Cities Index.
View Attachment A

Oakland City Council
July 15, 2025

Document
View Attachment A
Meeting
July 15, 2025
Body
Oakland City Council
Original file
484 KB
Text extracted from the city's file for reading and search. Open the original on oakland.legistar1.com. That file is the official record.

INTER OFFICE MEMORANDUM
Department of Workplace and Employment Standards (DWES)

TO: Pablo Miras, FROM: Shelley Darensburg,
Civil Engineer Contract Compliance Supervisor

PREPARED BY: Paula Peav, DATE: February 11, 2025
Contract Compliance Officer

SUBJECT: Compliance Analysis- Citywide Pavement Rehab 2024A Project No. 1007572

The Department of Workplace and Employment Standards (DWES) conducted a Compliance Analysis of three (3) bids submitted to the City in response to the above referenced project.

The Local and Small Local Business Enterprise (L/SLBE) participation requirement for this project was set at 20%: 15% LBE and 5% SLBE. Specialty items have been excluded from the contractor’s overall bid price for purposes of determining compliance with the minimum 20% L/SLBE requirement.

All firms met the 20%: 15% LBE and 5% minimum requirement. All firms have also been awarded Bid Discounts as summarized below:

Bidder

Original
Bid Amount

Specialty
Dollar Amount

Non-Specialty
Dollar Amount

Proposed versus Credited L/SLBE Participation
Trucking Met
L/SLBE Met
Earned Bid
Discounts

LBE

PROPOSED

LBE

CREDITED

SLBE

PROPOSED

SLBE

CREDITED

VSLBE

PROPOSED

VSLBE

CREDITED

TOTAL

CREDITED
Yes
or
No
Yes
or
No

2-
10%
Gallagher &
Burk, Inc.
$25,740,000 $1,077,500 $24,662,500 70.76% 15.00% 10.69% 10.69% 0% 0% 25.69% Yes Yes 2% McGuire
and Hester
$25,948,875 $1,835,000 $24,113,875 25.4% 15.00% 9.17% 9.17% 4.30% 8.61% 32.78% Yes Yes 3% Teichert
Construction
$27,994,780 $3,645,000 $24,349,780 19.75% 15.00% 8.72% 8.72% 0% 0% 23.72% Yes Yes 2%

Please contact Paula Peav, Contract Compliance Officer, at [email protected] or (510) 238-3190 with any questions.

Project Name:

Project No.: 1007572
Discipline Prime & Subs Location Cert. LBE/LPG SLBE VSLBE Total L/SLBE VSLBE Total Non-Specialty Bid Amount
TOTAL

ORIGINAL BID
AMOUNT
Status double counted
value
LBE/SLBE Trucking Trucking Trucking Dollars Dollars Ethn. MBE WBE PRIME Gallagher & Burk Inc Oakland CB 5,908,825 5,908,825 5,908,825 5,908,825 C Materials
Gallagher & Burk
Materials Oakland CB 4,845,400 4,845,400 4,845,400 4,845,400 C Trucking Double D Trucking Dublin UB 100,000 100,000 C
Adjust Iron Monroe Trucking Oakland CB 2,520,000 2,520,000 2,520,000 2,520,000 2,520,000 2,520,000 AA 2,520,000 Minor Concrete &
Related
Rosas Brothers
Construction Oakland CB 6,697,000 6,697,000 6,697,000 6,697,000 H 6,697,000 Crack Seal & Slurry
Seal Bond Blacktop Inc Union City UB 302,250 C
Striping & Signs,
Channelizers Chrisp Company Fremont UB 4,474,275 5,249,525 C Railroad Track & Tree
Stumps Removal
Dekay Demolition &
Clearing Oakland CB 117,000 117,000 117,000 117,000 O 117,000 Adjust Iron TDW Construction Livermore UB 888,500 888,500 H 888,500 17,451,225 2,637,000 0 20,088,225 2,520,000 0 2,520,000 24,662,500 25,740,000 9,334,000 0

70.760 10.692 0.000 81.453 100.000 0.000 100.000 100.000 36.263 0.000 Adjust Iron
LBE/LPG SLBE VSLBE Total L/SLBE VSLBE Total Non-Specialty Bid Amount
TOTAL

ORIGINAL BID
AMOUNT
LBE = Local Business Enterprise UB = Uncertified Business AA = African American
SLBE = Small Local Business Enterprise CB = Certified Business AI = Asian Indian Total LBE/SLBE = All Certified Local and Small Local Businesses MBE = Minority Business Enterprise AP = Asian Pacific NPLBE = NonProfit Local Business Enterprise WBE = Women Business Enterprise C = Caucasian NPSLBE = NonProfit Small Local Business Enterprise H = Hispanic NA = Native American
O = Other
NL = Not Listed
MO - Multiple Ownership
Percentages %
Project Totals

LBE/SLBE PARTICIPATION
BIDDER 1
For Tracking Only
Citywide Pavement Rehabilitation 2024A
Requirements: The 50% requirements is a combination of 25% LBE and 25% SLBE participation. An SLBE firm can be counted 100% towards achieving 50% requirements. A VSLBE's participation is double counted toward meeting the PROJECT NO.:

PROJECT NAME:

CONTRACTOR: Gallagher & Burk Inc Contractor's Bid Amount: $25,740,000 Specialty Dollar Amount Non-Specialty Bid Amount Discount Points:
$1,077,500 $ 24,662,500 2%

1. Did the 20% local/small local requirements apply? YES (15% LBE, 5% SLBE)

2. Did the contractor meet the 20% requirement? YES

PROPOSED CREDITED

70.76% 15.00%

10.69% 10.69%

0.00% 0.00%

81.45% 25.69%
YES
a) Total SLBE/LBE trucking participation 100%

4. Did the contractor receive bid discounts? YES
(If yes, list the percentage received) 2%

5. Additional Comments.
2/11/25
Date
Reviewing
Officer: Date:

Approved By: Date:

DEPARTMENT OF WORKPLACE & EMPLOYMENT STANDARDS
Contracts and Compliance Unit

PROJECT EVALUATION FORM
1007572
Citywide Pavement Rehabilitation 2024A
a) % of LBE participation
d) Total % L/SLBE participation
Shelley Darensburg 2/11/2025
b) % of SLBE participation
c) % of VSLBE participation

3. Did the contractor meet the Trucking requirement?

6. Date evaluation completed and returned to Contract Admin./Initiating Dept.

Paula Peav 2/11/2025

Project Name:

Project No.: 1007572
Discipline Prime & Subs Location Cert. LBE/LPG SLBE VSLBE Total L/SLBE VSLBE Total Non-Specialty Bid Amount
TOTAL

ORIGINAL BID
AMOUNTStatus double counted value LBE/SLBE Trucking Trucking Trucking Dollars Dollars Ethn. MBE WBE PRIME McGuire & Hester Oakland CB 6,125,372 6,125,372 6,125,372 6,125,372 C Adjust Iron
D's General
Engineering Oakland CB 1,038,000 1,038,000 1,038,000 1,038,000 H 1038000.00 Concrete RK Engineering SF UB 6,243,250 6,243,250 C
Crack Seal & Slurry
Seal
Bond Blacktop Inc
Union City UB 302,250 C 302250.00
Trucking
D's Trucking Services
Inc Oakland CB 2,210,644 2,210,644 2,210,644 2,210,644 2,210,644 2,210,644 H 2210644.00 Hot Mix Asphalt Dutra Materials Richmond UB 4,028,206 4,028,206 C Grinding
Pavement Recycling
Systems Jurupa Valley UB 383,828 383,828 C
Striping Chrisp Company Bloomington UB 3,716,775 5,249,525 C Survey
Benchmark
Engineering Modesto UB 93,000 93,000 O 93000.00
Tack Oil Pacific Northwest Oil Stockton UB 274,800 274,800 O 274800.00 6,125,372 2,210,644 1,038,000 9,374,016 2,210,644 0 2,210,644 24,113,875 25,948,875 3,616,444 302,250

25.402 9.168 8.609 38.874 100.000 0.000 100.000 100.000 13.937 1.165 LBE/LPG SLBE VSLBE Total L/SLBE Total Non-Specialty
Bid Amount
TOTAL

ORIGINAL BID
AMOUNT
LBE = Local Business Enterprise UB = Uncertified Business AA = African American SLBE = Small Local Business Enterprise CB = Certified Business AI = Asian Indian Total LBE/SLBE = All Certified Local and Small Local Businesses MBE = Minority Business Enterprise AP = Asian Pacific NPLBE = NonProfit Local Business Enterprise WBE = Women Business Enterprise C = Caucasian NPSLBE = NonProfit Small Local Business Enterprise H = Hispanic LBE/LPG = Local Produced Goods LBE NA = Native American O = Other
NL = Not Listed
MO - Multiple Ownership
Percentages %
Project Totals

LBE/SLBE PARTICIPATION
BIDDER 2
Citywide Pavement Rehabilitation 2024A
For Tracking Only
Requirements: The 50% requirements is a combination of 25% LBE and 25% SLBE participation. An SLBE firm can be counted 100% towards achieving 50% requirements. A VSLBE's participation is double counted toward meeting the PROJECT NO.:

PROJECT NAME:

CONTRACTOR: McGuire & Hester Contractor's Bid Amount: $25,948,875 Specialty Dollar Amount Non-Specialty Bid Amount Discount Points:
$1,835,000 3%\

1. Did the 20% local/small local requirements apply? YES (15% LBE, 5% SLBE)

2. Did the contractor meet the 20% requirement? YES

PROPOSED CREDITED

25.40% 15.00%

9.17% 9.17%

4.30% 8.61%

38.87% 32.78%
YES
a) Total SLBE/LBE trucking participation 100%

4. Did the contractor receive bid discounts? YES

(If yes, list the percentage received) 3%

5. Additional Comments.
2/11/2025
Date
Reviewing
Officer: Date:

Approved By: Date:

Paula Peav
Shelley Darensburg
b) % of SLBE participation

3. Did the contractor meet the Trucking requirement?

6. Date evaluation completed and returned to Contract Admin./Initiating Dept.

VSLBE participation was double counted.
2/11/2025
2/11/2025
c) % of VSLBE participation
d) Total % of L/S/VSLBE
24,113,875
a) % of LBE participation
Citywide Pavement Rehabilitation 2024A

DEPARTMENT OF WORKPLACE & EMPLOYMENT STANDARDS
Contracts and Compliance Unit

PROJECT EVALUATION FORM
1007572

Project Name:

Project No.: 1007572
Discipline Prime & Subs Location Cert. LBE/LPG SLBE VSLBE Total L/SLBE VSLBE Total Non-Specialty Bid Amount
TOTAL

ORIGINAL

BID AMOUNT
Status double counted
value
LBE/SLBE Trucking Trucking Trucking Dollars Dollars Ethn. MBE WBE PRIME
A. Teichert & Son,
Inc. Pleasanton UB 7,455,214 7,455,214 C
Trucking
SN Sands Corp
dba S & S Trucking Oakland CB 2,005,092 2,005,092 2,005,092 2,005,092 2,005,092 2,005,092 H 2,005,092 Supplier of Asphalt
Oliver DeSilva dba
Gallagher & Burk
Inc Oakland CB 4,797,949 4,797,949 4,797,949 4,797,949 C Railroad Tracks and
Tree Stump Removal
Dekay Demolition
and Clearance Inc Oakland CB 117,000 117,000 117,000 117,000 O 117,000 Utility Adjustment JCC Inc Concord UB 922,000 922,000 C Supplier of Aggregate
Base
Argent Materials
Inc Oakland CB 12,000 12,000 12,000 12,000 C
Crack Seal/Slurry
Seal Bond Blacktop Inc Union City UB 302,250 C 302,250
Operated Grinder
Rental Anrak CorporationSacramento UB 648,750 648,750 C Striping and Marking Chrisp Company Fremont UB 1,906,775 5,249,525 C Minor Concrete
Spencon
Construction Inc Danville UB 6,485,000 6,485,000 C
4,809,949 2,122,092 0 6,932,041 2,005,092 0 2,005,092 24,349,780 27,994,780 2,122,092 302,250

19.754 8.715 0.000 28.469 100.000 0.000 100.000 100.000 7.580 1.080 LBE/LPG SLBE VSLBE Total L/SLBE VSLBE Total Non-Specialty Bid Amount
TOTAL

ORIGINAL

BID AMOUNT
LBE = Local Business Enterprise UB = Uncertified Business AA = African American SLBE = Small Local Business Enterprise CB = Certified Business AI = Asian Indian Total LBE/SLBE = All Certified Local and Small Local Businesses MBE = Minority Business Enterprise AP = Asian Pacific NPLBE = NonProfit Local Business Enterprise WBE = Women Business Enterprise C = Caucasian NPSLBE = NonProfit Small Local Business Enterprise H = Hispanic NA = Native American
O = Other
NL = Not Listed
MO - Multiple Ownership
Project Totals
Percentages %

LBE/SLBE PARTICIPATION
BIDDER 3
Citywide Pavement Rehabilitation 2024A
For Tracking Only
Requirements: The 50% requirements is a combination of 25% LBE and 25% SLBE participation. An SLBE firm can be counted 100% towards achieving 50% requirements. A VSLBE's participation is double counted toward meeting the requirements.

PROJECT NO.:

PROJECT NAME:

CONTRACTOR: A. Teichert & Son, Inc. Contractor's Bid Amount: $27,994,780 Specialty Dollar Amount Non-Specialty Bid Amount Discount Points:
$3,645,000 2%

1. Did the 20% local/small local requirements apply? YES (15% LBE, 5% SLBE)

2. Did the contractor meet the 20% requirement? YES

PROPOSED CREDITED

19.75% 15.00%

8.72% 8.72%

0.00% 0.00%

28.47% 23.72%
YES
a) Total SLBE/LBE trucking participation 100%

4. Did the contractor receive bid discounts? YES

(If yes, list the percentage received) 2%

5. Additional Comments.

Date
Reviewing
Officer: Date:

Approved By: Date:
a) % of LBE participation

DEPARTMENT OF WORKPLACE & EMPLOYMENT STANDARDS
Contracts and Compliance Unit

PROJECT EVALUATION FORM
1007572
Citywide Pavement Rehabilitation 2024A
$24,249,780
Paula Peav 2/11/2025
Shelley Darensburg 2/11/2025
b) % of SLBE participation
2/11/2025
c) % of VSLBE participation

3. Did the contractor meet the Trucking requirement?

6. Date evaluation completed and returned to Contract Admin./Initiating Dept. d)Total % of L/S/VSLBE participation

← All documents from this meeting