AG

ENDA REPORT
TO: Jestin D. Johnson FROM: Betsy Lake
City Administrator Assistant City Administrator
SUBJECT: Informational Report Regarding 2023-
2025 Progress Implementing the 2030
Equitable Climate Action Plan
DATE: February 25, 2026
City Administrator Approval Date:

RECOMMENDATION
Staff Recommends That The City Council Receive An Informational Report Regarding Progress In 2023-2025 On Implementing The 2030 Equitable Climate Action Plan.

EXEC

UTIVE SUMMARY
This report provides the second progress update on the 2030 Equitable Climate Action Plan (ECAP) – adopted July 2020, covering implementation in calendar years 2023-2025. The ECAP contains 40 Actions to improve climate resilience, advance equity, and reduce local GHG emissions on a path toward full carbon neutrality by 2045. This report summarizes progress for each of Action, describes major milestones (projects, programs, and policies) across the ECAP’s seven themes, summarizes near-term plans and key implementation focus areas for near-term implementation, and includes two appendices summarizing implementation in 2023- 2024 for the Zero Emission Vehicle (ZEV) Action Plan and the General Plan Environmental Justice Element, two extensions of the ECAP.

BA

CKGROUND / LEGISLATIVE HISTORY
The City of Oakland (City) is a leader in ambitious and equity-driven climate action. Resolution No. 82129 C.M.S. (2009) directed staff to develop the City’s first climate strategy (2020 Energy and Climate Action Plan), with greenhouse gas (GHG) emissions reduction targets of 36 percent below 2005 levels by 2020 and 83 percent by 2050.

In 2016, the California Legislature enacted Senate Bill (SB) 32, building on the 2006 California Global Warming Solutions Act by requiring Statewide GHG emissions to be reduced to 40 percent below 1990 levels by 2030. In 2018, the City Council declared a climate emergency, calling for regional collaboration and a “citywide just transition and urgent climate mobilization effort to reverse global warming ... as quickly as possible towards zero net emissions” PWT Committee
March 24, 2026
Michelle N. Phillips (Mar 13, 2026 11:15:49 PDT)
Michelle N. Phillips
Mar 13, 2026

Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 2
(R
esolution No. 87397 C.M.S.) and established a GHG emissions reduction target of 56 percent below 2005 levels by 2030 (Resolution No. 87183 C.M.S.).

To respond to the abovementioned targets, the City Council adopted the 2030 ECAP in July 2020 (Resolution No. 88267 C.M.S.). The ECAP details 40 Actions within the City’s regulatory and legal spheres of control to improve Oakland’s climate resilience, advance equity, and reduce local GHG emissions on a path projected to exceed Council’s adopted targets.

Alongside the ECAP, the City Council created a 2045 full carbon neutrality target (Resolution No. 88268 C.M.S.). OMC 2.29.170.2.C defines equity as all people having full and equal access to opportunities that enable them to attain their full potential. This principle of fair and just access for all is centered throughout ECAP actions.

The City Council adopted the ZEV Action Plan in October 2022 (Resolution No. 89448 C.M.S), fulfilling ECAP Action TLU-5 and outlining a path to realizing a fully zero-emission transportation system by 2045. It focuses on reducing dependence on personal vehicles, supporting renewable energy adoption for transportation, and prioritizing the needs of frontline communities disproportionately burdened by air pollution.

In October 2023, the City completed Phase One of the General Plan Update (GPU), comprised of the Housing, Safety, and Environmental Justice (EJ) Elements. The Housing Element outlines strategies to meet Oakland’s housing needs through 2031, with a major focus on increasing the availability of affordable and accessible housing. It is an important avenue for implementing the ECAP’s Transportation and Land Use Actions, such as prioritizing housing around transportation centers to encourage public and active transportation. The Safety Element integrates climate resilience, addressing risks from natural disasters such as wildfires, flooding, and earthquakes, providing important specificity for the ECAP’s Adaptation Actions.

The EJ Element (Resolution No. C.M.S 89907) echoes the ECAP’s emphasis on climate equity and public health and mirrors the ECAP’s Racial Equity Impact and Implementation Guide (REIA). It includes policies to reduce pollution in historically impacted communities and improve access to healthy environments. This component was developed through extensive community engagement and is central to aligning future planning efforts with the City’s equity goals. It is also a central organizing factor for ECAP implementation.

Phase 2 of the GPU began in September 2024 and is underway. This phase expands the plan’s focus to additional elements that directly shape Oaklands built environment and quality of life.

These include the Land Use and Transportation Element (LUTE), which aims to create a transportation system that is safe, equitable, and accessible for all users; and the Open Space, Conservation, and Recreation (OSCAR) Element, which is being developed to improve access to parks and recreational facilities, especially in underserved neighborhoods, while promoting walkable, livable communities for all.

ANAL

YSIS AND POLICY ALTERNATIVES
Strong interdepartmental coordination bolstered implementation in the three-year reporting period. The ECAP’s focus on collaboration, holistic programs, and the wellbeing of most- impacted (frontline) communities allow continued integration with ongoing pandemic recovery PWT Committee
March 24, 2026
Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 3
3 ef
forts. ECAP implementation, including the City-community collaboration central to success, supports the Citywide priorities of housing, economic, and cultural security; vibrant, sustainable infrastructure; and responsive, trustworthy government. The ECAP’s structure integrates these goals within climate action via community health, social justice, and wealth equity. Many City departments share responsibility for implementing the ECAP (see Attachment 1). The Sustainability and Resilience Division (SRD) within the City Administrator’s Office (CAO) tracks overall ECAP progress and leads or supports implementation as appropriate.

Partnerships remain pivotal. In 2023-25, the City deepened collaborations with Oakland-based Rising Sun Center for Opportunity (RSCO), Laney College, and other workforce development partners to strengthen high-road labor pathways for electrifying Oakland’s buildings and transportation. The City continued its effort with GRID Alternatives, Habitat for Humanity, and Rebuilding Together East Bay Network to safely electrify homes owned by low-income Oaklanders. Ava Community Energy (Ava, formerly East Bay Community Energy) initiated a major investment in high-power electric vehicle (EV) charging between downtown and West Oakland. The City partnered with the Asian Pacific Environmental Network and the local Chinese-American community to fund work on the City’s first Resilience Hub at Lincoln Square Recreation Center. And the ECAP provided the foundation for the grant-funded Innovation Team (i-team) joining the City in 2024. That effort launched a new partnership among the City, Rising Sun Center for Opportunity, ESO Ventures, and OakStop to develop training and capacity building for increasing wealth equity through Oakland’s climate efforts.

ECAP implementation progress in 2023-2025 was impacted by ongoing effects of the pandemic, City budget constraints, and the U.S. presidential transition. Table 1 summarizes progress in calendar years 2023-2025. All summaries refer to activities undertaken during that three-year period, except where otherwise noted. The first column lists the Action number (#) with Section identifiers: Transportation and Land Use (TLU), Buildings (B), Material Consumption and Waste (MCW), Adaptation (A), Carbon Removal (CR), City Leadership (CL), and Port (P). Each Summary begins with a progress indicator in one of five categories: Not begun, Early Progress, In Progress, Major Progress, or Complete/Fully Implemented.

Table 1: ECAP Progress Summary
# Action Name Summary of Progress in 2023-2025
TLU-
1 Align All Planning
Policies &
Regulations with
ECAP Goals &
Priorities
Major Progress
The City adopted the Housing, Safety, and EJ Elements in 2023 after extensive community engagement. The Housing Element details strategies to meet Oakland’s housing needs through 2031, with a focus on increasing the availability of affordable and accessible options. The Safety Element integrates climate resilience and addresses natural disaster risks such as flooding, wildfires, and earthquakes. The EJ Element includes actions to reduce pollution in historically impacted communities and improve access to healthy environments and overlaps significantly with the ECAP; Attachment 2 provides a summary of implementation progress on that Element through this reporting period. In 2024, the City adopted a Sea Level Rise Combining zone as part of the Downtown Oakland Specific Plan. It is intended to ensure that new development accounts for scientifically accepted future rises in sea level to ensure the health and safety of future occupants and the long-term viability of new construction and associated infrastructure. The overlay is a mapped zoning district that was mapped to specific parcels near the 0 PWT Committee
March 26, 2 26
Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 4
waterfront. In 2025, the City launched Phase 2 of the GPU, which includes the LUTE; OSCAR Element; and Noise Element.

TLU-
2 Align Permit &
Project Approvals
with ECAP
Priorities
Major Progress
The 2021 adopted revised GHG Threshold of Significance, GHG Standard Condition of Approval, and project-level ECAP Consistency Checklist continue to align project approvals and mandatory environmental review of new construction projects with ECAP requirements. In 2025, the Building Bureau and Economic and Workforce Development Department (EWDD) made several process efficiency updates to speed the permitting and review processes for applicants. This includes enhanced, fully digitized, same-day permits for a majority of building project types; an expanded range of allowable ground-floor commercial uses in Downtown, Uptown, and Lake Merritt areas; streamlined permit application processes, and more. In 2025, SRD hired a staff person to build on lessons from Oakland’s ground-breaking EcoBlock to implement new streamlined internal processes and policies, including through Oakland’s Zoning Ordinance, to accelerate electrification, energy resilience, and other ECAP priorities at the neighborhood level. In late 2025, the City adopted updated building code requirements to harmonize with and exceed Statewide standards.

TLU-
3 Take Action to
Reduce and
Prevent
Displacement of
Residents &
Businesses
In Progress
Displacement prevention is led by the Housing & Community Development (HCD) and EWDD. In 2023-25, HCD leveraged State and Federal resources to address the overlapping housing, homelessness, and COVID-19 crises:
• Tenant Protections: Strengthened Rent Control and Just-Cause eviction protections by requiring property owners comply with business license r
equirements before pursuing evictions or rent increases; launched O
akland’s rent registry (75% compliance by March 2025); launched a t
argeted homelessness prevention program in partnership with Stanford U
niversity; continued emergency rental assistance, outreach, and legal services. The Rent Adjustment Program also awarded two contracts to c
ommunity-based organizations for tenant and small landlord r
epresentation services in rent adjustment hearings. This legal representation increases accessibility for parties involved in rent increase/decrease hearings.
• Affordable Housing Production: In 2025, the City awarded $143.5 million to over 830 units of new affordable housing, including 236 units for residents exiting homelessness. In 2025, the City brought online over 730 new affordable housing units. Over the 2023-2025 period, the City continued its previous success accessing the State’s Homekey program, resulting in a cumulative total of 12 project awards.
• Preservation: The Acquisition & Conversion to Affordable Housing (ACAH) program executed its financing for an additional $6.25 million to The Unity Council to preserve 24 affordable units at the 36th Ave.

Apartments, and 54 affordable units at 2000 36th Ave. Apartments; and an additional $2.2 million to the Northern California Land Trust to rehabilitate 16 affordable homes. Authorized a $10 million recourse loan f
rom Measure U Bond Funds to the Housing Accelerator Fund to establish a dedicated financing mechanism for Affordable Housing PWT Committee
March 24, 20264
Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 5
Acquisition and Rehabilitation projects, including anti-displacement bridge loans to mission-driven affordable housing developers and an overhaul of ACAH administration. Allocated $20 million additional Measure U Bond Funds to support permanent take-out financing for these loans.
• Transformative Climate Communities: Acts Cherry Hill, a 55-unit affordable housing development with 14 units reserved for those exiting homelessness at 95th and International, completed construction in 2023.

At the Better Neighborhoods, Same Neighbors Resource Center, the City and East Bay Permanent Real Estate Collaborative launched a D
isplacement Avoidance program with onsite counselors.
• Asset Management Services: Increased physical inspections across the City’s affordable housing portfolio to identify and correct habitability issues before they lead to tenant dissatisfaction, health concerns, or displacement. Conducting physical inspections and tenant file review once every three years for each property (~50 annually) including livin g
c
onditions, management practices, and affordability standards, with f
ollow-up to ensure timely correction of deficiencies.

EWDD continued serving Oakland's small business community. Of 650 applications received for the Façade and Tenant Improvement Program (FTIP) in 2023, EWDD selected 100+ for grants of $24,999 each. Issued an RFP in 2024 for a third party to administer FTIP and assist grantees with projects. Oakland-based Plenum Architecture, Inc. was selected and began assisting grantees in June of 2025, completing 3 FTIP projects during the remainder of the year. The Neighborhood Business Assistance (NBA) Program conducted over 159 appointments at its 6 Oakland Public Library Locations in 2025, supporting clients in creating 15 full- and part-time jobs through NBA appointments and a revamped Business Development Intake form, EWDD responded to over 300 inquiries, helping entrepreneurs access technical assistance, financing, and grant resources, and navigate complex City regulations. Business Development Staff provided referrals to technical assistance providers for mentoring, marketing support, business counseling, and business plan evaluation, and connected entrepreneurs to Community Development Financial Institutions (CDFIs) and the Small Business Administration (SBA) for funding opportunities. The NBA completed process efficiencies to improve Data collection and ensure more effective booking capabilities and intensified both virtual and in-person marketing efforts.

TLU-
4 Abundant,
Affordable, &
Accessible Public
Transit
In Progress
The Lakeside Drive and Lake Merritt Blvd project will close a gap in the transit-only lanes for the TEMPO BRT line on Lake Merritt Blvd. The project is fully designed, with construction anticipated to commence in Spring 2026.

An $11 million International Pedestrian Lighting Project (completed in Spring 2025) upgraded pedestrian lighting and enhanced ADA accessibility along the densely populated International Blvd BRT corridor. The 14th Street Project, installing 8 transit boarding islands with upgraded canopies along 14th Street in the Downtown core, broke ground in early 2024 with expected completion in early 2026. The City and AC Transit partnered to complete the International Quick Build Project in 2024, which implemented a comprehensive safety-focused upgrade on the Tempo BRT bus lanes on PWTC Committee
March 24, 5 2026
Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 6
6 International Blvd including measures to physically separate the bus -only lane along International and prevent illegal and dangerous use of the bus lane by motorists. In 2025, the City removed several hazardous bus shelters and is working on a contract to install 10-20 new ones.

TLU-
5 Create a Zero
Emission Vehicle
Action Plan
Complete / Fully Implemented
Council adopted the ZEV Action Plan in November 2022. Staff continue to seek external funding to implement ZEV Action Plan Actions. See Attachment 3 for implementation summary. In 2025, AVA Community Energy opened their first DC fast charger hub at Oakland’s City Center West Garage in November 2025. This site includes 18 fast chargers – the largest non-Tesla charger bank in California. Flash Parking, Inc. installed 24 charging stations at the Oakland City Center Garage and 32 charging stations at the Rotunda Garage.

TLU-
6 Establish
Temporary and
Permanent Car-
Free Areas
Major Progress
Oakland’s temporary and permanent car free areas include plazas and recurring special events that repurpose street space, as well as parklets and bike parking corrals that repurpose on-street parking spaces for other uses.

The expanded parklet program became permanent in 2023 with publication of new Parklet Program Guidelines. The City’s pandemic response also included slow streets: residential streets that provide outdoor space for walking, jogging, biking, and socializing with limited motor vehicle access .

The City reconstructed 8th St in West Oakland as a Slow Streets demonstration project and is developing a permanent slow streets program.

TLU-
7 Rethink Curb
Space
Early Progress
This Action encompasses strategies to optimize urban curb use, including updating parking pricing through OakPark+ to better match demand and encourage shared, non-vehicular, and/or all-electric transportation. OakDOT implemented demand-responsive parking pricing in Chinatown and Montclair with plans to expand across downtown in 2026. OakDOT also piloted metered loading zones in Chinatown and will meter all commercial loading zones in meter areas within the next three years. There was no progress in enforcing business compliance with parking cash-out requirements due to unstaffed Transportation Demand Management (TDM) plan enforcement.

Efforts to eliminate time limits, expand meter operation hours, and implement demand-based pricing were successfully implemented at Lake Merritt through OakPark+. Parking monitoring and enforcement have improved significantly with a near full-strength team achieving near-record levels of activity. The City is using a $1.6M grant from Caltrans and MTC to explore a Parking Benefit Districts to enhance multi-modal access and walkability in commercial districts. The City has no plans to build new off-street parking facilities. Current fees in residential parking permit zones ($105 per year) are not seen as a burden because most zones are in affluent areas; adjusting fees based on income would exceed current capabilities.

TLU-
8 Expand and
Strengthen
Transportation
Demand
Management
Requirements
Early Progress
This Action has seen no additional progress. OakDOT has made adjustment to the requirements of the Transportation Demand Management (TDM) requirements in earlier years, but further updates are not a priority given current staffing.

PWT Committee
0March 24, 2 26
Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 7
7 TLU-
9 Ensure Equitable
and Clean New
Mobility
In Progress
Oakland's bike share program provides $5 annual membership to low- income residents and requires 20% of stations to be East of Lake Merritt.

The dockless vehicle-sharing program requires a low-income membership.

Approximately 350 electric bikes were added to the Program in late 2024, and 19 new stations were installed in 2025 and 2026. OakDOT considers race and equity impacts in developing any relevant policies and programs.

The City is partnering with AC Transit to increase the use of Intelligent Transit Signal Priority (TSP) systems to prioritize transit. There was no progress in providing incentives for environmentally friendly travel behaviors or disincentives for fossil fuel-based on-demand delivery services due to regulatory limitations. The requirement for carbon emission reduction plans in the micromobility sector has not been pursued due to the industry’s decline. Facilitation of Transportation Management Associations, which would support public transit pass distribution and investment in mobility strategies to reduce vehicle miles traveled, is hindered by the absence of TDM staff. OakDOT is administering a "mobility wallet" to financially reward residents for choosing efficient travel modes through the West Oakland Universal Basic Mobility (UBM) program. In 2025, the City partnered with Family Laundry in Fruitvale and with the Los Angeles Cleantech Incubator, Bay Area Air District, and Pacific Coast Ventures to install integrated solar, battery energy storage, and EV chargers at Family Laundry to support shared electrified delivery van charging.

TLU-
10 Expand
Neighborhood
Car Sharing
Early Progress
Oakland’s only "free-floating" car share vendor, GIG, ceased business at the end of 2024. GIG provided up to 500 vehicles to pick up and drop off at any legal parking space in their service area. In 2025, Getaround, which offered a few dozen "dedicated space" vehicles, which must be rented and dropped off in the same location also ceased operation. One operator, ZipCar, remains servicing Oakland. OakDOT has explored non-profit run programs that provide vehicles at low cost in disadvantaged communities but have been unable to identify funds for the necessary subsidy. Staff are making an effort to collaborate with developers and property managers to provide dedicated EV car sharing services in multifamily affordable housing buildings. This is supported by a planning code provision that offers parking reductions if car sharing is provided, which six properties have utilized.

B-1 Eliminate Natural
Gas in New
Buildings
Major Progress
In 2023, the Ninth Circuit Court of Appeals issued a decision (California Restaurant Association v. City of Berkeley) that effectively invalidated Oakland's 2020 Ordinance prohibiting gas infrastructure in new construction.

No exemptions to the City's rule had been sought to that point. While the City can no longer enforce Ordinance No. 13632 C.M.S., the revised CEQA Thresholds of Significance and associated ECAP Development Checklist, combined with the cost-effectiveness of constructing all-electric compared to duel-fuel new buildings, has had the same impact on non-residential new construction. In 2025, the City adopted amendments to the CA state building and energy codes that again reinforced the preference for all-electric new construction, specifying stricter Source Energy budgets than state requirements.

PWT Committee
2March 24, 20 6
Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 8
8 B-2 Plan for All
Existing Buildings
to be Efficient
and All-Electric
by 2040
In Progress
The 2023 Ninth Circuit Court of Appeals Decision halted the Existing Building Electrification Roadmap due to legal uncertainty of regulating gas appliances and infrastructure. The City’s 2025 Building Code amendments did include strong requirements for electrification readiness in single- and multifamily residential buildings renovations, including electric panel readiness and installation of at least two measures supporting electrification, energy efficiency, solar, or energy storage. Staff continued encouraging existing building electrification through public education and engagement, workforce development, and internal capacity building. Public engagement continues to highlight the health, safety, and economic benefits of transitioning from gas to electricity; the long-term cost effectiveness of electrification in most cases; and the benefits of early preparation for the Bay Area Air District's 2023 rule requiring new water heating and space heating appliances installed in residences in 2027 and 2029, respectively, to be all-electric. Additional highlights include a successful City-led monthly Building Electrification Clubhouse for construction industry professionals; a $1M grant-funded Home Electrification Equity Pilot that enabled HCDs Residential Lending program to add electrification and solar to a set of qualified projects; and electrification training for HCD, Human Services, and other City staff. Regional programs like the Bay Area Multifamily Building Enhancements Program (BAMBE) that rely on local outreach significantly increased the number of heat pumps, solar and battery energy storage systems, and other electrification measures in Oakland homes. This includes 600+ residential heat pumps; and 244 apartment units, across 8 multifamily properties, completing BAMBE energy efficiency and electrification projects.

B-3 Prevent
Refrigerant
Pollution
Early Progress
California advanced legislation banning higher-GWP refrigerants. The City facilitated electrification trainings for HCD staff and private contractors that covered best installation practices to prevent refrigerant leakage. OPW, with SRD support, is planning municipal facility projects to identify and reduce refrigerant pollution in 2025 or later, depending on resources. In 2025, City partner BayREN launched a new Refrigeration Replacement program (BRR) serving businesses with remote condensing units in disadvantaged communities; these units are often old, inefficient, and costly to operate.

B-4 Reduce Lifecycle
Emissions from
Building Materials
Early Progress
The City paused work on this Action over concern about adding costs to building projects, and in recognition of ongoing action at the State level. The California Building Standards Commission adopted updates to the Green Building Standards Code (CALGreen) Part 11, Title 24, effective July 1, 2024, requiring nonresidential commercial building projects over 100,000 square feet and school building projects over 50,000 square feet to use practices and materials with lower embodied carbon. Oakland remains an epicenter of private-sector action to reduce embodied carbon, including the mass timber condo high rise at 15th and WebsterStreets by developer OWOW; low-carbon concrete start-up Brimstone in West Oakland; and East Oakland's Argent Materials, a leader in asphalt and concrete recycling.

B-5 Require All Major
Retrofits of City
Major Progress
PWT Committee
0March 24, 2 26
Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 9
9 Facilities to be
All-Electric
The Elmhurst branch Library was renovated in 2023, replacing all gas appliances with heat pumps for water and space heating and cooling, becoming Oakland’s first all-electric municipal building. SRD led replacement of 110+ gas water heaters with high-efficiency, electric heat pump water heaters through a PG&E incentive program at zero cost to the City.

Upcoming electrification projects for 2025 include the under-construction Mosswood Recreation Center and the Lincoln Square Community Center.

Resource constraints still lead to missed opportunities: the West Oakland Senior Center decided to install a new gas kitchen, though the rest of the project includes all-electric infrastructure, due to staff familiarity with gas equipment. The Main Library underwent a major retrofit that focused on energy efficiency but was unable to include replacement of the gas furnace system with a heat pump. Starting in 2020, the City began upgrading facilities using on-bill financing (OBF) from Pacific Gas & Electric (PG&E), which covers the up-front costs of energy upgrades. The City repays PG&E on its monthly utility bills, using savings from reduced energy consumption.

There are no up-front costs or financial risk to the City from the program.

Once all 100 projects are completed, projected monetary savings to the City from the energy savings will be upwards of $1 million annually.

MCW
-1
Eliminate
Disposal of
Compostable
Organic Materials
to Landfills
Major Progress
OPW began preparing for implementation of California's Plastic Pollution Prevention and Packaging Producer Responsibility Act (SB 54), which clarifies what types of packaging are considered recyclable and compostable statewide. City Council passed the Reusable Foodware and Plastic Litter Reduction Ordinance (Ordinance No. 13773 / Reusables Ordinance) in 2024, becoming one of the first cities to stop accepting bioplastics as compostable material. Staff conducted SB 1383 annual route reviews, inspecting 4,000 homes and businesses in 2023-24 for proper waste sorting and leaving tags/sending letters to property owners if contamination was found. In 2025 staff inspected an additional 1,800 homes and businesses.

MCW
-2
Strengthen
Infrastructure and
Partnerships for
Edible Food
Recovery
In Progress
Oakland food recovery organizations (FROs) recovered and redistributed 4,317,750 pounds of food in 2023 and 5,138,335 pounds in 2024. Staff continued advancing Oakland’s food recovery network in compliance with SB 1383, which requires certain businesses in Oakland to recover surplus edible food to feed people. Staff attend the Alameda County Food Recovery Network (hosted by StopWaste), and updated the City’s FRO database in early 2025. Inspections of certain food-generating businesses (e.g. grocery stores, large restaurants) are being conducted by Alameda County Environmental Health inspectors. Staff conduct direct outreach to businesses in violation, providing resources and technical assistance to aid compliance.

Staff also identified City facilities and other locations to act as “food hubs,” and are matching City facilities and grantees to FROs. Staff is using SB 1383 Local Assistance Grant Program funds to renovate commercial kitchens at West Oakland Senior Center, Lincoln Square Recreation Center, DeFremery Recreation Center, and Clinton Park Community Center to support more edible food recovery activity at these sites. Watershed’s Business Stormwater Inspection Program will incorporate food recovery questions into grocery store inspections and other high priority targets. 0 PWT Committee
March 24, 2 26
Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 10
MCW
-3
Eliminate Single-
Use Plastics &
Prioritize Reuse
in Food
Preparation,
Distribution, and
Sale
In Progress
Ordinance No. 13773 C.M.S. requires prepared food vendors to use reusable service ware for on-site dining. In 2024, staff prepared an Informational Report on the feasibility and equity impacts of implementing the Reusables Ordinance across Oakland’s food service sector. Preliminary research shows short-term cost recovery for investing in supplies and equipment to convert from disposables to reusables. However, local restaurants face challenges, including lasting COVID-19 impacts, crime, rising costs, and regulatory burdens. The report highlighted the need for education, incentives, and technical assistance, to ensure equitable implementation and enforcement. Key considerations include costs, supply chain readiness, public education, and enforcement capacity. Coordinated efforts across City departments and in partnership with StopWaste are ongoing to support local businesses with awareness and compliance.

MCW
-4
Support Reuse,
Repair,
Recovery, and
Refurbishment
Early Progress
The City lacks resources to provide dedicated support to this sub-sector.

Existing small business resources are available, but there is no data to identify how much of that support may be going to businesses in this sub- sector. EWDD and SRD began preparing a "Climate Economic Sector Brief" focused on the Reuse, Repair, and Refurbishment sector, to be completed in 2026, which will provide a preliminary understanding of the sector's demographics, threats, and growth needs. StopWaste produced "Re:Source," an online searchable guide for reuse, repair, recycling, and safe disposal for Alameda County and beyond. Staff promoted the Re:Source at dozens of public outreach events during the reporting period, and the guide is linked from the City website.

MCW
-5
Expand Repair
Resources
Early Progress
OPL has not yet identified resources to expand the City’s Tool Lending Library. Through the Transformative Climate Communities (TCC) project, the City is supporting East Oakland’s Original Scraper Bike Team on a reconstructed bike repair facility at the MLK Jr. Branch Library; construction is expected to begin by April 2026 and conclude within six months. In 2025, OPL launched a cell phone repair program at Elmhurst Branch Library.

MCW
-6
Establish a
Deconstruction
Requirement
Major Progress
After extensive research in 2023, OPW staff determined that education-first approaches with the business community that foster key economies through ambitious recovery standards would be the most efficient way to ensure robust compliance with the City's Construction and Demolition (C&D) requirements. OPW launched outreach and engagement through Civicorps and California Climate Action Corps (CCAC) in 2024, which will culminate in 2026. Civicorps and CCAC trainees are working with Oakland builders employing desired practices for jobsite salvage and reuse and will generate educational materials for broad distribution.

In 2025, OPW helped Stopwaste launch a county-wide Construction Materials Working Group focused on deconstruction; led a subcommittee to develop regional incentives for deconstruction that will take shape in 2026 and 2027; helped Stopwaste to plan its first deconstruction workshop; and recruited three Oakland builders to attend the training. OPW simultaneously implemented some of the most stringent recovery requirements in California PWT Committee
March 24, 10 2026
Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 11
by requiring a third-party-verified, non-ADC, non-inerts recovery rate of 65% for all projects requiring a building permit. By implementing this high standard and crediting all salvage activities with 95-100% recovery, OPW expects to incentivize key practices and grow the salvage economy.

Future plans include advanced deconstruction training for Oakland firms, recognizing and celebrating exemplary deconstruction companies, and planning an eventual deconstruction ordinance, which would take effect once key practices and economies have time to mature.

A-1 Fund Creation
and Operation of
Resilience Hubs
In Progress
Staff secured a $9.25 million grant from the CA Department of Agriculture to construct the Bay Area’s first municipal resilience hub at Lincoln Square Recreation Center. Construction will commence in May 2026. Staff is developing protocols and programming for the site, having already developed a resilience hub operations plan that will be a city-wide model.

The West Oakland Resilience Hub has a Capital Project Manager assigned, but lacks funding for completion in the current CIP cycle. That hub is likely to be based at the West Oakland Library when renovated and supported by the West Oakland Senior Center and DeFremery Recreation Center. More than 30 additional City facilities have had resilience components added in the form of improved air filtration systems as part of the Bay Area Air District's Clean Air Centers program. In 2025, the City used PG&E grant funding to hold a community workshop in East Oakland to identify trusted locations for future East Oakland resilience hubs. Staff completed an inventory of resilience elements in all public-facing municipal buildings in 2023 to further refine efforts to establish additional resilience hubs. Staff are now assessing the potential to add solar and battery systems on 13 critical municipal buildings. The City enrolled in the Resilient Libraries Network pilot program to conduct feasibility plans for West Oakland Library and 81st Avenue Library as resilience hubs. Oakland's Emergency Services Management Division is developing a community-focused mutual aid and communications network for emergency preparedness. The City used grant funding from the Bay Area Air District to distribute portable air filtration devices to over 40 schools, recreation centers, senior centers, libraries, fire stations.

A-2 Enhance
Community
Energy
Resilience
Early Progress
In 2023-25, Oakland saw 1,115 single family residential permits and 39 commercial permits (including multifamily buildings) completed for battery installations. The City continues working with Ava to reduce energy bills, increase electricity access during blackouts, and add resilient infrastructure in frontline communities. The California Building Code continues advancing resilient energy standards for new construction. However, energy costs have risen statewide beyond the City's control, and Oakland remains one of the most constrained electricity grids in the nation, hampering progress with large developments and business growth, and constraining the City's options for robust clean energy projects. The City gained valuable insights into the potential and challenges of neighborhood electrification and shared solar through the EcoBlock project, and in 2025 hired a staff member to develop specific recommendations for zoning, education, and technical assistance to facilitate neighborhood-based electrification. This Action includes PWT Committee
March 13, 11 2026
Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 12
collaboration with economic and workforce development programs so that local construction, renovation, and clean energy services can reduce costs through market certainty and economies of scale.

A-3 Citywide
Vulnerability
Assessment &
Comprehensive
Adaptation Plan
Major Progress
The City’s new General Plan Safety Element (adopted 2023) includes a Climate Vulnerability Assessment that provides additional analysis beyond what was in the Local Hazard Mitigation Plan, and furthers the City's understanding and planning for climate vulnerabilities. The Oakland Alameda Adaptation Committee (OAAC) has conducted analysis and project development for sea level rise issues in the Estuary, along with fundraising to implement projects. Additional needs include development of an SB272- compliant vulnerability assessment and plan for sea level rise, which is underway for the Estuary portion of the waterfront in coordination with the Port of Oakland and City of Alameda. For the areas north of the Bay Bridge Landing, the City is working with Emeryville, Albany, Berkeley, and the San Francisco Estuary Institute to pursue grants to provide equivalent analysis.

A-4 Wildfire Risk
Reduction
Major Progress
In 2024, Oakland voters approved Measure MM, which will provide $2.7 million annually for enhanced wildfire fuel reduction activities in OFD. Council subsequently appointed a Wildfire Prevention Commission to ensure public oversight of the use of funding to meet the goals and requirements of the legislation; the Commission began meeting in 2025. The City also completed a Wildfire Insurance Risk analysis to address cost increases and limited fire insurance access for private properties in Oakland. Additionally, the Oakland Fire Department has worked with partners like the East Bay Regional Parks District, East Bay Association of Wildfire Governments, and adjacent cities to implement fuel reduction activities in parkland areas adjacent to Oakland and along major evacuation corridors and routes.

A-5 Identify and
Reduce Financial
Risks from
Climate Change
Early Progress
In addition to completion of the Wildfire Insurance Risk Analysis report (see A-4), the City initiated work to reduce and mitigate costs associated with i
mpacts of climate change. This includes cost management of flooding i
mpacts via integration of sea level rise impacts in planning for stormwater improvements, expansion of the City's energy infrastructure to reduce ex
posure to increasing utility costs, and expansion of the City's tree planting and
maintenance programs (via grant funding) to reduce urban heat island i
mpacts (which include risk reduction for extreme heat, flooding impacts, and health costs associated with air pollution). The City still does not have the s
taffing levels or equipment needed to conduct proactive street tree maintenance citywide, leading to a shrinking overall canopy.

A-6 Expand and
Protect Green
Infrastructure &
Biodiversity
In Progress
To protect water quality in Oakland’s waterways, improve the City’s storm drainage system, and comply with stormwater treatment goals set by the Regional Water Quality Control Board Water, the City pursues opportunities to include green stormwater infrastructure (GSI) in public capital improvement projects (CIPs). OPW's Watershed and Stormwater Management Division (WSMD) encourages CIP Project Managers in OPW and OakDOT to incorporate GSI into projects where feasible. WSMD then collaborates with OPW’s Parks and Tree Services Division to monitor and PWT Committee
March 24, 12 2026
Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 13
13 maintain each City-owned GSI facility. The City also requires private development projects of a certain size to clean stormwater before it leaves the property using GSI treatment practices and to ensure their continued operations and maintenance. OPW also provides support where feasible to community groups on voluntary GSI installation. OPW tracks progress in an annual report to the Water Board.

The City sets protections for creekside development, protected trees, and listed threatened/endangered species. The City restricts the municipal use of pesticides and requires best practices during bird nesting season and for construction projects to limit erosion and sedimentation. The Urban Forest Plan (2024) includes policies for nature preservation and restoration.

CR-1 Develop Local
Carbon
Investment
Program
Early Progress
The City hosted a FUSE Fellow in 2022-23 to research and test municipal structures for hosting a local carbon investment program. The City has not yet formalized a structure to accomplish this goal. Beginning in 2024, the City began intensive work to establish a Green Bank, building on the Greenhouse Gas Reduction Fund (GGRF) in the Inflation Reduction Act, which could incorporate a local carbon investment structure. This work ended in 2025 when the new Federal administration eliminated the GGRF.

CR-2 Expand and
Protect Tree
Canopy
Coverage
Major Progress
In 2024, City Council adopted Oakland's first 50-year Urban Forest Plan. It incorporates the results of the 2021 Urban Tree Inventory; a revised Street Tree List (2023); a maintenance plan and cost estimates to care for all trees on City-owned property; and a data-driven process for growing equitable tree canopy so that all Oaklanders can share the benefits of trees. In 2023, as a result of the planning work for the Urban Forest Plan, the City was awarded an $8 million grant from the US Forest Service to plant and maintain trees in frontline communities. The City is working with trusted nonprofits Oakland Parks and Recreation Foundation (ongoing) and Common Vision (new subgrant agreement executed in 2025) to implement that grant, with the majority of activity in 2025 focused on community engagement.

CR-3 Rehabilitate
Riparian Areas
and Open Space
Major Progress
The Courtland Creek Restoration Project, an Oakland Measure DD Initiative and City-led Capital Improvement Project, is substantially complete. The Project improved creek habitat and water quality, reduced trash accumulation and illegal dumping, repaired steep and eroding creek banks, is enhancing climate change resilience and park appearance, and provides the community an educational and recreational resource. The Project will restored approximately 950 feet of open creek channel through grading, slope stabilization, native plant restoration, and installing community enhancement features such as two mosaic murals, accessible trails, seating, interpretive signs, gathering places, and a creek-viewing overlook. Project partners included the Measure DD Community Coalition, Oakland Parks and Recreation Foundation, Friends of Courtland Creek, the Melrose Neighborhood Council, Fremont High School, Frick United Academy of Language, Peralta Hacienda Historical Park, Sogorea Te’ Land Trust, the Insect Sciences Museum, and the Alameda County Flood Control and Water Conservation District. Funders included the California Department of Water Resources Urban Streams Restoration Program, the United States 20 PWT Committee
March 24, 26
Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 14
Environmental Protection Agency’s San Francisco Bay Water Quality Improvement Fund, Measure DD, Oakland’s Measure Q, and the Caltrans Clean California Local Grant Program.

CR-4 Explore Carbon
Farming
Early Progress
In 2024, SRD conducted a "carbon farming" pilot using a small plot of park land, where the City's Recycling Division (OPW) arranged to have municipal compost delivered and applied to the designated area. This pilot provided valuable insights into the logistics of compost delivery and application, which, combined with best available research, indicates a feasible pathway for pilot projects incorporating carbon farming and wildfire risk reduction in Oakland's wildland-urban interface. Further progress is dependent on staffing. Staff determined that municipal compost cannot be used on playing fields or in edible gardens due to regulatory and safety considerations. Future projects would need to be limited to unused open spaces and ornamental planters.

CR-5 Sequestration
Incubator
Not Begun
No change. Staff finalized the Economic Development Action Plan (EDAP) in Fall 2025, which included specific business and workforce development priorities for key ECAP sectors, but specifying a sequestration incubator was beyond the scope of that effort. In 2025, staff in SRD and EWDD, along with the Mayor’s iTeam, began planning a Climate and Green Business Accelerator, which will launch in 2026. While the Accelerator also cannot specify project types, it will include teaching on the scope and urgency of the ECAP.

CR-6 Regional Aquatic
Sequestration
Early Progress
The City held exploratory conversations with local organizations about establishing an aquatic sequestration pilot focused on eelgrass plantings and oyster bed creation. Discussions are in progress, but a formal pilot has not been established.

CL-1 Evaluate and
Reduce Climate
Impacts of City
Expenditures and
Operation
Not Begun
No update.

CL-2 Phase Out Fossil
Fuel Dependency
in City Contracts
and Agreements
Not Begun
No update.

CL-3 Accelerate City
Fleet Vehicle
Replacement
In Progress
OPW-Fleet Services continues to power all diesel vehicles and equipment (531 assets) exclusively with renewable diesel. Of the remaining on-road vehicles, one-third are zero emission or alternative fuel. Staff continue to pursue grant funding to support conversion of fossil fuel-based vehicles to zero-emission technologies.

CL-4 Explore Creation
of Public or
Green Bank
Early Progress
The Oakland Innovation Team (i-team), in collaboration with SRD and local CBOs, conducted extensive research and initial engagement within the PWT Committee
March 24, 14 2026
Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 15
15 community to understand the appropriate scale and partnership structure for a potential Oakland / East Bay green bank. The team's research also identified preliminary issues that a green bank should address to be successful. The goal was to launch a prototype local green bank by the end of 2026, dependent on the continuation of the Federal Greenhouse Gas Reduction Fund (GGRF) within the Inflation Reduction Act (see CR -1).

CL-5 Establish
Oakland Climate
Action Network to
Support Inclusive
Community
ECAP
Engagement
In Progress
Implementation in 2023-25 focused on internal capacity building for equitable, empowerment-based community engagement in the context of political and economic uncertainty. In 2023, the CAO hired a Citywide Community Engagement Coordinator to strengthen internal infrastructure for coordinated, equitable engagement. The Better Neighborhoods Same Neighbors project continued, supporting community leadership for place- based climate and economic justice in Deep East Oakland (closeout date is April 2026). PBD and SRD continued active involvement in AB 617 implementation (West Oakland) and planning (East Oakland), which is seeding and supporting community-led plans for interagency coordination around clean air and economic development. SRD and OPW continued partnering with OUSD to enhance climate curricula with strengthened workforce pathways, and to implement curricula and practices to increase waste sorting and composting awareness. Staff continued periodic involvement with Greenlining Institute efforts to build capacity among Oakland CBOs, particularly on climate and environmental justice issues, as well as on effectively working with public agencies to advance organizational goals. Funding and staffing were unavailable to support a more formalized network or citywide community engagement event series for climate justice.

P-1 Reduce
Emissions from
Port Vehicles and
Equipment
In Progress
2024, the Port of Oakland received an historic award of $322 million to fund the replacement of gas-powered equipment with electric alternatives. The grant will finance 663 pieces of zero-emissions equipment, including 475 drayage trucks and 188 pieces of cargo handling equipment. This will be implemented over the next 3-4 years and substantially reduce emissions associated with Port equipment. This grant supports several additional grant funded and budgeted conversions of vehicles, equipment, and facilities to lower-emission alternatives.

P-2 Reduce
Emissions from
Electricity
In Progress
The Port remains actively involved in negotiations for long-term procurement of more carbon-free energy for its electricity supply. The Port utilizes spot market electricity purchases for most of its electricity, resulting in a high percentage of "unspecified power" that cannot be confirmed as low- emission. In 2023, the Port identified 43 percent of its energy supply as carbon-free, with the remaining 57 percent unspecified. By 2025, the carbon- free percentage of electricity had risen to more than 75 percent.

Progress at a Glance
Of the 40 ECAP Actions, 16 saw significant progress since the end of the 2020-2022 reporting period. One Action (TLU-5) is Fully Implemented, and three have seen no progress. Another 12 have seen Major Progress to date. A full snapshot of all Actions is in Attachment 4.

CED Committee
March 10, 2026
Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 16
16 R
educing Greenhouse Gas Emissions
In the current reporting period, staff shifted from conducting the biennial greenhouse gas emissions inventory in-house to using an inventory conducted by the Cool Climate Network (CCN), housed at UC Berkeley with extensive vetting from StopWaste and others. According to this inventory, transportation remains Oakland’s largest source of GHG emissions, at 63.3 percent (a slight drop from 64 percent in the previous inventory). Transportation emissions remain a major cause of preventable respiratory and other poor health outcomes that disproportionately impact frontline communities. Transportation infrastructure and technologies, as well as land use patterns, determine how Oaklanders get around and interact with one another – whether a vehicle is needed, how safe a journey is, and how long a trip takes.

Vehicle miles traveled (VMT) increased from the 2020 pandemic low of 2,469 million to 2,592 million in 2021, then decreased to an estimated low of 2,471.5 million in 2023. Data for 2024 and 2025 are not yet available. The CCN data indicate that overall VMT in Oakland were higher by 4.9 percent in 2023 than they were in 2005. While these figures are estimates, they point to a need for further City, regional, and statewide action to make active and public transportation safer, more accessible, and more affordable, so that they become the default transportation mode for all Oaklanders.

Building energy use – onsite natural gas burning and electricity – is the second-largest source of climate emissions in Oakland, at 28 percent. If a building is fully electric and the electricity comes from renewable sources, the emissions from its energy use are zero. GHG emissions from natural gas occur at the point it is burned (for stoves, dryers, furnaces, and water heaters, as well as industrial and home luxury uses) as well as in leakages that occur throughout the distribution system. Emissions from electricity occur only where fossil fuels are burned at a central point to create electricity, such as at a natural gas or coal plant. (Statewide, less than 2% of electricity comes from coal; Oakland’s electricity mix does not include any coal.) Ava Community Energy, Oakland’s electricity provider, retains the goal of providing 100 percent carbon-free and renewable electricity for all customers by 2030. As of January 2026, they have installed 1,495 MW of wind, solar, and geothermal energy across 27 projects. Ava customers can choose between two plans: Renewable 100, where 100 percent of electricity comes from eligible renewable resources (such as solar, wind, and biomass); or Bright Choice, Ava’s baseline. The power mix for Bright Choice in 2024 was 62 percent eligible renewables, 34 percent large hydroelectric, and four percent “unspecified” – electricity purchased on a spot market where the origin cannot be definitively traced.

Total electricity consumption in Oakland reached 1,328,428,226 kWh in 2024, representing a decrease of 11.3 percent since 2005, and a steady decline since 2001. Importantly, residential electricity use declined steadily since 2020, from a high of 650,972,729 kWh to 580,059,594.

These changes reflect successes in energy efficiency programs, even as there has been marked progress in electrification of both buildings and transportation: natural gas use in Oakland decreased 22.2 percent from 2005 to 2024.

Priorities in 2026-2027:

In 2023-2025, ECAP implementation had a strong focus on strengthening interdepartmental engagement and coordination. Across sectors, staff prioritized bringing new funding into the community, primarily through the Inflation Reduction Act, Federal Infrastructure Act, and other PWT Committee
26March 24, 20
Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 17
oppor
tunities. Much of that funding dissipated in 2025 with the new Federal administration. In response to this and local budget challenges, in 2026 staff is prioritizing activities that promote both the ECAP and local economic development. The i-team is a critical boost for this effort, as is the newly-adopted Economic Development Action Plan (EDAP), which the ECAP informed.

Primary areas of focus in 2026-27 include:

1. Climate-positive Economic Development: Launch of the Green- and Climate- Business Accelerator in partnership with ESO Ventures, OakStop, and Rising Sun C
enter for Opportunity (an i-team-led effort with SRD advisory); launch of OakBiz, a “
front door”/concierge service for Oakland small businesses and entrepreneurs with an em
phasis on those aligned with ECAP Actions or the arts; holding Oakland’s first Clean and G
reen Jobs Fair, per the ZEV Action Plan; publishing the City’s first Climate Economic Sector Briefs; and continuing to expand the network of merchant associations and Business Improvement Districts. Building on the EDAP, the City will deepen its support of local businesses and entrepreneurs in ways that support both climate pr
ogress and wealth equity.

2. Climate Communication and Proactive Engagement: Relaunching proactive, community- and business-focused climate communication to better share the goals, reasoning, and motivating successes of the ECAP. Staff will continue to seek resources and partnerships to better tell the story of the ECAP for the sake of spurring continued ac
tion and ensuring that implementation serves frontline Oaklanders. This also links to Oakland Climate Action Network envisioned in Action CL-5 and the Clean and Green Job Fair called for in the ZEV Action Plan.

3. Decarbonization: Continuing to modify buildings and shift vehicle technologies so all mechanical systems and vehicles run on electricity rather than fossil fuels, so that all buildings and vehicles can be powered solely with 100% renewable energy. Community- wide decarbonization remains a top ECAP priority. The City and its partners m ade
i
mportant strides in 2023-25 through projects and policy development. While Federal funding for this work has largely evaporated, California continues to lead. SB-1221 has provided a rallying point for the City to work with partners to find solutions for holistically and affordably decarbonizing whole block, or “zones,” to maximize investments and increase safety. By the end of the next reporting period, the City will have a strategy for facilitating zonal decarbonization in Oakland neighborhoods, with partners in place to s
upport communities in navigating the process. Staff will continue advocating at the state and Federal levels for increased resources for equitable electrification and continue inter-agency coordination to ensure public resources are maximized, with a primary focus on health, resilience, safety, access, and affordability.

4. Sustainable Mobility: Staff will continue implementing Actions in the ZEV Action Plan, Bike Plan (Let’s Bike Oakland), and Pedestrian Master Plan. In the current reporting per
iod, private and utility sectors stepped up to install Level 2 and DC fast EV chargers at City-owned lots and garages. Most of these installations will occur in 2026-27, including from Flash Parking Inc. (244 level 2 chargers at eight facilities), and AVA Community Energy (DC fast chargers at four City-owned lots and garages). Staff will a
lso continue working with the region’s public transit agencies to improve public transit, referencing ambitious targets in the new LUTE.

PWT Committee
March 13, 202617
Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 18

5. G
reen Infrastructure: Staff will continue to seek external resources and partnerships to m
aximally implement the Urban Forest Plan. OPW’s Watershed and Stormwater Protection Division (WSP) will continue evaluating private new and redevelopment project plans to ensure sufficient green stormwater infrastructure when required by the M
unicipal Regional Stormwater Permit (MRP). The MRP requires the City to retrofit five ac
res of impervious surface by June 30, 2027. WSP is evaluating potential sites for this work, prioritizing projects that provide a combination flood control benefits, treatment against pollutants such as polychlorinated biphenyls (PCBs), mercury, and trash. WSD is also developing a Storm Drainage Master Plan that will be support storm drai nage
i
mprovements and additional green infrastructure investments.

6. Resilience: SRD will continue working across Departments and with community partners to advance the two identified Municipal Resilience Hubs (West Oakland and Li
ncoln Square) and identify an appropriate site for a third Hub in East Oakland. SRD and EMSD will continue working with community partners to identify and pursue r
esilience-building opportunities, and EMSD will work to identify suitable sites along the I-880 corridor for respite centers. Measure U continues to provide funding for critical infrastructure projects, affordable housing development and preservation, and municipal facility upgrades for resilience and decarbonization.

7. Circular Economy: OPW will continue leading SB 1383 compliance activities and bui
lding deconstruction policy advancement. OPW and EWDD will continue partnering to hel
p food service businesses understand and comply with the City’s 2024 Reusables Ordinance, and ensure that those efforts support economic activity in merchant corridors. SRD and EWDD will partner to identify pilot and business development opportunities to support robust, local, circular economies that uplift all Oaklanders.

F

ISCAL IMPACT
This item is for informational purposes only and has no direct fiscal impact or cost. Since its adoption, the ECAP’s ambition and specificity, combined with strong implementation, have helped enabled Oakland attract significant federal, state, regional, and philanthropic funding.

P

UBLIC OUTREACH / INTEREST
Because this report discusses ECAP progress implementation, it is directly informed by the community engagement process that took place in 2019-20 to develop the ECAP. SRD Staff work closely with numerous community-based organizations, including those listed above, in implementation and progress tracking. To continue identifying communication needs and opportunities for collaboration, staff meet regularly with community groups based on general interest as well as specific Action implementation (e.g. Asian Pacific Environmental Network, Rising Sun Center for Opportunity, Greenlining Institute, Chinatown Chamber of Commerce, East Bay Permanent Real Estate Collaborative, Unity Council, Black Cultural Zone, Planting Justice, Oakland Parks and Recreation Foundation, and more, as well as merchant and neighborhood groups).

PWT Committee
March 24, 202618
Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 19
19 S
RD and OPW-ESD publish a monthly newsletter sharing events and progress across ECAP implementation and Environmental Stewardship. That newsletter includes relevant community, residential, and business resources, as well as ways to get involved in projects. Staff also maintains a public online ECAP Storymap.

C

OORDINATION
The activities outlined in this progress report are the result of efforts led and supported by numerous City departments and work units, including OakDOT, EWDD, OPW, PBD, OFD- EMSD, Citywide Communications, and OPRYD. This report and the community engagement discussed have been led by CAO-SRD in collaboration with staff from OakDOT, DRE, EWDD, OPW, OFD-EMSD, and PBD.

S

USTAINABLE OPPORTUNITIES
Economic: The City Council has called for a “Just [economic and social] Transition and urgent climate mobilization effort to reverse global warming.” Assessing and providing for specific needs to ensure that this transition uplifts frontline Oaklanders first and foremost is central to the City’s ECAP implementation strategy. Investing in workforce demand and training, as well as in local entrepreneurship for resilience and decarbonization, can improve economic conditions, particularly for black, indigenous and people of color communities. As discussed in the Informational Report on workforce implications of building electrification (February 14, 2023), the transition to a low-carbon, resilient, and circular economy brings significant potential for high-road jobs to flow to Oaklanders, including youth, and those who are unemployed, underemployed, or with lower education. Interrelated benefits include more competitive local businesses, a more stable workforce, greater economic mobility for frontline residents, and increased regional economic growth. Oakland’s forward-thinking climate policies will increase local demand for electricians, electric appliance retailers, maintenance workers, repair professionals, those who install and maintain green infrastructure, and more.

Environmental: The ECAP is predicated on repairing and supporting the ecological and human environment. ECAP implementation has numerous environmental benefits including reduced air pollution both outside and indoors and increased green infrastructure and biodiversity. Major activities in the reporting period and near-term implementation include transitioning from auto- use to active and public transportation, electrifying remaining vehicles, and decreasing the use of natural gas, or methane, is a Short-Lived Climate Pollutant that has 84 times the global warming potential of carbon dioxide over a 20-year period. These activities are critical for stemming the climate crisis and its negative effects, which include extreme heat events, droughts, intense storms, flooding, and displacement. Importantly, the ECAP calls for placing benefits to frontline communities at the center of implementation, so that cleaner air, access to nature, and other environmental improvements can be felt first and foremost by those community members who have been most harmed by environmental degradation.

Race & Equity: Per OMC 2.29.170.1, the ECAP incorporates social and racial equity as the core guiding principle of climate action. The City’s charter defines equity as fair and just practices aimed to support social, economic, geographic, political and physical environment conditions in which people in our City are born, grow, live, work and age that lead to the creation PWT Committee
March 24, 2026
Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 20
of
a fair and just society. In alignment with this direction it explicitly addresses disparities in health outcomes, jobs, housing security, food and service access, and more. The ECAP Racial Equity Impact Assessment and Implementation Guide guides City staff in identifying specific frontline communities for each Action, and designing the specific programs, projects, and plans for implementation in ways that reduce disparities. This includes:
• Ensuring that vulnerable populations are protected from the dire consequences of climate disasters through establishment of Respite Centers and in the co-designing of Resilience Hubs;
• Reducing outdoor air pollution for communities in Deep East and West Oakl and and
al
ong the 880 Corridor, through implementation of the ZEV Action Plan and associated par
tnerships that will hasten the transition for all vehicles, including trucks and heavy equipment, to zero-emission technologies;
• Working to prevent housing and business displacement through the many programs and policies described above; and
• Improving indoor air quality, especially for lower-income residents, by centralizing and pr
omoting resources for energy efficiency and holistic building electrification.

CA

LIFORNIA ENVIRONMENTAL QUALITY ACT
This action is exempt from California Environmental Quality Act (CEQA) under CEQA Guidelines section 15061(b)(3) (common sense exemption), since it can be seen with certainty that an informational report will have no impact on the physical environment.

A

CTION REQUESTED OF THE CITY COUNCIL
Staff Recommends That The City Council Receive An Informational Report Regarding Progress To Date On Implementing The 2030 Equitable Climate Action Plan.

For questions regarding this report, please contact Shayna Hirshfield-Gold, Acting Sustainability Director, at (510) 238-6954.

R
espectfully submitted,
Betsy Lake (Mar 13, 2026 09:16:07 PDT)
Be
tsy Lake, Assistant City Administrator, City
Administrator’s Office
Reviewed by:

Daniel Hamilton, Chief Resilience Officer
Reviewed by:

PWT Committee
March 24, 202620
Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 21
A
ttachments:

Jacque Larrainzar, Program Analyst
Department of Race and Equity
Prepared by:

Shayna Hirshfield-Gold, Acting Sustainability
Director
Sustainability and Resilience Division

1. ECAP Actions: Lead Departments and Priority Timeline

2. General Plan Environmental Justice Element Progress Update Table

3. Zero Emission Vehicle Action Plan Progress Update Table

4. ECAP Action Progress at a Glance
PWT Committee
March 24, 202621
Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 22
A
ttachment 1: ECAP Actions: Lead Departments and Priority Timeline (ECAP, page 128) Note: “PW-SUS” is now SRD, as the Sustainability Program was absorbed by the City Administrator’s Office in 2023.

Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 23
A
ttachment 2: Environmental Justice Element
The City adopted its first Environmental Justice (EJ) Element in September 2023. As part of the GPU process, the City created a standalone EJ Element, and incorporated environmental justice polices throughout the different General Plan Elements adopted in Phase 1 of the Update. Some EJ Element policies were implemented in October 2023, and the City will implement others as part of Phase 2 of the GPU. The following Table shows the EJ Element polices and Actions that have been implement or have begun implementation. Strategies that were not started in the reporting period are not included. Implementation timeframes are defined as follows:
• Short: 0-5 years
• Ongoing: Efforts currently underway that the City will continue to implement EJ Element Goal Policy or Action Time
frame
Status
Goal EJ-1. Reduce
Pollution, Mitigate the
Impacts of Pollution
on Existing Sensitive
Land Uses, and
Eliminate Associated
Public Health
Disparities
EJ-1.6 Enhanced Enforcement. Prioritize
code enforcement to address illegal land
uses and activities that cause pollution and
are hazardous to health in EJ Communities.

Ongoing In progress
Goal EJ-1. Reduce
Pollution, Mitigate the
Impacts of Pollution
on Existing Sensitive
Land Uses, and
Eliminate Associated
Public Health
Disparities
EJ-1.8 Air Filtration. Consistent with the
State's Building Energy Efficiency
Standards for air filtration in effect as of
January 1, 2023, require newly constructed
buildings of four or more habitable floors to
include air filtration systems equal to or
greater than Minimum Efficiency Reporting
Value (MERV) 16 (ASHRAE Standard 52.2),
or a particle size efficiency rating equal to or
greater than 50 percent in the 0.3-1.0 μm
micrometer range and equal to or greater
than 85 percent in the 1.0-3.0 μm
micrometer range (AHRI Standard 680).

Short Completed
Reference:

Standard
Operating
Procedures
Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 24
Goal EJ-1. Reduce
Pollution, Mitigate the
Impacts of Pollution
on Existing Sensitive
Land Uses, and
Eliminate Associated
Public Health
Disparities
EJ-A.1 Amend the City’s Zoning code to
include the following changes:
• Allow greater residential density in less-
polluted areas, including existing single-
family residential neighborhoods.
• Condition the permitting of heavy industrial
uses within six hundred (600) feet or
whatever minimum is required by State Law
of a zone that permits residential activities.
• Establish special permit criteria for truck-
intensive industrial activities located withi
n
s
ix hundred (600) feet or whatever minimum
i
s required by State Law of any zone that
permits residential activities.
• Establish special performance standards
and standard conditions of approval for
Truck-Intensive Industrial Activities located
within six hundred (600) feet or whatever
minimum is required by State Law of any
zone that permits residential activities.
• Amend the permit procedures for
nonconforming Truck-Intensive Industrial
Activities
• Condition the permitting of commercial
kitchen operations designed for onli
ne
or
dering and food delivery.
• Modify the S-19 Health and Safety
Protection Combining Zone to prohibit use
of
diesel generators as the primary source
of power within six hundred (600) feet or
whatever minimum is required by State Law
from any Residential, Open Space, or
Institutional Zone boundary.

Short Completed
Reference:

Ordinance
No. 13763
CMS
Goal EJ-1. Reduce
Pollution, Mitigate the
Impacts of Pollution
on Existing Sensitive
Land Uses, and
Eliminate Associated
Public Health
Disparities
EJ-A.7 As part of the LUTE update in Phase
2, evaluate residential/industrial conflicts,
especially in areas such as West and East
Oakland, and evaluate measures, including
limiting additional residential development in
high pollution areas and ensuring adequate
buffering between industrial and residential
land uses through land use designations.

Short In progress
Reference:

General
Plan
Update
Website
Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 25
Goal EJ-1. Reduce
Pollution, Mitigate the
Impacts of Pollution
on Existing Sensitive
Land Uses, and
Eliminate Associated
Public Health
Disparities
EJ-A.8 As part of the LUTE update in Phase
2, explore modifications to truck routes and
truck management in partnership with the
Port of Oakland and WOIEP and
Communities for a Better Environment. The
West Oakland Truck Management Plan
(WOTMP), approved by the City and Port of
Oakland in 2019, should be used as the
framework to explore modifications to truck
routes.

Short In progress
Reference:

General
Plan
Update
Website
GOAL EJ-4.

Coordinate
Resources to
Improve Housing
Quality and
Habitability.

EJ-A.18 As part of the LUTE update in
Phase 2, explore incentives and strategies
to promote health-promoting features in
housing projects that are built in EJ
Communities. Health-promoting features
may include, but are not limited to,
enhanced filtration and ventilation systems;
low-emitting and environmentally
responsible materials; bicycle storage
facilities; access to open spaces; and
enhanced protection from external pollution
sources and indoor air contaminants.

Short In Progress
Reference:

General
Plan
Update
Website
Goal EJ-5 Support a
Food System that
Provides Nutritious,
Affordable, Culturally
Relevant, and
Affordable Food to
All Oaklanders.

EJ-A.23 As part of the LUTE update in
Phase 2, explore potential locations and
other strategies, such as incentives, zoning
overlays, land use changes, density or
intensity bonuses, or others, for prioritization
of new full-service grocery stores over a
certain square footage. Prioritize grocery
store development in EJ Communities with
the lowest food access, so that more
neighborhoods are within walking distance
of a grocery store, and incentivize
community-led, neighborhood resident-
owned and cooperatively owned full-service
grocery stores that also provide culturally
appropriate foods for black, indigenous and
people of color communities.

Short In Progress
Reference:

General
Plan
Update
Website
GOAL EJ-6 Support
a Network of Well-
Maintained
Community Facilities
that are Easily
Accessible, Culturally
Supportive, and
Responsive to
Community Needs.

EJ-A.26 As part of the update of the LUTE
and OSCAR Elements, and the creation of a
new Infrastructure and Facilities Element,
include policies that address equitable
distribution and maintenance of public
facilities in EJ Communities.

Short In progress
Reference:

General
Plan
Update
Website
Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 26
26 GOAL EJ-6 Support
a Network of Well-
Maintained
Community Facilities
that are Easily
Accessible, Culturally
Supportive, and
Responsive to
Community Needs.

EJ-A.27 As part of the LUTE update in
Phase 2, explore land use changes that are
supportive of cultural organization operation
in partnership with community groups, small
business associations, and the Cultural
Affairs office.

Short In progress
Reference:

General
Plan
Update
Website
Goal EJ-7 Create
Environments that
Support Physical
Activity, Recreation,
and Healthy
Lifestyles Through
Safe and
Comfortable
Walkable, Bikeable
Neighborhoods, with
Access to Green
Space, Trees, Paths,
and Parks.

EJ-A.28 As part of the LUTE update in
Phase 2, include policies that promote a
fine-grained neighborhood land use pattern
that encourages walking, biking, and getting
around without a car.

Short In progress
Reference:

General
Plan
Update
Website
Goal EJ-7 Create
Environments that
Support Physical
Activity, Recreation,
and Healthy
Lifestyles Through
Safe and
Comfortable
Walkable, Bikeable
Neighborhoods, with
Access to Green
Space, Trees, Paths,
and Parks.

EJ-A.29 As part of the LUTE update and
creation of the new Capital Facilities and
Infrastructure Element in Phase 2, include
policies that prioritize bicyclist, pedestrian,
and roadway improvements that prioritize
safety and comfort of non-auto users.

Target these improvements in EJ
Communities and areas identified in Figure
EJ-22.

Short In progress
Reference:

General
Plan
Update
Website
Goal EJ-7 Create
Environments that
Support Physical
Activity, Recreation,
and Healthy
Lifestyles Through
Safe and
Comfortable
Walkable, Bikeable
Neighborhoods, with
Access to Green
Space, Trees, Paths,
and Parks.

EJ-A.30 As part of the updates to the LUTE
and OSCAR in Phase 2, develop a citywide
greenway network that will connect
communities via an active transportation
network that includes trails, bikeways,
walking paths, etc., and expand access to
open recreation and green spaces. This
network should prioritize establishing
connections between Oakland’s
neighborhoods, parks on the Bay shoreline,
and regional parks (such as the MLK Jr.

Shoreline Park and Middle Harbor Shoreline
Short In progress
Reference:

General
Plan
Update
Website
26 Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 27
Park) as well as identify zones in need of
green infrastructure investments.

Goal EJ-7 Create
Environments that
Support Physical
Activity, Recreation,
and Healthy
Lifestyles Through
Safe and
Comfortable
Walkable, Bikeable
Neighborhoods, with
Access to Green
Space, Trees, Paths,
and Parks.

EJ-A.31 As part of LUTE update and
creation of the new Capital Facilities and
Infrastructure Element in Phase 2, study
shuttles and other local transit programs
that are supportive of AC Transit’s core
service to foster local mobility and
connections between neighborhoods and
rail transit. Prioritize investments in EJ
Communities that lack active transportation
infrastructure.

Short In progress
Reference:

General
Plan
Update
Website
Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 28
A
ttachment 3: Zero Emission Vehicle (ZEV) Action Plan Progress Action # Action Name Summary of Progress
CL-1 Fund Dedicated Staff
Resources for Zero Emission
Vehicle Infrastructure
Implementation
Not Begun
While Resolution #89448 (2022) included direction to hire a dedicated ZEV Planner position in the Fiscal Year 23-24 budget to implement the ZEV Action Plan, the position has not yet been included in the City budget. A lack of dedicated staff has hindered progress on implementing the ZEV Action Plan and other vehicle electrification initiatives.

CL-2 Conduct a Comprehensive
Audit of City Property for
Potential ZEV Infrastructure
Implementation
In Progress
Data has been collected for all City-owned parking facilities and associated electrical capacity; data has not been analyzed for site potential or prioritization. OPW is planning to release an RFP using Energy Efficiency and Conservation Block Groant (EECBG) funds to assess municipal facility electrification planning.

CL-3 Develop a Smart and
Equitable Mobility Hub
Program
Not Begun
No staff to complete. See CL-1
CL-4 Collaborate with Partner
Agencies to Expand the
Network of Public EV
Chargers
In Progress
OakDOT partnered with Flash Parking and Ava Community
Energy to install dozens of chargers across the City, including 24 in City Center West. The Flash chargers are in development at various locations.

CL-5 Expand affordable
neighborhood ZEV Car
Sharing Programs
Not Begun
No staff to complete. See CL-1
CL-6 Support ZEV Education and
Awareness in Underserved
Communities
Early Progress
Staff incorporates information about the benefits of switching to EVs and available incentives in all proactive climate, energy, and environmental justice outreach, such as event tabling and the monthly Sustainability and Stewardship Newsletter. In-person outreach ended due to resource limitations in Fall 2024.

CL-7 Ensure Fire Safety in the ZEV
Infrastructure Rollout
Early Progress
Coordination with OFD has been on an ad-hoc project basis to date.

CL-8 Accelerate City Fleet Vehicle
Replacement
In Progress
OPW-Fleet Services continues to power all diesel vehicles and equipment (531 assets) exclusively with renewable diesel. Of the remaining on-road vehicles, 365 (32%) are zero emission or alternative fuel. Staff will continue to pursue grant funding to support continued conversion of fossil fuel-based vehicles to zero-emission technologies.

Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 29
CL-9 Add EV Charger Installation
and Electrical Work to the
Contractor On-Call List
Fully Implemented
The majority of OPW on-call construction services contractors are capable of installing EV charging equipment, either through self-performing the work or by hiring a sub-contractor that can.

CL-10 Incentivize Use of ZEV's at
City-owned Parking Lots and
Garages
Major Progress
In 2022, OakDOT introduced new monthly parker rates for City employees, at City Center West, including a discounted rate for employees driving plug-in EVs ($150 per month vs. $180/month) CL-11 Establish an Inter-
Departmental Working Group
to Review, Assess, and
Streamline Strategic Mobility
Projects
Early Progress
An interdepartmental working group would include staff from EWDD, SRD, Fire, PBD, ADA programs, and others, but would be convened by the ZEV Program lead within OakDOT. Due to staffing constraints, such a team hasn't been convened. Staff have partnered cross-departmentally for ad-hoc projects, including the two EVGo pilot installations, a CFI Grant (in partnership with Ava Community Energy - unsuccessful), and integrated solar, battery-energy storage system, and dedicated delivery chargers at Family Laundry.

EMB-1 Develop an "EV-Ready"
Ordinance for Major Retrofits
and Property Transfers
In Progress
EV-readiness requirements were being considered as part of a broader set of requirements for major renovations in building code amendments expected to be proposed in 2025.

EMB-2 Conduct Outreach to Tenants
and Property
Owner/Managers
Early Progress
See update for ZEV Action Plan CL-6. SRD and HCD have been in discussions to provide additional outreach and technical assistance to buildings within their affordable housing portfolio, but staff have not identified implementation resources.

EMB-3 Working with Partners,
Establish A Program to
Facilitate Collection of
Information About Electric
Infrastructure and Peak
Demand for Multifamily
Buildings
Not Begun
Resources not yet identified.

EMB-4 Include Strategies to
Encourage EVSE Installation
in Existing Buildings in the
Building Electrification
Roadmap
Early Progress
Building Electrification Roadmap is on hold. In all outreach, City staff regularly include messaging about incentives, technical assistance programs, grants, and tax credits available to help multifamily property owners install EVSE in their buildings.

EMB-5 Analyze the Potential for
Reducing Localized Air
Pollution through Targeted
EV Charging Investments
Not Begun
Resources not yet identified.

Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 30
PC-1 Amend the Oakland
Municipal Code (OMC) to
Facilitate and Regulate
Equitable EV Charging in the
Public Right-of-Way
Not Begun
No staff to complete. See CL-1
PC-2 Create a Residential
Curbside EV Charging
Strategy and Ordinance
Not Begun
No staff to complete. See CL-1
PC-3 Develop and Implement a
Program to Deploy EV
Charging Infrastructure in
Frontline Communities
Not Begun
No staff to complete. See CL-1
PC-4 Study the Feasibility of
Subsidizing Public Charging
for Low-income Users
Not Begun
No staff to complete. See CL-1
PC-5 Pursue EV Charging
Requirements for Fuel
Service Stations
Not Begun
This item is being evaluated for inclusion in the Land Use and Transportation Element, which will be developed in 2026.

MHD-1 Develop a Zero-Emission
MHD Vehicle Charging
Overlay Zone in the City's
Zoning Ordinance
Fully Implemented
Electrical Vehicle Charging Stations serving automobiles & other light vehicles are permitted anywhere the Essential Service Civic Activities are permitted, per OMC 17.10.140. Electric truck charging is allowed in 11 zones, per OMC 17.10.585 Trucking and Truck-Related Industrial Activities; and F. Electrical Vehicle Charging Stations serving Trucks and Other Heavy Vehicles.

MHD-2 Require Upgrades to MHD
Vehicle Fleet Sites
Early Progress
EWDD has begun early analysis to understand the numbers, locations, types, and sizes of businesses that would be affected by this scope. Analysis will be ongoing into 2026, along with business outreach and assessment of available funding sources.

MHD-3 Establish an Inter-Agency
Working Group and
Partnership Agreement to
Facilitate Site Identification
and Streamlined Construction

Not Begun
The agencies and departments named in MHD-3 (PBD, EWDD, OakDOT, SRD; and Ava Community Energy, Port of Oakland, and PG&E) are pursuing individual strategies. An interagency working group is impractical at this time. Staff are collaborating on an ad-hoc basis as specific opportunity sites and funding become available.

MHD-4 Develop a Zero-Emission
Delivery Zone Pilot Program
In Progress
Oakland participated in a Zero-Emission Delivery Accelerator, convened by the Los Angeles Cleantech Incubator (LACI).

Participating cities explored policy and program strategies, while LACI developed best practice materials and lists of companies and funders able to provide key services or technologies.

Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 31
Oakland launched its first pilot site in partnership with Fruitvale’s Family Laundry and Community Kitchens in November 2025.

MHD-5 Study the Potential for
Autonomous Delivery
Vehicles
Not Begun
No staff to complete. See CL-1
MHD-6 Support Enhanced Action on
Zero Emission MHD
Infrastructure in the East
Oakland Community Action
Plan
Not Begun
This item will be addressed in the GPU process when the Land Use and Transportation Element is revised in 2025-2026. The General Plan Environmental Justice Element includes two related Actions: EJ-A.11 (Work with OakDOT and Oakland
Sustainability program to develop a zero emission Medium Heavy Duty Fleets Vehicle Charging Overlay Zone, to be
launched in 2025), and EJ-A.13 (Coordinate with public agencies in the Bay Area region to catalyze the development and
deployment of zero emission medium- and heavy-duty fleets and support development of shared charging hubs and resources.

Support advocacy efforts for significant additional funding for retrofitting or replacing diesel trucks with zero-emission EV trucks, prioritizing a just transition approach by including economic support for independent truckers to compensate for lost wages while waiting for retrofitted or new EV trucks.) MM-1 Create and Expand an E-bike
Lending Library
Early Progress
Contract with vendor to operate bike lending program nearly complete. Expected to launch in 2025.

MM-2 Connect Residents with
Subsidies and Incentives to
Residents for Purchasing E-
micromobility
Not Begun
No staff to complete. See CL-1
MM-3 Puruse Resources to Assist
Local Businesses to
Purchase Cargo E-bikes
Not Begun
No staff to complete. See CL-1
MM-4 Assess Continuation and
Expansion of City's Universal
Basic Mobility Program Pilot
Early Progress
To be analyzed as part of the OakPark+ grant-funded project.

That project will launch in early 2025 and conclude in 2028.

MM-5 Incentivize Promotion of
Adaptive E-micromobility
Devices for Persons with
Disabilities
Not Begun
No staff to complete. See CL-1
MM-6 Expand Public Secure
Parking and Bikeways for
Bikes and Scooters
In Progress
In 2023-2024, the City added eight miles of “better” bikeways.

The bikeway network expanded to 201 miles with 75% of the network being “better” bikeways. The City added 309 public bike parking spaces, increasing the total inventory to 12,187 spaces (not including private parking in residential or commercial buildings). The numbers include racks, lockers, and stations.

Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 32
MM-7 Include E-micromobility in
Next Bike Plan
Not Begun
Work has not yet begun on a revised Bike Plan
ZE-1 Fund and Conduct a Local
Economic Assessment for
ZEV Transition
Not Begun
Staff will begin this analysis in 2025 as part of the EDAP.

ZE-2 Hold an Annual "Clean,
Green, and Just Business
and Employment Expo"
Not Begun
Staff will plan and convene this job fair in 2026.

ZE-3 Partner with Local
Community Colleges and
Work-force Training Partners
to Create ZEV-specific
Training Programs and
Pathways
Early Progress
The EDAP, adopted 2025, provides a foundation for specific partnerships around these themes, which EWDD, the i-team, and workforce partners are exploring in 2026.

ZE-4 Work Across City
Departments to Incorporate
the ZEV Ecosystem into
Relevant Plans
In Progress
OakDOT, SRD, and PBD began partnering to incorporate ECAP and ZEV AP Actions and approaches into the General Plan, including all its elements.

ZE-5 Establish High-Road Labor
Standards and Goals for All
City of Oakland Municipal
Decarbonization Projects
Early Progress
The 2025 EDAP provides a foundation for specific partnerships around this item, which EWDD, DWES, and the i-team are
exploring in 2026
ZE-6 Build Partnerships with Local
Labor Leaders to Ensure
Critical Needs Are Being
Addressed
Early Progress
The EDAP, adopted 2025, provides a foundation for specific partnerships around these themes, which EWDD, the i-team, and workforce partners are exploring in 2026.

Jestin D. Johnson, City Administrator
Subject: Informational Report 2023-2025 Progress Implementing the 2030 Equitable Climate Action Plan
Date: March 10, 2026 Page 33
A
ttachment 4: ECAP Action Progress at a Glance