INTER OFFICE MEMORANDUM
Department of Workforce & Employment Standards (DWES)
TO: Tiffany Pham FROM: Shelley Darensburg,
OPW Civil Engineer Contract Compliance Supervisor PRE
PARED BY: Paula Peav, Paula Peav
Contract Compliance Officer DATE: September 18, 2024 REVISED SUBJECT: RFP for Storm Drainage Master Plan (8792007)
Project No 1005274—Amendment 4
At the request of the Public Works Department, DWES conducted a compliance analysis of the updated Schedule E dated August 9, 2024 from Wood Rodgers, the firm selected for award of the above subject project.

Per the email from Wood Rodgers, including a statement from their subconsultant, declining the work, and therefore, consenting to the substitution. Additionally, an additional consultant was added to the project as a general consultant. Wood Rodgers as the prime intends to perform the services originally assigned to Horizon Water and Environmental, LLC. Per the L/SLBE Program, the contractor must make reasonable to maintain the L/SLBE participation achieved at the time of award.

Due to the lack of certified SLBE firms, DWES has determined that Wood Rodger was unable to maintain the original L/SLBE proposed at the time of award. Therefore, they have complied with L/SLBE requirement in this regard. Following is the revised level of L/SLBE compliance achieved.

Responsive to
Social Justice
Policies

PROPOSED

L/SLBE PARTICIPATION

PERCENTAGES

EARNED PREFERENCE
POINTS
EBO Compliant?
Y/N Company Name
Total
L/SLBE
LBE
SLBE
*VSLBE
Total
Credited
L/SLBE
Participation
Years in
Oakland
Oakland
Workforce
Total
Preference
Points

Wood Rodgers 96% 96% 0.00% 0.00% 96% 5 pts 1.5 pts NA 6.5 pts Y For questions or comments, please contact Paula Peav, Contract Compliance Officer at (510) 238- 3190.

Attachment D
Project Name:

Project No.: 1005274 Engineers Est:

Discipline Prime & Subs Location Cert. LBE SLBE LPG/VSLBE Total L/SLBE Total TOTAL Status LBE/SLBE Trucking Trucking Dollars Ethn. MBE WBE PRIME Wood Rodgers, Inc. OaklandCB 86.00% 86.00% 86.00% C Green
Infrastructure
Geosyntec
Consultants Oakland CB 10.00% 10.00% 10.00% C
QA/QC
Coordination
Aqua Flows
Engineering San Ramon UB 1.00% O
Financial
Funding SCI Consulting Group Fairfield UB 2.00% C
Survey Cinquini & PassarinoOakland UB 1.00% C
Project Totals 96.00% 0.00% 0.00% 96.00% 0.00% 0.00% 100.00% 0.00% Ethnicity
AA = African American
AI = Asian Indian
Legend AP = Asian Pacific
C = Caucasian
LBE = Local Business Enterprise UB = Uncertified Business H = Hispanic SLBE = Small Local Business Enterprise CB = Certified Business NA = Native American Total LBE/SLBE = All Certified Local and Small Local BusinessesMBE = Minority Business Enterprise O = Other NPLBE = NonProfit Local Business Enterprise WBE = Women Business Enterprise NL = Not Listed NPSLBE = NonProfit Small Local Business Enterprise MO = Multiple Ownership

0.00%
LBE 25%SLBE 25% or
50% TOTAL LBE/SLBE 50% LBE/SLBE

TRUCKINGVSLBE/LPG
For Tracking Only

LBE/SLBE PARTICIPATION
Wood Rodgers, Inc.

Storm Drainage Master Plan (8792007)-Amendment 4 (08/09/24) Under/Over Engineers Estimate:

Requirements:The 50% requirements is a combination of 25% LBE and 25% SLBE participation. An SLBE firm can be counted 100% towards achieving 50% requirements.

PROJECT NO.:

PROJECT NAME:

Engineer's Estimate: Contractors' Bid Amount Over/Under Engineer's Estimate NA
Discounted Bid Amount: Amount of Bid Discount Preference points NA 5 points

1. Did the 50% local/small local requirements apply?YES

2. Did the contractor meet the 50% requirement? YES

96.00%

0.00%
0%
NA
c) Total SLBE/LBE trucking participation0.00%

4. Did the contractor receive preference points? YES

(If yes, list the percentage received) 5 Points

5. Additional Comments.
9/18/2024
Date
Reviewing
Officer: Date:

Approved By: Date:Shelley Darenburg 9/18/2024
b) % of SLBE participation

3. Did the contractor meet the Trucking requirement?

6. Date evaluation completed and returned to Contract Admin./Initiating Dept.

Paula Peav 9/18/2024
c) % of VSLBE/LPG participation
a) % of LBE participation

OFFICE OF THE CITY ADMINISTRATOR
Contracts & Compliance Unit

PROJECT EVALUATION FORM
1005274
Storm Drainage Master Plan (8792007)- Amendment 4 (08/09/24) CONTRACTOR:Wood Rodgers, Inc.