Exhibit E
The following City of Oakland Standard Condi�ons of Approval apply to construc�on condi�ons. The full details of each condi�on can be found in the Current (February 2024) Standard Condi�ons of Approval.
Part 1: Standard Condi�ons of Approval – General Administra�ve Condi�ons
15. Construc�on Management Plan
16. Standard Condi�ons of Approval / Mi�ga�on Monitoring and Repor�ng Program (SCAMMRP)
Part 2: Standard Condi�ons of Approval – Environmental Protec�on Measures
AESTHETICS
18. Trash and Blight Removal
19. Graffi� Control
20. Landscape Plan
AIR QUALITY
22. Dust Controls – Construc�on Related
23. Criteria Air Pollutant Controls - Construc�on and Opera�on Related
24. Toxic Air Contaminant Controls-Construc�on Related
25. Reduce Exposure to Air Pollu�on (Toxic Air Contaminants)
26. Sta�onary Sources of Air Pollu�on (Toxic Air Contaminants)
28. Asbestos in Structures
29. Naturally-Occurring Asbestos
CULTURAL RESOURCES
38. Archaeological and Paleontological Resources – Discovery During Construc�on
39. Archaeologically Sensi�ve Areas – Pre-Construc�on Measures
40. Human Remains – Discovery During Construc�on
GEOLOGY AND SOILS
[The following condi�on applies to all projects requiring a construc�on-related permit.]
42. Construc�on-Related Permit(s)
43. Soils Report
44. Earthquake Fault Zone
45. Seismic Hazards Zone (Landslide/Liquefac�on)
46. Oakland Area Geologic Hazard Abatement District (GHAD)
47. Project Compliance with the Equitable Climate Ac�on Plan (ECAP) Consistency Checklist
48. Greenhouse Gas (GHG) Reduc�on Plan
HAZARDS AND HAZARDOUS MATERIALS
49. Hazardous Materials Related to Construc�on
50. Hazardous Building Materials and Site Contamina�on
52. Fir 53. Designated Very High Fire Severity Zone – Vegeta�on Management e Safety Phasing Plan
HYDROLOGY AND WATER QUALITY
54. Erosion and Sedimenta�on Control Measures for Construc�on
55. Erosion and Sedimenta�on Control Plan for Construc�on
56. State Construc�on General Permit
57. Drainage Plan for Post-Construc�on Stormwater Runoff on Hillside Proper�es
58. Site Design Measures to Reduce Stormwater Runoff
59. Source Control Measures to Limit Stormwater Pollu�on
60. NPDES C.3 Stormwater Requirements for Regulated Projects
61. NPDES C.3 Stormwater Requirements for Small Projects
64. Creek Protec�on Plan
66. Structures in a Flood Zone
NOISE
69. Construc�on Days/Hours
70. Construc�on Noise
71. Extreme Construc�on Noise
72. Project-Specific Construc�on Noise Reduc�on Measures
73. Construc�on Noise Complaints
74. Exposure to Community Noise
75. Opera�onal Noise
76. Exposure to Vibra�on
77. Vibra�on Impacts on Adjacent Structures or Vibra�on-Sensi�ve Ac�vi�es
TRANSPORTATION/TRAFFIC
82. Construc�on Ac�vity in the Public Right-of-Way
84. Transporta�on Improvements
UTILITY AND SERVICE SYSTEMS
89. Construc�on and Demoli�on Waste Reduc�on and Recycling
90. Underground U�li�es
94. Sanitary Sewer System
95. Storm Drain System