LAMMPS PHASE I
HSIP 8 BANCROFT
HSIP 8
DOWNTOWN
HSIP 7 VARIOUS
LOCATIONS
HSIP 7 MARKET
SAN PABLO
HSIP 7 SHATTUCK
& CLAREMONT AVE
HSIP 8 GUARDRAILS
OAKLAND HILLS
LOWER PARK BLVD BIKE & PED ENHANCEMENTS
LAKESIDE
GREENSTREET
ROCKRIDGE BART SAFE
ROUTES TO TRANSIT
I-880 UNDERCROSSING
IMPROVEMENTS
LAKE MERRITT TO BAY
TRAIL PED BRIDGE
ESTUARY PARK TRANSP.
IMPROVEMENTS
HSIP 8
FRUITVALE
HSIP 8 HIGH ST
HSIP 8 35TH AVE
19 TH ST BART TO LAKE
MERRITT URBAN GREENWAY
2023-25 Complete Streets Capital Projects Department of Transportation
Committed Projects**
Parks
Schools
N
HSIP 10 Systemic Crossing
Improvement Locations
*The following projects are not shown in this map: Underpass Improvements, HSIP 11 Projects **Committed projects have grant obligated funding. The Complete Streets Program provides the required local match as mandated by each grant program. *The following projects are not shown in this map: Underpass Improvements, HSIP 11 Projects **Committed projects have grant obligated funding. The Complete Streets Program provides the required local match as mandated by each grant program.
GRAND VIEW DR
NORTH HILL CT
MILES AVE
BUCKEYE AVE
HERMOSA AVE
THORNHILL DR
SARONI DR
CHAMBERS LN
VILLANOVA DR
SNAKE RD
MOUNTAIN
BLVD
CRESTMONT DR
VICTOR AVE
PAMPAS AVE
PENNIMAN AVE
FULLINGTON ST
LEIMERT BLVD
CASTERLINE RD
TOMPKINS AVE
WHITTLE AVE
KNOLL AVE
LAGUNA AVE
55TH AVE
39TH AVE
52ND AVE
11TH AVE
10TH AVE
4TH AVE
12TH AVE
13TH AVE
98TH AVE
97TH AVE
86TH AVE76TH AVE
ROYAL ST
ASHTON AVE
83RD AVE81ST AVE
82ND AVE OAK KNOLL
BLVD
64TH AVE
69TH AVE61ST AVE63RD AVE
23RD AVE
23RD AVE
24TH AVE
26TH AVE
37TH AVE
E 9TH ST
E 28TH STE 30TH ST
29TH AVE
73RD AVE64TH AVE65TH AVE
EDWARDS AVE
HAVENSCOURT BLVD
72ND AVE
87TH AVE
102ND AVE104TH AVE
109TH AVE
ST ELMO DR
CARY AVE
TOPANGA DRCATRON DR
ESTEPA DR
36TH ST
12TH ST
28TH ST
24TH ST
APGAR ST
46TH ST
26TH ST
7TH ST
5TH ST
8TH ST
12TH ST
10TH ST
10TH ST
14TH ST
14TH ST
BAY PL
W GRAND AVE
ELYSIAN
FIELDS DR
42ND ST
61ST ST
62ND ST
ALCATRAZ AVE
YERBA
BUENA AVE
CARRINGTON
ST
44TH ST
43RD ST
CLAREMONT AVE
INTERNATIONAL BLVD
INTERNATIONAL BLVD BRT-SUPPORTIVE PED IMPROVEMENT PHASE IISAN ANTONIO WAY
PLYMOUTH ST
BANCROFT AVE
STEARNS AVE
BURR ST
SUNNYSIDE ST
HILLSIDE ST
HARVEY AVE
EDES AVEWALTER AVE
FOOTHILL BLVD
FOOTHILL BLVD
E 15TH ST
E 15TH ST
E 19TH ST
VICKSBURG AVE
COOLIDGE AVE
KINGSLAND AVE
CAMDEN ST
HALLIDAY AVE
HILLSIDE ST
TELEGRAPH AVE
TELEGRAPH AVE
WESTALL AVE MACARTHUR BLVD
MACARTHUR BLVDHAROLD ST
PARK BLVD
TELEGRAPH AVE
WEST ST
ELM ST
BROOK ST
JEFFERSON ST
PINE ST
WOOD ST
POPLAR ST
ADELINE ST
FRANKLIN STALICE STBROADWAY
KELLER AVE
FONTAINE ST
UTAH ST
GRANADA AVE
HOLLIS ST
OAKPORT ST
COLISEUM WAY
COLLEGE AVE
LOWELL ST
GRAND AVE
OAKLAND AVE
ESTEPA DR
12TH ST
APGAR ST
26TH ST
28TH ST
BAY PL
ELYSIAN
FIELDS DR
GREENVIEW DR
42ND ST
54TH ST
65TH ST
POIRIER ST
62ND ST
ALCATRAZ AVE
YERBA
BUENA AVE
CARRINGTON
ST
44TH ST
43RD ST
Knowland
Park
SUMMIT ST
GLEASON WAY
E 18TH ST
E 21ST ST
FRUITVALE ALIVE
GAP CLOSURE
MARR AVE KNOLL AVE
55TH AVE
39TH AVE
52ND AVE
11TH AVE
10TH AVE
12TH AVE
13TH AVE
98TH AVE
76TH AVE ROYAL ST
ASHTON AVE
82ND AVE
64TH AVE
69TH AVE61ST AVE63RD AVE
23RD AVE
BRIDGE
23RD AVE
24TH AVE
26TH AVE
37TH AVE
E 28TH STE 30TH ST
HSIP 8 FRUITVALE
73RD AVE
EDWARDS AVE
HOLMES AVE
GREENRIDGE DR
HAVENSCOURT BLVD
72ND AVE
87TH AVE
ST ELMO DR
CARY AVE
TOPANGA DRCATRON DR
WEST ST
JEFFERSON ST
ADELINE ST
BROADWAY
KELLER AVE
SHETLAND AVE
PERALTA
OAKS CT
FONTAINE ST
UTAH ST
HOLLIS ST
OAKPORT ST
COLISEUM WAY
GRAND VIEW DR
MILES AVE
THORNHILL DR
THORNHILL DR
SNAKE RD
CASTLE
PARK WAY
LA CUESTA ST
KLAMATH ST
BALMORAL DR
MOUNTAIN
BLVD
MOUNTAIN
BLVD
MOUNTAIN
BLVD
ST PAUL CT
SHERIDAN RD
OSTRANDER RD
LAMMPS PHASE I
FULLINGTON ST
TOMPKINS AVEWHITTLE AVE
HEARST AVE FLORIDA ST
SAN LUIS
AVE
CLAREMONT AVE
INTERNATIONAL BLVD
INTERNATIONAL BLVD
SAN ANTONIO WAY
PLYMOUTH ST
STEARNS AVE
SUNNYSIDE ST
HARVEY AVE
EDES AVE
EDES AVE
WALTER AVE
EMPIRE RD
42ND HIGH ST
I-880 ACCESS
FOOTHILL BLVD
E 15TH ST
E 15TH ST
E 19TH ST
CONGRESS AVE
COOLIDGE AVE
KINGSLAND AVE
CAMDEN ST
HALLIDAY AVE
HILLSIDE ST
COLLEGE AVE
BENVENUE AVE
REGENT ST
CANNING ST
LOWELL ST
GRAND AVE
OAKLAND AVE
MACARTHUR BLVD
MACARTHUR BLVDHAROLD ST
PARK BLVD
Berkeley
Emeryville
Piedmont
Alameda
San Leandro
Joaquin Miller
Park
Holy Names
University
Joaquin Miller
Elementary
Oakland
Tech
Claremont
Middle
Skyline High
School
Mills
College
King Estate
Park
Castlemont
High
Merritt Community
College
42ND HIGH ST
I-880 ACCESS
FRUITVALE ALIVE
GAP CLOSURE
High Ranking Projects*
INTERMODAL
COLISEUM
BART
E 12TH BIKEWAY
2ND ST
TRANSPORTATION HUB
& BIKE GAP CLOSURE
LAMMPS PHASE 2 -
RICHARDS RD to
SEMINARY
SURE
HSIP 9 FOOTHILL & MACARTHUR
INTERNATIONAL BLVD BRT PED IMPROVEMENT PHASE II
73RD AVE TRANSIT
CO
NNECTIO
NS
FOOTHILL BLVD PED
SAFETY IMPROVEMENTS
HSIP 9 FOOTHILL & MACARTHUR
H
SIP 10 98T
H A
VE IMP
S.
LOWER HIGH ST
COMPLETE STREETS
PROJECT
W. OAKLAND
INDUSTRIAL STS.
W. OAKLAND COMMUNITY
ACTION PLAN IMPLEMENTATION/
TRANSIT ACCESS IMPROVEMENTS
27TH ST COMPLETE STREETS
GRAND AV. MOBILITY PLAN IMPLEME NTATION
18TH ST BIKEWAY
HSIP 10 14TH ST
PED. CROSSING
IMPS. & ROAD DIET
8TH ST TRAFFIC CALMING
7TH ST:
WOOD TO BAY
GAP CLOSURE
7TH ST
CONNECTIONS
ADELINE
STREETSCAPE
IMPROVEMENTS
MARKET STREETSCAPE
MLK JR WAY
STREETSCAPE
EMBARCADERO
WEST RAIL SAFETY
& ACCESS IMP.
BROADAY
STREETSCAPE
FRANKLIN
PAVING
IMP.
14TH ST SAFE ROUTES
8TH ST
STREETSCAPE
IMPROVEMENTS
LAKESIDE DR/
LAKE MERRITT BLVD
COMPLETE STREETS
14TH AVE ST
REETSCAPE & GAP CLO
MACARTHUR SMART CITY CORRIDOR
E OAKLAND NEIGHBORHOOD BIKE RTES.
BANCROFT AVE GREENWAY
EAST BAY GREENWAY SEG. 2/COLISEUM CONNECTIONS BIKE LANES
COLISEUM BART
TO BAY TRAIL
(66TH AVE)
3RD ST CORRIDOR
STREETSCAPE
LAKESIDE
FAMILY
STREETS
Attachment A
Project Name (Website Hyperlinked If Available) Description 14th Avenue Streetscape Phase 1 & 3 Improve safety for all transportation modes through reduction of lanes from 4 to 2, addition of buffered bike lanes, and new flashing beacons, high visibility crosswalks, and ADA compliant curb ramps at all uncontrolled intersections. 19th Street BART to Lake Merritt
Urban Greenway
20th St/Thomas L. Berkeley Way from Browadway to Harrisson St, connecting to 19th St BART and Lake Merritt. Construction of Class II bicycle lanes, widened sidewalks, crosswalk enhancements, and a landscaped median. 27th St Complete Streets Create a protected bikeway between Telegraph Ave and the future Grand Ave bikeway. Install pedestrian safety treatments including curb ramps, pedestrian signal heads, and enhanced crosswalks; convert slip lane at 27th & Harrison to a bike-only slip lane. 73rd Avenue Connections to Transit
Provide a safer connection for people walking and biking to Eastmont Transit Center, International BRT, Coliseum BART, and bu s stops along 73rd Ave. Preliminary scope includes upgrading/installing bike lanes, bus boarding islands, and crossings. 8th Street West Oakland Traffic Calming Project Traffic calming and pedestrian improvements along 8th Street between Market Street and Pine Street ATP 14th St Safety Project 14th St between Brush St and Oak St, project will reduce lanes from 4 to 2, add Class IV bike lanes separated from traffic; install bus boarding islands, pedestrian refuges, and green stormwater infrastructure; improve signals and pedestrian crossings.14t ATP 7th St Connection Project
Create a safe route for all modes on 7th St from Mandela to MLK Jr Way. Repair/improve sidewalks, install protected bike lanes, install curb ramps, add pedestrian lighting, shorten crossings at major intersections, upgrade traffic signals with accessible pedestrian signalization.
ATP Fruitvale Alive Gap Closure Install Class IV bike lanes between Alameda Ave and E.12th St along Fruitvale Ave; widen sidewalks, improve pedestrian crossi ngs, add pedestrian lighting and landscaped buffers. Remove conflicting vehicular through and slip turn lanes to increase safety.
ATP Telegraph Complete Streets Parking protected bike lanes (20th-29th St), raised buffer islands, road diet (29th-41st St), bulb-outs, refuge islands, signal upgrades, bus boarding islands, pavement repair, RRFBs
E. 12th St Bikeway Complete the gap for a continuous bikeway from downtown Oakland through East Oakland. Install buffered bike lanes, traffic circles and upgraded curb ramps.
East Bay Greenway - Segment II New segment of the East Bay Greenway; the cycletrack will run parallel to San Leandro St from Seminary to 69th Ave, with a new bike lane from 69th Ave to 75th Ave
East Oakland Neighborhood Bike Routes Construct 6 miles of bike routes in East Oakland, connecting schools, retail, transit and community centers Foothill Blvd Pedestrian Safety Improvements Upgrade pedestrian safety at intersections on Foothill Blvd from 26th to 42nd Ave HSIP 10 14th St Pedestrian
Crossing Improvements
Install a combination of Rapid Rectangular Flashing Beacons, left-turn only signal phases, pedestrian countdown heads, and leading pedestrian intervals at 4 intersections on 14th St with a history of pedestrian collisions.
HSIP 10 98th Ave Crossing Imps. Install side street signal mast arms, leading pedestrian intervals, flashing beacons, pedestrian refuge islands, and left-turn-only phases at pedestrian collision locations
HSIP 10 Systemic Crossing Imps. Install Rapid Rectangular Flashing Beacons (RRFBs) and Intersection Lighting at six intersections in the City of Oakland with a history of pedestrian collisions.
FY2023-24 OakDOT Measure KK-Funded Complete Streets Projects Attachment B
Project Name (Website Hyperlinked If Available) Description HSIP 7 Telegraph Ave Pedestrian safety improvements plus intersection improvements at Telegraph Ave / 45th St / Shattuck Ave HSIP 8 Bancroft Avenue Safety Improvements Install crosswalk enhancements, pedestrian countdowns, HAWKs, RRFBs, signal upgrades and modifications, landscape median, signing, striping, markings
HSIP 8 Downtown (Various Locations) Install crosswalk enhancements, signal upgrades and modifications, signing, striping, markings HSIP 8 Fruitvale Avenue Road Diet Install crosswalk enhancements, RRFBs, signal upgrades and modifications, signing, striping, markings.Implement road diet, pa rking lane reduction and Class II bicycle lane
HSIP 8 Oakland Hills Guardrails Upgrade existing guardrail sections, end treatments, mounting hardware, posts and foundations to current Caltrans standards HSIP 9 - Pedestrian Crossing Improvements Pedestrian crossing improvements at three intersections with uncontrolled crosswalks: Filbert St & 7th St, 98th Ave & C St, and Oakland Ave & Moss Av.
HSIP 9 Foothill/MacArthur Implement pedestrian safety improvements on Foothill Blvd (Harrington Ave to Cole St) and MacArthur Blvd (69th to 96th Ave) I-880/42nd/High Freeway Access Safety improvements at 42nd/High St, including roadway connection/extension of 42nd Ave; new roadway connection/extension at Jensen St; signal modifications
Intermodal Terminal Coliseum BART
Improvements
Streetscape and pedestrian improvements for a major transit village project at the Coliseum BART Station, including bus route reconfigurations to better encourage transit use, new landscaping, signalized intersections, pedestrian crosswalks and walkways.
International Blvd Pedestrian Lighting (36th-
107th Ave)
Install pedestrian-scale lighting and repair sidewalks and ADA-compliant curb ramps to provide safer pedestrian conditions for people along the International Boulevard corridor
Lakeside Family Streets Install protected 2-way cycle track on east side of Harrison from Lakeside to Grand, and a buffered bikeway on west side. On Harrison from Grand to 27th. Protected intersection treatments at Grand/Harrison and Grand/Bay Place. MacArthur Blvd Smart City Corridor Extend ITS network with fiber cable to 62 traffic signals on MacArthur and adjacent streets. Includes queue jump lanes, transit signal priority, pedestrian/bike/vehicle detection, curb ramps, sidewalks, communications for traffic operations/maintenance.
Park Blvd/Excelsior Crossing to Safety
Traffic signal upgrades and geometric improvements at Park Blvd/Grosvenor Pl/Alma Pl/Excelsior Ave, including closure of Exce lsior Ave between Park Blvd and Kingsley Ave.
West Oakland Sustainable Transportation
Equity Project
Planning, design, and implementation of strategies identified in the West Oakland Community Action Plan. Includes West Oaklan d Truck Management Plan Implementation, Pedestrian Improvements and Urban Greening, and West Oakland Bike Resource Hub.
West Oakland Transit Access Improvements Installation of sidewalk repairs and street improvements, urban greening and vegetation, bus stop improvements, and truck management. Includes West Oakland Universal Basic Mobility pilot.
FY2023-24 OakDOT Measure KK-Funded Complete Streets Projects Attachment B
COUNCIL
DISTRICT 5
COUNCIL
DISTRICT 6
COUNCIL
DISTRICT 7
COUNCIL
DISTRICT 1
COUNCIL
DISTRICT 2
COUNCIL
DISTRICT 3
COUNCIL
DISTRICT 4
50 51
52 53
55 56
59 54
57 58
47 48
23 24
25 26
27 28
29 30
31 33
34 35
32 1011
12 13
14 15
16 17
18 19
22 1
2 3
4 5
6 7
8 9
Bureau of Land Management, Esri, HERE, Garmin, INCREMENT P, USGS, METI/
NASA, EP
A, USDA
´
Measure KK Funded
Projects (Active)
Pr
oject Category
Fire
Library
OPRYD & DHS
Police
Water, Energy, Seismic
Attachment C
Project # on
Map Measure KK Category Project Name CIP Project # Project Phase 1 Fire Fire Station #7 STCTRL Assessment 1005852 Pre-planning / not started 2 Fire Fire Station #29 1004854 Design
3 Fire Fire Station #13 HVAC Replacement 1005853 Pre-planning / not started 4 Fire Fire Station #20 Repaving 1005850 Pre-planning / not started 5 Fire Fire Station #10 Renovation 1003439C Construction 6 Fire Fire Station #4 1003435 Planning
7 Fire Fire Station #17 HVAC Replacement 1005853 Pre-planning / not started 8 Fire Fire Station #15 HVAC Replacement 1005853 Pre-planning / not started 9 Fire Fire Station #6 Shell Repair 1005851 Pre-planning / not started 10 Library Main Library Improvements, Library Renovation Phase 2 1003451, 1004859 Construction 11 Library Asian Branch Library Improvements 1003440B Pre-planning / not started 12 Library AAMLO Preservation of African American Collections & Energy Upgrades 1005845 Design 13 Library Main Library New Facility Feasibility Study; Library Roof Energy Upgrade 1004858, 1005855 Planning; Pre-Planning 14 Library Oakland Tool Lending Library at Temescal Branch; Library Energy Assessment & Upgrade 1004983, 1005867 Bid-Award; Pre-Planning 15 Library Library Energy Assessment & Upgrade Lakeview Branch 1005867 Pre-planning / not started 16 Library Library Energy Assessment & Upgrade Golden Gate Branch 1005867 Pre-planning / not started 17 Library Hoover Branch Library Feasibility Study 1004856 Planning 18 Library Library Energy Assessment & Upgrade MLK Jr Branch 1005867 Pre-planning / not started 19 Library New Piedmont Library 1005858 Design
22 Library Brookfield Library Improvements 1003440 Design; Planning 23 OPRYD & DHS East Oakland Senior Center 1004852 Planning 24 OPRYD & DHS San Antonio Park Head Start Improvements 1004863 Planning 25 OPRYD & DHS West Oakland Senior Center 1004865 Construction 26 OPRYD & DHS Downtown Oakland Senior Center 1004984 Construction 27 OPRYD & DHS Brookdale Recreation Center Expansion 1004849 Planning 28 OPRYD & DHS Lincoln Square Recreation Center Renovation/Expansion Project 1004857 Design 29 OPRYD & DHS Mosswood Recreation Center 1003625 Construction 30 OPRYD & DHS Sobrante Park Renovation 1005330 Bid-Award 31 OPRYD & DHS Digital Arts & Culinary Academy 1004851 Construction 32 OPRYD & DHS Caldecott Trail 1001412 Design
33 OPRYD & DHS Arroyo Viejo Master Plan 1004848 Pre-planning / not started 34 OPRYD & DHS East Oakland Sports Center - Phase 2 1004978 Design 35 OPRYD & DHS Verdese Carter Park 1005871 Design
47 Police Eastmont Police Station Improvement 1005847 Pre-planning / not started 48 Police
Police Administration Building Feasibility; Replace Chiller & HVAC; Replace Roof; Replace Supply Fan; Replace Cooler; OPD Crime Lab
1005848, 1005860, 1005861,
1005863, 1005864, 1007059 Pre-planning / not started
50 Water, Energy, Seismic OMCA Museum Collection Center 1004861 Pre-planning / not started 51 Water, Energy, Seismic Oakland Animal Shelter Floor Replacment/Drainage; Replace HVAC & Energy 1004862, 1003449 Construction 52 Water, Energy, Seismic West Oakland Resilience Hub 1005872 Pre-planning / not started 53 Water, Energy, Seismic Fox Theater Roof & HVAC Replacement (Phase 1 & 2) 1005784 Design 54 Water, Energy, Seismic Culvert Repairs Richmond Blvd 1006261 Pre-planning / not started 55 Water, Energy, Seismic Willie Keyes Recreation Center Improvement 1005866 Planning 56 Water, Energy, Seismic Melrose Library 1005856 Pre-planning / not started 57 Water, Energy, Seismic Henry Robinson MSC Air Conditioning Replacement 1003448 Construction 58 Water, Energy, Seismic 710 73RD Avenue Pump Station 1007053 Pre-planning / not started 59 Water, Energy, Seismic Tassafaronga Recreation Center Updgrade 1005865 Planning Attachment C
COUNCIL
DISTRICT 5
COUNCIL
DISTRICT 6
COUNCIL
DISTRICT 7
COUNCIL
DISTRICT 1
COUNCIL
DISTRICT 2
COUNCIL
DISTRICT 3
COUNCIL
DISTRICT 4
60 49
36 37
38 39
40 41
42 43
44 45
46 20
21 Bureau of Land Management, Esri, HERE, Garmin, INCREMENT P, USGS, METI/
NASA, EPA, USDA
¯
Measure KK Funded
Project (Completed)
Projects Category
Library
OPRYD & DHS
Police
Water, Energy, Seismic
Attachment D
Project #
on Map Measure KK Category Project Name CIP Project # Project Phase 20 Library Elmhurst Library Renovation 1004853 Complete 21 Library Melrose Branch Library Net Zero 1005869 Complete 36 OPRYD & DHS San Antonio Park Head Start Improvements 1003444 Complete 37 OPRYD & DHS
Manzanita Recreation Center, Head Start Playground
Replacement 1003444, 1003445 Complete
38 OPRYD & DHS Allendale Park Tot Lot 1004768 Complete
39 OPRYD & DHS Dimond Park Lions Pool Replacement 1003434 Complete 40 OPRYD & DHS Rainbow Recreation Center Expansion 1000854 Complete 41 OPRYD & DHS
Arroyo Viejo Recreation Center, Head Start Playground
Replacement 1003443, 1003444 Complete
42 OPRYD & DHS Madison Park Irrigation Update 1004980 Complete 43 OPRYD & DHS
Head Start Brookfield Updgrade, Head Start Playground
Replacement 1003442, 1003444 Complete
44 OPRYD & DHS Tassafaronga Gym Improvements, Head Start Renovation 1003446, 1004855 Complete 45 OPRYD & DHS Holly Mini Park 1004866 Complete
46 OPRYD & DHS Dimond Tennis Courts 1004977 Complete
49 Police
Police Administration Building Replace ATS and Emergency Generators 1005862 Complete
60 Water, Energy, Seismic 55TH Avenue Storm Drain Repair 1007054 Complete Attachment D
New Construction Funded by Measure KK
(2017-Present)
Project Name Developer
3268 San Pablo Satellite Affordable Housing Associates
7th & Campbell Oakland & The World, lnc,/MPI/McCormack Baron Ancora Place Satellite Affordable Housing Associates
Aurora Apartments Affirmed Housing
Camino 23 Satellite Affordable Housing Associates
Coliseum Place Resources for Community Development
Fruitvale Transit Village II-B BRIDGE Housing Corporation Longfellow Corner (aka 3801 MLK Resources for Community Development Family Housing) Nova Apartments Affirmed Housing
West Grand & Brush East Bay Asian Local Development Corp Total New Construction Units
51 0
79 78
77 16
44 43
37 0
59 0
181 46
77 34
57 56
59 28
721 301
CITY OF
OAKLAND
Status
Completed (2020)
Completed (2024)
Completing 2024
Completed (2021)
Completed (2019)
Completed (2021)
Completed 2024
In Construction
Completed (2021)
In construction
Acquisition and Conversion to Affordable Housing (ACAH) Funded by Measure KK Pro·ect Name
10320 Mac Arthur Blvd Project
10th Ave Eastlake*
1432 12th Avenue Cooperative
2000 36th Avenue
285 Newton Avenue
3 SF Homes
36th Avenue Apartments
524-530 8th Street
6106-6108 Hilton St.
6470 MacArthur Blvd
789 61st Street
Garrett Cooperatives Homes
Highland Palms*
Shadetree
Harvest House
E24 Community Studios*
OakCLT Scattered Site
Develo er/Pro·ect S onsor ffordable Units
Richmond Neighborhood Housing Services 17
East Bay Asian Local Development Corp. 35
Bay Area Community Land Trust 7
The Spanish Speaking Unity Council 55
Bay Area Community Land Trust 9
Oakland Community Land Trust 3
The Spanish Speaking Unity Council 25
Housing Consortium of the East Bay 39
Northern California Land Trust (NCLT) 16
Oakland Community Land Trust (OakCLT) 2
Northern California Land Trust (NCLT) 6
Northern Community Land Trust 1
East Bay Asian Local Development Corp. 23
Bay Area Community Land Trust/SHADE 23
Oakland Community Land Trust 1
Oakland Community Land Trust 7
Oakland Community Land Trust 3
Attachment E
Attachment E