Cities Index.
Agenda packet

Oakley City Council
March 26, 2024

Document
Agenda packet
Meeting
March 26, 2024
Body
Oakley City Council
Pages
15
Original file
24.4 MB
Text extracted from the city's file for reading and search. Open the original on d3n9y02raazwpg.cloudfront.net. That file is the official record.

CYPRESS ROAD IMPROVEMENTS

FINAL DESIGN SCOPE OF WORK

INTRODUCTION AND UNDERSTANDING
Mark Thomas & Company, Inc. (Mark Thomas) has prepared this additional scope of services for the East Cypress Road Lane Alignment (RR tracks to Main Street) Project (Project). Per the request from the City of Oakley (City), this scope amends the previously approved scope to provide additional tasks and modifications to several tasks described in the original agreement (Preliminary Engineering/ Feasibility Study Phase) between the City and Mark Thomas. This scope includes the Final Design Phase for the Project and includes only final, signed plans as the City intends to construct these improvements via negotiated contract change order with a contractor which will not require specifications, quantities, or engineer’s estimate. The additional scope of service documented herein includes management, survey, additional preliminary design, final design, and project documentation of non-standard design features.

Beyond the additional task, Mark Thomas also performed additional preliminary design services. The original agreement included the conceptual development of three roadway alternatives along Cypress Road within the project limits. Based upon discussions with the City, Mark Thomas prepared a total of five alternatives. The fifth alternative, the City’s preferred alternative, serves as the basis for the Final Design Phase. The City’s preferred alternative will reconfigure the westbound direction on East Cypress Road from the railroad tracks to Main Street. This alternative will construct dual left turn lanes, one through lane, and a dedicated right turn lane in the westbound direction at the Cypress Road/ Main Street intersection. Per the City's direction, the Project will implement high visibility crosswalks on all four legs of the E Cypress Road and Main Street intersection as well as a bike lane for the westbound direction.

The project will require, but is not limited to, the design and construction of new curb and gutter, utility relocation, grading modifications, pedestrian enhancements at crosswalks, installation of signage and striping, and modification of median.

SERVICES TO BE PERFORMED BY MARK THOMAS
 Project management / coordination
 Final roadway design
 Preparation of plans

SERVICES TO BE PERFORMED BY OTHERS
 Right of way acquisition
 Right of way engineering
 Traffic signal design
 Utility relocation
 Street light design and relocation
 Constructability review
 Construction inspection and testing
 Specifications

EXHIBIT A
161
Cypress Road Improvements
City of Oakley

Page 2 of 6 ends

 Temporary Water Pollution Control and Erosion Control Plans and Details  Utility Plans and Details
 Stage Construction and Traffic Handling Plan and Construction Area Signs

APPLICABLE STANDARDS
The preliminary plans and preliminary estimates will be prepared in accordance with Caltrans' regulations, policies, procedures, manuals and standards. Items A and E are not all inclusive, but are intended only to illustrate types of sources.

A. Roadway design will be in accordance with the 7th edition of the Caltrans Highway Design Manual (with updates through May 20, 2022), the 2022 Caltrans Standard Plans, the 2022 Caltrans Standard Specifications and updates, the Manual on Uniform Traffic Control Devises (MUTCD) and its California Supplement.

B. City of Oakley Standard Plans
C. Roadway plans will be prepared in conformance with the current editions of the Caltrans Drafting and Plans Manual, and the Caltrans CADD User’s Manual
D. Plans, specifications, and estimates will be prepared in conformance with the 2022 edition of the Caltrans Plans, Specifications and Estimates Guide.

E. Caltrans Local Assistance Procedures Manual
Mark Thomas will perform the additional services related to the East Cypress Road Lane Alignment (RR tracks to Main Street) Project outlined below.

TASK 1. PROJECT MANAGEMENT AND COORDINATION
Mark Thomas will continue to provide project management for the additional services described herein due to the extension of the project schedule. Additional budget for management activities consisting of administration, coordination, supervision, project controls, attending meetings, and quality assurance and control are required.

Additional budget is needed for the following tasks as a result:

Task 1.1. Project Management & Coordination
Mark Thomas will continue to provide project management and coordination through the completion of the final design for the project.

Task 1.2. Meetings
No changes to this task.

EXHIBIT A
162
Cypress Road Improvements
City of Oakley

Page 3 of 6 ends

Task 1.3. Quality Assurance & Quality Control
The Mark Thomas team will implement quality control and quality assurance procedures for design activities, perform in-house quality control reviews for each report and other task deliverables. Quality Control documentation can be submitted to the City upon request.

TASK 1 DELIVERABLES
 Monthly Progress Reports to be included with monthly invoices.  QA/QC documentation available as requested by City.

TASK 2. DATA COLLECTION
Task 2.1. Data Gathering
No changes to this task.

Task 2.2. Topographic Survey
On-site control points will be set as necessary for topographic survey task. GPS will be used to accurately locate the on-site control. Mark Thomas will conduct a topographic survey of approximately 300’ along East Cypress Road measured from the easterly travelled way of Main Street to the east side of the bridge over Marsh Creek which will include the EP, grade breaks, existing curb, gutter, and sidewalks, paint striping, stop bars, surface visible utilities and street signs. Cross sections are excluded from the creek and will be limited to the street surface. Mark Thomas will locate and dip the Storm Drain Inlets along E. Cypress Road. Any storm drain or sanitary sewer manholes within Main Street are excluded. It is assumed that an encroachment permit will not be needed as Mark Thomas will not need to impede traffic. This Topographic Survey scope is limited to one (1) day of fieldwork.

TASK 2 DELIVERABLES
 Topographic Survey in AUTOCAD
TASK 3. PRELIMINARY ENGINEERING
Task 3.1. Preliminary Geometrics
Mark Thomas will develop an additional two alternative layouts based on the City's revised direction and updated topographic base map, resulting in a total of five total alternatives. The fifth alternative is the City's preferred alternative and will serve as the basis for the Final Design Phase.

There will be no exhibit updates to the first four alternatives (Alternatives 1A, 1B, 2, and 3). The latest alternatives were sent to the City on 9/26/2023.

Task 3.2. Preliminary Project Cost Estimate
No changes to the contracted scope are anticipated. Additional cost estimating for the additional services is not required by the City.

EXHIBIT A
163
Cypress Road Improvements
City of Oakley

Page 4 of 6 ends

Task 3.3. Design Standard Decision Document
For the City’s Preferred Alternative, Mark Thomas will identify the proposed geometric features that do not meet the City of Oakley standards and Caltrans design standards described in the latest HDM by filling out the DIB 78 checklist.

Design features not meeting current HDM standards will be documented in the Design Standard Decision Document (DSDD). A total of two submittals to the City are included in this scope. Mark Thomas will submit the draft DSDD to the City. As final design progresses, additional nonstandard features may be identified. This scope includes documentation of up to four nonstandard features. If additional design exceptions are needed due to design changes initiated by the City, additional budget will be required.

TASK 3 DELIVERABLES
 Conceptual Design Exhibit for Alternative 4 (includes updates per 1 round of City comments)  Draft and Final Design Standard Decision Document
TASK 4. FEASIBILITY MEMORANDUM
Mark Thomas will include five alternatives in the Feasibility Memorandum and stipulate that the City's preferred alternative is the fifth alternative. Understanding that the City intends to provide final plans to the contractor for a contract change order, a preliminary cost estimate for Alternative 4 is excluded. There are no other changes to this task.

TASK 4 DELIVERABLES
 Draft Feasibility Memorandum
 Final Feasibility Memorandum
TASK 5. FINAL DESIGN
Mark Thomas will develop the final plans to enable the City to construct the project improvements via a negotiated contract change order with an existing City Contractor. Consultant activities will include, but are not limited to the following:

Task 5.1. Final Plans
Final construction documents will be prepared for City to provide to contractor as a negotiated contract change order.

Project design elements will be checked, conflicts resolved, and design details resolved. Detailed cross checking of various design elements will be performed and cross referenced. This task assumes no significant design changes for the preferred alternative. Design changes initiated by City comments that affect the preferred alternative will require additional budget.

Relocation and removal of utilities, streetlights, irrigation, Temporary Water Pollution Control and Erosion Control Plans and Details, Utility Plans and Details, and Stage Construction and Traffic Handling Plan and Construction Area Signs are the responsibility of the City of Oakley.

EXHIBIT A
164
Cypress Road Improvements
City of Oakley

Page 5 of 6 ends

The following design plans will be prepared and are included in this scope of service:

Sheet Count Sheet Type
1 Title Sheet
1 Layout, Demolition, and Typical Section Plan
1 Construction Details
1 Sign and Striping Plan and Details
4 Total

FINAL DELIVERABLES
 Final Plans (includes up to 1 submittal)

SCHEDULE
It is assumed the duration will be 2 months approximately depending on the City’s review time.

BASE ASSUMPTIONS/EXCLUSIONS

1. No traffic counts or analysis will be conducted for this study.

2. No geotechnical investigation will be conducted.

3. No utility field investigation or potholing will be conducted for this study.

4. Regulatory or resource agency permitting is not included.

5. Retaining wall or structural design is excluded from this scope.

6. No retrofit of the existing bridge is required.

7. Scope assumes no changes in profile of Cypress, Main Street, and the existing structures.

8. Landscape or irrigation design and plans are not included in this scope.

9. R/W acquisition support is excluded from this scope.

10. Streetlight relocation and design are excluded from this scope.

11. Utility relocation, utility agreements, utilities plan and details, and utility conflicts map are excluded from this scope.

12. Assumes a utility policy variance is not required.

13. Dry Utility (joint trench) design is not included in this scope.

14. Right of way acquisition will be handled by the City (if required).

15. Technical specifications for the work and estimates in the final design phase are excluded.

16. Construction Management/Administration is excluded from this scope.

17. All printing for bidding purposes to be provided by City.

18. Preparation of a SWPPP is excluded.

19. This scope does not include bid support, construction support, and Resident Engineer and survey files.

20. Drainage design and drainage modification plans are excluded.

21. All deliverables will be provided in Adobe PDF format unless otherwise specified.

22. All deliverables will be in electronic format and no hard copies reproductions are included in the scope.

23. Monument Preservation is not included.

EXHIBIT A
165
Cypress Road Improvements
City of Oakley

Page 6 of 6 ends

24. Boundary is not included in this scope of work.

25. A Record of Survey is not included.

26. If required, Encroachment permits will be provided at no cost to Mark Thomas.

27. No underground utility locating or geotechnical borings are included in this scope of work.

28. All access to the site will be provided.

29. Stage Construction and Traffic Handling Plan and Construction Area Signs are excluded from this scope.

30. Temporary Water Pollution Control and Erosion Control Plans and Details are excluded from this scope.

31. Project Control is the responsibility of the City of Oakley.

EXHIBIT A
166
Kevin Rohani, Public Works Director SUMMARY 03/11/24
City of Oakley File No. 23-00188
3231 Main Street HIDE REALLOCATION COLUMNS BEFORE SENDING INVOICE Oakley, CA 94561 Re:

Contract Exp 06/30/24
Engineering Services: Through December 31, 2023
Original 53,264.50
Additional Services Authorization #1 9,000.00
Additional Services Final Design 26,250.00
Total Contract Amount 88,514.50
PHASE TASK ORIGINAL 11/8/2023 12/19/2023 REALLOCATED PREVIOUSLY BILLED COSTS BALANCE BILLED NO. NO. PHASE/TASK DESCRIPTION BUDGET Addt'l Svcs #1 Final Design BUDGET BILLED THIS PERIOD TO DATE REMAINING BUDGET 001 TASK 1. PROJECT MANAGEMENT
001 1.1 Project Controls and Management 5,422.00 2,500.00 7,922.00 5,146.68 2,116.86 7,263.54 658.46 92% 002 1.2 Meetings 1,910.00 1,910.00 1,209.87 338.72 1,548.59 361.41 81% 003 1.3 Quality Assurance & Quality Control 2,000.00 2,000.00 903.24 0.00 903.24 1,096.76 45% 099 OTHER DIRECT COSTS 500.00 500.00 10.82 0.00 10.82 489.18 2% SUBTOTAL PHASE 1 7,832.00 0.00 4,500.00 12,332.00 7,270.61 2,455.58 9,726.19 2,605.81 79% 002 TASK 2. DATA COLLECTION
001 2.1 Data Gathering 1,978.00 1,978.00 1,513.11 0.00 1,513.11 464.89 76% 002 2.2 Topographic Survey 9,000.00 9,000.00 8,979.25 0.00 8,979.25 20.75 100% SUBTOTAL PHASE 2 1,978.00 9,000.00 0.00 10,978.00 10,492.36 0.00 10,492.36 485.64 96% 003 TASK 3. PRELIMINARY ENGINEERING
001 3.1 Preliminiary Geometrics 17,905.00 1,130.00 19,035.00 16,919.70 2,114.76 19,034.46 0.54 100% 002 3.2 Preliminary Project Cost Estimate 8,661.50 0.00 8,661.50 5,192.24 0.00 5,192.24 3,469.26 60% 003 3.3 Design Standard Decision Document 6,620.00 6,620.00 6,615.96 0.00 6,615.96 4.04 100% SUBTOTAL PHASE 3 26,566.50 0.00 7,750.00 34,316.50 28,727.90 2,114.76 30,842.66 3,473.84 90% 004 TASK 4. FEASIBILITY MEMORANDUM
001 4.1 Feasibility Memorandum 11,888.00 11,888.00 8,009.34 0.00 8,009.34 3,878.66 67% SUBTOTAL PHASE 4 11,888.00 0.00 0.00 11,888.00 8,009.34 0.00 8,009.34 3,878.66 67% 005 TASK 5. FINAL DESIGN
001 5.1 Final Plans 14,000.00 14,000.00 0.00 798.86 798.86 13,201.14 6% SUBTOTAL PHASE 5 0.00 0.00 14,000.00 14,000.00 0.00 798.86 798.86 13,201.14 6% 900 UNALLOCATED CONTINGENCY
001 Unauthorized Contingency 5,000.00 5,000.00 0.00 0.00 0.00 5,000.00 0% SUBTOTAL PHASE 900 5,000.00 0.00 0.00 5,000.00 0.00 0.00 0.00 5,000.00 0% GRAND TOTAL SERVICES 53,264.50 9,000.00 26,250.00 88,514.50 54,500.21 5,369.20 59,869.41 28,645.09 68% CIP 301 East Cypress Road Lane Alignment Analysis
(RR tracks to Main Street) Capital Improvement Project
#301

EXHIBIT B
167

EXHIBIT C
168

EXHIBIT C
169

EXHIBIT C
170

CONSULTING SERVICES AGREEMENT BETWEEN THE CITY
OF OAKLEY AND MARK THOMAS & COMPANY, INC. FOR

ENGINEERING DESIGN SERVICES ASSOCIATED WITH EAST

CYPRESS ROAD LANE ALIGNMENT ANALYSIS (RAILROAD

TRACKS TO MAIN STREET) CAPITAL IMPROVEMENT
PROJECT NUMBER 301
THIS AGREEMENT for consulting services is entered into by and between the City of Oakley, a municipal corporation in the State of California (hereinafter referred to as “City”) and MARK THOMAS & COMPANY, INC. (hereinafter referred to as “Consultant”), collectively sometimes referred to hereinafter as the “Parties”, as of JULY 11, 2023 (the “Effective Date”).

Section 1. SERVICES. Subject to the terms and conditions set forth in this Agreement, Consultant shall provide to City the services described in the Scope of Work or proposal letter attached hereto and incorporated herein as Exhibit A at the time and place and in the manner specified therein. In the event of a conflict in or inconsistency between the terms of this Agreement and Exhibit A, the Agreement shall prevail.

1.1 Term of Services. The term of this Agreement shall begin on the Effective Date and shall end on JUNE 30, 2024, the date of completion specified in Exhibit A, and Consultant shall complete the work described in Exhibit A prior to that date, unless the term of the Agreement is otherwise terminated or extended, as provided for in Section 8. The time provided to Consultant to complete the services required by this Agreement shall not affect the City’s right to terminate the Agreement, as provided for in Section 8. Should this Agreement be amended to include additional tasks as contemplated in Section 1, the term of services shall be extended as mutually agreed upon by City and Consultant.

1.2 Standard of Performance. Consultant shall perform all services required pursuant to this Agreement in the manner and according to the standards observed by a competent practitioner of the profession in which Consultant is engaged in the geographical area in which Consultant practices its profession. Consultant shall prepare all work products required by this Agreement in a substantial, first-class manner and shall conform to the standards of quality normally observed by a person practicing in Consultant's profession.

1.3 Assignment of Personnel. Consultant shall assign only competent personnel to perform services pursuant to this Agreement. In the event that City, in its sole discretion, at any time during the term of this Agreement, desires the reassignment of any such persons, Consultant shall, immediately upon receiving notice from City of such desire of City, reassign such person or persons.

1.4 Time. Consultant shall devote such time to the performance of services pursuant to this Agreement as may be reasonably necessary to meet the standard of performance provided in Section 1.1 above and to satisfy Consultant’s obligations hereunder.

1.5 Public Works Requirement. Notice is hereby given that “work performed during the design and preconstruction phases of construction including, but not limited to, inspection and land Commented [SD1]: Creates an elevated and potentially
uninsurable standard of care.

EXHIBIT D
171
City of Oakley and Mark Thomas & Company, Inc.–– Design Services for East Cypress Rd Alignment Project - CIP 301
surveying work,” the services constitute a public works within the definition of Section 1720(a)(1) of the California Labor Code, requiring the payment of prevailing wages and the provisions set out in Exhibit B.

Section 2. COMPENSATION. City hereby agrees to pay Consultant a sum not to exceed FIFTYTHREE THOUSAND TWO HUNDRED SIXTY FOUR DOLLARS AND FIFTY Cents ($53,264.50), notwithstanding any contrary indications that may be contained in Consultant’s proposal, for services to be performed and reimbursable costs incurred under this Agreement. In the event of a conflict between this Agreement and Consultant’s proposal, attached as Exhibit A, regarding the amount of compensation, the Agreement shall prevail. City shall pay Consultant for services rendered pursuant to this Agreement at the time and in the manner set forth herein. The payments specified below shall be the only payments from City to Consultant for services rendered pursuant to this Agreement. Consultant shall submit all invoices to City in the manner specified herein. Except as specifically authorized by City, Consultant shall not bill City for duplicate services performed by more than one person.

Consultant and City acknowledge and agree that compensation paid by City to Consultant under this Agreement is based upon Consultant’s estimated costs of providing the services required hereunder, including salaries and benefits of employees and subcontractors of Consultant. Consequently, the parties further agree that compensation hereunder is intended to include the costs of contributions to any pensions and/or annuities to which Consultant and its employees, agents, and subcontractors may be eligible. City therefore has no responsibility for such contributions beyond compensation required under this Agreement.

2.1 Invoices. Consultant shall submit invoices, not more often than once a month during the term of this Agreement, based on the cost for services performed and reimbursable costs incurred prior to the invoice date. Invoices shall contain the following information:
 Serial identifications of progress bills; i.e., Progress Bill No. 1 for the first invoice, etc.;
 The beginning and ending dates of the billing period;  A Task Summary containing the original contract amount, the amount of prior billings, the total due this period, the balance available under the Agreement, and the percentage of completion;
 At City’s option, for each work item in each task, a copy of the applicable time entries or time sheets shall be submitted showing the name of the person doing the work, the hours spent by each person, a brief description of the work, and each reimbursable expense;
 The Consultant’s signature.

2.2 Monthly Payment. City shall make monthly payments, based on invoices received, for services satisfactorily performed, and for authorized reimbursable costs incurred. City shall have 30 days from the receipt of an invoice that complies with all of the requirements above to pay Consultant.

EXHIBIT D
172
City of Oakley and Mark Thomas & Company, Inc.–– Design Services for East Cypress Rd Alignment Project - CIP 301

2.3 Final Payment. City shall pay the last 10% of the total sum due pursuant to this Agreement within 60 days after completion of the services and submittal to City of a final invoice, if all services required have been satisfactorily performed.

2.4 Total Payment. City shall pay for the services to be rendered by Consultant pursuant to this Agreement. City shall not pay any additional sum for any expense or cost whatsoever incurred by Consultant in rendering services pursuant to this Agreement. City shall make no payment for any extra, further, or additional service pursuant to this Agreement, except as agreed to my mutual, written agreement of both the City and Consultant.

In no event shall Consultant submit any invoice for an amount in excess of the maximum amount of compensation provided above either for a task or for the entire Agreement, unless the Agreement is modified prior to the submission of such an invoice by a properly executed change order or amendment approved by the City Manager, which shall not exceed the maximum amount allowed by the Oakley Municipal Code.

2.5 Hourly Fees. Fees for work performed by Consultant shall not exceed the amounts shown on the Compensation Schedule attached hereto and incorporated herein as Exhibit A.

2.6 Reimbursable Expenses. Reimbursable expenses are specified in Exhibit A, and expenses not listed in Exhibit A are not chargeable to the City.

2.7 Payment of Taxes. Consultant is solely responsible for the payment of employment taxes incurred under this Agreement and any similar federal or state taxes.

2.8 Payment upon Termination. In the event that the City or Consultant terminates this Agreement pursuant to Section 8 of this Agreement, the City shall compensate the Consultant for all outstanding costs and reimbursable expenses incurred for work satisfactorily completed as of the date of written notice of termination. Consultant shall maintain adequate logs and timesheets in order to verify costs incurred to that date.

2.9 Authorization to Perform Services. The Consultant is not authorized to perform any services or incur any costs whatsoever under the terms of this Agreement until receipt of authorization from the Contract Administrator.

Section 3. FACILITIES AND EQUIPMENT. Except as set forth herein, Consultant shall, at its sole cost and expense, provide all facilities and equipment that may be necessary to perform the services required by this Agreement. City shall make available to Consultant only the facilities and equipment listed in this section, and only under the terms and conditions set forth herein.

City shall furnish physical facilities such as desks, filing cabinets, and conference space, as may be reasonably necessary for Consultant’s use while consulting with City employees and reviewing records and the information in possession of the City. The location, quantity, and time of furnishing those facilities shall be in the sole discretion of City. In no event shall City be obligated to furnish any facility that may involve Commented [SD2]: Added to reflect the real possibility of contract modification.

EXHIBIT D
173
City of Oakley and Mark Thomas & Company, Inc.–– Design Services for East Cypress Rd Alignment Project - CIP 301
incurring any direct expense, including but not limited to computer, long-distance telephone or other communication charges, vehicles, and reproduction facilities.

Section 4. INSURANCE REQUIREMENTS. Before beginning any work under this Agreement, Consultant, at its own cost and expense, shall procure the types and amounts of insurance listed below and in Exhibit C against claims for injuries to persons or damages to property that may arise from or in connection with the performance of the work hereunder by the Consultant and its agents, representatives, employees, and subcontractors. Consistent with the following provisions, Consultant shall provide proof satisfactory to City of such insurance that meets the requirements of this section and under forms of insurance satisfactory in all respects to the City, and that such insurance is in effect prior to commencing work under this Agreement.

Consultant shall maintain the insurance policies required by this section throughout the term of this Agreement. The cost of such insurance shall be included in the Consultant's bid. Consultant shall not allow any subcontractor to commence work on any subcontract until Consultant has obtained all insurance required herein for the subcontractor(s) and provided evidence thereof to City. Verification of the required insurance shall be submitted and made part of this Agreement prior to execution. Verification of the required insurance is attached hereto and incorporated herein as Exhibit D.

4.1 Variation. The City may approve a variation in the insurance requirements, upon a determination that the coverage, scope, limit, and form of such insurance is either not commercially available, or that the City’s interests are otherwise sufficiently protected.

4.2 Notice of Reduction in Coverage. In the event that any coverage required by this section is reduced, limited, or materially affected in any other manner, Consultant shall provide written notice to City at Consultant’s earliest possible opportunity and in no case later than five days after Consultant is notified of the change in coverage.

4.3 Remedies. In addition to any other remedies City may have if Consultant fails to provide or maintain any insurance policies or policy endorsements to the extent and within the time herein required, City may, at its sole option, exercise any of the following remedies, which are alternatives to other remedies City may have and are not the exclusive remedy for Consultant’s breach:
 Order Consultant to stop work under this Agreement or withhold any payment that becomes due to Consultant hereunder, or both stop work and withhold any payment, until Consultant demonstrates compliance with the requirements hereof; and/or  Terminate this Agreement.

Section 5. INDEMNIFICATION AND CONSULTANT’S RESPONSIBILITIES. Consistent with California Civil Code 2782.8, Consultant shall to the fullest extent allowed by law, with respect to all Services performed in connection with this Agreement, defend with counsel acceptable to the City, and indemnify and hold the City and its officials, officers, and employees, agents, and volunteers harmless from and against any and all lossesliability for damages to the extent such damages that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant (“Claims”).Consultant will bear all loses, costs, damages, expense and liability of every kind, nature and description that arise out of, pertain to, or Formatted: Right: 0.08", Space Before: 4 pt
Commented [SD3]: Edited to be consistent with Cal Civil Code

EXHIBIT D
174
City of Oakley and Mark Thomas & Company, Inc.–– Design Services for East Cypress Rd Alignment Project - CIP 301
relate to such Claims, whether directly or indirectly (“Liability”). Such obligations to defend, hold harmless and indemnify the City shall not apply to the extent that such Liability is caused by the sole negligence, active negligence, or willful misconduct of the City or any third party.

With respect to third party claims against the Consultant, the Consultant waives any and all rights of any type of express or implied indemnity against the indemnitees.

However, notwithstanding the foregoing, in accordance with California Civil Code Section 1668, nothing in this Agreement shall be construed to exempt the City from its own fraud, willful injury to the person or property of another, or violation of law. In addition, and notwithstanding the foregoing, to the extent this Agreement is a “construction contract” as defined by California Civil Code section 2783, as may be amended from time to time, such duties of Consultant to indemnify shall not apply when to do so would be prohibited by California Civil Code Section 2782.

Section 6. STATUS OF CONSULTANT.

6.1 Independent Contractor. At all times during the term of this Agreement, Consultant shall be an independent contractor and shall not be an employee of City. City shall have the right to control Consultant only insofar as the results of Consultant's services rendered pursuant to this Agreement and assignment of personnel pursuant to Subparagraph 1.3; however, otherwise City shall not have the right to control the means by which Consultant accomplishes services rendered pursuant to this Agreement. Notwithstanding any other City, state, or federal policy, rule, regulation, law, or ordinance to the contrary, Consultant and any of its employees, agents, and subcontractors providing services under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any and all claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in the California Public Employees Retirement System (PERS) as an employee of City and entitlement to any contribution to be paid by City for employer contributions and/or employee contributions for PERS benefits.

6.2 Consultant, Not Agent. Except as City may specify in writing, Consultant shall have no authority, express or implied, to act on behalf of City in any capacity whatsoever as an agent.

Consultant shall have no authority, express or implied, pursuant to this Agreement to bind City to any obligation whatsoever.

Section 7. LEGAL REQUIREMENTS.

7.1 Governing Law. The laws of the State of California shall govern this Agreement.

7.2 Compliance with Applicable Laws. Consultant and any subcontractors shall comply with all laws applicable to the performance of the work hereunder, including but not limited to, the California Building Code, the Americans with Disabilities Act, and any copyright, patent or trademark law. Consultant’s failure to comply with any law(s) or regulation(s) applicable to the performance of the work hereunder shall constitute a breach of contract.

EXHIBIT D
175
City of Oakley and Mark Thomas & Company, Inc.–– Design Services for East Cypress Rd Alignment Project - CIP 301

7.3 Other Governmental Regulations. To the extent that this Agreement may be funded by fiscal assistance from another governmental entity, Consultant and any subcontractors shall comply with all applicable rules and regulations to which City is bound by the terms of such fiscal assistance program.

7.4 Licenses and Permits. Consultant represents and warrants to City that Consultant and its employees, agents, and any subcontractors have all licenses, permits, qualifications, and approvals of whatsoever nature that are legally required to practice their respective professions. Consultant represents and warrants to City that Consultant and its employees, agents, any subcontractors shall, at their sole cost and expense, keep in effect at all times during the term of this Agreement any licenses, permits, and approvals that are legally required to practice their respective professions. In addition to the foregoing, Consultant and any subcontractors shall obtain and maintain during the term of this Agreement valid business licenses from City.

7.5 Nondiscrimination and Equal Opportunity. Consultant shall not discriminate, on the basis of a person’s race, religion, color, national origin, age, physical or mental handicap or disability, medical condition, marital status, sex, or sexual orientation, against any employee, applicant for employment, subcontractor, bidder for a subcontract, or participant in, recipient of, or applicant for any services or programs provided by Consultant under this Agreement.

Consultant shall comply with all applicable federal, state, and local laws, policies, rules, and requirements related to equal opportunity and nondiscrimination in employment, contracting, and the provision of any services that are the subject of this Agreement.

Consultant shall include the provisions of this Subsection in any subcontract approved by the Contract Administrator of this Agreement.

Section 8. TERMINATION AND MODIFICATION.

8.1 Termination. City may cancel this Agreement at any time and without cause upon 7 days written notification to Consultant.

Consultant may cancel this Agreement upon 30 days written notice to City and shall include in such notice the reasons for cancellation.

In the event of termination, Consultant shall be entitled to compensation for services performed to the effective date of termination; City, however, may condition payment of such compensation upon Consultant delivering to City any or all documents, photographs, computer software, video and audio tapes, and other materials provided to Consultant or prepared by or for Consultant or the City in connection with this Agreement.

8.2 Extension. City may, in its sole and exclusive discretion, extend the end date of this Agreement beyond that provided for in Subsection 1.1. This Agreement may be extended Commented [SD4]: We ask for reasonable notice ahead of
termination for convenience.

EXHIBIT D
176
City of Oakley and Mark Thomas & Company, Inc.–– Design Services for East Cypress Rd Alignment Project - CIP 301
at the option of the City. Should City decide to exercise its option to extend this Agreement, City shall provide written notice to Consultant at least sixty (60) days prior to the end date of this Agreement. Any such extension shall require a written amendment to this Agreement, as provided for herein. Consultant understands and agrees that, if City grants such an extension, City shall have no obligation to provide Consultant with compensation beyond the maximum amount provided for in this Agreement, unless City agrees to do so by written amendment to this Agreement. Similarly, Consultant understands and agrees that, City shall have no obligation to reimburse Consultant for any otherwise reimbursable expenses incurred during the extension period, unless City agrees to do so by written amendment to this Agreement.

8.3 Amendments. The parties may amend this Agreement only by a writing signed by all the parties.

8.4 Assignment and Subcontracting. City and Consultant recognize and agree that this Agreement contemplates personal performance by Consultant and is based upon a determination of Consultant’s unique personal competence, experience, and specialized personal knowledge. Moreover, a substantial inducement to City for entering into this Agreement was and is the professional reputation and competence of Consultant.

Consultant may not assign this Agreement or any interest therein without the prior written approval of the Contract Administrator. Consultant shall not subcontract any portion of the performance contemplated and provided for herein, other than to the subcontractors noted in the proposal, without prior written approval of the Contract Administrator.

8.5 Survival. All obligations arising prior to the termination of this Agreement and all provisions of this Agreement allocating liability between City and Consultant shall survive the termination of this Agreement.

8.6 Options upon Breach by Consultant. If Consultant materially breaches any of the terms of this Agreement, and after the City has given Consultant reasonable opportunity to correct the source of the breach, City’s remedies shall include, but not be limited to the following:

8.6.1 Immediately terminate the Agreement;

8.6.2 Retain the plans, specifications, drawings, reports, design documents, and any other work product prepared by Consultant pursuant to this Agreement;

8.6.3 Retain a different consultant to complete the work described in Exhibit A not finished by Consultant; or

8.6.4 Charge Consultant the difference between the cost to complete the work described in Exhibit A that is unfinished at the time of breach and the amount that City would have paid Consultant pursuant to Section 2 of this Agreement if Consultant had completed the work.

Commented [SD5]: We request the opportunity to correct any issues that would lead to termination for cause.

EXHIBIT D
177
City of Oakley and Mark Thomas & Company, Inc.–– Design Services for East Cypress Rd Alignment Project - CIP 301
Section 9. KEEPING AND STATUS OF RECORDS.

9.1 Records Created as Part of Consultant’s Performance. All reports, data, maps, models, charts, studies, surveys, photographs, memoranda, plans, studies, specifications, records, files, or any other documents or materials, in electronic or any other form, that Consultant prepares or obtains pursuant to this Agreement and that relate to the matters covered hereunder shall be the property of the City. Consultant hereby agrees to deliver those documents to the City upon termination of the Agreement. It is understood and agreed that the documents and other materials, including but not limited to those described above, prepared pursuant to this Agreement are prepared specifically for the City and are not necessarily suitable for any future or other use. City and Consultant agree that, until final approval by City, all data, plans, specifications, reports and other documents are confidential and will not be released to third parties without prior written consent of both parties.

9.2 Consultant’s Books and Records. Consultant shall maintain any and all ledgers, books of account, invoices, vouchers, canceled checks, and other records or documents evidencing or relating to charges for services or expenditures and disbursements charged to the City under this Agreement for a minimum of three (3) years, or for any longer period required by law, from the date of final payment to the Consultant to this Agreement.

9.3 Inspection and Audit of Records. Any records or documents that Section 9.2 of this Agreement requires Consultant to maintain shall be made available for inspection, audit, and/or copying at any time during regular business hours, upon oral or written request of the City. Under California Government Code Section 8546.7, if the amount of public funds expended under this Agreement exceeds TEN THOUSAND DOLLARS ($10,000.00), the Agreement shall be subject to the examination and audit of the State Auditor, at the request of City or as part of any audit of the City, for a period of three (3) years after final payment under the Agreement.

Section 10 MISCELLANEOUS PROVISIONS.

10.1 Attorneys’ Fees. If a party to this Agreement brings any action, including an action for declaratory relief, to enforce or interpret the provision of this Agreement, the prevailing party shall be entitled to reasonable attorneys’ fees in addition to any other relief to which that party may be entitled. The court may set such fees in the same action or in a separate action brought for that purpose.

10.210.1 Venue. In the event that either party brings any action against the other under this Agreement, the parties agree that trial of such action shall be vested exclusively in the state courts of California in the County of Contra Costa or in the United States District Court for the Northern District of California.

10.310.2 Severability. If a court of competent jurisdiction finds or rules that any provision of this Agreement is invalid, void, or unenforceable, the provisions of this Agreement not so Commented [SD6]: We believe that prevailing party provisions result in additional incentive to litigate disputes and attorneys are the only winners with these provisions, which is why attorneys include them in agreements.

Secondly, these types of provisions are likely uninsurable.

EXHIBIT D
178
City of Oakley and Mark Thomas & Company, Inc.–– Design Services for East Cypress Rd Alignment Project - CIP 301
adjudged shall remain in full force and effect. The invalidity in whole or in part of any provision of this Agreement shall not void or affect the validity of any other provision of this Agreement.

10.410.3 No Implied Waiver of Breach. The waiver of any breach of a specific provision of this Agreement does not constitute a waiver of any other breach of that term or any other term of this Agreement.

10.510.4 Successors and Assigns. The provisions of this Agreement shall inure to the benefit of and shall apply to and bind the successors and assigns of the parties.

10.610.5 Use of Recycled Products. Consultant shall prepare and submit all reports, written studies and other printed material on recycled paper to the extent it is available at equal or less cost than virgin paper.

10.710.6 Conflict of Interest. Consultant may serve other clients, but none whose activities within the corporate limits of City or whose business, regardless of location, would place Consultant in a “conflict of interest,” as that term is defined in the Political Reform Act, codified at California Government Code Section 81000 et seq.

Consultant shall not employ any City official in the work performed pursuant to this Agreement. No officer or employee of City shall have any financial interest in this Agreement that would violate California Government Code Sections 1090 et seq.

Consultant hereby warrants that it is not now, nor has it been in the previous twelve (12) months, an employee, agent, appointee, or official of the City. If Consultant was an employee, agent, appointee, or official of the City in the previous twelve months, Consultant warrants that it did not participate in any manner in the forming of this Agreement.

Consultant understands that, if this Agreement is made in violation of Government Code §1090 et.seq., the entire Agreement is void and Consultant will not be entitled to any compensation for services performed pursuant to this Agreement, including reimbursement of expenses, and Consultant will be required to reimburse the City for any sums paid to the Consultant. Consultant understands that, in addition to the foregoing, it may be subject to criminal prosecution for a violation of Government Code § 1090 and, if applicable, will be disqualified from holding public office in the State of California.

10.810.7 Solicitation. Consultant agrees not to solicit business at any meeting, focus group, or interview related to this Agreement, either orally or through any written materials.

10.910.8 Contract Administration. This Agreement shall be administered by Kevin Rohani, P.E., Public Works Director/City Engineer ("Contract Administrator"). All correspondence shall be directed to or through the Contract Administrator or his or her designee.

10.1010.9 Notices.

EXHIBIT D
179
City of Oakley and Mark Thomas & Company, Inc.–– Design Services for East Cypress Rd Alignment Project - CIP 301
Seal and Signature of Registered Professional with
report/design responsibility.

Any written notice to Consultant shall be sent to:

Mark Thomas & Company, Inc.

Attn: Sasha Dansky
2121 N. California Blvd. Suite 260
Walnut Creek, CA 94596
Any written notice to City shall be sent to:

City of Oakley
Attn: Kevin Rohani, Public Works Director/City Engineer 3231 Main Street
Oakley, CA 94561

10.1110.10 Professional Seal. Where applicable in the determination of the Contract Administrator, the first page of a technical report, first page of design specifications, and each page of construction drawings shall be stamped/sealed and signed by the licensed professional responsible for the report/design preparation. The stamp/seal shall be in block entitled “Seal and Signature of Registered Professional with report/design responsibility,” as in the following example.

10.1210.11 Integration. This Agreement, including the Scope of Work and Compensation Schedule, Provisions Required for Public Works Contracts, Insurance Requirements, and Verification of Required Insurance, attached hereto and incorporated herein as Exhibit A, B, C and D respectively, represents the entire and integrated agreement between City and Consultant and supersedes all prior negotiations, representations, or agreements, either written or oral.

Exhibit A Scope of Services and Compensation Schedule
Exhibit B Provisions Required for Public Works Contracts Exhibit C Insurance Requirements
Exhibit D Verification of Required Insurance

10.1310.12 Counterparts. This Agreement may be executed in multiple counterparts, each of which shall be an original and all of which together shall constitute one agreement.

EXHIBIT D
180
City of Oakley and Mark Thomas & Company, Inc.–– Design Services for East Cypress Rd Alignment Project - CIP 301

10.1410.13 Authorized Signature. Each person and party signing this Agreement warrants that he/she has the authority to execute this Agreement on behalf of the principal and that the party will be bound by such signature.

The parties have executed this Agreement as of the Effective Date.

CITY CONSULTANT
City of Oakley, a municipal corporation Mark Thomas & Company, Inc., a California Corporation
in the State of California
By: By:

Joshua McMurray, City Manager Signature
By:

Attest: Name, Title
Libby Vreonis, City Clerk
Approved as to Form:

Derek P. Cole, City Attorney

EXHIBIT D
181

STAFF REPORT
1 City of Oakley | 3231 Main Street, Oakley, CA 94561
O (925) 625-7000 | F (925) 625-9859 | www.ci.oakley.ca.us DATE: March 26, 2024
TO: Joshua McMurray, City Manager
FROM: Derek Cole, City Attorney
SUBJECT: Resolution of the City Council of Oakley Terminating the Existence of a Local Emergency Related to the City’s Sustaining of a Cyberattack on February 22, 2024
Background and Analysis
The City sustained a ransomware cyberattack on February 22, 2024. The City Manager declared a local emergency due to the cyberattack on February 23, 2024.

The City Council ratified and extended the declaration of the local emergency during its meeting held February 27, 2024. The City Manager reported on the status of the local emergency during the City Council s regular meeting held March 12, 2024, indicating staff s recommendation is to terminate the local emergency. A resolution is brought forth for the Council s consideration on March 26, 2024 as formal action to terminate the local emergency.

Consistency with the Oakley Strategic Plan 27+
The proposed action is consistent with The City’s Sustainable Organization Goal.

Fiscal Impact
The fiscal impact associated with cyberattack was responsive to the event.

Staff Recommendation
The City Council is requested to adopt the Resolution of the City Council of Oakley Terminating the Existence of a Local Emergency Related to the City’s Sustaining of a Cyberattack on February 22, 2024.

Attachments

1. Proposed Resolution Terminating Local Emergency
Approved and
Forwarded to the
City Council
182
Resolution No. XX-24 Page 1 of 1
RESOLUTION NO. XX-24

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF OAKLEY TERMINATING

THE EXISTENCE OF A LOCAL EMERGENCY
WHEREAS, California Government Code section 8630 empowers the City Council to proclaim the existence or threatened existence of a local emergency when the City is affected or likely to be affected by a public calamity; and WHEREAS, on February 22, 2024, the City suffered a cyber-attack, which crippled access to its City servers, electronic data, and institutional technology resources; and WHEREAS, on February 23, 2024, the City Manager declared the existence of a local emergency due to the February 22, 2024 cyber-attack; and WHEREAS, the impacts concerning the cyber-attack continued to be experienced such that the City continued to sustain acts that may have created conditions of danger or extreme peril to the safety of persons or property within the limits of the City; and WHEREAS, the impacts associated with the cyber-attacks were likely to be beyond the control of the services, personnel, equipment, and facilities of the City; and WHEREAS, the declared local emergency was ratified by the Oakley City Council on February 27, 2024 by Resolution No. 24-24; and
WHEREAS, the aforementioned condition of danger or extreme peril has been abated and impacts associated with the cyber-attack are now within the control of the services, personnel, equipment and facilities of the City; and
NOW, THEREFORE, BE IT RESOLVED AND ORDERED, that the City Council of the City of Oakley does hereby terminate the existence of a local emergency.

PASSED AND ADOPTED by the City Council of the City of Oakley this 26th day of March, 2024 by the following vote:

AYES:

NOES:

ABSTENTIONS:

ABSENT:

APPROVED:

___________________
ATTEST: Anissa Williams, Mayor
_____________________ __________________
Libby Vreonis, City Clerk Date
183

STAFF REPORT

City of Oakley | 3231 Main Street, Oakley, CA 94561
O (925) 625-7000 | F (925) 625-9859 | www.ci.oakley.ca.us DATE: March 26, 2024
TO: Joshua McMurray, City Manager
FROM: Danielle Navarro, Assistant City Manager
SUBJECT: Adopt a Resolution Authorizing the City Manager to Amend the Agreement with Townsend Public Affairs, Inc. to Include Legislative Advocacy Services
Background and Analysis
In September 2023, the City Council adopted a resolution authorizing the City Manager to enter into a contract with Townsend Public Affairs, Inc. for grant writing and submission services, grant administration, and post-grant services. Townsend Public Affairs, Inc has taken an active role in providing these services to the City for the contract term, which ends on August 31, 2024.

With Townsend’s assistance and Assemblymember Wilson’s advocacy, $2,000,000 was earmarked in the State budget for the City’s East Cypress Road Widening project.

Townsend also guided the City in securing $850,000 in federal funds put forward by Congressman DeSaulnier for the rehabilitation of Enrico Cinquini Park. In addition, Townsend assisted the City in securing $45,000 in Transportation Development Act funds from the Metropolitan Transportation Commission for the installation of a Pedestrian Crossing Light System on Live Oak Road and O’Hara Avenue at Delta De Anza Trail Crossing.

The City has several major unfunded or incompletely funded infrastructure projects, including a new library and community center, the future phases of the East Cypress Road Widening project, and the 55-acre regional park. Staff has been satisfied with the services provided by Townsend Public Affairs, Inc. to date and would like to amend the agreement by $7,500 (to a new not-to-exceed amount of $67,500) to add legislative advocacy services for assistance with statewide bond proposals, housing and land use issues, and transportation infrastructure funding measures to name a few.

Townsend Public Affairs, Inc.’s business model is a fixed monthly fee contract over one calendar year; there are no limits on the number of grants and other funding measures they will pursue, lobby, and help administer for the City. The amended scope of the services is included as an attachment to the contract included with this staff report.

Consistency with the Oakley Strategic Plan 27+
This item is consistent with following Oakley Strategic Plan 27+ goals: Community Health and Safety, Parks and Open Space, Finance and Fiscal Responsibility, and Sustainable Approved and
Forwarded to the
City Council
184

STAFF REPORT
CITY HALL | 3231 Main Street, Oakley, CA 94561 2
O (925) 625-7000 | F (925) 625-9859 | www.ci.oakley.CA.US Organization. Working with an experienced firm will continue to augment City staff’s ability to seek out and be more competitive for grant funding.

Fiscal Impact
The proposed amendment for $7,500 would increase the total not-to-exceed amount to $67,500 for the remainder of the agreement term (through August 31, 2024). The additional $7,500 is available in the General Fund contingency account approved in the FY 2023-2024 annual budget.

Staff Recommendation
Staff recommends the Council adopt the proposed resolution authorizing the City Manager to amend the agreement with Townsend Public Affairs, Inc. to Include legislative advocacy services and increase the agreement by $7,500 for a new total not-to-exceed amount of $67,500 for the remaining contract term.

Attachments

1. Proposed Resolution
Exhibit A – Townsend Public Affairs, Inc. Contract Amendment No. 1 185
Resolution No. XX-23 Page 1 of 1
RESOLUTION NO. XX-24

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF OAKLEY, AUTHORIZING

THE CITY MANAGER TO EXECUTE AN AMENDMENT TO THE AGREEMENT WITH TOWNSEND PUBLIC AFFAIRS, INC. TO INCLUDE LEGISLATIVE ADVOCACY

SERVICES
WHEREAS, the City desires to include legislative advocacy services to the existing agreement for grant services provided to the City by Townsend Public Affairs, Inc. to support City services; and
WHEREAS, the additional cost to include legislative advocacy services through the remaining term of the agreement ending August 31, 2024 is $7,500 for a new total notto-exceed amount of $67,500; and NOW, THEREFORE, BE IT RESOLVED AND ORDERED, that the City Council of the City of Oakley does hereby authorize the City Manager to execute an amendment to the Agreement with Townsend Public Affairs, Inc., attached as Exhibit A to the resolution for on-call grant writing and legislative advocacy services.

PASSED AND ADOPTED by the City Council of the City of Oakley this 26th day of March, 2024 by the following vote:

AYES:

NOES:

ABSTENTIONS:

ABSENT:

APPROVED:

_______________________
ATTEST: Anissa Williams, Mayor
______ _____
Libby Vreonis, City Clerk Date
186
AMENDMENT NO. 1 TO THE AGREEMENT BETWEEN THE
CITY OF OAKLEY AND TOWNSEND PUBLIC AFFAIRS, INC.

FOR CONSULTANT SERVICES ASSOCIATED WITH GRANT

WRITING AND LEGISLATIVE ADVOCACY
THIS AGREEMENT for consulting services is entered into by and between the City of Oakley, a municipal corporation in the State of California (hereinafter referred to as “City”) and Townsend Public Affairs, Inc. (hereinafter referred to as “Consultant”), collectively sometimes referred to hereinafter as the “Parties”, as of April 1, 2024 (the “Effective Date”).

RECITALS
A. On September 1, 2023, City and Consultant executed an Agreement for on-call consulting services related to grant writing services (hereinafter referred to as the “Agreement”); and,
B. City and Consultant now desire that the following additional amendment be made to the Consultant services: include legislative advocacy services and increase to the not-to-exceed contract amount from $60,000 to $67,500 for FY 2023/24 as described in the attached Scope of Services and Fees; and,
C. Except as provided herein, all other terms and provisions of the Agreement shall remain in full force and effect.

AGREEMENT
IN WITNESS WHEREOF, the City of Oakley, a municipal corporation in the State of California, has authorized the execution of this Amendment in duplicate by its City Manager, Approved to as Form by the City Attorney and attested by its City Clerk as of the 1st day of April 2024, and the parties have caused this Amendment to be executed in duplicate.

CITY CONSULTANT
City of Oakley, a municipal corporation Townsend Public Affairs, Inc., a State of California California corporation
By: ____________________________ By: _____________________________ Joshua McMurray, City Manager Christopher Townsend, President ATTEST: APPROVED AS TO FORM:
_______________________________ ________________________________ Libby Vreonis, City Clerk Derek P. Cole, City Attorney

EXHIBIT A
187
EXHIBIT A TO AMENDMENT NO. 1 TO THE AGREEMENT
BETWEEN THE CITY OF OAKLEY AND TOWNSEND PUBLIC AFFAIRS, INC.

FOR CONSULTANT SERVICES ASSOCIATED WITH GRANT WRITING

AND LEGISLATIVE ADVOCACY

SCOPE OF SERVICES AND COMPENSATION SCHEDULE
188
Legislative Advocacy and Grant Writing Services | City of Oakley Page 1 TPA will utilize the following strategic and comprehensive approach to provide state legislative advocacy services to the City:
 Conduct Detailed Orientation: TPA utilizes a comprehensive onboarding process that includes extensive meetings with various relevant members of City leadership and key City departments to help develop a strategic plan that is carefully tailored to satisfy the needs of the City and is designed for maximum success in the current political climate and funding environment.
 Develop Legislative Strategy: Utilizing the information gathered during the onboarding process, TPA will coordinate with the City to develop an official legislative platform and strategy that represents the City’s priorities in Sacramento. This blueprint will be shared with key stakeholders in the State Legislature and Governor’s Administration.  Implement the Legislative Strategy: TPA will advocate for the City’s legislative agenda utilizing the following methods:
o Build and Strengthen Relevant Relationships: TPA has cultivated a network of valuable relationships that will be leveraged to promote the City’s legislative agenda. o Leverage Relationships for Strategic Advocacy Plan: TPA will engage various techniques to leverage our network of key relationships on behalf of the City:
 Schedule meetings for the City to discuss relevant legislation  Prepare all briefing materials and talking points for the City  Brief legislative offices and stakeholders on the City’s legislative agenda  Follow-up on meetings to ensure commitments and deliverables are being met o Coordinate Advocacy Trips: TPA will work with the City to coordinate advocacy trips to Sacramento to meet with the City’s legislative delegation, as well as legislators that serve on committees relevant to the City’s agenda. Furthermore, whenever possible, TPA will also schedule site visits by legislators to the City. o Track Legislation: TPA will identify, analyze, and monitor all bill introductions and amendments relevant to the City’s legislative platform and assess their potential impact on the City.
o Craft Testimony and Position Letters: TPA will prepare and submit written and verbal testimony regarding legislation relevant to the City. TPA will also draft and deliver position letters to legislators and key officials on specific bill language. o Draft Bill Language: TPA will draft language and amendments for relevant legislation, as required to protect and promote the City’s agenda.
o State Budget Funding Opportunities: In an effort to maximize state funding, TPA will work with the City to identify projects and other funding priorities that may be suitable for funding through the State Budget. TPA will coordinate with the City to develop supporting materials for the budget request. TPA will also work with members of the City’s state legislative delegation, along with the Assembly and Senate Budget Committees, to gain support for the inclusion of the City’s project in the final State Budget approved by the Legislature.

SCOPE OF SERVICES
189

SCOPE OF SERVICES
Legislative Advocacy and Grant Writing Services | City of Oakley Page 2  Provide Progress Reports: TPA will confer regularly with the City on our activities. TPA will provide timely electronic reports on the status of all legislative activity, such as bill language, amendments, and committee analyses. In addition to written reports, TPA will be available to the City for conference calls, in-person briefings, and meetings.  Prepare and File Lobbying Disclosure Reports: TPA will prepare and file, on behalf of the City, all applicable state lobbying disclosure reports.

TPA will utilize the following strategic and comprehensive approach to provide grant writing services to the City:
 Craft Strategic Funding Plan: Utilizing the information gathered during the onboarding process, TPA will coordinate with the City to develop a proactive and comprehensive strategic funding plan that serves the needs of the City’s priorities. The plan will do more than simply identify City projects; it will outline and prioritize multiple funding options for each project and develop a specific plan of work tailored for each project. It will also identify key “strings attached” to help assess the cost/benefit ratio for each grant opportunity.  Identify, Research, and Monitor Grant Funding Opportunities: TPA will utilize list-serve subscription programs, funding workshops, agency canvassing, and other networking tactics to ensure every potential opportunity is identified and reviewed for relevance with the City’s projects. TPA will then share these opportunities with the City for further assessment and determination if a grant application is warranted. The City will also receive a grant matrix of funding programs that is updated regularly as new opportunities arise.  Community Outreach: TPA will assist the City with community outreach required for grant applications by ensuring the City is aware of specific requirements, helping develop materials that capture all elements required by the grant, and compiling the outreach data for inclusion in the application.
 Grant Application Development and Submittal: TPA will develop, draft, submit, and follow up on each City grant application through the following process:
o Establishment of Clear Accountabilities: TPA will coordinate with the City to ensure the assignment of responsibilities and tasks are made clear so that confusion and inefficiency are avoided, and the City is burdened as little as possible while TPA pursues a grant opportunity.
o Provide Overview of Full Application Requirements: For each grant application, TPA will provide the City with a detailed overview of the requirements for the grant program and corresponding application to ensure that the program is a strong fit for the City’s project. This will include:
 Application timeline
 Eligible project types
 Funding availability and award maximums and minimums
 List of application components, including proposal questions and any required attachments
190

SCOPE OF SERVICES
Legislative Advocacy and Grant Writing Services | City of Oakley Page 3 o Assemble Project Background and Details: TPA will conduct a detailed informational interview with City staff most involved with each project in order to gain a full understanding of the project background and scope details necessary for developing the grant proposal and addressing all application questions. o Coordinate Technical Project Details: For technical application components such as site plans, detailed cost estimates, project timelines, engineering plans, and costbenefit analyses, TPA will coordinate with City staff to compile all necessary attachments and ensure consistency across all elements of the application. o Draft Written Proposal: TPA will fully draft all narrative components of the application and, when applicable, will indicate where additional input or project detail from the City could be provided during the proposal review process.
o Incorporate Feedback to Finalize Proposal: Well ahead of the application deadline, TPA will provide the City with a full draft for review and feedback. TPA will incorporate any additional details or revisions provided during this process to finalize the grant application and will obtain City approval for the final version of the application prior to submission.
o Submit Completed Application: TPA will ensure that applications are submitted prior to the deadline, whether the submission is electronic or through hard copies, in accordance with submission instructions for each individual program. For hard copy submissions, TPA will print and package applications according to submission instructions and will ship applications through a reliable carrier service such as FedEx in order to provide the City with tracking and delivery confirmation for the application.

TPA will also obtain a receipt for proof of submission and provide the City with a final copy of all submitted application documents.
o Funding Advocacy: Throughout the grant application process TPA will leverage relationships with relevant officials and program officers in various state and federal funding agencies to ensure that City grant applications are aligned with the goals of the specific grant program and that the applications are well-crafted and wellpositioned for funding.  Post-Grant Submittal Advocacy: TPA will frequently contact legislators and agency officials to follow up on the status of a grant application and promote its need and urgency. This will include drafting letters of support after grant submissions and distributing them to legislators for their consideration. In addition, TPA will work with legislators to reach out to individual granting agencies to provide background on City’s projects and convey their support for those projects.
 Post-Award Grant Administration and Compliance: TPA will also assist, as needed, with post-award administration and compliance for all grant applications submitted by TPA on behalf of the City. This assistance will include interacting with granting agencies on behalf of the City, providing support for the drafting and submission of required reports and evaluations, and other tasks related to the successful monitoring of and compliance with the program requirements.
191

SCOPE OF SERVICES
Legislative Advocacy and Grant Writing Services | City of Oakley Page 4  Post-Award Services—Above and Beyond Advocacy: TPA has a track record of success with post-award grant administration and retention. TPA has worked on behalf of clients who, due to unforeseen circumstances, have needed to request an extension of the grant performance period to accomplish project deliverables. TPA is prepared to engage in the legislative process and work with legislators to get bills passed that would allow for the City to retain its grant funding after the performance period would have otherwise ended. Additionally, TPA is prepared to work directly with the City and agencies to secure scope of work changes to already awarded projects to ensure the City will not have to return any hard-won grant funding.
 Comprehensive Follow-Up on Unsuccessful Applications: Despite all best efforts, some grant applications are not selected for funding. In those instances where grant applications are unsuccessful, TPA will work with the relevant state and federal funding agencies to set up in-person or telephone debriefing sessions to discuss the grant applications and how to best revise the grant applications for the next funding round to ensure success.  Provide Monthly Progress Reports: TPA will confer regularly with the City on our activities.

TPA will provide timely electronic monthly reports on the status of all funding activity, such as current funding opportunities, current applications, submitted applications, and post-grant submittal advocacy. In addition to written reports, TPA will be available to the City for conference calls, in-person briefings, and meetings.
192
Legislative Advocacy and Grant Writing Services | City of Oakley Page 5 ALL-INCLUSIVE RETAINER:

DESCRIPTION OF SERVICES MONTHLY FEE
State Legislative Advocacy and Grant Writing Services $6,500* State Legislative Advocacy
 Conduct Detailed Orientation Included
 Develop Legislative Strategy Included
 Implement the Legislative Strategy Included
 Build and Strengthen Relevant Relationships Included
 Leverage Relationships for Strategic Advocacy Plan Included  Coordinate Advocacy Trips Included
 Track Legislation Included
 Craft Testimony and Position Letters Included
 Draft Bill Language Included
 State Budget Funding Opportunities Included
 Provide Progress Reports Included
 Prepare and File Lobbying Disclosure Reports Included Grant Writing
 Craft Strategic Funding Plan Included
 Identify, Research, and Monitor Grant Funding Opportunities Included  Grant Application Development and Submittal Included
 Establishment of Clear Accountabilities Included
 Provide Overview of Full Applications Requirements Included  Assemble Project Background and Details Included
 Coordinate Technical Project Details Included
 Draft Written Proposal Included
 Incorporate Feedback to Finalize Proposal Included
 Submit Completed Application Included
 Funding Advocacy Included
 Post-Grant Submittal Advocacy Included
 Post-Award Grant Administration and Compliance Included  Post-Award Services—Above and Beyond Advocacy Included  Comprehensive Follow-Up on Unsuccessful Applications Included *The monthly fee includes all reasonable business and travel expenses.

FEE SCHEDULE
193

STAFF REPORT

City of Oakley | 3231 Main Street, Oakley, CA 94561
O (925) 625-7000 | F (925) 625-9859 | www.ci.oakley.ca.us DATE: March 26, 2024
TO: City Council
FROM: Joshua McMurray, City Manager
SUBJECT: Strategic Plan 27+ Update
Background and Analysis
Since its incorporation, the City of Oakley has developed and operated under the direction of a Strategic Plan. A Strategic Plan guides governing bodies in making complex decisions, such as resource allocation, and sets the organization’s priorities and a path forward. It does this through a clear and compelling mission and vision and thoughtful, community-oriented values, goals, and objectives. Strategic Plans are a best practice in municipal organizations as they allow leadership to take a step back from day-to-day challenges and look at the big picture.

The City Council adopted the current Strategic Plan 27+ in April of 2022 and the Staff have been working since that time to implement the goals and objectives of the plan.

With the plan encompassing a five-year period, some of the objectives have been completed while others are in various stages of work and there are some that we have not started to work on. The Council received updates in November 2022 and May 2023 on the Strategic Plan.

Fiscal Impact
There is no fiscal impact associated with this update to the City Council.

Staff Recommendation
Staff recommends that the City Council accept the Strategic Plan 27+ Update.

Attachments

1. Strategic Plan Update Spreadsheet

2. Strategic Plan 27+
Approved and
Forwarded to the
City Council
194
Strategic Plan 2022-2027+ Objectives Dashboard
2024 Update
Department Key:

ALL - All Departments
CDD - Community Development
CMO - City Manager's Office
ED - Economic Development
FIN - Finance
HR - Human Resources
PD - Police Department
PW - Public Works
REC - Recreation
Complete
Goal Subgoal Objective Sub Objective Sub Sub Objectives Assigned Dept(s)
FY 23-24
A1 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Strategically plan and pursue commerce
that meets the new service demands of
local residents and attracts customers as a
destination (e.g., grocery store, retail,
entertainment, and light industrial near
Amazon and on west end).

CDD
ED
Efforts continue to move forward with a strong
focus on nurturing the small business community
and fostering an ecosystem that supports growth
including: Mercantile building projects, Delta
Pointe Plaza in the Downtown, Bridgehead
Industrial Project; and the new the Logistics
Center.

A2 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Strategically plan and pursue commerce
that meets the new service demands of
local residents and attracts customers as a
destination (e.g., grocery store, retail,
entertainment, and light industrial near
Amazon and on west end).

Attract businesses that create alternative
revenue sources to property tax through
sales and business taxes and employ our
residents.

CDD
ED
This is a continuous endeavor. With our 2023
Economic Development Work Plan, we refined our
strategy to draw businesses that expand our
revenue sources beyond property tax,
incorporating sales and business taxes, while also
generating job opportunities for our community
through collaborations with local agencies and
partnerships.

A3 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Strategically plan and pursue commerce
that meets the new service demands of
local residents and attracts customers as a
destination (e.g., grocery store, retail,
entertainment, and light industrial near
Amazon and on west end).

Seek, in conjunction with the community,
sustainable economic opportunities to
attract businesses and create jobs, while
being sensitive to the types of businesses
the community needs and wants.

CDD
ED
This is a continuous endeavor. Our 2023
Economic Development Work Plan outlines
streamlined, actionable strategies to attract
businesses, specifically focusing on expanding
outreach by emphasizing the development of
marina and recreational sectors.

A4 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Strategically plan and pursue commerce
that meets the new service demands of
local residents and attracts customers as a
destination (e.g., grocery store, retail,
entertainment, and light industrial near
Amazon and on west end).

Prioritize planning by targeting new
businesses that align with Oakley’s vision.

CDD
ED
This is a continuous endeavor. Our 2023
Economic Development Work Plan outlines
streamlined, actionable strategies to attract
businesses, specifically focusing on expanding
outreach by emphasizing the development of
marina and recreational sectors.

A5 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Provide affordable housing sites that meet
our legislated Regional Housing Needs
Allocation (RHNA).

CDD The City is planning to pursue a Rezone rather
than an overlay to accommodate RHNA; however,
the latest information is that HCD may be open to
overlays on commercial sites. Staff will seek
expertise to assist in how to proceed and
complete the rezone prior to January 31, 2026.

Objectives Status Color Key:

Complete
In Progress/In Process/Ongoing
Future/Not Yet Begun
1 195
Strategic Plan 2022-2027+ Objectives Dashboard
2024 Update
Department Key:

ALL - All Departments
CDD - Community Development
CMO - City Manager's Office
ED - Economic Development
FIN - Finance
HR - Human Resources
PD - Police Department
PW - Public Works
REC - Recreation
Complete
Goal Subgoal Objective Sub Objective Sub Sub Objectives Assigned Dept(s)
FY 23-24
Objectives Status Color Key:

Complete
In Progress/In Process/Ongoing
Future/Not Yet Begun
A6 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Update Oakley’s Downtown Specific Plan to
reflect and envision the City’s future.

CDD The City Council decided at its January 23, 2024
meeting that the current Downtown Specific Plan
does not need to be updated at this time.

A7 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Update Oakley’s Downtown Specific Plan to
reflect and envision the City’s future.

Encourage quality, sustainable growth--
housing with business and requisite road
infrastructure and sidewalks to support
pedestrian and bicyclist movement
CDD
PW
The City Council decided at its January 23, 2024
meeting that the current Downtown Specific Plan
does not need to be updated at this time.

A8 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Update Oakley’s Downtown Specific Plan to
reflect and envision the City’s future.

Leverage the train platform that will offer
better access for Downtown programming
ED
CDD
PW
City infrastructure for the train platform will be
complete in Fall 2024. Construction of the train
platform should be complete by Fall 2025 to
attract and promote downtown development.

A9 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Update Oakley’s Downtown Specific Plan to
reflect and envision the City’s future.

Create better streetscapes that can
promote traffic calming
PW The construction of recent Downtown
Infrastructure Improvements have enhanced the
Downtown complementing the Downtown Specific
Plan
A10 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Update Oakley’s Downtown Specific Plan to
reflect and envision the City’s future.

Consider funding elements of the Downtown
Specific Plan with American Rescue Plan
Act (ARPA) monies
CDD
ED
Staff presented the DSP to the City Council in
January 2024. There was no consensus to
proactively open the DSP at this time.

A11 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Update Oakley’s Downtown Specific Plan to
reflect and envision the City’s future.

Revitalize and draw people downtown to
live, work, and play
CDD
ED
Staff presented the DSP to the City Council in
January 2024. There was no consensus to
proactively open the DSP at this time. Staff will
still continue to implement the spirit of the sub
objective.

A12 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Update Oakley’s Downtown Specific Plan to
reflect and envision the City’s future.

Revitalize and draw people downtown to
live, work, and play
Develop an expanded
downtown with additional
buildings and mixed use.

CDD Staff presented the DSP to the City Council in
January 2024. There was no consensus to
proactively open the DSP at this time. In the spirit
of the sub objective, Planning is processing Delta
Pointe, a commercial/residential mixed use project
in the Core Area of the DSP.
2 196
Strategic Plan 2022-2027+ Objectives Dashboard
2024 Update
Department Key:

ALL - All Departments
CDD - Community Development
CMO - City Manager's Office
ED - Economic Development
FIN - Finance
HR - Human Resources
PD - Police Department
PW - Public Works
REC - Recreation
Complete
Goal Subgoal Objective Sub Objective Sub Sub Objectives Assigned Dept(s)
FY 23-24
Objectives Status Color Key:

Complete
In Progress/In Process/Ongoing
Future/Not Yet Begun
A13 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Update Oakley’s Downtown Specific Plan to
reflect and envision the City’s future.

Revitalize and draw people downtown to
live, work, and play
Consider a park, including
programming specific to
Economic Development, from
north 2nd Street to Rose Ave.

ED
CDD
PW
Staff presented the DSP to the City Council in
January 2024. There was no consensus to
proactively open the DSP at this time.

A14 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Update Oakley’s Downtown Specific Plan to
reflect and envision the City’s future.

Revitalize and draw people downtown to
live, work, and play
Develop or sell City-owned
properties based on community
benefit.

CMO Staff presented the DSP to the City Council in
January 2024. There was no consensus to
proactively open the DSP at this time. City has
transferred ownership of a commercially zoned
downtown property to a private developer currently
in the design phase of the building project (Delta
Pointe) aiming to maximize the community
benefits.

A15 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Update Oakley’s Downtown Specific Plan to
reflect and envision the City’s future.

Revitalize and draw people downtown to
live, work, and play
Consider relocating the cohosted City/High School Library to a downtown location that can
be a unifying location for
Seniors, Youth, Veterans, and
possible satellite location for
County services.

CMO
PW
FIN
CDD
PD
REC
Staff presented the DSP to the City Council in
January 2024. There was no consensus to
proactively open the DSP at this time. City
Council held a separate work session on potential
library options and in February 2024 established a
City Council library project subcommittee. Staff
continues to work toward solutions for a new City
library. DSP may be updated at that time. PD
staffed the new Special Services Team (SST) in
July 2023. SST is focusing on quality of life issues
in the downtown area.

A16 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Update Oakley’s Downtown Specific Plan to
reflect and envision the City’s future.

Revitalize and draw people downtown to
live, work, and play
Research rezoning of River
Oaks Crossing
CDD This site is not in the DSP and now has an official application for the Bridgehead Industrial Project,
which includes a Rezone to P-1 District.) Staff
presented the DSP to the City Council in January
2024. There was no consensus to pro-actively
open the DSP at this time. Staff will monitor
projects and propose amendments as applicable,
such as for a future library, or until the City
Council directs Staff otherwise.
3 197
Strategic Plan 2022-2027+ Objectives Dashboard
2024 Update
Department Key:

ALL - All Departments
CDD - Community Development
CMO - City Manager's Office
ED - Economic Development
FIN - Finance
HR - Human Resources
PD - Police Department
PW - Public Works
REC - Recreation
Complete
Goal Subgoal Objective Sub Objective Sub Sub Objectives Assigned Dept(s)
FY 23-24
Objectives Status Color Key:

Complete
In Progress/In Process/Ongoing
Future/Not Yet Begun
A17 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Develop a vital Shoreline Plan to attract
both people and commerce to our
waterfront.

CDD
ED
The master planning of the Oakley Regional Park
is complete. Staff will pursue grant opportunities to
implement the Master Plan in future years.

A18 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Develop a vital Shoreline Plan to attract
both people and commerce to our
waterfront.

Expand marina zoning: restaurants,
recreational access, fishing tournaments, 55-
acre park
CDD
ED
Complete
A19 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Develop a vital Shoreline Plan to attract
both people and commerce to our
waterfront.

Determine viable economic uses of the
Oakley shoreline and visit other cities to see
how they attracted visitors as a destination
(e.g., new Science Center)
CDD
ED
Economic Development partners with fishing
tournament organizations to attract visitors.

A20 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Plan and develop Cypress Corridor
holistically with improvements and
commerce to service new development to
ease downtown traffic (e.g., grocery,
restaurants).

ED
CDD
PW
Planning is complete. The infrastructure projects
are estimated to be complete by 2027.

A21 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Reinforce Planning Commission to
understand Oakley’s vision and encourage
public engagement:

CDD Staff continues to facilitate monthly meetings
where the Planning Commission reviews projects
and receives informational updates from City Staff
and Outside Agencies
A22 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Reinforce Planning Commission to
understand Oakley’s vision and encourage
public engagement:

Update zoning to promote single and
multi-family housing, mixed use, light
industry, and commercial opportunities
and remaining residential opportunities.

Ensure that zoning considers potential
conflicts with adjacent properties that are
not compatible.

CDD The City continues to adapt to changing State
housing laws and has a certified Housing Element
in place.

A23 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Reinforce Planning Commission to
understand Oakley’s vision and encourage
public engagement:

Enforce codes consistently in all districts
to create consistent standard to code
enforcement by using a combination of
reactive and proactive code enforcement
CDD Ongoing
4 198
Strategic Plan 2022-2027+ Objectives Dashboard
2024 Update
Department Key:

ALL - All Departments
CDD - Community Development
CMO - City Manager's Office
ED - Economic Development
FIN - Finance
HR - Human Resources
PD - Police Department
PW - Public Works
REC - Recreation
Complete
Goal Subgoal Objective Sub Objective Sub Sub Objectives Assigned Dept(s)
FY 23-24
Objectives Status Color Key:

Complete
In Progress/In Process/Ongoing
Future/Not Yet Begun
A24 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Reinforce Planning Commission to
understand Oakley’s vision and encourage
public engagement:

Enforce codes consistently in all districts
to create consistent standard to code
enforcement by using a combination of
reactive and proactive code enforcement
Maintain code enforcement
officers and provide proper
training
CDD Currently staffed with (1) Code Enforcement
Officer, and (2) Code Enforcement Technicians.

Staff attends CACEO training as needed,
A25 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Reinforce Planning Commission to
understand Oakley’s vision and encourage
public engagement:

Encourage objective decision-making
versus subjective decision-making for
application approvals to meet Oakley’s
vision and economic goals by focusing on
formal plan and study outcomes
CDD Staff continues to rely on the General Plan and
Zoning Ordinance to ensure uniformity,
consistency and equity when making decisions.

A26 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Reinforce Planning Commission to
understand Oakley’s vision and encourage
public engagement:

Require developer fees for proper
infrastructure (e.g., roads and parks) to
support development and growth.

CDD
PW
Staff continues to assess the appropriate 'Impact
Fees' based on the Development's Use, Size and
Impact. Impact Fees are paid with the Permit
Fees, prior to Permit Issuance.

A27 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Reinforce Planning Commission to
understand Oakley’s vision and encourage
public engagement:

Communicate and build consensus through
the results of the special studies that are
commissioned to provide for the feasibility of
projects and engage the public at the
beginning of all projects to ensure project
delivery is not stunted or stopped without
defining success from all stakeholders.

CDD
PW
Oakley is currently using more tools such as
Engage Oakley to receive public input on special
projects, which is then forwarded to the City
Council for consideration during work sessions.

A28 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Enhance Environmental Stewardship ED
CDD
PW
The City evaluates opportunities for additional
environmental enhancement projects.

A29 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Enhance Environmental Stewardship Collaborate with the water and sewer special districts to maximize the
distribution and use of recycled water
CDD
PW
Staff continues to stay engaged with ISD and
DWD to review projects and to encourage the
districts to install recycled water infrastructure.

A30 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Enhance Environmental Stewardship Explore and report on green energy opportunities.

CDD
PW
City Hall Solar Roof project is complete. Staff
explores green energy grant opportunities.
5 199
Strategic Plan 2022-2027+ Objectives Dashboard
2024 Update
Department Key:

ALL - All Departments
CDD - Community Development
CMO - City Manager's Office
ED - Economic Development
FIN - Finance
HR - Human Resources
PD - Police Department
PW - Public Works
REC - Recreation
Complete
Goal Subgoal Objective Sub Objective Sub Sub Objectives Assigned Dept(s)
FY 23-24
Objectives Status Color Key:

Complete
In Progress/In Process/Ongoing
Future/Not Yet Begun
A31 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Enhance Environmental Stewardship Explore and report on green energy opportunities.

Solar at City facilities PW City Hall Solar Roof project is complete.

A32 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Enhance Environmental Stewardship Explore and report on green energy opportunities.

Expansion of City's EV
Charging Program
PW The City has constructed and instilled EV charging
stations at the Civic Center and at the new
downtown parking lots.

A33 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Enhance Environmental Stewardship Remove the allowance for non-drought tolerant landscaping.

CDD Completed in September 2022
A34 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Enhance Environmental Stewardship Ensure new residential construction meets adopted standards for energy efficiency,
including solar and power storage.

CDD Staff continues to perform comprehensive plan
reviews for all Residential and Commercial
Projects, which includes reviews for compliance
with the currently adopted California Energy and
Green Building Codes.

A35 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Enhance Environmental Stewardship Implement energy, air quality, and greenhouse gas emissions goals within the
Oakley General Plan, including the adoption
and implementation of a Climate Action Plan
by 2025 that complies with State
greenhouse gas reduction targets.

CDD
PW
The Climate Action Plan will begin in spring 2024
and is expected to be adopted by 2025.

A36 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Complete a comprehensive update of the
City’s Zoning Code.

CDD Target completion date by end of 2025
A37 Community and
Economic
Development Goal
Strategic and
Thoughtful
Growth
Complete a comprehensive update of the
City’s Zoning Code.

Ensure consistency with current and future
vision for Oakley and the recently updated
Oakley General Plan.

CDD Target completion date by end of 2025
A38 Community and
Economic
Development Goal
BusinessFriendlyResearch other “like cities” to develop a Strategic Business Outreach Plan.

ED With the introduction on our new ED Work Plan,
we've streamlined growth strategies and
conducted research on like cities to identify
success practices and taylor our approach.
6 200
Strategic Plan 2022-2027+ Objectives Dashboard
2024 Update
Department Key:

ALL - All Departments
CDD - Community Development
CMO - City Manager's Office
ED - Economic Development
FIN - Finance
HR - Human Resources
PD - Police Department
PW - Public Works
REC - Recreation
Complete
Goal Subgoal Objective Sub Objective Sub Sub Objectives Assigned Dept(s)
FY 23-24
Objectives Status Color Key:

Complete
In Progress/In Process/Ongoing
Future/Not Yet Begun
A39 Community and
Economic
Development Goal
BusinessFriendlyResearch other “like cities” to develop a Strategic Business Outreach Plan.

Conduct a Stimulate Oakley Business
analysis for Oakley and compare to
adjacent cities for differentiators and
opportunities.

ED With the introduction on our new ED Work Plan,
we've streamlined growth strategies and
conducted research on like cities to identify
success practices and taylor our approach.

A40 Community and
Economic
Development Goal
BusinessFriendlyResearch other “like cities” to develop a Strategic Business Outreach Plan.

Develop a Business Vision for Oakley that
will attract and retain high-quality, diverse
commerce through incentives for
businesses including small businesses.

ED With the introduction on our new ED Work Plan,
we've streamlined growth strategies and
conducted research on like cities to identify
success practices and taylor our approach.

A41 Community and
Economic
Development Goal
BusinessFriendlyResearch other “like cities” to develop a Strategic Business Outreach Plan.

Develop a Property Utilization Plan on Cityowned properties to maximize the City’s potential return on investment
ED Ongoing
A42 Community and
Economic
Development Goal
BusinessFriendlyBolster and support existing businesses through the use of financial and funding
incentives such as business low-interest
loans, grant funding, ARPA funding, and
promote “buy local” incentives.

ED This is an ongoing effort. In 2023, launched Small
Business Recovery Grant Program and Retail and
Light Industrial Improvement Grant Program.

A43 Community and
Economic
Development Goal
BusinessFriendlyShowcase businesses through active
engagement and outreach (e.g., social
media, storefronts images, local business
newsletter with coupon book included)
ED
REC
Ongoing
A44 Community and
Economic
Development Goal
BusinessFriendlyContinue to streamline business license fee/permits
FIN
PW
CDD
Ongoing effort that will be optimized with the new
Tyler Munis Platform, with a expected completion
of Summer 2025.

A45 Community and
Economic
Development Goal
BusinessFriendlyBeautify Oakley’s streetscapes, parks, and business facades to attract and retain
businesses and their customers
PW Complete
A46 Community and
Economic
Development Goal
Local
Employment
Capitalize on Logistics Center and
strategize with developers and surrounding
property owners to create job opportunities.

CDD
ED
Bridgehead Industrial Project was submitted in
late 2023 and is currently being processed by the
Planning Division.
7 201
Strategic Plan 2022-2027+ Objectives Dashboard
2024 Update
Department Key:

ALL - All Departments
CDD - Community Development
CMO - City Manager's Office
ED - Economic Development
FIN - Finance
HR - Human Resources
PD - Police Department
PW - Public Works
REC - Recreation
Complete
Goal Subgoal Objective Sub Objective Sub Sub Objectives Assigned Dept(s)
FY 23-24
Objectives Status Color Key:

Complete
In Progress/In Process/Ongoing
Future/Not Yet Begun
A47 Community and
Economic
Development Goal
Local
Employment
Create employer-employee partnerships to
reduce State’s regulations on vehicle miles
traveled (VMT) and complement our
existing housing (Logistics Center
development).

CDD
ED
Ongoing
B1 Community Health
and Safety
Safe Streets Create an Emergency Disaster & Response
Plan including resiliency resources.

CM Ongoing
B2 Community Health
and Safety
Safe Streets Create an Emergency Disaster & Response
Plan including resiliency resources.

Develop a Communication Plan for
emergency responders, Public Works, the
public, and other key stakeholders.

CM Ongoing
B3 Community Health
and Safety
Safe Streets Create an Emergency Disaster & Response
Plan including resiliency resources.

Provide and reinforce public and staff
training through regular community
meetings.

CMO Ongoing
B4 Community Health
and Safety
Safe Streets Create an Emergency Disaster & Response
Plan including resiliency resources.

Ensure resiliency to power outages
(traffic controls, cellular and broadband
backup, generators).

PW The installation of emergency generators at City
Hall and Recreation center has been completed.

B5 Community Health
and Safety
Safe Streets Create an Emergency Disaster & Response
Plan including resiliency resources.

Implement training, communicate broadly,
and seek grants for implementation
CMO Ongoing
B6 Community Health
and Safety
Safe Streets Create an Emergency Disaster & Response
Plan including resiliency resources.

Modernize the Oakley Emergency
Operations Center (EOC).

CMO Ongoing
B7 Community Health
and Safety
Safe Streets Address streets and main arteries
vulnerable to fire, flood, and traffic hazards
with improving infrastructure and evacuation
plans to provide for safe passage for people
including emergency responders.

PD
PW
CMO
PD has been more visible in this area creating
safer and more manageable traffic flows. Areaspecific updates are included with the subobjectives below.
8 202
Strategic Plan 2022-2027+ Objectives Dashboard
2024 Update
Department Key:

ALL - All Departments
CDD - Community Development
CMO - City Manager's Office
ED - Economic Development
FIN - Finance
HR - Human Resources
PD - Police Department
PW - Public Works
REC - Recreation
Complete
Goal Subgoal Objective Sub Objective Sub Sub Objectives Assigned Dept(s)
FY 23-24
Objectives Status Color Key:

Complete
In Progress/In Process/Ongoing
Future/Not Yet Begun
B8 Community Health
and Safety
Safe Streets Address streets and main arteries
vulnerable to fire, flood, and traffic hazards
with improving infrastructure and evacuation
plans to provide for safe passage for people
including emergency responders.

East Cypress Corridor Specific Plan Area PW East Cypress Road corridor infrastructure improvement projects are currently underway and
anticipated to be completed by 2027 in response
to the emergency access and health and safety of
the public in far East Oakley.

B9 Community Health
and Safety
Safe Streets Address streets and main arteries
vulnerable to fire, flood, and traffic hazards
with improving infrastructure and evacuation
plans to provide for safe passage for people
including emergency responders.

Main Street – improve areas to their full
right-of-way
PW Complete
B10 Community Health
and Safety
Safe Streets Address streets and main arteries
vulnerable to fire, flood, and traffic hazards
with improving infrastructure and evacuation
plans to provide for safe passage for people
including emergency responders.

Complete Laurel Road, including
widening to its full width, and the
extension and over-crossing over the
railroad track to Sellers Avenue
PW Ongoing
B11 Community Health
and Safety
Safe Streets Explore improving lighting for safety PW We make improvements where we can, based on projects and community need.

B12 Community Health
and Safety
Safe Streets Align police resources with City’s growth. PD PD staffing is currently sitting at 40 sworn people.

Traffic/Investigation Units are full and we started
the SST.

B13 Community Health
and Safety
Safe Streets Align police resources with City’s growth. Develop and implement a staffing plan to scale police personnel to City’s growing
safety needs.

PD
HR
PD staffing is currently sitting at 40 sworn people.

The "overhiring" of officers is still permissible and
we are seeking qualified candidates.
9 203
Strategic Plan 2022-2027+ Objectives Dashboard
2024 Update
Department Key:

ALL - All Departments
CDD - Community Development
CMO - City Manager's Office
ED - Economic Development
FIN - Finance
HR - Human Resources
PD - Police Department
PW - Public Works
REC - Recreation
Complete
Goal Subgoal Objective Sub Objective Sub Sub Objectives Assigned Dept(s)
FY 23-24
Objectives Status Color Key:

Complete
In Progress/In Process/Ongoing
Future/Not Yet Begun
B14 Community Health
and Safety
Safe Streets Align police resources with City’s growth. Streamline and civilianize where appropriate (i.e., admin, budget/finance,
records, property, fleet management, etc.).

PD
HR
We now have a full time "Fleet PSA" who tends to
all matters regarding fleet maintenance. We have
a patrol PSA who takes low level cold reports and
we are in the process of hiring a second patrol
PSA.

B15 Community Health
and Safety
Safe Streets Align police resources with City’s growth. Improve and invest in technology. PD We have signed off on an extended 5 year contract with Flock Safety for ALPR services. The
ALPR cameras are an effective force multiplier.

B16 Community Health
and Safety
Safe Streets Align police resources with City’s growth. Improve and invest in technology. Map accident scenes to open roads quicker
PD The LEICA continues to be used as a force
multiplier and it is now linked with our drones. We
trained an additional 8 officers on its use.

B17 Community Health
and Safety
Safe Streets Align police resources with City’s growth. Improve and invest in technology. Research red light cameras to supplement sworn enforcement
officers.

PD Ongoing
B18 Community Health
and Safety
Safe Streets Align police resources with City’s growth. Improve and invest in technology. Create a larger “cyber shield” over the City via a robust
camera program
PD Ongoing
B19 Community Health
and Safety
Safe Streets Align police resources with City’s growth. Establish strong neighborhood watch programs, including National Night
Out, and maintain close communication
between the neighborhoods, the City
Council, Oakley Police, and City Hall
PD We continue to offer advice on neighborhood
watch programs and we continue to expand our
social interactions with the community.

B20 Community Health
and Safety
Safe Streets Align police resources with City’s growth. Collaborate with neighboring agencies to maximize efficiencies with shared
resources (e.g., equipment).

PD OPD continues to share traffic enforcement/
VSET/SWAT resources with/from other agencies.

B21 Community Health
and Safety
Safe Streets Align police resources with City’s growth. Expand the Citizen Emergency Response Training (CERT) program.

PD Timing on starting up the CERT Program is still
not known.
10 204
Strategic Plan 2022-2027+ Objectives Dashboard
2024 Update
Department Key:

ALL - All Departments
CDD - Community Development
CMO - City Manager's Office
ED - Economic Development
FIN - Finance
HR - Human Resources
PD - Police Department
PW - Public Works
REC - Recreation
Complete
Goal Subgoal Objective Sub Objective Sub Sub Objectives Assigned Dept(s)
FY 23-24
Objectives Status Color Key:

Complete
In Progress/In Process/Ongoing
Future/Not Yet Begun
B22 Community Health
and Safety
Safe Streets Align police resources with City’s growth. Dedicate traffic enforcement team to improve traffic safety
PD The Traffic Unit now has three officers and a
dedicated sergeant.

B23 Community Health
and Safety
Safe Streets Prioritize road improvements and provide
robust enforcement to manage traffic, given
accidents are the #1 safety challenge.

PD The Traffic Unit now has three officers and a
dedicated sergeant. The Traffic Unit participates in
a traffic enforcement task force and they develop
areas of interest for directed enforcement based
on the needs of the City.

B24 Community Health
and Safety
Safe Streets Prioritize road improvements and provide
robust enforcement to manage traffic, given
accidents are the #1 safety challenge.

Consider road improvements such as
delineators for areas where speed is an
issue.

PD
PW
This is always monitored and has already been
implemented at some intersections.

B25 Community Health
and Safety
Safe Streets Prioritize road improvements and provide
robust enforcement to manage traffic, given
accidents are the #1 safety challenge.

Implement traffic-calming policy and
update to new practices for increased
traffic as Oakley grows.

PD
PW
Ongoing
B26 Community Health
and Safety
Safe Streets Promote Safe Pedestrian and Bike Routes. PD The Traffic Sergeant has applied for an Office of Traffic Safety (OTS) grant. These grants include
programs directed at bike/pedestrian safety.

B27 Community Health
and Safety
Safe Streets Promote Safe Pedestrian and Bike Routes. Collaborate with School Districts to apply for State and Federal grants to create safer and
more accessible connectivity
PD The PD remains in constant contact with school
administrators. Transit safety is discussed.

B28 Community Health
and Safety
Safe Streets Promote Safe Pedestrian and Bike Routes. Improve trail connectivity to provide pedestrians and cyclists safe passage.

PW This is an ongoing effort as new projects get
implemented.

B29 Community Health
and Safety
Safe and
Healthy
Neighborhoods
Rejuvenate our downtown and residential
and business developments to discourage
blight through beautification and
development of standards for commercial
code enforcement
CDD
ED
The downtown public infrastructure has been
rejuvenated all downtown infrastructure will be
completed by summer 2024.

B30 Community Health
and Safety
Safe and
Healthy
Neighborhoods
Promote community service opportunities to
build the community and beautify Oakley
ALL Ongoing
11 205
Strategic Plan 2022-2027+ Objectives Dashboard
2024 Update
Department Key:

ALL - All Departments
CDD - Community Development
CMO - City Manager's Office
ED - Economic Development
FIN - Finance
HR - Human Resources
PD - Police Department
PW - Public Works
REC - Recreation
Complete
Goal Subgoal Objective Sub Objective Sub Sub Objectives Assigned Dept(s)
FY 23-24
Objectives Status Color Key:

Complete
In Progress/In Process/Ongoing
Future/Not Yet Begun
B31 Community Health
and Safety
Safe and
Healthy
Neighborhoods
Implement Phase 2 of the Recreation
Center
FIN
PW
REC
Staff will work with our grant writers to seek grant
funding opportunities for this project.

B32 Community Health
and Safety
Safe and
Healthy
Neighborhoods
Connect and promote the County and
Non-Governmental Organizations (NGOs)
resources available to assist our vulnerable
populations (e.g., unhoused persons,
people seeking mental health assistance,
Veterans services).

CDD
REC
PD
CMO
PD SST has been instrumental in getting
unhoused persons off of the streets of Oakley and
into environments more conducive to their needs.

B33 Community Health
and Safety
Safe and
Healthy
Neighborhoods
Connect and promote the County and
Non-Governmental Organizations (NGOs)
resources available to assist our vulnerable
populations (e.g., unhoused persons,
people seeking mental health assistance,
Veterans services).

Educate and promote use of 211 for
essential community services.

REC
CMO
Ongoing
B34 Community Health
and Safety
Safe and
Healthy
Neighborhoods
Connect and promote the County and
Non-Governmental Organizations (NGOs)
resources available to assist our vulnerable
populations (e.g., unhoused persons,
people seeking mental health assistance,
Veterans services).

Initiate and partner with other agencies to
create regional support to provide services
to help unhoused persons
CMO Contra Costa county rolled out A3 Crisis
Response, and initiative that provides timely and
appropriate mental and behavioral health crisis
services to anyone, anywhere, at anytime in the
county.

C1 Parks and Open
Space
Parks and
Public Areas
Upgrade and develop parks and open
space for diverse interests and expanded
underserved areas to reinvigorate “play” in
Oakley.

PW
CDD
REC
The City maintains 40 (and growing) public parks
at the highest standards.

C2 Parks and Open
Space
Parks and
Public Areas
Upgrade and develop parks and open
space for diverse interests and expanded
underserved areas to reinvigorate “play” in
Oakley.

Envision a Downtown Park to attract
people downtown (e.g., new park parallel
to the railroad tracks with a museum and
bocce ball courts).

PW
CDD
REC
The site of the prospective park is owned by
private owners and any changes will be contingent
upon their development plans.
12 206
Strategic Plan 2022-2027+ Objectives Dashboard
2024 Update
Department Key:

ALL - All Departments
CDD - Community Development
CMO - City Manager's Office
ED - Economic Development
FIN - Finance
HR - Human Resources
PD - Police Department
PW - Public Works
REC - Recreation
Complete
Goal Subgoal Objective Sub Objective Sub Sub Objectives Assigned Dept(s)
FY 23-24
Objectives Status Color Key:

Complete
In Progress/In Process/Ongoing
Future/Not Yet Begun
C3 Parks and Open
Space
Parks and
Public Areas
Upgrade and develop parks and open
space for diverse interests and expanded
underserved areas to reinvigorate “play” in
Oakley.

Envision, develop, and fund Oakley’s 55-
Acre Regional Park and seek grant funding
that will compete at the State level.

PW
CMO
FIN
The Master Planning process is underway and will
be completed by summer 2024
C4 Parks and Open
Space
Parks and
Public Areas
Upgrade and develop parks and open
space for diverse interests and expanded
underserved areas to reinvigorate “play” in
Oakley.

Envision, develop, and fund Oakley’s 55-
Acre Regional Park and seek grant funding
that will compete at the State level.

Envision Oakley as the front
door of the Delta and one of
California's natural wonders.

ALL Marketing efforts are ongoing
C5 Parks and Open
Space
Parks and
Public Areas
Upgrade and develop parks and open
space for diverse interests and expanded
underserved areas to reinvigorate “play” in
Oakley.

Envision, develop, and fund Oakley’s 55-
Acre Regional Park and seek grant funding
that will compete at the State level.

Include trail and waterway
access to attract outdoor
sporting such as hiking,
kayaking, boating, and
recreational and sports fishing
that would serve as an amenity
to draw homeowners and
sporting events alike.

PW The Master Planning of the Oakley Regional Park
is complete and staff is pursuing grant
opportunities to implement the Master Plan.

C6 Parks and Open
Space
Parks and
Public Areas
Upgrade and develop parks and open
space for diverse interests and expanded
underserved areas to reinvigorate “play” in
Oakley.

Create and maintain sporting fields (bocce,
baseball/softball, soccer, equestrian arena)
and provide shade, bathrooms, and lighting
services.

PW Complete
C7 Parks and Open
Space
Programs and
Recreation
Upgrade parks and open space to be
accessible and attract the many interests of
our diverse residents and visitors and
provide access for all.

PW Ongoing
C8 Parks and Open
Space
Programs and
Recreation
Upgrade parks and open space to be
accessible and attract the many interests of
our diverse residents and visitors and
provide access for all.

Celebrate and promote our local history
through educational and enrichment
opportunities and consider work with
historical society
REC
ED
Ongoing
C9 Parks and Open
Space
Programs and
Recreation
Upgrade parks and open space to be
accessible and attract the many interests of
our diverse residents and visitors and
provide access for all.

Complete Phase 2 of Oakley’s Recreation
Center to encourage indoor sports, Camp
Room, and Teen Room for classes
FIN
PW
REC
Dependent on funding being secured
13 207
Strategic Plan 2022-2027+ Objectives Dashboard
2024 Update
Department Key:

ALL - All Departments
CDD - Community Development
CMO - City Manager's Office
ED - Economic Development
FIN - Finance
HR - Human Resources
PD - Police Department
PW - Public Works
REC - Recreation
Complete
Goal Subgoal Objective Sub Objective Sub Sub Objectives Assigned Dept(s)
FY 23-24
Objectives Status Color Key:

Complete
In Progress/In Process/Ongoing
Future/Not Yet Begun
C10 Parks and Open
Space
Programs and
Recreation
Upgrade parks and open space to be
accessible and attract the many interests of
our diverse residents and visitors and
provide access for all.

Continue to offer special events and
streamline the process for community
groups to host events that create a sense of
Oakley community and showcase the
importance of families, youth, seniors, and
Veterans
REC
PW
CDD
Ongoing
C11 Parks and Open
Space
Programs and
Recreation
Upgrade parks and open space to be
accessible and attract the many interests of
our diverse residents and visitors and
provide access for all.

Promote Oakley’s events and recreation
and differentiate our offerings from adjacent
cities
REC Ongoing
D1 Community and
Collaborative
Partnerships
Community
Outreach and
Engagement
Focus on establishing community trust and
public-private partnerships through positive
dialog and tangible outcomes.

ALL Ongoing
D2 Community and
Collaborative
Partnerships
Community
Outreach and
Engagement
Focus on establishing community trust and
public-private partnerships through positive
dialog and tangible outcomes.

Encourage community neighborhood
involvement, such as cleanup walks, that
reinforce healthy lifestyles and shared goals
with Oakley Police, Council, and City Hall.

PD + Others The City recently partnered with the Rotary Club of Oakley, the Oakley Union Elementary School
District and the County Office of Education to
install several Free Little Libraries around the City.

We also partnered with the Rotary Club of Oakley
and the Oakley Union Elementary School to host a
Girls Empowerment Day for Delta Vista and
O"Hara park students.

D3 Community and
Collaborative
Partnerships
Community
Outreach and
Engagement
Focus on establishing community trust and
public-private partnerships through positive
dialog and tangible outcomes.

Create interactive face-to-face dialog as a
supplement to one-sided social media
communication where full participation
cannot be facilitated due to Brown Act
limitations.

CMO CM's Office to institute a Neighborhood
Committee in 2024 to help with various issues in
the City.

D4 Community and
Collaborative
Partnerships
Community
Outreach and
Engagement
Focus on establishing community trust and
public-private partnerships through positive
dialog and tangible outcomes.

Create interactive face-to-face dialog as a
supplement to one-sided social media
communication where full participation
cannot be facilitated due to Brown Act
limitations.

Promote City
Council/Community meetings
through social media to inform
about agendas where public
can participate in person.

CMO The PIO posts all City Council & Planning
Commission agendas on the City's social media
and includes notices in the Oakley Outreach
newsletter.
14 208
Strategic Plan 2022-2027+ Objectives Dashboard
2024 Update
Department Key:

ALL - All Departments
CDD - Community Development
CMO - City Manager's Office
ED - Economic Development
FIN - Finance
HR - Human Resources
PD - Police Department
PW - Public Works
REC - Recreation
Complete
Goal Subgoal Objective Sub Objective Sub Sub Objectives Assigned Dept(s)
FY 23-24
Objectives Status Color Key:

Complete
In Progress/In Process/Ongoing
Future/Not Yet Begun
D5 Community and
Collaborative
Partnerships
Community
Outreach and
Engagement
Focus on establishing community trust and
public-private partnerships through positive
dialog and tangible outcomes.

Celebrate Oakley in demonstrating and
communicating our achievements in
accomplishing SP27+, community events,
and activities that unite us (e.g., Heart of
Oakley, Harvest Festival, Christmas Tree
Lighting, Summerfest Celebration, etc.).

ALL Ongoing
D6 Community and
Collaborative
Partnerships
Community
Outreach and
Engagement
Focus on establishing community trust and
public-private partnerships through positive
dialog and tangible outcomes.

Actively uphold Oakley’s Governance
Guidelines & Protocols Policy to encourage
productive partnerships, positive
communication, and achievement of shortand long-term goals.

ALL Ongoing; the City Council held a governance
workshop in February 2024
D7 Community and
Collaborative
Partnerships
Community
Outreach and
Engagement
Increase Oakley’s communication through
outward-facing media, social media
platforms, and website.

REC
CMO
Recreation staff and the PIO regularly post on the
Recreation and City's social media, update the
City's website, and utilize Constant Contact
campaigns and the Oakley Outreach e-news to
provide information to the community.

D8 Community and
Collaborative
Partnerships
Community
Outreach and
Engagement
Increase Oakley’s communication through
outward-facing media, social media
platforms, and website.

Promote City Council agendas and
decisions via social media with updates on
economic activity, business growth, and
community events
CMO Ongoing; the PIO includes a City Council debrief
in each Oakley Outreach e-newsletter, and
promotes business workshops and community
events on the City's website and social media.

D9 Community and
Collaborative
Partnerships
Community
Outreach and
Engagement
Increase Oakley’s communication through
outward-facing media, social media
platforms, and website.

Communicate how Oakley is living its core
values and meeting its stated mission and
vision (e.g., newspapers, electronic boards,
website, newsletter, social media).

CMO
ALL
Ongoing; the City published a 2023 annual report
in January 2024
15 209
Strategic Plan 2022-2027+ Objectives Dashboard
2024 Update
Department Key:

ALL - All Departments
CDD - Community Development
CMO - City Manager's Office
ED - Economic Development
FIN - Finance
HR - Human Resources
PD - Police Department
PW - Public Works
REC - Recreation
Complete
Goal Subgoal Objective Sub Objective Sub Sub Objectives Assigned Dept(s)
FY 23-24
Objectives Status Color Key:

Complete
In Progress/In Process/Ongoing
Future/Not Yet Begun
D10 Community and
Collaborative
Partnerships
Community
Outreach and
Engagement
Increase Oakley’s communication through
outward-facing media, social media
platforms, and website.

Modernize website to be user friendly,
transparent, functional, and reflective of the
City’s vision.

REC
CMO
The release of the website RFP was postponed
with the August 2023 reorganization of the City's
departments and subsequent hiring of a new IT
Manager in the first quarter of calendar year 2024;
the website RFP will be released by Summer 2024
D11 Community and
Collaborative
Partnerships
Community
Outreach and
Engagement
Communicate and uphold the City’s
information systems to reinforce
transparency and access to build trust.

CC
FIN
CMO
ALL
Ongoing
D12 Community and
Collaborative
Partnerships
Collaborative
Partnerships
Consider creating new partnerships that will
involve community participation (e.g., Park
and Arts Commission).

CMO CM's Office to institute a Neighborhood
Committee in 2024 to help with various issues in
the City.

D13 Community and
Collaborative
Partnerships
Collaborative
Partnerships
Establish, align, and maintain partnerships
with local Special Districts, Agencies,
NGOs, and Commerce to realize our
responsibilities to deliver on the General
Plan and Specific Plan and where goals
mutually align and meet quarterly
CMO Efforts to stay in touch and communicate with the
Agencies and Districts we do business with are
ongoing. The PIO established a weekly email
request that includes the school, water, and
sanitary districts for community information to
include in the Oakley Outreach e-newsletters.

D14 Community and
Collaborative
Partnerships
Collaborative
Partnerships
Establish, align, and maintain partnerships
with local Special Districts, Agencies,
NGOs, and Commerce to realize our
responsibilities to deliver on the General
Plan and Specific Plan and where goals
mutually align and meet quarterly
Diablo Water District CMO Efforts to stay in touch and communicate with the Agencies and Districts we do business with are
ongoing. The PIO established a weekly email
request that includes the school, water, and
sanitary districts for community information to
include in the Oakley Outreach e-newsletters.

D15 Community and
Collaborative
Partnerships
Collaborative
Partnerships
Establish, align, and maintain partnerships
with local Special Districts, Agencies,
NGOs, and Commerce to realize our
responsibilities to deliver on the General
Plan and Specific Plan and where goals
mutually align and meet quarterly
Diablo Water District Develop collaborative
efficiencies to serve our shared
constituents
CMO Efforts to stay in touch and communicate with the
Agencies and Districts we do business with are
ongoing. The PIO established a weekly email
request that includes the school, water, and
sanitary districts for community information to
include in the Oakley Outreach e-newsletters.
16 210
Strategic Plan 2022-2027+ Objectives Dashboard
2024 Update
Department Key:

ALL - All Departments
CDD - Community Development
CMO - City Manager's Office
ED - Economic Development
FIN - Finance
HR - Human Resources
PD - Police Department
PW - Public Works
REC - Recreation
Complete
Goal Subgoal Objective Sub Objective Sub Sub Objectives Assigned Dept(s)
FY 23-24
Objectives Status Color Key:

Complete
In Progress/In Process/Ongoing
Future/Not Yet Begun
D16 Community and
Collaborative
Partnerships
Collaborative
Partnerships
Establish, align, and maintain partnerships
with local Special Districts, Agencies,
NGOs, and Commerce to realize our
responsibilities to deliver on the General
Plan and Specific Plan and where goals
mutually align and meet quarterly
Ironhouse Sanitary District CMO Efforts to stay in touch and communicate with the Agencies and Districts we do business with are
ongoing. The PIO established a weekly email
request that includes the school, water, and
sanitary districts for community information to
include in the Oakley Outreach e-newsletters.

D17 Community and
Collaborative
Partnerships
Collaborative
Partnerships
Establish, align, and maintain partnerships
with local Special Districts, Agencies,
NGOs, and Commerce to realize our
responsibilities to deliver on the General
Plan and Specific Plan and where goals
mutually align and meet quarterly
Ironhouse Sanitary District Consider opportunities for water reuse (e.g., recycled and
industrial water).

CMO Staff continues to stay engaged with ISD to review
projects and to encourage the district to install
recycled water infrastructure.

D18 Community and
Collaborative
Partnerships
Collaborative
Partnerships
Establish, align, and maintain partnerships
with local Special Districts, Agencies,
NGOs, and Commerce to realize our
responsibilities to deliver on the General
Plan and Specific Plan and where goals
mutually align and meet quarterly
Mt. Diablo Resource and Recovery (MDRR) CMO Efforts to stay in touch and communicate with the Agencies and Districts we do business with are
ongoing.

D19 Community and
Collaborative
Partnerships
Collaborative
Partnerships
Establish, align, and maintain partnerships
with local Special Districts, Agencies,
NGOs, and Commerce to realize our
responsibilities to deliver on the General
Plan and Specific Plan and where goals
mutually align and meet quarterly
CONFIRE CMO Efforts to stay in touch and communicate with the Agencies and Districts we do business with are
ongoing.

D20 Community and
Collaborative
Partnerships
Collaborative
Partnerships
Establish, align, and maintain partnerships
with local Special Districts, Agencies,
NGOs, and Commerce to realize our
responsibilities to deliver on the General
Plan and Specific Plan and where goals
mutually align and meet quarterly
School District CMO Efforts to stay in touch and communicate with the Agencies and Districts we do business with are
ongoing. The PIO established a weekly email
request that includes the school, water, and
sanitary districts for community information to
include in the Oakley Outreach e-newsletters.
17 211
Strategic Plan 2022-2027+ Objectives Dashboard
2024 Update
Department Key:

ALL - All Departments
CDD - Community Development
CMO - City Manager's Office
ED - Economic Development
FIN - Finance
HR - Human Resources
PD - Police Department
PW - Public Works
REC - Recreation
Complete
Goal Subgoal Objective Sub Objective Sub Sub Objectives Assigned Dept(s)
FY 23-24
Objectives Status Color Key:

Complete
In Progress/In Process/Ongoing
Future/Not Yet Begun
D21 Community and
Collaborative
Partnerships
Collaborative
Partnerships
Establish, align, and maintain partnerships
with local Special Districts, Agencies,
NGOs, and Commerce to realize our
responsibilities to deliver on the General
Plan and Specific Plan and where goals
mutually align and meet quarterly
School District Explore joint-use opportunities
to optimally partner with
elementary and high school
(e.g., satellite classrooms and
recreation, library).

CMO Staff is currently working with the OUESD to
develop a new joint use facility agreement.

D22 Community and
Collaborative
Partnerships
Collaborative
Partnerships
Establish, align, and maintain partnerships
with local Special Districts, Agencies,
NGOs, and Commerce to realize our
responsibilities to deliver on the General
Plan and Specific Plan and where goals
mutually align and meet quarterly
School District Re-visit agreements with
shared facilities and public
access
CMO Staff is currently working with the OUESD to
develop a new joint use facility agreement.

D23 Community and
Collaborative
Partnerships
Collaborative
Partnerships
Establish, align, and maintain partnerships
with local Special Districts, Agencies,
NGOs, and Commerce to realize our
responsibilities to deliver on the General
Plan and Specific Plan and where goals
mutually align and meet quarterly
County/Region/State CMO The CM meets monthly with the General Manager's of the water and sewer districts as well
as quarterly with the other 3 Delta-centered cities
and the County. The City has maintained
communication with the CCCFPD.

D24 Community and
Collaborative
Partnerships
Collaborative
Partnerships
Establish, align, and maintain partnerships
with local Special Districts, Agencies,
NGOs, and Commerce to realize our
responsibilities to deliver on the General
Plan and Specific Plan and where goals
mutually align and meet quarterly
County/Region/State Encourage collaboration for
public safety and enforcement
particularly where there is multijurisdictional responsibility (e.g., fire, road access, school sites).

CMO
PD
The Police Chief and Assistant City Manager
attend monthly Multi-Agency Coordination
Meetings facilitated by the County Office of
Emergency Services for all cities, special districts,
and other agencies within the County as well as
the quarterly City Emergency Management
meetings.
18 212
Strategic Plan 2022-2027+ Objectives Dashboard
2024 Update
Department Key:

ALL - All Departments
CDD - Community Development
CMO - City Manager's Office
ED - Economic Development
FIN - Finance
HR - Human Resources
PD - Police Department
PW - Public Works
REC - Recreation
Complete
Goal Subgoal Objective Sub Objective Sub Sub Objectives Assigned Dept(s)
FY 23-24
Objectives Status Color Key:

Complete
In Progress/In Process/Ongoing
Future/Not Yet Begun
D25 Community and
Collaborative
Partnerships
Collaborative
Partnerships
Establish, align, and maintain partnerships
with local Special Districts, Agencies,
NGOs, and Commerce to realize our
responsibilities to deliver on the General
Plan and Specific Plan and where goals
mutually align and meet quarterly
County/Region/State Discuss Regional Park
interests.

CMO The PIO includes periodic updates from the
EBRPD and activities at Big Break Reegional
Shoreline on social media and in the Oakley
Outreach e-news.

D26 Community and
Collaborative
Partnerships
Collaborative
Partnerships
Establish, align, and maintain partnerships
with local Special Districts, Agencies,
NGOs, and Commerce to realize our
responsibilities to deliver on the General
Plan and Specific Plan and where goals
mutually align and meet quarterly
County/Region/State Invite key electeds, Board
representatives, and others to
speak at Council meetings for
outside updates and
perspective.

CC The City Council gets regular updates from
executives who represent the various special
districts and agencies in which we work and
partner with.

D27 Community and
Collaborative
Partnerships
Collaborative
Partnerships
Establish, align, and maintain partnerships
with local Special Districts, Agencies,
NGOs, and Commerce to realize our
responsibilities to deliver on the General
Plan and Specific Plan and where goals
mutually align and meet quarterly
NGOs CMO The City awarded ARPA grants to local non-profits benefitting the Oakley community in 2022 and
received written and oral reports from those nonprofits throughout the fiscal year.

D28 Community and
Collaborative
Partnerships
Collaborative
Partnerships
Establish, align, and maintain partnerships
with local Special Districts, Agencies,
NGOs, and Commerce to realize our
responsibilities to deliver on the General
Plan and Specific Plan and where goals
mutually align and meet quarterly
NGOs Partner with Rotary, Friends of
Oakley, Kiwanis, Oakley Delta
Lions Club, Oakley Seniors
Club, Veterans of Oakley,
Masonic Lodge and Concordant
Bodies, Friends of the Oakley
Library
CMO Staff released a request for proposals earlier this year for the alcohol services at specific City
events as a fundraising opportunity for local
nonprofits.

D29 Community and
Collaborative
Partnerships
Collaborative
Partnerships
Establish, align, and maintain partnerships
with local Special Districts, Agencies,
NGOs, and Commerce to realize our
responsibilities to deliver on the General
Plan and Specific Plan and where goals
mutually align and meet quarterly
NGOs Consider creating a Sister City ED This is an ongoing effort 19 213
Strategic Plan 2022-2027+ Objectives Dashboard
2024 Update
Department Key:

ALL - All Departments
CDD - Community Development
CMO - City Manager's Office
ED - Economic Development
FIN - Finance
HR - Human Resources
PD - Police Department
PW - Public Works
REC - Recreation
Complete
Goal Subgoal Objective Sub Objective Sub Sub Objectives Assigned Dept(s)
FY 23-24
Objectives Status Color Key:

Complete
In Progress/In Process/Ongoing
Future/Not Yet Begun
D30 Community and
Collaborative
Partnerships
Collaborative
Partnerships
Establish, align, and maintain partnerships
with local Special Districts, Agencies,
NGOs, and Commerce to realize our
responsibilities to deliver on the General
Plan and Specific Plan and where goals
mutually align and meet quarterly
NGOs Consider expanding outreach to
NGOs beyond our region
CMO Task not started yet
E1 Finance and Fiscal
Responsibility
N/A Communicate on financial updates
including financial health, priorities, and
unexpected expenditures.

FIN This is an ongoing effort. Staff presented the Midyear budget at the first meeting in Feburary and will continue to provide updates as needed.

E2 Finance and Fiscal
Responsibility
N/A Communicate on financial updates
including financial health, priorities, and
unexpected expenditures.

Provide training related to community
facility districts to educate the public
regarding the various types of
assessments, which are not all taxes
FIN
PW
Annual formal reports regarding the Community
Facilities Districts are prepared and provided to
the Council and public.

E3 Finance and Fiscal
Responsibility
N/A Communicate on financial updates
including financial health, priorities, and
unexpected expenditures.

Educate Executive Leadership and Council
on annual budget through communication,
reporting, and training to create better
partnership on fiscal strategies.

FIN Budget has been at the forefront for staff this year.

We started in early December reviewing mid-year
and we have held a Budget Kickoff Training with
the leadership team as well as other staff who are
key in the budget process. Forms have been
created to better track the needs of each
department and guidelines and budget templates
will be used to help each department through the
process.

E4 Finance and Fiscal
Responsibility
N/A Communicate on financial updates
including financial health, priorities, and
unexpected expenditures.

Educate the community on large, planned
revenue expenditures and how surplus
monies will be invested or retained for longterm “rainy day” funds (budget process).

FIN The Leadership team is currently going through an
exercise to help determine the risks and needs of
the City when it comes to reserves. This exercise
will help us to explain why our rainy day funds are
necessary.

E5 Finance and Fiscal
Responsibility
N/A Communicate on financial updates
including financial health, priorities, and
unexpected expenditures.

Partner with Special Districts and
agencies to realize economies of scale
and efficiencies.

PW Engineering Team works with neighboring
agencies to take advantage of bidding
opportunities on similar public projects.
20 214
Strategic Plan 2022-2027+ Objectives Dashboard
2024 Update
Department Key:

ALL - All Departments
CDD - Community Development
CMO - City Manager's Office
ED - Economic Development
FIN - Finance
HR - Human Resources
PD - Police Department
PW - Public Works
REC - Recreation
Complete
Goal Subgoal Objective Sub Objective Sub Sub Objectives Assigned Dept(s)
FY 23-24
Objectives Status Color Key:

Complete
In Progress/In Process/Ongoing
Future/Not Yet Begun
E6 Finance and Fiscal
Responsibility
N/A Determine how the City will leverage its
strong financial position with development
revenues and ARPA Covid Relief money
($10M).

FIN ARPA has been 100% allocated. A large amount
of the funding will fund technology upgrades,
small business grants and facade improvements
as well as funds allocated to the library project.

E7 Finance and Fiscal
Responsibility
N/A Determine how the City will leverage its
strong financial position with development
revenues and ARPA Covid Relief money
($10M).

Consider input by the community on how
funds should be prioritized.

FIN
CMO
This was completed last fiscal year
E8 Finance and Fiscal
Responsibility
N/A Determine how the City will leverage its
strong financial position with development
revenues and ARPA Covid Relief money
($10M).

Implement technology upgrades to
improve transparency and public access to
City documents and remote transactions.

FIN We are on track to go live on our new EERP
software in July of 2024 for Financials and
January of 2025 for HR/Payroll. The new
functionality of the software will help us to improve
transparency and public access.

E9 Finance and Fiscal
Responsibility
N/A Determine how the City will leverage its
strong financial position with development
revenues and ARPA Covid Relief money
($10M).

Make the most needed improvements
to streets, utilizing development’s
improvements, funds from the sale of
property, and other financing sources to
make improvements to the East Cypress
traffic flow situation, etc.

CMO East Cypress Road corridor infrastructure
improvement projects are currently underway and
anticipated to be completed by 2027 in response
to the emergency access and health and safety of
the public in far East Oakley.

E10 Finance and Fiscal
Responsibility
N/A Determine how the City will leverage its
strong financial position with development
revenues and ARPA Covid Relief money
($10M).

Complete a feasibility study pertaining
to broadband services and free Wi-Fi
throughout the City
ED Ongoing
E11 Finance and Fiscal
Responsibility
N/A Determine how the City will leverage its
strong financial position with development
revenues and ARPA Covid Relief money
($10M).

Provide one free session of City-run
summer camp to Oakley residents.

REC We will be able to offer a week of free camp in this summer to several residents and it will complete
the amount allocated from ARPA to the
Recreation Division.
21 215
Strategic Plan 2022-2027+ Objectives Dashboard
2024 Update
Department Key:

ALL - All Departments
CDD - Community Development
CMO - City Manager's Office
ED - Economic Development
FIN - Finance
HR - Human Resources
PD - Police Department
PW - Public Works
REC - Recreation
Complete
Goal Subgoal Objective Sub Objective Sub Sub Objectives Assigned Dept(s)
FY 23-24
Objectives Status Color Key:

Complete
In Progress/In Process/Ongoing
Future/Not Yet Begun
E12 Finance and Fiscal
Responsibility
N/A Develop a sustainable financial plan that will
identify opportunities for less dependency
on property taxes while maintaining the
quality of life that residents and businesses
expect.

CDD
ED
The City recently adopted a new Economic
Development Workplan, and Staff is in the
process of implementing it. In addition to that, the
City's ongoing attraction efforts continue to pay off
as we have several exciting commercial and
industrial projects (Safeway and Bridgehead
Industrial) that have positive potential sales tax
implications.

E13 Finance and Fiscal
Responsibility
N/A Develop a sustainable financial plan that will
identify opportunities for less dependency
on property taxes while maintaining the
quality of life that residents and businesses
expect.

Attract more businesses (commercial and
industrial) to increase Oakley’s per-capita
Sales and Use Tax revenues.

ED This is a continuous endeavor - with our 2023
Economic Development Work Plan, refined our
strategy to draw businesses that expand our
revenue sources beyond property tax,
incorporating sales and business taxes, while also
generating job opportunities for our community
through collaborations with local agencies and
partnerships.

E14 Finance and Fiscal
Responsibility
N/A Develop a sustainable financial plan that will
identify opportunities for less dependency
on property taxes while maintaining the
quality of life that residents and businesses
expect.

Seek to supplement existing funding
sources with State and Federal grants for
special projects
CMO
ALL
The City utilizes a contract grant writer and
lobbyist.

E15 Finance and Fiscal
Responsibility
N/A Develop a sustainable financial plan that will
identify opportunities for less dependency
on property taxes while maintaining the
quality of life that residents and businesses
expect.

Consider the implementation of
an EIFD (enhanced infrastructure
financing district) to make infrastructure
improvements that will attract businesses
and generate revenue
FIN
CMO
The City is still exploring options.

E16 Finance and Fiscal
Responsibility
N/A Align infrastructure spending and long-term
growth so we can plan beyond two years to
improve streets and parks and provide for
long-term maintenance
PW Ongoing
E17 Finance and Fiscal
Responsibility
N/A Align infrastructure spending and long-term
growth so we can plan beyond two years to
improve streets and parks and provide for
long-term maintenance
Create an internal services fund for
facilities maintenance and improvements.

FIN This is still in process and will likely not happen until July of 2025.
22 216
Strategic Plan 2022-2027+ Objectives Dashboard
2024 Update
Department Key:

ALL - All Departments
CDD - Community Development
CMO - City Manager's Office
ED - Economic Development
FIN - Finance
HR - Human Resources
PD - Police Department
PW - Public Works
REC - Recreation
Complete
Goal Subgoal Objective Sub Objective Sub Sub Objectives Assigned Dept(s)
FY 23-24
Objectives Status Color Key:

Complete
In Progress/In Process/Ongoing
Future/Not Yet Begun
E18 Finance and Fiscal
Responsibility
N/A Align infrastructure spending and long-term
growth so we can plan beyond two years to
improve streets and parks and provide for
long-term maintenance
Establish a minimum baseline for General
Fund contributions for street maintenance
and improvements and include a growth
factor in the recurring operating transfers
budget each year.

FIN This baseline was assigned in Fiscal year 2023
and we will continue to utilize this in future years.

E19 Finance and Fiscal
Responsibility
N/A Modernize Oakley to accommodate
growth and improve efficiency by funding
technology to improve:

FIN
ALL
See responses to subobjectives below.

E20 Finance and Fiscal
Responsibility
N/A Modernize Oakley to accommodate
growth and improve efficiency by funding
technology to improve:

Service for public-business license
applications/other applications
FIN This will be part of our new software and is
anticipated to be available by the end of fiscal
year 2025.

E21 Finance and Fiscal
Responsibility
N/A Modernize Oakley to accommodate
growth and improve efficiency by funding
technology to improve:

Financial modeling and finance/budget
balancing
FIN This will be made possible when we go live on our
new financial software this coming year.

E22 Finance and Fiscal
Responsibility
N/A Modernize Oakley to accommodate
growth and improve efficiency by funding
technology to improve:

Public safety and roads PD
PW
PD is using cameras to monitor high risk
intersections more than before.

E23 Finance and Fiscal
Responsibility
N/A Modernize Oakley to accommodate
growth and improve efficiency by funding
technology to improve:

Customer-Friendly access to the City’s
financial reporting information and to
allow easier transactions without the need
for customers to come to City Hall
FIN
ALL
This will be made possible when we go live on our
new financial software this coming year.

E24 Finance and Fiscal
Responsibility
N/A Modernize Oakley to accommodate
growth and improve efficiency by funding
technology to improve:

Infrastructure and asset management PW
FIN
This will be made possible when we go live on our
new financial software this coming year.

E25 Finance and Fiscal
Responsibility
N/A Develop a Financial Strategy and
Reporting Policy
FIN Complete
E26 Finance and Fiscal
Responsibility
N/A Develop a Financial Strategy and
Reporting Policy
Continue to receive third party
professional acknowledgment of our City’s
financial practices:

FIN Ongoing
23 217
Strategic Plan 2022-2027+ Objectives Dashboard
2024 Update
Department Key:

ALL - All Departments
CDD - Community Development
CMO - City Manager's Office
ED - Economic Development
FIN - Finance
HR - Human Resources
PD - Police Department
PW - Public Works
REC - Recreation
Complete
Goal Subgoal Objective Sub Objective Sub Sub Objectives Assigned Dept(s)
FY 23-24
Objectives Status Color Key:

Complete
In Progress/In Process/Ongoing
Future/Not Yet Begun
E27 Finance and Fiscal
Responsibility
N/A Develop a Financial Strategy and
Reporting Policy
Continue to receive third party
professional acknowledgment of our City’s
financial practices:

Continue to present, apply for,
and receive the Government
Finance Officers’ Association
Award on the City’s Annual
Comprehensive Financial
Report
FIN The City recieved the GFOA ACFR Award in FY
2021/2022 and has submitted the application for
FY 2022/2023 and are awaiting the results.

E28 Finance and Fiscal
Responsibility
N/A Develop a Financial Strategy and
Reporting Policy
Continue to receive third party
professional acknowledgment of our City’s
financial practices:

Continue to apply for and
receive the California Society of
Municipal Financial Officers’
Operating Budget Excellence
Award.

FIN The City of Oakely recevied the CSMFO Budget
Award for FY 2023/2024 Budget and staff will
submit an application for the 2024/2025 Budget
when it is completed.

E29 Finance and Fiscal
Responsibility
N/A Develop a Financial Strategy and
Reporting Policy
Continue to update the Budget
Strategies and Financial Policies in the
City’s annual budgets.

FIN Staff will continue to review these annually and
suggest changes when they are needed.

E30 Finance and Fiscal
Responsibility
N/A Develop a Financial Strategy and
Reporting Policy
Consider how to include performance audits
in the City’s budget to provide accountability
for performance and compliance
FIN Staff continues to refine the performance
mearsures in the annual budget.

E31 Finance and Fiscal
Responsibility
N/A Develop a Financial Strategy and
Reporting Policy
Maintain 10-year budget forecast to be
updated with each annual budget
FIN Staff continues to look to the future with every
financial obligation that is considered. The 10
year plan is reviewed anytime an ongoing cost is
recommended to ensure our future remains
fiscally sound. The 10 year plan is presented each
year to the City Council with the annual budget.

E32 Finance and Fiscal
Responsibility
N/A Develop a Financial Strategy and
Reporting Policy
Establish a 30% General Fund Reserve
Policy to protect the City’s operations
from a sudden drop in property tax and
development-related revenues
FIN Complete
E33 Finance and Fiscal
Responsibility
N/A Develop a Financial Strategy and
Reporting Policy
Establish a formal policy for the restrictions
on and allowed uses of funds in the 30%
General Fund Reserve Policy
FIN Ongoing
24 218
Strategic Plan 2022-2027+ Objectives Dashboard
2024 Update
Department Key:

ALL - All Departments
CDD - Community Development
CMO - City Manager's Office
ED - Economic Development
FIN - Finance
HR - Human Resources
PD - Police Department
PW - Public Works
REC - Recreation
Complete
Goal Subgoal Objective Sub Objective Sub Sub Objectives Assigned Dept(s)
FY 23-24
Objectives Status Color Key:

Complete
In Progress/In Process/Ongoing
Future/Not Yet Begun
E34 Finance and Fiscal
Responsibility
N/A Develop a Financial Strategy and
Reporting Policy
Consider separating out the Capital
Improvement Project (CIP) budget from
the general operational budget.

FIN Complete
E35 Finance and Fiscal
Responsibility
N/A Develop a Financial Strategy and
Reporting Policy
Consider separating out the Capital
Improvement Project (CIP) budget from
the general operational budget.

Itemize individual project line
items for Council consideration
in addition to aggregated
projects.

FIN Complete
E36 Finance and Fiscal
Responsibility
N/A Develop a Financial Strategy and
Reporting Policy
Align Strategic Plan Goals and Objectives
into the annual budget document, including
performance measures
FIN Complete
F1 Sustainable
Organization
N/A Create a Recruitment and Retention Plan
that will hire and retain staff to serve
Oakley’s growing demands and sustain the
level of service our residents and
businesses expect.

HR We are constantly looking to improve on our
process.

F2 Sustainable
Organization
N/A Create a Recruitment and Retention Plan
that will hire and retain staff to serve
Oakley’s growing demands and sustain the
level of service our residents and
businesses expect.

Create a competitive compensation
package that is sustainable to attract and
retain our greatest assets – our people.

HR Complete
F3 Sustainable
Organization
N/A Create a Recruitment and Retention Plan
that will hire and retain staff to serve
Oakley’s growing demands and sustain the
level of service our residents and
businesses expect.

Provide appropriate training and
professional development to keep up with
regulatory requirements and skill sets to
maintain the City
ALL PD has increased its frequency of training (84
sessions in 2023). Other staff continues to attend
and host appropriate training.

F4 Sustainable
Organization
N/A Create a Recruitment and Retention Plan
that will hire and retain staff to serve
Oakley’s growing demands and sustain the
level of service our residents and
businesses expect.

Properly staff our Police Department to
best protect and serve Oakley.

HR
PD
Considerations are being made to create a police
recruit position.
25 219
Strategic Plan 2022-2027+ Objectives Dashboard
2024 Update
Department Key:

ALL - All Departments
CDD - Community Development
CMO - City Manager's Office
ED - Economic Development
FIN - Finance
HR - Human Resources
PD - Police Department
PW - Public Works
REC - Recreation
Complete
Goal Subgoal Objective Sub Objective Sub Sub Objectives Assigned Dept(s)
FY 23-24
Objectives Status Color Key:

Complete
In Progress/In Process/Ongoing
Future/Not Yet Begun
F5 Sustainable
Organization
N/A Create a Recruitment and Retention Plan
that will hire and retain staff to serve
Oakley’s growing demands and sustain the
level of service our residents and
businesses expect.

Address staffing limitations by hiring,
contracting, or prioritizing programs,
projects, and initiatives to scale
appropriately.

ALL We continue to look at the needs of the
community and the services we need to deliver
on. Staffing and scaling appropriately is all tied to
our budget and available resources.

F6 Sustainable
Organization
N/A Create a Recruitment and Retention Plan
that will hire and retain staff to serve
Oakley’s growing demands and sustain the
level of service our residents and
businesses expect.

Base the City’s performance on execution of
SP27+ and other major initiatives.

ALL Ongoing
F7 Sustainable
Organization
N/A Create a Recruitment and Retention Plan
that will hire and retain staff to serve
Oakley’s growing demands and sustain the
level of service our residents and
businesses expect.

Encourage employee wellness by creating a
safe and healthy work environment, an
Employee Assistance Program (EAP),
regular employee appreciation events and
team building, and the employee wellness
program.

HR Staff continues to seek out wellness events for the
team and encourages participation. The HR team
along with our Events Committee continues to
look for ways to team build and provide
appreciation events to show staff they are valued
and important to the success of the City.

F8 Sustainable
Organization
N/A Create a Recruitment and Retention Plan
that will hire and retain staff to serve
Oakley’s growing demands and sustain the
level of service our residents and
businesses expect.

Rebuild and re-energize staff by surveying
all employees to understand what would
make Oakley a great place to work (e.g.,
work life balance, work from home
schedule).

HR This is an ongoing effort to continuely look for
ways to keep staff morale high. The Assistant City
Manager restarted the Communications
Committee, which provides feedback from all
departments on employee's interests in training,
City information, and activities.

F9 Sustainable
Organization
N/A Identify and invest in resources to execute
the City’s responsibilities.

ALL We continue to look at the needs of the
community and the services we need to deliver
on. Staffing and scaling appropriately is all tied to
our budget and available resources.
26 220
Strategic Plan 2022-2027+ Objectives Dashboard
2024 Update
Department Key:

ALL - All Departments
CDD - Community Development
CMO - City Manager's Office
ED - Economic Development
FIN - Finance
HR - Human Resources
PD - Police Department
PW - Public Works
REC - Recreation
Complete
Goal Subgoal Objective Sub Objective Sub Sub Objectives Assigned Dept(s)
FY 23-24
Objectives Status Color Key:

Complete
In Progress/In Process/Ongoing
Future/Not Yet Begun
F10 Sustainable
Organization
N/A Identify and invest in resources to execute
the City’s responsibilities.

Invest in Electric Vehicle fleet, which would
require downtown charging stations.

FIN
PW
PD
Ongoing
F11 Sustainable
Organization
N/A Identify and invest in resources to execute
the City’s responsibilities.

Upgrade IT services to include new
computer systems and more efficient
IT response to computer and technical
issues to ensure projects can be
delivered efficiently
CMO The City's IT MSP implemented a helpdesk
ticketing system in the first quarter of the fiscal
year to better manage help requests from staff.

The City hired a new in-house IT Manager in
February 2024, who, with the Assistant City
Manager, will create an Information Technology
Plan.

F12 Sustainable
Organization
N/A Identify and invest in resources to execute
the City’s responsibilities.

Consider fulfilling staffing and hiring
needs based on comprehensive Staffing
Plan as aligned with SP27+ and other
major initiatives.

HR The City completed a significant reorgainzation
this year. The reorgainzation has allowed for a
department/division type orgainzation which
provides opportunity for growth within the
department as well as succession planning for the
future.

F13 Sustainable
Organization
N/A Identify and invest in resources to execute
the City’s responsibilities.

Consider fulfilling staffing and hiring
needs based on comprehensive Staffing
Plan as aligned with SP27+ and other
major initiatives.

Grant writer to identify State
and Federal grants to support
Oakley
CMO The City utilizes a contract grant writer and
lobbyist.

F14 Sustainable
Organization
N/A Identify and invest in resources to execute
the City’s responsibilities.

Consider fulfilling staffing and hiring
needs based on comprehensive Staffing
Plan as aligned with SP27+ and other
major initiatives.

Parks & Recreation staff to
keep up with demands of new
parks and recreational
programming
PW
REC
The City hired a new Recreation Manager this
year with a goal of increasing what we can offer to
the community. The City also created a Sr.

Recreation Leader position to ensure that all City
led programs have the proper guidance and
oversight.

F15 Sustainable
Organization
N/A Identify and invest in resources to execute
the City’s responsibilities.

Consider fulfilling staffing and hiring
needs based on comprehensive Staffing
Plan as aligned with SP27+ and other
major initiatives.

Public Works staff to keep up
with demands of new housing,
parks and infrastructure
development and maintenance.

PW Ongoing
27 221
Strategic Plan 2022-2027+ Objectives Dashboard
2024 Update
Department Key:

ALL - All Departments
CDD - Community Development
CMO - City Manager's Office
ED - Economic Development
FIN - Finance
HR - Human Resources
PD - Police Department
PW - Public Works
REC - Recreation
Complete
Goal Subgoal Objective Sub Objective Sub Sub Objectives Assigned Dept(s)
FY 23-24
Objectives Status Color Key:

Complete
In Progress/In Process/Ongoing
Future/Not Yet Begun
F16 Sustainable
Organization
N/A Identify and invest in resources to execute
the City’s responsibilities.

Consider fulfilling staffing and hiring
needs based on comprehensive Staffing
Plan as aligned with SP27+ and other
major initiatives.

Police to keep up with growing
safety needs
PD Considerations are being made to create a police
recruit position to increase the candidate pool to
better match the needs of the community.

F17 Sustainable
Organization
N/A Identify and invest in resources to execute
the City’s responsibilities.

Consider fulfilling staffing and hiring
needs based on comprehensive Staffing
Plan as aligned with SP27+ and other
major initiatives.

Other needs as determined ALL The City completed a significant reorgainzation this year. The reorgainzation has allowed for a
department/division type orgainzation which
provides opportunity for growth within the
department as well as succession planning for the
future.

F18 Sustainable
Organization
N/A Create a City-wide Succession Plan that
anticipates retirement, attrition, and
promotions, and provides opportunity for
development and growth, to build a wellrounded team that is prepared to serve the City now and well into its future.

HR
ALL
Ongoing
F19 Sustainable
Organization
N/A Reinforce a safe and healthy work
environment to protect our employees and
minimize compensation claims.

HR
PD
Police policy is being drafted to govern and
encourage the use of the gym. The HR Manager
also meets with the Safety Committee.

F20 Sustainable
Organization
N/A Establish trust in City Hall. Reinforce the investment of our revitalized staff and Council and create measurable
partnerships among the trio of Council, staff,
and the community to deliver on Oakley’s cocreated SP27+.

CMO Ongoing
F21 Sustainable
Organization
N/A Establish trust in City Hall. In order to recruit and retain staff, Oakley must improve its public-private
partnership and live its established values to
attract residents, businesses, and
employees alike.

ALL Ongoing
28 222
Strategic Plan 2022-2027+ Objectives Dashboard
2024 Update
Department Key:

ALL - All Departments
CDD - Community Development
CMO - City Manager's Office
ED - Economic Development
FIN - Finance
HR - Human Resources
PD - Police Department
PW - Public Works
REC - Recreation
Complete
Goal Subgoal Objective Sub Objective Sub Sub Objectives Assigned Dept(s)
FY 23-24
Objectives Status Color Key:

Complete
In Progress/In Process/Ongoing
Future/Not Yet Begun
F22 Sustainable
Organization
N/A Establish trust in City Hall. Reinforce Team Oakley: Council, staff, and the public by celebrating successes and
communicating obstacles for full
transparency to create a learning
environment.

ALL Ongoing
F23 Sustainable
Organization
N/A Establish trust in City Hall. Inspire and encourage Oakley staff to be visible and work with the community
at large.

ALL Ongoing
F24 Sustainable
Organization
N/A Establish trust in City Hall. Acknowledge roles and responsibilities per the City’s Governance Guidelines &
Protocols Policy Framework to guide the
execution of the Strategic Plan.

ALL Ongoing
29 223

PLAY WORK LIVE
City of Oakley

STRATEGIC
PLAN
2022—2027+
Adopted April 2022
224
Contents
Oakley’s History...........................................................................2 Mission, Vision, and Values .....................................................4 Goals and Priority Objectives .................................................6 Community and Economic Development Goal...............8 Community Health & Safety Goal..................................... 12 Parks and Open Space Goal................................................. 14 Finance and Fiscal Responsibility Goal ............................ 18 Sustainable Organization Goal ........................................... 20 Team Oakley: Partnering for Success................................ 22 225
Oakley has a vision for its future: Action. For the 5-year Strategic Plan 2027+ (SP27+), the City engaged many diverse community voices to explore who we are, who we want to be, and where we want to go. This process resulted in a clear mission, inspiring vision, redefined values, and a path forward. Now, more than ever, we recognize and celebrate the history, uniqueness, and future potential of our Delta city.

This time in the City’s history is filled with excitement, growth, and so much possibility. SP27+ provides us with a long-term framework to provide exceptional service to residents and businesses while capitalizing on the shoreline to enhance the overall quality of the area for both visitors and businesses, investing in people and technological advances for organizational sustainability, and leveraging recent successes, like the Logistics Center, that can provide regional jobs and associated economic activity and investment. The SP27+ gives us focus and keeps our priorities centered around what matters most to our engaged residents, businesses, and partners.

As one community oriented around action, we collectively set our sights on strategic and thoughtful growth, safe and healthy neighborhoods, vibrant open spaces, collaborative engaged partnerships, and a sustainable organization that will benefit current and future residents and businesses. These goals will be realized through our collective values, to set our PATH forward: Promoting fair and equitable stewardship of our community, Advocating for a collaborative environment, demonstrating Transparency for accountability, and leading with Honesty and integrity. Together we can cultivate an inclusive and vibrant City where we live in a safe community, work together, and play in our backyard.

We look forward to working with you as we take action toward creating a resilient future that fosters and attracts a vibrant and evolving community that welcomes and values all people.

Randy Pope Joshua McMurray
Mayor City Manager
Mayor Randy Pope
Joshua McMurray
226
City of Oakley 2 Strategic Plan 2022–2027+
1860 1870 1880 1890 1900 1910 1920
1860
Farmers settled in the
Oakley area
1889
Almond Growers
Association of East Contra
Costa County formed
1913
First library established
Oakley Women’s Club founded
1900
Santa Fe Railroad first train
1898
First Postmaster appointed
1915
Vineyards developed
1924
Fire struck
Oakley, burning
most of the
businesses in
town
1905
Oakley Hotel built
First annual Oakley Jack Rabbit Bar-b-que
Oakley’s History
Officially incorporated on July 1,
1999, Oakley is the 11th newest city
in California. Oakley is one of the last
pioneer communities established inland from
California’s great coastal centers. Located
beyond the extensive San Francisco Bay, the
area was historically known as a railroad town
along the Santa Fe railroad line and became
San Francisco’s easternmost frontier for
agricultural production in the 1960s.

Early landholders in the 1860s, including Fred
Babbe, Andrew Walker, Samuel Sellers, James
O’Hara, Edward Emerson, and Benjamin F.

Porter, all grew vegetables, fruits, and grains
for the San Francisco Market.
227
City of Oakley 3 Strategic Plan 2022–2027+
1930 1940 1950 1960 1970 1980 1990 2000 2010 2020 2030
1945
Oakley Sanitary District formed
1947
Oakley Observer established
1949
Oakley Observer renamed East Contra Costa Observer
1928
Levee break north of town
flooded 2.5 sq. miles
1950
First shopping center
Chamber of Commerce founded
2009
First Harvest Festival
2020
Contra Costa Logistics
Center broke ground
2022
General Plan
updated and
Strategic Plan
adopted
2010–2021
~2,600 new single
family homes
constructed
2012
First all-abilities playground
2014
Oakley Veterens
Memorial opened
2016
City Police department formed
2019
Recreation Center opened
1986
Miwok skeletons found
in Big Break area
1996
Freedom High School opened
1999
The City of Oakley
incorporated
1930
Fire struck downtown
1955
Water treatment plant
opened
From the early 1900s through the 1960s,
Oakley was a very self-sufficient town as
it supported an automotive and farm
equipment dealership, a hotel, four schools,
several grocery stores, movie theaters,
restaurants, and bars. The Atchison, Topeka,
and Santa Fe railroad – also known as one
of the larger railroads in the United States in
the 1900s – stopped in Oakley morning and
night, allowing easy transport to Stockton for
more expanded shopping opportunities and
cultural enrichment. Transformation of Oakley
from an exclusively agricultural community
to a bedroom community supporting an
industrial waterfront caused community
changes in the late 1950s.

In 1898, a native of Ohio and Civil War
veteran Randolph Marsh bought 12 acres
in the northwest quarter of Section 25 of
eastern Contra Costa that became Oakley
Township, and the streets, Main, Acme,
Ruby, Star, and Home, so christened by
Marsh, recall his name today. During the
same period, Mary O’Hara, wife of Oakley
pioneer James O’Hara, became the first
president of the Ladies Improvement Club,
which was later known as Oakley Women’s
Club, established one of the first free
libraries in Contra Costa County.

Today, Oakley has blossomed into a
growing suburban community
of planned business and commercial
development, landscaped parks, shopping
centers, and abundant leisure opportunities,
including excellent fishing and recreational
boating opportunities along the Delta.
228
City of Oakley 4 Strategic Plan 2022–2027+
Mission, Vision, and Values
As part of the SP27+ community process, the City’s Mission, Vision, and Values reflect our mission to grow with purposeful intent while embracing our diverse and vibrant communities who choose to build their lives and livelihoods in Oakley’s Delta heartland. In recognition that the City is under new leadership and that our community has almost doubled in size, the City is committed to a PATH forward to create a better Oakley today while anticipating who Oakley is becoming. Although the City is still young we are advancing to meet the planned growth that was set almost 25 years ago. The SP27+ revisits what is important to the diverse communities and recalibrates the City’s collective priorities while not losing sight of what binds us together through our core values. We encourage every citizen, business, and visitor to support our Mission, enliven our Vision, and promote our Core Values to realize a City where anyone can choose to Live, Work, and Play.

Mission
The City of Oakley will create a resilient
future that fosters and attracts a
vibrant and evolving community that
welcomes and values all people.

Vision
The City of Oakley celebrates our
unique Delta lifestyle and small-town
feel where we Live in a safe dynamic
community, Work together to build the
future, and Play in our own backyard.
229
City of Oakley 5 Strategic Plan 2022–2027+
Core Values
Our values guide us on a PATH to where we want to Live, Work, and Play in the heart of the Delta.

Promote fair and equitable stewardship for the welfare of our diverse individuals that comprise our inclusive community.

Advocate a professional and family-friendly environment where Council, Staff, and the Public can envision and realize the City’s future together with a recognition of our shared commitments and opportunities.

Transparency is how we will create accountable partnerships to cultivate communication and collaboration to engage our thriving community.

Honesty and integrity are the foundation for building trust and fostering teamwork to live our mission and vision.

Our values
guide us on a
PATH to where
we want to
Live, Work,
and Play in the
heart of the
Delta.

OAKLEY
230
City of Oakley 6 Strategic Plan 2022–2027+
Goals and Priority Objectives
Throughout the SP27+ process, it was broadly acknowledged that the City is growing fast since its incorporation in 1999. With the population doubling in almost 2 decades the City is well positioned to design its future and take advantage of its home-town position on the edge of the Delta. With input from more than 400 community members, it is recognized that Oakley is converging from a rural farm town to a central location that can provide and serve local and regional jobs while providing a safe and vibrant community. More than 69 percent of the community said that Oakley was a good to excellent place to live based on its access to schools and regional jobs, its safe hometown feel, and abundant parks and active community events. But with rapid growth also comes challenges and the community participation helped to steer the SP27+ in the direction of addressing key stressors in order to keep us on the path where Oakley residents, businesses, and visitors can Live, Work, and Play in the heart of the Delta. Primarily participants asked for the City to create more access to shopping, groceries, and jobs while balancing housing with infrastructure demands to manage traffic congestion and public safety.

The SP27+ Goals and Priority Objectives were developed with no implication of hierarchy of importance and outlined in the following sections. It also should be recognized that some goals will be launched in tandem and some may not be launched for years to come based on shifting circumstances and priorities. What is critical is that the City has a vision and plan that allows Council and Staff to weigh priorities and measure them purposefully while respecting investments made for both short- and long-term gains. The joint commitment of the Council and Staff is to move the City’s goals forward and achieve alignment based on purposeful communication to partner for informed decision-making to advance progress. 231
City of Oakley 7 Strategic Plan 2022–2027+
The City’s goals, illustrated below, will be accomplished through priority objectives that will be measured, evaluated, and prioritized though the annual budgeting process to realize and advance the City’s potential.

Community
and Economic
Development
Community
Health
and Safety
Parks and
Open Space
Community
and Collaborative
Partnerships
Finance and
Fiscal
Responsibility
Sustainable
Organization
Strategic and
Thoughtful
Growth
Business-Friendly
Environment
Local Jobs
Safe Streets
Healthy
Neighborhoods
and Community
Resources
Parks and
Public Areas
Programs and
Recreation
Community
Outreach and
Engagement
Collaborative
Partnerships
Oakley’s Goals
232
City of Oakley 8 Strategic Plan 2022–2027+
Community and Economic Development Goal
The City of Oakley will inspire and encourage Community & Economic Development through strategic and thoughtful growth, a business-friendly environment, and local employment opportunities. ◦ Seek, in conjunction with the community,
sustainable economic opportunities to
attract businesses and create jobs, while
being sensitive to the types of businesses
the community needs and wants.
◦ Prioritize planning by targeting new
businesses that align with Oakley’s vision.
• Provide affordable housing sites that meet
our legislated Regional Housing Needs
Allocation (RHNA).
• Update Oakley’s Downtown Specific Plan to
reflect and envision the City’s future.
◦ Encourage quality, sustainable growth--
housing with business and requisite road
infrastructure and sidewalks to support
pedestrian and bicyclist movement.
◦ Leverage the train platform that will offer
better access for Downtown programming.
◦ Create better streetscapes that can
promote traffic calming.

Strategic and Thoughtful Growth
Sub-goal
We will strategically plan and thoughtfully
align our residential, commercial, and
industrial growth to meet our short- and
long-term vision.

Strategic and Thoughtful Growth
Objectives
• Strategically plan and pursue commerce
that meets the new service demands of
local residents and attracts customers as
a destination (e.g., grocery store, retail,
entertainment, and light industrial near
Amazon and on west end).
◦ Attract businesses that create
alternative revenue sources to property
tax through sales and business taxes
and employ our residents. The City of Oakley will strategically plan and thoughtfully align the town’s residential, commercial,
and industrial growth to meet both its short- and longterm goals. 233
City of Oakley 9 Strategic Plan 2022–2027+
◦ Consider funding elements of the
Downtown Specific Plan with American
Rescue Plan Act (ARPA) monies.
◦ Revitalize and draw people downtown to
live, work, and play.
–Develop an expanded downtown with
additional buildings and mixed use.
–Consider a park, including programming
specific to Economic Development, from
north 2nd Street to Rose Ave.
–Develop or sell City-owned properties
based on community benefit.
–Consider relocating the co-hosted City/
High School Library to a downtown
location that can be a unifying location
for Seniors, Youth, Veterans, and possible
satellite location for County services.
–Research rezoning of River Oaks Crossing
• Develop a vital Shoreline Plan to attract both
people and commerce to our waterfront.
◦ Expand marina zoning: restaurants,
recreational access, fishing tournaments,
55-acre park.
◦ Determine viable economic uses of the
Oakley shoreline and visit other cities
to see how they attracted visitors as a
destination (e.g., new Science Center).
• Plan and develop Cypress Corridor holistically
with improvements and commerce to service
new development to ease downtown traffic
(e.g., grocery, restaurants).
• Reinforce Planning Commission to
understand Oakley’s vision and encourage
public engagement:
◦ Update zoning to promote single and
multi-family housing, mixed use, light
industry, and commercial opportunities
and remaining residential opportunities.

Ensure that zoning considers potential
conflicts with adjacent properties that are
not compatible.
◦ Enforce codes consistently in all districts
to create consistent standard to code
enforcement by using a combination of
reactive and proactive code enforcement.
–Maintain code enforcement officers and
provide proper training.
◦ Encourage objective decision-making
versus subjective decision-making for
application approvals to meet Oakley’s
vision and economic goals by focusing on
formal plan and study outcomes.
◦ Require developer fees for proper
infrastructure (e.g., roads and parks) to
support development and growth.
◦ Communicate and build consensus through
the results of the special studies that are
commissioned to provide for the feasibility
of projects and engage the public at the
beginning of all projects to ensure project
delivery is not stunted or stopped without
defining success from all stakeholders.
• Enhance Environmental Stewardship
◦ Collaborate with the water and sewer
special districts to maximize the
distribution and use of recycled water.
◦ Explore and report on green energy
opportunities.
–Solar at City facilities
–Expansion of City’s EV Charging Program
The City of Oakley’s business-friendly environment will attract residential, commercial, and industrial partners to revitalize Oakley where people will come to Live,
Work, and Play.
234
City of Oakley 10 Strategic Plan 2022–2027+
◦ Remove the allowance for non-drought
tolerant landscaping.
◦ Ensure new residential construction meets
adopted standards for energy efficiency,
including solar and power storage.
◦ Implement energy, air quality, and
greenhouse gas emissions goals within
the Oakley General Plan, including the
adoption and implementation of a Climate
Action Plan by 2025 that complies with
State greenhouse gas reduction targets.
• Complete a comprehensive update of the
City’s Zoning Code.
◦ Ensure consistency with current and future
vision for Oakley and the recently updated
Oakley General Plan.

Business-Friendly Environment
Sub-Goal
Our business-friendly environment will
attract residential, commercial, and
industrial partners to revitalize Oakley where
people will come to Live, Work, and Play.

Business-Friendly Environment
Objectives
• Research other “like cities” to develop a
Strategic Business Outreach Plan.
◦ Conduct a Stimulate Oakley Business
analysis for Oakley and compare to adjacent
cities for differentiators and opportunities.
◦ Develop a Business Vision for Oakley
that will attract and retain high-quality,
diverse commerce through incentives for
businesses including small businesses.
◦ Develop a Property Utilization Plan on
City-owned properties to maximize the
City’s potential return on investment.
• Bolster and support existing businesses
through the use of financial and funding
incentives such as business low-interest
loans, grant funding, ARPA funding, and
promote “buy local” incentives.
• Showcase businesses through active
engagement and outreach (e.g., social
media, storefronts images, local business
newsletter with coupon book included).
• Continue to streamline business license
fee/permits.
• Beautify Oakley’s streetscapes, parks, and
business facades to attract and retain
businesses and their customers.

Local Employment Opportunities
Sub-Goal
We will partner with and attract businesses
that can employ our regional workforce to
invest in local talent and expertise.

Local Employment Opportunities
Objectives
• Capitalize on Logistics Center and strategize
with developers and surrounding property
owners to create job opportunities.
• Create employer-employee partnerships to
reduce State’s regulations on vehicle miles
traveled (VMT) and complement our existing
housing (Logistics Center development).

Oakley will partner with and attract businesses that can employ our regional workforce to invest in local talent. 235
City of Oakley 11 Strategic Plan 2022
–2027+
OAKLEYWe will partner with
and attract businesses
that can employ our
regional workforce
to invest in
local talent and
expertise.
236
City of Oakley 12 Strategic Plan 2022–2027+
Oakley will preserve and secure safe streets that are
welcoming to motorists, cyclists, and pedestrians.

Community Health & Safety Goal
The City of Oakley will protect our public and prioritize safe streets, healthy neighborhoods, and robust community resources to benefit our most valued assets — our people.

Safe Streets Sub-Goal
We will preserve and secure the City of
Oakley with safe streets that are welcoming
to motorists, cyclists, and pedestrians.

Safe Streets Objectives
• Create an Emergency Disaster & Response
Plan including resiliency resources.
◦ Develop a Communication Plan for
emergency responders, Public Works, the
public, and other key stakeholders.
◦ Provide and reinforce public and staff training
through regular community meetings.
◦ Ensure resiliency to power outages
(traffic controls, cellular and broadband
backup, generators).
◦ Implement training, communicate broadly,
and seek grants for implementation.
◦ Modernize the Oakley Emergency
Operations Center (EOC).
• Address streets and main arteries vulnerable
to fire, flood, and traffic hazards with
improving infrastructure and evacuation
plans to provide for safe passage for people
including emergency responders.
◦ East Cypress Corridor Specific Plan Area
◦ Main Street – improve areas to their full
right-of-way
◦ Complete Laurel Road, including
widening to its full width, and the
extension and over-crossing over the
railroad track to Sellers Avenue
• Explore improving lighting for safety.
• Align police resources with City’s growth.
◦ Develop and implement a staffing plan to
scale police personnel to City’s growing
safety needs.
◦ Streamline and civilianize where
appropriate (i.e., admin, budget/finance,
records, property, fleet management, etc.).
237
City of Oakley 13 Strategic Plan 2022–2027+
◦ Improve and invest in technology.
–Map accident scenes to open roads quicker.
–Research red light cameras to supplement
sworn enforcement officers.
–Create a larger “cyber shield” over the
City via a robust camera program.
◦ Establish strong neighborhood watch
programs, including National Night
Out, and maintain close communication
between the neighborhoods, the City
Council, Oakley Police, and City Hall.
◦ Collaborate with neighboring agencies
to maximize efficiencies with shared
resources (e.g., equipment).
◦ Expand the Citizen Emergency Response
Training (CERT) program.
◦ Dedicate traffic enforcement team to
improve traffic safety.
• Prioritize road improvements and provide
robust enforcement to manage traffic, given
accidents are the #1 safety challenge.
◦ Consider road improvements such as
delineators for areas where speed is an issue.
◦ Implement traffic-calming policy and
update to new practices for increased
traffic as Oakley grows.
• Promote Safe Pedestrian and Bike Routes.
◦ Collaborate with School Districts to apply
for State and Federal grants to create safer
and more accessible connectivity.
◦ Improve trail connectivity to provide
pedestrians and cyclists safe passage.

Safe and Healthy Neighborhoods
+ Community Resources Sub-Goal
We will offer a high quality of life by
partnering with residents and businesses to
promote and maintain a safe and healthy
living and work environment with community
resources to serve our diverse community.

Safe and Healthy Neighborhoods
+ Community Resources
Objectives
• Rejuvenate our downtown and residential
and business developments to discourage
blight through beautification and
development of standards for commercial
code enforcement.
• Promote community service opportunities
to build the community and beautify Oakley.
• Implement Phase 2 of the Recreation Center.
• Connect and promote the County and
Non-Governmental Organizations (NGOs)
resources available to assist our vulnerable
populations (e.g., unhoused persons,
people seeking mental health assistance,
Veterans services).
◦ Educate and promote use of 211 for
essential community services.
◦ Initiate and partner with other agencies to
create regional support to provide services
to help unhoused persons.

Oakley will maintain close communication between the
neighborhoods the City Council, Oakley Police, and City Hall to manage traffic.
238
City of Oakley 14 Strategic Plan 2022–2027+
Parks and Open Space Goal
The City of Oakley will capitalize on our greatest Delta asset where our residents, businesses, and visitors can recreate and relax.

Parks and Public Areas Sub-Goal
We will upgrade and maintain our City parks
and open spaces to be a focal point that
encourages community use and civic pride.

Parks and Public Areas Objectives
• Upgrade and develop parks and open space
for diverse interests and expanded underserved areas to reinvigorate “play” in Oakley. ◦ Envision a Downtown Park to attract
people downtown (e.g., new park parallel
to the railroad tracks with a museum and
bocce ball courts).
◦ Envision, develop, and fund Oakley’s 55-
Acre Regional Park and seek grant funding
that will compete at the State level.
–Envision Oakley as the front door
of the Delta and one of California’s
natural wonders.
–Include trail and waterway access to
attract outdoor sporting such as hiking,
kayaking, boating, and recreational
and sports fishing that would serve as
an amenity to draw homeowners and
sporting events alike.
◦ Create and maintain sporting fields (bocce,
baseball/softball, soccer, equestrian arena)
and provide shade, bathrooms, and
lighting services.

Programs and Recreation Sub-Goal
We will serve our diverse people, parks, and
programs by providing inclusive activities and
access to engage the City’s family and friends
in science, culture, sports, and creativity.

Programs and Recreation Objectives
• Upgrade parks and open space to be
accessible and attract the many interests
of our diverse residents and visitors and
provide access for all.
◦ Celebrate and promote our local history
through educational and enrichment
opportunities and consider work with
historical society.
◦ Complete Phase 2 of Oakley’s Recreation
Center to encourage indoor sports, Camp
Room, and Teen Room for classes.
◦ Continue to offer special events and
streamline the process for community
groups to host events that create a sense
of Oakley community and showcase the
importance of families, youth, seniors,
and Veterans.
◦ Promote Oakley’s events and recreation
and differentiate our offerings from
adjacent cities.
239
City of Oakley 15 Strategic Plan 2022
–2027+
We envision Oakley as the
front door of the Delta
and one of California’s
natural wonders.

OAKLEY
240
City of Oakley 16 Strategic Plan 2022–2027+
Community and Collaborative Partnerships Goal
The City of Oakley will build strong community and collaborative partnerships to be mutually beneficial and cocreate shared goals.

Community Outreach and
Engagement Sub-Goal
We will engage and partner with our
residents and businesses in meaningful
and relevant dialogue to realize our shared
vision and values.

Community Outreach and
Engagement Objectives
• Focus on establishing community trust and
public-private partnerships through positive
dialog and tangible outcomes.
◦ Encourage community neighborhood
involvement, such as cleanup walks, that
reinforce healthy lifestyles and shared goals
with Oakley Police, Council, and City Hall.
◦ Create interactive face-to-face dialog as
a supplement to one-sided social media
communication where full participation
cannot be facilitated due to Brown Act
limitations.
–Promote City Council/Community
meetings through social media to
inform about agendas where public can
participate in person.
◦ Celebrate Oakley in demonstrating and
communicating our achievements in
accomplishing SP27+, community events,
and activities that unite us (e.g., Heart of
Oakley, Harvest Festival, Christmas Tree
Lighting, Summerfest Celebration, etc.).
◦ Actively uphold Oakley’s Governance
Guidelines & Protocols Policy to
encourage productive partnerships,
positive communication, and achievement
of short- and long-term goals.
• Increase Oakley’s communication through
outward-facing media, social media
platforms, and website.
◦ Promote City Council agendas and
decisions via social media with updates on
economic activity, business growth, and
community events.
◦ Communicate how Oakley is living its core
values and meeting its stated mission and
vision (e.g., newspapers, electronic boards,
website, newsletter, social media).
◦ Modernize website to be user friendly,
transparent, functional, and reflective of
the City’s vision.
• Communicate and uphold the City’s
information systems to reinforce
transparency and access to build trust.
241
City of Oakley 17 Strategic Plan 2022–2027+
Collaborative Partnerships Sub-Goal
We will foster and maintain strong
relationships with our public-private
partnerships to mutually benefit our
shared goals.

Collaborative Partnerships
Objectives
• Consider creating new partnerships that will
involve community participation (e.g., Park
and Arts Commission).
• Establish, align, and maintain partnerships
with local Special Districts, Agencies, NGOs,
and Commerce to realize our responsibilities
to deliver on the General Plan and Specific
Plan and where goals mutually align and
meet quarterly.
◦ Diablo Water District
–Develop collaborative efficiencies to serve
our shared constituents.
◦ Ironhouse Sanitary District
–Consider opportunities for water reuse
(e.g., recycled and industrial water).
◦ Mt. Diablo Resource and Recovery (MDRR)
◦ CONFIRE
◦ School District
–Explore joint-use opportunities to
optimally partner with elementary and
high school (e.g., satellite classrooms and
recreation, library).
–Re-visit agreements with shared facilities
and public access.
◦ County/Region/State
–Encourage collaboration for public safety
and enforcement particularly where there
is multi-jurisdictional responsibility (e.g.,
fire, road access, school sites).
–Discuss Regional Park interests.
–Invite key electeds, Board representatives,
and others to speak at Council meetings
for outside updates and perspective.
◦ NGOs
–Partner with Rotary, Friends of Oakley,
Kiwanis, Oakley Delta Lions Club,
Oakley Seniors Club, Veterans of Oakley,
Masonic Lodge and Concordant Bodies,
Friends of the Oakley Library.
–Consider creating a Sister City.
–Consider expanding outreach to NGOs
beyond our region.

We will celebrate Oakley with community events and
activities that unite us.
242
City of Oakley 18 Strategic Plan 2022–2027+
Finance and Fiscal Responsibility Goal
The City of Oakley will leverage its financial resources for the long-term benefit of our residents and businesses while maintaining sufficient reserves to provide stability and ensure a successful future.

Finance and Fiscal Responsibility
Objectives
• Communicate on financial updates
including financial health, priorities, and
unexpected expenditures.
◦ Provide training related to community
facility districts to educate the public
regarding the various types of
assessments, which are not all taxes.
◦ Educate Executive Leadership and Council
on annual budget through communication,
reporting, and training to create better
partnership on fiscal strategies.
◦ Educate the community on large, planned
revenue expenditures and how surplus
monies will be invested or retained for longterm “rainy day” funds (budget process). ◦ Partner with Special Districts and
agencies to realize economies of scale
and efficiencies.
• Determine how the City will leverage its strong
financial position with development revenues
and ARPA Covid Relief money ($10M).
◦ Consider input by the community on how
funds should be prioritized.
◦ Implement technology upgrades to
improve transparency and public access to
City documents and remote transactions.
◦ Make the most needed improvements
to streets, utilizing development’s
improvements, funds from the sale of
property, and other financing sources to
make improvements to the East Cypress
traffic flow situation, etc.
◦ Complete a feasibility study pertaining
to broadband services and free Wi-Fi
throughout the City.
◦ Provide one free session of City-run
summer camp to Oakley residents.
• Develop a sustainable financial plan that will
identify opportunities for less dependency on
property taxes while maintaining the quality
of life that residents and businesses expect.
◦ Attract more businesses (commercial and
industrial) to increase Oakley’s per-capita
Sales and Use Tax revenues.
◦ Seek to supplement existing funding
sources with State and Federal grants for
special projects.
◦ Consider the implementation of
an EIFD (enhanced infrastructure
financing district) to make infrastructure
improvements that will attract businesses
and generate revenue.
243
City of Oakley 19 Strategic Plan 2022–2027+
• Align infrastructure spending and long-term
growth so we can plan beyond two years to
improve streets and parks and provide for
long-term maintenance.
◦ Create an internal services fund for
facilities maintenance and improvements.
◦ Establish a minimum baseline for General
Fund contributions for street maintenance
and improvements and include a growth
factor in the recurring operating transfers
budget each year.
• Modernize Oakley to accommodate
growth and improve efficiency by funding
technology to improve:
◦ Service for public-business license
applications/other applications
◦ Financial modeling and finance/budget
balancing
◦ Public safety and roads
◦ Customer-Friendly access to the City’s
financial reporting information and to
allow easier transactions without the need
for customers to come to City Hall
◦ Infrastructure and asset management
• Develop a Financial Strategy and
Reporting Policy
◦ Continue to receive third party
professional acknowledgment of our City’s
financial practices:
–Continue to present, apply for, and
receive the Government Finance Officers’
Association Award on the City’s Annual
Comprehensive Financial Report.
–Continue to apply for and receive
the California Society of Municipal
Financial Officers’ Operating Budget
Excellence Award.
◦ Continue to update the Budget
Strategies and Financial Policies in the
City’s annual budgets.
◦ Consider how to include performance audits
in the City’s budget to provide accountability
for performance and compliance.
◦ Maintain 10-year budget forecast to be
updated with each annual budget.
◦ Establish a 30% General Fund Reserve
Policy to protect the City’s operations
from a sudden drop in property tax and
development-related revenues.
◦ Establish a formal policy for the restrictions
on and allowed uses of funds in the 30%
General Fund Reserve Policy.
◦ Consider separating out the Capital
Improvement Project (CIP) budget from
the general operational budget.
–Itemize individual project line items for
Council consideration in addition to
aggregated projects.
◦ Align Strategic Plan Goals and Objectives
into the annual budget document,
including performance measures.

Oakley will leverage financial resources for the longterm benefit of our residents and businesses. 244
City of Oakley 20 Strategic Plan 2022–2027+
Sustainable Organization Goal
The City of Oakley will create a vibrant municipal workforce that reflects our commitment to an inclusive and equitable community and can meet our mission today while striving for our envisioned future tomorrow.

Sustainable Organization
Objectives
• Create a Recruitment and Retention Plan
that will hire and retain staff to serve Oakley’s
growing demands and sustain the level of
service our residents and businesses expect.
◦ Create a competitive compensation
package that is sustainable to attract and
retain our greatest assets – our people.
◦ Provide appropriate training and
professional development to keep up with
regulatory requirements and skill sets to
maintain the City.
◦ Properly staff our Police Department to
best protect and serve Oakley.
◦ Address staffing limitations by hiring,
contracting, or prioritizing programs, projects,
and initiatives to scale appropriately.
◦ Base the City’s performance on execution
of SP27+ and other major initiatives.
◦ Encourage employee wellness by creating
a safe and healthy work environment,
an Employee Assistance Program (EAP),
regular employee appreciation events
and team building, and the employee
wellness program.
◦ Rebuild and re-energize staff by
surveying all employees to understand
what would make Oakley a great place to
work (e.g., work life balance, work from
home schedule).

Oakley will encourage employee wellness by creating a
safe and healthy work environment.
245
City of Oakley 21 Strategic Plan 2022–2027+
• Identify and invest in resources to execute
the City’s responsibilities.
◦ Invest in Electric Vehicle fleet, which would
require downtown charging stations.
◦ Upgrade IT services to include new
computer systems and more efficient
IT response to computer and technical
issues to ensure projects can be
delivered efficiently.
◦ Consider fulfilling staffing and hiring
needs based on comprehensive Staffing
Plan as aligned with SP27+ and other
major initiatives.
–Grant writer to identify State and Federal
grants to support Oakley.
–Parks & Recreation staff to keep
up with demands of new parks and
recreational programming.
–Public Works staff to keep up with demands
of new housing, parks and infrastructure
development and maintenance.
–Police to keep up with growing safety needs.
–Other needs as determined.
• Create a City-wide Succession Plan that
anticipates retirement, attrition, and
promotions, and provides opportunity for
development and growth, to build a wellrounded team that is prepared to serve the City now and well into its future.
• Reinforce a safe and healthy work
environment to protect our employees and
minimize compensation claims.
• Establish trust in City Hall.
◦ Reinforce the investment of our revitalized
staff and Council and create measurable
partnerships among the trio of Council,
staff, and the community to deliver on
Oakley’s co-created SP27+.
◦ In order to recruit and retain staff,
Oakley must improve its public-private
partnership and live its established values
to attract residents, businesses, and
employees alike.

Oakley will create accountable partnerships among the trio of City Council, staff, and the community to deliver on this co-created Strategic Plan.
◦ Reinforce Team Oakley: Council, staff, and
the public by celebrating successes and
communicating obstacles for full transparency
to create a learning environment.
◦ Inspire and encourage Oakley staff to
be visible and work with the community
at large.
◦ Acknowledge roles and responsibilities
per the City’s Governance Guidelines &
Protocols Policy Framework to guide the
execution of the Strategic Plan.
246
City of Oakley 22 Strategic Plan 2022–2027+
Team Oakley: Partnering for Success
The City of Oakley recognizes that the implementation of the SP27+ is incumbent on the strength of our partnership with the Council and community of residents, businesses, and stakeholders that benefit from the City’s success. Our strategic planning process included outreach to more than 400 community members and stakeholders that actively responded to a survey of questions and attendance at 4 public meetings to co-create the City’s new mission, vision, values, and priority objectives. With our unique new leadership of both Council and staff alike, along with a new community that has doubled since our City’s incorporation less than 25 years ago, together we re-envisioned who Oakley is becoming. We are thankful to all of those who participated to help co-design our shared future as we implement key goals that will meet our desires for today and for future generations to come.

City Council Members
Randy Pope, Mayor
Aaron Meadows, Vice Mayor
Anissa Williams
George Fuller
Sue Higgins
Stakeholders-Partners
Jeff Quimby, Contra Costa Water District
Tyson Zimmerman, Angela Lowrey, Dawn
Morrow, Ironhouse Sanitary District
Jeffrey Palmquist, Oakley Union Elementary
School District Superintendent
City Staff
Joshua McMurray, City Manager
Tim Przybyla, Finance Director
Kevin Rohani, Public Works Director
Paul Beard, Police Chief
Jeri Tejeda, Human Resources Director
Brent Smith, Community Development Director
Libby Vreonis, City Clerk
Lindsey Bruno, Recreation Director
Felicia Escover, Assistant to the City Manager
Strategic Planning Consultants
Ellen Cross, Strategy Driver, Inc.

Maria Pascoal, GEI Consultants
247
OAKLEYThank you for helping Oakley co-create
a resilient future and a vibrant and
evolving community that welcomes and
values all people.
248
City of Oakley
3231 Main Street, Oakley, CA 94561
(925) 625-7000
https://www.ci.oakley.ca.us/
249

STAFF REPORT

City of Oakley | 3231 Main Street, Oakley, CA 94561
O (925) 625-7000 | F (925) 625-9859 | www.ci.oakley.ca.us DATE: March 26, 2024
TO: Joshua McMurray, City Manager
FROM: Ken Strelo, Planning Manager
SUBJECT: Bridgehead Industrial Project Environmental Impact Report – Resolution authorizing the City Manager to Execute an Agreement with Raney Planning and Management, Inc. to prepare an Environmental Impact Report for the project titled “Bridgehead Industrial Project” Summary
The City of Oakley Planning Division has received an application for the project titled, “Bridgehead Industrial Project,” which consists of an application by Oxfoot Oakley LLC (“Applicant”) requesting approval of 1) a General Plan Amendment (GPA 02-23) to redesignate the General Plan Land Use Designation of the southern portion (approximately 76.4-acres) of the approximately 164-acre site from Commercial (CO) to Light Industrial (LI); 2) a Rezone (RZ 04-23) to re-classify the Zoning District for the entire project from BPL (Business Park Low) District (northern portion) and SP-1 (River Oaks Crossing Specific Plan) District (southern portion) to P-1 (Planned Unit Development) District in conjunction with a Preliminary Development Plan; 3) a Tentative Map (TM 10- 23) to subdivide the three existing parcels totaling approximately 164 acres into 10 lots; 4) a Design Review (DR 11-23) for the first phase of the development, including site development and building architecture for an approximately 182,590 square foot building on one of the proposed parcels (10.6-acres) bordering Bridgehead Road; and 5) a Master Sign Program (MSP 01-23) for sign designs and specifications for the entire site, including all future buildings and entrances (“Project”).

The City has reached out to Raney Planning and Management, Inc. to provide a scope of service and cost to prepare an Environmental Impact Report (EIR) for the project. A of March 12, 2024, Raney has submitted a revised Scope of Work with a total not to exceed amount of $389,862, which would be wholly funded through the applicant’s developer deposit. Staff has reviewed the proposal and Raney Planning and Management, Inc. is ready to start work immediately.

Consistency with Oakley Strategic Plan 27+
The City of Oakley Strategic Plan 2022-2027+ (SP27+) was adopted by the City Council in April of 2022. Approval of this services agreement and the subsequent environmental work is consistent with the Strategic and Thoughtful Growth Objectives within Oakley’s Strategic Plan 27+, as it furthers the City’s efforts to Approved and
Forwarded to the
City Council
250

STAFF REPORT
CITY HALL | 3231 Main Street, Oakley, CA 94561 2
O (925) 625-7000 | F (925) 625-9859 | www.ci.oakley.ca.us encourage objective decision-making versus subjective decision-making for application approvals in order to meet Oakley’s vision and economic goals by focusing on formal plan and study outcomes.

Fiscal Impact
The fixed fee to complete the scope of work is a not to exceed contract of $389,862.

This contract will not impact the General Fund as all costs associated with the contract and all Staff time and materials associated with processing the application will be funded by the developer deposit.

Staff Recommendation
Staff recommends the City Council approve of the Resolution that authorizes the City Manager to execute a professional contract for services Raney Planning and Management, INC. to prepare an Environmental Impact Report (EIR) for the Bridgehead Industrial Project.

Attachments

1. Proposal to Prepare and Environmental Impact Report – Bridgehead Industrial Project – Scope of Work and Estimate from Raney Planning and Management, Inc., dated March 12, 2024

2. Proposed Resolution
Exhibit A. Short Form Services Agreement Template
251

PROPOSAL TO PREPARE AN

ENVIRONMENTAL IMPACT REPORT
Bridgehead Industrial Project
City of Oakley, CA
March 12, 2024
Submitted to:

Kenneth Strelo, Planning Manager
City of Oakley
2131 Main Street
Oakley, CA 94561
[email protected]
Submitted by:

Raney Planning & Management, Inc.
1501 Sports Drive, Suite A
Sacramento, CA 95834
Office: (916) 372-6100
Contacts:

Cindy Gnos, AICP
Senior Vice President
[email protected]
Rod Stinson
Vice President/Air Quality Specialist
[email protected]
252

TABLE OF CONTENTS
I. Project Understanding and Approach 1
II. Technical Scope of Services 4
III. Project Schedule 19
IV. Cost Estimate 21
Appendix A: Monk and Associates Scope of Work
Appendix B: Tom Origer and Associates Scope of Work
Appendix C: Saxelby Acoustics Scope of Work
Appendix D: Fehr & Peers Scope of Work
253
1 Raney has developed the following proposal to prepare a project-level Environmental Impact Report (EIR) for the Bridgehead Industrial Project (proposed project) in the City of Oakley. Below please find Raney’s project understanding and approach to providing CEQA documentation.

PROJECT UNDERSTANDING
Project Location
The approximately 160-acre project site (APNs 037-020-007, 037-040-007, and -015) is bounded by Big Break Road to the east, Bridgehead Road to the west, and Main Street to the south in the City of Oakley, California. The Burlington Northern Santa Fe (BNSF) railroad tracks bisect the project site, which is split into northern and southern portions. An existing stormwater drain runs north-to-south on the northern portion of the project site. The northern and southern portions of the site are developed with vineyards. Existing on-site buildings associated with the vineyards are located on the northern portion of the site. Surrounding existing uses include wetlands, a marina, and the San Joaquin River to the north; a construction company, single-family residences, and Big Break Regional Bike Trail to the east, across Big Break Road; commercial uses and single-family residences to the south, across Main Street; and light industrial uses to the west. The City of Oakley General Plan designates the site as Light Industrial and the site is zoned as Business Park Low (BPL).

Project Description
The proposed project would include the removal of the existing vineyard and associated buildings and subsequent construction of 10 light industrial buildings (Buildings 1 through 10) totaling 3.18 million square feet (sf) of new building space, including three million sf of warehouse space and 44,000 sf of office space. Buildings 1 through 5 would be located on the northern portion of the site and Buildings 6 through 10 would be located on the southern portion of the project site. The 936,680-sf Building 1 would be centrally located within the northern portion of the project site and Buildings 2 through 5 would range from approximately 117,180 sf to 269,700 sf and would be located along the eastern and northern boundaries of the northern portion of the project site.

The 737,674-sf Building 7 would be centrally located within the southern portion of the project site and the 232,328-sf Building 6 would be located west of Building 7. Buildings 8 through 10 would range from 106,215 sf to 272,758 sf and would be located east of Building 7.

The proposed project would also include the development of a Class I bike path, which would serve as a continuation of the existing Big Break Regional Bike Trail, and would run along the northern and eastern boundaries of the project site. As part of the proposed project, the existing on-site stormwater drain would be rerouted along the western boundary of the project site. Two stormwater basins would also be provided in the northwest and southeast corners of the site. The project would include construction of a new internal road, which would connect to the existing stubbed street serving the light industrial uses to the west. Site access to Buildings 3 through 5 would also be provided by five new driveways off of Big Break Road and would serve cars only.

In addition, site access to Buildings 6 through 10 would be provided by two new driveways off of Bridgehead Road and three driveways off of Main Street.

I. PROJECT UNDERSTANDING AND APPROACH
254
2 Raney will confirm the required entitlements for the proposed project with the City and the applicant team at the kick-off meeting.

APPROACH
Raney proposes to prepare a project-level EIR to analyze the potential environmental effects associated with the proposed project. Analysis in the EIR will include an assessment of the individual and cumulative environmental effects of the project. The Draft EIR, Final EIR, and related work products will be prepared in accordance with the criteria, standards, and provisions of the California Environmental Quality Act of 1970 (CEQA), Section 21000 et seq. of the Public Resources Code and the State CEQA Guidelines (California Code of Regulations Section 15000 et seq.), and the regulations, requirements, and procedures of the City of Oakley.

Rather than prepare an Initial Study, Raney proposes to evaluate all CEQA topics set forth in Appendix G of the CEQA Guidelines within the EIR.1 While it is anticipated that most CEQA topics will require detailed analysis within the EIR, some topics may be addressed at a lesser level.

According to CEQA Guidelines Section 15128, an EIR shall contain a statement briefly indicating the reasons that various possible significant effects of a project were determined not to be significant and were therefore not discussed in detail in the EIR. Such statements will be included in the EIR within the Effects Not Found to be Significant chapter.

Raney will rely on existing information for the proposed project and the surrounding vicinity to the greatest extent feasible, including any technical reports prepared by the project team, technical reports prepared by Raney and its sub-consultants, and information from the City of Oakley, including the City of Oakley General Plan and General Plan EIR. Raney firmly believes that the level of coordination between the City of Oakley, pertinent local and State agencies, and the local citizens is directly proportional to the success of the project. Raney intends to work closely with the City and the project team throughout the development and processing of the EIR. The expectation of Raney is that we will provide environmental services to the City of Oakley, under contract with the City, and will make ourselves available to assist the City to facilitate the process.

Applicant-Provided Technical Reports
The applicant team has provided a Phase I Environmental Site Assessment (ESA) prepared by SCS Engineers for use in the EIR. Raney anticipates the applicant team will provide photo simulations, a Geotechnical Report, and infrastructure studies (i.e., water, sewer, drainage).

Technical Reports prepared by Raney and its Sub-Consultants Raney proposes to sub-contract with the following technical consultants for the preparation of project-specific technical reports:
1 This is consistent with CEQA Guidelines Section 15060(d), which states:
“If the lead agency can determine that an EIR will be clearly required for a project, the agency may skip further initial review of the project and begin work directly on the EIR process described in Article 9, commencing with Section 15080. In the absence of an initial study, the lead agency shall still focus the EIR on the significant effects of the project and indicate briefly its reasons for determining that other effects would not be significant or potentially significant.” 255
3 • Biological Resources Analysis and Planning Survey Report – Monk and Associates; • Cultural Resources Report – Tom Origer and Associates; • Noise Study – Saxelby Acoustics; and
• Transportation Impact Analysis – Fehr & Peers.

The air quality and greenhouse gas (GHG) analysis for the project will be prepared in-house by Raney’s Air Quality Division led by Vice President, Rod Stinson and Division Manager/Air Quality Specialist, Angela DaRosa. The air quality and GHG analyses will be prepared consistent with the regulations and requirements of CEQA, Assembly Bill (AB) 32, Senate Bill (SB) 32, the Bay Area Air Quality Management District (BAAQMD), and the City of Oakley. 256
4 The following technical scope of services identifies each task in the preparation of the necessary documents and includes all the work products associated with each task. Raney anticipates that the scope of services will be further refined in consultation with the City of Oakley as the CEQA lead agency for the project.

Task 1 Project Initiation
The objective of this task is to coordinate with City staff and the project team to confirm assumptions regarding the proposed project and scope of work. Senior Vice President Cindy Gnos, AICP, will serve as the Project Director and will be responsible for overseeing the environmental process, and providing quality control. Vice President/Air Quality Specialist Rod Stinson will serve as the Project Manager and will be responsible for managing the day-to-day preparation of the environmental document; coordinating with the City, outside agencies; and the project team; managing any technical subconsultants; and responding to inquiries on the environmental document. Both Ms. Gnos and Mr. Stinson are familiar with environmental review services and are highly qualified to assist the City in processing the project. Raney anticipates any applicantprovided technical reports will be provided at the kick-off meeting.

Raney will complete the following deliverables:
• Participate in a kick-off meeting with City staff and the applicant to review project schedule/milestones;
• Review existing documentation for the project and identify key issues; • Determine project entitlements with the applicant team; • Identify the role that each will play during the effort, as well as a summary of meetings and products;
• Perform a site visit; and
• Refine the scope with any revisions for the City of Oakley to approve.

Task 2 Agency Consultation
The objective of this task is to coordinate with appropriate departments and prepare AB 52 tribal consultation letters for the City. Given the passage of AB 52, and the associated amendments to Public Resources Code 21080.3.1, lead agencies are required to consult with Native American tribes early in the CEQA process. Raney understands the City of Oakley has received letters from tribes requesting notice pursuant to AB 52/PRC 21080.3.1, and the City will notify the tribes in writing of the proposed project within 14 days from the start of the CEQA process. Raney will assist the City in completing requirements and formal consultation pursuant to AB 52.

Raney will complete the following deliverables:
• Assist City staff with AB 52 consultation, including preparation of tribal consultation letters.

Task 3 Project Description
The objective of this task is to prepare a draft project description in consultation with City staff and the project applicant team. Based on Raney’s extensive CEQA experience, completing a draft of the project description during the project initiation phase greatly reduces the potential for II. TECHNICAL SCOPE OF SERVICES
257
5 project-related issues throughout the preparation of the environmental documents. The project description will include a detailed project location, background, and history of the project (including past ownership and land uses); intended uses of the proposed project; existing environmental setting; description of on- and off-site infrastructure necessary to serve the project; discretionary actions; project characteristics; important project features; project objectives; phasing; agreements; and permits and approvals that are required for the project based on available information. In addition, Raney will prepare regional and project location maps. Raney will also provide a list of responsible agencies that are anticipated to rely on the EIR for decision making.

Raney will complete the following deliverables:
• Submit one electronic copy of the draft project description to the City of Oakley and the applicant for review and comment; and
• Submit one electronic copy of the final project description to the City of Oakley and the applicant prior to incorporation into the EIR.

Task 4 Prepare Notice of Preparation
The objective of this task is to prepare/distribute a Notice of Preparation (NOP) for public review that includes a description of the proposed project, location map, and general environmental effects anticipated to be caused by the proposed project, as well as attend a public scoping meeting to solicit the public’s input on the content of the EIR. Raney assumes the public scoping meeting will be set up as a brief project overview presentation, in order for the community to gain an understanding of the project and make comments based upon accurate knowledge of the project.

It should be noted that, if during the NOP public review period, a substantial number of comments are received on a topic that would otherwise be addressed and dismissed in the Effects Not Found to be Significant chapter, Raney would consult with the City of Oakley to discuss whether the scope of services for the EIR should be revised to include additional technical chapters or technical analysis of additional topics. If additional chapters or technical analysis are deemed necessary by City staff, Raney would propose to amend the scope of work, schedule, and budget accordingly.

Raney understands the City will be publishing, posting, and distributing the NOP and electronically submitting the NOP with a completed Notice of Completion (NOC) to the State Clearinghouse.

Raney will complete the following deliverables:
• Submit one electronic copy of the Administrative Draft NOP to City staff for review; • Submit one electronic copy of the Final NOP (with edits from the City of Oakley incorporated) to the City of Oakley;
• Facilitate and attend one public scoping meeting to emphasize the review process as well as the intent and requirements of CEQA, as outlined in Task 13 Project Management, Meetings, and Hearings;
• Create an administrative record of all written and verbal comments regarding the NOP to bring together and resolve the concerns of affected federal, state, and local agencies, as well as the local community; and
• Revise the scope of services for the EIR, if needed, based upon NOP verbal and written comments received during the NOP comment period.
258
6 Task 5 Prepare Administrative Draft EIR
The objective of this task is to prepare an accurate, thorough, and complete Administrative Draft EIR for the proposed project that will provide a project-level analysis to evaluate the potential environmental effects associated with the proposed project. The Administrative Draft EIR will include all statutory sections required by CEQA Sections 15120 through 15132, and provide the public and decision-makers with a thorough, legally defensible environmental analysis of the proposed project.

Task 5.1 Introduction, Executive Summary, and Project Description The Introduction will cite the provisions of CEQA to which the proposed project is subject. This section will identify the intended uses of the EIR, agencies that may rely upon the EIR, purpose of the EIR and statutory authority, summary of the scoping procedures, and a list of the NOP comment letters and concerns raised in the letters.

The EIR will also include an Executive Summary chapter to briefly describe in text the impacts and mitigation measures. A summary table will be included, consisting of a matrix of impacts and mitigation measures, with levels of significance of impacts before and after mitigation. The summary table will include all mitigation measures applicable to the proposed project.

The Project Description chapter will be consistent with the one developed in Task 3 Project Description.

Task 5.2 Environmental Setting, Impacts, and Mitigation Measures The environmental analysis for the proposed project is anticipated to focus on the following areas:

Agriculture Resources; Aesthetics; Air Quality and GHG Emissions; Biological Resources; Cultural and Tribal Cultural Resources; Geology and Soils; Hazards and Hazardous Materials; Hydrology and Water Quality; Land Use and Planning; Noise; Public Services and Utilities; and Transportation. Project alternatives and statutorily required sections will also be included. Some refinement to these issues may be required based on the comments that will be received during the NOP scoping process.

Consistent with CEQA, each environmental chapter will include the following: an introduction; existing environmental setting; regulatory context; standards of significance; method of analysis; identification of environmental impacts; development of mitigation measures and monitoring strategies; level of significance after mitigation; cumulative impacts and mitigation measures; significant impacts; and effects not found to be significant. Raney proposes to include the following technical environmental chapters:
a) Agriculture Resources
The Agriculture Resources chapter will provide information in regards to the existing setting relative to agricultural resources on the project site. This will include reviewing maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency to determine whether Prime Farmland, Unique Farmland, or Farmland of Statewide Importance occurs on-site. The setting section will also identify the types of on-site soils, determined through a Web Soil Survey, which will 259
7 be conducted on-line by Raney, using the USDA Natural Resources Conservation Service website.
b) Aesthetics
The Aesthetics chapter of the EIR will summarize existing regional and project area aesthetics and visual setting. To the extent applicable, the chapter will describe projectspecific aesthetics issues such as scenic vistas, trees, historic buildings, scenic highways, existing visual character or quality of the project area, as well as light and glare. Raney will rely on the photo simulations to be provided by the applicant team for use in the Aesthetics chapter. Pursuant to Appendix G of the CEQA Guidelines, the focus will be on whether the proposed project could substantially degrade the existing visual character or quality of the project site and surroundings. Raney will rely on the City of Oakley General Plan and associated EIR for the analysis. c) Air Quality and GHG Emissions
The air quality analysis for the proposed project will be performed in-house by Raney’s air quality team, utilizing the California Emissions Estimator Model (CalEEMod) software program and following BAAQMD CEQA Guidelines. Raney will utilize the CalEEMod software program and trip generation information to be provided by Fehr & Peers’ Transportation Impact Analysis (TIA) to conduct a quantitative assessment of short-term (i.e., construction) and long-term (i.e., operational) increases of criteria air pollutant emissions of primary concern (i.e., ROG, NOX, PM10, and PM2.5) resulting from the proposed project. The construction emissions estimate will include emissions associated with on-site grading, as well as earthwork equipment and building construction. The significance of air quality impacts will be determined in comparison to BAAQMD recommended thresholds of significance. The project’s cumulative contribution to regional air quality will be discussed, based in part on the modeling conducted at the project level. Mitigation measures will be incorporated to reduce any significant air quality impacts, and anticipated reductions in emissions associated with proposed mitigation measures will be quantified.

Health Risk Assessment
It should be noted that any project that exceeds 100 truck trips per day and is within 1,000 feet of a sensitive receptor necessitates the preparation of a Health Risk Assessment (HRA) to address the impacts of TACs. Although the project is speculative, due to the number of anticipated docks and bays, Raney anticipates the trip generation from the project could exceed the threshold of 100 truck trips per day. In addition, the project site is less than 1,000 feet away from sensitive receptors (singlefamily residences to the east and west); therefore, Raney assumes an HRA will be required for the project. This does not necessarily mean that there will be a significant TAC impact, but rather it provides justification for preparing an HRA to calculate the cancer risk associated with on-site truck diesel particulate matter (DPM) emissions to determine if the risk is below the District’s threshold. The analysis for the HRA would include both acute and chronic health hazards, carcinogenic and non-carcinogenic, due to exposure of TACs. The significance of health risk impacts will be determined in comparison to the criteria identified in the California Office of Environmental Health 260
8 Hazard Assessment (OEHHA) Guidelines. The significance of carcinogenic health risk impacts will be expressed in terms of cancer cases per one million individuals. Noncarcinogenic health risk impacts will be determined using BAAQMD’s recommended Hazard Index (HI). The results of the analysis will be summarized in the air quality and GHG emissions section of the IS. The analysis will be performed in accordance with the 2015 California OEHHA Risk Assessment Guidelines.

GHG Emissions
Raney will run the CalEEMod program using project land use, and trip generation rates, to produce an estimate of annual GHG emissions for the proposed project.

The BAAQMD has recently adopted new thresholds of significance for GHG emissions. Pursuant to the new BAAQMD thresholds of significance for GHG emissions, new land use development projects need to implement specific design elements (i.e., no natural gas, electric vehicle charging) or show consistency with a local GHG reduction strategy in order to do its “fair share” of implementing the goal of carbon neutrality by 2045. If the project can implement the specific design elements, it can reasonably be determined that the proposed project will not make a cumulatively considerable contribution to global climate change.

Raney will work closely with the City and BAAQMD throughout preparation of the GHG analysis with respect to identifying the methodology and thresholds of significance to be used for the GHG analysis. Raney’s GHG analysis for the proposed project will follow the agreed upon methodology and thresholds. Mitigation measures would be identified, as appropriate, in coordination with the City and BAAQMD to identify feasible mitigations for GHG emissions.
d) Biological Resources
The Biological Resources chapter of the EIR will summarize the setting and describe the potential project effects to plant communities, oak woodlands, wildlife, and wetlands, including adverse effects on rare, endangered, candidate, sensitive, and special-status species for the project site. It should be noted that 158.76 acres of the project site are covered by the East Contra Costa Habitat Conservation Plan/Natural Community Plan (ECCCHCP/NCCP), while the remaining 1.26 acres, located primarily along the northern portion of the site, are outside of the ECCCHCP/NCCP covered area. Raney proposes to subcontract with Monk and Associates (M&A) to prepare a Biological Resources Analysis to address CEQA-related biological resources and a Planning Survey Report (PSR) for the 158.76-acre portion of the project site covered by the ECCCHCP/NCCP (please see Appendix A for a complete scope of work).

Biological Resources Analysis
M&A will prepare a description of plant communities and wildlife habitats present within the project site, to address impacts to special-status species known from the area.

M&A will evaluate sensitive biological resources such as special-status species, designated by the U.S. Fish and Wildlife Service (USFW), California Department of 261
9 Fish and Wildlife (CDFW), and other resource organizations include the California Native Plant Society (CNPS), and “waters of the United States” as regulated by the U.S. Army Corps of Engineers and “waters of the State” as regulated by the California Regional Water Quality Control Board (RWQCB) and the CDFW. In addition, M&A will review the CDFW’s most current version of the Natural Diversity Database (RareFind5 application) for records of special-status plant and animal species known to occur at the project site and within three miles of the site. M&A will also review the CNPS Inventory of Rare and Endangered Vascular Plants of California for information regarding the potential for special-status plant and animal species to occur in the area. An M&A wetland specialist/botanist and wildlife biologist will conduct a site survey to confirm current project site plant communities and wildlife habitats and prepare a final list of all plants or animals observed or expected to occur on the project site.

Planning Survey Report
M&A will also prepare a Planning Survey Report (PSR) to be submitted to the East Contra Costa Habitat Conservancy (Conservancy), allowing the project to receive incidental coverage under the ECCCHCP/NCCP. M&A will prepare a PSR application for the East Contra Costa Habitat Conservancy (Conservancy) for the project’s coverage under the ECCCHCP/NCCP. Use of the ECCCHCP/NCCP will be granted through the participating entity, in this case, being the City of Oakley. The ECCCHCP/NCCP provides “incidental take” coverage and provides required mitigation for potential project-related impacts to most regionally known special-status plant and animal species (known as covered species), including most species under the California and Federal Endangered Species Acts, and species with lower regulatory status that generally require mitigation for applicants developing in the area. The ECCCHCP/NCCP application package will be submitted to the City of Oakley and the Conservancy for approval.

Raney will internally review the Biological Resources Analysis and PSR to ensure that all CEQA issues are adequately addressed and will incorporate the results into the Biological Resources chapter of the EIR.
e) Cultural and Tribal Cultural Resources
The Cultural and Tribal cultural Resources chapter of the EIR will summarize the setting and briefly describe the potential effects to any on-site historical and archaeological resources due to implementation of the proposed project. Raney’s analysis will be based on a Cultural Resources Report to be prepared by Tom Origer and Associates (Origer), under contract with Raney (please see Appendix B for a complete scope of work). Origer will conduct archival research at the Northwest Information Center and at the offices of Tom Origer and Associates, as well as make contact with the Native American Heritage Commission and local Native American tribes and individuals. Origer will conduct a pedestrian survey of the project site and complete preliminary documentation on DPR 523 forms if cultural resources are found.

Origer will prepare a report that details their findings and recommendations for the treatment of cultural resources. Raney will internally review the report to ensure that 262
10 all CEQA issues have been adequately and accurately addressed and will incorporate the results of the analysis into the Cultural and Tribal Cultural Resources chapter of the EIR. In addition, Raney will address the potential for the onsite vineyards to qualify as a historic resource due to its age. Raney will rely on CEQA criteria regarding historic resources and will coordinate with the City to determine whether the vineyards could be eligible for listing as a historic resource.

Tribal Consultation
Given the passage of AB 52, and the associated amendments to Public Resources Code 21080.3.1, lead agencies are required to consult with Native American tribes early in the CEQA process. Raney understands the City of Oakley has received letters from tribes requesting notice pursuant to AB 52/PRC 21080.3.1, and the City will notify the tribes in writing of the proposed project within 14 days from the start of the CEQA process. . Raney will prepare the tribal consultation letters and will assist the City in completing requirements and formal consultation pursuant to AB 52. Should one or more tribes request formal consultation, non-confidential information provided though the consultation process will be included in the Tribal Cultural Resources portion of the chapter.
f) Geology and Soils
The Geology and Soils chapter of the EIR will summarize the setting and describe the potential effects from soil erosion, earthquakes, liquefaction, and expansive/unstable soils, as well as identify any paleontological resources or unique geological features within the project area. Raney anticipates the applicant team will provide a Geotechnical Report for use in the chapter. Raney will internally review the report to ensure all CEQA issues have been adequately and accurately addressed and will incorporate the results of the analysis into the Geology and Soils chapter of the EIR. g) Hazards and Hazardous Materials
The Hazards and Hazardous Materials chapter of the EIR will summarize the setting and describe any potential for existing or possible hazardous materials within the project area, such as hazardous wastes, or soil and/or groundwater impacts on the site, such as 55-gallon drums, underground and aboveground storage tanks, chemical containers, waste storage, etc. Raney will use the applicant-provided Phase I ESA for use in the chapter. Raney will internally review the Phase I ESA to ensure all CEQA issues have been adequately and accurately addressed and will incorporate the results of the analysis into the Hazards and Hazardous Materials chapter of the EIR. h) Hydrology and Water Quality
The Hydrology and Water Quality chapter will summarize setting information and identify potential project impacts on storm water drainage, flooding, groundwater, and water quality. Raney assumes the applicant team will provide infrastructure studies to address water quality and drainage and evaluate the removal and rerouting of the stormwater drain that currently runs through the site. Raney will coordinate with the City Engineer to ensure the adequacy of the reports and to confirm all CEQA issues 263
11 have been adequately and accurately addressed. Raney will incorporate the results of the analysis into the Hydrology and Water Quality chapter of the EIR. i) Land Use and Planning
The Land Use and Planning chapter will evaluate the consistency of the proposed project with the City of Oakley’s adopted plans and policies as well as compatibility with surrounding land uses, both existing and shown in the conceptual land use map.

Raney will review the Oakley General Plan, Zoning Ordinances, and any other appropriate documents to address consistency issues. The chapter will identify land use impacts and note any inconsistencies or incompatibilities with adopted plans and policies created by the approval of the proposed project. j) Noise
The Noise chapter of the EIR will be based on a technical report to be prepared by Saxelby Acoustics (Saxelby), under contract with Raney (please see Appendix C for a complete scope of work). Saxelby will utilize the Federal Highway Administration Traffic Noise Prediction Model to quantify existing noise levels due to nearby transportation noise sources. Direct inputs from the traffic model will include traffic data, existing speed limits, truck count information, and 24-hour traffic split data to be collected by Saxelby. Saxelby will conduct a noise survey within the project site to quantify existing background noise levels. The survey will consist of short-term noise level measurements and continuous noise level measurements for a period of 24-hours.

Saxelby will evaluate increased traffic noise levels at existing sensitive receptors in the project vicinity using traffic volumes and truck trips from the TIA to be prepared by Fehr & Peers. Saxelby anticipates providing traffic noise levels for Existing, Existing Plus Project, Cumulative, and Cumulative Plus Project scenarios, as well as any additional scenarios that might be included in the TIA. Saxelby will provide an analysis of noise levels associated with the proposed project at the nearest noise-sensitive residential uses, including an evaluation of the proposed loading docks, on-site truck circulation, parking lots, and any proposed mechanical equipment. In addition, Saxelby will conduct an analysis of the noise and vibration impacts associated with construction of the project at existing sensitive receptors in the project vicinity. It is expected that this analysis will follow the assumptions used in the project AQ/GHG analysis.

Saxelby will provide a noise report which details their findings, methodology, and noise reduction measures (if required). The report will be prepared to meet the requirements of the City of Oakley and CEQA. Raney will internally review the noise report for accuracy and adequacy in meeting the requirements of CEQA, and incorporate the results of the analysis into the Noise chapter of the EIR. k) Public Services and Utilities
The Public Services portion of this chapter will evaluate whether the project could increase demands upon local service providers (e.g., fire, police, schools) such that physical improvements would be required to their existing facilities, or new facilities would be required, the construction of which could cause physical impacts to the 264
12 environment. Raney will contact local service providers to solicit input regarding their ability to adequately service the anticipated demands resulting from the proposed development. Raney will also request that the applicant provide any “will serve” letters that they have obtained for the project from service providers.

The Utilities portion of the chapter will evaluate the project’s increase in water supply demand and wastewater generation, and whether the existing water and sewer infrastructure systems can accommodate the demands from the project, or whether upgrades to the systems would be required. The Utilities portion will also estimate the amount of solid waste generated by the project and the receiving landfill’s capacity to accommodate the increase in solid waste. Other utility systems that would be considered in this chapter include electricity and natural gas. l) Transportation
Since July 1, 2020, the metric of analysis to determine whether a project’s transportation impact(s) would be significant under CEQA is vehicle miles travelled (VMT). According to CEQA Guidelines Section 15064.3, VMT is the most appropriate measure of transportation impacts. VMT refers to the amount and distance of automobile travel attributable to a project. While lead agencies must evaluate a project’s transportation impacts using VMT for CEQA review purposes, it is anticipated that most lead agencies will continue to evaluate level of service (LOS) given that these agencies have adopted LOS standards in their General Plan.

The Transportation chapter of the EIR will be based on the TIA to be prepared by Fehr & Peers, under contract with Raney, (please see Appendix D for a complete scope of work). Fehr & Peers’ TIA will evaluate both VMT and LOS, where the VMT analysis will be used for CEQA review purposes, and the LOS analysis will be used to determine the project’s consistency with the City of Oakley’s adopted LOS standards. It should be noted that Fehr & Peer’s will schedule a preliminary meeting with City of Oakley engineering staff to discuss the presented scope of work, obtain comments, and adjust the approach as necessary.

Vehicle Miles Traveled
Consistent with SB 743, Fehr & Peers will perform a VMT assessment using the guidance published by the Contra Costa Transportation Authority (CCTA), as the City of Oakley has not yet adopted VMT thresholds. Fehr & Peers will obtain Streetlight Data for similar local warehouses in the area to understand truck and automobile trip lengths and travel patterns, including origin and destinations for trip originating or terminating at the project site and will help inform project trip distribution and VMT calculations. Using the assembled data, Fehr & Peers will generate off-model trip generation and trip length calculations for the proposed project. The data will then be used to prepare calculations for both passenger vehicle and commercial vehicle VMT.

Fehr & Peers will coordinate with City staff to develop an appropriate significance threshold for the project based on currently published guidance and available information.
265
13 Level of Service
It should be noted that the LOS analysis is not a requirement of CEQA; however, Fehr & Peers will be conducting the analysis to satisfy the requirements of the City of Oakley’s adopted LOS standards.

Fehr & Peers will collect new weekday morning (7:00 AM to 9:00 AM) and evening (4:00 PM to 6:00 PM) peak period intersection turning movement counts at the following intersections:

1. State Route (SR) 160 SB Ramps and Wilbur Avenue;

2. SR 160 NB Ramps and Wilbur Avenue;

3. Bridgehead Road and Wilbur Avenue;

4. SR 160 SB Ramps and E. 18th Street;

5. SR 160 NB Ramps and Main Street;

6. Neroly Road/Bridgehead Road and Main Street;

7. Live Oak Avenue and Main Street;

8. Big Break Road and Main Street;

9. Empire Avenue and Main Street;

10. Laurel Road and Live Oak Avenue;

11. Laurel Road and Empire Avenue;

12. Oakley Road and Empire Avenue;

13. Big Break Road and Southern Project Driveway; and

14. Big Break Road and Northern Project Driveway.

Based on the data collected, Fehr & Peers will conduct field reconnaissance to verify intersection configurations and traffic control, with traffic signal timings being obtained from City staff. Fehr and Peers will estimate the weekday daily, morning, and evening peak hour vehicle trip generation for the proposed project using appropriate trip generation rates published in the Institute of Transportation Engineers’ Trip Generation Manual (11th Edition), data available from the project team, national resources on distribution center trip generation, site traffic counts, and information developed by Fehr & Peers for other California-based facilities. Fehr & Peers will estimate the trip distribution of project traffic under Existing, Near-Term, and Cumulative conditions using sources such as existing counts, origins, and destinations of existing distribution facility trips, the location of complementary land uses, and information from the CCTA travel demand model.

Peak-hour intersection operations will be evaluated for the following scenarios using the Highway Capacity Manual 6th Edition method for vehicles:
• Existing – Existing conditions based on traffic counts at the study locations; • Existing Plus Project – Existing traffic counts plus traffic expected to be generated by the project;
• Near-Term – Existing traffic counts plus traffic from approved projects expected to be developed in the next 5 to 10 years. We will confirm with City of Oakley staff the level of anticipated development and transportation 266
14 improvements in the study area to consider in the analysis of near-term conditions, consistent with their guidelines and Vistro network; • Near-Term Plus Project – Near-term conditions plus traffic expected to be generated by the project;
• Cumulative – Forecasts for the cumulative scenario will be based on traffic growth trends as described in the City of Oakley General Plan EIR and supplemented by a check of traffic forecasts for the study area in the 2040 Contra Costa Countywide travel demand model. Vehicle trips generated under the project site current zoning would be subtracted from the base forecasts to develop the “no Project” traffic forecasts. Recent forecasts prepared for other projects will also be reviewed. Land uses assumed on the parcels adjacent to the project site will be reviewed with the project team. We will consult with City staff regarding future roadway improvements, that should be included in the cumulative forecasts; and
• Cumulative Plus Project – Cumulative forecasts plus traffic expected to be generated by the project.

Fehr & Peers will conduct all LOS calculations using the latest edition of the Synchro analysis software, per city requirements. For study locations that exceed the City’s LOS standard, improvement measures will be identified. Fehr & Peers will utilize the most recent edition of the Peak Hour Traffic Volume Signal Warrant from the California Manual on Uniform Traffic Control Devices (CA MUTCD) to evaluate all unsignalized study intersections and determine if signal warrants are met under each scenario. In addition to the study intersections previously mentioned, the intersection analysis will evaluate the conditions at the two proposed new driveways on Bridgehead Road and the three proposed new driveways on Main Street.

Fehr & Peers will also evaluate the levels of bus, bicycle, and pedestrian activity forecast to be generated by the proposed project, and the potential impacts of that demand on the area circulation networks. The effects of the project, if any, on local County Connection routes will be assessed based on the most recent available headway and ridership information. The proposed internal and existing surrounding pedestrian and bicycle networks will be reviewed for safety (compliance with design standards) and adequacy to serve projected levels of travel activity.

Fehr & Peers will conduct a site access, circulation, and parking assessment to ensure safe and efficient circulation of vehicles, bicycles, and pedestrians around the project site and on the roadways adjacent to the project site. The site plan will be reviewed for:
• Site access and interface with roadway network, including traffic control recommendations;
• Emergency vehicle access and circulation;
• Vehicular circulation, intersection traffic control, and roadway sizing within the site, including turn pocket lengths;
• Bus access adjacent to the site and circulation within the site; and 267
15 • Parking adequacy compared to City Code and national demand statistics.

As part of this task, Fehr & Peers will review the project’s consistency with transportation related goals from the City of Oakley General Plan and identify any conflicts, if necessary.

Task 5.3 Effects Not Found to be Significant
This chapter will include abbreviated discussions of impacts determined not to be significant and warranting detailed analysis in the EIR, some of which are preliminarily anticipated to be related to mineral resources, population and housing, recreation, and wildfire.

Task 5.4 Statutorily Required Sections
The Statutorily Required Sections chapter of the EIR will summarize significant and unavoidable, significant irreversible, and growth-inducing impacts, to the extent that such impacts are identified in the EIR analysis. The chapter will also summarize the cumulative impact analyses, which will be provided in each technical chapter of the EIR.

Task 5.5 Alternatives to the Proposed Project
The EIR will include an alternatives analysis in compliance with CEQA Guidelines Section 15126.6. The Alternatives chapter will evaluate, at a minimum, three alternatives, including a No Project Alternative, as required by CEQA. Alternatives will be selected when more information related to project impacts is available in order for the alternatives to be designed to reduce significant project impacts. Alternatives shall be developed in consultation with the City staff during preparation of the Administrative Draft EIR to respond to identified significant impacts.

The Alternatives chapter will describe the project alternatives and identify the environmentally superior alternative. The alternatives will be analyzed at a level of detail less than that of the proposed project which is permissible under CEQA; however, the analyses will include sufficient detail to allow a meaningful comparison of the impacts. The Alternatives chapter will include a qualitative-level analysis of all impacts for the alternatives and a section for alternatives considered but dismissed. A matrix comparing the impacts of the proposed project to the alternatives will also be included.

Raney will complete the following deliverables:
• Submit one electronic copy of the Administrative Draft EIR to City staff to review for adequacy and accuracy.

Task 6 Prepare Screencheck Draft EIR
The objective of this task is to edit the Administrative Draft EIR, based on the comments received from City’s review, to prepare a Screencheck Draft EIR. Raney assumes City comments on the Administrative Draft EIR will be in a consolidated set and will not require additional technical analysis. Raney will provide the Screencheck Draft EIR to the County in track changes format.

Raney will complete the following deliverables:
• Attend conference calls, as needed, with City staff to discuss City comments on the Administrative Draft EIR; and
• Submit one electronic copy of the Screencheck Draft EIR to the City of Oakley. 268
16 Task 7 Prepare Public Review Draft EIR
The objective of this task is to edit the Screencheck Draft EIR, based on any additional comments received, and prepare and distribute the Draft EIR for the 45-day public review period in accordance with CEQA requirements. Raney assumes that the revisions from additional comments on the Screencheck Draft EIR will only require editorial or other non-substantive changes. Raney will prepare the Notice of Availability (NOA) of the Draft EIR, and assumes the City of Oakley will publish the NOA in the newspaper, distribute to responsible agencies, and post at the County Clerk’s Office. Raney understands the City will electronically submit the NOC, State Clearinghouse Summary Form (Summary Form F), and the Draft EIR to the State Clearinghouse.

Raney will complete the following deliverables:
• Submit one electronic copy of the Draft EIR, one hard copy of the Draft EIR with the appendices on a flashdrive adhered to the back cover, and one hard copy of the appendices to the City of Oakley;
• Prepare the NOA, NOC, and Summary Form F; and
• Coordinate with the City of Oakley to perform the necessary posting, noticing, and distribution of the Draft EIR.

Task 8 Prepare Administrative Final EIR
The objective of this task is to respond to all comments received during the 45-day public review period and compile the comments into an Administrative Final EIR for review by the City of Oakley. Raney assumes these comments will not raise new issues, or that new surveys or technical studies will be required to complete adequate responses. Further, Raney assumes that the amount and nature of responses can be addressed within the hours shown in the proposed “Cost Estimate” spreadsheet included in Section IV of this scope of work. For the purposes of this scope of work, Raney’s budget for this task would allow Raney to prepare responses to up to 100 individual comments that are substantive in nature. Repetitive comments do not count toward this total. For example, it is not uncommon for the public to submit a large volume of comments on a particular issue/concern. In such a case, Raney will prepare a master response to address the thematic concern; and this effort would only constitute one response. Raney’s budget for this task is based upon our experience preparing Administrative Final EIR documents for other similar projects.

Should more time or technical analyses be needed to respond to additional comment letters, Raney will initiate discussions immediately with City staff to conduct this extra work. The Final EIR will consist of the following chapters: Introduction; List of Commenters; Responses to Comments; revisions to the Draft EIR text as a result of comments; and Mitigation Monitoring and Reporting Program (see Task 9).

Raney will complete the following deliverables:
• Meet with City staff to review all comments received and determine the appropriate written responses to the comments, as outlined in Task 13 Project Management, Meetings, and Hearings;
• Prepare responses to up to 100 individual comments on the Public Review Draft EIR; and • Submit one electronic copy of the Administrative Final EIR. 269
17 Task 9 Prepare Mitigation Monitoring and Reporting Program (MMRP)
The objective of this task is to prepare a Mitigation Monitoring and Reporting Program (MMRP) for the City of Oakley to be incorporated into the Final EIR. Raney will prepare an MMRP to comply with Public Resources Code Section 21081.6, which will include, but not be limited to actions identified in the EIR, as well as methods of implementation.

Raney will complete the following deliverables:
• Submit one electronic copy of the draft MMRP to the City of Oakley with the Administrative Final EIR; and
• Submit one electronic copy of the final MMRP to the City of Oakley with the Final EIR.

Task 10 Prepare Screencheck Final EIR
The objective of this task is to revise the Administrative Final EIR in track changes based on City comments received and prepare a Screencheck Final EIR.

Raney will complete the following deliverables:
• Conversations with City staff to discuss City comments and revisions to the Administrative Final EIR; and
• Submit one electronic copy of the Screencheck Final EIR to the City of Oakley (with City edits incorporated).

Task 11 Prepare Final EIR
The objective of this task is to revise the Screencheck Final EIR, based on any additional comments from the City of Oakley, in order to provide a thorough, responsive Final EIR. Raney assumes edits will only require editorial or other non-substantive changes to the Screencheck Final EIR.

Raney will complete the following deliverables:
• Submit one hard copy, with appendices on a flashdrive in the back cover, if applicable, and one electronic copy of the Final EIR to the City of Oakley; and • Coordinate with the City of Oakley to prepare all required noticing.

Task 12 Prepare Findings of Fact and Statement of Overriding Considerations and Notice of Determination
The objective of this task is to prepare the required Findings of Fact/Statement of Overriding Considerations (FOF/SOC), pursuant to CEQA, that incorporate information regarding the project’s environmental impacts disclosed in the EIR, and prepare a Notice of Determination (NOD). Should the project be approved, Raney understands the City will file the NOD at the County Clerk Recorder’s Office and post the NOD at the State Clearinghouse. Raney will prepare FOF/SOC pursuant to CEQA Guidelines Section 15091 to provide the appropriate language to dismiss the project alternatives not selected, as well as language on the overriding considerations, if necessary, to describe the benefits of the project that may outweigh any adverse environmental effects. Information from the fiscal impact analysis will also be utilized for this purpose. 270
18 Raney will complete the following deliverables:
• Submit one electronic copy of the administrative draft FOF/SOC to City staff for the City Attorney to review;
• Submit one electronic copy of the final FOF/SOC to City staff with the Final EIR with revisions made based upon comments from the City Attorney; and • Prepare an NOD, should the project be approved.

Task 13 Project Management, Meetings, and Hearings
The objective of this task is to outline the meetings/hearings that Raney plans on attending during the course of the project, and ensure close, extensive coordination and interaction with City staff, the project team, technical sub-consultants, and the public. The Raney project management team, identified in Task 1 Project Initiation, will be responsible for coordination with City staff and technical consultants, handling the day-to-day activities of the EIR preparation and responding to staff inquiries about the EIR and process.

Raney will complete the following deliverables:
• Project Management from Senior Vice President, Cindy Gnos, AICP, serving as Project Director, and Vice President/Air Quality Specialist, Rod Stinson, serving as Project Manager;
• Project support from President, Tim Raney, AICP; Vice President, Nick Pappani; and Division Manager/Air Quality Specialist, Angela DaRosa; as well as Associate and Administrative staff;
• Regular phone and e-mail communications with City staff, project stakeholders, and pertinent City, state, and local agencies throughout the process; • Prepare any necessary materials and/or presentations prior to the meetings, and answer questions and respond to comments as needed;
• Attendance at up to six in-progress meetings with the applicant and/or City staff; • Facilitate and attend one NOP public scoping meeting to emphasize the review process as well as the intent and requirements of CEQA;
• Attendance at one working meeting with City staff to discuss internal comments on the Administrative Draft EIR;
• Attendance at one meeting with City staff to discuss comments received on the Draft EIR; • Attendance at up to two public hearings; and
• Additional meetings and hearings can easily be accommodated upon request and would be billed on a time-and-materials basis following Raney’s standard billing rates. 271
19 The tentative schedule on the following page is based on Raney’s experience preparing similar documents. Factors that could lengthen or shorten the schedule include dates of receipt of project information (including information from the applicant), length of document reviews and unanticipated issues arising from City staff, the project team, AB 52 requirements or public review of the environmental documents.

III. PROJECT SCHEDULE
272
20 *Extended due to holiday.

Tentative Schedule
Bridgehead Industrial Project EIR

MILESTONES & CRITICAL PATH TIMING ESTIMATED DATE
Notice to Proceed To Be Determined March 18, 2024
Project Initiation Meeting Week of NTP Week of March 18, 2024 Submit Draft Project Description to the City to
Review Two Weeks April 1, 2024
Receipt of City Edits on Project Description One Week April 8, 2024 Submit Final Project Description to the City One Week April 15, 2024 Submit Draft NOP to the City for Review One Week April 22, 2024 Receipt of City edits on NOP One Week April 29, 2024
Submit Final NOP Three Days May 2, 2024
NOP Public Review Period (30 days) Thirty Days May 3, 2024 to June 3, 2024
NOP Public Scoping Meeting To Be Determined
(during review period) TBD
Receipt of All Technical Reports
Two Weeks from End of
NOP Public Review
Period
June 17, 2023
Submit Administrative Draft EIR to City of
Oakley for Review
Four Weeks from Receipt
of All Technical Reports July 15, 2024
Receipt of City Comments on Administrative
Draft EIR Three Weeks August 5, 2024
Submit Screencheck Draft EIR the City of
Oakley for Review Two Weeks August 19, 2024
Receipt of City Comments on Screencheck Draft
EIR 1 ½ Weeks August 29, 2024
Submit Draft EIR to the City One Week September 5, 2024 Public Review Period of Draft EIR (45 Days) 45 Days September 6, 2024 to October 21, 2024
Submit Administrative Final EIR and FOF/SOC
to the City of Oakley for Review
Four Weeks from Close of
Draft EIR Comment
Period
November 18, 2024
Receipt of City comments on Administrative
Final EIR Two Weeks December 4, 2024*
Submit Screencheck Final EIR to the City of
Oakley for Review One Week December 11, 2024
Receipt of City Comments on Screencheck Final
EIR One Week December 18, 2024
Submit Final EIR and FOF/SOC to City One Week January 2, 2025* Public Review Period of Final EIR (10 Days) Ten Days January 3, 2025 to January 13, 2025
Public Hearings TBD February 2025
273
21 The cost for completion of the proposed project-level EIR is anticipated not to exceed $389,862.

The tasks are summarized in the Technical Scope of Services of this proposal and costs by task are shown in the attached spreadsheet. These costs are based on the estimates of time for each task provided in the chart on the following page. Costs for EIR preparation will be billed on a not-toexceed basis, following Raney standard billing rates included in the attached spreadsheet. It should be noted, however, as indicated below, that the cost for the preparation of the Final EIR is based upon the receipt of a reasonable number of comments (anticipated not to exceed 100 comments) on the Draft EIR. Should the comments be excessive or require additional technical analysis, Raney would negotiate with the City of Oakley immediately to determine a reasonable cost for completion of the Final EIR.

The following assumptions were used in the calculations:
• Raney will attend meetings with City staff and the project team, as well as public hearings as described in the scope of work. Raney assumes that the number of meetings required will be achieved within the hours allocated in the attached spreadsheet. • Additional meetings and hearings are easily accommodated and will be billed on a timeand-material basis following Raney’s billing rates. • Raney costs are based on the assumption that the existing data and information for the City of Oakley and the project area is accurate and current and will be available for the preparation of the proposed environmental documents.
• Specific amounts of time for revisions to the Screencheck Draft EIR and Screencheck Final EIR have been assumed. Raney expects that responding to comments will not exceed the budgeted time. If unanticipated comments result in additional time beyond that which has been budgeted, those items will need to be renegotiated. • Raney will provide the City of Oakley and the project team the number of copies of the documents as indicated in the technical scope of services. The printing budget included in the cost sheet is Raney’s best estimate based upon printing other EIRs for similar projects and the electronic copies assumed herein. However, because the size of the EIR that is the subject of this scope is not yet known, it is impossible for Raney to reasonably include a fixed not-to-exceed cost for the printing of this EIR (which may be multiple volumes depending upon not only the size of the technical analysis in the body of the EIR but also the size of the proposed technical reports). Therefore, the City of Oakley will be billed for the actual printing costs, which shall be paid prior to release of the Final EIR. • Raney assumes that the appendices to the EIR will be submitted on flashdrives attached to the back cover.
• Raney assumes that once a Notice to Proceed is issued, the preparation of the environmental documents would be a continuous process without excessive delays. Raney would propose to renegotiate the contract with respect to schedule and cost should substantial delays occur in the processing of the proposed project.

Factors that would increase the scope of work and estimated costs outlined in the proposal include:
attendance at additional meetings or hearings; printing of additional copies of reports out of the scope of work; analysis of additional issues beyond those discussed in this proposal, or a more detailed level of analysis than described in this proposal; changes in the project requiring reanalysis IV. COST ESTIMATE
274
22 or rewriting of report sections; collection of data required for the environmental documents beyond that described in this proposal; attendance at additional in-house meetings beyond those budgeted; and excessive comments on the environmental documents. Raney would propose to renegotiate these items, if required, or charge on a time-and-materials basis.

PROPOSED COST ESTIMATE
Bridgehead Industrial Project EIR Project Director Project Manager Division Manager
Air Quality Specialist
Air Quality Technician
Associate
Cost Per Task
Task 1 Project Initiation 4 8 $ 2,420
Task 2 Agency Consultation (Including Preparation of AB 52 Letters) 4 10 2,130 $ Task 3 Project Description 2 6 7 24 6,065 $
Task 4 Prepare NOP 2 4 4 12 3,530 $
Task 5 Prepare Administrative Draft EIR 6 10 12 20 8,040 $ Technical Sections
Task 5.1 Introduction, Executive Summary, and PD 2 4 4 10 3,260 $ Task 5.2 Environmental Setting, Impacts, Mitigation Measures a Agriculture Resources 2 5 6 32 6,775 $
b Aesthetics 2 6 6 34 7,240 $
c.1 Air Quality & GHG Emissions 2 5 6 32 6,775 $
c.2 AQ/GHG Technical Analysis 15 25 $ 6,500
c.3 Health Risk Assessment 20 35 $ 8,925
d Biological Resources 3 7 6 36 7,920 $
e Cultural and Tribal Cultural Resources 2 5 6 30 6,505 $ f Geology and Soils 2 5 6 32 6,775 $
g Hazards and Hazardous Materials 2 5 6 32 6,775 $
h Hydrology and Water Quality 2 6 6 34 7,240 $
i Land Use and Planning 2 5 6 32 6,775 $
j Noise 2 6 7 32 7,145 $
k Public Services and Utilities 2 5 6 34 7,045 $
l Transportation 3 7 6 36 7,920 $
Other Sections
Task 5.3 Effects Not Found to Be Significant 1 4 8 18 4,825 $ Task 5.4 Statutorily Required Sections 1 4 4 16 3,855 $ Task 5.5 Alternatives 2 5 6 30 6,505 $
Task 6 Prepare Screencheck Draft EIR 2 5 8 30 6,855 $
Task 7 Prepare Public Review Draft EIR 4 6 16 3,990 $
Task 8 Prepare Administrative Final EIR 6 12 18 52 13,800 $ Task 9 Prepare MMRP 1 3 2 8 $ 2,230
Task 10 Prepare Screencheck Final EIR 2 6 6 18 5,080 $
Task 11 Prepare Final EIR 2 3 10 2,265 $
Task 12 Prepare FOF/SOC and NOD 2 4 4 20 4,610 $
Task 13 Project Management, Meetings, and Hearings 30 100 20 $ 29,450 Total Hours 89 252 185 35 60 690
Hourly Rate $ 215 $ 195 $ 175 $ 175 $ 155 $ 135
Total EIR Labor $ 19,135 $ 49,140 $ 32,375 $ 6,125 $ 9,300 $ 93,150 $ 209,225 `
Subconsultants and Expenses $ 180,637
Copying/Printing* $ 1,150
Subconsultant: Monk and Associates $ 21,885
Subconsultant: Tom Origer and Associates $ 9,525
Subconsultant: Saxelby Acoustics $ 11,010
Subconsultant: Fehr & Peers $ 124,465

7.5% Administrative Fee $ 12,603
Total Budget $ 389,862
* Estimate only, To Be Billed at Cost
275
APPENDIX A: MONK & ASSOCI AT ES

SCOPE OF WORK
276

MONK & ASSOCIATES
Environmental Consultants
1136 Saranap Ave., Suite Q  Walnut Creek  California  94595 (925) 947-4867  [email protected]
August 1, 2023
Raney Planning and Management
1501 Sports Drive, Suite A
Sacramento, California 95834
Attention: Ms. Malena Garcia
RE: Revised Cost Proposal to Prepare a California Environmental Quality Act Biology Section and the Permit Application for Coverage Under the East Contra Costa County Habitat Conservation Plan and Natural Community Conservation Plan Bridgehead Logistics Center, Oakley, California
APN: 037-020-007 (87.2 Acres)
Dear Ms. Garcia:

Monk & Associates, Inc. (M&A) is pleased to present this proposal to prepare a biological resources section (report) for the Bridgehead Logistics Center project located in the City of Oakley that can be used for your submittal to the Lead CEQA Agency, the City of Oakley for inclusion in their CEQA review document. M&A will prepare a Biological Resources Analysis report that can be used for any level of CEQA review from an Initial Study to preparation of an Environmental Impact Report (EIR) for the above referenced project. M&A’s report would also include mitigation measures that would reduce potentially significant and significant impacts to levels regarded as less than significant to the extent practicable.

As the Bridgehead Logistics Center project is within the East Contra Costa County Habitat Conservation Plan/Natural Community Conservation Plan (HCP/NCCP) jurisdictional area, M&A will also prepare a Planning Survey Report (PSR) which will be submitted to the East Contra Costa County Habitat Conservancy (Conservancy) that will allow the project to receive incidental take coverage under the HCP/NCCP.

Please note that all work performed under this agreement will be on a time and materials basis not to exceed the proposed budget without express written permission from the client. Below, M&A presents the tasks and costs for preparation of the CEQA Biological Resources Analysis report and the PSR
.

SCOPE OF SERVICES
Task 1. CEQA Biology Section
M&A’s report would present the current site conditions, plant communities, and wildlife habitats. The report would also present any potential project impacts to special-status species and habitats, the regulatory considerations of potential impacts, and will present any necessary mitigation measures that could be implemented to offset any potentially significant impacts to a level considered “less-than-significant” pursuant to CEQA. M&A’s report would also discuss 277
Revised Cost Proposal to Prepare a California Environmental Quality Act Biology Section and the Permit Application for Coverage Under the East Contra Costa County Habitat Conservation Plan and Natural Community Conservation Plan
Bridgehead Logistics Center, Oakley, California
APN: 037-020-007, 037-040-007, 037-040-015 (~160 Acres)

Page 2 ends

Monk & associates
environmental regulatory agency jurisdictions and any permitting requirements that would be pertinent to a development proposal for the project site.

M&A’s CEQA Biological Resources Analysis Report will discuss the following resource agencies and any regulatory requirements or the absence of regulatory requirements for the proposed project as required by: 1) California Department of Fish and Wildlife (CDFW); 2) U.S.

Fish and Wildlife Service (USFWS); 3) U.S. Army Corps of Engineers (Corps); and, 4) the California Regional Water Quality Control Board (RWQCB).

M&A’s Biological Resources Analysis will include:
• Preparation of plant community descriptions and wildlife habitats present within the project site (necessary to address impacts to special-status species known from the area). • Evaluation of sensitive biological resources that could be present or that the resource agencies would regard as present on the project site. M&A will evaluate the presence of special-status species including plants and animals so designated by the USFWS, CDFW, and other resource organizations including the California Native Plant Society. • Biological resources also include discussion of “waters of the United States” as regulated by the Corps, and “waters of the State” as regulated by the RWQCB and the CDFW. • Review of any local ordinances that are pertinent to a City/County review of any proposed project, including General Plan Policies and other ordinances. • Review of pertinent regulatory requirements from other regulatory agencies. M&A will examine Fish & Game Code administered by the CDFW, and regulations administered by the Corps, RWQCB, and USFWS.

Task 1A. Background Research
M&A would review the CDFW’s most current version of the Natural Diversity Data Base (RareFind 5 application) for records of special-status plant and animal species known from the project site and within 3 miles of the project site. Similarly, the California Native Plant Society’s (CNPS) electronic update of the Inventory of Rare and Endangered Vascular Plants of California (Fifth Edition) would be checked for information concerning the potential occurrence of special-status plant species in the area of the project site. 278
Revised Cost Proposal to Prepare a California Environmental Quality Act Biology Section and the Permit Application for Coverage Under the East Contra Costa County Habitat Conservation Plan and Natural Community Conservation Plan
Bridgehead Logistics Center, Oakley, California
APN: 037-020-007, 037-040-007, 037-040-015 (~160 Acres)

Page 3 ends

Monk & associates
Project Biologist II 2 hours @ $147/hr. $ 294.00
Staff Biologist 4 hours @ $116/hr. $ 464.00
California Natural Diversity Data Base Search Fees $ 50.00 Subtotal Cost of Task 1A: $ 808.00
Task 1B. Perform a Site Visit to Characterize Vegetation Communities and Animals Observed or Expected to Occur on the Project Site
It will be necessary to have a wetland specialist/botanist and a wildlife biologist conduct a cursory site survey to confirm current project site plant communities and wildlife habitats.

During the project site visit, a list of all plants and animals observed or expected to occur on the project site will be prepared. Habitats potentially supporting special-status plant or animal species on the project site, or within a zone of influence around the project site, will be recorded.

Principal Biologist 8 hours @ $210/hr. $ 1,680.00
Project Biologist II 8 hours @ $147/hr. $ 1,176.00
Mileage 60 miles @ $0.655/mile $ 39.30
GPS Rental $ 50.00
Subtotal Cost of Task 1B: $ 2,945.30
Task 1C. Prepare Biological Resources Analysis Report
Task 1C-a. Plants, Animals, and Waters of the State/United States A characterization of the project site will be prepared that includes a discussion of the project site’s plant communities and wildlife habitats. Lists of all plant and animal species observed or expected to occur on the site will be prepared. Finally, “waters of the United States” subject to regulation by the Corps or RWQCB, will be discussed.

Project Biologist II 4 hours @ $147/hr. $ 588.00
Principal Biologist 4 hours @ $210/hr. $ 840.00
Subtotal Cost of Task 1C-a: $ 1,428.00
Task 1C-b. Report Preparation – Evaluation of Potential Special-Status Species and Sensitive Habitats
From M&A’s literature review and site survey, the potential presence of special-status plant and animal species and/or their habitats on the project site will be evaluated and discussed. This task also includes the hours necessary to prepare a table that addresses known special-status species 279
Revised Cost Proposal to Prepare a California Environmental Quality Act Biology Section and the Permit Application for Coverage Under the East Contra Costa County Habitat Conservation Plan and Natural Community Conservation Plan
Bridgehead Logistics Center, Oakley, California
APN: 037-020-007, 037-040-007, 037-040-015 (~160 Acres)

Page 4 ends

Monk & associates
from resource agency data bases and/or that are otherwise known from the region of the project site.

Project Biologist II 4 hours @ $147/hr. $ 588.00
Principal Biologist 4 hours @ $210/hr. $ 840.00
Subtotal Cost of Task 1C-b: $ 1,428.00
Task 1C-c. Discussion of Regulatory Considerations for Project-Related Impacts to SpecialStatus Plant and Animal Species and Waters of the U.S.

Principal Biologist 8 hours @ $210/hr. $ 1,680.00
Project Biologist II 8 hours @ $147/hr. $ 1,176.00
Subtotal Cost of Task 1C-c: $ 2,856.00
Task 1C-d. Mitigation Measures for Project Related Impacts If necessary, mitigation measures will be developed that reduce potentially significant biological impacts to a level considered less than significant pursuant to CEQA, or to the greatest extent practicable.

Principal Biologist 8 hours @ $210/hr. $ 1,680.00
Project Biologist II 8 hours @ $147/hr. $ 1,176.00
Subtotal Cost of Task 1C-d: $ 2,856.00
Subtotal Cost of Task 1C: $ 8,568.00
Task 1D. Prepare Graphics.

M&A will prepare suitable graphics for inclusion in our report (for example, site location maps, a vegetation/wildlife habitat map, a data base records graphic).

Graphics 4 hours @$141/hr. $ 564.00
Report Materials Costs, Photocopying $ 25.00
Subtotal Task 1D: $ 589.00
Subtotal Cost of Task 1: $12,910.30
280
Revised Cost Proposal to Prepare a California Environmental Quality Act Biology Section and the Permit Application for Coverage Under the East Contra Costa County Habitat Conservation Plan and Natural Community Conservation Plan
Bridgehead Logistics Center, Oakley, California
APN: 037-020-007, 037-040-007, 037-040-015 (~160 Acres)

Page 5 ends

Monk & associates
Task 2: Prepare Planning Survey Report for the Project’s Coverage Under the

HCP/NCCP
M&A will prepare a Planning Survey Report (PSR) application for the East Contra Costa County Habitat Conservancy for the project’s coverage under the Habitat Conservation Plan and Natural Communities Conservation Plan (HCP/NCCP). Use of the HCP/NCCP is granted through a fee payment to the HCP/NCCP participating entity; the City of Oakley is a participating City in the HCP/NCCP. The HCP/NCCP provides “incidental take” coverage and provides the required mitigation for potential project-related impacts to most (there are rare exceptions) regionally known special-status plant and animal species (known as “covered species” under the HCP/NCCP). This includes most species listed under the California and Federal Endangered Species Acts, and species with lower regulatory status that typically generate mitigation requirements for applicants undertaking development projects. The HCP/NCCP application would be submitted to the City of Oakley for approval as they are a participating City in the HCP/NCCP. That said, M&A routinely submits a draft application package to the East Contra Costa County Conservancy (Conservancy), the HCP/NCCP administrating agency, during permit preparation as they always have many requested changes to the application package. Thus, by the time we submit the application to the City of Oakley all the details are agreed upon by the HCP/NCCP administrator, saving time and middle-person labor. The time budgeted in this task allows for the preparation of a draft submittal that will be submitted to the Conservancy and the City of Oakley, and for subsequent modifications that are typically requested by the Conservancy at the draft submittal stage.

Principal Biologist 4 hours @ $210/hr. $ 840.00
Project Biologist II 32 hours @ $147/hr. $ 4,704.00
Staff Biologist 8 hours @ $116/hr. $ 928.00
Graphics 4 hours @ $141/hr. $ 564.00
Office Manager 2 hours @ $110/hr. $ 220.00
Report Materials Costs, Photocopying $ 50.00
Subtotal Cost of Task 2: $ 7,106.00
281
Revised Cost Proposal to Prepare a California Environmental Quality Act Biology Section and the Permit Application for Coverage Under the East Contra Costa County Habitat Conservation Plan and Natural Community Conservation Plan
Bridgehead Logistics Center, Oakley, California
APN: 037-020-007, 037-040-007, 037-040-015 (~160 Acres)

Page 6 ends

Monk & associates
Task 3. Project Management
Project management tasks include report and graphics preparation oversight, and telephone calls with the project civil engineer, client and/or its contractors. Administrative tasks include contracting, billing, and budget tracking. This task does not include additional meetings or Zoom calls.

Principal Biologist 4 hours @ $210/hr. $ 840.00
Project Biologist II 4 hours @ $147/hr. $ 588.00
Office Manager 4 hours @ $110/hr. $ 440.00
Subtotal Costs Task 3: $ 1,868.00
Total Proposed Costs: $21,884.30

CONDITIONS
• It should be noted that 1.26 acres of the project site are outside of the HCP area. As such any impacts to special-status species may require a California Department of Fish and Wildlife (CDFW) Incidental Take permit and/or U.S. Fish and Wildlife Service Biological Opinion.

This cost proposal does not include the tasks to prepare the CDFW Incidental Take permit application or the USFWS Section 7 or 10 permit applications.

THE FOLLOWING TASKS ARE BEYOND THIS SCOPE OF WORK
• M&A is not proposing to conduct any focused surveys for special-status plant or animal species. If necessary, M&A would discuss with Client and could prepare a Task proposal thereafter. Note that even with use of the HCP, rare plant surveys can be required as part of the application process.
• If necessary, in the future, M&A could prepare any required permit applications if the project would impact waters of the U.S./State. Fortunately, the HCP makes obtaining a Corps permit a bit easier than in the absence of the HCP.
• M&A has not proposed to acquire any environmental permit(s) within this proposal. M&A, however, does have the capability of assisting with acquisition of applicable environmental permits including permits and/or authorizations issued by the U.S. Army Corps of Engineers (Corps), U.S. Fish and Wildlife Service, California Regional Water Quality Control Board, and/or California Department of Fish and Wildlife. M&A will be happy to prepare a separate proposal at a later date that will detail tasks and costs of assisting with preparation of any necessary environmental permit applications.
282
Revised Cost Proposal to Prepare a California Environmental Quality Act Biology Section and the Permit Application for Coverage Under the East Contra Costa County Habitat Conservation Plan and Natural Community Conservation Plan
Bridgehead Logistics Center, Oakley, California
APN: 037-020-007, 037-040-007, 037-040-015 (~160 Acres)

Page 7 ends

Monk & associates
• M&A has not proposed to prepare a formal delineation of waters of the U.S. and State (which include wetlands), although our report would state whether potential jurisdictional areas occur on the site. It should be noted that only the Corps can determine the extent of its jurisdiction, but that wetland consultants typically prepare a preliminary jurisdictional map of the project site for the Corps. Should M&A see a need to prepare such a map (and delineation report for the Corps) we will notify you of the necessity of completing such work. This work would require a budget revision.
• M&A cannot warrant that use of the East Contra Costa County Habitat Conservation Plan will be granted by the Conservancy, only that we will endeavor to obtain coverage under the HCP/NCCP for the proposed project. The likelihood of obtaining coverage under the HCP, provided the project is within the mapped area of coverage of the HCP, is very high. • Please note that sometimes applications get particular attention by a project manager at the Conservancy requiring additional investigations or modifications/analyses for the PSR. M&A is only proposing to prepare a straight forward PSR, the way we see the issues now. We prepare PSRs routinely and know from experience that some require extensive review, while others go straight through. We would hope your PSR application goes straight through. That said, if the PSR gets worked over and requires more than simple revisions, we may have to amend this proposal to cover any additional services that are required. We truly hope this will not be the case.
• Any unscheduled meetings would require a budget revision.

CAVEATS
• M&A requires authorization to be on the site. Your signature on this proposal constitutes written permission that M&A can be on the site. This contract agreement is a conveyed permission for M&A and any necessary personnel to access the project site with M&A. If there are special entrance instructions, please be sure to let M&A know right away. • If the execution of the proposed work takes longer than one year from acceptance of this proposal, owing to no fault of M&A (for example this happens when project plans are not far enough along etc. and the job has long delays in starting), M&A reserves the right to adjust our billing rates to be consistent with our normal schedule of charges in the year work actually commences.
• The costs presented herein are a guideline. All task costs will be averaged over the total budget to account for the complete products proposed herein. If selected tasks are approved and others not approved, M&A will have to revise individual task costs. 283
Revised Cost Proposal to Prepare a California Environmental Quality Act Biology Section and the Permit Application for Coverage Under the East Contra Costa County Habitat Conservation Plan and Natural Community Conservation Plan
Bridgehead Logistics Center, Oakley, California
APN: 037-020-007, 037-040-007, 037-040-015 (~160 Acres)

Page 8 ends

Monk & associates
• Any unspecified new work that develops or becomes necessary will be charged for on a T&M basis in accordance with the attached Schedule of Charges. • This proposal is good for 60 days.

All work performed under this agreement will be on a time and materials basis in accordance to costs proposed herein. Task that are not completed or only partially completed will only be billed in accordance with actual work completed and/or material expenditures as required for the portion of work completed. You may terminate any and all work at any time, allowing M&A 48 hours of time to formally close the books on the job and process final billing. No unauthorized work would be completed without a formal request and approval from you.

M&A appreciates the opportunity to be able to assist you with this project. Please call Ms. Sarah Lynch at (925) 947-4867 ext. 203 should you wish to discuss any aspect of the proposal.

Sincerely,
Christopher Milliken
Office Manager
I/We agree to the terms of this Cost Proposal. I/We also permit work to proceed in accordance with this Cost Proposal. I/We agree to pay Monk & Associates, Inc., to perform the tasks proposed herein. Payment will be made to M&A Net 30 days from the invoice date(s). ___________________________________________________
Duly Authorized Approval Signature
___________________________________________________
Name (Please Print)
___________________________________________________ _________________ Title Date
284

MONK & ASSOCIATES
Environmental Consultants
1136 Saranap Ave., Suite Q  Walnut Creek  California  94595 (925) 947-4867  [email protected]

SCHEDULE OF CHARGES
Attachment B
August 2023
Hourly Rates
Principal Biologist Field Work/Permitting/Agency Negotiations $210/hour Principal Biologist Testimony/Public Hearings/Affidavits $350/hour in 4-hour increments.

Senior Associate Biologist Field/Office Work $205/hour
Associate Biologist Field/Office Work $180/hour
Senior Botanist Field/Office Work $163/hour
Senior Biologist Field/Office Work $163/hour
Project Botanist Field/Office Work $147/hour
Project Biologist II Field/Office Work $147/hour
Project Biologist I Field/Office Work $141/hour
Staff Biologist Field/Office Work $116/hour
Office Manager $110/hour
Graphics $141/hour
Sub-contracting Biologists Field Work $116 to $210/hour • Any Biological Construction Monitoring performed on weekends will be billed at 1.5 times the hourly rate.

Other Expenses (Flat Rates)
Any invoices submitted through 3rd Party Online Portal: $100 plus portal service fee + 15% would require a budget amendment or change order.

Any weekly Zoom calls, Microsoft Teams calls, or conference calls would require a budget amendment or change order.

Per Diem: $250/day/per person (major metropolitan/Rural areas may be adjusted to hotel rate plus $60/day)
Vehicles: Passenger vehicle: $0.655/mile
Oversize Maps $2.00/square foot.

Color Photographs (laser printed, $2.00 per page).

Air fares: Cost plus 10 percent
Materials/Supplies/Permit & Fees Payments : Cost plus 15 percent Equipment Rentals: GPS (sub-meter accuracy) $50/day. Surveillance Cameras $15/day each; rodent traps 0.20/day each; Burrowing owl eviction doors at $5.00/day each; medium- size mammal traps $5.00/day each. Spotlight charged at $3.00/day. Other equipment priced on a job basis by approved proposal. 285
APPENDIX B: TOM ORGIER & ASSOCI AT ES

SCOPE OF WORK
286
Tom Origer & Associates
Archaeology / Historical Research
www.origer.com P.O. Box 1531, Rohnert Park, California 94927 (707) 584-8200 August 1, 2023
Malena Garcia
Raney Planning and Management, Inc.
1501 Sports Drive, Suite A
Sacramento, CA 95834
RE: Proposal to conduct a Cultural Resources Study for the Bridgehead – Big Break Road Project, Oakley, Contra Costa County
Dear Ms. Garcia:

I write to provide you with a proposal to complete a cultural resources study for the Bridgehead – Big Break Road Project, Oakley, Contra Costa County. Our proposed scope of services is designed to meet the requirements of the California Environmental Quality Act and those of the City of Oakley, and includes the following:
• Archival research at the Northwest Information Center, and the offices of Tom Origer & Associates.
• Contact with the Native American Heritage Commission and local Native American tribes and individuals. This notification does not constitute formal consultation. • Field study of the ~160-acre project site. Preliminary documentation on DPR 523 forms will be completed if cultural resources are found.
• Preparation of a written report of findings that summarizes the preceding tasks and offers recommendations for the treatment of cultural resources.

The cost for the above scope is $9,525.00, which allows for the documentation of three cultural resources.

If additional cultural resources are found, the cost to document them is approximately $560.00 per resource.

However, if no cultural resources are found then the final cost of the invoice will be less.

The above cost assumes that our report will be submitted to the City of Oakley for review. If any additional agencies review our report and require changes, additional costs may be incurred. This proposal will remain in effect for 45 days. No formal evaluation of resources is proposed under this scope of work. We estimate that all work can be completed within 30 business days of receipt of authorization to proceed. We anticipate that you will arrange access to the project area.

Please contact us if you have questions.

Sincerely,
Eileen Barrow
Senior Associate
287
APPENDIX C: SAXELBY ACOUST ICS

SCOPE OF WORK
288
August 2, 2023
Malena Garcia
Raney Planning & Management
1501 Sports Drive
Sacramento, California 95834
[email protected]
Subject: Proposal to Prepare an CEQA Noise/Vibration Analysis for the Bridgehead Logistics Center EIR – City of Oakley, California
Dear Ms. Garcia:

Based upon the information you provided, Saxelby Acoustics is pleased to provide the following scope of services for the above-referenced project located in the City of Oakley, California. It is our understanding that the project includes approximately 1.6 million sf of office and warehouse buildings on the north 87.6- acre parcel and an additional 1.4 million sf of warehouse on the south 72.8-acre site. We propose to provide the following scope to prepare a noise and vibration study for use in the project EIR.

Scope of Work:

Task 1 – CEQA Noise and Vibration Study
1A. Existing Noise Environment:
 Transportation Noise: Existing noise levels due to nearby transportation noise sources will be quantified. Saxelby Acoustics uses the Federal Highway Administration (FHWA) traffic noise prediction model for the prediction of traffic noise levels. Direct inputs to the traffic model will include traffic data provided by the project traffic engineer, existing posted speed limits, truck count information, and 24-hour traffic split data collected by Saxelby Acoustics.  Community Noise Survey: Saxelby Acoustics will conduct a noise survey within the project site to quantify existing background noise levels. The noise survey will consist of short-term noise level measurements and continuous noise level measurements for a minimum period of 24-hours.
1B. Analysis of Traffic Noise Environment:

Saxelby Acoustics will evaluate increased traffic noise levels at existing sensitive receptors in the project vicinity. This task will be performed using traffic volumes and truck trips to be provided by the traffic engineer. We anticipate providing traffic noise levels for existing, existing plus project, cumulative, and cumulative plus project scenarios. However, should additional scenarios be included in the traffic study, we will also evaluate those scenarios. 289

Malena Garcia, RPM August 2, 2023 www.SaxNoise.com
\\192.168.68.50\Saxelby Acoustics\General\Sax Acoustic Files\Proposals\Environmental - RPM - City of Oakley - Contra Costa County - Bridgehead Logistics Center.docx 1C. Analysis of Stationary Noise Environment:

Saxelby Acoustics will provide an analysis of noise levels associated with the proposed project at the nearest noise-sensitive residential uses. It is expected that this would include evaluation of the proposed loading docks, on-site truck circulation, parking lots, and any proposed mechanical equipment. We will also conduct an analysis of the noise and vibration impacts associated with construction of the project at existing sensitive receptors in the project vicinity. It is expected that this analysis will follow the assumptions used in the project air quality analysis. 1D. Report Preparation:

Saxelby Acoustics will provide a draft report which details our findings, methodology, and noise reduction measures (if required). The report will be prepared to meet the requirements of the City of Oakley and CEQA. Saxelby Acoustics will provide the technical noise study in a generic technical format, or a RPM specific format if preferred. 1E. Response to Comments:

Saxelby Acoustics will respond to comments on the draft technical report. After comments are received, a final report will be provided.

Fee:

Saxelby Acoustics will conduct the above-described scope of work for a total fee of $11,009.60, including expenses, as outlined below.

Saxelby Acoustics Fee Proposal – Bridgehead Logistics Center Attendance at additional meetings or performance of additional work which is outside of this proposal will be invoiced based upon hourly rates and expenses, as outlined in the attached fee schedule.

Task Description Fee
1A Existing Noise Environment
Technical Staff 16 hrs. $ 150 /hr. $2,400
Mileage 320 miles $ 0.655 /mile $209.60
1B Analysis of Traffic Noise on Existing Uses
Principal Consultant 4 hrs. $ 200 /hr. $800
Technical Staff 8 hrs. $ 150 /hr. $1,200
1C Analysis of Stationary Noise Environment
Principal Consultant 4 hrs. $ 200 /hr. $800
Technical Staff 16 hrs. $ 150 /hr. $2,400
1D Report Preparation
Principal Consultant 4 hrs. $ 200 /hr. $800
Technical Staff 8 hrs. $ 150 /hr. $1,200
AdministraƟon 4 hrs. $ 100 /hr. $400
1E Response to Comments
Principal Consultant 4 hrs. $ 200 /hr. $800
$11,009.60
Task 1 – CEQA Noise and Vibration Study
Quantity Rate
Total for Task 1:
290

Malena Garcia, RPM August 2, 2023 www.SaxNoise.com
\\192.168.68.50\Saxelby Acoustics\General\Sax Acoustic Files\Proposals\Environmental - RPM - City of Oakley - Contra Costa County - Bridgehead Logistics Center.docx Timing:

We will commit to meeting deadlines as required to keep the project schedule. We request two weeks to provide a completed study after receipt of traffic volumes from the traffic engineer.

Saxelby Acoustics maintains automobile, general, workers compensation, and professional liability insurance policies as outlined on the attached fee schedule.

Thank you again for inviting our proposal, and please call or email me if you have any questions.

Sincerely,
Saxelby Acoustics LLC
Luke Saxelby, INCE Bd. Cert.

Principal Consultant
Board Certified, Institute of Noise Control Engineering

291

Malena Garcia, RPM August 2, 2023 www.SaxNoise.com
\\192.168.68.50\Saxelby Acoustics\General\Sax Acoustic Files\Proposals\Environmental - RPM - City of Oakley - Contra Costa County - Bridgehead Logistics Center.docx Saxelby Acoustics 2023 Fee Schedule and Consulting Terms Item Rate
Principal Consultant
Regular Rate
Legal Rate (Inspections, depositions, court testimony, expert witness conference, etc.)
$200/hr.
$500/hr.

Technical Staff $150/hr.

Administrative Staff $100/hr.

Mileage Rate IRS Rate ($0.655/mile)
Meals and Lodging $250/day
Sound Level Meter
Basic (daily)
Basic (weekly)
Advanced (daily)
Advanced (weekly)
Very Low Noise (daily)
Very Low Noise (weekly)
Sound Meter – Advanced Outdoor Setup
Very low noise, wind measurement, audio recording, solar panels, environmental protection shroud, etc.
$100/day
$400/week
$150/day
$600/week
$200/day
$800/week
$1,000/week
IIC Tapping Machine $500/day
$2000/week
Sound System for Acoustic Testing $200/day
$800/week
Vibration Sensor with Calibrator $200/day
$800/week
Insurance Coverage
Saxelby Acoustics LLC maintains the following insurance limits:
 Commercial General Liability – $2,000,000 per occurrence / $4,000,000 aggregate  Auto Liability – $1,000,000
 Umbrella Liability – $3,000,000 per occurrence / $3,000,000 aggregate  Worker’s Compensation – Per Statute
 Professional Liability - $1,000,000
Certificates of insurance to our clients can be issued for no additional fee.

Request for Retainers
For new clients, a retainer of up to 50% of the contract is required prior to beginning work on the project. Payment for the balance of the study will be required prior to issuance of signed/stamped report.

Invoicing and Terms of Payment
Saxelby Acoustics reserves the right to submit monthly invoices for services and expenses which have been incurred when the project duration is expected to exceed 30 days. Payment for professional services is due within 30 days of the invoice date, and past due thereafter. Past due invoices will incur interest at the rate of 2% per month on the balance due, unless otherwise agreed upon. We will accept bank transfer (ACH) and credit card payments for no additional fee. Cash payments are not accepted.
292
APPENDIX D: FEHR & PEERS

SCOPE OF WORK
293
100 Pringle Avenue | Suite 600 | Walnut Creek, CA 94596 | T: (925) 930-7100 | F: (925) 933-7090 www.fehrandpeers.com
August 8, 2023
Malena Garcia
Marketing Assistant
Raney Planning and Management
1501 Sports Drive, Suite A
Sacramento, CA 95834
Subject: Proposal – CEQA Transportation Study – Project Bridgehead/Oakley Dear Malena:

Fehr & Peers is pleased to submit this proposal to prepare a Transportation Impact Assessment as part of California Environmental Quality Act (CEQA) review for the proposed Project Bridgehead development in Oakley, California. We understand that the project contemplates a substantial warehousing and distribution facility of approximately 3.0 million square feet on a site located north of Main Street between Big Break Road and Bridgehead Road. Access to the site would be provided by Big Break Road, Bridgehead Road, and Main Street. Regional access is primarily available via full movement interchanges with State Route 160 at Main Street and Wilbur Avenue.

The following scope of work outlines tasks to prepare a city standard Transportation Impact Assessment for the project for use within CEQA review. We have developed this draft scope of work based on our understanding of the project and the city’s typical requirements for large development projects (City of Oakley, Traffic Impact Analysis Guidelines, October 2018). As the project will generate more than 100 trips in both the weekday morning and evening peak hours, the preparation of a full Contra Costa Transportation Authority (CCTA) compliant TIA is required.

It should be noted that this draft scope of work will need to be reviewed and approved by City staff. At this time, we have included the calculation of both intersection level of service and Vehicle Miles Traveled (VMT). While VMT is currently used and required within California environmental assessments, most cities, including Oakley, still desire the evaluation of levels of service to understand project effects and provide information to the public. 294
Malena Garcia
August 8, 2023

Page 2 of 7 ends
← All documents from this meeting