLFUL MISCONDUCT, IBE DIGITAL'S AND ITS SUBCONTRACTOR'S TOTAL

AGGREGATE LIABILITY TO CLIENT ARISING OUT OF SERVICES PERFORMED UNDER THIS SOW,

REGARDLESS OF THE LEGAL THEORY UPON WHICH SUCH LIABILITY MAY BE BASED, SHALL NOT

EXCEED THE TOTAL PAYMENTS MADE BY CLIENT TO IBE DIGITAL FOR THE SERVICES IN QUESTION IN THE TWELVE (12) MONTH PERIOD IMMEDIATELY PRECEDING THE FIRST OCCURRENCE OF THE EVENT GIVING RISE TO SUCH LIABILITY.

5. ConfidenHal and Proprietary InformaHon: (a) Each party agrees that all know-how, business, technical and financial informaFon it obtains (as a "Receiving Party") from the disclosing party (as a "Disclosing Party") consFtute the confidenFal property of the Disclosing Party ("ConfidenFal InformaFon"), provided that it is idenFfied as confidenFal at the Fme of 9 562.921.0202
[email protected] ibedigital.com 11266 Monarch St. B, Garden Grove, CA
disclosure or should be reasonably known by the Receiving Party to be ConfidenFal InformaFon due to the nature of the informaFon disclosed and the circumstances surrounding the disclosure. Except as may be necessary to perform its obligaFons under this SOW, the Receiving Party will hold in confidence and not use or disclose any of the Disclosing Party's ConfidenFal InformaFon. The Receiving Party's nondisclosure obligaFon shall not apply to informaFon that:
(i) was known to it prior to receipt of the ConfidenFal InformaFon; (ii) is publicly available; (iii) is righoully obtained by the Receiving Party from a third party; (iv) is independently developed by employees of the Receiving Party; or (v) is required to be disclosed pursuant to a regulaFon, law or court order. (b) Any templates, schemaFcs, processes or technical documentaFon provided by IBE Digital shall be deemed ConfidenFal InformaFon and proprietary informaFon of IBE Digital without any marking or further designaFon. Client may use such informaFon solely for its own internal business purposes. IBE Digital shall retain all rights to the aforemenFoned, which shall be returned to IBE Digital upon terminaFon of the applicable SOW. (c) IBE Digital shall maintain the confidenFality of protected health informaFon in its possession or under its control in accordance with the Health Insurance Portability and Accountability Act of 1996, as amended by the Health InformaFon Technology for Economic and Clinical Health Act.

6. Independent Contractor: IBE Digital and Client shall at all Fmes be independent contractors.

There is no relaFonship of partnership, joint venture, employment, franchise or agency created hereby between the parFes. Neither party shall have the power to bind the other or incur obligaFons on the other party's behalf without the other party's prior wriNen consent.

7. Assignment: This SOW may not be assigned by either party without the prior wriNen consent of the other party, which consent shall not be unreasonably withheld or delayed. No consent shall be required where an assignment is made (i) pursuant to a merger or change of control or (ii) to an assignee of all or substanFally all of the party's assets. Any purported assignment in violaFon of this secFon shall be void.

8. Complete Understanding; ModificaHon: This SOW, as well as any applicable terms of service posted at www.ibedigital.com/terms, shall consFtute the full and complete understanding and agreement between Client and IBE Digital and supersedes all prior or contemporaneous negoFaFons, discussions or agreements, whether wriNen or oral, between the parFes regarding the subject maNer contained herein. Any waiver, modificaFon or amendment of any provision of this SOW shall be effecFve only if in wriFng and signed by both parFes.

9. Waiver and Severability: Waiver or failure by either party to exercise in any respect any right or obligaFon provided for in this SOW shall not be deemed a waiver of any further right or obligaFon hereunder. If any provision of this SOW is found by a court of competent jurisdicFon to be unenforceable for any reason, the remainder of this SOW shall conFnue in full force and effect.
10 562.921.0202
[email protected] ibedigital.com 11266 Monarch St. B, Garden Grove, CA

10. Force Majeure: Neither party shall be liable to the other for any delay or failure to perform any obligaFon under this SOW, except for a failure to pay fees, if the delay or failure is due to unforeseen events which are beyond the reasonable control of such party, such as strikes, blockade, war, terrorism, riots, natural disasters, power outages, and/or refusal of license by the government, insofar as such an event prevents or delays the affected party from fulfilling its obligaFons and such party is not able to prevent or remove the force majeure at reasonable cost.

11. Counterparts. This SOW may be executed in any number of counterparts and each fully executed counterpart shall be deemed an original. The parFes agree (a) that facsimile or electronic signature shall be accepted as original signatures; and (b) that the SOW, or any document created pursuant to the SOW, may be maintained in an electronic document storage and retrieval system, a copy of which shall be considered an original. In any legal proceeding relaFng to the SOW, the parFes waive their right to raise any defense based on the execuFon of the SOW in counterparts or the delivery of such executed counterparts by copy, facsimile, or electronic delivery.

8. Authorization and Signatures
By signing below, the authorized representaFves of both parFes agree to the terms, scope, and condiFons set forth in this Statement of Work.

IBE Digital
Authorized Signature
Printed Name & Title
Date
City of Norwalk
Authorized Signature
Printed Name & Title
Date

SALES QUOTE
Sales Quote No: 40737
Account No:

Date: 9/17/26
CO07
City of Norwalk - City Hall
12700 Norwalk Blvd
Norwalk, CA 90650
City of Norwalk - City Hall Ship To:
12700 Norwalk Blvd
Norwalk, CA 90650
Bill To:

Sales Person P.O. Number Ship Method Payment Terms Quote Expires On Notes
Sloan Varing UPS Ground No Freight Charge 30 Days 10/17/26 NCPA 01-170
Item No Description Quantity UM Price Disc Amount
GMGF0PN5D-0002-P Office LTSC Standard 2024 - Commercial 275.00 License $495.00 0.02 $133,402.50 NCE Office 365 G1
(GCC)
NCE Office 365 G1 (GCC) Annual Commit 275.00 License $120.00 0.02 $32,340.00 NCE Microsoft Entra
ID P1
NCE Microsoft Entra ID P1 (GCC) Annual Commit 275.00 License $79.20 0.02 $21,344.40 NCE Microsoft 365
F3 GCC
NCE Microsoft 365 F3 GCC (Governmental Community Cloud
Pricing) Annual Commit

65.00 License $105.60 0.02 $6,726.72
Discount
Sales Tax
Freight
Sales Order Total
Subtotal
$0.00
$193,813.62
$0.00
*Change in Remittance*
F&M Bank
Account Name: I Copy Inc dba IBE Digital
Account Number: 31074324
ABA/Routing Number: 122201198
$193,813.62
$0.00

Page 1 of 1 ends

SALES QUOTE
Sales Quote No: 40736
Account No:

Date: 9/16/26
CO07
City of Norwalk - City Hall
12700 Norwalk Blvd
Norwalk, CA 90650
City of Norwalk - City Hall Ship To:
12700 Norwalk Blvd
Norwalk, CA 90650
Bill To:

Sales Person P.O. Number Ship Method Payment Terms Quote Expires On Notes
Sloan Varing UPS Ground No Freight Charge 30 Days 10/16/26 NCPA 01-170
Item No Description Quantity UM Price Disc Amount
MST-R18-02412 WinSvrCAL LicSAPk OLV D 1Y AqY1 AP UsrCAL 575.00 License $12.00 0.02 $6,762.00 MST-9EA-00516 Microsoft Windows Server DC Core Software Assurance OLV 2 Licenses LevelD Additional Product CoreLic 1 Year
Acquiredyear1

64.00 License $213.00 0.02 $13,359.36
MST-359-04623 SQLCAL SA OLV D 1Y AP UsrCAL 100.00 License $58.00 0.02 $5,684.00 MST-228-07281 SQLSvrStd LicSAPk OLV D 1Y AqY1 AP 2.00 License $579.00 0.02 $1,134.84 Discount
Sales Tax
Freight
Sales Order Total
Subtotal
$0.00
$26,940.20
$0.00
*Change in Remittance*
F&M Bank
Account Name: I Copy Inc dba IBE Digital
Account Number: 31074324
ABA/Routing Number: 122201198
$26,940.20
$0.00

Page 1 of 1 ends

1 City of Norwalk
City Hall & Transit Firewall Upgrade
To: Mike Johnson
City of Norwalk
From: Matt Abshire
IBE Digital
[email protected]
(562) 921-0202
Date: September 17, 2026
Attachment No. 3
2 Table of Contents

1. Overview.......................................................................................................................3

2. Scope of Work ..............................................................................................................3

3. Assumptions and Dependencies ................................................................................4

4. Out of Scope .................................................................................................................5

5. Commercial Terms.......................................................................................................6

6. Investment....................................................................................................................6

7. Terms and Conditions ...................................................................................................7

8. Authorization and Signatures ......................................................................................9 3 1. Overview
The City of Norwalk operates perimeter firewalls at City Hall and at Norwalk Transit that have reached end of life. To replace this end-of-life hardware, advance the City’s security posture, restore full manufacturer support, and improve operational resiliency, the City intends to deploy new high availability firewall pairs at both locations. City Hall will be served by a high availability pair of Palo Alto Networks PA-1420 firewalls and Norwalk Transit will be served by a high availability pair of Palo Alto Networks PA-460 firewalls.

The solution will replace the existing end-of-life Palo Alto Networks firewalls at each site with a resilient, secure perimeter firewall architecture that restores full manufacturer support, aligns with current operational requirements, and minimizes service disruption. The design will leverage Palo Alto Networks best practices for high availability deployment, configuration and policy migration from the outgoing firewalls, and lifecycle support, and will preserve existing network connectivity, security policies, and integrations at both City Hall and Norwalk Transit.

2. Scope of Work
Phase 1: Planning and Design
• Review current firewall configuration and network topology at City Hall and Norwalk Transit.
• Define the high availability deployment and migration strategy for the PA-1420 pair at City Hall and the PA-460 pair at Norwalk Transit.
• Confirm interface assignment, addressing, routing, and management access requirements for each site.
• Validate requirements, assumptions, and implementation schedule.

Phase 2: Implementation and Migration
• Stage, license, and update the high availability pair of PA-1420 firewalls for City Hall. • Stage, license, and update the high availability pair of PA-460 firewalls for Norwalk Transit.
• Configure high availability at each site, including HA links, device priority, and failover behavior.
• Migrate and validate security policies, address and service objects, NAT, and routing at each site.
4 • Enable the procured subscription services on each pair, including Advanced Threat Prevention, Advanced URL Filtering, Advanced WildFire, and Advanced DNS Security. • Generate and deploy the required certificates on each firewall pair signed by the City's new certificate authority, including management interface, GlobalProtect portal/gateway, and decryption certificates as applicable, and confirm trust distribution to City endpoints.
• Schedule and perform cutover from the existing firewalls to the new platform at each site.

Phase 3: Testing and Project Closeout
• Conduct high availability failover and functional testing at City Hall and Norwalk Transit. • Verify logging, management access, and administrative authentication. • Address post-cutover adjustments or optimizations.
• Create documentation and perform knowledge transfer.
• Update the documentation with new hardware and/or services. • Client project sign-off.

3. Assumptions and Dependencies
This SOW is predicated on the following assumptions. Material deviation from these assumptions may require a Change Order to adjust scope and/or fees. • Client will provide people and/or resources necessary to enable successful completion of this project.
• Client will identify a resource that will act as the primary contact for this project. IBE Digital will communicate project status, system requirements, issues, etc. to this individual.
• Client will provide IBE Digital with remote access accounts to required resources for accessing and supporting the project.
• Client will provide IBE Digital with a reasonably suitable workspace that has network connectivity and phone sets while onsite.
• Client will provide computing resources with access to production and test systems to facilitate the needs of the project.
5 • Client acknowledges that IBE Digital will require information from Client in order for IBE Digital resources to be fully utilized and to perform the services in the schedule and estimated days outlined herein. Client agrees that it is responsible for ensuring that IBE Digital is provided with such information in a timely manner to avoid delay or additional costs to Client which may result.
• Provide access to current firewall configurations and network documentation for both sites.
• Issue purchase authorization for the hardware, licenses, and subscriptions identified in this Statement of Work, and maintain those subscriptions following the initial term. • Assign appropriate technical and project contacts for coordination and approvals. • Participate in testing, validation, and acceptance of the final solution. • Unidentified configuration dependencies or legacy rules may require additional remediation during migration.
• Cutover activities may result in temporary service disruptions if unexpected issues arise. • PAN-OS version and hardware model differences between the outgoing firewalls and the new PA-1420 and PA-460 platforms may require configuration adjustments, including interface mapping, feature parity checks, and deprecated setting remediation. • Timely delivery and availability of Palo Alto Networks hardware and required licenses. • Availability of City technical staff for coordination, testing, and approvals at both sites. • Completion of prerequisite network readiness at each site, including power, cabling, interfaces, and uplinks.
• Agreed-upon maintenance windows to perform migration and cutover activities at City Hall and Norwalk Transit.

4. Out of Scope
The following items are explicitly excluded from this Statement of Work and may be engaged as separate projects or Change Orders as needed:
• Applications/services not explicitly defined in the statement of work. • Changes to existing internet circuits, carrier handoffs, or internal switching and routing beyond the firewall interfaces.
• Removal, decommissioning, or disposal of the legacy firewall hardware. 6 5. Commercial Terms
Engagement Type
This engagement is delivered on a fixed-fee basis for the scope of work defined in this SOW. The fixed fee covers all professional labor required to complete the scope of work.

Invoicing
• IBE Digital will invoice the fixed professional services fee per the schedule agreed with the City.
• Invoices are due Net 30 from date of invoice.
• Any approved Change Orders will be invoiced separately from the base SOW.

Change Order Process
Scope additions or material changes to the assumptions will require a written Change Order executed by both parties prior to IBE Digital committing to the additional work.

6. Investment
Hardware and Subscriptions
Site Item Qty Term
City Hall Palo Alto Networks PA-1420 firewall 2 One time City Hall PA-1420 Premium Support 2 12 months
City Hall PA-1420 Precision AI Network Security
Subscription Bundle
2 12 months
Transit Palo Alto Networks PA-460 firewall 2 One time
Transit PA-460 Premium Support 2 12 months
Transit PA-460 Precision AI Network Security Subscription Bundle
2 12 months
Investment Breakdown
Hardware / Software $116,560.00
7 Please Refer to provided Quote for more detail
Professional Services $7,800.00
Fixed fee for the services described in Section 2
Sales Tax (10.5% on Hardware / Software) $12,238.80
Total Project Investment $136,598.80
All prices are exclusive of any shipping costs.

Sourcewell Contract # 112124-KON & NCPA 01-170

7. Terms and Conditions
By executing this Statement of Work, Client agrees to purchase the services designated above and further agrees that the services shall be subject to the following Terms and Conditions of Service.

1. Fees and Payment: Client agrees to pay all fees specified in this SOW. Payment terms are net 30 days from date of invoice. Client shall be responsible for all applicable taxes arising from the services. IBE Digital may suspend service if Client has failed to pay any undisputed invoice within fifteen (15) days of the due date.

Undisputed invoices not paid by the due date may be subject to a monthly service charge which is the lesser of one and one-half percent (1.5%) per month or the highest rate allowed by law.

2. Limited Warranty: (a) IBE Digital warrants for a period of thirty (30) days following delivery (the "Warranty Period") that all services shall be performed in a professional manner in accordance with generally applicable industry standards. IBE Digital sole liability (and Client's exclusive remedy) for any breach of this warranty shall be for IBE Digital to re-perform any deficient services, or, if IBE Digital is unable to remedy such deficiency within thirty (30) days, to void the invoice for the deficient services. IBE Digital shall have no obligation with respect to a warranty claim: (i) if notified of such claim after the Warranty Period or (ii) if the claim is the result of third-party hardware or software failures, or the actions of Client or a third party. (b) THIS SECTION 2 IS A LIMITED WARRANTY AND SETS FORTH THE ONLY WARRANTIES MADE BY IBE DIGITAL. IBE DIGITAL MAKES NO

OTHER WARRANTIES, CONDITIONS OR UNDERTAKINGS, EXPRESS OR IMPLIED, STATUTORY OR OTHERWISE,

INCLUDING BUT NOT LIMITED TO WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE OR NONINFRINGEMENT. ALL SOFTWARE AND HARDWARE PROVIDED OR INSTALLED BY IBE DIGITAL HEREUNDER ARE SUBJECT EXCLUSIVELY TO THE RESPECTIVE MANUFACTURER'S WARRANTY.

3. COMPENSATION FOR HIRING OTHER PARTY'S EMPLOYEES: During the term of this SOW and for a period of twelve (12) months following the termination or expiration of this SOW, Client agrees not to directly or indirectly solicit for employment, hire, engage, or retain (whether as an employee, independent contractor, consultant, or otherwise) any employee or contractor of IBE Digital who was involved in providing services to Client under this SOW. In the event Client hires, engages, or otherwise retains the services of any such employee or contractor of IBE Digital, whether directly or indirectly (including through a third-party staffing firm or contractor), Client agrees to pay IBE Digital, as reasonable compensation for the loss of such personnel and associated recruitment and training costs, a fee of One Hundred Thousand Dollars ($100,000) for each such employee or contractor. This provision shall apply to any employee or contractor of IBE Digital who provided services to Client during the twelve (12) months preceding such hiring or engagement. 8 4. LIMITATION OF LIABILITY: (A) NEITHER PARTY SHALL BE LIABLE TO THE OTHER FOR ANY INDIRECT,

INCIDENTAL, SPECIAL, OR CONSEQUENTIAL DAMAGES (INCLUDING, WITHOUT LIMITATION, DAMAGES FOR

INTERRUPTION OF SERVICES, LOSS OF BUSINESS, LOSS OF PROFITS, LOSS OF REVENUE, LOSS OF DATA, OR

LOSS OR INCREASED EXPENSE OF USE), WHETHER IN AN ACTION IN CONTRACT, WARRANTY, TORT (INCLUDING, WITHOUT LIMITATION, NEGLIGENCE), OR STRICT LIABILITY, EVEN IF THE PARTIES HAVE BEEN ADVISED OF THE POSSIBILITY OF SUCH LIABILITIES. IBE DIGITAL SHALL NOT BE RESPONSIBLE FOR PROBLEMS THAT OCCUR AS A RESULT OF THE USE OF ANY THIRD-PARTY SOFTWARE OR HARDWARE. (B). EXCEPT FOR

GROSS NEGLIGENCE OR WILLFUL MISCONDUCT, IBE DIGITAL'S AND ITS SUBCONTRACTOR'S TOTAL

AGGREGATE LIABILITY TO CLIENT ARISING OUT OF SERVICES PERFORMED UNDER THIS SOW, REGARDLESS OF

THE LEGAL THEORY UPON WHICH SUCH LIABILITY MAY BE BASED, SHALL NOT EXCEED THE TOTAL PAYMENTS MADE BY CLIENT TO IBE DIGITAL FOR THE SERVICES IN QUESTION IN THE TWELVE (12) MONTH PERIOD IMMEDIATELY PRECEDING THE FIRST OCCURRENCE OF THE EVENT GIVING RISE TO SUCH LIABILITY.

5. Confidential and Proprietary Information: (a) Each party agrees that all know-how, business, technical and financial information it obtains (as a "Receiving Party") from the disclosing party (as a "Disclosing Party") constitute the confidential property of the Disclosing Party ("Confidential Information"), provided that it is identified as confidential at the time of disclosure or should be reasonably known by the Receiving Party to be Confidential Information due to the nature of the information disclosed and the circumstances surrounding the disclosure. Except as may be necessary to perform its obligations under this SOW, the Receiving Party will hold in confidence and not use or disclose any of the Disclosing Party's Confidential Information. The Receiving Party's nondisclosure obligation shall not apply to information that: (i) was known to it prior to receipt of the Confidential Information; (ii) is publicly available; (iii) is rightfully obtained by the Receiving Party from a third party; (iv) is independently developed by employees of the Receiving Party; or (v) is required to be disclosed pursuant to a regulation, law or court order. (b) Any templates, schematics, processes or technical documentation provided by IBE Digital shall be deemed Confidential Information and proprietary information of IBE Digital without any marking or further designation. Client may use such information solely for its own internal business purposes. IBE Digital shall retain all rights to the aforementioned, which shall be returned to IBE Digital upon termination of the applicable SOW. (c) IBE Digital shall maintain the confidentiality of protected health information in its possession or under its control in accordance with the Health Insurance Portability and Accountability Act of 1996, as amended by the Health Information Technology for Economic and Clinical Health Act.

6. Independent Contractor: IBE Digital and Client shall at all times be independent contractors. There is no relationship of partnership, joint venture, employment, franchise or agency created hereby between the parties.

Neither party shall have the power to bind the other or incur obligations on the other party's behalf without the other party's prior written consent.

7. Assignment: This SOW may not be assigned by either party without the prior written consent of the other party, which consent shall not be unreasonably withheld or delayed. No consent shall be required where an assignment is made (i) pursuant to a merger or change of control or (ii) to an assignee of all or substantially all of the party's assets. Any purported assignment in violation of this section shall be void.

8. Complete Understanding; Modification: This SOW, as well as any applicable terms of service posted at www.ibedigital.com/terms, shall constitute the full and complete understanding and agreement between Client and IBE Digital and supersedes all prior or contemporaneous negotiations, discussions or agreements, whether written or oral, between the parties regarding the subject matter contained herein. Any waiver, modification or amendment of any provision of this SOW shall be effective only if in writing and signed by both parties.

9. Waiver and Severability: Waiver or failure by either party to exercise in any respect any right or obligation provided for in this SOW shall not be deemed a waiver of any further right or obligation hereunder. If any provision of this SOW is found by a court of competent jurisdiction to be unenforceable for any reason, the remainder of this SOW shall continue in full force and effect. 9 10. Force Majeure: Neither party shall be liable to the other for any delay or failure to perform any obligation under this SOW, except for a failure to pay fees, if the delay or failure is due to unforeseen events which are beyond the reasonable control of such party, such as strikes, blockade, war, terrorism, riots, natural disasters, power outages, and/or refusal of license by the government, insofar as such an event prevents or delays the affected party from fulfilling its obligations and such party is not able to prevent or remove the force majeure at reasonable cost.

11. Counterparts. This SOW may be executed in any number of counterparts and each fully executed counterpart shall be deemed an original. The parties agree (a) that facsimile or electronic signature shall be accepted as original signatures; and (b) that the SOW, or any document created pursuant to the SOW, may be maintained in an electronic document storage and retrieval system, a copy of which shall be considered an original. In any legal proceeding relating to the SOW, the parties waive their right to raise any defense based on the execution of the SOW in counterparts or the delivery of such executed counterparts by copy, facsimile, or electronic delivery.

8. Authorization and Signatures
By signing below, the authorized representatives of both parties agree to the terms, scope, and conditions set forth in this Statement of Work.

IBE Digital
Authorized Signature
Printed Name & Title
Date
City of Norwalk
Authorized Signature
Printed Name & Title
Date
1 562.921.0202
[email protected] ibedigital.com 11266 Monarch St. B, Garden Grove, CA
City of Norwalk
VMware vSphere Upgrade (ESXi &
vCenter)
To: Mike Johnson
City of Norwalk
From: Ma1 Abshire
IBE Digital
[email protected]
(562) 921-0202
Date: September 17, 2026
2 562.921.0202
[email protected] ibedigital.com 11266 Monarch St. B, Garden Grove, CA
Table of Contents

1. Purpose and Overview ........................................................................................................ 3

2. Background and Current State ..................................................Error! Bookmark not defined.

3. Scope of Work..................................................................................................................... 3

3.1 vCenter Server Upgrade.............................................................................................................. 3

3.2 ESXi Host Upgrades..................................................................................................................... 3

3.3 VMware Licensing ...................................................................................................................... 4

3.4 VMware Tools Updates............................................................................................................... 4

3.5 ValidaAon and Handoff............................................................................................................... 4

4. Assump@ons and Dependencies.......................................................................................... 4

5. Out of Scope ....................................................................................................................... 5

6. Commercial Terms............................................................................................................... 5

6.1 VMware Licensing ...................................................................................................................... 5

6.2 Invoicing..................................................................................................................................... 6

6.3 Change Order Process................................................................................................................. 6

7. General Terms and Condi@ons............................................................................................. 6

8. Investment Breakdown ....................................................................................................... 9

9. Authoriza@on and Signatures............................................................................................ 10 3 562.921.0202
[email protected] ibedigital.com 11266 Monarch St. B, Garden Grove, CA

1. Purpose and Overview
This Statement of Work (SOW) establishes the scope, deliverables, and commercial terms for IBE Digital's engagement with the City of Norwalk (hereinaEer the Client) to upgrade the City's VMware virtualizaJon plaKorm. The engagement covers upgrading the City's five (5) ESXi hosts and their vCenter Server management appliance to a current, supported release, applying VMware licensing across the hosts, and updaJng VMware Tools on all virtual machines running on the plaKorm.

The work brings the City's virtualizaJon plaKorm to a current, fully supported baseline, ensures the hosts are correctly licensed under VMware's current subscripJon model, and updates the in-guest VMware Tools across the virtual machine estate to maintain performance, stability, and supportability.

All work will be performed in coordinaJon with City of Norwalk IT staff and sequenced into controlled maintenance windows to minimize risk to producJon services.

3. Scope of Work
IBE Digital will perform the following work. All upgrade acJviJes will be sequenced to preserve virtual machine availability, using vMoJon and host maintenance mode where the cluster configraJon permits, and scheduled with City IT staff.

Phase 1: vCenter Server Upgrade
• Review the current vCenter Server version, topology, and configuraJon, and confirm the supported upgrade path to the target release
• Take a backup and snapshot of the vCenter Server appliance prior to the upgrade • Upgrade the vCenter Server appliance to the target supported release • Validate vCenter services, inventory, host connecJvity, and single sign-on following the upgrade
Phase 2: ESXi Host Upgrades
• Confirm hardware compaJbility for the target ESXi release against the vendor compaJbility guide for each of the five hosts
• Place each host into maintenance mode in sequence, migraJng running virtual machines to the remaining hosts where the cluster configuraJon permits • Upgrade each of the five (5) ESXi hosts to the target supported release 4 562.921.0202
[email protected] ibedigital.com 11266 Monarch St. B, Garden Grove, CA
• Validate host configuraJon, networking, storage connecJvity, and cluster services following each host upgrade
• Return each host to service and confirm virtual machine distribuJon across the cluster Phase 3: VMware Licensing
• Apply the City's VMware licensing to the five hosts following the upgrade and confirm each host reflects the correct licensed state in vCenter • Confirm the purchased license enJtlement covers the host core counts and apply it across the five hosts
Phase 4: VMware Tools Updates
• Update VMware Tools to the version aligned with the upgraded plaKorm on all virtual machines running on the cluster
• Sequence VMware Tools updates to accommodate reboots during agreed maintenance windows where a reboot is required
• Confirm VMware Tools reports a current and running state on each virtual machine following the update
Phase 5: ValidaCon and Handoff
• Confirm cluster health, host status, and virtual machine operaJon following compleJon of all upgrades
• Update IBE Digital's documentaJon with the upgraded plaKorm versions and licensing details for ongoing managed-services reference
• Deliver a project compleJon sign-off confirming scope compleJon

4. Assumptions and Dependencies
This SOW is predicated on the following assumpJons. Material deviaJon from these assumpJons may require a Change Order to adjust scope and/or fees. • The City of Norwalk will provide IBE Digital with administraJve access to vCenter, the ESXi hosts, and the virtualizaJon management network prior to project kickoff • The five ESXi hosts are on hardware listed as compaJble with the target ESXi release; hosts found to be incompaJble will be addressed via Change Order • The City has already purchased the required VMware licensing and support renewal through IBE Digital; that licensing will be applied to the hosts as part of this engagement (see SecJon 8)
5 562.921.0202
[email protected] ibedigital.com 11266 Monarch St. B, Garden Grove, CA
• Sufficient cluster capacity exists to place one host at a Jme into maintenance mode and migrate its virtual machines to the remaining hosts; where capacity does not permit live migraJon, brief virtual machine downJme will be scheduled during maintenance windows
• The City will maintain current, validated backups of vCenter and all virtual machines prior to the upgrade acJviJes
• IBE Digital will have the ability to schedule maintenance windows with City IT staff for host upgrades and for any VMware Tools updates that require a virtual machine reboot • All work will be performed remotely unless on-site presence is mutually agreed upon; on-site travel Jme is not included in the esJmate

5. Out of Scope
The following items are explicitly excluded from this Statement of Work and may be engaged as separate projects or Change Orders as needed:
• Procurement of addiJonal VMware licensing beyond the licensing and support renewal the City has already purchased through IBE Digital
• Server hardware upgrades, firmware or BIOS updates, or replacement of hosts found incompaJble with the target ESXi release
• Guest operaJng system upgrades or in-guest applicaJon changes beyond the VMware Tools update
• Storage array, SAN fabric, or physical network changes beyond those directly required to complete the host upgrades
• MigraJon to a different hypervisor or virtualizaJon plaKorm • Redesign of the cluster, networking, or storage architecture

6. Commercial Terms
VMware Licensing
The City has purchased its VMware licensing and support renewal through IBE Digital under VMware's current per-core subscripJon model. This licensing will be applied to the five hosts as part of the engagement, and IBE Digital will confirm that each host reflects the correct licensed state in vCenter following the upgrade. No addiJonal licensing purchase is required to complete the scope of this SOW.
6 562.921.0202
[email protected] ibedigital.com 11266 Monarch St. B, Garden Grove, CA
Invoicing
• IBE Digital will invoice the fixed professional services fee per the schedule agreed with the City.
• Invoices are due Net 30 from date of invoice.
• Any approved Change Orders will be invoiced separately from the base SOW.

6.3 Change Order Process
Scope addiJons or material changes to the assumpJons will require a wriben Change Order executed by both parJes prior to IBE Digital commicng to the addiJonal work.

7. General Terms and Conditions
By execuJng this Statement of Work, Client agrees to purchase the services designated above and further agrees that the services shall be subject to the following Terms and CondiJons of Service.

1. Fees and Payment: Client agrees to pay all fees specified in this SOW. Payment terms are net 30 days from date of invoice. Client shall be responsible for all applicable taxes arising from the services. IBE Digital may suspend service if Client has failed to pay any undisputed invoice within fiEeen (15) days of the due date. Undisputed invoices not paid by the due date may be subject to a monthly service charge which is the lesser of one and one-half percent (1.5%) per month or the highest rate allowed by law.

2. Limited Warranty: (a) IBE Digital warrants for a period of thirty (30) days following delivery (the "Warranty Period") that all services shall be performed in a professional manner in accordance with generally applicable industry standards. IBE Digital sole liability (and Client's exclusive remedy) for any breach of this warranty shall be for IBE Digital to re-perform any deficient services, or, if IBE Digital is unable to remedy such deficiency within thirty (30) days, to void the invoice for the deficient services. IBE Digital shall have no obligaJon with respect to a warranty claim: (i) if noJfied of such claim aEer the Warranty Period or (ii) if the claim is the result of third-party hardware or soEware failures, or the acJons of Client or a third party. (b) THIS SECTION 2 IS A LIMITED WARRANTY AND SETS FORTH THE ONLY WARRANTIES MADE BY IBE DIGITAL. IBE DIGITAL MAKES NO OTHER WARRANTIES, CONDITIONS OR UNDERTAKINGS,

EXPRESS OR IMPLIED, STATUTORY OR OTHERWISE, INCLUDING BUT NOT LIMITED TO

WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE OR NONINFRINGEMENT. ALL SOFTWARE AND HARDWARE PROVIDED OR INSTALLED BY IBE DIGITAL HEREUNDER ARE SUBJECT EXCLUSIVELY TO THE RESPECTIVE MANUFACTURER'S WARRANTY. 7 562.921.0202
[email protected] ibedigital.com 11266 Monarch St. B, Garden Grove, CA

3. COMPENSATION FOR HIRING OTHER PARTY'S EMPLOYEES: During the term of this SOW and for a period of twelve (12) months following the terminaJon or expiraJon of this SOW, Client agrees not to directly or indirectly solicit for employment, hire, engage, or retain (whether as an employee, independent contractor, consultant, or otherwise) any employee or contractor of IBE Digital who was involved in providing services to Client under this SOW. In the event Client hires, engages, or otherwise retains the services of any such employee or contractor of IBE Digital, whether directly or indirectly (including through a third-party staffing firm or contractor), Client agrees to pay IBE Digital, as reasonable compensaJon for the loss of such personnel and associated recruitment and training costs, a fee of One Hundred Thousand Dollars ($100,000) for each such employee or contractor. This provision shall apply to any employee or contractor of IBE Digital who provided services to Client during the twelve (12) months preceding such hiring or engagement.

4. LIMITATION OF LIABILITY: (A) NEITHER PARTY SHALL BE LIABLE TO THE OTHER FOR ANY

INDIRECT, INCIDENTAL, SPECIAL, OR CONSEQUENTIAL DAMAGES (INCLUDING, WITHOUT

LIMITATION, DAMAGES FOR INTERRUPTION OF SERVICES, LOSS OF BUSINESS, LOSS OF PROFITS,

LOSS OF REVENUE, LOSS OF DATA, OR LOSS OR INCREASED EXPENSE OF USE), WHETHER IN AN

ACTION IN CONTRACT, WARRANTY, TORT (INCLUDING, WITHOUT LIMITATION, NEGLIGENCE), OR

STRICT LIABILITY, EVEN IF THE PARTIES HAVE BEEN ADVISED OF THE POSSIBILITY OF SUCH LIABILITIES. IBE DIGITAL SHALL NOT BE RESPONSIBLE FOR PROBLEMS THAT OCCUR AS A RESULT OF THE USE OF ANY THIRD-PARTY SOFTWARE OR HARDWARE. (B). EXCEPT FOR GROSS

NEGLIGENCE OR WILLFUL MISCONDUCT, IBE DIGITAL'S AND ITS SUBCONTRACTOR'S TOTAL

AGGREGATE LIABILITY TO CLIENT ARISING OUT OF SERVICES PERFORMED UNDER THIS SOW,

REGARDLESS OF THE LEGAL THEORY UPON WHICH SUCH LIABILITY MAY BE BASED, SHALL NOT

EXCEED THE TOTAL PAYMENTS MADE BY CLIENT TO IBE DIGITAL FOR THE SERVICES IN QUESTION IN THE TWELVE (12) MONTH PERIOD IMMEDIATELY PRECEDING THE FIRST OCCURRENCE OF THE EVENT GIVING RISE TO SUCH LIABILITY.

5. ConfidenHal and Proprietary InformaHon: (a) Each party agrees that all know-how, business, technical and financial informaJon it obtains (as a "Receiving Party") from the disclosing party (as a "Disclosing Party") consJtute the confidenJal property of the Disclosing Party ("ConfidenJal InformaJon"), provided that it is idenJfied as confidenJal at the Jme of disclosure or should be reasonably known by the Receiving Party to be ConfidenJal InformaJon due to the nature of the informaJon disclosed and the circumstances surrounding the disclosure. Except as may be necessary to perform its obligaJons under this SOW, the Receiving Party will hold in confidence and not use or disclose any of the Disclosing Party's ConfidenJal InformaJon. The Receiving Party's nondisclosure obligaJon shall not apply to informaJon that:
(i) was known to it prior to receipt of the ConfidenJal InformaJon; (ii) is publicly available; (iii) is righKully obtained by the Receiving Party from a third party; (iv) is independently developed by 8 562.921.0202
[email protected] ibedigital.com 11266 Monarch St. B, Garden Grove, CA
employees of the Receiving Party; or (v) is required to be disclosed pursuant to a regulaJon, law or court order. (b) Any templates, schemaJcs, processes or technical documentaJon provided by IBE Digital shall be deemed ConfidenJal InformaJon and proprietary informaJon of IBE Digital without any marking or further designaJon. Client may use such informaJon solely for its own internal business purposes. IBE Digital shall retain all rights to the aforemenJoned, which shall be returned to IBE Digital upon terminaJon of the applicable SOW. (c) IBE Digital shall maintain the confidenJality of protected health informaJon in its possession or under its control in accordance with the Health Insurance Portability and Accountability Act of 1996, as amended by the Health InformaJon Technology for Economic and Clinical Health Act.

6. Independent Contractor: IBE Digital and Client shall at all Jmes be independent contractors.

There is no relaJonship of partnership, joint venture, employment, franchise or agency created hereby between the parJes. Neither party shall have the power to bind the other or incur obligaJons on the other party's behalf without the other party's prior wriben consent.

7. Assignment: This SOW may not be assigned by either party without the prior wriben consent of the other party, which consent shall not be unreasonably withheld or delayed. No consent shall be required where an assignment is made (i) pursuant to a merger or change of control or (ii) to an assignee of all or substanJally all of the party's assets. Any purported assignment in violaJon of this secJon shall be void.

8. Complete Understanding; ModificaHon: This SOW, as well as any applicable terms of service posted at www.ibedigital.com/terms, shall consJtute the full and complete understanding and agreement between Client and IBE Digital and supersedes all prior or contemporaneous negoJaJons, discussions or agreements, whether wriben or oral, between the parJes regarding the subject maber contained herein. Any waiver, modificaJon or amendment of any provision of this SOW shall be effecJve only if in wriJng and signed by both parJes.

9. Waiver and Severability: Waiver or failure by either party to exercise in any respect any right or obligaJon provided for in this SOW shall not be deemed a waiver of any further right or obligaJon hereunder. If any provision of this SOW is found by a court of competent jurisdicJon to be unenforceable for any reason, the remainder of this SOW shall conJnue in full force and effect.

10. Force Majeure: Neither party shall be liable to the other for any delay or failure to perform any obligaJon under this SOW, except for a failure to pay fees, if the delay or failure is due to unforeseen events which are beyond the reasonable control of such party, such as strikes, blockade, war, terrorism, riots, natural disasters, power outages, and/or refusal of license by the government, insofar as such an event prevents or delays the affected party from fulfilling its 9 562.921.0202
[email protected] ibedigital.com 11266 Monarch St. B, Garden Grove, CA
obligaJons and such party is not able to prevent or remove the force majeure at reasonable cost.

11. Counterparts. This SOW may be executed in any number of counterparts and each fully executed counterpart shall be deemed an original. The parJes agree (a) that facsimile or electronic signature shall be accepted as original signatures; and (b) that the SOW, or any document created pursuant to the SOW, may be maintained in an electronic document storage and retrieval system, a copy of which shall be considered an original. In any legal proceeding relaJng to the SOW, the parJes waive their right to raise any defense based on the execuJon of the SOW in counterparts or the delivery of such executed counterparts by copy, facsimile, or electronic delivery.

8. Investment Breakdown
The fixed professional services fee for the scope defined in this Statement of Work is set out below. This fee covers professional labor only; the VMware licensing and support renewal purchased separately by the City is not included in this fee.

Professional Services $10,400.00
Fixed fee for the services described in Sec2on 2
Total Project Investment $10,400.00
Sourcewell Contract # 112124-KON
10 562.921.0202
[email protected] ibedigital.com 11266 Monarch St. B, Garden Grove, CA

9. Authorization and Signatures
By signing below, the authorized representaJves of both parJes agree to the terms, scope, and condiJons set forth in this Statement of Work.

IBE Digital
Authorized Signature
Printed Name & Title
Date
City of Norwalk
Authorized Signature
Printed Name & Title
Date

← All documents from this meeting