Cities Index.
View Attachment A

Rules & Legislation Committee
October 15, 2026

Document
View Attachment A
Meeting
October 15, 2026
Body
Rules & Legislation Committee
Pages
1
Original file
443 KB
Text extracted from the city's file for reading and search. Open the original on oakland.legistar1.com. That file is the official record.
Page 1 of 1 ends

INTER OFFICE MEMORANDUM
Department of Workplace and Employment Standards (DWES) _____________________________________________________________________________________ TO: Beaver Boonsook, Transportation Engineer
FROM: Paula Peav, Contract Compliance Officer Paula Peav DATE: August 25, 2026
SUBJECT: Compliance Analysis- MLK Jr. Way Streetscape CMSS Project No. 1008516
The Department of Workplace and Employment Standards (DWES) reviewed two (2) proposals in response to the above referenced project. In summary, both proposers can be further considered for contract award.

The Local and Small Local Business Enterprise (L/SLBE) participation requirement for this project was set at 50%: 25% LBE and 25% SLBE.

Accepted Proposals
Both firms listed below are responsive to the L/SLBE participation requirement and should be further considered for contract award:
• Azad Engineering, PC, a certified SLBE business, exceeds the minimum 50% L/SLBE requirement by proposing to self-perform 70% of the scope. • 3D Built, a noncertified business, exceeds the minimum 50% L/SLBE requirement by proposing to self-perform 30% of the scope, in addition to having the following S/VSLBE participation:

Name of Firm Type of Firm % of Scope
Calichi Design SLBE 20%
Progression Engineering VSLBE 25% (credited 50%)
Preference Points for L/SLBE Participation
Both firms should be awarded Preference Points as summarized below:

Company Name
Total L/SLBE
Proposed versus Credited L/SLBE Participation
Accepted
Proposal
Earned
Preference
Points
LBE

PROPOSED
LBE

CREDITED
SLBE

PROPOSED
SLBE

CREDITED
VSLBE

PROPOSED
VSLBE

CREDITED
TOTAL

CREDITED
Yes or
No 2-10
Azad Engineering, PC 78% 8.00% 8.00% 70.00% 70.00% 0.00% 0.00% 78.00% YES 4 3D Built 75% 0.00% 0.00% 25.00% 25.00% 25.00% 50.00% 75.00% YES 4 Please contact me at [email protected] or (510) 238-3190 with any questions.

Attachment A
Project Name:

Project No.: 1008516
Discipline Prime & Subs Location Cert. LBE SBALBE SLBE VSLBE Total Total For Tracking Only Status LBE/SLBE % Percentages Ethn. MBE WBE
PRIME Azad Engineering PC Oakland CB 70.00% 70.00% 70.00% O 70.00% Material Testing and Special
Inspection
Applied Materials and
Engineering, Inc. Oakland CB 5.00% 5.00% 5.00% AP 5.00% Environmental and Biological
Monitoring, Compliance and
Reporting ENGEO, Inc. Oakland CB 3.00% 3.00% 3.00% C
Assistant Resident Engineer and
Inspection Ghirardelli Associates Pleasanton CB 21.00% C Public/Community Outreach The Allen Group Oakland CB 1.00% AA 1.00% Project Totals 8.00% 0.00% 70.00% 0.00% 78.00% 100.00% 5.00% 71.00% Ethnicity
AA = African American
AI= Asian Indian
AP= Asian Pacific
C = Caucasian
Legend LBE = Local Business Enterprise UB = Uncertified Business H = Hispanic SLBE = Small Local Business Enterprise CB = Certified Business NA = Native American Total LBE/SLBE = All Certified Local and Small Local Businesses MBE = Minority Business Enterprise O = Other NPLBE = NonProfit Local Business Enterprise WBE = Women Business Enterprise NL = Not Listed NPSLBE = NonProfit Small Local Business Enterprise
LBE/SLBE Participation
Azad Engineering PC
MLK Jr. Way Streetscape CMSS

LBE 25% SLBE 25% TOTAL
LBE/SLBE 50% SBALBE VSLBE TOTAL
Requirements
The 50% L/SLBE requirement can be met with a combination of 25% LBE and 25% SLBE. An SLBE firm can be counted 100% towards achieving 50% requirements. A VSLBE's participation is double counted toward meeting the requirements.

RE:

CONSULTANT/CONTRACTOR:
4 POINTS

1. Did the 50% L/SLBE requirement apply: YES

2. Did the contractor meet the 50% L/SLBE requirement? YES Proposed Credited

8.00% 8.00%

70.00% 70.00%

0.00% 0.00%
d) Total L/SL/VSLBE 78.00% 78.00%

3. Did the contractor receive bid discount/preference points? YES (If yes, list the points received) 4 points

4. Additional Comments.

Prepared By: Paula Peav Date: 8/25/2026
Verified By: Sophany Hang Date: 8/25/2026
Department of Workplace & Employment Standards
DWES
PROJECT COMPLIANCE EVALUATION FOR :

MLK Jr. Way Streetscape CMSS
Azad Engineering PC
Date
a) % of LBE participation
b) % of SLBE participation
c) % of VSLBE participation

5. Date evaluation completed and returned to Contract Admin./Initiating Dept. 8/25/2026
Preference Points:

Project Name:

Project No.: 1008516
Discipline Prime & Subs Location Cert. LBE SBALBE SLBE VSLBE Total Total For Tracking Only Status LBE/SLBE % Percentages Ethn. MBE WBE
PRIME 3D Built Oakland UB 30.00% AP 30.00%
Right of Way Engineering Services
Technical Consulting Calichi Design Oakland CB 25.00% 25.00% 25.00% C Civil Engineering Construction
Management Progression Engineering Oakland CB 25.00% 25.00% 25.00% AP 25.00% Special Inspections Material Testing
Environmental Work
Universal Engineering
Sciences 'UES' Oakland UB 20.00% C
Project Totals 0.00% 0.00% 25.00% 25.00% 50.00% 100.00% 55.00% 0.00% Ethnicity
AA = African American
AI= Asian Indian
AP= Asian Pacific
C = Caucasian
Legend LBE = Local Business Enterprise UB = Uncertified Business H = Hispanic SLBE = Small Local Business Enterprise CB = Certified Business NA = Native American Total LBE/SLBE = All Certified Local and Small Local Businesses MBE = Minority Business Enterprise O = Other NPLBE = NonProfit Local Business Enterprise WBE = Women Business Enterprise NL = Not Listed NPSLBE = NonProfit Small Local Business Enterprise
LBE/SLBE Participation
3D Built
MLK Jr. Way Streetscape CMSS

LBE 25% SBALBE SLBE 25% TOTAL
LBE/SLBE 50% VSLBE TOTAL
Requirements:

The 50% L/SLBE requirement can be met with a combination of 25% LBE and 25% SLBE.

An SLBE firm can be counted 100% towards achieving 50% requirements. A VSLBE's participation is double counted toward meeting the requirements.

RE:

CONSULTANT/CONTRACTOR:
4 POINTS

1. Did the 50% L/SLBE requirement apply: YES

2. Did the contractor meet the 50% L/SLBE requirement? YES Proposed Credited

0.00% 0.00%

25.00% 25.00%

25.00% 50.00%
d) Total L/SL/VSLBE 50.00% 75.00%

3. Did the contractor receive bid discount/preference points? YES (If yes, list the points received) 4 points

4. Additional Comments.

Prepared By: Paula Peav Date: 8/25/2026
Verified By: Sophany Hang Date: 8/25/2026
3D Built
Department of Workplace & Employment Standards
DWES
PROJECT COMPLIANCE EVALUATION FOR :

MLK Jr. Way Streetscape CMSS
VSLBE participation is double counted towards meeting the L/SLBE requirement.

5. Date evaluation completed and returned to Contract Admin./Initiating Dept. 8/25/2026
Date
Preference Points:
a) % of LBE participation
b) % of SLBE participation
c) % of VSLBE participation

← All documents from this meeting