Cities Index.
View Exhibit E

Oakland City Council
March 19, 2024

Document
View Exhibit E
Meeting
March 19, 2024
Body
Oakland City Council
Original file
151 KB
Text extracted from the city's file for reading and search. Open the original on oakland.legistar1.com. That file is the official record.

Exhibit E

The following City of Oakland Standard Condi�ons of Approval apply to construc�on condi�ons. The full details of each condi�on can be found in the Current (February 2024) Standard Condi�ons of Approval.

Part 1: Standard Condi�ons of Approval – General Administra�ve Condi�ons

15. Construc�on Management Plan

16. Standard Condi�ons of Approval / Mi�ga�on Monitoring and Repor�ng Program (SCAMMRP)

Part 2: Standard Condi�ons of Approval – Environmental Protec�on Measures

AESTHETICS

18. Trash and Blight Removal

19. Graffi� Control

20. Landscape Plan

AIR QUALITY

22. Dust Controls – Construc�on Related

23. Criteria Air Pollutant Controls - Construc�on and Opera�on Related

24. Toxic Air Contaminant Controls-Construc�on Related

25. Reduce Exposure to Air Pollu�on (Toxic Air Contaminants)

26. Sta�onary Sources of Air Pollu�on (Toxic Air Contaminants)

28. Asbestos in Structures

29. Naturally-Occurring Asbestos

CULTURAL RESOURCES

38. Archaeological and Paleontological Resources – Discovery During Construc�on

39. Archaeologically Sensi�ve Areas – Pre-Construc�on Measures

40. Human Remains – Discovery During Construc�on

GEOLOGY AND SOILS
[The following condi�on applies to all projects requiring a construc�on-related permit.]

42. Construc�on-Related Permit(s)

43. Soils Report

44. Earthquake Fault Zone

45. Seismic Hazards Zone (Landslide/Liquefac�on)

46. Oakland Area Geologic Hazard Abatement District (GHAD)

47. Project Compliance with the Equitable Climate Ac�on Plan (ECAP) Consistency Checklist

48. Greenhouse Gas (GHG) Reduc�on Plan

HAZARDS AND HAZARDOUS MATERIALS

49. Hazardous Materials Related to Construc�on

50. Hazardous Building Materials and Site Contamina�on

52. Fir 53. Designated Very High Fire Severity Zone – Vegeta�on Management e Safety Phasing Plan

HYDROLOGY AND WATER QUALITY

54. Erosion and Sedimenta�on Control Measures for Construc�on

55. Erosion and Sedimenta�on Control Plan for Construc�on

56. State Construc�on General Permit

57. Drainage Plan for Post-Construc�on Stormwater Runoff on Hillside Proper�es

58. Site Design Measures to Reduce Stormwater Runoff

59. Source Control Measures to Limit Stormwater Pollu�on

60. NPDES C.3 Stormwater Requirements for Regulated Projects

61. NPDES C.3 Stormwater Requirements for Small Projects

64. Creek Protec�on Plan

66. Structures in a Flood Zone

NOISE

69. Construc�on Days/Hours

70. Construc�on Noise

71. Extreme Construc�on Noise

72. Project-Specific Construc�on Noise Reduc�on Measures

73. Construc�on Noise Complaints

74. Exposure to Community Noise

75. Opera�onal Noise

76. Exposure to Vibra�on

77. Vibra�on Impacts on Adjacent Structures or Vibra�on-Sensi�ve Ac�vi�es

TRANSPORTATION/TRAFFIC

82. Construc�on Ac�vity in the Public Right-of-Way

84. Transporta�on Improvements

UTILITY AND SERVICE SYSTEMS

89. Construc�on and Demoli�on Waste Reduc�on and Recycling

90. Underground U�li�es

94. Sanitary Sewer System

95. Storm Drain System

← All documents from this meeting