CITY OF ONTARIO
Regular City Council/Housing Authority
Meeting
JANUARY 21, 2025
City Hall
303 East B Street, Ontario, CA 91764

MAYOR PAUL S. LEON • MAYOR PRO TEM DEBRA PORADA
COUNCIL MEMBERS ALAN D. WAPNER, JIM W. BOWMAN AND DAISY MACIAS CITY CLERK SHEILA MAUTZ • TREASURER JAMES R. MILHISER
CITY MANAGER SCOTT OCHOA • CITY ATTORNEY RUBEN DURAN

WELCOME TO A MEETING OF THE ONTARIO CITY COUNCIL

All documents for public review are on file with the Records Management/City Clerk's Department located at 303 East B Street, Ontario, CA 91764.

Anyone wishing to speak in person during public comment or on a particular item will be required to fill out a blue slip. Blue slips must be turned in prior to public comment beginning or before an agenda item is taken up. The Clerk will not accept blue slips after that time. To comment by email, submit your comments no later than 4:00 p.m. on the day of the meeting by emailing your name, agenda item you are commenting on and your comments to
[email protected].

All
comments received by the deadline will be forwarded to the City Council for consideration before action is taken on the matter and will be entered into the record.

Speakers will be alerted when they have 1 minute remaining and when their time is up. Speakers are then to return to their seats and no further comments will be permitted.

In accordance with State Law, remarks during public comment are to be limited to subjects within Council's jurisdiction. Remarks on other agenda items will be limited to those items.

Remarks from those seated or standing in the back of the chamber will not permitted. All those wishing to speak including Council and Staff need to be recognized by the Chair before speaking.

CITY OF ONTARIO Regular City Council/Housing Authority Meeting CITY HALL 303 EAST B STREET, ONTARIO CA 91764 • www.OntarioCA.gov 1

ACCOMMODATIONS

If you need special assistance or accommodations to participate in this meeting, please contact the City Clerk's office at 909-395-2009. Notification of 48 hours prior to the meeting will help the City make reasonable arrangements. Equipment for the hearing impaired is available in the Records Management Office.

ORDER OF BUSINESS

The regular City Council and Housing Authority meeting begins with Closed Session and Closed Session Comment at
6:00 p.m.
, Public Comment at 6:30 p.m. immediately followed by the Regular Meeting and Public Hearings. No agenda item will be introduced for consideration after 10:00 p.m. except by majority vote of the City Council.

CALL TO ORDER
(OPEN SESSION)

ROLL CALL

Porada, Wapner, Bowman, Macias, Mayor/Chairman Leon

CLOSED SESSION PUBLIC COMMENT

The Closed Session Public Comment portion of the Council/Housing Authority meeting is limited to matters appearing on the Closed Session. Additional opportunities for further Public Comment will be given during and at the end of the meeting.

CLOSED SESSION
GC 54956.9(d)(1), CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION City of Ontario, et al. v. Inland Empire Utilities Agency , Orange County Superior Court Case No. 30-
2023-01344236-CU-WM-CJC
Chino Basin Municipal Water District v. City of Chino, et al. , San Bernardino Superior Court Case No.

RCVRS 51010
Chino Basin Municipal Water District v. City of Chino et al ., San Bernardino Superior Court Case No.

RCVRS 51010, 4th District Appellate Case No. E080457
GC 54956.8, CONFERENCE WITH REAL PROPERTY NEGOTIATORS
Property: APN: 1047-172-17; 1005-1007 East Sixth Street; City/Authority negotiator: Scott Ochoa or his designee; Negotiating parties: T&S Allied Investments, LLC; Under negotiation: Price and terms of payment
GC 54956.8, CONFERENCE WITH REAL PROPERTY NEGOTIATORS
CITY OF ONTARIO Regular City Council/Housing Authority Meeting CITY HALL 303 EAST B STREET, ONTARIO CA 91764 • www.OntarioCA.gov 2

ATTACHMENT:

20250121 Closed Session
Property: APN: 1047-172-22; 1023 East Sixth Street; City/Authority negotiator: Scott Ochoa or his designee; Negotiating parties: TAVK Holding, LLC; Under negotiation: Price and terms of payment

PLEDGE OF ALLEGIANCE
Council Member Bowman

INVOCATION
Senior Pastor Gresford Thomas, Ontario Seventh Day Adventist

REPORT ON CLOSED SESSION
City Attorney
PUBLIC COMMENTS 6:30 P.M.

The Public Comment portion of the Council/Housing Authority meeting is limited to 30 minutes.

An opportunity for further Public Comment may be given at the end of the meeting. Under provisions of the Brown Act, Council is prohibited from taking action on oral requests.

To comment by email, submit your comments by email no later than 4:00 p.m. on the day of the meeting by emailing your name, agenda item you are commenting on and your comment to [email protected]. All Comments received by the deadline will be forwarded to the City Council for consideration before action is taken on the matter and entered into the record. As previously noted -- if you wish to address the Council, fill out one of the blue slips at the rear of the chambers and give it to the City Clerk.

AGENDA REVIEW/ANNOUNCEMENTS

The City Manager will go over all updated materials and correspondence received after the Agenda was distributed to ensure Council Members have received them. He will also make any necessary recommendations regarding Agenda modifications or announcements regarding Agenda items to be considered.

INFORMATION RELATIVE TO POSSIBLE CONFLICT OF INTEREST
Agenda item contractors, subcontractors and agents may require member abstentions due to conflict of interests and financial interests. Council Member abstentions shall be stated under this item for recordation on the appropriate item.

CITY OF ONTARIO Regular City Council/Housing Authority Meeting CITY HALL 303 EAST B STREET, ONTARIO CA 91764 • www.OntarioCA.gov 3

1. APPROVAL OF MINUTES

ATTACHMENT:

20241203 Meeting Minutes (Not Official Until Approved).docx

ATTACHMENT:

20241217 Meeting Minutes (Not Official Until Approved).docx

2. BILLS & PAYROLL

3. PRE-AUTHORIZED LIST OF VENDORS TO PROVIDE SPECIALIZED PERSONAL PROTECTIVE

EQUIPMENT, MAINTENANCE AND SPECIALIZED SERVICE

4. A RESOLUTION FOR PLACEMENT OF SPECIAL ASSESSMENTS ON THE SAN BERNARDINO

COUNTY TAX ROLLS

ATTACHMENT:

20250121 Special Assessments for County Tax Rolls 01^RESO^RM.docx

ATTACHMENT:

20250121_Special Assessments^02 - Exhibit A.pdf

ATTACHMENT:

20250121_Special Assessments^03 - Exhibit B.pdf

ATTACHMENT:

20250121_Special Assessments^04 - Exhibit C.pdf

5. DESIGNATION OF VOTING DELEGATE FOR THE SOUTHERN CALIFORNIA ASSOCIATION OF

CONSENT CALENDAR

All matters listed under CONSENT CALENDAR will be enacted by one motion in the form listed below – there will be no separate discussion on these items prior to the time Council votes on them, unless a member of the Council requests a specific item be removed from the Consent Calendar for a separate vote.

Minutes for the regular meetings of the City Council and Housing Authority of December 3, 2024 and December 17, 2024 and approving same as on file in the Records Management Department.

Bills December 12, 2024 through January 2, 2025, and Payroll December 1, 2024 through December 14, 2024.

That the City Council approve a pre-authorized vendors list to provide personal protective equipment and maintenance services for emergency equipment and services for the Fire Department.

That the City Council adopt a Resolution for recovery of fees and costs incurred in abating property and dangerous building violations, as well as administrative citations and civil penalties associated with property maintenance violations and placing assessments on the San Bernardino County Tax Rolls.

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ONTARIO, CALIFORNIA, ADOPTING A

REPORT REQUESTING THE PLACEMENT OF SPECIAL ASSESSMENTS ON PROPERTY TAX BILLS

FOR CIVIL PENALTIES OR RECOVERY OF COSTS INCURRED FOR ABATEMENT OF VIOLATIONS OF CITY CODES AND ORDINANCES.

CITY OF ONTARIO Regular City Council/Housing Authority Meeting CITY HALL 303 EAST B STREET, ONTARIO CA 91764 • www.OntarioCA.gov 4

GOVERNMENTS GENERAL ASSEMBLY

6. AN AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT WITH PURESOUND

PRODUCTIONS FOR AUDIO, VISUAL AND LIGHTING SERVICES

ATTACHMENT:

Amendment No 3 Paul Pierce - Unilateral No Cost Option to Extend with Additional Funds Agreement.pdf

7. A CONSTRUCTION CONTRACT WITH PUB CONSTRUCTION, INC. FOR THE JAMES R. BRYANT

PARK FUTSAL COURT RENOVATION

ATTACHMENT:

James R Bryant Futsal Court Renovation PM 2425-20 Agreement.pdf

8. MAINTENANCE SERVICES AGREEMENTS WITH BRIGHTVIEW LANDSCAPE SERVICES, INC.

FOR OLD MODEL COLONY WEED ABATEMENT AND PRIORITY LANDSCAPE SERVICES, LLC.

FOR CELEBRATION PARK NORTH AND SOUTH

ATTACHMENT:

Maintenance Services Agreement-BrightView Landscape Services, Inc That the City Council designate Mayor Pro Tem Debra Porada as the City's voting delegate and Mayor Paul Leon as the alternate representative for the Southern California California Association of Governments (SCAG) General Assembly scheduled for May 1, 2025.

That the City Council authorize the City Manager, or his designee, to execute Amendment No. 3 to the Professional Services Agreement with Puresound Productions in the amount of $170,000 for a total not-to-exceed contract amount of $320,000 and extend the contract term to June 30, 2026.

That the City Council take the following actions:

A
.

Authorize the City Manager, or his designee, to execute Construction Contract No. PM 2425-20 with PUB Construction, Inc., of Diamond Bar, California, for the James R. Bryant Park Futsal Court Renovation Project for a total contract amount of $329,202 and authorize a 10% contingency of $32,920 for a total not-to-exceed contract amount of $362,122; and
B
.

Authorize the City Manager, or his designee, to execute all documents required for the completion of the project including, but not limited to, contracts, agreements, assessments, reductions of retention accounts, and filing a notice of completion at the conclusion of all construction-related activities.

That the City Council take the following actions:

A
.

Authorize the City Manager, or his designee, to execute a Maintenance Services Agreement
with BrightView Landscape Services, Inc., of Upland, California, for Old Model
Colony Weed Abatement for a total
not-to-exceed
contract amount of $863,784 for up to
five (5) years; and
B
.

Authorize the City Manager, or his designee, to execute a Maintenance Services Agreement
with Priority Landscape Services, LLC., of Anaheim, California, for Celebration
Park North and South for a total
not-to-exceed
contract amount of $952,902 for up to
five (5) years.

CITY OF ONTARIO Regular City Council/Housing Authority Meeting CITY HALL 303 EAST B STREET, ONTARIO CA 91764 • www.OntarioCA.gov 5

ATTACHMENT:

Maintenance Services Agreement-Priority Landscape Services, LLC

9. AMENDMENTS TO THE MAINTENANCE SERVICES AGREEMENT WITH CONVERGINT

TECHNOLOGIES, LLC FOR THE ONTARIO MUSEUM OF HISTORY AND ARTS EXTERIOR DOOR

ACCESS CONTROL UPGRADE AND THE CCTV INTERSECTION CAMERA INSTALLATION

PROJECT

ATTACHMENT:

Amendment No. 3 - Convergint Technologies, LLC.pdf

ATTACHMENT:

Amendment No. 4 - Convergint Technologies, LLC.pdf

10. AN AMENDMENT TO THE DESIGN SERVICES AGREEMENT WITH RJM DESIGN GROUP, INC.

FOR ON-CALL LANDSCAPE ARCHITECTURAL SERVICES FOR THE ONTARIO SPORTS EMPIRE

PROJECT

ATTACHMENT:

Amendment No. 2- RJM Design Group, Inc..pdf

11. AN AMENDMENT TO THE GOODS AND SERVICES AGREEMENT WITH FLOCK GROUP INC

FOR THE AUTOMATED LICENSE PLATE RECOGNITION SYSTEM
That the City Council take the following actions:

A
.

Authorize the City Manager, or his designee, to execute Amendment No. 3 to the Maintenance Services Agreement with Convergint Technologies, LLC, of La Palma, California, for the Ontario Museum of History and Arts Exterior Door Access Control Upgrade in the amount of $8,648 for a total not-to-exceed contract amount of $3,851,128, and
B
.

Authorize the City Manager, or his designee, to execute Amendment No. 4 to the Maintenance Services Agreement with Convergint Technologies, LLC, of La Palma, California, for the Closed-Circuit Television (CCTV) Intersection Camera Installation Project in the amount of $402,348 for a total not-to-exceed contract amount of $4,253,476; and
C
.

Authorize the City Manager, or his designee, to execute all documents required for the completion of the project including, but not limited to agreements, assessments, easements, reduction of retention accounts, contracts amendments within the authorization limits, and filing a notice of completion at the conclusion of all construction related activities.

That the City Council take the following actions:

A
.

Authorize the City Manager, or his designee, to execute Amendment No. 2 to the Design Services Agreement with RJM Design Group, Inc. (RJM), of San Juan Capistrano, California, to provide on-call landscape architectural services for the Ontario Sports Empire Project in the amount of $581,710 for a total not-to-exceed contract amount of $1,240,575; B
.

Authorize the City Manager, or his designee, to execute all documents required for the completion of the project including, but not limited to, contracts, agreements, assessments, easements, reduction of retention accounts, and filing a notice of completion at the conclusion of all construction related activities.

CITY OF ONTARIO Regular City Council/Housing Authority Meeting CITY HALL 303 EAST B STREET, ONTARIO CA 91764 • www.OntarioCA.gov 6

ATTACHMENT:

Flock_Group_Inc_Amendment_2_01.09.2025.pdf

12. AMENDMENT TO THE WEST END ANIMAL SERVICES AGENCY JOINT POWERS AUTHORITY

AGREEMENT

ATTACHMENT:

JPA Animal Services Agreement - Updated Exhibit B 1.8.25.doc

ATTACHMENT:

JPA West End County Unincorporated Area Map.pdf

ATTACHMENT:

1st Amendment to Joint Powers Agreement re Name 1.16.25.docx

13. AN ORDINANCE AMENDING CERTAIN SECTIONS UNDER ARTICLE 16 TO CHAPTER 6 OF TITLE 4 OF THE MUNICIPAL CODE RELATED TO PARKING PENALTIES AND CITATIONS

ATTACHMENT:

Ordinance Amending Article 16 Baltimore revised version 01^ORD^RM.docx
That the City Council authorize the City Manager, or his designee, to execute Amendment No. 1 to the Goods and Services Agreement with Flock Group Inc., with its principal place of business in Atlanta, Georgia, increasing the authorized contract amount for the Automated License Plate Recognition by $243,500 for a total not-to-exceed amount of $1,731,000.

That the City Council consider and:

A
.

Approve an amendment to the Joint Exercise of Powers Agreement renaming the Agency to Animal Resource Center of the Inland Empire (ARC),
B
.

Approve the admission of both the City of Montclair and the County of San Bernardino (West end unincorporated area only) as member agencies to the Joint Powers Agency; C
.

Authorize the City Manager, or designee, to sign the amendment and to take all other actions and execute all other documents to carry out the terms of this action.

ADMINISTRATIVE REPORTS/DISCUSSION/ACTION
That the City Council introduce and waive further reading of an Ordinance amending Sections 4-6.1602 (Penalties: Citations), 4-6.1603 (Penalties: Citations: Method of Payment), and 4-

6.1604 (Penalties: Citations: State-mandated added penalties) under Article 16 (Violations and Penalties) to Chapter 6 (Traffic) to Title 4 (Public Safety) of the Municipal Code ("Code")

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF ONTARIO, CALIFORNIA, AMENDING CERTAIN SECTIONS UNDER ARTICLE 16 TO CHAPTER 6 OF TITLE 4 OF THE MUNICIPAL CODE RELATED TO PARKING PENALTIES AND CITATIONS.

STAFF MATTERS

City Manager Ochoa

COUNCIL MATTERS

City Council Reorganization - Mayor pro Tem
CITY OF ONTARIO Regular City Council/Housing Authority Meeting CITY HALL 303 EAST B STREET, ONTARIO CA 91764 • www.OntarioCA.gov 7

Mayor Leon
Mayor pro Tem Porada
Council Member Wapner
Council Member Bowman
Council Member Macias

ADJOURNMENT
CITY OF ONTARIO Regular City Council/Housing Authority Meeting CITY HALL 303 EAST B STREET, ONTARIO CA 91764 • www.OntarioCA.gov 8 1 of 2

CITY OF ONTARIO

CLOSED SESSION REPORT
City Council // Housing Authority // Other // (GC 54957.1) January 21, 2025
ROLL CALL: Porada _, Wapner _, Bowman _, Macias _, Mayor / Chairman Leon _.

STAFF: City Manager / Executive Director __, City Attorney __ In attendance: Porada _, Wapner _, Bowman _, Macias _, Mayor / Chairman Leon _.  GC 54956.9(d)(1), CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION City of Ontario, et al. v. Inland Empire Utilities Agency, Orange County Superior Court Case No. 30-2023-01344236-CU-WM-CJC
 Chino Basin Municipal Water District v. City of Chino, et al., San Bernardino Superior Court Case No. RCVRS 51010
 Chino Basin Municipal Water District v. City of Chino et al., San Bernardino Superior Court Case No. RCVRS 51010, 4th District Appellate Case No. E080457 No Reportable Action Continue Approved
/ / / / / /
Disposition: _________________________________________________________________ In attendance: Porada _, Wapner _, Bowman _, Macias _, Mayor / Chairman Leon _.  GC 54956.8, CONFERENCE WITH REAL PROPERTY NEGOTIATORS Property: APN: 1047-172-17; 1005-1007 East Sixth Street; City/Authority negotiator: Scott Ochoa or his designee; Negotiating parties: T&S Allied Investments, LLC; Under negotiation: Price and terms of payment.

No Reportable Action Continue Approved
/ / / / / /
Disposition: _________________________________________________________________ 9 2 of 2

CITY OF ONTARIO

CLOSED SESSION REPORT
City Council // Housing Authority // Other // (GC 54957.1) January 21, 2025
(Continued)
In attendance: Porada _, Wapner _, Bowman _, Macias _, Mayor / Chairman Leon _.  GC 54956.8, CONFERENCE WITH REAL PROPERTY NEGOTIATORS Property: APN: 1047-172-22; 1023 East Sixth Street; City/Authority negotiator: Scott Ochoa or his designee; Negotiating parties: TAVK Holding, LLC; Under negotiation: Price and terms of payment
No Reportable Action Continue Approved
/ / / / / /
Disposition: _________________________________________________________________ Reported by:
___________________________________________
City Attorney / City Manager / Executive Director
10 ONTARIO CITY COUNCIL/

ONTARIO HOUSING AUTHORITY

MINUTES
DECEMBER 3, 2024
(Not Official Until Approved)
(Not Official Until Approved)
(Not official Until Approt Official Until Approved)

JOINT MEETINGS
The regular meetings of the Ontario City Council and Housing Authority were held on Tuesday, December 3, 2024 at Ontario City Hall, 303 E. B Street Ontario, California.

OPEN MEETING CALLED TO ORDER
Mayor Leon called the joint meetings to order at 6:04 p.m.

ROLL CALL
PRESENT: Mayor/Chairman: Paul S. Leon
Mayor pro Tem/Vice Chair: Debra Porada
Council/Authority Members: Alan D. Wapner, and Jim W. Bowman ABSENT: Council/Authority Members: Ruben Valencia

Also present were City Manager / Executive Director Scott Ochoa, City Attorney/Legal Counsel Ruben Duran, and City Clerk / Secretary Sheila Mautz.

INFORMATION RELATIVE TO POSSIBLE CONFLICTS OF INTEREST
There were no conflicts of interest announced by the City Council.

CLOSED SESSION
Mayor Leon inquired whether persons were present who wished to speak to the Closed Session items. Hearing no one, City Attorney Duran announced the matters for discussion as listed on the agenda and recessed to Closed Session at 6:05 p.m. for discussion of the following:

GC 54956.9(d)(1), CONFERENCE WITH LEGAL COUNSEL, EXISTING LITIGATION Ruben Valencia v. City of Ontario, Case No. CIVSB2302751 GC 54956.9 (d)(2), CONFERENCE WITH LEGAL COUNSEL - ANTICIPATED LITIGATION One Case

OPEN MEETING CALLED TO ORDER
Mayor Leon reconvened the meetings at 6:31 p.m. for the regular session. 11 Ontario City Council/Ontario Housing Authority
Regular Meeting Minutes – December 3, 2024

Page 2 of 9 ends

PLEDGE OF ALLEGIANCE
The Pledge of Allegiance was led by Council Member Bowman.

INVOCATION
The invocation was led by Pastor Richard Hernandez, The Church of God Ontario.

CLOSED SESSION REPORT
City Attorney Duran announced there was no reportable action.

AGENDA REVIEW/ANNOUNCEMENTS
The City Manager made no announcements.

ADMINISTRATIVE REPORTS/DISCUSSION/ACTION

1. CANVASS OF GENERAL MUNICIPAL ELECTION ON NOVEMBER 5, 2024 The City Council adopted a Resolution of the City Council of the City of Ontario, California, reciting the facts of the General Municipal Election held on November 5, 2024, and declaring the results thereof and such other matters as provided by law.

RESOLUTION NO. 2024-201 A RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF ONTARIO, CALIFORNIA, RECITING THE FACT OF THE GENERAL MUNICIPAL ELECTION HELD ON NOVEMBER 5, 2024, DECLARING THE RESULT AND SUCH OTHER MATTERS AS PROVIDED BY LAW.

MOTION: Moved by Council Member Wapner, seconded by Council Member Bowman and carried by a unanimous vote 4-0, with Council Member Valencia absent, to adopt Resolution No. 2024-201.

Mayor Leon adjourned the meetings in sine die at 6:36 p.m. and opened a new meeting at 6:36 p.m.

SPECIAL CEREMONIES
City Clerk Mautz administered the oath of office to the newly elected City Council Member Macias, City Council Member Porada, and City Treasurer Milhiser.

Mayor Leon recessed the meetings at 6:51 p.m. and reconvened at 7:01 p.m.

CONSENT CALENDAR
MOTION: Moved by Mayor pro Tem Porada, seconded by Council Member Wapner and carried by a unanimous vote 5-0, to approve the Consent Calendar as presented. 12 Ontario City Council/Ontario Housing Authority
Regular Meeting Minutes – December 3, 2024

Page 3 of 9 ends

2. APPROVAL OF MINUTES
Approved minutes for the regular meeting of the City Council, and Housing Authority, of November 5, 2024 and approving same as on file in the Records Management Department.

3. BILLS & PAYROLL
Approved bills November 1, 2024 through November 14, 2024, in the amount of $59,516,245.60, and Payroll October 20, 2024 through November 2, 2024 in the amount of $5,716,805.50.

4. RESOLUTIONS UPDATING AUTHORIZED DEPUTY CITY TREASURERS AND

THE UPDATED INVESTMENT POLICY
The City Council adopted Resolutions rescinding Resolution Nos. 2023-158 and 2023-159; and amending the list of Deputy City Treasurers authorized to invest City funds in the Local Agency Investment Fund (LAIF) and other eligible investment securities and consider and approve the update to the City of Ontario's Investment Policy.

RESOLUTION NO. 2024-202 A RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF ONTARIO, CALIFORNIA, PROVIDING FOR THE INVESTMENT OF

INACTIVE FUNDS IN THE LOCAL AGENCY INVESTMENT FUND OF THE

CALIFORNIA STATE TREASURY AND HEREBY RESCINDING RESOLUTION NO. 2023-158.

RESOLUTION NO. 2024-203 A RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF ONTARIO, CALIFORNIA, AUTHORIZING THE INVESTMENT OF CITY FUNDS AND HEREBY RESCINDING RESOLUTION NO. 2023-159.

5. A RESOLUTION APPROVING AN IMPROVEMENT AGREEMENT AND
IMPROVEMENT SECURITY FOR DEVELOPMENT PLAN NO. PDEV22-027

GENERALLY LOCATED AT THE NORTHWEST CORNER OF EUCLID AVENUE

AND WALNUT STREET
The City Council adopted a Resolution approving an Improvement Agreement and Improvement Security for Project No. PDEV22-027, generally located at the northwest corner of Euclid Avenue and Walnut Street.

RESOLUTION NO. 2024-204 A RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF ONTARIO, CALIFORNIA, APPROVING AN IMPROVEMENT
AGREEMENT AND IMPROVEMENT SECURITY FOR DEVELOPMENT PLAN NO.

PDEV22-027 GENERALLY LOCATED AT THE NORTHWEST CORNER OF

EUCLID AVENUE AND WALNUT STREET
13 Ontario City Council/Ontario Housing Authority
Regular Meeting Minutes – December 3, 2024

Page 4 of 9 ends

6. A CONSTRUCTION CONTRACT WITH ONYX PAVING COMPANY, INC. FOR THE ACTIVE TRANSPORTATION PROGRAM CYCLE 5 FOR THE VINE AVENUE

AND B STREET BIKE BOULEVARD PROJECT
The City Council took the following actions:

A. Awarded a Construction Contract with Onyx Paving Company, Inc. of Anaheim, California, for the Active Transportation Program (ATP) Cycle 5 for the Vine Avenue and B Street Bike Boulevard Project in the amount of $6,963,000 plus a 10% contingency of $696,300 for a total not-to-exceed contract amount of $7,659,300; and
B. Authorized the City Manager, or his designee, to execute all documents required for the completion of the project including, but not limited to, contracts, agreements, assessments, easements, reduction of retention accounts, and filing a notice of completion at the conclusion of all construction related activities.

7. A CONSTRUCTION CONTRACT WITH ALL AMERICAN ASPHALT FOR THE

TRANSFORMATIVE CLIMATE COMMUNITIES GRANT ACTIVE

TRANSPORTATION PROJECTS A & B
The City Council took the following actions:

A. Awarded a Construction Contract with All American Asphalt, of Corona, California, for the Transformative Climate Communities (TCC) Grant Active Transportation Projects A & B in the amount of $9,678,888 and authorize a 10% contingency of $967,889 for a total not-to-exceed contract amount of $10,646,777; and
B. Authorized the City Manager, or his designee, to execute all documents required for the completion of the project including, but not limited to, contracts, agreements, assessments, easements, reduction of retention accounts, and filing a notice of completion at the conclusion of all construction related activities.

8. INLAND EMPIRE UTILITIES AGENCY REGIONAL WATER USE EFFICIENCY

FLEX / CORE PROGRAM FUNDING
The City Council authorized the City Manager, or his designee, to execute program documents related to the Inland Empire Utilities Agency (IEUA) Water Use Eciency (WUE) Flex and Core funds from FY 2024-25 thru FY 2028-29 and accept an aggregate total of up to $1,500,000.

9. A DEVELOPMENT CODE AMENDMENT (FILE NO. PDCA24-003) REVISING

AND CLARIFYING CERTAIN PROVISIONS OF THE CITY OF ONTARIO

DEVELOPMENT CODE
The City Council considered and adopted an Ordinance Approving File No. 14 Ontario City Council/Ontario Housing Authority
Regular Meeting Minutes – December 3, 2024

Page 5 of 9 ends

PDCA24-003, a Development Code Amendment revising and clarifying certain provisions of Chapters 2.0 (Administration and Procedures), 4.0 (Permits, Actions, and Decisions), 5.0 (Zoning and Land Use), 6.0 (Development and Subdivision Regulations), 8.0 (Sign Regulations), and 9.0 (Definitions and Glossary) of the City of Ontario Development Code. First reading and introduction took place at a regular meeting on November 19, 2024.

ORDINANCE NO. 3289 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF ONTARIO, CALIFORNIA, APPROVING FILE NO. PDCA24-003, A

DEVELOPMENT CODE AMENDMENT REVISING AND CLARIFYING CERTAIN PROVISIONS OF CHAPTERS 2.0 (ADMINISTRATION AND PROCEDURES), 4.0 (PERMITS, ACTIONS, AND DECISIONS), 5.0 (ZONING AND LAND USE), 6.0 (DEVELOPMENT AND SUBDIVISION REGULATIONS), 8.0 (SIGN
REGULATIONS), AND 9.0 (DEFINITIONS AND GLOSSARY) OF THE CITY OF

ONTARIO DEVELOPMENT CODE, AND MAKING FINDINGS IN SUPPORT THEREOF.

10. AUTHORIZE THE PURCHASE OF SPECIALIZED POLICE EQUIPMENT WITH FLYMOTION, LLC.

The City Council authorized the City Manager or his designee to execute a Sole Source purchase of Specialized Police Equipment through Flymotion, LLC, with its principal place of business in Tampa, Florida, for an amount not to exceed $284,922.

11. AN ORDINANCE AMENDING SECTION 3-1.112 TO TITLE 3 OF THE MUNICIPAL

CODE RELATING TO LICENSE REQUIREMENTS OF CONTRACTORS AND

SUBCONTRACTORS TO ENHANCE COMPLIANCE WITH LOCAL LABOR

STANDARDS
The City Council adopted an Ordinance amending Section 3-1.112 to Title 3 of the Ontario Municipal Code relating to requirements of contractors and subcontractors to enhance compliance with local labor standards. First reading and introduction took place at a regular meeting on November 19, 2024.

ORDINANCE NO. 3291 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF ONTARIO, CALIFORNIA, AMENDING SECTION 3-1.112 TO TITLE 3 OF THE

MUNICIPAL CODE RELATING TO LICENSE REQUIREMENTS OF

CONTRACTORS AND SUBCONTRACTORS TO ENHANCE COMPLIANCE WITH LOCAL LABOR STANDARDS.

PUBLIC HEARINGS

12. A PUBLIC HEARING TO CONSIDER TWO MILLS ACT CONTRACTS (PRESERVATION AGREEMENTS), FILE NOS. PHP24-003 AND PHP24-008,

FOR TWO LOCAL DESIGNATED HISTORIC PROPERTIES
The City Council considered and adopted a Resolution approving and authorizing 15 Ontario City Council/Ontario Housing Authority
Regular Meeting Minutes – December 3, 2024

Page 6 of 9 ends

the City Manager or designee to enter into Mills Act Contracts (Preservation Agreement), for the local designated historic properties located at:

A. File No. PHP24-003 - 314 West H Street (APN: 1048-262-25); submitted by Kali Rose Heitholt and Christopher Ordaz
B. File No. PHP24-008 - 208 East El Morado Court (APN: 1048-243-02); submitted by Daniel Gillis
RESOLUTION NO. 2024-205 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ONTARIO, CALIFORNIA, APPROVING FILE NO. PHP24-003, AND

AUTHORIZING THE CITY OF ONTARIO TO ENTER INTO A HISTORIC

PROPERTY PRESERVATION AGREEMENT (MILLS ACT CONTRACT) WITH

KALI ROSE HEITHOLT AND CHRISTOPHER ORDAZ, FOR THE PROPERTY LOCATED AT 314 WEST H STREET (APN: 1048-262-25).

RESOLUTION NO. 2024-206 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ONTARIO, CALIFORNIA, APPROVING FILE NO. PHP24-008, AND

AUTHORIZING THE CITY OF ONTARIO TO ENTER INTO A HISTORIC

PROPERTY PRESERVATION AGREEMENT (MILLS ACT CONTRACT) WITH DANIEL GILLIS, FOR THE PROPERTY LOCATED AT 208 EAST EL MORADO COURT (APN: 1048-243-02).

Notice of public hearing was duly given. Affidavits of compliance are on file. There were no written communications.

Mayor Leon opened the public hearing and inquired if anyone was interested in speaking to the item. Hearing no one wishing to speak, Mayor Leon closed the public hearing and opened the item for Council discussion.

MOTION: Moved by Mayor pro Tem Porada, seconded by Council Member Bowman and carried by a unanimous vote 5-0, adopt Resolution Nos. 2024-205 and 2024-206.

13. A PUBLIC HEARING TO CONSIDER AN ORDINANCE ADOPTING AN AMENDMENT TO CHAPTER 14, TITLE 8 OF THE ONTARIO MUNICIPAL CODE

TITLED HISTORIC BUILDING CODE, EXISTING BUILDING CODE AND REFERENCED STANDARDS ESTABLISHING SECTION 8-14.04 ALTERNATIVE

BUILDING STANDARDS FOR ADAPTIVE REUSE PROJECTS
The City Council introduced and waived further reading of the Ordinance Approving an amendment to Chapter 14, Title 8 of the Ontario Municipal Code establishing alternative building standards for adaptive reuse projects.

ORDINANCE NO. 3292 (FIRST READING) AN ORDINANCE OF THE CITY

COUNCIL OF THE CITY OF ONTARIO, CALIFORNIA, ADOPTING AN AMENDMENT TO CHAPTER 14, TITLE 8 OF THE ONTARIO MUNICIPAL CODE

TITLED HISTORIC BUILDING CODE, EXISTING BUILDING CODE AND REFERENCED STANDARDS ESTABLISHING SECTION 8-14.04 ALTERNATIVE BUILDING STANDARDS FOR ADAPTIVE REUSE PROJECTS.
16 Ontario City Council/Ontario Housing Authority
Regular Meeting Minutes – December 3, 2024

Page 7 of 9 ends

Notice of public hearing was duly given. Affidavits of compliance are on file. There were no written communications.

Mayor Leon opened the public hearing and inquired if anyone was interested in speaking to the item. Hearing no one, Mayor Leon closed the public hearing and opened the item for Council discussion.

MOTION: Moved by Council Member Wapner seconded by Council Member Bowman and carried by a unanimous vote 5-0, to introduce Ordinance No. 3292.

14. A PUBLIC HEARING TO CONSIDER ADOPTING RESOLUTIONS OF

NECESSITY FOR THE ACQUISITION BY EMINENT DOMAIN OF A FEE SIMPLE INTEREST IN CERTAIN REAL PROPERTY LOCATED AT 1514 WEST MISSION BOULEVARD AND 1530 WEST BOULEVARD
The City Council conducted a public hearing and adopted Resolutions of Necessity declaring that the acquisition by eminent domain of a fee simple interest in certain real property located at 1514 West Mission Boulevard and 1530 West Mission Boulevard, more particularly described as Assessor Parcel No.'s 1011-221-13 and 1011-221-15 (the Property), is necessary for the City of Ontario's Continuum of Care Campus Project (the Project).

RESOLUTION NO. 2024-207 A RESOLUTION OF NECESSITY OF THE CITY

COUNCIL OF THE CITY OF ONTARIO, CALIFORNIA, FOR THE ACQUISITION

BY EMINENT DOMAIN OF A FEE SIMPLE INTEREST IN CERTAIN REAL PROPERTY LOCATED AT 1514 WEST MISSION BOULEVARD IN THE CITY OF

ONTARIO, COUNTY OF SAN BERNARDINO, CALIFORNIA AND MORE
PARTICULARLY DESCRIBED AS ASSESSOR PARCEL NUMBER 1011-221-13,

FOR THE ONTARIO CONTINUUM OF CARE CAMPUS PROJECT, IN ONTARIO, CALIFORNIA.

RESOLUTION NO. 2024-208 A RESOLUTION OF NECESSITY OF THE CITY

COUNCIL OF THE CITY OF ONTARIO, CALIFORNIA, FOR THE ACQUISITION

BY EMINENT DOMAIN OF A FEE SIMPLE INTEREST IN CERTAIN REAL PROPERTY LOCATED AT 1530 MISSION BOULEVARD IN THE CITY OF

ONTARIO, COUNTY OF SAN BERNARDINO, CALIFORNIA AND MORE
PARTICULARLY DESCRIBED AS ASSESSOR PARCEL NUMBER 1011-221-15,

RESPECTIVELY, FOR THE ONTARIO CONTINUUM OF CARE CAMPUS
PROJECT, IN ONTARIO, CALIFORNIA.

Notice of public hearing was duly given. Affidavits of compliance are on file. There was one written communication from Charles S. Krolikowski in opposition.

Mayor Leon opened the public hearing and inquired if anyone was interested in speaking to the item.

Assistant City Attorney Guillermo Frias provided a presentation regarding the property in 17 Ontario City Council/Ontario Housing Authority
Regular Meeting Minutes – December 3, 2024

Page 8 of 9 ends

question.

Greg Tross spoke in opposition.

Hearing no one else wishing to speak, Mayor Leon closed the public hearing and opened the item for Council discussion.

MOTION: Moved by Council Member Wapner seconded by Mayor pro Tem Porada and carried by a unanimous vote 5-0, to adopt Resolution Nos. 2024-207 and 2024-208.

ADMINISTRATIVE REPORT/DISCUSSION/ACTION

15. CONSIDERATION TO AMEND CHAPTER 3, TITLE 4, OF THE ONTARIO

MUNICIPAL CODE RELATING TO THE CITY'S EMERGENCY ORGANIZATION The City Council introduced and waived further reading of an ordinance amending Chapter 3, Title 4, of the Ontario Municipal Code related to the City' s Emergency Organization.

ORDINANCE NO. 3293 (FIRST READING) AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF ONTARIO, CALIFORNIA, AMENDING CHAPTER 3 OF TITLE 4 OF THE ONTARIO MUNICIPAL CODE RELATING TO EMERGENCY ORGANIZATION.

Mayor Leon opened the public hearing and inquired if anyone was interested in speaking to the item. Hearing no one, Mayor Leon closed the public hearing and opened the item for Council discussion.

MOTION: Moved by Mayor pro Tem Porada, seconded by Council Member Wapner and carried by a unanimous vote 5-0, to introduce Ordinance No. 3293.

PUBLIC COMMENT
Assistant City Clerk Isbell announced there was one written comment:

Brad Neumann, regarding his personnel matters.

Mayor Leon called upon the first speaker:

Stephanie, requested support for a local toy drive.

Aaron Mathiesen , spoke regarding Ontario Eastern Little League and improvements being made to Latimer Field.

Matthew Guerrero, announced the City’s upcoming Document Shredding event.

Tommy Mushegan, spoke regarding campaign statements.

Brad Neumann, spoke regarding his personnel grievance.

STAFF MATTERS
City Manager Ochoa made no announcements.
18 Ontario City Council/Ontario Housing Authority
Regular Meeting Minutes – December 3, 2024

Page 9 of 9 ends

COUNCIL MATTERS
Council Member Bowman congratulated the newly elected and incumbents on their successful election.

Council Member Wapner had no comments.

Mayor pro Tem Porada noted that the City Council is inclusive of all Districts.

Mayor Leon congratulated Council on their elections.

Council Member Macias stated she looks forward to working with residents.

ADJOURNMENT
Mayor Leon adjourned the meetings of the Joint Agencies at 7:38 p.m. and announced the next regular meeting was scheduled for December 17, 2024.

Respectfully submitted,
____________________________________

SHEILA MAUTZ, CITY CLERK/SECRETARY
APPROVED:
_____________________________________
PAUL S. LEON, MAYOR/CHAIRMAN
19 ONTARIO CITY COUNCIL/

ONTARIO HOUSING AUTHORITY

MINUTES
DECEMBER 17, 2024
(Not Official Until Approved)
(Not

JOINT MEETINGS
The regular meetings of the Ontario City Council and Housing Authority were held on Tuesday, December 17, 2024 at Ontario City Hall, 303 E. B Street Ontario, California.

OPEN MEETING CALLED TO ORDER
Mayor Leon called the joint meetings to order at 6:01p.m.

ROLL CALL
PRESENT: Mayor/Chairman: Paul S. Leon
Mayor pro Tem/Vice Chair: Debra Porada
Council/Authority Members: Alan D. Wapner, Jim W. Bowman, and Daisy Macias
ABSENT: Council/Authority Members: None

Also present were City Manager / Executive Director Scott Ochoa, City Attorney/Legal Counsel Ruben Duran, and City Clerk / Secretary Sheila Mautz.

INFORMATION RELATIVE TO POSSIBLE CONFLICTS OF INTEREST
Council Member Macias announced a potential conflict with Item No. 14 and recused herself from the item out of an abundance of caution.

CLOSED SESSION
Mayor Leon inquired whether persons were present who wished to speak to the Closed Session items. Hearing no one, City Attorney Duran announced the matters for discussion noting his request to remove one of the listed items:

GC 54956.9(d)(1), CONFERENCE WITH LEGAL COUNSEL, EXISTING LITIGATION Ruben Valencia v. City of Ontario, Case No. CIVSB2302751 The item was removed and meeting recessed to Closed Session at 6:03 p.m. for discussion of the following:

GC 54956.8, CONFERENCE WITH REAL PROPERTY NEGOTIATORS
20 Ontario City Council/Ontario Housing Authority
Regular Meeting Minutes – December 17, 2024

Page 2 of 8 ends

Property: APN: 0110-321-29, 0110-321-74, 0110-321-75, 0110-321-76; 2350-2630 East Inland Empire Boulevard; City/Authority negotiator: Scott Ochoa or his designee; Negotiating parties: IKEAProperty Inc; Under negotiation: Price and terms of payment.

OPEN MEETING CALLED TO ORDER
Mayor Leon reconvened the meetings at 6:37 p.m. for the regular session.

PLEDGE OF ALLEGIANCE
The Pledge of Allegiance was led by Mayor pro Tem Porada.

INVOCATION
Mayor Leon held a moment of silence in lieu of an invocation.

CLOSED SESSION REPORT
City Attorney Duran reminded members of the public that only one item was considered in closed session and added there was no reportable action.

AGENDA REVIEW/ANNOUNCEMENTS
The City Manager made no announcements.

PUBLIC COMMENT
Assistant City Clerk Isbell announced that there were two written comments:

Brad Neumann, regarding his personnel matters.

Jose Elias Parrilla, regarding his personal grievance.

Mayor Leon called upon the first speaker:

Brad Neumann, spoke regarding his personnel grievance.

Esther Schmall, regarding MENSA International.

CONSENT CALENDAR
MOTION: Moved by Mayor pro Tem Porada, seconded by Council Member Wapner and carried by a unanimous vote 5-0, to approve the Consent Calendar without Item Nos. 9, 11, 12, and 14.

1. APPROVAL OF MINUTES
Approved minutes for the regular meeting of the City Council, and Housing Authority, of November 19, 2024 and approving same as on file in the Records Management Department.
21 Ontario City Council/Ontario Housing Authority
Regular Meeting Minutes – December 17, 2024

Page 3 of 8 ends

2. BILLS & PAYROLL
Approved bills November 15, 2024 through November 27, 2024, in the amount of $28,294,509.96, and Payroll November 3, 2024 through November 16, 2024 in the amount of $7,748,856.64.

3. ADOPTION OF ORDINANCE APPROVING A MILITARY EQUIPMENT USE POLICY PURSUANT TO GOVERNMENT CODE SECTIONS 7070, ET. SEQ.

The City Council adopted an Ordinance adopting a Military Equipment Use Policy.

Introduction and first reading took place at a regular meeting on November 19, 2024.

ORDINANCE NO. 3290 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY

OF ONTARIO, CALIFORNIA, ADOPTING A MILITARY EQUIPMENT USE POLICY PURSUANT TO GOVERNMENT CODE §§ 7070, ET. SEQ.

4. DESIGNATION OF VOTING DELEGATE FOR THE WEST VALLEY MOSQUITO

AND VECTOR CONTROL DISTRICT
The City Council appointed Mayor Leon to serve as a Board of Trustee on the West Valley Mosquito and Vector Control District for a two-year term.

5. AN ORDINANCE ADOPTING AN AMENDMENT TO CHAPTER 14, TITLE 8 OF

THE ONTARIO MUNICIPAL CODE TITLED HISTORIC BUILDING CODE,

EXISTING BUILDING CODE AND REFERENCED STANDARDS ESTABLISHING SECTION 8-14.04 ALTERNATIVE BUILDING STANDARDS FOR ADAPTIVE

REUSE PROJECTS
The City Council considered and adopted a Ordinance approving an amendment to Chapter 14, Title 8 of the Ontario Municipal Code establishing alternative building standards for adaptive reuse projects. Introduction and first reading took place at a regular meeting on December 3, 2024.

ORDINANCE NO. 3292 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF ONTARIO, CALIFORNIA, AMENDING CHAPTER 14 OF TITLE 8 OF THE ONTARIO MUNICIPAL CODE, ADDING SECTION 8-14.04, ALTERNATIVE

BUILDING STANDARDS FOR ADAPTIVE REUSE PROJECTS, AND MAKING FINDINGS IN SUPPORT THEREOF.

6. AN ORDINANCE AMENDING CHAPTER 3, TITLE 4, OF THE ONTARIO

MUNICIPAL CODE RELATING TO THE CITY'S EMERGENCY ORGANIZATION The City Council adopted an Ordinance amending Chapter 3, Title 4, of the Ontario Municipal Code related to the City' s Emergency Organization. Introduction and first reading took place at a regular meeting on December 3, 2024.

ORDINANCE NO. 3293 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF ONTARIO, CALIFORNIA, AMENDING CHAPTER 3 OF TITLE 4 OF THE 22 Ontario City Council/Ontario Housing Authority
Regular Meeting Minutes – December 17, 2024

Page 4 of 8 ends

ONTARIO MUNICIPAL CODE RELATING TO EMERGENCY ORGANIZATION.

7. UPDATED LEGISLATIVE PLATFORMS
The Council approved the 2025-2026 State and Federal Legislative Platforms.

8. ACCEPTANCE OF SOLID WASTE INFRASTRUCTURE FOR RECYCLING GRANTS PROGRAM FUNDING FROM THE U.S. ENVIRONMENTAL

PROTECTION AGENCY
The City Council authorized the City Manager, or his designee, to execute all documents necessary to accept grant award funds in the amount of $3,571,064 from the U.S. Environmental Protection Agency (EPA) for the Solid Waste Infrastructure for Recycling (SWIFR) Grants Program.

10. AWARD OF TWO CONSTRUCTION CONTRACTS IN CONNECTION WITH THE

CONSTRUCTION OF THE ONTARIO PROFESSIONAL BASEBALL STADIUM The City Council took the following actions:

A. Authorized the City Manager or his designee to execute two (2) Construction Contracts to provide various construction services for Bid No. 1856 - D&C23- 011 – Professional Baseball Stadium in the amount of $11,758,970 and authorized a combined contingency of $1,175,897 for a total not-to-exceed contract amount of $12,934,867,

1. 02 – Concrete: Site – Bogh Construction LLC.: $5,178,000,

2. 06 – Finish Carpentry – K&Z Cabinet Co., Inc.: $6,580,970, and B. Rejected all bids received for Bid No. 1856 Ontario Ballpark Section 20 - Signage and authorized Sta  to solicit new bids for these trades in relation to the Professional Baseball Stadium; and
C. Authorized the City Manager, or his designee, to execute all documents required for the completion of the project including, but not limited to, contracts, agreements, assessments, easements, reduction of retention accounts, and filing a notice of completion at the conclusion of all construction related activities.

13. AB1600 DEVELOPMENT IMPACT FEE ANNUAL REPORT FOR FISCAL YEAR ENDED JUNE 30, 2024, AND SB165 LOCAL AGENCY SPECIAL TAX AND BOND ACCOUNTABILITY REPORT FOR FISCAL YEAR ENDED JUNE 30, 2024 The City Council accepted the City of Ontario’s AB1600 Development Impact Fee (DIF) Annual Report (unaudited) for Fiscal Year Ended June 30, 2024, and the City of Ontario's SB165 Local Agency Special Tax and Bond Accountability Report (unaudited) for Fiscal Year Ended June 30, 2024.
23 Ontario City Council/Ontario Housing Authority
Regular Meeting Minutes – December 17, 2024

Page 5 of 8 ends

ITEMS PULLED FOR DISCUSSION

9. AUTHORIZE THE PURCHASE AND INSTALLATION OF FURNITURE WITH INFO-COM BUSINESS PRODUCTS FOR FIRE STATION NO. 1
The City Council took the following actions:

A. Authorized a cooperative purchase agreement for D&C21-001 New Fire Station No. 1 with Margaret C. Pett, Inc. DBA Info-Com Business Products (Info-Com), of Altadena, California, for the purchase and installation of furniture in the amount of $358,372, consistent with the terms and conditions of the National Cooperative Purchasing Alliance Contract Number 07-97; and B. Authorized the City Manager, or his designee, to execute all documents required for the completion of the project including, but not limited to agreements, assessments, easements, reduction of retention accounts, contracts amendments within the authorization limits, and filing a notice of completion at the conclusion of all construction related activities.

Council Member Wapner asked for clarification regarding the national cooperative. City Attorney Duran provided additional information.

MOTION: Moved by Council Member Wapner, seconded by Mayor pro Tem Porada and carried by a unanimous vote 5-0, contingent on additional cooperative precedence language added by the City Attorney.

11. A CHANGE ORDER TO THE CONSTRUCTION CONTRACT WITH MC ELECTRIC

FOR THE PARKS POLE REPLACEMENT PROJECT
The City Council continued the item.

Council Member Wapner requested a discussion to decide the future of Jay Littleton Ball Park prior to approving construction funds. Mayor pro Tem requested the item be back to Council before the end of February.

MOTION: Moved by Council Member Wapner, seconded by Council Member Macias and carried by a unanimous vote 5-0, to continue the item to February.

12. AN AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT WITH TRANSTECH, INC. FOR ON-CALL CONSTRUCTION MANAGEMENT SERVICES The City Council authorized the City Manager or his designee to execute Amendment No. 5 to the on-call Professional Services Agreement with Transtech, Inc. (Transtech), of Chino, California, to provide the bridging document preparation and Construction Management for the D-Block Parking Structure in the amount of $1,361,750 for total not-to-exceed contract amount of $4,019,500.

Council Member Wapner noted the importance of having an availability of multiple qualified service providers..
24 Ontario City Council/Ontario Housing Authority
Regular Meeting Minutes – December 17, 2024

Page 6 of 8 ends

MOTION: Moved by Council Member Wapner, seconded by Council Member Bowman and carried by a unanimous vote 5-0, to continue the item to February.

PUBLIC HEARINGS

14. A DISPOSITION AND DEVELOPMENT AGREEMENT FOR THE DEVELOPMENT

OF A HOUSING DEVELOPMENT LOCATED ON HOLT BOULEVARD EAST OF ALLYN AVENUE; AND A GRANT AGREEMENT BETWEEN THE CITY OF

ONTARIO AND THE ONTARIO HOUSING AUTHORITY IN THE AMOUNT OF $15,000,000.

The City Council and the Ontario Housing Authority Board:

A. Held a Public Hearing to adopt Resolutions approving the Disposition and Development Agreement between the Authority and National Community Renaissance of California; and
B. Approved the Grant Agreement between the City and the Authority, in an amount of $15,000,000.

RESOLUTION NO. 2024-209 A RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF ONTARIO, CALIFORNIA, APPROVING THAT CERTAIN CITY GRANT AGREEMENT [HOLT/ALLYN MULTIFAMILY HOUSING PROJECT]

CONCERNING THE GRANT OF AFFORDABILITY IN-LIEU FEE FUNDS TO THE

ONTARIO HOUSING AUTHORITY FOR THE HOLT/ALLYN MULTIFAMILY

HOUSING PROJECT
RESOLUTION OHA-118 A RESOLUTION OF THE ONTARIO HOUSING

AUTHORITY OF THE CITY OF ONTARIO, CALIFORNIA, APPROVING THAT CERTAIN CITY GRANT AGREEMENT [HOLT/ALLYN MULTIFAMILY HOUSING PROJECT] CONCERNING THE GRANT OF AFFORDABILITY IN-LIEU FEE

FUNDS TO THE ONTARIO HOUSING AUTHORITY FOR THE HOLT/ALLYN

MULTIFAMILY HOUSING PROJECT
RESOLUTION OHA-119 A RESOLUTION OF THE ONTARIO HOUSING

AUTHORITY OF THE CITY OF ONTARIO, CALIFORNIA, APPROVING A

DISPOSITION AND DEVELOPMENT AGREEMENT BETWEEN THE ONTARIO

HOUSING AUTHORITY AND NATIONAL COMMUNITY RENAISSANCE OF

CALIFORNIA FOR PROPERTY GENERALLY LOCATED ON EAST HOLT

BOULEVARD EAST OF ALLYN AVENUE
Notice of public hearing was duly given. Affidavits of compliance are on file. There were no written communications.

Mayor Leon opened the public hearing and inquired if anyone was interested in speaking to the item. Hearing no one wishing to speak, Mayor Leon closed the public hearing and opened the item for Council discussion.

City Attorney noted Council Member Macias’ potential for a conflict of interest and out of 25 Ontario City Council/Ontario Housing Authority
Regular Meeting Minutes – December 17, 2024

Page 7 of 8 ends

an abundance of caution would recuse herself. Council Member Macias recused herself and left the Council Chambers.

MOTION: Moved by Mayor pro Tem Porada, seconded by Council Member Wapner and carried by a unanimous vote 4-0, with Council Member Macias recused, to adopt Resolution Nos. 2024-209, OHA-118, and OHA-119.

Council Member Macias returned to the Council Chamber.

ADMINISTRATIVE REPORT/DISCUSSION/ACTION

15. AN ORDINANCE APPROVING A THIRD AMENDMENT TO THE DEVELOPMENT AGREEMENT (FILE NO. PDA05-001) BETWEEN THE CITY OF ONTARIO AND

EDENGLEN ONTARIO, LLC
The City Council considered and waived further reading of an Ordinance approving a Third Amendment to the Development Agreement (File No. PDA05-001) between the City of Ontario and Edenglen Ontario, LLC.

ORDINANCE NO. 3294 (FIRST READING) AN ORDINANCE OF THE CITY

COUNCIL OF THE CITY OF ONTARIO, CALIFORNIA, APPROVING THE THIRD AMENDMENT TO THE DEVELOPMENT AGREEMENT, FILE NO. PDA05-001,

BETWEEN THE CITY OF ONTARIO AND EDENGLEN ONTARIO, LLC, TO

EXTEND THE TERM OF THE DEVELOPMENT AGREEMENT ASSOCIATED WITH TRACT MAP NO'S 17392, 17558, 17559, 17560, 17561, 17562, 17563, 17564, 18789, 18790, 18791, AND 20524, GENERALLY LOCATED NORTH OF

CHINO AVENUE, SOUTH OF RIVERSIDE DRIVE, EAST OF MILL CREEK

AVENUE, AND WEST OF THE SCE UTILITY CORRIDOR, WITHIN PLANNING AREAS 1 THROUGH 8 OF THE EDENGLEN SPECIFIC PLAN, AND MAKING FINDINGS IN SUPPORT THEREOF - ; APN: 0218-171-15; 0218-921-07, 08, 16, 19, 22, AND 30; 0218-931-01 THROUGH 25; 218-931-75 THROUGH 89; 0218-932- 01 THROUGH 21; 0218-933-01 THROUGH 17; 0218-934-01 THROUGH 24; 0218- 935-01- THROUGH 04; 0218-935-12 THROUGH 19; 0218-935-22 THROUGH 38; 0218-941-01 THROUGH 39; 0218-941-55 THROUGH 93; 0218-951-01 THROUGH 70; 0218-952-19 THROUGH 82; 0218-954-01 THROUGH 42; 0218-955-01 THROUGH 42; 0218-956-01 THROUGH 58; 0218-961-07 THROUGH 88.

Mayor Leon inquired if anyone was interested in speaking to the item. Hearing no one, Mayor Leon opened the item for Council discussion.

MOTION: Moved by Council Member Bowman, seconded by Mayor pro Tem Porada and carried by a unanimous vote 5-0, to introduce Ordinance No. 3294.

STAFF MATTERS
City Manager Ochoa made no announcements.

COUNCIL MATTERS
26 Ontario City Council/Ontario Housing Authority
Regular Meeting Minutes – December 17, 2024

Page 8 of 8 ends

Council Member Bowman made no comments.

Council Member Wapner announced the passing of Planning Commissioner Ken Dean and asked for consensus to adjourn in his memory.

Mayor pro Tem Porada thanked Staff for their work on the Holiday Parade.

Mayor Leon noted that the Council takes all District needs into consideration.

Council Member Macias wished everyone Happy Holidays.

ADJOURNMENT
Mayor Leon adjourned the meetings of the Joint Agencies at 7:17 p.m., in memory of Kenneth Dean, and announced the next regular meeting was scheduled for January 7, 2025.

Respectfully submitted,
____________________________________

SHEILA MAUTZ, CITY CLERK/SECRETARY
APPROVED:
_____________________________________
PAUL S. LEON, MAYOR/CHAIRMAN
27 Department: Fire Department
Prepared By: Janny Phan
Department:

Prepared By: Janny Phan
Staff Member Presenting: Mike Gerken, Fire
Chief
Approved By:

Submitted To: Council/OHA
Approved: _______________________________
Continued To: ___________________________
Denied: __________________________________
Item No: 3
SUBJECT:

PRE-AUTHORIZED LIST OF VENDORS TO PROVIDE SPECIALIZED PERSONAL

PROTECTIVE EQUIPMENT, MAINTENANCE AND SPECIALIZED SERVICE

CITY OF ONTARIO
Agenda Report
January 21, 2025
SECTION:

CONSENT CALENDAR

RECOMMENDATION:

That the City Council approve a pre-authorized vendors list to provide personal protective equipment and maintenance services for emergency equipment and services for the Fire Department.

THE FOLLOWING COUNCIL GOALS ARE BEING ACHIEVED:

Maintain the Current High Level of Public Safety
Operate in a Businesslike Manner
FISCAL IMPACT:

There is no direct fiscal impact with the approval of this vendor list. The designation of pre-authorized vendors to provide specialized safety equipment, maintenance and specialized services does not commit to the City to any specific level of future expenditures with these vendors. Expenditures for each vendor, and in total for each fiscal year, will not exceed the Fire Department's appropriations limits established by the City Council.

BACKGROUND & ANALYSIS:

The Fire Department utilizes specialized personal protective equipment (PPE) and specialized services that allow firefighters to safely perform their duties during all-risk emergency responses. The Fire Department must ensure that all fire personnel have the appropriate equipment and personal protective equipment and that all PPE is maintained appropriately. Due to the specialized nature of the equipment and services, as well as the specialized cleaning and maintenance that must be performed promptly, there are a limited number of vendors that can provide these goods and services.

For these reasons, it is not cost-effective for the City to follow its standard purchasing procedures to solicit bids or issue requests for proposals. Establishing a pre-authorized list of vendors will facilitate the following:

Ensuring that necessary equipment and PPE are available when needed; Services are performed by qualified vendors familiar with firefighter PPE; and 28 Better maintenance because pre-authorized vendors are familiar with the service and repair history of the Department's firefighting PPE.

The list of recommended vendors was developed based on input from the manufacturers of all current firefighter PPE utilized by the Ontario Fire Department, as well as the City's past procurement experience. If approved, purchase orders (within approved budgeted amounts) will be issued to each vendor, without quotes for individual equipment or services for expeditious ordering at current market rates.

Ontario Municipal Code Section 2-6.23(b) and 2-6.23(c) authorizes the Purchasing Officer to make purchases without following the standard purchasing procedures whenever (1) the goods can be obtained from only one source, and/or (2) a breakdown in machinery, equipment or an essential service which requires immediate purchase of supplies and equipment to protect public health, safety and welfare generates circumstances that a competitive process would be unavailing or would not produce an advantage, and the advertisement for competitive bid would thus be undesirable, impractical, or impossible.

Sole Source Vendor
Not to Exceed*
Allstar Fire Equipment Inc.
$1,200,000
Bauer Compressors
$500,000
L.N. Curtis & Sons
$650,000
Zoll Medical Corporation
$150,000

Non-Sole Source Vendor
Not to Exceed*
California PPE Recon, Inc.
$250,000
CMC Rescue Inc.
$200,000
Diamondback Fire and Rescue Equipment
$200,000
Fire Innovations
$200,000
Fire Suppression Innovations
$150,000
Firefighter Safety
$200,000
Foothill Communications, Inc.
$300,000
Life-Assist, Inc.
$375,000
Municipal Emergency Services, Inc.
$200,000
R.S. Hughes Company, Inc.
$185,000
29 Department: Community Improvement
Prepared By: Angel Hamilton
Staff Member Presenting: Rudy Zeledon,
Executive Director Community Development
Approved By:

Submitted To: Council/OHA
Approved: _______________________________
Continued To: ___________________________
Denied: __________________________________
Item No: 4
SUBJECT:

A RESOLUTION FOR PLACEMENT OF SPECIAL ASSESSMENTS ON THE SAN

BERNARDINO COUNTY TAX ROLLS

CITY OF ONTARIO
Agenda Report
January 21, 2025
SECTION:

CONSENT CALENDAR

RECOMMENDATION:

That the City Council adopt a Resolution for recovery of fees and costs incurred in abating property and dangerous building violations, as well as administrative citations and civil penalties associated with property maintenance violations and placing assessments on the San Bernardino County Tax Rolls.

THE FOLLOWING COUNCIL GOALS ARE BEING ACHIEVED:

Operate in a Businesslike Manner
Focus Resources in Ontario's Commercial and Residential Neighborhoods FISCAL IMPACT:

The levy of special assessments will result in the recovery of $42,386.67 in costs that the City has expended for inspection or abatement of property violations, as well as the collection of $16,250.00 associated with civil penalties and/or fines for continued violations, for a total of $58,636.67 related to 100 parcels. When received, these reimbursements will be deposited into the General Fund. The special assessment revenue is included in the Fiscal Year 2024-25 Budget.

BACKGROUND & ANALYSIS:

The City has established administrative citations and fines for property maintenance violations and fees and penalties associated with the Systematic Health and Safety Inspection Program, Abandoned and Distressed Property Program, and Weed and Refuse Abatement Program. These costs, fines, fees, and penalties are recovered through placement of special tax assessments upon the properties. The placement of special assessments and collection of revenue is done under Ordinance 3046, Property Appearance (Title 5, Chapter 22 of the Ontario Municipal Code); Chapter 9 of the Uniform Code for the Abatement of Dangerous Buildings; and Ordinance 2920 for civil penalties for continued violations of the Ontario Municipal Code and fines associated with administrative citations (Title 1, Chapters 2 and 5 of the Ontario Municipal Code).

The City and County currently have a contractual agreement regarding the implementation of special assessments; however, a Resolution authorizing the placement of the specific assessments is required. During this assessment cycle, the Community Improvement Department has billed property owners for: the abatement of violations; the issuance of fines associated with 30 administrative citation; the issuance of fees and penalties associated with the Systematic Health and Safety Inspection Program; the issuance of registration fees and civil penalties associated with the Abandoned and Distressed Property Program; the issuance of notice and re-inspection fees; and, civil penalties for the Weed and Refuse Abatement Program on 207 parcels. Of these, there are remaining amounts due on 100 parcels. Attached are itemized accounts that include: 1) costs associated with inspection or abatement as shown in Exhibit A of the Resolution; 2) civil penalties and/or fines for continued violations as shown in Exhibit B of the Resolution; and 3) total amounts per parcel as shown in Exhibit C of the Resolution. All affected property owners were given notice of the imposition of special assessments via certified mail as provided in Ontario Municipal Code Section 1-4.05(a) and have either not requested an appeal or have exhausted the appellate procedure in Ontario Municipal Code Section 1-4.05(b).
31 RESOLUTION NO. ________

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ONTARIO,

CALIFORNIA, ADOPTING A REPORT REQUESTING THE PLACEMENT

OF SPECIAL ASSESSMENTS ON PROPERTY TAX BILLS FOR CIVIL

PENALTIES OR RECOVERY OF COSTS INCURRED FOR ABATEMENT
OF VIOLATIONS OF CITY CODES AND ORDINANCES.

WHEREAS, Ordinance No. 3046, Property Appearance (Title 5, Chapter 22, of the Ontario Municipal Code) and Chapter 9 of the Uniform Code for the Abatement of Dangerous Buildings provide for the abatement of property nuisances by repair, rehabilitation, demolition or removal; and
WHEREAS, under Resolution 94-112, Resolution ORA-499, and the Cooperation and Reimbursement Agreement entered into on the 15 th day of November, 1994, by the City of Ontario and the Ontario Redevelopment Agency, the Ontario Redevelopment Agency made a one-time advance to the City of One Hundred Fifty Thousand Dollars ($150,000) to repair or abate dangerous buildings and properties throughout the City; and WHEREAS, under a first amendment to the Cooperation and Reimbursement Agreement entered into on the 16th day of July 1996, by the City of Ontario and the Ontario Redevelopment Agency, the Ontario Redevelopment Agency made an additional advance to the City of One Hundred Thousand Dollars ($100,000) to continue to repair or abate dangerous buildings and properties throughout the City; and WHEREAS, under Resolution 94-113, Resolution ORA-500, and the Cooperation and Reimbursement Agreement entered into on the 15 th day of November 1994, by the City of Ontario and the Ontario Redevelopment Agency, the Ontario Redevelopment Agency made a one-time advance to the City of Thirty Thousand Dollars ($30,000) to repair or abate dangerous buildings and properties in the 6th and Grove area; and WHEREAS, under Resolution 94-12, Resolution ORA-464, and the Cooperation and Reimbursement Agreement entered into on the 22 nd day of February 1994, by the City of Ontario and the Ontario Redevelopment Agency, the Ontario Redevelopment Agency made a one-time advance to the City of One Hundred Fifty Thousand Dollars ($150,000) to repair or demolish dangerous buildings throughout the City; and WHEREAS, Ordinance No. 2894, Systematic Health and Safety Inspection Program (Title 8, Chapter 17, of the Ontario Municipal Code), provides for the collection of unpaid service fees, plus any penalties and accrued interest by Special Assessment; and
WHEREAS, Ordinance No. 2920, provides for the assessment of civil penalties for continued violations of the Ontario Municipal Code (Title 1, Chapter 2 of the Ontario Municipal Code), and for fines associated with administrative citations to be collected by Special Assessment (Title 1, Chapter 5 of the Ontario Municipal Code), and establishes a uniform procedure before imposing such Special Assessments (Title 1, Chapter 4 of the 32 Ontario Municipal Code); and
WHEREAS, the above said ordinances, resolutions and agreements provide for recovery of costs incurred in the abatement of violations by means of a Special Assessment placed on the tax rolls; and
WHEREAS, the City has incurred costs involved in the abatement of violations under the Ontario Municipal Code and Uniform Code for the Abatement of Dangerous Buildings, issuing Notices of Violation, and administering the Systematic Health and Safety Program and wishes to recover said costs; and
WHEREAS, the owners of all parcels listed in Exhibit A, B, and C were given notice of imposition of such Special Assessment as provided in Ontario Municipal Code Section 1-4.05(a), and either have not requested an appeal, or have exhausted the appellate procedure provided in Ontario Municipal Code Section 1-4.05(b); and WHEREAS, the City has an executed contract with the San Bernardino County Board of Supervisors for collection of said assessments; NOW, THEREFORE, BE IT RESOLVED that the City Council:

1. Confirmed the costs associated with inspection or abatement on the properties as set forth in the report in Exhibit A; and

2. Confirmed the civil penalties and/or fines for continued violations on the properties as set forth in the report in Exhibit B; and

3. Confirmed that Exhibit C contains the total amount assessed for both confirmed costs and confirmed civil penalties and/or fines for each of the properties; and

4. Found and determined that the report, and Exhibits contained therein are true and accurate; and

5. Adopts the above said report and finds that the costs of inspection or abatement on the properties listed are the costs set forth in Exhibit A, the civil penalties and/or fines for continued violations are the penalties and/or fines as set forth in Exhibit B, and the same are hereby charged and placed as special assessments upon the respective properties; and

6. Directs Exhibit C shall be sent to the Auditor-Controller of San Bernardino County and shall be collected on the County tax roll.

The City Clerk of the City of Ontario shall certify as to the adoption of this Resolution.
33 PASSED, APPROVED, AND ADOPTED this 21st day of January, 2025. _____________________________________
PAUL S. LEON, MAYOR
ATTEST:
____________________________________

SHEILA MAUTZ, CITY CLERK
APPROVED AS TO FORM:
____________________________________

BEST BEST & KRIEGER LLP

CITY ATTORNEY
34 STATE OF CALIFORNIA )

COUNTY OF SAN BERNARDINO )

CITY OF ONTARIO )
I, SHEILA MAUTZ, City Clerk of the City of Ontario, DO HEREBY CERTIFY that foregoing Resolution No. 2024- was duly passed and adopted by the City Council of the City of Ontario at their regular meeting held January 21, 2025 by the following roll call vote, to wit:

AYES: COUNCIL MEMBERS:

NOES: COUNCIL MEMBERS:

ABSENT: COUNCIL MEMBERS:
____________________________________

SHEILA MAUTZ, CITY CLERK
(SEAL)
The foregoing is the original of Resolution No. 2024- duly passed and adopted by the Ontario City Council at their regular meeting held January 21, 2024. _____________________________________

SHEILA MAUTZ, CITY CLERK
(SEAL)
35 City of Ontario
Community Improvement Department
2025/2026 Tax Roll Year Special Assessments
Exhibit A - Costs Associated with Inspection or Abatement Parcel Number Address Amount Due
0108-381-24 1425 E FOURTH ST, Ontario, CA 91764 790.79
0108-474-04 1722 N LEEDS AV, Ontario, CA 91764 46.00
0108-511-16 1466 E FIFTH ST, Ontario, CA 91764 140.00
0108-511-17 1480 E FIFTH ST, Ontario, CA 91764 140.00
0110-071-06 1381 E HOLT BL, Ontario, CA 91761 140.00
0110-071-07 1381 E HOLT BL, Ontario, CA 91761 140.00
0110-111-01 1614 E HOLT BL, Building:1, Unit:105, Ontario, CA 91761 1,087.65 0110-332-01 1802 E FOURTH ST, Unit:A, Ontario, CA 91764 127.00 0110-332-02 1808 E FOURTH ST, Unit:A, Ontario, CA 91764 107.00 0210-182-60 0 N HAVEN AV, Ontario, CA 91764 288.00
0210-204-07 0 E CONCOURS ST, Ontario, CA 91764 4,192.30 0210-551-08 0 E CENTRELAKE DR, Ontario, CA 91761 140.00 0211-351-04 3100 E CEDAR ST, Unit:3, Ontario, CA 91761 424.27 0216-341-60 2401 S GROVE AV, Ontario, CA 91761 845.52
0218-161-11 0 S MILL CK, Ontario, CA 91761 140.00
0218-221-04 0 E EDISON AV, Ontario, CA 91710 140.00
0218-221-05 0 E EDISON AV, Ontario, CA 91710 140.00
0218-221-08 0 E EUCALYPTUS AV, Ontario, CA 91710 140.00 0218-241-43 10469 E EDISON AV, Ontario, CA 91710 91.00
0218-402-31 0 S TURNER AV, Ontario, CA 91761 91.00
0218-452-08 3942 S ALEXANDER AV, Ontario, CA 91761 91.00 0218-554-65 4933 S BOUNTIFUL TR, Ontario, CA 91762 46.00 0218-911-01 2943 E THOROUGHBRED ST, Ontario, CA 91761 167.00 0238-012-30 5060 E FOURTH ST, Ontario, CA 91764 288.00
0238-014-03 990 N ONTARIO MILLS DR, Building:1, Unit:B, Ontario, CA 91764 91.00 0238-051-33 0 E ONTARIO MILLS PW, Ontario, CA 91764 140.00 0238-133-26 1670 S ETIWANDA AV, Building:1, Unit:A, Ontario, CA 91761 1,140.13 0238-211-72 720 S ROCHESTER AV, Unit:B, Ontario, CA 91761 3,344.03 1010-173-22 864 W EL MORADO CT, Ontario, CA 91762 287.00 1010-462-03 452 N MOUNTAIN AV, Building:1, Ontario, CA 91762 47.00 1011-181-11 1118 W MISSION BL, Building:1, Unit:A, Ontario, CA 91762 619.22 1011-361-08 1517 W MISSION BL, Ontario, CA 91762 91.00
1011-361-19 1411 W MISSION BL, Ontario, CA 91762 288.00 1047-143-01 1235 E EIGHTH ST, Ontario, CA 91764 6,151.60 1047-251-02 1521 N EUCLID AV, Ontario, CA 91762 288.00
1047-372-12 634 E BONNIE BRAE CT, Ontario, CA 91764 462.00 1048-191-16 933 E G ST, Ontario, CA 91764 62.03
1048-202-06 712 E H ST, Ontario, CA 91764 107.00
1048-211-31 807 E GRANADA CT, Ontario, CA 91764 227.00
1048-213-18 739 E H ST, Ontario, CA 91764 347.00
1048-413-03 812 E F ST, Ontario, CA 91764 91.00
1048-566-07 303 N EUCLID AV, Building:1, Ontario, CA 91762 1,960.00 1048-566-07 307 N EUCLID AV, Building:1, Ontario, CA 91762 873.52 1048-571-02 423 W D ST, Ontario, CA 91762 62.76

Page 1 ends

City of Ontario
Community Improvement Department
2025/2026 Tax Roll Year Special Assessments
Exhibit A - Costs Associated with Inspection or Abatement Parcel Number Address Amount Due
1048-581-28 301 N VINE AV, Ontario, CA 91762 140.00
1049-021-30 534 W BROOKS ST, Ontario, CA 91762 91.00
1049-055-02 215 W HOLT BL, Ontario, CA 91762 1,269.19
1049-111-01 316 S BON VIEW AV, Building:1, Ontario, CA 91761 3,646.61 1049-111-05 725 E STATE ST, Building:1, Ontario, CA 91761 140.00 1049-111-06 235 S CAMPUS AV, Unit:A, Ontario, CA 91761 140.00 1049-111-07 807 E STATE ST, Building:1, Ontario, CA 91761 140.00 1049-201-07 439 S CAMPUS AV, Ontario, CA 91761 140.00
1049-204-09 854 E ONTARIO BL, Ontario, CA 91761 91.00
1049-232-20 560 E PARK ST, Ontario, CA 91761 140.00
1049-245-04 318 E STATE ST, Ontario, CA 91761 140.00
1049-392-04 1030 S GROVE AV, Ontario, CA 91761 140.00
1049-392-05 1044 S GROVE AV, Ontario, CA 91761 140.00
1049-392-06 1050 S GROVE AV, Ontario, CA 91761 140.00
1049-451-20 1009 S CAMPUS AV, Ontario, CA 91761 288.00
1050-553-03 614 E BIRCH CT, Ontario, CA 91761 91.00
1050-624-15 2115 S SAN ANTONIO AV, Ontario, CA 91762 5,927.39 1050-632-36 0 S CYPRESS AV, Ontario, CA 91762 140.00
1051-171-44 2460 S GROVE AV, Building:1, Ontario, CA 91761 2,303.96 1051-621-57 2930 S VIA BELAMARIA, Ontario, CA 91762 46.00 1052-221-01 0 S BON VIEW AV, Ontario, CA 91761 140.00
1073-312-07 4572 S CALISTOGA AV, Building:, Unit:, Ontario, CA 91762 91.00 1083-071-21 0 S ARCHIBALD AV, Ontario, CA 91761 91.00
1083-301-62 3348 E MORNINGWOOD CT, Ontario, CA 91761 148.70 42,386.67

Page 2 ends

City of Ontario
Community Improvement Department
2025/2026 Tax Roll Year Special Assessments
Exhibit B - Civil Penalties and/or Fines for Continued Violations Parcel Number Address Amount Due
0110-241-57 1752 E G ST, Ontario, CA 91764 120.00
0110-311-51 853 N QVC WY, Ontario, CA 91764 120.00
0110-431-10 750 N ARCHIBALD AV, Building:1, Unit:I, Ontario, CA 91764 120.00 0110-512-35 845 N BAKER AV, Ontario, CA 91764 120.00
0113-285-08 2401 S VINEYARD AV, Building:1, Unit:B, Ontario, CA 91761 120.00 0113-285-12 2403 S VINEYARD AV, Unit:C, Ontario, CA 91761 320.00 0210-182-60 0 N HAVEN AV, Ontario, CA 91764 500.00
0216-401-63 2450 S VINEYARD AV, Building:1, Ontario, CA 91761 120.00 0216-441-13 2713 S MILDRED PL, Ontario, CA 91761 120.00 0216-441-60 2737 S GROVE AV, Ontario, CA 91761 490.00
0216-471-30 1231 E COTTONWOOD ST, Ontario, CA 91761 340.00 0218-131-37 13610 S ARCHIBALD AV, Ontario, CA 91761 340.00 0218-241-43 10469 E EDISON AV, Ontario, CA 91710 120.00 0218-272-29 3372 S PRIMROSE DR, Ontario, CA 91761 120.00 0218-402-18 0 E COMMON AREA, Ontario, CA 91761 120.00
0218-402-31 0 S TURNER AV, Ontario, CA 91761 340.00
0218-452-08 3942 S ALEXANDER AV, Ontario, CA 91761 220.00 0218-462-72 3947 S OAKVILLE AV, Ontario, CA 91761 760.00 0218-483-39 3190 E RUTHERFORD DR, Ontario, CA 91761 320.00 0218-653-42 2944 E MERRITT PASEO, Building:, Unit:, Ontario, CA 91761 120.00 0218-801-63 3707 S PALOMINO PL, Ontario, CA 91761 120.00 0218-881-35 3238 S CENTURION PL, Ontario, CA 91761 170.00 0238-012-30 5060 E FOURTH ST, Ontario, CA 91764 500.00
1011-141-07 961 W HOLT BL, Ontario, CA 91762 120.00
1011-361-19 1411 W MISSION BL, Ontario, CA 91762 500.00 1014-111-04 1519 S OAKS AV, Ontario, CA 91762 320.00
1014-173-17 1646 S CYPRESS AV, Ontario, CA 91762 520.00 1047-251-02 1521 N EUCLID AV, Ontario, CA 91762 500.00
1047-372-12 634 E BONNIE BRAE CT, Ontario, CA 91764 840.00 1047-462-07 1156 N VIRGINIA AV, Ontario, CA 91764 120.00 1048-101-12 1049 N BERLYN AV, Ontario, CA 91764 640.00
1048-133-07 946 E J ST, Ontario, CA 91764 170.00
1048-413-03 812 E F ST, Ontario, CA 91764 420.00
1049-022-01 215 S SAN ANTONIO AV, Ontario, CA 91762 120.00 1049-203-01 0 S TAYLOR AV, Ontario, CA 91761 640.00
1049-231-05 520 E STATE ST, Ontario, CA 91761 170.00
1049-451-20 1009 S CAMPUS AV, Ontario, CA 91761 500.00
1050-031-18 408 W LOCUST ST, Ontario, CA 91762 120.00
1050-221-09 1725 S CAMPUS AV, Ontario, CA 91761 520.00
1050-401-19 410 E FRANCIS ST, Ontario, CA 91761 340.00
1051-041-14 2245 S SAN ANTONIO AV, Ontario, CA 91762 3,120.00 1051-301-40 2556 S PHOENIX PL, Ontario, CA 91761 490.00 1083-071-21 0 S ARCHIBALD AV, Ontario, CA 91761 340.00
16,250.00

Page 1 ends

City of Ontario
Community Improvement Department
2025/2026 Tax Roll Year Special Assessments
Exhibit C - Total Amounts per Parcel
Parcel Number Address Amount Due
0108-381-24 1425 E FOURTH ST, Ontario, CA 91764 790.79
0108-474-04 1722 N LEEDS AV, Ontario, CA 91764 46.00
0108-511-16 1466 E FIFTH ST, Ontario, CA 91764 140.00
0108-511-17 1480 E FIFTH ST, Ontario, CA 91764 140.00
0110-071-06 1381 E HOLT BL, Ontario, CA 91761 140.00
0110-071-07 1381 E HOLT BL, Ontario, CA 91761 140.00
0110-111-01 1614 E HOLT BL, Building:1, Unit:105, Ontario, CA 91761 1,087.65 0110-241-57 1752 E G ST, Ontario, CA 91764 120.00
0110-311-51 853 N QVC WY, Ontario, CA 91764 120.00
0110-332-01 1802 E FOURTH ST, Unit:A, Ontario, CA 91764 127.00 0110-332-02 1808 E FOURTH ST, Unit:A, Ontario, CA 91764 107.00 0110-431-10 750 N ARCHIBALD AV, Building:1, Unit:I, Ontario, CA 91764 120.00 0110-512-35 845 N BAKER AV, Ontario, CA 91764 120.00
0113-285-08 2401 S VINEYARD AV, Building:1, Unit:B, Ontario, CA 91761 120.00 0113-285-12 2403 S VINEYARD AV, Unit:C, Ontario, CA 91761 320.00 0210-182-60 0 N HAVEN AV, Ontario, CA 91764 788.00
0210-204-07 0 E CONCOURS ST, Ontario, CA 91764 4,192.30 0210-551-08 0 E CENTRELAKE DR, Ontario, CA 91761 140.00 0211-351-04 3100 E CEDAR ST, Unit:3, Ontario, CA 91761 424.27 0216-341-60 2401 S GROVE AV, Ontario, CA 91761 845.52
0216-401-63 2450 S VINEYARD AV, Building:1, Ontario, CA 91761 120.00 0216-441-13 2713 S MILDRED PL, Ontario, CA 91761 120.00 0216-441-60 2737 S GROVE AV, Ontario, CA 91761 490.00
0216-471-30 1231 E COTTONWOOD ST, Ontario, CA 91761 340.00 0218-131-37 13610 S ARCHIBALD AV, Ontario, CA 91761 340.00 0218-161-11 0 S MILL CK, Ontario, CA 91761 140.00
0218-221-04 0 E EDISON AV, Ontario, CA 91710 140.00
0218-221-05 0 E EDISON AV, Ontario, CA 91710 140.00
0218-221-08 0 E EUCALYPTUS AV, Ontario, CA 91710 140.00 0218-241-43 10469 E EDISON AV, Ontario, CA 91710 211.00 0218-272-29 3372 S PRIMROSE DR, Ontario, CA 91761 120.00 0218-402-18 0 E COMMON AREA, Ontario, CA 91761 120.00
0218-402-31 0 S TURNER AV, Ontario, CA 91761 431.00
0218-452-08 3942 S ALEXANDER AV, Ontario, CA 91761 311.00 0218-462-72 3947 S OAKVILLE AV, Ontario, CA 91761 760.00 0218-483-39 3190 E RUTHERFORD DR, Ontario, CA 91761 320.00 0218-554-65 4933 S BOUNTIFUL TR, Ontario, CA 91762 46.00 0218-653-42 2944 E MERRITT PASEO, Building:, Unit:, Ontario, CA 91761 120.00 0218-801-63 3707 S PALOMINO PL, Ontario, CA 91761 120.00 0218-881-35 3238 S CENTURION PL, Ontario, CA 91761 170.00 0218-911-01 2943 E THOROUGHBRED ST, Ontario, CA 91761 167.00 0238-012-30 5060 E FOURTH ST, Ontario, CA 91764 788.00
0238-014-03 990 N ONTARIO MILLS DR, Building:1, Unit:B, Ontario, CA 91764 91.00 0238-051-33 0 E ONTARIO MILLS PW, Ontario, CA 91764 140.00

Page 1 ends

City of Ontario
Community Improvement Department
2025/2026 Tax Roll Year Special Assessments
Exhibit C - Total Amounts per Parcel
Parcel Number Address Amount Due
0238-133-26 1670 S ETIWANDA AV, Building:1, Unit:A, Ontario, CA 91761 1,140.13 0238-211-72 720 S ROCHESTER AV, Unit:B, Ontario, CA 91761 3,344.03 1010-173-22 864 W EL MORADO CT, Ontario, CA 91762 287.00 1010-462-03 452 N MOUNTAIN AV, Building:1, Ontario, CA 91762 47.00 1011-141-07 961 W HOLT BL, Ontario, CA 91762 120.00
1011-181-11 1118 W MISSION BL, Building:1, Unit:A, Ontario, CA 91762 619.22 1011-361-08 1517 W MISSION BL, Ontario, CA 91762 91.00
1011-361-19 1411 W MISSION BL, Ontario, CA 91762 788.00 1014-111-04 1519 S OAKS AV, Ontario, CA 91762 320.00
1014-173-17 1646 S CYPRESS AV, Ontario, CA 91762 520.00 1047-143-01 1235 E EIGHTH ST, Ontario, CA 91764 6,151.60 1047-251-02 1521 N EUCLID AV, Ontario, CA 91762 788.00
1047-372-12 634 E BONNIE BRAE CT, Ontario, CA 91764 1,302.00 1047-462-07 1156 N VIRGINIA AV, Ontario, CA 91764 120.00 1048-101-12 1049 N BERLYN AV, Ontario, CA 91764 640.00
1048-133-07 946 E J ST, Ontario, CA 91764 170.00
1048-191-16 933 E G ST, Ontario, CA 91764 62.03
1048-202-06 712 E H ST, Ontario, CA 91764 107.00
1048-211-31 807 E GRANADA CT, Ontario, CA 91764 227.00
1048-213-18 739 E H ST, Ontario, CA 91764 347.00
1048-413-03 812 E F ST, Ontario, CA 91764 511.00
1048-566-07 303 N EUCLID AV, Building:1, Ontario, CA 91762 1,960.00 1048-566-07 307 N EUCLID AV, Building:1, Ontario, CA 91762 873.52 1048-571-02 423 W D ST, Ontario, CA 91762 62.76
1048-581-28 301 N VINE AV, Ontario, CA 91762 140.00
1049-021-30 534 W BROOKS ST, Ontario, CA 91762 91.00
1049-022-01 215 S SAN ANTONIO AV, Ontario, CA 91762 120.00 1049-055-02 215 W HOLT BL, Ontario, CA 91762 1,269.19
1049-111-01 316 S BON VIEW AV, Building:1, Ontario, CA 91761 3,646.61 1049-111-05 725 E STATE ST, Building:1, Ontario, CA 91761 140.00 1049-111-06 235 S CAMPUS AV, Unit:A, Ontario, CA 91761 140.00 1049-111-07 807 E STATE ST, Building:1, Ontario, CA 91761 140.00 1049-201-07 439 S CAMPUS AV, Ontario, CA 91761 140.00
1049-203-01 0 S TAYLOR AV, Ontario, CA 91761 640.00
1049-204-09 854 E ONTARIO BL, Ontario, CA 91761 91.00
1049-231-05 520 E STATE ST, Ontario, CA 91761 170.00
1049-232-20 560 E PARK ST, Ontario, CA 91761 140.00
1049-245-04 318 E STATE ST, Ontario, CA 91761 140.00
1049-392-04 1030 S GROVE AV, Ontario, CA 91761 140.00
1049-392-05 1044 S GROVE AV, Ontario, CA 91761 140.00
1049-392-06 1050 S GROVE AV, Ontario, CA 91761 140.00
1049-451-20 1009 S CAMPUS AV, Ontario, CA 91761 788.00
1050-031-18 408 W LOCUST ST, Ontario, CA 91762 120.00
1050-221-09 1725 S CAMPUS AV, Ontario, CA 91761 520.00

Page 2 ends

City of Ontario
Community Improvement Department
2025/2026 Tax Roll Year Special Assessments
Exhibit C - Total Amounts per Parcel
Parcel Number Address Amount Due
1050-401-19 410 E FRANCIS ST, Ontario, CA 91761 340.00
1050-553-03 614 E BIRCH CT, Ontario, CA 91761 91.00
1050-624-15 2115 S SAN ANTONIO AV, Ontario, CA 91762 5,927.39 1050-632-36 0 S CYPRESS AV, Ontario, CA 91762 140.00
1051-041-14 2245 S SAN ANTONIO AV, Ontario, CA 91762 3,120.00 1051-171-44 2460 S GROVE AV, Building:1, Ontario, CA 91761 2,303.96 1051-301-40 2556 S PHOENIX PL, Ontario, CA 91761 490.00 1051-621-57 2930 S VIA BELAMARIA, Ontario, CA 91762 46.00 1052-221-01 0 S BON VIEW AV, Ontario, CA 91761 140.00
1073-312-07 4572 S CALISTOGA AV, Building:, Unit:, Ontario, CA 91762 91.00 1083-071-21 0 S ARCHIBALD AV, Ontario, CA 91761 431.00
1083-301-62 3348 E MORNINGWOOD CT, Ontario, CA 91761 148.70 100 58,636.67

Page 3 ends

Department: Management Services
Prepared By: Vanny Khu
Staff Member Presenting: Jordan Villwock,
Management Services Director
Approved By:

Submitted To: Council/OHA
Approved: _______________________________
Continued To: ___________________________
Denied: __________________________________
Item No: 5
SUBJECT:

DESIGNATION OF VOTING DELEGATE FOR THE SOUTHERN CALIFORNIA

ASSOCIATION OF GOVERNMENTS GENERAL ASSEMBLY

CITY OF ONTARIO
Agenda Report
January 21, 2025
SECTION:

CONSENT CALENDAR

RECOMMENDATION:

That the City Council designate Mayor Pro Tem Debra Porada as the City's voting delegate and Mayor Paul Leon as the alternate representative for the Southern California California Association of Governments (SCAG) General Assembly scheduled for May 1, 2025.

THE FOLLOWING COUNCIL GOALS ARE BEING ACHIEVED:

Pursue City's Goals and Objectives by Working with Other Governmental Agencies FISCAL IMPACT:

There is no direct fiscal impact by taking this action; however, representation and participation in the SCAG General Assembly will help establish policy on matters which may affect the City's finances.

BACKGROUND & ANALYSIS:

SCAG has scheduled their General Assembly for May 1, 2025, during the 2025 Regional Conference in Palm Desert, California. At the General Assembly, members consider and take actions on resolutions that determine policy matters for SCAG.

Consistent with the SCAG bylaws, a City's voting delegate must be designated by the City Council. 42 Department: Recreation & Community Services
Prepared By: Danielle Guevara
Department:

Prepared By: Danielle Guevara
Staff Member Presenting: Helen McAlary,
Executive Director Community Life and Culture
Reviewed By: Lacey A Rightmer
Approved By:

Submitted To: Council/OHA
Approved: _______________________________
Continued To: ___________________________
Denied: __________________________________
Item No: 6
SUBJECT:

AN AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT WITH

PURESOUND PRODUCTIONS FOR AUDIO, VISUAL AND LIGHTING SERVICES

CITY OF ONTARIO
Agenda Report
January 21, 2025
SECTION:

CONSENT CALENDAR

RECOMMENDATION:

That the City Council authorize the City Manager, or his designee, to execute Amendment No. 3 to the Professional Services Agreement with Puresound Productions in the amount of $170,000 for a total not-to-exceed contract amount of $320,000 and extend the contract term to June 30, 2026.

THE FOLLOWING COUNCIL GOALS ARE BEING ACHIEVED:

Operate in a Businesslike Manner
Encourage, Provide or Support Enhanced Recreational, Educational, Cultural and Healthy City Programs, Policies and Activities
FISCAL IMPACT:

The Fiscal Year 2024-25 Budget includes appropriations for this service. The cost for the current year is $105,000. Should the City exercise the extension, the additional cost would amount to $170,000, for a total not-to-exceed amount of $320,000. If approved, appropriations will be added to the future years’ budget consistent with the annual budget adoption process.

BACKGROUND & ANALYSIS:

The Community Life & Culture Agency provides community members with many large-scale events and programs throughout the year. Many of these events requiring extensive audio, visual and lighting needs. The Community Life & Culture Agency has recognized an increased need for these services over the years.

On March 14, 2022, the City solicited bids for audio, visual and lighting services for special events. On March 25, 2022, two (2) bids were received ranging from $18,300 to $123,970 for the provided events and scope. After reviewing the bids, Staff determined Puresound Productions was the lowest bidder based on pricing, availability and services.

The City entered into a Professional Services Agreement on June 27, 2022, with a one-year term, three optional one-year extensions, and a not-to-exceed amount of $100,000. On March 17, 2023, Amendment No. 1 extended the term through June 30, 2024. Amendment No. 2 was entered into on June 2, 2024, extended the term another year and increased the not-to-exceed amount to $150,000.

43 If approved, Amendment No. 3 will allow the City to maintain the commitments to support special events and programs requiring audio, visual and lighting services by extending the term through June 2026 and increasing the contract amount by $170,000 for a total not-to-exceed amount of $320,000. 44 45
Department: Public Works
Prepared By: Philip Marino
Staff Member Presenting: Tito Haes, Executive
Director Public Works
Reviewed By: Jacqueline Leon, Bonnie Tam
Approved By:

Submitted To: Council/OHA
Approved: _______________________________
Continued To: ___________________________
Denied: __________________________________
Item No: 7
SUBJECT:

A CONSTRUCTION CONTRACT WITH PUB CONSTRUCTION, INC. FOR THE JAMES R. BRYANT PARK FUTSAL COURT RENOVATION

CITY OF ONTARIO
Agenda Report
January 21, 2025
SECTION:

CONSENT CALENDAR

RECOMMENDATION:

That the City Council take the following actions:

A
.

Authorize the City Manager, or his designee, to execute Construction Contract No. PM 2425- 20 with PUB Construction, Inc., of Diamond Bar, California, for the James R. Bryant Park Futsal Court Renovation Project for a total contract amount of $329,202 and authorize a 10% contingency of $32,920 for a total not-to-exceed contract amount of $362,122; and B
.

Authorize the City Manager, or his designee, to execute all documents required for the completion of the project including, but not limited to, contracts, agreements, assessments, reductions of retention accounts, and filing a notice of completion at the conclusion of all construction-related activities.

THE FOLLOWING COUNCIL GOALS ARE BEING ACHIEVED:

Invest in the City's Infrastructure (Water, Streets, Sewers, Parks, Storm Drains and Public Facilities)
FISCAL IMPACT:

The recommended Construction Contract with PUB Construction, Inc. is in the amount of $329,202 plus a 10% contingency of $32,920 for a total not-to-exceed contract amount of $362,122. The Fiscal Year 2024-25 Adopted Budget includes appropriations in the Capital Projects Fund- Measure Q Fund for the James R. Bryant Park Futsal Court Renovation Project.

BACKGROUND & ANALYSIS:

James R. Bryant Park, located on the northeast corner of D. Street and San Antonio Avenue, offers various amenities such as a dog park, basketball courts, backstop for tee ball, playground, exercise equipment, and a tennis court. As the park has aged, the tennis court deteriorated beyond repair and required new surfacing and fencing. In collaboration with the Community Life and Culture Agency, a survey was conducted at the park to determine if the tennis court should be replaced with a new type of sporting court. Sixty-four community members participated in the survey with 56 votes for a futsal court, 8 votes for a pickleball court, and 0 votes for a tennis court. Based on these survey results, Staff decided that a futsal court would replace the 46 existing tennis court.

On November 18 , 2024, the City solicited bids for Bid No. 1862 James R. Bryant Park Futsal Court Renovation under Construction Contract No. PM 2425-20. The four (4) bids received met the bid criteria and standards necessary to perform this work.

Vendor
Location
Bid Amount
PUB Construction, Inc.

Diamond Bar, CA
$329,202
Pacific Tennis Courts, Inc.

Moorpark, CA
$373,333
Williamson Development Group
Lake Elsinore, CA
$458,000
Elegant Construction Company
Irvine, CA
$575,000

PUB Construction, Inc., of Diamond Bar, California, was the lowest responsive bid that met all requirements with a total cost of $329,202. Based on their credentials, pricing, and favorable reference checks, Staff recommends awarding the Construction Contract to PUB Construction, Inc. for the James R. Bryant Park Futsal Court Renovation Project. 47 James R Bryant Park Futsal Court
Renovation PM 2425-20 -1-
SECTION 00500 – CONTRACT FOR CONSTRUCTION
This Contract for Construction (“Contract”), No. is made and entered as of , by and between City of Ontario, with its principal place of business at 303 East “B” Street, Ontario, CA 91764, sometimes hereinafter called the “City” and PUB Construction, Inc., sometimes hereinafter called “Contractor.”
WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other as follows:

ARTICLE 1. SCOPE OF WORK.

The Contractor shall perform all Work within the time stipulated in the Contract, and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5, below, for the following Project:

James R Bryant Park Futsal Court Renovation PM 2425-20
Contractor is an independent contractor and not an agent of the City. The Contractor and its surety shall be liable to the City for any damages arising as a result of the Contractor’s failure to comply with this obligation.

ARTICLE 2. TIME FOR COMPLETION.

Time is of the essence in the performance of the Work. The Work shall be commenced on the date stated in the City’s Notice to Proceed. The Contractor shall complete all Work required by the Contract Documents within 90 calendar days from the commencement date stated in the Notice to Proceed. By its signature hereunder, Contractor agrees the time for completion set forth above is adequate and reasonable to complete the Work.

ARTICLE 3. CONTRACT PRICE.

The City shall pay to the Contractor as full compensation for the performance of the Contract, subject to any additions or deductions as provided in the Contract Documents, and including all applicable taxes and costs, the sum of Three Hundred Twenty-Nine Thousand Two Hundred Two Dollars ($329,202) . Payment shall be made as set forth in the General Conditions. The City will pay to Contractor compensation based upon the prices set forth in the Bid Schedule.
48 James R Bryant Park Futsal Court
Renovation PM 2425-20 -2- SECTION 00500 – CONTRACT FOR

CONSTRUCTION
ARTICLE 4. LIQUIDATED DAMAGES.

Contractor acknowledges that the City will sustain actual damages for each and every Day completion of the Project is delayed beyond the Contract Time. Because of the nature of the Project, it would be impracticable or extremely difficult to determine the City’s actual damages.

Accordingly, in accordance with Government Code section 53069.85, it is agreed that the Contractor will pay the City the sum of $250 for each and every calendar day of delay beyond the time prescribed in the Contract Documents for finishing the Work, as Liquidated Damages and not as a penalty or forfeiture. In the event this is not paid, the Contractor agrees the City may deduct that amount from any money due or that may become due the Contractor under the Contract. This Section does not exclude recovery of other damages specified in the Contract Documents. Liquidated damages may be deducted from progress payments due Contractor, Project retention or may be collected directly from Contractor, or from Contractor's surety. These provisions for liquidated damages shall not prevent the City, in case of Contractor's default, from terminating the Contractor.

ARTICLE 5. COMPONENT PARTS OF THE CONTRACT.

The “Contract Documents” include the following:

Notice Inviting Bids
Instructions to Bidders
Bid Forms
Bid Acknowledgement
Bid Schedule
Bid Guarantee
Designation of Subcontractors
Information Required of Bidders
Non-Collusion Declaration Form
Iran Contracting Act Certification
Public Works Contractor DIR Registration Certification
Performance Bond
Payment (Labor and Materials) Bond
Contract for Construction
General Conditions
Special Conditions
Specifications
Addenda
Construction Plans and Drawings
Standard Specifications for Public Works Construction “Greenbook”, latest edition, Except Sections 1-9
Applicable Local Agency Standards and Specifications, as last revised Reference Specifications
Approved and fully executed Change Orders
Permits
Any other documents contained in or incorporated into the Contract The Contractor shall complete the Work in strict accordance with all of the Contract Documents. 49 James R Bryant Park Futsal Court
Renovation PM 2425-20 -3- SECTION 00500 – CONTRACT FOR

CONSTRUCTION
All of the Contract Documents are intended to be complementary. Work required by one of the Contract Documents and not by others shall be done as if required by all. In the event of conflict, the various Contract Documents will be given effect in the order set forth in the General Conditions. This Contract shall supersede any prior agreement of the parties.

ARTICLE 6. PROVISIONS REQUIRED BY LAW AND CONTRACTOR COMPLIANCE.

Each and every provision of law required to be included in these Contract Documents shall be deemed to be included in these Contract Documents. The Contractor shall comply with all requirements of applicable federal, state and local laws, rules and regulations, including, but not limited to, the provisions of the California Labor Code and California Public Contract Code which are applicable to this Work.

ARTICLE 7. INDEMNIFICATION.

Contractor shall provide indemnification and defense as set forth in the General Conditions.

ARTICLE 8. PREVAILING WAGES.

Contractor shall be required to pay the prevailing rate of wages in accordance with the Labor Code which such rates shall be made available at the City’s Office or may be obtained online at http://www.dir.ca.gov and which must be posted at the job site.

ARTICLE 9. FALSE CLAIMS.

Contractor acknowledges that if a false claim is submitted to the City, it may be considered fraud and Contractor may be subject to criminal prosecution. Contractor acknowledges that the False Claims Act, California Government Code sections 12650, et seq., provides for civil penalties where a person knowingly submits a false claim to a public entity. These provisions include within their scope false claims made with deliberate ignorance of the false information or in reckless disregard of the truth or falsity of the information. In the event the City seeks to recover penalties pursuant to the False Claims Act, it is entitled to recover its litigation costs, including attorneys’ fees. Contractor hereby acknowledges that the filing of a false claim may the Contractor to an administrative debarment proceeding wherein Contractor may be prevented from further bidding on public contracts for a period of up to five (5) years. [REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
50 James R Bryant Park Futsal Court
Renovation PM 2425-20 -4- SECTION 00500 – CONTRACT FOR

CONSTRUCTION
IN WITNESS WHEREOF, this Contract has been duly executed by the above-named parties, on the day and year above written.

CITY OF ONTARIO
By:

Scott Ochoa
City Manager
ATTEST:

By:

Sheila Mautz, City Clerk
APPROVED AS TO FORM:

By:

Best Best & Krieger LLP
City Attorney
PUB Construction, Inc.

By:

Its:

Printed Name:

By:

Its:

Printed Name:

Contractor’s License Number and
Classification
DIR Registration Number
[IF CORPORATION, TWO SIGNATURES,

PRESIDENT OR VICE PRESIDENT AND

SECRETARY OR TREASURER
REQUIRED]

END OF CONTRACT
51 James R Bryant Park Futsal Court
Renovation PM 2425-20 -5- SECTION 00500 – CONTRACT FOR

CONSTRUCTION
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA

COUNTY OF
On , 20 , before me, , Notary Public, personally
appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s)
Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
52 James R Bryant Park Futsal Court
Renovation PM 2425-20 -6- SECTION 00610 – BOND FORMS
SECTION 00610 – BOND FORMS
Performance Bond
KNOW ALL PERSONS BY THESE PRESENTS:

THAT WHEREAS, the City of Ontario, with its principal place of business at 303 East “B” Street, Ontario, CA 91764, (hereinafter referred to as the “City”) has awarded to , (hereinafter referred to as the “Contractor”) an agreement for Contract No. , (hereinafter referred to as the “Project”).

WHEREAS, the work to be performed by the Contractor is more particularly set forth in the Contract Documents for the Project dated , (hereinafter referred to as “Contract Documents”), the terms and conditions of which are expressly incorporated herein by reference; and
WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof and to furnish a bond for the faithful performance of said Contract Documents.

NOW, THEREFORE, we, , the undersigned Contractor and
as Surety, a corporation organized
and duly authorized to transact business under the laws of the State of California, are held and firmly bound unto the City in the sum of DOLLARS,
($ ), said sum being not less than one hundred percent (100%) of the total amount of the Contract, for which amount well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the Contract Documents and any alteration thereof made as therein provided, on its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their intent and meaning; and shall faithfully fulfill all obligations including the one (1) year guarantee of all materials and workmanship; and shall indemnify and save harmless the City, its officials, officers, employees, and authorized volunteers, as stipulated in said Contract Documents, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a part of the obligation secured hereby and in addition to the face amount specified therefore, there shall be included costs and reasonable expenses and fees including reasonable attorney’s fees, incurred by the City in enforcing such obligation.

As a condition precedent to the satisfactory completion of the Contract Documents, unless otherwise provided for in the Contract Documents, the above obligation shall hold good for a period of one (1) year after the acceptance of the work by the City, during which time if Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage resulting from or caused by defective materials or faulty workmanship.

The obligations of Surety hereunder shall continue so long as any obligation of Contractor remains. Nothing herein shall limit the City’s rights or the Contractor or Surety’s obligations under 53 James R Bryant Park Futsal Court
Renovation PM 2425-20 -7- SECTION 00610 – BOND FORMS
the Contract, law or equity, including, but not limited to, California Code of Civil Procedure Section 337.15.

Whenever Contractor shall be, and is declared by the City to be, in default under the Contract Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall promptly, at the City’s option:
i. Take over and complete the Project in accordance with all terms and conditions in the Contract Documents; or
ii. Obtain a bid or bids for completing the Project in accordance with all terms and conditions in the Contract Documents and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a Contract between such bidder, the Surety and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.
iii. Permit the City to complete the Project in any manner consistent with California law and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.

Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.

Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from Contractor for completion of the Project if the City, when declaring the Contractor in default, notifies Surety of the City’s objection to Contractor’s further participation in the completion of the Project.

The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project to be performed thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project.
[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
54 James R Bryant Park Futsal Court
Renovation PM 2425-20 -8- SECTION 00610 – BOND FORMS

IN WITNESS WHEREOF, we have hereunto set our hands and seals this day of , 20 .
(Corporate Seal)
Contractor/ Principal
By

Title

(Corporate Seal)

Surety
By
Attorney-in-Fact
(Attach Attorney-in-Fact Certificate) Title
The rate of premium on this bond is per thousand. The total amount of premium charges is $ .
(The above must be filled in by corporate attorney.)

THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety)

(Name and Address of Agent or
Representative for service of
process in California, if different
from above)
(Telephone number of Surety
and Agent or Representative for
service of process in California)
55 James R Bryant Park Futsal Court
Renovation PM 2425-20 -9- SECTION 00610 – BOND FORMS

Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA

COUNTY OF
On , 20 , before me, , Notary Public, personally
appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s)
Limited

General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for Contractor/Principal. 56 James R Bryant Park Futsal Court
Renovation PM 2425-20 -10- SECTION 00610 – BOND FORMS

Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA

COUNTY OF
On , 20 , before me, , Notary Public, personally
appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s)
Limited

General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of Attorney to local representatives of the bonding company must also be attached.

END OF PERFORMANCE BOND
57 James R Bryant Park Futsal Court
Renovation PM 2425-20 -11- SECTION 00610 – BOND FORMS

Payment Bond (Labor and Materials).

KNOW ALL MEN BY THESE PRESENTS That
WHEREAS, the City of Ontario , with its principal place of business at 303 East “B” Street, Ontario, CA 91764 (hereinafter designated as the “City”), by action taken or a resolution passed , 20 , has awarded to hereinafter
designated as the “Principal,” a contract for the work described as follows: Contract No. (the “Project”); and
WHEREAS, the work to be performed by the Contractor is more particularly set forth in the Contract Documents for the Project dated , (hereinafter referred to as “Contract Documents”), the terms and conditions of which are expressly incorporated herein by reference; and
WHEREAS, said Principal is required to furnish a bond in connection with said contract; providing that if said Principal or any of its Subcontractors shall fail to pay for any materials, provisions, provender, equipment, or other supplies used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Code or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of said Principal and its Subcontractors with respect to such work or labor the Surety on this bond will pay for the same to the extent hereinafter set forth.

NOW THEREFORE, we, the Principal and as Surety, are held and firmly bound unto the City in the penal sum of Dollars ($ ) lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of the persons named in Civil Code Section 9100, fail to pay for any materials, provisions or other supplies, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department or Franchise Tax Board from the wages of employees of the contractor and his subcontractors pursuant to Revenue and Taxation Code Section 18663, with respect to such work and labor the Surety or Sureties will pay for the same, in an amount not exceeding the sum herein above specified, and also, in case suit is brought upon this bond, all litigation expenses incurred by the City in such suit, including reasonable attorneys’ fees, court costs, expert witness fees and investigation expenses.

This bond shall inure to the benefit of any of the persons named in Civil Code Section 9100 so as to give a right of action to such persons or their assigns in any suit brought upon this bond.

It is further stipulated and agreed that the Surety on this bond shall not be exonerated or released from the obligation of this bond by any change, extension of time for performance, addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement herein above described, or pertaining or relating 58 James R Bryant Park Futsal Court
Renovation PM 2425-20 -12- SECTION 00610 – BOND FORMS

to the furnishing of labor, materials, or equipment therefore, nor by any change or modification of any terms of payment or extension of the time for any payment pertaining or relating to any scheme or work of improvement herein above described, nor by any rescission or attempted rescission or attempted rescission of the contract, agreement or bond, nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement or under the bond, nor by any fraud practiced by any person other than the claimant seeking to recover on the bond and that this bond be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is given, and under no circumstances shall Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of contract between the owner or the City and original contractor or on the part of any obligee named in such bond, but the sole conditions of recovery shall be that claimant is a person described in Civil Code Section 9100, and has not been paid the full amount of his claim.

The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract to be performed thereunder, shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of Contract, including but not limited to, the provisions of Sections 2819 and 2845 of the California Civil Code.

IN WITNESS WHEREOF, we have hereunto set our hands and seals this day of , 20 .
(Corporate Seal)
Contractor/ Principal
By

Title

(Corporate Seal)

Surety
By
Attorney-in-Fact
(Attach Attorney-in-Fact Certificate) Title
59 James R Bryant Park Futsal Court
Renovation PM 2425-20 -13- SECTION 00610 – BOND FORMS

Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA

COUNTY OF
On , 20 , before me, , Notary Public, personally
appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s)
Limited

General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for Contractor/Principal. 60 James R Bryant Park Futsal Court
Renovation PM 2425-20 -14- SECTION 00610 – BOND FORMS

Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA

COUNTY OF
On , 20 , before me, , Notary Public, personally
appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s)
Limited

General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of-Attorney to local representatives of the bonding company must also be attached.

END OF PAYMENT BOND
61 James R Bryant Park Futsal Court
Renovation PM 2425-20 -15- SECTION 00700 – GENERAL CONDITIONS

SECTION 00700 – GENERAL CONDITIONS

ARTICLE 1 -TERMS; DEFINITIONS

1.1 Defined Terms
A. Whenever used in the Contract Documents and printed with initial capital letters, the terms listed below will have the meanings indicated which are applicable to both the singular and plural thereof. In addition to terms specifically defined below, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms.

1. Act of God – An earthquake of magnitude of 3.5 or higher on the Richter scale or a tidal wave.

2. Addenda -- Written or graphic instruments issued prior to the submission of Bids which clarify, correct, or change the Contract Documents.

3. Additional Work -- New or unforeseen work will be classified as “Additional Work” when the Engineer determines that it is not covered by the Contract.

4. Applicable Laws -- The laws, statutes, ordinances, rules, codes, regulations, permits, and licenses of any kind, issued by local, state or federal governmental authorities or private authorities with jurisdiction (including utilities), to the extent they apply to the Work.

5. Bid -- The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices and other terms for the Work to be performed.

6. Bid Guarantee -- The Bid Bond, cashier’s check, or certified check to be made by the Bidder, which is to accompany the Bid as a guaranty of good faith to enter into a written contract.

7. Bidder -- The individual or entity who submits a Bid directly to the City.

8. Change Order (“CO”) -- A document that authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Times, issued on or after the Effective Date of the Contract, in accordance with the Contract Documents and in the form contained in the Contract Documents.

9. Change Order Request (“COR”) -- A request made by the Contractor for an adjustment in the Contract Price and/or Contract Times as the result of a Contractor-claimed change to the Work.

10. City’s Representative – The City of Ontario, and acting through properly authorized agents, such as the Engineer or such other agents acting within the scope of the particular duties entrusted to them. Also sometimes referred to as the “City’s Representative” or “Representative” in the Contract Documents. The terms the City and Owner may be used interchangeably
62 James R Bryant Park Futsal Court
Renovation PM 2425-20 -16- SECTION 00700 – GENERAL CONDITIONS

11. Claim -- A demand or assertion by the City or Contractor seeking an adjustment of Contract Price or Contract Times, or both, or other relief with respect to the terms of the Contract. A demand for money or services by a third party is not a Claim.

12. Contract -- The entire integrated written agreement between the City and Contractor concerning the Work. “Contract” may be used interchangeably with “Agreement” in the Contract Documents. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral, and includes all Contract Documents.

13. Contract Documents -- The documents listed in Section 00 52 13, Article 5 of the Contract for Construction. Some documents provided by the City to the Bidders and Contractor, including but not limited to reports and drawings of subsurface and physical conditions are not Contract Documents.

14. Contract Price -- Amount to be paid by the City to the Contractor as full compensation for the performance of the Contract and completion of the Work, subject to any additions or deductions as provided in the Contract Documents, and including all applicable taxes and costs.

15. Contract Time -- The number of days or the dates stated in the Contract Documents to: achieve defined milestones, if any; and to complete the Work so that it is ready for final payment.

16. Contractor -- The individual or entity with which the City has contracted for performance of the Work.

1. Contractor’s Designated On -Site Representative -- The Contractor’s Designated On-Site Representative will be identified by the Contractor and shall not be changed without prior written consent of the City.

2. Critical Supply Shortage -- An unusual shortage in materials that is (a) supported by documented proof that Contractor made every effort to obtain such materials from all available sources; (b) such shortage is due to the fact that such materials are not physically available from single or multiple sources or could have been obtained only at exorbitant prices entirely inconsistent with current and standard rates taking into account the quantities involved and the usual industry practices in obtaining such quantities; and (c) such shortages and the difficulties in obtaining alternate sources of materials could not have been known or anticipated by Contractor at the time it submitted its bid or entered the Contract. Market fluctuations in prices of materials, whether or not resulting from a Force Majeure Event, does not constitute a Critical Supply Shortage.

3. Day -- A calendar day of 24 hours measured from midnight to the next midnight.

4. Defective Work -- Work that is unsatisfactory, faulty, or deficient; or that does not conform to the Contract Documents; or that does not meet the requirements of any inspection, reference standard, test, or approval referenced in the Contract Documents.
63 James R Bryant Park Futsal Court
Renovation PM 2425-20 -17- SECTION 00700 – GENERAL CONDITIONS

5. Demobilization -- The complete dismantling and removal by the Contractor of all of the Contractor’s temporary facilities, equipment, and personnel at the Site.

6. Drawings -- That part of the Contract Documents prepared by of the Engineer of Record which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Shop Drawings and other Contractor Submittals are not Drawings as so defined.

7. Effective Date of the Contract -- The date indicated in the Contract on which it becomes effective, but if no such date is indicated, it means the date on which the Contract is signed and delivered by the last of the two parties to sign and deliver.

8. Engineer -- Whenever not qualified, shall mean the City Engineer or the Engineer authorized to act for and in behalf of the City, acting either directly or through properly authorized agents, such agents acting severally within the scope of the particular duties entrusted to them.

9. Force Majeure Event -- An event that materially affects a party’s performance and is one or more of the following: (1) Acts of God or other natural disasters occurring at the Site; (2) terrorism or other acts of a public enemy; (3) orders of governmental authorities (including, without limitation, unreasonable and unforeseeable delay in the issuance of permits or approvals by governmental authorities that are required for the Work); (4) pandemics, epidemics or quarantine restrictions; (5) strikes and other organized labor action occurring at the Site and the effects thereof on the Work, only to the extent such strikes and other organized labor action are beyond the control of Contractor and its Subcontractors, of every Tier, and to the extent the effects thereof cannot be avoided by use of replacement workers; and (6) a Critical Supply Shortage. For purposes of this section, “orders of governmental authorities,” includes ordinances, emergency proclamations and orders, rules to protect the public health, welfare and safety, and other actions of the City in its capacity as a municipal authority.

10. Hazardous Waste -- The term “Hazardous Waste” shall have the meaning provided in Section 104 of the Solid Waste Disposal Act (42 U.S.C. § 6903) as amended from time to time, or any substance or material identified as hazardous under any state or federal statute governing handling, disposal and/or cleanup of any such substance or material, whichever is more restrictive.

11. Holiday – Holidays occur on:

New Year’s Day - January 1
President’s Day – Third Monday in February
Memorial Day - Last Monday in May
Independence Day - July 4
Labor Day - First Monday in September
Veteran’s Day - November 11
Thanksgiving Day - Fourth Thursday in November
Friday after Thanksgiving
Christmas Eve – December 24
Christmas Day - December 25
64 James R Bryant Park Futsal Court
Renovation PM 2425-20 -18- SECTION 00700 – GENERAL CONDITIONS

Day After Christmas – December 26
New Year’s Eve – December 31
If any Holiday listed above falls on a Saturday, Saturday and the preceding Friday are both Holidays. If the Holiday should fall on a Sunday, Sunday and the following Monday are both Holidays.

12. Notice of Award -- The written notice by the City to the Successful Bidder stating that upon timely compliance by the Successful Bidder with the conditions precedent listed therein, the City will sign and deliver the Contract.

13. Notice of Completion -- The form which may be executed by the City constituting final acceptance of the Project.

14. Notice to Proceed -- A written notice given by the City to Contractor fixing the date on which the Contractor may proceed with the Work and when Contract Times will commence to run.

15. Project -- The total construction of which the Work to be performed under the Contract Documents may be the whole, or a part.

16. Record Drawings – The record set of as-builts prepared by the Contractor during the Work in accordance with the requirements of the General Conditions.

17. Recyclable Waste Materials -- Materials removed from the Site which are required to be diverted to a recycling center rather than an area landfill. Recyclable Waste Materials include, but are not limited to, asphalt, concrete, brick, concrete block, and rock.

18. Sample -- A physical example furnished by the Contractor to illustrate materials, equipment or workmanship; to establish standards by which the Work will be judged.

19. Schedule of Submittals -- A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to facilitate scheduled performance of related construction activities.

20. Shop Drawings -- All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work.

21. Site -- Lands or areas indicated in the Contract Documents as being furnished by the City upon which the Work is to be performed, including rights -of-way and easements for access thereto, and such other lands furnished by the City which are designated for the use of Contractor.

22. Specifications -- That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto.
65 James R Bryant Park Futsal Court
Renovation PM 2425-20 -19- SECTION 00700 – GENERAL CONDITIONS

23. Stop Payment Notice -- A written notice as defined in Civil Code section 8044.

24. Subcontractor -- An individual or entity other than a Contractor having a contract with any other entity than the City for performance of any portion of the Work at the Site.

25. Submittal -- Written and graphic information and physical samples prepared and supplied by the Contractor demonstrating various portions of the Work.

26. Successful Bidder -- The responsible Bidder submitting a responsive Bid to whom the City makes an award.

27. Supplier -- A manufacturer, fabricator, supplier, distributor, material man, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment used in the performance of the Work or to be incorporated in the Work.

28. Underground Facilities -- All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

29. Unit Price Work -- Work to be paid for on the basis of unit prices as provided by the Contractor in its Bid or as adjusted in accordance with the Contract Documents.

30. Warranty -- A guarantee provided to the City by the Contractor that the Work will remain free of defects and suitable for its intended use for the period required by the Contract Documents or the longest period permitted by the law of this state, whichever is longer.

31. Work -- The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents.

1.2 Terminology.

A. The words and terms below are not defined but, when used in the Contract Documents, have the indicated meaning.

1. The word “furnish,” when used in connection with services, materials, or equipment, shall mean to supply and deliver said services, materials, or equipment to the Site (or some other specified location) ready for use or installation and in usable or operable condition.
66 James R Bryant Park Futsal Court
Renovation PM 2425-20 -20- SECTION 00700 – GENERAL CONDITIONS

2. The word “install,” when used in connection with services, materials, or equipment, shall mean to put into use or place in final position said services, materials, or equipment complete and ready for intended use.

3. The words “perform” or “provide,” when used in connection with services, materials, or equipment, shall mean to furnish and install said services, materials, or equipment complete and ready for intended use.

4. Regardless of whether “furnish,” “install,” “perform,” or “provide” is used in connection with services, materials, or equipment, an obligation of Contractor is implied.

B. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning.

ARTICLE 2 -PRELIMINARY MATTERS

2.1 Delivery of Contract Documents
A. Within ten (10) Days after receipt of the Notice of Award and before the City will execute the Contract, the Contractor shall furnish and file with the City a signed Contract and the necessary Performance Bond, Payment Bond, and Certificates of Insurance and Endorsements, as well as any other documents specified in the Contract Documents.

2.2 Bonds
A. Contractor shall submit the bonds on the forms provided with the Contract Documents, duly executed by a responsible corporate surety admitted to transact surety business in the State of California, as defined in Code of Civil Procedure section 995.120, and listed in the United States Department of the Treasury circular entitled "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies," authorized to do business in the State of California and acceptable to the City conditioned upon the faithful performance by the Contractor of all requirements of the Contract Documents. Each of the bonds shall be in a sum no less than one hundred percent (100%) of the Contract Price. Bonds shall be delivered to the City within ten (10) Days after receipt of the Notice of Award and before execution of the Contract by the City.

2.3 Evidence of Insurance
A. Prior to commencing any Work but no later than ten (10) Days after receipt of the Notice of Award, the Contractor shall submit or cause to be submitted any and all Certificates of Insurance and Endorsements, showing that the Contractor has the required insurance, to the attention of the City. Such insurance is to be provided at the sole cost and expense of the Contractor. No Work shall be performed until all of the required insurance has been received and approved.
67 James R Bryant Park Futsal Court
Renovation PM 2425-20 -21- SECTION 00700 – GENERAL CONDITIONS

2.4 Execution of the Contract
A. Upon receipt of the required Contract Documents, the City will execute the Contract, establishing the Effective Date of the Contract.

2.5 Contractor’s Failure to Perform
A. Should Contractor fail to comply with timelines provided above, the City shall retain the right to enforce and collect on the Contractor’s Bid Guarantee, rescind award to the Contractor and award the Contract to the next lowest responsive, responsible bidder as determined by the City. If the City elects to accept bonds and insurance submitted late, the Contract Times will begin to run as of the date stated in the Notice to Proceed. However, the number of days beyond the original ten (10) Days it took to receive the properly executed Contract and related items may be deducted from the Contract Times.

2.6 Commencement of Contract Times; Notice to Proceed
A. The City will not issue a Notice to Proceed until after the Effective Date of the Contract.

Work shall commence within ten (10) Days of the date stated in the Notice to Proceed.

The Contract Times begin to run on the date specified in the Notice to Proceed. No Work shall be done at the Site prior to the issuance of the Notice to Proceed.

2.7 Copies of Documents
A. Contractor will be furnished, free of charge, five (5) copies of the Contract Documents. Additional copies may be obtained at cost of reproduction. Contractor shall maintain a clean, undamaged set of Contract Documents, including Submittals, at the Project site.

2.8 Substitution Requests, Schedule of Submittals, and Schedule A. Substitution Requests. Within thirty -five (35) days of Contract award (unless otherwise specified in the Contract Documents), Contractor shall provide all substitution requests as further described in the General Conditions.

B. Schedule of Submittals. Within five (5) Days after the issuance of the Notice of Proceed (unless otherwise specified in the Contract Documents), Contractor shall submit to the City a Schedule of Submittals that conforms with the requirements of Section 00 72 00, Article 5.21.

C. Schedule. Within ten (10) days after the issuance of the Notice of Proceed (unless otherwise specified in the Contract Documents), the Contractor shall submit a construction schedule that conforms with the requirements of Section 00 72 00, Article 8.2.

2.9 Preconstruction Conference; Designation of Authorized Representatives.

A. Before any Work at the Site is started, a conference attended by the City, Contractor, Engineer, and others as appropriate will be held to establish a working understanding among the parties as to the Work and to discuss the schedules 68 James R Bryant Park Futsal Court
Renovation PM 2425-20 -22- SECTION 00700 – GENERAL CONDITIONS

referred to herein, procedures for handling Submittals and Shop Drawings, processing applications for payment, and maintaining required records.

B. At this conference the City and Contractor each shall designate, in writing, a specific individual to act as its authorized representative with respect to the services and responsibilities under the Contract. Such individuals shall have the authority to transmit instructions, receive information, render decisions relative to the Contract, and otherwise act on behalf of each respective party.

2.10 Subcontractor Mobilization Meeting.

A. Prior to the start of each major Subcontractor’s Site Work, the Contractor, the involved Subcontractor, and Engineer shall attend a pre-start meeting to discuss the schedule, coordination, procedures, and other administrative issues.

2.11 Authority of Council; Engineer
A. The City Council has the final authority in all matters affecting the Work. Within the scope of the Contract, the Engineer has the authority to enforce compliance with the Contract Documents. The Contractor shall promptly comply with instructions from the Engineer.

B. The decision of the Engineer is final and binding on all questions relating to:

1. quantities;

2. acceptability of material, equipment, or work;

3. execution, progress or sequence of work;

4. interpretation of the Plans, Specifications, or other Contract Documents; and

5. Any other areas specifically identified in the Contract Documents or under the law.

C. Compliance with instructions from the Engineer shall be a condition precedent to any payment under the Contract, unless otherwise ordered by the City Council.

2.12 Mobilization
A. When a Bid item is included in the Bid Schedule for mobilization, the costs of Work in advance of construction operations and not directly attributable to any specific bid item will be included in the progress estimate. When no bid item is provided for mobilization payment for such costs will be deemed to be included in the other items of the Work.

B. Payment for mobilization based on the lump sum provided in the Bid Schedule, shall constitute full compensation for all such Work. No payment for mobilization will be made until all of the listed items have been completed to the satisfaction of the Engineer. The scope of the Work included under mobilization shall include, but shall not be limited to, the following principal items:
69 James R Bryant Park Futsal Court
Renovation PM 2425-20 -23- SECTION 00700 – GENERAL CONDITIONS

1. Obtaining and paying for all bonds, insurance, and permits.

2. Moving on to the Project Site of all Contractor’s plant and equipment required for the first month’s operations.

3. Installing temporary construction power, wiring, and lighting facilities, as applicable.

4. Establishing fire protection system, as applicable.

5. Developing and installing a construction water supply, as applicable.

6. Providing and maintaining the field office trailers for the Contractor, if necessary, and the Engineer (if specified), complete, with all specified furnishings and utility services.

7. Providing on-site sanitary facilities and potable water facilities as specified per Cal- OSHA and these Contract Documents.

8. Furnishing, installing, and maintaining all storage buildings or sheds required for temporary storage of products, equipment, or materials that have not yet been installed in the Work. All such storage shall meet manufacturer’s specified storage requirements, and the specific provisions of the specifications, including temperature and humidity control, if recommended by the manufacturer, and for all security.

9. Arranging for and erection of Contractor’s work and storage yard.

10. Posting all OSHA required notices and establishment of safety programs per Cal- OSHA.

11. Full-time presence of Contractor’s superintendent at the job Site as required herein.

12. Submittal of construction schedule as required by the Contract Documents.

ARTICLE 3 -CONTRACT DOCUMENTS; INTENT

3.1 Examination of Drawings, Specifications, and Site of Work A. Examination of Contract Documents; Site . Before commencing any portion of the Work, Contractor shall again carefully examine all applicable Contract Documents, the Project Site, and other information given to Contractor as to materials and methods of construction and other Project requirements. Contractor shall immediately notify the Engineer of any potential error, inconsistency, ambiguity, conflict, or lack of detail or explanation. If Contractor performs, permits, or causes the performance of any Work which is in error, inconsistent or ambiguous, or not sufficiently detailed or explained, Contractor shall bear any and all resulting costs, including, without limitation, the cost of correction. In no case shall the Contractor or any Subcontractor proceed with Work if uncertain as to the applicable requirements.
70 James R Bryant Park Futsal Court
Renovation PM 2425-20 -24- SECTION 00700 – GENERAL CONDITIONS

B. Additional Instructions . After notification of any error, inconsistency, ambiguity, conflict, or lack of detail or explanation, the Engineer will provide any required additional instructions, by means of drawings or other written direction, necessary for proper execution of Work.

C. Quality of Parts, Construction and Finish. All parts of the Work shall be of the best quality of their respective kinds and the Contractor must use all diligence to inform itself fully as to the required construction and finish.

D. Contractor’s Variation from Contract Document Requirements. If it is found that the Contractor has varied from the requirements of the Contract Documents including the requirement to comply with all Applicable Laws, the Engineer may at any time, before or after completion of the Work, order the improper Work removed, remade or replaced by the Contractor at the Contractor’s expense.

3.2 Intent of Contract Documents
A. The Contract Documents are complementary; what is required by any one will be binding as if required by all. It is the intent of the Contract Documents to describe a functionally complete Project (or part thereof) to be constructed in accordance with the Contract Documents. Any labor, documentation, services, materials, or equipment that reasonably may be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the indicated result will be provided whether or not specifically called for, at no additional cost to the City.

B. The Contractor shall furnish, unless otherwise provided in the Contract Documents, all materials, implements, machinery, equipment, tools, supplies and labor necessary to the prosecution and completion of the Project.

C. Clarifications and interpretations of the Contract Documents shall be issued by the Engineer as provided in these General Conditions.

D. If utilities to equipment/fixtures are not shown but are necessary to operate the equipment/fixtures, the utilities service installation is considered to be part of the Work. The implied Work will conform to the appropriate sections of the Contract Documents.

E. Organization of the Contract Documents into divisions, sections, and articles, and arrangement of drawings shall not control the Contractor in dividing Work among Subcontractors or in establishing the extent of Work to be performed by any trade.

3.3 Reference Standards.

A. Standards, Specifications, Codes, Laws, and Regulations.

1. Reference to federal specifications, federal standards, other standards, specifications, manuals, or codes of any technical society, organization, or association, or to Applicable Laws, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Applicable Laws in effect at the time of opening of Bids (or on the Effective Date of the 71 James R Bryant Park Futsal Court
Renovation PM 2425-20 -25- SECTION 00700 – GENERAL CONDITIONS

Contract if there were no Bids), except as may be otherwise specifically stated in the Contract Documents.

2. No provision of any such standard, specification, manual, or code, or any instruction of a Supplier, shall be effective to change the duties or responsibilities of the City, Contractor, or any of their Subcontractors, consultants, agents, or employees, from those set forth in the Contract Documents. No such provision or instruction shall be effective to assign to the City, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents.

3.4 Reporting and Resolving Discrepancies; Order of Precedence.

A. Reporting Discrepancies.

1. The Contract Documents are intended to be fully cooperative and complementary.

Before undertaking each part of the Work, Contractor shall carefully study and compare the Contract Documents and check and verify pertinent figures therein and all applicable field measurements. Contractor shall promptly report in writing to the City any conflict, error, ambiguity, or discrepancy which Contractor discovers, should have discovered, or has actual knowledge of, and shall obtain a written interpretation or clarification from the City before proceeding with any Work affected thereby. If, during the performance of the Work, Contractor discovers any conflict, error, ambiguity, or discrepancy within the Contract Documents, or between the Contract Documents and (i) any Applicable Law, (ii) any standard, specification, manual, or code, or (iii) any instruction of any Supplier, then Contractor shall promptly submit a written Request for Information (RFI) to the City.

Contractor shall not proceed with the Work affected thereby (except in an emergency) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in the Contract Documents, and any Work performed by Contractor before receipt of an amendment or supplement shall be at Contractor’s own risk.

B. Order of Precedence.

1. In case of conflicts between the Contract Documents, the order of precedence shall be as follows:
a. Permits from other agencies as may be required by law b. Change Orders, most recent first
c. Contract
d. Addenda, most recent first
e. Special Conditions
f. Specifications
72 James R Bryant Park Futsal Court
Renovation PM 2425-20 -26- SECTION 00700 – GENERAL CONDITIONS

g. Construction Plans and Drawings(Contract Drawings)
h. General Conditions
i. Instructions to Bidders
j. Notice Inviting Bids
k. Contractor’s Bid (Bid Forms)
l. Standard Specifications for Public Works Construction “Greenbook” latest edition (Sections 1-9 Excluded)
m. Applicable Local Agency Standards and Specifications n. Standard Drawings
o. Reference Documents

2. With reference to the Drawings the order of precedence shall be as follows:
a. Figures govern over scaled dimensions
b. Detail drawings govern over general drawings
c. Addenda/Change Order drawings govern over Drawings
d. Contract Drawings govern over Standard Drawings
e. Contract Drawings govern over Shop Drawings

3. Notwithstanding the orders of precedence established above, in the event of conflicts, the higher standard, higher quality and most expensive shall always apply.

3.5 Amending and Supplementing Contract Documents.

A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof only by Change Order or written amendment to the Contract duly executed by the parties.

B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work may be authorized at no cost to the City, by one or more of the following ways:

1. The City’s review of a Submittal, Shop Drawing, Sample or substitution request without exception (subject to the provisions of the Contract Documents); or

2. The City’s issuance of a response to an RFI.

C. However, no review or RFI response will reduce or modify the Contractor’s obligation to fully satisfy and comply with the requirements of the Contract Documents. 73 James R Bryant Park Futsal Court
Renovation PM 2425-20 -27- SECTION 00700 – GENERAL CONDITIONS

3.6 Reuse of Documents.

A. Contractor and any Subcontractor or Supplier shall not:

1. have or acquire any title to or ownership rights in any of the Drawings, Specifications, or other documents (or copies of any thereof) prepared by or bearing the seal of Engineer of Record or its consultants, including electronic media editions; or

2. reuse any such Drawings, Specifications, other documents, or copies thereof on extensions of the Project or any other project without written consent of the City and Engineer of Record and specific written verification or adaptation by Engineer of Record.

B. The prohibitions of this Article will survive final payment, or termination of the Contract. Nothing herein shall preclude Contractor from retaining copies of the Contract Documents for record purposes.

ARTICLE 4 -INDEMNIFICATION; INSURANCE

4.1 Indemnification
A. To the fullest extent permitted by law, Contractor shall immediately defend (with counsel of the City’s choosing), indemnify and hold harmless the City, its officials, officers, agents, employees, and representatives, and each of them from and against:

1. Any and all claims, demands, causes of action, costs, expenses, injuries, losses or liabilities, in law or in equity, of every kind or nature whatsoever, but not limited to, injury to or death, including wrongful death, of any person, and damages to or destruction of property of any person, arising out of, related to, or in any manner directly or indirectly connected with the Work or this Contract, including claims made by subcontractors for nonpayment, including without limitation the payment of all consequential damages and attorney’s fees and other related costs and expenses, however caused, regardless of whether the allegations are false, fraudulent, or groundless, and regardless of any negligence of the City or its officers, employees, or authorized volunteers (including passive negligence), except the sole negligence or willful misconduct or active negligence of the City or its officials, officers, employees, or authorized volunteers.

2. Contractor’s defense and indemnity obligation herein includes, but is not limited to damages, fines, penalties, attorney’s fees and costs arising from claims under the Americans with Disabilities Act (ADA) or other federal or state disability access or discrimination laws arising from Contractor’s Work during the course of construction of the improvements or after the Work is complete, as the result of defects or negligence in Contractor’s construction of the improvements.

3. Any and all actions, proceedings, damages, costs, expenses, fines, penalties or liabilities, in law or equity, of every kind or nature whatsoever, arising out of, resulting from, or on account of the violation of any governmental law or regulation, compliance with which is the responsibility of Contractor; 74 James R Bryant Park Futsal Court
Renovation PM 2425-20 -28- SECTION 00700 – GENERAL CONDITIONS

4. Any and all losses, expenses, damages (including damages to the Work itself), attorney’s fees, and other costs, including all costs of defense which any of them may incur with respect to the failure, neglect, or refusal of Contractor to faithfully perform the Work and all of Contractor’s obligations under Contract. Such costs, expenses, and damages shall include all costs, including attorney’s fees, incurred by the indemnified parties in any lawsuit to which they are a party.

B. Contractor shall immediately defend, at Contractor’s own cost, expense and risk, with the counsel of the City choosing, any and all such aforesaid suits, actions or other legal proceedings of every kind that may be brought or instituted against the City, its officials, officers, agents, employees and representatives. Contractor shall pay and satisfy any judgment, award or decree that may be rendered against the City, its officials, officers, employees, agents, employees and representatives, in any such suit, action or other legal proceeding. Contractor shall reimburse the City, its officials, officers, agents, employees and representatives for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. The only limitations on this provision shall be those imposed by Civil Code section 2782.

C. The provisions of this Article shall survive the termination of this Contract howsoever caused, and no payment, partial payment, or acceptance of occupancy in whole or part of the Work shall waive or release any of the provisions of this Article.

4.2 Insurance
The Contractor shall obtain, and at all times during performance of the Work of Contract, maintain all of the insurance described in this Article. Contractor shall not commence Work under this Contract until it has provided evidence satisfactory to the City that it has secured all insurance required hereunder. Contractor shall not allow any Subcontractor to commence work on any subcontract until it has provided evidence satisfactory to the City that the subcontractor has secured all insurance required under this Article. Failure to provide and maintain all required insurance shall be grounds for the City to terminate this Contract for cause. Contractor shall furnish the City with original certificates of insurance and endorsements effective coverage required by this Contract on forms satisfactory to the City. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf, and shall be on forms acceptable to the City. All certificates and endorsements must be received and approved by the City before Work commences.

A. Additional Insureds; Waiver of Subrogation . The City, its officials, officers, employees, agents and authorized volunteers shall be named as Additional Insureds on Contractor’s All Risk policy and on Contractor’s and its subcontractors’ policies of Commercial General Liability and Automobile Liability insurance using, for Contractor’s policy/ies of Commercial General Liability insurance, ISO CG forms 20 10 and 20 37 (or endorsements providing the exact same coverage, including completed operations), and, for subcontractors’ policies of Commercial General Liability insurance, ISO CG form 20 38 (or endorsements providing the exact same coverage). Notwithstanding the minimum limits set forth in this Contract for any type of insurance coverage, all available insurance proceeds in excess of the specified minimum limits of coverage shall be available to the parties required to be named as Additional Insureds hereunder. All insurance coverage maintained or procured 75 James R Bryant Park Futsal Court
Renovation PM 2425-20 -29- SECTION 00700 – GENERAL CONDITIONS

pursuant to this Contract shall be endorsed to waive subrogation against the City, its officers, officials , agents, employees or volunteers or shall specifically allow Contractor - or others providing insurance evidence in compliance with these specifications - to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against the City, and shall require similar written express waivers and insurance clauses from each of its subcontractors. Copies of these waivers shall be submitted to the City prior to commencement of work.

B. Workers’ Compensation Insurance . The Contractor shall provide workers’ compensation insurance for all of the employees engaged in Work under this Contract, on or at the Site, and, in case of any sublet Work, the Contractor shall require the subcontractor similarly to provide workers’ compensation insurance for all the latter’s employees as prescribed by State law. Any class of employee or employees not covered by a subcontractor’s insurance shall be covered by the Contractor’s insurance. In case any class of employees engaged in work under this Contract, on or at the Site, is not protected under the Workers’ Compensation Statutes, the Contractor shall provide or shall cause a subcontractor to provide, adequate insurance coverage for the protection of such employees not otherwise protected. The Contractor is required to secure payment of compensation to his employees in accordance with the provisions of section 3700 of the Labor Code.

The Contractor shall file with the City certificates of his insurance protecting workers.

Company or companies providing insurance coverage shall be acceptable to the City, if in the form and coverage as set forth in the Contract Documents.

C. Employer’s Liability Insurance . Contractor shall provide Employer’s Liability Insurance, including Occupational Disease, in the amount of at least one million dollars ($1,000,000.00) per person per accident. Contractor shall provide the City with a certificate of Employer’s Liability Insurance. Such insurance shall comply with the provisions of the Contract Documents. The policy shall be endorsed, if applicable, to provide a Borrowed Servant/Alternate Employer Endorsement and contain a Waiver of Subrogation in favor of the City.

D. Commercial General Liability Insurance . Contractor shall provide “occurrence” form Commercial General Liability insurance coverage at least as broad as the most current ISO CGL Form 00 01, including but not limited to, premises liability, contractual liability, products/completed operations, personal and advertising injury which may arise from or out of Contractor’s operations, use, and management of the Site, or the performance of its obligations hereunder. The policy shall not contain any exclusion contrary to this Contract including but not limited to endorsements or provisions limiting coverage for (1) contractual liability (including but not limited to ISO CG 24 26 or 21 39); or (2) cross-liability for claims or suits against one insured against another. Policy limits shall not be less than $2,000,000 per occurrence for bodily injury, personal injury and property damage. Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. Defense costs shall be paid in addition to the limits.

1. Such policy shall comply with all the requirements of this Article. The limits set forth herein shall apply separately to each insured against whom claims are made or 76 James R Bryant Park Futsal Court
Renovation PM 2425-20 -30- SECTION 00700 – GENERAL CONDITIONS

suits are brought, except with respect to the limits of liability. Further the limits set forth herein shall not be construed to relieve the Contractor from liability in excess of such coverage, nor shall it limit Contractor’s indemnification obligations to the City, and shall not preclude the City from taking such other actions available to the City under other provisions of the Contract Documents or law.

2. All general liability policies provided pursuant to the provisions of this Article shall comply with the provisions of the Contract Documents.

3. All general liability policies shall be written to apply to all bodily injury, including death, property damage, personal injury, owned and non -owned equipment, blanket contractual liability, completed operations liability, explosion, collapse, under-ground excavation, removal of lateral support, and other covered loss, however occasioned, occurring during the policy term, and shall specifically insure the performance by Contractor of that part of the indemnification contained in these General Conditions relating to liability for injury to or death of persons and damage to property.

4. If the coverage contains one or more aggregate limits, a minimum of 50% of any such aggregate limit must remain available at all times; if over 50% of any aggregate limit has been paid or reserved, the City may require additional coverage to be purchased by Contractor to restore the required limits. Contractor may combine primary, umbrella, and as broad as possible excess liability coverage to achieve the total limits indicated above. Any umbrella or excess liability policy shall include the additional insured endorsement described in the Contract Documents.

5. All policies of general liability insurance shall permit and Contractor does hereby waive any right of subrogation which any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss.

E. Automobile Liability Insurance . Contractor shall provide Automobile Liability Insurance at least as broad as ISO CA 00 01 (Any Auto) in the amount of, at least, one million dollars ($1,000,000) per accident for bodily injury and property damage.

Such insurance shall provide coverage with respect to the ownership, operation, maintenance, use, loading or unloading of any auto owned, leased, hired or borrowed by Contractor or for which Contractor is responsible, in a form and with insurance companies acceptable to the City. All policies of automobile insurance shall permit and Contractor does hereby waive any right of subrogation which any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss.

F. Builder’s Risk [“All Risk”]

1. It is the Contractor’s responsibility to maintain or cause to be maintained Builder’s Risk [“All Risk”] extended coverage insurance on all work, material, equipment, appliances, tools, and structures that are or will become part of the Work and subject to loss or damage by fire, and vandalism and malicious mischief, in an amount to cover 100% of the replacement cost. The City accepts no responsibility for the Work until the Work is formally accepted by the City. The Contractor shall 77 James R Bryant Park Futsal Court
Renovation PM 2425-20 -31- SECTION 00700 – GENERAL CONDITIONS

provide a certificate evidencing this coverage before commencing performance of the Work.

2. The named insureds shall be Contractor, all Subcontractors of any tier (excluding those solely responsible for design work), suppliers, and the City, its elected officials, officers, employees, agents and authorized volunteers, as their interests may appear. Contractor shall not be required to maintain property insurance for any portion of the Work following acceptance by the City.

3. Policy shall be provided for replacement value on an “all risk” basis. There shall be no coinsurance penalty provision in any such policy. Policy must include: (1) coverage for any ensuing loss from faulty workmanship, nonconforming work, omission or deficiency in design or specifications; (2) coverage against machinery accidents and operational testing; (3) coverage for removal of debris, and insuring the buildings, structures, machinery, equipment, materials, facilities, fixtures and all other properties constituting a part of the Project; (4) transit coverage, including ocean marine coverage (unless insured by the supplier), with sub -limits sufficient to insure the full replacement value of any key equipment item; and (5) coverage with sub-limits sufficient to insure the full replacement value of any property or equipment stored either on or off the Site. Such insurance shall be on a form acceptable to the City to ensure adequacy and sublimit.

4. In addition, the policy shall meet the following requirements:
a. Insurance policies shall be so conditioned as to cover the performance of any extra work performed under the Contract.
b. Coverage shall include all materials stored on site and in transit. c. Coverage shall include Contractor’s tools and equipment. d. Insurance shall include boiler, machinery and material hoist coverage.

G. Contractor’s Pollution Liability Coverage . Contractor shall provide pollution liability insurance in an amount not less than $1,000,000 per occurrence and $2,000,000 aggregate.

H. Contractor shall require all tiers of Subcontractors working under this Contract to provide the insurance required under this Article unless otherwise agreed to in writing by the City. Contractor shall make certain that any and all Subcontractors hired by Contractor are insured in accordance with this Contract. If any Subcontractor’s coverage does not comply with the foregoing provisions, Contractor shall indemnify and hold the City harmless from any damage, loss, cost, or expense, including attorneys’ fees, incurred by the City as a result thereof.

I. Notwithstanding the minimum limits set forth in this Contract for any type of insurance coverage, if Contractor maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City. 78 James R Bryant Park Futsal Court
Renovation PM 2425-20 -32- SECTION 00700 – GENERAL CONDITIONS

J. Form and Proof of Carriage of Insurance

1. Any insurance carrier providing insurance coverage required by the Contract Documents shall be admitted to and authorized to do business in the State of California unless waived, in writing, by the City’s Risk Manager. Carrier(s) shall have an A.M. Best rating of not less than an A:VII. Insurance deductibles or self- insured retentions must be declared by the Contractor. At the election of the City the Contractor shall either 1) reduce or eliminate such deductibles or self -insured retentions, or 2) procure a bond which guarantees payment of losses and related investigations, claims administration, and defense costs and expenses. If umbrella or excess liability coverage is used to meet any required limit(s) specified herein, the Contractor shall provide a “follow form” endorsement satisfactory to the City indicating that such coverage is subject to the same terms and conditions as the underlying liability policy.

2. Each insurance policy required by this Contract shall be endorsed to state that: (1) coverage shall not be suspended, voided, reduced or cancelled except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City; and (2) any failure to comply with reporting or other provisions of the policies, including breaches of warranties, shall not affect coverage provided to the City, its officials, officers, agents, employees, and volunteers.

3. The Certificates(s) and policies of insurance shall contain or shall be endorsed to contain the covenant of the insurance carrier(s) that it shall provide no less than thirty (30) days written notice be given to the City prior to any material modification or cancellation of such insurance. In the event of a material modification or cancellation of coverage, the City may terminate the Contract or stop the Work in accordance with the Contract Documents, unless the City receives, prior to such effective date, another properly executed original Certificate of Insurance and original copies of endorsements or certified original policies, including all endorsements and attachments thereto evidencing coverage’s set forth herein and the insurance required herein is in full force and effect. Contractor shall not take possession, or use the Site, or commence operations under this Contract until the City has been furnished original Certificate(s) of Insurance and certified original copies of endorsements or policies of insurance including all endorsements and any and all other attachments as required in this Article. The original endorsements for each policy and the Certificate of Insurance shall be signed by an individual authorized by the insurance carrier to do so on its behalf.

4. The Certificate(s) of Insurance, policies and endorsements shall so covenant and shall be construed as primary, and the City’s insurance and/or deductibles and/or self-insured retentions or self -insured programs shall not be construed as contributory.

5. The City reserves the right to adjust the monetary limits and types of insurance coverages during the term of this Contract including any extension thereof if, in the City’s reasonable judgment, the amount or type of insurance carried by the Contractor becomes inadequate.
79 James R Bryant Park Futsal Court
Renovation PM 2425-20 -33- SECTION 00700 – GENERAL CONDITIONS

6. Contractor shall report to the City, in addition to the Contractor’s insurer, any and all insurance claims submitted by the Contractor in connection with the Work under this Contract.

7. Products/completed operations coverage shall extend a minimum of three years after the project completion. Coverage shall be included on behalf of the insured for covered claims arising out of the actions of independent contractors. If the insured is using subcontractors, the policy must include work performed “by or on behalf” of the insured. Policy shall contain no language that would invalidate or remove the insurer’s duty to defend or indemnify for claims or suits expressly excluded from coverage. Policy shall specifically provide for a duty to defend on the part of the insurer. The City, its officers, officials, agents employees, and volunteers shall be included as insureds under the policy.

ARTICLE 5 -CONTRACTOR RESPONSIBILITIES; REGULATORY REQUIREMENTS

5.1 Applicable Laws
A. Contractor shall give all notices required by and shall comply with all Applicable Laws applicable to the performance of the Work. Except where otherwise expressly required by Applicable Laws, neither the City nor the City’s Representative shall be responsible for monitoring Contractor’s compliance with any Applicable Laws. If Contractor performs any Work knowing or having reason to know that it is contrary to Applicable Laws, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Work.

5.2 Permits and Licenses
A. Permits and licenses necessary for prosecution of the Work shall be secured and paid for by Contractor, including, but not limited to, excavation permit, for plumbing, mechanical and electrical work and for operations in or over public streets or right of way under jurisdiction of public agencies other than the City, unless otherwise specified in the Contract Documents.

B. The Contractor shall arrange and pay for all off-site inspection of the Work related to permits and licenses, including certification, required by the specifications, drawings, or by governing authorities, except for such off -site inspections delineated as the City’s responsibility pursuant to the Contract Documents.

C. Before acceptance of the Work, the Contractor shall submit all licenses, permits, certificates of inspection and required approvals to the City.

5.3 Taxes
A. Contractor shall pay all sales, consumer, use, and other similar taxes required to be paid in accordance with the Applicable Laws of the place of the Project which are applicable during the performance of the Work. In accordance with Revenue and Taxation Code section 107.6, the Contract Documents may create a possessory 80 James R Bryant Park Futsal Court
Renovation PM 2425-20 -34- SECTION 00700 – GENERAL CONDITIONS

interest subject to personal property taxation for which Contractor will be responsible.

5.4 Traffic Control
A. Traffic control plans, if required, shall be prepared at Contractor’s expense. Traffic control shall be performed at Contractor’s expense in accordance with the requirements of the City and/or the local agency with jurisdiction. Costs for traffic control plans, implementation of traffic control, or traffic signal services required by the City shall be included in the Contractor’s Bid.

B. All warning signs and safety devices used by the Contractor to perform the Work shall conform to the requirements contained in the State of California, Department of Transportation’s current edition of “Manual of Traffic Controls for Construction and Maintenance Work Zones” or to the requirements of the local agency. The Contractor shall also be responsible for all traffic control required by the agency having jurisdiction over the Project on the intersecting streets. Contractor must submit a traffic control plan to the agency having jurisdiction over the Project for approval prior to starting Work.

C. The Contractor’s representative on the site responsible for traffic control shall produce evidence that he/she has completed training acceptable to the California Department of Transportation for safety through construction zones. All of the streets in which the Work will occur shall remain open to traffic and one lane of traffic maintained at all times unless otherwise directed by the agency of jurisdiction.

Businesses and residences adjacent to the Work shall be notified forty -eight (48) hours in advance of closing of driveways. The Contractor shall make every effort to minimize the amount of public parking temporarily eliminated due to construction in areas fronting businesses. No stockpiles of pipe or other material will be allowed in traveled right -of-ways after working hours unless otherwise approved by the Engineer.

5.5 Safety
A. Contractor shall be solely responsible for all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety laws. Contractor shall comply with all Applicable Laws relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property.

B. The Contractor shall maintain emergency first aid treatment for his employees which complies with the Federal Occupational Safety and Health Act of 1970 (29 U.S.C. § 651 et seq.), and California Code of Regulations, Title 8, Industrial Relations Division 1, Department of Industrial Relations, Chapter 4. The Contractor shall ensure the availability of emergency medical services for its employees in accordance with 81 James R Bryant Park Futsal Court
Renovation PM 2425-20 -35- SECTION 00700 – GENERAL CONDITIONS

California Code of Regulations, Title 8, Section 1512. The Contractor shall submit an Illness and Injury Prevention Program and a Project Site specific safety program to the City prior to beginning Work. Contractor shall maintain a confined space program that meets or exceeds the City’s standards. Contractor needs to make themselves aware of the City’s safety policies and procedures, and shall meet or exceed all City standards in areas where the City must enter to perform inspections.

C. Hazard Communication Programs. Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers at the Site in accordance with Applicable Laws.

5.6 Hazardous Materials
A. The City shall not be responsible for any Hazardous Waste brought to the site by the Contractor. If the Contractor: (i) introduces and/or discharges a Hazardous Waste onto the site in a manner not specified by the Contract Documents; and/or (ii) disturbs a Hazardous Material identified in the Contract Documents, the Contractor shall hire a qualified remediation contractor at Contractor’s sole cost to eliminate the condition as soon as possible. Under no circumstance shall the Contractor perform Work for which it is not qualified. The City, in its sole discretion, may require the Contractor to retain at Contractor’s cost an independent testing laboratory.

B. If the Contractor encounters a Hazardous Waste which may cause foreseeable injury or damage, Contractor shall immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection with such material or substance (except in an emergency situation); and (iii) notify the City (and promptly thereafter confirm such notice in writing).

C. Subject to Contractor’s compliance with this Article 5.6(B), the City shall verify the presence or absence of the Hazardous Waste reported by the Contractor, except as qualified under Article 5.6(A) and Article 5.6(B) in the event such material or substance is found to be present, verify that the levels of the hazardous material are below OSHA Permissible Exposure Levels and below levels which would classify the material as a state of California or federal hazardous waste. When the material falls below such levels, Work in the affected area shall resume upon direction by the City.

D. Contractor shall indemnify and hold harmless the City from and against claims, damages, losses and expenses, arising from a Hazardous Waste on the Project Site, if such Hazardous Waste exceeded OSHA Permissible Exposure Levels or levels which would classify the material as a state of California or federal hazardous waste, and was either i) shown on the Contract Documents or information available to bidders; or (ii) brought to the site by Contractor. Nothing in this paragraph shall obligate the Contractor to indemnify the City in the event of the sole or active negligence or willful misconduct of the City, its officers, agents, or employees. 82 James R Bryant Park Futsal Court
Renovation PM 2425-20 -36- SECTION 00700 – GENERAL CONDITIONS

5.7 Sanitary Facilities.

A. Contractor shall provide sanitary temporary toilet buildings and hand washing facilities for the use of all workers. All toilets and hand washing facilities shall comply with local codes and ordinances. Toilets shall be placed inside sealed secondary containment devices installed on a flat, level surface. Accumulated liquids in the secondary containment devices shall be properly removed and legally disposed without spillage onto the ground. Toilets shall be kept supplied with toilet paper and shall have workable door fasteners. Toilets and hand washing facilities shall be serviced no less than once weekly and shall be present in a quantity of not less than 1 per 20 workers as required by Cal/OSHA regulations. The toilets and hand washing facilities shall be maintained in a sanitary condition at all times. Use of toilet and hand washing facilities in the Work under construction shall not be permitted.

Any other sanitary facilities required by Cal/OSHA shall be the responsibility of the Contractor.

5.8 Dust Control
A. Contractor, at its expense, shall maintain all excavations, embankments, haul roads, permanent access roads, plant sites, waste disposal areas, borrow areas, and all other work areas free from dust. Industry accepted methods of dust control suitable for the area involved, such as sprinkling, chemical treatment, light bituminous treatment or similar methods, will be permitted.

5.9 Air Pollution Control
A. Contractor shall comply with all air pollution control rules, regulations, ordinances and statutes. All containers of paint, thinner, curing compound, solvent or liquid asphalt shall be labeled to indicate that the contents fully comply with the applicable material requirements.

B. Without limiting the foregoing, Contractor must fully comply with all applicable laws, rules and regulations in furnishing or using equipment and/or providing services, including, but not limited to, emissions limits and permitting requirements imposed by the Air Quality Management District with jurisdiction over the Project and/or California Air Resources Board (CARB). Contractor shall specifically be aware of the application of these limits and requirements to "portable equipment", which definition includes any item of equipment with a fuel -powered engine. Contractor shall indemnify the City against any fines or penalties imposed by the air quality management district, CARB, or any other governmental or regulatory agency for its violations of Applicable Laws as well as those of its subcontractors or others for whom Contractor is responsible under its indemnity obligations provided for in the Contract Documents.

5.10 Water Quality Management and Compliance
A. Storm, surface, ground, nuisance, or other waters may be encountered at various times during construction of the Work. The Contractor hereby acknowledges that it has investigated the risk arising from such waters, has prepared its Bid accordingly, and assumes any and all risks and liabilities arising therefrom. 83 James R Bryant Park Futsal Court
Renovation PM 2425-20 -37- SECTION 00700 – GENERAL CONDITIONS

B. Contractor shall keep itself and all subcontractors, staff, and employees fully informed of and in compliance with all local, state and federal laws, rules and regulations that may impact, or be implicated by the performance of the Work including, without limitation, all applicable provisions regulating discharges of storm water; the Federal Water Pollution Control Act (33 U.S.C. § 13000 et seq.); the California Porter-Cologne Water Quality Control Act (Cal Water Code §§ 13000 - 14950); and any and all regulations, policies, or permits issued pursuant to any such authority. These include, but are not limited to California State Water Resources Control Board Order Number 2009 -0009-DWQ (NPDES Permit No. CAS000002), as amended by Order Numbers 2010 -0014-DWQ, 2012 -0006-DWQ, and any subsequent amendment to or renewal thereof, State Water Resources Control Board Order No. 2013 -0001-DWQ (NPDES Order No. CAS000004), Santa Ana Regional Water Quality Control Board No. R8-2010-0036 (NPDES No. CAS618036), and any amendment or renewal thereof.

C. Contractor shall comply with all conditions of the State Water Resources Control Board (“State Water Board”) National Pollutant Discharge Elimination System General Permit for Waste Discharge Requirements for Discharges of Storm Water Runoff Associated with Construction Activity (“Construction General Permit”) for all construction activity which results in the disturbance of in excess of one acre of total land area or which is part of a larger common area of development or sale.

Contractor shall comply with the lawful requirements of the City, and any other applicable municipality, drainage district, or other local agency with jurisdiction over the location where the Work is to be conducted, regarding discharges of storm water to separate storm drain systems or other watercourses under their jurisdiction, including applicable requirements in municipal storm water management programs.

D. Unless otherwise specified in the Special Conditions or other portion of the Contract Documents, the City has not prepared a Storm Water Pollution Prevention Plan (“SWPPP”) or other storm water compliance plan for the Project Site. Contractor shall be responsible for filing the Notice of Intent (“NOI”) and for obtaining coverage under the Construction General Permit. This includes filing all necessary documentation including the Permit Registration Documents (“PRDs”) through the Stormwater Multiple Applications and Report Tracking System (“SMARTS”); preparing and implementing a SWPPP for the Work site; implementing all other provisions, and monitoring and reporting requirements required by the Construction General Permit; and providing a Qualified SWPPP Developer (“QSD”) and Qualified SWPPP Practitioner (“QSP”), as necessary for all Work site activities, including but not limited to preparation and submittal of all reports, plans, inspections, and monitoring information in compliance with the Construction General Permit. All submittals shall be coordinated with the City’s Legally Responsible Person and Authorized Signatory as those terms are defined in the Construction General Permit.

Before any NOI, PRD, SWPPP, or other Construction General Permit -related document may be submitted to the State Water Board or implemented on the Project site, it must first be reviewed and approved by the City and/or City’s designee.

Contractor shall include all costs of compliance with specified requirements in the Contract Price.

E. The City retains the right to develop its own documentation for the Project site, including but not limited to the SWPPP, and in the alternative may require Contractor 84 James R Bryant Park Futsal Court
Renovation PM 2425-20 -38- SECTION 00700 – GENERAL CONDITIONS

to adopt and implement portions of the City developed SWPPP. The City expressly reserves the right to procure coverage under the Construction General Permit for the Work site if Contractor fails to draft satisfactory PRDs or SWPPP or otherwise fails to proceed in a manner that complies with the requirements of the Construction General Permit. The City additionally reserves the right to hire additional contractors to maintain compliance at the Work site. Whether Contractor has adequately maintained compliance with the Construction General Permit shall be the City’s sole determination. Any costs incurred by the City in procuring coverage under the Construction General Permit, or drafting and/or implementing a SWPPP for the Work site shall be paid by Contractor.

F. Notwithstanding the above, for those Work sites where construction activity results in the disturbance of less than one acre of total land area and/or do not need coverage under the Construction General Permit, the Contractor shall be responsible for preparing and implementing an Erosion and Sediment Control Plan in accordance with State Water Resources Control Board Order No. 2013 -0001- DWQ (NPDES Order No. CAS000004) and any amendment to or renewal thereof.

G. Failure to comply with the Construction General Permit, laws, regulations, and ordinances listed in this Article is a violation of federal and state law.

Notwithstanding any other indemnity contained in these Contract Documents, Contractor agrees to indemnify and hold harmless the City, its officials, officers, agents, employees and authorized volunteers from and against any and all claims, demands, fees, costs, expenses, or losses or liabilities of any kind or nature which the City, its officials, officers, agents, employees and authorized volunteers may sustain or incur for noncompliance with the Permit, laws, regulations, and ordinances listed above, arising out of or in connection with the Work, except for liability resulting from the sole established negligence, willful misconduct or active negligence of the City, its officials, officers, agents, employees or authorized volunteers.

H. The City reserves the right to defend any enforcement action or civil action brought against the City for Contractor’s failure to comply with any applicable water quality law, regulation, or policy. Contractor hereby agrees to be bound by, and to reimburse the City for the costs associated with, any settlement reached between the City and any relevant enforcement entity.

5.11 Environmental Quality Protection
A. The Contractor shall comply with all requirements of applicable federal, state, and local environmental rules and regulations. Any infractions of said rules and regulations by the Contractor during the term of the Contract, which result in penalties, will be the responsibility of the Contractor. The City operates under a number of environmental permits issued by various agencies. If due to an action, inaction, or negligence by the Contractor, the City becomes subject to non - compliance penalties, the cost of such penalties shall be borne by the Contractor.

B. The Contractor shall exercise care to preserve the natural landscape and vegetation, and shall conduct operations so as to prevent unnecessary destruction, scarring, or defacing of the natural surroundings in the vicinity of the Work.

Movement of crews and equipment within the rights-of-way and over routes provided 85 James R Bryant Park Futsal Court
Renovation PM 2425-20 -39- SECTION 00700 – GENERAL CONDITIONS

for access to the Work shall be performed in a manner to prevent damage to property. When no longer required, construction roads shall be restored to original contours. Upon completion of the Work, and following removal of construction facilities and required cleanup, land used for construction purposes and not required for the completed installation shall be scarified and regraded, as required, so that all surfaces are left in a condition that will facilitate natural revegetation, provide for proper drainage, and prevent erosion.

C. If, in the performance of the Work, evidence of the possible occurrence of any Federally listed threatened or endangered plant or animal is discovered, the Contractor shall notify the City Representative immediately, giving the location and nature of the findings. Written confirmation of the evidence, location and nature of the findings shall be forwarded to City within two (2) Days. The Contractor shall immediately cease all construction activities in the immediate area of the discovery to the extent necessary to protect the endangered plant or animal. If directed by the City Representative, Contractor will refrain from working in the immediate area, suspend the Work in its entirety, or alter its performance to ensure full compliance with all applicable permits, laws and regulations. Any City directed changes to the Work as a result of a siting will be pursuant to the Contract Documents. Any costs or delays incurred by City or the Contractor due to unreasonable or false notification of an endangered plant or animal will be borne by the Contractor.

D. If, in the performance of the Work, Contractor should unearth cultural resources (for example, human remains, animal bones, stone tools, artifacts and/or midden deposits) through excavation, grading, watering or other means, the Contractor shall notify the construction/archeological monitor and/or the City Representative immediately, giving the location and nature of the findings. Written confirmation of the evidence, location and nature of the findings shall be forwarded to the construction/archeological monitor and/or City within two (2) Days. The Contractor shall immediately cease all construction activities in the immediate area of the discovery to the extent necessary to protect the cultural resource. If directed by the City Representative, Contractor will refrain from working in the immediate area, suspend the Work in its entirety, or re -sequence and/or alter its performance to ensure full compliance with all applicable permits, laws and regulations. Should the presence of cultural resources be confirmed, the Contractor will assist the City Representative and the construction/archeological monitor in the preparation and implementation of a data recovery plan. The Contractor shall provide such cooperation and assistance as may be necessary to preserve the cultural resources for removal or other disposition. Any City directed changes to the Work as a result of the cultural resource will be pursuant to the Contract Documents. Should Contractor, without permission, injure, destroy, excavate, appropriate, or remove any cultural resource on or adjacent to the Site, it will be subject to disciplinary action, arrest and penalty under applicable law. The Contractor shall be principally responsible for all costs of mitigation and/or restoration of cultural resources related to the unauthorized actions identified above. Contractor shall be required to pay for unauthorized damage and mitigation costs to cultural resources (historical and archeological resources) as a result of unauthorized activities that damage cultural resources and shall indemnify City pursuant to the Contract Documents. 86 James R Bryant Park Futsal Court
Renovation PM 2425-20 -40- SECTION 00700 – GENERAL CONDITIONS

5.12 Excessive Noise
A. Contractor shall use only such equipment on the Work and in such state of repair so that the emission of sound therefrom is within the noise tolerance level of that equipment as established by Cal/OSHA. Contractor shall comply with the most restrictive of the following: (1) local sound control and noise level rules, regulations and ordinances and (2) the requirements contained in these Contract Documents, including hours of operation requirements.

B. No internal combustion engine shall be operated on the Project without a muffler of the type recommended by the manufacturer. Should any muffler or other control device sustain damage or be determined to be ineffective or defective, the Contractor shall promptly remove the equipment and shall not return said equipment to the job until the device is repaired or replaced. Said noise and vibration level requirements shall apply to all equipment on the job or related to the job, including but not limited to, trucks, transit mixers or transit equipment that may or may not be owned by the Contractor.

5.13 Diversion of Recyclable Waste Material
A. In compliance with the applicable City’s waste reduction and recycling efforts, Contractor shall divert all Recyclable Waste Materials to appropriate recycling centers as required for compliance with the local jurisdiction’s waste diversion ordinances. Contractor will be required to submit weight tickets and written proof of diversion with its monthly progress payment requests. Contractor shall complete and execute any certification forms required by the City or other applicable agencies to document Contractor’s compliance with these diversion requirements. All costs incurred for these waste diversion efforts shall be the responsibility of the Contractor.

5.14 Inspector’s Field Office.

A. If required by the City, the Contractor shall be responsible for providing the inspector’s field office. The office shall be a substantial waterproof construction with adequate natural light and ventilation by means of stock design windows. Door shall have a key type lock or padlock clasp. The office shall have heating and air conditioning and shall be equipped with a telephone, a telephone answering machine, an ability to connect to the internet, and a fax machine at Contractor’s expense. The field office shall be provided within 20 Days of the Notice to Proceed.

B. A table satisfactory for the study of plans and two chairs shall be provided by Contractor. Contractor shall provide and pay for adequate electric lights, local telephone service, and adequate heat and air conditioning for the field office until authorized removal.

5.15 Contractor’s Supervision.

A. Contractor shall continuously keep at the Project site, a competent and experienced full-time Project superintendent acceptable to the City. Superintendent must be able to proficiently speak, read and write in English and shall have the authority to make 87 James R Bryant Park Futsal Court
Renovation PM 2425-20 -41- SECTION 00700 – GENERAL CONDITIONS

decisions on behalf of the Contractor. Contractor shall continuously provide efficient supervision of the Project.

5.16 Workers.

A. Contractor shall at all times enforce strict discipline and good order among its employees. Contractor shall not employ on the Project any unfit person or any one not skilled in the Work assigned to him or her.

B. Any person in the employ of the Contractor whom the City may deem incompetent or unfit shall be dismissed from the Work and shall not be employed on this Project.

5.17 Independent Contractors.

A. Contractor shall be an independent contractor for the City and not an employee.

Contractor understands and agrees that it and all of its employees shall not be considered officers, employees, or agents of the City and are not entitled to benefits of any kind normally provided employees of the City, including but not limited to, state unemployment compensation or workers’ compensation. Contractor assumes full responsibility for the acts and omissions of its employees or agents related to the Work.

5.18 Verification of Employment Eligibility.

A. By executing the Contract, Contractor verifies that it fully complies with all requirements and restrictions of state and federal law respecting the employment of undocumented aliens, including, but not limited to, the Immigration Reform and Control Act of 1986, as may be amended from time to time, and shall require all subcontractors, sub-subcontractors and consultants to comply with the same. Each person executing this Contract on behalf of Contractor verifies that he or she is a duly authorized officer of Contractor and that any of the following shall be grounds for the City to terminate the Contract for cause: (1) failure of the Contractor or its Subcontractors, sub-subcontractors or consultants to meet any of the requirements provided for in this Article; (2) any misrepresentation or material omission concerning compliance with such requirements; or (3) failure to immediately remove from the Work any person found not to be in compliance with such requirements.

5.19 Labor.

A. Hours of Work

1. As provided in Article 3 (commencing at section 1810), Chapter 1, Part 7, Division 2 of the Labor Code, Contractor stipulates that eight (8) hours of labor shall constitute a legal day’s work. The time of service of any worker employed at any time by the Contractor or by any subcontractor on any subcontract under this Contract upon the Work or upon any part of the Work contemplated by this Contract is limited and restricted to eight (8) hours during any one calendar day and 40 hours during any one calendar week, except as hereinafter provided.

Notwithstanding the provisions herein above set forth, work performed by employees of Contractor in excess of eight (8) hours per day, and 40 hours during any one week, shall be permitted upon this public work upon compensation for all 88 James R Bryant Park Futsal Court
Renovation PM 2425-20 -42- SECTION 00700 – GENERAL CONDITIONS

hours worked in excess of eight (8) hours per day at not less than one and one- half times the basic rate of pay.

2. The Contractor and every Subcontractor shall keep an accurate record showing the name of and actual hours worked each calendar day and each calendar week by each worker employed in connection with the Work or any part of the Work contemplated by this Contract. The record shall be kept open at all reasonable hours to the inspection of the City and to the Division of Labor Law Enforcement, Department of Industrial Relations of the State of California.

3. The Contractor shall pay to the City a penalty of twenty -five dollars ($25.00) for each worker employed in the execution of this Contract by the Contractor or by any subcontractor for each calendar day during which such worker is required or permitted to work more than eight (8) hours in any calendar day and 40 hours in any one calendar week in violation of the provisions of Article 3 (commencing at section 1810), Chapter 1, Part 7, Division 2 of the Labor Code.

4. Any work necessary to be performed after regular working hours, or on Saturdays and Sundays or other holidays, shall be performed without additional expense to the City.

5. If Contractor gives notice of an inspection pursuant to the Contract Documents, the City will provide inspection during normal working hours from 7:00 a.m. to 3:30 p.m. Monday through Friday. Requested inspections before or after this time will be charged to the Contractor as reimbursable inspection time. Inspections on weekends requires two (2) Days’ notice for review and approval. Upon written request and approval the 8.5 hour working day may be changed to other limits subject to city/county ordinance.

6. It shall be unlawful for any person to operate, permit, use, or cause to operate any of the following at the Project Site, other than between the hours of 7:00 a.m. to 5:00 p.m., Monday through Friday, with no Work allowed on City -observed Holidays, unless otherwise approved by the City:
a. Powered Vehicles
b. Construction Equipment
c. Loading and Unloading Vehicles
d. Domestic Power Tools
B. Payroll Records; Labor Compliance

1. Pursuant to Labor Code section 1776, Contractor and all subcontractors shall maintain weekly certified payroll records, showing the names, addresses, Social Security numbers, work classifications, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by them in connection with the Work under this Contract. Contractor shall certify under penalty of perjury that records maintained and submitted by Contractor are true and accurate. Contractor 89 James R Bryant Park Futsal Court
Renovation PM 2425-20 -43- SECTION 00700 – GENERAL CONDITIONS

shall also require Subcontractor(s) to certify weekly payroll records under penalty of perjury.

2. In accordance with Labor Code section 1771.4, the Contractor and each Subcontractor shall furnish the certified payroll records directly to the Department of Industrial Relations (“DIR”) on the specified interval and format prescribed by the DIR, which may include electronic submission. Contractor shall comply with all requirements and regulations from the DIR relating to labor compliance monitoring and enforcement. The requirement to submit certified payroll records directly to the Labor Commissioner under Labor Code section 1771.4 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4.

3. Any stop orders issued by the DIR against Contractor or any Subcontractor that affect Contractor’s performance of Work, including any delay, shall be Contractor’s sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered Contractor caused delay subject to any applicable liquidated damages and shall not be compensable by the City. Contractor shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the DIR against Contractor or any Subcontractor.

4. The payroll records described herein shall be certified and submitted by the Contractor at a time designated by the City. The Contractor shall also provide the following:
a. A certified copy of the employee’s payroll records shall be made available for inspection or furnished to such employee or his or her authorized representative on request. b. A certified copy of all payroll records described herein shall be made available for inspection or furnished upon request of the DIR.

5. Unless submitted electronically, the certified payroll records shall be on forms provided by the Division of Labor Standards Enforcement (“DLSE”) of the DIR or shall contain the same information as the forms provided by the DLSE.

6. Any copy of records made available for inspection as copies and furnished upon request to the public or any public agency, the City, the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement shall be marked or obliterated in such a manner as to prevent disclosure of an individual's name, address and social security number. The name and address of the Contractor awarded the Contract or performing the Contract shall not be marked or obliterated.

7. In the event of noncompliance with the requirements of this Article, the Contractor shall have ten (10) Days in which to comply subsequent to receipt of written notice specifying in what respects the Contractor must comply with this Article. Should noncompliance still be evident after such 10 -day period, the Contractor shall pay a penalty of one hundred dollars ($100.00) to the City for each calendar day, or portion thereof, for each worker, until strict compliance is effectuated. Upon the 90 James R Bryant Park Futsal Court
Renovation PM 2425-20 -44- SECTION 00700 – GENERAL CONDITIONS

request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, such penalties shall be withheld from progress payment then due.

8. The responsibility for compliance with this Article shall rest upon the Contractor.

C. Prevailing Rates of Wages

1. The Contractor is aware of the requirements of Labor Code sections 1720 et seq. and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000 et seq. (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on certain “public works” and “maintenance” projects. Since this Project involves an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and since the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. The Contractor shall obtain a copy of the prevailing rates of per diem wages at the commencement of this Contract from the website of the Division of Labor Statistics and Research of the Department of Industrial Relations located at www.dir.ca.gov. In the alternative, the Contractor may view a copy of the prevailing rate of per diem wages which are on file at the City’s Administration Office and shall be made available to interested parties upon request. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification, or type of worker needed to perform work on the Project available to interested parties upon request, and shall post copies at the Contractor’s principal place of business and at the Project site. Contractor shall defend, indemnify and hold the City, its officials, officers, employees and authorized volunteers free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or allege failure to comply with the Prevailing Wage Laws.

2. The Contractor shall forfeit as a penalty to the City not more than Two Hundred Dollars ($200.00), pursuant to Labor Code section 1775, for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rate as determined by the Director of the DIR for such work or craft in which such worker is employed for any public work done under the Contract by it or by any Subcontractor under it. The difference between such prevailing wage rate and the amount paid to each worker for each calendar day or portion thereof, for which each worker was paid less than the prevailing wage rate, shall be paid to each worker by the Contractor.

3. Contractor shall post, at appropriate conspicuous points on the Project Site, a schedule showing all determined general prevailing wage rates and all authorized deductions, if any, from unpaid wages actually earned.

D. Public Works Contractor Registration

1. Pursuant to Labor Code sections 1725.5 and 1771.1, the Contractor and its Subcontractors must be registered with the DIR prior to the execution of a contract to perform public works. By entering into this Contract, Contractor represents that it is aware of the registration requirement and is currently registered with the DIR.

Contractor shall maintain a current registration for the duration of the Project. 91 James R Bryant Park Futsal Court
Renovation PM 2425-20 -45- SECTION 00700 – GENERAL CONDITIONS

Contractor shall further include the requirements of Labor Code sections 1725.5 and 1771.1 in any subcontract and ensure that all Subcontractors are registered at the time this Contract is entered into and maintain registration for the duration of the Project. Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1.

E. Employment of Apprentices

1. Contractor and all Subcontractors shall comply with the requirements of Labor Code sections 1777.5 and 1777.6 in the employment of apprentices.

2. Information relative to apprenticeship standards, wage schedules, and other requirements may be obtained from the Director of Industrial Relations, ex officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices.

3. Knowing violations of Labor Code section 1777.5 will result in forfeiture not to exceed one hundred dollars ($100.00) for each calendar day of non -compliance pursuant to Labor Code section 1777.7.

F. Nondiscrimination/Equal Employment Opportunity

1. Pursuant to Labor Code section 1735 and other applicable provisions of law, the Contractor and its Subcontractors shall not discriminate against any employee or applicant for employment because of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, or any other classifications protected by law on this Project. The Contractor will take affirmative action to insure that employees are treated during employment or training without regard to their race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, or any other classifications protected by law.

G. Debarment of Contractors and Subcontractors

1. Contractors or Subcontractors may not perform work on a public works project with a subcontractor who is ineligible to perform work on a public project pursuant to Labor Code section 1777.1 or 1777.7. Any contract on a public works project entered into between a contractor and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works contract. Any public money that is paid, or may have been paid to a debarred subcontractor by a contractor on the project shall be returned to the City. The Contractor shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the Project.
92 James R Bryant Park Futsal Court
Renovation PM 2425-20 -46- SECTION 00700 – GENERAL CONDITIONS

5.20 Subcontracts.

A. Contractor agrees to bind every Subcontractor to the terms of the Contract Documents as far as such terms are applicable to Subcontractor’s portion of the Work. Contractor shall be as fully responsible to the City for the acts and omissions of its subcontractors and of persons either directly or indirectly employed by its subcontractors, as Contractor is for acts and omissions of persons directly employed by Contractor. Nothing contained in these Contract Documents shall create any contractual relationship between any subcontractor and the City.

B. The City reserves the right to accept all subcontractors. The City’s acceptance of any Subcontractor under this Contract shall not in any way relieve Contractor of its obligations in the Contract Documents.

C. Prior to substituting any Subcontractor listed in the Bid Forms, Contractor must comply with the requirements of the Subletting and Subcontracting Fair Practices Act pursuant to California Public Contract Code section 4100 et seq.

5.21 Progress Meetings
A. The Contractor shall schedule and hold regular progress meetings at least weekly and at other times as requested by Engineer or as required by progress of the Work.

The Contractor, City, and all Subcontractors active on the Site shall attend each meeting. Contractor may at its discretion request attendance by representatives of its Suppliers, manufacturers, and other Subcontractors. The City will preside at the progress meetings and will arrange for keeping and distributing the minutes. The purpose of the meetings is to review the progress of the Work, maintain coordination of efforts, discuss changes in scheduling, and resolve other problems which may develop. During each meeting, the Contractor shall present any issues which may impact its progress with a view to resolve these issues expeditiously.

5.22 Submittals
A. Schedule of Submittals . Within five (5) Days after the Notice to Proceed (unless otherwise specified in the Contract Documents), Contractor will prepare and deliver a Schedule of Submittals to the City that has been fully integrated with the progress schedule and identifies each Submittal required by the Contract Documents as well as the date on which Contractor will deliver each Submittal to the City. Each Submittal must be delivered to the City at least thirty (30) Days prior to the date the material or equipment is scheduled to be incorporated into the Work. The Contractor is responsible for any schedule delays resulting from the Submittal process.

B. Submittal Procedures.

1. Contractor will follow the following procedures for each Submittal, Shop Drawing and Sample required by the Contract Documents:
a. Submittals must be transmitted electronically.
b. Transmittals will be sequentially numbered. Contractor to mark revised Submittals with original number and sequential alphabetic suffix. 93 James R Bryant Park Futsal Court
Renovation PM 2425-20 -47- SECTION 00700 – GENERAL CONDITIONS

c. Each Submittal will identify the Project, Contractor, Subcontractor and Supplier, pertinent Drawing and detail number, and Specification Section number appropriate to Submittal.
d. By transmitting a Submittal, Contractor certifies it has reviewed and approved each Submittal, verified products required, field dimensions, adjacent construction Work, and that coordination of information is according to requirements of the Work and Contract Documents.
e. Identify variations in Contract Documents and product or system limitations that may differ and/or be detrimental to successful performance of completed Work.
f. When Submittal is revised for resubmission, Contractor shall promptly address the City’s comments and resubmit. Contractor shall identify changes made since previous submission.
g. The City’s review of Shop Drawings shall not relieve Contractor from responsibility for deviations from the Contract Documents unless Contractor has, in writing, called the City’s attention to such deviations at time of submission and the City has taken no exception to the deviation. The City’s review of Shop Drawings shall not relieve Contractor from responsibility for errors in Shop Drawings.
h. Submittals not required by the Contract Documents or requested by the City will not be acknowledged or processed.
i. Incomplete Submittals will not be reviewed by the City. Delays resulting from incomplete Submittals are not the responsibility of the City. j. Contractor shall not be entitled to any extension of the Contract Times as a result of the Submittal process.
k. Contractor shall allow a minimum of 20 working days for review of Submittals unless otherwise specified in the Contract Documents.

2. Where a Submittal, Shop Drawing or Sample is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to the City review and approval of the pertinent submittal will be performed at the sole risk and expense and responsibility of Contractor.

C. Schedule Milestone for Submittals. Contractor must submit all Submittals required by the Contract Documents in accordance with the Schedule of Submittals. If Contractor fails to submit the Submittals in accordance with the Schedule of Submittals, Contractor will be solely liable for any delays or impacts caused by the delayed Submittal, whether direct or indirect. Contractor will be liable for the time calculated from the date the Submittal is due until the date a compliant Submittal is made. A compliant Submittal will be one that is complete and satisfies the requirements of the Contract Documents.
94 James R Bryant Park Futsal Court
Renovation PM 2425-20 -48- SECTION 00700 – GENERAL CONDITIONS

5.23 Shop Drawings and Sample Submittal Procedures.

A. Before submitting each Shop Drawing or Sample, Contractor shall have:

1. Reviewed and coordinated each Shop Drawing or Sample with other Shop Drawings and Samples and with the requirements of the Work and the Contract Documents;

2. Determined and verified all field measurements, quantities, dimensions, specified performance and design criteria, installation requirements, materials, catalog numbers, and similar information with respect thereto;

3. Determined and verified the suitability of all materials offered with respect to the indicated application, fabrication, shipping, handling, storage, assembly, and installation pertaining to the performance of the Work; and

4. Determined and verified all information relative to Contractor’s responsibilities for means, methods, techniques, sequences, and procedures of construction, and safety precautions and programs incident thereto.

B. With each Submittal, Contractor shall give the City specific written notice of any variations that the Shop Drawing or Sample may have from the requirements of the Contract Documents. This notice shall be both a written communication separate from the Shop Drawings or Sample Submittal and, in addition, a specific notation made on each Shop Drawing or Sample submitted to the City for review and approval of each such variation.

C. Shop Drawings.

1. Data shown on the Shop Drawings will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show the City the services, materials, and equipment Contractor proposes to provide and to enable the City to review the information for assessing conformance with information given and design concept expressed in Contract Documents.

2. When required by individual Specification sections, provide Shop Drawings signed and sealed by a professional engineer responsible for designing components shown on Shop Drawings. Shop Drawings must include signed and sealed calculations to support design in a form suitable for submission to and approval by authorities having jurisdiction.

3. Shop Drawings for steel structures shall consist of shop details, erection and other working Drawings showing details, dimensions, sizes of members and other information necessary for the complete fabrication and erection of the metal work.

4. Shop Drawings of concrete structures shall consist of such detailed drawings as may reasonably be required for the successful prosecution of the Work and which are not included in the Drawings furnished by the Engineer. These may include drawings for false work, bracing, centering and form work, masonry layout diagrams, and diagrams for bent reinforcement.
95 James R Bryant Park Futsal Court
Renovation PM 2425-20 -49- SECTION 00700 – GENERAL CONDITIONS

5. Contractor shall make revisions and provide additional information when required by authorities having jurisdiction.

D. Samples. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as required to enable the City to review the submittal for assessing conformance with information given and design concept expressed in Contract Documents. Samples should be of appropriate size and detail to assess functional, aesthetic, color, texture, patterns and finish selection.

E. City’s Review.

1. The City will review Shop Drawings and Samples in accordance with the Schedule of Submittals. The City’s review and acceptance will be only to determine if the items covered by the Submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents.

2. The City review and approval will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and approval of a separate item as such will not indicate approval of the assembly in which the item functions.

3. The City’s review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless the City has given written approval of each such variation by specific written notation thereof incorporated in or accompanying the Shop Drawing or Sample.

F. Resubmittal Procedures. Contractor shall make corrections required by the City and shall return corrected Shop Drawings and submit, as required, new Samples for review and approval. Contractor shall direct specific attention in writing to revisions other than the corrections called for by the City on previous Submittals.

5.24 Record (“As-Built”) Drawings.

A. The Contractor shall maintain one record set of Contract Documents at the Site or digitally in an acceptable format. On these, it shall mark all Project conditions, locations, configurations, and any other changes or deviations which may vary from the information represented in the original Contract Documents, including buried or concealed construction and utility features which are revealed during the course of construction. Special attention shall be given to recording the horizontal and vertical location of all buried utilities that differ from the locations indicated, or which were not indicated on the Drawings. For all Projects involving the installation of any pipeline, Contractor shall survey and record the top of the pipe at a minimum of every 100 linear feet, and at each bend, recording both the horizontal and vertical locations. Said Drawings shall be supplemented by any detailed sketches as necessary or directed to fully indicate the Work as actually constructed. Any required 96 James R Bryant Park Futsal Court
Renovation PM 2425-20 -50- SECTION 00700 – GENERAL CONDITIONS

as-built drawings of civil engineering elements of the Work shall be prepared by a registered civil engineer.

B. These master Record Drawings of the as -built conditions, including all revisions made necessary by Addenda and Change Orders, shall be maintained up -to-date during the progress of the Project. Red ink shall be used for alterations and notes.

Notes shall identify relevant Change Orders by number and date. Record Drawings shall be accessible to the Engineer at all times during the construction period.

Failure on the Contractor’s part to keep Record Drawings current could result in withholding partial payment.

C. Upon completion of the Project and as a condition of final acceptance, the Contractor shall finalize and deliver a complete set of Record Drawings to the Engineers. The information submitted by the Contractor will be assumed to be correct, and the Contractor shall be responsible for, and liable to the City, for the accuracy of such information, and for any errors or omissions which may or may not appear on the Record Drawings.

D. Unless otherwise called for by the Contract Documents, the cost of all material, equipment, and labor required to complete the Record Drawings shall be included in Contractor’s bid and distributed in the Bid Schedule. No additional compensation shall be made to the Contractor for this Work.

5.25 Layout and Field Engineering.

A. The Contractor shall utilize a properly licensed surveyor to perform all layout surveys required for the control and completion of the Work, and all necessary surveys to compute quantities of Work performed.

5.26 Separate Contracts and Cooperation.

A. Separate Contracts. The City reserves the right to let other contracts in connection with this Work or on the Project site. Contractor shall permit other contractors reasonable access and storage of their materials and execution of their work and shall properly connect and coordinate its Work with theirs. To ensure proper execution of its subsequent Work, Contractor shall immediately inspect work already in place and shall at once report to the Engineer any problems with the Work in place or discrepancies with the Contract Documents.

B. Cooperation. Contractor shall ascertain to its own satisfaction the scope of the Project and nature of any other contracts that have been or may be awarded by the City in prosecution of the Project to the end that Contractor may perform this Contract in the light of such other contracts, if any. Nothing herein contained shall be interpreted as granting to Contractor exclusive occupancy at site of the Project.

Contractor shall not cause any unnecessary hindrance or delay to any other contractor working on the Project. If simultaneous execution of any contract for the Project is likely to cause interference with performance of some other contract or contracts, the Engineer shall decide which Contractor shall cease Work temporarily and which contractor shall continue or whether work can be coordinated so that contractors may proceed simultaneously. The City shall not be responsible for any 97 James R Bryant Park Futsal Court
Renovation PM 2425-20 -51- SECTION 00700 – GENERAL CONDITIONS

damages suffered or for extra costs incurred by Contractor resulting directly or indirectly from award, performance, or attempted performance of any other contract or contracts on the Project Site.

5.27 Work Site.

A. Limitation of Use of Site and Other Areas. Rights-of-way, easements, or rights -of- entry for the Work will be provided by the City. Unless otherwise specified in the Special Provisions, the Contractor shall make arrangements, pay for, and assume all responsibility for acquiring, using, and disposing of additional work areas and facilities temporarily required. The Contractor shall indemnify and hold the City harmless from all claims for damages caused by such actions. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Applicable Laws, and shall not unreasonably encumber the Site and other areas with construction equipment or other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to City or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work.

B. Site Maintenance. During the progress of the Work, Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to Applicable Laws. The Contractor shall furnish trash bins for all debris from construction. All debris shall be placed in trash bins daily. Forms and false-work that are to be re -used shall be stacked neatly concurrently with their removal. Forms and false -work that are not to be re -used shall be disposed of concurrently with their removal.

C. Cleaning. Prior to Completion of the Work, Contractor shall clean the Site and make it ready for utilization by the City. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition all property not designated for alteration by the Contract Documents.

5.28 Utility Usage.

A. All temporary utilities, including but not limited to electricity, water, gas, and telephone, used on the Work shall be furnished and paid for by Contractor.

Contractor shall provide necessary temporary distribution systems, including meters, if necessary, from distribution points to points on the Work where the utility is needed. Upon completion of the Work, Contractor shall remove all temporary distribution systems. Contractor shall provide necessary and adequate utilities and pay all costs for water, electricity, gas, oil, and sewer charges required for completion of the Work, including but not limited to startup and testing required in the Contract Documents. All permanent meters installed shall be listed in the Contractor’s name until the Work is accepted. For Work to be performed in existing City facilities, Contractor may use the City’s existing utilities, provided such use is reasonable under the circumstances. If Contractor uses the City utilities, it will not need to compensate the City for reasonably consumption of utilities, but Contractor will be 98 James R Bryant Park Futsal Court
Renovation PM 2425-20 -52- SECTION 00700 – GENERAL CONDITIONS

responsible for any excessive, unreasonable or wasteful utility usage. Amounts due the City under this section may be deducted from progress payments.

5.29 Protection of Work and Property.

A. The Contractor shall digitally record video and take photographs of the Project site and adjacent improvements in a manner and quality that clearly depicts the existing condition of the Project Site and adjacent improvements immediately prior to the start of Work (minimum 1080p video and 4MP photo). All videos and photographs shall be date and time stamped. The Contractor shall submit the video and photos in digital format on a memory stick before the commencement of Work, along with a map outlining the route and locations of the videos and/or photographs. The Contractor shall be responsible for all damages to persons or property that occur as a result of the Work. Contractor shall be responsible for the proper care and protection of all materials delivered and Work performed until completion and final acceptance by the City. All Work shall be solely at the Contractor’s risk.

B. Contractor shall adequately protect adjacent property from settlement or loss of lateral support as necessary. Contractor shall comply with all applicable safety laws and building codes to prevent accidents or injury to persons on, about, or adjacent to the Project site where Work is being performed. Contractor shall erect and properly maintain at all times, as required by field conditions and progress of work, all necessary safeguards, signs, barriers, lights, and watchmen for protection of workers and the public, and shall post danger signs warning against hazards created in the course of construction.

C. Contractor shall provide such heat, covering, and enclosures as are necessary to protect all Work, materials, equipment, appliances, and tools against damage by weather conditions.

D. Contractor shall take adequate precautions to protect existing sidewalks, curbs, pavements, utilities, and other adjoining property and structures, and to avoid damage thereto, and Contractor shall repair any damage thereto caused by the Work operations. Contractor shall:

1. Enclose the working area with a substantial barricade, and arrange work to cause minimum amount of inconvenience and danger to the public.

2. Provide substantial barricades around any shrubs or trees indicated to be preserved.

3. Deliver materials to the Site over a route designated by the City.

4. Provide any and all dust control required and follow the applicable air quality regulations as appropriate. If the Contractor does not comply immediately with a notice from the City or a public agency responsible for air quality, the City shall have the authority to provide dust control and deduct the cost from payments to the Contractor.
99 James R Bryant Park Futsal Court
Renovation PM 2425-20 -53- SECTION 00700 – GENERAL CONDITIONS

5. Confine Contractor’s apparatus, the storage of materials, and the operations of its workers to limits required by law, ordinances, permits, or directions of the City.

Contractor shall not unreasonably encumber the Site with its materials.

6. Take care to prevent disturbing or covering any survey markers, monuments, or other devices marking property boundaries or corners. If such markers are disturbed by accident, they shall be replaced by a civil engineer or land surveyor acceptable to the City, at no cost to the City.

7. Ensure that existing facilities, fences and other structures are all adequately protected and that, upon completion of all Work, all facilities that may have been damaged are restored to a condition acceptable to the City.

8. Preserve and protect from injury all buildings, pole lines and all directional, warning and mileage signs that have been placed within the right-of-way.

9. At the completion of work each day, leave the Work and the Site in a clean, safe condition.

10. Comply with any stage construction and/or traffic handling plans. Access to residences and businesses shall be maintained at all times, except with the City’s written approval. Any request for approval to reduce or restrict access to residences and business must be submitted to the City at least seven (7) Days in advance, and the City may issue or withhold approval in its sole discretion.

E. These precautionary measures will apply continuously and not be limited to normal working hours. Full compensation for the work involved in the protection and preservation of life, safety and property as above specified shall be considered as included in the prices paid for the various contract items of Work, and no additional allowance will be made therefor.

F. Should damage to persons or property occur as a result of the Work, Contractor shall promptly notify the City, in writing. Contractor shall be responsible for proper investigation, documentation, including video or photography, to adequately memorialize and make a record of what transpired. The City shall be entitled to inspect and copy any such documentation, video, or photographs.

G. Contractor shall maintain all investigation documentation including video and/or photographs for a minimum of four (4) years following completion of the Project.

5.30 Emergencies.

A. In emergencies affecting the safety or protection of persons or the Work or Property at the Site or adjacent thereto, the Contractor, without special instruction or authorization from the City or the Engineer, is obligated to act to prevent threatened damage, injury or loss. The Contractor shall give the Engineer prompt written notice if the Contractor believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby.
100
James R Bryant Park Futsal Court
Renovation PM 2425-20 -54- SECTION 00700 – GENERAL CONDITIONS

ARTICLE 6 -MATERIALS; INSPECTION

6.1 Access to Work.

A. The City, Engineer, their consultants and other representatives and personnel, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor’s safety procedures and programs.

6.2 Materials.

A. Except as otherwise specifically stated in the Contract Documents, Contractor shall provide and pay for all materials, labor, tools, equipment, water, lights, power, transportation, superintendence, temporary constructions of every nature, and all other services and facilities whatsoever necessary to execute and complete this Contract within the Contract Time. Unless otherwise specified, all materials, parts, and equipment furnished by the Contractor in the Work shall be new, the best of their respective kinds and grades as noted and/or specified, and workmanship shall be of good quality.

B. No materials, supplies, or equipment for Work under this Contract shall be purchased subject to any chattel mortgage or under a conditional sale or other agreement by which an interest therein or in any part thereof is retained by the seller or supplier. Contractor warrants good title to all material, supplies, and equipment installed or incorporated in the Work and agrees upon completion of all work to deliver the Project, to the City free from any claims, liens, or charges.

C. Materials shall be furnished in ample quantities and at such times as to ensure uninterrupted progress of the Work and shall be stored properly and protected as required by the Contract Documents. Contractor shall be entirely responsible for damage or loss by weather or other causes to materials or Work. Materials shall be stored on the Project Site in such manner so as not to interfere with any operations of the City or any independent contractor.

D. Contractor shall verify all measurements, dimensions, elevations, and quantities before ordering any materials or performing any Work, and the City shall not be liable for Contractor’s failure to so. Except for an adjustment to Unit Price Work for item overruns and underruns in accordance with the Contract Documents, no additional compensation, over and above payment for the actual quantities at the prices set out in the Bid Schedule, will be allowed because of differences between actual measurements, dimension, elevations and quantities and those indicated on the Plans and in the Specifications. Any difference therein shall be submitted to the Engineer for consideration before proceeding with the Work.

6.3 Test and Inspections.

A. Inspection and Testing of Work and Materials
101
James R Bryant Park Futsal Court
Renovation PM 2425-20 -55- SECTION 00700 – GENERAL CONDITIONS

1. If the Contract Documents, the Engineer, or any instructions, laws, ordinances, or public authority requires any part of the Work to be tested or approved, Contractor shall provide the Engineer at least two (2) working days’ notice of its readiness for observation or inspection. If inspection is by a public authority other than the City, Contractor shall promptly inform the City of the date fixed for such inspection.

Required certificates of inspection (or similar) shall be secured by Contractor.

Costs for City testing and inspection shall be paid by the City. Costs of tests for Work found not to be in compliance shall be paid by the Contractor.

2. The Contractor shall pay for the cost of any minimum “show up” costs of a materials testing technician that was called for by the Contractor but ultimately the Contractor work was not ready for the inspection. Any such costs shall be deducted from any amounts due to the Contractor.

3. If any Work is done or covered up without the required testing or approval, the Contractor shall uncover or deconstruct the Work, and the Work shall be redone after completion of the testing at the Contractor’s cost in compliance with the Contract Documents.

4. Where inspection and testing are to be conducted by an independent laboratory or agency, materials or samples of materials to be inspected or tested shall be selected by such laboratory or agency, or by the City, and not by Contractor.

Unless otherwise stated and as provided by the Contract Documents, the City shall employ and pay for the services of an independent testing laboratory to perform all inspections, tests, or approvals required by the Contract Documents. All tests or inspections of materials shall be made in accordance with the commonly recognized standards of national organizations.

5. Reexamination of Work may be ordered by the City. If so ordered, Work must be uncovered or deconstructed by Contractor. If Work is found to be in accordance with the Contract Documents, the City shall pay the costs of reexamination and reconstruction. If such work is found not to be in accordance with the Contract Documents, Contractor shall pay all costs.

B. Testing of Materials

1. In advance of manufacture of materials to be supplied by Contractor which must be tested or inspected, Contractor shall notify the City so that the City may arrange for testing at the source of supply. Any materials which have not satisfactorily passed such testing and inspection shall not be incorporated into the Work.

2. If the manufacture of materials to be inspected or tested will occur in a plant or location greater than sixty (60) miles from the City, the Contractor shall pay for any excessive or unusual costs associated with such testing or inspection, including but not limited to excessive travel time, standby time and required lodging.

3. Unless otherwise specified in the Special Provisions, all initial testing and a reasonable amount of retesting will be performed under the direction of the Engineer, and at no expense to the Contractor. The Contractor shall notify the Engineer in writing, at least 15 days in advance, of its intention to use materials for 102
James R Bryant Park Futsal Court
Renovation PM 2425-20 -56- SECTION 00700 – GENERAL CONDITIONS

which tests are specified, to allow sufficient time to perform the tests. The notice shall name the proposed supplier and source of material. If the notice of intent to use is sent before the materials are available for testing or inspection, or is sent so far in advance that the materials on hand at the time will not last but will be replaced by a new lot prior to use on the Work, it will be the Contractor's responsibility to re- notify the Engineer when samples which are representative may be obtained.

4. A Certificate of Compliance shall be furnished to the Engineer prior to the use of any material or assembled material for which these Specifications so require or if so required by the Engineer. The Engineer may waive the materials testing requirements and accept a Certificate of Compliance. Material test data may be required by the Engineer to be included with the submittal. Materials used on the basis of a Certificate of Compliance may be sampled and tested at any time. The submission of a Certificate of Compliance shall not relieve the Contractor of responsibility for incorporating material into the Work which conforms to the requirements of the Contract Documents, and any material not conforming to the requirements will be subject to rejection by the Engineer whether in place or not.

5. Copies of mill certificates of composition and quality of all component materials (reinforcing steel, structural steel, lumber, etc.) incorporated in the construction of the Work shall be provided to the City at the time of delivery. City shall retain the right to reject any raw material not provided with a mill certificate at the time of delivery.

6. If, after incorporating such materials into the Work, it is found that sources of supply that have been approved do not furnish a uniform product, or if the product from any source proves unacceptable at any time, the Contractor shall furnish approved material from other approved sources. If any product proves unacceptable after improper storage, handling or for any other reason it shall be rejected, not incorporated into the Work, and shall be removed from the Project Site all at the Contractor’s expense.

6.4 Requests for Substitutions.

A. For the purposes of this provision, the term “substitution” shall mean the substitution of any material, method or service substantially equal to or better in every respect to that indicated in the Standard Specifications or otherwise referenced herein.

B. Pursuant to Public Contract Code section 3400(b), the City may make a finding that is described in the Notice Inviting Bids that designates certain products, things, or services by specific brand or trade name.

C. Unless specifically designated in the Special Conditions, whenever any material, process, or article is indicated or specified by grade, patent, or proprietary name or by name of manufacturer, such specifications shall be deemed to be used for the purpose of facilitating the description of the material, process, or article desired and shall be deemed to be followed by the words “or equal.” Contractor may, unless otherwise stated, offer for substitution any material, process, or article which may be substantially equal to or better in every respect to that so indicated or specified in 103
James R Bryant Park Futsal Court
Renovation PM 2425-20 -57- SECTION 00700 – GENERAL CONDITIONS

the Contract Documents. However, the City has adopted uniform standards for certain materials, processes, and articles.

D. The Contractor shall submit substitution requests, together with substantiating data, for substitution of any “or equal” material, process, or article no later than thirty-five (35) calendar days after award of Contract. Provisions regarding submission of substitution requests shall not in any way authorize an extension of time for the performance of this Contract. If a substitution request is rejected by the City, the Contractor shall provide the material, method or service specified herein. The City shall not be responsible for any costs incurred by the Contractor associated with substitution requests. The burden of proof as to the equality of any material, process, or article shall rest with the Contractor. The Engineer has the complete and sole discretion to determine if a material, process, or article is substantially equal to or better than that specified and to approve or reject all substitution requests.

E. Substantiating data as described above shall include, at a minimum, the following information:

1. A signed affidavit from the Contractor stating that the material, process, or article proposed as a substitution is substantially equal to or better than that specified in every way except as may be listed on the affidavit.

2. Illustrations, specifications, catalog cut sheets, and any other relevant data required to prove that the material, process, or article is substantially equal to or better than that specified.

3. A statement of the cost implications of the substitution being requested, indicating whether and why the proposed substitution will reduce or increase the amount of the contract.

4. Information detailing the durability and lifecycle costs of the proposed substitution.

F. Failure to submit all the required substantiating data detailed above in a timely manner so that the substitution request can be adequately reviewed may result in rejection of the substitution request. The Engineer is not obligated to review multiple submittals related the same substitution request resulting from the Contractor’s failure to initially submit a complete package.

G. Time limitations within this Article shall be strictly complied with and in no case will an extension of time for completion of the contract be granted because of Contractor’s failure to provide substitution requests at the time and in the manner described herein.

H. The Contractor shall bear the costs of all the City work associated with the review of substitution requests.

I. If substitution requests approved by the Engineer require that Contractor furnish materials, methods or services more expensive than that specified, the increased costs shall be borne by Contractor.
104
James R Bryant Park Futsal Court
Renovation PM 2425-20 -58- SECTION 00700 – GENERAL CONDITIONS

ARTICLE 7 -SUBSURFACE AND PHYSICAL CONDITIONS; UTILITIES

7.1 Soils Investigations.

A. When a soils investigation report for the Site is available, such report is provided for informational purposes only. Any information obtained from such report as to subsurface soil condition, or to elevations of existing grades or elevations of underlying rock, is approximate only and is not guaranteed. Contractor acknowledges that any soils investigation report (including any borings) was prepared for purposes of design only and Contractor is required to examine the Site before submitting its Bid and must make whatever tests it deems appropriate to determine the condition of the so

7.2 Ownership of Site Materials Found.

A. The title to water, soil, rock, gravel, sand, minerals, timber and any other materials developed or obtained in the excavation or other operations of Contractor or any of its Subcontractors in the performance of the Contract, and the right to use said items in carrying out the Contract, or to dispose of same, is hereby expressly reserved by the City. Neither Contractor nor any of its Subcontractors nor any of their representatives or employees shall have any right, title, or interest in said materials, nor shall they assert or make any claim thereto. Contractor will, as determined by the City’s Representative, be permitted to use in the Work without charge, any such materials which meet the requirements of the Contract Documents, provided the City shall have the right to use or consume these materials without payment to a third party.

7.3 Existence of Utilities at the Work Site.

A. Existing Utilities

1. The location of known existing utilities and pipelines are shown on the Plans in their approximate locations. However, nothing herein shall be deemed to require the City to indicate the presence of existing service laterals or appurtenances whenever the presence of such utilities on the site of the project can be inferred from the presence of other visible facilities, such as buildings, cleanouts, meter and junction boxes, on or adjacent to the Site of the Project.

2. The City will assume the responsibility for the timely removal, relocation, or protection of existing main or trunk line utility facilities located on the Project site if such utilities are not identified by the City in the Contract Documents or which cannot reasonably be inferred from the presence of other visible facilities.

B. Utility Location

1. It shall be the Contractor’s responsibility to determine the exact location and depth of all utilities, including service connections, which have been marked by the respective utility owners and which the Contractor believes may affect or be affected by the Contractor’s operations. The Contractor shall not be entitled to additional compensation nor time extensions for work necessary to avoid 105
James R Bryant Park Futsal Court
Renovation PM 2425-20 -59- SECTION 00700 – GENERAL CONDITIONS

interferences nor for repair to damaged utilities if the Contractor does not expose all such existing utilities as required by this Article.

2. The locating of utilities shall be in conformance with Government Code Section 4216 et seq. except for the City’s utilities located on the City’s property and not on public right-of-way.

3. A “High Priority Subsurface Installation” is defined in Government Code Section 4216 (j) as “high -pressure natural gas pipelines with normal operating pressures greater than 415kPA gauge (60psig) or greater than six inches nominal pipe diameter, petroleum pipelines, pressurized sewage pipelines, high-voltage electric supply lines, conductors, or cables that have a potential to ground of greater than or equal to 60kv, or hazardous materials pipelines that are potentially hazardous to workers or the public if damaged.”

4. A “Subsurface Installation” is defined in Government Code Section 4216 (s) as “any underground pipeline, conduit, duct, wire, or other structure, except nonpressurized sewer lines, nonpressurized storm drains, or other nonpressurized drain lines.”

5. Pursuant to Government Code Section 4216.2 the Contractor shall contact the appropriate regional notification center at least two (2) working days but not more than 14 Days before performing any excavation. The date of the notification shall not count as part of the two -working-day notice. Before notifying the appropriate regional notification center, the Contractor shall delineate the area to be excavated. The Contractor shall request that the utility owners conduct a utility survey and mark or otherwise indicate the location of their service. The Contractor shall furnish to the Engineer written documentation of its contact(s) with the regional notification center prior to commencing excavation at such locations.

6. After the utility survey is completed, the Contractor shall commence “potholing” or hand digging to determine the actual location of the pipe, duct, or conduit and in accordance with Government Code Section 4216.4 if the excavation within the “tolerance zone” of a subsurface installation. The Engineer shall be given notice prior to commencing potholing operations. The Contractor shall uncover all piping and conduits, to a point one (1) foot below the pipe, where crossings, interferences, or connections are shown on the Drawings, prior to trenching or excavating for any pipe or structures, to determine actual elevations. New pipelines shall be laid to such grade as to clear all existing facilities, which are to remain in service for any period subsequent to the construction of the run of pipe involved.

7. The Contractor's attention is directed to the requirements of Government Code Section 4216.2 (c) which provides: “When the excavation is proposed within 10 feet of a high priority subsurface installation, the operator of the high priority subsurface installation shall notify the excavator of the existence of the high priority subsurface installation to set up an onsite meeting prior to the legal excavation start date and time or at a mutually agreed upon time to determine actions or activities required to verify the location and prevent damage to the high priority subsurface installation. As part of the meeting, the excavator shall discuss with the operator the method and tools that will be used during the excavation and the 106
James R Bryant Park Futsal Court
Renovation PM 2425-20 -60- SECTION 00700 – GENERAL CONDITIONS

information the operator will provide to assist in verifying the location of the subsurface installation. The excavator shall not begin excavating until after the completion of the onsite meeting.” The Contractor shall notify the Engineer in advance of this meeting.

C. Utility Relocation and Repair

1. If interferences occur at locations other than those indicated in the Contract Documents with reasonable accuracy, the Contractor shall notify the Engineer in writing. The Engineer will supply a method for correcting said interferences in accordance with the responsibilities of this section and Government Code Section 4215. To the extent any delay is caused thereby, Contractor shall submit a notice of delay within five (5) Days of discovery of the circumstances giving rise to the delay in accordance with Article 9.1 Change Orders and Time Extensions.

2. Care shall be exercised by the Contractor to prevent damage to adjacent existing facilities and public or private works; where equipment will pass over these obstructions, suitable planking shall be placed. If high priority subsurface installations are damaged and the operator cannot be contacted, the Contractor shall call 911 emergency services.

3. The City will compensate the Contractor for the costs of locating and repairing damage not due to the failure of the Contractor to exercise reasonable care, and for removing or relocating such main or trunk line utility facilities not indicated in the Contract Documents with reasonable accuracy, and for the cost of equipment on the Project necessarily idled during such work. The payment for such costs will be made as provided in Article 9.1 Change Orders and Time Extensions. The Contractor shall not be assessed liquidated damages for delay in completion of the Project, when such delay is caused by the failure of the City or utility company to provide for removal or relocation of such utility facilities. Requests for extensions of time arising out of utility relocation or repair delays shall be filed in accordance with Article 9.1 Change Orders and Time Extensions and Article 9.3 Time for Completion and Liquidated Damages.

4. The public utility, where it is the owner of the affected utility, shall have the sole discretion to perform repairs or relocation work or permit the Contractor to do such repairs or relocation work at a reasonable price. The right is reserved to the City and the owners of utilities or their authorized agents to enter upon the Work area for the purpose of making such changes as are necessary for the rearrangement of their facilities or for making necessary connections or repairs to their properties.

The Contractor shall cooperate with forces engaged in such work and shall conduct its operations in such a manner as to avoid any unnecessary delay or hindrance to the work being performed by such forces and shall allow the respective utilities time to relocate their facility.

5. When the Contract Documents indicate that a utility is to be relocated, altered or constructed by others, the City will conduct all negotiations with the utility company and the work will be done at no cost to the Contractor, unless otherwise stipulated in the Contract Documents.
107
James R Bryant Park Futsal Court
Renovation PM 2425-20 -61- SECTION 00700 – GENERAL CONDITIONS

6. Temporary or permanent relocation or alteration of utilities desired by the Contractor for its own convenience shall be the Contractor’s responsibility and it shall make arrangements and bear all costs for such work.

D. Construction at Existing Utilities

1. Where the Work to be performed crosses or otherwise interferes with water, sewer, gas, or oil pipelines; buried cable; or other public or private utilities, the Contractor shall perform construction in such a manner so that no damage will result to either public or private utilities. It shall be the responsibility of the Contractor to determine the actual locations of, and make accommodates to maintain, all utilities.

2. Before any utility is taken out of service, permission shall be obtained by the Contractor from the owner. The owner, any impacted resident or business owner and the City Representative will be advised of the nature and duration of the utility outage as well as the Contractor’s plan for providing temporary utilities if required by the owner. The Contractor shall be liable for all damage which may result from its failure to maintain utilities during the progress of the Work, and the Contractor shall indemnify City as required by the Contract Documents from all claims arising out of or connected with damage to utilities encountered during construction; damages resulting from disruption of service; and injury to persons or damage to property resulting from the negligent, accidental, or intentional breaching of utilities.

3. Unless otherwise called for by the Contract Documents, the cost of all material, equipment, and labor required to complete this work, shall be included in Contractor’s bid and distributed in the schedule of pay Items. No additional compensation shall be made to the Contractor for this work.

7.4 Trenches
A. Trenches Five Feet or More in Depth.

1. Contractor shall submit to the Engineer at the preconstruction meeting, a detailed plan showing the design of shoring, bracing, sloping or other provisions to be made for worker protection from hazards of caving ground during the excavation of any trench or trenches five feet or more in depth. If such plan varies from shoring system standards established by the Construction Safety Orders of the California Code of Regulations, Department of Industrial Relations, the plan shall be prepared by a California registered civil or structural engineer. The plan shall not be less effective than the shoring, bracing, sloping, or other provisions of the Construction Safety Orders, as defined in the California Code of Regulations. The Contractor shall designate in writing the “competent person” as defined in Title 8, California Code of Regulations, who shall be present at the Work Site each day that trenching/excavation is in progress. The “competent person” shall prepare and provide daily trenching/excavation inspection reports to the Engineer.

Contractor shall also submit a copy of its annual California Occupational Safety and Health Administration (Cal/OSHA) trench/excavation permit.

B. Excavations Deeper than Four Feet.
108
James R Bryant Park Futsal Court
Renovation PM 2425-20 -62- SECTION 00700 – GENERAL CONDITIONS

1. If the Work involves excavating trenches or other excavations that extend deeper than four (4) feet below the surface, Contractor shall promptly within three (3) Days, and before the excavation is further disturbed, notify the City in writing of any of the following conditions:
a. Material that the Contractor believes may be material that is hazardous waste, as defined in section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law. b. Subsurface or latent physical conditions at the site differing from those indicated. c. Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract

2. The City shall promptly investigate the conditions, and if it finds that the conditions do so materially differ, or do involve hazardous waste, and cause a decrease or increase in Contractor’s cost of, or the time required for, performance of any part of the Work, shall issue a Change Order under the procedures described in Article

9.1 Change Orders and Time Extensions.

3. In the event that a dispute arises between the City and the Contractor as to whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the Contractor’s cost of, or time required for, performance of any part of the Work, the Contractor shall not be excused from any scheduled completion date provided for by the Contract, but shall proceed with all Work to be performed under the Contract. Contractor shall retain any and all rights provided either by contract or by law which pertain to the resolution of disputes and protests between the parties.

ARTICLE 8 -PROSECUTION OF THE WORK

8.1 Contractor’s Means and Methods.

A. Contractor is solely responsible for the means and methods utilized to perform the Work. In no case shall the Contractor’s means and methods deviate from commonly used industry standards.

8.2 Construction Schedule.

A. General Requirements. The schedule shall be prepared in a Critical Path Method (“CPM”) format and in an electronic scheduling program acceptable to the City and as specified in the Contract Documents. Contractor shall deliver the schedule and all updates to the City in both paper and electronic form. The electronic versions shall be in the format and include all data used to prepare the schedule. Copies are not acceptable.

B. Schedule. The receipt or approval of any schedules by the City shall not in any way relieve the Contractor of its obligations under the Contract Documents. The Contractor is fully responsible to determine and provide for any and all staffing and resources at levels which allow for good quality and timely completion of the Project. 109
James R Bryant Park Futsal Court
Renovation PM 2425-20 -63- SECTION 00700 – GENERAL CONDITIONS

Contractor’s failure to incorporate all elements of Work required for the performance of the Contract or any inaccuracy in the schedule shall not excuse the Contractor from performing all Work required for a completed Project within the specified Contract Time. If the required schedule is not received by the time the first payment under the Contract is due, Contractor shall not be paid until the schedule is received, reviewed and accepted by the City.

C. Schedule Contents. The schedule shall allow enough time for inclement weather.

The schedule shall indicate the beginning and completion dates of all phases of construction; critical path for all critical, sequential time related activities; and “float time” for all “slack” or “gaps” in the non-critical activities. The schedule shall include appropriate time allowances and constraints for submittals, items of interface with Work performed by others, and specified construction, start -up and performance tests. All float shall be owned by the Project. Schedules indicating early or late completion shall not modify or have any effect on the Contract Time, regardless of whether the schedules are reviewed and/or accepted by the City. For purposes of determining Liquidated Damages, the Contract Time shall control and may only be altered by a duly authorized Change Order.

D. Schedule Updates. Contractor shall continuously update its construction schedule.

Contractor shall submit an updated and accurate construction schedule to the City:
(1) prior to the start of construction, if there are any changes to the initial schedule; (2) with each progress payment request; and (3) whenever requested to do so by the City. The City may withhold progress payments or other amounts due under the Contract Documents if Contractor fails to submit an updated and accurate construction schedule. Upon the City’s request, Contractor shall submit any schedules or updates to the City in the native electronic format of the software used to create the schedule. Contractor shall also submit schedules showing a two-week detailed look-ahead at weekly meetings conducted with the City. The two-week look- ahead schedule shall clearly identify all staffing and other resources which in the Contractor’s judgment are needed to complete the Work within the Contract Time, and it shall clearly state the number of staff to be used on each daily segment of the Work.

E. Acceptance. Acceptance of the schedules by the City will not impose on responsibility for accuracy, for sequencing, scheduling, or progress of the Work, or compliance with the Contract Documents. Acceptance will not interfere with or relieve Contractor from Contractor’s full responsibility therefor.

F. Recovery Schedule.

1. Should any of the following conditions exist, City may require Contractor to prepare, at no extra cost to City, a plan of action and a recovery schedule for completing the Work and achieving all contractual milestones within the allotted Contract Time:
a. The Contractor's monthly progress report indicates delays that are, in the opinion of City, of sufficient magnitude that City questions the Contractor's ability to complete the Work; 110
James R Bryant Park Futsal Court
Renovation PM 2425-20 -64- SECTION 00700 – GENERAL CONDITIONS

b. The schedule shows the Contractor to be thirty (30) or more days behind the critical path at any time during construction;
c. The Contractor desires to make changes in the logic or the planned duration of future activities of the schedule which, in the opinion of City, are major in nature.

2. The recovery schedule shall include proposed revisions to the Construction Schedule, demonstrating how Contractor intends to achieve all contractual milestones including Contract completion within the allotted Contract Time. The submittal shall include a narrative describing the actions planned by the Contractor to recover the schedule.

3. Contractor shall submit the Recovery Schedule within seven (7) Days of City’s request. If Contractor asserts that City is responsible for the delay, failure to submit the recovery schedule within seven (7) Days of City’s request, will be considered a concurrent delay event attributable to Contractor, and Contractor shall only be entitled to non -compensable adjustments to Contract Times. If Contractor is responsible for the delay, this provision will not limit or affect Contractor's liability and failure to submit the recovery schedule with seven (7) Days of City’s request may result in City withholding progress payments or other amounts due under the Contract Documents.

4. Contractor is responsible for all costs associated with the preparation and execution of the recovery schedule, including any necessary recovery actions, which may include, but are not limited to, assignment of additional labor, and/or equipment, shift or overtime work, expediting of submittals or deliveries, overlapping of activities or sequencing changes to increase activity concurrence.

Regardless of whether City directs Contractor to prepare a recovery schedule pursuant to this Section, Contractor shall promptly undertake appropriate action at no additional cost to City to recover the schedule whenever the current construction schedule shows that the Contractor will not achieve a milestone and/or complete the Work within the allotted Contract Time.

8.3 Time for Completion and Liquidated Damages
A. Time for Completion. The time for completion set forth in Article 2 of the Contract for Construction shall commence: (1) on the date stated in the Notice to Proceed, or (2) if the Notice to Proceed does not specify a commencement date, then on the date of the Notice to Proceed and shall be completed by Contractor in the time specified in the Contract Documents. The City is under no obligation to consider early completion of the Project; and the Contract completion date shall not be amended by the City’s receipt or acceptance of the Contractor’s proposed earlier completion date. Any difference in time between the Contractor’s early completion and the Contract Time shall be considered a part of the Project float. Contractor shall not be entitled to compensation, and the City will not compensate Contractor, for delays which impact early completion. Contractor shall not, under any circumstances, receive additional compensation from the City (including but not limited to indirect, general, administrative or other forms of overhead costs) for the period between the time of earlier completion proposed by the Contractor and the Contract completion date.
111
James R Bryant Park Futsal Court
Renovation PM 2425-20 -65- SECTION 00700 – GENERAL CONDITIONS

B. Liquidated Damages. If the Work is not completed within the Contract Time(s), it is understood that the City will suffer damage. In accordance with Government Code section 53069.85 and Public Contract Code section 7102, being impractical and infeasible to determine the amount of actual damage, it is agreed that Contractor shall pay to the City as fixed and liquidated damages, and not as a penalty, the sum stipulated in the Contract for each calendar day of delay until the Work is fully completed. Contractor and its surety shall be liable for any liquidated damages. Any money due or to become due the Contractor may be retained to cover liquidated damages.

C. Inclement Weather. Contractor shall abide by the City’s determination of what constitutes inclement weather. Time extensions for inclement weather shall only be granted when the Work stopped during inclement weather is on the critical path of the Project schedule. Contractor shall not be entitled to reverse liquidated damages for time extensions resulting from inclement weather.

D. Extension of Time. Contractor’s entitlement to an extension of the Contract Time is limited to a City -caused extension of the critical path, reduced by the Contractor’s concurrent delays, and established by a proper time impact analysis. Contractor shall not be charged liquidated damages because of any delays in completion of the Work due to unforeseeable causes beyond the control and without the fault or negligence of Contractor (or its Subcontractors or Suppliers). The City shall ascertain the facts and extent of delay and grant extension of time for completing the Work when, in its judgment, the facts justify such an extension. Contractor shall not be entitled to an adjustment in the Contract Times for delays within the control of Contractor. Delays attributable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of Contractor.

E. Reverse Liquidated Damages. Consistent with Public Contract Code Section 7102, Contractor will be compensated for damages incurred due to unreasonable delays to the critical path for which the City is responsible. The parties agree that determining Contractor’s exact delay damages are and will continue to be impracticable and extremely difficult. As such, for each calendar day in excess of the time for completion set forth in Article 2 of the Contract for Construction, the City shall pay to the Contractor the sum stipulated in the Contract per day. Such amount shall constitute the only payment allowed for any City -caused delays and shall necessarily include all overhead, all profits, all administrative costs, all bond costs, all labor, materials, equipment and rental costs and any other costs, expenses and fees incurred or sustained as a result of such delays. Contractor shall not be entitled to reverse liquidated damages for any change in the Work in which Contractor is compensated for overhead and profit through a change in Unit Price Work or a Change Order resulting in a lump sum or allowed mark -up for the additional Work.

The amount of reverse liquidated damages shall be reduced by Contractor’s concurrent delays.

F. Force Majeure . In accordance with subparagraphs “D” and “E” above, the Contractor shall not be charged liquidated damages, and the City shall not be responsible, for any delays resulting from a Force Majeure Event. If a delay to the critical path results from a Force Majeure Event, the Contractor will be entitled to a time extension but will not receive an adjustment to the Contract Price or any other 112
James R Bryant Park Futsal Court
Renovation PM 2425-20 -66- SECTION 00700 – GENERAL CONDITIONS

compensation. Such a non-compensable adjustment shall be Contractor’s sole and exclusive remedy for such delays.

G. No Damages for Reasonable Delay. The City’s liability to Contractor for delays for which the City is responsible shall be limited to only an extension of time unless such delays were unreasonable under the circumstances. In no case shall the City be liable for any costs which are borne by the Contractor in the regular course of business, including, but not limited to, home office overhead and other ongoing costs. Damages caused by unreasonable City delay shall be based on actual costs only, no proportions or formulas shall be used to calculate any delay damages.

H. Procedure for Time Extensions and Delay Damages. Contractor shall not be entitled to any extension of time or any reverse liquidated damages unless Contractor properly notices the delay and adjustment to compensation and requests a Change Order in accordance with Article 9.1 Change Orders and Time Extensions.

Contractor’s failure to timely and fully comply with the Change Order procedures in the Contract Documents shall constitute a waiver of Contractor’s right to a time extension or reverse liquidated damages.

8.4 Contractor’s Responsibility for Work.

A. Until the acceptance of the Work by the Engineer as evidenced in writing, it shall be under the charge and care of the Contractor. The Contractor shall take every necessary precaution against injury or damage to any part thereof by the action of the elements or from any cause whether arising from the execution or non-execution of the Work. The Contractor shall rebuild, repair, restore and make good at its own expense all injuries or damages to any portion of the Work before its completion and acceptance. In the event of damage proximately caused by an Act of God, as defined by Section 7105 of the Public Contract Code, the City will pay for repair or restoration to damaged Work in excess of 5% of the total Bid.

8.5 Occupancy.

A. The City reserves the right to occupy or utilize any portion of the Work at any time before completion, and such occupancy or use shall not constitute acceptance of any part of Work covered by this Contract. This use shall not relieve the Contractor of its responsibilities under the Contract.

8.6 Securities for Money Withheld
A. Pursuant to section 22300 of the Public Contract Code of the State of California, Contractor may request the City to make retention payments directly to an escrow agent or may substitute securities for any money withheld by the City to ensure performance under the contract. At the request and expense of Contractor, securities equivalent to the amount withheld shall be deposited with the City or with a state or federally chartered bank as the escrow agent who shall return such securities to Contractor upon satisfactory completion of the contract. Deposit of securities with an escrow agent shall be subject to a written agreement substantially in the form provided in section 22300 of the Public Contract Code. 113
James R Bryant Park Futsal Court
Renovation PM 2425-20 -67- SECTION 00700 – GENERAL CONDITIONS

8.7 The City’s Right to Suspend/Terminate the Contract
A. Suspension of Work by the City

1. The City may, at its sole option, decide to suspend at any time the performance of all or any portion of the Work by notice in writing to Contractor. Such notice of suspension of Work will designate the amount and type of plant, labor, and equipment to be committed to the Project during the period of suspension.

Contractor shall use its best efforts to utilize its plant, labor, and equipment in such a manner as to minimize costs associated with suspension.

2. Upon receipt of any such notice, Contractor shall, unless the notice requires otherwise:
a. Immediately discontinue Work on the date and to the extent specified in the notice; b. Place no further orders or subcontracts for material, services, or facilities with respect to suspended Work other than to the extent required in the notice; c. Promptly make every reasonable effort to obtain suspension upon terms satisfactory to the City’s Representative of all orders, subcontracts, and rental agreements to the extent they relate to performance of Work suspended; and
d. Continue to protect and maintain the Work including those portions on which Work has been suspended.

3. Except as provided by this Article, as full and complete compensation for such suspension, Contractor shall be granted an adjustment in the Contract Price based on a negotiated daily rate that reflects the Contractor’s actual costs associated with the demobilized condition of the Site and an extension of the Contract Times equal to the number of days performance of Work is suspended; provided, however, that no adjustment of Contract Price or extension of Contract Times shall be granted if the suspension results from Contractor's non-compliance with the requirements of the Contract.

B. Termination for Cause by the City:

1. In the sole estimation of the City, if the Contractor refuses or fails to prosecute the Work or any separable part thereof with such diligence as will insure its completion within the time specified by the Contract Documents, or any extension thereof, or fails to complete such Work within such time, or if the Contractor should be adjudged a bankrupt, or if it should make a general assignment for the benefit of its creditors, or if a receiver should be appointed on account of its insolvency, or the Contractor or any of its subcontractors should violate any of the provisions of this Contract, the City may serve written notice upon the Contractor and its surety of the City's intention to terminate this Contract. This notice of intent to terminate shall contain the reasons for such intention to terminate this Contract, and a statement to the effect that the Contractor's right to perform this Contract shall cease and terminate upon the expiration of ten (10) Days unless such violations have ceased and arrangements satisfactory to the City have been made for correction of said violations.
114
James R Bryant Park Futsal Court
Renovation PM 2425-20 -68- SECTION 00700 – GENERAL CONDITIONS

2. After expiration of the ten (10) Day period, the City may terminate the Contract by providing a Notice of Termination to the Contractor. The City may take over and complete the Work by any method it may deem appropriate, including enforcement of the Project performance bond. Contractor and its surety shall be liable to the City for any excess costs or other damages incurred by the City to complete the Work. If the City takes over the Work, the City may, without liability for so doing, take possession of and utilize in completing the Work such materials, appliances, plant, and other property belonging to the Contractor as may be on the Site.

3. Upon termination, Contractor shall not be entitled to receive any further payment from the City, except for Work which was duly performed prior to the effective date of the Notice of Termination. Contractor shall submit an invoice for final payment within thirty (30) Days of the effective date of the Notice of Termination. The City may withhold from final payment up to 150% of any disputed amounts, including any amounts which may be necessary to repair defective Work, complete unfinished Work, or are otherwise occasioned by Contractor’s failure to perform its duties under the Contract.

C. Termination for Convenience by the City:

1. The City may terminate performance of the Work called for by the Contract Documents in whole or, from time to time, in part, upon ten (10) Days written notice if the City determines that a termination is in the City's interest.

2. The Contractor shall terminate all or any part of the Work upon delivery to the Contractor of a Notice of Termination specifying that the termination is for the convenience of the City, the extent of termination, and the effective date of such termination.

3. After receipt of Notice of Termination, and except as directed by the City's Representative, the Contractor shall, regardless of any delay in determining or adjusting any amounts due under this termination for convenience clause, immediately proceed with the following obligations:
a. Stop Work as specified in the Notice.
b. Complete any Work specified in the Notice of Termination in a least cost/shortest time manner while still maintaining the quality called for under the Contract Documents. c. Leave the property upon which the Contractor was working and upon which the facility (or facilities) forming the basis of the Contract Document is situated in a safe and sanitary manner such that it does not pose any threat to the public health or safety. d. Terminate all subcontracts to the extent that they relate to the portions of the Work terminated.
e. Place no further subcontracts or orders, except as necessary to complete the continued portion of the Contract.
f. Submit to the City's Representative, within ten (10) Days from the effective date of the Notice of Termination, all of the usual documentation called for by the Contract Documents 115
James R Bryant Park Futsal Court
Renovation PM 2425-20 -69- SECTION 00700 – GENERAL CONDITIONS

to substantiate all costs incurred by the Contractor for labor, materials and equipment through the effective date of the Notice of Termination. Any documentation substantiating costs incurred by the Contractor solely as a result of the City's exercise of its right to terminate this Contract pursuant to this clause, which costs the contractor is authorized under the Contract documents to incur, shall: (1) be submitted to and received by the Engineer no later than 30 Days after the effective date of the Notice of Termination; (2) describe the costs incurred with particularity; and (3) be conspicuously identified as “Termination Costs occasioned by the City's Termination for Convenience.” If the City rejects any costs, Contractor shall be deemed to waive the rejected costs unless Contractor files a Claim within thirty (30) Days of the rejection pursuant to Article 9.2. g. Contractor shall be entitled to receive only the amounts payable under this Article, and Contractor specifically waives any claim for any other amounts or damages, including, but not limited to, any claim for consequential damages or lost profits. The provisions in this Article are in addition to and not in limitation of any other rights or remedies available to the City.

4. Termination of the Contract shall not relieve surety of its obligation for any just claims arising out of or relating to the Work performed.

5. Notwithstanding any other provision of this Article, when immediate action is necessary to protect life and safety or to reduce significant exposure or liability, the City may immediately order Contractor to cease Work on the Project until such safety or liability issues are addressed to the satisfaction of the City or the Contract is terminated.

6. If the City terminates Contractor for cause, and if it is later determined that the termination was wrongful, such default termination shall automatically be converted to and treated as a termination for convenience. In such event, Contractor shall be entitled to receive only the amounts payable under this section, and Contractor specifically waives any claim for any other amounts or damages, including, but not limited to, any claim for consequential damages or lost profits.

8.8 Completion and Acceptance of Work
A. Final Inspection. Upon written notice from Contractor that the entire Work is complete, the Engineer will promptly make a final inspection with the City and Contractor and will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies.

B. Final Acceptance. The acceptance of the Work on behalf of the City will be made by the Engineer. Such acceptance by the City shall not constitute a waiver of defects. After Contractor has, in the opinion of the Engineer, satisfactorily completed all corrections identified during the final inspection and has delivered, in accordance with the Contract Documents, all maintenance and operating instructions, schedules, guarantees, bonds, certificates or other evidence of insurance, certificates of inspection, Record Documents, and other documents required by the 116
James R Bryant Park Futsal Court
Renovation PM 2425-20 -70- SECTION 00700 – GENERAL CONDITIONS

Contract Documents, the City shall execute a Notice of Completion, constituting final acceptance and completion of the Project, except as may be expressly noted.

8.9 Warranty and Guaranty of Work.

A. Contractor hereby warrants that materials and Work shall be completed in conformance with the Contract Documents and that the materials and Work provided will fulfill the requirements of this Warranty. Contractor hereby agrees to repair or replace, at the discretion of the City, any or all Work that may prove to be defective in its workmanship, materials furnished, methods of installation or fail to conform to the Contract Document requirements together with any other Work which may be damaged or displaced by such defect(s) within a period of one (1) year (or as otherwise indicated in the Contract Documents or in any guarantee or warranty provided by any manufacturer or supplier of equipment or materials incorporated into the Work, whichever is later) from the date of the Notice of Completion of the Project without any expense whatever to the City, ordinary wear and tear and unusual abuse and neglect excepted. Contractor shall be required to promptly repair or replace defective equipment or materials, at Contractor’s option. All costs associated with such corrective actions and testing, including the removal, replacement, and reinstitution of equipment and materials necessary to gain access, shall be the sole responsibility of the Contractor.

B. For any Work so corrected, Contractor’s obligation hereunder to correct defective Work shall be reinstated for an additional one (1) year period, commencing with the date of acceptance of such corrected Work. The reinstatement of the one (1) year warranty shall apply only to that portion of work that was corrected. Contractor shall perform such tests as the City may require to verify that any corrective actions, including, without limitation, redesign, repairs, and replacements comply with the requirements of the Contract. In the event of Contractor’s failure to comply with the above-mentioned conditions within ten (10) Days after being notified in writing of required repairs, to the reasonable satisfaction of the City, the City shall have the right to correct and replace any defective or non -conforming Work and any work damaged by such work or the replacement or correction thereof at Contractor’s sole expense. Contractor shall be obligated to fully reimburse the City for any expenses incurred hereunder immediately upon demand.

C. In addition to the warranty set forth in this Article, Contractor shall obtain for the City all warranties that would be given in normal commercial practice and assign to the City any and all manufacturer’s or installer’s warranties for equipment or materials not manufactured by Contractor and provided as part of the Work, to the extent that such third-party warranties are assignable and extend beyond the warranty period set forth in this Article. Contractor shall furnish the City with all warranty and guarantee documents prior to final acceptance of the Project by the City as required.

D. When specifically indicated in the Contract Documents or when directed by the Engineer, the City may furnish materials or products to the Contractor for installation.

In the event any act or failure to act by Contractor shall cause a warranty applicable to any materials or products purchased by the City for installation by the Contractor to be voided or reduced, Contractor shall indemnify the City from and against any cost, expense, or other liability arising therefrom, and shall be responsible to the City 117
James R Bryant Park Futsal Court
Renovation PM 2425-20 -71- SECTION 00700 – GENERAL CONDITIONS

for the cost of any repairs, replacement or other costs that would have been covered by the warranty but for such act or failure to act by Contractor.

E. The Contractor shall remedy at its expense any damage to City-owned or controlled real or personal property.

F. The City shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage. The Contractor shall within ten (10) Days after being notified commence and perform with due diligence all necessary Work. If the Contractor fails to promptly remedy any defect or damage, the City shall have the right to replace, repair or otherwise remedy the defect, or damage at the Contractor’s expense.

G. In the event of any emergency constituting an immediate hazard to health, safety, property, or licensees, when caused by Work of the Contractor not in accordance with the Contract requirements, the City may undertake at Contractor’s expense, and without prior notice, all Work necessary to correct such condition.

H. Acceptance of Defective Work.

1. If, instead of requiring correction or removal and replacement of defective Work, the City prefers to accept it, the City may do so. Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) attributable to the City’s evaluation of and determination to accept such defective Work and for the diminished value of the Work. If any acceptance of Defective Work occurs prior to release of the Project retention, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and the City shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished value of Work and all costs incurred by the City. If the acceptance of defective occurs after release of the Project retention, an appropriate amount will be paid by Contractor to the City.

I. The City May Correct Defective Work

1. If Contractor fails within a reasonable time after written notice from the City to correct Defective Work, or to remove and replace rejected Work as required by the City, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, the City may, after seven (7) Days written notice to Contractor, correct, or remedy any such deficiency.

2. In connection with such corrective or remedial action, the City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor’s services related thereto, take possession of Contractor’s tools, appliances, construction equipment and machinery at the Site, and incorporate in the Work all materials and equipment stored at the Site or for which the City has paid Contractor but which are stored elsewhere. Contractor shall allow the City, and the agents, employees, other contractors, and consultants of each of 118
James R Bryant Park Futsal Court
Renovation PM 2425-20 -72- SECTION 00700 – GENERAL CONDITIONS

them, access to the Site to enable the City to exercise the rights and remedies to correct the Defective Work.

3. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) incurred or sustained by the City correcting the Defective Work will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and the City shall be entitled to an appropriate decrease in the Contract Price. Such claims, costs, losses and damages will include but not be limited to all costs of repair, or replacement of work of others destroyed or damaged by correction, removal, or replacement of defective Work.

4. If the Change Order is executed after all payments under the Contract have been paid by the City and the Project Retention is held in an escrow account as permitted by the Contract Documents, Contractor will promptly alert the escrow holder, in writing, of the amount of Retention to be paid to the City. If the Change Order is executed after release of the Project retention, an appropriate amount will be paid by Contractor to the City. Contractor shall not be allowed an extension of the Contract Times because of any delay in the performance of the Work attributable to the City correcting Defective Work.

J. Nothing in the warranty or in the Contract Documents shall be construed to limit the rights and remedies available to the City at law or in equity, including, but not limited to, Code of Civil Procedure section 337.15.

ARTICLE 9 -CHANGE ORDERS; DISPUTE RESOLUTION

9.1 Change Orders and Time Extensions
All changes to the Contract, including compensation increases and time extensions, shall be through a written Change Order in accordance with this Article. The City, without invalidating the Contract, may order changes in the Work consisting of additions, deletions or other revisions, and Contractor’s compensation and the time for completion shall be adjusted accordingly. Whenever any change is made as provided for herein, such change shall be considered and treated as though originally included in the Contract, and shall be subject to all terms, conditions, and provisions of the original Contract. Contractor shall not be entitled to claim or bring suit for damages, whether for loss of profits or otherwise, on account of any decrease or omission of any item or portion of Work to be done. No dispute, disagreement, or failure of the parties to reach agreement on the terms of the Change Order shall relieve the Contractor from the obligation to proceed with performance of the Work, including Additional Work, promptly and expeditiously.

Any alterations, extensions of time, Additional Work, or any other changes may be made without securing consent of the Contractor’s surety or sureties.

A. Change in Contract Procedures

1. City Directive. The City may direct changes in the Work by delivering a written directive. To the extent the work directive results in a change to compensation or time, Contractor must timely request a Change Order and comply with all Change 119
James R Bryant Park Futsal Court
Renovation PM 2425-20 -73- SECTION 00700 – GENERAL CONDITIONS

Order procedures in accordance with this Article. Notwithstanding issuance of a work directive, Contractor’s failure to timely request a Change Order shall constitute a waiver by Contractor of any adjustment to compensation or time extension for Work performed under the directive. The City shall not be liable to Contractor for Work performed or omitted by Contractor in reliance on verbal orders.

2. Contractor’s Notice of Change/Delay . If Contractor intends to initiate a Change Order Request, then Contractor shall provide the City with written notice of the underlying facts and circumstances that gave rise to the proposed change within the following times:
a. If due to unknown subsurface or latent physical conditions, within three (3) Days from the discovery date or prior to the alterations of the conditions, whichever is earlier. b. If due to a Force Majeure Event, as soon as reasonably practicable under the conditions, which shall be no longer than three (3) Days from the date the Contractor discovers that the Force Majeure Event gives rise to a change, unless that the conditions are such that notice within three (3) Days is not possible or practicable. c. If due to any other matter that may involve an adjustment to the Contract Time or the Contract Price, within seven (7) days from the discovery date.

To be considered valid and complete, the notice of change/delay shall include a general statement of the circumstances giving rise to the notice of change/delay and a reasonable order of magnitude estimate of the additional costs and/or time.

If the circumstances give rise to both a cost adjustment and time extension, Contractor shall submit the notice of change and notice of delay concurrently.

3. Request for Change in Compensation and/or Extension of Time. Contractor shall submit a Change Order Request for any adjustment to Contractor’s compensation and/or any extension of time. The Change Order Request shall be made prior to incurring any expense and within fourteen (14) Days from either Contractor’s notice of change/delay or the City’s directive ordering the change. The Change Order Request shall include all of the following information (unless inapplicable to the change):
a. A detailed description of the circumstances giving rise to the request; b. A complete itemized cost proposal, including itemized pricing for first tier Subcontractors; c. Supporting documentation for all costs;
d. A time impact analysis showing the impact of the delay to the critical path to completion; e. If any added costs or information cannot be determined at the time of the Change Order Request, the reason the costs or information cannot be determined at the time; and f. Certification to the accuracy of the Change Order Request under penalty of perjury. 120
James R Bryant Park Futsal Court
Renovation PM 2425-20 -74- SECTION 00700 – GENERAL CONDITIONS

The time impact analysis shall be in the critical path method format and shall show the sequencing of all critical and non-critical new activities and/or activity revisions affected by the delay, with logic ties to all affected existing activities noted on the schedule.

The City may demand, and Contractor shall provide, any additional information supporting the Change Order Request, including but not limited to native electronic format version of schedules and time impact analyses. Contractor shall provide the requested additional information within five (5) Days of the request.

For any costs or information that cannot be determined at the time Contractor submits the Change Order Request, Contractor shall submit to the City notice of the costs or information and all supporting documentation within five (5) Days of when the costs or other information become subject to determination.

4. City’s Final Decision on Change Order; Ordered Changes . If the City denies the Change Order Request or disagrees with the proposal submitted by Contractor, it will notify the Contractor, and the City will provide its opinion of the appropriate price and/or time extension. If no agreement can be reached, the City shall have the right to order the Work performed on a time and materials basis or to issue a unilateral Change Order setting forth the City’s determination of the reasonable additions or savings in costs and time attributable to the extra or deleted work. The City shall also have the right to order changes in the Work to be performed promptly by the Contractor on a time and materials basis or to issue a unilateral Change Order setting forth the City’s determination of the reasonable additions or savings in costs and time attributable to the extra or deleted work. The City’s determination shall become final and binding if the Contractor fails to submit a Claim in writing to the City within fourteen (14) Days of the issuance of the unilateral Change Order, disputing the terms of the unilateral Change Order and providing such supporting documentation for its position as the City may reasonably require.

5. Contractor’s Waiver of Further Relief. CONTRACTOR’S FAILURE TO PROVIDE

A COMPLETE AND TIMELY NOTICE OF CHANGE/DELAY AND/OR CHANGE

ORDER REQUEST, OR TO COMPLY WITH ANY OTHER REQUIREMENT OF

THIS ARTICLE, SHALL CONSTITUTE A WAIVER BY CONTRACTOR OF THE

RIGHT TO A CONTRACT ADJUSTMENT ON ACCOUNT OF SUCH

CIRCUMSTANCES AND A WAIVER OF ANY RIGHT TO FURTHER RECOURSE

OR RECOVERY BY REASON OF OR RELATED TO SUCH CHANGE BY

MEANS OF THE CLAIMS DISPUTE RESOLUTION PROCESS OR BY ANY

OTHER LEGAL PROCESS OTHERWISE PROVIDED FOR UNDER
APPLICABLE LAWS.

Contractor recognizes and acknowledges that timely submission of a formal written notice of change/delay and Change Order Request, whether or not the circumstances of the change may be known to the City or available to the City through other means, is not a mere formality but is of crucial importance to the ability of the City to promptly identify, prioritize, evaluate and mitigate the potential effects of changes. Any form of informal notice, whether verbal or written 121
James R Bryant Park Futsal Court
Renovation PM 2425-20 -75- SECTION 00700 – GENERAL CONDITIONS

(including, without limitation, statements in requests for information, statements in Submittals, statements at any job meeting or entries on monthly reports, daily logs or job meeting minutes), that does not strictly comply with the formal requirements of this Article, shall accordingly be insufficient.

6. Change Order Format
a. A Change Order signed by the Contractor indicates the Contractor's agreement therewith, including any adjustment in compensation or extension of time, and the full and final settlement of all costs (direct, indirect and overhead) related to the Work authorized by the Change Order.
b. The City may designate the forms to be used for notices, requests, and Change Orders.

If so designated, Contractor may only use such forms. Contractor shall not reserve a right to assert impact costs, extended job site costs, extended overhead, constructive acceleration and/or actual acceleration beyond what is stated in the Change Order. No Claims shall be allowed for impact, extended overhead costs, constructive acceleration and/or actual acceleration due to a multiplicity of changes and/or clarifications. The Contractor may not change or modify the City’s Change Order form in an attempt to reserve additional rights.

B. Determining Adjustments to Compensation.

1. Limitation on Costs. Contractor shall not be entitled to any compensation for Work subject to a Change Order except as expressly set forth in this Article. The mark- up added in instances of Additional Work shall constitute the entire amount of profit, any mark-ups, any field or home office overhead costs, including personnel, equipment or office space, any materials, or any costs of equipment idle time for such Work.

2. Unit Price Change Orders . When the actual quantity of a Unit Price Work item varies from the Bid Schedule, compensation for the change in quantity will be calculated by multiplying the actual quantity by the unit price. This calculation may result in either an additive or deductive Change Order. Bid items included on the Bid Schedule may be deducted from the Work in their entirety without any negotiated extra costs. Because Unit Price Work includes overhead and profit as determined by Contractor at the time of its Bid submission, no mark up or deduction for overhead and profit will be allowed.

3. Lump Sum Change Orders. Whenever possible, any changes affecting compensation shall be in a lump sum mutually agreed by the Contractor and the City.

4. Time and Materials Change Orders. The City may direct the Contractor to proceed with the Additional Work with payment to be made on the basis of actual cost of the labor and materials required to complete the Additional Work. If the Project is federally funded, a time and materials Change Order shall only be issued after a determination that no other Change Order is suitable and the Change Order shall include a ceiling price that the Contractor exceeds at its own risk. 122
James R Bryant Park Futsal Court
Renovation PM 2425-20 -76- SECTION 00700 – GENERAL CONDITIONS

5. Federally Funded Projects. For any change in price to the Contract, general and administrative expenses shall be negotiated and must conform to the cost principles set forth under at 2 C.F.R. Part 200, subpart E, and profit shall be negotiated as a separate element of the cost. To establish a fair and reasonable profit, consideration must be given to the complexity of the Additional Work to be performed, the risk borne by the Contractor, the Contractor's investment, the amount of subcontracting, the quality of its record of past performance, and industry profit rates in the surrounding geographical area for similar work.

6. Allowed Costs. Estimates for lump sum quotations and accounting for time -and- material work shall be limited to direct expenditures necessitated specifically by the change and shall be segregated as follows:
a. Labor. The costs of labor will be the actual cost for wages prevailing locally for each craft or type of worker at the time the Additional Work is done, plus employer payments of payroll taxes and insurance, health and welfare, pension, vacation, apprenticeship funds, and other direct costs resulting from federal, state or local laws, as well as assessment or benefits required by lawful collective bargaining agreements. The use of a labor classification which would increase the Additional Work cost will not be permitted unless the Contractor establishes the necessity for such additional costs. Labor costs for equipment operators and helpers shall be reported only when such costs are not included in the invoice for equipment rental.
b. Materials. The cost of materials reported shall be at the lowest current price at which such materials are locally available in the quantities involved, plus sales tax, freight and delivery. Materials costs shall be based upon supplier or manufacturer’s invoice. c. Tool and Equipment Use. Regardless of ownership, the rates to be used in determining equipment use shall not exceed listed rates prevailing locally at equipment rental agencies, or distributors, at the time the work is performed. The Contractor shall furnish cost data supporting the establishment of the rental rate. The rental rate to be applied for use of each items of equipment shall be the rate resulting in the least total cost to the City for the total period of use. The City shall the make the final determination as to an equitable rental rate for the equipment. No payment will be made for the use of small tools, which have a replacement value of $1,000 or less. (i) The rental time to be paid for equipment shall be the time the equipment is in productive operation on the Additional Work being performed. Rental time will not be allowed while equipment is inoperative due to breakdowns. (ii) All equipment shall, in the opinion of the City, be in good working condition and suitable for the purpose for which the equipment is to be used. Equipment with no direct power unit shall be powered by a unit of at least the minimum rating recommended by the manufacturer.
(iii) Before construction equipment is used on any Additional Work, the Contractor shall plainly stencil or stamp an identifying number thereon at a conspicuous location, and shall furnish to the City, in duplicate, a description of the equipment and its identifying number.
123
James R Bryant Park Futsal Court
Renovation PM 2425-20 -77- SECTION 00700 – GENERAL CONDITIONS

(iv) When hourly rates are listed, any part of an hour less than 30 minutes of operation shall be considered to be 1/2 -hour of operation, and any part of an hour greater than 30 minutes will be considered one hour of operation. When daily rates are listed, any part of a day less than 4 hours operation shall be considered to be 1/2- day of operation.
d. Allowed Mark-up. The allowed mark -up for any and all overhead (including supervision and home and field office costs) and profit on work added to the Contract shall be determined in accordance with the following provisions:
(i) “Net Cost” is defined as the actual costs of labor, materials and tools and equipment only, excluding overhead and profit. The costs of applicable insurance and bond premium will be reimbursed to the Contractor and Subcontractors at cost only, without mark-up. Contractor shall provide the City with documentation of the costs, including but not limited to payroll records, invoices, and such other information as the City may reasonably request.
(ii) For Work performed by the Contractor’s forces the allowed mark -up shall not exceed fifteen (15%) percent of labor costs, ten percent (10%) of material costs, and ten percent (10%) of the cost of tools and equipment use. (iii) For Work performed by a Subcontractor, the added cost for overhead and profit shall not exceed fifteen percent (15%) of the Subcontractor’s Net Cost of the Work to which the Contractor may add up to five percent (5%) of the Subcontractor’s Net Cost.
(iv) For Work performed by a sub -subcontractor, the added cost for overhead and profit shall not exceed fifteen percent (15%) of the sub -subcontractor’s Net Cost for Work to which the Subcontractor and Contractor may each add up to an additional five percent (5%) of the Net Cost of the lower tier subcontractor. (v) No additional mark-up will be allowed for lower tier subcontractors, and in no case shall the added cost for overhead and profit payable by the City exceed twenty - five percent (25%) of the Net Cost as defined herein, of the party that performs the Work.
(vi) Calculation of the mark-up will be subject to the limitations above and to calculation as further detailed in (b)(B)(5) above.
e. Documentation of Time-and-Material Costs.
(i) T&M Daily Sheets. Contractor must submit timesheets, materials invoices, records of equipment hours, and records of rental equipment hours to the City’s for an approval signature each day that Work is performed on a time-and-material basis.

The Engineer’s signature on time sheets only serves as verification that the Work was performed and is not indicative of the City’s agreement to Contractor’s entitlement to the cost.
(ii) T&M Summary Sheet. Contractor shall submit a T&M Summary Sheet, which shall include total actual costs, within five (5) Days following completion of Additional Work on a time-and-material basis. Contractor’s total actual cost shall be 124
James R Bryant Park Futsal Court
Renovation PM 2425-20 -78- SECTION 00700 – GENERAL CONDITIONS

presented in a summary table in an electronic spreadsheet file by labor, material, equipment, and any other costs, along with documentation supporting the costs.

Contractor’s failure to submit the T&M Summary Sheet within five (5) Days of completion of the Additional Work will result in Contractor’s waiver for any reimbursement of any costs associated with the Additional Work. f. Excluded Costs. The following costs or any other home or field office overhead costs, all of which are to be considered administrative costs covered by the Contractor’s mark -up, shall not be allowed costs and shall not be included in any lump sum proposals or time - and-materials invoices:
(i) Overhead Cost . Payroll costs and other compensation of Contractor’s officers, executives, principals, general managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, timekeepers, clerks, and other personnel employed by Contractor whether at the Site or in Contractor’s principal office or any branch office, material yard, or shop for general administration of the Work;
(ii) Office Expenses. Expenses of Contractor’s principal and branch offices; (iii) Capital Expenses. Any part of Contractor’s capital expenses, including interest on Contractor’s capital employed for the Additional Work and charges against Contractor for delinquent payments;
(iv) Negligence. Costs due to the negligence of Contractor or any Subcontractor or Supplier, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including without limitation the correction of Defective Work, disposal of materials or equipment wrongly supplied, and making good any damage to property;
(v) Small Tools. Cost of small tools valued at less than $1,000 and that remain the property of Contractor;
(vi) Administrative Costs. Costs associated with the preparation of Change Orders (whether or not ultimately authorized), cost estimates, or the preparation or filing of Claims;
(vii) Anticipated Lost Profits. Expenses of Contractor associated with anticipated lost profits or lost revenues, lost income or earnings, lost interest on earnings, or unpaid retention;
(viii) Home Office Overhead . Costs derived from the computation of a “home office overhead” rate by application of the Eichleay, Allegheny , burden fluctuation, or other similar methods;
(ix) Special Consultants and Attorneys . Costs of special consultants or attorneys, whether or not in the direct employ of Contractor, employed for services specifically related to the resolution of a Claim, dispute, or other matter arising out of or relating to the performance of the Additional Work.
125
James R Bryant Park Futsal Court
Renovation PM 2425-20 -79- SECTION 00700 – GENERAL CONDITIONS

(x) Other. Other overhead or general expense costs of any kind and the cost of any item not specifically and expressly included in the Contract Documents; including but not limited to: submittals, drawings, field drawings, shop drawings, including submissions of drawings; field inspection; general superintendence; computer services; reproduction services; salaries of project engineer, superintendent, timekeeper, storekeeper, and secretaries; janitorial services; small tools, incidentals and consumables; temporary on-site facilities (offices, telephones, high speed internet access, plumbing, electrical power, lighting; platforms, fencing, water); surveying; estimating; protection of work; handling and disposal fees; final cleanup; other incidental work; related warranties; insurance and bond premiums. (xi) Compliance with Federal Cost Principles . If the Project is federally funded, any costs that are not allowable, reasonable and allocable to the Project, under generally accepted accounting principles and the applicable federal requirements.

9.2 Procedure for Resolving Claims.

Contractor shall timely comply with any and all requirement of the Contract Documents pertaining to notices and requests for changes to the Contract Time or Contract Price, including but not limited to all requirements of Article 9.1, as a prerequisite to filing any claim governed by this Article. The failure to timely submit a notice of delay or notice of change, or to timely request a change to the time for completion or Contractor’s compensation, or to timely provide any other notice or request required herein shall constitute a waiver of the right to further pursue the claim under the Contract or at law.

A. Intent. Effective January 1, 1991, Section 20104 et seq., of the California Public Contract Code prescribes a process utilizing informal conferences, non -binding judicial supervised mediation, and judicial arbitration to resolve disputes on construction claims of $375,000 or less. Effective January 1, 2017, Section 9204 of the Public Contract Code prescribes a process for negotiation and mediation to resolve disputes on construction claims. The intent of this Article is to implement Sections 20104 et seq. and Section 9204 of the California Public Contract Code.

This Article shall be construed to be consistent with all applicable law, including but not limited to these statutes.

B. Claims. For purposes of this Article, “Claim” means a separate demand by the Contractor for:

1. An adjustment to the time for completion including, without limitation, for relief from damages or penalties for delay assessed by the City;

2. Payment by the City of money or damages arising from Work done by or on behalf of the Contractor pursuant to the Contract, payment for which is not otherwise expressly provided or to which the Contractor is not otherwise entitled; or

3. An amount the payment of which is disputed by the City.

A “Claim” does not include any demand for payment for which the Contractor has failed to provide notice, request a Change Order, or otherwise failed to follow any procedures contained in the Contract Documents.
126
James R Bryant Park Futsal Court
Renovation PM 2425-20 -80- SECTION 00700 – GENERAL CONDITIONS

C. Filing Claims. Claims governed by this Article may not be filed unless and until the Contractor completes any and all requirements of the Contract Documents pertaining to notices and requests for changes to the Contract Time or Contract Price, and Contractor’s request for a change has been denied in whole or in part.

Claims governed by this Article must be filed no later than thirty (30) Days after a request for change has been denied in whole or in part or after any other event giving rise to the Claim. The Claim shall be submitted in writing to the City and shall include on its first page the following words in 16 point capital font: “THIS IS A CLAIM.” The Claim shall include the all information and documents necessary to substantiate the Claim, including but not limited to those identified below. Nothing in this Article is intended to extend the time limit or supersede notice requirements otherwise provided by Contract Documents. Failure to follow such contractual requirements shall bar any Claims or subsequent proceedings for compensation or payment thereon.

D. Documentation. The Contractor shall submit all Claims in the following format:

1. Summary description of Claim including basis of entitlement, merit and amount of time or money requested, with specific reference to the Contract Document provisions pursuant to which the Claim is made

2. List of documents relating to Claim:
a. Specifications
b. Drawings
c. Clarifications (Requests for Information)
d. Schedules
e. Other

3. Chronology of events and correspondence

4. Narrative analysis of Claim merit

5. Analysis of Claim cost, including calculations and supporting documents

6. Time impact analysis in the form required by the Contract Documents or, if the Contract Documents do not require a particular format, CPM format, if an adjustment of the Contract Time is requested
E. City’s Response. Upon receipt of a Claim pursuant to this Article, the City shall conduct a reasonable review of the Claim and, within a period not to exceed 45 Days, shall provide the Contractor a written statement identifying what portion of the Claim is disputed and what portion is undisputed. Any payment due on an undisputed portion of the Claim will be processed and made within 60 Days after the City issues its written statement.
127
James R Bryant Park Futsal Court
Renovation PM 2425-20 -81- SECTION 00700 – GENERAL CONDITIONS

1. If the City needs approval from its governing body to provide the Contractor a written statement identifying the disputed portion and the undisputed portion of the Claim, and the City’s governing body does not meet within the 45 Days or within the mutually agreed to extension of time following receipt of a Claim sent by registered mail or certified mail, return receipt requested, the City shall have up to three (3) Days following the next duly publicly noticed meeting of the City’s governing body after the 45 -Day period, or extension, expires to provide the Contractor a written statement identifying the disputed portion and the undisputed portion.

2. Within 30 Days of receipt of a Claim, the City may request in writing additional documentation supporting the Claim or relating to defenses or Claims the City may have against the Contractor. If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of the City and the Contractor. The City’s written response to the Claim, as further documented, shall be submitted to the Contractor within 30 Days (if the Claim is less than $50,000, within 15 Days) after receipt of the further documentation, or within a period of time no greater than that taken by the Contractor in producing the additional information or requested documentation, whichever is greater.

F. Meet and Confer. If the Contractor disputes the City’s written response, or the City fails to respond within the time prescribed, the Contractor may so notify the City, in writing, either within 15 Days of receipt of the City’s response or within 15 Days of the City’s failure to respond within the time prescribed, respectively, and demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand, the City shall schedule a meet and confer conference within 30 Days for settlement of the dispute.

G. Mediation. Within 10 business days following the conclusion of the meet and confer conference, if the Claim or any portion of the Claim remains in dispute, the City shall provide the Contractor a written statement identifying the portion of the Claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the Claim shall be processed and made within 60 Days after the City issues its written statement. Any disputed portion of the Claim, as identified by the Contractor in writing, shall be submitted to nonbinding mediation, with the City and the Contractor sharing the associated costs equally. The public entity and Contractor shall mutually agree to a mediator within 10 business days after the disputed portion of the Claim has been identified in writing, unless the parties agree to select a mediator at a later time.

1. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the Claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator.

2. For purposes of this Article, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through 128
James R Bryant Park Futsal Court
Renovation PM 2425-20 -82- SECTION 00700 – GENERAL CONDITIONS

negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this Article.

3. Unless otherwise agreed to by the City and the Contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.

4. The mediation shall be held no earlier than the date the Contractor completes the Work or the date that the Contractor last performs Work, whichever is earlier. All unresolved Claims shall be considered jointly in a single mediation, unless a new unrelated Claim arises after mediation is completed.

H. Procedures After Mediation. If following the mediation, the Claim or any portion remains in dispute, the Contractor must file a Claim pursuant to Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code prior to initiating litigation.

For purposes of those provisions, the running of the period of time within which a Claim must be filed shall be tolled from the time the Contractor submits his or her written Claim pursuant to subdivision (a) until the time the Claim is denied, including any period of time utilized by the meet and confer conference.

I. Civil Actions. The following procedures are established for all civil actions filed to resolve Claims of $375,000 or less:

1. Within 60 Days, but no earlier than 30 Days, following the filing or responsive pleadings, the court shall submit the matter to non -binding mediation unless waived by mutual stipulation of both parties or unless mediation was held prior to commencement of the action in accordance with Public Contract Code section 9204 and the terms of this Contract. The mediation process shall provide for the selection within 15 Days by both parties of a disinterested third person as mediator, shall be commenced within 30 Days of the submittal, and shall be concluded within 15 Days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court.

2. If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding Section 1114.11 of that code. The Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter 3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to any proceeding brought under this subdivision consistent with the rules pertaining to judicial arbitration. In addition to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, (A) arbitrators shall, when possible, be experienced in construction law, and (B) any party appealing an arbitration award who does not obtain a more favorable judgment shall, in addition to payment of costs and fees under that chapter, also pay the attorney’s fees on appeal of the other party.

J. Government Code Claim Procedures.
129
James R Bryant Park Futsal Court
Renovation PM 2425-20 -83- SECTION 00700 – GENERAL CONDITIONS

1. This Article does not apply to tort claims and nothing in this Article is intended nor shall be construed to change the time periods for filing tort claims or actions specified by Chapter 1 (commending with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.5 of Title 1 of the Government Code.

2. In addition to any and all requirements of the Contract Documents pertaining to notices of and requests for adjustment to the Contract Time, Contract Price, or compensation or payment for Additional Work, disputed Work, construction claims and/or changed conditions, the Contractor must comply with the claim procedures set forth in Government Code Section 900, et seq. prior to filing any lawsuit against the City.

3. Such Government Code claims and any subsequent lawsuit based upon the Government Code claims shall be limited to those matters that remain unresolved after all procedures pertaining to adjustment of the Contract Time or Contract Price for Additional Work, disputed Work, construction claims, and/or changed conditions have been followed by Contractor. If Contractor does not comply with the Government Code claim procedure or the prerequisite contractual requirements, Contractor may not file any action against the City.

4. A Government Code claim must be filed no earlier than the date the Work is completed or the date the Contractor last performs Work on the Project, whichever occurs first. A Government Code claim shall be inclusive of all unresolved Claims known to Contractor or that should reasonably by known to Contractor excepting only new unrelated Claims that arise after the Government Code claim is submitted.

K. Non-Waiver. The City’s failure to respond to a Claim from the Contractor within the time periods described in this Article or to otherwise meet the time requirements of this Article shall result in the Claim being deemed rejected in its entirety, and shall not constitute a waiver of any rights under this Article.

ARTICLE 10 - MEASUREMENT; PAYMENT

10.1 Cost Breakdown.

A. Lump Sum Work.

1. Contractor shall furnish on forms approved by the City within ten (10) Days of the Notice to Proceed, a schedule of values allocating the entire Contract Price to the various portions of the Work and prepared in such a form and supported by such data to substantiate its accuracy as the Engineer may require. This schedule of values, unless objected to by the Engineer, shall be used as a basis for reviewing the Contractor’s applications for payment. Contractor shall submit the schedule of values prior to submitting its first application for payment, and the City will not issue any payment until it receives and approves the schedule of values.

B. Unit Price Work.
130
James R Bryant Park Futsal Court
Renovation PM 2425-20 -84- SECTION 00700 – GENERAL CONDITIONS

1. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the unit price for each separately identified item of Unit Price Work multiplied by the estimated quantity of each item as indicated in the Contract. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Each unit price will be deemed to include an amount considered by Contractor to be adequate to cover Contractor’s overhead and or profit for each separately identified item.

2. Unless otherwise specified, payment will be based on the actual quantities of Work as verified and approved by the Engineer, based on the price per unit as set forth in the Bid.

3. The City or Contractor may initiate a Change Order or Change Order Request to adjust the Contract Price in accordance with Contractor Documents based on actual quantities of Unit Price Work. The City or Contractor may make a claim for an adjustment in the Unit Price in accordance with the Contract Documents if:
a. the quantity of any item of Unit Price Work performed by Contractor differs by twenty-five percent (25%) or more from the estimated quantity of such item indicated in the Contract; and
b. there is no corresponding adjustment with respect to any other item of Work; and c. Contractor believes that Contractor is entitled to an increase in unit price as a result of having incurred additional expense or the City believes that the City is entitled to a decrease in unit price and the parties are unable to agree as to the amount of any such increase or decrease.

10.2 Progress Estimates and Payment.

A. By the tenth (10th) Day of the following calendar month, Contractor shall submit to Engineer a payment request which shall set forth in detail the value of the Work done for the period beginning with the date Work was first commenced and ending on the end of the calendar month for which the payment request is prepared. Contractor shall include an adjusted list of actual quantities, verified by the Engineer, for unit price items listed, if any, in the Bid. Contractor shall include any amount earned for authorized Additional Work. Contractor shall certify under penalty of perjury, that all cost breakdowns and periodic estimates accurately reflect the Work on the Project.

B. From the total thus computed, a deduction shall be made in the amount of five percent (5%) for retention, except where the City has adopted a finding that the Work done under the Contract is substantially complex, and then the amount withheld as retention shall be the percentage specified in the Notice Inviting Bids. From the remainder a further deduction may be made in accordance with Section C below.

The amount computed, less the amount withheld for retention and any amounts withheld as set forth below, shall be the amount of the Contractor’s payment request. 131
James R Bryant Park Futsal Court
Renovation PM 2425-20 -85- SECTION 00700 – GENERAL CONDITIONS

C. The City may withhold a sufficient amount or amounts of any payment or payments otherwise due to Contractor, as in its judgment may be necessary to cover:

1. Payments which may be past due and payable for just claims against Contractor or any Subcontractors for labor or materials furnished in and about the performance of work on the Project under this Contract.

2. Defective work not remedied.

3. Failure of Contractor to make proper payments to his Subcontractor or for material or labor.

4. Completion of the Contract if there is a reasonable doubt that the Work can be completed for balance then unpaid.

5. Damage to another contractor or a third party.

6. Amounts which may be due the Count for claims against Contractor.

7. Failure of Contractor to keep the Record Drawings up to date.

8. Failure to provide update on construction schedule as required herein.

9. Site cleanup.

10. Failure to comply with Contract Documents.

11. Liquidated damages.

12. Legally permitted penalties.

D. The City may apply such withheld amount or amounts to payment of such claims or obligations at its discretion with the exception of subsections (C)(1), (3), and (5) of this Article, which must be retained or applied in accordance with applicable law. In so doing, the City shall be deemed the agent of Contractor and any payment so made by the City shall be considered as a payment made under contract by the City to Contractor and the City shall not be liable to Contractor for such payments made in good faith. Such payments may be made without prior judicial determination of claim or obligations. The City will render Contractor a proper accounting of such funds disbursed on behalf of Contractor.

E. Upon receipt, the Engineer shall review the payment request to determine whether it is undisputed and suitable for payment. If the payment request is determined to be unsuitable for payment, it shall be returned to Contractor as soon as practicable but not later than seven (7) Days after receipt, accompanied by a document setting forth in writing the reasons why the payment request is not proper. The City shall make the progress payment within 30 Days after the receipt of an undisputed and properly submitted payment request from Contractor, provided that a release of liens and claims has been received from the Contractor pursuant to Civil Code section 8132. The number of days available to the City to make a payment without incurring 132
James R Bryant Park Futsal Court
Renovation PM 2425-20 -86- SECTION 00700 – GENERAL CONDITIONS

interest pursuant to this paragraph shall be reduced by the number of Days by which the Engineer exceeds the seven (7) Day requirement.

F. A payment request shall be considered properly executed if funds are available for payment of the payment request and payment is not delayed due to an audit inquiry by the financial officer of the City.

G. The City shall have the right to adjust any estimate of quantity and to subsequently correct any error made in any estimate for payment.

10.3 Final Acceptance and Payment
A. Following the City’s acceptance of the Work, the Contractor shall submit to the City a written statement of the final quantities of unit price items for inclusion in the final payment request. The City shall have the right to adjust any estimate of quantity and to correct any error made in any estimate for payment.

B. When the Work has been accepted there shall be paid to Contractor a sum equal to the Contract Price less any amounts previously paid Contractor and less any amounts withheld by the City from Contractor under the terms of the Contract. The final five percent (5%), or the percentage specified in the Notice Inviting Bids where the City has adopted a finding of substantially complete, shall not become due and payable until as required by Public Contract Code section 7107. If the Contractor has placed securities with the City as described herein, the Contractor shall be paid a sum equal to one hundred percent (100%) of the Contract Price less any amounts due the City under the terms of the Contract.

C. Unless Contractor advises the City in writing prior to acceptance of the final five percent (5%) or the percentage specified in the Notice Inviting Bids where the City has adopted a finding of completion, or the return of securities held as described herein, said acceptance shall operate as a release to the City of all claims and all liability to Contractor for all things done or furnished in connection with this Work and for every act of negligence of the City and for all other claims relating to or arising out of this Work. If Contractor advises the City in writing prior to acceptance of final payment or return of the securities that there is a dispute regarding the amount due the Contractor, the City may pay the undisputed amount contingent upon the Contractor furnishing a release of all undisputed claims against the City with the disputed claims in stated amounts being specifically excluded by Contractor from the operation of the release. No payments, however, final or otherwise, shall operate to release Contractor or its sureties from the Faithful Performance Bond, Labor and Material Payment Bond, or from any other obligation under this Contract.

D. In case of suspension of the Contract any unpaid balance shall be and become the sole and absolute property of the City to the extent necessary to repay the City any excess in the cost of the Work above the Contract Price.

E. Final payment shall be made no later than 60 Days after the date of acceptance of the Work by the City or the date of occupation, beneficial use and enjoyment of the Work by the City including any operation only for testing, start-up or commissioning accompanied by cessation of labor on the Work, provided that a release of liens and 133
James R Bryant Park Futsal Court
Renovation PM 2425-20 -87- SECTION 00700 – GENERAL CONDITIONS

claims has been received from the Contractor pursuant to Civil Code section 8136.

In the event of a dispute between the City and the Contractor, the City may withhold from the final payment an amount not to exceed 150% of the disputed amount.

F. Within ten (10) Days from the time that all or any portion of the retention proceeds are received by Contractor, Contractor shall pay each of its Subcontractors from whom retention has been withheld each Subcontractor’s share of the retention received. However, if a retention payment received by Contractor is specifically designated for a particular Subcontractor, payment of the retention shall be made to the designated Subcontractor if the payment is consistent with the terms of the subcontract.

ARTICLE 11 -MISCELLANEOUS

11.1 Patents.

A. Contractor shall hold and save the City, officials, officers, employees, and authorized volunteers harmless from liability of any nature or kind of claim therefrom including costs and expenses for or on account of any patented or unpatented invention, article or appliance manufactured, furnished or used by Contractor in the performance of this Contract.

11.2 Document Retention & Examination
A. In accordance with Government Code section 8546.7, records of both the City and the Contractor shall be subject to examination and audit by the State Auditor General for a period of three (3) years after final payment.

B. Contractor shall make available to the City any of the Contractor’s other documents related to the Project immediately upon request of the City.

C. In addition to the State Auditor rights above, the City shall have the right to examine and audit all books, estimates, records, contracts, documents, bid documents, subcontracts, and other data of the Contractor (including computations and projections) related to negotiating, pricing, or performing the modification in order to evaluate the accuracy and completeness of the cost or pricing data at no additional cost to the City, for a period of four (4) years after final payment.

11.3 Notice.

A. All notices shall be in writing and either served by personal delivery or mailed to the other party. Written notice to the Contractor shall be addressed to Contractor’s principal place of business unless Contractor designates another address in writing for service of notice. Notice to the City shall be addressed to the City as designated in the Notice Inviting Bids unless the City designates another address in writing for service of notice. Notice shall be effective upon receipt or five (5) Days after being sent by first class mail, whichever is earlier. Notice given by facsimile shall not be effective unless acknowledged in writing by the receiving party. 134
James R Bryant Park Futsal Court
Renovation PM 2425-20 -88- SECTION 00700 – GENERAL CONDITIONS

11.4 Notice of Third Party Claims
A. Pursuant to Public Contract Code section 9201, the City shall provide the Contractor with timely notification of the receipt of any third-party claims relating to the Contract.

The City is entitled to recover reasonable costs incurred in providing such notification.

11.5 State License Board Notice
A. Contractors are required by law to be licensed and regulated by the Contractors’ State License Board which has jurisdiction to investigate complaints against contractors if a complaint regarding a patent act or omission is filed within four (4) years of the date of the alleged violation. A complaint regarding a latent act or omission pertaining to structural defects must be filed within ten (10) years of the date of the alleged violation. Any questions concerning a contractor may be referred to the Registrar, Contractors’ State License Board, P.O. Box 26000, Sacramento, California 95826.

11.6 Assignment of Contract
A. Contractor shall not assign, transfer, convey, sublet or otherwise dispose of the rights or title of interest of any or all of this contract without the prior written consent of the City. Any assignment or change of Contractor’s name of legal entity without the written consent of the City shall be void. Any assignment of money due or to become due under this Contract shall be subject to a prior lien for services rendered or material supplied for performance of Work called for under the Contract Documents in favor of all persons, firms, or corporations rendering such services or supplying such materials to the extent that claims are filed pursuant to the Civil Code, the Code of Civil Procedure or the Government Code.

11.7 Change In Name And Nature Of Contractor’s Legal Entity.

A. Should a change be contemplated in the name or nature of the Contractor’s legal entity, the Contractor shall first notify the City in order that proper steps may be taken to have the change reflected on the Contract and all related documents. No change of Contractor’s name or nature will affect the City’s rights under the Contract, including but not limited to the bonds.

11.8 Prohibited Interests
A. No City official or representative who is authorized in such capacity and on behalf of City to negotiate, supervise, make, accept, or approve, or to take part in negotiating, supervising, making, accepting or approving any engineering, inspection, construction or material supply contract or any subcontract in connection with construction of the project, shall be or become directly or indirectly interested financially in the Contract.

11.9 Controlling Law
A. Notwithstanding any subcontract or other contract with any subcontractor, supplier, or other person or organization performing any part of the Work, this Contract shall 135
James R Bryant Park Futsal Court
Renovation PM 2425-20 -89- SECTION 00700 – GENERAL CONDITIONS

be governed by the law of the State of California excluding any choice of law provisions.

11.10 Jurisdiction; Venue
A. Contractor and any subcontractor, supplier, or other person or organization performing any part of the Work agrees that any action or suits at law or in equity arising out of or related to the bidding, award, or performance of the Work shall be maintained in the Superior Court of San Bernardino County, California, and expressly consent to the jurisdiction of said court, regardless of residence or domicile, and agree that said court shall be a proper venue for any such action.

11.11 Cumulative Remedies.

A. The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Applicable Laws, by special warranty or guarantee, or by other provisions of the Contract Documents.

The provisions of this Article will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply.

11.12 Survival of Obligations.

A. All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor.

11.13 Headings.

A. Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions.

11.14 Assignment of Antitrust Actions
A. In accordance with §7103.5(b) of the California Public Contract Code, Contractor and Subcontractors must conform to the following requirements:

1. In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to a public works contract, Contractor or Subcontractor offer and agree to assign to the awarding body all rights, title, and interest in and to all causes of action it may have under §4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 (commencing with §16700) of Part 2 of Division 7 of the Business and Professions Code) arising from purchases of goods, services, or materials pursuant to the public works contract or the subcontract.

2. This assignment must be made and become effective at the time the awarding body tenders to Contractor, without further acknowledgment by the parties. 136
James R Bryant Park Futsal Court
Renovation PM 2425-20 -90- SECTION 00700 – GENERAL CONDITIONS

11.15 All Legal Provisions Included
A. Contractor shall give all notices and comply with all federal, state and local laws, ordinances, rules and regulations bearing on conduct of work as indicated and specified by their terms. References to specific laws, rules or regulations in this Contract are for reference purposes only, and shall not limit or affect the applicability of provisions not specifically mentioned. If Contractor observes that drawings and specifications are at variance therewith, he shall promptly notify City in writing and any necessary changes shall be adjusted as provided for in this Contract for changes in Work. If Contractor performs any Work knowing it to be contrary to such laws, ordinances, rules and regulations, and without such notice to City, he shall bear all costs arising therefrom.

B. Contractor shall be responsible for familiarity with the Americans with Disabilities Act (“ADA”) (42 U.S.C. § 12101 et seq.). The Work will be performed in compliance with ADA laws, rules and regulations. Contractor shall comply with the Historic Building Code, including, but not limited to, as it relates to the ADA, whenever applicable.

C. Contractor acknowledges and understands that, pursuant to Public Contract Code section 20676, sellers of "mined material" must be on an approved list of sellers published pursuant to Public Resources Code section 2717(b) in order to supply mined material for this Contract.

D. No City official or representative who is authorized in such capacity and on behalf of City to negotiate, supervise, make, accept, or approve, or to take part in negotiating, supervising, making, accepting or approving any engineering, inspection, construction or material supply contract or any subcontract in connection with construction of the Work, shall be or become directly or indirectly interested financially in the Contract.

E. All provisions of law required to be inserted in the Contract or Contract Documents pursuant to any Applicable Laws shall be and are inserted herein. If through mistake, neglect, oversight, or otherwise, any such provision is not herein inserted or inserted in improper form, upon the application of either party, the Contract or Contract Documents shall be changed by City, at no increase in Contract Price or extension in Contract Times, so as to strictly comply with the Applicable Laws and without prejudice to the rights of either party hereunder.
137
Department: Public Works
Prepared By: Philip Marino
Staff Member Presenting: Tito Haes, Executive
Director Public Works
Reviewed By: Jacqueline Leon, Bonnie Tam
Approved By:

Submitted To: Council/OHA
Approved: _______________________________
Continued To: ___________________________
Denied: __________________________________
Item No: 8
SUBJECT:

MAINTENANCE SERVICES AGREEMENTS WITH BRIGHTVIEW LANDSCAPE SERVICES, INC. FOR OLD MODEL COLONY WEED ABATEMENT AND PRIORITY LANDSCAPE SERVICES, LLC. FOR CELEBRATION PARK NORTH AND SOUTH

CITY OF ONTARIO
Agenda Report
January 21, 2025
SECTION:

CONSENT CALENDAR

RECOMMENDATION:

That the City Council take the following actions:

A
.

Authorize the City Manager, or his designee, to execute a Maintenance Services Agreement with BrightView Landscape Services, Inc., of Upland, California, for Old Model Colony Weed
Abatement for a total
not-to-exceed
contract amount of $863,784 for up to five (5) years; and B
.

Authorize the City Manager, or his designee, to execute a Maintenance Services Agreement with Priority Landscape Services, LLC., of Anaheim, California, for Celebration Park North and
South for a total
not-to-exceed
contract amount of $952,902 for up to five (5) years.

THE FOLLOWING COUNCIL GOALS ARE BEING ACHIEVED:

Invest in the City's Infrastructure (Water, Streets, Sewers, Parks, Storm Drains and Public Facilities)
FISCAL IMPACT:

Old Model Colony Weed Abatement
The recommended contract award to BrightView Landscape Services, Inc. is for $490,860 plus urgency services in the amount of $9,000, for a total not-to-exceed contract amount of $499,860 over the three-year term. Two (2) one-year extensions may be exercised at the City’s sole discretion for an additional contract amount of $357,924 plus urgency services in an amount of $6,000 for a total
not-to-exceed
contract amount of $863,784 over the five-year term. The Fiscal Year 2024-25 Adopted Budget includes appropriations in the General Fund for Old Model Colony Weed Abatement Landscape Maintenance Services.

Celebration Park North and South
138
The recommended contract award to Priority Landscape Services, LLC is for $521,100 plus urgency services in the amount of $39,570, for a total not-to-exceed contract amount of $560,670 over the three-year term. Two (2) one-year extensions may be exercised at the City’s sole discretion for an additional contract amount of $365,852 plus urgency services in an amount of $26,380 for a total
not-to-exceed
contract amount of $952,902
over the five-year term. The Fiscal Year 2024-25
Adopted Budget includes appropriations in the General Fund for Celebration Park North and South Landscape Maintenance Services.

BACKGROUND & ANALYSIS:

Old Model Colony Weed Abatement
On November 27th, 2024, the City solicited proposals for Bid No. 1871, Landscape Maintenance Services for the Old Model Colony Weed Abatement. The four (4) proposals received met the bid criteria and standards necessary to perform this work.

Vendor
Location
Proposal Amount
Pest Options, Inc.

Anaheim, CA
$431,640
BrightView Landscape Services, Inc
.

Upland, CA
$490,860
Priority Landscape Services, Inc.

Anaheim, CA
$495,000
Merchants Landscape Services, Inc.

Rancho Cucamonga, CA
$576,000
BrightView Landscape Services, Inc., of Upland California, submitted a proposal that met all the required specifications with a total contract cost of $490,860 over a three-year term. Based on their proposal, credentials, pricing, content, and clarity of their proposal, Staff recommends awarding the Maintenance Services Agreement for weed abatement in the Old Model Colony to BrightView Landscape Services, Inc.

Celebration Park North and South
On November 27th, 2024, the City solicited proposals for Bid No. 1870, Landscape Maintenance Services for Celebration Park North and South. The three (3) proposals received met the bid criteria and standards necessary to perform this work.

Vendor
Location
Proposal Amount
Priority Landscape Services, LLC
Anaheim, CA
$521,100
BrightView Landscape Services, Inc.

Upland, CA
$698,802
Merchants Landscape Services, Inc.

Rancho Cucamonga, CA
$712,800

Priority Landscape Services, LLC., of Anaheim, California, submitted a proposal that met all the required specifications with a total contract cost of $521,100 over a three-year term. Based on their proposal, credentials, pricing, content and clarity of their proposal, Staff recommends awarding the Maintenance Services Agreement to Priority Landscape Services, LLC. 139
46700.00100\40935194.1
BB&K (2024) -1- MAINTENANCE SERVICES AGREEMENT

CITY OF ONTARIO

MAINTENANCE SERVICES AGREEMENT

1. PARTIES AND DATE.

This Agreement is made and entered as of ____________, by and between the City of Ontario, a municipal corporation organized under t he laws of the State of California with its principal place of business at 303 East “B” Street, Ontario, California 91764-4196, County of San Bernardino, State of California ("City") and BrightView Landscape Services Inc. , a Corporation, with its principal place of business at 1659 W 9th Street, Upland, CA 91786 ("Contractor"). City and Consultant are sometimes individually referred to herein as "Party" and collectively as "Parties."

2. RECITALS.

2.1 Contractor.

Contractor desires to perform and assume responsibility for the provision of certain maintenance services required by the City on the terms and conditions set forth in this Agreement.

Contractor represents that it is experienced in providing Landscape Maintenance Services for Old Model Colony Weed Abatement services to public clients, that it and its employees or subcontractors have all necessary licenses and permits to perform the Services in the State of California, and that is familiar with the plans of City.

2.2 Project.

City desires to engage Contractor to render such services for the Landscape Maintenance Services for Old Model Colony Weed Abatement PM 2526-1 project (“Project”) as set forth in this Agreement.
140
46700.00100\40935194.1
BB&K (2024) -2 - MAINTENANCE SERVICES AGREEMENT

3. TERMS.

3.1 Scope of Services and Term.

3.1.1 General Scope of Services. Contractor promises and agrees to furnish to the City all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately supply the maintenance services necessary for the Project (“Services”). The Services are more particularly described in Exhibit “A” attached hereto and incorporated herein by reference. All Services shall be subject to, and performed in accordance with, this Agreement, the exhibits attached hereto and incorporated herein by reference, and all applicable local, state and federal laws, rules and regulations.

3.1.2 Term. The term of this Agreement shall be from July 1, 2025 to June 30, 2028, unless earlier terminated as provided herein. The City shall have the unilateral option, at its sole discretion, to renew this Agreement automatically for no more than two (2) additional one- year terms. Contractor shall complete the Services within the term of this Agreement, and shall meet any other established schedules and deadlines. The Parties may, by mutual, written consent, extend the term of this Agreement if necessary to complete the Services.

3.2 Compensation.

3.2.1 Compensation. Contractor shall receive compensation, including authorized reimbursements, for all Services rendered under this Agreement at the rates set forth in Exhibit “C” attached hereto and incorporated herein by reference. The total compensation shall not exceed Four Hundred Ninety Thousand Eight Hundred Sixty with Zero Cents ($490,860) without written approval of City Manager. Extra Work may be authorized, as described below, and if authorized, will be compensated at the rates and manner set forth in this Agreement.

3.2.2 Payment of Compensation. Contractor shall submit to City a monthly itemized statement which indicates work completed and hours of Services rendered by Contractor. The statement shall describe the amount of Services and supplies provided since the initial commencement date, or since the start of the subsequent billing periods, as appropriate, through the date of the statement. City shall, within 45 days of receiving such statement, review the statement and pay all approved charges thereon.

3.2.3 Deductions. City may deduct or withhold, as applicable, from each progress payment an amount necessary to protect City from loss because of: (1) stop payment notices as allowed by state law; (2) unsatisfactory prosecution of the Services by Contractor; (3) sums representing expenses, losses, or damages as determined by the City, incurred by the City for which Contractor is liable under the Agreement; and (4) any other sums which the City is entitled to recover from Contractor under the terms of the Agreement or pursuant to state law, including Section 1727 of the California Labor Code. The failure by the City to deduct any of these sums from a progress payment shall not constitute a waiver of the City's right to such sums.

3.2.4 Reimbursement for Expenses. Contractor shall not be reimbursed for any expenses unless authorized in writing by City.

3.2.5 Extra Work. At any time during the term of this Agreement, City may request that Contractor perform Extra Work. As used herein, “Extra Work” means any work which is determined by City to be necessary for the proper completion of the Project, but which the parties did not reasonably anticipate would be nece ssary at the execution of this Agreement. 141
46700.00100\40935194.1
BB&K (2024) -3 - MAINTENANCE SERVICES AGREEMENT

Contractor shall not perform, nor be compensated for, Extra Work without written authorization from City’s Representative.

3.2.6 It is the City’s policy to pay its consultant invoices via electronic fund transfers through the ACH network. All payments due and owing pursuant to a properly issued and correct invoice or under this Agreement shall be made through electronic ACH transfers, unless otherwise agreed upon by both Parties in writing. Contractor shall provide the City with ACH payment details whereby the City shall initiate the ACH transfers to Contractor in the amount required pursuant to a properly issued and correct invoice or under this Agreement. Each Party shall undertake any and all required actions and execute any required documents, instruments, or agreements required to effectuate the requirements of this Section. In the event the City erroneously deposits funds into an account, or otherwise deposits funds to which Contractor is not entitled: (1) Contractor shall immediately noti fy the City and the financial institution; (2) Contractor shall not withdraw any of the funds which were erroneously deposited or to which Contractor is not entitled; and (3) Contractor authorizes both the City and financial institution to take all actions necessary to correct the erro r and return to the City all funds erroneously deposited or to which Contractor is not entitled.

3.3 Responsibilities of Contractor.

3.3.1 Control and Payment of Subordinates; Independent Contractor. The Services shall be performed by Contractor or under its supervision. Contractor will determine the means, methods and details of performing the Services subject to the requirements of this Agreement. City retains Contractor on an independent contractor basis and not as an employee.

Contractor retains the right to perform similar or different services for others during the term of this Agreement. Any additional personnel performing the Services under this Agreement on behalf of Contractor shall also not be employees of City and shall at all times be under Contractor’s exclusive direction and control. Contractor shall pay all wages, salaries, and other amounts due such personnel in connection with their performance of Services under this Agreement and as required by law. Contractor shall be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: social security taxes, income tax withholding, unemployment insurance, disability insurance, and workers’ compensation insurance.

3.3.2 Schedule of Services. Contractor shall perform the Services expeditiously, within the term of this Agreement, and in accordance with the Schedule of Services set forth in Exhibit “B” attached hereto and incorporated herein by reference. Contractor represents that it has the professional and technical personnel required to perform the Services in conformance with such conditions. In order to facilitate Contractor’s conformance with the Schedule, City shall respond to Contractor’s submittals in a timely manner. Upon request of City, Contractor shall provide a more detailed schedule of anticipated performance to meet the Schedule of Services.

3.3.3 Conformance to Applicable Requirements. All work prepared by Contractor shall be subject to the approval of City.

3.3.4 City’s Representative. The City hereby designates Philip Marino, Urban Forestry Manager, or his or her designee, to act as its representative for the performance of this Agreement (“City’s Representative”). City’s Representative shall have the power to act on behalf of the City for all purposes under this Agreement except for increasing compensation. Contractor shall not accept direction or orders from any person other than the City’s Representative or his or her designee.
142
46700.00100\40935194.1
BB&K (2024) -4 - MAINTENANCE SERVICES AGREEMENT

3.3.5 Contractor’s Representative. Contractor hereby designates David Moo, Business Development Executive, or his or her designee, to act as its representative for the performance of this Agreement (“Contractor’s R epresentative”). Contractor’s Representative shall have full authority to represent and act on behalf of the Contractor for all purposes under this Agreement. The Contractor’s Representative shall supervise and direct the Services, using his best skill and attention, and shall be responsible for all means, methods, techniques, sequences and procedures and for the satisfactory coordination of all portions of the Services under this Agreement.

3.3.6 Coordination of Services. Contractor agrees to work closely with City staff in the performance of Services and shall be available to City’s staff, consultants and other staff at all reasonable times.

3.3.7 Standard of Care; Performance of Employees. Contractor shall perform all Services under this Agreement in a skillful and competent manner, consistent with the standards generally recognized as being employed by professi onals in the same discipline in the State of California. Contractor represents and maintains that it is skilled in the professional calling necessary to perform the Services. Contractor warrants that all employees and subcontractors shall have sufficient skill and experience to perf orm the Services assigned to them. Finally, Contractor represents that it, its employees and subcontractors have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Services, including a City Business License, and that such licenses and approvals shall be maintained throughout the term of this Agreement. As provided for in the indemnification provisions of this Agreement, Contractor shall perform, at its own cost and expense and without reimbursement from the City, any services necessary to correct errors or omissions which are caused by the Contractor’s failure to comply with the standard of care provided for herein. Any employee of the Contractor or its sub-contractors who is determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project, a threat to the safety of persons or property, or any employee who fails or refuses to perform the Services in a manner acceptable to the City, shall be promptly removed from the Project by the Contractor and shall not be re-employed to perform any of the Services or to work on the Project.

3.3.8 Period of Performance

3.3.8.1 Contractor shall perform and complete all Services under this Agreement within the term set forth in Section 3.1.2 above (“Performance Time”). Contractor shall perform the Services in strict accordance with any completion schedule or Project milestones described in Exhibits “A” or “B” attached hereto, or which may be provided separately in writing to the Contractor. Contractor agrees that if the Services are not completed within the aforementioned Performance Time and/or pursuant to any such completion schedule or Project milestones developed pursuant to provisions of this Agreement, it is understood, acknowledged and agreed that the City will suffer damage. Pursuant to Government Code Section 53069.85, Contractor shall pay to the City as fixed and liquidated damages, and not as a penalty, the sum of Two Hundred Twenty-Four Dollars ($224) per day for each and every calendar day of delay beyond the Performance Time or beyond any completion schedule or Project milestones established pursuant to this Agreement.

3.3.8.2 Neither City nor Contractor shall be considered in default of this Agreement for delays in performance caused by circumstances beyond the reasonable control of the non-performing Party. For purposes of this Agreement, such circumstances include a Force Majeure Event. A Force Majeure Event shall mean an event that materially affects a Party’s 143
46700.00100\40935194.1
BB&K (2024) -5 - MAINTENANCE SERVICES AGREEMENT

performance and is one or more of the following: (1) Acts of God or other natural disasters; (2) terrorism or other acts of a public enemy; (3) orders of governmental authorities (including, without limitation, unreasonable and unforeseeable delay in the issuance of permits or approvals by governmental authorities that are required for the Services); (4) strikes and other organized labor action occurring at the site and the effects thereof on the Services, only to the extent such strikes and other organized labor action are beyond the control of Contractor and its subconsultants, and to the extent the effects thereof cannot be avoided by use of replacement workers; and (5) pandemics, epidemics or quarantine restrictions. For purposes of this section, “orders of governmental authorities,” includes ordinances, emergency proclamations and orders, rules to protect the public health, welfare and safety, and other actions of a public agency applicable to the Services and Agreement.

3.3.8.3 Should a Force Majeure Event occur, the non-performing Party shall, within a reasonable time of being prevented from performing, give written notice to the other Party describing the circumstances preventing continued performance and the efforts being made to resume performance of this Agreement. Force Majeure Events and/or delays, regardless of the Party responsible for the delay, shall not entitle Contractor to any additional compensation.

Notwithstanding the foregoing in this section, the City may still terminate this Agreement in accordance with the termination provisions of this Agreement.

3.3.9 Disputes. Should any dispute arise respecting the true value of any work done, of any work omitted, or of any extra work which Contractor may be required to do, or respecting the size of any payment to Contract or during the performance of this Contract, Contractor shall continue to perform the Work while said dispute is decided by the City. If Contractor disputes the City’s decision, Contractor shall have such remedies as may be provided by law.

3.3.10 Laws and Regulations; Employee/Labor Certifications.

3.3.10.1 Compliance with Laws. Contractor shall keep itself fully informed of and in compliance with all local, state and federal laws, rules and regulations in any manner affecting the performance of the Project or the Services, including all Cal/OSHA requirements, and shall give all notices required by law. Contractor shall be liable for all violations of such laws and regulations in connection with Services. If the Contractor performs any work knowing it to be contrary to such laws, rules and regulations and without giving written notice to the City, Contractor shall be solely responsible fo r all costs arising therefrom. City is a public entity of the State of California subject to certain provisions of the Health & Safety Code, Government Code, Public Contract Code, and Labor Code of the State. It is stipulated and agreed that all provisions of the law applicable to the public contracts of a municipality are a part of this Agreement to the same extent as though set forth herein and will be complied with. These include but are not limited to the payment of prevailing w ages, the stipulation that eight (8) hours’ labor shall constitute a legal day’s work and that no worker shall be permitted to work in excess of eight (8) hours during any one calendar day except as permitted by law. Contractor shall defend, indemnify and hold City, its officials, directors, officers, employees and agents free and harmless, pursuant to the indemnification provisions of this Agreement, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations.

3.3.10.2 Employment Eligibility; Contractor. By executing this Agreement, Contractor verifies that it fully complies with all requirements and restrictions of state and federal law respecting the employment of undocumented aliens, including, but not limited to, the Immigration Reform and Control Act of 1986, as may be amended from time to time. Such 144
46700.00100\40935194.1
BB&K (2024) -6 - MAINTENANCE SERVICES AGREEMENT

requirements and restrictions include, but are not limited to, examination and retention of documentation confirming the identity and immigration status of each employee of the Contractor.

Contractor also verifies that it has not committed a violation of any such law within the five (5) years immediately preceding the date of execution of this Agreement, and shall not violate any such law at any time during the term of the Agre ement. Contractor shall avoid any violation of any such law during the term of this Agreement by participating in an electronic verification of work authorization program operated by the United States Department of Homeland Security, by participating in an equivalent federal work authorization program operated by the United States Department of Homeland Security to verify information of newly hired employees, or by some other legally acceptable method. Contractor shall maintain records of each such verification, and shall make them available to the City or its representatives for inspection and copy at any time during normal business hours. The City shall not be responsible for any costs or expenses related to Contractor’s compliance with the requirements provided for in Section 3.3.10 or any of its sub- sections.

3.3.10.3 Employment Eligibility; Subcontractors, Sub-subcontractors and Consultants. To the same extent and under the same conditions as Contractor, Contractor shall require all of its subcontractors, sub-subcontractors and consultants performing any work relating to the Project or this Agreement to make the same verifications and comply with all requirements and restrictions provided for in Section 3.3.10.1.

3.3.10.4 Employment Eligibility; Failure to Comply. Each person executing this Agreement on behalf of Contractor verifies that they are a duly authorized officer of Contractor, and understands that any of the following shall be grounds for the City to terminate the Agreement for cause: (1) failure of Contractor or its subcontractors, sub-subcontractors or consultants to meet any of the requirements provided for in Sections 3.3.10.1 or 3.3.10.2; (2) any misrepresentation or material omission concerning compliance with such requirements (including in those verifications provided to the Contractor under Section 3.3.10.2); or (3) failure to immediately remove from the Project any person found not to be in compliance with such requirements.

3.3.10.5 Equal Opportunity Employment. Contractor represents that it is an equal opportunity employer and it shall not discriminate against any subcontractor, employee or applicant for employment because of race, religion, color, national origin, handicap, ancestry, sex or age. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination. Contractor shall also comply with all relevant provisions of City’s Minority Business Enterprise program, Affirmative Action Plan or other related programs or guidelines currently in effect or hereinafter enacted.

3.3.10.6 Air Quality. Contractor must fully comply with all applicable laws, rules and regulations in furnishing or using equipment and/or providing services, including, but not limited to, emissions limits and permitting requirements imposed by the California Air Resources Board (CARB). Contractor shall specifically be aware of the CARB limits and requirements’ application to “portable equipment”, which definition is considered by CARB to include any item of equipment with a fuel-powered engine. Contractor shall indemnify City against any fines or penalties imposed by CARB or any other governmental or regulatory agency for violations of applicable laws, rules and/or regulations by Contractor, its subcontractors, or others for whom Contractor is responsible under its indemnity obligations provided for in this Agreement.

3.3.10.7 Water Quality.
145
46700.00100\40935194.1
BB&K (2024) -7 - MAINTENANCE SERVICES AGREEMENT

(A) To the extent applicable, Contractor’s Services must account for, and fully comply with, all local, state and federal laws, rules and regulations that may impact water quality compliance, including, without limitation, all applicable provisions of the Federal Water Pollution Control Act (33 U.S.C. §§ 1300); the California Porter-Cologne Water Quality Control Act (Cal Water Code §§ 13000-14950); laws, rules and regulations of the Environmental Protection Agency, the State Water Resources Control Board and the Colorado River Regional Water Quality Control Board; the City’s ordinances regulating discharges of storm water; and any and all regulations, policies, or permits issued pursuant to any such authority regulating the discharge of pollutants, as that term is used in the Porter-Cologne Water Quality Control Act, to any ground or surface water in the State. (B) Liability for Non-Compliance. Failure to comply with the laws, regulations and policies described in this Se ction is a violation of law that may subject Contractor or City to penalties, fines, or additi onal regulatory requirements. Contractor shall defend, indemnify and hold the City, its directors, officials, officers, em ployees, volunteers and agents free and harmless, pursuant to the indemnification provisions of this Agreement, from and against any and all fines, penalties, claims or other regulatory requirements imposed as a result of Contractor’s non-compliance with the laws, regulations and policies described in this Section, unless such non-compliance is the result of the sole established negligence, willful misconduct or active negligence of the City, its officials, officers, agents, employees or authorized volunteers. (C) Training. In addition to any other standard of care requirements set forth in this Agreement, Contractor warrants that all employees and subcontractors shall have sufficient skill and experience to perform the Services assigned to them without impacting water quality in violation of the laws, regulations and policies described in this Section. Contractor further warrants that it, its employees and subcontractors will receive adequate training, as determined by City, regarding the requirements of the laws, regulations and policies described in this Section as they may relate to the Services provided under this Agreement. Upon request, City will provide Contractor with a list of training programs that meet the requirements of this paragraph.

3.3.11 Insurance.

3.3.11.1 Time for Compliance. Contractor shall not commence Services under this Agreement until it has provided evidence satisfactory to the City that it has secured all insurance required under this Section. In additi on, Contractor shall not allow any subcontractor to commence work on any subcontract until it has provided evidence satisfactory to the City that the subcontractor has secured all insurance required under this Section.

3.3.11.2 Minimum Requirements. Contractor shall, at its expense, procure and maintain for the duration of the Agreement insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the Agreement by the Contractor, its agents, r epresentatives, employees or subcontractors.

Contractor shall also require all of its subcontractors to procure and maintain the same insurance for the duration of the Agreement. Such insurance shall meet at least the following minimum levels of coverage:
(A) Minimum Scope of Insurance. Coverage shall be at least as broad as the latest version of the following: (1) General Liability: Insurance Services Office Commercial General Liability coverage (occurrence form CG 0001); (2) Automobile Liability :

Insurance Services Office Business Auto Coverage form number CA 0001, code 1 (any auto); 146
46700.00100\40935194.1
BB&K (2024) -8 - MAINTENANCE SERVICES AGREEMENT

and (3) Workers’ Compensation and Employer’s Liability: Workers’ Compensation insurance as required by the State of California and Employer’s Liability Insurance. The policy shall not contain any exclusion contrary to the Agreement, including but not limited to endorsements or provisions limiting coverage for (1) contractual liability (including but not limited to ISO CG 24 26 or 21 29); or (2) cross liability for claims or suits by one insured against another. (B) Minimum Limits of Insurance. Contractor shall maintain limits no less than: (1) General Liability: $2,000,000 per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or other form with general aggregate limit is used including, but not limited to, form CG 2503, either the general aggregate limit shall apply separately to this Agreement/location or the general aggregate limit shall be twice the required occurrence limit; (2) Automobile Liability: $2,000,000 per accident for bodily injury and property damage; and (3) Workers’ Compensation and Employer’s Liability: W o r k e r s ’ Compensation limits as required by the Labor Code of the State of California. Employer’s Liability limits of $1,000,000 per accident for bodily injury or disease. Defense costs shall be paid in addition to the limits.
(C) Notices; Cancellation or Reduction of Coverage. At least fifteen (15) days prior to the expiration of any such policy, evidence showing that such insurance coverage has been renewed or extended shall be filed with the City. If such coverage is cancelled or materially reduced, Contractor shall, within ten (10) days after receipt of written notice of such cancellation or reduction of coverage, file with the City evidence of insurance showing that the required insurance has been reinstated or has been provided through another insurance company or companies. In the event any policy of insurance required under this Agreement does not comply with these specifications or is cancel ed and not replaced, the City has the right but not the duty to obtain the insurance it deems necessary and any premium paid by the City will be promptly reimbursed by Contractor or the City may withhold amounts sufficient to pay premium from Contractor payments. In the alternative, the City may suspend or terminate this Agreement. (D) Additional Insured. The City, its directors, officials, officers, employees, agents, and volunteers shall be named as additional insureds on Contractor’s and its subcontractors’ policies of commercial general liability and automobile liability insurance using the endorsements and forms specified herein or exact equivalents.

3.3.11.3 Insurance Endorsements. The insurance policies shall contain the following provisions, or Contractor shall provide endorsements on forms supplied or approved by the City to add the following provisions to the insurance policies:
(A) General Liability. The general liability policy shall include or be endorsed (amended) to state that: (1) using ISO CG forms 20 10 and 20 37, or endorsements providing the exact same coverage, the City of Ontario, its directors, officials, officers, employees, agents, and volunteers shall be covered as additional insured with respect to the Services or ongoing and complete operations performed by or on behalf of the Contractor, including materials, parts or equipment furnished in connection with such work; and (2) using ISO form 20 01, or endorsements providing the exact same coverage, the insurance coverage shall be primary insurance as respects the City, its directors, officials, officers, employees, agents, and volunteers, or if excess, shall stand in an unbroken chain of coverage excess of the Contractor’s scheduled underlying coverage. Any excess insurance shall contain a provision that such coverage shall also apply on a primary and noncontributory basis for the benefit of the City, before the City’s own primary insurance, deductible, or self-insurance shall be called upon to protect it as a named insured. Any insurance, deductible, or self-insurance maintained by the City, its directors, 147
46700.00100\40935194.1
BB&K (2024) -9 - MAINTENANCE SERVICES AGREEMENT

officials, officers, employees, agents, and volunteers shall be excess of the Contractor’s insurance and shall not be called upon to contribute with it in any way. Notwithstanding the minimum limits set forth in Section 3.3.11.2(B), any available insurance proceeds in excess of the specified minimum limits of coverage shall be available to the parties required to be named as additional insureds pursuant to this Section 3.3.11.3(A).
(B) Automobile Liability. The automobile liability policy shall include or be endorsed (amended) to state that: (1) the City, its directors, officials, officers, employees, agents, and volunteers shall be cover ed as additional insureds with respect to the ownership, operation, maintenance, use, loading or unloading of any auto owned, leased, hired or borrowed by the Contractor or for which the Contractor is responsible; and (2) the insurance coverage shall be primary insurance as respects the City, its directors, officials, officers, employees, agents, and volunteers, or if excess, shall stand in an unbroken chain of coverage excess of the Contractor’s scheduled underlying coverage. Any insurance, deductible, or self- insurance maintained by the City, its directors, officials, officers, employees, agents, and volunteers shall be excess of the Contractor’s insurance and shall not be called upon to contribute with it in any way. Policy shall contain or be endorsed to contain such provisions. Notwithstanding the minimum limits set forth in Section 3.3.11.2(B), any available insurance proceeds in excess of the specified minimum limits of coverage shall be available to the parties required to be named as additional insureds pursuant to this Section 3.3.11.3(B). (C) Workers’ Compensation and Employer’s Liability Coverage.

The insurer shall agree to waive all rights of subrogation against the City, its directors, officials, officers, employees, agents, and volunteers for losses paid under the terms of the insurance policy which arise from work performed by the Contractor. (D) All Coverages. Each insurance policy required by this Agreement shall be endorsed to state that: (A) coverage shall not be suspended, voided, reduced or canceled except after thirty (30) days (10 days for nonpayment of premium) prior written notice by certified mail, return receipt requested, has been given to the City; and (B) any failure to comply with reporting or other provisions of the policies, including breaches of warranties, shall not affect coverage provided to the City, its directors, officials, officers, employees, agents, and volunteers.

Any failure to comply with reporting or other provisions of the policies including breaches of warranties shall not affect coverage provided to the City, its officials, officers, employees, agents and volunteers, or any other additional insureds.

3.3.11.4 Separation of Insureds; No Special Limitations; Waiver of Subrogation. All insurance required by this Section shall contain standard separation of insureds provisions. In addition, such insurance shall not contain any special limitations on the scope of protection afforded to the City, its directors, officials, officers, employees, agents, and volunteers.

Requirement of specific coverage or minimum limits contained in this Section are not intended as a limitation on coverage, limits, or other require ment, or a waiver of any coverage normally provided by any insurance. All policies shall waive any right of subrogation of the insurer against the City, its officials, officers, employees, agents, and volunteers, or any other additional insureds, or shall specifically allow Cont ractor or others providing insu rance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against City, its officials, officers, employees, agents, and volunteers, or any other additional insureds, and shall require similar written express waivers and insurance clauses from each of its subcontractors.
148
46700.00100\40935194.1
BB&K (2024) -1 0 - MAINTENANCE SERVICES AGREEMENT

3.3.11.5 Deductibles and Self-Insurance Retentions. Any deductibles or self-insured retentions must be declared to and approved by the City. Contractor shall guarantee that, at the option of the City, either: (1) the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its directors, officials, officers, employees, agents, and volunteers; or (2) the Contractor shall procure a bond guaranteeing payment of losses and related investigation costs, claims and administrative and defense expenses.

3.3.11.6 Subcontractor Insurance Requirements. Contractor shall not allow any subcontractors to commence work on any subcontract relating to the work under the Agreement until they have provided evidence satisfactory to the City that they have secured all insurance required under this Section. If requested by Contractor, the City may approve different scopes or minimum limits of insurance for particular subcontractors. The Contractor and the City shall be named as additional insureds on all subcontractors’ policies of Commercial General Liability using ISO form 20 38, or coverage at least as broad.

3.3.11.7 Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best’s rating no less than A:VIII, licensed to do business in California, and satisfactory to the City.

3.3.11.8 Verification of Coverage. Contractor shall furnish City with original certificates of insurance and endorsements effecting coverage required by this Agreement on forms satisfactory to the City. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf, and shall be on forms provided by the City if requested. All certificates and endorsements must be received and approved by the City before work commences. The City reserves the right to require complete, certified copies of all required insurance policies, at any time.

3.3.11.9 Reporting of Claims. Contractor shall report to the City, in addition to Contractor’s insurer, any and all insurance claims submitted by Contractor in connection with the Services under this Agreement.

3.3.12 Safety. Contractor shall execute and maintain its work so as to avoid injury or damage to any person or property. In carrying out its Services, the Contractor shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the work and the conditions under which the work is to be performed. Safety precautions as applicable shall include, but shall not be limited to: (A) adequate life protection and lifesaving equipment and procedures; (B) instructions in accident prevention for all employees and subcontractors, such as safe walkways, scaffolds, fall protection ladders, bridges, gang planks, confined space procedures, trenching and shoring, equipment and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and (C) adequate facilities for the proper inspection and maintenance of all safety measures.

3.3.13 Bonds.

3.3.13.1 Performance Bond. If required by law or otherwise specifically requested by City in Exhibit “C” attached hereto and incorporated herein by reference, Contractor shall execute and provide to City concurrently wit h this Agreement a Performance Bond in the amount of the total, not-to-exceed compensation indicated in this Agreement, and in a form 149
46700.00100\40935194.1
BB&K (2024) -1 1 - MAINTENANCE SERVICES AGREEMENT

provided or approved by the City. If such bond is required, no payment will be made to Contractor until it has been received and approved by the City.

3.3.13.2 Payment Bond. If required by law or otherwise specifically requested by City in Exhibit “C” attached hereto and incorporated herein by reference, Contractor shall execute and provide to City concurrently with this Agreement a Payment Bond in the amount of the total, not-to-exceed compensation indicated in this Agreement, and in a form provided or approved by the City. If such bond is required, no payment will be made to Contractor until it has been received and approved by the City.

3.3.13.3 Bond Provisions. Should, in City’s sole opinion, any bond become insufficient or any surety be found to be unsatisfactory, Contractor shall renew or replace the affected bond within 10 days of receiving notice from City. In the event the surety or Contractor intends to reduce or cancel any requ ired bond, at least thirty (30) days prior written notice shall be given to the City, and Contractor shall post acceptable replacement bonds at least ten (10) days prior to expiration of the original bonds. No further payments shall be deemed due or will be made under this Agreement until any replacement bonds required by this Section are accepted by the City. To the extent, if any, that the total compensation is increased in accordance with the Agreement, the Contractor shall, upon request of the City, cause the amount of the bonds to be increased accordingly and shall promptly deliver satisfactory evidence of such increase to the City. To the extent available, the bonds shall further provide that no change or alteration of the Agreement (including, without limitation, an increase in the total compensation, as referred to above), extensions of time, or modifications of the time, terms, or conditions of payment to the Contractor, will release the surety. If the Contractor fails to furnish any required bond, the City may terminate this Agreement for cause.

3.3.13.4 Surety Qualifications. Only bonds executed by an admitted surety insurer, as defined in Code of Civil Procedure Section 995.120, shall be accepted. The surety must be a California-admitted surety with a current A.M. Best’s rating no less than A:VIII and satisfactory to the City. If a California-admitted surety insurer issuing bonds does not meet these requirements, the insurer will be considered qualified if it is in conformance with Section 995.660 of the California Code of Civil Procedure, and proof of such is provided to the City.

3.3.14 Work Site.

3.3.14.1 Inspection Of Site. Contractor shall visit sites where Services are to be performed and shall become acquainted with all conditions affecting the Services prior to commencing the Services. Contractor shall make such examinations as it deems necessary to determine the condition of the work sites, its accessibility to materials, workmen and equipment, and to determine Contractor’s ability to protect existing surface and subsurface improvements. No claim for allowances–time or money–will be allowed as to such matters after commencement of the Services.

3.3.14.2 Field Measurements. Contractor shall make field measurements, verify field conditions and shall carefully compare such field measurements and conditions and other information known to Contractor with the Contract Documents, including any plans, specifications, or scope of work before commencing Services. Errors, inconsistencies or omissions discovered shall be reported to the City immediately and prior to performing any Services or altering the condition.
150
46700.00100\40935194.1
BB&K (2024) -1 2 - MAINTENANCE SERVICES AGREEMENT

3.3.15 Loss and Damage. Contractor shall be responsible for all loss and damage which may arise out of the nature of the Services agreed to herein, or from the action of the elements, or from any unforeseen difficulties which may arise or be encountered in the prosecution of the Services until the same is fully completed and accepted by City.

3.3.16 Warranty. Contractor warrants all Services under the Contract (which for purposes of this Section shall be deemed to include unauthorized work which has not been removed and any non-conforming materials incorporated into the work) to be of good quality and free from any defective or faulty material and workmanship. Contractor agrees that for a period of one year (or the period of time specified else where in the Contract or in any guarantee or warranty provided by any manufacturer or supplier of equipment or materials incorporated into the work, whichever is later) after the date of final acceptance, Contractor shall within ten (10) days after being notified in writing by the City of any defect in the Services or non-conformance of the Services to the Contract, commence and prosecute with due diligence all Services necessary to fulfill the terms of the warranty at its sole cost and expense. Contractor shall act sooner as requested by the City in response to an emergency. In addition, Contractor shall, at its sole cost and expense, repair and replace any portions of the work (or work of other contractors) damaged by its defective Services or which becomes damaged in the course of repairing or replacing defective work. For any work so corrected, Contractor’s obligation hereunder to correct defective work shall be reinstated for an additional one year period, commencing with the date of acceptance of such corrected work. Contractor shall perform such tests as the City may require to verify that any corrective actions, incl uding, without limitation, redesign, repairs, and replacements comply with the requirements of the Contract. All costs associated with such corrective actions and testing, including the removal, replacement, and reinstitution of equipment and materials necessary to gain access, shall be the sole responsibility of the Contractor. All warranties and guarantees of subcontractors, suppliers and manufacturers with respect to any portion of the work, whether express or implied, are deemed to be obtained by Contractor for the benefit of the City, regardless of whether or not such warranties and guarantees have been transferred or assigned to the City by separate agreement and Contractor agrees to enforce such warranties and guarantees, if necessary, on behalf of the City. In the event that Contractor fails to perform its obligations under this Section, or under any other warranty or guaranty under this Contract, to the reasonable satisfaction of the City, the City shall have the right to correct and replace any defective or non-conforming work and any work damaged by such work or the replacement or correction thereof at Contractor's sole expense. Contractor shall be obligated to fully reimburse the City for any expenses incurred hereunder upon demand.

3.4 Labor Code Requirements.

3.4.1 Prevailing Wages. Contractor is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on “public works” and “maintenance” projects. 6LQFH the Services are being performed as part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and VLQFH the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Services available to interested parties upon request, and shall post copies at the Contractor’s principal place of business and at the project site.

Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability 151
46700.00100\40935194.1
BB&K (2024) -1 3 - MAINTENANCE SERVICES AGREEMENT

arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. It shall be mandatory upon the Contractor and all subcontractors to comply with all California Labor Code provisions, which include but are not limited to prevailing wages (Labor Code Sections 1771, 1774 and 1775), employment of apprentices (Labor Code Section 1777.5), certified payroll records (Labor Code Sections 1771.4 and 1776), hours of labor (Labor Code Sections 1813 and 1815) and debarment of contractors and subcontractors (Labor Code Section 1777.1). The requirement to submit certified payroll records directly to the Labor Commissioner under Labor Code section 1771.4 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4.

3.4.2 Registration/DIR Compliance. 6LQFH the Services are being performed as part of an applicable “public works” or “maintenance” project, and VLQFH the total compensation is $15,000 or more, then pursuant to Labor Code Sections 1725.5 and 1771.1, the Contractor and all subcontractors performing such Services must be registered with the Department of Industrial Relations. Contractor shall maintain registration for the duration of the Project and require the same of any subcontractors, as applicable.

3.4.3 Registration/DIR Compliance. This Project LV also subject to compliance monitoring and enforcement by the Department of Industrial Relations. It shall be Contractor’s sole responsibility to comply with all applicable registration and labor compliance requirements. Any stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor that affect Contractor’s performance of Services, including any delay, shall be Contractor’s sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered Contractor caused delay and shall not be compensable by the City. Contractor shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor.

3.4.4 Labor Certification. By its signature hereunder, Consultant certifies that it is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker's Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Services.

3.5 Termination of Agreement.

3.5.1 Grounds for Termination. City may, by written notice to Contractor, terminate the whole or any part of this Agreement at any time and without cause by giving written notice to Contractor of such termination, and specifying the effective date thereof, at least seven (7) days before the effective date of such termination. Upon termination, Contractor shall be compensated only for those services which have been adequately rendered to City, and Contractor shall be entitled to no further compensation. Contractor may not terminate this Agreement except for cause. The rights and remedies of the City provided in this section shall not be exclusive and are in addition to any other rights and remedies provided by law, equity or under this Agreement.

3.5.2 Effect of Termination. If this Agreement is terminated as provided herein, City may require Contractor to provide all finished or unfinished Documents and Data and other information of any kind prepared by Contractor in connection with the performance of Services under this Agreement. Contractor shall be required to provide such document and other information within fifteen (15) days of the request.
152
46700.00100\40935194.1

BB&K (2024) - 14 - MAINTENANCE SERVICES AGREEMENT

3.5.3 Additional Services. In the event this Agreement is terminated in whole or in part as provided herein, City may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated.

3.6 Indemnification.

3.6.1 Scope of Indemnity. To the fullest extent permitted by law, Contractor shall defend, indemnify and hold the City, its official s, employees, agents and volunteers free and harmless from any and all claims, demands, causes of action, suits, actions, proceedings, costs, expenses, liability, judgments, awards, decrees, settlements, loss, damage or injury of any kind, in law or equity, regardless of whether the allegations are false, fraudulent, or groundless, to property or persons, including wrongful death, (collectively, “Claims”) in any manner arising out of, pertaining to, or incident to any acts, errors or omissions, or willful misconduct of Contractor, its officials, officers, employees, subcontractors, consultants or agents in connection with the performance of the Contractor’s Services, the Project or this Agreement, including without limitation the payment of all expert witness fees, attorneys’ fees and other related costs and expenses. Notwithstanding the foregoing, to the extent required by Civil Code section 2782, Contractor’s indemnity obligation shall not apply to such loss or damage which is caused by the sole or active negligence or willful misconduct of the City.

3.6.2 Additional Indemnity Obligations. C ontractor shall defend, with counsel of City’s choosing and at Contractor’s own cost, expense and risk, any and all Claims covered by this section that may be brought or instituted against City or its officials, employees, agents and volunteers. In addition, Contractor shall pay and satisfy any judgment, award or decree that may be rendered against City or its officials, employ ees, agents and volunteers as part of any such claim, suit, action or other proceeding. Contractor shall also reimburse City for the cost of any settlement paid by City or its officials, empl oyees, agents and volunteers as part of any such claim, suit, action or other proceeding. Such reimbursement shall include payment for City’s attorney’s fees and costs, including expert witness fees. Contractor shall reimburse City and its officials, employees, agents and volunteers, for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. Contractor’s obligation to indemnify shall survive expiration or termination of this Agreement, and shall not be restricted to insurance proceeds, if any, received by the City, its officials, employees, agents and volunteers.

3.7 General Provisions.

3.7.1 Accounting Records. Contractor shall maintain complete and accurate records with respect to all costs and expenses incurred under this Agreement. All such records shall be clearly identifiable. Contractor shall allow a representative of City during normal business hours to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement. Contractor shall allow inspection of all work, data, documents, proceedings, and activities related to the Agreement for a period of three (3) years from the date of final payment under this Agreement.

3.7.2 Independent Contractors and Subcontracting.

3.7.2.1 Use of Contractors. Contractor is aware of statutory and case law regarding classification of workers as indep endent contractors, including California Labor Code Section 2750.3 and Dynamex Operations West , Inc. v. Superior Court, 4 Cal. 5th 903 (2018). To ensure that Contractor is in compli ance with the California Labor Code, Contractor 153
46700.00100\40935194.1

BB&K (2024) - 15 - MAINTENANCE SERVICES AGREEMENT

shall only utilize its employees to provide the Services. Contractor may not provide the services through any independent contractor, subcontractor or subconsultant (“Subcontractor(s)”) unless approved by the City as set forth in Section 3.7.2.2 below. Contractor represents and warrants that all personnel who perform the Services on Contractor’s behalf are Contractor’s employees, and that Contractor complies with all applicable laws, rules and regulations governing its employees, including, but not limited to, the California Labor Code, Unemployment Insurance Code and all applicable Industrial Welfare Commission Wage Orders.

3.7.2.2 Prior Approval Required. Contractor shall not use any Subcontractor to provide the Services, or any portion of the work required by this Agreement, without prior written approval of City. In the event that City authorizes Contractor to use a Subcontractor, Contractor shall enter into a written agreement with the Subcontractor, which must include all provisions of the Agreement, including a restriction on the Subcontractor’s use of further independent contractors, subcontractors or subconsultants without the City’s prior written consent.

3.7.3 Delivery of Notices. All notices permitted or required under this Agreement shall be given to the respective parties at the following address, or at such other address as the respective parties may provide in writing for this purpose:

Contractor:

BrightView Landscape Services Inc.
1659 W 9th Street
Upland, CA 91786
Attn: David Moo, Business Development Executive
City:

City of Ontario
303 East “B” Street
Ontario, CA 91764
Attn: Philip Marino, Urban Forestry Manager
Such notice shall be deemed made when personally delivered or when mailed, forty-eight (48) hours after deposit in the U.S. Mail, first class postage prepaid and addressed to the party at its applicable address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service.

3.7.4 Governing Law; Government Code Claim Compliance. This Agreement shall be governed by the laws of the State of California. Venue shall be in San Bernardino County.

In addition to any and all contract requirements pertaining to notices of and requests for compensation or payment for extra work, disputed work, claims and/or changed conditions, Contractor must comply with the claim procedures set forth in Government Code sections 900 et seq. prior to filing any lawsuit against the City. Such Government Code claims and any subsequent lawsuit based upon the Government Code claims shall be limited to those matters that remain unresolved after all procedures pertaining to extra work, disputed work, claims, and/or changed conditions have been followed by Contractor. If no such Government Code claim is submitted, or if any prerequisite contractual requirements are not otherwise satisfied as specified herein, Contractor shall be barred from bringing and maintaining a valid lawsuit against the City.

3.7.5 Attorneys’ Fees. If either Party commences an action against the other party, either legal, administrative or otherwise, arising out of or in connection with this Agreement, 154
46700.00100\40935194.1

BB&K (2024) - 16 - MAINTENANCE SERVICES AGREEMENT

the prevailing party in such litigation shall be entitled to have and recover from the losing party reasonable attorneys’ fees and all other costs of such action.

3.7.6 Time of Essence. Time is of the essence for each and every provision of this Agreement.

3.7.7 City’s Right to Employ Other Contractors. City reserves right to employ other contractors in connection with this Project.

3.7.8 Successors and Assigns. This Agreement shall be binding on the successors and assigns of the parties.

3.7.9 Assignment or Transfer. Contractor shall not assign, hypothecate or transfer, either directly or by operation of law, this Agreement or any interest herein without the prior written consent of the City. Any attempt to do so shall be null and void, and any assignees, hypothecates or transferees shall acquire no right or interest by reason of such attempted assignment, hypothecation or transfer.

3.7.10 Construction; References; Captions. Since the Parties or their agents have participated fully in the preparation of this Agreement, the language of this Agreement shall be construed simply, according to its fair meaning, and not strictly for or against any Party. Any term referencing time, days or period for performance shall be deemed calendar days and not work days. All references to Contractor include all personnel, employees, agents, and subcontractors of Contractor, except as otherwise specified in this Agreement. All references to City include its elected officials, officers, employees, agents, and volunteers except as otherwise specified in this Agreement. The captions of the various articles and paragraphs are for convenience and ease of reference only, and do not define, limit, augment , or describe the scope, content or intent of this Agreement.

3.7.11 Amendment; Modification. No supplement, modification or amendment of this Agreement shall be binding unless executed in writing and signed by both Parties.

3.7.12 Waiver. No waiver of any defaul t shall constitute a waiver of any other default or breach, whether of the same or other covenant or condition. No waiver, benefit, privilege, or service voluntarily given or performed by a Party shall give the other Party any contractual rights by custom, estoppel or otherwise.

3.7.13 No Third Party Beneficiaries. Except to the extent expressly provided for in Section 3.5.7, there are no intended third party beneficiaries of any right or obligation assumed by the Parties.

3.7.14 Invalidity; Severability. If any portion of this Agreement is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions shall continue in full force and effect.

3.7.15 Prohibited Interests. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Agreement. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. Contractor further 155
46700.00100\40935194.1

BB&K (2024) - 17 - MAINTENANCE SERVICES AGREEMENT

agrees to file, or shall cause its employees or subcontractors to file, a Statement of Economic Interest with the City’s Filing Officer as required under state law in the performance of the Services. For breach or violation of this warranty, City shall have the right to rescind this Agreement without liability. For the term of this Agreement, no member, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom.

3.7.16 Cooperation; Further Acts. The Parties shall fully cooperate with one another, and shall take any additional acts or sign any additional documents as may be necessary, appropriate or convenient to attain the purposes of this Agreement.

3.7.17 Authority to Enter Agreement. Contractor has all requisite power and authority to conduct its business and to execute, deliver, and perform the Agreement. Each Party warrants that the individuals who have signed th is Agreement have the legal power, right, and authority to make this Agreement and bind each respective Party.

3.7.18 Counterparts. This Agreement may be signed in counterparts, each of which shall constitute an original.

3.7.19 Entire Agreement. This Agreement contains the entire Agreement of the parties with respect to the subject matter hereof, and supersedes all prior negotiations, understandings or agreements. This Agreement may only be modified by a writing signed by both parties.

3.8 Federal Provisions . When funding for the Services is provided, in whole or in part, by an agency of the federal government, Contractor shall also fully and adequately comply with the provisions included in Exhibit “D” (Federal Requirements) attached hereto and incorporated herein by reference (“Federal Requirements”). With respect to any conflict between such Federal Requirements and the terms of this Agreement and/or the provisions of state law, the more stringent requirement shall control.

SIGNATURES NEXT PAGE

156
46700.00100\40935194.1

BB&K (2024) - 18 - MAINTENANCE SERVICES AGREEMENT

SIGNATURE PAGE FOR MAINTENANCE SERVICES AGREEMENT

BETWEEN THE CITY OF ONTARIO
AND BRIGHTVIEW LANDSCAPE SERVICES INC.

IN WITNESS WHEREOF, the Parties have executed this Agreement as of the date first written above.

CITY OF ONTARIO BrightView Landscape Services Inc.

By:

Its:

Printed Name:

By:

Its:

Printed Name:

____________________________________
Contractor’s License Number and
Classification

____________________________________
DIR Registration Number
Approved By:

Scott Ochoa
City Manager
Approved as to Form:

_____________________________________
Best Best & Krieger LLP
City Attorney

Attested By:

City Clerk

[If Corporation, TWO SIGNATURES,
President OR Vice President AND
Secretary OR Treasurer REQUIRED]
157
46700.00100\40935194.1
BB&K (2024) Exhibit A-1 MAINTENANCE SERVICES AGREEMENT

EXHIBIT “A”

SCOPE OF SERVICES
“SEE ATTACHMENT”
158

FEE PROPOSAL
159
BrightView Landscape Services 14
160
BrightView Landscape Services 15
161
BrightView Landscape Services 16
162
BrightView Landscape Services 17
163
BrightView Landscape Services 18
164
46700.00100\40935194.1
BB&K (2024) Exhibit B-1 MAINTENANCE SERVICES AGREEMENT

EXHIBIT “B”

SCHEDULE OF SERVICES
JULY 1, 2025 TO JUNE 30, 2028
165
46700.00100\40935194.1

BB&K (2024) Exhibit C-1 MAINTENANCE SERVICES AGREEMENT

EXHIBIT “C”

COMPENSATION
NOT TO EXCEED $490,860

166
46700.00100\40935194.1

BB&K (2024) Exhibit C-2 MAINTENANCE SERVICES AGREEMENT

PERFORMANCE BOND
KNOW ALL PERSONS BY THESE PRESENTS:

THAT WHEREAS, the City of Ontario (hereinafter referred to as “City”) has awarded to ____________________, (hereinafter referred to as the “Contractor”) _______________________ an agreement for ______________________________ (hereinafter referred to as the “Project”).

WHEREAS, the work to be performed by the Contractor is more particularly set forth in the Contract Documents for the Project dated ________________, (hereinafter referred to as “Contract Documents”), the terms and conditions of which are expressly incorporated herein by reference; and
WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof and to furnish a bond for the faithful performance of said Contract Documents.

NOW, THEREFORE, we, _______________, the undersigned Contractor and _____________________________________________ as Surety, a corporation organized and duly authorized to transact business under the laws of the State of California, are held and firmly bound unto the City in the sum of ___________________________ DOLLARS, ($____________), said sum being not less than one hundred percent (100%) of the total amount of the Contract, for which amount well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the Contract Documents and any alteration thereof made as therein provided, on its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their intent and meaning; and shall faithfully fulfill all obligations including the one-year guarantee of all materials and workmanship; and shall indemnify and save harmless the City, its officers and agents, as stipulated in said Contract Documents, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a condition precedent to the satisfactory completion of the Contract Documents, unless otherwise provided for in the Contract Documents, the above obligation shall hold good for a period of one (1) year after the acceptance of the work by City, during which time if Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage resulting from or caused by defective materials or faulty workmanship, Surety shall undertake and faithfully fulfill all such obligations. The obligations of Surety hereunder shall continue so long as any obligation of Contractor remains. Nothing herein shall limit the City’s rights or the Contractor or Surety’s obligations under the Contract, law or equity, including, but not limited to, California Code of Civil Procedure section 337.15.

Whenever Contractor shall be, and is declare d by the City to be, in default under the Contract Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall promptly, at the City’s option:
167
46700.00100\40935194.1

BB&K (2024) Exhibit C-3 MAINTENANCE SERVICES AGREEMENT

(1) Take over and complete the Project in accordance with all terms and conditions in the Contract Documents; or
(2) Obtain a bid or bids for completing the Project in accordance with all terms and conditions in the Contract Documents and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a Contract between such bidder, the Surety and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.
(3) Permit the City to complete the Project in any manner consistent with local, California and federal law and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.

Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.

Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from Contractor for completion of the Project if the City, when declaring the Contractor in default, notifies Surety of the City’s objection to Contractor’s further participation in the completion of the Project.

The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project to be performed thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project, including but not limited to the provisions of sections 2819 and 2845 of the California Civil Code.

168
46700.00100\40935194.1

BB&K (2024) Exhibit C-4 MAINTENANCE SERVICES AGREEMENT

IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20__).
(Corporate Seal)
Contractor/ Principal
By
Title

(Corporate Seal)
Surety
By
Attorney-in-Fact
Signatures of those signing for the Contractor and Surety must be notarized and evidence of corporate authority attached.
(Attach Attorney-in-Fact Certificate) Title
The rate of premium on this bond is ____________ per thousand. The total amount of premium charges, $_______________________________.
(The above must be filled in by corporate attorney.)

THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety)

(Name and Address of Agent or
Representative for service of
process in California, if different
from above)

(Telephone number of Surety
and Agent or Representative for
service of process in California)

NOTE: A copy of the Power-of-Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto.
169
46700.00100\40935194.1

BB&K (2024) Exhibit C-5 MAINTENANCE SERVICES AGREEMENT

Notary Acknowledgment
A notary public or other officer completing this
certificate verifies only the identity of the individual who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally

appeared , who proved to me on the basis of satisfactory

evidence to be the person(s) whose name(s) is/are s ubscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s)  Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above

170
46700.00100\40935194.1

BB&K (2024) Exhibit C-6 MAINTENANCE SERVICES AGREEMENT

PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS That
WHEREAS, the City of Ontario (hereinafter designated as the “City”), has awarded to ________________ hereinafter designated as the “Principal,” a contract for the work described as follows:
_____________________________________________________ (the “Project”); and WHEREAS, the work to be performed by the Principal is more particularly set forth in the Contract Documents for the Project dated __________________ (“Contract Documents”), the terms and conditions of which are expressly incorporated by reference; and WHEREAS, said Principal is required to furnish a bond in connection with said contract; providing that if said Principal or any of its Subcontractors shall fail to pay for any materials, provisions, provender, equipment, or other supplies used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Code or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of said Principal and its Subcontractors with respect to such work or labor the Surety on this bond will pay for the same to the extent hereinafter set forth.

NOW THEREFORE, we, the Principal and __________________________ as Surety, are held and firmly bound unto the City in the penal sum of ______________ Dollars ($___________) lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of the persons named in Section 9100 of the Civil Code, fail to pay for any materials, provisions or other supplies, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department or Franchise Tax Board from the wages of employees of the contractor and his subcontractors pursuant to Section 18663 of the Revenue and Taxation Code, with respect to such work and labor the Surety or Sureties will pay for the same, in an amount not exceeding the sum herein above specified.

This bond shall inure to the benefit of any of the persons named in Section 9100 of the Civil Code so as to give a right of action to such persons or their assigns in any suit brought upon this bond.

It is further stipulated and agreed that the Surety on this bond shall not be exonerated or released from the obligation of this bond by any change, extension of time for performance, addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement herein above described, or pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any change or modification of any terms of payment or extens ion of the time for any payment pertaining or relating to any scheme or work of improvement herein above described, nor by any rescission or 171
46700.00100\40935194.1

BB&K (2024) Exhibit C-7 MAINTENANCE SERVICES AGREEMENT

attempted rescission of the contract, agreement or bond, nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement or under the bond, nor by any fraud practiced by any person other than the claimant seeking to recover on the bond and that this bond be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is given, and under no circumstances shall Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of contract between the owner or City and original contractor or on the part of any obligee named in such bond, but the sole conditions of recovery shall be that claimant is a person described in Section 9100 of the Civil Code, and has not been paid the full amount of his claim and that Surety does hereby waive notice of any such change, extension of time, addition, alteration or modification herein mentioned and the provisions of sections 2819 and 2845 of the California Civil Code.

IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20__.
(Corporate Seal)
Contractor/ Principal
B y
T i t l e

(Corporate Seal) Surety
By

Attorney-in-Fact
T i t l e
Signatures of those signing for the Contractor and Surety must be notarized and evidence of corporate authority attached. A Power-of-Attorney authorizing the person signing on behalf of the Surety to do so much be attached hereto.

NOTE: A copy of the Power-of-Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto.

172
46700.00100\40935194.1

BB&K (2024) Exhibit C-8 MAINTENANCE SERVICES AGREEMENT

Notary Acknowledgment
A notary public or other officer completing this
certificate verifies only the identity of the individual who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally

appeared , who proved to me on the basis of satisfactory

evidence to be the person(s) whose name(s) is/are s ubscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s)  Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)

Signer(s) Other Than Named Above

173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
.05.05.05.06.5025.0045.00225.0014,475.00 173,700.005,975.00 71,700.008,500.00 102,000.00 193
.06.06.06.07.5530.0050.00235.0014,981.63 179,779.566,184.13 74,209.568,797.50 105,570.00 194
.065.065.065.075.6035.0055.00240.0015,505.98 186,071.766,400.57 76,806.849,105.41 109,264.92 195
196
197
198
199
200
201
202
203
204
Department: Public Works
Prepared By: Gil H Mars
Staff Member Presenting: Tito Haes, Executive
Director Public Works
Reviewed By: Andrea Ampig, Bonnie Tam
Approved By:

Submitted To: Council/OHA
Approved: _______________________________
Continued To: ___________________________
Denied: __________________________________
Item No: 9
SUBJECT:

AMENDMENTS TO THE MAINTENANCE SERVICES AGREEMENT WITH

CONVERGINT TECHNOLOGIES, LLC FOR THE ONTARIO MUSEUM OF HISTORY

AND ARTS EXTERIOR DOOR ACCESS CONTROL UPGRADE AND THE CCTV

INTERSECTION CAMERA INSTALLATION PROJECT

CITY OF ONTARIO
Agenda Report
January 21, 2025
SECTION:

CONSENT CALENDAR

RECOMMENDATION:

That the City Council take the following actions:

A
.

Authorize the City Manager, or his designee, to execute Amendment No. 3 to the Maintenance Services Agreement with Convergint Technologies, LLC, of La Palma, California, for the Ontario Museum of History and Arts Exterior Door Access Control Upgrade in the amount of $8,648 for a total not-to-exceed contract amount of $3,851,128, and B
.

Authorize the City Manager, or his designee, to execute Amendment No. 4 to the Maintenance Services Agreement with Convergint Technologies, LLC, of La Palma, California, for the Closed-Circuit Television (CCTV) Intersection Camera Installation Project in the amount of $402,348 for a total not-to-exceed contract amount of $4,253,476; and C
.

Authorize the City Manager, or his designee, to execute all documents required for the completion of the project including, but not limited to agreements, assessments, easements, reduction of retention accounts, contracts amendments within the authorization limits, and filing a notice of completion at the conclusion of all construction related activities.

THE FOLLOWING COUNCIL GOALS ARE BEING ACHIEVED:

Invest in the City's Infrastructure (Water, Streets, Sewers, Parks, Storm Drains and Public Facilities)
Encourage, Provide or Support Enhanced Recreational, Educational, Cultural and Healthy City Programs, Policies and Activities
Operate in a Businesslike Manner
FISCAL IMPACT:

The proposed Amendment No. 3 to the Maintenance Services Agreement with Convergint Technologies, LLC (Convergint) increases the contract amount by $8,648 for a total not- to-exceed contract amount of $3,851,128. The Fiscal Year 2024-25 Adopted Budget includes appropriations in the Capital Projects- Measure Q Fund for the Ontario Museum of History and Arts 205
Exterior Door Access Control Upgrade. The proposed Amendment No. 4 to the Maintenance Services Agreement with Convergint increases the contract amount by $402,348 for a total not-to- exceed contract amount of $4,253,476. If approved, additional appropriations in the Capital Projects- Measure Q Fund will be requested at a future quarterly budget update as needed for the CCTV Intersection Camera Installation Project. The combined total cost of all recommended actions is $410,996. The total contract amount includes work performed for various citywide projects.

BACKGROUND & ANALYSIS:

On January 16, 2024, the City Council approved Amendment No. 2 to the Maintenance Services Agreement with Convergint to bring five (5) doors up to code for ADA compliance with an access control system upgrade. As the project commenced, Staff identified more work needed to be done on the framework, hardware, and alarm system than originally anticipated. If approved, Amendment No. 3 will include the additional materials and labor needed to complete the Ontario Museum of History and Arts Exterior Door Access Control Upgrade project.

The total cost for the Ontario Museum of History and Arts Exterior Door Access Control Upgrade project will be $49,246.

The Ontario Museum of History and Arts is a historical building. Due to its age, a master plan was created to outline necessary upgrades to improve the safety, security and functionality of the Museum. The City of Ontario Information Technology Agency utilizes Convergint for access control citywide due to the standardization they provide.

The proposed Amendment No. 4 allows funding for additional intersection cameras for several key intersections not covered during the initial CCTV Intersection Camera Installation Project. Additional cameras will expand coverage to high-traffic and high-incident areas currently unmonitored to ensure consistent monitoring across the city. This will help improve the Real Time Information Center's capabilities by expanding camera coverage areas to identify quality of life problems before they have a negative impact on the community and increase the solvability of crimes both in real- time and post-crime investigations.
206
46700.00100\33287662.1

Page 1 of 5 ends