DEPARTMENT PROPOSED FEES
FY 2026-27 MASTER FEE SCHEDULE
Exhibits:
A-1 CITYWIDE SERVICES
A-2 ANIMAL SERVICES
A-3 CITY ATTORNEY
A-4 CITY CLERK
A-5 FINANCE DEPARTMENT
A-6 FIRE DEPARTMENT (OFD)
A-7 PARKS AND RECREATION AND YOUTH DEVELOPMENT
A-8 HUMAN SERVICES
A-9 PUBLIC WORKS (OPW)
A-10 ECONOMIC WORKFORCE DEVELOPMENT
A-11 HOUSING AND COMMUNITY DEVELOPMENT
A-12 PLANNING AND BUILDING (PBD)
A-13 INFORMATION TECHNOLOGY
A-14 TRANSPORTATION (OakDOT)
A-15 SPECIAL EVENTS
A-16 WORKPLACE EMPLOYMENT STANDARDS
EX
HIBIT A
CITYWIDE SERVICES
FY 2026-27 MASTER FEE SCHEDULE
EX
HIBIT A: A-1
City of Oakland
Master Fee Schedule
Effective July 1, 202 5 6
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT
% Change Justification for Fee Change
CITY WIDE
CREDIT CARD CONVENIENCE
A. 3.00 Each Transaction At Cost Cost recovery
CITY WIDE SERVICES
ONLINE WEB PAYMENTS
A-1
ANIMAL SERVICES
FY 2026-27 MASTER FEE SCHEDULE
EX
HIBIT A: A-2
City of Oakland ANIMAL SERVICES Master Fee Schedule
Effective July 1, 202 5 6
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT Fee Unit % Change Justification for Fee Change
ANIMAL SHELTER
A.
113.56 Dog 116.96 3.00% Fee increase based on labor cost increases to reflect full cost recovery 198.73 Dog 204.69 3.00% Fee increase based on labor cost increases to reflect full cost recovery 255.50 Dog 263.16 3.00% Fee increase based on labor cost increases to reflect full cost recovery B.
85.17 Dog 87.72 3.00% Fee increase based on labor cost increases to reflect full cost recovery 149.04 Dog 153.51 3.00% Fee increase based on labor cost increases to reflect full cost recovery 191.63 Dog 197.37 3.00% Fee increase based on labor cost increases to reflect full cost recovery C.
20.00 Dog 20.60 3.00% Fee increase based on labor cost increases to reflect full cost recovery
35.00 Dog 36.05 3.00% Fee increase based on labor cost increases to reflect full cost recovery
50.00 Dog 51.50 3.00% Fee increase based on labor cost increases to reflect full cost recovery D.
15.00 Dog 15.45 3.00% Fee increase based on labor cost increases to reflect full cost recovery
28.00 Dog 28.84 3.00% Fee increase based on labor cost increases to reflect full cost recovery
40.00 Dog 41.20 3.00% Fee increase based on labor cost increases to reflect full cost recovery F. 28.39 Animal 29.24 3.00% Fee increase based on labor cost increases to reflect full cost recovery G. POTENTIALLY DANGEROUS DOG PERMIT 177.00 Permit 182.31 3.00% Fee increase based on labor cost increases to reflect full cost recovery H. VICIOUS DOG PERMIT 284.00 Permit 292.52 3.00% Fee increase based on labor cost increases to reflect full cost recovery I. IMPOUND FINES
1 58.00 Animal 60 3.00% Fine increase
2 100.00 Animal 110 10.00% Fine increase
3 200.00 Animal 220 10.00% Fine increase
J. INSPECTIONS
1 71.00 Inspection 73.13 3.00% Fee increase based on labor cost increases to reflect full cost recovery 2 71.00 Inspection 73.13 3.00% Fee increase based on labor cost increases to reflect full cost recovery K. DAILY BOARDING FEES 27.04 Day 27.85 3.00% Fee increase based on labor cost increases to reflect full cost recovery L. SURRENDER FEES 68.25 Animal 70.29 3.00% Fee increase based on labor cost increases to reflect full cost recovery M. LABOR FEES 71.00 Officer/Hour 73.13 3.00% Fee increase based on labor cost increases to reflect full cost recovery N. DECEASED ANIMAL DISPOSAL FEES 26.25 Animal 27.03 3.00% Fee increase based on labor cost increases to reflect full cost recovery O. DECEASED ANIMAL PICK UP
1 Deceased Animal Pick up with one officer 71.00 under 10 pounds 73.13 3.00% Fee increase based on labor cost increases to reflect full cost recovery 2 Deceased Animal Pick up with one officer 97.25 10 pounds and over 100.16 3.00% Fee increase based on labor cost increases to reflect full cost recovery 3 Deceased Large Animal Pick up with two officers 168.25 over 60 pounds 173.29 3.00% Fee increase based on labor cost increases to reflect full cost recovery P. ADOPTION FEES
1 150.00 Dog or Pair 154.5 3.00% Fee increase based on labor cost increases to reflect full cost recovery 2 75.00 Cat or Pair 77.25 3.00% Fee increase based on labor cost increases to reflect full cost recovery 3 40.00 Rabbit or Pair 41.20 3.00% Fee increase based on labor cost increases to reflect full cost recovery 4 Small Rodents 15.00 Rodent 15.45 3.00% Fee increase based on labor cost increases to reflect full cost recovery Rabbits (Including Spay/Neuter, Microchip)
Second Impound (within 12 Rolling Months)
Third Impound (within 12 Rolling Months)
Penalty for 2nd Inspection for PDD/VD Dog Permit
At-Large Dog Inspections
Dogs (Including Spay/Neuter, Vaccines, Microchip)
Cats (Including Spay/Neuter, Vaccines, Microchip)
TRANSFER FEE FOR OWNERSHIP CHANGE
Impound Fine
2 Years
3 Years
REDUCED DOG LICENSE FOR SPAYED OR NEUTERED DOG
BELONGING TO SENIOR CITIZEN AS REQUIRED BY OAKLAND
MUNICIPAL CODE SECTION 6.04.030
1 Year
2 Years
3 Years
1 Year
DOG LICENSE FEE (UNALTERED) AS REQUIRED BY
OAKLAND MUNICIPAL CODE SECTION 6.04.030
1 Year
2 Years
3 Years
REDUCED DOG LICENSE FEE (UNALTERED) BELONGING TO
SENIOR CITIZEN AS REQUIRED BY OAKLAND MUNICIPAL
CODE SECTION 6.04.030
1 Year
2 Years
3 Years
REDUCED DOG LICENSE FOR A SPAYED OR NEUTERED DOG
AS REQUIRED BY OAKLAND MUNICIPAL CODE SECTION
6.04.030
C - 1
City of Oakland ANIMAL SERVICES Master Fee Schedule
Effective July 1, 202 5 6
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT Fee Unit % Change Justification for Fee Change 5 Parakeets/Finches 15.00 Bird 15.45 3.00% Fee increase based on labor cost increases to reflect full cost recovery 6 Pigeons/Doves/Chickens 20.00 Bird 20.60 3.00% Fee increase based on labor cost increases to reflect full cost recovery 7 Large Exotic Birds 65.00 Bird 66.95 3.00% Fee increase based on labor cost increases to reflect full cost recovery Q. MEDICAL SERVICES
2 Spay/Neuter 150.00 per animal 154.50 3.00% Fee increase based on labor cost increases to reflect full cost recovery 3 Veterinary Care Fee 150.00 per hour 154.50 3.00% Fee increase based on labor cost increases to reflect full cost recovery 4 Microchips 10.00 per chip 10.30 3.00% Fee increase based on labor cost increases to reflect full cost recovery R. ADMINISTRATIVE CITATIONS
1 Referral to collections 250
This fee is associated with the staff cost to prepare and send materials to the Finance Department when a citation is not paid.
* Pursuant to OMC 6.04.140, OAS has authority to waive fees or costs based on financial hardship.
C - 2
CITY ATTORNEY
FY 2026-27 MASTER FEE SCHEDULE
EX
HIBIT A: A-3
City of Oakland CITY ATTORNEY Master Fee Schedule
Effective July 1, 202 5 6 Proposed
2026-27
Fee
Proposed
2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change A. CITY ATTORNEY'S HOURLY RATES
1 Deputy City Attorney I 268.07 Hour 276.11 Hour 3.00% Fee increase based on labor cost increases to reflect full cost recovery
2 Deputy City Attorney II 362.06 Hour 372.93 Hour 3.00% Fee increase based on labor cost increases to reflect full cost recovery
3 Deputy City Attorney III 399.34 Hour 411.32 Hour 3.00% Fee increase based on labor cost increases to reflect full cost recovery
4 Deputy City Attorney IV 439.44 Hour 452.62 Hour 3.00% Fee increase based on labor cost increases to reflect full cost recovery
5 Deputy City Attorney V 483.66 Hour 498.17 Hour 3.00% Fee increase based on labor cost increases to reflect full cost recovery
6 Paralegal 210.05 Hour 216.35 Hour 3.00% Fee increase based on labor cost increases to reflect full cost recovery
7 Claim Investigator III 273.62 Hour 281.83 Hour 3.00% Fee increase based on labor cost increases to reflect full cost recovery
8 Special Counsel 508.56 Hour 523.82 Hour 3.00% Fee increase based on labor cost increases to reflect full cost recovery
9 Neighborhood Law Corps Attorney 124.37 Hour 178.54 Hour 43.55% Increase to reflect the salary adjustment
mandated in the Salary Ordinance as
amended by Council pursuant to Ordinance
No. 13878 C.M.S.
10 City Attorney, Assistant 560.56 Hour N/A Newly added D - 1
CITY CLERK
FY 2026-27 MASTER FEE SCHEDULE
EX
HIBIT A: A-4
City of Oakland CITY CLERK
Master Fee Schedule
Effective July 1, 202 5 6
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT
% Change Justification for Fee Change
C. ELECTION FILING FEES
2 500.00 Filing 200.00 -60.00% Statutory rate decrease to match California Elections Code as required by the Charter.
KTOP
A.
10 a.
1 134.11 Hour 138.13 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
2 201.16 Hour 207.19 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
3 163.03 Hour 167.92 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
4 147.87 Hour 152.31 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
6 66.50 Hour 68.50 3.00% Fee increase based on labor cost increases to reflect full cost recovery.Cable TV Production Asst
Labor Charges - Daytime
Cable TV Operations Technician - Regular
Cable TV Operations Technician - Overtime
Cable TV Operations Manager
Cable TV Engineer
Video Operator Technician Labor Charge
PRODUCTION SERVICES
Initiative Petitions (Filing Fee May Be Refunded within One Year if Clerk Certifies Sufficiency of Petition)
E - 1
FINANCE DEPARTMENT
FY 2026-27 MASTER FEE SCHEDULE
EX
HIBIT A: A-5
City of Oakland
Master Fee Schedule
Effective July 1, 2025 6 Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change A. Removing the fees from the Master Fee Schedule as fees are established pursuant to separate noticing process and ordinance, specifically OMC Chapter 13.04 (Ordinance No. 13035).
1 Removing the fees from the Master Fee Schedule as fees are established pursuant to separate noticing process and ordinance, specifically OMC Chapter 13.04 (Ordinance No. 13035).
a. 37.57Premise / Month Removing the fees from the Master Fee Schedule as fees are established pursuant to separate noticing process and ordinance, specifically OMC Chapter 13.04 (Ordinance No. 13035).
b. Removing the fees from the Master Fee Schedule as fees are established pursuant to separate noticing process and ordinance, specifically OMC Chapter 13.04 (Ordinance No. 13035).
1 42.15 Premise / Month Removing the fees from the Master Fee Schedule as fees are established pursuant to separate noticing process and ordinance, specifically OMC Chapter 13.04 (Ordinance No. 13035).
2 63.22Premise / Month Removing the fees from the Master Fee Schedule as fees are established pursuant to separate noticing process and ordinance, specifically OMC Chapter 13.04 (Ordinance No. 13035).
3 84.30Premise / Month Removing the fees from the Master Fee Schedule as fees are established pursuant to separate noticing process and ordinance, specifically OMC Chapter 13.04 (Ordinance No. 13035).
c. 2.57100 Cubic Feet / Month Removing the fees from the Master Fee Schedule as fees are established pursuant to separate noticing process and ordinance, specifically OMC Chapter 13.04 (Ordinance No. 13035).
d. 37.57Premise / Month Removing the fees from the Master Fee Schedule as fees are established pursuant to separate noticing process and ordinance, specifically OMC Chapter 13.04 (Ordinance No. 13035).
2 Removing the fees from the Master Fee Schedule as fees are established pursuant to separate noticing process and ordinance, specifically OMC Chapter 13.04 (Ordinance No. 13035).
a. Removing the fees from the Master Fee Schedule as fees are established pursuant to separate noticing process and ordinance, specifically OMC Chapter 13.04 (Ordinance No. 13035).
1 2.33100 Cubic Feet / Month Removing the fees from the Master Fee Schedule as fees are established pursuant to separate noticing process and ordinance, specifically OMC Chapter 13.04 (Ordinance No. 13035).
2 2.57100 Cubic Feet / Month Removing the fees from the Master Fee Schedule as fees are established pursuant to separate noticing process and ordinance, specifically OMC Chapter 13.04 (Ordinance No. 13035).
3 2.65100 Cubic Feet / Month Removing the fees from the Master Fee Schedule as fees are established pursuant to separate noticing process and ordinance, specifically OMC Chapter 13.04 (Ordinance No. 13035).
4 2.84100 Cubic Feet / Month Removing the fees from the Master Fee Schedule as fees are established pursuant to separate noticing process and ordinance, specifically OMC Chapter 13.04 (Ordinance No. 13035).
5 3.00100 Cubic Feet / Month Removing the fees from the Master Fee Schedule as fees are established pursuant to separate noticing process and ordinance, specifically OMC Chapter 13.04 (Ordinance No. 13035).
6 37.57Premise / Month Removing the fees from the Master Fee Schedule as fees are established pursuant to separate noticing process and ordinance, specifically OMC Chapter 13.04 (Ordinance No. 13035).
b. Removing the fees from the Master Fee Schedule as fees are established pursuant to separate noticing process and ordinance, specifically OMC Chapter 13.04 (Ordinance No. 13035).
1 3.11100 Cubic Feet / Month Removing the fees from the Master Fee Schedule as fees are established pursuant to separate noticing process and ordinance, specifically OMC Chapter 13.04 (Ordinance No. 13035).
Residential Premises Not Included in (a) or (b) Above, Based on Cubic Feet of Water Used Upon the Premises
FINANCE DEPARTMENT
SEWER SERVICE CHARGES AS ALLOWED BY OAKLAND MUNICIPAL
CODE SECTION 13.04.020
Residential Premises
Single Family Residences
Multiple Family Dwellings
Duplexes
Triplexes
Fourplexes
Minimum Monthly Service Charge Per Residential Premise
Commercial, Industrial, and Public Authority Classifications Premises without a Sewer Meter are Charged on Total Amount of Water Used
Industrial Accounts
Commercial Accounts
Restaurants/Hotels
Hospitals
Laundromats/Carwashes
Minimum monthly Charge Per Premise
Premises with a Sewage Meter are Charged on Cubic Feet of Measured Sewage Flow. This Rate also Applies to Premises Where a Portion of the Water Received Does Not Flow into Sewers Due to Manufacturing Processes or Removal by Other Means and a Meter Measures the Volume of Sewage Discharge.
All Classifications
F - 1
2 37.57Premise / Month Removing the fees from the Master Fee Schedule as fees are established pursuant to separate noticing process and ordinance, specifically OMC Chapter 13.04 (Ordinance No. 13035).
B. A. 116.00Invoice 119.00 2.59% Heading letter updated. Fee increase based on labor cost increases to reflect cost recovery.
Update OMC.
C. B. 5.00 Invoice Heading letter updated
D. C. Heading letter updated
1 25.00 Check Added eCheck
2 10.00 Check Added eCheck
E. D. 1.73%Of Delinquent Charge Heading letter updated
F. E. Heading letter updated. Fee increase based on labor cost increases to reflect cost recovery.
Update OMC.
1 324.00Per Delinquent Account 333.00 2.78% Fee increase based on labor cost increases to reflect cost recovery. 2 100% of Collection
Dollar Amount of
Account (up to
balance of
$323.99)
Per Delinquent Account100% of Collection
Dollar Amount of
Account (up to balance
of $332.99)
2.78% Fee increase based on labor cost increases to reflect cost recovery.
G. F. 43.00Request 44.00 2.33% Heading letter updated. Fee increase based on labor cost increases to reflect cost recovery.
Update OMC.
H.G. 120.00Per Hour, or Fraction
thereof plus cost of
materials
123.00 2.50% Heading letter updated. Fee increase based on labor cost increases to reflect cost recovery.
Update OMC.
I. H. 100.00Per New Established
Business
103.00 3.00% Heading letter updated. Fee increase based on labor cost increases to reflect cost recovery.
Update OMC.
J. I. 5.00 Per New Business
License & Per Business
License Renewal
Heading letter updated
K. J. 29.00Per Certificate 29.85 2.93% Heading letter updated. Fee increase based on labor cost increases to reflect cost recovery.
Update OMC.
L. K. 175.00Per Lien 180.00 2.86% Heading letter updated. Fee increase based on labor cost increases to reflect cost recovery.
Update OMC.
M. L. 5.00 Per Note Heading letter updated
N. M. 25.00 Per Note Heading letter updated
O. N. 103.00 Per Note Heading letter updated
P. O. 175.00Per Lien 180.00 2.86% Heading letter updated. Fee increase based on labor cost increases to reflect cost recovery.
Update OMC.
Q. P. 29.00Per Duplicate Certificate
Heading letter updated. Update OMC.
R. Q. 175.00Per Lien 180.00 2.86% Heading letter updated. Fee increase based on labor cost increases to reflect cost recovery.
Update OMC.
S. R. 166.00Per Issuance Removing fee for consistency with the current business tax ordinance T. S. 175.00Per Lien 180.00 2.86%
Heading letter updated. Fee increase based on labor cost increases to reflect cost recovery.
U. T. 175.00Per Request 180.00 2.86% Heading letter updated. Fee increase based on labor cost increases to reflect cost recovery.
V. U. 139.00Per Note 143.00 2.88% Heading letter updated. Fee increase based on labor cost increases to reflect cost recovery.
W. V. Heading letter updated
X. W. 15.00Notarized Signature Heading letter updated
Y. X. Heading letter updated
Minimum Monthly Charge Per Premise
COUNTY COLLECTION FEE FOR LIENS
COLLECTION FEE ON DELINQUENT ACCOUNTS
Accounts with a balance of $324 $333 or more
Accounts with a balance less than $324 $333
CITY SUBSCRIPTION ADMINISTRATIVE SERVICE CHARGE AS
ALLOWED BY OAKLAND MUNICIPAL CODE SECTION 8.28.190 (Solid Waste Collection; Special Assessment: Nuisance Conditions)
ADMINISTRATIVE SERVICE CHARGE AS ALLOWED BY OAKLAND
MUNICIPAL CODE SECTION 8.28.240 (Solid Waste Collection; Payment prior to placement on tax roll, to avoid collection of special assessment)
BANK SERVICE FEES
Service Fee for any check or eCheck returned by the bank Service Fee for any check or eCheck stop payment request
PARKING PROMISSORY NOTE ADMINISTRATIVE FEE INDIGENT
PARKING PROMISSORY NOTE ADMINISTRATIVE FEE FOR NON-
INDIGENT
PARKING PROMISSORY NOTE MAINTENANCE FEE
PER NON-INDIGENT
ADMINISTRATIVE SERVICE CHARGE AS ALLOWED BY OAKLAND
MUNICIPAL CODE SECTION 4.20.070 (Release of Lien)
BUSINESS LICENSE VERIFICATION FEE
INFORMATION RELATING TO BUSINESS TAX CERTIFICATES
NEW BUSINESS REGISTRATION
RECORDATION AND TECHNOLOGY FEE
CERTIFICATE FOR NON-PROFIT BUSINESS
DUPLICATE RELEASE OF LIEN
ADMINISTRATIVE SERVICE CHARGE AS ALLOWED BY OAKLAND
MUNICIPAL CODE SECTION 5.04.180 5.04.360 (Business Tax certificates)
ADMINISTRATIVE SERVICE CHARGE AS ALLOWED BY OAKLAND
MUNICIPAL CODE SECTION 5.04.260 5.04.420 (Collection by Special Tax Roll)NOTICE OF VIOLATION FEE - NON PROCUREMENT OF A BUSINESS
CITYWIDE LIEN ADMINISTRATION FEE
DEMAND LETTER / RESEARCH & PROCESSING FEE
ADMINISTRATIVE FEE FOR PROMISSORY NOTES
TRANSACTION FEES
NOTARY FEE
FINANCIAL REPORTS (RETIREMENT)
F - 2
1 $5.67 per report up
to 30 pages +
$0.28 per page in
excess of 30 pageReport
$5.84 per report up to
30 pages +
$0.29 per page in
excess of 30 page
3.00% Fee increase based on labor cost increases to reflect cost recovery. 2 $5.67 per report up
to 30 pages +
$0.28 per page in
excess of 30 pageReport
$5.84 per report up to
30 pages +
$0.29 per page in
excess of 30 page
3.00% Fee increase based on labor cost increases to reflect cost recovery.
Z. Y. Heading letter updated
AA. Z. Heading letter updated
AB. Fees removed and moved to Public Works
1 230.00Per Year (or pro-rata) Fees removed and moved to Public Works 2 910.00Per Year (or pro-rata) Fees removed and moved to Public Works 3 3,815.00Per Year (or pro-rata) Fees removed and moved to Public Works 4 100.00Per Year (or pro-rata) Fees removed and moved to Public Works 5 50.00Per Year Fees removed and moved to Public Works
6 10%of Invoice Fees removed and moved to Public Works
7 25%of Invoice Fees removed and moved to Public Works
8 50%of Invoice Fees removed and moved to Public Works
9 1%Per Month Fees removed and moved to Public Works
10 67.50Appeal Fees removed and moved to Public Works
AC. 5.00Form Employees can access through Oracle portal AD. AA. Heading letter updated
Oakland Police & Fire Retirement System
Failure to File an Annual Declaration
Oakland Municipal Employees' Retirement System
WORKER'S COMPENSATION FINANCIAL REPORTS (RISK)
RISK MANAGEMENT INSURANCE FEES
EXCESS LITTER FEE
Small Business
Medium Business
Large Business
Mobile Food Vending
COLLECTIONS COURT APPROVED LEGAL FEES PER COURT ORDER
Penalty for Failure to Pay Excess Litter Fee Invoice within 60 Days from Due Date
Penalty for Failure to Pay Excess Litter Fee Invoice beyond 90 Days from Due Date
Penalty for Failure to Pay Excess Litter Fee Invoice beyond 120 Days from Due Date
Interest, Inclusive of Penalties, for Delinquent Excess Litter Fees Due Filing Fee for an Appeal for Litter Ordinance
RE-ISSUE OF W2 FORM
F - 3
FIRE DEPARTMENT (OFD)
FY 2026-27 MASTER FEE SCHEDULE
EX
HIBIT A: A-6
City of Oakland
Master Fee Schedule
Effective July 1, 202 5 6 Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FE E UNIT FEE UNIT % Change Justification for Fee Change
ADMINISTRATION
D.
1 410.00 Plan 422.00 2.93% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
2 1,364.00 Plan 1404.00 2.93% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
3 669.00 Flat 689.00 2.99% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
E.
1 613.00 Appeal 631.00 2.94% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
2 8.70% Surcharge n/a - moving fee
category
Moving to stand-alone fee (vs under "Fire Impact Fee") authorizes FIRE to charge per new plan review or inspection record (including Hazardous Fire/Vegetation Management inspections).
F.
4 457.00 Flat 470.00 2.84% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
L. TECHNOLOGY AND RECORDS SURCHARGE 8.70% Surcharge per record n/a - moving fee category
Moving from "E.2" to stand-alone fee (vs under "Fire Impact Fee") authorizes FIRE to charge per new plan review or inspection record (including Hazardous Fire/Vegetation Management inspections).
A.
1 381.00 Year 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
2 381.00 Per Bldg/Instance 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
3 a. 381.00 Year/Hanger 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
b. 381.00 Year/Vehicle 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
4 381.00 Instance 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
5 381.00 Year 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
6 381.00 Each 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
7 381.00 Year 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
8 381.00 Year 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
9 1051.00 Year 1082.00 2.95% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
10 1051.00 Year 1082.00 2.95% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
11 1051.00 Year 1082.00 2.95% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
12 1051.00 Year 1082.00 2.95% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
13 a. 381.00 Year/Instance 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
b. 381.00 Year/Instance 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
c. 381.00 Year/Instance 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
d. 381.00 Year/Instance 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
FIRE DEPARTMENT
COMPLIANCE PLAN
Building/Property not declared substandard
Technology and Records Surcharge
FALSE ALARM FEES as provided in the Oakland Fire Code
Fire Inspector Follow-up of a False Alarm Incident
Building/Property declared substandard
Vegetation Management Fire Protection Plan Review
FIRE SERVICES IMPACT FEES
Administrative Appeal Fee
PERMITS
OPERATIONAL PERMITS as required by the Oakland Fire Code Aerosol Product Level 2 and Level 3
Christmas Tree Lots
Combustible Dust Producing Operations
Combustible Fibers
Combustible Liquids (C/L) - Class II or III Liquids - Store, Handle, Use, Dispense, and/or Temporarily Place Tank Out of Service
Combustible Materials (Store/Handle)
Compressed Gases (storage, use & handling of flammable and non- flammable compressed gases)
Amusement Buildings
Aviation Facilities
Aircraft Repair/Servicing Hanger
Aircraft Refueling Vehicle
Carnival/Fair/Circus
Cellulose Nitrate Film
Corrosive Materials (storage, use & handling)
Covered Mall Buildings
Use of Open Flame
Display liquid- or Gas Fired Equipment
Placement of Concession Equipment
Display of Highly Combustible Goods
H-1
City of Oakland
Master Fee Schedule
Effective July 1, 202 5 6 Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FE E UNIT FEE UNIT % Change Justification for Fee Change
FIRE DEPARTMENT
14 381.00 Year 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
15 381.00 Year 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
16 381.00 Year 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
17 381.00 Year 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
18 381.00 Instance 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
19 534.00 Instance 550.00 3.00% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
20 381.00 Year 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
21 381.00 Instance 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
22 381.00 Year 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
23 381.00 Year 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
24 381.00 Year 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
25 381.00 Year 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
26 381.00 Year/Instance 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
27 381.00 Year 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
28 381.00 Year 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
29 381.00 Vehicle/Instance 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
30 a. 1051.00 Year 1082.00 2.95% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
b. 1051.00 Year/Truck 1082.00 2.95% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
31 1051.00 Year 1082.00 2.95% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
32 1051.00 Year 1082.00 2.95% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
33 381.00 Instance 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
34 381.00 Instance 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
35 a. 534.00 Year 550.00 3.00% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
b. 534.00 Instance 550.00 3.00% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
c. 534.00 Year 550.00 3.00% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
d. 534.00 Instance 550.00 3.00% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
e. 534.00 Instance 550.00 3.00% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
f. 534.00 Year 550.00 3.00% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
g. 534.00 Instance 550.00 3.00% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
36 381.00 Year/Instance 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
37 991.00 Instance 1020.00 2.93% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
38 381.00 Year 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
39 381.00 Year 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
Cryogenic Fluids
Cutting/Welding/Hot works
Exhibits & Trade Shows
Explosives: Store, Handle, Transport, Use
Fire Hydrants & Valves, Use of
Fireworks Public Display - One Time
Hot Work/Welding/Cutting Operations
Industrial Ovens
Lumber Yards
Liquid/Gas Fueled Vehicles/Equipment in Assembly Buildings Liquid Petroleum Gas (LPG)
Storage or Use of
Flammable Liquids - Store, Handle, Use, Dispense
Flammable Finishes (spray, dip, powder-coating, etc.)
Food Truck
Fruit/Crop Ripening
Hazardous Materials
High-Piled Storage
Paint Removal
Used in Wildfire Risk Area
Assembly, Restaurant/Drinking Establishments
Ceremonial
Public Exhibition/Demonstration
Outdoor Cooking Establishment/Vendor
Cargo Tanker Transport
Magnesium (Melt, Cast, Heat-treat, Grind)
Miscellaneous Combustible Storage
Non-Profit Special Event
Open Burning
Open Flames, Candles, and Torches
Application of Roof Covering
Places of Assembly (50 + persons)
Pyrotechnic Special Effects Material (Use and Handling) Pyroxylin Plastics: Storage or Handling
Refrigeration Equipment (Operation of)
H-2
City of Oakland
Master Fee Schedule
Effective July 1, 202 5 6 Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FE E UNIT FEE UNIT % Change Justification for Fee Change
FIRE DEPARTMENT
40 381.00 Year 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
41 381.00 Year 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
42 1051.00 Year 1082.00 2.95% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
43 381.00 Structure 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
44 a. 1051.00 Year 1082.00 2.95% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
b. 1051.00 Year 1082.00 2.95% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
45 1051.00 Year 1082.00 2.95% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
46 1051.00 Year 1082.00 2.95% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
B.
1 1116.00 flat 1149.00 2.96% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
2 2231.00 P/H 2297.00 2.96% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
3 1116.00 flat 1149.00 2.96% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
4 All Pre-Engineered Systems (FM200, UL300, etc.) 1116.00 flat 1149.00 2.96% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
5 Private Hydrant/Dry Horizontal Standpipe 1116.00 flat 1149.00 2.96% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
6 Underground Mains/Feeds 1116.00 flat 1149.00 2.96% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
7 Fire Pumps and Related Equipment 1562.00 flat 1608.00 2.94% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
8 System Modification/Repairs - Tenant Improvement (TI) 669.00 flat 689.00 2.99% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
9 669.00 P/H 689.00 2.99% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
10 669.00 flat 689.00 2.99% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
11 669.00 P/H 689.00 2.99% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
12 669.00 P/H 689.00 2.99% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
13 669.00 flat 689.00 2.99% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
14 669.00 flat 689.00 2.99% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
15 669.00 flat 689.00 2.99% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
16 669.00 flat 689.00 2.99% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
17 669.00 flat 689.00 2.99% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
18 669.00 flat 689.00 2.99% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
19 669.00 flat 689.00 2.99% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
20 669.00 flat 689.00 2.99% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
21 a. 669.00 P/H 689.00 2.99% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
b. 669.00 P/H 689.00 2.99% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
22 a. 1339.00 flat 1379.00 2.99% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
b. 1339.00 flat 1379.00 2.99% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
Roof Top Heliports
Spraying or Dipping Operations
Tents, Canopies, and/or Temporary Membrane Structures
Tires
Rebuilding and/or Re-threading
Storage of Spare Tires and Tire Byproducts
Repair Garages
Battery System Installation
Combustible and Flammable Liquids System Installation (C/L) - Class II or III Liquids
Compressed Gases Installation, Repair, Abandon, Remove or placed temporarily out of service, or Closed or Modified)
Cryogenic Fluids (Installation or Alteration to Outdoor Storage Systems) Emergency Responder Radio Coverage System (Installation or Modification)
Fire Alarm and Detection Systems and related Equipment
Waste Handling Plants/Recycler (wrecking yards, junk yards, waste handling facilities)
Wood products/Mill
CONSTRUCTION PERMITS as required by the Oakland Fire Code Plan Review
Expedited Plan Review Charge
Automatic Fire Extinguishing Systems Installation - All 13 Systems Evacuation
Fire Safety Plan
Evacuation Map/Plan
Miscellaneous
Zoning Requests
Parcel Map Waiver Review
Fire Pumps and Related Equipment
Hazardous Materials (Install, Repair, Abandon, Remove, Place Temp out of service, or Close or Substantially Modify a Storage Facility) Industrial Ovens
Spraying or Dipping Booth, Tank or Room
Standpipe System
Tents, Canopies, and/or Temporary Membrane Structures (installation or construct)
H-3
City of Oakland
Master Fee Schedule
Effective July 1, 202 5 6 Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FE E UNIT FEE UNIT % Change Justification for Fee Change
FIRE DEPARTMENT
c. 1339.00 flat 1379.00 2.99% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
d. 669.00 P/H 689.00 2.99% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
e. 669.00 P/H 689.00 2.99% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
f. 669.00 P/H 689.00 2.99% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
g. 669.00 P/H 689.00 2.99% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
24 (NEW) Plan Check/Processing Fee for Planning Permits a. Consultation/Processing Fee and Initial Round of Review 2068.00 Flat - Initial Round of Review n/a - NEW Have never had a fee schedule item for this work that has been performed and unfunded. Add this fee for joint FPB/Planning project reviews to provide Planning the ability to charge the customer upfront on FPB’s behalf. There were 32 Planning projects reviewed in 2025. Basis mirrors the Parcel Map Construction Permit fee initially developed per the Citywide Development Services Fee Analysis (CWDS-FA) study by MGT and validated by Fire. Includes a nominal fee increase to the referred parcel map fee basis based on labor cost increases to reflect full cost recovery. b. Additional Round of Planning Permit Review 1379.00 Each Additional round of review n/a - NEW Have never had a fee schedule item for this work that has been performed and unfunded. Add this fee for joint FPB/Planning project reviews to provide Planning the ability to charge the customer upfront on FPB’s behalf. There were 32 Planning projects reviewed in 2025. Includes plan review and pre-application consultation fee. Basis mirrors the Parcel Map Construction Permit fee initially developed per the Citywide Development Services Fee Analysis (CWDS-FA) study by MGT and validated by Fire. Includes a nominal fee increase to the referred parcel map fee basis based on labor cost increases to reflect full cost recovery.
25 24
26 25 669.00 P/H 689.00 2.99% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
27 26
a. 1339.00 flat 1379.00 2.99% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
b. 1339.00 flat 1379.00 2.99% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
c. 1339.00 flat 1379.00 2.99% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
INSPECTIONS
A. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
B. 839.00 flat 550.00 P/H - 2.5 MIN n/a - different models Aligns with similar 'after hours' rates for inspection such as Hazardous Materials. Hourly rate is more accurate for cost recovery. Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
C. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
E. 381.00 P/H 392.00 3.00% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
H.
991.000 flat 0.015 Per Square Foot n/a - different models Revenues have dropped to 25% of previous levels before the 2025- 26 change to a flat rate. Returning to FY 2024-25 Highrise levels to accurately reflect cost-recovery.
Security Bars
Tentative Parcel Map
Site Utility Review
EBMUD Meter Approval
As-Builts
Resubmittals
Inspections are authorized under the California Fire Code as adopted by the City of Oakland. Fees are charged in accordance with Government Code Section 66014.
INSPECTION CONDUCTED BY FIRE INSPECTOR
AFTER HOURS INSPECTION CONDUCTED BY FIRE INSPECTOR
INSPECTION CONDUCTED BY FPB - RESIDENTIAL GROUP R-2
OCCUPANCIES
COMPLAINT INSPECTION
Consultation Requested For Preliminary Review Of Improvements And Construction Projects (One-Hour Minimum)
Processing Request For Alternate Materials Or Method Of Construction (AMMR)
Grade I - Code Deviations Requiring Limited Staff Time
Grade II - Code Violations Found During Plan Checking or Field Inspection
Grade III - Appeals Regarding Code Requirements When Projects are Still in the Design Stage
HIGH-RISE BUILDINGS INSPECTIONS (Occupiable space => 75 feet above point of access)
Annual Inspection
H-4
City of Oakland
Master Fee Schedule
Effective July 1, 202 5 6 Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change
FIRE DEPARTMENT
991.00 flat 392.00 Per Hour n/a - different models Hourly rate is more accurate to reflect costs and ensure cost recovery for re-inspections that a flat rate. Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
I. 381.00 P/H 392.00 Per Hour 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
J.
1 436.00 Inspection 224.00 Per Inspection -48.62% Reducing 2025-26 hourly rate 50% as most take up to 30 min.
Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
2 304.00 Inspection 157.00 Per re-inspection -48.36% Adjusting to 70% of adjusted enginee company inspection rate.
Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
K.
1 a.
1 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
2 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
3 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
b.
1 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
2 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
3 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
c.
1 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
2 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
3 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
d.
1 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
2 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
3 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
e.
1 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
2 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
3 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
f.
1 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
2 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
3 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
g.
1 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
2 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
3 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
h.
Annual Inspection
Re-Inspection
CARE FACILITIES defined by Oakland Fire Code Chapter 2
New/Modified Care Facility as Identified by Department of Social Services Adult Residential Facilities
Re-Inspection
MID-RISE BUILDINGS INSPECTIONS =>4 stories (Floor of Penthouse excluded as a Story for Residential Property Only, Not Classified as a High- Rise)
INSPECTION CONDUCTED BY AN ENGINE COMPANY
State Final Fire Clearance Request
Foster Family Homes
Proposed Facility Inspection 25 or less persons
Proposed Facility Inspection 26 or more persons
State Final Fire Clearance Request
Group Homes
Proposed Facility Inspection 25 or less persons
Proposed Facility Inspection 26 or more persons
State Final Fire Clearance Request
Congregate Living Health Facilities
Proposed Facility Inspection 25 or less persons
Proposed Facility Inspection 26 or more persons
State Final Fire Clearance Request
Intermediate Care for Developmentally Disabled Nursing
Proposed Facility Inspection 25 or less persons
Proposed Facility Inspection 26 or more persons
State Final Fire Clearance Request
Nurseries
Proposed Facility Inspection 25 or less persons
Proposed Facility Inspection 26 or more persons
State Final Fire Clearance Request
Intermediate Care for Developmentally Disabled Habilitative Proposed Facility Inspection 25 or less persons
Proposed Facility Inspection 26 or more persons
Proposed Facility Inspection 25 or less persons
Proposed Facility Inspection 26 or more persons
State Final Fire Clearance Request
Residential Care for Elderly (RCFE)
H-5
City of Oakland
Master Fee Schedule
Effective July 1, 202 5 6 Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FE E UNIT FEE UNIT % Change Justification for Fee Change
FIRE DEPARTMENT
1 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
2 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
3 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
i.
1 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
2 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
3 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
j.
1 a. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
b. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
c. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
2 a. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
b. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
c. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
3 a. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
b. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
c. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
4 a. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
b. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
c. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
5 a. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
b. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
c. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
6 a. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
b. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
c. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
k. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
l. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
m. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
n. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
o. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
p. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
State Final Fire Clearance Request
Chronically Ill
Proposed Facility Inspection 25 or less persons
Proposed Facility Inspection 26 or more persons
State Final Fire Clearance Request
Rehabilitation Houses
Proposed Facility Inspection 25 or less persons
Proposed Facility Inspection 26 or more persons
Proposed Facility Inspection 26 or more persons
State Final Fire Clearance Request
Community Correction Reentry Centers
Proposed Facility Inspection 25 or less persons
Proposed Facility Inspection 26 or more persons
State Final Fire Clearance Request
Halfway Houses
Proposed Facility Inspection 25 or less persons
Proposed Facility Inspection 26 or more persons
State Final Fire Clearance Request
Community Correctional Centers
Proposed Facility Inspection 25 or less persons
Proposed Facility Inspection 26 or more persons
State Final Fire Clearance Request
Alcoholism or Drug Abuse Recover/Treatment
Proposed Facility Inspection 25 or less persons
Proposed Facility Inspection 26 or more persons
State Final Fire Clearance Request
Community Treatment Programs
Proposed Facility Inspection 25 or less persons
Proposed Facility Inspection 26 or more persons
State Final Fire Clearance Request
Work Furlough Programs
Proposed Facility Inspection 25 or less persons
Hospitals
Nursing Homes
Mental Hospitals
Detoxification Facilities
Jail
Prison
H-6
City of Oakland
Master Fee Schedule
Effective July 1, 202 5 6 Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FE E UNIT FEE UNIT % Change Justification for Fee Change
FIRE DEPARTMENT
q. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
r. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
s. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
t. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
u.
1 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
2 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
3 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
v.
2 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
4 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
w.
2 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
4 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
x.
1 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
2 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
3 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
y.
1 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
2 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
3 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
z.
1 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
2 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
3 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
aa. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
2 a.
1. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
b. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
L.
381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
M. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
N. Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
Reformatories
Detention Center
Correctional Centers
Juvenile Hall
Adult Day Care
Proposed Facility Inspection 25 or less persons
Pre-Inspection for Fire Safety
Family Day-care Homes
Proposed Facility Inspection 26 or more persons
State Final Fire Clearance Request
Adult Day Care Support
Proposed Facility Inspection 26 or more persons
Proposed Facility Inspection 26 or more persons
State Final Fire Clearance Request
Infant Care Center
Proposed Facility Inspection 25 or less persons
Proposed Facility Inspection 26 or more persons
State Final Fire Clearance Request
Proposed Facility Inspection 26 or more children
Pre-Inspection for Fire Safety
Day Care Center For Mildly ILL Children
Proposed Facility Inspection 25 or less persons
Residential Care for the Elderly (RCFE).
(Pursuant to Health and Safety Code Section 1569.84, neither the State Fire Marshal nor any local public entity shall charge any fee for enforcing fire inspection regulations pursuant to state law or regulations or local ordinance, with respect to residential-care facilities for the elderly (RCFE) which service six or fewer persons) Seven or more persons
All others Classifications
SECURITY BARS
Inspection/Investigation Fees
COMPLIANCE PLAN INSPECTIONS (Verify/Monitor Progress)
School Aged Child Day Care
Proposed Facility Inspection 25 or less persons
Proposed Facility Inspection 26 or more persons
State Final Fire Clearance Request
All Other State/County Fire Clearance Requests
EXISTING CARE FACILITY
COMMENCE OR COMPLETE WORK FOR WHICH PERMITS ARE REQUIRED
BY THE OAKLAND FIRE CODE WITHOUT FIRST HAVING OBTAINED THE
REQUIRED PERMITS & INSPECTIONS
H-7
City of Oakland
Master Fee Schedule
Effective July 1, 202 5 6 Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FE E UNIT FEE UNIT % Change Justification for Fee Change
FIRE DEPARTMENT
2 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
O. STATE MANDATED INSPECTIONS 457.00 Inspection (flat) 470.00 2.84% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
A. 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
B. 534.00 P/H - 2.5 MIN 550.00 3.00% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
C.
381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
D.
1 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
2 381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
E.
1 446.00 P/H 459.00 2.91% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
2 669.00 P/H 689.00 2.99% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
HAZARDOUS FIRE AREA
C. 457.00 Property 470.00 2.84% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
HAZARDOUS MATERIALS INSPECTION
AFTER HOURS HAZARDOUS MATERIALS INSPECTION
SPILLS, LEAKS AND CONTAMINATED SITES
Spills, Leaks and Contaminated Sites Oversight (Hourly Fee)
TANK/PIPELINES PERMITS - ALL TANK TYPES
Tank/Pipelines Permits - Plan Review (Installation, Modification, and/or Removal)
Investigation/Inspection of Unpermitted Work
HAZARDOUS MATERIALS MANAGEMENT
Inspections are authorized under the California Fire Code as adopted by the City of Oakland. Fees are charged in accordance with Government Code Section 66014.
Re-Inspection
Tank/Pipelines Permits - Inspection (Installation, Modification, and/or Removal)
HAZARDOUS MATERIALS - (Install, Repair, Abandon, Remove, Place Temporarily out of Service, Close, or Substantially Modify a Storage Facility or Area)
Hazardous Materials - Plan Review
Hazardous Materials - Expedited Plan Review
H-8
PARKS AND RECREATION AND YOUTH DEVELOPMENT
FY 2026-27 MASTER FEE SCHEDULE
EX
HIBIT A: A-7
City of Oakland
Master Fee Schedule
Proposed 2026-27
Fee Addition
Proposed 2026-27
Unit Addition
FEE UNIT FEE UNIT % Change Justification for Fee Change
ADMINISTRATION
A.
1 a.
1 12.00 Adult / Child Org moved to EWD
2 6.00 Person Org moved to EWD
3 Org moved to EWD
2 delete
a. delete
1 22.00-30.00 Person delete
2 18.00-26.00 Person delete
3 No Charge delete
4 18.00-26.00 Person delete
5 17.00-25.00 Person delete
6 14.00-22.00 Person delete
7 14.00-22.00 Person delete
8 No Charge delete
b. delete
1 18.00-26.00 Person delete
2 14.00-22.00 Person delete
3 14.00-22.00 Person delete
c. delete
1 19.00-27.00 Person delete
2 15.00-23.00 Person delete
3 15.00-23.00 Person delete
d. delete
1 1.50-6.00 Person delete
e. delete
1 10.00-15.00 Entry delete
2 15.00-20.00 Entry delete
B.
3 g. Add'l 50% of Rental Fees Additional 50% Spell out entire word 4 g. Add'l 50% of Rental Fees Additional 50% Spell out entire word 10 a. 103.00 Day delete
B b. 154.00 Day delete
c. delete
1 103.00 Day delete
11 a.
7 Add'l 50% Rental Fees Additional 50% Spell out entire word b.
6 Add'l 50% Day Additional 50% Spell out entire word
C.
10 Add'l 50% Rental Fees Additional 50% Spell out entire word n.
9 5.00 - 20.00 Parking Stall 15.00 Increase rate to closer to the current fair market rate and increase rates every 2-year budget cycle.Special Event Parking Misc. Fees
Holiday Surcharge (For Christmas Day, New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, Presidents' Day and Labor Day)
RENTAL FACILITIES
Holiday Surcharge
Holiday Surcharge
Rates - Nonresidents
Less Than 30 Days Before Reservation Date
Park Use Permit for Special Events (Fairs, Exhibits, Festivals, Concerts, Rallies, Sporting Events, Runs, Walks and Related Activities)
(4 hr Minimum).
Rates
Knowland Park (These Fees are Included for Information Only) : fees are set by service provider and not by City of Oakland
Deposit
Family and Group Sites
Cancellation Fee
Holiday Surcharge
Picnic & Related Event Rates (Nonresidents) (4-Hr Minimum) Holiday Surcharge
Picnic & Related Event Rates (Residents) (4-Hr Minimum) Rides
Miniature Train / Roller Coaster / Sky Ride / Kiddie Ride Parking
Automobiles
Bus
PARK USE PERMITS
Children
Seniors
Group Rates (12 or More) Without Reservation
Adults
Children
Seniors
Military Adults (15 - 64 Years)
Military Children (2 - 14 Years)
Military Seniors (65-79 Years)
Over Age 76
Group Rates (12 or more) With Reservation (2 Weeks Advance Notice) Adults
Oakland Zoo at Knowland Park
Admission
Adults (15 - 64)
Children (2 - 14 Years)
Children (Under 2 Years)
Seniors (65-79 Years)
Children's Fairyland
Admission
Adults and Children
Children with a School Group Weekday Only
Children (Under 1 Year) No Charge
PARKS, RECREATION &
YOUTH DEVELOPMENT
Effective July 1, 2025 6
AMUSEMENT PARKS
Oakland Zoo at Knowland Park: fees (These fees are included for information only; they are set and charged directly by service providers and not by the City of Oakland) J-1
City of Oakland
Master Fee Schedule
Proposed 2026-27
Fee Addition
Proposed 2026-27
Unit Addition
FEE UNIT FEE UNIT % Change Justification for Fee Change
PARKS, RECREATION &
YOUTH DEVELOPMENT
Effective July 1, 2025 6
D.
1 a.
1 3.00 2 Hour Delete item. Enforcement has been changed to daily instead of hourly.
1 2 12.00 Day The hourly rate, week day and weekend rate are consolidated into one item.
3 5.00 Day Delete item. It is consolidated with "Cars- All Day Parking, Any Day"
2 4 10.00 Vehicle 15.00 50.00%
Updating time to match event parking start times;
Increase rate to closer to the current fair market rate and increase rates every 2-year budget cycle.
3 5 15.00 Day Change the description
b.
1 5.00-10.00 Entry 12.00 Increase rate to closer to the current fair market rate and increase rates every 2-year budget cycle.
2 15.00 Day Change the description
E.
1 a.
1 1.00
Hour 1.50 50.00%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
2 25.00
Hour 27.50 10.00%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
b.
1 10.00
Hour 12.00 20.00%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
2 46.00 Hour 48.00 4.35%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
c.
1 25.00
Hour 27.00 8.00%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
2 56.00 Hour 58.00 3.57%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
2 a.
1 25.00
Hour 27.00 8.00%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
2 61.00 Hour 63.00 3.28%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
b.
1 41.00
Hour 43.00 4.88%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
2 61.00 Hour 63.00 3.28%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
Field Rental
Tournaments / Special Events / Related Activities
Private Schools / Charter Schools / Organizations
Field Rental
Tournaments / Special Events / Related Activities
Tournaments / Special Events / Related Activities
Adult
Field Rental
Tournaments / Special Events / Related Activities
Nonresidents
Youth
Residents
Youth
Field Rental
Tournaments / Special Events / Related Activities
Private Schools / Organizations
Field Rental
FIELD RENTALS (GROUPS)
Cars- All Day Parking, Weekend and Holidays
Cars - Special Events Parking after 5pm 4pm
Buses/RV/Trailers
Joaquin Miller Park Special Events and Performance Dates Cars
Buses/RV/Trailers
MISCELLANEOUS FEES
Parking
Lakeside Park
Cars- Hourly Parking
Cars- All Day Parking, Weekday Any Day
J-2
City of Oakland
Master Fee Schedule
Proposed 2026-27
Fee Addition
Proposed 2026-27
Unit Addition
FEE UNIT FEE UNIT % Change Justification for Fee Change
PARKS, RECREATION &
YOUTH DEVELOPMENT
Effective July 1, 2025 6
c.
1 30.00 Hour 32.00 6.67%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
2 61.00 Hour 63.00 3.28%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
3 a. 10.00
Season/Player 12.00 20.00%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
b. 10.00 Season/Player 12.00 20.00%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
c. 72.00 Week 90.00 25.00%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
d. 46.00 Game 48.00 4.35%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
e. 61.00
Game 63.00 3.28%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
f. 20.00
Hour 22.00 10.00%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
g. 25.00 Hour 35.00 40.00%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
h. 36.00 Hour 40.00 11.11%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
i. 15.00 Hour 20.00 33.33%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
j.
1 10.00 Hour 12.00 20.00%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
2 15.00 Hour 17.00 13.33%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
3 25.00 Hour 27.00 8.00%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
4 30.00 Hour 32.00 6.67%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
k. 15.00 Hour/Team 75.00 400.00%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
6 a. 15.00 Hour 20.00 33.33%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
pass 15 years
RECREATION SERVICES
A.
1 Delete
p.
1 25% Percent of Rental 25% Discount Wording clarification Discounts (May Not Be Used Simultaneously, or in addition to Another) Senior Citizens and Disabled Persons (25% discount on all boating activities listed above)
Boat Rental Hours available at www.oaklandnet.com/parks and 510-238-2196
AQUATICS
Turf Field(s)
Added to the above field rental fee
Outside Basketball Courts
Half Court Practice
Full Court Practice
Half Court Special Events, Games & Tournaments
Full Court Special Events, Games & Tournaments
Locker Room Usage
Field Preparation - Residents (Adult & Private School)
Field Preparation - Nonresidents (Adult & Private School) Holiday Surcharge (add to above rates)
Scoreboard - Resident (Youth & Adults)
Scoreboard - Nonresident (Youth & Adult)
Field with Lights
Field Rental
Tournaments / Special Events / Related Activities
Additional Fees
Youth Sports Field Usage Fee
Adult Sports Field Usage Fee
Port-A-Potty Fee
Adult
J-3
City of Oakland
Master Fee Schedule
Proposed 2026-27
Fee Addition
Proposed 2026-27
Unit Addition
FEE UNIT FEE UNIT % Change Justification for Fee Change
PARKS, RECREATION &
YOUTH DEVELOPMENT
Effective July 1, 2025 6
2 25% Percent of Rental 25% Discount Wording clarification q. 20% Percent of resident fee Above resident fee Wording clarification 6 d. 20% Percent of Resident
Fee
Above Resident
Fee Wording clarification
7 c. 20% Percent of Resident
Fee
Above Resident
Fee Wording clarification
8 a.
1 1.00 Person / Entry 2.00 100.00% Fees have not increased in a decade; proposed fee is still below market rate.
2 2.00 Person / Entry 3.00 50.00% Fees have not increased in a decade; proposed fee is still below market rate.
3 3.00 Person / Entry 4.00 33.33% Fees have not increased in a decade; proposed fee is still below market rate.
b.
1 77.00
Hour 125.00 62.34% Only a 2.6% increased in a decade; Proposed fee is still below market rate.
2 92.00
Hour 150.00 63.04% Only a 2.6% increased in a decade; Proposed fee is still below market rate.
3 51.00
Hour 83.00 62.75% Only a 2.6% increased in a decade; Proposed fee is still below market rate.
4 103.00
Use 200.00 94.17% Only a 2.6% increased in a decade; Proposed fee is still below market rate.
6 25.00
Hour 35.00 40.00% Fees have not increased in a decade; proposed fee is still below market rate.
7 25.00 Hour Delete item: Redundant information and fee. c.
1 6.00 Person / Entry 7.00 16.67% Fees have not increased in a decade; proposed fee is still below market rate.
2 4.00
Person / Entry 5.00 25.00% Fees have not increased in a decade; proposed fee is still below market rate.
3 51.00 Pass Book 61.00 19.61% Only a 2% increased in a decade; Proposed fee is still below market rate.
4 31.00
Pass Book 41.00 32.26% Fees have not increased in a decade; proposed fee is still below market rate.
6 139.00 Pass Book 151.00 8.63% Only a 2.96% increased in a decade 7 77.00 Pass Book 87.00 12.99% Only a 2.67% increased in a decade 9 a.
1 51.00 Person/Course 60.00 17.65% Only a 2% increased in a decade; Proposed fee is still below market rate.
2 36.00 Person/Course 40.00 11.11% Only a 2.86% increased in a decade; Proposed fee is still below market rate.
Regular
Adult
Youth (7 - 17 years)
Senior (55 Years and Older) or Disabled
10 Swim Pass Book - Adult
10 Swim Pass Book - Senior or Disabled
30 Swim Pass Book - Adult
30 Swim Pass Book - Senior or Disabled
Swimming Instruction Classes
Lifeguards-add one lifeguard for each 10 patrons above 40 patrons Pool Party Rental (Birthday Party, Meeting, Reception, etc.) Adult Lap Swim
Adult (Except for Seniors)
Adult (Except for Seniors)
Pool Reservation
Private Use (Residents)
Private Use (Non-Residents)
Non-Profit Group
Deposit
Nonresident fee (20% added on all sailing activities listed above) Swimming Pools
General Admission (Public Swim)
Individual (Under 18 Years)
Senior (55 Years and Older) or Disabled
Nonresident fee
Sailing Into Science
Mariner Day Camps
Groups Renting 5 or More Boats Simultaneously (25% discount on all boating activities listed above)
Non-resident fees (20% added on all boating activities listed above) J-4
City of Oakland
Master Fee Schedule
Proposed 2026-27
Fee Addition
Proposed 2026-27
Unit Addition
FEE UNIT FEE UNIT % Change Justification for Fee Change
PARKS, RECREATION &
YOUTH DEVELOPMENT
Effective July 1, 2025 6
3 41.00 Person/Course 45.00 9.76% Only a 2.5% increased in a decade; Proposed fee is still below market rate.
4 51.00 Person/Course 60.00 17.65% Only a 2% increased in a decade; Proposed fee is still below market rate.
5 36.00 Person/Course 40.00 11.11% Only a 2.86% increased in a decade; Proposed fee is still below market rate.
6 20.00 Person/Course 65.00 225.00% Fees have not increased in a decade; proposed fee is still below market rate.
7 30.00 Person / 1/2 Hour 75.00 150.00% Fees have not increased in a decade; proposed fee is still below market rate.
8 51.00 Person/Course 66.00 29.41% Only a 2% increased in a decade; Proposed fee is still below market rate.
9 41.00 Person/Course 56.00 36.59% Only a 2.5% increased in a decade; Proposed fee is still below market rate.
10 51.00 Person/Course 56.00 9.80% Only a 2% increased in a decade; Proposed fee is still below market rate.
11 1.20 Times Resident Rates 20% Above Resident
Fee Percentage and wording clarification
b.
2 a. 3.00 Person/Course 7.00 133.33% Fees have not increased in a decade; proposed fee is still below market rate.
b. 2.25 Person/Course 5.00 122.22% Fees have not increased in a decade; proposed fee is still below market rate.
B.
2 c. delete
1 delete
a. 95.00 Person/Day delete
b. 86.00 Person/Day delete
c. 79.00 Person/Day delete
d. 61.00 Person/Day delete
e. delete
2 delete
a. 106.00 Person/Day delete
b. 97.00 Person/Day delete
c. 90.00 Person/Day delete
d. 72.00 Person/Day delete
e. delete
3 delete
a. 106.00 Person/Day delete
b. 97.00 Person/Day delete
c. 90.00 Person/Day delete
d. 72.00 Person/Day delete
e. No Charge delete
4 5.00 Tent or Cabin/Day delete
5 Facility Maintenance Surcharge 10.00 Tent or Cabin/Day delete 6 delete
a. 50.00 Fee Per Cancellation delete
b 25.00 Fee Per Reservation
Change delete
d. delete
1 675.00 Person/Session delete
Reservation Change
Youth Resident Camps
Kamp Kidd / Sierra (ages 7-17) 5 nights
School-aged (6-12 Years)
Pre-School (2-5 Years)
Infant (under 2)
Electricity Surcharge
Reservation Cancellation/Change
31 Days or More Notice
School-aged (6-12 Years)
Pre-School (2-5 Years)
Infant (under 2)
Residents/Nonresidents - Transient
(Lodging, meals & full-service activities-4 nights or less) Adult (18+)
Teen (13-18 years)
School-aged (12 Years)
Pre-School (2-5 Years)
Infant (under 2)
Nonresidents - Regular (Lodging, Meals & Full Service Activities) Adult (18+)
Teen (13-18)
Feather River Camp: fees (These fees are included for information only; they are set and charged directly by service provider and not by the City of Oakland.
Feather River Camp is committed to serving Oakland residents by providing - both directly and in collaboration with local organizations - generous financial assistance to families so that everyone who desires can experience a mountain camp experience and enjoy the power of the outdoors.
Family Camps
Residents - Regular (Lodging, Meals & Full Service Activities) Adult (18+)
Teen (13-18)
CAMPS
Special Instruction
Water Exercise
Adults
Senior or Disabled
Semi-private Instruction (2 or More)
Private Instruction (Space Permitting)
Junior Lifeguard Camp
Junior Lifeguard Program
Youth Swim Team
Non-Resident Fee
Preschool (4 - 6 Years)
Parent & Child (6 months – 3 Years)
Adapted Swimming
J-5
City of Oakland
Master Fee Schedule
Proposed 2026-27
Fee Addition
Proposed 2026-27
Unit Addition
FEE UNIT FEE UNIT % Change Justification for Fee Change
PARKS, RECREATION &
YOUTH DEVELOPMENT
Effective July 1, 2025 6
a. delete
1 50.00 Fee Per Cancellation delete
2 25.00 Fee Per Cancellation delete
e. delete
a. Rental Group - Day Use delete
1 65.00 Person/Day delete
2 56.00 Person/Day delete
3 50.00 Person/Day delete
4 40.00 Person/Day delete
b. Rental Group - Overnight delete
1 106.00 Person / Day delete
2 97.00 Person / Day delete
3 90.00 Person / Day delete
4 72.00 Person / Day delete
C.
6 10% Standard Fee 10% Discount Discount clarification
D.
1 a.
1 a. 12.00 Court / Hour 13.00 8.33%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
b. 14.00 Court / Hour 15.00 7.14%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
2 10.00
Court / Hour 11.00 10.00%
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
3 180.00 One Hour Session 180.00-360.00
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
4 231.00
One Hour Session 231.00-450.00
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
c. 1.00-200.00 Use 1.00-300.00 Range
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
d. 1.00-300.00 Month 12.00-400.00 Range
Increasing to be closer to what is charged by other
local cities. We have not increased our fees for the
past 15 years
E.
1 Delete
a. Delete
1 Monday - Friday, Before 2:00 p.m. Delete
a. Resident 35.00 Person Delete
b. Nonresidents (Monday-Friday Only) 40.00 Person Delete 2 Monday - Friday, After 2 p.m. Delete
a. Resident 27.00 Person Delete
b. Nonresidents (Monday-Friday Only) 31.00 Person Delete 3 Monday - Friday, Senior (Over 60) Delete
a. Resident 27.00 Person Delete
b. Nonresidents (Monday-Friday Only) 32.00 Person Delete 4 10.00 Person Delete
5 Saturday, Sunday or Holiday, After 2:00 pm Del ete
a. Resident 34.00 Person Delete
Equipment Rental & Tennis Sales
Racquets/Balls/Basket/ Ball Machine/Stringing
Parking Pass
GOLF (These fees are included for information only; they are charged directly by service providers and not by the City of Oakland) Chabot Golf Course and Montclair Golf Course: fees are charged directly by service providers and not by the City of Oakland
Chabot Golf Course General Admission
Standard Eighteen-Hole Course
Monday - Friday, After 1 pm, Resident Youth (Under 19 Years) Age 55+ rate, Mon - Fri, 9 am t o 3 pm, walk on only
Special Use of Club House for Private events/Use of all five courts included (Resident)
Special Use of Club House for Private events/Use of all five courts included (Non-resident)
TENNIS
Court Reservations
Davies Tennis Stadium
Adult
Resident
Nonresidents
Discount for Disabled Person
Teen (13-18)
6-12 Years
2-5 Years
CLASSES/PROGRAMS/SPECIAL EVENTS
Rental Group Base Rates (include meals & full service activities) Adults (18+)
Teen (13-18)
6-12 Years
2-5 Years
Adults (18+)
Reservation Cancellation
30 Days or Less Notice
31 Days or More Notice
J-6
City of Oakland
Master Fee Schedule
Proposed 2026-27
Fee Addition
Proposed 2026-27
Unit Addition
FEE UNIT FEE UNIT % Change Justification for Fee Change
PARKS, RECREATION &
YOUTH DEVELOPMENT
Effective July 1, 2025 6
b. Nonresidents 41.00 Person Delete
6 Saturday, Sunday or Holiday, Before 2:00 pm Delete
a. Resident 46.00 Person Delete
b. Nonresidents 53.00 Person Delete
7 Delete
a. Resident 23.00 Person Delete
b. Nonresidents 26.00 Person Delete
b. Nine-Hole Course Del ete
1 Adult (Any Day, Including Holidays) Del ete
a. Resident 12.00 Person Delete
b. Nonresidents 13.00 Person Delete
2 Youth (Under 19 Years) 7.00 Person Delete
c. 18 Hole Disc Golf Del ete
1 Adult Monday-Friday Del ete
a. Resident 11.00 Person Delete
b. Nonresidents 12.00 Person Delete
c. Junior 7.00 Person Delete
2 Adult Saturday, Sunday, Holidays Delete
a. Resident 13.00 Person Delete
b. Nonresidents 15.00 Person Delete
d. 18 Hole Cart Rates Del ete
1 Shared Rider Rates Del ete
a. Senior Weekday Only 12.00 Person Delete
b. Twilight Mon-Sun 12.00 Person Delete
c. Before Twilight Mon-Sun 17.00 Person Delete
d. Employee/Comp Cart 7.00 Person Delete
e. Driving Range Del ete
1 Bucket of Balls 5.00 to 12.00 Bucket Delete
2 Large 12.00 105 Balls Delete
b. Junior Program Token 5.00 30 balls Delete
3 Monthly Range Membership 40.00 Month Delete
c. Tournaments Delete
1 Monday-Sunday (includes green fee and cart fee) 27.00-75.00 Person Delete 3 Delete
a. Delete
1 7.00 Person Delete
2 9.00 Person Delete
b. Delete
1 8.00 Bucket Delete
2 10.00 Bucket Delete
3 12.00 Bucket Delete
4 Range Ticket-buy 5 buckets for the price of 4 32.00 small Delete
40.00 Medium Delete
48.00 Large Buckets Delete
F.
1 Delete
a. Delete
1 27.00 Person Delete
2 41.00 Person Delete
3 37.00 Person Delete
4 57.00 Person Delete
9 Holes without cart
9 Holes with cart
18 Holes 'Daytime' without cart
18 Holes 'Daytime' with cart
Small
Medium
Large
METROPOLITAN GOLF (These fees are included for information only; they: fees are charged directly by service providers and not by the City of Oakland )
Residents
Monday - Thursday
"Super Twilight" Everyday, not more than 3 hours before official sunset time
Montclair Golf Course General Admission
Pitch & Putt - 9 Holes
Monday - Thursday
Friday, Saturday, Sunday and Holidays
Driving Range - Bucket of Balls
J-7
City of Oakland
Master Fee Schedule
Proposed 2026-27
Fee Addition
Proposed 2026-27
Unit Addition
FEE UNIT FEE UNIT % Change Justification for Fee Change
PARKS, RECREATION &
YOUTH DEVELOPMENT
Effective July 1, 2025 6
5 28.00 Person Delete
6 39.00 Person Delete
7 20.00 Person Delete
8 31.00 Person Delete
9 17.00 Person Delete
10 37.00 Person Delete
11 42.00 Person Delete
b. Delete
1 27.00 Person Delete
2 38.00 Person Delete
3 38.00 Person Delete
4 58.00 Person Delete
5 37.00 Person Delete
6 48.00 Person Delete
7 29.00 Person Delete
8 40.00 Person Delete
9 17.00 Person Delete
10 37.00 Person Delete
11 42.00 Person Delete
c. Delete
1 31.00 Person Delete
2 42.00 Person Delete
3 65.00 Person Delete
4 72.00 Person Delete
5 37.00 Person Delete
6 48.00 Person Delete
7 30.00 Person Delete
8 41.00 Person Delete
9 22.00 Person Delete
10 42.00 Person Delete
2 Delete
a. Delete
1 32.00 Person Delete
2 43.00 Person Delete
3 47.00 Person Delete
4 67.00 Person Delete
9 Holes without cart
9 Holes with cart
18 Holes 'Daytime' without cart
18 Holes 'Daytime' with cart
18 Holes ' Super Twilight' without cart { Super Twilight begins at 3:00 p.m. during non daylight savings time (PST) and at 5:00 p.m. during daylight savings time (DST).}
18 Holes ' Super Twilight' with cart
18 Holes Junior (age 18 and under) without cart
18 Holes Junior (age 18 and under) with cart
Nonresidents
Monday - Thursday
9 Holes without cart
9 Holes with cart
18 Holes 'Daytime' without cart
18 Holes 'Daytime' with cart
18 Holes 'Twilight' without cart {Twilight begins at 1:00 p.m. during non daylight savings time (PST) and at 3:00 p.m. during daylight savings time (DST).}
18 Holes 'Twilight' with cart
18 Holes ' Super Twilight' without cart { Super Twilight begins at 3:00 p.m. during non daylight savings time (PST) and at 5:00 p.m. during daylight savings time (DST).}
18 Holes ' Super Twilight' with cart
18 Holes Junior (age 18 and under) without cart
18 Holes Junior (age 18 and under) with cart
18 Holes Senior (age 62 and over) cart included
Weekends/Holidays
9 Holes without cart
9 Holes with cart
18 Holes 'Daytime' without cart
18 Holes 'Daytime' with cart
18 Holes 'Twilight' without cart {Twilight begins at 1:00 p.m. during non daylight savings time (PST) and at 3:00 p.m. during daylight savings time (DST).}
18 Holes 'Twilight' with cart
18 Holes ' Super Twilight' without cart { Super Twilight begins at 2:30 p.m. during non daylight savings time (PST) and at 3:30 p.m. during daylight savings time (DST).}
18 Holes ' Super Twilight' with cart
18 Holes Junior (age 18 and under) without cart
18 Holes Junior (age 18 and under) with cart
18 Holes Senior (age 62 and over) cart included
Friday
18 Holes 'Twilight' without cart {Twilight begins at 1:00 p.m. during non daylight savings time (PST) and at 3:00 p.m. during daylight savings time (DST).}
18 Holes 'Twilight' with cart
J-8
City of Oakland
Master Fee Schedule
Proposed 2026-27
Fee Addition
Proposed 2026-27
Unit Addition
FEE UNIT FEE UNIT % Change Justification for Fee Change
PARKS, RECREATION &
YOUTH DEVELOPMENT
Effective July 1, 2025 6
5 32.00 Person Delete
6 43.00 Person Delete
7 27.00 Person Delete
8 38.00 Person Delete
9 17.00 Person Delete
10 37.00 Person Delete
11 42.00 Person Delete
b. Delete
1 32.00 Person Delete
2 43.00 Person Delete
3 57.00 Person Delete
4 77.00 Person Delete
5 44.00 Person Delete
6 55.00 Person Delete
7 35.00 Person Delete
8 46.00 Person Delete
9 17.00 Person Delete
10 37.00 Person Delete
11 42.00 Person Delete
c. Delete
1 37.00 Person Delete
2 48.00 Person Delete
3 73.00 Person Delete
4 93.00 Person Delete
5 45.00 Person Delete
6 56.00 Person Delete
7 36.00 Person Delete
8 47.00 Person Delete
9 22.00 Person Delete
10 42.00 Person Delete
H.
11 a. 432.00 Hour 583.00 34.95%
Proposed fee will assist recovering Staffing,
Maintenance Cost, and be closer to the Fair-Market-
Value.
b. 519.00 Hour 700.00 34.87%
Proposed fee will assist recovering Staffing,
Maintenance Cost, and be closer to the Fair-Market-
Value.
Pool Reservation (2 hr Minimum)
Private Use with Lifeguard Service and Party Room - Resident Private Use with Lifeguard Service and Party Room -
Non-Resident
LARRY E. REID SPORTS CENTER (Formerly Known as East Oakland Sports Center) 18 Holes ' Super Twilight' without cart { Super Twilight begins at 3:00 p.m. during non daylight savings time (PST) and at 5:00 p.m. during daylight savings time (DST).}
18 Holes ' Super Twilight' with cart
18 Holes Junior (age 18 and under) without cart
18 Holes Junior (age 18 and under) with cart
9 Holes without cart
9 Holes with cart
18 Holes 'Daytime' without cart
18 Holes 'Daytime' with cart
18 Holes 'Twilight' without cart {Twilight begins at 1:00 p.m. during non daylight savings time (PST) and at 3:00 p.m. during daylight savings time (DST).}
18 Holes 'Twilight' with cart
18 Holes ' Super Twilight' without cart {Super Twilight begins at 3:00 p.m. during non daylight savings time (PST) and at 5:00 p.m. during daylight savings time (DST).}
18 Holes ' Super Twilight' with cart
18 Holes Junior (age 18 and under) without cart
18 Holes Junior (age 18 and under) with cart
18 Holes Senior (age 62 and over) cart included
Weekends/Holidays
9 Holes without cart
9 Holes with cart
18 Holes 'Daytime' without cart
18 Holes 'Daytime' with cart
18 Holes 'Twilight' without cart {Twilight begins at 1:00 p.m. during non daylight savings time (PST) and at 3:00 p.m. during daylight savings time (DST).}
18 Holes 'Twilight' with cart
18 Holes ' Super Twilight' without cart { Super Twilight begins at 3:00 p.m. during non daylight savings time (PST) and at 5:00 p.m. during daylight savings time (DST).}
18 Holes ' Super Twilight' with cart
18 Holes Junior (age 18 and under) without cart
18 Holes Junior (age 18 and under) with cart
18 Holes Senior (age 62 and over) cart included
Friday
18 Holes 'Twilight' without cart {Twilight begins at 1:00 p.m. during non daylight savings time (PST) and at 3:00 p.m. during daylight savings time (DST).}
18 Holes 'Twilight' with cart
J-9
City of Oakland
Master Fee Schedule
Proposed 2026-27
Fee Addition
Proposed 2026-27
Unit Addition
FEE UNIT FEE UNIT % Change Justification for Fee Change
PARKS, RECREATION &
YOUTH DEVELOPMENT
Effective July 1, 2025 6
c. 360.00 Hour 486.00 35.00%
Proposed fee will assist recovering Staffing,
Maintenance Cost, and be closer to the Fair-Market-
Value.
d. 103.00 Hour 168.00 63.11%
Proposed fee will assist recovering Staffing,
Maintenance Cost, and be closer to the Fair-Market-
Value.
e. 123.00 Hour 202.00 64.23%
Proposed fee will assist recovering Staffing,
Maintenance Cost, and be closer to the Fair-Market-
Value.
f. 82.00 Hour 112.00 36.59%
Proposed fee will assist recovering Staffing,
Maintenance Cost, and be closer to the Fair-Market-
Value.
I.
1 485.00-650.00 Month delete
2 25.00-85.00 Hour delete
3 60.00-100.00 Hour delete
4 200.00-500.00 Week delete
5 100.00-1,000.00 Clinic delete
6 delete
a. 15.00 Hour delete
b. 20.00 Hour delete
7 66.00 Hour delete
8 41.00 Hour delete
9 309.00 Event delete
10 5.00-100.00 Month delete
Facility Rental Deposit
Surcharge For Feed
Equestrian Clinics (all ages)
Arena Rental
Arena Rental (Monday-Friday)
Arena Rental (Saturday-Sunday)
Stable Grounds Rental (Area A)
Stable Grounds Rental (Area B)
OAKLAND CITY STABLES: fees are set and charged directly by service provider and not by the City of Oakland.
Horse Stall Rental
Riding Lessons (Group)
Riding Lessons (Private)
Equestrian Day Camp
Private Use with Lifeguard Service and Party Room -
Oakland Non-Profit
Private Use of Only 1 Area of Pool (lap or zero depth) with 2 Lifeguards, 15 patrons maximum - Resident
Private Use of Only 1 Area of Pool (lap or zero depth) with 2 Lifeguards, 15 patrons maximum - Non-Resident
Private Use of Only 1 Area of Pool (lap or zero depth) with 2 Lifeguards, 15 patrons maximum - Oakland Non-Profit Organization
J-10
HUMAN SERVICES
FY 2026-27 MASTER FEE SCHEDULE
EX
HIBIT A: A-8
City of Oakland HUMAN SERVICES Master Fee Schedule
Effective July 1, 202 5 6
Proposed
2026-27
Fee
Proposed
2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change B.
updated title
1 130.00 Hour fee broken down below
a. 130.00 Hour 200.00
53.85%
increasing to meet rising operational costs and
increasing based on comparable prices of neighboring
jurisdictions
b. 130.00 Hour 200.00
53.85%
increasing to meet rising operational costs and
increasing based on comparable prices of neighboring
jurisdictions
c. 130.00 Hour 200.00 53.85%
g g p
increasing based on comparable prices of neighboring
jurisdictions
2 250.00 Hour
92.31%
increasing to meet rising operational costs and
increasing based on comparable prices of neighboring
jurisdictions
2 150.00 Hour
removed for ease of understanding. Kitchen is now it's
own rental and doesn't need to be listed along side each type of room.
3 70.00 Hour 100.00
42.86%
increasing to meet rising operational costs and
increasing based on comparable prices of neighboring
jurisdictions
4 3 70.00 Hour updated for ease of understanding
a. 70.00 Hour 100.00
42.86%
increasing to meet rising operational costs and
increasing based on comparable prices of neighboring
jurisdictions
b. 70.00 Hour 100.00
42.86%
increasing to meet rising operational costs and
increasing based on comparable prices of neighboring
jurisdictions
b. 70.00 Hour 100.00
42.86%
increasing to meet rising operational costs and
increasing based on comparable prices of neighboring
jurisdictions
c. 70.00 Hour 100.00
42.86%
increasing to meet rising operational costs and
increasing based on comparable prices of neighboring
jurisdictions
4 90.00 Hour
removed for ease of understanding. Kitchen is now it's
own rental and doesn't need to be listed along side each type of room.
5 47.00 Hour
a. 47.00 Hour 75.00
59.57%
increasing to meet rising operational costs and
increasing based on comparable prices of neighboring
jurisdictions
b. 47.00 Hour 75.00
59.57%
increasing to meet rising operational costs and
increasing based on comparable prices of neighboring
jurisdictions
b. 47.00 Hour 75.00
59.57%
increasing to meet rising operational costs and
increasing based on comparable prices of neighboring
jurisdictions
c. 47.00 Hour 75.00
59.57%
increasing to meet rising operational costs and
increasing based on comparable prices of neighboring
jurisdictions
MULTIPURPOSE SENIOR CENTERS: (4 hour min required)
Multipurpose Room
Multipurpose Room with Kitchen
One-half Multipurpose Room Large Room
One-half Multipurpose Room with Kitchen
One Meeting Room
East Oakland Senior Center
West Oakland Senior Center
Downtown Oakland Senior Center
East Oakland Senior Center
West Oakland Senior Center
Downtown Oakland Senior Center
North Oakland Senior Center (does not include game
room)
Ballroom
East Oakland Senior Center
West Oakland Senior Center
North Oakland Senior Center
One-half Multipurpose Room (WOSC only)
North Oakland Senior Center
K - 1
City of Oakland HUMAN SERVICES Master Fee Schedule
Effective July 1, 202 5 6
Proposed
2026-27
Fee
Proposed
2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change 6 70.00 Hour
removed for ease of understanding. Kitchen is now it's
own rental and doesn't need to be listed along side each type of room.
6 7 90.00 Hour 50.00 -44.44% Updated for ease of processing and understanding. 8 100.00 Hour
removed for ease of understanding. Kitchen is now it's
own rental and doesn't need to be listed along side each type of room.
9 115.00 Hour removed for ease of understanding and processing. each additional room is one price
10 130.00 Hour
removed for ease of understanding. Kitchen is now it's
own rental and doesn't need to be listed along side each type of room.
7 5 New heading
a. 100.00 Hour
New Fee
Adding to MFS so space can be rented, price based on
facility size and estimated value of rental
b. 100.00 Hour
New Fee
Adding to MFS so space can be rented, price based on
facility size and estimated value of rental
b. 200.00 Hour
New Fee
Adding to MFS so space can be rented, price based on
facility size and estimated value of rental
c. 200.00 Hour
New Fee
Adding to MFS so space can be rented, price based on
facility size and estimated value of rental
8 New heading, removed for ease of understanding.
Kitchen is now it's own rental and doesn't need to be
listed along side each type of room.
a. 150.00 Use New Fee based on comparable prices of neighboring jurisdictions b. 150.00 Use New Fee based on comparable prices of neighboring jurisdictions c. 150.00 Use New Fee based on comparable prices of neighboring jurisdictions d. 150.00 Use New Fee based on comparable prices of neighboring jurisdictions 9 New heading
a. 125.00 Hour
New Fee
There was no option to rent the kitchen only before,
price based on comparable prices of neighboring
jurisdictions
b. 125.00 Hour
New Fee
There was no option to rent the kitchen only before,
price based on comparable prices of neighboring
jurisdictions
c. 125.00 Hour
New Fee
There was no option to rent the kitchen only before,
price based on comparable prices of neighboring
jurisdictions
d. 125.00 Hour
New Fee
There was no option to rent the kitchen only before,
price based on comparable prices of neighboring
jurisdictions
One Meeting Room with Kitchen
Two Meeting Rooms Each Additional Room of equal or
lesser value
Two Meeting Rooms with Kitchen
Three Meeting Rooms
Three Meeting Rooms with Kitchen
Outdoor Spaces
East Oakland Senior Center Patio (as add on only)
West Oakland Senior Center (as add on only)
Downtown Oakland Senior Center Patio
North Oakland Senior Center Courtyard
Large Kitchen - as add-on to Room Rental
East Oakland Senior Center
West Oakland Senior Center
Downtown Oakland Senior Center
North Oakland Senior Center
Large Kitchen - Without Room Rental
East Oakland Senior Center
West Oakland Senior Center
Downtown Oakland Senior Center
North Oakland Senior Center
K - 2
City of Oakland HUMAN SERVICES Master Fee Schedule
Effective July 1, 202 5 6
Proposed
2026-27
Fee
Proposed
2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change 10 11 70.00 Hour 100.00 42.86%
update title, qualification was incorrectly listed for
Membership fee on the last MFS, While the reduced
rental fees for Senior Center members will result in less revenues, higher fees paid by non-members will not be
used to subsidize or make-up for any loss in revenues.
a.
70.00 Hour 100.00 42.86% While the reduced rental fees for Senior Center members will result is less revenues, higher fees paid
by non-members will not be used to subsidize or make-
up for any loss in revenues.
b. 70.00 Hour 100.00 42.86% While the reduced rental fees for Senior Center members will result is less revenues, higher fees paid
by non-members will not be used to subsidize or make-
up for any loss in revenues.
c. 70.00 Hour 100.00 42.86% While the reduced rental fees for Senior Center members will result is less revenues, higher fees paid
by non-members will not be used to subsidize or make-
up for any loss in revenues.
d. 70.00 Hour 100.00 42.86% While the reduced rental fees for Senior Center members will result is less revenues, higher fees paid
by non-members will not be used to subsidize or make-
up for any loss in revenues.
12 Removed for ease of understanding. Kitchen is now it's own rental and doesn't need to be listed along side each type of room.
a. 90.00 Hour / Event
Removed for ease of understanding. Kitchen is now it's
own rental and doesn't need to be listed along side each type of room.
b. 90.00 Hour / Event
Removed for ease of understanding. Kitchen is now it's
own rental and doesn't need to be listed along side each type of room.
c. 90.00 Hour / Event
Removed for ease of understanding. Kitchen is now it's
own rental and doesn't need to be listed along side each type of room.
d. 90.00 Hour / Event
Removed for ease of understanding. Kitchen is now it's
own rental and doesn't need to be listed along side each type of room.
11 13 updated number
12 14 updated number
13 15 updated title
a. 12.00 Year 15.00 25.00% members suggestion revenue source, ease of change for cash payment, membership fees have not increased
in years. A membership model is consistent with other
Senior Centers
East Oakland Senior Center
West Oakland Senior Center
Downtown Oakland Senior Center
North Oakland Senior Center
Rental Fee Set-Up and Take-Down
Senior Center Membership Qualification Fee: Age 55 + .
Minimum 6 Months Participation; Must be Senior-oriented Event for Member Rate
East Oakland Senior Center - Membership Fee
Member Rental Rate Membership Qualification Fee: Age 55 +, Minimum 6 Months as a member; Must be Senior-
oriented Event for the Senior Center Member
Member Rental Rate with Kitchen
East Oakland Senior Center - Rental Revenue
West Oakland Senior Center - Rental Revenue
Downtown Oakland Senior Center - Rental Revenue
North Oakland Senior Center - Rental Revenue
Security Damage and Cleaning Deposit
K - 3
City of Oakland HUMAN SERVICES Master Fee Schedule
Effective July 1, 202 5 6
Proposed
2026-27
Fee
Proposed
2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change b. 12.00 Year 15.00 25.00% members suggestion revenue source, ease of change for cash payment, membership fees have not increased
in years. A membership model is consistent with other
Senior Centers
c. 12.00 Year 15.00 25.00% members suggestion revenue source, ease of change for cash payment, membership fees have not increased
in years. A membership model is consistent with other
Senior Centers
d. 12.00 Year 15.00 25.00% members suggestion revenue source, ease of change for cash payment, membership fees have not increased
in years. A membership model is consistent with other
Senior Centers
14 16 updated number
15 17 While the reduced rental fees for Senior Center
members will result in less revenues, higher fees paid
by non-members will not be used to subsidize or make-
up for any loss in revenues.
a. 10.00 application New Fee help cover the administrative cost of receiving a rental applicaiton
b. 10.00 application New Fee help cover the administrative cost of receiving a rental applicaiton
c. 10.00 application New Fee help cover the administrative cost of receiving a rental applicaiton
d. 10.00 application New Fee help cover the administrative cost of receiving a rental applicaiton
16 New Header
a. Forfeit 1/2 deposit day/site New Fee potential lost revenue due to reservation of date and to cover staff time used in the coordination of rental, time to cancel shifts of rental staff and cancellation
communication.
b. Forfeit Entire deposit New Fee potential lost revenue due to reservation of date and to cover staff time used in the coordination of rental, time to cancel shifts of rental staff and cancellation
communication.
c. Deposit plus 1/2 rental fee New Fee potential lost revenue due to reservation of date and to cover staff time used in the coordination of rental, time to cancel shifts of rental staff and cancellation
communication.
d. all fees New Fee potential lost revenue due to reservation of date and to cover staff time used in the coordination of rental, time to cancel shifts of rental staff and cancellation
communication.
West Oakland Senior Center - Membership Fee
Downtown Oakland Senior Center - Membership Fee
North Oakland Senior Center - Membership Fee
Rental Application Fee for nonmember
Rental Application Fee for member
Cancellation
61 days or more notice
31 days or more notice
11-30 days notice
10 days or less notice
East Oakland Senior Center
West Oakland Senior Center
Downtown Oakland Senior Center
North Oakland Senior Center
K - 4
City of Oakland HUMAN SERVICES Master Fee Schedule
Effective July 1, 202 5 6
Proposed
2026-27
Fee
Proposed
2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change 17 Holiday surcharge 35.00 hour New Fee Cover holiday pay for staff C. 8.00 Per Vehicle/ Yr 10.00 25.00% increasing to meet rising operational costs, cost is below market value
DOWNTOWN OAKLAND SENIOR CENTER PARKING PASS
STICKER FEE. MEMBERS OF THE SENIOR CENTER ARE
ELIGIBLE TO PURCHASE A PASS STICKER.
K - 5
PUBLIC WORKS (OPW)
FY 2026-27 MASTER FEE SCHEDULE
EX
HIBIT A: A-9
City of Oakland PUBLIC WORKS Master Fee Schedule
Effective July 1, 2025 6
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change
ENVIRONMENT
KEEP OAKLAND CLEAN & BEAUTIFUL
A.
1 185.33 Hour 178.55 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
2 160.09 Hour 154.23 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
3 142.48 Hour 137.27 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
4 134.23 Hour 129.31 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
5 136.52 Hour 131.71 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
6 121.31 Hour 116.70 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
7 128.51 Hour 123.80 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
8 130.34 Hour 125.72 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
9 104.17 Hour 100.36 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
10 105.95 Hour 102.23 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
C.
3 286.70 Appeal 276.21 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
4 143.35 Hour 138.10 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
D.
1 142.48 Hour 137.27 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
E.
1 b.
1 349.03 Request 336.25 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
c.
1 581.71 Request 560.41 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
PARK MAINTENANCE
A.
1 121.24 Hour 116.80 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
2 102.20 Hour 98.45 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
3 49.73 Hour 49.10 -1% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
4 181.69 Hour 175.04 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
5 156.95 Hour 151.21 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
6 130.40 Hour 125.64 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
7 124.20 Hour 119.65 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
B.
1 181.69 Hour 175.04 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
2 156.95 Hour 151.21 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
3 121.24 Hour 116.80 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
4 102.20 Hour 98.45 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
5 49.73 Hour 49.10 -1% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
ENVIRONMENTAL SERVICES DIVISION
B. 495.63 3 Hours + 159.52 per
additional hour
477.50 3 Hours + 159.17 per
additional hour
-4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
Park Attendant (PT)
HARD COPY PLAN AND REPORT REVIEW - CONSTRUCTION & DEMOLITION RECYCLING (3
HOURS MINIMUM)
SERVICE FEE FOR PARK CLEANUP RELATED TO SPECIAL EVENTS
Park Supervisor II
Park Supervisor I
Gardener Crew Leader
Gardener II
Gardener II
Park Attendant (PT)
Park Supervisor II
Park Supervisor I
Irrigation Repair Specialist
Park Equipment Operator
SERVICE FEE FOR REPAIRING DAMAGE TO LANDSCAPING AND PLANTS (OTHER THAN Gardener Crew Leader
Request
Special Event Crowd Control Barriers
Request
BARRICADES AND SAFETY BARRIERS
Rental Fee
Barricade (Delivery & Pick-up)
REMOVAL OF UNLAWFULLY PLACED ADVERTISING MATERIALS AND GRAFFITI Removal and Restoration (Two Hours Minimum)
INVESTIGATION, ENFORCEMENT, REMOVAL AND DISPOSAL OF ILLEGAL DUMPING Appeal of Civil Penalty Citation Issued Under O.M.C. Chapters 1.08 and 1.12 - Administrative Fee Community Service in Lieu - Administrative Penalty (1 Hour Minimum)
SERVICE FEE FOR BILLING OUTSIDE PARTIES OR AGENCIES FOR WORK PERFORMED Public Works Supervisor II
Street Maintenance Leader (Plus Premiums)
Public Works Maintenance Worker
Public Works Maintenance Worker (Plus Premiums)
Public Works Supervisor I
Painter
Heavy Equipment Operator
Heavy Equipment Operator (Plus Premiums)
Street Sweeper Operator
Street Maintenance Leader
L - 1
City of Oakland PUBLIC WORKS Master Fee Schedule
Effective July 1, 2025 6
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change C. 247.82 Review 239.03 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
4 159.52 Incident 153.68 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
E.
206.67 Per Review 199.11 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303
F.
206.67 Per Verification 199.11 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
G.
957.10 Per Review 922.07 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
H.
638.07 Per Verification 614.72 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
J.
2 Administrative Fee 77.63 Per load of construction &
demolition debris collected
75.47 -3% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
K. 206.67 Each 199.11 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
L.
1 230.00 Per Year (or pro-rata) 230.00 Per Year (or pro-rata) Fee moved from Finance to Public Works as indicated by the MFS Team. There is no fee change as a result to this change.
2 910.00 Per Year (or pro-rata) 910.00 Per Year (or pro-rata) Fee moved from Finance to Public Works as indicated by the MFS Team. There is no fee change as a result to this change.
3 3,815.00 Per Year (or pro-rata) 3,815.00 Per Year (or pro-rata) Fee moved from Finance to Public Works as indicated by the MFS Team. There is no fee change as a result to this change.
4 100.00 Per Year (or pro-rata) 100.00 Per Year (or pro-rata) Fee moved from Finance to Public Works as indicated by the MFS Team. There is no fee change due to the result of this change.
5 50.00 Per Year 50.00 Per Year Fee moved from Finance to Public Works as indicated by the MFS Team. There is no fee change as a result to this change.
6 10% of Invoice 10% of Invoice Fee moved from Finance to Public Works as indicated by the MFS Team. There is no fee change due to the result of this change.
7 25% of Invoice 25% of Invoice Fee moved from Finance to Public Works as indicated by the MFS Team. There is no fee change as a result to this change.
8 50% of Invoice 50% of Invoice Fee moved from Finance to Public Works as indicated by the MFS Team. 9 1% Per Month 1% Per Month Fee moved from Finance to Public Works as indicated by the MFS Team. There is no fee change as a result to this change.
10 67.50 Appeal 67.50 Appeal Fee moved from Finance to Public Works as indicated by the MFS Team. There is no fee change as a result to this change.
TREE SERVICES DIVISION
A.
1 b. 599.83 Each 581.18 -3% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
c. 1,009.19 Each 981.21 -3% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
2 a. 601.05 Permit 579.06 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
b. 601.05
+ 10.00
Permit
Per Tree
579.06
+ 10.00
-4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
c. 776.21 Permit 747.81 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
d. 776.21
+ 10.00
Permit
Per Tree over 10 Trees
747.81
+ 10.00
-4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
e. 776.21
+ $164.80
Permit
Per Hour
747.81
+ 10.00
-4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
f.
1 1,178.94 Appeal 1135.80 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
2 1,933.93 Appeal 1863.16 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
Development tree permit
(11-100 Trees to be Reviewed for Removal plus $10 per tree over 10 trees) Development tree permit
(Over 100 Trees to be Reviewed for Removal)
Appeal of the Tree Removal Permit
Non-development fee permit
Development tree permit
Plant 15 Gallon Size Tree
Plant 24 Inch Box Size Tree
Tree Removal Permits
Non-development tree permit (1-10 Trees)
Non-development tree permit (11-100 Trees) plus $10.00 per tree Development tree permit
(1-10 Trees to be Reviewed for Removal)
CONSTRUCTION & DEMOLITION NON EXCLUSIVE FRANCHISE
REUSABLE AND DISPOSABLE FOOD SERVICE WARE FOR FOOD SERVICE - WAIVER
APPLICATION REVIEW
TREE AND SIDEWALK SERVICES
Service Fee for Street Tree Planting
SELF HAUL PERMIT - APPLICATION REVIEW AND INSPECTION
SELF HAULING PERMIT - ANNUAL VERIFICATION
EXCESS LITTER FEE
Small Business - Annual Gross Receipts between $5,000 to $499,999 Medium Business - Annual Gross Receipts between $500,000 to $999,999 Large Business - Annual Gross Receipts between $1,000,000 or more Mobile Food Vending
Failure to File an Annual Declaration
Penalty for Failure to Pay Excess Litter Fee Invoice within 60 Days from Due Date Penalty for Failure to Pay Excess Litter Fee Invoice beyond 90 Days from Due Date Penalty for Failure to Pay Excess Litter Fee Invoice beyond 120 Days from Due Date Interest, Inclusive of Penalties, for Delinquent Excess Litter Fees Due Filing Fee for an Appeal for Litter Ordinance
Administrative Processing Fee (Applies to All Penalties) City may impose additional civil penalties pursuant to OMC chapter 1.08. Up to $1000 per day.
EXEMPTIONS FROM MINIMUM REQUIRED COLLECTION SERVICE (2ND UNIT) - APPLICATION
REVIEW & INSPECTION
EXEMPTIONS FROM MINIMUM REQUIRED COLLECTION SERVICES (2ND UNIT) - ANNUAL
VERIFICATION
ONLINE PLAN REVIEW - CONSTRUCTION & DEMOLITION RECYCLING L - 2
City of Oakland PUBLIC WORKS Master Fee Schedule
Effective July 1, 2025 6
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change 3 1,178.94 Appeal 1135.80 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
4 1,178.94 Appeal 1135.80 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
3 b.
1 599.83 Tree 581.18 -3% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
2 24 Inch Box-Sized Tree 1,009.19 Tree 981.21 -3% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
c.
1 4 1,516.99 each 1461.48 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
MAINTENANCE & INTERNAL SERVICES
FACILITIES SERVICES
A.
2 86.54 Hour 83.36 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
3 Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
a. 129.11 Hour 124.38 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
4 Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
a. 142.48 Hour 137.27 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
5 Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
a. 190.78 Hour 183.80 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
B.
1 a. 123.81 Hour 119.28 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
2 Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
a. 152.09 Hour 146.52 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
3 Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
a. 142.51 Hour 137.29 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
4 a. 156.01 Hour 150.30 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
5 Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
a. 142.51 Hour 137.29 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
6 Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
a. 142.48 Hour 137.27 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
SEWERS & STORM DRAIN MAINTENANCE
A.
Personnel Services Fee Schedule
1 577.37 2 Hours + 277.00 per
additional hour
560.33 -3% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
2 1,125.49 2.5 Hours 1088.38 -3% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
B.
1 138.62 Hour 133.54 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
2 140.89 Hour 135.92 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
3 185.33 Hour 178.55 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
4 160.09 Hour 154.23 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
Not During Normal Operating Hours
SERVICE FEE FOR BILLING OUTSIDE PARTIES OR AGENCIES FOR WORK PERFORMED Sewer Maintenance Leader
Sewer Maintenance Leader Plus Premium
Public Works Supervisor II
Public Works Supervisor I
BOARDING OF WINDOWS AND DOORS, RETRIEVAL OF PERSONAL ITEMS FROM CITY
FACILITIES AND STRUCTURES, AND SAFELY SECURING PUBLIC HAZARDOUS LOCATIONS Normal Operating Hours
- 8:00 am to 4:30 PM, Monday Through Friday Except Holiday Normal Operating Hours
Construction & Maintenance Mechanic
Normal Operating Hours
Painter
Normal Operating Hours
Normal Operating Hours
Plumber
Normal Operating Hours
Carpenter
Normal Operating Hours
Electrician
REPAIRS FOR DAMAGE TO CITY PROPERTY
Maintenance Mechanic
Normal Operating Hours
Chief Stationary Engineer
Normal Operating Hours
Custodian Services
Custodial Services Supervisor 1
Normal Operating Hours
Stationary Engineering Services
Partially Damaged Tree
Percentage of Damage is Estimated by Tree Services Division Using the ISA Formula Above.
View Preservation Claim Appeal
FACILITIES USAGE FEE
City Hazardous Tree Apeal
Service Fee for Damaged Trees
Trees of Replaceable Size
15-Gallon Tree Size
City Owned Tree Apeal
L - 3
City of Oakland PUBLIC WORKS Master Fee Schedule
Effective July 1, 2025 6
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change 5 128.51 Hour 123.80 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
6 130.34 Hour 125.72 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
7 134.23 Hour 129.31 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
8 136.52 Hour 131.71 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
9 104.17 Hour 100.36 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
10 105.95 Hour 102.23 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
11 113.22 Hour 109.09 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
12 115.10 Hour 111.07 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
ENGINEERING & CONSTRUCTION
ENGINEERING PLANNING & DESIGN
A. 311.21 Hour 299.82 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
C. 1,243.41 Application 1,197.91 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
D. WILL SERVE LETTER 175.05 1/2 Hour 168.65 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
PROJECT DELIVERY
A. 208.11 Hour 200.48 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
WATERSHED PROGRAM
A.
1 1,123.00 Inspection 1,081.90 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
2 3,477.48 Appeal 3,350.22 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
a. Hourly Fee Over 4 Hours 869.59 Hour 837.76 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
B. STORMWATER INSPECTION FEE
1 522.54 Inspection 889.37 70% Staff previously performing these services (Hazardous Materials Inspector II) is no longer performing the inspections and these are now all completed by the Program Analyst III from start to finish.
2 384.34 Inspection 711.49 85% Staff previously performing these services (Hazardous Materials Inspector II) is no longer performing the inspections and these are now all completed by the Program Analyst III from start to finish.
3 256.76 Inspection 444.68 73% Staff previously performing these services (Hazardous Materials Inspector II) is no longer performing the inspections and these are now all completed by the Program Analyst III from start to finish.
4 204.61 Hour 311.28 Request 52% Staff previously performing these services (Hazardous Materials Inspector II) is no longer performing the inspections and these are now all completed by the Program Analyst III from start to finish.
C.
1 800.43 Permit New fee per OMC 13.16 as OPW Watershed staff are needed as subject matter experts to review these permits in addition to PBD staff members. The current Creek Protection Permit fee in PBD only captures PBD staff costs and does not include OPW Watershed staff as subject matter experts due to the proximity of the exterior development or work to the creek itself.
2 1,067.24 Permit New fee per OMC 13.16 as OPW Watershed staff are needed as subject matter experts to review these permits in addition to PBD staff members. The current Creek Protection Permit fee in PBD only captures PBD staff costs and does not include OPW Watershed staff as subject matter experts due to the proximity of the exterior development or work to the creek itself.
3 266.81 Request New fee per OMC 13.16 as OPW Watershed staff are needed as subject matter experts to review these permits in addition to PBD staff members. The current Creek Protection Permit fee in PBD only captures PBD staff costs and when PBD staff receive requests to have the category of these permits downgraded from III or IV to categories I or II, Watershed staff are requested to provide this determination.
PRIVATE SEWER LATERALS
A. INSPECTION FOR ISSUANCE OF A PERMIT AS REQUIRED BY OAKLAND MUNICIPAL CODE SECTION 13.08, BUILDING SERVICES AND BUILDING SEWER CONNECTIONS Creek Determination Inspection Fee
Creek Determination Appeals (4 hours Minimum)
Industrial (CA Industrial General Permit)
Industrial (No CA Industrial General Permit)
Commercial facility
Business Inspection Fee
Category III - Watershed Review (from 20 Feet to 100 Feet)
CREEK PROTECTION PERMIT FEE - SUBJECT MATTER EXPERT REVIEW BY WATERSHED
PROGRAM SPECIALIST
Category IV - Watershed Review (20 Feet & Hydrology Report) Category Downgrade Determination
SEWER DISCHARGE AUTHORIZATION
MATERIALS TESTING SERVICE
CREEK FIELD INSPECTION
Sewer Maintenance Worker
Sewer Maintenance Worker (Plus Premiums)
ENGINEERING REVIEW
Street Maintance Leader (plus Premiums)
Heavy Equipment Operator
Heavy Equipment Operator (plus Premiums)
Public Works Maintenance Worker
Public Works Maintenance Worker (plus Premiums)
Street Maintance Leader
L - 4
City of Oakland PUBLIC WORKS Master Fee Schedule
Effective July 1, 2025 6
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change 1 a. 622.67 Up to 2 Inspections 599.82 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
b. 939.37 Up to 3 Inspections 904.91 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
2 1,867.40 Up to 3 Inspections 1798.93 Up to 3 Inspections (includes plans check
up to 2 reviews)
-4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
3 486.72 Inspection 468.86 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
4 a. 1,130.89 Parcel 1089.37 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303
b. 1,803.29 Parcel 1737.08 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303
5 337.54 Inspection 325.16 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
6 472.33 Inspection 454.99 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
8 110.50 1/2 Hour New fee per OMC 13.08 for Private Sewer Lateral (PSL) Plan Review Fees to recover staff costs associated with review of PSL plans to ensure compliance with the City’s standards specifically to new construction.
9 274.59 Inspection New fee per OMC 13.08 for PSL permit has expired and was not finalized due to final paving restoration. The recovery costs are associated with staff costs needed for this inspection.
B.
4 292.91 Inspection 282.16 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
C.
1 d. 955.00 Abatement 920.00 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
2 c. 2,806.20 Abatement 2704.82 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
D.
1 a. No Fee No Fee Duplicate fee in another Department's Section b. No Fee No Fee Duplicate fee in another Department's Section D.
1 168.30 Per Permit New fee per OMC 13.08 for recovery costs is associated with staff time for reprocessing the expired permit and reviewing the permit application.
E.
1 698.11 2 Inspections 672.48 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
2 281.80 Inspection 271.46 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
3 431.62 Inspection 415.78 -4% Decrease in benefits, central overhead and department overhead rates for 23.38% per FY2026 AI1303.
ENGINEERING
A. PRIVATE SEWER ASSESSMENT DISTRICT (PSAD)
1 Application Actual Cost Duplicate fee in another Department's Section 2 Assessment Collection Actual Cost Duplicate fee in another Department's Section Administrative Fee
COMMENCING WORK FOR WHICH A PERMIT, IN ACCORDANCE WITH OAKLAND MUNICIPAL CODE CHAPTERS 12.40, 12.12, 12.32, AND 13.08. IS REQUIRED WITHOUT FIRST HAVING
OBTAINED A PERMIT
Investigation of Work
Sewer, Common Private
UTILITY CROSS BORE SEWER MAIN ABATEMENT
Permit to Abate (Includes 2 inspections)
Additional Inspections During Normal Hours
Additional Inspections Not During Normal Hours
Mandatory
Administrative Fee
REPAIR OF SIDEWALK, DRIVEWAYS, CURBS, AND GUTTERS
Repair of City tree damaged sidewalk by private property owner During Normal Working Hours
Not During Normal Operating Hours
Additional Inspections During Normal Hours
Additional Inspections Not During Normal Hours
Additional Plan Check for New Construction of Sewer Lateral Inspection for Expired Permit for Final Paving Restoration
SERVICE CHARGE TO PROCESS REQUEST TO REINSTATE PERMIT FOR EXPIRED PERMIT WITH
NO INSPECTION
Reinstatement (If Expired for More than One Year, Applicant Required to Obtain New Sewer Lateral Permit)
Collection Surcharge
Administrative Fee
SEWER ABATEMENT
Voluntary
Repair or Replace Existing Sewer Lateral:
Lateral on Private Property (Includes main connection in easement) Upper and/or Lower Lateral Within Private Property and Sidewalk/Roadway New Sewer Lateral Connection: (Includes Accessory Dwelling Unit and Mobile Home) a. Lateral Connect to Existing Lateral or
b. Lateral Connect to Sewer Main in Easement or
c. Lateral Connect to Sewer Main in Sidewalk/Roadway (additoinal engineering review charges and inspection charges may apply)
Sewer Abandonment (Alameda County Health Department provides permits for Septic Tank Abandonment)
L - 5
ECONOMIC WORKFORCE DEVELOPMENT
FY 2026-27 MASTER FEE SCHEDULE
EX
HIBIT A: A-10
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change
ECONOMIC DEVELOPMENT
REAL ESTATE SERVICES
A.
1 3,566.00 Parcel 3,672.00 2.97% Fee increase based on labor cost increases to reflect full cost recovery. 2 2,397.00 Parcel 2,468.00 2.96% Fee increase based on labor cost increases to reflect full cost recovery. 3 a. 1,226.00 Appraisal 1,262.00 2.94% Fee increase based on labor cost increases to reflect full cost recovery. b. 1,763.00 Appraisal 1,815.00 2.95% Fee increase based on labor cost increases to reflect full cost recovery. 4 3,770.00 Request 3,883.00 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 5 214.00 Each License Request 220.00 2.80% Fee increase based on labor cost increases to reflect full cost recovery. 6 55.50 Each License Request 57.00 2.70% Fee increase based on labor cost increases to reflect full cost recovery. 7 3,384.00 Request 3,485.00 2.98% Fee increase based on labor cost increases to reflect full cost recovery. 8 2,685.00 Request 2,765.00 2.98% Fee increase based on labor cost increases to reflect full cost recovery. 9 3,746.00 Each 3,858.00 2.99% Fee increase based on labor cost increases to reflect full cost recovery.
CB.
298.00 Hour 306.00 2.68%
Fee increase based on labor cost increases to reflect full cost recovery.
Correction to read section "B."
PUBLIC ART PROGRAM
A.
1 168.00 per hour 173.00 2.98% Fee increase based on labor cost increases to reflect full cost recovery. 2 168.00 per hour 173.00 2.98% Fee increase based on labor cost increases to reflect full cost recovery.
B.
1 1,685.00 Each 1,735.00 2.97% Fee increase based on labor cost increases to reflect full cost recovery.
C.
1 1,685.00 Each 1,735.00 2.97% Fee increase based on labor cost increases to reflect full cost recovery.
A.
1 245.00 Day 252.00 2.86% Fee increase based on labor cost increases to reflect full cost recovery. 2 306.00 Day 315.00 2.94% Fee increase based on labor cost increases to reflect full cost recovery. 3 306.00 Day 315.00 2.94% Fee increase based on labor cost increases to reflect full cost recovery. 4 245.00 Day 252.00 2.86% Fee increase based on labor cost increases to reflect full cost recovery. 5 122.00 Day 125.00 2.46% Fee increase based on labor cost increases to reflect full cost recovery. 6 61.00 Day 62.00 1.64% Fee increase based on labor cost increases to reflect full cost recovery. 7 92.00 Day 94.00 2.17% Fee increase based on labor cost increases to reflect full cost recovery. 8 125.00 Application 128.00 2.40% Fee increase based on labor cost increases to reflect full cost recovery.
SPECIAL ACTIVITIES
A.
1 916.00 Permit 943.00 2.95% Fee increase based on labor cost increases to reflect full cost recovery. 2 916.00 Permit 943.00 2.95% Fee increase based on labor cost increases to reflect full cost recovery. 3 916.00 Permit 943.00 2.95% Fee increase based on labor cost increases to reflect full cost recovery. 4 916.00 Permit 943.00 2.95% Fee increase based on labor cost increases to reflect full cost recovery. 5 a. 724.00 Application 745.00 2.90% Fee increase based on labor cost increases to reflect full cost recovery. b. 1,295.00 Permit 1,333.00 2.93% Fee increase based on labor cost increases to reflect full cost recovery. c. 1,754.00 Permit 1,806.00 2.96% Fee increase based on labor cost increases to reflect full cost recovery. d. 4,034.00 Permit 4,155.00 3.00% Fee increase based on labor cost increases to reflect full cost recovery. e. 517.00 Permit 532.00 2.90% Fee increase based on labor cost increases to reflect full cost recovery. 6 916.00 Permit 943.00 2.95% Fee increase based on labor cost increases to reflect full cost recovery. 7 916.00 Permit 943.00 2.95% Fee increase based on labor cost increases to reflect full cost recovery. 8 916.00 Permit 943.00 2.95% Fee increase based on labor cost increases to reflect full cost recovery.
PROCESS FEE
Administrative Processing Fee for the Sale of Substandard Surplus City Parcels Administrative Processing Fee for Surplus Property (City Council) Processing Fee for Appraisals
Residential Properties
Commercial Properties
City of Oakland
Master Fee Schedule
ECONOMIC & WORKFORCE
DEVELOPMENT
Effective July 1, 202 5 6
DEVELOPMENT AGREEMENT NEGOTIATION AND PREPARATION FEE
REVIEW AND FACILITATION FEE
Public Art proposals for City property initiated by artist or community (with or without City funding) and City- funded or required Public Art proposals for private property Public Art official gifts to the City
REVIEW, PERMIT PREPARATION AND PROCESS FEE
Non-City Public Art projects proposed for Caltrans property. Additional fees apply for projects requiring coordination of multiple City department approvals.
Administrative Processing Fee for new telecommunication leases or licensesAdministrative Processing Fee for new single small cell telecommunication lease or license or for related equipment modification reviews
Administrative Processing Fee for new single small cell telecommunication lease or licenseAdministrative Processing Fee for second and subsequent new small cell telecommunication lease or license, or for related equipment modification reviews, when submitted in a batch of multiple licenses or equipment modifications of like kind and location.
Administrative Processing Fee for second and subsequent new small cell telecommunication lease or license when submitted in a batch of multiple licenses of like kind and location.Administrative Processing Fee for all other types (i.e., non-small cell) of new telecommunication leases or licenses.
Administrative processing fee for all other types (i.e., non-small cell) of Telecommunication Lease or License Equipment Modification Reviews
Administrative processing fee for new Leases, and Licenses and rights of entry to a for-profit organization Easement Processing Fee
Film Permit for Commercial Advertising Production
Film Permit for Industrial or Web-based Production
Film Permit for Music Video
Film Permit for Short Subject Production
Film Permit for Still photography
New Film Application Fee
PUBLIC ART REVIEW FEE FOR PRIVATE DEVELOPMENT
Administrative processing fee for review of Public Art proposals for Private Development (O.M.C. Chapter
15.78). Additional fees apply for projects placed in the Public Right of Way. See above.
FILM
FILM-RELATED FEES
Film Permit for Major Feature Production
Film Permit for Television Production
Permit Application Fee
Large Entertainment Venue Annual Permit Fee
Extended Hours Permit Application
Extended Hours Annual Permit Fee
Small Entertainment Venue Exemption Annual Permit Fee
Pool Room & Bowling Alley Permit
APPLICATION FILING FEE FOR A SPECIAL ACTIVITY PERMIT AS
REQUIRED BY OAKLAND MUNICIPAL CODE
Mechanical and Electronic Games
Theater Permit
Moving Picture Permit
Dance Hall Permit
Entertainment Venue Application Fee
Skating Rink Permit
Riding Academy Permit
M-1
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change City of Oakland
Master Fee Schedule
ECONOMIC & WORKFORCE
DEVELOPMENT
Effective July 1, 202 5 6
9 916.00 Permit 943.00 2.95% Fee increase based on labor cost increases to reflect full cost recovery. 10 916.00 Permit 943.00 2.95% Fee increase based on labor cost increases to reflect full cost recovery. 11 916.00 Permit 943.00 2.95% Fee increase based on labor cost increases to reflect full cost recovery. 12 916.00 Permit 943.00 2.95% Fee increase based on labor cost increases to reflect full cost recovery. 13 3,012.00 Permit 3,102.00 2.99% Fee increase based on labor cost increases to reflect full cost recovery. 14 a. 374.00 Permit 385.00 2.94% Fee increase based on labor cost increases to reflect full cost recovery. b. 318.00 Permit 327.00 2.83% Fee increase based on labor cost increases to reflect full cost recovery. c. 159.00 Permit 163.00 2.52% Fee increase based on labor cost increases to reflect full cost recovery. d. 33.75 Permit 34.00 0.74% Fee increase based on labor cost increases to reflect full cost recovery. e. 52.25 Permit 53.00 1.44% Fee increase based on labor cost increases to reflect full cost recovery. 15 1,048.00 Permit 1,079.00 2.96% Fee increase based on labor cost increases to reflect full cost recovery. a. 327.00 Permit 336.00 2.75% Fee increase based on labor cost increases to reflect full cost recovery. 16 1,048.00 Permit 1,079.00 2.96% Fee increase based on labor cost increases to reflect full cost recovery. a. 327.00 Permit 336.00 2.75% Fee increase based on labor cost increases to reflect full cost recovery. 17 1,048.00 Permit 1,079.00 2.96% Fee increase based on labor cost increases to reflect full cost recovery. a. 327.00 Permit 336.00 2.75% Fee increase based on labor cost increases to reflect full cost recovery. 18 195.00 Permit 200.00 2.56% Fee increase based on labor cost increases to reflect full cost recovery. 19 1,048.00 Permit 1,079.00 2.96% Fee increase based on labor cost increases to reflect full cost recovery. 20 1,048.00 Permit 1,079.00 2.96% Fee increase based on labor cost increases to reflect full cost recovery. 22 916.00 Permit 943.00 2.95% Fee increase based on labor cost increases to reflect full cost recovery. 23 916.00 Permit 943.00 2.95% Fee increase based on labor cost increases to reflect full cost recovery. 24 56.75 Permit 58.00 2.20% Fee increase based on labor cost increases to reflect full cost recovery.
B. 145.00 Notice 149.00 2.76% Fee increase based on labor cost increases to reflect full cost recovery.
C. 933.00 Appeal 960.00 2.89% Fee increase based on labor cost increases to reflect full cost recovery.
D.
1 36.00 Permit 37.00 2.78% Fee increase based on labor cost increases to reflect full cost recovery.
E. 50.00 Year 51.00 2.00% Fee increase based on labor cost increases to reflect full cost recovery. 1 a. 2,065.00 Permit 2,126.00 2.95% Fee increase based on labor cost increases to reflect full cost recovery. b. 5,300.00 Audit 5,459.00 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2 a. 1,753.00 Month 1,805.00 2.97% Fee increase based on labor cost increases to reflect full cost recovery.
F.
1 a. 3,419.00 Application 3,521.00 2.98% Fee increase based on labor cost increases to reflect full cost recovery. b. 1,008.00 Application 1,038.00 2.98% Fee increase based on labor cost increases to reflect full cost recovery. c. 3,514.00 Application 3,619.00 2.99% Fee increase based on labor cost increases to reflect full cost recovery. d. 117.00 Updated Application 120.00 2.56% Fee increase based on labor cost increases to reflect full cost recovery. 2 a. 800.00 Permit/Year 824.00 3.00% Fee increase based on labor cost increases to reflect full cost recovery. b. 427.00 Permit/Year 439.00 2.81% Fee increase based on labor cost increases to reflect full cost recovery. c. 239.00 Permit/Year 246.00 2.93% Fee increase based on labor cost increases to reflect full cost recovery. 3 18,147.00 Annual Permit 18,691.00 3.00% Fee increase based on labor cost increases to reflect full cost recovery. a.
13,218.00 Annual Permit 13,614.00 3.00% Fee increase based on labor cost increases to reflect full cost recovery. b.
6,089.00 Annual Permit 6,271.00 2.99% Fee increase based on labor cost increases to reflect full cost recovery. c. 14,128.00 Annual Permit New Fee
This fee is being added to provide a clear understanding of the annual cultivator permit fee for facilities over 5,000 square feet and gross sales in excess of $999,999.
4 Gross Sales - $500,000 - $999,999
a. 6,604.00 Annual Permit 6,802.00 3.00% Fee increase based on labor cost increases to reflect full cost recovery. b.
2,452.00 Annual Permit 2,525.00 2.98% Fee increase based on labor cost increases to reflect full cost recovery. c. 7,316.00 Annual Permit New Fee
This fee is being added to provide a clear understanding of the annual cultivator permit fee for facilities over 5,000 square feet and gross sales between $500,000 - $999,999.
5 Gross Sales < $500,000
a. 3,587.00 Annual Permit 3,694.00 2.98% Fee increase based on labor cost increases to reflect full cost recovery. b.
1,328.00 Annual Permit 1,367.00 2.94% Fee increase based on labor cost increases to reflect full cost recovery. c. 4,208.00 Annual Permit New Fee
This fee is being added to provide a clear understanding of the annual cultivator permit fee for facilities over 5,000 square feet and gross sales less than $500,000.
6 3,131.00 Application 3,224.00 2.97% Fee increase based on labor cost increases to reflect full cost recovery. 7 2,494.00 Annual Permit 2,568.00 2.97% Fee increase based on labor cost increases to reflect full cost recovery. 8 272 Per 120-day Plan 280.00 2.94% Fee increase based on labor cost increases to reflect full cost recovery.
Massage Establishment Permit
Massage Therapist and Trainee Permit
Original
Renewal
Upgrading from Trainee to Therapist
Replacement of Badge
Miniature Golf Course Permit
Carnival Permit
Outdoor Amusement Center Permit
Trampoline Center Permit
Renewal
Storage of Second Hand Building Materials Permit
Scrap Dealer Permit
Scrap Collector Permit
Livery Stable
Flying Field, Heliport, Helistop Permit
Change of Workplace
Pawn Broker Permit
Renewal
Second Hand Dealer, Exchange Dealer Permit
Renewal
Second Hand Jewelry Dealer
ANNUAL PERMIT TO CONDUCT BINGO GAMES FOR CHARITY
Bingo Hall
Permit Fee for Manager of Bingo Hall
City Auditor Review of Independent Audit, if applicable Bingo Game Operator Law Enforcement and Public Safety Fee Monthly Fee
Outdoor Sound Amplification
NOTICE OF HEARING ON THE APPLICATION FOR A SPECIAL ACTIVITY PERMIT NOTICE TO BE
PUBLISHED ONCE IN THE OFFICIAL NEWSPAPER OF THE CITY OF OAKLAND
APPEAL FILING FEE, SPECIAL ACTIVITY PERMITS
FEES FOR CHARITABLE SOLICITATION PERMIT
Permit Filing Fee (valid for up to 90 days)
Change of Application Fee
Renewal Processing fee for Cannabis Permits
Dispensary Permit Application
Non-Dispensary Permit Application
Additional Non-Dispensary at same Location
Annual Dispensary Permit
CANNABIS PERMITS
Application fee
First Non-Dispensary Application submitted
Application fee for each additional non-dispensary permit for same operator at same location
Dispensary Application Fee
Application Fee - On Site Consumption
Permit Fee - On Site Consumption
Compliance Plan Fee
Annual No-Dispensary Permit if Gross Sales > $999,999
Each additional permit for same operator at same location if Gross Sales > $999,999 Annual Permit if Gross Sales = $500,000 - $999,999
Each additional Permit for same operator at same location if Gross Sales = $500,000 - $999,999
Annual Permit if Gross Sales < $500,000
Each additional Permit for same operator at same location if Gross Sales < $500,000 Cultivator annual permit fee (5,000+ square foot facility) if Gross Sales < $500,000 Cultivator annual permit fee (5,000+ square foot facility) if Gross Sales = $500,000 - $999,999 Cultivator annual permit fee (5,000+ square foot facility) if Gross Sales > $999,999 M-2
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change City of Oakland
Master Fee Schedule
ECONOMIC & WORKFORCE
DEVELOPMENT
Effective July 1, 202 5 6
9 499.00 Annual Permit
This $499 fee is now eliminated and has been consolidated above with an increase by 3% to $513 based on labor cost increases to reflect full cost recovery. The $513 is now added on to the increased fees listed on lines F.3.c., F.4.c. & F.5.c. for 5,000 square feet facilities to clarify the total owed by applicants based on gross sales.
G. 525.00 Application 540.00 2.86% Fee increase based on labor cost increases to reflect full cost recovery.
H. 952.00 Fee 980.00 2.94% Fee increase based on labor cost increases to reflect full cost recovery.
I. MOBILE VENDING PERMIT
a. Food Truck, Trailers, Large Push Carts (Motorized), Merchandise 497.00 Annual 511.00 2.82% Fee increase based on labor cost increases to reflect full cost recovery. b. Food Truck, Trailers, Large Push Carts (Motorized), Merchandise 248.00 Semi Annual (182 Consecutive Days) 255.00 2.82% Fee increase based on labor cost increases to reflect full cost recovery. c. Push Cart (non-motorized sidewalk vendor) 412.00 Annual 424.00 2.91% Fee increase based on labor cost increases to reflect full cost recovery. d. Push Cart (non-motorized sidewalk vendor) 213.00 Semi Annual (182 Consecutive Days) 219.00 2.82% Fee increase based on labor cost increases to reflect full cost recovery. e. Group Site (all types) 1,291.00 Annual 1,329.00 2.94% Fee increase based on labor cost increases to reflect full cost recovery.
J. SPECIAL EVENT APPLICATION FEE (As allowed in OMC section 9.52) 1 Tier One (Less than 300 people) 83.25 Application 85.00 2.10% Fee increase based on labor cost increases to reflect full cost recovery. 2 Tier Two (300 or more) 427.00 Application 439.00 2.81% Fee increase based on labor cost increases to reflect full cost recovery. 3 Tier Three (2,500 or more people/parade) 1,752.00 Application 1,804.00 2.97% Fee increase based on labor cost increases to reflect full cost recovery. 4 Tier Four (marathons) 4,935.00 Application 5,083.00 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 6 Events That Include Cannabis Vendors
a. 591.00 Application 608.00 2.88% Fee increase based on labor cost increases to reflect full cost recovery. b. 95.00 Application 97.00 2.11% Fee increase based on labor cost increases to reflect full cost recovery. 8 Special Event Late Application Fee for Tier Two, Tier Three, and Tier Four 377.00 Late Application 388.00 2.92% Fee increase based on labor cost increases to reflect full cost recovery.
NUISANCE ENFORCEMENT UNIT
A.
1 3,228.25 Letter 3,325.00 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2 5,568.50 Management Fee 5,735.00 2.99% Fee increase based on labor cost increases to reflect full cost recovery. 4 746.00 Notice 768.00 2.95% Fee increase based on labor cost increases to reflect full cost recovery. 5 4,641.00 Case 4,780.00 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 6 190.50 Hour 196.00 2.89% Fee increase based on labor cost increases to reflect full cost recovery. 7 90.75 Hour 93.00 2.48% Fee increase based on labor cost increases to reflect full cost recovery. 8 140.50 Per Appeal 144.00 2.49% Fee increase based on labor cost increases to reflect full cost recovery. 9 119.50 Hour 123.00 2.93% Fee increase based on labor cost increases to reflect full cost recovery.
B. 2,600.00 Per Day New Fee New regulatory fee added for cost recovery. See Director's Memo.
C.
2,600.00 Per Day New Fee New regulatory fee added for cost recovery. See Director's Memo.
D. SPECIAL ACTIVITY PERMITS DIVISION (SAPD) STAFF TIME (Regular Time) 1 Cannabis Officer 183.00 Per Hour New Fee New regulatory fee added for cost recovery. See Director's Memo. 2 Special Activity Permit Inspector 149.00 Per Hour New Fee New regulatory fee added for cost recovery. See Director's Memo. 3 Special Activity Permit Coordinator 125.00 Per Hour New Fee New regulatory fee added for cost recovery. See Director's Memo. 4 Special Activity Permit Technician 101.00 Per Hour New Fee New regulatory fee added for cost recovery. See Director's Memo. 5 Administrative Analyst 158.00 Per Hour New Fee New regulatory fee added for cost recovery. See Director's Memo.
E. OVERTIME SERVICE FEE FOR FIELD INSPECTIONS OR OTHER OPERATIONS (4 hour Minimum) 1 Cannabis Officer
275.00 Per Hour New Fee
New regulatory fee added for cost recovery. Overtime rate is 1.5x Regular Time. See Director's Memo.
2 Special Activity Permit Inspector
223.00 Per Hour New Fee
New regulatory fee added for cost recovery. Overtime rate is 1.5x Regular Time. See Director's Memo.
3 Special Activity Permit Coordinator
188.00 Per Hour New Fee
New regulatory fee added for cost recovery. Overtime rate is 1.5x Regular Time. See Director's Memo.
4 Special Activity Permit Technician
152.00 Per Hour New Fee
New regulatory fee added for cost recovery. Overtime rate is 1.5x Regular Time. See Director's Memo.
F. RE-INSPECTION AFTER FAILING INSPECTION (Regular Time) 1 Cannabis Officer 367.00 Per Hour New Fee New regulatory fee added for cost recovery. See Director's Memo. 2 Special Activity Permit Inspector 298.00 Per Hour New Fee New regulatory fee added for cost recovery. See Director's Memo.
G. OVERTIME SERVICE FEE FOR RE-INSPECTION AFTER FAILING SECONDARY INSPECTION 1 Cannabis Officer
550.00 Per Hour New Fee
New regulatory fee added for cost recovery. Overtime rate is 1.5x Regular Time. See Director's Memo.
2 Special Activity Permit Inspector 447.00 Per Hour New Fee New regulatory fee added for cost recovery. Overtime rate is 1.5x Regular Time. See Director's Memo.
Large (5,000+ square foot facility) Cultivator Annual Fee
REHEARING FILING FEE
HEARING NOTIFICATION FEE FOR SPECIAL ACTIVITY PERMIT APPLICATIONS Notice to Evict by City
Administrative Costs for Civil Penalty Citation
Assistant to the City Administrator (Case Manager)
Administrative Assistant II
Nuisance Abatement Appeal Fee
Muni Enforcement Officer
VOLUNTARY DISPOSAL FEE FOR UNPERMITTED CANNABIS OPERATIONS VOLUNTARY DISPOSAL FEE FOR UNPERMITTED CANNABIS OPERATIONS (Other than dispensary & cultivation)
Up to 15 vendors
Each additional 15 cannabis vendors
PUBLIC NUISANCE ORDINANCE AND NUISANCE EVICTION ORDINANCE (OMC: PNO - 1.08.070 and 1.12.070; NEO 8.23.100)
Drug Nuisance Abatement Letter - Repeat Offender
Administrative Nuisance Cases
M-3
HOUSING AND COMMUNITY DEVELOPMENT
FY 2026-27 MASTER FEE SCHEDULE
EX
HIBIT A: A-11
City of Oakland
Master Fee Schedule
Effective July 1, 2025 6
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change
LENDING
B. 236.90Refund 244.00 3.00%Fee increase based on labor cost increases to reflect full cost recovery
D.
1 56.60Loan 58.30 3.00%Fee increase based on labor cost increases to reflect full cost recovery
2 173.00Loan 178.19 3.00%Fee increase based on labor cost increases to reflect full cost recovery
3 551.00Loan 567.53 3.00%Fee increase based on labor cost increases to reflect full cost recovery
4 896.00Loan 922.88 3.00%Fee increase based on labor cost increases to reflect full cost recovery
6 963.00Loan 991.89 3.00%Fee increase based on labor cost increases to reflect full cost recovery
7 551.00Loan 567.53 3.00%Fee increase based on labor cost increases to reflect full cost recovery
E.
1 270.00Loan 278.10 3.00%Fee increase based on labor cost increases to reflect full cost recovery
G.
2 3460.80Loan 3564.62 3.00%Fee increase based on labor cost increases to reflect full cost recovery
3 1514.00Loan 1559.42 3.00%Fee increase based on labor cost increases to reflect full cost recovery
4 1730.00Loan 1781.90 3.00%Fee increase based on labor cost increases to reflect full cost recovery
5 2163.00Loan 2227.89 3.00%Fee increase based on labor cost increases to reflect full cost recovery
6 628.30 base fee +
8.24 / unit
647.15 base fee +
8.49 / unit 3.00%Fee increase based on labor cost increases to reflect full cost recovery
7 398.61 base fee +
5.15 / unit
410.57 base fee +
5.30 / unit 3.00%Fee increase based on labor cost increases to reflect full cost recovery
8 144.00Per unit charge 148.32 3.00%Fee increase based on labor cost increases to reflect full cost recovery
Re-Sale Fees
HOMEOWNERSHIP PROGRAM FEE
Subordination Fee
Loan Assumption Fee
Annual Monitoring Fee - City-Assisted Projects
Annual Monitoring Fee - Restricted Unassisted Projects
(3+ Restricted Units)
Annual Monitoring Fee - Restricted Unassisted Projects
(1-2 Restricted Units)
Subordination Fee
HOUSING & COMMUNITY
DEVELOPMENT
FTHB Loan Application Fee
HOUSING DEVELOPMENT SERVICES FEES
Loan Modification Fee
Re-Sale Fees
Loan Assumption Fee
RESIDENTIAL LENDING LOAN FEES
Statement Fee
Reconveyance Fee
Loan Extension Fee
APPLICATION FEE REFUNDS PROCESSING COST
N - 1
City of Oakland
Master Fee Schedule
Effective July 1, 202 5 6
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change
HOUSING & COMMUNITY
DEVELOPMENT
A.
1 7.98 Square Foot 8.24 per Square Foot 3.26%
To be in conformity with the Marshall and Swift
(M&S) cost index followed by the industry and
inflation increase. See memo submitted for
details.
2 600.50
Apeal 618.52 3.00% Fee increase based on labor cost increases to reflect full cost recovery
Job Housing Impact Fee
Administrative Appeal Fee
MISCELLANEOUS
JOBS/HOUSING FEE
(OVER 25,000 S.F. OFFICE/WAREHOUSE)
N - 2
PLANNING AND BUILDING (PBD)
FY 2026-27 MASTER FEE SCHEDULE
EX
HIBIT A: A-12
City of Oakland PLANNING & BUILDING Master Fee Schedule DEPARTMENT Effective August 28, 2025 July 1, 2026
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT Fee Unit % Change Justification for Fee Change
BUILDING SERVICES
A.
1. b. Online submission 112.83Per Permit 134.32 19% Re-review by staff, process takes longer to process
2. b. Online submission 112.83 Per Permit 134.32 19% Re-review by staff, process takes longer to process c. SolarApp+ Filing Fee 40.29Per Permit 21.49 -47% Due to system improvement in the past year; time was reduce
d.Rapid Permit Filing Fee 67.16 Per Permit
New fee- due to technology enhancements of creating
permits and issuing , some permits can be done with
minimal review by staff
D.
1. 268.64 Each Wording change
4. 537.29Each Seperating out Refund request
a. Expired/Inactive Permits 402.96 Each New Fee - Reorganization for refund request to capture the different types of refunds that are received.
b. Permits exclude filing fees and reduced permit amounts 134.32 Each New Fee - Reorganization for refund request to capture the different types of refunds that are received.
E.
1.Surety Bonds 604.45Each 537.28 -11% Due to system improvement in the past year; time was reduce
2.Cash, Cashier checks, Checks 604.45Each 537.28 -11% Due to system improvement in the past year; time was reduce
3.Certificate of Deposits, etc. 604.45Each 537.28 -11% Due to system improvement in the past year; time was reduce
K.
EXPIRATION LIMITATION OR REINSTATE PERMIT
2. If more than 2 years 268.64Per Permit 201.48 -25% Due to system improvement in the past year; time was reduce
3. If impact fees need to be reviewed 671.61Per Permit 201.48 -70% Due to system improvement in the past year; time was reduce
L. 67.16 Per Certification Changing name only
CODE ENFORCEMENT
A.
1. 402.96 Inspection New Fee - Moved for ease of reading & Staff re-review of fee item times from A4.
2. 537.28 Instance New Fee - Moved for ease of reading & Staff re-review of fee item times from D6
1. 3. Wording change for clarity and number change
c. 537.29 Inspection Wording change for clarity
d. 268.64 Per Hour New fee - adding a regular inspection fee for clarity for re- inspections
e. 402.96 Per Hour New fee - adding a fee for inspections done outside regular hours for clarity for re-inspections
2. 4. Update heading number
3. 5. 402.97Each Actual Cost Error in previous MFS
4. 402.97Inspection moved to 1.
5. 6.
B.
3. 159.65Each 150.00 -6% Per Graffiti Ordinance
4. 265.74Each 250.00 -6% Per Graffiti Ordinance
5. 530.45Each 500.00 -6% Per Graffiti Ordinance
C. STOP WORK / ACTIVITY ORDER
1. Regular Time During Regular Working Hours 1,343.22 Each Wording clarification a. Each additional over 1 1,611.84 Each
New fee for SWO multiple violators - Due to the
challenges, monitoring, research, of repeat Stop Work
violators increased the number of hours staff spend on
each stop work order
Outside Normal Working Hours
During Regular Working Hours
Graffiti Penalties 1st Citation (OMC 8.10.240.B)
Graffiti Penalties 2nd Citation (OMC 8.10.240.B)
Graffiti Penalties 3rd Citation (OMC 8.10.240.B)
Complaint Investigation
Repeat Offender - violation within 24 months
GRAFFITI
Others ie., Declaration of Substandard
Cerificate of Occupancy
Third-Party Contract
INSTALLATION / REGISTRATION / INSPECTION CERTIFICATION FOR RE- ROOFING OR
CERTIFICATION FOR INSULATION INSULATION CERTIFICATION
SERVICE FEES
Re-inspection to Verify or Monitor Progress of Violations Abatement (Blight, Housing, Zoning) Complaint Investigation
Violation Processing Fee
SERVICE CHARGE TO PROCESS REQUEST TO EXTEND PERMIT
Refund Request on Expired/Inactive permits
PROCESSING SECURITY DEPOSITS
PROCESSING ADMINISTRATIVE/BILLING/VIOLATION APPEALS (BLIGHT HOUSING, ZONING,
VACANT BUILDING, NON- OWNER OCCUPIED RESIDENTIAL)
Processing appeals - Determined to be unfounded
ADMINISTRATION
PERMIT APPLICATION FEE
All record types to include: Building, Electrical, Mechanical, Plumbing Permits, Planning/Zoning All Other Permits
O- 1
City of Oakland PLANNING & BUILDING Master Fee Schedule DEPARTMENT Effective August 28, 2025 July 1, 2026
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT Fee Unit % Change Justification for Fee Change b. 2 or more 1,880.48 Each
New fee for SWO multiple violators - Due to the
challenges, monitoring, research, of repeat Stop Work
violators increased the number of hours staff spend on
each stop work order
2. Outside Normal Working Hours 2,014.83 Each
a. 2,417.76 Each
New fee for SWO multiple violators - Due to the
challenges, monitoring, research, of repeat Stop Work
violators increased the number of hours staff spend on
each stop work order after hours. Since after hours at 1.5. b. 2 or more 2,820.72 Each
New fee for SWO multiple violators - Due to the
challenges, monitoring, research, of repeat Stop Work
violators increased the number of hours staff spend on
each stop work order after hours. Since after hours at 1.5.
D.
1. a. 268.64Instance 201.48 -25% Due to system improvement in the past year; time was reduce
c.
1. Base Fee (includes 3 inspections) 1343.22 Per Permit 1,007.40 -25% Due to system improvement in the past year; time was reduce
2. a.
10.Notice of Violation (NOV) Recordation 134.32 Document New Fee -Due to system improvement and process changes in the past year
11.Release of Notice of Violation (NOV) Recordation 268.64 Document New Fee -Due to system improvement and process changes in the past year
12.Re-Inspection Notice (Blight, Housing, Zoning) 134.32 Document New Fee -Due to system improvement and process changes in the past year
13.Declaration of Public Nuisance/ Substandard Recordation 1,746.16 Document New Fee -Due to system improvement and process changes in the past year
14.Release of Declaration of Public Nuisance/ Substandard Recordation New subheading a. Certificate of Occupancy Required 268.64 Document New Fee -Due to system improvement and process changes in the past year
b. No Certificate of Occupancy Required 134.32 Document New Fee -Due to system improvement and process changes in the past year
4. b. 201.48Report 134.32 -33% Due to system improvement in the past year; time was reduce
6. 537.29Instance moved to Code Enforcement A.Services Fee # 2
7. 6. 201.48 Document Update heading number
E.
1. a. Zoom Meeting 309.00Per Meeting 275.00 -11% Per California Government Code § 68097.2 - only charged the $275.00
b. In-person meeting 309.00Per Meeting + Mileage 275.00 -11% Per California Government Code § 68097.2 - only charged the $275.00
2. a. Zoom Meeting 309.00Per Meeting 275.00 -11% Per California Government Code § 68097.2 - only charged the $275.00
b. In-person meeting 309.00Per Meeting + Mileage
275.00 11% Per California Government Code § 68097.2 - only charged the $275.00
F.
1. 402.97Instance Delete - Duplicate - under Administration
2. 1. Actual Cost Appeal correcting number sequence
3. 2. 1,880.51 Appeal correcting number sequence
4. 3. 738.77 Instance correcting number sequence
G.
1. 537.29Inspection 268.64 -50% Due to system improvement in the past year; time was reduce
INSPECTION
D. Building Construction Permits - Plan Review and Inspection
5. Residential - Electrical - R3 - Plan Review 0.31per $1,000 of construction valuation minimum value 335.81
Moved for Clarity to W. PLAN CHECKING FOR
ELECTRICAL, PLUMBING OR MECHANICAL PERMITS
6. 5. Residential - Electrical - R3 - Inspection 7.66per $1,000 of construction valuation minimum value 335.81 Renumbering only
Each additional over 1
Reschedule Appeals Hearing
GARBAGE AND REFUSE RECEPTACLES FOR - R3 OCCUPANCIES SERVICE AND ADMINISTRATIVE FEES (except lien- related fees)
Occurrence (OMC Chapter 8.24)
Witness Fee (Not Related to Employee's Duties)
Witness Fee (Related to Employee's Duties)
APPEALS TO HEARING EXAMINER
Filing Fee
Review Appeal and Conduct Hearing by Hearing Officer
Processing Fee
Process Violation
Non-Compliant Property Owner Certification
SUBPOENA
Real Property Title Research
Processing
Bid/Contract Development
Public Documents (Order, Invoice, Notice, Declaration, Lien, Release, Termination, etc.) Preparation
ADMINISTRATIVE FEES
Contracted Work
Demolition - $1-$5,000:
O- 2
City of Oakland PLANNING & BUILDING Master Fee Schedule DEPARTMENT Effective August 28, 2025 July 1, 2026
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT Fee Unit % Change Justification for Fee Change
7. Residential - Plumbing - R3 - Plan Review 0.31per $1,000 of construction valuation minimum value 335.81
Moved for Clarity to W. PLAN CHECKING FOR
ELECTRICAL, PLUMBING OR MECHANICAL PERMITS
8. 6. Residential - Plumbing - R3 - Inspection 4.79per $1,000 of construction valuation minimum value 335.81 Renumbering only
9. Residential - Mechanical - R3 - Plan Review 0.32per $1,000 of construction valuation minimum value 335.81
Moved for Clarity to W. PLAN CHECKING FOR
ELECTRICAL, PLUMBING OR MECHANICAL PERMITS
10 7.Residential - Mechanical - R3 - Inspection 4.36per $1,000 of construction valuation minimum value 335.81 Renumbering only
11 8.Building - New Construction - All Occupancies other than R3 - Plan Review 9.71per $1,000 of construction valuation minimum value 335.81 Renumbering only
12 9. Building - New Construction - All Occupancies other than R3 - Inspection 8.37per $1,000 of construction valuation minimum value 335.81 Renumbering only
13 10.Private Infrastructure - Plan Review 11.73per $1,000 of construction valuation minimum value 335.81 Renumbering only
14 11.Private Infrastructure - Inspection 10.36per $1,000 of construction valuation minimum value 335.81 Renumbering only
15 12.Building - Reparis Repairs/Additions/Alterations - All Occupancies other than R3 - Plan Review 11.73per $1,000 of construction valuation minimum value 335.81 Renumbering only and correcting spelling 16 13.Building - Reparis Repairs/Additions/Alterations - All Occupancies other than R3 - Inspection 10.36per $1,000 of construction valuation minimum value 335.81 Renumbering only and correcting spelling G.
1. 268.64 Permit (2 inspections max) 10.36
Per $1,000 of
construction
valuation
minimum value
335.81
New fee - due to procedural process Window -
Replacement/Retro Fit will coincide with the building
construction permits from approved fee study
2. 537.29 Permit (4 inspections max) Consolidate fee above
3. 1,074.58 Permit (6 inspections max) Consolidate fee above L.
1. Wording Clarification
a. Electrical Inspection 15% or minimum $ 335.81of bldg pmt Change of department process. Department will use individual items.
b. Mechanical Inspection 15% or minimum $ 335.81of bldg pmt c. Plumbing Inspection 15% or minimum $ 335.81of bldg pmt V.
1. 537.29Per Permit Change wording to specify building type and to include higher valuation
a. 537.28 Per Permit New Fee for higher (500,000) valuation and types of buildings
b. 805.92 Per Permit New Fee for higher (500,000) valuation and types of buildings
2. 134.32
521.84 + $130.41 Each additional
$100,000 for over $200,000, not to
exceed $10,000
Header only
a. 201.48
Each Additional
$100,000 over
$500,001, not to
exceed $13,432
New Fee for surcharge for higher (500,001) valuation with new maximum
3. 402.97 Per Permit Increasing valuation
W. PLAN CHECKING FOR ELECTRICAL, PLUMBING OR MECHANICAL PERMITS
1. 805.93Per Permit Reclassified during fee study but did not update in MFS a. Residential - Electrical - R3 - Plan Review 0.31
per $1,000 of
construction
valuation
minimum value
335.81
Moved for clarity from D. Building Construction Permits - Plan Review and Inspection
b. Residential - Plumbing - R3 - Plan Review 0.31
per $1,000 of
construction
valuation
minimum value
335.81
Moved for clarity from D. Building Construction Permits - Plan Review and Inspection
c.Residential - Mechanical - R3 - Plan Review 0.32
per $1,000 of
construction
valuation
minimum value
335.81
Moved for clarity from D. Building Construction Permits - Plan Review and Inspection
ZONING INSPECTIONS FOR BUILDING PERMITS
New Construction up to $200,000
Surcharge for New Construction over $200,000 $500,001
Additions/Alterations over $5,000 $25,000
Residential
1-2 Units - Residential equals $500,000 or more
3 or more Residential and all others occupancies $500,000 or more Per Each $100,000 Over $300,000 $500,001
ELECTRICAL, MECHANICAL, PLUMBING INSPECTION FOR NEW CONSTRUCTION, ADDITION OR REMODEL Electrical, Mechanical, Plumbing Inspection Fees for New, Addition, Alteration Multi 3 Unit or more Residential and all other Occupancies Combination Permits
WINDOW - REPLACEMENT/RETRO FIT
1-10 windows Windows (Per $1,000 valuation)
11-100 Windows
101 Windows or more
O- 3
City of Oakland PLANNING & BUILDING Master Fee Schedule DEPARTMENT Effective August 28, 2025 July 1, 2026
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT Fee Unit % Change Justification for Fee Change
3. 1611.87 Per Permit Description change for clarity
AP.
3. 134.32 Per Property Per California Assembly Bill 968 AW. RE-ROOF PERMIT (UP TO 2 INSPECTIONS) 268.64 Permit New fee for new service being provided. Hourly rate is $268.64 based on the last approved fee study; On
average the inspections for a re-roof permit should be 1-2 inspections.
PLAN CHECK
A.
5. 1611.87Per Permit Change formating for valuation change
1. 1,611.87 Per Permit New Fee for valuation changes - fee reflects the previous process coordination fee only the valuation changed
2. 3,492.32 Per Permit
New Fee due to the complexity and coordination required for larger projects reorganizing based on valuations of projects
3. 6,178.72 Per Permit
New Fee due to the complexity and coordination required for larger projects reorganizing based on valuations of projects
C.
1. Processing Request For Handicapped Accessibility Exceptions to Title 24 Regulation Change in description only
2. Processing Request for Alternate Materials or Method of Construction a. 940.26Request 1,007.40 7% staff work on process and only plan checkers were included
b.
1. 1,074.58Request 1,141.72 6%
Re-review by staff realized that during the fee study other staff work on process and only plan checkers were
included
2. 1,746.19Request 1,813.32 4% Re-review by staff, process takes longer to process c.
1. 1,746.19Request 1,813.32 4%
Re-review by staff realized that during the fee study other staff work on process and only plan checkers were
included
2. 1,880.51Request 1,947.64 4% staff work on process and only plan checkers were included
D. Delete - Staff no longer processing individual fee - added to regualar plan check fee
1. 940.26Plan Delete - Staff no longer processing individual fee - added to regualar plan check fee
2. 671.61Plan Delete - Staff no longer processing individual fee - added to regualar plan check fee
3. Delete - Staff no longer processing individual fee - added to regualar plan check fee
a. 402.97Plan Delete - Staff no longer processing individual fee - added to regualar plan check fee
E. D. Update heading letter
F. E. Actual Cost Update heading letter
G. F. 402.97 Per Permit 268.64 -33% Staff Re-review of number of hours it takes for fee item & determine process is combined with with demo inspection H. G. Update heading letter
I. H.
1. 3,626.70 Per Permit Change formating for valuation change to match zoning inspection valuations
Projects between $3,000,000 - $9,999,999
Projects between $500,000 - $2,999,999
EARTHQUAKE DAMAGE ASSESSMENT REVIEW
(No Report Fee for Owner-Occupied Single Family Dwellings)
ZONING CONDITIONS OF APPROVAL COMPLIANCE
New Construction Up to $300,000 $500,000
MAKING BUILDING RECORDS AVAILABLE FOR VIEWING AND/OR COPYING FROM ARCHIVES
PROCESSING DEMOLITION PERMITS
(EXEMPT: SFD DETACHED GARAGE LESS THAN 400 S.F.)
Site Plan Review
Parking Review First 4 Spaces
Surcharge
Above 5 or more Parking Spaces
GEOLOGICAL REPORT REVIEW OR GEOLOGICAL REPORT WAIVER REVIEW
AS REQUIRED BY OAKLAND MUNICIPAL CODE
First Two Requests
Additional Request
Grade III - Appeals Regarding Code Requirements
When Projects are Still in the Design Stage
First Two Requests
Additional Request
SITE PLAN REVIEW
BOARD OF EXAMINERS & APPEALS
Grade I - Minimum Code Deviations Requiring
Limited Staff Time
Grade II - Code Violations Found During Plan Checking or Field Inspection Process Coordination Fee for each applicable Permit
Projects between $10,000,000 and over
PLAN CHECKING AND/OR PROCESSING OF APPLICATION FOR A PERMIT REQUIRED Research for Permit Record and Code Enforcement Cases on Property (California Assembly Bill 968)
REPORT OF PERMIT RECORD
Commercial 3 or more Residential Units and All Others
O- 4
City of Oakland PLANNING & BUILDING Master Fee Schedule DEPARTMENT Effective August 28, 2025 July 1, 2026
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT Fee Unit % Change Justification for Fee Change a. 1,611.84 Per Permit
New Fee for higher (500,00) valuation and types of
buildings and process and system improvements; to
match zoning inspections valuation tiers
b. 5,372.80 Per Permit
New Fee for higher (500,00) valuation and types of
buildings and process and system improvements; to
match zoning inspections valuation tiers
2. Change in valuation only
a. 604.45 Per Permit
Each Additional
$100,000 over
$500,000, not to
exceed $17,640
Change in valuation and max amount
J. I.
3. Other: Consultation with Building Staff 402.96 Per Hour New Fee - Staff is requested to consult for other
departments and are asked by applicants for multiple
meetings for pre-apps or other
K. J.
1. 2,417.80 Up to 500
Cubic Yds
a. 501 - 10,000 9,999 cubic yards 3,761.02501 - 10,000 Cubic Yds
501 - 9,999
Cubic Yds Correction of wording only
b. 5,372.89 1st 10,000 Cu Yd Correction of wording only
3. 1,477.55 Per Permit Delete - Staff no longer performs this fee, creates a regular garding permit
L. K.
M. L.
1. 3,895.35Review Delete - Staff no longer performs this fee item
1. 1,343.22 Document correction of number sequence
N. Delete - Staff no longer performs this fee item
1. Delete - Staff no longer performs this fee item
a. 1,611.87 Per Permit Delete - Staff no longer performs this fee item b. 268.64 Hour or Fraction Thereof Delete - Staff no longer performs this fee item
2. Delete - Staff no longer performs this fee item
a. 1,813.35Request Delete - Staff no longer performs this fee item b. 268.64 Hour or Fraction Thereof Delete - Staff no longer performs this fee item
3. Contract Cost + Review 14%Review Delete - Staff no longer performs this fee item O. M. OSHPD 3 Certification Paperwork Review and Completion 268.64 Per Permit Update heading letter
PLANNING & ZONING
A.
1. a. 9,740.11Report 10,461.68 7% After further review; support from other department time spent on fee
2. a. 10,535.79Report 11,058.06 5% After further review; support from other department time spent on fee
3. a. 6,393.29Report 7,496.08 17% After further review; support from other department time spent on fee
4. a. 24,904.97Report 25,469.64 2% After further review; support from other department time spent on fee
5. a. 19,987.70Report 20,826.00 4% After further review; support from other department time spent on fee
6. a. 4,584.06Report 4,959.35 8% After further review; support from other department time spent on fee
b. 1,163.21 Report
New Fee item - Due processes changing that will reduce
time for staff, a new fee is needed to have an exception to a minor minor variance.
Planned Unit Development (Final)
Basic Fee
Minor Variance
Report Fee
Minor Zoning Exception
Rezoning
Rezoning
Planned Unit Development (Preliminary)
Basic Fee
Peer Review
APPLICATIONS UNDER THE OAKLAND ZONING REGULATIONS
Major Conditional Use Permit
Report Fee
Major Variance
Report Fee
Permit Application
Basic
Over 6 hours
Request for Waiver Application
Basic
Over 6 hours
Plan Review
REVIEW OF GEOTECHNICAL REPORT REQUIRED FOR PROJECTS LOCATED
IN SEISMIC HAZARD ZONE AS IDENTIFIED BY THE STATE GEOLOGIST a. Prepare Agreements (Stormwater, etc.)
Review of Materials Related to Request
for Emergency Grading Permit
WORK WITHOUT A GRADING PERMIT
CONSTRUCTION SITE MONITORING (DUST, NOISE, C3)
Per Each $100,000 Over $300,000 $500,000
PRE-APPLICATION FEE
GRADING PERMIT
Basic 1 - 500 cubic yards
Over 10,000 Ccubic Yyards and over
Surcharge for New Construction Over $300,000 $500,000 per $100,000 1-2 Units - Residential equals $500,000 or more
3 or more Residential and all others occupancies $500,000 or more O- 5
City of Oakland PLANNING & BUILDING Master Fee Schedule DEPARTMENT Effective August 28, 2025 July 1, 2026
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT Fee Unit % Change Justification for Fee Change
7. a. 4,584.06Report 4,959.35 8% After further review; support from other department time spent on fee
8. Design Review in the S-7 or S-20 zones
a. 4,363.28Report 4,937.86 13% After further review; support from other department time spent on fee
b. 8,444.73Report 9,204.02 9% After further review; support from other department time spent on fee
8a.
a. 4,363.28Report 5,574.28 28%
Since this was launched after further review, staff time required is greater than originally stated in the FY 25/26 resolution.
9. d. 1,163.23Report Delete - change in procedures
10. c.
1. Category I, II & III 491.62 Per Appllication 878.58 79% After further review; support from other department time spent on fee
2. Category IV 738.77 Per Appllication Delete - change in procedures
3. 2. Amnesty Program 1,473.16 Per Appllication 1,461.53 -1% After further review; support from other department time spent on fee
11. 13,710.00 Report
a. 3,995.00Report 5,344.02 34% After further review; support from other department time spent on fee
14. 75.22Report 88.65 18% After further review; staff spends more time on fee item & wording change
a. 507.86 Report
New Fee Item - Staff spends more time on verifying
cannabis project to ensure that they meet with Zoning
codes
15. a. 6,220.87Report 6,942.48 12% After further review; support from other department time spent on fee
16. New Construction or Additions Surcharge: Non-Residential per square foot (Not PUD) a. Up to 5,000 square Feet - Base Fee 1,139.18 Per Permit Each additional square foot, from 5,000 - 49,999 0.08 Per Sq Ft This was placed in the incorrect location on the MFS. b. 50,000 square feet - Base Fee 4,688.56 Per Permit
Each additional square foot, from 50,000 to 99,999 0.19 Per Sq Ft This was placed in the incorrect location on the MFS.
Each additional square foot, from 5,000 - 49,999 0.08Per Sq Ft Moved for clarity c. 100,000 square feet - Base Fee 14,063.80 Per Permit Each additional sqare foot, from 100,000 - 299,999 0.10 Per Sq Ft Overlooked on FY 25-26 MFS but charging the amount Each additional square foot, from 50,000 to 99,999 0.19Per Sq Ft Moved for Clarity
25. 22,278.90Per Space Delete - change in procedures
26. 33.99Per Square Foot Delete - change in procedures
B.
1. 11,845.84Report 12,509.36 6% After further review; support from other department time spent on fee
2. a. 6,096.31Report 7,409.99 22% After further review; support from other department time spent on fee
3. a. 2,682.06Report 3,444.35 28% After further review; support from other department time spent on fee
4. 5,158.22Report 5,445.46 6% After further review; support from other department time spent on fee
6. 6,063.80Report 6,638.35 9% After further review; support from other department time spent on fee
7. 10,788.81 Report
8. 402.97Report Delete - Duplicate entry
9. 8. 2,608.32 Report 2,966.24 14% After further review; support from other department time spent on fee
C.
1. c. 25% or $2242.31 Minimum Exemption Determination 25% or 2380.38 Minimum 6% After further review; support from other department time spent on fee
3. 28% / or minimum
$13,293.18EIR/EIS Consultant Fee
Ministerial Project Design Review
Report Fee
Environmental Review Processing Fee-EIR/EIS (minimum or 28% of the contract amount Request for Environmental Review (If Project is exempt but requires analysis and/or findings equivalent to an initial study) or an Environmental Assessment under NEPA (Minimum or 28% of contract amount
Condominium Conversion: Tentative Parcel Map
Condominium Conversion: Tentative Tract Map
Request for Extension of Time Limits
Projects Involving Purchase of Condo Conversion Rights
REQUEST FOR ENVIRONMENTAL IMPACT ASSESSMENT (CEQA/NEPA) Request for Environmental Determination (If Project is Exempt) Basic Fee
Private Access Easement
Private Access Easement
Tentative Parcel Map
In-Lieu Fee for Parking
In-Lieu Fee for Open Space in a Residential Project
APPLICATIONS UNDER THE OAKLAND SUBDIVISION REGULATIONS (42512) Tentative Tract Map (In Connection with Planned Unit Development or Use Permit) All Other Tentative Maps (Other than Condominium Conversions) Business Tax Certificate / Zoning Clearance
General Plan Amendment
General Plan Amendment
Cannabis Review
Report Fee for Secondary Units/ADU
Development Agreement and/or Amendment
Development Agreement: Annual Review
Report Fee - Track Three
Design Review Exemption
Report Fee
Regular Design Review
Report Fee - Minor Project
Report Fee - Major Project
Small Project Design Review
Minor Conditional Use Permit
O- 6
City of Oakland PLANNING & BUILDING Master Fee Schedule DEPARTMENT Effective August 28, 2025 July 1, 2026
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT Fee Unit % Change Justification for Fee Change
4. Delete - Duplicate entry
a. 5,121.37Appeal Delete - Duplicate entry
b. 6,425.53Appeal Delete - Duplicate entry
5. 4. 14,404.14 Report Update heading number
6. 5.NEPA Review Processing - Other Update heading number g. NEPA - Consulation Services for Preliminary NEPA 268.64 Hour or Fraction Thereof New Fee - to support NEPA review for services and staff time that are provided without compensation
h. Prepare Historic Analysis and letter for SHPO Review 2,149.12 Application New Fee - to support NEPA review for services and staff time that are provided without compensation
D. 21.49Package Delete - service no longer provided
E. D. Time and Materials Cost Per Application Update heading letter F. E.
1. a. 1,880.51Each 2788.74 48% After further review; support from other department time spent on fee
2. 402.97Hour or Fraction thereof 268.64 -33% Correction for hourly rate based on fee study
3. 537.29Hour or Fraction thereof 402.36 -25% Correction for hourly rate at 1.5 based on fee study G. F. 402.97 Each Update heading letter
H. G. 80.59 Each Update heading letter
I. H. Update heading letter
1. 67.16 Each
2. 268.64 Hour or Fraction thereof
J. I. Update heading letter
1. 2,920.41Application 3,207.69 10% After further review; support from other department time spent on fee
K. J. Update heading letter
L. K. Unattended Donation/Collection Boxes (UDCB) Update heading letter M. L. Update heading letter
6. 2,686.40 Permit
New Fee – Staff are required to review the categories of submitted creek protection permits. When this review
determines that a permit category should be downgraded, applicants often expect a refund; however, staff time has already been spent to complete the evaluation. This new fee is to recover costs associated with conducting the review and determining a downgrade.
6. 6,390.85Appeal Delete - PBD does not perform task
7. 8,529.04Appeal Delete - Duplicate fee
M. REVISIONS OR RESUBMITTALS
1. a.
2,788.74 Report
New Fee – Resubmittals were previously charged under the general staff hourly rate rather than a dedicated fee item. This new fee establishes a specific charge for resubmittals and allows the department to better track the number of resubmittals associated with each project.
2. a.
655.61 Report
New Fee – Resubmittals were previously charged under the general staff hourly rate rather than a dedicated fee item. This new fee establishes a specific charge for resubmittals and allows the department to better track the number of resubmittals associated with each project.
3. 201.48 Report
New Fee – Revisions were previously charged under the
general staff hourly rate rather than a dedicated fee item. This new fee establishes a specific charge for resubmittals and allows the department to better track the number of resubmittals associated with each project.
4. 268.64 Report
New Fee – Revisions were previously charged under the
general staff hourly rate rather than a dedicated fee item. This new fee establishes a specific charge for resubmittals and allows the department to better track the number of resubmittals associated with each project.
N. OTHER SERVICES
3. Requested meetings with case planner (Major over 4) 924.25 Application New Fee – This fee is proposed to capture staff time that exceeds the amount covered by existing fees. It ensures that additional time spent beyond the allotted scope is appropriately recovered.
4. Memorandum of Agreement Review, CED Meeting, Council Meeting 2,788.74 Per Memorandum New fee item - to recover staff time in reviewing, attending meeting for Memorandums.
Appeal of Determination to Building Official
Appeal to the Planning Commission
Resubmittals during Review for Descretionary (PUD, Major, REzones, GPA, DA, Maps) 2 or more Resubmittals
Resubmittals during Review for Descretionary (Minor Zoning Cases) 2 or more Resubmittals
Revisions for Design Review Exemptions
Revisions for Small Project Design Review
Creek Downgrade
CREEK PROTECTION PERMIT - PLANNING REVIEW
Standard - No Research Required
Research Required
MILLS ACT
Application Fee
NEIGHBORHOOD MEETING STAFF ATTENDANCE FEE (PER STAFF MEMBER REQUESTED BY PROJECT SPONSOR) Consultation Services or Plan Review Requested Outside Regular Hours (Two Hour Minimum)
WRITTEN DETERMINATION BY ZONING ADMINISTRATOR
ZONING COMPLIANCE REVIEW
ZONING CONFIRMATION LETTER
ANNEXATION FEE
PLAN CHECKING AND/OR PROCESSING OF APPLICATION FOR A PERMIT REQUIRED BY OAKLAND ZONING REGULATION,
SUBDIVISION REGULATIONS, AND/OR ENVIRONMENTAL REVIEW
Consultation Services Requested or Preliminary Plan Review (Pre-Apps) (One Hour Minimum)
Consultation Services Requested or Preliminary Plan Review (Minor Projects) Additional Plan Checking and/or Processing Required Due to Plan Deficiencies or Changes (Two Hour Minimum)
Challenge or Appeal of any Environmental Determination or a Categorical Exclusion under NEPA To City Planning Commission
To City Council
Environmental Impact Data Collection, if EIR/EIS required
CONDOMINIUM CONVERSION INFORMATION PACKAGE DOCUMENT
O- 7
INFORMATION TECHNOLOGY
FY 2026-27 MASTER FEE SCHEDULE
EX
HIBIT A: A-13
City of Oakland INFORMATION TECHNOLOGY Master Fee Schedule
Effective July 1, 202 5 6
Proposed 2026-
27 Fee
Proposed
2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change A.
28.35 per radio Obsolete fee
96.39 per hour Obsolete fee
B.
1 120.38 per hour Obsolete fee
2 97.53 Appraisal Obsolete fee
3 79.39 per hour Obsolete feeIT Technical Services
RADIO SERVICES
Monthly Radio Usage Fee
Radio Programming, Installation, and Support
CONSULTING SERVICES
IT Project Management Services
IT Administrative Services
P - 1
TRANSPORTATION (OakDOT)
FY 2026-27 MASTER FEE SCHEDULE
EX
HIBIT A: A-14
City of Oakland
Master Fee Schedule
Effective July 1, 202 5 6
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change
INFRASTRUCTURE & OPERATIONS
ELECTRICAL SERVICES
B.
1 304.23 Hour 313.36 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2 31,338.59 Permit 32,278.75 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
C. To consolidate rates for 'RELOCATION AND REPAIR OR INSTALLATION OF
TRAFFIC SIGNALS OR STREETLIGHTS'
1 Actual Cost To consolidate rates for 'RELOCATION AND REPAIR OR INSTALLATION OF
TRAFFIC SIGNALS OR STREETLIGHTS'
2 Actual Cost To consolidate rates for 'RELOCATION AND REPAIR OR INSTALLATION OF
TRAFFIC SIGNALS OR STREETLIGHTS'
C. D. To consolidate rates for 'RELOCATION AND REPAIR OR INSTALLATION OF
TRAFFIC SIGNALS OR STREETLIGHTS'
1 a. 304.23 Hour 313.36 3.00% Fee increase based on labor cost increases to reflect full cost recovery. b. 237.81 Hour 244.94 3.00% Fee increase based on labor cost increases to reflect full cost recovery. d. 187.39 Hour 193.01 3.00% Fee increase based on labor cost increases to reflect full cost recovery. e. 215.24 Hour 221.70 3.00% Fee increase based on labor cost increases to reflect full cost recovery. f. 133.84 Hour 137.86 3.00% Fee increase based on labor cost increases to reflect full cost recovery. g. 339.48 Hour 349.66 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
E. 278.50 Permit 286.86 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
METER OPERATIONS
A.
1 a. 227.14 Hour 233.95 3.00% Fee increase based on labor cost increases to reflect full cost recovery. b. 194.83 Hour 200.67 3.00% Fee increase based on labor cost increases to reflect full cost recovery. c. 136.10 Hour 140.18 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
C.
1 310.27 Hour 319.58 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
D.
1 a. 227.14 Hour 233.95 3.00% Fee increase based on labor cost increases to reflect full cost recovery. b. 194.83 Hour 200.67 3.00% Fee increase based on labor cost increases to reflect full cost recovery. c. 136.10 Hour 140.18 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 3 Interagency Permits - Review 477.54 Hour 491.87 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 4 Interagency Permits - Inspection 268.30 Hour 276.35 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
TRAFFIC MAINTENANCE
A.
1 512.65 Per Sign 528.03 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
B.
1 593.66 Marking 611.47 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
C.
1 a. 512.65 Per Sign 528.03 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2 a. 400.55 Marking 412.57 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
D.
1 a. 1,039.83 Marking 1,071.02 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
E.
Painting of Street Curb Only and Street Markings
Materials and labor up to 22 FT
INSTALLATION OF SIGN TO INDICATE LOADING ZONE REGULATIONS AS ALLOWED BY OAKLAND MUNICIPAL CODE SECTION 10.40.030
PUBLIC MOTOR VEHICLE STAND AS ALLOWED BY OAKLAND
MUNICIPAL CODE SECTION 5.30.200
Installation of Sign Post
Materials and labor
Painting of Street Curb Adjacent to Public Motor Vehicle Stand Materials and labor up to 22 FT
PAINTING OF CURBS TO INDICATE PARKING REGULATIONS INCLUDING
YELLOW, WHITE, AND GREEN ZONES AS ALLOWED BY OAKLAND
MUNICIPAL CODE SECTION 10.40.020
INSTALLATION OF QUIET ZONE SIGN AS ALLOWED BY OAKLAND
MUNICIPAL CODE SECTION 12.56.090
Materials and labor
PAINTING OF CURB MARKING TO INDICATE A DRIVEWAY AS ALLOWED BY OAKLAND MUNICIPAL CODE SECTION 10.40.040
Materials and labor
Hourly Staff Review
INSTALL NEW PARKING METER or MULTI-SPACE KIOSKS
Labor
Public Works Supervisor II
Public Works Supervisor I
Parking Meter Repair Worker
Public Works Supervisor II
Public Works Supervisor I
Parking Meter Repair Worker
TRAFFIC CONTROL PLAN REVIEW (UTILITIES AND CONSTRUCTION)
ELECTRICAL ENGINEERING REVIEW
RELOCATION OR INSTALLATION OF SINGLE-SPACE PARKING METERS
OR MULTI-SPACE KIOSKS
Labor
Electrical Supervisor (1 hour minimum)
Electrician (1 hour minimum)
Electrical Leader (1 hour Minimum)
Electrical Helper (1 hour Minimum)
Electrical Manager (1 hour Minimum)
Labor
Materials
RELOCATION AND REPAIR OR INSTALLATION OF TRAFFIC SIGNALS OR
STREETLIGHTS
Labor
Electrical Engineer III (1 hour minimum)
RULE 20A & RULE 20B UNDERGROUNDING
ENGINEERING SERVICE FEES
Electrical Engineer III
Council Resolution & Report
DEPARTMENT OF
TRANSPORTATION
REPAIRS FOR DAMAGE TO CITY OF OAKLAND STREETLIGHT & TRAFFIC
SIGNAL EQUIPMENT
Q - 1
City of Oakland
Master Fee Schedule
Effective July 1, 202 5 6
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change
DEPARTMENT OF
TRANSPORTATION
1 a. 512.65 Per Sign 528.03 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
G.
1 227.14 Hour 233.95 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2 194.83 Hour 200.67 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 3 125.82 Hour 129.59 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 4 133.27 Hour 137.27 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 5 142.71 Hour 146.99 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 6 170.99 Hour 176.12 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
M.
1 2,411.87 Per Sign 2,484.23 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
STREET & SIDEWALK MAINTENANCE
B.
1 355.87 Hour 366.55 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2 227.14 Hour 233.95 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 3 194.83 Hour 200.67 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 4 155.20 Hour 159.86 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 5 175.46 Hour 180.72 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 6 164.71 Hour 169.65 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 7 125.82 Hour 129.59 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
ENGINEERING & CONSTRUCTION
ENGINEERING PLANNING & DESIGN
A. 310.27 Hour 319.58 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
B. Duplicate: this is an OPW fee "Engineering Planning & Design" B (see page L- 4)
C. 837.12 Application Duplicate: this is an OPW fee "Engineering Planning & Design" C (see page L- 4)
D. B. PAVEMENT IMPACT Per Engineering Analysis Update heading letter
PROJECT DELIVERY
A.
1 375.00 Location 386.25 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2 100.00 Appeal 103.00 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
B.
1 2,523.25 Each 2,598.95 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2 Standard 3 person survey party and equipment (First 4 hours) 3,288.91 Each 3,387.58 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 3 275.55 Hour 283.82 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 4 152.33 Hour 156.90 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 5 757.07 Permit 779.78 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 6 5,000.00 Each 5,150.00 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 7 a. Review of Subdivision: Tentative Tract Map 5,096.29 Each 5,249.18 3.00% Fee increase based on labor cost increases to reflect full cost recovery. b. 732.55 Each 754.53 3.00% Fee increase based on labor cost increases to reflect full cost recovery. c. 397.08 Each 408.99 3.00% Fee increase based on labor cost increases to reflect full cost recovery. d. Parcel Map Waiver 2,207.61 Each 2,273.84 3.00% Fee increase based on labor cost increases to reflect full cost recovery. e. Certificate of Compliance 2,204.40 Each 2,270.53 3.00% Fee increase based on labor cost increases to reflect full cost recovery. f. PPE: R/W Vacation/Dedication/Abandonment 1,102.20 Each 1,135.27 3.00% Fee increase based on labor cost increases to reflect full cost recovery. g. Zoning Pre-Application 1,102.20 Each 1,135.27 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 7 8
a. 4,989.01 Each 5,138.68 3.00% Fee increase based on labor cost increases to reflect full cost recovery. b. 551.10 Each 567.63 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 8 9
a. 5,663.33 Each 5,833.23 3.00% Fee increase based on labor cost increases to reflect full cost recovery.Final Map Per Engineering Analysis
SEWER DISCHARGE AUTHORIZATION
STREET FURNITURE
Advertising permits for bus shelters and kiosks
Advertising permit appeal fee
Review of Subdivision: Final Map
ENGINEERING REVIEW
Concrete Finisher
Public Works Maintenance Worker
SURVEY SERVICES
Standard 2 person survey party and equipment (First 4 hours) City Surveyor
Senior Survey Tech
Review of Subdivision: Tentative Map
Parcel Map: Up to two reviews at two hours each
Additional Reviews two hours
Review of Subdivision: Parcel Map
Parcel Map
Additional Reviews two hours
Excavation Permit - Compliance with BPC8771 Review
Replacement of a Survey Monument After Disturbance or Loss (Destruction) Without Prior Notice (Flat Fee) + Labor and Materials
SEWER MITIGATION FEE
Public Works Operations Manager
Public Works Supervisor II
Public Works Supervisor I
Street Maintenance Leader
Heavy Equipment Operator
SERVICE FEE FOR BILLING OUTSIDE PARTIES OR AGENCIES FOR WORK
PERFORMED
INSTALLATION OF COMMEMORATIVE STREET NAME PLAQUE
Materials and labor
Sign Maintenance Worker
Traffic Sign Maker
Traffic Painter
SERVICE FEE FOR BILLING OUTSIDE PARTIES OR AGENCIES FOR WORK
PERFORMED
Public Works Supervisor II
Public Works Supervisor I
Public Works Maintenance Worker
Installation of Sign
Materials and labor
Q - 2
City of Oakland
Master Fee Schedule
Effective July 1, 202 5 6
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change
DEPARTMENT OF
TRANSPORTATION
b. 551.10 Each 567.63 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 4,347.80 Each 4,478.23 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2,143.40 Each 2,207.70 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 9 10 Actual Cost Hour Update heading number
RIGHT OF WAY MANAGEMENT
A.
1 596.60 Permit 614.50 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2 a. 298.30 Hour 307.25 3.00% Fee increase based on labor cost increases to reflect full cost recovery. b. 447.45 Hour 460.87 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 3 c. 2,346.63 Repair 2,417.03 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 4 745.50 Each Occurrence 767.87 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 6 Excavation Permit Review Fee
a. Exceeding 300 Feet 1,789.80 Each 1,843.49 3.00% Fee increase based on labor cost increases to reflect full cost recovery. b. Shorter than 300 Feet or Within One City Block 596.60 Each 614.50 3.00% Fee increase based on labor cost increases to reflect full cost recovery. d. Survey Services - Compliance with BPC8771 Review 757.07 Each Application 779.78 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 7 583.08 Each 600.57 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 8 Survey Review - Compliance with BPC8771 Review 757.07 Each 779.78 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
B.
1 No Fee Since this is a zero fee, it is not necessary. 1 2
a. 298.30 Hour 307.25 3.00% Fee increase based on labor cost increases to reflect full cost recovery. b. 447.45 Hour 460.87 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2 3 71.19 25 Lin/Ft. Per Day 17.00 -76.12% Reduced to be consistent with "Engineering" S.b.1.Un-metered Area 3 4 Street Obstruction Fee - Non-Metered Parking 71.19 25 Lin/Ft. Per Day 17.00 -76.12% Reduced to be consistent with "Engineering" S.b.1.Un-metered Area 4 5 745.50 Each Occurrence 767.87 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 5 6 14.00 Each Application Update heading number 6 7 Excavation Permit Review Fee Update heading number
a. Exceeding 300 Feet 1,789.80 Each 1,843.49 3.00% Fee increase based on labor cost increases to reflect full cost recovery. b. Shorter than 300 Feet or Within One City Block 596.60 Each 614.50 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
D.
1 d. 1,058.62 Abatement 1,090.38 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2 d. 1,266.04 Abatement 1,304.02 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
E.
1 804.90 Permit 829.05 3.00% Fee increase based on labor cost increases to reflect full cost recovery. a. 804.90 Permit 829.05 3.00% Fee increase based on labor cost increases to reflect full cost recovery. b. 804.90 Permit 829.05 3.00% Fee increase based on labor cost increases to reflect full cost recovery. c. New Driveway - Review 477.54 Permit 491.87 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2 a. 298.30 Hour 307.25 3.00% Fee increase based on labor cost increases to reflect full cost recovery. b. 447.45 Hour 460.87 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
F.
1 3,073.16 Appeal 3,165.35 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2 3,073.16 Appeal 3,165.35 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 3 3,073.16 Appeal 3,165.35 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 4 6,377.77 Appeal 6,569.10 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
ADMINISTRATION - APPLIES TO:
ENGINEERING AND RIGHT OF WAY MANAGEMENT
Appeals to City Council
DRIVEWAY APPEALS
Grade I - Minimum Code Deviations Requiring Limited Staff Time Grade II - Code Violations Found During Plan Checking or Field Inspection Requiring Field Review by Management
Appeals for Projects in Design Stage
Normal Operating Hours
Not During Normal Operating Hours
Permit (includes maximum 3 hours of inspection)
Sidewalk and/or Driveway over 200 sq ft (includes minimum 3 hrs inspection, hourly thereafter)
Curb and Gutter over 35 linear feet (includes 3 hrs inpsection, hourly thereafter)
Additional Inspection Hours
Administrative and Inspection Fee
INSPECTION OF SIDEWALKS, DRIVEWAYS CURBS AND GUTTERS
City Performed Repairs - Voluntary
Administrative and Inspection Fee
City Performed Repairs - Mandatory
REPAIR OF SIDEWALKS, DRIVEWAYS, CURBS, AND GUTTERS
One Hour Minimum Inspection Fee
One Hour Minimum Inspection Fee
Street Obstruction Fee - Metered Parking
Violation of Mandatory Completion Notice
Emergency Surcharge
Extension of Excavation Permit
EXCAVATION PERMIT (UTILITY COMPANIES ONLY)
Permit
Inspection for Excavation Permit
City Performed Repairs Mandatory per OMC 12.12 et. al
Administrative Fee
Violation of Mandatory Completion Notice
EXCAVATION PERMIT
Permit (Includes max 2 Hours of Inspection)
Additional Inspection Hours
Normal Operating Hours
Not During Normal Operating Hours
Additional Reviews two hours
Corner Record - Pre Construction
Corner Record - Post Construction
Review by Consultant
Q - 3
City of Oakland
Master Fee Schedule
Effective July 1, 202 5 6
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change
DEPARTMENT OF
TRANSPORTATION
A.
1 These are Planning & Building items. We recommend deleting to clean up the MFS.
a. 95.00 Permit These are Planning & Building items. We recommend deleting to clean up the MFS.
1 2
a. 95.00 Permit 97.85 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2 3 14.40 Verification 14.83 2.99%
Fee increase based on labor cost increases to reflect full cost recovery.
C. 69.22 per hour 71.30 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
D. 1,332.74 Appeal 1,372.72 3.00%
Fee increase based on labor cost increases to reflect full cost recovery.
E. 263.03 Each 270.92 3.00%
Fee increase based on labor cost increases to reflect full cost recovery.
ENGINEERING
A. PATH VACATION 14,580.84 Proceeding 15,018.27 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
B. STREET VACATION
1 Summary Vacation 13,124.83 Street 13,518.57 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2 General Vacation 14,471.15 Street 14,905.28 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 3 Notifications 1,816.66 Block 1,871.16 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
C. EASEMENT - DEDICATION OR VACATION
1 City Council Action 9,317.25 Easement 9,596.77 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2 City Engineer Action 2,721.87 Easement 2,803.53 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 3 Shared Access Engineering Review 1,900.81 Easement 1,957.83 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
D. CERTIFICATE OF COMPLIANCE
1 For Work Through Six Hours 2,561.86 Certificate 2,638.72 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2 For Work After Six Hours 310.27 Hour or Fraction of 319.58 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
E. ENCROACHMENT IN THE PUBLIC RIGHT OF WAY OR PUBLIC EASEMENT 1 City Engineer Action
a. 1,935.99 Permit 1,994.07 3.00% Fee increase based on labor cost increases to reflect full cost recovery. b. Previously Existing Encroachment 3,805.31 Permit 3,919.47 3.00% Fee increase based on labor cost increases to reflect full cost recovery. c. 95.00 Permit 97.85 3.00%
Fee increase based on labor cost increases to reflect full cost recovery. d. Non-structural Minor Encroachment (e.g.; flower pot, planter boxes and non-advertising benches) OMC Section 12.08.030 authorizes and regulates minor encroachments within the public right-of-way, including items such as but not limited to flowerpots and planter boxes. The proposed fee establishes cost recovery for staff time required to review applications for certain types of minor encroachments.
1 Filing & Routing (Intake) 97.85 new fee
OMC Section 12.08.030 authorizes and regulates minor encroachments within the public right-of-way, including items such as but not limited to flowerpots and planter boxes. The proposed fee establishes cost recovery for staff time required to review applications for certain types of minor encroachments.
2 Inspection (Normal Operating Hours) 307.25 new fee
OMC Section 12.08.030 authorizes and regulates minor encroachments within the public right-of-way, including items such as but not limited to flowerpots and planter boxes. The proposed fee establishes cost recovery for staff time required to review applications for certain types of minor encroachments.
e. d. New Bike Share Station Encroachment 1,834.43 Permit 1,889.46 3.00% Fee increase based on labor cost increases to reflect full cost recovery. f. e. Encroachment for R3 Occupancy 1,935.99 Permit 1,994.07 3.00% Fee increase based on labor cost increases to reflect full cost recovery. g. f. Amendment or Recession 1,935.99 Permit 1,994.07 3.00% Fee increase based on labor cost increases to reflect full cost recovery. h. g. Actual Cost Hour
Private Party bike rack installation, in accordance with City design process
Review by Consultant
PROCESS BILLING APPEALS AND REFUND REQUESTS THAT ARE
DETERMINED TO BE UNFOUNDED
PROCESSING SECURITY DEPOSITS (BONDS, CASH, CERTIFICATE OF DEPOSITS, ETC.) & REFUNDS
New encroachment (except for encroachment types specified elsewhere in this section)
Filing and Routing (Intake)
Permit Intake
Filing and Routing (Intake)
Service Charge for Verification of Proof of License and Workers Compensation Information Required by State Law for Approval of Permit Application
DOCUMENT RESEARCH FEE
PERMIT APPLICATION FEE
Building, Electrical, Mechanical, Plumbing Permits
Q - 4
City of Oakland
Master Fee Schedule
Effective July 1, 202 5 6
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change
DEPARTMENT OF
TRANSPORTATION
2 City Council Action for Major Encroachment Permit (or when required) 9,317.25 Permit 9,596.77 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
F. TRACT MAP
1 Tentative Map 6,073.75 Map 6,255.96 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2 Final Map (Engineer Review + Council Action) 11,908.82 Tract 12,266.08 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 3 Tentative Map - Each Lot over 5 600.03 Lot 618.03 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 4 Certificate of Correction 852.86 Certificate 878.45 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 5 Subdivision Improvement Agreement 5,230.67 Agreement 5,387.59 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 6 Amended Final Map 666.76 Map 686.76 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 7 Revisions to Final Map, Tentative Map, or SIA
a. Regular Operating Hours 275.55 Hour or Fraction of 283.82 3.00% Fee increase based on labor cost increases to reflect full cost recovery. b. Overtime Hours 413.32 Hour or Fraction of 425.72 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 8 City Council Action 9,596.77 Each 100.00% To be consistent with "Engineering" E.2.City Council Action G. STREET DEDICATION 16,352.72 Street 16,843.30 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
H. STREET NAME CHANGE
1 Application 25,584.85 Street 26,352.40 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2 Notifications 2,414.61 Block 2,487.05 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
I. REVIEW OF PUBLIC INFRASTRUCTURE PERMIT
1 $1 to $5,000 Construction Valuation 1,563.68 Plan/Improvement 1,610.59 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2 $5,001 to $10,000 Construction Value 1,563.68 Plan/Improvement 1,610.59 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 3 3,292.79 Valuation Base 3,391.57 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 4 57.07 Each Additional
$1,000 or Fraction
Thereof
58.78 3.00%
Fee increase based on labor cost increases to reflect full cost recovery. 5 5,578.54 Valuation Base 5,745.90 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 6 123.11 Each Additional
$1,000 or Fraction
Thereof
126.80 3.00%
Fee increase based on labor cost increases to reflect full cost recovery. 7 11,869.48 Valuation Base 12,225.56 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 8 45.69 Each Additional
$1,000 or Fraction
Thereof
47.06 3.00%
Fee increase based on labor cost increases to reflect full cost recovery. 9 30,449.53 Valuation Base 31,363.02 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 10 8,227.98 Initial payment
includes maximum 6
review cycles +
additional review
cycle(s)
8,474.82 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 12 Extension of P-Job Permit for Work Incomplete After One Year 477.54 Plan/ Improvement 491.87 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 13 Review of Plan Revisions
a. Regular Working Hours 310.27 Hour or Fraction of 319.58 3.00% Fee increase based on labor cost increases to reflect full cost recovery. b. Outside of Regular Working Hours 465.41 Hour or Fraction of 479.37 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 14 Actual Cost Hour
J. FRANCHISE APPLICATION OR RENEWAL
1 Personal Services Fee Schedule 5,677.00 Permit 5,847.31 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
K. 310.27 Hour or Fraction of 319.58 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
M. CITY OF OAKLAND MAPS AND PLANS
4 Survey Technician (Hourly) 191.41 Hour 197.15 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
N. S-11 ENGINEERING REVIEW 718.94 Report 740.51 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
O. PARCEL MAP
1 Tentative Map 2,428.26 Map 2,501.11 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2 Parcel Map 2,899.21 Map 2,986.19 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 3 Amended Tentative Map or Parcel Map 666.76 Map 686.76 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 4 Revisions to Tentative Map or Parcel Map
a. Regular Working Hours 407.93 Hour or Fraction of 420.17 3.00% Fee increase based on labor cost increases to reflect full cost recovery. b. Outside of Regular Working Hours 611.89 Hour or Fraction of 630.25 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 5 Certificate of Correction 852.86 Certificate 878.45 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 6 Parcel Map Waiver 2,428.26 Cross support to PBD
2,501.11 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
P. INSPECTION OF PUBLIC INFRASTRUCTURE
5 Outside of Regular Working Hours 357.45 Hour or Fraction of 368.17 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
Over $500,000 Construction Value - additional review cycles Plan Review by Consultant
CONSULTATION REQUESTED FOR PRELIMINARY REVIEW OF
IMPROVEMENTS AND CONSTRUCTION PROJECTS
$10,001 to $50,000; per $1,000 over base amount
$50,000 Valuation Base
$50,001 to $100,000; per $1,000 over base amount
$100,000 Valuation Base
$100,001 - $500,000 Construction Value
$500,000 Valuation Base
$10,000 Valuation Base
Q - 5
City of Oakland
Master Fee Schedule
Effective July 1, 202 5 6
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change
DEPARTMENT OF
TRANSPORTATION
Q. PERMIT APPLICATION REVIEW
1 596.61 Hour or Fraction of 479.37 -19.65% Recommend to be consistent with "Engineering" I.13.b.Outside of Regular Working Hours
R. LOT LINE MERGER AND ADJUSTMENT 3,329.16 Certificate 3,429.03 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
S. OBSTRUCTION PERMITS
2 Long-term Permits (15-180 Day Maximum)
3 Film Short-Term Obstruction Permits These services are administered by EWD. a. Metered Area 15.00 Meter/Day These services are administered by EWD. b. Un-metered Area 2.95 25 Ft/Day These services are administered by EWD. 3 4 Records Management Fee & Technology Enhancement Fee 14.75% Consultant fees Update heading number T. PARKLET PERMIT
1 New Parklet
a. 1,222.84 Permit / Year 1,259.53 3.00% Fee increase based on labor cost increases to reflect full cost recovery. b. 120.00 Permit/Year 123.60 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2 Ann
a. Permit (includes max two hour of inspection) 476.59 Permit / Year 490.89 3.00% Fee increase based on labor cost increases to reflect full cost recovery. b. 50.00 Permit/Year 51.50 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
TAXI CAB PERMIT FEES
1a 251.35 Permit 258.89 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 1b 57.18 Year 58.90 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 1c 31.07 Permit 32.00 2.99% Fee increase based on labor cost increases to reflect full cost recovery. 1d 31.07 Permit 32.00 2.99% Fee increase based on labor cost increases to reflect full cost recovery. 1e Taxi Permit - Lapsed 116.50 Permit 120.00 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2a1 Admin. Services for Inspection 155.33 Permit 159.99 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2a2 Inspection Fee 495.00 Inspection 509.85 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2b Penalty for Missed Inspection 118.00 Inspection 121.54 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2c Transfer Vehicle Operating Permit 193.00 Permit 198.79 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2d Replace or Spare Vehicle 193.00 Permit 198.79 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2e Reinspection 218.00 Re-Inspection 224.54 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 3a Original issuance of medallion 688.34 Medallion 708.99 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 3b Replacement Medallion 38.83 Medallion 39.99 2.99% Fee increase based on labor cost increases to reflect full cost recovery. 3c Transfer of Permit 960.17 Permit 988.98 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 3d Vehicle Application Fee 960.17 Application 988.98 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 3e Original Issuance of Temporary Permit 388.33 Permit 399.98 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 3f Annual Renewal of vehicle 388.33 Permit 399.98 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 3f1 Taxi stand installation/maintenance 38.83 Permit 39.99 2.99% Fee increase based on labor cost increases to reflect full cost recovery. 4a Fleet Management Company Permit 155.33 Permit 159.99 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 5a Amend permit record, 1-10 38.83 Each 39.99 2.99% Fee increase based on labor cost increases to reflect full cost recovery. 5b Amend permit record, 11 or more 233.00 Flat Rate 239.99 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 6a Costs of Investigation, Manager 192.70 Hour 198.48 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 6b Costs of Investigation, Admin 163.10 Hour 167.99 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
PARKING MANAGEMENT
B.
1 a.
1 6.00 Space / Hr 3.00 Space / 20 min 50.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
2 36.00 Space / Day 48.00 33.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
3 300.00 Space / Month 350.00 17.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
4 240.00 Space / Month 275.00 15.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
5 6.00 Space 20.00 233.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
6 75.00 Monthly 120.00 60.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
b.
1 42.00 Ticket 48.00
14.00%
These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
Monthly Parking (Unreserved) MAX
Overnight Parking (Close to Open) Max
Motorcycles Monthly Parking (Unreserved) MAX
Special Fees
Lost Ticket MAX
OFF-STREET PARKING FACILITIES
Franklin Parking Plaza
Basic Fees
Transient Parking (Automobiles) MAX
Daily Maximum (Automobiles) MAX
Monthly Parking (Reserved) MAX
Taxi Permit - Additional/Transfer
Reduced Fee Permit (for applicants who meet certain equity criteria) Taxi Driver Permit - Initial
Taxi Driver Permit - Renewal
Taxi Driver Permit - Replacement
Permit Application Review and Processing Outside of Regular Working Hours
Permit (includes max two hour of inspection and two hours of review) Reduced Fee Permit (for applicants who meet certain equity criteria) Q - 6
City of Oakland
Master Fee Schedule
Effective July 1, 202 5 6
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change
DEPARTMENT OF
TRANSPORTATION
5 25.00 Space/Event 40.00
60.00%
These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
2 a.
1 4.00 Space / Hr 2.00 Space / 20 min 50.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
2 30.00 Space / Day 36.00 20.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
3 240.00 Space / Month 260.00 8.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
5 5.00 Space 6.00 20.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
7 30.00 Space 36.00 20.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
b.
1 36.00 Ticket 48.00 33.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
3 a.
1 8.00 Space / Hr 3.00 Space / 20 min 13.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
2 36.00 Space / Day 48.00 33.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
3 6.00 Space / Night 10.00 67.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
4 300.00 Space / Month 350.00 17.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
5 250.00 Space / Month 275.00 10.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
b.
1 54.00 Ticket 56.00 4.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
5 a.
1 6.00 Space / Hr 3.00 Space / 20 min 50.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
2 30.00 Space / Day 36.00 20.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
3 230.00 Space / Month 280.00 22.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
4 95.00 Space / Month 100.00 5.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
5 6.00 Space / Night 10.00 67.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
6 a.
1 4.00 Space / Hr 2.00 Space / 20 min 50.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
2 30.00 Space / Day 36.00 20.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
3 275.00 Space / Month 280.00 2.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
4 225.00 Space / Month 240.00 7.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
5 6.00 Space / Night 8.00 33.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
7 a.
1 3.00 Space / Hour 4.00 33.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
2 12.00 Space / Day 24.00 100.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
Montclair Parking Garage
Basic Fees
Hourly Parking (Automobiles) MAX
Daily Maximum (Automobiles) MAX
Basic Fees
Transient Parking (Automobiles) MAX
Daily Maximum (Automobiles) MAX
Monthly Parking (Reserved) MAX
Monthly Parking (Unreserved) MAX
Overnight Parking (Close to Open) MAX
1200 Harrison Frank Mar Garage
Transient Parking (Automobiles) MAX
Daily Maximum (Automobiles) MAX
Monthly Parking (Unreserved) MAX
Motorcycle Monthly Parking (Unreserved) Max
Overnight Parking (Close to Open) MAX
Telegraph Parking Plaza
Basic Fees
Monthly Parking (Unreserved) MAX
Special Fees
Lost Ticket MAX
Dalziel Garage
Basic Fees
Transient Parking (Automobiles) MAX
Daily (Automobiles) MAX
Overnight Parking (Close to Open) MAX
Monthly Parking (Reserved) MAX
Special Fees
Lost Ticket MAX
Transient Parking (Automobiles) MAX
Daily (Automobiles) MAX
Monthly Parking (Unreserved) Monday through Sunday MAX
Evening Rate After 5:00 pm to Closing Time MAX
Special Event MAX
Special Event Parking MAX
Pacific Renaissance Plaza Garage
Basic Fees
Q - 7
City of Oakland
Master Fee Schedule
Effective July 1, 202 5 6
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change
DEPARTMENT OF
TRANSPORTATION
3 4.00 Space / Night 8.00 100.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
4 120.00 Space / Month 180.00 50.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
7 8.00 Space / Day 10.00 25.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
b. 100.00 Book of 100 200.00 100.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
c.
1 12.00 Ticket 24.00 100.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
8 a.
6 6.00 Space / Night 10.00 67.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
9 a.
4 200.00 Space / Month 260.00 30.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
5 180.00 Space / Month 200.00 11.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
6 280.00 Space / Month 300.00 7.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
10 a. 4.00 Space / Hour 6.00 50.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
b. 80.00 Space / Month 120.00 50.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
c. 15.00 Space 25.00 67.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
11 a. 4.00 Space / Hour 6.00 50.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
b. 80.00 Space / Month 120.00 50.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
c. 15.00 Space 25.00 67.00% These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
12 a. 4.00 Space / Hour 6.00
50.00%
These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
b. 80.00 Space / Month 120.00
50.00%
These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
13 a. 80.00 Space / Month 120.00
50.00%
These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
b. 10.00 Space 25.00
150.00%
These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
14 a. 4.00 Space / Hour 6.00
50.00%
These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
b. 90.00 Space / Month 120.00
33.00%
These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
15 b. 200.00 Space / Month 240.00
20.00%
These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
c. 350.00 Space/ Month 400.00
14.00%
These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
Wake Ave. Truck
Monthly Parking -Tractor MAX
Monthly Parking - Chassis/Contain an Chassis MAX
Special Event MAX
Lake Park Avenue Parking Lot
Hourly Parking MAX
Monthly Parking MAX
Hourly Parking MAX
Monthly Parking MAX
Scout Road & Mountain Blvd. Parking Lot
Monthly Parking (Unreserved) MAX
Parkway District Municipal Parking Lot as Described by Section 23.09 of Oakland City Council Resolution No.1989 C.M.S.
Hourly Parking MAX
Monthly Parking MAX
Special Event MAX
Piedmont Avenue Municipal Parking Lot as Described by Section 23.05 of Oakland City Council Resolution No. 1987 C.M.S.
Grand Avenue District Municipal Parking Lot as Described by Section
23.08 of Oakland City Council Resolution No.1989 C.M.S. Hourly Parking (Automobiles)
Hourly Parking MAX
Monthly Parking MAX
Special Event MAX
Monthly Parking (Unreserved) MAX
Monthly Parking Mon-Fri (Unreserved) MAX
Monthly Parking Tandem (Unreserved) MAX
Franklin 88 Garage
Basic Fees
Overnight Parking (Close to Open) MAX
City Center West Garage
Basic Fees
Special Fees
Lost Ticket MAX
Monthly Parking (Unreserved) MAX
Early Bird in by 9:30 am MAX
Validations Tickets (Max. 2 hrs per ticket)
Overnight Parking (Close to Open) MAX
Q - 8
City of Oakland
Master Fee Schedule
Effective July 1, 202 5 6
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change
DEPARTMENT OF
TRANSPORTATION
d. 400.00 Space/ Month 480.00
20.00%
These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
17 a.
b. 4.00 Space / Hour 2.00 Space / 20 min
50.00%
These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
18 150.00 Tag
a.
1 6.00 Space / Hr 3.00 Space / 20 min
50.00%
These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
2 36.00 Space / Day 42.00
17.00%
These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
19 a. 2.00 Space / Hour 4.00
100.00%
These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
b. 100.00 Space / Month 120.00
20.00%
These are rental rates. These increases to MAX rate. Based on empirical data from garage operators
C.
1 a. 84.00 Per Lic. Plate 86.52 3.00% Fee increase based on labor cost increases to reflect full cost recovery. b. 61.00 Per Lic. Plate 62.83 3.00% Fee increase based on labor cost increases to reflect full cost recovery. c. 59.00 Per Lic. Plate 60.77 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2 a. 98.00 Per Lic. Plate 100.94 3.00% Fee increase based on labor cost increases to reflect full cost recovery. b. 98.00 Per Lic. Plate 100.94 3.00% Fee increase based on labor cost increases to reflect full cost recovery. c. 69.00 Per Lic. Plate 71.07 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 3 a. 162.00 Per Lic. Plate 166.86 3.00% Fee increase based on labor cost increases to reflect full cost recovery. b. 162.00 Per Lic. Plate 166.86 3.00% Fee increase based on labor cost increases to reflect full cost recovery. c. 117.00 Per Lic. Plate 120.51 3.00% Fee increase based on labor cost increases to reflect full cost recovery. d. 10.00 Vehicle 10.30 3.00% Fee increase based on labor cost increases to reflect full cost recovery. e. 52.00 Vehicle 53.56 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 4 11.00 Per Lic. Plate 11.33 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 5 a. 5.00 Per Permit 5.15 3.00% Fee increase based on labor cost increases to reflect full cost recovery. b. 27.00 Per Permit 27.81 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
E.
1 25.00 Per Day 25.75 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2 500.00 Per Boot 515.00 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 3 250.00 Per Boot 257.50 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 4 25.00 Per Boot 25.75 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 5 177.00 Per Boot 182.31 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
F.
G. 1 - 58.00 Per Citation 59.74 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
G. 1 - 58.00 Per Citation 59.74 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
G. 25.00 Per Violation 25.75
3.00%
Fee increase based on labor cost increases to reflect full cost recovery.
H. CAR SHARING PERMITS AND SUPPORT SERVCES
1 1,278.00 Vehicle/ Year 1,316.34 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 2 105.00 Vehicle/ Year 108.15 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 3 5,000.00 Space/Year 5,150.00 3.00% Fee increase based on labor cost increases to reflect full cost recovery. 4 400.00 Per Space 412.00 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
MOBILITY MANAGEMENT
A.
1 SCOOTER SHARING PROGRAM
Scooter Share Permit Program
No person shall utilize in any manner more than the parking space that
ADMINISTRATIVE FEE IN LIEU OF FINE FOR NON-DISPLAYED DISABLED PLACARD (DP) -The $25.00 $25.75 processing fee for cancellation of a citation for non-display of DP will be available only as a one-time courtesy to the registered owner of the cited vehicle with a valid DP.
Free Floating Permit Parking Fee for Eligible Vehicles MAX Master Residential Permit Parking Fee Permit for Eligible Vehicles of a Dedicated Space Car Share Permit Fee for Eligible Vehicles of a Qualified Dedicated Space Car Share Installation Fee for Eligible Vehicles of a Boot Replacement Fee
Damaged Boot Fee
Parking Boot Administration Fee
Vehicle Immobilizer Removal Fee
CHAPTER 8.44.040, SECURITY FOR EVENTS AT THE OAKLAND
ALAMEDA COUNTY COLISEUM COMPLEX
No person shall park or stand a vehicle in more than one parking Visitor
One-day
14-day
VEHICLE IMMOBILIZER "BOOT"
Daily Fee for Unreturned Paylock Book
Annual
Renewal
Prorated (less than six months)
One-day
14-day
Update Permit License Plate
Prorated (less than six months)
Permit for Eligible Vehicles of Owners or Employees of Businesses with the Vehicle Not Registered at the Business Address
Annual
Renewal
Prorated (less than six months & Except Area M)
Area M Permits
RESIDENTIAL PERMIT PARKING FEE
Permit for Eligible Vehicles of Residents
Registered Permit Address
Annual
Renewal
Hourly Parking MAX
Monthly Parking MAX
Fruitvale Lot (35th Ave and International)
Webster-Valdez Garage
Basic Fees
Transient Parking (Automobiles) MAX
Daily (Automobiles) MAX
1800 San Pablo Lot
Hourly Parking MAX
Monthly Parking MAX
Monthly Parking - Other MAX
Q - 9
City of Oakland
Master Fee Schedule
Effective July 1, 202 5 6
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change
DEPARTMENT OF
TRANSPORTATION
a. 2,500.00 Non-Refundable 2,575.00 3.00% Fee increase based on labor cost increases to reflect full cost recovery. b. 30,000.00 Permit 30,900.00 3.00% Fee increase based on labor cost increases to reflect full cost recovery. c. 0.10 Per Trip Correct typo
d. Annual Scooter Vehicle Permit 64.00 Per Vehicle 65.92 3.00% Fee increase based on labor cost increases to reflect full cost recovery. e. Improper Parking Fine 50.00 Per Parking Event 51.50 3.00% Fee increase based on labor cost increases to reflect full cost recovery. f. Scooter Confiscation Fee (Minimum 1 Hour) 147.00 Hour or fraction of 151.41 3.00% Fee increase based on labor cost increases to reflect full cost recovery.
Scooter Share Operator Application Fee
Annual Scooter Operator Permit Fee
Scooter Parking Fee, Insoide Meter Zones
Q - 10
SPECIAL EVENTS
FY 2026-27 MASTER FEE SCHEDULE
EX
HIBIT A: A-15
City of Oakland
Master Fee Schedule
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change Special Event Fees
1 83.25 Application 85.00 2.10%
Rate of $81 was incorrect. The current rate now lists the correct rate for Special Event Application Fees listed on the EWDD MFS sheet and reflects a nominal fee increase based on labor cost increases to reflect full cost recovery.
2 427.00 Application 439.00 2.81%
Rate of $415 was incorrect. The current rate now lists the correct rate for Special Event Application Fees listed on the EWDD MFS sheet and reflects a nominal fee increase based on labor cost increases to reflect full cost recovery.
3 1,752.00 Application 1,804.00 2.97%
Rate of $1701 was incorrect. The current rate now lists the correct rate for Special Event Application Fees listed on the EWDD MFS sheet and reflects a nominal fee increase based on labor cost increases to reflect full cost recovery.
4 4,935.00 Application 5,083.00 3.00%
Rate of $4792 was incorrect. The current rate now lists the correct rate for Special Event Application Fees listed on the EWDD MFS sheet and reflects a nominal fee increase based on labor cost increases to reflect full cost recovery.
6 a 591.00 Application 608.00 2.88%
Rate of $574 was incorrect. The current rate now lists the correct rate for Special Event Application Fees listed on the EWDD MFS sheet and reflects a nominal fee increase based on labor cost increases to reflect full cost recovery.
b. 95.00 Application 97.00 2.11%
Rate of $92.50 was incorrect. The current rate now lists the correct rate for Special Event Application Fees listed on the EWDD MFS sheet and reflects a nominal fee increase based on labor cost increases to reflect full cost recovery.
1 381.00 Per Bldg/Inst 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
2 381.00 Instance 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
3 381.00 Year 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
4 381.00 Instance 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
5 381.00 Year/Instance 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
6 a. 1051.00 Year 1082.00 2.95% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
7 381.00 Instance 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
8 381.00 Instance 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
9 a. 534.00 Instance 550.00 3.00% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
b. 534.00 Year 550.00 3.00% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
c. 534.00 Instance 550.00 3.00% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
d. 534.00 Instance 550.00 3.00% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
e. 534.00 Year 550.00 3.00% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
10 381.00 Year/Instance 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
11 381.00 Structure 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
Tents, Canopies, and/or Temporary Membrane Structures
Places of Assembly (50 + persons)
Storage or Use of
Non-Profit Special Event
Open Burning
Open Flames, Candles, and Torches
Used in Wildfire Risk Area
Assembly, Restaurant/Drinking Establishments
Ceremonial
Public Exhibition/Demonstration
Outdoor Cooking Establishment/Vendor
Exhibits & Trade Shows
Fireworks Public Display - One Time
Hot Work/Welding/Cutting Operations
Liquid Petroleum Gas (LPG)
Carnival/Fair/Circus
H. OPERATIONAL PERMITS as required by the Oakland Fire Code Amusement Buildings
Events That Include Cannabis Vendors
Up to 15 vendors
Each additional 15 cannabis vendors
B. SPECIAL EVENT APPLICATION FEE (As allowed in OMC section 9.52) Tier One (less than 300 people)
Tier Two (300 or more)
Tier Three (2,500 or more people/parade)
Tier Four (marathons)
SPECIAL EVENTS
Effective July 1, 202 5 6
S - 1
City of Oakland
Master Fee Schedule
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change Justification for Fee Change
SPECIAL EVENTS
Effective July 1, 202 5 6
381.00 P/H 392.00 2.89% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
839.00 Flat 550.00 P/H 2.5 Min
n/a -
different
models
Aligns with similar 'after hours' rates for inspection such as Hazardous Materials. Hourly rate is more accurate for cost recovery. Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
108.00 P/H 111.00 2.78% Includes a nominal fee increase based on labor cost increases to reflect full cost recovery.
I. INSPECTION CONDUCTED BY FIRE INSPECTOR
J. AFTER HOURS INSPECTION CONDUCTED BY FIRE INSPECTOR
K. FIRE INSPECTION RATE FOR COMMUNITY EVENTS as defined by OMC
9.52.040
S - 2
WORKPLACE EMPLOYMENT STANDARDS
FY 2026-27 MASTER FEE SCHEDULE
EX
HIBIT A: A-16
City of Oakland
Master Fee Schedule
Effective July 1, 2025 6
Proposed 2026-27
Fee
Proposed 2026-27
Unit
FEE DESCRIPTION FEE UNIT FEE UNIT % Change
A. COMPLIANCE SOFTWARE USAGE FEE 950.00 Per Project Per Year Removed for FY 2026-27. Funding
changed to internal service funds.
B. Removed for FY 2026-27. Funding
changed to internal service funds.
1 25.75 Each
C. A. 6.50 Employee 6.70 3.00% Fee increase based on labor cost increases to reflect cost recovery.
D. B. HOTEL WORKPLACE REGULATORY FEE 1.00 Per Occupied Room 1.03 3.00% Fee increase based on labor cost increases to reflect cost recovery.
DEPARTMENT OF WORKPLACE & EMPLOYMENT STANDARDS (DWES)
STAFF FEE FOR NON COMPLIANCE INVESTIGATIONS & LEP SHORTFALL
CLOSEOUTS
LEP Non Compliance Investigations & Closeouts
MINIMUM WAGE & LABOR STANDARDS ENFORCEMENT FEE
DEPARTMENT OF WORKPLACE &
EMPLOYMENT STANDARDS
Justification for Fee Change
T - 1