CED Committee
March 25, 2025

AGENDA REPORT

TO: Jestin D. Johnson FROM: William Gilchrist, Director City Administrator Planning and Building Department

Emily Weinstein, Director
Housing and Community Development
Josh Rowan, Director
Oakland Department of Transportation
Interim Director
Oakland Public Works Department

SUBJECT: Impact Fee Annual
Informational Report and
Findings Resolution for Fiscal
Year 2023-24
DATE: February 24, 2025

City Administrator Approval
Jestin Johnson (Mar 13, 2025 13:31 PDT)
Date: Mar 13, 2025

RECOMMENDATION
Staff Recommends The City Council Adopt A Resolution Accepting The Fiscal Year 2023-2024 Annual Impact Fee Informational Report And Making Findings Regarding Said Annual Impact Fee Report And Previously Presented Five-Year Impact Fee Reports Consistent With The Mitigation Fee Act, California Government Code Sections 66000 To 66025.

EXECUTIVE SUMMARY

To ensure that new development in the City of Oakland (City) pays its appropriate share towards funding affordable housing, transportation improvements, and capital facilities, certain development projects must pay impact fees as part of the building permit process.

The purpose of this agenda report is to present the annual report (Impact Fees Annual Report, Attachment A) for the fiscal year (FY) July 1, 2023 to June 30, 2024 (FY 2023-24) of the Affordable Housing, Transportation, Capital Improvements and Jobs/Housing Impact Fees, together “Impact Fees,” consistent with the Mitigation Fee Act, California Government Code Sections 66000 – 66025. This agenda report additionally supports adoption of a resolution accepting the FY 2023-24 report as well as making findings regarding the City of Oakland 's Five-Year Impact Fee Reports, which were previously prepared and presented 'to the City

Jestin D. Johnson, City Administrator
Subject: Impact Fee Annual Informational Report and Findings Resolution for Fiscal Year 2023- 24 Date: February 24, 2025 Page 2
CED Committee
March 25, 2025

Council Community and Economic Development Committee consistent with the Mitigation Fee Act.

This information is being provided separately from the ongoing project by Strategic Planning Division of the Planning Bureau to prepare and recommend to City Council revisions to the City’s Impact Fee ordinances.

BACKGROUND / LEGISLATIVE HISTORY

The Mitigation Fee Act requires cities to prepare an annual report containing an annual accounting for fees and information regarding the types of fees, amounts, balances of the accounts, and amounts collected, among other things. The City has prepared the Impact Fees Annual Report for FY 2023-24 provided as Attachment A. The Mitigation Fee Act additionally requires that for the fifth fiscal year following the first deposit into the account or fund and every five years thereafter the City make a five-year impact fee report with respect to that portion of the account of fund remaining unexpended. Those reports were previously presented to the Community and Economic Development Committee on June 28, 2022. Full copies of each of these reports may be accessed here: Impact Fee Review and Update Reports.

There are two sets of impact fees: one passed by the City Council in 2016, consisting of the Affordable Housing, Transportation and Capital Improvement Impact Fees; and one passed by that body in 2002, consisting of the Jobs Housing Impact Fee. The background on these two sets of Impact Fees is discussed in Sections 1 and 2 below.

1. Summary of the Affordable Housing, Transportation and Capital Improvement Impact Fees

In 2016, the City adopted into the Oakland Municipal Code (OMC) the Affordable Housing Impact Fee (OMC Chapter 15.72), the Transportation Impact Fee and the Capital Improvements Impact Fee (OMC Chapter 15.74) via Ordinance No. 13365 to defray the costs associated with addressing its housing affordability crisis and its need to enhance the City’s infrastructure. The ordinance found that as Oakland experiences economic growth, it is specifically important that the City plan for and provide funds for affordable housing, transportation improvements, and capital facilities to meet the evolving needs of residents. For each impact fee, the City conducted a nexus study that examined the link between the development and its generation of demand on public facilities and affordable housing. The City last updated its nexus studies in December 2021.

Multiple City policies and initiatives, such as the General Plan, Housing Equity Roadmap, and the Mayor’s Housing Cabinet “Oakland At Home” report called for adopting development impact fees so that new development in the City pays its fair share towards funding affordable housing, transportation improvements, and capital facilities. The Housing and Community Development Department (HCD) 2021-2023 Strategic Action Plan and 2023-2027 Strategic Action Plans, which included an equity investment framework to target available resources towards vulnerable low and extremely low-income households, provides further policy directives to “accelerate the pace of creating housing opportunities for people who have been left out of the housing market, face displacement, and experience homelessness while planting the seeds for more substantial resources in the future.” While impact fees alone will not solve Oakland’s pressing affordable Jestin D. Johnson, City Administrator
Subject: Impact Fee Annual Informational Report and Findings Resolution for Fiscal Year 2023- 24 Date: February 24, 2025 Page 3
CED Committee
March 25, 2025

housing and in frastructure improvement needs, the Impact Fees passed by Ordinance No. 13365 are an important resource that may be utilized towards addressing these problems.

The Oakland Impact Fee Five-Year Review and Update Phase 2: Development Feasibility Analysis and Housing Strategy Study used the findings from the Five-year Review of the Impact Fees required under the Mitigation Fee Act to study the market and economic feasibility context for new development in Oakland. It evaluated the policy context and program design considerations to increase affordable housing and ensure the implementation of affordable housing impact fees and/or inclusionary housing requirements to maximize the production of affordable housing in all areas of the City. The findings from the study and feedback from focused outreach were then used as a basis to identify and evaluate potential fee program changes and refinements in terms of potential benefits and ability to implement without impacting development feasibility.

The proposed fee program changes were presented to the Community and Economic Devel
opment (CED) Committee of the City Council on December 10, 2024 for their feedback.

As stated previously, the Strategic Planning Division of the Planning Bureau is working on proposed revisions to the City’s Impact Fee ordinances for City Council’s consideration in Summer 2025.

Applicable Pro jects and Exemptions
The 2016 Impact Fees focus on specific development projects as follows:

Affordable Housing Impact Fee
New housing units (including live/work and work/live units) Transportation and Capital Improvements Impact Fees
New housing units (including live/work and work/live units) New nonresidential projects
Nonresidential projects with additional floor area
Nonresidential projects with a “Change and Intensification of Use” The following projects are exempt from paying the 2016 Impact Fees:

Accessory Dwelling Units (ADUs) previously called secondary units Affordable housing projects (exempt from the Affordable Housing Impact Fee and the Capital Improvements Impact Fee, but subject to the Transportation Impact Fee).

Nonresidential projects converting less than 5,000 square feet of floor area to another use.

Nonresidential projects involving less than 5,000 square feet of building floor area occupied by institutional uses.

Vehicular residential facilities, as defined in Section 17.10.700 of the Oakland Planning Code, are also exempt from Affordable Housing, Transportation, and Capital Improvement Impact Fees.

Zones for Residential Development Projects

Jestin D. Johnson, City Administrator
Subject: Impact Fee Annual Informational Report and Findings Resolution for Fiscal Year 2023- 24 Date: February 24, 2025 Page 4
CED Committee
March 25, 2025

Pursuant to Ordinance No. 13365, three (3) different 2016 Impact Fee zones for residential projects correspond to three (3) geographic zones of the City that have different market characteristics (i.e., support different prices and rents) and different levels of economic feasibility, and thus different abilities to pay impact fees. A general description of the zones is listed below (see pages 31-34 of Attachment A for maps of the Impact Fee Zones):

1. Impact Fee Zone 1: Downtown, the east side of Lake Merritt, much of North Oakland, and the Hills above Interstate-580

2. Impact Fee Zone 2: West Oakland, a small part of North Oakland, the area east of Lake Merritt to 23rd Avenue

3. Impact Fee Zone 3: areas east of 23rd Avenue and below Interstate-580

Payment Requirements, Fee Amounts

When reviewing the Impact Fees Annual report, it is important to note that pursuant to OMC

15.72.070 for Affordable Housing Impact Fees, and OMC 15.74.070 for Transportation and Capital Improvements Impact Fees, the 2016 Impact Fees are designed to generate revenue over time to mitigate impacts from new development.

Fee Amounts and Phasing

The amount charged for the Affordable Housing Impact Fee is intended to balance the need to generate funding for more affordable housing, without impeding construction of new housing for all income levels. The City has prepared and updated both a nexus study that establishes the link between new market-rate development and the growth of employment associated with the consumer expenditures of new residents with the demand for affordable housing to accommodate the new worker households in Oakland. This update also includes an economic feasibility study to ensure fees are set at levels supported by the development market. The generation of additional housing units addresses the scarcity of available units in the current market; scarcity which ultimately contributes to displacement.

The Transportation Impact Fee is intended to assure that development projects pay their fair share to compensate for the increased demand for transportation infrastructure generated by such development projects within the City. These fees can also be used to cover the California Environmental Quality Act (CEQA) transportation cumulative impact mitigations that are within the Environmental Impact Report for all the Specific Plans, Redevelopment Plans, General Plan, and other major projects. The Transportation Impact Fee fund cannot be used for rehabilitation, maintenance, or operating costs.

The Capital Improvements Fee is intended to pay for projects that are required for fire, police, library, parks & recreation, or storm drain services that improve or expand the City’s public facilities to accommodate service demand from new developments. The Capital Improvement fee fund cannot be used for rehabilitation, maintenance, or operating costs.

The fees are assessed at the time of building permit application based upon the date when the applicant applied for a building permit and reassessed based on the current rate if the project does not receive a certificate of occupancy within three years of issuance of the building permit.

Starting July 1, 2021, the fees were adjusted based upon inflation and will continue to be Jestin D. Johnson, City Administrator
Subject: Impact Fee Annual Informational Report and Findings Resolution for Fiscal Year 2023- 24 Date: February 24, 2025 Page 5
CED Committee
March 25, 2025

Table 2a. Transportation Impact Fees Nonresidential (Fee Per Square Foot)
The Date is Based on When the Applicant Applies for Building Permit

adjusted for inflation in future years. Although assessed at the time of building permit application, the fees do not begin to be due and collected until building permit issuance. If the building permit is never issued, then the assessed fee is not collected. See Tables 1 – 3a below for amounts.

Affordable Housing Impact Fees

Table 1. Affordable Housing Impact Fees - Residential (Fee Per Housing Unit) The Date is Based on When the Applicant Applies for Building Permit Housing
Use Type Zone 7/1/19 -
6/30/20
7/1/20 -
9/19/2021
9/20/21 -
6/30/22
7/1/22 -
6/30/23
7/1/23-
6/30/24

Multi-family
Zone 1 $22,000 $22,000 $23,166 $26,652 $29,658
Zone 2 $17,750 $17,750 $18,691 $21,504 $23,929
Zone 3 $3,000 $12,000 $12,636 $14,538 $16,177

Townhome
Zone 1 $20,000 $20,000 $21,060 $24,230 $26,962
Zone 2 $14,250 $14,250 $15,005 $17,263 $19,210
Zone 3 $4,000 $8,000 $8,424 $9,692 $10,785
Single-
family
Zone 1 $23,000 $23,000 $24,219 $27,864 $31,006
Zone 2 $16,500 $16,500 $17,375 $19,990 $22,244
Zone 3 $1,000 $8,000 $8,424 $9,692 $ 10,785

Transportation Impact Fees

Table 2. Transportation Impact Fees – Residential (Fee Per Housing Unit) The Date is Based on When the Applicant Applies for Building Permit Housing Use
Type

Zone
Fiscal Year
7/1/19 -
6/30/20
Fiscal Year
7/1/20 –
6/30/21
Fiscal Year
7/1/21 -
6/30/22
Fiscal Year
7/1/22 –
6/30/23
Fiscal
Year
7/1/23 -
6/30/24

Multi-family
Zone 1 $750 $750 $790 $909 $1,012
Zone 2 $750 $750 $790 $909 $1,012
Zone 3 $750 $750 $790 $909 $1,012

Townhome
Zone 1 $1,000 $1,000 $1,053 $1,212 $1,349
Zone 2 $1,000 $1,000 $1,053 $1,212 $1,349
Zone 3 $1,000 $1,000 $1,053 $1,212 $1,349

Single-family
Zone 1 $1,000 $1,000 $1,053 $1,212 $1,349
Zone 2 $1,000 $1,000 $1,053 $1,212 $1,349
Zone 3 $1,000 $1,000 $1,053 $1,212 $1,349

Jestin D. Johnson, City Administrator
Subject: Impact Fee Annual Informational Report and Findings Resolution for Fiscal Year 2023- 24 Date: February 24, 2025 Page 6
CED Committee
March 25, 2025

Nonresidential Use
Type
Fiscal Year
7/1/19 -
6/30/20
Fiscal Year
7/1/20 -
6/30/21
Fiscal Year
7/1/21 -
6/30/22
Fiscal Year
7/1/22 -
6/30/23
Fiscal
Year
7/1/23 -
6/30/24
Office $1.00 $2.00 $2.11 $2.43 $2.70
Retail, Freestanding $0.75 $0.75 $0.79 $0.91 $1.01
Retail, Ground Floor $0.75 $0.75 $0.79 $0.91 $1.01
Industrial $0.55 $0.55 $0.58 $0.67 $0.75
Warehouse $0.35 $0.35 $0.37 $0.43 $0.48
Hotel/Motel $0.65 $0.65 $0.68 $0.79 $0.88
Institutional $2.00 $3.00 $3.16 $3.64 $4.05

Capital Improvement Impact Fees

Table 3. Capital Improvement Impact Fees - Residential (Fee Per Housing Unit) The Date is Based on When the Applicant Applies for Building Permit Housing Use
Type Zone
Fiscal Year
7/1/19 -
6/30/20
Fiscal Year
7/1/20 -
6/30/21
Fiscal Year
7/1/21 -
6/30/22
Fiscal Year
7/1/22 -
6/30/23
Fiscal Year
7/1/23 -
6/30/24

Multi-family
Zone 1 $1,250 $1,250 $1,316 $1,515 $1,686
Zone 2 $750 $750 $790 $909 $1,012
Zone 3 $0 $250 $263 $303 $337

Townhome
Zone 1 $3,000 $3,000 $3,159 $3,635 $4,045
Zone 2 $2,000 $2,000 $2,106 $2,423 $2,696
Zone 3 $1,000 $1,000 $1,053 $1,212 $1,349

Single family
Zone 1 $4,000 $4,000 $4,212 $4,846 $5,392
Zone 2 $3,000 $3,000 $3,159 $3,635 $4,045
Zone 3 $1,000 $1,000 $1,053 $1,212 $1,349

Table 3a. Capital Improvements Impact Fees - Nonresidential (Fee Per Square Foot) The Date is Based on When the Applicant Applies for Building Permit Nonresidential Use
Type
Fiscal Year
7/1/19 -
6/30/20
Fiscal Year
7/1/20 -
6/30/21
Fiscal Year
7/1/21 -
6/30/22
Fiscal Year
7/1/22 -
6/30/23
Fiscal Year
7/1/23 -
6/30/24
Office $1.00 $2.00 $2.11 $2.43 $2.70
Retail, Freestanding $0.25 $0.50 $0.53 $0.61 $0.68
Retail, Ground Floor $0.00 $0.00 $0.00 $0.00 $0.00
Industrial $0.75 $1.00 $1.05 $1.21 $1.35
Warehouse $1.00 $1.00 $1.05 $1.21 $1.35
Hotel/Motel $0.35 $0.60 $0.63 $0.73 $0.81
Institutional $2.50 $3.00 $3.16 $3.64 $4.05
Jestin D. Johnson, City Administrator
Subject: Impact Fee Annual Informational Report and Findings Resolution for Fiscal Year 2023- 24 Date: February 24, 2025 Page 7
CED Committee
March 25, 2025

Self/Mini Storage* $0.00 $0.00 $0.22 $0.25 $0.28
*New category per recommendation from the Oakland Transportation and Capital Improvements Impact Fee 5-Year Review and Update Report, dated December 23, 2021.

On-Site and Off-Site Affordable Housing Options

As an alternative to payment of the Affordable Housing Impact Fee, developers have the option to mitigate their projects’ impacts by building affordable units on-site or off-site.

The Affordable Housing Impact Fee, OMC Chapter 15.72, incentivizes the creation of on-site affordable housing units in market-rate developments by providing an exemption or reduction of a project’s Affordable Housing Impact Fee. The extra costs associated with providing a higher percentage of affordable units can be offset because the developer can take advantage of the State and local Density Bonus and Incentive Programs to bridge the gap between the cost of the Impact Fees and the cost of building affordable units on-site. Per Section 17.107.040 of the Oakland Planning Code, to receive a density bonus for the affordable units on-site, a developer is required to construct: ten (10) percent of the units for either low-income or moderate-income households; or five (5) percent for very low-income households. Attachment B lists the projects that opted to build low-income housing in lieu of impact fees, the number of market rate and affordable units, and the level of affordability for restricted units that involved permits opened in FY 2023-24. Note that Attachment B does not include City-funded affordable housing developments, which are also exempt from paying the Affordable Housing Impact Fee. An applicant for a development project that is otherwise subject to the impact fee can mitigate the fee by building off-site affordable housing units approved by City Council that are within one half of a mile of the development project. This provides an applicant with flexibility to contribute affordable housing units when there are constraints on the existing property.

2. Summary of Jobs/Housing Impact Fee
On July 30
, 2002, the City Council adopted the Jobs/Housing Impact Fee, OMC Chapter 15.68 (Ordinance No. 12442 C.M.S.). This impact fee went into effect for development projects submitting a building permit on or after July 1, 2005. The intent of the Jobs/Housing Fee was to assure that certain commercial development projects compensate and mitigate for the increased demand for affordable housing generated by such development projects within the City. The Jobs/Housing Impact Fee started at $4.00 per square foot and have adjusted with inflation in construction costs. For FY 2023-24 the fee is $8.05 per square foot.

D
evelopment Projects Subject to Jobs/Housing Impact Fee and Exemptions The following development projects are subject to the Jobs/Housing Impact Fee:

New nonresidential Office or Warehouse projects that exceed 25,000 square feet.

Nonresidential Office or Warehouse projects with additional floor area that exceeds 25,000 square feet.

Nonresidential projects with a “Change and Intensification of Use” to an office or warehouse that exceeds 25,000 square feet.

A building that is vacant for a year or more and exceeds 25,000 square feet that obtains a building permit for an office or warehouse activity.

Development projects subject to the Jobs/Housing Impact Fee only pay for square footage of the building that exceeds 25,000 square feet.

Jestin D. Johnson, City Administrator
Subject: Impact Fee Annual Informational Report and Findings Resolution for Fiscal Year 2023- 24 Date: February 24, 2025 Page 8
CED Committee
March 25, 2025

Fee Amounts and Payment Requirements

Development projects subject to the Jobs/Housing Impact Fee only pay for square footage of the building that exceeds 25,000 square feet or may elect to construct affordable housing as per OMC Section 15.68.080. The Jobs/Housing Fee is set out in Table 4.

Table 4. Jobs/Housing Impact Fees - Nonresidential (Fee Per Square Foot on Projects >25,000 sq. ft.)
The Date is Based on When the Applicant Applies for Building Permit Nonresidential Use
Type
Fiscal Year
7/1/19 -
6/30/20
Fiscal Year
7/1/20 -
6/30/21
Fiscal Year
7/1/21 -
6/30/22
Fiscal Year
7/1/22 -
6/30/23
Fiscal Year
7/1/23 -
6/30/24
Office $5.89 $5.98 $6.29 $7.24 $8.05
Warehouse $5.89 $5.98 $6.29 $7.24 $8.05

The Jobs/Housing Impact Fee is due in three installments:

The first installment of 25 percent is due prior to the issuance of a building permit; The second installment of 50 percent is due prior to the issuance of a temporary or permanent certificate of occupancy, whichever comes first; and The third installment for the remaining 25 percent is due 18 months after the temporary certificate of occupancy.

ANALYSIS A ND POLICY ALTERNATIVES

Compliance with the Mitigation Fee Act through the annual reporting and findings as well as use of the funds advances the following Citywide priorities: 1) housing, economic, and cultural security, 2) vibrant, sustainable infrastructure, and 3) responsive, trustworthy government.

Summary of Impact Fees Collected and Assessed

As expected, and as shown in previous years, there is not a correlation between the Impact Fees assessed and collected in FY 2023-24. This discrepancy results from the timing of payments, and the cancellation of some projects. The assessment may have occurred the same year as collection if a building permit is quickly sought and issued, or it may be years later if the project faces delays. If a project never moves forward, then the assessment is never collected.

Table 5 contains a summary of the Impact Fees collected and assessed including:

1. The amount of Impact Fees already collected/paid during the last 5 fiscal years.

2. The amount of Impact Fees that have been assessed. Note: Assessed Impact Fees listed in this report will only be fully collected if all the projects that have applied for building permits are built to completion.

3. Impact Fees collected in any fiscal year include projects where the impact fees were assessed in prior fiscal years.

Jestin D. Johnson, City Administrator
Subject: Impact Fee Annual Informational Report and Findings Resolution for Fiscal Year 2023- 24 Date: February 24, 2025 Page 9
CED Committee
March 25, 2025

Table 5. Impact Fee Summary by Fund and Fiscal Year
Impact Fee Fund Impact Fee Amount
Collected/Paid* Assessed

Affordable
Housing Trust
Fund

Affordable
Housing Impact
Fees (AHIF)
FY 2019-2020 $5,616,699 $6,630,877
FY 2020-2021 $4,430,250 $15,688,799
FY 2021-2022 $8,013,783 $28,579,457
FY 2022-2023 $2,238,635 $9,393,221
FY 2023-2024 $3,310,216 $3,915,115
Total FY 2020 -
2024 $23,609,583 $64,207,469

Jobs/Housing
Impact Fee
(JHIF)
FY 2019-2020 $4,190,080 $8,746,381
FY 2020-2021 $2,841,342 $3,250,168
FY 2021-2022 $2,089,819 $889,243
FY 2022-2023 $2,276,425 $9,138,900
FY 2023-2024 $1,752,809 $501,692
Total FY 2020 -
2024 $13,150,475 $22,526,384

AHIF & JHIF**
FY 2019-2020 $9,806,779 $15,377,258
FY 2020-2021 $7,271,592 $18,938,967
FY 2021-2022 $10,103,602 $29,468,700
FY 2022-2023 $4,515,060 $18,532,121
FY 2023-2024 $5,063,025 $4,416,807
Total FY 2020 -
2024 $36,760,058 $86,733,853

Transportation
Impact Fee Trust
Fund

Transportation
Impact Fee (TIF)
FY 2019-2020 $1,082,171 $2,383,796
FY 2020-2021 $1,319,704.00 $2,148,217
FY 2021-2022 $1,203,661.00 $4,313,208
FY 2022-2023 $1,979,184 $5,246,826
FY 2023-2024 $1,312,509 $1,116,709
Total FY 2020 -
2024 $6,897,229 $15,208,756

Capital
Improvements
Impact Fee Trust
Fund

Capital
Improvements
Impact Fee (CIIF)
FY 2019-2020 $1,210,684 $2,072,728
FY 2020-2021 $984,335 $2,040,876
FY 2021-2022 $1,447,618 $3,976,321
FY 2022-2023 $2,032,301 $5,056,149
FY 2023-2024 $867,205 $604,010
Total FY 2020 -
2024 $6,542,143 $13,750,084
* The “Amount Collected/Paid” represents the total amount collected less any refunds. **AHIF & JHIF: These rows provide a summation of the not-yet-transferred two impact fee funds under Fund 1870 – Affordable Housing Trust Fund at 6/30/24 along with impact fee resources transferred to the two new fund numbers established in FY23-24, which are Fund 1871 – Job Housing Impact Fee Fund and Fund 1872 – Affordable Housing Impact Fee Fund.

Jestin D. Johnson, City Administrator
Subject: Impact Fee Annual Informational Report and Findings Resolution for Fiscal Year 2023- 24 Date: February 24, 2025 Page 10
CED Committee
March 25, 2025

Analysis of Fees Collected vs. Assessed

The assessed Impact Fees that are listed in this report will only be fully collected if all the projects that have applied for building permits obtain a C.O or T.C.O. Table 6 below summarizes projects with an expired permit status on July 1, 2024 that have had fees assessed during FY 2023-24. Staff cannot determine whether or when these projects will be completed.

The variability in the construction market contributes to the variances summarized in Table 5 between the amount of assessed Impact Fees versus the fees that have been collected in any given fiscal year.

Table 6. Expired Permits with Assessed Fees for FY 2024 on July 1, 2024

Impact Fee Type Total Fees for Expired Permits
Affordable Housing Impact Fee (AHIF) $246,132
Jobs/Housing Impact Fee (JHIF) $0
AHIF & JHIF Total $246,132
Transportation Impact Fee (TIF) $9,839
Capital Improvements Impact Fee (CIIF) $47,607
Additional City Council Data Requests for the Impact Fee Annual Report

Staff has prepared Attachment C for FY 2023-24. The data contained in Attachment C comes from Accela – Planning and Building Department’s permit tracking system. The report covers the period beginning July 1, 2023 ending June 30, 2024. The Excel version may be downloaded here: https://www.oaklandca.gov/documents/city-of-oakland-annual-impact-fee-reports. Readers should note that each time a fee is assessed, a transaction line is then generated; therefore, some records appear several times. Note that a record is the unique identifier associated with the project in the Accela system.

Description of Data Fields in Attachment C

a. Name and location of project.
i. Record ID: The record number used to identify the project ii. Address: The project address
b. The Impact Fee Zone in which the project is located. i. The Impact Fee Zones correspond with the maps that were adopted at the time the ordinances went into effect.
c. Number of housing units.
i. Housing Units: The total number of housing units to be constructed d. Amount of fee assessed.
i. Amount Assessed: The impact fee that was assessed for that project. ii. Description: The fee that has been assessed for a given project. iii. Date Assessed: The date that the impact fee was assessed for the project.
iv. Date Invoiced: The date that the impact fee was invoiced.

Jestin D. Johnson, City Administrator
Subject: Impact Fee Annual Informational Report and Findings Resolution for Fiscal Year 2023- 24 Date: February 24, 2025 Page 11
CED Committee
March 25, 2025

v. Amount Due: The current impact fee invoiced and due for the project at time of report.
vi. Amount Paid: The amount of impact fee paid.
e. Date building permit application was submitted.
i. Date Opened: The date the building permit application was filed with the City.
f. Date building permit was issued.
i. Record Status: Status of the permit on 7/1/2024
ii. Record Status Date: This column contains the date that the record status was updated. It is aligned with the Current Record Status.

Affordable Housing Impact Fee Projects

Affordable Housing Impact Fee (AHIF) allocations are critical sources of early funding for affordable housing projects – these commitments enable projects to secure other public and private dollars to highly leverage the City’s investment. After a few fiscal years during which there were minimal expenditures from the AHIF fund as projects applied for gap funding, projects are moving into construction and expending funding.

Projects that were awarded AHIF funds in prior fiscal years have made significant progress in the past year, with two projects completing construction, six projects under construction and four projects starting construction as well as two Acquisition and Conversion to Affordable Housing (ACAH) projects. City funding for new construction affordable housing rental developments is limited to 40 percent of total development costs from all City funding sources.

A Notice of Funding Availability (NOFA) for New Construction of Affordable Rental Housing was released in early 2023, with funding awards approved by Council in Spring 2023 pursuant to Council Resolution Nos. 89646 and 89809, approved on March 21, 2023 and June 28, 2023, respectively. Although, approved in FY2023 fiscal year, these awards included commitments of budgeted impact fee revenue for FY2023-2024. A supplemental set of pipeline awards for this NOFA was made in February 2024 from non-impact fee sources. That funding round, which included impact fees as well as other sources, including Measure U affordable housing set-aside bond funds and other funds, propelled several projects in pre- development (including Longfellow Corner) into construction in FY 2023-2024.

Due to project funding needs in FY2023-2024, several projects in HCD’s portfolio had their funding sources changed to meet State and Federal funding program requirements. For example, the City has received State Housing and Community Development Department funding awards through the State’s Local Housing Trust Fund, which require very specific matches for the City’s AHIF and JHIF funding.

Although all the projects with previously reported AHIF and JHIF funds from prior years remain in the current year’s reporting, funding allocations have shifted in some cases, and a few projects from the City’s ACAH NOFA are now funded by AHIF and JHIF funding sources. The purpose of the ACAH Program is: to protect and preserve long-term affordable housing options throughout the City by providing loans to eligible borrowers to acquire and rehabilitate Jestin D. Johnson, City Administrator
Subject: Impact Fee Annual Informational Report and Findings Resolution for Fiscal Year 2023- 24 Date: February 24, 2025 Page 12
CED Committee
March 25, 2025

market rate rental properties; and then to convert the properties to long-term affordable housing through recorded affordability restrictions.

Remaining AHIF fund balance will be awarded through future HCD NOFA processes to eligible affordable housing activities. Table 7 lists the funding and current status of AHIF-funded projects.

Table 7. Summary of Affordable Housing Impact Fee (AHIF) Projects

Project and
Address
Affordable
Units
AHIF
Funding Status as of June 30, 2024
2700 International 75 $2,500,000 In predevelopment, seeking additional funding commitments.
500 Lake Park 53 $983,130 In predevelopment, seeking additional funding commitments.

34th & San Pablo

60 $527,870
In predevelopment, seeking additional
funding commitments. Planning
entitlements were secured during FY
2022-23.

Agnes Memorial
Senior Housing

60 $769,629
In predevelopment, seeking additional
funding commitments. (Funding
commitment expired after 6/30/2024.

Funding has been redeployed in FY25.)
3050 International 75 $1,430,371 In construction as of March 2024.

Phoenix 101 $272,034 In construction as of August 2023.

Friendship Senior
Rental Housing, 1904
Adeline Street
48 $2,872,998 In construction as of September 2023.

Longfellow Corner,
3801-3807 and 3823-
3829 Martin Luther
King Jr. Way

77 $11,318,000

In construction as of May 2024.

West Grand & Brush
Phase I, 760 22nd
Street & 2201 Brush
Street

59 $2,330,000
Construction is underway as of October
2022. After severe winter storm event-
related delays in December 2022, the
building is now back under construction,
and scheduled for completion by the
Spring 2025.
7th & Campbell 79 $460,192 Construction commenced in June 2024.

Preparing for permanent loan closing.

Oak Hill
Apartments/NOVA,
445 30th Street

57 $1,600,000
Construction was completed as of June
2021, the building is 100 percent
occupied as of July 2021, and the
permanent loan conversion was
completed in April 2022.

Jestin D. Johnson, City Administrator
Subject: Impact Fee Annual Informational Report and Findings Resolution for Fiscal Year 2023- 24 Date: February 24, 2025 Page 13
CED Committee
March 25, 2025

95th Avenue &
International Blvd

55 $1,409,717
The project received a temporary
certificate of occupancy in June 2023,
and permanent closing occurred in
February 2024.
2000 36th Avenue
(ACAH) 55 $40,119
Acquisition phase completed,
rehabilitation phase to start in FY 2024-
25 524-530 8th Street
(ACAH) 39 $1,158,809
Acquisition phase completed,
rehabilitation phase to start in FY 2024-

25. Jobs/Housing Impact Fee Projects

As is the case for AHIF, Jobs/Housing Impact Fee allocations are critical sources of early funding for affordable housing projects – these commitments enable projects to secure other public and private dollars to leverage the City’s investment.

New Construction projects that were awarded JHIF funds in prior fiscal years have made significant progress in the past year with two projects having completed construction (one in FY2023-2024), four projects starting construction as well as three Acquisition and Conversion to Affordable Housing (ACAH) projects. City funding for new construction affordable housing rental developments is limited to 40 percent of total development costs from all City funding sources.

A Notice of Funding Availability (NOFA) for New Construction of Affordable Rental Housing was released in early 2023 with funding awards approved by Council in Spring 2023 pursuant to Council Resolution Nos. 89646 and 89809, approved on March 21, 2023 and June 28, 2023, respectively. Although these awards were approved in FY2023 fiscal year, they included commitments of budgeted impact fee revenue for FY2023-2024. A supplemental set of pipeline awards for this NOFA was made in February 2024 from non-impact fee sources. That funding round, which included impact fees as well as other sources, such as Measure U affordable housing set-aside bond funds, propelled several projects in pre-development (including Longfellow Corner and 3050 International) into construction in FY 2023-2024.

This funding round, which included impact fees as well as other sources, such as State tax credits and other funds, propelled several projects in pre-development (including Longfellow Corner and 3050 International) into construction in the first half of 2024.

Due to project funding needs in FY2023-2024, several projects in HCD’s portfolio had their funding sources changed to meet State and Federal funding program requirements. For example, the City has received State Housing and Community Development Department funding awards through the State’s Local Housing Trust Fund, which require very specific matches for the City’s AHIF and JHIF funding. Although all the projects with previously reported AHIF and JHIF funds from prior years remain in the current year’s reporting, funding allocations have shifted in some cases, and a few projects from the City’s Acquisition and Conversion to Affordable Housing NOFA are now funded by AHIF and JHIF funding sources.

Remaining JHIF fund balance will be awarded through future HCD NOFA processes to eligible affordable housing activities.

Jestin D. Johnson, City Administrator
Subject: Impact Fee Annual Informational Report and Findings Resolution for Fiscal Year 2023- 24 Date: February 24, 2025 Page 14
CED Committee
March 25, 2025

Table 8 lists the funding and current status of JHIF-funded projects.

Table 8. Summary of Jobs/Housing Impact Fee (JHIF) Projects

Project and
Address
Affordable
Units
JHIF
Funding Status as of June 30, 2024

2700 International

75 $2,500,000 In predevelopment, seeking additional funding commitments.
34th & San Pablo 60 $3,472,130 Predevelopment, seeking additional funding commitments.

Agnes Memorial
Senior Housing

60 $1,096,456
In predevelopment, seeking additional funding
commitments. (Funding commitment expired
after 6/30/2024. Funding has been redeployed
in FY25.)

3050 International

75 $2,263,889

In construction as of March 2024.

Longfellow Corner,
3801-3807 and 3823-
3829 Martin Luther
King Jr. Way

77 $1,018,000

In construction as of May 2024.

Phoenix: 801 Pine
Street

101 $
1,018,588

In construction as of August 2023.

Friendship Senior
Rental Housing: 1904
Adeline Street
48 $1,193,000 In construction as of September 2023.

Casa Suenos, aka
Fruitvale Transit
Village Phase II-B: E.
12 th Street & 35th
Avenue

181

$1,604,123

Construction completed in January 2024.
95th Avenue &
International Blvd 55 $129,681
The project received a temporary certificate of
occupancy in June 2023, and permanent
closing occurred in February 2024
1432 12th Avenue
(ACAH) 7 $1,209,000 Acquisition phase completed; rehabilitation 99 percent completed.
2000 36th Avenue
(ACAH) 55 $138,096 Acquisition phase completed, rehabilitation phase to start in FY2024-25.
1921 & 2022 36th
Avenue (ACAH)

25 $1,450,000
Acquisition and minor rehabilitation phase
completed, larger rehabilitation phase to start in
early 2025.

Predevelopment
Loan Program n/a $400,000 Over the counter.

Jestin D. Johnson, City Administrator
Subject: Impact Fee Annual Informational Report and Findings Resolution for Fiscal Year 2023- 24 Date: February 24, 2025 Page 15
CED Committee
March 25, 2025

Transportation Impact Fee Projects

For FY 2023-24, the City’s Department of Transportation (OakDOT) had two existing projects with updates as listed in Table 9 below. The City committed $3,100,000 to these two projects.

Table 9: Transportation Impact Fee (TIF) Projects

Active TIF Project TIF Funding FY 2023-24
Expenditures Status as of June 30, 2023

Public Improvements at 24th
Street, Harrison Street, Bay
Place and 27th Street

$2,100,000

$0
Project began construction in
June 2022 and is expected to
be completed by Spring 2025.

No funds were expended in
FY 23-24 due to invoicing
delays. An invoice is currently
being processed as of Fall
2024.

Traffic Signals
Garfield Elementary
Pedestrian Improvements,
Foothill Blvd at intersections
with 22nd Ave and Munson
Way

$1,000,000

$461,068

Project began construction in
June 2022 and is expected to
be completed by Spring 2025.

Capital Improvement Impact Fee Projects

For FY 2023-24, Oakland Public Works (OPW) had $1,306,744 in expenditures in Capital Improvement Impact Fees for July 1, 2023 to June 30, 2024 across multiple projects. Of the $5,898,947 in fund balance and newly collected funding in FY 2024, $3,072,031 has been committed (see Table 10).

Table 10: Capital Improvement Impact Fee (CIIF) Projects

Project
CIIF
Funding
through FY
2024

Status as of June 30, 2024

Storm Drainage Master Plan
(SDMP)

$991,000
Currently in process. For example, the hydraulic
model is 100 percent complete, condition
assessments 40 percent complete, and design
standards are 95 percent complete. Public
outreach is underway. The City Council approved
Resolution No. 88355 C.M.S. on November 10,
2020 to award the firm Wood Rogers the contract
to develop the SDMP.

Fire Station 10 & 12
Renovation Project $1,609,500 The project is currently in construction for Fire Station 10. Fire Station 12 paving is in process
Jestin D. Johnson, City Administrator
Subject: Impact Fee Annual Informational Report and Findings Resolution for Fiscal Year 2023- 24 Date: February 24, 2025 Page 16
CED Committee
March 25, 2025

and pending the contractor to proceed with the
work. Construction is set to begin in February
2025.

Brookfield Library Renovation
Project

$300,000
This project is currently complete in the design
phase and will be going out to bid for construction
at the end of 2024.Construction is set to begin in
July of 2025.

Malonga Center Feasibility
Study

$800,000
Feasibility Study was completed and issued to
stakeholders in September of 2024. Further work
pending outcome of presentation and feedback to
stakeholders.

Digital Arts & Culinary
Academy Phase 2
Renovations & Expansion
$800,000
The project is currently in construction and
expected to be substantially completed by the
end of 2024.

Mosswood Recreation Center
Expansion $965,000 Project is currently in construction. Completion is anticipated in late summer 2025
Junior Science Center $40,000 This project is complete, and invoices are in process for payment.

West Oakland Youth Center $50,000 Project is complete and final invoices are in process for payment.

District 3 Community Center
CIP

$96,000
These funds were initially set aside by CM/
District 3 for building improvements at a non-City
facility. The CM sought to repurpose the funds to
the DeFremery Recreation Center for facility
improvements.

Arroyo Viejo Park $25,000
The project is currently on hold awaiting larger
site remodel, including construction and
expansion of a commercial kitchen.

Feasibility Study for 1310 Oak
Street Fire Alarm Building

$30,000
Consultant is preparing report by the end of 2023
The project has been completed and remaining
available funds of $8,947 has been returned to
the fund balance.

Redwood Heights Park Tot
Lot & Park Expansion $100,000 Project is completed and all funds have been expended
Holly Mini Park $250,000 The project is complete. A ribbon-cutting celebration was held in September 2024.
73rd Avenue Soil
Remediation $50,000 Project is currently in process with construction to begin in March of 2025
East Oakland Sports Center
Expansion $200,000 The project will go out to bid through the City’s On-Call contractor’s list in January 2025.

Oakland Tool Lending Library $35,000 The project is on hold pending additional funding or reduction in design scope.

Five Year Annual Impact Fee Report

Five-year impact fee review and update reports were written for all four of the impact fees categories that the City charges on development. These reports contain the required findings of the Mitigation Fee Act as well as updated maximum legal impact fee findings. These reports were previously presented to the Community and Economic Development Committee on June Jestin D. Johnson, City Administrator
Subject: Impact Fee Annual Informational Report and Findings Resolution for Fiscal Year 2023- 24 Date: February 24, 2025 Page 17
CED Committee
March 25, 2025

28, 2022 . These reports can be found here: Impact Fee Review and Update Reports. The next five-year impact fee review and update reports will be prepared in 2026.

FISCAL IMPACT

This item is for informational purposes and does not have a direct fiscal impact or cost. The fiscal benefit of the revenues generated by the Impact Fees for FY 2023-24 is $3,310,216 for the Affordable Housing Impact Fee, $1,312,509 for the Transportation Impact Fee, $867,205 for the Capital Improvements Impact Fee, and $1,752,809 for the Jobs/Housing Impact Fee. The Affordable Housing and Jobs/Housing Impact Fees are part of the City’s Affordable Housing Trust Funds, and deposited into Funds 1872 and 1871, respectively. The Transportation Impact Fee is deposited into Fund 2420 and the Capital Improvements Impact Fee is deposited into Fund 2421.

Affordable Housing Impact Fee Fund Balance

1. The starting balance for the Affordable Housing Impact Fee fund in FY 2023-24 was $25,420,635. In FY 2023-24, a total of $,3,310,216 were collected, $137,724 of refunds were provided, $531,103 of interest was earned, and $10,962,124 were expended, resulting in an ending balance of $18,162,106 (See Table 3 of the Impact Fee Annual Report FY 2023-24, Attachment A). There were $11,067,664 in Affordable Housing Impact Fee funds committed. As of June 30, 2024, there was $7,094,443 in Affordable Housing Impact Fee funds that had yet to be committed through NOFAs in Fall 2024.

Jobs/Housing Impact Fee Fund Balance

The starting balance for the Jobs/Housing Impact Fee fund in FY 2023-24 was $10,518,369. In FY 2023-24, a total of $1,752,809 were collected, $0 of refunds were provided, $669,442 of interest was earned, and $2,941,187 were expended. An additional $3,965,000 of prior year expenditures for the West Grant project were returned to the JHIF as part of the funding swaps noted above and in the annual report, resulting in an overall ending balance of $13,964,433 (See Table 5 of the Impact Fee Annual Report FY 2023-24, Attachment A). There were $9,547,703 in Jobs/Housing Impact Fee funds committed as of June 30, 2024. As of June 30, 2023, there was $4,416,730 in Jobs/Housing Impact Fee funds that had yet to be committed through NOFAs in Fall 2024.

Transportation Impact Fee Fund Balance

The starting balance of the Transportation Impact Fee fund for FY 2023-24 was $9,373,212 and the ending balance was $10,481,326. There was $436,870 in Transportation Impact Fee fund expenditures in FY 2023-24. For additional details, see Table 7 of the Impact Fee Annual Report FY 2023-24, Attachment A.

OakDOT programs TIF funds in accordance with the ordinance authorizing collection of the fee (OMC Chapter 15.74, Ordinance No. 12442 C.M.S). The Capital Improvement Program (CIP), approved every two years, programs a portion of TIF funds to eligible capital projects, and plays Jestin D. Johnson, City Administrator
Subject: Impact Fee Annual Informational Report and Findings Resolution for Fiscal Year 2023- 24 Date: February 24, 2025 Page 18
CED Committee
March 25, 2025

a role assessing alignment of existing capital projects and cumulative mitigation measures to ensure TIF funding is best utilized and impact from future developments are addressed. Several policy documents guided the overall preparation of the City’s Fiscal Year 2023-2025 CIP for transportation assets. These include:

• 2022 Infrastructure Bond, Measure KK (Resolution 89021 C.M.S., 2022) • 2021 Measure KK Reallocation from OPW to OakDOT (Resolution 88651 C.M.S., 2021)
• 2020 Infrastructure Bond, Measure KK (Resolution 87981 C.M.S., 2020) • 2019 Infrastructure Bond, Approved CIP Projects (Resolution 87981 C.M.S., 2019) • Capital Improvement Program Prioritization Process (Resolution 87376 C.M.S., 2018)
• 2017 Infrastructure Bond, Approved CIP Projects (Resolution 86773 C.M.S., 2017) • 2016 Infrastructure Bond, Measure KK (Resolution 86335 C.M.S., 2016) • Five Year Pavement Program (Resolution 85227 C.M.S., 2014) • Sidewalk Prioritization Program (Resolution 81751 C.M.S., 2009) • Racial Equity (Ordinance 14-0457, O.M.C. 2.29.170, 2016) • Public Art Ordinance (Ordinance 11086 C.M.S., 1989)
• Transit First Strategy
• 2030 Oakland Equitable Climate Action Plan (ECAP) (Resolution 88267 C.M.S., 2020)
• 2045 Carbon Neutrality TIF Project Eligibility Criteria (Resolution 88268 C.M.S., 2020)

Capital Improvement Impact Fee Fund Balance

The starting balance for the Capital Improvement Impact Fee fund in FY 2023-24 was $5,898,947 and the ending balance was $5,501,667 (See Table 9 of the Impact Fee Annual Report FY 2023-24, Attachment A). There was $1,306,744 in Capital Improvement Impact Fee fund expenditures in FY 2023-24 and $2,42,636 in Capital Improvement Impact Fee funds committed as of June 30, 2024. As of June 30, 2024, there was $3,072,031 in Capital Improvement Impact Fee funds that had yet to be committed.

O
PW will program the remaining $3,072,031 Capital Improvement Impact Fee through the CIP process fund balance. OPW will make recommendations to commit funds to projects through the mid-cycle and next two-year CIP and in accordance with ordinance authorizing collection of the fee (OMC Chapter 15.74, Ordinance No. 12442 C.M.S).

PUBLIC OUTREACH / INTEREST

The Impact Fee Annual Report for FY 2023-24was posted to the City website and may be accessed here: https://www.oaklandca.gov/documents/city-of-oakland-annual-impact-fee- reports.

Subscribers to the Planning and Building department’s newsletter were also sent notice that the Impact Fee Annual Report had been posted.

Jestin D. Johnson, City Administrator
Subject: Impact Fee Annual Informational Report and Findings Resolution for Fiscal Year 2023- 24 Date: February 24, 2025 Page 19
CED Committee
March 25, 2025

COORDINATION

Project management, policy guidance, and implementation was coordinated with the City Administrator’s Office, Office of the City Attorney, the Planning and Building Department, OPW, OakDOT, and HCD along with other departments, as appropriate, based on the topic(s) addressed.

SUSTAINABLE OPPORTUNITIES
Economic: The Impact Fees require private development to fund its fair share of affordable housing, transportation and capital improvements infrastructure in a manner that does not hamper new development. The application of the development impact fee process helps provide certainty about development costs.

Environmental: Impact fees mitigate the transportation and infrastructure impacts that a project will have on the environment. The fees provide for bike and pedestrian improvements that can remove a major barrier for people walking and biking and reduce the number of potential conflicts between all modes. Active transportation improvements can have both air quality and mode shift benefits, reducing the environmental impacts associated with transportation.

Race & Equity: Impact Fees on new development fund affordable housing units and transportation and infrastructure improvements. These funds will be used to mitigate impacts of new development citywide such as the displacement of long-term residents, particularly African American residents, who are the overwhelming majority of the unhoused/unsheltered in Oakland. In addition, these funds are used in support of capital and infrastructure improvements that have been evaluated for their capacity to address historic underinvestment in Oakland neighborhoods where the majority of residents are Black, Indigenous, and People of Color.

Active infrastructure improvements, including transportation improvements, address safety, prioritize people walking and biking, allow for more convenient, affordable, and safe forms of transportation, helping reduce collision disparities and economic and physical barriers to accessing essential places.

ACTION REQUESTED OF THE CITY COUNCIL

Staff Recommends That The City Council Adopt A Resolution Accepting The Fiscal Year 2023- 2024 Annual Impact Fee Informational Report And Making Findings Regarding Said Annual Impact Fee Report And Previously Presented Five-Year Impact Fee Reports Consistent With The Mitigation Fee Act, California Government Code Sections 66000 To 66025.

Jestin D. Johnson, City Administrator
Subject: Impact Fee Annual Informational Report and Findings Resolution for Fiscal Year 2023- 24 Date: February 24, 2025 Page 20
CED Committee
March 25, 2025

For questions regarding this report, please contact Albert Merid, Assistant Director, Planning and Building Department, at [email protected], 510-238-3558

Respectfully submitted,

William Gilchrist
Director, Planning and Building

Emily Weinstein
Director, Housing and Community Development

Josh Rowan
Director, Department of Transportation
Interim Director, Oakland Public Works

Reviewed by:

Albert Merid, Assistant Director
Planning and Building Department

Prepared by:

Susan Olson, Administrative Analyst II
Planning and Building Department

Attachments (3):

A. Impact Fee Annual Report, Affordable Housing, Jobs/Housing Transportation, and Capital Improvements Impact Fees, Fiscal Year Ended June 30, 2024 B. Projects that opted to build affordable units in lieu of paying impact fees C. Projects Assessed Impact Fees in FY 2023-24

Attachment A

City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

CITY OF OAKLAND

ANNUAL REPORT FOR:

AFFORDABLE HOUSING ,

JOBS /H OUSING ,

TRANSPORTATION , & CAPITAL

IMPROVEMENTS IMPACT FEES

Fiscal Year Ended June 30, 2024
(FY 2023-2024)

December 27, 2024
City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

TABLE OF CONTENTS
I. Reporting Requirements for Impact Fees....................................................................................................... 1 II. Description of Development Impact Fees ...................................................................................................... 1 A. Affordable Housing Impact Fees .......................................................................................................... 1 B. Jobs/Housing Impact Fees .................................................................................................................... 2 C. Transportation Impact Fees ................................................................................................................. 2 D. Capital Improvement Impact Fees ....................................................................................................... 2 III. Amount of Impact Fee, Fund Balance, and Project Descriptions ................................................................... 3 A. Summary of the Impact Fees Program ................................................................................................. 3 B. Affordable Housing Impact Fees .......................................................................................................... 6 C. Jobs/Housing Impact Fees .................................................................................................................. 13 D. Transportation Impact Fees ............................................................................................................... 19 E. Capital Improvements Impact Fees .................................................................................................... 24 IV. Impact Fee Zone Maps ................................................................................................................................. 31 City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 1 of 36 ends

I. REPORTING REQUIREMENTS FOR IMPACT FEES
In California, State legislation set legal and procedural parameters for the implementation of Impact Fees.

This legislation was passed as AB1600 by the California Legislature and is now codified as California Government Code Sections (GC §) 66000 through 66008 (“Mitigation Fee Act”). This State law went into effect on January 1, 1989.

GC § 66006(b)(1) states the following requirements as pertains to Impact Fees for the prior fiscal year:

a. A brief description of the type of fee in the account or fund. b. The amount of the fee.
c. The beginning and ending balance of the account or fund. d. The amount of the fees collected, and the interest earned. e. An identification of each public improvement on which fees were expended and the amount of the expenditures on each improvement, including the total percentage of the cost of the public improvement that was funded with fees.
f. (i) An identification of an approximate date by which the construction of the public improvement will commence if the local agency determines that sufficient funds have been collected to complete financing on an incomplete public improvement, as identified in paragraph (2) of subdivision (a) of Section 66001, and the public improvement remains incomplete.
(ii) An identification of each public improvement identified in a previous report pursuant to clause (i) and whether construction began on the approximate date noted in the previous report.
(iii) For a project identified pursuant to clause (ii) for which construction did not commence by the approximate date provided in the previous report, the reason for the delay and a revised approximate date that the local agency will commence construction. g. A description of each interfund transfer or loan made from the account or fund, including the public improvement on which the transferred or loaned fees will be expended, and, in the case of an interfund loan, the date on which the loan will be repaid, and the rate of interest that the account or fund will receive on the loan.
h. The amount of refunds made pursuant to subdivision (e) of Section 66001, the number of persons or entities identified to receive those refunds, and any allocations pursuant to subdivision (f) of Section 66001.

II. Description OF DEVELOPMENT IMPACT FEES
A. Affordable Housing Impact Fees
Oakland Municipal Code (OMC) Chapter 15.72 (Ordinance No. 13365 C.M.S.) establishes affordable housing impact fees in the City of Oakland to assure that market-rate residential development projects City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 2 of 36 ends

pay their fair share to compensate for the increased demand for affordable housing generated by such development projects within the City of Oakland. Unless exempt from this chapter, any development project resulting in additional housing units in new or existing buildings must pay to the City the Affordable Housing Impact Fees; or the applicant may elect to construct either on-site or off-site affordable housing units as permitted under OMC Sections 15.72.100 and 15.72.110. These Impact Fees are further broken down into three Impact Fee Zones for which fees vary.

The Affordable Housing Trust Fund established under OMC Chapter 15.62 receives all Affordable Housing Impact Fees collected and all interest and investment earnings accrued thereon shall be used to increase, improve, and preserve the supply of affordable housing in the City with priority given to housing for very low-income households. The United Stated Department of Housing and Urban Development (HUD) defines “very low-income” as 50 percent of the median family income for the area.

B. Jobs/Housing Impact Fees
OMC Chapter 15.68 (Ordinance No. 12442 C.M.S.) establishes a Jobs/Housing Impact Fee in the City of Oakland to assure that certain commercial development projects compensate and mitigate for the increased demand for affordable housing generated by such development projects within the City of Oakland. Any new office or warehouse/distribution development project in a new or existing building over 25,000 square feet must pay to the City the Jobs/Housing Impact Fee, or may elect to construct affordable housing as per OMC Section 15.68.080.

The Affordable Housing Trust Fund established under OMC Chapter 15.62 receives all Jobs/Housing Impact Fees collected and all interest and investment earnings thereon, shall be used to increase, improve, and preserve the supply of affordable housing in the City, with priority given to housing for very low-income households.

C. Transportation Impact Fees
OMC Chapter 15.74 (Ordinance No. 13366 C.M.S.) establishes citywide transportation impact fees in the City of Oakland to assure that development projects pay their fair share to compensate for the increased demand for transportation infrastructure generated by such development projects within the City of Oakland. Unless exempt from the chapter any development project resulting in additional square footage for a non-residential project or additional housing units in a residential project in new or existing buildings must pay to the City the Transportation Impact Fees, or comply with the Developer Constructed Facilities in OMC Section 15.74.120. For residential development projects, these Impact Fees are further broken down into three Impact Fee Zones for which fees vary.

A Transportation Impact Fee Fund receives all Transportation Impact Fees collected and all interest and investment earnings thereon, shall be used to pay for improvements within the public right-of-way for pedestrians, bicyclists and/or motor vehicles. Fee revenues may be used to fund a capital project or portion of a capital project that meets the requirements of OMC Section 15.74.100.

D. Capital Improvement Impact Fees
OMC Chapter 15.74 (Ordinance No. 13366 C.M.S.) establishes citywide capital improvement impact fees in the City of Oakland to assure that development projects pay their fair share to compensate for City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 3 of 36 ends

the increased demand for capital improvements infrastructure generated by such development projects within the City of Oakland. Any development project, unless exempt from the chapter, resulting in additional square footage for a non-residential project or additional housing units in a residential project in new or existing buildings, must pay to the City the Capital Improvement Impact Fees, or comply with the Developer Constructed Facilities in OMC Section 15.74.120. For residential development projects, these Impact Fees are further broken down into three Impact Fee Zones for which fees vary.

A Capital Improvements Impact Fee Fund receives all the Capital Improvements Impact Fees collected and all interest and investment earnings thereon, shall be used to pay for projects that are required for fire, police, library, parks and recreation, or storm drain services. Fee revenues may be used to fund a public facility or portion of a public facility that meets the requirements of OMC Section 15.74.110

III. AMOUNT OF IMPACT FEE, FUND BALANCE, AND PROJECT

DESCRIPTIONS
A. Summary of the Impact Fees Program

1. The Impact Fee program is designed for revenues generated over time to mitigate impacts from new development and is not meant to cover existing shortfalls.

2. The Impact fees in this report include all the fees collected in the past five fiscal years.

3. Projects that obtained vested rights prior to the effective date of the Impact Fees are not subject to Impact Fees, provided the vested rights remained vested at the time of building permit issuance.

4. A number of projects had development agreements that already require some type of community benefits and were not subject to Impact Fees.

5. Impact Fees are assessed at the time of building permit application; however, payments are made later in the building permit process according to installment schedule provided in the Impact Fee ordinances:
a. At building permit issuance, 100% of Transportation and Capital Improvements Impact Fees, 50% of the Affordable Housing Impact Fee, and 25% of the Jobs/Housing Impact Fee are paid. Building permit issuance may occur up to one year after a building permit application.
b. At project completion, the remaining 50% of the Affordable Housing Impact Fee and 50% of the Jobs/Housing Impact Fee are paid. For larger projects, completion typically occurs 1 to 3 years after the building permit issuance (and 2 to 4 years after the building permit application).
c. For the Jobs/Housing Impact Fee, the remaining 25% of the Impact Fees is paid at 18 months after project completion.

6. The Impact Fees were phased in to allow developers time to incorporate the Impact Fees into their project cost, as well as to incentivize development projects to be built and to address the housing demand. Phasing in new fees was also consistent with continued real growth of rents and improved feasibility of housing development. The 2% service charge associated with this program is being used to pay for the five-year assessment and update of the City’s impact fee program as required under California Government Code Section 66001(d). In FY 2023-2024, $337,587.50 was paid to Hausrath Economic Group to conduct Phase II: Development City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 4 of 36 ends

Feasibility Analysis and Housing Strategy Study.

7. Refunds for a total of $719,309 were issued FY 2023-2024* Affordable Housing: $ 137,724
Jobs/Housing $ 0
Capital Improvements: $ 400,602
Transportation: $ 180,983
Refund Total: $719,309

8. Prior to FY2023-2024, AHIF and JHIF funding were captured in one fund (Fund 1870). Fund 1870 also houses the City’s affordable housing boomerang funds. This made reporting on funding commitments and spending complicated, particularly since many affordable housing projects have multiple sources of City funding. In order to appropriately separate the funding streams, HCD staff requested that the AHIF and JHIF have fully separate funds (from Boomerang and from each other), resulting in the creation of Fund 1871 for JHIF and Fund 1872 for AHIF from FY 2023-2024 onward.

*The refund amounts listed here include money refunded from both the revenue and expense accounts. Individual fund balance summaries will only include refunds issued from the expense account.

This section has been left intentionally blank
City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 5 of 36 ends

Table 1 lists

1. The amount of Impact Fees already collected/paid.

2. The amount of Impact Fees that have been assessed. Note: Assessed Impact Fees listed in this report will only be fully collected if all the projects that have applied for building permits are built to completion.

3. Impact Fees collected/paid in any fiscal year include projects where the impact fees were assessed in prior fiscal years.

Table 1. Impact Fee Summary by Fund and Fiscal Year
Impact Fee Fund Impact Fee Amount Collected/Paid* Assessed

Affordable Housing
Trust Fund

Affordable Housing
Impact Fees (AHIF)
FY 2019-2020 $5,616,699 $6,630,877
FY 2020-2021 $4,430,250 $15,688,799
FY 2021-2022 $8,013,783 $28,579,457
FY 2022-2023 $2,238,635 $9,393,221
FY 2023-2024 $3,310,216 $3,915,115
Total FY 2020 -2024 $23,609,583 $64,207,469

Jobs/Housing Impact
Fee (JHIF)
FY 2019-2020 $4,190,080 $8,746,381
FY 2020-2021 $2,841,342 $3,250,168
FY 2021-2022 $2,089,819 $889,243
FY 2022-2023 $2,276,425 $9,138,900
FY 2023-2024 $1,752,809 $501,692
Total FY 2020 -2024 $13,150,475 $22,526,384

AHIF & JHIF**
FY 2019-2020 $9,806,779 $15,377,258
FY 2020-2021 $7,271,592 $18,938,967
FY 2021-2022 $10,103,602 $29,468,700
FY 2022-2023 $4,515,060 $18,532,121
FY 2023-2024 $5,063,025 $4,416,807
Total FY 2020 -2024 $36,760,058 $86,733,853

Transportation Impact
Fee Trust Fund

Transportation Impact
Fee (TIF)
FY 2019-2020 $1,082,171 $2,383,796
FY 2020-2021 $1,319,704 $2,148,217
FY 2021-2022 $1,203,661 $4,313,208
FY 2022-2023 $1,979,184 $5,246,826
FY 2023-2024 $1,312,509 $1,116,709
Total FY 2020 -2024 $6,897,229 $15,208,756

Capital Improvements
Impact Fee Trust Fund

Capital Improvements
Impact Fee (CIIF)
FY 2019-2020 $1,210,684 $2,072,728
FY 2020-2021 $984,335 $2,040,876
FY 2021-2022 $1,447,618 $3,976,321
FY 2022-2023 $2,032,301 $5,056,149
FY 2023-2024 $867,205 $604,010
Total FY 2020 -2024 $6,542,143 $13,750,084
* The “Amount Collected/Paid” represents the total amount collected less any refunds. **AHIF & JHIF: These rows provide a summation of the not-yet-transferred two impact fee funds under Fund 1870 – Affordable Housing Trust Fund at 6/30/24 along with impact fee resources transferred to the two new fund numbers established in FY23-24, which are Fund 1871 – Job Housing Impact Fee Fund and Fund 1872 – Affordable Housing Impact Fee Fund.

City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 6 of 36 ends

B. Affordable Housing Impact Fees
The Amount of Affordable Housing Impact Fee

Table 2. Affordable Housing Impact Fees - Residential (Fee Per Housing Unit) The Date is Based on When the Applicant Applies for Building Permit Housing Use
Type Zone 7/1/19 -
6/30/20
7/1/20 -
9/19/21
9/20/21 -
6/30/22
7/1/22 -
6/30/23
7/1/23-
6/30/24

Multi-family
Zone 1 $ 22,000 $ 22,000 $ 23,166 $ 26,652 $ 29,658
Zone 2 $ 17,750 $ 17,750 $ 18,691 $ 21,504 $ 23,929
Zone 3 $ 3,000 $ 12,000 $ 12,636 $ 14,538 $ 16,177

Townhome
Zone 1 $ 20,000 $ 20,000 $ 21,060 $ 24,230 $ 26,962
Zone 2 $ 14,250 $ 14,250 $ 15,005 $ 17,263 $ 19,210
Zone 3 $ 4,000 $ 8,000 $ 8,424 $ 9,692 $ 10,785

Single-family
Zone 1 $ 23,000 $ 23,000 $ 24,219 $ 27,864 $ 31,006
Zone 2 $ 16,500 $ 16,500 $ 17,375 $ 19,990 $ 22,244
Zone 3 $ 1,000 $ 8,000 $ 8,424 $ 9,692 $ 10,785

Fund Balance Summary

Table 3. Affordable Housing Impact Fees, Fiscal Year 7/1/23 – 6/30/24 Document Establishing Fee Oakland Municipal Code Chapters 15.72 & 15.62 Starting Balance $25,420,635
Fees Collected (Fund 1870, 1872) $3,310,216
Refunds* ($137,724)
Interest Earned (Fund 1870, 1872)** $531,103
Expenditures ($10,962,124)
Ending Balance as of June 30, 2024 $18,162,106
Funds Committed as of June 30, 2024*** $11,067,664
Funds Yet to be Committed as of June 30, 2024 $7,094,443 *The refund amount in this table reflects refunds only issued from the expense account. See page 4 of this report for the total refund amount, which includes money refunded from both the revenue and expense accounts. **Interest Earned for the fiscal year on AHIF is the sum of interest earned for cash balances under Fund #1870 before the transfer to the new Fund #1872 for AHIF at FYE 6/30/2024, along with the interest earned for AHIF fees deposited into Fund #1872 during the fiscal year.

Beginning FY24-25, Fund #1870 will no longer be used for AHIF transactions. Cash for AHIF will be entirely reported under Fund 1872, where AHIF transactions will be recorded and reported.
***Funds have been committed to projects (see projects listed below) but those projects have either not yet closed their City loans, or are currently drawing other funding sources first, so this money is still in the fund balance at this time. These funds were moved into projects in FY2024-2025, outside the reporting timeframe for this report.

City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 7 of 36 ends

Affordable Housing Impact Fees Project Descriptions
Affordable Housing Impact Fee allocations are critical sources of early funding for affordable housing projects – these commitments enable projects to secure other public and private dollars to highly leverage the City’s investment. After a few fiscal years during which there were minimal expenditures from the Affordable Housing Impact Fees (AHIF) as projects applied for gap funding, projects are moving into construction and expending funding.

Projects that were awarded AHIF funds in prior fiscal years have made significant progress in the past year, with two projects completing construction, six projects under construction and four projects starting construction as well as two Acquisition and Conversion to Affordable Housing (ACAH) projects. City funding for new construction affordable housing rental developments is limited to 40% of total development costs from all City funding sources.

A Notice of Funding Availability (NOFA) for New Construction of Affordable Rental Housing was released in early 2023, with funding awards approved by City Council in Spring 2023 pursuant to City Council Resolution Nos. 89646 and 89809,
approved on March 21, 2023 and June 28, 2023, respectively.

Although, approved in FY2023 fiscal year, these awards included commitments of budgeted impact fee revenue for FY2023-2024. A supplemental set of pipeli ne awards for this NOFA was made in February 2024 from non-impact fee sources. That funding round, which included impact fees as well as other sources, including Measure U affordable housing set-aside bond funds and other funds, propelled several projects in pre-development (including Longfellow Corner) into construction in FY 2023-2024.

Due to project funding needs, in FY2023-2024, several projects in HCD’s portfolio had their funding sources changed to meet State and Federal funding program requirements. For example, the City has received State Housing and Community Development Department funding awards through the State’s Local Housing Trust Fund, which require very specific matches for the City’s AHIF and JHIF funding.

Although all of the projects with previously reported AHIF and JHIF funds from prior years remain in the current year’s reporting, funding allocations have shifted in some cases, and a few projects from the City’s ACAH NOFA are now funded by AHIF and JHIF funding sources.

Remaining AHIF fund balance will be awarded through future HCD NOFA processes to eligible affordable housing activities.

Projects in Predevelopment During FY 2023 – 2024:
a. Project: 2700 International (PRE-DEVELOPMENT)
Description: Located at 2700 International Boulevard in the Fruitvale San Antonio neighborhood, the proposed project will be a 75-unit large-family affordable and permanent supportive housing development located near the Fruitvale commercial center in Oakland. The building will include 35 1-bedroom units, 21 2-bedrooms, and 19 3-bedrooms, all for households between 30% and 60% of Area Median Income. One apartment will be reserved for an on-site manager, and 19 units will be set aside for formerly homeless veterans, supported by HUD-VASH vouchers.

Status: In predevelopment, seeking additional funding commitments.

Funds Committed: FY 2022-2023 AHIF in the amount of $2,500,000 have been committed for this project.

FY 2023-2024 AHIF Project Expenditures: There were no expenditures in FY 2023-2024.

City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 8 of 36 ends

b. Project: 500 Lake Park (PRE-DEVELOPMENT)
Description: Located at 500 Lake Park Avenue in the Grand Lake neighborhood, the proposed project includes 53 total units of multifamily affordable rental housing with 52 units for extremely low to low-income households from 30% to 60% of the Area Median Income. The project will include 20 units set aside as permanent supportive housing for homeless veterans, and 1 unrestricted on-site property manager’s unit. The project will include studios, 1, 2, and 3-bedroom units with accommodations for accessibility.

Status: In predevelopment, seeking additional funding commitments.

Funds Committed: AHIF in the amount of $983,130 have been committed for this project, a revision from the original FY 2021-2022 award to the project of $1,983,130.

FY 2023-2024 AHIF Project Expenditures: There were no expenditures in FY 2023-2024. c. Project: 34th & San Pablo (PRE-DEVELOPMENT)
Description: Located at 3419-3441 San Pablo Avenue in the West Oakland neighborhood, the proposed project includes 60 total units of multifamily affordable rental housing with 59 units for extremely low to low-income households from 15% to 80% of the Area Median Income. The project will include 30 units set aside as permanent supportive housing for homeless households, and 1 unrestricted on-site property manager’s unit. The project will include studios, 1, and 2- bedroom units with accommodations for accessibility.

Status: In predevelopment, seeking additional funding commitments.

Funds Committed: FY 2021-2022 AHIF in the amount of $527,870 have been committed for this project.

FY 2023-2024 AHIF Project Expenditures: There were no expenditures in FY 2023-2024. d. Project: Agnes Memorial Senior Housing (PRE-DEVELOPMENT) Description: Located at 2372 International Boulevard in the San Antonio neighborhood, the proposed project includes 60 total units of senior affordable rental housing with 59 units for extremely low to low-income households from 30% to 60% of the Area Median Income. The project will include 18 units set aside as permanent supportive housing for homeless households, and 1 two-bedroom unrestricted on-site property manager’s unit. The project will include studios and one-bedroom units with accommodations for accessibility.

Status: In predevelopment, seeking additional funding commitments. Planning entitlements were secured during FY 2022-2023, though the development team has indicated they are contemplating changes to the unit mix.

Funds C
ommitted: Due to the funding revisions HCD made to projects in FY 2023-2024, this project funding during the fiscal year was revised to include $1,096,456 in AHIF funding.

FY 2023-2024 AHIF Project Expenditures: There were no expenditures in FY 2023-2024.

Projects in Construction During FY 2023 – 2024:
a. Project: 3050 International (CONSTRUCTION)
Description: Located at 3050 International in the Fruitvale neighborhood, the proposed project includes 75 total units of multifamily affordable rental housing with 75 units for extremely low to low-income households from 20% to 60% of the Area Median Income. The project will include 31 City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 9 of 36 ends

units set aside as special needs housing, and 1 unrestricted on-site property manager’s unit. The project will include 1, 2, and 3-bedroom units with accommodations for accessibility.

Status: Started construction in March 2024.

Funds Committed: AHIF funds in the amount of $1,430,371 have been committed for this project through internal funding swaps in FY 2023-2024. AHIF represent approximately 1.1% of the $126,595,654 total development costs for this project.

FY 2023-2024 AHIF Project Expenditures: In FY 2023-2024, AHIF expenditures for this project totaled $844,260.
b. Project: Phoenix (CONSTRUCTION)
Description: Located at 801 Pine Street in the Prescott neighborhood of West Oakland, the proposed project includes 101 total units of multifamily affordable rental housing for extremely low to low-income households 30% to 60% of the Area Median Income with a 50% set aside for persons formerly homeless. One hundred (100) units are designated affordable with one (1) on-site un-restricted unit for property management. The project will include studios, 1, 2, and 3-bedroom units with accommodations for accessibility.

Status: Development started construction in August 2023.

Funds Committed: AHIF funds in the amount of $272,034 have been committed for this project through internal funding swaps in FY 2023-2024. AHIF represent approximately 0.4% of the $68,879,127 total development costs for this project.

FY 2023-2024 AHIF Project Expenditures: There were no AHIF expenditures in FY 2023-2024. c. Project: Friendship Senior Rental Housing (CONSTRUCTION) Description: Located at 1904 Adeline Street in the Ralph Bunche neighborhood of West Oakland, the proposed project includes 48 total units of affordable rental housing to very low to low-income seniors 50%-60% of the Area Median Income. Affordability will likely deepen with an additional funding commitment of Project Based Section 8 vouchers. Forty-seven (47) units are designated affordable with one (1) unit set aside as an on-site unrestricted property manager’s unit. The project will consist of all 1-bedroom units with accommodations for accessibility.

Status: The project commenced construction in September 2023.

Funds Committed: AHIF funds in the amount of $2,872,998 (awards were made from various fiscal years for this project). Overall AHIF funding for this project has been adjusted from prior year reporting of $4,042,000. AHIF represent approximately 5.6% of the $51,602,601 total development costs for this project.

FY 2023-2024 AHIF Project Expenditures: All funding -- $2,872,998 -- was expended in FY 2023-2024.
d. Project: Longfellow Corner (CONSTRUCTION)
Description: Located at 3801-3807 and 3823-3829 Martin Luther King Jr. Way in the Longfellow neighborhood of North Oakland, the proposed project includes 77 total units of multifamily affordable rental housing with 76 units for extremely low to low-income households from 20% to 60% of the Area Median Income. The project will include 34 units set aside for permanent supportive homeless housing and 1 unrestricted on-site property manager’s unit. The project will include 1, 2, and 3-bedroom units with accommodations for accessibility.

City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 10 of 36 ends

Status: Project started construction in May 2024.

Funds Committed: A total of $11,318,000 in AHIF funds have been committed for this project (awards were made from various fiscal years for this project). Overall AHIF funding for this project has been adjusted from prior year reporting. AHIF represent approximately 12% of the $85,663,425 total development costs for this project.

FY 2023-2024 AHIF Project Expenditures: AHIF funding in the amount of $5,814,023 was expended in FY 2023-2024.
e. Project: West Grand & Brush Phase I (CONSTRUCTION)
Description: Located at 760 22nd Street & 2201 Brush Street in the Ralph Bunche neighborhood of West Oakland, the proposed project includes 59 total units of multifamily affordable rental housing with 58 units for extremely low to low-income households from 15% to 70% of the Area Median Income. The project will include 28 units set aside as permanent supportive housing for homeless households, 2 additional units set aside as non-permanent supportive homeless housing, and 1 unrestricted on-site property manager’s unit. The project will include studios, 1, 2, and 3- bedroom units with accommodations for accessibility.

Status: Planning and building entitlements secured, 100% of funds committed, construction underway as of October 2022. After severe winter storm event-related delays in December 2022, the building is now back under construction, and scheduled for completion by Fall 2025.

Funds Committed: Total AHIF funds of $2,330,000 have been committed to this project. (FY 2017-2018 AHIF in the amount of $330,000 and FY 2022-2023, $2,000,000). AHIF represent approximately 3.8% of the $60,796,828 total development costs for this project.

FY 2023-2024 AHIF Project Expenditures: There were no expenditures in FY 2023-2024. f. Project: 7th & Campbell (CONSTRUCTION)
Description: Located at 7th & Campbell in the Prescott neighborhood of West Oakland, the proposed project includes 79 total units of affordable rental housing with 78 units for extremely low to low-income individuals with special needs from 20% to 60% of the Area Median Income. The project will include 39 units set aside for homeless households and 1 unrestricted on-site property manager’s unit. The project will include studios, 1 and 2-bedroom units with accommodations for accessibility. Over 12,000 square feet will be available for incubator enterprises slated for ownership by economically marginalized people.

Status: C onstruction commenced in August 2022, and completed in FY2024-2025 .

Funds Committed: While awarded AHIF in 2019-2020, the funds in the amount of $460,192 that have been committed for this project are from the 2020-2021 AHIF allocation. AHIF represent approximately 0.6% of the $77,887,389 total development costs for this project.

FY 2023-2024 AHIF Project Expenditures: All AHIF commitments were spent prior to FY 2023-2024.

Fiscal Year Awards – Projects Completed During or Prior to FY 2022 – 2023:
a. Project: Oak Hill Apartments/NOVA (CONSTRUCTION COMPLETED) Description: Located at 445 30th Street in the Pill Hill neighborhood of Oakland, the proposed project includes 57 total units of affordable rental housing for chronically homeless persons at 20% City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 11 of 36 ends

of the Area Median Income. Fifty-six (56) units are designated for extremely low-income households with one (1) unrestricted on-site property manager’s unit. The project will include studios and 1- bedroom units with accommodations for accessibility, plus a single 2-bedroom property manager’s unit.

Status: Construction was completed as of June 2021, the building is 100% occupied as of July 2021, and the permanent loan conversion was completed in April 2022.

Funds Committed: AHIF funds in the amount of $1,600,000 have been committed for this project. AHIF represent approximately 4% of the $40,150,093 total development costs for this project.

FY 2023-2024 AHIF Project Expenditures: All AHIF were spent prior to FY 2023-2024.

b. Project: 95th Avenue & International Blvd (CONSTRUCTION COMPLETED) Description: Located at 95th Avenue & International Blvd in the Elmhurst neighborhood of East Oakland, the proposed project includes 55 total units of multifamily affordable rental housing for extremely low to very low-income households 20% to 50% of the Area Median Income with 14 units set aside for persons homeless or at risk of homelessness. Fifty-four (54) units are designated affordable with one (1) unrestricted on-site property manager’s unit. Unit types will include studios, 1, 2, and 3 bedrooms with accommodations for accessibility. The project is a critical housing component of the City of Oakland’s grant application to the State of California under the Transit Climate Communities (TCC) Program which seeks to fund development and implementation of neighborhood level transformative climate community plans that include multiple coordinated greenhouse gas emission reduction projects providing local economic, environmental, and health benefits to disadvantaged communities.

Status: The project received a temporary certificate of occupancy in June 2023, and permanent closing occurred in February 2024.

Funds Committed: AHIF funds in the amount of $1,409,717 have been committed for this project. AHIF represent approximately 2.9% of the $49,059,621 total development costs for this project.

FY 2023-2024 AHIF Project Expenditures: All AHIF were spent prior to FY 2023-2024.

ACAH Projects
The purpose of the ACAH Program is to protect and preserve long-term affordable housing options throughout the City by providing loans to eligible borrowers to acquire and rehabilitate market rate rental properties, and then convert the properties to long-term affordable housing through recorded affordability restrictions.

a. Project: 2000 36th Avenue (ACAH)
Description: Located at 2000 36th Avenue in the Fruitvale neighborhood, the project includes 55 total units of multifamily affordable rental housing with units for low-income households under 80% of the Area Median Income. The project includes 1 unrestricted on-site property manager’s unit and 1-bedroom and 2-bedroom units.

Status: Acquisition phase completed, rehabilitation phase to start in FY 2024-25.

City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 12 of 36 ends

Funds Committed: AHIF funds in the amount of $40,119 have been committed for this project in FY 2023-2024. 0.3% of the total development costs is funded with AHIF.

FY 2023-2024 AHIF Project Expenditures: In FY 2023-2024, there were no AHIF expenditures for this project.

b. Project: 524-530 8th Street (ACAH)
Description: Located at 524 -530 8th Street in the Old Oakland neighborhood, the project includes 39 total units of multifamily affordable rental housing with all units reserved for extremely low to low-income households from 30% to 60% of the Area Median Income The project includes 10 units set aside as housing for homeless residents. The project includes single room occupancy units with accommodations for accessibility.

Status: Acquisition phase completed, rehabilitation phase to start in FY 2024-25.

Funds Committed: AHIF funds in the amount of $1,158,809 have been committed for this project in FY 2023-2024. 23% of the total development costs is funded with AHIF.

FY 2023-2024 AHIF Project Expenditures: In FY 2023-2024, AHIF expenditures for this project total $1,158,809.

This section has been left intentionally blank
City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 13 of 36 ends

C. Jobs/Housing Impact Fees
The Amount of Jobs/Housing Impact Fee

Table 4. Jobs/Housing Impact Fees - Nonresidential (Fee Per Square Foot on Projects >25,000 sq. ft.) The Date is Based on When the Applicant Applies for Building Permit Nonresidential Use
Type
Fiscal Year
7/1/19 -
6/30/20
Fiscal Year
7/1/20 -
6/30/21
Fiscal Year
7/1/21 -
6/30/22
Fiscal Year
7/1/22 -
6/30/23
Fiscal Year
7/1/23 -
6/30/24
Office $5.89 $5.98 $6.29 $7.24 $8.05
Warehouse $5.89 $5.98 $6.29 $7.24 $8.05

Fund Balance Summary

Table 5. Jobs/Housing Impact Fee, Fiscal Year 7/1/23 – 6/30/24 Document Establishing Fee Oakland Municipal Code Chapters 15.68 & 15.62 Starting Balance $10,518,369
Fees Collected (Fund 1871) $1,752,809
Refunds* $0
Interest Earned (Fund 1870, 1871)** $669,442
Expenditures $(2,941,187)
Prior Year Expenditures Returned to JHIF*** $3,965,000
Ending Balance as of June 30, 2024 $13,964,433
Funds Committed as of June 30, 2024**** $9,547,703
Funds Yet to be Committed as of June 30, 2024 $4,416,730 *The refund amount in this table reflects refunds only issued from the expense account. See page 4 of this report for the total refund amount, which includes money refunded from both the revenue and expense accounts. **Interest Earned for the fiscal year on JHIF is the sum of interest earned for cash balances under Fund #1870 before the transfer to the new Fund #1871 for JHIF at FYE 6/30/2024, along with the interest earned for JHIF fees deposited into Fund #1871 during the fiscal year.

Beginning FY24-25, Fund #1870 will no longer be used for JHIF transactions. Cash for JHIF will be entirely reported under Fund 1871, where JHIF transactions will be recorded and reported.
***$3,965,000 of FY22-23 JHIF expenditures for West Grant were returned to JHIF in FY23-24. The expenditures were transferred to the Boomerang Fund.
****Funds have been committed to projects (see projects listed below), but those projects have either not yet closed their City loans, or are currently drawing other funding sources first, so this money is still in the fund balance at this time.

City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 14 of 36 ends

Jobs/Housing Impact Fee Project Descriptions
As is the case for AHIF, Jobs/Housing Impact Fee allocations are critical sources of early funding for affordable housing projects – these commitments enable projects to secure other public and private dollars to highly leverage the City’s investment.

New Construction projects that were awarded JHIF funds in prior fiscal years have made significant progress in the past year, with two projects having completed construction (one in FY2023-2024), four projects starting construction as well as three Acquisition and Conversion to Affordable Housing (ACAH) projects. City funding for new construction affordable housing rental developments is limited to 40% of total development costs from all City funding sources.

A Notice of Funding Availability (NOFA) for New Construction of Affordable Rental Housing was released in early 2023, with funding awards approved by City Council in Spring 2023 pursuant to City Council Resolution Nos. 89646 and 89809, approved on March 21, 2023 and June 28, 2023, respectively.

Although, approved in FY2023 fiscal year, these awards included commitments of budgeted impact fee revenue for FY2023-2024. A supplemental set of pipeline awards for this NOFA was made in February 2024 from non-impact fee sources. That funding round, which included impact fees as well as other sources, including Measure U affordable housing set-aside bond funds and other funds, propelled several projects in pre-development (including Longfellow Corner and 3050 International) into construction in FY 2023-2024.

This funding round, which included impact fees as well as other sources, including State tax credits and other funds, propelled several projects in pre-development (including Longfellow Corner and 3050 International) into construction in the first half of 2024.

Due to project funding needs, in FY2023-2024, several projects in HCD’s portfolio had their funding sources changed to meet State and Federal funding program requirements. For example, the City has received State Housing and Community Development Department funding awards through the State’s Local Housing Trust Fund, which require very specific matches for the City’s AHIF and JHIF funding.

Although all the projects with previously reported AHIF and JHIF funds from prior years remain in the current year’s reporting, funding allocations have shifted in some cases, and a few projects from the City’s Acquisition and Conversion to Affordable Housing NOFA are now funded by AHIF and JHIF funding sources.

Remaining JHIF fund balance will be awarded through future HCD NOFA processes to eligible affordable housing activities.

Predevelopment During FY 2023 – 2024:
a. Project: 2700 International (PRE-DEVELOPMENT)
Description: Located at 2700 International Boulevard in the Fruitvale San Antonio neighborhood, the proposed project will be a 75-unit large-family affordable and permanent supportive housing City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 15 of 36 ends

development located near the Fruitvale commercial center in Oakland. The building will include 35 1-bedroom units, 21 2-bedrooms, and 19 3-bedrooms, all for households between 30% and 60% of Area Median Income. One apartment will be reserved for an on-site manager, and 19 units will be set aside for formerly homeless veterans, supported by HUD-VASH vouchers.

Status: In predevelopment, seeking additional funding commitments.

Funds Committed: Due to funding revisions in FY2023-2024, current JHIF funding committed to this project is $2,500,000.

FY 2023-2024 JHIF Project Expenditures: There were no expenditures in FY 2023-2024 b. Project: 34th & San Pablo (PRE-DEVELOPMENT)
Description: Located at 3419-3441 San Pablo Avenue in the West Oakland neighborhood, the proposed project includes 60 total units of multifamily affordable rental housing with 59 units for extremely low to low-income households from 15% to 80% of the Area Median Income. The project will include 30 units set aside as permanent supportive housing for homeless households, and 1 unrestricted on-site property manager’s unit. The unit types will include studios, 1, and 2- bedroom units with accommodations for accessibility.

Status: In predevelopment, seeking additional funding commitments.

Funds Committed: Due to funding revisions in FY2023-2024, current JHIF funding committed to this project is $928,687.

FY 2023-2024 JHIF Project Expenditures: There were no JHIF expenditures in FY 2023-2024 c. Project: Agnes Memorial Senior Housing (PRE-DEVELOPMENT) Description: Located at 2372 International Boulevard in the San Antonio neighborhood, the proposed project includes 60 total units of senior affordable rental housing with 59 units for extremely low to low-income households from 30% to 60% of the Area Median Income. The project will include 18 units set aside as permanent supportive housing for homeless households, and 1 two-bedroom unrestricted on-site property manager’s unit. The unit types will include studios and one-bedroom units with accommodations for accessibility.

Status: In predevelopment, seeking additional funding commitments. Planning entitlements were secured during FY 2022-2023, though the development team has indicated they are contemplating changes to the unit mix.

Funds Committed: Due to the funding revisions HCD made to projects in FY 2023-2024, this project funding during the fiscal year was revised to include $769,629 in JHIF funding.

FY 2023
-2024 JHIF Project Expenditures: There were no expenditures in FY 2023-2024.

Projects in Construction During FY 2023 – 2024:
a. Project: Longfellow Corner (CONSTRUCTION)
Description: Located at 3801-3807 and 3823-3829 Martin Luther King Jr. Way in the Longfellow neighborhood of North Oakland, the proposed project includes 77 total units of multifamily affordable rental housing with 76 units for extremely low to low-income households from 20% to 60% of the Area Median Income. The project will include 34 units set aside for permanent supportive homeless housing and 1 unrestricted on-site property manager’s unit. The unit types will include 1, 2, and 3-bedroom units with accommodations for accessibility.

Status: Project started construction in May 2024.

City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 16 of 36 ends

Funds Committed: $1,018,000 in JHIF were awarded to the project in FY 2022-2023 (from FY 2023-24 funds). JHIF represent approximately 1.2% of the $85,663,425 total development costs for this project.

FY 20232-20243 JHIF Project Expenditures: There were no JHIF expenditures in FY 2023-2024. b. Project: 3050 International (CONSTRUCTION)
Description: Located at 3050 International in the Fruitvale neighborhood, the proposed project includes 75 total units of multifamily affordable rental housing with 75 units for extremely low to low-income households from 20% to 60% of the Area Median Income. The project will include 31 units set aside as special needs housing, and 1 unrestricted on-site property manager’s unit. The unit types will include 1, 2, and 3-bedroom units with accommodations for accessibility.

Status: Started construction in March 2024.

Funds Committed: Due to funding revisions in FY2023-2024, current JHIF funding committed to this project is $2,263,889. JHIF represent approximately 1.8% of the $126,595,654 total development costs for this project.

FY 2023-2024 JHIF Project Expenditures: There were no JHIF expenditures in FY 2023-2024. c. Project: Phoenix (CONSTRUCTION)
Description: Located at 801 Pine Street in the Prescott neighborhood of West Oakland, CA, the proposed project includes 101 total units of multifamily affordable rental housing for extremely low to low income households 30% to 60% of the Area Median Income with a 50% set aside for persons formerly homeless. One hundred (100) units are designated affordable with one (1) on-site un- restricted unit for property management. Unit types will include studios, 1, 2, and 3-bedroom units with accommodations for accessibility.

Status: started construction in August 2023.

Funds Committed: Due to funding revisions in FY2023-2024, current JHIF funding committed to this project is $1,018,588. JHIF represent approximately 1.2% of the $68,879,127 total development costs for this project.

FY 2023-2024 JHIF Project Expenditures: JHIF expenditures totaled $816,878 in FY 2023-2024. d. Project: Friendship Senior Rental Housing (CONSTRUCTION) Description: Located at 1904 Adeline Street in the Ralph Bunche neighborhood of West Oakland, the proposed project includes 48 total units of affordable rental housing to very low to low-income seniors 50%-60% of the Area Median Income. Affordability will likely deepen with an additional funding commitment of Project Based Section 8 vouchers. Forty-seven (47) units are designated affordable with one (1) unit set aside as an on-site unrestricted property manager’s unit. All unit types will include 1-bedroom units with accommodations for accessibility.

Status Update: The project commenced construction in September 2023.

Funds Committed: Due to funding revisions in FY2023-2024, current JHIF funding committed to this project is $1,193,000. Overall JHIF funding for this project has been adjusted from prior year reporting of $3,018,000. JHIF represent approximately 2% of the $51,602,601 total development costs for this project.

FY 2023-2024 JHIF Project Expenditures: JHIF expenditures totaled $1,123,173 in FY 2023- 2024.

City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 17 of 36 ends

e. Project: West Grand & Brush Phase I (CONSTRUCTION)
Funds Committed: FY 2019-2020 JHIF funds in the amount of $3,965,000 were previously committed for this project in FY2023-2024, other City funding was identified, which resulted in returning the $3,965,000 in JHIF funding, which is being redeployed to other eligible affordable housing projects .

Projects Completed During or Prior to FY 2023 – 2024:
a. Project: 95th Avenue & International Blvd (CONSTRUCTION COMPLETED) Description: Located at 95th Avenue & International Blvd in the Elmhurst neighborhood of East Oakland, the proposed project includes 55 total units of multifamily affordable rental housing for extremely low to very low-income households 20% to 50% of the Area Median Income with 14 units set aside for persons homeless or at risk of homelessness. Fifty-four (54) units are designated affordable with one (1) unrestricted on-site property manager’s unit. Unit types will include studios, 1, 2, and 3 bedrooms with accommodations for accessibility. The project is a critical housing component of the City of Oakland’s grant application to the State of California under the Transit Climate Communities (TCC) Program which seeks to fund development and implementation of neighborhood level transformative climate community plans that include multiple coordinated greenhouse gas emission reduction projects providing local economic, environmental, and health benefits to disadvantaged communities.

Status: The project received a temporary certificate of occupancy in June 2023, and permanent closing has occurred
Funds Committed: JHIF funds in the amount of $129,681 have been committed for this project.

JHIF represent approximately 0.3% of the $49,059,621 total development costs for this project.

FY 2023-2024 JHIF Project Expenditures: No expenditures in FY 2023-2024. All JHIF funds were expended at the beginning of FY 2021-2022.
b. Project: Casa Sueňos, aka Fruitvale Transit Village Phase II-B (CONSTRUCTION) Description: Located at E.12th Street & 35th Avenue in the Fruitvale neighborhood of East Oakland, the proposed project includes 181 total units of multifamily affordable rental housing for extremely low to low-income households 20% to 80% of the Area Median Income with a 20% set aside for persons formerly homeless. One hundred seventy-nine (179) units are designated affordable with two (2) on-site unrestricted units for property management. Unit types will include studios, 1, 2, and 3-bedroom units with accommodations for accessibility.

Status: Construction completed in January 2024.

Funds Committed: JHIF funds in the amount of $1,604,123 have been committed for this project.

JHIF represent approximately 1% of the $155,592,383 total development costs for this project.

FY 2023-2024 JHIF Project Expenditures: All JHIF funds for Fruitvale Transit Village IIB ($1,604,123) were expended in June 2021, so there were no further expenditures in FY 2023-2024.

City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 18 of 36 ends

ACAH Projects:

The purpose of the ACAH Program is to protect and preserve long-term affordable housing options throughout the City by providing loans to eligible borrowers to acquire and rehabilitate market rate rental properties, and then convert the properties to long-term affordable housing through recorded affordability restrictions.

a. Project: 1432 12th Avenue (ACAH)
Description: Located at 1432 12th Avenue in the San Antonio neighborhood, the project includes 7 total units of multifamily affordable rental housing with 7 units for low-income households under 60% of the Area Median Income. The unit types include studio, 1, 2, and 3-bedroom units with accommodations for accessibility.

Status: Acquisition phase completed; rehabilitation is 99% completed.

Funds Committed: JHIF funds in the amount of $1,209,000 have been committed for this project in FY 2023-2024. 37% of the total development costs is funded with JHIF.

FY 2023-2024 JHIF Project Expenditures: In FY 2023-2024, JHIF expenditures for this project totaled $1,001,136.
b. Project: 2000 36th Avenue (ACAH)
Description: Located at 2000 36th Avenue in the Fruitvale neighborhood, the project includes 55 total units of multifamily affordable rental housing with units for low-income households under 80% of the Area Median Income. The project includes 1 unrestricted on-site property manager’s unit. The unit types include 1 and 2-bedroom units.

Status: Acquisition phase completed, rehabilitation phase to start in FY2024-25.

Funds Committed: JHIF funds in the amount of $138,096 have been committed for this project in FY 2023-2024. 1.14% of the total development cost is funded with JHIF.

FY 2023-2024 JHIF Project Expenditures: In FY 2023-2024, there were no JHIF expenditures for this project.
c. Project: 1921 & 2022 36th Avenue (ACAH)
Description: Located at 1921 & 2022 36th Avenue in the Fruitvale neighborhood, the project includes 25 total units of multifamily affordable rental housing with 24 units for low-income households under 60% of the Area Median Income. The project includes 1 unrestricted on-site property manager’s unit. The unit types will include 1 and 2-bedroom units.

Status: Acquisition and minor rehabilitation phase completed, larger rehabilitation phase to start in Quarter 1 2025.

Funds C
ommitted: AHIF funds in the amount of $1,450,000 have been committed for this project in FY 2023-2024. 23% of the total development cost is funded with JHIF.

FY 2023-2024 JHIF Project Expenditures: In FY 2023-2024, there were no JHIF expenditures for this project.

In addition to the projects funded with JHIF funds, on December 11, 2018, City Council approved replenishing the City’s Affordable Housing Predevelopment Loan Program with $400,000 in JHIF funding, per City Council Resolution No. 87472 C.M.S. The funds were made available starting in FY 2019-2020.

City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 19 of 36 ends

This program was not included in Annual Impact Fee reports prior to FY 2022-2023, which focused on project construction/permanent loans.
a. Program: Predevelopment Loan Program
Description: The City has long had a minor pre-development loan (current limits: $50,000 per loan) for non-profit sponsors to cover some of their predevelopment costs associated with due diligence on potential affordable housing developments. Note that this is a revolving loan fund.

Status: Over the counter.

Funds Committed: JHIF funds in the amount of $400,000 have been committed for this program.

FY 2023-2024 JHIF Project Expenditures: There were no JHIF expenditures for this program recorded in FY 2023-2024.

D. Transportation Impact Fees
The Amount of Transportation Impact Fees

Table 6. Transportation Impact Fees – Residential (Fee Per Housing Unit) The Date is Based on When the Applicant Applies for Building Permit Housing Use
Type Zone
Fiscal Year
7/1/19 -
6/30/20
Fiscal Year
7/1/20 –
6/30/21
Fiscal Year
7/1/21 -
6/30/22
Fiscal Year
7/1/22 –
6/30/23
Fiscal Year
7/1/23 -
6/30/24

Multi-family
Zone 1 $750 $750 $790 $909 $1,012
Zone 2 $750 $750 $790 $909 $1,012
Zone 3 $750 $750 $790 $909 $1,012

Townhome
Zone 1 $1,000 $1,000 $1,053 $1,212 $1,349
Zone 2 $1,000 $1,000 $1,053 $1,212 $1,349
Zone 3 $1,000 $1,000 $1,053 $1,212 $1,349

Single-family
Zone 1 $1,000 $1,000 $1,053 $1,212 $1,349
Zone 2 $1,000 $1,000 $1,053 $1,212 $1,349
Zone 3 $1,000 $1,000 $1,053 $1,212 $1,349

Table 6a. Transportation Impact Fees – Nonresidential (Fee Per Square Foot) The Date is Based on When the Applicant Applies for Building Permit

Nonresidential Use Type
Fiscal Year
7/1/19 -
6/30/20
Fiscal Year
7/1/20 -
6/30/21
Fiscal Year
7/1/21 -
6/30/22
Fiscal Year
7/1/22 -
6/30/23
Fiscal Year
7/1/23 -
6/30/24
Office $1.00 $2.00 $2.11 $2.43 $2.70
Retail, Freestanding $0.75 $0.75 $0.79 $0.91 $1.01
Retail, Ground Floor $0.75 $0.75 $0.79 $0.91 $1.01
Industrial $0.55 $0.55 $0.58 $0.67 $0.75
Warehouse $0.35 $0.35 $0.37 $0.43 $0.48
Hotel/Motel $0.65 $0.65 $0.68 $0.79 $0.88
Institutional $2.00 $3.00 $3.16 $3.64 $4.05
City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 20 of 36 ends

Fund Balance Summary

Table 7. Transportation Impact Fees, Fiscal Year 7/1/23– 6/30/24 Document Establishing Fee Oakland Municipal Code Chapter 15.74 Starting Balance $9,373,212
Fees Collected $1,312,509
Refunds* ($180,197)
Interest Earned** $436,870
Expenditures ($461,068)
Ending Balance as of June 30, 2024*** $10,481,326
Funds Committed as of June 30, 2024**** $9,373,868
Funds Yet to be Committed as of June 30, 2024 $1,107,458 *The refund amount in this table reflects refunds only issued from the expense account. See page 4 of this report for the total refund amount, which includes money refunded from both the revenue and expense accounts. **Interest is being accrued on this fee at the fund level and is being allocated to the transportation impact fee account. ***Unrealized gain/loss of in market is not included.
****Funds have been committed to projects, but some projects are not at the point yet when they receive the funds, so this money is still in the fund balance at this time.

Transportation Impact Fees Project Descriptions
The Department of Transportation (OakDOT) budgets funds from the Transportation Impact Fees (TIF) to capital projects1 in each two-year budget, as applicable, and to prioritize CEQA cumulative mitigation measures, as mandated by Oakland Municipal Code Chapter 15.74 (Ordinance No. 12442 C.M.S.).

The Capital Improvement Program (CIP), approved every two years, programs a portion of TIF funds to eligible capital projects and plays a role assessing alignment of existing capital projects and cumulative mitigation measures to ensure TIF funding is best utilized and impact from future developments are addressed. Projects that receive TIF funding are listed under the city’s Complete Streets Capital program, which is updated through the biennial budget process. Several policy documents guided the overall preparation of the City’s Fiscal Year 2023-2025 CIP for transportation assets. These include:
• 2023 Infrastructure Bond, Measure KK & Measure U (Resolution 89894 C.M.S., 2023) • 2022 Infrastructure Bond, Measure KK (Resolution 89021 C.M.S., 2022) • 2021 Measure KK Reallocation from OPW to OakDOT (Resolution 88651 C.M.S., 2021) • 2020 Infrastructure Bond, Measure KK (Resolution 87981 C.M.S., 2020) • 2019 Infrastructure Bond, Approved CIP Projects (Resolution 87981 C.M.S., 2019) • Capital Improvement Program Prioritization Process (Resolution 87376 C.M.S., 2018) • 2017 Infrastructure Bond, Approved CIP Projects (Resolution 86773 C.M.S., 2017) • 2016 Infrastructure Bond, Measure KK (Resolution 86335 C.M.S., 2016) • Five Year Pavement Program (Resolution 85227 C.M.S., 2014)

1 Capital projects included in a CIP are defined as any long-term investment that builds, replaces, or improves an asset, such as buildings, roads, parks, traffic signals, sewers and drainage lines. CIP projects typically have a useful design life of at least ten years and a minimum cost of approximately $100,000.

City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 21 of 36 ends

• Sidewalk Prioritization Program (Resolution 81751 C.M.S., 2009) • Racial Equity (Ordinance 14-0457, O.M.C. 2.29.170, 2016) • Public Art Ordinance (Ordinance 11086 C.M.S., 1989)
• Transit First Strategy
• 2030 Oakland Equitable Climate Action Plan (ECAP) (Resolution 88267 C.M.S., 2020) • 2045 Carbon Neutrality (Resolution 88268 C.M.S., 2020) TIF Project Eligibility Criteria
Funds deposited into the Transportation Impact Fee Fund, and all interest and investment earnings thereon, are used to pay for improvements within the public right-of-way for pedestrians, bicyclists and/or motor vehicles. Transportation Impact Fees can also fund projects that are CEQA cumulative mitigation measures.

Fee revenues may be used to fund a capital project or portion of a capital project that meets the following criteria:
a. The project is consistent with City goals, plans, and policies; and b. The project is a capital project contained within the City’s Capital Improvement Program; and c. The project is part of the City’s citywide transportation infrastructure or provides connectivity between neighborhoods and activity centers within the City, or to neighboring communities or regional transportation facilities, and is not primarily for access to one specific neighborhood or development site; and
d. The project improves or expands the City’s citywide transportation infrastructure to address and manage travel demand from new development.

Projects may include not only managing vehicle impacts, but also shifting demand to transit, biking, and walking. Funds may not be used for rehabilitation, maintenance, or operating costs.

TIF-Funded Projects
As shown in Table 7, there was a total of $461,068 of expenditures in Transportation Impact Fees (TIFs) for the July 1, 2023 to June 30, 2024 fiscal year. These expenditures were for TIF projects that had received funding in prior years. This report includes updates on these two existing projects: (a) Public Improvements at 24th Street, Harrison Street, Bay Place and 27th Street and (b) Traffic Signals.

TIF Projects with Prior Fiscal Year Awards
a. Project: Public Improvements at 24th Street, Harrison Street, Bay Place and 27th Street Description: This public improvement project will address pedestrian safety, bicycling and traffic concerns realigning a five-way intersection to a four-way intersection, shortening the traffic signal cycle length, reducing vehicle delay, reducing the crossing distance for pedestrians and bicyclists, providing continuous bike lanes, as well as creating a public plaza. These intersection improvements are a cumulative mitigation measures identified in the 2013 Broadway Valdes District Specific Plan Environmental Impact Report, and therefore, meets funding eligibility as per existing TIF criteria detailed above. The project received City Council approval on October 20, 2021, to enter into a Public Improvements Reimbursement Agreement with Holland 24th & Harrison Investors, allocate TIF funding, waive advertising and competitive bidding for construction, and adopt appropriate City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 22 of 36 ends

California Environmental Quality Act (“CEQA”) findings. This project has been previously discussed in past reports dating back to the Fiscal Year 2018-2019 Annual Impact Fee Report.

Status: The project began construction in June 2022 and is expected to be completed by Winter 2025.

Funds Committed: An amount not to exceed $2,100,000 in TIF funding has been appropriated to this project. This funding covers 100% of total capital improvements for this project.

FY 2023-2024 TIF Project Expenditures: No funds were expended in FY 2023-24 due to invoicing delays. An invoice is currently being processed as of Fall 2024.

b. Project: Traffic Signals
Description: To respond to safety concerns occurring at or near high injury corridors, the Fiscal Year 2021-2023 Adopted CIP identified the Garfield Elementary School Safe Routes to School project as a funding priority to utilize the $1,000,000 in TIF funding programmed during Fiscal Year 2019-21 CIP, listed under the Traffic Management Program, a process that also coincides with the Biennial and Mid-Cycle Budget processes. The Garfield Elementary Pedestrian Improvements project scored 70 out of 100 in the CIP prioritization process and is included under the CIP Neighborhood Traffic Calming Program.

Garfield Elementary Pedestrian Improvements
(Location: Foothill Boulevard at the intersections with 22nd Avenue and Munson Way) The project will improve safety and walkability at two intersections adjacent to Garfield Elementary School. These intersections are on the travel paths of students walking to and from school and have a history of collisions, including a tragic fatality in October 2020. Together, these project elements will eliminate a barrier to safe, comfortable travel between Garfield Elementary School and destinations south of Foothill Boulevard, where most students live, and will connect people with businesses, gathering places, and high-quality transit.

The project will improve signal visibility, eliminate conflicts between left-turning vehicles and pedestrians, and install leading pedestrian intervals, and accessible pedestrian signals (APS) while modernizing signal equipment at the intersection of 22nd Avenue and Foothill Boulevard. It will also install a concrete median island at the intersection of Foothill Boulevard and Munson Way.

Status: The project is currently undergoing design and is anticipated to start construction by Spring 2025 and completed by Winter 2025.

Funds Committed: An amount not to exceed $1,000,000 has been committed to this project. This funding covers 100% of total capital improvements for this project.

FY 2023-2024 TIF Project Expenditures: $461,068 of funds were expended in FY 2023-24.

TIF-Future Projects
OakDOT continues to evaluate eligible TIF listed projects to ensure that projects align with evolving state goals and policies, as well as department priorities, the OakDOT Strategic Plan and the City Council- adopted CIP Prioritization Process. Projects with scores of 50 or above in the CIP Prioritization Process (Resolution 87376 C.M.S., 2018) that demonstrate a funding need, project readiness and ability to spend City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 23 of 36 ends

down within the next 5 years while also advancing equity and safety for Oaklanders will be considered for TIF funding in FY 2023-2025 CIP. These projects are listed on the city’s OpenGov budget website. Projects that score less than 50 must include additional elements that increase ADA accessibility, universal mobility, transit access, citywide transportation network connectivity, traffic safety, and climate adaptation, and/or be community-driven in order to be included in the TIF alternative project list.

The table below includes sample capital projects to be funded by Fund 2420 in Fiscal Year 2024-2025 in accordance with the City Council approved budget. The actual projects and their scopes that will be funded by the “yet to be committed” fund balance of $1,107,548 will be clarified and developed prior to project implementation.

Item # Fund Dept. Description FY 2024-2025
One-Time
FY 2024-2025
Total
Notes
1 2420 DOT 14th Avenue $1,107,548 $1,107,548 Funding
Streetscape amount to be
confirmed
upon
allocation
2 2420 DOT Fruitvale Alive Funding
Streetscape amount to be
Project confirmed
upon
allocation
3 2420 DOT 27th Street Funding
Complete Streets amount to be
Project confirmed
upon
allocation
4 2420 DOT East 12th Street Funding
Bikeway amount to be
confirmed
upon
allocation
City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 24 of 36 ends

E. Capital Improvements Impact Fees

The Amount of Capital Improvements Impact Fees

Table 8. Capital Improvement Impact Fees - Residential (Fee Per Housing Unit) The Date is Based on When the Applicant Applies for Building Permit Housing Use
Type

Zone
Fiscal Year
7/1/19 -
6/30/20
Fiscal Year
7/1/20 -
6/30/21
Fiscal Year
7/1/21 -
6/30/22
Fiscal Year
7/1/22 -
6/30/23
Fiscal Year
7/1/23 -
6/30/24

Multi-family
Zone 1 $1,250 $1,250 $1,316 $1,515 $1,686
Zone 2 $750 $750 $790 $909 $1,012
Zone 3 $0 $250 $263 $303 $337

Townhome
Zone 1 $3,000 $3,000 $3,159 $3,635 $4,045
Zone 2 $2,000 $2,000 $2,106 $2,423 $2,696
Zone 3 $1,000 $1,000 $1,053 $1,212 $1,349

Single family
Zone 1 $4,000 $4,000 $4,212 $4,846 $5,392
Zone 2 $3,000 $3,000 $3,159 $3,635 $4,045
Zone 3 $1,000 $1,000 $1,053 $1,212 $1,349

Table 8a. Capital Improvements Impact Fees - Nonresidential (Fee Per Square Foot) The Date is Based on When the Applicant Applies for Building Permit Nonresidential Use
Type
Fiscal Year
7/1/19 -
6/30/20
Fiscal Year
7/1/20 -
6/30/21
Fiscal Year
7/1/21 -
6/30/22
Fiscal Year
7/1/22 -
6/30/23
Fiscal Year
7/1/23 -
6/30/24
Office $1.00 $2.00 $2.11 $2.43 $2.70
Retail, Freestanding $0.25 $0.50 $0.53 $0.61 $0.68
Retail, Ground Floor $0.00 $0.00 $0.00 $0.00 $0.00
Industrial $0.75 $1.00 $1.05 $1.21 $1.35
Warehouse $1.00 $1.00 $1.05 $1.21 $1.35
Hotel/Motel $0.35 $0.60 $0.63 $0.73 $0.81
Institutional $2.50 $3.00 $3.16 $3.64 $4.05
Self/Mini Storage* $0.00 $0.00 $0.22 $0.25 $0.28
*New category per recommendation from the Oakland Transportation and Capital Improvements Impact Fee 5-Year Review and Update Report dated December 23, 2021.

City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 25 of 36 ends

Fund Balance Summary

Table 9. Capital Improvement Impact Fees
Fiscal Year 7/1/23– 6/30/24
Document Establishing Fee Oakland Municipal Code Chapter 15.74 Starting Balance $5,898,947
Fees Collected* $867,205
Refunds** ($282,136)
Interest Earned*** $269,657
Expenditures ($1,306,744)
Ending Balance as of June 30, 2024 $5,501,667
Funds Committed as of June 30, 2024**** $2,429,636
Funds Yet to be Committed as of June 30, 2024 $3,072,031 *Unrealized gain/loss of in market is not included.
** The refund amount in this table reflects refunds only issued from the expense account. See page 4 of this report for the total refund amount, which includes money refunded from both the revenue and expense accounts. ***Interest is being accrued on these fees at the fund level and those funds are being allocated to the appropriate impact fee accounts.
****Funds have been committed to projects (see projects listed below), but those projects are not at the point yet when they receive the funds, so this money is still in the fund balance at this time.

Capital Improvements Impact Fees Project Descriptions
The Public Works Department will consult with the Planning and Building Department and City Attorney’s Office to continue to develop eligible projects and implement capital project in accordance with the Administrative Regulations and Manual. The following projects were identified for funding as part of the City’s CIP Process which coincides with the Biennial and Mid-Cycle Budget processes.

Several policy documents guided the overall preparation of the City’s Fiscal Year 2023-2025 CIP. These include:
• Capital Improvement Program Prioritization Process (Resolution 87376 C.M.S., 2018) • 2017 Infrastructure Bond, Approved CIP Projects (Resolution 86773 C.M.S., 2017) • 2016 Infrastructure Bond, Measure KK (Resolution 86335 C.M.S., 2016) • 2020 Infrastructure Bond, Measure KK (Resolution 87981 C.M.S., 2020) • 2022 Infrastructure Bond, Measure KK (Resolution 89021 C.M.S., 2022) • 2023 Infrastructure Bond, Measure KK & Measure U (Resolution 89894 C.M.S., 2023) Future Projects
Funds deposited into the Capital Improvements Impact Fee (CIF) Fund, and all interest and investment earnings thereon, shall be used to pay for future projects that are required for fire, police, library, parks and recreation, or storm drain services. Fee revenues may be used to fund a public facility or portion of a public facility that meets all the following criteria:

City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 26 of 36 ends

• The project is a capital project contained within the City’s Capital Improvement Program; • If the project supports fire, police, library, or parks and recreation services, the project must improve or expand the City’s public facilities to accommodate service demand from new development; funds may not be used for rehabilitation, maintenance, or operating costs. • If the project supports storm drain services the project must improve, expand, or rehabilitate the City’s storm drain facilities to accommodate service demand from new development. • The project may include preparation and revision of plans, policies, and studies that are required to make necessary findings, prioritizations, and determinations for projects that improve, expand, or rehabilitate approved infrastructure.

The table below includes six capital projects (Item #1-6) to be funded by Fund 2421 in Fiscal Year 2024- 2025 in accordance with City Council approved budget. Projects listed in Items #7-8 reflect some, but not all, sample projects that could be funded by the yet to be committed fund balance of $3,072,031. The actual projects and their scopes that will be funded by the $3,072,031 fund balance will be clarified and developed prior to project implementation.

Item
#
Fund Dept. Description (Include Job
Class & FTE)
FY 2024-2025
One-Time
FY 2024-2025
Total
Notes
1 2421 OPW Caldecott Trail $115,000 $115,000
2 2421 OPW Mosswood Recreation Center Expansion $35,000 $35,000 3 2421 OPW Digital Arts – Phase 2 $350,000 $350,000
4 2421 OPW Storm Drain Master Plan $300,000 $300,000
5 2421 OPW Tyrone Carney Park Renovation $700,000 $700,000 6 2421 OPW Sobrante Park Renovation $600,000 $600,000
7 2421 OPW Tyrone Carney Park Renovation $200,000 $200,000 Sample Project
8 2421 OPW Sobrante Park Renovation $772,031 $772,031 Sample Project
Subtotal of Expenditure Additions $3,072,031 $3,072,031

Prior Fiscal Year Awards
A status update is provided below for projects for which CIF was identified in prior years. a. Project: Storm Drainage Master Plan
Description: As part of the phased effort to improve, expand, or rehabilitate the City’s storm drain facilities to accommodate service demand from new development, the City is preparing an updated Storm Drainage Master Plan (SDMP). The SDMP work is to assess the condition of the City’s storm drainage system and identify areas prone to flooding. It includes an inventory and assessment of the City’s storm drainage system, studies to evaluate if drains and pipes have capacity to handle storm drainage flows; a prioritized list of improvements to reduce local flooding and to add green stormwater infrastructure designed to clean stormwater and provide urban greening benefits; preliminary cost estimates of storm drainage system improvements; and suggestions for funding sources to implement the planned storm drainage improvements.

City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 27 of 36 ends

Status: Currently in process. For example, the hydraulic model is 100% complete, condition assessments 40% complete, and design standards are 95% complete. Public outreach is underway.

The City Council approved Resolution No. 88355 C.M.S. on November 10, 2020 to award the firm Wood Rogers the contract to develop the SDMP.

Funds Committed: The FY 2020-2021 Adopted Midcycle Budget, Resolution No. 88714 C.M.S., authorized a $991,000 budget allocation to the Storm Drainage Master Plan (SDMP) project. 29.39% of this project was funded by CIIF.

FY 2023-2024 CIF Project Expenditures: Total amount of $305,418 was expended in FY 2023- 2024.
b. Project: Fire Station 10 & 12 Renovation project
Description: Fire Station 12 is located in one of the most densely development-impacted areas in the City, serving the Chinatown/Lake Merritt BART neighborhood. Fire Station 10 will expand its dormitory, increasing capacity for additional firefighters.

Status: The project is currently in construction for Fire Station 10. Fire Station 12 paving is in process and pending the contractor to proceed with the work. Construction is set to begin in February 2025.

Funds Committed: Funding in the amount of $700,000 was allocated to this existing Measure KK project in the Adopted FY 2017-2019 Capital program with an additional $691,000.00 added in FY 2020-2021 and $218,500 added in FY 2022-2023, to make improvements to existing facilities to accommodate fire operations and improve ADA accessibility. 22.52% of this project was funded by CIIF.

FY 2023-2024 CIF Project Expenditures: Total amount of $99,102 was expended in FY 2023- 2024.

c. Project: Brookfield Library Renovation project
Description: The project will demolish existing children's reading room and build new, expanded children's reading room, supporting parks and recreational use, expanding program opportunity for the area.

Status: This project is currently complete in the design phase and will be going out to bid for construction at the end of 2024.Construction is set to begin in July of 2025.

Funds Committed: Funding in the amount of $300,000 has been allocated to this existing Measure KK project in the Adopted FY 2017-2019 Capital Program for public services facilities serving the East Oakland community. 3.98% of this project is funded by CIIF.

FY 2023-2024 CIF Project Expenditures: No funds were expended in FY 2023-2024. d. Project: Malonga Center Feasibility Study
Description: Expanding security system and prepare a facility feasibility study.

Status: Feasibility Study was completed and issued to stakeholders in September of 2024. Further work pending outcome of presentation and feedback to stakeholders.

Funds Committed: Funding in the amount of $800,000 was allocated to this project in FY 2020-2021. 100% of this project is funded by CIIF.

FY 2023-2024 CIF Project Expenditures: Total amount of $194,514 was expended in FY 2023- 2024.

City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 28 of 36 ends

e. Project: Digital Arts & Culinary Academy Phase 2 Renovations & Expansion Description: Expanding the program space by converting the storage area into multipurpose rooms, gender neutral restrooms with ADA improvements.

Status: The project is currently in construction and expected to be substantially completed by the end of 2024.

Funds Committed: Funding in the amount of $800,000 was allocated to this project in FY 2021-2022. 30.47% of this project is funded by CIIF.

FY 2023-2024 CIF Project Expenditures: Total amount of $459,078 was expended in FY 2023-2024.
f. Project: Mosswood Recreation Center Expansion
Description: Rebuilding and expanding a new community center that was destroyed by fire in 2016. The center includes a new social hall, kitchen, classrooms, computer lab and maker space, offices, and other support spaces to help increases services for the community.

Status: The project is currently in construction. Completion is anticipated in late summer 2025.

Funds Committed: Funding in the amount of $125,000 was allocated to this existing project in FY 2021-2022, an additional $125,000 was allocated in FY 2022-2023 and an additional amount of $715,000 was allocated in FY 2023-2024. 3.16% of this project is funded by CIIF.

FY 2023-2024 CIF Project Expenditures: Total amount of $24,997.59 was expended in FY 2023-2024.
g. Project: Redwood Heights Park Tot Lot & Park Expansion Description: Install sunshade at park to enhance usage during warm days as well as improve the overall façade of the park.

Status: Project is completed and all funds have been expended.

Funds Committed: Funding in the amount of $100,000 was allocated to this project in FY 2021-2022. 100% of this project was funded by CIIF.

FY 2023-2024 CIF Project Expenditures: Total amount of $100,000 was expended in FY 2023- 2024.
h. Project: Junior Science Center
Description: Install CCTV and Burglar alarm system
Status: The building was initially damaged in a fire in March of 2021, it sustained additional damage in a second fire in March of 2022. This caused the project scope to increase and the completion date to be extended. The funds are needed to add a burglar alarm system and a CCTV system as part of the restoration since the center previously did not have these systems. This project is completed and invoices are in process for payment.

The City’s Risk Department is coordinating with the City’s Insurance Company’s Restoration vendor who is handling the restoration project.

Funds Committed: Funding in the amount of $40,000 was allocated to this project in FY 2021-2022. 100% of this project is funded by CIIF
FY 2023-2024 CIF Project Expenditures: No funds were expended in FY 2023-2024. i. Project: West Oakland Youth Center
Description: Landscape/Building Improvements to install a new alarm system.

City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 29 of 36 ends

Status: Project is complete and final invoices are in process for payment.

Funds Committed: Funding in the amount of $50,000 was allocated to this project in FY 2021-2022. 100% of this project is funded by CIIF.

FY 2023-2024 CIF Project Expenditures: No funds were expended in FY 2023-2024. j. Project: District 3 Community Center CIP
Description: Community Center Improvements
Status: These funds were initially set aside by CM/ District 3 for building improvements at a non- City of Oakland facility. The CM sought to repurpose the funds to the deFremery Recreation Center for facility improvements.

Funds Committed: Funding in the amount of $96,000 was allocated to this project in FY 2021-2022. 100% of this project is funded by CIIF.

FY 2023-2024 CIF Project Expenditures: No funds were expended in FY 2023-2024. k. Project: Arroyo Viejo Park
Description: Install grease trap system in Recreation Center Kitchen.

Status: The project is currently on hold awaiting larger site remodel, including construction and expansion of a commercial kitchen.

Funds Committed: Funding in the amount of $25,000 was allocated to this project in FY 2021-2022. 100% of this project is funded by CIIF.

FY 2023-2024 CIF Project Expenditures: No funds were expended in FY 2023-2024. l. Project: Feasibility Study for 1310 Oak Street Fire Alarm Building Description: The City needs to preserve access to the fiber optic lines at the Oakland Fire Alarm Building at 1310 Oak Street for maint enance and operational purposes. The professional services required from the consultant will be to locate and delineate all fiber optic lines within the property limits and to generate a report associated with the necessary costs for relocation or creation of new public easements for fiber optic lines within the proposed footprint of Museum of Jazz and Art to ensure City access.

Status: The project has been completed and remaining available funds of $8,947 has been returned to the fund balance.

Funds Committed: Funding in the amount of $30,000 was allocated to this project in FY 2021-2022. 100% of this project is funded by CIIF.

FY 2023-2024 CIF Project Expenditures: No funds were expended in FY 2023-2024. m. Project: Holly Mini Park
Description: Expanding the play structure and installing new fencing/gates throughout the park area.

Status: The project is complete. A ribbon-cutting celebration was held in September 2024.

Funds Committed: Funding in the amount of $250,000 was allocated to this project in FY 2022-2023. 16.28% of this project is funded by CIIF.

FY 2023-2024 CIF Project Expenditures: Total amount of $123,634 was expended in FY 2023- 2024.

City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 30 of 36 ends

n. Project: 73rd Avenue Soil Remediation
Description: Remediation of site soil to meet State DTSC standards.

Status: Project is currently in process with construction to begin in March of 2025.

Funds Committed: Funding in the amount of $50,000 was allocated to this project in FY 2023-2024. 1.05% of this project is funded by CIIF.

FY 2023-2024 CIF Project Expenditures: No funds were expended in FY 2023-2024. o. Project: East Oakland Sports Center Expansion
Description: The project includes improvements to the existing indoor pool including pool shell refurbishing, new deck resurfacing, slide replacement, ventilation upgrade and window replacement.

Status: The project will go out to bid through the City’s On-Call contractor’s list in January 2025.

Funds Committed: Funding in the amount of $200,000 was allocated to this project in FY 2023-2024. 9.09% of this project is funded by CIIF.

FY 2023-2024 CIF Project Expenditures: No funds were expended in FY 2023-2024. p. Project: Oakland Tool Lending Library
Description: Design and installation of pre-fabricated unit structures and associated site work to provide free-standing Tool Lending Library space behind the Temescal Branch Library.

Status: The project is on hold pending additional funding or reduction in design scope.

Funds Committed: Funding in the amount of $35,000 was allocated to this project in FY 2023-2024.

FY 2023-2024 CIF Project Expenditures: No funds were expended in FY 2023-2024.

This section has been left intentionally blank
City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 31 of 36 ends

IV. IMPACT FEE ZONE MAPS

Impact Fee Zones for Residential Projects

City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 32 of 36 ends

Impact Fee Zone Map - North Oakland Detail

City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 33 of 36 ends

Impact Fee Zone Map - Castro Street and Embarcadero Detail

City of Oakland Impact Fee Annual Report, Fiscal Year Ended June 30, 2024

Page 34 of 36 ends

Impact Fee Zone Map - Lake Merritt to 23rd Avenue Detail

Attachment B - Projects that opted to build Affordable Housing Units in lieu of paying impact fees in FY 2023-2024

RECORD ID

Residential Impact
Fee Zone
Project Name

Address

Valuation

Exemption
Justification

Aggreement
Recorded
Total Units
Market Rate Units
Affordable
Housing Units
Moderate Income
Low Income
Very Low Income
Extremely Low
Income
Manager Unit
On Site?
B2302677 Fee Zone 2 820 West Macarthur Blvd $ 15,508,000.00 On Site Option Percentage of Affordable Units 1/24/2024 166 115 51 51 0 0 0 0 Yes B2401162 Fee Zone 2 1031 62nd St $ 400,000.00 On Site Option Percentage of Affordable Units 7/12/2024 8 7 1 0 1 0 0 0 Yes B2204376 Fee Zone 3 856 34th Ave $ 895,000.00 On Site Option Percentage of Affordable Units 11/7/2023 6 5 1 1 0 0 0 0 Yes Attachment C - Projects Assessed Impact Fees in FY 2023-2024 Attachment C Final 01.29.2024

B1603684 1065 46TH AVE Fee Zone 3 1 $ 6,592.05 Capital Improvements Impact Fee 12/14/2023 12/14/2023 $ - $ 6,592.05 8/4/2016 Final 4/30/2024 B1603684 1065 46TH AVE Fee Zone 3 1 $ 2,343.84 Transportation Impact Fee 12/14/2023 12/14/2023 $ - $ 2,343.84 8/4/2016 Final 4/30/2024 B1604231 880 W MACARTHUR BLVD Fee Zone 2 39 $ 466,610.04 Affordable Housing Impact Fee - At Final 3/15/2024 N/A $ - $ - 8/30/2016 Reinstated 4/5/2023 B1702409 1218 MILLER AVE Fee Zone 3 9 $ 7,376.49 Affordable Housing Impact Fee - Issuance 12/20/2023 12/20/2023 $ - $ 7,376.49 6/2/2017 Final 5/6/2024 B1702409 1218 MILLER AVE Fee Zone 3 9 $ 72,796.23 Affordable Housing Impact Fee - At Final 12/20/2023 12/20/2023 $ - $ 72,796.23 6/2/2017 Final 5/6/2024 B1702409 1218 MILLER AVE Fee Zone 3 9 $ 306.00 Capital Improvements Impact Fee 12/20/2023 12/20/2023 $ - $ 306.00 6/2/2017 Final 5/6/2024 B1702409 1218 MILLER AVE Fee Zone 3 9 $ 6,225.80 Transportation Impact Fee 12/20/2023 12/20/2023 $ - $ 6,225.80 6/2/2017 Final 5/6/2024 B1800654 1402 E 12TH ST Fee Zone 2 0 $ 2,597.00 Capital Improvements Impact Fee 2/13/2024 2/13/2024 $ - $ 2,597.00 2/9/2018 Inspection Final 7/1/2024 B1800654 1402 E 12TH ST Fee Zone 2 0 $ 1,274.00 Transportation Impact Fee 2/13/2024 2/13/2024 $ - $ 1,274.00 2/9/2018 Inspection Final 7/1/2024 B1901133 5900 SHATTUCK AVE Fee Zone 1 8 $ 118,630.92 Affordable Housing Impact Fee - Issuance 3/6/2024 3/6/2024 $ - $ 118,630.92 3/12/2019 Issued 5/21/2024 B1901133 5900 SHATTUCK AVE Fee Zone 1 8 $ 118,630.92 Affordable Housing Impact Fee - At Final 3/6/2024 3/9/2024 $ 118,630.92 $ - 3/12/2019 Issued 5/21/2024 B1901133 5900 SHATTUCK AVE Fee Zone 1 8 $ 12,120.00 Capital Improvements Impact Fee 3/6/2024 3/6/2024 $ - $ 12,120.00 3/12/2019 Issued 5/21/2024 B1901133 5900 SHATTUCK AVE Fee Zone 1 8 $ 13,488.00 Transportation Impact Fee 3/6/2024 3/6/2024 $ - $ 13,488.00 3/12/2019 Issued 5/21/2024 B1905092 811 PINE ST Fee Zone 2 0 $ 13,989.30 Capital Improvements Impact Fee 10/10/2023 10/10/2023 $ - $ 13,989.30 11/7/2019 Permit Issued 11/3/2023 B1905092 811 PINE ST Fee Zone 2 0 $ 13,989.30 Transportation Impact Fee 10/10/2023 10/10/2023 $ - $ 13,989.30 11/7/2019 Permit Issued 11/3/2023 B2103226 48 5TH AVE Fee Zone 1 21 $ 311,406.16 Affordable Housing Impact Fee - Issuance 11/20/2023 11/27/2023 $ 311,406.16 $ - 7/20/2021 Plan Review In Progress 3/7/2022 B2103226 48 5TH AVE Fee Zone 1 21 $ 311,406.16 Affordable Housing Impact Fee - At Final 11/20/2023 11/27/2023 $ 311,406.16 $ - 7/20/2021 Plan Review In Progress 3/7/2022 B2103226 48 5TH AVE Fee Zone 1 21 $ 35,406.00 Capital Improvements Impact Fee 11/20/2023 11/27/2023 $ 35,406.00 $ - 7/20/2021 Plan Review In Progress 3/7/2022 B2104369 2166 HIGH ST Fee Zone 3 1 $ 2,088.47 Affordable Housing Impact Fee - Issuance 4/3/2024 4/3/2024 $ - $ 2,088.47 10/15/2021 Issued 4/5/2024 B2104369 2166 HIGH ST Fee Zone 3 1 $ 2,088.47 Affordable Housing Impact Fee - At Final 4/3/2024 4/3/2024 $ - $ 2,088.47 10/15/2021 Issued 4/5/2024 B2104369 2166 HIGH ST Fee Zone 3 1 $ 87.00 Capital Improvements Impact Fee 4/3/2024 4/3/2024 $ - $ 87.00 10/15/2021 Issued 4/5/2024 B2104369 2166 HIGH ST Fee Zone 3 1 $ 262.00 Transportation Impact Fee 4/3/2024 4/3/2024 $ - $ 262.00 10/15/2021 Issued 4/5/2024 B2200332 2302 9TH AVE Fee Zone 2 2 $ 23,928.72 Affordable Housing Impact Fee - Issuance 11/16/2023 11/16/2023 $ - $ 23,928.72 1/24/2022 Issued 2/5/2024 B2200332 2302 9TH AVE Fee Zone 2 2 $ 23,928.72 Affordable Housing Impact Fee - At Final 11/16/2023 11/16/2023 $ 23,928.72 $ - 1/24/2022 Issued 2/5/2024 B2200332 2302 9TH AVE Fee Zone 2 2 $ 2,024.00 Capital Improvements Impact Fee 11/16/2023 11/16/2023 $ - $ 2,024.00 1/24/2022 Issued 2/5/2024 B2200332 2302 9TH AVE Fee Zone 2 2 $ 2,024.00 Transportation Impact Fee 11/16/2023 11/16/2023 $ - $ 2,024.00 1/24/2022 Issued 2/5/2024 B2202256 8425 MACARTHUR BLVD Fee Zone 3 23 $ 1,702.00 Capital Improvements Impact Fee 2/13/2024 2/13/2024 $ 1,702.00 $ - 6/28/2022 On Hold 3/14/2023 B2202256 8425 MACARTHUR BLVD Fee Zone 3 23 $ 5,106.00 Transportation Impact Fee 2/13/2024 2/13/2024 $ 5,106.00 $ - 6/28/2022 On Hold 3/14/2023 B2202257 8425 MACARTHUR BLVD Fee Zone 3 5 $ 370.00 Capital Improvements Impact Fee 2/13/2024 2/13/2024 $ 370.00 $ - 6/28/2022 On Hold 3/14/2023 B2202257 8425 MACARTHUR BLVD Fee Zone 3 5 $ 1,110.00 Transportation Impact Fee 2/13/2024 2/13/2024 $ 1,110.00 $ - 6/28/2022 On Hold 3/14/2023 B2202878 347 E 18TH ST Fee Zone 2 27 $ 2,472.00 Capital Improvements Impact Fee 2/13/2024 2/13/2024 $ 2,472.00 $ - 8/10/2022 On Hold 2/13/2024 B2202878 347 E 18TH ST Fee Zone 2 27 $ 2,781.00 Transportation Impact Fee 2/13/2024 2/13/2024 $ 2,781.00 $ - 8/10/2022 On Hold 2/13/2024 B2202878 347 E 18TH ST Fee Zone 2 27 $ 223.50 Transportation Impact Fee 2/13/2024 2/13/2024 $ 223.50 $ - 8/10/2022 On Hold 2/13/2024 B2203574 7711 OAKPORT ST Fee Zone 3 0 $ 1,666.00 Capital Improvements Impact Fee 6/4/2024 6/4/2024 $ - $ 1,666.00 10/4/2022 On Hold 6/4/2024 B2203574 7711 OAKPORT ST Fee Zone 3 0 $ 2,380.00 Transportation Impact Fee 6/4/2024 6/4/2024 $ - $ 2,380.00 10/4/2022 On Hold 6/4/2024 B2204132 500 LAKE PARK AVE Fee Zone 1 53 $ 2,466.42 Transportation Impact Fee 6/24/2024 6/24/2024 $ 2,466.42 $ - 11/17/2022 On Hold 6/24/2024 B2204132 500 LAKE PARK AVE Fee Zone 1 53 $ 53,636.00 Transportation Impact Fee 6/24/2024 6/24/2024 $ 53,636.00 $ - 11/17/2022 On Hold 6/24/2024 B2204162 2700 INTERNATIONAL BLVD Fee Zone 3 75 $ 8,155.73 Transportation Impact Fee 4/16/2024 6/5/2024 $ 8,155.73 $ - 11/21/2022 Application Inactive 5/22/2023 B2204376 856 34TH AVE Fee Zone 3 6 $ 1,515.00 Capital Improvements Impact Fee 4/9/2024 4/9/2024 $ 1,515.00 $ - 12/13/2022 Plan Routing - Completed 4/17/2024 B2300336 3012 MYRTLE ST Fee Zone 2 2 $ 23,928.72 Affordable Housing Impact Fee - Issuance 2/27/2024 2/27/2024 $ 23,928.72 $ - 2/1/2023 Plan Routing - Completed 4/3/2024 B2300336 3012 MYRTLE ST Fee Zone 2 2 $ 23,928.72 Affordable Housing Impact Fee - At Final 2/27/2024 2/27/2024 $ 23,928.72 $ - 2/1/2023 Plan Routing - Completed 4/3/2024 B2300336 3012 MYRTLE ST Fee Zone 2 2 $ 2,024.00 Capital Improvements Impact Fee 2/27/2024 2/27/2024 $ 2,024.00 $ - 2/1/2023 Plan Routing - Completed 4/3/2024 B2300336 3012 MYRTLE ST Fee Zone 2 2 $ 2,024.00 Transportation Impact Fee 2/27/2024 2/27/2024 $ 2,024.00 $ - 2/1/2023 Plan Routing - Completed 4/3/2024 B2300433 1090 29TH AVE Fee Zone 3 0 $ 117,884.70 Capital Improvements Impact Fee 11/27/2023 11/27/2023 $ 117,884.70 $ - 2/8/2023 Application Inactive 2/9/2024 B2300433 1090 29TH AVE Fee Zone 3 0 $ 41,914.56 Transportation Impact Fee 11/27/2023 11/27/2023 $ 41,914.56 $ - 2/8/2023 Application Inactive 2/9/2024 B2300433 1090 29TH AVE Fee Zone 3 0 $ 125,423.02 Job Impact Fee - Housing 12/12/2023 12/12/2023 $ 125,423.02 $ - 2/8/2023 Application Inactive 2/9/2024 B2300433 1090 29TH AVE Fee Zone 3 0 $ 250,846.05 Job Impact Fee - Housing 12/12/2023 12/12/2023 $ 250,846.05 $ - 2/8/2023 Application Inactive 2/9/2024 Record ID
Address
Impact Zone
Housing Units
Amount Assessed
Fee Description
Date Assessed
Date Invoiced
Amount Due
Amount Paid
Application Date
Record Status
Record Status Date
Attachment C - Projects Assessed Impact Fees in FY 2023-2024 Attachment C Final 01.29.2024

B2300433 1090 29TH AVE Fee Zone 3 0 $ 125,423.02 Job Impact Fee - Housing 12/12/2023 12/12/2023 $ 125,423.02 $ - 2/8/2023 Application Inactive 2/9/2024 B2301933 1232 HIGH ST Fee Zone 3 0 $(117,679.68) Capital Improvements Impact Fee 5/23/2024 5/23/2024 $ - $(117,679.68) 6/26/2023 Permit Issued 3/4/2024 B2302240 822 6TH AVE Fee Zone 2 3 $ 11,964.36 Affordable Housing Impact Fee - Issuance 2/7/2024 2/7/2024 $ 11,964.36 $ - 7/19/2023 On Hold 2/9/2024 B2302240 822 6TH AVE Fee Zone 2 3 $ 11,964.36 Affordable Housing Impact Fee - At Final 2/7/2024 2/7/2024 $ 11,964.36 $ - 7/19/2023 On Hold 2/9/2024 B2302240 822 6TH AVE Fee Zone 2 3 $ 1,012.00 Capital Improvements Impact Fee 2/7/2024 2/7/2024 $ 1,012.00 $ - 7/19/2023 On Hold 2/9/2024 B2302240 822 6TH AVE Fee Zone 2 3 $ 1,012.00 Transportation Impact Fee 2/7/2024 2/7/2024 $ 1,012.00 $ - 7/19/2023 On Hold 2/9/2024 B2302443 3801 M L KING JR WY Fee Zone 2 77 $ 77,924.00 Transportation Impact Fee 8/1/2023 8/3/2023 $ - $ 77,924.00 8/1/2023 Permit Issued 5/16/2024 B2302443 3801 M L KING JR WY Fee Zone 2 77 $ 2,380.57 Transportation Impact Fee 1/17/2024 1/17/2024 $ - $ 2,380.57 8/1/2023 Permit Issued 5/16/2024 B2302677 820 W MACARTHUR BLVD Fee Zone 2 166 $ 167,992.00 Capital Improvements Impact Fee 8/21/2023 8/21/2023 $ - $ 167,992.00 8/18/2023 Permit Issued 4/25/2024 B2302677 820 W MACARTHUR BLVD Fee Zone 2 166 $ 167,992.00 Transportation Impact Fee 8/21/2023 8/21/2023 $ - $ 167,992.00 8/18/2023 Permit Issued 4/25/2024 B2302677 820 W MACARTHUR BLVD Fee Zone 2 166 $ (51,612.00) Capital Improvements Impact Fee 3/20/2024 3/20/2024 $ - $ (51,612.00) 8/18/2023 Permit Issued 4/25/2024 B2302782 4821 TIDEWATER AVE Fee Zone 3 0 $ 21,483.90 Capital Improvements Impact Fee 8/27/2023 9/10/2023 $ - $ 21,483.90 8/27/2023 Application Inactive 2/25/2024 B2302782 4821 TIDEWATER AVE Fee Zone 3 0 $ 21,483.90 Transportation Impact Fee 9/10/2023 9/10/2023 $ - $ 21,483.90 8/27/2023 Application Inactive 2/25/2024 B2302804 121 E 12TH ST Fee Zone 1 91 $ 92,521.25 Transportation Impact Fee 8/29/2023 8/30/2023 $ - $ 92,521.25 8/29/2023 Permit Issued 3/8/2024 B2302894 8452 EDES AVE Fee Zone 3 0 $ 94,536.00 Transportation Impact Fee 9/6/2023 9/6/2023 $ - $ 94,536.00 9/6/2023 On Hold 3/27/2024 B2303138 718 WEBSTER ST Fee Zone 1 7 $ 103,802.06 Affordable Housing Impact Fee - Issuance 1/22/2024 1/22/2024 $ - $ 103,802.06 9/29/2023 Issued 1/24/2024 B2303138 718 WEBSTER ST Fee Zone 1 7 $ 103,802.06 Affordable Housing Impact Fee - At Final 1/22/2024 1/22/2024 $ 103,802.06 $ - 9/29/2023 Issued 1/24/2024 B2303138 718 WEBSTER ST Fee Zone 1 7 $ 11,802.00 Capital Improvements Impact Fee 1/22/2024 1/22/2024 $ - $ 11,802.00 9/29/2023 Issued 1/24/2024 B2303138 718 WEBSTER ST Fee Zone 1 7 $ 7,084.00 Transportation Impact Fee 1/22/2024 1/22/2024 $ - $ 7,084.00 9/29/2023 Issued 1/24/2024 B2303192 2805 PARK BLVD Fee Zone 1 20 $ 26,976.00 Capital Improvements Impact Fee 10/5/2023 10/5/2023 $ 26,976.00 $ - 10/5/2023 On Hold 5/3/2024 B2303192 2805 PARK BLVD Fee Zone 1 20 $ 20,240.00 Transportation Impact Fee 10/5/2023 10/5/2023 $ 20,240.00 $ - 10/5/2023 On Hold 5/3/2024 B2303474 2131 FILBERT ST Fee Zone 2 1 $ 11,964.36 Affordable Housing Impact Fee - Issuance 10/27/2023 12/8/2023 $ 11,964.36 $ - 10/27/2023 Application Inactive 4/26/2024 B2303474 2131 FILBERT ST Fee Zone 2 1 $ 11,964.36 Affordable Housing Impact Fee - At Final 10/27/2023 12/8/2023 $ 11,964.36 $ - 10/27/2023 Application Inactive 4/26/2024 B2303474 2131 FILBERT ST Fee Zone 2 1 $ 1,012.00 Capital Improvements Impact Fee 10/27/2023 12/8/2023 $ 1,012.00 $ - 10/27/2023 Application Inactive 4/26/2024 B2303474 2131 FILBERT ST Fee Zone 2 1 $ 1,012.00 Transportation Impact Fee 10/27/2023 12/8/2023 $ 1,012.00 $ - 10/27/2023 Application Inactive 4/26/2024 B2303764 48 5TH AVE Fee Zone 1 3 $ 44,486.60 Affordable Housing Impact Fee - Issuance 11/20/2023 11/27/2023 $ 44,486.60 $ - 11/20/2023 Application Inactive 5/20/2024 B2303764 48 5TH AVE Fee Zone 1 3 $ 44,486.60 Affordable Housing Impact Fee - At Final 11/20/2023 11/27/2023 $ 44,486.60 $ - 11/20/2023 Application Inactive 5/20/2024 B2303764 48 5TH AVE Fee Zone 1 3 $ 5,058.00 Capital Improvements Impact Fee 11/20/2023 11/27/2023 $ 5,058.00 $ - 11/20/2023 Application Inactive 5/20/2024 B2303764 48 5TH AVE Fee Zone 1 3 $ 3,036.00 Transportation Impact Fee 11/20/2023 11/27/2023 $ 3,036.00 $ - 11/20/2023 Application Inactive 5/20/2024 B2303765 48 5TH AVE Fee Zone 1 1 $ 14,828.86 Affordable Housing Impact Fee - Issuance 11/20/2023 11/27/2023 $ 14,828.86 $ - 11/20/2023 Application Inactive 5/20/2024 B2303765 48 5TH AVE Fee Zone 1 1 $ 14,828.86 Affordable Housing Impact Fee - At Final 11/20/2023 11/27/2023 $ 14,828.86 $ - 11/20/2023 Application Inactive 5/20/2024 B2303765 48 5TH AVE Fee Zone 1 1 $ 1,686.00 Capital Improvements Impact Fee 11/20/2023 11/27/2023 $ 1,686.00 $ - 11/20/2023 Application Inactive 5/20/2024 B2303765 48 5TH AVE Fee Zone 1 1 $ 1,012.00 Transportation Impact Fee 11/20/2023 11/27/2023 $ 1,012.00 $ - 11/20/2023 Application Inactive 5/20/2024 B2303766 48 5TH AVE Fee Zone 1 1 $ 14,828.86 Affordable Housing Impact Fee - Issuance 11/20/2023 11/27/2023 $ 14,828.86 $ - 11/20/2023 Application Inactive 5/20/2024 B2303766 48 5TH AVE Fee Zone 1 1 $ 14,828.86 Affordable Housing Impact Fee - At Final 11/20/2023 11/27/2023 $ 14,828.86 $ - 11/20/2023 Application Inactive 5/20/2024 B2303766 48 5TH AVE Fee Zone 1 1 $ 1,686.00 Capital Improvements Impact Fee 11/20/2023 11/27/2023 $ 1,686.00 $ - 11/20/2023 Application Inactive 5/20/2024 B2303766 48 5TH AVE Fee Zone 1 1 $ 1,012.00 Transportation Impact Fee 11/20/2023 11/27/2023 $ 1,012.00 $ - 11/20/2023 Application Inactive 5/20/2024 B2400081 51 9TH ST Fee Zone 1 97 $ 98,164.00 Transportation Impact Fee 1/3/2024 1/3/2024 $ 98,164.00 $ - 1/3/2024 Plan Review In Progress 5/20/2024 B2400244 8201 MACARTHUR BLVD Fee Zone 3 10 $ 3,370.00 Capital Improvements Impact Fee 1/16/2024 1/17/2024 $ 3,370.00 $ - 1/16/2024 On Hold - Fee Due 5/7/2024 B2400244 8201 MACARTHUR BLVD Fee Zone 3 10 $ 10,120.00 Transportation Impact Fee 1/16/2024 1/17/2024 $ 10,120.00 $ - 1/16/2024 On Hold - Fee Due 5/7/2024 B2400653 3001 E 12TH ST Fee Zone 3 2 $ 10,784.63 Affordable Housing Impact Fee - Issuance 2/16/2024 2/16/2024 $ 10,784.63 $ - 2/16/2024 Plan Review In Progress 3/21/2024 B2400653 3001 E 12TH ST Fee Zone 3 2 $ 10,784.63 Affordable Housing Impact Fee - At Final 2/16/2024 2/16/2024 $ 10,784.63 $ - 2/16/2024 Plan Review In Progress 3/21/2024 B2400653 3001 E 12TH ST Fee Zone 3 2 $ 2,698.00 Capital Improvements Impact Fee 2/16/2024 2/16/2024 $ 2,698.00 $ - 2/16/2024 Plan Review In Progress 3/21/2024 B2400653 3001 E 12TH ST Fee Zone 3 2 $ 2,698.00 Transportation Impact Fee 2/16/2024 2/16/2024 $ 2,698.00 $ - 2/16/2024 Plan Review In Progress 3/21/2024 B2400817 3012 MYRTLE ST Fee Zone 2 1 $ 11,964.36 Affordable Housing Impact Fee - Issuance 2/28/2024 2/28/2024 $ 11,964.36 $ - 2/28/2024 Plan Routing - Completed 4/3/2024 B2400817 3012 MYRTLE ST Fee Zone 2 1 $ 11,964.36 Affordable Housing Impact Fee - At Final 2/28/2024 2/28/2024 $ 11,964.36 $ - 2/28/2024 Plan Routing - Completed 4/3/2024 B2400817 3012 MYRTLE ST Fee Zone 2 1 $ 1,012.00 Transportation Impact Fee 2/28/2024 2/28/2024 $ 1,012.00 $ - 2/28/2024 Plan Routing - Completed 4/3/2024 Record ID
Address
Impact Zone
Housing Units
Amount Assessed
Fee Description
Date Assessed
Date Invoiced
Amount Due
Amount Paid
Application Date
Record Status
Record Status Date
Attachment C - Projects Assessed Impact Fees in FY 2023-2024 Attachment C Final 01.29.2024

B2400817 3012 MYRTLE ST Fee Zone 2 1 $ 1,012.00 Capital Improvements Impact Fee 3/5/2024 3/5/2024 $ 1,012.00 $ - 2/28/2024 Plan Routing - Completed 4/3/2024 B2401162 1031 62ND ST Fee Zone 2 8 $ 105,653.96 Affordable Housing Impact Fee - Issuance 3/21/2024 3/21/2024 $ 105,653.96 $ - 3/21/2024 Application Approved 6/18/2024 B2401162 1031 62ND ST Fee Zone 2 8 $ 105,653.96 Affordable Housing Impact Fee - At Final 3/21/2024 3/21/2024 $ 105,653.96 $ - 3/21/2024 Application Approved 6/18/2024 B2401162 1031 62ND ST Fee Zone 2 8 $ 29,656.00 Capital Improvements Impact Fee 3/21/2024 3/21/2024 $ 29,656.00 $ - 3/21/2024 Application Approved 6/18/2024 B2401162 1031 62ND ST Fee Zone 2 8 $ 14,839.00 Transportation Impact Fee 3/21/2024 3/21/2024 $ 14,839.00 $ - 3/21/2024 Application Approved 6/18/2024 B2401162 1031 62ND ST Fee Zone 2 8 $(105,653.96) Affordable Housing Impact Fee - Issuance 3/22/2024 3/22/2024 $(105,653.96) $ - 3/21/2024 Application Approved 6/18/2024 B2401162 1031 62ND ST Fee Zone 2 8 $(105,653.96) Affordable Housing Impact Fee - At Final 3/22/2024 3/22/2024 $(105,653.96) $ - 3/21/2024 Application Approved 6/18/2024 B2401162 1031 62ND ST Fee Zone 2 8 $ (4,047.00) Transportation Impact Fee 3/22/2024 3/22/2024 $ (4,047.00) $ - 3/21/2024 Application Approved 6/18/2024 B2401162 1031 62ND ST Fee Zone 2 8 $ (10,784.00) Capital Improvements Impact Fee 3/22/2024 3/22/2024 $ (10,784.00) $ - 3/21/2024 Application Approved 6/18/2024 B2401465 255 3RD ST Fee Zone 1 1 $ 14,828.87 Affordable Housing Impact Fee - Issuance 4/18/2024 4/18/2024 $ 14,828.87 $ - 4/17/2024 On Hold - Fee Due 4/18/2024 B2401465 255 3RD ST Fee Zone 1 1 $ 14,828.87 Affordable Housing Impact Fee - At Final 4/18/2024 4/18/2024 $ 14,828.87 $ - 4/17/2024 On Hold - Fee Due 4/18/2024 B2401465 255 3RD ST Fee Zone 1 1 $ 1,686.00 Capital Improvements Impact Fee 4/18/2024 4/18/2024 $ 1,686.00 $ - 4/17/2024 On Hold - Fee Due 4/18/2024 B2401465 255 3RD ST Fee Zone 1 1 $ 1,012.00 Transportation Impact Fee 4/18/2024 4/18/2024 $ 1,012.00 $ - 4/17/2024 On Hold - Fee Due 4/18/2024 B2401520 623 15TH ST Fee Zone 1 10 $ 148,288.65 Affordable Housing Impact Fee - Issuance 4/21/2024 4/21/2024 $ 148,288.65 $ - 4/21/2024 On Hold - Fee Due 4/21/2024 B2401520 623 15TH ST Fee Zone 1 10 $ 148,288.65 Affordable Housing Impact Fee - At Final 4/21/2024 4/21/2024 $ 148,288.65 $ - 4/21/2024 On Hold - Fee Due 4/21/2024 B2401520 623 15TH ST Fee Zone 1 10 $ 10,120.00 Transportation Impact Fee 4/21/2024 4/21/2024 $ 10,120.00 $ - 4/21/2024 On Hold - Fee Due 4/21/2024 B2401520 623 15TH ST Fee Zone 1 10 $ 16,860.00 Capital Improvements Impact Fee 5/15/2024 5/15/2024 $ 16,860.00 $ - 4/21/2024 On Hold - Fee Due 4/21/2024 B2401975 1699 MARITIME ST Fee Zone 2 0 $ 3,888.00 Capital Improvements Impact Fee 5/24/2024 5/28/2024 $ 3,888.00 $ - 5/24/2024 Plan Routing - Completed 6/29/2024 B2401975 1699 MARITIME ST Fee Zone 2 0 $ 3,888.00 Transportation Impact Fee 5/28/2024 5/28/2024 $ 3,888.00 $ - 5/24/2024 Plan Routing - Completed 6/29/2024 B2401976 1699 MARITIME ST Fee Zone 2 0 $ 1.00 Capital Improvements Impact Fee 5/24/2024 5/28/2024 $ - $ 1.00 5/24/2024 Plan Routing - Completed 7/1/2024 B2401976 1699 MARITIME ST Fee Zone 2 0 $ 2,024.00 Capital Improvements Impact Fee 5/29/2024 5/29/2024 $ - $ 2,024.00 5/24/2024 Plan Routing - Completed 7/1/2024 B2401976 1699 MARITIME ST Fee Zone 2 0 $ 720.00 Transportation Impact Fee 5/29/2024 5/29/2024 $ - $ 720.00 5/24/2024 Plan Routing - Completed 7/1/2024 B2401977 1699 MARITIME ST Fee Zone 2 0 $ 518.40 Capital Improvements Impact Fee 5/24/2024 5/28/2024 $ 518.40 $ - 5/24/2024 On Hold - Fee Due 5/29/2024 B2401977 1699 MARITIME ST Fee Zone 2 0 $ 518.40 Transportation Impact Fee 5/24/2024 5/28/2024 $ 518.40 $ - 5/24/2024 On Hold - Fee Due 5/29/2024 B2402250 2125 TELEGRAPH AVE Fee Zone 1 97 $ 98,164.00 Transportation Impact Fee 6/17/2024 6/17/2024 $ 98,164.00 $ - 6/17/2024 On Hold - Fee Due 6/17/2024 B2402360 10550 INTERNATIONAL BLVD Fee Zone 3 140 $ 141,680.00 Transportation Impact Fee 6/27/2024 6/27/2024 $ 141,680.00 $ - 6/27/2024 On Hold - Fee Due 6/27/2024 RB1603660 6538 HEATHER RIDGE WY Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - Issuance 1/16/2024 1/16/2024 $ 15,502.91 $ - 8/2/2016 Permit Expired 5/12/2024 RB1603660 6538 HEATHER RIDGE WY Fee Zone 1 1 $ 5,392.00 Capital Improvements Impact Fee 1/16/2024 1/16/2024 $ 5,392.00 $ - 8/2/2016 Permit Expired 5/12/2024 RB1603660 6538 HEATHER RIDGE WY Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 1/16/2024 1/16/2024 $ 1,349.00 $ - 8/2/2016 Permit Expired 5/12/2024 RB1603661 6558 HEATHER RIDGE WY Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - Issuance 1/25/2024 1/26/2024 $ 15,502.91 $ - 8/2/2016 Permit Expired 5/12/2024 RB1603661 6558 HEATHER RIDGE WY Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 1/25/2024 N/A $ - $ - 8/2/2016 Permit Expired 5/12/2024 RB1603661 6558 HEATHER RIDGE WY Fee Zone 1 1 $ 5,392.00 Capital Improvements Impact Fee 1/25/2024 1/26/2024 $ 5,392.00 $ - 8/2/2016 Permit Expired 5/12/2024 RB1603661 6558 HEATHER RIDGE WY Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 1/25/2024 1/26/2024 $ 1,349.00 $ - 8/2/2016 Permit Expired 5/12/2024 RB1603663 6534 HEATHER RIDGE WY Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - Issuance 1/25/2024 1/26/2024 $ 15,502.91 $ - 8/2/2016 Permit Expired 5/12/2024 RB1603663 6534 HEATHER RIDGE WY Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 1/25/2024 N/A $ - $ - 8/2/2016 Permit Expired 5/12/2024 RB1603663 6534 HEATHER RIDGE WY Fee Zone 1 1 $ 5,392.00 Capital Improvements Impact Fee 1/25/2024 1/26/2024 $ 5,392.00 $ - 8/2/2016 Permit Expired 5/12/2024 RB1603663 6534 HEATHER RIDGE WY Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 1/25/2024 1/26/2024 $ 1,349.00 $ - 8/2/2016 Permit Expired 5/12/2024 RB1603664 6550 HEATHER RIDGE WY Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - Issuance 1/25/2024 1/26/2024 $ 15,502.91 $ - 8/2/2016 Permit Expired 5/12/2024 RB1603664 6550 HEATHER RIDGE WY Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 1/25/2024 N/A $ - $ - 8/2/2016 Permit Expired 5/12/2024 RB1603664 6550 HEATHER RIDGE WY Fee Zone 1 1 $ 5,392.00 Capital Improvements Impact Fee 1/25/2024 1/26/2024 $ 5,392.00 $ - 8/2/2016 Permit Expired 5/12/2024 RB1603664 6550 HEATHER RIDGE WY Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 1/25/2024 1/26/2024 $ 1,349.00 $ - 8/2/2016 Permit Expired 5/12/2024 RB1604195 912 61ST ST Fee Zone 2 2 $ 11,121.97 Affordable Housing Impact Fee - Issuance 3/15/2024 3/15/2024 $ 11,121.97 $ - 8/30/2016 Permit Expired 3/3/2024 RB1604195 912 61ST ST Fee Zone 2 2 $ 11,121.97 Affordable Housing Impact Fee - At Final 3/15/2024 3/15/2024 $ 11,121.97 $ - 8/30/2016 Permit Expired 3/3/2024 RB1604195 912 61ST ST Fee Zone 2 2 $ 4,045.00 Capital Improvements Impact Fee 3/15/2024 3/15/2024 $ 4,045.00 $ - 8/30/2016 Permit Expired 3/3/2024 RB1604195 912 61ST ST Fee Zone 2 2 $ 1,349.00 Transportation Impact Fee 3/15/2024 3/15/2024 $ 1,349.00 $ - 8/30/2016 Permit Expired 3/3/2024 RB1604394 5037 MACARTHUR BLVD Fee Zone 3 1 $ 5,392.32 Affordable Housing Impact Fee - Issuance 3/5/2024 3/5/2024 $ 5,392.32 $ - 9/12/2016 Permit Expired 3/28/2024 RB1604394 5037 MACARTHUR BLVD Fee Zone 3 1 $ 5,392.32 Affordable Housing Impact Fee - At Final 3/5/2024 N/A $ - $ - 9/12/2016 Permit Expired 3/28/2024 Record ID
Address
Impact Zone
Housing Units
Amount Assessed
Fee Description
Date Assessed
Date Invoiced
Amount Due
Amount Paid
Application Date
Record Status
Record Status Date
Attachment C - Projects Assessed Impact Fees in FY 2023-2024 Attachment C Final 01.29.2024

RB1604394 5037 MACARTHUR BLVD Fee Zone 3 1 $ 1,349.00 Capital Improvements Impact Fee 3/5/2024 3/5/2024 $ 1,349.00 $ - 9/12/2016 Permit Expired 3/28/2024 RB1604394 5037 MACARTHUR BLVD Fee Zone 3 1 $ 349.00 Transportation Impact Fee 3/5/2024 3/5/2024 $ 349.00 $ - 9/12/2016 Permit Expired 3/28/2024 RB1604478 2527 WALLACE ST Fee Zone 2 1 $ 1,127.00 Affordable Housing Impact Fee - Issuance 8/3/2023 8/3/2023 $ - $ 1,127.00 9/15/2016 Final 3/2/2024 RB1604478 2527 WALLACE ST Fee Zone 2 1 $ 410.00 Capital Improvements Impact Fee 8/3/2023 8/3/2023 $ - $ 410.00 9/15/2016 Final 3/2/2024 RB1604478 2527 WALLACE ST Fee Zone 2 1 $ 137.00 Transportation Impact Fee 8/3/2023 8/3/2023 $ - $ 137.00 9/15/2016 Final 3/2/2024 RB1604478 2527 WALLACE ST Fee Zone 2 1 $ 1,127.00 Affordable Housing Impact Fee - At Final 8/3/2023 8/3/2023 $ - $ 1,127.00 9/15/2016 Final 3/2/2024 RB1604480 2531 WALLACE ST Fee Zone 2 1 $ 1,127.00 Affordable Housing Impact Fee - Issuance 8/3/2023 8/3/2023 $ - $ 1,127.00 9/15/2016 Final 3/2/2024 RB1604480 2531 WALLACE ST Fee Zone 2 1 $ 1,127.00 Affordable Housing Impact Fee - At Final 8/3/2023 8/3/2023 $ - $ 1,127.00 9/15/2016 Final 3/2/2024 RB1604480 2531 WALLACE ST Fee Zone 2 1 $ 410.00 Capital Improvements Impact Fee 8/3/2023 8/3/2023 $ - $ 410.00 9/15/2016 Final 3/2/2024 RB1604480 2531 WALLACE ST Fee Zone 2 1 $ 137.00 Transportation Impact Fee 8/3/2023 8/3/2023 $ - $ 137.00 9/15/2016 Final 3/2/2024 RB1606215 6605 OAKWOOD DR Fee Zone 1 1 $ 12,502.91 Affordable Housing Impact Fee - Issuance 3/1/2024 3/1/2024 $ 12,502.91 $ - 12/28/2016 Permit Expired 12/9/2023 RB1606215 6605 OAKWOOD DR Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 3/1/2024 N/A $ - $ - 12/28/2016 Permit Expired 12/9/2023 RB1606215 6605 OAKWOOD DR Fee Zone 1 1 $ 3,892.00 Capital Improvements Impact Fee 3/1/2024 3/1/2024 $ 3,892.00 $ - 12/28/2016 Permit Expired 12/9/2023 RB1606215 6605 OAKWOOD DR Fee Zone 1 1 $ 349.00 Transportation Impact Fee 3/1/2024 3/1/2024 $ 349.00 $ - 12/28/2016 Permit Expired 12/9/2023 RB1700302 8349 OUTLOOK AVE Fee Zone 3 1 $ 349.00 Transportation Impact Fee 11/17/2023 11/17/2023 $ - $ 349.00 1/20/2017 Final 3/2/2024 RB1700463 555 56TH ST Fee Zone 1 1 $ 12,502.91 Affordable Housing Impact Fee - Issuance 8/3/2023 8/3/2023 $ - $ 12,502.91 2/1/2017 Reinstated 2/22/2024 RB1700463 555 56TH ST Fee Zone 1 1 $ 3,892.00 Capital Improvements Impact Fee 8/3/2023 8/3/2023 $ - $ 3,892.00 2/1/2017 Reinstated 2/22/2024 RB1700463 555 56TH ST Fee Zone 1 1 $ 349.00 Transportation Impact Fee 8/3/2023 8/3/2023 $ - $ 349.00 2/1/2017 Reinstated 2/22/2024 RB1700463 555 56TH ST Fee Zone 1 1 $ 12,502.91 Affordable Housing Impact Fee - At Final 4/10/2024 4/10/2024 $ - $ 12,502.91 2/1/2017 Reinstated 2/22/2024 RB1702104 5454 FERNHOFF RD Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - Issuance 1/3/2024 N/A $ - $ - 5/16/2017 Permit Expired 2/16/2024 RB1702104 5454 FERNHOFF RD Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 1/3/2024 N/A $ - $ - 5/16/2017 Permit Expired 2/16/2024 RB1702104 5454 FERNHOFF RD Fee Zone 1 1 $ 5,392.00 Capital Improvements Impact Fee 1/3/2024 N/A $ - $ - 5/16/2017 Permit Expired 2/16/2024 RB1702104 5454 FERNHOFF RD Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 1/3/2024 N/A $ - $ - 5/16/2017 Permit Expired 2/16/2024 RB1704027 5200 COCHRANE AVE Fee Zone 1 1 $ 9,252.91 Affordable Housing Impact Fee - Issuance 4/18/2024 4/18/2024 $ 9,252.91 $ - 8/31/2017 Reinstated 4/22/2024 RB1704027 5200 COCHRANE AVE Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 4/18/2024 4/18/2024 $ 15,502.91 $ - 8/31/2017 Reinstated 4/22/2024 RB1704027 5200 COCHRANE AVE Fee Zone 1 1 $ 3,392.00 Capital Improvements Impact Fee 4/18/2024 4/18/2024 $ 3,392.00 $ - 8/31/2017 Reinstated 4/22/2024 RB1704027 5200 COCHRANE AVE Fee Zone 1 1 $ 349.00 Transportation Impact Fee 4/18/2024 4/18/2024 $ 349.00 $ - 8/31/2017 Reinstated 4/22/2024 RB1705679 1448 16TH ST Fee Zone 2 2 $ 6,621.97 Affordable Housing Impact Fee - Issuance 11/7/2023 11/7/2023 $ - $ 6,621.97 12/20/2017 Final 3/2/2024 RB1705679 1448 16TH ST Fee Zone 2 2 $ 11,121.97 Affordable Housing Impact Fee - At Final 11/7/2023 11/7/2023 $ - $ 11,121.97 12/20/2017 Final 3/2/2024 RB1705679 1448 16TH ST Fee Zone 2 2 $ 2,545.00 Capital Improvements Impact Fee 11/7/2023 11/7/2023 $ - $ 2,545.00 12/20/2017 Final 3/2/2024 RB1705679 1448 16TH ST Fee Zone 2 2 $ 349.00 Transportation Impact Fee 11/7/2023 11/7/2023 $ - $ 349.00 12/20/2017 Final 3/2/2024 RB1802673 2314 LINDEN ST Fee Zone 2 1 $ 6,004.91 Affordable Housing Impact Fee - Issuance 3/22/2024 3/22/2024 $ 6,004.91 $ - 6/4/2018 Permit Expired 1/16/2023 RB1802673 2314 LINDEN ST Fee Zone 2 1 $ 6,004.91 Affordable Housing Impact Fee - At Final 3/22/2024 N/A $ - $ - 6/4/2018 Permit Expired 1/16/2023 RB1802673 2314 LINDEN ST Fee Zone 2 1 $ 1,696.00 Capital Improvements Impact Fee 3/22/2024 3/22/2024 $ 1,696.00 $ - 6/4/2018 Permit Expired 1/16/2023 RB1802673 2314 LINDEN ST Fee Zone 2 1 $ 349.00 Transportation Impact Fee 3/22/2024 3/22/2024 $ 349.00 $ - 6/4/2018 Permit Expired 1/16/2023 RB1803211 4804 MCDONELL AVE Fee Zone 1 1 $ 1,570.92 Affordable Housing Impact Fee - Issuance 3/15/2024 3/15/2024 $ - $ 1,570.92 6/28/2018 Final 3/17/2024 RB1803211 4804 MCDONELL AVE Fee Zone 1 1 $ 1,570.92 Affordable Housing Impact Fee - At Final 3/15/2024 3/15/2024 $ - $ 1,570.92 6/28/2018 Final 3/17/2024 RB1803211 4804 MCDONELL AVE Fee Zone 1 1 $ 546.00 Capital Improvements Impact Fee 3/15/2024 3/15/2024 $ - $ 546.00 6/28/2018 Final 3/17/2024 RB1803211 4804 MCDONELL AVE Fee Zone 1 1 $ 137.00 Transportation Impact Fee 3/15/2024 3/15/2024 $ - $ 137.00 6/28/2018 Final 3/17/2024 RB1803217 1167 63RD ST Fee Zone 2 1 $ 3,996.97 Affordable Housing Impact Fee - Issuance 1/16/2024 1/16/2024 $ - $ 3,996.97 6/28/2018 Inspection Final 2/28/2024 RB1803217 1167 63RD ST Fee Zone 2 1 $ 11,121.97 Affordable Housing Impact Fee - At Final 1/16/2024 1/16/2024 $ - $ 11,121.97 6/28/2018 Inspection Final 2/28/2024 RB1803217 1167 63RD ST Fee Zone 2 1 $ 2,045.00 Capital Improvements Impact Fee 1/16/2024 1/16/2024 $ - $ 2,045.00 6/28/2018 Inspection Final 2/28/2024 RB1803217 1167 63RD ST Fee Zone 2 1 $ 349.00 Transportation Impact Fee 1/16/2024 1/16/2024 $ - $ 349.00 6/28/2018 Inspection Final 2/28/2024 RB1803260 1626 14TH ST Fee Zone 2 2 $ 16,728.72 Affordable Housing Impact Fee - Issuance 3/4/2024 3/4/2024 $ 16,728.72 $ - 6/29/2018 Inspection Final 12/27/2023 RB1803260 1626 14TH ST Fee Zone 2 2 $ 23,928.72 Affordable Housing Impact Fee - At Final 3/4/2024 3/4/2024 $ 23,928.72 $ - 6/29/2018 Inspection Final 12/27/2023 RB1803260 1626 14TH ST Fee Zone 2 2 $ 24.00 Capital Improvements Impact Fee 3/4/2024 3/4/2024 $ 24.00 $ - 6/29/2018 Inspection Final 12/27/2023 RB1803260 1626 14TH ST Fee Zone 2 2 $ 24.00 Transportation Impact Fee 3/4/2024 3/4/2024 $ 24.00 $ - 6/29/2018 Inspection Final 12/27/2023 Record ID
Address
Impact Zone
Housing Units
Amount Assessed
Fee Description
Date Assessed
Date Invoiced
Amount Due
Amount Paid
Application Date
Record Status
Record Status Date
Attachment C - Projects Assessed Impact Fees in FY 2023-2024 Attachment C Final 01.29.2024

RBC1804277 10 TURNER CT Fee Zone 1 1 $ 2,431.98 Affordable Housing Impact Fee - Issuance 3/7/2024 3/7/2024 $ 2,431.98 $ - 10/19/2018 Inspection Final 5/1/2023 RBC1804277 10 TURNER CT Fee Zone 1 1 $ 2,431.98 Affordable Housing Impact Fee - At Final 3/7/2024 3/7/2024 $ 2,431.98 $ - 10/19/2018 Inspection Final 5/1/2023 RBC1804303 1776 GASPAR DR Fee Zone 1 1 $ 4,002.91 Affordable Housing Impact Fee - Issuance 8/31/2023 8/31/2023 $ - $ 4,002.91 10/22/2018 Inspection Final 1/31/2024 RBC1804303 1776 GASPAR DR Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 8/31/2023 8/31/2023 $ - $ 15,502.91 10/22/2018 Inspection Final 1/31/2024 RBC1804303 1776 GASPAR DR Fee Zone 1 1 $ 1,392.00 Capital Improvements Impact Fee 8/31/2023 8/31/2023 $ - $ 1,392.00 10/22/2018 Inspection Final 1/31/2024 RBC1804303 1776 GASPAR DR Fee Zone 1 1 $ 349.00 Transportation Impact Fee 8/31/2023 8/31/2023 $ - $ 349.00 10/22/2018 Inspection Final 1/31/2024 RBC1901729 6715 SNAKE RD Fee Zone 1 1 $ 12,502.91 Affordable Housing Impact Fee - Issuance 5/24/2024 5/24/2024 $ - $ 12,502.91 4/16/2019 Permit Expired 6/27/2024 RBC1901729 6715 SNAKE RD Fee Zone 1 1 $ 1,552.91 Affordable Housing Impact Fee - At Final 5/24/2024 5/24/2024 $ - $ 1,552.91 4/16/2019 Permit Expired 6/27/2024 RBC1901729 6715 SNAKE RD Fee Zone 1 1 $ 3,892.00 Capital Improvements Impact Fee 5/24/2024 5/24/2024 $ - $ 3,892.00 4/16/2019 Permit Expired 6/27/2024 RBC1901729 6715 SNAKE RD Fee Zone 1 1 $ 349.00 Transportation Impact Fee 5/24/2024 5/24/2024 $ - $ 349.00 4/16/2019 Permit Expired 6/27/2024 RBC1902270 7309 SNAKE RD Fee Zone 1 1 $ 11,500.00 Affordable Housing Impact Fee - At Final 9/29/2023 9/29/2023 $ - $ 11,500.00 5/20/2019 Inspection Final 12/13/2023 RBC1902694 462 37TH ST Fee Zone 1 1 $ 10,000.00 Affordable Housing Impact Fee - Issuance 5/1/2024 5/1/2024 $ - $ 10,000.00 6/14/2019 Inspection Final 10/9/2023 RBC1902694 462 37TH ST Fee Zone 1 1 $ 10,000.00 Affordable Housing Impact Fee - At Final 5/1/2024 5/1/2024 $ - $ 10,000.00 6/14/2019 Inspection Final 10/9/2023 RBC1902694 462 37TH ST Fee Zone 1 1 $ 3,000.00 Capital Improvements Impact Fee 5/1/2024 5/1/2024 $ - $ 3,000.00 6/14/2019 Inspection Final 10/9/2023 RBC1902694 462 37TH ST Fee Zone 1 1 $ 1,000.00 Transportation Impact Fee 5/1/2024 5/1/2024 $ - $ 1,000.00 6/14/2019 Inspection Final 10/9/2023 RBC1903740 1011 30TH ST Fee Zone 2 1 $ 11,121.97 Affordable Housing Impact Fee - Issuance 6/5/2024 6/5/2024 $ 11,121.97 $ - 8/20/2019 Reinstated 5/28/2024 RBC1903740 1011 30TH ST Fee Zone 2 1 $ 11,121.97 Affordable Housing Impact Fee - At Final 6/5/2024 6/5/2024 $ 11,121.97 $ - 8/20/2019 Reinstated 5/28/2024 RBC1903740 1011 30TH ST Fee Zone 2 1 $ 4,045.00 Capital Improvements Impact Fee 6/5/2024 6/5/2024 $ 4,045.00 $ - 8/20/2019 Reinstated 5/28/2024 RBC1903740 1011 30TH ST Fee Zone 2 1 $ 1,349.00 Transportation Impact Fee 6/5/2024 6/5/2024 $ 1,349.00 $ - 8/20/2019 Reinstated 5/28/2024 RBC1903822 854 MEAD AVE Fee Zone 2 2 $ 8,250.00 Affordable Housing Impact Fee - At Final 9/22/2023 9/22/2023 $ - $ 8,250.00 8/26/2019 Final 9/26/2023 RBC1904732 1191 72ND AVE Fee Zone 3 1 $ 349.00 Transportation Impact Fee 1/26/2024 1/26/2024 $ - $ 349.00 10/18/2019 Inspection Final 2/20/2024 RBC1905694 6610 DOVER ST Fee Zone 1 1 $ 14,828.87 Affordable Housing Impact Fee - Issuance 2/22/2024 N/A $ - $ - 12/16/2019 Final 3/22/2022 RBC1905694 6610 DOVER ST Fee Zone 1 1 $ 14,828.87 Affordable Housing Impact Fee - At Final 2/22/2024 N/A $ - $ - 12/16/2019 Final 3/22/2022 RBC1905694 6610 DOVER ST Fee Zone 1 1 $ 1,686.00 Capital Improvements Impact Fee 2/22/2024 N/A $ - $ - 12/16/2019 Final 3/22/2022 RBC1905694 6610 DOVER ST Fee Zone 1 1 $ 1,012.00 Transportation Impact Fee 2/22/2024 N/A $ - $ - 12/16/2019 Final 3/22/2022 RBC1905954 13639 CAMPUS DR Fee Zone 1 1 $ 4,002.91 Affordable Housing Impact Fee - Issuance 11/29/2023 11/29/2023 $ - $ 4,002.91 12/30/2019 Permit Expired 5/4/2024 RBC1905954 13639 CAMPUS DR Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 11/29/2023 4/3/2024 $ - $ 15,502.91 12/30/2019 Permit Expired 5/4/2024 RBC1905954 13639 CAMPUS DR Fee Zone 1 1 $ 1,392.00 Capital Improvements Impact Fee 11/29/2023 11/29/2023 $ - $ 1,392.00 12/30/2019 Permit Expired 5/4/2024 RBC1905954 13639 CAMPUS DR Fee Zone 1 1 $ 349.00 Transportation Impact Fee 11/29/2023 11/29/2023 $ - $ 349.00 12/30/2019 Permit Expired 5/4/2024 RBC1906005 6268 ACACIA AVE Fee Zone 1 2 $ 4,002.91 Affordable Housing Impact Fee - Issuance 3/20/2024 3/20/2024 $ - $ 4,002.91 12/31/2019 Reinstated 5/16/2024 RBC1906005 6268 ACACIA AVE Fee Zone 1 2 $ 4,002.91 Affordable Housing Impact Fee - At Final 3/20/2024 4/4/2024 $ - $ 4,002.91 12/31/2019 Reinstated 5/16/2024 RBC1906005 6268 ACACIA AVE Fee Zone 1 2 $ 1,392.00 Capital Improvements Impact Fee 3/20/2024 3/20/2024 $ - $ 1,392.00 12/31/2019 Reinstated 5/16/2024 RBC1906005 6268 ACACIA AVE Fee Zone 1 2 $ 349.00 Transportation Impact Fee 3/20/2024 3/20/2024 $ - $ 349.00 12/31/2019 Reinstated 5/16/2024 RBC2001507 2222 23RD AVE Fee Zone 3 2 $ 3,392.32 Affordable Housing Impact Fee - Issuance 2/26/2024 2/26/2024 $ 3,392.32 $ - 6/5/2020 Application Inactive 6/5/2024 RBC2001507 2222 23RD AVE Fee Zone 3 2 $ 3,392.32 Affordable Housing Impact Fee - At Final 2/26/2024 2/26/2024 $ 3,392.32 $ - 6/5/2020 Application Inactive 6/5/2024 RBC2001507 2222 23RD AVE Fee Zone 3 2 $ 349.00 Capital Improvements Impact Fee 2/26/2024 2/26/2024 $ 349.00 $ - 6/5/2020 Application Inactive 6/5/2024 RBC2001507 2222 23RD AVE Fee Zone 3 2 $ 349.00 Transportation Impact Fee 2/26/2024 2/26/2024 $ 349.00 $ - 6/5/2020 Application Inactive 6/5/2024 RBC2003144 3635 13TH AVE Fee Zone 1 1 $ 4,002.91 Affordable Housing Impact Fee - Issuance 9/11/2023 9/11/2023 $ 4,002.91 $ - 11/3/2020 Application Inactive 11/4/2023 RBC2003144 3635 13TH AVE Fee Zone 1 1 $ 4,002.91 Affordable Housing Impact Fee - At Final 9/11/2023 9/11/2023 $ 4,002.91 $ - 11/3/2020 Application Inactive 11/4/2023 RBC2003144 3635 13TH AVE Fee Zone 1 1 $ 1,392.00 Capital Improvements Impact Fee 9/11/2023 9/11/2023 $ 1,392.00 $ - 11/3/2020 Application Inactive 11/4/2023 RBC2003144 3635 13TH AVE Fee Zone 1 1 $ 349.00 Transportation Impact Fee 9/11/2023 9/11/2023 $ 349.00 $ - 11/3/2020 Application Inactive 11/4/2023 RBC2003333 2911 MAGNOLIA ST Fee Zone 2 1 $ 2,871.97 Affordable Housing Impact Fee - Issuance 3/7/2024 3/7/2024 $ - $ 2,871.97 11/18/2020 Reinstated 4/23/2024 RBC2003333 2911 MAGNOLIA ST Fee Zone 2 1 $ 2,871.97 Affordable Housing Impact Fee - At Final 3/7/2024 3/7/2024 $ - $ 2,871.97 11/18/2020 Reinstated 4/23/2024 RBC2003333 2911 MAGNOLIA ST Fee Zone 2 1 $ 1,045.00 Capital Improvements Impact Fee 3/7/2024 3/7/2024 $ - $ 1,045.00 11/18/2020 Reinstated 4/23/2024 RBC2003333 2911 MAGNOLIA ST Fee Zone 2 1 $ 349.00 Transportation Impact Fee 3/7/2024 3/7/2024 $ - $ 349.00 11/18/2020 Reinstated 4/23/2024 RBC2003607 2913 MAGNOLIA ST Fee Zone 2 1 $ 2,871.97 Affordable Housing Impact Fee - Issuance 3/7/2024 3/7/2024 $ - $ 2,871.97 12/13/2020 Reinstated 4/23/2024 RBC2003607 2913 MAGNOLIA ST Fee Zone 2 1 $ 2,871.97 Affordable Housing Impact Fee - At Final 3/7/2024 3/7/2024 $ - $ 2,871.97 12/13/2020 Reinstated 4/23/2024 Record ID
Address
Impact Zone
Housing Units
Amount Assessed
Fee Description
Date Assessed
Date Invoiced
Amount Due
Amount Paid
Application Date
Record Status
Record Status Date
Attachment C - Projects Assessed Impact Fees in FY 2023-2024 Attachment C Final 01.29.2024

RBC2003607 2913 MAGNOLIA ST Fee Zone 2 1 $ 1,045.00 Capital Improvements Impact Fee 3/7/2024 3/7/2024 $ - $ 1,045.00 12/13/2020 Reinstated 4/23/2024 RBC2003607 2913 MAGNOLIA ST Fee Zone 2 1 $ 349.00 Transportation Impact Fee 3/7/2024 3/7/2024 $ - $ 349.00 12/13/2020 Reinstated 4/23/2024 RBC2101808 13526 CAMPUS DR Fee Zone 1 2 $ 15,502.91 Affordable Housing Impact Fee - Issuance 3/13/2024 3/13/2024 $ - $ 15,502.91 4/19/2021 Permit Issued 3/22/2024 RBC2101808 13526 CAMPUS DR Fee Zone 1 2 $ 15,502.91 Affordable Housing Impact Fee - At Final 3/13/2024 3/22/2024 $ 15,502.91 $ - 4/19/2021 Permit Issued 3/22/2024 RBC2101808 13526 CAMPUS DR Fee Zone 1 2 $ 5,392.00 Capital Improvements Impact Fee 3/13/2024 3/13/2024 $ - $ 5,392.00 4/19/2021 Permit Issued 3/22/2024 RBC2101808 13526 CAMPUS DR Fee Zone 1 2 $ 1,349.00 Transportation Impact Fee 3/13/2024 3/13/2024 $ - $ 1,349.00 4/19/2021 Permit Issued 3/22/2024 RBC2102898 3500 BRUNELL DR Fee Zone 1 1 $ 1,570.93 Affordable Housing Impact Fee - Issuance 7/20/2023 7/20/2023 $ 1,570.93 $ - 6/28/2021 Application Inactive 6/29/2024 RBC2102898 3500 BRUNELL DR Fee Zone 1 1 $ 1,570.93 Affordable Housing Impact Fee - At Final 7/20/2023 7/20/2023 $ 1,570.93 $ - 6/28/2021 Application Inactive 6/29/2024 RBC2102898 3500 BRUNELL DR Fee Zone 1 1 $ 546.00 Capital Improvements Impact Fee 7/20/2023 7/20/2023 $ 546.00 $ - 6/28/2021 Application Inactive 6/29/2024 RBC2102898 3500 BRUNELL DR Fee Zone 1 1 $ 137.00 Transportation Impact Fee 7/20/2023 7/20/2023 $ 137.00 $ - 6/28/2021 Application Inactive 6/29/2024 RBC2202724 6000 MOUNTAIN BLVD Fee Zone 1 1 $ 1,570.93 Affordable Housing Impact Fee - Issuance 9/11/2023 9/11/2023 $ 1,570.93 $ - 8/1/2022 On Hold 9/11/2023 RBC2202724 6000 MOUNTAIN BLVD Fee Zone 1 1 $ 1,570.93 Affordable Housing Impact Fee - At Final 9/11/2023 9/11/2023 $ 1,570.93 $ - 8/1/2022 On Hold 9/11/2023 RBC2202724 6000 MOUNTAIN BLVD Fee Zone 1 1 $ 546.00 Capital Improvements Impact Fee 9/11/2023 9/11/2023 $ 546.00 $ - 8/1/2022 On Hold 9/11/2023 RBC2202724 6000 MOUNTAIN BLVD Fee Zone 1 1 $ 137.00 Transportation Impact Fee 9/11/2023 9/11/2023 $ 137.00 $ - 8/1/2022 On Hold 9/11/2023 RBC2203335 7270 WOODROW DR Fee Zone 1 1 $ 1,570.93 Affordable Housing Impact Fee - Issuance 1/10/2024 1/10/2024 $ - $ 1,570.93 9/12/2022 Permit Issued 1/17/2024 RBC2203335 7270 WOODROW DR Fee Zone 1 1 $ 1,570.93 Affordable Housing Impact Fee - At Final 1/10/2024 1/10/2024 $ - $ 1,570.93 9/12/2022 Permit Issued 1/17/2024 RBC2203335 7270 WOODROW DR Fee Zone 1 1 $ 546.00 Capital Improvements Impact Fee 1/10/2024 1/10/2024 $ - $ 546.00 9/12/2022 Permit Issued 1/17/2024 RBC2203335 7270 WOODROW DR Fee Zone 1 1 $ 137.00 Transportation Impact Fee 1/10/2024 1/10/2024 $ - $ 137.00 9/12/2022 Permit Issued 1/17/2024 RBC2203337 7260 WOODROW DR Fee Zone 1 1 $ 1,570.93 Affordable Housing Impact Fee - Issuance 1/9/2024 1/9/2024 $ - $ 1,570.93 9/12/2022 Permit Issued 1/17/2024 RBC2203337 7260 WOODROW DR Fee Zone 1 1 $ 1,570.93 Affordable Housing Impact Fee - At Final 1/9/2024 1/9/2024 $ - $ 1,570.93 9/12/2022 Permit Issued 1/17/2024 RBC2203337 7260 WOODROW DR Fee Zone 1 1 $ 546.00 Capital Improvements Impact Fee 1/9/2024 1/9/2024 $ - $ 546.00 9/12/2022 Permit Issued 1/17/2024 RBC2203337 7260 WOODROW DR Fee Zone 1 1 $ 137.00 Transportation Impact Fee 1/9/2024 1/9/2024 $ - $ 137.00 9/12/2022 Permit Issued 1/17/2024 RBC2300270 7545 SKYLINE BLVD Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - Issuance 5/11/2024 5/11/2024 $ - $ 15,502.91 1/25/2023 Ready to Issue - Fee Due 5/21/2024 RBC2300270 7545 SKYLINE BLVD Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 5/11/2024 5/11/2024 $ - $ 15,502.91 1/25/2023 Ready to Issue - Fee Due 5/21/2024 RBC2300270 7545 SKYLINE BLVD Fee Zone 1 1 $ 5,392.00 Capital Improvements Impact Fee 5/11/2024 5/11/2024 $ - $ 5,392.00 1/25/2023 Ready to Issue - Fee Due 5/21/2024 RBC2300270 7545 SKYLINE BLVD Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 5/11/2024 5/11/2024 $ - $ 1,349.00 1/25/2023 Ready to Issue - Fee Due 5/21/2024 RBC2301195 984 STANFORD AVE Fee Zone 2 2 $ 2,424.72 Affordable Housing Impact Fee - Issuance 5/8/2024 5/8/2024 $ 2,424.72 $ - 4/18/2023 On Hold 5/9/2024 RBC2301195 984 STANFORD AVE Fee Zone 2 2 $ 2,424.72 Affordable Housing Impact Fee - At Final 5/8/2024 5/8/2024 $ 2,424.72 $ - 4/18/2023 On Hold 5/9/2024 RBC2301195 984 STANFORD AVE Fee Zone 2 2 $ 206.00 Capital Improvements Impact Fee 5/8/2024 5/8/2024 $ 206.00 $ - 4/18/2023 On Hold 5/9/2024 RBC2301195 984 STANFORD AVE Fee Zone 2 2 $ 206.00 Transportation Impact Fee 5/8/2024 5/8/2024 $ 206.00 $ - 4/18/2023 On Hold 5/9/2024 RBC2301213 980 STANFORD AVE Fee Zone 2 2 $ 2,424.72 Affordable Housing Impact Fee - Issuance 5/8/2024 5/8/2024 $ 2,424.72 $ - 4/19/2023 On Hold 5/9/2024 RBC2301213 980 STANFORD AVE Fee Zone 2 2 $ 2,424.72 Affordable Housing Impact Fee - At Final 5/8/2024 5/8/2024 $ 2,424.72 $ - 4/19/2023 On Hold 5/9/2024 RBC2301213 980 STANFORD AVE Fee Zone 2 2 $ 206.00 Capital Improvements Impact Fee 5/8/2024 5/8/2024 $ 206.00 $ - 4/19/2023 On Hold 5/9/2024 RBC2301213 980 STANFORD AVE Fee Zone 2 2 $ 206.00 Transportation Impact Fee 5/8/2024 5/8/2024 $ 206.00 $ - 4/19/2023 On Hold 5/9/2024 RBC2302010 1206 77TH AVE Fee Zone 3 1 $ 5,392.32 Affordable Housing Impact Fee - Issuance 4/24/2024 4/24/2024 $ - $ 5,392.32 7/1/2023 Permit Issued 6/8/2024 RBC2302010 1206 77TH AVE Fee Zone 3 1 $ 5,392.32 Affordable Housing Impact Fee - At Final 4/24/2024 4/24/2024 $ 5,392.32 $ - 7/1/2023 Permit Issued 6/8/2024 RBC2302010 1206 77TH AVE Fee Zone 3 1 $ 1,349.00 Capital Improvements Impact Fee 4/24/2024 4/24/2024 $ - $ 1,349.00 7/1/2023 Permit Issued 6/8/2024 RBC2302010 1206 77TH AVE Fee Zone 3 1 $ 1,349.00 Transportation Impact Fee 4/24/2024 4/24/2024 $ - $ 1,349.00 7/1/2023 Permit Issued 6/8/2024 RBC2302078 2409 25TH AVE Fee Zone 3 1 $ 4,845.91 Affordable Housing Impact Fee - Issuance 7/7/2023 7/11/2023 $ 4,845.91 $ - 7/7/2023 Plan Review In Progress 5/2/2024 RBC2302078 2409 25TH AVE Fee Zone 3 1 $ 4,845.91 Affordable Housing Impact Fee - At Final 7/7/2023 7/11/2023 $ 4,845.91 $ - 7/7/2023 Plan Review In Progress 5/2/2024 RBC2302078 2409 25TH AVE Fee Zone 3 1 $ 1,212.00 Capital Improvements Impact Fee 7/7/2023 7/11/2023 $ 1,212.00 $ - 7/7/2023 Plan Review In Progress 5/2/2024 RBC2302078 2409 25TH AVE Fee Zone 3 1 $ 1,212.00 Transportation Impact Fee 7/7/2023 7/11/2023 $ 1,212.00 $ - 7/7/2023 Plan Review In Progress 5/2/2024 RBC2302686 933 PINE ST Fee Zone 2 1 $ 15,502.91 Affordable Housing Impact Fee - Issuance 8/18/2023 8/25/2023 $ - $ 15,502.91 8/18/2023 Final Check - On Hold 4/14/2024 RBC2302686 933 PINE ST Fee Zone 2 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 8/18/2023 8/25/2023 $ - $ 15,502.91 8/18/2023 Final Check - On Hold 4/14/2024 RBC2302686 933 PINE ST Fee Zone 2 1 $ 5,392.00 Capital Improvements Impact Fee 8/18/2023 8/25/2023 $ - $ 5,392.00 8/18/2023 Final Check - On Hold 4/14/2024 RBC2302686 933 PINE ST Fee Zone 2 1 $ 1,349.00 Transportation Impact Fee 8/18/2023 8/25/2023 $ - $ 1,349.00 8/18/2023 Final Check - On Hold 4/14/2024 RBC2302817 6030 GIRVIN DR Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - Issuance 8/30/2023 8/30/2023 $ - $ 15,502.91 8/30/2023 On Hold 5/8/2024 Record ID
Address
Impact Zone
Housing Units
Amount Assessed
Fee Description
Date Assessed
Date Invoiced
Amount Due
Amount Paid
Application Date
Record Status
Record Status Date
Attachment C - Projects Assessed Impact Fees in FY 2023-2024 Attachment C Final 01.29.2024

RBC2302817 6030 GIRVIN DR Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 8/30/2023 8/30/2023 $ - $ 15,502.91 8/30/2023 On Hold 5/8/2024 RBC2302817 6030 GIRVIN DR Fee Zone 1 1 $ 5,392.00 Capital Improvements Impact Fee 8/30/2023 8/30/2023 $ - $ 5,392.00 8/30/2023 On Hold 5/8/2024 RBC2302817 6030 GIRVIN DR Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 8/30/2023 8/30/2023 $ - $ 1,349.00 8/30/2023 On Hold 5/8/2024 RBC2303089 7720 HILLMONT DR Fee Zone 3 2 $ 5,392.32 Affordable Housing Impact Fee - Issuance 9/25/2023 9/25/2023 $ - $ 5,392.32 9/25/2023 Permit Issued 5/13/2024 RBC2303089 7720 HILLMONT DR Fee Zone 3 2 $ 5,392.32 Affordable Housing Impact Fee - At Final 9/25/2023 9/25/2023 $ - $ 5,392.32 9/25/2023 Permit Issued 5/13/2024 RBC2303089 7720 HILLMONT DR Fee Zone 3 2 $ 1,349.00 Capital Improvements Impact Fee 9/25/2023 9/25/2023 $ - $ 1,349.00 9/25/2023 Permit Issued 5/13/2024 RBC2303089 7720 HILLMONT DR Fee Zone 3 2 $ 1,349.00 Transportation Impact Fee 9/25/2023 9/25/2023 $ - $ 1,349.00 9/25/2023 Permit Issued 5/13/2024 RBC2303099 6375 GIRVIN DR Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - Issuance 9/26/2023 9/26/2023 $ 15,502.91 $ - 9/26/2023 Application Inactive 3/26/2024 RBC2303099 6375 GIRVIN DR Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 9/26/2023 9/26/2023 $ 15,502.91 $ - 9/26/2023 Application Inactive 3/26/2024 RBC2303157 3537 BUTTERS DR Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - Issuance 10/2/2023 10/2/2023 $ - $ 15,502.91 10/2/2023 Permit Issued 5/31/2024 RBC2303157 3537 BUTTERS DR Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 10/2/2023 10/2/2023 $ 15,502.91 $ - 10/2/2023 Permit Issued 5/31/2024 RBC2303157 3537 BUTTERS DR Fee Zone 1 1 $ 5,392.00 Capital Improvements Impact Fee 10/2/2023 10/2/2023 $ - $ 5,392.00 10/2/2023 Permit Issued 5/31/2024 RBC2303157 3537 BUTTERS DR Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 10/2/2023 10/2/2023 $ - $ 1,349.00 10/2/2023 Permit Issued 5/31/2024 RBC2303246 6959 BALSAM WY Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - Issuance 10/9/2023 10/9/2023 $ 15,502.91 $ - 10/9/2023 Application Inactive 4/8/2024 RBC2303246 6959 BALSAM WY Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 10/9/2023 10/9/2023 $ 15,502.91 $ - 10/9/2023 Application Inactive 4/8/2024 RBC2303246 6959 BALSAM WY Fee Zone 1 1 $ 5,392.00 Capital Improvements Impact Fee 10/9/2023 10/9/2023 $ 5,392.00 $ - 10/9/2023 Application Inactive 4/8/2024 RBC2303246 6959 BALSAM WY Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 10/9/2023 10/9/2023 $ 1,349.00 $ - 10/9/2023 Application Inactive 4/8/2024 RBC2303420 6018 GLENARMS DR Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - Issuance 10/24/2023 10/24/2023 $ - $ 15,502.91 10/24/2023 Plan Routing - Completed 5/9/2024 RBC2303420 6018 GLENARMS DR Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 10/24/2023 10/24/2023 $ 15,502.91 $ - 10/24/2023 Plan Routing - Completed 5/9/2024 RBC2303420 6018 GLENARMS DR Fee Zone 1 1 $ 5,392.00 Capital Improvements Impact Fee 10/24/2023 10/24/2023 $ - $ 5,392.00 10/24/2023 Plan Routing - Completed 5/9/2024 RBC2303420 6018 GLENARMS DR Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 10/24/2023 10/24/2023 $ - $ 1,349.00 10/24/2023 Plan Routing - Completed 5/9/2024 RBC2303546 1046 ASHMOUNT AVE Fee Zone 1 1 $ 5,392.00 Capital Improvements Impact Fee 11/3/2023 11/3/2023 $ - $ 5,392.00 11/3/2023 Permit Issued 12/20/2023 RBC2303546 1046 ASHMOUNT AVE Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 11/3/2023 11/3/2023 $ - $ 1,349.00 11/3/2023 Permit Issued 12/20/2023 RBC2303546 1046 ASHMOUNT AVE Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - Issuance 11/3/2023 11/3/2023 $ - $ 15,502.91 11/3/2023 Permit Issued 12/20/2023 RBC2303546 1046 ASHMOUNT AVE Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 11/3/2023 11/3/2023 $ - $ 15,502.91 11/3/2023 Permit Issued 12/20/2023 RBC2303694 1975 WRENN ST Fee Zone 1 2 $ 15,502.91 Affordable Housing Impact Fee - Issuance 11/15/2023 11/16/2023 $ 15,502.91 $ - 11/15/2023 Application Inactive 5/15/2024 RBC2303694 1975 WRENN ST Fee Zone 1 2 $ 15,502.91 Affordable Housing Impact Fee - At Final 11/15/2023 11/16/2023 $ 15,502.91 $ - 11/15/2023 Application Inactive 5/15/2024 RBC2303694 1975 WRENN ST Fee Zone 1 2 $ 5,392.00 Capital Improvements Impact Fee 11/15/2023 11/16/2023 $ 5,392.00 $ - 11/15/2023 Application Inactive 5/15/2024 RBC2303694 1975 WRENN ST Fee Zone 1 2 $ 1,349.00 Transportation Impact Fee 11/15/2023 11/16/2023 $ 1,349.00 $ - 11/15/2023 Application Inactive 5/15/2024 RBC2303870 7635 SKYLINE BLVD Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - Issuance 12/4/2023 12/4/2023 $ 15,502.91 $ - 12/4/2023 Application Inactive 6/3/2024 RBC2303870 7635 SKYLINE BLVD Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 12/4/2023 12/4/2023 $ 15,502.91 $ - 12/4/2023 Application Inactive 6/3/2024 RBC2303870 7635 SKYLINE BLVD Fee Zone 1 1 $ 5,392.00 Capital Improvements Impact Fee 12/4/2023 12/4/2023 $ 5,392.00 $ - 12/4/2023 Application Inactive 6/3/2024 RBC2303870 7635 SKYLINE BLVD Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 12/4/2023 12/4/2023 $ 1,349.00 $ - 12/4/2023 Application Inactive 6/3/2024 RBC2304042 7675 SKYLINE BLVD Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - Issuance 12/19/2023 12/19/2023 $ 15,502.91 $ - 12/19/2023 Application Inactive 6/19/2024 RBC2304042 7675 SKYLINE BLVD Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 12/19/2023 12/19/2023 $ 15,502.91 $ - 12/19/2023 Application Inactive 6/19/2024 RBC2304042 7675 SKYLINE BLVD Fee Zone 1 1 $ 5,392.00 Capital Improvements Impact Fee 12/19/2023 12/19/2023 $ 5,392.00 $ - 12/19/2023 Application Inactive 6/19/2024 RBC2304042 7675 SKYLINE BLVD Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 12/19/2023 12/19/2023 $ 1,349.00 $ - 12/19/2023 Application Inactive 6/19/2024 RBC2400124 1877 NORTHWOOD CT Fee Zone 1 2 $ 15,502.91 Affordable Housing Impact Fee - Issuance 1/5/2024 1/5/2024 $ 15,502.91 $ - 1/5/2024 Final Check - On Hold 5/25/2024 RBC2400124 1877 NORTHWOOD CT Fee Zone 1 2 $ 15,502.91 Affordable Housing Impact Fee - At Final 1/5/2024 1/5/2024 $ 15,502.91 $ - 1/5/2024 Final Check - On Hold 5/25/2024 RBC2400124 1877 NORTHWOOD CT Fee Zone 1 2 $ 5,392.00 Capital Improvements Impact Fee 2/5/2024 2/5/2024 $ 5,392.00 $ - 1/5/2024 Final Check - On Hold 5/25/2024 RBC2400124 1877 NORTHWOOD CT Fee Zone 1 2 $ 1,349.00 Transportation Impact Fee 2/5/2024 2/5/2024 $ 1,349.00 $ - 1/5/2024 Final Check - On Hold 5/25/2024 RBC2400184 1414 15TH ST Fee Zone 2 2 $ 11,121.97 Affordable Housing Impact Fee - Issuance 1/18/2024 1/18/2024 $ 11,121.97 $ - 1/11/2024 On Hold - Fee Due 1/18/2024 RBC2400184 1414 15TH ST Fee Zone 2 2 $ 11,121.97 Affordable Housing Impact Fee - At Final 1/18/2024 1/18/2024 $ 11,121.97 $ - 1/11/2024 On Hold - Fee Due 1/18/2024 RBC2400184 1414 15TH ST Fee Zone 2 2 $ 4,045.00 Capital Improvements Impact Fee 1/18/2024 1/18/2024 $ 4,045.00 $ - 1/11/2024 On Hold - Fee Due 1/18/2024 RBC2400184 1414 15TH ST Fee Zone 2 2 $ 1,349.00 Transportation Impact Fee 1/18/2024 1/18/2024 $ 1,349.00 $ - 1/11/2024 On Hold - Fee Due 1/18/2024 RBC2400191 11190 LOCHARD ST Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - Issuance 1/11/2024 1/11/2024 $ 15,502.91 $ - 1/11/2024 On Hold - Fee Due 5/21/2024 RBC2400191 11190 LOCHARD ST Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 1/11/2024 1/11/2024 $ 15,502.91 $ - 1/11/2024 On Hold - Fee Due 5/21/2024 Record ID
Address
Impact Zone
Housing Units
Amount Assessed
Fee Description
Date Assessed
Date Invoiced
Amount Due
Amount Paid
Application Date
Record Status
Record Status Date
Attachment C - Projects Assessed Impact Fees in FY 2023-2024 Attachment C Final 01.29.2024

RBC2400191 11190 LOCHARD ST Fee Zone 1 1 $ 5,392.00 Capital Improvements Impact Fee 1/11/2024 1/11/2024 $ 5,392.00 $ - 1/11/2024 On Hold - Fee Due 5/21/2024 RBC2400191 11190 LOCHARD ST Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 1/11/2024 1/11/2024 $ 1,349.00 $ - 1/11/2024 On Hold - Fee Due 5/21/2024 RBC2400345 2201 SANTA RITA ST Fee Zone 3 2 $ 5,392.32 Affordable Housing Impact Fee - Issuance 1/23/2024 2/11/2024 $ - $ 5,392.32 1/23/2024 Plan Routing - Completed 3/4/2024 RBC2400345 2201 SANTA RITA ST Fee Zone 3 2 $ 5,392.32 Affordable Housing Impact Fee - At Final 1/23/2024 2/11/2024 $ - $ 5,392.32 1/23/2024 Plan Routing - Completed 3/4/2024 RBC2400345 2201 SANTA RITA ST Fee Zone 3 2 $ 1,349.00 Capital Improvements Impact Fee 1/23/2024 2/11/2024 $ - $ 1,349.00 1/23/2024 Plan Routing - Completed 3/4/2024 RBC2400345 2201 SANTA RITA ST Fee Zone 3 2 $ 1,349.00 Transportation Impact Fee 1/23/2024 2/11/2024 $ - $ 1,349.00 1/23/2024 Plan Routing - Completed 3/4/2024 RBC2400363 15 HOMEGLEN LN Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - Issuance 4/24/2024 4/24/2024 $ - $ 15,502.91 1/24/2024 Permit Issued 5/14/2024 RBC2400363 15 HOMEGLEN LN Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 4/24/2024 4/24/2024 $ - $ 15,502.91 1/24/2024 Permit Issued 5/14/2024 RBC2400363 15 HOMEGLEN LN Fee Zone 1 1 $ 5,392.00 Capital Improvements Impact Fee 4/24/2024 4/24/2024 $ - $ 5,392.00 1/24/2024 Permit Issued 5/14/2024 RBC2400363 15 HOMEGLEN LN Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 4/24/2024 4/24/2024 $ - $ 1,349.00 1/24/2024 Permit Issued 5/14/2024 RBC2400419 7001 BALSAM WY Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - Issuance 1/30/2024 1/30/2024 $ 15,502.91 $ - 1/30/2024 Plan Review In Progress 5/7/2024 RBC2400419 7001 BALSAM WY Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 1/30/2024 1/30/2024 $ 15,502.91 $ - 1/30/2024 Plan Review In Progress 5/7/2024 RBC2400419 7001 BALSAM WY Fee Zone 1 1 $ 5,392.00 Capital Improvements Impact Fee 1/30/2024 1/30/2024 $ 5,392.00 $ - 1/30/2024 Plan Review In Progress 5/7/2024 RBC2400419 7001 BALSAM WY Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 1/30/2024 1/30/2024 $ 1,349.00 $ - 1/30/2024 Plan Review In Progress 5/7/2024 RBC2400457 761 CALMAR AVE Fee Zone 3 1 $ 5,392.32 Affordable Housing Impact Fee - Issuance 2/1/2024 2/1/2024 $ - $ 5,392.32 2/1/2024 Permit Issued 3/21/2024 RBC2400457 761 CALMAR AVE Fee Zone 3 1 $ 5,392.32 Affordable Housing Impact Fee - At Final 2/1/2024 2/1/2024 $ - $ 5,392.32 2/1/2024 Permit Issued 3/21/2024 RBC2400457 761 CALMAR AVE Fee Zone 3 1 $ 1,349.00 Capital Improvements Impact Fee 2/1/2024 2/1/2024 $ - $ 1,349.00 2/1/2024 Permit Issued 3/21/2024 RBC2400457 761 CALMAR AVE Fee Zone 3 1 $ 1,349.00 Transportation Impact Fee 2/1/2024 2/1/2024 $ - $ 1,349.00 2/1/2024 Permit Issued 3/21/2024 RBC2400484 6776 PINEHAVEN RD Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - Issuance 2/2/2024 4/12/2024 $ 15,502.91 $ - 2/2/2024 On Hold - Fee Due 4/12/2024 RBC2400484 6776 PINEHAVEN RD Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 2/2/2024 4/12/2024 $ 15,502.91 $ - 2/2/2024 On Hold - Fee Due 4/12/2024 RBC2400484 6776 PINEHAVEN RD Fee Zone 1 1 $ 5,392.00 Capital Improvements Impact Fee 2/2/2024 4/12/2024 $ 5,392.00 $ - 2/2/2024 On Hold - Fee Due 4/12/2024 RBC2400484 6776 PINEHAVEN RD Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 2/2/2024 4/12/2024 $ 1,349.00 $ - 2/2/2024 On Hold - Fee Due 4/12/2024 RBC2400787 2533 23RD AVE Fee Zone 2 2 $ 19,209.81 Affordable Housing Impact Fee - Issuance 3/20/2024 3/21/2024 $ 19,209.81 $ - 2/26/2024 Plan Routing - Completed 3/27/2024 RBC2400787 2533 23RD AVE Fee Zone 2 2 $ 19,209.81 Affordable Housing Impact Fee - At Final 3/20/2024 3/21/2024 $ 19,209.81 $ - 2/26/2024 Plan Routing - Completed 3/27/2024 RBC2400787 2533 23RD AVE Fee Zone 2 2 $ 5,392.00 Capital Improvements Impact Fee 3/20/2024 3/21/2024 $ 5,392.00 $ - 2/26/2024 Plan Routing - Completed 3/27/2024 RBC2400787 2533 23RD AVE Fee Zone 2 2 $ 2,698.00 Transportation Impact Fee 3/20/2024 3/21/2024 $ 2,698.00 $ - 2/26/2024 Plan Routing - Completed 3/27/2024 RBC2400880 6951 CHARING CROSS RD Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - Issuance 3/12/2024 3/12/2024 $ 15,502.91 $ - 3/2/2024 On Hold - Fee Due 3/12/2024 RBC2400880 6951 CHARING CROSS RD Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 3/12/2024 3/12/2024 $ 15,502.91 $ - 3/2/2024 On Hold - Fee Due 3/12/2024 RBC2400880 6951 CHARING CROSS RD Fee Zone 1 1 $ 5,392.00 Capital Improvements Impact Fee 3/12/2024 3/12/2024 $ 5,392.00 $ - 3/2/2024 On Hold - Fee Due 3/12/2024 RBC2400880 6951 CHARING CROSS RD Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 3/12/2024 3/12/2024 $ 1,349.00 $ - 3/2/2024 On Hold - Fee Due 3/12/2024 RBC2400889 6703 EXETER DR Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - Issuance 3/12/2024 3/12/2024 $ 15,502.91 $ - 3/3/2024 Plan Routing - Completed 4/9/2024 RBC2400889 6703 EXETER DR Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 3/12/2024 3/12/2024 $ 15,502.91 $ - 3/3/2024 Plan Routing - Completed 4/9/2024 RBC2400889 6703 EXETER DR Fee Zone 1 1 $ 5,392.00 Capital Improvements Impact Fee 3/12/2024 3/12/2024 $ 5,392.00 $ - 3/3/2024 Plan Routing - Completed 4/9/2024 RBC2400889 6703 EXETER DR Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 3/12/2024 3/12/2024 $ 1,349.00 $ - 3/3/2024 Plan Routing - Completed 4/9/2024 RBC2400946 2607 22ND AVE Fee Zone 2 2 $ 19,209.81 Affordable Housing Impact Fee - Issuance 3/20/2024 3/21/2024 $ 19,209.81 $ - 3/7/2024 Plan Routing - Completed 3/27/2024 RBC2400946 2607 22ND AVE Fee Zone 2 2 $ 19,209.81 Affordable Housing Impact Fee - At Final 3/20/2024 3/21/2024 $ 19,209.81 $ - 3/7/2024 Plan Routing - Completed 3/27/2024 RBC2400946 2607 22ND AVE Fee Zone 2 2 $ 5,392.00 Capital Improvements Impact Fee 3/20/2024 3/21/2024 $ 5,392.00 $ - 3/7/2024 Plan Routing - Completed 3/27/2024 RBC2400946 2607 22ND AVE Fee Zone 2 2 $ 2,698.00 Transportation Impact Fee 3/20/2024 3/21/2024 $ 2,698.00 $ - 3/7/2024 Plan Routing - Completed 3/27/2024 RBC2401256 4031 PARK BLVD Fee Zone 1 1 $ 4,045.00 Capital Improvements Impact Fee 3/28/2024 3/29/2024 $ - $ 4,045.00 3/28/2024 On Hold 5/20/2024 RBC2401256 4031 PARK BLVD Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 3/28/2024 3/29/2024 $ - $ 1,349.00 3/28/2024 On Hold 5/20/2024 RBC2401257 4033 PARK BLVD Fee Zone 1 1 $ 4,045.00 Capital Improvements Impact Fee 3/28/2024 3/29/2024 $ - $ 4,045.00 3/28/2024 On Hold 5/20/2024 RBC2401257 4033 PARK BLVD Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 3/28/2024 3/29/2024 $ - $ 1,349.00 3/28/2024 On Hold 5/20/2024 RBC2401258 4035 PARK BLVD Fee Zone 1 1 $ 4,045.00 Capital Improvements Impact Fee 3/29/2024 3/29/2024 $ - $ 4,045.00 3/28/2024 On Hold 5/20/2024 RBC2401258 4035 PARK BLVD Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 3/29/2024 3/29/2024 $ - $ 1,349.00 3/28/2024 On Hold 5/20/2024 RBC2401259 4037 PARK BLVD Fee Zone 1 0 $ 1,349.00 Transportation Impact Fee 3/29/2024 3/29/2024 $ - $ 1,349.00 3/28/2024 On Hold 5/20/2024 RBC2401259 4037 PARK BLVD Fee Zone 1 0 $ 4,045.00 Capital Improvements Impact Fee 3/29/2024 3/29/2024 $ - $ 4,045.00 3/28/2024 On Hold 5/20/2024 RBC2401260 4039 PARK BLVD Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 3/29/2024 3/29/2024 $ - $ 1,349.00 3/28/2024 On Hold 5/20/2024 Record ID
Address
Impact Zone
Housing Units
Amount Assessed
Fee Description
Date Assessed
Date Invoiced
Amount Due
Amount Paid
Application Date
Record Status
Record Status Date
Attachment C - Projects Assessed Impact Fees in FY 2023-2024 Attachment C Final 01.29.2024

RBC2401261 1231 HAMPEL ST Fee Zone 1 1 $ 4,045.00 Capital Improvements Impact Fee 3/29/2024 3/29/2024 $ - $ 4,045.00 3/28/2024 On Hold 5/19/2024 RBC2401261 1231 HAMPEL ST Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 3/29/2024 3/29/2024 $ - $ 1,349.00 3/28/2024 On Hold 5/19/2024 RBC2401262 1233 HAMPEL ST Fee Zone 1 1 $ 4,045.00 Capital Improvements Impact Fee 3/29/2024 3/29/2024 $ - $ 4,045.00 3/28/2024 On Hold 5/20/2024 RBC2401262 1233 HAMPEL ST Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 3/29/2024 3/29/2024 $ - $ 1,349.00 3/28/2024 On Hold 5/20/2024 RBC2401263 1235 HAMPEL ST Fee Zone 1 1 $ 4,045.00 Capital Improvements Impact Fee 3/29/2024 3/29/2024 $ - $ 4,045.00 3/28/2024 On Hold 5/19/2024 RBC2401263 1235 HAMPEL ST Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 3/29/2024 3/29/2024 $ - $ 1,349.00 3/28/2024 On Hold 5/19/2024 RBC2401267 769 CALMAR AVE Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - Issuance 3/29/2024 3/29/2024 $ - $ 15,502.91 3/29/2024 Permit Issued 5/16/2024 RBC2401267 769 CALMAR AVE Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 3/29/2024 3/29/2024 $ - $ 15,502.91 3/29/2024 Permit Issued 5/16/2024 RBC2401267 769 CALMAR AVE Fee Zone 1 1 $ 5,392.00 Capital Improvements Impact Fee 3/29/2024 3/29/2024 $ - $ 5,392.00 3/29/2024 Permit Issued 5/16/2024 RBC2401267 769 CALMAR AVE Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 3/29/2024 3/29/2024 $ - $ 1,349.00 3/29/2024 Permit Issued 5/16/2024 RBC2401270 6661 SKYLINE BLVD Fee Zone 1 1 $ 5,392.00 Capital Improvements Impact Fee 4/12/2024 5/14/2024 $ - $ 5,392.00 3/29/2024 Plan Review In Progress 6/17/2024 RBC2401270 6661 SKYLINE BLVD Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 4/12/2024 5/14/2024 $ - $ 1,349.00 3/29/2024 Plan Review In Progress 6/17/2024 RBC2401270 6661 SKYLINE BLVD Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - Issuance 5/14/2024 5/14/2024 $ - $ 15,502.91 3/29/2024 Plan Review In Progress 6/17/2024 RBC2401270 6661 SKYLINE BLVD Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 5/14/2024 5/14/2024 $ - $ 15,502.91 3/29/2024 Plan Review In Progress 6/17/2024 RBC2401331 7014 HAMILTON ST Fee Zone 3 1 $ 1,349.00 Transportation Impact Fee 4/4/2024 4/4/2024 $ 1,349.00 $ - 4/4/2024 On Hold - Fee Due 4/4/2024 RBC2401331 7014 HAMILTON ST Fee Zone 3 1 $ 5,392.32 Affordable Housing Impact Fee - Issuance 4/4/2024 4/4/2024 $ 5,392.32 $ - 4/4/2024 On Hold - Fee Due 4/4/2024 RBC2401331 7014 HAMILTON ST Fee Zone 3 1 $ 5,392.32 Affordable Housing Impact Fee - At Final 4/4/2024 4/4/2024 $ 5,392.32 $ - 4/4/2024 On Hold - Fee Due 4/4/2024 RBC2401331 7014 HAMILTON ST Fee Zone 3 1 $ 1,349.00 Capital Improvements Impact Fee 4/4/2024 4/4/2024 $ 1,349.00 $ - 4/4/2024 On Hold - Fee Due 4/4/2024 RBC2401337 15435 SKYLINE BLVD Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - Issuance 4/5/2024 4/5/2024 $ 15,502.91 $ - 4/5/2024 On Hold - Fee Due 4/5/2024 RBC2401337 15435 SKYLINE BLVD Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 4/5/2024 4/5/2024 $ 15,502.91 $ - 4/5/2024 On Hold - Fee Due 4/5/2024 RBC2401337 15435 SKYLINE BLVD Fee Zone 1 1 $ 5,392.00 Capital Improvements Impact Fee 4/5/2024 4/5/2024 $ 5,392.00 $ - 4/5/2024 On Hold - Fee Due 4/5/2024 RBC2401337 15435 SKYLINE BLVD Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 4/5/2024 4/5/2024 $ 1,349.00 $ - 4/5/2024 On Hold - Fee Due 4/5/2024 RBC2401339 15535 SKYLINE BLVD Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - Issuance 4/5/2024 4/5/2024 $ 15,502.91 $ - 4/5/2024 Final Check - On Hold 6/29/2024 RBC2401339 15535 SKYLINE BLVD Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 4/5/2024 4/5/2024 $ 15,502.91 $ - 4/5/2024 Final Check - On Hold 6/29/2024 RBC2401339 15535 SKYLINE BLVD Fee Zone 1 1 $ 5,392.00 Capital Improvements Impact Fee 4/5/2024 4/5/2024 $ 5,392.00 $ - 4/5/2024 Final Check - On Hold 6/29/2024 RBC2401339 15535 SKYLINE BLVD Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 4/5/2024 4/5/2024 $ 1,349.00 $ - 4/5/2024 Final Check - On Hold 6/29/2024 RBC2401516 6735 SIMS DR Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - Issuance 4/20/2024 4/20/2024 $ 15,502.91 $ - 4/20/2024 On Hold 6/3/2024 RBC2401516 6735 SIMS DR Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 4/20/2024 4/20/2024 $ 15,502.91 $ - 4/20/2024 On Hold 6/3/2024 RBC2401516 6735 SIMS DR Fee Zone 1 1 $ 5,392.00 Capital Improvements Impact Fee 4/20/2024 4/20/2024 $ 5,392.00 $ - 4/20/2024 On Hold 6/3/2024 RBC2401516 6735 SIMS DR Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 4/20/2024 4/20/2024 $ 1,349.00 $ - 4/20/2024 On Hold 6/3/2024 RBC2401523 4110 ALLENDALE AVE Fee Zone 3 1 $ 5,392.32 Affordable Housing Impact Fee - Issuance 4/22/2024 4/22/2024 $ 5,392.32 $ - 4/22/2024 On Hold - Fee Due 4/22/2024 RBC2401523 4110 ALLENDALE AVE Fee Zone 3 1 $ 5,392.32 Affordable Housing Impact Fee - At Final 4/22/2024 4/22/2024 $ 5,392.32 $ - 4/22/2024 On Hold - Fee Due 4/22/2024 RBC2401523 4110 ALLENDALE AVE Fee Zone 3 1 $ 1,349.00 Capital Improvements Impact Fee 4/22/2024 4/22/2024 $ 1,349.00 $ - 4/22/2024 On Hold - Fee Due 4/22/2024 RBC2401523 4110 ALLENDALE AVE Fee Zone 3 1 $ 1,349.00 Transportation Impact Fee 4/22/2024 4/22/2024 $ 1,349.00 $ - 4/22/2024 On Hold - Fee Due 4/22/2024 RBC2401550 6701 SNAKE RD Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - Issuance 4/23/2024 4/24/2024 $ 15,502.91 $ - 4/23/2024 On Hold 6/19/2024 RBC2401550 6701 SNAKE RD Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 4/23/2024 4/24/2024 $ 15,502.91 $ - 4/23/2024 On Hold 6/19/2024 RBC2401550 6701 SNAKE RD Fee Zone 1 1 $ 5,392.00 Capital Improvements Impact Fee 4/23/2024 4/24/2024 $ 5,392.00 $ - 4/23/2024 On Hold 6/19/2024 RBC2401550 6701 SNAKE RD Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 4/23/2024 4/24/2024 $ 1,349.00 $ - 4/23/2024 On Hold 6/19/2024 RBC2401666 3700 WEST ST Fee Zone 2 1 $ 11,121.97 Affordable Housing Impact Fee - Issuance 5/3/2024 5/3/2024 $ 11,121.97 $ - 5/3/2024 On Hold - Fee Due 5/3/2024 RBC2401666 3700 WEST ST Fee Zone 2 1 $ 11,121.97 Affordable Housing Impact Fee - At Final 5/3/2024 5/3/2024 $ 11,121.97 $ - 5/3/2024 On Hold - Fee Due 5/3/2024 RBC2401666 3700 WEST ST Fee Zone 2 1 $ 4,045.00 Capital Improvements Impact Fee 5/3/2024 5/3/2024 $ 4,045.00 $ - 5/3/2024 On Hold - Fee Due 5/3/2024 RBC2401666 3700 WEST ST Fee Zone 2 1 $ 1,349.00 Transportation Impact Fee 5/3/2024 5/3/2024 $ 1,349.00 $ - 5/3/2024 On Hold - Fee Due 5/3/2024 RBC2401721 7009 SHIRLEY DR Fee Zone 1 2 $ 11,121.97 Affordable Housing Impact Fee - Issuance 5/8/2024 5/8/2024 $ 11,121.97 $ - 5/8/2024 Intake - On Hold 5/8/2024 RBC2401721 7009 SHIRLEY DR Fee Zone 1 2 $ 11,121.97 Affordable Housing Impact Fee - At Final 5/8/2024 5/8/2024 $ 11,121.97 $ - 5/8/2024 Intake - On Hold 5/8/2024 RBC2401721 7009 SHIRLEY DR Fee Zone 1 2 $ 4,045.00 Capital Improvements Impact Fee 5/8/2024 5/8/2024 $ 4,045.00 $ - 5/8/2024 Intake - On Hold 5/8/2024 RBC2401721 7009 SHIRLEY DR Fee Zone 1 2 $ 1,349.00 Transportation Impact Fee 5/8/2024 5/8/2024 $ 1,349.00 $ - 5/8/2024 Intake - On Hold 5/8/2024 RBC2401934 2130 35TH AVE Fee Zone 3 2 $ 5,392.32 Affordable Housing Impact Fee - Issuance 5/23/2024 5/23/2024 $ 5,392.32 $ - 5/21/2024 On Hold - Fee Due 6/3/2024 Record ID
Address
Impact Zone
Housing Units
Amount Assessed
Fee Description
Date Assessed
Date Invoiced
Amount Due
Amount Paid
Application Date
Record Status
Record Status Date
Attachment C - Projects Assessed Impact Fees in FY 2023-2024 Attachment C Final 01.29.2024

RBC2401934 2130 35TH AVE Fee Zone 3 2 $ 5,392.32 Affordable Housing Impact Fee - At Final 5/23/2024 5/23/2024 $ 5,392.32 $ - 5/21/2024 On Hold - Fee Due 6/3/2024 RBC2401934 2130 35TH AVE Fee Zone 3 2 $ 1,349.00 Capital Improvements Impact Fee 5/23/2024 5/23/2024 $ 1,349.00 $ - 5/21/2024 On Hold - Fee Due 6/3/2024 RBC2401934 2130 35TH AVE Fee Zone 3 2 $ 1,349.00 Transportation Impact Fee 5/23/2024 5/23/2024 $ 1,349.00 $ - 5/21/2024 On Hold - Fee Due 6/3/2024 RBC2402178 73 AGNES ST Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - Issuance 6/12/2024 6/12/2024 $ 15,502.91 $ - 6/11/2024 On Hold - Fee Due 6/12/2024 RBC2402178 73 AGNES ST Fee Zone 1 1 $ 15,502.91 Affordable Housing Impact Fee - At Final 6/12/2024 6/12/2024 $ 15,502.91 $ - 6/11/2024 On Hold - Fee Due 6/12/2024 RBC2402178 73 AGNES ST Fee Zone 1 1 $ 5,392.00 Capital Improvements Impact Fee 6/12/2024 6/12/2024 $ 5,392.00 $ - 6/11/2024 On Hold - Fee Due 6/12/2024 RBC2402178 73 AGNES ST Fee Zone 1 1 $ 1,349.00 Transportation Impact Fee 6/12/2024 6/12/2024 $ 1,349.00 $ - 6/11/2024 On Hold - Fee Due 6/12/2024 RBC2402267 3722 GLEN PARK RD Fee Zone 1 1 $ 4,845.91 Affordable Housing Impact Fee - Issuance 6/18/2024 6/18/2024 $ 4,845.91 $ - 6/18/2024 On Hold - Fee Due 6/18/2024 RBC2402267 3722 GLEN PARK RD Fee Zone 1 1 $ 4,845.91 Affordable Housing Impact Fee - At Final 6/18/2024 6/18/2024 $ 4,845.91 $ - 6/18/2024 On Hold - Fee Due 6/18/2024 RBC2402267 3722 GLEN PARK RD Fee Zone 1 1 $ 1,212.00 Capital Improvements Impact Fee 6/18/2024 6/18/2024 $ 1,212.00 $ - 6/18/2024 On Hold - Fee Due 6/18/2024 RBC2402267 3722 GLEN PARK RD Fee Zone 1 1 $ 1,212.00 Transportation Impact Fee 6/18/2024 6/18/2024 $ 1,212.00 $ - 6/18/2024 On Hold - Fee Due 6/18/2024 RBC2402330 914 70TH AVE Fee Zone 3 2 $ 5,392.32 Affordable Housing Impact Fee - Issuance 6/27/2024 6/27/2024 $ 5,392.32 $ - 6/25/2024 On Hold - Fee Due 6/27/2024 RBC2402330 914 70TH AVE Fee Zone 3 2 $ 5,392.32 Affordable Housing Impact Fee - At Final 6/27/2024 6/27/2024 $ 5,392.32 $ - 6/25/2024 On Hold - Fee Due 6/27/2024 RBC2402330 914 70TH AVE Fee Zone 3 2 $ 1,349.00 Capital Improvements Impact Fee 6/27/2024 6/27/2024 $ 1,349.00 $ - 6/25/2024 On Hold - Fee Due 6/27/2024 RBC2402330 914 70TH AVE Fee Zone 3 2 $ 1,349.00 Transportation Impact Fee 6/27/2024 6/27/2024 $ 1,349.00 $ - 6/25/2024 On Hold - Fee Due 6/27/2024 RBC2402340 6000 COLTON BLVD Fee Zone 1 2 $ 13,931.98 Affordable Housing Impact Fee - Issuance 6/26/2024 6/26/2024 $ 13,931.98 $ - 6/26/2024 On Hold - Fee Due 6/26/2024 RBC2402340 6000 COLTON BLVD Fee Zone 1 2 $ 13,931.98 Affordable Housing Impact Fee - At Final 6/26/2024 6/26/2024 $ 13,931.98 $ - 6/26/2024 On Hold - Fee Due 6/26/2024 RBC2402340 6000 COLTON BLVD Fee Zone 1 2 $ 4,846.00 Capital Improvements Impact Fee 6/26/2024 6/26/2024 $ 4,846.00 $ - 6/26/2024 On Hold - Fee Due 6/26/2024 RBC2402340 6000 COLTON BLVD Fee Zone 1 2 $ 1,212.00 Transportation Impact Fee 6/26/2024 6/26/2024 $ 1,212.00 $ - 6/26/2024 On Hold - Fee Due 6/26/2024

Record ID
Address
Impact Zone
Housing Units
Amount Assessed
Fee Description
Date Assessed
Date Invoiced
Amount Due
Amount Paid
Application Date
Record Status
Record Status Date