January 7, 2025
Terri Fashing
Acting Watershed and Stormwater Division and DD Program Manager City of Oakland Public Works Department
250 Frank H. Ogawa Plaza, Suite 4314
Oakland, CA 94612
[email protected]
Re:   Oakland 1005274‐Storm Drainage Master Plan (8792007) – Contract Amendment 2 Dear Ms. Fashing,
The purpose of Contract Amendment 2 to the Oakland Storm Drainage Master Plan contract is to request authorization for a budget increase to replenish funds for services that have already been performed and to allocate additional funds for anticipated services for the remainder of the contract term.

Out‐of‐Scope Tasks
The City of Oakland’s storm drainage system has deteriorated due to historical lack of resources to keep up  with  the  necessary  improvements.  Many  the  storm  drainage  assets  are  over  80  years  old  and  are reaching  the  end  of  their  serviceable  life.  Consequently,  emergency  situations  sometimes  arise  when infrastructure failures occur. Additionally, developments over the years  have increased runoff, creating erosion in many locations, and overwhelming the capacity of many existing pipes and culverts. This, along with delayed maintenance have resulted in the need for urgent assistance to provide hydrologic/hydraulic assessments.. The City is currently short‐staffed and has modified the Project 1005274 scope to request the  services  of  Wood  Rodgers  to  address  em
ergency  situations  or  provide  support  to  assess
capacity/flooding  issues.  Wood  Rodgers  provided  engineering  services  listed  in  Table  1  below  as requested by the City.

Table 1 – Out‐of‐Scope Tasks, 8792007
Out‐of‐Scope Tasks   Description  Spent Cost
10070 Empire Rd.

Flooding

1. Reviewed topographic data and Caltrans’ plans

2. Interviewed City’s O&M crew

3. Further refined hydraulic model to reflect site condition $12,000
1451 Mountain Blvd.

1. Performed additional inspections and surveys

2. Updated GIS database with inspection findings

3. Planned and requested CCTV

4. Investigated storm network connectivity

5. Performed flood analysis
$15,000
1815 Wood Haven

1. Reviewed catchment boundary

2. Refined hydrologic and hydraulic model to reflect small local/ private drainage systems

3. Simulated design storms

4. Determined design deficiencies
$25,000
2421 Telegraph  1. Researched as‐builts

2. Reviewed maintenance service request complaints $3,000 Attachment B
Oakland 1005274‐Storm Drainage Master Plan (8792007)
January 7, 2025

Page 2 of 5 ends

3. Reviewed hydraulic model results
69 95 Simson St.

1. Reviewed maintenance service request complaints

2. Reviewed catchment boundary

3. Reviewed hydrologic and hydraulic model results
$8,000
7005 Skyline Blvd.

1. Researched as‐builts

2. Reviewed maintenance service request complaints

3. Researched ownership and easement

4. Reviewed and refined catchment boundary

5. Updated geodatabase to include private drainage facilities.

6. Refined and simulated hydrologic and hydraulic model $30,000
769 Santa Ray Ave‐
Storm Drain Rehab

1. Developed catchment area and design flow

2. Recommended pipe rehabilitation size, material and type  $5,000 Oakland Alameda
Access Project (ACTC)

1. Reviewed design plans and determined project extent

2. Reviewed hydrologic and hydraulic model results and
determined deficient pipes

3. Estimated improvement extent
$15,000
FEMA Peralta Creek
Flood Risk Review

1. Provided information, data, and models to FEMA

2. Attended coordination meetings

3. Reviewed FEMA revised models and floodplains
$25,000
Oakland Zoo
Emergency Repair

1. Researched as‐builts

2. Reviewed and refined catchment boundary

3. Refined and simulated hydrologic and hydraulic model

4. Developed improvement alternatives
$15,000
7330 International
Storm Line Repair

1. Researched as‐builts and GIS geodatabase

2. Reviewed hydrologic and hydraulic model results

3. Verified replacement pipe size
$5,000
High St. and 42nd Ave.

Flood

1. Researched as‐builts and GIS database

2. Performed additional inspections and surveys

3. Updated Geodatabase
$35,000
1232 High St. Pipe
Improvement Review

1. Reviewed hydraulic model results

2. Determined proposed pipe capacity and size

3. Researched design standards and provided improvement recommendations
$2,000
E. 9th St. Flooding
Investigation & CCTV
Planning

1. Researched as‐builts

2. Reviewed maintenance service request complaints

3. Reviewed hydraulic model results

4. Planned and requested CCTV inspections
$5,000
Total  $200,000
Wood  Rodge
rs  utilized  the  budgets  from  the  tasks  shown  in  Table  2  for  the  out‐of‐scope  tasks  and consequently reduced the scope of those tasks. To complete the original scope of the master plan, Wood Rodgers is requesting an additional $200,000 as shown in Table 2.

As‐Needed Hydrologic and Hydraulic Services
Additionally, the Watershed and Stormwater Management Division has requested Wood Rodgers to add an as‐needed task for $150,000 to  provide  hydrologic and  hydraulic engineering services  for potential tasks similar to those in the previous section and for which the City may continue to request assistance.

These services may include engineering review and an alysis tasks related to storm drainage emergencies, Oakland 1005274‐Storm Drainage Master Plan (8792007)
January 7, 2025

Page 3 of 5 ends

new  developments,  and  improvement  requests.  Wood  Rodgers  possesses  extensive  knowledge  of  the conditions  of  the  City’s drainage  facilities,  the  complexity  of  drainage  networks,  understanding  of capacity, and intricacies of the intertwined Alameda County storm drainage facilities. We can deliver these services with minimal research, in the most cost‐effective manner, and with accurate e ngineering design and analysis.

The fund will only be utilized when the City requests and approves additional services. A scope of work and budget for each additional service will be developed and agreed upon in writing by the City prior to Wood Rodger starting work under the as‐needed tas k.

Extreme Precipitation
Recent flooding caused by heavy and intense rainstorms has brought climate change to the forefront of many citizens. Because of climate change, researchers expect future precipitation events to increase in both  volume  and  frequency,  putting  the  City’s current  level  of  service  into  question.  The  capital improvement projects recommended by Wood Rodgers in the Drainage Master Plan are based on current precipi
tation frequencies. Therefore, the City requested an analysis of the effect of climate change to be included.   Wood  Rodgers  proposes  to  assess  the  effect  of  increased  volume  and  frequency  of  design rainfall  on  the  recommended  capital  improvement  projects,  refining  both  the  improvements  and  cost estimates accordingly. Climate chan
ge criteria will be established for design storms, adjusting existing 2‐, 5‐, 10‐, 25‐, and 100‐Year, 24‐Hour design storms to reflect potential increases in volume and frequency.

These criteria are informed by global climate modeling results, subject to ongoing refinement as new da ta becomes available. Given the uncertainty of climate change projections, this analysis will focus solely on deficient facilities under current conditions, rather than identifying and improving facilities that may only become deficient under future climate change scenarios. Should the improvement projects developed for the  Drainage  Master  Plan  based  on  current  pr ecipitation  frequencies  prove  inadequate,  additional improvements and costs will be developed to address the effects of climate change.

Catch Basin Inlet Inventory & Analysis
Per  the  City’s  request,  Wood  Rodgers  proposes  to  inventory  and  categorize  11,000  catch  basin  inlets owned by the City (excluding those belong to Caltrans and the Port of Oakland). We will identify inlets that are not bike safe, coordinate with the City’s staff for field inspections and additional data collection, and recommend a re habilitation and replacement program along with associated costs. The findings and recommendations of this task will further refine the drainage facility inventory for the Master Plan project to better define the existing conveyance capacity and to minimize clogging risk. This task will also help the City satisfy Provision C.5.f. – Muni cipal Separate Storm Sewer System (MS4) Map – in the City’s California Regional Water Quality Control Board San Francisco Bay Regional Municipal Regional Stormwater National Pollutant Discharge Elimination System (NPDES) Permit (MRP 3.0). Provision C.5.f. requires the City to add missing information to the MS4 map.

Wood Rodgers will use hig h  resolution aerial imagery and the storm drain inlets and pipe networks in the City’s GIS  geodatabase  to  identify  missing  inlets,  update  the  geodatabase  with  the  missing  inlets, georeference the existing inlets to the aerial, and determine the dimensions of the inlet grates and curb opening  widths.  Wood  Rodgers  will  fo cus   this  effort  within  the  existing  storm  drain  networks  in  the geodatabase. Streets with no storm drain pipes will not be investigated. Our engineers will develop typical Oakland 1005274‐Storm Drainage Master Plan (8792007)
January 7, 2025

Page 4 of 5 ends

inlet dimensions used in conjunction with the aerial measurements to standardize the inlet dimensions in the geodatabase.

Subsequently, Wood Rodgers will use Google Street View to determine the type of inlet grate and curb opening  using  a  predefined  list  of  grate  types  based  on  industry  standards.  Inlet  grates  unsafe  for bicyclists’ us e  will be identified for the City's field inspections and grate opening data collection. Wood Rodgers will coordinate with the City’s inspection team to reconcile and update the collected data into the geodatabase.

Wood Rodgers will then use the updated geodatabase to develop a grate and/ or catch basin structure rehabilitation  and  repla cement  program  and  associated  capital  costs.  We  will  consider  the  existing performance  of  the  catch  basin  for  our  recommendations  in  the  program.  The  rehabilitation  and replacement program will be documented in a technical memorandum.

Wood Rodgers will implement a grid system to track the progress of this task and to ensur e  that the storm drain inlets have their dimensions populated and grate types properly categorized. Wood Rodgers will also refine the geodatabase to capture the collected inlet dimensions, sizes, and grate types to standardize the inventory process.

FEMA LOMR Applications
Wood  Rodgers  proposes  to  prepare  a  Flood  Emergency  Management  Agency  (FEMA)  Letter  of  Map Revision  (LOMR)  application  to  revise  the  currently  effective  Flood  Insurance  Rate  Maps  (FIRM).  The application will be prepared and submitted through the Online LOMC system. The submissions will follow FEMA  standards  and  guidelines,  in  particular  the  Guidance  for  Flood  Risk  Analysis  and  M apping,  Data Capture ‐Workflow Details, November 2021. Due to the completeness of the Zone 12 Drainage Master Plan developed and adopted by the Alameda County, its models, results, and reports will be used as the basis for the LOMC submissions. The submissions will include the following materials:

1. MT‐2 Appli
cation Forms

2. A narrative which describes the purpose of the request, the methodology used to analyze the floodplain, and discusses the hydrologic analysis, hydraulic analysis, calibration, reconciliation, criteria, data sources, and results of the comprehensive model.

3. Packaged model files

4. Spatial (GIS) data formatted for submis sion  to FEMA MIP

5. Flood profiles and annotated FIRMs

6. Certified topographic work map

7. Responses to FEMA’s comments
Due  to  the  uncertainty  regarding  the  extent  of  FEMA  comments,  Wood  Rodgers  has  included  a  15% budget contingency in the budget provided below to address FEMA’s anticipated comments, to be used as neede
d and approved by the City.

Wood Rodgers is requesting additional funds to replenish the budget used for out‐of‐scope tasks, provide as‐needed hydrologic and hydraulic services, conduct extreme precipitation analysis, develop catch basin inlet inventory and analysis, and provide a FEMA LOMR application and submission as detailed in Ta ble 2.

Oakland 1005274‐Storm Drainage Master Plan (8792007)
January 7, 2025

Page 5 of 5 ends

Table 2 ‐ Budget Request, 8792007
Move from Task   Existing
Budget
Budget used for
Out‐of‐Scope tasks
Additional
Budget Request
Revised
Budget

3.1‐ Geodatabase Refine/ Reconcile  $39,780  $(15,000)  $15,000  $54,780

3.6‐ Inspection & Inventory  $596,790   $(100,000)  $100,000  $696,790

5.1‐ Delineate Watershed  $177,230  $(35,000)  $35,000  $212,230

5.2‐ Develop Hydraulic 1d/2D Model  $270,480  $(50,000)  $50,000  $320,480

12.0 ‐ Extreme Precipitation (new task;
See Exhibit A)  $5 3,040  $53,040

13.0 ‐ Catch Basin Inlet Inventory &
Analysis (new task; See Exhibit A)  $4 54,090  $454,090

14.0 ‐ As‐Needed Hydrologic and
Hydraulic Services (new task)  $1 50,000  $150,000

15.0 – Arroyo Viejo LOMR (new task;
See Exhibit A)  $1 14,440  $114,440
Total  $1,084,280  $(200,000)  $971,570  $2,055,850
The es
timated fees are based on 2025 rates (see Exhibit B) to be utilized for the scope of work and budgets identified above. Wood Rodgers proposes to perform the above‐identified scope of work on a T&M basis for  a  total  estimated  fee  of  $971,570  T&M.  This  amendment  will  increase  the  contrac t   total  from $3,099,882 to $4,071,452.

To authorize this work, please return a signed copy of this proposal.

Sincerely,  IN AGREEMENT WITH THE ABOVE TERMS:

Dan Matthies   By:

Vice President, Wood Rodgers, Inc.   Print Name:

City of Oakland Exhibit A ‐ Contract Amendment 2 1/7/2025 Wood Rodgers, Inc.

Prin Eng II
Prin Eng I
Senior Engineer II
Senior GIS I
Engineer II
GIS I
Project Coord.

Subtotal Total
Quantity Unit 360 $       315 $     295 $  285 $    240 $    $230 $190 Task 12 ‐ Extreme Precipitation
36          60       100        $53,040 $53,040
Task 13 ‐ Catch Basin Inlet Inventory & Analysis
Task 13.1 Project  Management 24          40         $18,960 $18,960 Task 13.2 Data Setup 4         4           8             $4,160 $4,160 Task 13.3 Inlet Inventory 100       100        20           $57,100 $57,100 Task 13.4 Inlet Categorization  and Dimensions 600       600        125         $343,750 $343,750 Task 13.5 Field  Inspection Coordination 4           16           $4,820 $4,820 Task 13.6 Rehabilitation  and Replacement Program 20          40       30          $25,300 $25,300 Subtotal 44 44 748 730 169 $454,090 $454,090
Task 15 ‐ Arroyo Viejo LOMR
16          80       40         200 50            $14,900 $114,440 $114,440 Total ‐           96          184     788       1,030    219         ‐            $14,900 $621,570 $621,570 Storm Drainage Master Plan
Contingency

Page 1 of 1 ends

EXHIBIT “B”

OAKLAND FEE SCHEDULE

CLASSIFICATION STANDARD RATE
Principal Engineer/Geologist/Surveyor/Planner/GIS/LA* II $360 Principal Engineer/Geologist/Surveyor/Planner/GIS/LA* I $315 Senior Engineer/Geologist/Surveyor/Planner/GIS/LA* II $295 Senior Engineer/Geologist/Surveyor/Planner/GIS/LA* I $285 Project Engineer/Geologist/Surveyor/Planner/GIS/LA* II $265 Project Engineer/Geologist/Surveyor/Planner/GIS/LA* I $250 Engineer/Geologist/Surveyor/Planner/GIS/LA* II $240
Engineer/Geologist/Surveyor/Planner/GIS/LA* I $230
Assistant Engineer/Geologist/Surveyor/Planner/GIS/LA* $200 Designer $105
Senior CAD Technician/Graphics Designer II $220
Senior CAD Technician/Graphics Designer I $205
CAD Technician/Graphics Designer $180
Project Coordinator $190
Administrative Assistant $170
Construction Manager $360
1 Person Survey Crew $260
2 Person Survey Crew $370
3 Person Survey Crew $470
Consultants, Outside Services, Materials & Direct Charges Cost Plus 10% Overtime Work, Expert Witness Testimony and Preparation Rate Plus 50% *LA = Landscape Architect
Blueprints, reproduction
s, and outside graphic services will be charged at vendor invoice. Auto mileage will be charged at the IRS standard rate, currently 67 cents per mile.

Fee Schedule subject to change January 1, 2026.