APPROVED AS TO FORM AND LEGALITY

CITY ATTORNEY’S OFFICE

OAKLAND CITY COUNCIL
RESOLUTION NO. __________C.M.S.

RESOLUTION IDENTIFYING PROJECTS AUTHORIZED FOR

FUNDING WITH PROCEEDS OF CITY OF OAKLAND GENERAL
OBLIGATION BONDS (MEASURE U), SERIES 2025B-1 (TAX-
EXEMPT), SERIES 2025B-2 (TAXABLE) (SOCIAL BONDS) AND
SERIES 2025B-3 (TAXABLE) I SSUED PURSUANT TO THE 2022

AFFORDABLE HOUS ING AND INFRASTR UCTURE BOND

ORDINANCE (MEASURE U), AND ALLOCATING BO ND PROCEEDS

FOR THE IDENTIFI ED PROJECTS

WHEREAS, the 2022 Affordable Housing and Infrastructure Bond Ordinance, which authorizes the issuance of general obligation bonds in an amount not to exceed $850,000,000 to fund various City infrastructure and affordab le housing projects, was submitted to the voters pursuant to City Council Resolution No. 89314 C.M.S. and approved by at least two-thirds of the qualified voters of the City at the November 8, 2022 General Municipal Election (“Measure U”); and

WHEREAS, concurrent with this Resolution and by separate legislation, the City intends to approve the issuance of City of Oakland General Obligation Bonds (Measure U), Series 2025B- 1 (Tax-Exempt), City of Oakland General Obligation Bonds (Measure U), Series B-2 (Taxable) (Social Bonds), and City of Oakland General Ob ligation Bonds (Measure U), Series 2025B-3 (Taxable) pursuant to Measure U in an amount not to exceed $300,000,000 (the “Measure U Bonds”); and

WHEREAS, Measure U allows the proceeds of the Measure U Bonds to be used to fund projects and programs related to Affordable Hous ing Projects, Streets & Road Projects and Facilities Projects; and

WHEREAS, pursuant to Section 3(C) of Measure U, prior to issuance of the Measure U Bonds, the Council must identity how the projects and programs authorized for funding with Measure U bond proceeds 1) address improvements to the City’s existing core capital assets, 2) maintain or decrease the City’s existing operations and maintenan ce costs, and 3) address social and geographic equity and provide greater bene fit to under-served populations and geographic areas of the greatest need; and

WHEREAS, in compliance with Section 3(C) of Measure U, Exhibit A reflects the results of the investigation conducted by the City Ad ministrator of the projects and programs proposed for funding with the Measure U Bonds (the “ Measure U Projects”), and identifies how the

2 Measure U Projects address improvements to the City’s existing core capital assets, maintain or decrease the City’s existing operations and maintenance costs, and address social and geographic equity and provide greater benefit to under-served populations and geographic areas of the greatest need; and

WHEREAS, in addition to the descriptions and results in Exhibit A, the City performed an extensive analysis of the manner in which th e Measure U Projects described in that exhibit address improvements to the City’s existing core cap ital assets, maintain or decrease the City’s existing operations and maintenance costs, and address social and geographic equity and provide greater benefit to under-served populations and geographic areas of the greatest need as part of the Capital Improvement Program Prioritization Pro cess adopted pursuant to Resolution No. 87376 C.M.S., and such analysis contributed and was critical to the previous approval of those projects and programs and for their proposed inclusion in this Resolution; and

WHEREAS, the Measure U Projects described in Exhibit A, for the reasons described in that exhibit and as provided by the Capital Improvement Program Prioritization Process meet the criteria established under Section 3(C) of Measure U and are eligible for funding pursuant to Measure U; and

WHEREAS, the requirements of the California Environmental Quality Act (“CEQA”), the CEQA Guidelines as prescribed by the Se cretary for Resources, and the provisions of the Environmental Review Regulations of City of Oakland have been satisfied; now, therefore, be it

RESOLVED: That the City Council finds and determines that the foregoing recitals are true and correct and are hereby incorporated herein as findings and determinations of the City Council; and be it

FURTHER RESOLVED: That the City Council hereby identifies the Measure U Projects as set forth in Exhibit A as projects and programs to be included in the issuance of the Measure U Bonds and, as set forth in Exhibit A, how said Measure U Projects 1) address improvements to the City’s existing core capital assets, 2) maintain or decrease the City’s existing operations and maintenance costs, and 3) address social and ge ographic equity and provide greater benefit to under-served populations and geographic areas of the greatest need; and be it

FURTHER RESOLVED: If any Measure U Projects set forth in Exhibit A are unable to proceed or if surplus funds remain after the M easure U Projects set forth in Exhibit A are completed, the City Administrator is authorized to allocate funding to projects or programs eligible for Measure U funding as set forth in Exhibit B, a list of alternative projects and programs that received the highest scores a ccording to the City’s Capital Improvement Program Prioritization Process adopted pursuant to Resolution No. 87376 C.M.S. (the “Alternative Measure U Projects”), and may, upon complying with the requiremen ts of Section 3(C) of Measure U and any other applicable law, make such Alternative Measure U Projects eligible for funding from the issuance of the Measure U Bonds; and be it

FURTHER RESOLVED: That the City Administrator may adjust the Measure U funding allocations described within Exhibit A and Exhibit B as between each individual exhibit and may transfer funding allocations between exhibits, to meet demand, to meet community needs, to timely

3 expend funds, to cover the cost of issuance of the Measure U Bonds, and to allocate Measure U Bond proceeds to cover appropriate staff costs; and be it

FURTHER RESOLVED: That, to the extent allowed by law, each of the Measure U Projects or the Alternative Measure U Projects identified in Exhibit A and Exhibit B, respectively, shall comply with the requirements of Oakland Public Art Ordinance Nos. 11086 C.M.S. and 13562 C.M.S., except to the extent the City Council determines by resolution to exclude one or more such capital improvements projects pursuant to a request of the City Administrator, pursuant to Ordinance No. 13562 C.M.S.; and be it

FURTHER RESOLVED: That the City Council has independently reviewed and considered this Resolution, and the Council finds and determines, based on information provided in the agenda report accompanying this Resolution, that this action complies with CEQA because it is exempt from CEQA pursuant to Section 151 83 (projects consistent with community plan or zoning), Section 15378 (not a proj ect), Section 15301 (minor alterations to existing facilities), Section 15303 (new construction of small structure s), Section 15061(b)(3) (no significant effect on the environment), and Section 15302 (replacement or reconstruction of existing structures).

IN COUNCIL, OAKLAND, CALIFORNIA,

PASSED BY THE FOLLOWING VOTE:

AYES - BROWN, FIFE, GALLO, HOUSTON, RAMACHANDRAN, UNGER, WANG, AND

PRESIDENT JENKINS
NOES –
ABSENT –
ABSTENTION –

ATTEST:

ASHA REED
City Clerk and Clerk of the Council of the
City of Oakland, California

3437504/ARM
A-1

EXHIBIT A
Fund Dept. Project/Program Budget
FY2025/26
Affordable
Housing,
Transportation,
or Facilities?
Social & Geographical
Equity
Improvements to
Assets: extend the
useful life of
facilities/assets and
increase the program
usability
O&M reduction or
neutral
OPW Economic Development

Oakland Ice Center Refrigeration
System and Related
Improvements

10,000,000 Facilities This improvement is in a
medium priority
neighborhood per
OakDOT's geographic
equity toolbox.

This improvement
extends the useful life of
the Ice Center and its
programs, as absent the
improvement, the
refrigeration system will
cease to function in the
nex
t couple years.

Reduction. The project
includes a lease
agreement for the Ice
Center, which will
reduce the City's O&M
costs and create new
rental revenue for the
City.

Library
Measure U

Oakland Tool Lending Library at
Temescal Library

1,500,000 Facilities This improvement is in a
low priority
neighborhood per
OakDOT's geographic
equity toolbox.

These improvements
provide additional
dedicated space to the
tool lending program,
allowing it to serve more
residents and with a
higher qual
ity
experience.

Reduction.

OPW Parks and Recreation/Human Services

Brookdale Recreation Center
Expansion & Park Improvements
3,000,000 Facilities This improvement is in a
medium priority
neighborhood per
OakDOT's geographic
equity toolbox.

The park improvements
and recreation center
expansion shall extend
the useful life of the
elements at the park,
increase park
programming, and make
park access co
de
compliant
Reduce operations
costs.

A-2

Fund Dept. Project/Program Budget
FY2025/26
Affordable
Housing,
Transportation,
or Facilities?
Social & Geographical
Equity
Improvements to
Assets: extend the
useful life of
facilities/assets and
increase the program
usability
O&M reduction or
neutral

Caldecott Trailhead
Improvements
2,850,000 Facilities This improvement is in a
low priority
neighborhood per
OakDOT's geographic
equity toolbox.

The improvements will
improve access and
accessibility of the
parking lot and
connection to trail.

Minimal.

East Oakland Senior Center
Renovation
2,000,000 Facilities This improvement is in a
highest priority
neighborhood per
OakDOT's geographic
equity toolbox.

The senior center
renovation will extend
the useful life of this
building and improve
the experience of
building users.

Reduce operational
costs.

Measure U

San Antonio Park 1,850,000 Facilities This improvement is in a high priority
neighborhood per
OakDOT's geographic
equity toolbox.

The park improvements
will extend the useful life
of these park assets,
and improve the
experience of park
users.

Reduce operational
costs.

OPW Watershed & Other City Facilities

Empire Road Storm Drain
Improvement (Project #1007056
1,443,750 Facilities These projects are in a
high priority
neighborhood per
OakDOT's geographic
equity toolbox.

These projects improve
public safety by
increasing the capacity
of the storm drainage
system to handle
flooding.

Reduction. Fewer
flooding incidents after
the improvements will
reduce the return of
storm drainage
maintenance staff to this
location to respond to
flooding calls.

High Street Storm Drainage
Improvements (Project
#1008055)
1,113,281 Facilities
A-3

Fund Dept. Project/Program Budget
FY2025/26
Affordable
Housing,
Transportation,
or Facilities?
Social & Geographical
Equity
Improvements to
Assets: extend the
useful life of
facilities/assets and
increase the program
usability
O&M reduction or
neutral
OPW
Museum Collection Center
Seismic Improvement (Project
#1004861)
1,999,885 Facilities The Oakland Museum
serves all of Oakland.

These improvements
extend the useful life of
this City-owned asset by
making it more likely to
endure a future seismic
event.

Minimal.

OPW Measure U FY
2025/26 Subtotal

$25,756,916

DOT
Transportation Programs (Projects funded through DOT Programs) Measure U
Bridge Rehabilitation Program 1,000,000 Transportation This program's overall focus is on the safety
and maintenance of
existing roadway and
structures. While this
program is primarily
driven by asset
condition instead of
geographic equity, it is
part of the City's
required work to
maintain safe structures.

Bridge repair projects
improve the useful life
and seismic resiliency of
existing city assets

Reduction: Bridge
rehabilitation work
reduces maintenance
costs such as repair of
deck surface cracks and
joints.

A-4

Fund Dept. Project/Program Budget
FY2025/26
Affordable
Housing,
Transportation,
or Facilities?
Social & Geographical
Equity
Improvements to
Assets: extend the
useful life of
facilities/assets and
increase the program
usability
O&M reduction or
neutral
Citywide Street Resurfacing 50,500,000 Transportation The City's Paving Plan dedicates the majority of
funding to local streets,
prioritizing paving
locations with equal
weight to equity and
street condition. Poor
pavement condition
disproportionately
impacts high priority
populations in regard to
mobility, safety, and
economic security. For
example, the costs of
damage to
vehicles/bicycles due to
potholes has a greater
impact on people with
low to no incomes.

Potholes also pose a
greater safety risk to
bicyclists and
pedestrians.

Pavement useful life is
tracked according to the
Pavement Condition
Index (PCI) standard.

Investing in paving
improves PCI and
prevents further
d
eterioration and
potential damage to
vehicles from potholes
Reduction. Repaving
streets reduces ongoing
costs for short-term
maintenance (i.e. filling
potholes).

A-5

Fund Dept. Project/Program Budget
FY2025/26
Affordable
Housing,
Transportation,
or Facilities?
Social & Geographical
Equity
Improvements to
Assets: extend the
useful life of
facilities/assets and
increase the program
usability
O&M reduction or
neutral
Measure U
DOT
Complete Streets Capital
Program
13,000,000 Transportation The City's prioritization
tool places social and
geographic equity as the
top consideration when
determining which
capital projects to fund.

Complete Streets
Capital projects deliver
infrastructure
improvements
--
supporting access by
bus, bike, on foot, in a
wheelchair or stroller, or
in a car
--in high priority
equity neighborhoods
based on the OakDOT
Geographic Equity
Toolbox.

Complete Streets
Capital projects typically
upgrade and/or replace
existing city
infrastructure, including
traffic signals,
curb
ramps, sidewalks, and
roadway surfaces, thus
extending the useful life
of existing assets and
improving overall
mobility of the
transportation system
Complete Street
improvements include a
mixture of new
pedestrian, bicycle,
traffic safety
infrastruc
ture, and
greening or other street
amenities, as well as
upgrades to existing
facilities. While new
infrastructure may
increase maintenance
costs, extending the
useful life of existing
assets can decrease
maintenance costs.

Curb Ramps Program 9,500,000 Transportation Bringing City sidewalks/curb ramps
up to current ADA
standards increases
safety and accessibility,
especially for people
with disabilities.

Curb ramp
reconstruction and the
addition of new curb
ramps improves the
walking and roll
ing
environment for people
using the City's
transportation system.

Neutral. No additional
operating impacts
identified at this time.

This program brings City
curb ramps up to current
ADA standards.

Emergency Roadway
Reconstruction
3,000,000 Transportation Emergency roadway
reconstruction helps to
minimize severe
weather impacts for all
Oaklanders, especially
priority communities
which are more
vulnerable to the
negative impacts of
collapsed roadways,
sinkhole rehabilitation,
and landslides.

This program will extend
the useful life of
roadways by
reconstructing collapsed
roadways and
constructing retaining
walls.

Minimal impacts.

Emergency roadway
reconstruction may
reduce future
maintenance costs.

A-6

Fund Dept. Project/Program Budget
FY2025/26
Affordable
Housing,
Transportation,
or Facilities?
Social & Geographical
Equity
Improvements to
Assets: extend the
useful life of
facilities/assets and
increase the program
usability
O&M reduction or
neutral
Measure U

Traffic Signal Capital Program 1,500,000 Transportation Traffic signal management projects
can enhance safety and
mobility in priority
neighborhoods when
delivered according to
Oakland's CIP
prioritization process.

This program funds
various safety, access
and mobility projects
connected to traffic
signals, including signal
operations, upgrades
and modernization, as
well as planning and
development of traffic
capital projects and
intelligent transportation
systems. These projects
extend the useful life of
the city's transportation
assets and the overall
functioning of the city's
transportation system.

Minimal impacts
identified at this time.

Typical improvements
within this program
include traffic signal
upgrades and
modernization, which
may lead to a minimal
increase in
operations/maintenance
costs.

DOT Measure U
FY 2025/26 Subtotal
$78,500,000

HCD
New Construction*
Mandela TOD 33,000,000 Affordable Housing Creates affordable housing through long-
term affordability
restrictions.

Does not directly
improve core capital
assets but may provide
collateral improvements
as new affordable
housing development is
built.

Neutral. Operations and
maintenance cost will be
covered by the property
owner.
2700 International 6,511,313 Affordable Housing
Mark Twain 7,700,000 Affordable Housing
Chinatown TOD 1,860,000 Affordable Housing
500 Lake Park 885,000 Affordable Housing
Liberation Park 28,000,000 Affordable Housing
2125 Telegraph Ave. (Eliza) 5,765,903 Affordable Housing Additional New Construction
Pipeline NOFA Projects
29,277,784 Affordable Housing
A-7

Fund Dept. Project/Program Budget
FY2025/26
Affordable
Housing,
Transportation,
or Facilities?
Social & Geographical
Equity
Improvements to
Assets: extend the
useful life of
facilities/assets and
increase the program
usability
O&M reduction or
neutral
Measure U
HCD
Acquisition and Conversion to Affordable Housing*
ACAH Program (Acquisition and
Preservation of Existing Rental
units)
30,000,000 Affordable Housing Creates affordable
housing through long-
term affordability
restrictions.

Does not directly
improve core capital
assets but may provide
collateral improvements
as affordable housing
developments are
purchased and/or
rehabilitated with new or
extended affordability
restrictions.

Neutral. Operations and
maintenance cost will be
covered by the property
owner.

Homeless Housing*
Extended Stay America 8,000,000 Affordable Housing Creates affordable housing through long-
term affordability
restrictions.

Does not directly
improve core capital
assets but may provide
collateral improvements
as affordable housing
developments are
purchased and/or
rehabilitated with new or
extended affordability
restrictions.

Neutral. Operations and
maintenance cost will be
covered by the property
owner.

Friendly Manor 359,776 Affordable Housing
The Maya 5,484,199 Affordable Housing
Other Homeless Housing
Projects
7,156,025 Affordable Housing
Rehabilitation*
Rehabilitation Program (Existing
Restricted Affordable Housing)
7,000,000 Affordable Housing Creates affordable
housing through long-
term affordability
restrictions.

Does not directly
improve core capital
assets but may provide
collateral improvements
as affordable housing
developments are
purchased and/or
rehabilitated with new or
extended affordability
restrictions.

Neutral. Operations and
maintenance cost will be
covered by the property
owner.

Housing Administration
A-8

Fund Dept. Project/Program Budget
FY2025/26
Affordable
Housing,
Transportation,
or Facilities?
Social & Geographical
Equity
Improvements to
Assets: extend the
useful life of
facilities/assets and
increase the program
usability
O&M reduction or
neutral
Affordable Housing
Administration
9,000,000 Affordable Housing Allowance for
administrative costs for
project/program
administration and
oversight.

N/A N/A
* Includes some projects with Tranche 1 Measure U funding. Project/Program funding may be switched between bond tranches and projects/programs as needed due to project/program timing requirements.

HCD Measure U FY
2025/26 Subtotal
$180,000,000.00

Total Measure U FY
2025/26 Total
$284,256,916

B-1

EXHIBIT B
Fund Dept. Project/Program Budget
FY2025/26
Affordable
Housing,
Transportation,
or Facilities?
Social & Geographical
Equity
Improvements to Assets:
extend the useful life of
facilities/assets and increase
the program usability
O&M reduction or neutral
Measure U
HCD
New Construction*
3050 International
22,583,610
Affordable Housing Creates affordable
housing through long-
term affordability
restrictions.

Does not directly improve core
capital assets but may provide
collateral improvements as new
affordable housing development
is built.

Neutral. Operations and
maintenance cost will be
covered by the property
owner.

Friendship Senior
3,109,002
Affordable Housing
Longfellow
3,500,000
Affordable Housing
East 12th Street
15,500,000
Affordable Housing
Phoenix
1,773,821
Affordable Housing
34th & San Pablo
3,772,130
Affordable Housing
3135 San Pablo
4,522,964
Affordable Housing
Agnes Memorial Senior
Apartments

14,815,719
Affordable Housing
285 12th St
15,000,000
Affordable Housing
125 E12th Street
20,400,000
Affordable Housing
Kingdom Builders Senior
Housing

13,100,000
Affordable Housing
2700 International
9,907,000
Affordable Housing
500 Lake Park Apartments
18,710,000
Affordable Housing
2301 Telegraph Avenue
10,000,000
Affordable Housing
430 Broadway Building C
18,500,000
Affordable Housing
Brooklyn Arms Apartments
10,391,000
Affordable Housing
Villa Fruitvale
15,000,000
Affordable Housing
2610 International
35,692,000
Affordable Housing
East 12th Senior Housing
18,709,000
Affordable Housing
Joshua Senior Housing
15,002,000
Affordable Housing
77th and Bancroft
15,000,000
Affordable Housing
B-2

Fund Dept. Project/Program Budget
FY2025/26
Affordable
Housing,
Transportation,
or Facilities?
Social & Geographical
Equity
Improvements to Assets:
extend the useful life of
facilities/assets and increase
the program usability
O&M reduction or neutral
3073 International
Boulevard

22,799,500
Affordable Housing
111 Fairmount
38,543,126
Affordable Housing
430 Broadway Building A
15,000,000
Affordable Housing
430 Broadway Building B
17,000,000
Affordable Housing
2125 Telegraph Ave. (Eliza)
9,838,473
Affordable Housing
Measure U
HCD
Acquisition and Conversion to Affordable Housing*
ACAH Program
(Acquisition and
Preservation of Existing
Rental units)

10,000,000
Affordable Housing Creates affordable
housing through long-
term affordability
restrictions.

Does not directly improve core
capital assets but may provide
collateral improvements as
affordable housing developments
are purchased and/or
rehabilitated with new or
extended affordability restrictions.

Neutral. Operations and
maintenance cost will be
covered by the property
owner.

Homeless Housing*
Other Homeless
Housing Projects

10,000,000
Affordable Housing Creates affordable
housing through long-
term affordability
restrictions.

Does not directly improve core
capital assets but may provide
collateral improvements as
affordable housing developments
are purchased and/or
rehabilitated with new or
extended affordability restrictions.

Neutral. Operations and
maintenance cost will be
covered by the property
owner.

Rehabilitation*
B-3

Fund Dept. Project/Program Budget
FY2025/26
Affordable
Housing,
Transportation,
or Facilities?
Social & Geographical
Equity
Improvements to Assets:
extend the useful life of
facilities/assets and increase
the program usability
O&M reduction or neutral
Rehabilitation Program
(Existing Restricted
Affordable Housing)

10,000,000
Affordable Housing Creates affordable
housing through long-
term affordability
restrictions.

Does not directly improve core
capital assets but may provide
collateral improvements as
affordable housing developments
are purchased and/or
rehabilitated with new or
extended affordability restrictions.

Neutral. Operations and
maintenance cost will be
covered by the property
owner.

* Includes some projects with Tranche 1 Measure U funding. Project/Program funding may be switched between bond tranches and projects/programs as needed due to project/program timing requirements.

HCD Measure U
FY 2025/26
Subtotal
$
418,169,345

Total Measure U
FY 2025/26 Total
$418,169,345

CERTIFICATE OF THE CITY CLERK
I, Asha Reed, City Clerk and Clerk of the City Council of the City of Oakland (the “City”), hereby certify that the foregoing is a full, true and correct copy of Resolution No. _________ C.M.S., duly adopted at a meeting of the City Council of the City duly and regularly held on __________, 2025, of which meeting all of said City Council had due notice.

I further certify that I have carefully compared the foregoing copy with the original minutes of said meeting on file and of record in my office; that said copy is a true, complete and correct copy of the original Resolution duly adopted at said meeting and entered in said minutes; and that said Resolution has not been modified, amended, rescinded or revoked except as provided in such Resolution in any manner since the date of their adoption, and the same is now in full force and effect.

IN WITNESS WHEREOF, I have executed this certificate this ___ day of _______, 2025.

________________________________________

ASHA REED
City Clerk and Clerk of the City Council
City of Oakland, California