Text extracted from the city's file for reading and search. Open the original on d3n9y02raazwpg.cloudfront.net. That file is the official record.

BB&K 2020

3.1.2 Term. The term of this Agreement shall be from June 4, 2024 to June 3, 2029, unless earlier terminated as provided herein. Consultant shall complete the Services within the term of this Agreement, and shall meet any other established schedules and deadlines. The Parties may, by mutual, written consent, extend the term of this Agreement if necessary to complete the Services.

3.2.1 Compensation. Consultant shall receive compensation, including authorized reimbursements, for all Services rendered under this Agreement at the rates set forth in Exhibit "A" and Exhibit “B” attached hereto and incorporated herein by reference. The total compensation shall not exceed Two Million Eight Hundred Seventy-Five Thousand Nine Hundred Fifty-Two Dollars ($2,875,952) without written approval of the City Council or City Manager, as applicable. Extra Work may be authorized, as described below, and if authorized, will be compensated at the rates and manner set forth in this Agreement.

Exhibit “A” - SCOPE OF SERVICES is hereby amended to add Attachment A which is hereto and incorporated herein by reference. All other previously added or deleted scope of services are retained in their entirety.

Exhibit “B” – SCHEDULE OF SERVICES is hereby deleted in its entirety and replaced with Attachment B attached hereto and incorporated herein by reference.

3.2 Continuing Effect of Agreement. Except as amended by this Amendment No. 3, all other provisions of the Agreement remain in full force and effect and shall govern the actions of the parties under this Amendment No. 3. From and after the date of this Amendment No. 3, whenever the term “Agreement” appears in the Agreement, it shall mean the Agreement as amended by this Amendment No. 3.

3.3 Adequate Consideration. The Parties hereto irrevocably stipulate and agree that they have each received adequate and independent consideration for the performance of the obligations they have undertaken pursuant to this Amendment No. 3.

3.4 Severability. If any portion of this Amendment No. 3 is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions shall continue in full force and effect.

3.5 Integration. This Amendment represents the entirety of the Parties’ understanding relating to the subject of this Amendment, including written or verbal communications between the Parties, which shall have no relevance unless expressly incorporated herein. This is an integrated amendment.
[SIGNATURES ON FOLLOWING PAGE]
1101
46700.00100\33287662.1

Page 3 of 5 ends

BB&K 2020
SIGNATURE PAGE FOR AMENDMENT NO. 3 TO PROFESSIONAL SERVICES

AGREEMENT BETWEEN THE CITY OF ONTARIO

AND AKM CONSULTING ENGINEERS
IN WITNESS WHEREOF, the Parties have entered into this Amendment No. 3 as of the day and year first above written.

CITY OF ONTARIO AKM CONSULTING ENGINEERS, INC.

By:

Its:

Printed Name:

By:

Its:

Printed Name:
[If Corporation, TWO SIGNATURES,
President OR Vice President AND Secretary
OR Treasurer REQUIRED]
Approved By:

Scott Ochoa
City Manager
Approved as to Form:
_____________________________________
Best Best & Krieger LLP
City Attorney
Attested By:

City Clerk

1102
46700.00100\33287662.1

Page 4 of 5 ends

BB&K 2020
Attachment A
Exhibit “A” - SCOPE OF SERVICES
1103
553 Wald, Irvine, CA 92618
Telephone: 949.753.7333 | Fax: 949.753.7320
www.akmce.com
Consulting Engineers
Water Resources | Infrastructure | Construction Management AKM Prop. 26-1017 Page-1
February 19, 2026
Ontario Municipal Utilities Company
1425 S. Bon View Avenue
Ontario, CA 91764
Attn: Luke Zhipeng QU
Subject: Request for Proposal: Construction Management and Inspection for OMUC Contract No. UT 1072 – Euclid Avenue Recycled Water System Project
To Mr. Zhipeng Qu:

In response to your Request for Qualifications dated January 28, 2026, AKM Consulting Engineers is pleased to submit this Proposal to provide construction management services for OMUC Contract No. UT1072, Euclid Avenue Recycled Water System Project for the Ontario Municipal Utilities Company (OMUC). Our submittal reflects our understanding of the scope of work based upon the RFP, OMCU’s responses to questions and information provided by OMUC.

Contact information for this proposal is:

Emin Kayiran, CPII - Vice President/Director of Construction Management Services AKM Consulting Engineers, Inc. - 553 Wald, Irvine, CA 92618 Phone: 949-753-7333 – Email: [email protected]
AKM has assembled a highly experienced Project Team specializing in the design, operations, and construction management of recycled water pipeline projects, with recent roles on similar assignments. The team will be led by Mr.

Emin Kayiran, CPII, as Project Manager, bringing over 21 years of inspection and construction management experience.

He will act as OMUC’s contract representative and will oversee the work of our proposed Construction Manager, Mr.

Mike Fredriksz, and Inspector, Mr. Garrick Frost.

Our proposed Construction Manager is Mr. Mike Fredriksz, who has over 30 years of experience providing construction management, inspection and operations and maintenance services. Prior to joining AKM in 2017, Mr. Fredriksz served as the Inspection Supervisor for the Irvine Ranch Water District and in that role, was responsible for overseeing the construction of multiple welded steel and PVC pipeline projects within the public right-of-way, all of which included coordinating with multiple partnering agencies during construction.

Mr. Fredriksz possesses direct experience in pipeline operations, construction of siphons, removals and replacements, hydrostatic testing, flushing, and coordinating tie-ins. He has cooperatively worked with partnering and permitting agencies to complete projects on-time and within budget. Mr. Fredriksz also has recent experience working with OMUC as he has completed services as the Construction Manager for OMUC’s Equipping of Well 43 project.

Mr. Garrick Frost possesses unparalleled experience in recycled waterline construction within the public right-of-way.

He has been responsible for inspecting multiple welded steel pipeline installations, including all appurtenances, and cathodic protection systems.

Contained within this proposal is our staffing plan, our specific methodology and approach to achieving the scope of work requested by OMUC, our proposed fee for accomplishing the work, as well as project profiles highlighting the successful completion of similar assignments by AKM. We appreciate the opportunity to submit our proposal and look forward to being of service to Ontario Municipal Utilities Company on this most important project. Should you have any questions regarding our submittal, or require additional information, please do not hesitate to contact the undersigned.

Very truly yours,
AKM Consulting Engineers
Emin Kayiran
Vice President/Director of Construction Management Services 1104
AKM Prop. 26-1017 Page-2
Contract. UT1072

1. Staffing Resources
All construction management, inspection, and administrative support services performed by AKM are structured to respond to the technical and managerial requirements of the project by assigning senior, highly qualified personnel to the scope of work tasks. They function in a simple organization with clear lines of delegated authority and responsibility. The key to successful completion of the work for OMUC will be our proposed Construction Manager. He will be responsible for day-to-day communications with the Inspector, Contractor, OMUC and Permitting Agency Inspectors, City Engineering staff assigned to the project, concerned members of the public, and in many ways, his effectiveness will dictate how efficiently the project is completed. This position requires a team member who is knowledgeable of the project’s plans and specifications; possesses excellent communication skills, is confident, and capable of exercising basic fairness when confronted with conflicts or differences of opinions, while still protecting OMUC’s interests and those of the project. Our Project Team has been assembled based upon our understanding of the scope of work, our experience with similar projects and our insight into the project’s needs. Resumes are provided at the end of this proposal.

Mr. Emin Kayiran will serve as the responsible representative to OMUC during the project and regularly review our Construction Manager and Inspector’s work product and deliverables. Mr. Kayiran will develop the project specific management and inspection protocol and attend progress meetings as needed. He will additionally be responsible for managing the project budget and regularly reporting its status to OMUC. Our proposed team will be available for the duration of the project.

Project Manager – Emin Kayiran, CPII - Mr. Emin Kayiran, CPII, is the Vice President and Director of Construction Management Services with AKM. He has over 21 years of responsible experience in the inspection and construction management of pipelines, wells, treatment facilities, pump stations and other pumping facilities, pressure reducing facilities, forcemains, complex reinforced concrete structures including, concrete tanks within treatment facilities, sumps, wet wells and valve vaults, sheet piling, deep excavations, ground remediation, dewatering, shut-downs, tie-ins, commissioning and testing, installation of emergency power generators and automatic transfer switches, electrical and control systems for water resource facilities, as well as special protective linings and coatings. Several of Mr. Kayiran’s completed projects involved close coordination amongst the project owner, their operations staff, outside stakeholders and the Contractor in order to achieve varying project objectives within constrained project sites and scheduling timeframes. Additionally, he is trained in schedule and delay analysis including Primavera P6. He has the requisite knowledge, experience and demonstrated ability for successfully completing challenging work with demanding schedules and budgets.

Mr. Kayiran served as a Subject Matter Expert for the American Public Works Association in support of an overhaul of their public infrastructure inspection training and certification material. During this effort, he co-authored a new training module on the inspection of pumping and treatment facilities for inclusion in the updated manual which was published in April of 2019
Construction Manager – Mike Fredriksz - Mike Fredriksz brings over 30 years of experience in construction management and inspection for capital improvement initiatives and large-scale residential development projects.

Before joining AKM, he served as Inspection Services Supervisor at Irvine Ranch Water District. His extensive portfolio includes water, recycled water, and wastewater facilities; reservoirs; pipelines; pump stations; pressure reducing stations; sewer lift stations; treatment plants; buildings; and street rehabilitation, including slurry seal projects.

Mr. Fredriksz has a strong track record of collaboration with a wide range of stakeholders, including the public, partner agencies, elected officials, developers, contractors, engineers, and architects. His responsibilities have encompassed construction activity monitoring, traffic control coordination, daily reporting, compliance verification, record drawing maintenance, final inspections, and oversight of testing and facility startups.

He is also experienced in project management processes, including handling submittals, RFIs, and change orders.

Notably, he has managed multiple welded steel pipeline projects, several involving jack-and-bore operations and coordination across multiple agencies. Mr. Fredriksz is currently completing services as the Construction Manager for the Equipping of Well 43 Project with OMUC.

Construction Inspector – Garrick Frost - Mr. Frost has over 29 years of experience in construction inspection and supervision. He has a strong background in capital improvement and subdivision projects. His experience includes inspections of water, reclaimed water, and sewer pipelines, as well as pumping stations, pressure reducing stations, water reclamation facilities, and sewage lift stations. In addition to inspection experience, he has served in supervisory roles with field crews and was responsible for maintenance and installation of civil and mechanical systems. 1105
AKM Prop. 26-1017 Page-3
Contract. UT1072

2. Method to Accomplish Work
Ontario Municipal Utilities Company (OMUC) is implementing a significant recycled water infrastructure expansion along Euclid Avenue and Riverside Drive to reduce reliance on imported potable water supplies and improve long-term water sustainability within the City.

The project includes:
• Approximately 3,025 LF of 8-inch PVC recycled water main along Flora Street, Vine Avenue, and F Street • Approximately 5,175 LF of 8-inch PVC recycled water main along Euclid Avenue between Holt Boulevard and 4th Street
• Approximately 175 LF of 8-inch PVC main along B Street and E Street • Approximately 11,150 LF of 24-inch CML&C welded steel pipe recycled water main along Riverside Drive between Euclid Avenue and Vineyard Avenue
• Approximately 125 LF of 8-inch PVC recycled water main near Euclid Avenue and Riverside Avenue The plans indicate extensive work within heavily traveled arterial corridors, including Euclid Avenue and Riverside Drive. Construction will occur during restricted daytime hours (8:30 a.m. to 3:30 p.m.) and must be completed within a 450-calendar-day contract duration .

This project presents several notable complexities:
• Installation of large-diameter 24-inch welded steel recycled water main with double-welded joints and field coating requirements along Riverside Drive
• Multiple valve installations including 24-inch butterfly valves and associated appurtenances • Numerous air release/vacuum assemblies, blow-off assemblies, and service connections • Extensive pavement restoration including grind and overlay limits • Work adjacent to existing high-pressure gas, overhead electrical, and underground utility corridors as shown throughout the Riverside Drive plan sheets
• Traffic signal loop removals and replacements
• Irrigation conversions and restoration
Because the work spans two major corridors and multiple intersecting streets, coordination of sequencing, testing, tieins, traffic control, and stakeholder communication will be critical to project success. AKM understands that our role is to provide comprehensive Construction Management and Inspection support throughout pre-construction, construction, and post-construction phases. We recognize that this project requires not only strong field oversight, but also disciplined documentation control, proactive issue resolution, and schedule management to ensure successful completion within the allotted 450 days.

Proposed Method to Accomplish the Work
AKM has thoroughly reviewed the Scope of Services and accepts it in its entirety. Successful delivery of UT1072 will require disciplined construction management, experienced pipeline inspection, and proactive coordination across multiple stakeholders. Our methodology is built around proactive planning, disciplined field oversight, structured documentation, and constant communication with OMUC. Based on our review of the plans RFP, and al documents provided with this solicitation, the most critical project challenges include:
• Management of long linear 24-inch welded
steel pipeline installation
• Coordination of multiple tie-ins, testing, and
flushing
• Working within high-traffic arterial corridors
under restricted working hours
• Utility conflict mitigation
• Maintaining strict schedule control over a
450-day contract
• Comprehensive documentation and claim
avoidance

1. Pre-Construction Phase – Setting the Foundation
Contract Document Review and Risk Identification
1106
AKM Prop. 26-1017 Page-4
Contract. UT1072
Prior to construction, AKM will conduct a comprehensive review of the plans, specifications, and special provisions. We will prepare a written risk matrix identifying potential construction challenges and bring these to OMUC’s attention early to minimize disruption. Particular focus will be placed on:
• 24-inch CML&C WSP installation
requirements, welding procedures, and
coating specifications
• Locations of steel casings, reducers, blind
flanges, and future connection points
• Utility conflict areas identified on plan sheets
• Traffic signal loop replacement areas
• Pavement restoration limits and grind/overlay
requirements
Document Control Implementation
AKM will establish a structured document control system consistent with OMUC requirements. Structured workflows will be programmed at the outset to ensure accountability and response tracking. We propose use of a cloud-based system, Procore, to manage:
• Submittals and RFIs
• Change orders
• Daily reports
• Photo documentation
• Decision log
• Schedule tracking
• Pay applications
Utility Coordination
Given the extent of work along Riverside Drive and Euclid Avenue, AKM will coordinate preliminary potholing verification and confirm conflict resolution strategies with the Contractor and Engineer of Record prior to trenching operations.

2. Construction Phase – Proactive Field Leadership
Full-Time Inspection and Oversight
As required, AKM will provide a superbly qualified inspector onsite during all construction activities. Non-conforming work will be documented promptly and corrective action required in writing. Inspection focus areas will include:
• Proper trench excavation and shoring
• Pipe bedding, installation, and joint restraint
• Weld inspection and coating verification for
24-inch steel main
• Installation of valves, air/vac assemblies, and
blow-offs
• Service connections and meter installations
• Traffic control compliance
• SWPPP/WPCP compliance
• Pavement restoration
Large-Diameter Steel Main Installation Oversight
The 24-inch CML&C welded steel pipe along Riverside Drive represents the most technically demanding component of the project. AKM will:
• Verify welder qualifications and WPS
compliance
• Monitor joint preparation, welding,
inspection, and coating
• Confirm proper installation of butterfly valves
and reducers
• Oversee hydrostatic testing and coating
repairs
• Coordinate AR/AV assembly installations
Improper steel main installation can result in costly rework and delays; therefore, heightened oversight will be maintained.

Testing, Flushing, and Tie-In Coordination
Before any tie-in to the recycled water system, AKM will coordinate:
• Hydrostatic testing
• Flushing
• Chlorination and dechlorination
• Regulatory-compliant discharge
Coordination with OMUC Operations will be scheduled well in advance to minimize service disruptions. 1107
AKM Prop. 26-1017 Page-5
Contract. UT1072
Schedule Management
With a 450-day contract duration and limited daily working hours, schedule control is critical. AKM will:
• Conduct a detailed baseline CPM schedule
review
• Verify logical ties between submittals,
procurement, and field activities
• Monitor weekly look-ahead schedules
• Issue Weekly Statement of Working Day
reports
• Identify early warning signs of delay
Special attention will be given to steel pipe procurement lead times and specialty valve deliveries.

Change Order and Claims Management
AKM will proactively identify potential claims and maintain a claims log. For each proposed change order, we will:
• Evaluate entitlement
• Perform independent quantity and cost
review
• Assess schedule impacts
• Provide written recommendations to OMUC
Early documentation and timely analysis will reduce dispute potential.

Public and Traffic Coordination
Work along Euclid Avenue and Riverside Drive requires disciplined traffic control oversight. AKM will:
• Monitor contractor compliance with approved
traffic control plans
• Verify signal loop replacements
• Ensure pedestrian access is maintained
• Coordinate with City staff for public
communication

3. Post-Construction – Efficient Closeout
AKM will lead punch list development with OMUC staff and track corrective actions through completion.

Closeout efforts will include:
• Verification of record drawings
• Warranty documentation
• Lien releases
• Final quantity reconciliation
• Final pay application review
• Archiving of project documents
Our goal is clean, defensible project closeout without residual disputes.

The Euclid Avenue Recycled Water System Project is a major capital investment that spans two critical corridors and includes both distribution-scale PVC pipeline and large-diameter welded steel transmission main. Its success depends on proactive leadership, disciplined inspection, and structured documentation.

AKM’s approach emphasizes:
• Early risk identification
• Continuous schedule control
• Aggressive documentation management
• Technical oversight of steel pipeline
installation
• Proactive claim avoidance
• Full alignment with OMUC staff
We are prepared to support OMUC from pre-construction through final acceptance and ensure this project is delivered safely, efficiently, and within the contract duration.
1108
AKM Prop. 26-1017 Page-6
Contract. UT1072

3. Fee
To complete the proposed scope of services, we estimate the following budget will be required. Work will be performed on a time and material, not to exceed basis, in accordance with AKM’s rate schedule established as part of OMUC On-Call Construction Management contract, included in this section.

AKM CONSULTING ENGINEERS - RATE SCHEDULE
Labor Classification
Hourly
Rate
Hourly
Rate
Hourly
Rate
2024 2025 2026
Principal $253 $261 $269
Principal Engineer $253 $261 $269
Project Manager $246 $253 $261
Project Engineer $234 $241 $248
Senior Construction Manager $233 $240 $247
QA/QC Manager $233 $240 $247
Senior Engineer $215 $221 $228
Construction Manager $200 $206 $212
Senior Field Engineer / Inspector $197 $203 $209
Field Engineer / Inspector $173 $178 $184
Associate Engineer $167 $172 $177
Staff Engineer $148 $153 $157
Financial Analyst $136 $140 $144
Senior Designer / Senior CADD Technician $117 $121 $124 Designer / CADD Technician $109 $112 $115
Assistant Engineer $107 $111 $114
Engineering Technician $99 $102 $105
Engineering Aide $84 $86 $89
Office Support $84 $86 $89
Data or Word Processing $81 $84 $86
Out of pocket expenses (blueprinting, reproduction and printing, delivery, etc.) will be invoiced at cost plus 10%.

Subcontracted services will be marked up 10% in order to cover costs associated with administration, coordination and management of subcontractors. Mileage will be invoiced at $0.75/mile. This schedule of rates is in effect until December 31, 2026, at which time it may be adjusted.
1109
AKM Prop. 26-1017 Page-8
Contract. UT1072

4. Other Information
AKM Consulting Engineers has a long and distinguished track record in providing quality construction management and inspection services for water, recycled water, and wastewater systems. Specific examples of AKM's experience are listed below. These projects are representative of the types of work that AKM staff members have completed. Please note, all projects listed were completed within budget and schedule. Contacts are included with each of projects for your reference.

ANDERSON PARK RECYCLED WATER IRRIGATION CONVERSION
West Basin Municipal Water District: 17140 South Avalon Boulevard, Suite 210, Carson, CA 90746 Contact: Kevin Cullen, Engineer III (310) 217-2411 [email protected] AKM Consulting Engineers provided construction managemet and inspection services for the Project which consisted of converting the existing irrigation water supply system at Anderson Park from potable water to recycled water. The scope of work includeed:
• Connection and disconnection of irrigation supply piping • Installation of required signage and identification tags • Replacement of quick couplers
• Installation of a backflow prevention device and pressure regulator • Meter connections and disconnections
• Cross-connection testing and verification
• Restoration of disturbed landscaping and hardscape surfaces This project was funded in part through the Proposition 84 Funding Program.

WRCRWA PIPELINE PROJECT
City of Corona: 400 S Vicentia Avenue, Corona, CA 92882 Contact: Nathan Armendariz (951) 736-2264 [email protected] AKM Consulting Engineers provided
construction management and inspection
services for the Project which involved
installation of approximately 3900LF of 20”
DIP and 100LF of 12” PVC pipe. The pipeline
extends through three jurisdictions (City of
Norco, City of Eastvale, and USACE).

Challenges to the project included work
within an existing and operable treatment
plant and within public right-of-way.

LOS ANGELES “SOFI” STADIUM AND ENTERTAINMENT DISTRICT AT HOLLYWOOD PARK RECLAIMED WATER PLANS PHASE 1
Completed Under On-Call Services Contract
West Basin Municipal Water District: 17140 South Avalon Boulevard, Suite 210, Carson, CA 90746 Contact: Kevin Cullen, Engineer III (310) 217-2411 [email protected] AKM provided construction management and inspection for the project which involved the construction of approximately 13,500 lineal feet of 8 inch to 12 inch PVC recycled water pipe. The project included valves, air/vacuum release valves, blow-offs, and hydrostatic testing and flushing of the completed pipeline. The pipeline was designed to supply recycled water for irrigation at the Los Angeles Rams/Los Angeles Chargers SoFi Stadium and Entertainment District, as well as to fill a lake within the district. Constructed by Turner/AECOM, the stadium’s developer, the pipeline will be owned and operated by West Basin Municipal Water District. With 49 different contractors working on-site daily, effective communication and coordination at the field level were essential to maintaining the project schedule. Work on this portion of the project was intermittently paused to accommodate other stadium construction activities, requiring AKM to be highly responsive to schedule changes and to restart work on short notice.
1110
AKM Prop. 26-1017 Page-9
Contract. UT1072

NORTHROP GRUMMAN RECYCLED WATER LATERAL
West Basin Municipal Water District: 17140 South Avalon Boulevard, Suite 210, Carson, CA 90746 Contact: Veronica Govea, Project Manager [email protected] 310-660-6269 AKM Consulting Engineers provided construction management and inspection services for the project which required installation of a 6- inch recycled water service between two existing 6-inch recycled water pipeline systems. Work included furnishing all materials, labor, equipment, fuel, tools, transportation, and services for construction, testing, and completion of the project. Work also included mobilization and demobilization, utility potholing, installation of recycled water service lateral, valves, hydrostatic testing as well as trench repair pavement. The project required permits from the City of Redondo Beach and the City of Manhattan Beach as the project boundaries were on the boarder of the two Cities.

CATHODIC PROTECTION IMPROVEMENTS PROJECT
West Basin Municipal Water District: 17140 South Avalon Boulevard, Suite 210, Carson, CA 90746 Contact: Kevin Cullen (310) 217-2411 [email protected] AKM Consulting Engineers provided construction management and inspection services for the Cathodic Protection Improvements Project. Work included the repair and rehabilitation of existing cathodic protection (CP) test stations, the construction of new CP test stations, the construction of new corrosion monitoring test stations, and the repair of discontinuous joints within West Basin’s recycled water distribution system. The Project requires work on 22 metallic pipelines, within 12 separate permitting jurisdictions, which convey secondary effluent, recycled water, barrier injection water, and brine wastewater. Several of the 22 work locations were constrained by specific dates and windows of time imposed by the various permitting agencies. The project sequencing was therefore critical to ensuring that all work could be completed within the Contract duration.

The project extended through the cities of Torrance, Manhattan Beach, El Segundo, Redondo Beach, Los Angeles, Hawthorne, Carson, Lawndale, Gardena, and Inglewood.

CONSTRUCTABILITY REVIEW FOR RIVERSIDE-JURUPA RECYCLED WATER LINE PROJECT Ontario Municipal Utilities District: 1425 South Bon View Avenue, Ontario, CA 91761 Contact: Omar Gonzales, Senior Associate Civil Engineer (909) 395-2578 [email protected] AKM Consulting Engineers provided construction management and inspection services for the Project which involved installation of approximately 3900LF of 20” DIP and 100LF of 12” PVC pipe. The pipeline extends through three jurisdictions (City of Norco, City of Eastvale, and USACE). Challenges to the project included work within an existing and operable treatment plant and within public right-of-way. 1111
TITLE
Vice President
Director of Construction
Management

REGISTRATION
APWA – Certified Public
Infrastructure Inspector

YEARS OF EXPERIENCE
21 years (21 with AKM)

EDUCATION
Civil Engineering Studies –
CSU Long Beach
B.S. Business Administration
– University of Arizona

CAREER HIGHLIGHTS
Subject Matter Expert for the
American Public Works
Association
Co-Author of a new training
module on the inspection of
pumping and treatment
facilities – Published in 2019
Authored “CPII as a standard
of practice” – Published
September 2014
Co-presenter and speaker for
“De-mystifying Risk” and ENR
webinar

EMIN KAYIRAN, CPII
Project Manager
Mr. Emin Kayiran, CPII, is the Director of Construction Management Services with AKM. He has over 21 years of responsible experience in the inspection and construction management of pump stations; pipelines, treatment facilities; forcemains; complex reinforced concrete structures including concrete tanks within treatment facilities, sumps, wet wells and valve vaults; sheet piling; deep excavations; ground remediation; dewatering; shut-downs; tie-ins; commissioning and testing; installation of emergency power generators and transfer switches; electrical and control systems for water resource facilities; as well as special protective linings and coatings. Mr. Kayiran also possesses a wealth of experience in managing, coordinating and overseeing materials testing and special inspection during the construction of water resources facilities. Several of the Mr. Kayiran’s completed projects involved close coordination amongst the project owner, their operations staff, outside stakeholders and the Contractor in order to achieve varying project objectives within constrained project sites and scheduling timeframes.

Additionally, Mr. Kayiran has provided claims management, cost control, change order preparation, change order negotiation, warrantee inspections, schedule review and analysis, warrantee work coordination with contractors and constructability review services to special districts and municipal agencies. He is trained in schedule and delay analysis including Primavera P6.

Anderson Park Recycled Water Irrigation Conversion | West Basin Municipal Water District Role: Project Manager | AKM Consulting Engineers provided construction managemet and inspection services for the Project which consisted of converting the existing irrigation water supply system at Anderson Park from potable water to recycled water. The scope of work includeed:Connection and disconnection of irrigation supply piping; Installation of required signage and identification tags; Replacement of quick couplers; Installation of a backflow prevention device and pressure regulator; Meter connections and disconnections; Crossconnection testing and verification; Restoration of disturbed landscaping and hardscape surfaces. This project is funded in part through the Proposition 84 Funding Program.

Unit 8 Second Gap Connection Pipeline | Water Replenishment District Role: Project Manager | AKM provided construction management and inspection services for the project which involved the construction of approximately 3,000 linear feet of recycled water pipeline using ductile iron and welded steel pipe, mostly ranging from 6 to 24 inches in diameter. It also included 1,900 feet of 4-inch spare conduit and 51 feet of relocated 8-inch steel drain pipe. Additional work consisted of potholing and protecting existing subsurface utilities, remodeling sewer and water house connections as needed, and conducting CCTV inspections of Los Angeles' existing sanitary sewer and storm drain systems before and after construction. The project included installation of various pipe appurtenances such as butterfly valves, gate valves, air valves, blow-offs, and several flow meter and valve vaults of varying sizes. Electrical and control systems, including PLCs and SCADA integration, were installed, along with a galvanic cathodic protection system. Construction activities involved hydrostatic pressure testing, system startup and commissioning, traffic control with temporary striping and restoration, excavation, dewatering, paving with both asphalt and concrete, and removal of conflicting existing pipelines totaling 103 linear feet.

Los Angeles Stadium and Entertainment District at Hollywood Park Reclaimed Water Plans Phase I | West Basin Municipal Water District
Role: Project Manager | AKM provided Construction Inspection for the project which involved the construction of approximately 13,500 lineal feet of 8 inch to 12 inch PVC recycled water pipe. Also included are valves, air/vacs and blow-offs, as well as hydrostatic testing and flushing of the completed pipeline. The pipeline will serve recycled water for irrigation at the new Los Angeles Rams Stadium and Entertainment District, as well as filling a proposed lake within the entertainment district. The facility was constructed by Turner/AECOM, the 1112
TITLE
Vice President
Director of Construction
Management

REGISTRATION
APWA – Certified Public
Infrastructure Inspector

YEARS OF EXPERIENCE
21 years (21 with AKM)

EDUCATION
Civil Engineering Studies –
CSU Long Beach
B.S. Business Administration
– University of Arizona

CAREER HIGHLIGHTS
Subject Matter Expert for the
American Public Works
Association
Co-Author of a new training
module on the inspection of
pumping and treatment
facilities – Published in 2019
Authored “CPII as a standard
of practice” – Published
September 2014
Co-presenter and speaker for
“De-mystifying Risk” and ENR
webinar

EMIN KAYIRAN, CPII
Project Manager
developer of the stadium and entertainment district; yet will be owned and operated by West Basin Municipal Water District. With 49 different contractors working on the site each day, communication and coordination at the field level was critical to maintain schedule.

Cathodic Protection Improvements Project | West Basin Municipal Water District Role: Project Manager | AKM Consulting Engineers provided construction management and inspection services for the Cathodic Protection Improvements Project. Work included the repair and rehabilitation of existing cathodic protection (CP) test stations, the construction of new CP test stations, the construction of new corrosion monitoring test stations, and the repair of discontinuous joints within West Basin’s recycled water distribution system. The Project required work on 22 metallic pipelines, within 12 separate permitting jurisdictions, which convey secondary effluent, recycled water, barrier injection water, and brine wastewater. Several of the 22 work locations are constrained by specific dates and windows of time imposed by the various permitting agencies. The project sequencing was therefore critical to ensuring that all work could be completed within the Contract duration.

Riverside – Jurupa Recycled Water Improvement Project | Ontario Municipal Utilities Company
Role: Constructability Review Project Manager | AKM Consulting Engineers conducted a thorough constructability review for the planned pipeline project for the Ontario Municipal Utilities Company (OMUC), The Riverside – Jurupa Recycled Water Project. The Project consists of the installation of approximately 12,300 linear feet of PVC recycled water pipeline ranging in size from 8-inch to 16-inch, within arterial streets and included appurtenant valves, fire hydrants, air/vacs, blow-offs and cement mortar lined and coated steel pipe offsets. Also included is a 30-foot deep jack and bore operation under a flood control channel.

Northrop Grumman Recycled Water Lateral | West Basin Municipal Water District Role: Project Manager/Construction Manager | AKM Consulting Engineers provided construction management and inspection services for the project which required installation of a 6-inch recycled water service between two existing 6-inch recycled water pipeline systems. Work included furnishing all materials, labor, equipment, fuel, tools, transportation, and services for construction, testing, and completion of the project. Work also included mobilization and demobilization, utility potholing, installation of recycled water service lateral, valves, hydrostatic testing as well as trench repair pavement. The project required permits from the City of Redondo Beach and the City of Manhattan Beach as the project boundaries were on the boarder of the two Cities.

Wastewater Treatment Plant and Recycled Water Transmission System Expansion | City of San Clemente
Role: Construction Manager | AKM provided Constructability Review of the final design documents for the project which involved two (2) Title 22 effluent pump stations within the existing wastewater treatment plant, 48,000 LF of 6-inch PVC C-900 and D.I. pipeline, 8-inch PVC C-900 pipeline, 12-inch PVC C-900 pipeline, 16-inch D.I. pipeline, and 20-inch D.I. recycled water main in the City of San Clemente including one pressure reducing station, and cathodic protection for D.I. pipelines. The work also included a 0.2 MG pre-stressed post tensioned concrete potable water forebay reservoir and the conversion of a 2 MG pre-stressed post tensioned concrete reservoir to recycled water usage. The constructability review included a thorough review of the plans and specifications, and several field inspections of the existing facilities. The constructability review identified potential utility conflicts as well as recommended additions and modifications to facility startup and testing phasing/requirements to the design team.

JRWSS LTM Pipeline Replacement and Slope Repair at Calle Vista Torito | South Coast Water District
1113
TITLE
Vice President
Director of Construction
Management

REGISTRATION
APWA – Certified Public
Infrastructure Inspector

YEARS OF EXPERIENCE
21 years (21 with AKM)

EDUCATION
Civil Engineering Studies –
CSU Long Beach
B.S. Business Administration
– University of Arizona

CAREER HIGHLIGHTS
Subject Matter Expert for the
American Public Works
Association
Co-Author of a new training
module on the inspection of
pumping and treatment
facilities – Published in 2019
Authored “CPII as a standard
of practice” – Published
September 2014
Co-presenter and speaker for
“De-mystifying Risk” and ENR
webinar

EMIN KAYIRAN, CPII
Project Manager
Role: Project Manager | AKM Consulting Engineers is providing construction management and full-time field inspection services for the JRWSS Local Transmission Main (LTM) Pipeline Replacement and Slope Repair Project at Calle Vista Torito in San Clemente, California, for South Coast Water District. This complex infrastructure effort involves slope stabilization followed by replacement of approximately 445 linear feet of a compromised 1961-era transmission main, installation of a new owner-furnished 24-inch ball valve, abandonment of the existing concrete cylinder pipe, and removal of temporary bypass piping installed after a major failure in February 2021. The project also includes access improvements, drainage and erosion control, shoring and dewatering systems, and retaining wall work within a steep ravine located between private residences and the Caltrans I-5 right-of-way. AKM’s responsibilities include contractor coordination, schedule and shutdown planning, submittal and RFI management, field documentation, change order evaluation, permit compliance monitoring, and closeout support, ensuring safe execution and uninterrupted operation of this critical regional water transmission facility.

WRCRWA Reclaimed Waterline Improvements | City of Corona Role: Project Manager | AKM Consulting Engineers provided construction management and inspection services for the Project which involved installation of approximately 3900LF of 20” DIP and 100LF of 12” PVC pipe. The pipeline extends through three jurisdictions (City of Norco, City of Eastvale, and USACE). Challenges to the project included work within an existing and operable treatment plant and within public right-of-way.

Joint Transmission Main Vault Upgrades | South Coast Water District Role: Project Manager | AKM provided construction management and inspection for the project which consisted of valve actuator / operator replacements, valve replacements, pipeline improvements, pump and drainage pipe installation and retaining wall. Also included was the demolition of portions of existing retaining walls and construction of new walls and concrete slabs. Work was also performed at three additional vaults which included modifications to Vault 1, 2, and 4, assessing viability of existing 42-inch, 30-inch, and 24-inch ball valves, replacing new gear boxes and operators, removing portions of pipe and installing dismantling joint, removal of vault’s top slab and manway, extending vault walls, and provided new aluminum hatches, and provided and installing new air release valve assembly. The pipe and valve replacements were completed during a coordinated 14 day shutdown of the JTM pipeline.

Watermain Improvements at Center, Walnut, and Maple | City of El Segundo Role: Project Manager | AKM provided construction management and inspection for the project which consisted of approximately 3,500 LF of 10” DIP, 850 LF of 8” DIP, 1,000 feet of a temporary high-line system to serve customers while replacements were being conducted on Center Street, appurtenant valves, new fire hydrants, fire hydrant abandonments; 8 connections to existing system; re-establishment of water services; installation of new service meters; hydrostatic testing of new water main; chlorination and de-chlorination of water main; and final flushing. Also included was rehabilitation of concrete paving, cross gutters, curb/gutter/sidewalks, and a grind and cap of the streets along the pipe alignment.

Watermain Improvements at Virginia, Oak, and Bayonne | City of El Segundo Role: Project Manager | AKM provided construction management and inspection for the project which consisted of approximately 4,000 LF of 8” DIP, appurtenant valves, new fire hydrants, fire hydrant abandonments; 108 connections to existing system; re-establishment of water services; installation of new service meters; hydrostatic testing of new water main; chlorination and de-chlorination of water main; and final flushing. Also included was rehabilitation of concrete paving, cross gutters, curb/gutter/sidewalks, and slurry seal. 1114
TITLE
Vice President
Director of Construction
Management

REGISTRATION
APWA – Certified Public
Infrastructure Inspector

YEARS OF EXPERIENCE
21 years (21 with AKM)

EDUCATION
Civil Engineering Studies –
CSU Long Beach
B.S. Business Administration
– University of Arizona

CAREER HIGHLIGHTS
Subject Matter Expert for the
American Public Works
Association
Co-Author of a new training
module on the inspection of
pumping and treatment
facilities – Published in 2019
Authored “CPII as a standard
of practice” – Published
September 2014
Co-presenter and speaker for
“De-mystifying Risk” and ENR
webinar

EMIN KAYIRAN, CPII
Project Manager
Watermain and Street Improvements at Center Street and Pine Avenue | City of El Segundo Role: Construction Manager | AKM provided construction management and inspection for the project which consisted of the construction of 1,500 linear feet of 10-inch ductile iron watermain pipe; 50 linear feet of 6-inch ductile iron watermain; appurtenant valves; fire hydrant abandonments; ten (10) connections to the existing system; reestablishment of water services; hydrostatic testing of the new watermain; chlorination and then subsequent dechlorination of the new watermain and final flushing. The project also included rehabilitation of asphalt concrete paving within the limits of the watermain alignment; reconstruction of an existing concrete cross gutter; reconstruction of curb, gutter and sidewalk improvements; slurry seal of Center Street and Pine Avenue within the limits of construction and traffic striping. Project challenges included the establishment of one way traffic control and a detour around the work area which was within several hundred feet of two (2) schools. 16-inch Transmission Main for Well No. 9 | City of Fountain Valley Role: Construction Manager/Inspector | AKM provided construction management and inspection for the 16-inch cement mortar-lined and coated welded steel discharge pipe (2,800 LF), from the City’s new Well No. 9 facility to a connection with the existing distribution system within the busy intersection of Warner Avenue and Bushard Street. The work also included a crossing of the Ocean View Channel, and repaving of the three (3) southbound lanes of Bushard and pavement rehabilitation of Gardena Avenue. Additional responsibilities included reviewing the Contractor’s flushing, chlorination, de-chlorination and hydrostatic testing plans, coordination of the testing with the City’s operation and maintenance staff as well as observing the flushing, chlorination, de-chlorination and hydrostatic testing in the field.

Tract 16929 16-Inch Steel Cement Mortar Lined and Coated Watermain | City of Fountain Valley
Role: Resident Engineer | AKM provided construction management and inspection for the installation of a 16-Inch, welded joint, cement mortar lined and coated watermain through a new housing development under construction, to eventually be connected to a proposed ground water well and pumping facility adjacent to the development. The work included excavation and trenching, verifying proper storage and handling procedures of the pipe, verifying proper backfill, inspecting the welding of the joints; inspecting the coating of exterior and interior joints, observing compaction, facilitating hydrostatic testing and CCTV inspection of the pipe.

Inspection of Golden State Water Company Inverted Waterline Siphon and Sewer Repair | City of Cypress
Role: Resident Engineer | AKM provided construction management and inspection for the construction of a 12-inch ductile iron inverted siphon installed by the Golden State Water Company to avoid a conflict for a future box culvert project to be completed by the City of Cypress. The work included removing an approximately 50-foot section of asbestos cement pipe (ACP), disposing of the ACP in accordance with applicable hazardous material handling and disposal requirements, tying the new ductile iron pipe into existing valves on each side of the new pipe, a polyethylene encasement, backfill, concrete paving of the trenched area and a closed circuit television inspection. While installing the line, the contractor damaged an existing City of Cypress 12-inch vitrified clay pipe sewer line and replaced approximately 40- feet of the VCP line, including replacing the crushed rock bedding and backfill. Due to high groundwater conditions, a continuous dewatering system complete with effluent filtering station was maintained during the work.
1115

YEARS OF EXPERIENCE
35 years (8 with AKM)

HIGHLIGHTS
Construction oversight of
capital improvements and
large residential development
projects
Previously Inspection Services
Supervisor for Irvine Ranch
Water District
Experience includes: water,
recycled water, and
wastewater facilities
Reservoirs, pipelines, pump
stations, lift stations, buildings,
treatment plants, street
rehabilitation, slurry seal

MIKE FREDRIKSZ
Senior Construction Manager
Mike Fredriksz has more than 35 years of experience providing construction oversight of Capital Improvements and large residential development projects. Mike's project experience includes water and wastewater facilities, reservoirs, pipelines, pump stations, sewer lift stations, buildings, treatment plants, street rehabilitation and slurry seal. He has been extensively involved with multiple stakeholders including the public, elected officials, developers, contractors, engineers and architects. His responsibilities have included monitoring construction activities, traffic control, preparing daily construction reports, verifying compliance with plans and specifications, maintaining record drawings, final inspections and project startups. Mike has knowledge and experience with project management, submittal process and requests for information and change orders.

Anderson Park Recycled Water Irrigation Conversion | West Basin Municipal Water District Role: Construction Manager | AKM Consulting Engineers provided construction managemet and inspection services for the Project which consisted of converting the existing irrigation water supply system at Anderson Park from potable water to recycled water. The scope of work includeed:Connection and disconnection of irrigation supply piping; Installation of required signage and identification tags; Replacement of quick couplers; Installation of a backflow prevention device and pressure regulator; Meter connections and disconnections; Crossconnection testing and verification; Restoration of disturbed landscaping and hardscape surfaces. This project is funded in part through the Proposition 84 Funding Program.

WRCRWA Reclaimed Waterline Improvements | City of Corona Role: Construction Manager | AKM Consulting Engineers provided construction management and inspection services for the Project which involved installation of approximately 3900LF of 20” DIP and 100LF of 12” PVC pipe. The pipeline extends through three jurisdictions (City of Norco, City of Eastvale, and USACE). Challenges to the project included work within an existing and operable treatment plant and within public right-of-way.

Jeffrey Road South Domestic and Reclaimed Water Mains | Irvine Ranch Water District Role: Construction Inspector | Provided construction inspection for the $5-million excavation and installation of reclaimed water, 3600 LF of 30" CMLC and C steel pipe and appurtenances, 720 LF of 42" steel casing, jack and bore under the 1-5 Freeway, 1020 LF of 6" PVC C-9 00 pipe, 120 LF of slurry backfill, 17,700 SF grind and cap pavement and striping. The project also included the excavation and installation of domestic water, 2000 LF of 24" cement mortar lined and coated steel pipe, 1000' LF 12" PVC AWWA C-900, 400 LF 8" C-900 and 300 LF slurry backfill.

Inspected all welding on the steel casing and grouting the exterior and annular space per the requirement of the local agency. Inspected the final restoration of the street asphalt the grinding and capping of pipe trenches and then a final slurry seal and striping.

Cathodic Protection Improvements Project | West Basin Municipal Water District Role: Construction Manager | AKM Consulting Engineers provided construction management and inspection services for the Cathodic Protection Improvements Project. Work included the repair and rehabilitation of existing cathodic protection (CP) test stations, the construction of new CP test stations, the construction of new corrosion monitoring test stations, and the repair of discontinuous joints within West Basin’s recycled water distribution system. The Project required work on 22 metallic pipelines, within 12 separate permitting jurisdictions, which convey secondary effluent, recycled water, barrier injection water, and brine wastewater.

Several of the 22 work locations were constrained by specific dates and windows of time imposed by the various permitting agencies. The project sequencing was therefore critical to ensuring that all work could be completed within the Contract duration.

Zone 3 to Zone 5 (Domestic) and Zone A to Zone C (Recycled) Dual Pump Station | Irvine Ranch Water District
1116

YEARS OF EXPERIENCE
35 years (8 with AKM)

HIGHLIGHTS
Construction oversight of
capital improvements and
large residential development
projects
Previously Inspection Services
Supervisor for Irvine Ranch
Water District
Experience includes: water,
recycled water, and
wastewater facilities
Reservoirs, pipelines, pump
stations, lift stations, buildings,
treatment plants, street
rehabilitation, slurry seal

MIKE FREDRIKSZ
Senior Construction Manager
Role: Construction Inspector |Work included installation of six 300 HP vertical turbine pumps with a 36” discharge header, CML&C discharge piping, connections to recycled water system (Rattlesnake Zone A reservoir to Zone C), connections to potable water (Zone 3 to Zone 5), new CMU building, motor control center and switchgear
Jeffrey Road Grade Separation | Irvine Ranch Water District Role: Construction Inspector |Provided construction inspection for this $40-million project that consisted of lowering existing roadway and all existing utilities below a new bridge for the Metro link Railroad. Inspected the relocation and installation of 16" ACP domestic water pipe and 30" cement mortar lined and coated steel recycled water pipe. There were numerous conflicts with existing utilities, provided assistance in navigating installing new pipelines in existing street while maintaining continuous service and keeping roadway open during the three years of construction. Site had high groundwater, which required dewatering the project with extensive well points continuously during the project into Baker tanks. Provided coordination with multiple agencies and assisted in keeping communication open with residents living adjacent to project. Inspected all pipe installation, testing, backfill and compaction, tie-ins to existing water system.

Alton Roadway | Irvine Ranch Water District
Role: Construction Inspector |Provided construction inspection for $40-million joint venture project between the County of Orange and City of Lake Forest. The project consisted of rough grading new roadway approximately one mile. Installed storm drain box and associated storm drain pipe, new 16" AWWA C-905 PVC gravity sewer pipe and manholes, new 24", 16", 12" and 8" domestic waterlines, new 24", 16" and 12" recycled waterlines.

The Irvine Company and Five Points Development | Irvine Ranch Water District Role: Construction Inspector |Projects consisted of inspection of the installation of water, recycled and sewer systems. Inspected material and installation per plans and specifications, testing, hydrostatic testing and health samples, and chlorine residuals. Inspected air and mandrel sewer pipe and set up video inspection of pipeline and all backfill and compaction and pavement. Coordinated with multiple agencies that required meeting developer's tight schedules.

Walnut Park Mutual Water Company Meter Replacement Project | Water Replenishment District
Role: Construction Manager | AKM provided construction management and inspection service for the project which involved replacement of all existing residential water meters within the Walnut Park MWC system. The water meters were replaced with Kamstrup ultrasonic meters.

Work included removal of existing water meters, installation of new water meters, installation of new transmission antennas and receiving units, replacement of existing inlet and outlet couplings, replacement of concrete meter boxes, and installation of data system programming.

SA-5 Vault Replacement Project | City of Santa Ana
Role: Construction Manager | AKM Consulting Engineers provided construction management and inspection services for the project which consisted of constructing a new SA-5 vault and pressure reducing vault, abandoning the existing SA-5 vault, and constructing the associated CML&C piping, valves, and appurtenances to connect to the existing system and replace the existing SA-5 vault.

Alamitos Seawater Barrier Improvement Project | Orange County Water District Role: Construction Inspector | AKM Consulting Engineers provided construction management and inspection services for the project which involved the drilling and equipping of seventeen (17) injection wells including associated vaults, piping, valves electrical and SCADA equipment, the construction of four (4) nested monitoring wells; two (2) shallow piezometers, pipeline connections to the existing supply line and integration of the new equipment with the Los 1117

YEARS OF EXPERIENCE
35 years (8 with AKM)

HIGHLIGHTS
Construction oversight of
capital improvements and
large residential development
projects
Previously Inspection Services
Supervisor for Irvine Ranch
Water District
Experience includes: water,
recycled water, and
wastewater facilities
Reservoirs, pipelines, pump
stations, lift stations, buildings,
treatment plants, street
rehabilitation, slurry seal

MIKE FREDRIKSZ
Senior Construction Manager
Angeles County Department of Public Works (LACDPW), the agency who maintains the barrier facilities, existing SCADA system. The AKM project team performed a comprehensive constructability review for the preliminary design reports, 30-percent, 80-percent and 95- percent design documents. Project challenges included the work site being situated within the access road to the Orange County Flood Control District (OCFCD) Alamitos Channel causing significant space limitations and access restriction as well as a large residential retirement community adjacent to the south of the Channel and the Los Angeles Department of Water and Power (LADWP) Haynes Power Generating Station adjacent to the project to the north.

Permitting and close coordination with LACDPW, OCFCD and LADWP was required.

Joint Transmission Main Vault Upgrades | South Coast Water District Role: Construction Manager | AKM Consulting Engineers provided construction management and inspection services for the project which consisted of valve actuator / operator replacements, valve replacements, pipeline improvements, pump and drainage pipe installation and retaining wall. Also included was the demolition of portions of existing retaining walls and construction of new walls and concrete slabs. Work was also performed at three additional vaults which included modifications to Vault 1, 2, and 4, assessing viability of existing 42-inch, 30-inch, and 24-inch ball valves, replacing new gear boxes and operators, removing portions of pipe and installing dismantling joint, removal of vault’s top slab and manway, extending vault walls, and providing new aluminum hatches, and providing and installing new air release valve assembly. The pipe and valve replacements were completed during a coordinated 14 day shutdown of the JTM pipeline.

Bellflower and Spring Bridge Repair | City of Long Beach Role: Construction Inspector | AKM Consulting Engineers provided construction management and inspection services for the Project which involved repair of a damaged section of the Bellflower / Spring Bridge which also serves as a quadruple box culvert under the road. The culvert was damaged by a Contractor performing work at street grade for Southern California Edison (SCE) under a City issued encroachment permit. Because the City had jurisdiction of the bridge and street, and County of Los Angeles Flood Control District (LACFCD) owns and maintains the drainage culvert, SCE’s repair contractor was required to obtain permits from both the City and LACFCD. The work entailed constructing a diversion of dry-weather drainage flows away from the culvert chamber where the repair was located, the erection of a designed falsework system within the culvert underneath the location of the repair, the demolition and removal of a 25 by 15 foot section of the bridge/culvert, sandblasting of existing reinforcement bar, doweling and epoxy setting new reinforcement into the existing concrete and placement of new concrete. The work required traffic control beginning at the 405 freeway as well as a full street closure during concrete placement, which was performed at night. Due to the urgency to complete the work within a dry weather window and relive the public of the burden caused by the work, Construction was performed in both day and night shifts, 7 days a week.

AKM rotated inspectors to adequately cover the work which required close communication amongst the AKM team as well as all involved parties.

Watermain Improvements at Center, Walnut, and Maple | City of El Segundo Role: Construction Manager | AKM Consulting Engineers provided construction management and inspection services for the project which consisted of approximately 3,500 LF of 10” DIP, 850 LF of 8” DIP, 1,000 feet of a temporary high-line system to serve customers while replacements were being conducted on Center Street, appurtenant valves, new fire hydrants, fire hydrant abandonments; 8 connections to existing system; re-establishment of water services; installation of new service meters; hydrostatic testing of new water main; chlorination and de-chlorination of water main; and final flushing. Also included was rehabilitation of concrete paving, cross gutters, curb/gutter/sidewalks, and a grind and cap of the streets along the pipe alignment.
1118

YEARS OF EXPERIENCE
35 years (8 with AKM)

HIGHLIGHTS
Construction oversight of
capital improvements and
large residential development
projects
Previously Inspection Services
Supervisor for Irvine Ranch
Water District
Experience includes: water,
recycled water, and
wastewater facilities
Reservoirs, pipelines, pump
stations, lift stations, buildings,
treatment plants, street
rehabilitation, slurry seal

MIKE FREDRIKSZ
Senior Construction Manager
Capital Improvements, Portola Parkway | Irvine Ranch Water District Role: Construction Inspector |Lead construction inspector for the project which included installation of 3,596 LF of 20",9226 LF of 30",4000 LF of 16" cement mortar lined and coated steel pipe, and 4,000 LF of 16" AWWA C-905 pipe and appurtenances. The project included pressure and water quality testing for all piping and connection to existing water systems and 152,000 SF of trench pavement restoration, including striping in addition and 550,000 SF of slurry seal type 2. Inspected the installation of all pipelines, checked shoring for compliance with OSHA Standards and inspected all weld joints on the cement mortar lined and coated steel pipe. Inspected the pressure testing of all pipelines, witnessed the proper flushing of the chlorine chlorinated water, and collected the Bacti or health samples and delivered to laboratory.

Dyer Road Well No. 6 | Irvine Ranch Water District
Role: Construction Inspector | Work included installation of a new 600 HP vertical turbine pump, CML&C discharge piping, connecting to existing 24” CML&C distribution main, new CMU building, medium voltage motor control center and switchgear.

Villages of Turtle Rock, Quail Hill and Woodbury | Irvine Ranch Water District Role: Construction Inspector | Provided construction inspection for the $6.8-million, 8.1 million SF of slurry seal and 3.6 million SF of asphalt grind and cap project. 1119

YEARS OF EXPERIENCE
29 years (1 with AKM)

REGISTRATION
• Grade 3 Water
Distribution Operator
Certification

EDUCATION
• Bachelor of Science/
Business Administration /
Management and
Operations Management
– CSU Long Beach

HIGHLIGHTS
• Experience in construction
inspection and
supervision, with a strong
background in both capital
improvement and
subdivision projects.
• Experience includes
inspections of water,
reclaimed water, and
sewer pipelines, as well
as pumping stations,
pressure reducing
stations, water
reclamation facilities, and
sewage lift stations.
• Supervisory rolls were
with the field crews and
was responsible for
maintenance and
installation of domestic
water, reclaimed water,
and wastewater collection
systems.

GARRICK FROST
Senior Construction Inspector
Mr. Frost has over 29 years of experience in construction inspection and supervision. He has a strong background in capital improvement and subdivision projects. His experience includes inspections of water, reclaimed water, and sewer pipelines, as well as pumping stations, pressure reducing stations, water reclamation facilities, and sewage lift stations. In addition to inspection experience, Supervisory rolls were with the field crews and was responsible for maintenance and installation of civil and mechanical systems. • SAN JOAQUIN RESERVOIR RECYCLED FILTRATION | IRWD | Inspector. New recycled filtration facility inside a new building, replacement of a backwash waste return basin, vault, and pipeline, replacement of the existing sodium hypochlorite tanks, pumps, and piping; replacement of existing reservoir booster pumps, new flow control valve, expansion to the existing electrical control room, replacement of the existing PLC, MCC, and UPS and replacement of existing SCE service and transformer.
• WOODBRIDGE RECYCLED WATER PIPELINE REPLACEMENT | IRWD | Inspector.

Replacement of approx. 50,000 linear feet of recycled water piping in the Woodbridge Community. Existing asbestos cement pipe was replaced with PVC piping. • 54” BAKER PIPELINE REALIGNMENT THROUGH SANTIAGO CREEK | IRWD | Inspector.

Removal of approx. 300 linear feet of 54-inch CML&C pipe within the Santiago Creek in Irvine Park and the construction of approximately 300 linear feet of 54” CML&C pipe with an additional 10 feet of cover. Scope includes open trench construction with dewatering of the pipeline, dewatering of the groundwater, filtering of all dewatering flows, slurry fill in the pipe zone, backfill, and restoring the creek to per-construction conditions. All work was performed in the 25-foot easement.
• LAGUNA CANYON ROAD AND QUAIL HILL PKWY CATHODIC PROTECTION | IRWD | Inspector. Installation of five impressed current cathodic protection systems (deep anode beds and rectifiers), five-meter pedestals, two insulating flange kits, bond wires, insulator joint test stations and all appurtenant work.
• WATER RECLAMATION PLANT NO.7 AERATION IMPROVEMENTS - Coachella Valley Water District | Senior Inspector. Aeration Improvements including new Blower Building, Electric Building, blowers, process air piping and fine bubble diffuser system, submersible mixers, mixed liquor return pumps and piping, instrumentation, valves, modifications to the existing secondary splitter box, replacement of gates, and all corresponding site civil, yard piping, electrical, and controls upgrades.
• SOLIDS HANDLING FACILITY IMPROVEMENTS Central Contra Costa Sanitary District | Senior Inspector. Renovation in an operating industrial facility and included demolition, structural, architectural, mechanical, electrical, instrumentation, and controls upgrades for the Sludge Dewater System, multiple Hearth Furnaces, Wet Scrubber and Air Pollution Control, Seismic Strengthening, and related facilities. • INJECTION WELL FACILITIES PHASE 4 Monterey One Water | Senior Inspector. Two deep injection wells, vertical turbine backwash pumps and motors, chlorine analyzers, electrical House Buildings for power equipment and variable frequency drives, percolation basins 4 acre-feet, 1.5 miles of Product Water (24” Ductile Iron) from Blackstone Reservoir to Well Site No. 7.
• NEWPORT COAST LIFT STATION REHABILITATION | IRWD | Inspector. Rehabilitation of the lift station wet well coating, lift station dry well piping, ventilation system, and ductile iron sewer force main. Also included a new CMU Electrical Building and a new stairwell for access to the underground lift station dry well.
• SEWER SIPHON IMPROVEMENTS | IRWD | Inspector. Sewer siphon and sewer cleaning and CCTV, CIPP lining of sewer siphon barrels, site improvements, sewer siphon vault rehabilitation improvements, air jumper repairs, air jumper construction, construction of a chemical dosing facility, two grit traps and two odor control vents. 1120
46700.00100\33287662.1

Page 5 of 5 ends

BB&K 2020
Attachment B
Exhibit “B” – Schedule of Services
1121
Project
Manager Construction Manager Inspector Total Hours Labor Total $261.00 $212.00 $184.00

1.1 Contract Document Review, PreConstruction Site Photos and Videos 8 24 8 40 $8,648

1.2 Document Control Procedures, Coordination with City Staff 8 16 24 $5,480

1.3 Pre-Construction Meeting 2 12 2 16 $3,4341.4 Preliminary Utility Coordination 24 24 $5,088 18 76 10 104 $22,650

2.1 On-Site Construction Management 16 168 184 $39,7922.2 Scheduling and Progress Meetings 24 160 184 $40,1842.3 Change Order Management 24 64 88 $19,8322.4 Requests for Information (RFIs) 12 60 72 $15,8522.5 Submittal Management 4 48 52 $11,2202.6 Claims Management 8 24 32 $7,1762.7 Weekly Resident Engineer Report 2 40 42 $9,0022.8 Schedule of Values and Progress Pay Estimates 2 48 50 $10,6982.9 Safety Program and Traffic Control Plan 20 20 $4,240

2.10 Project Records 2 16 18 $3,9142.11 Full-Time Inspection Services 2 16 2320 2338 $430,794 96 664 2320 3080 $592,704

3.1 Punch List 2 8 12 22 $4,4263.2 Coordinate Close-Out and Submittal of Final Documents 2 8 10 $2,2183.3 Final Payment 2 2 $424 4 18 12 34 $7,068
118 758 2342 3218
Total Fee $30,798 $160,696 $430,928 $622,422SUBTOTALSUBTOTALSUBTOTALTask 2 - Construction PhaseTask 3 - Post Construction PhaseTotal Hours Task1 - Pre-Construction Euclid Avenue Recycled Water System Projet
Construction Management for OMUC Contract NO. UT 1072
Ontario Municipal Utilities Company
Proposal - February 19, 2026
Task No. Description
Labor Hours and Rates by Classification Fees
1122
46700.00100\33287662.1
PAUL S. LEON
MAYOR
ALAN D. WAPNER

MAYOR PRO TEM
JIM W. BOWMAN

DEBRA PORADA

DAISY MACIAS

COUNCIL MEMBERS

SHEILA MAUTZ

CITY CLERK
JAMES R. MILHISER

CITY TREASURER

SCOTT OCHOA

CITY MANAGER
AMENDMENT NO. 3

TO THE PROFESSIONAL SERVICES AGREEMENT

BETWEEN THE CITY OF ONTARIO AND
SMITH-EMERY LABORATORIES INC.

1. Parties and Date.

This Amendment No. 3 to the Agreement (as defined herein) is made and entered as of ____________, by and between the City of Ontario (“City”) and Smith-Emery Laboratories Inc., a California Corporation, “Consultant”. City and Consultant are sometimes individually referred to as “Party” and collectively as “Parties.”

2. Recitals.

2.1 Agreement. The City and Consultant have entered into an agreement entitled “OnCall Material Testing and Geotechnical Engineering Services” dated May 2, 2023 (“Agreement”).

2.2 Amendment Purpose. The City and Consultant desire to amend this Agreement to increase the compensation by One Hundred Twenty-Four Thousand Ninety-Five Dollars ($124,095) for a total not-to-exceed compensation of Five Hundred Eighty-Four Thousand Two Hundred Sixty Dollars ($584,260) and include additional project specific proposal to the Exhibit A through Exhibit B. This increase in compensation is for the additional scope of work listed in the attached Consultants’ Proposal titled “Material Testing and Geotechnical Engineering Services for Euclid Avenue Recycled Water System Project (OMUC Contract No. UT1072)” and dated February 18, 2026.

2.3 Amendment Authority. This Amendment No. 3 is authorized pursuant to Section

3.1.2 and 3.2.4 of the Agreement.

3. Terms.

3.1 Amendment. Sections 3.1.2 and 3.2.1, Exhibit A through Exhibit B of the Agreement are hereby amended in their entirety to read as follows:
1123
46700.00100\33287662.1

Page 2 of 5 ends

BB&K 2020

3.1.2 Term. The term of this Agreement shall be from May 2, 2023 to April 30, 2028, unless earlier terminated as provided herein. Consultant shall complete the Services within the term of this Agreement, and shall meet any other established schedules and deadlines. The Parties may, by mutual, written consent, extend the term of this Agreement if necessary to complete the Services.

3.2.1 Compensation. Consultant shall receive compensation, including authorized reimbursements, for all Services rendered under this Agreement at the rates set forth in Exhibit "A" and Exhibit “B” attached hereto and incorporated herein by reference. The total compensation shall not exceed Five Hundred Eighty-Four Thousand Two Hundred Sixty Dollars ($584,260) without written approval of the City Council or City Manager, as applicable. Extra Work may be authorized, as described below, and if authorized, will be compensated at the rates and manner set forth in this Agreement.

Exhibit “A” - SCOPE OF SERVICES is hereby amended to add Attachment A which is hereto and incorporated herein by reference. All other previously added or deleted scope of services are retained in their entirety.

Exhibit “B” – SCHEDULE OF SERVICES is hereby deleted in its entirety and replaced with Attachment B attached hereto and incorporated herein by reference.

3.2 Continuing Effect of Agreement. Except as amended by this Amendment No. 3, all other provisions of the Agreement remain in full force and effect and shall govern the actions of the parties under this Amendment No. 3. From and after the date of this Amendment No. 3, whenever the term “Agreement” appears in the Agreement, it shall mean the Agreement as amended by this Amendment No. 3.

3.3 Adequate Consideration. The Parties hereto irrevocably stipulate and agree that they have each received adequate and independent consideration for the performance of the obligations they have undertaken pursuant to this Amendment No. 3.

3.4 Severability. If any portion of this Amendment No. 3 is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions shall continue in full force and effect.

3.5 Integration. This Amendment represents the entirety of the Parties’ understanding relating to the subject of this Amendment, including written or verbal communications between the Parties, which shall have no relevance unless expressly incorporated herein. This is an integrated amendment.
[SIGNATURES ON FOLLOWING PAGE]
1124
46700.00100\33287662.1

Page 3 of 5 ends

BB&K 2020
SIGNATURE PAGE FOR AMENDMENT NO. 3 TO PROFESSIONAL SERVICES

AGREEMENT BETWEEN THE CITY OF ONTARIO
AND SMITH-EMERY LABORATORIES INC.

IN WITNESS WHEREOF, the Parties have entered into this Amendment No. 3 as of the day and year first above written.

CITY OF ONTARIO SMITH-EMERY LABORATORIES INC.

By:

Its:

Printed Name:

By:

Its:

Printed Name:
[If Corporation, TWO SIGNATURES,
President OR Vice President AND Secretary
OR Treasurer REQUIRED]
Approved By:

Scott Ochoa
City Manager
Approved as to Form:
_____________________________________
Best Best & Krieger LLP
City Attorney
Attested By:

City Clerk

1125
46700.00100\33287662.1

Page 4 of 5 ends

BB&K 2020
Attachment A
Exhibit “A” - SCOPE OF SERVICES
1126
1127
1128
1129
1130
1131
46700.00100\33287662.1

Page 5 of 5 ends

BB&K 2020
Attachment B
Exhibit “B” – Schedule of Services
1132
1133
1134
Department: Housing
Prepared By: Albert Ramirez
Department:

Prepared By: Albert Ramirez
Staff Member Presenting: Helen McAlary,
Executive Director Community Life and Culture
Reviewed By: Albert Ramirez, Lacey A
Rightmer, Kelly Zackmann
Approved By:

Submitted To: Council/OHA
Approved: _______________________________
Continued To: ___________________________
Denied: __________________________________
Item No: 16
SUBJECT: A RESOLUTION DECLARING CITY-OWNED PROPERTY LOCATED AT 801 S.

MOUNTAIN AVENUE (ASSESSOR'S PARCEL NO. 1011-382-09) AND 1045 W.

MISSION BOULEVARD (ASSESSOR'S PARCEL NO. 1011-382-65) AS EXEMPT

SURPLUS LAND FOR AFFORDABLE HOUSING DEVELOPMENT

CITY OF ONTARIO
Agenda Report
July 7, 2026
SECTION:

PUBLIC HEARINGS
RECOMMENDATION: That the Housing Authority adopt a Resolution declaring the two properties located at 801 S. Mountain, identified with Assessor's Parcel No. 1011-382-09 and 1045 W. Mission Boulevard, identified with Assessor's Parcel No. 1011-382-65, as Exempt Surplus Land pursuant to Government Code Section 54221 (f) (1)(F).

THE FOLLOWING COUNCIL GOALS ARE BEING ACHIEVED:

Pursue City's Goals and Objectives by Working with Other Governmental Agencies Focus Resources in Ontario's Commercial and Residential Neighborhoods Invest in the Growth and Evolution of the City's Economy FISCAL IMPACT: There is no direct fiscal impact associated with this action. Adoption of the Resolution will allow the City to proceed with the process of developing affordable housing on the properties.

BACKGROUND & ANALYSIS: The Ontario Housing Authority ("OHA") owns approximately 1.28 acres of real property located at 801 S. Mountain, identified with Assessor's Parcel No. 1011-382-09, and 1045 W. Mission Boulevard, identified with Assessor's Parcel No. 1011-382-65, described and depicted in Exhibit "A" of the attached Resolution ("Properties"). Previously, three small commercial businesses occupied the Properties and a deteriorated motel that had become a nuisance to the surrounding area due to recurring illegal activity and frequent safety concerns. The site's condition negatively affected the area, posing challenges with lighting, safety, and neighborhood quality. OHA acquired the properties with the intent of facilitating future affordable housing development.

The Surplus Land Act ("SLA") (California Government Code Section 54220 et. seq.) establishes 1135
procedures that local agencies must follow before they sell or transfer public property that is no longer needed for government use. Under SLA, local agencies must formally classify public property as either "surplus land" or "exempt surplus land" and create written findings to support the classification.

New State legislation (AB 1486, effective January 1, 2020) strengthened the requirements of the Surplus Land Act by prioritizing the availability of surplus land for affordable housing development and other public uses. However, some properties qualify as exempt surplus land and are not subject to the notice, solicitation, and negotiation requirements otherwise required under the Act.

After review, Staff has determined that the Properties qualify as Exempt Surplus Land pursuant to Government Code Section 54221 (f)(1)(F). This exemption is applicable because a housing authority owns the Properties and they are designated for affordable housing development.

The proposed project will be a 100% affordable rental housing development that will provide longterm housing opportunities for low- and moderate-income households within the City. To ensure long-term affordability, the project will include a recorded affordability covenant requiring the units to remain affordable for at least 55 years, consistent with State funding requirements.

The Properties do not sit in any areas that would prevent qualifying for the exemption, including coastal zones, land adjacent to a historical unit of the State Parks System, land listed on or determined eligible for the National Register of Historic Places, or land located within the Lake Tahoe region.

Declaring the Properties as Exempt Surplus Land will allow OHA to move forward with facilitating affordable housing development at the Properties, supporting the City's housing goals and OHA's mission to expand housing opportunities and promote housing stability for low-income households.

Staff recommends the adoption of the Resolution, allowing the affordable housing project to move forward under State law.
1136
RESOLUTION NO. ________

A RESOLUTION OF THE ONTARIO HOUSING AUTHORITY OF THE

CITY OF ONTARIO, CALIFORNIA, DECLARING A HOUSING

AUTHORITY-OWNED LAND TO BE EXEMPT SURPLUS LAND
PURSUANT TO GOVERNMENT CODE SECTION 54221(f)(1)(F).

RECITALS:

WHEREAS, the Ontario Housing Authority (“OHA”) is the owner of that certain real property located within the City of Ontario, California, on 801 S. Mountain, (Assessor’s Parcel No. 1011-382-09) and 1045 W. Mission, (Assessor’s Parcel No. 1011-382-65), and more particularly described in Exhibit “A” attached hereto (the “Property”); and WHEREAS, the Property is proposed to be developed as a 100% affordable rental housing project, intended to provide housing opportunities for low- and moderate-income households within the City: and
WHEREAS, the maximum affordable sales price or rent level shall not be higher than 20 percent below the median market rents or sales prices for the neighborhood in which the Property is located; and
WHEREAS, the proposed development will be subject to a recorded affordability covenant requiring the units to remain affordable for a minimum period of fifty-five (55) years, thereby ensuring long-term housing affordability and compliance with applicable funding requirements: and
WHEREAS, for the purposes of Government Code Section 54221(f)(2), the Property does not qualify as land within a coastal zone, land adjacent to a historical unit of the State Parks System, land listed on or determined by the State Office of Historic Preservation as eligible for the National Register of Historic Places, or land within the Lake Tahoe region; and
WHEREAS, the development of the Property will further the OHA’s mission to expand the supply of affordable housing and promote housing stability within the community; and
WHEREAS, pursuant to California Government Code Section 54221 (f)(1)(F), real property owned by a housing authority that is restricted for use for affordable housing is exempt from the requirements of the Surplus Land Act (Government Code Section 54220 et. seq.); and
WHEREAS, the OHA further finds that declaring the Property exempt from the Surplus Land Act will facilitate the timely development of affordable housing and avoid unnecessary delays that could adversely impact project feasibility and funding; and WHEREAS, the OHA desires to formally declare the Property exempt from the Surplus Land Act in accordance with Government Code Section 54221(f)(1)(F); and 1137
WHEREAS, the OHA finds and determines that the Property will be utilized for affordable housing purposes and will be subject to enforceable affordability restrictions consistent with the requirements of Government Code Section 54221(f)(1)(F).

NOW, THEREFORE, BE IT RESOLVED BY THE City of Ontario Housing Authority, as follows:

SECTION 1. The above recitals and findings are incorporated herein as if set forth herein in full.

SECTION 2. The Property, as described herein and in Exhibit “A,” is hereby declared to be exempt surplus land pursuant to California Government Code Section 54221(f)(1)(F), as it is owned by a housing authority and will be restricted for use as affordable housing.

SECTION 3. The Ontario Housing Authority affirms that the Property will be developed as a 100% affordable rental housing project and will be subject to a recorded affordability covenant for a minimum of fifty-five (55) years to ensure long-terms affordability for qualifying households.

SECTION 4. The Executive Director or his designee is hereby authorized and directed to take all actions necessary to implement this Resolution, including by not limited to executing documents, recording affordability covenants and completing any required fillings or notifications with the California Department of Housing and Community Development or other applicable agencies.

SECTION 5. The Secretary of the Ontario Housing Authority shall certify as to the adoption of this Resolution.

PASSED, APPROVED, AND ADOPTED this 7
th day of July 2026.
_____________________________________
PAUL S. LEON, CHAIRMAN
ATTEST:
____________________________________

SHEILA MAUTZ, AUTHORITY SECRETARY
1138
APPROVED AS TO FORM:
_______________________________________

AUTHORITY COUNSEL
1139

STATE OF CALIFORNIA )

COUNTY OF SAN BERNARDINO )

CITY OF ONTARIO )
I, SHEILA MAUTZ, Secretary of the Ontario Housing Authority, DO HEREBY CERTIFY that the foregoing Resolution No. OHA- was duly passed and adopted by the Board Members of the Ontario Housing Authority at their regular meeting held July 7, 2026 by the following roll call vote, to wit:

AYES: BOARD MEMBERS:

NOES: BOARD MEMBERS:

ABSENT: BOARD MEMBERS:
___________________________________

SHEILA MAUTZ, AUTHORITY SECRETARY
(SEAL)
The foregoing is the original of Resolution No. OHA- duly passed and adopted by the Ontario Housing Authority at their regular meeting held July 7, 2026. ____________________________________

SHEILA MAUTZ, AUTHORITY SECRETARY
(SEAL)
1140

EXHIBIT A

PROPERTY
County: San Bernardino
Assessor: Josie Gonzales
Property Address and Parcel No. (APN): (801 S. Mountain) 1011-382-09 and (1045 W.

Mission) 1011-382-65
Owner Name: Ontario Housing Authority
Mailing Address: 303 E B Street, Ontario, CA 91764
1141
Department: Fire Department
Prepared By: Sagar Patel
Staff Member Presenting: Mike Gerken, Fire
Chief
Approved By:

Submitted To: Council/OHA
Approved: _______________________________
Continued To: ___________________________
Denied: __________________________________
Item No: 17
SUBJECT: AMENDMENT OF TO SECTION 4-21.05 (A) ADMINISTRATIVE FINES, OF THE

ONTARIO MUNICIPAL CODE PERTAINING TO MANAGING THE CITY'S RESPONSE

TO FIREWORKS FEES AND FINES

CITY OF ONTARIO
Agenda Report
July 7, 2026
SECTION:

ADMINISTRATIVE

REPORTS/DISCUSSION/ACTION
RECOMMENDATION: That the City Council amend Section 4-21.05(a) Administrative Fines of the Ontario Municipal code relating to fines for illegal use of fireworks, pyrotechnic devices, explosives, destructive devices or their components and establishing the amount of the fees and fines set forth in this section shall be specified in the City Fee Schedule, which may only be revised by a dulyadopted resolution of the City Council.

THE FOLLOWING COUNCIL GOALS ARE BEING ACHIEVED:

Maintain the Current High Level of Public Safety
Operate in a Businesslike Manner
FISCAL IMPACT: This recommended action amends the fee structure from Section 4-21.5(a) of the Ontario Municipal Code and provides for the revenue fee structure to be included in the City Fee Schedule that will be presented to City Council in separate actions for consideration approved by Resolution.

BACKGROUND & ANALYSIS: The Ontario City Council is committed to safeguarding the health, safety, and welfare of its residents and maintaining a high quality of life throughout the community.

As such, it is the City's priority to protect its residents from activities such as the use of illegal fireworks.

Illegal fireworks pose a significant threat to public safety and community well-being. Their use increases the risk of residential, commercial, and vegetation fires. Fireworks-related incidents can result in serious injuries, property damage, and disruptions to critical infrastructure. Additionally, the illegal use of fireworks places increased demands on fire, law enforcement, and emergency medical personnel, requiring the diversion of resources from other emergency incidents and public safety priorities.

Beyond the immediate safety concerns, illegal fireworks negatively impact the quality of life for residents by generating excessive noise, disturbing families, seniors, and individuals with medical 1142
conditions, and triggering stress and anxiety for veterans and others affected by post-traumatic stress disorder (PTSD). Fireworks also contribute to environmental pollution through smoke, litter, and chemical residue, while causing distress to pets and wildlife. Collectively, these impacts create substantial financial and operational costs for the community and underscore the importance of continued enforcement, public education, and prevention efforts.

In an effort to deter the use of illegal fireworks, on Tuesday June 23, 2026, City Council directed Staff to create an escalating fee structure of $1,000 for a first citation, $2,000 for a second citation, and $3,000 for a third citation and to be specified in the City Fee Schedule, which may only be revised by a duly-adopted resolution of the City Council. 1143
ORDINANCE NO. _____

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF ONTARIO,

CALIFORNIA, AMENDING THE ADMINISTRATIVE FINES AS
ESTABLISHED IN CHAPTER 21, TITLE 4, SUBSECTION (A) OF THE

ONTARIO MUNICIPAL CODE THAT PROHIBIT THE POSSESSION, USE,

STORAGE OR MANUFACTURE OF FIREWORKS, PYROTECHNIC

DEVICES, EXPLOSIVES, DESTRUCTIVE DEVICES OR THEIR

COMPONENTS AND ESTABLISHING ADMINISTRATIVE FINES FOR
VIOLATIONS THEREOF.

WHEREAS, hundreds of fires cause property destruction in California each year by the private use of all types of fireworks; and
WHEREAS, the City of Ontario faces an increasing incidence of the use of all types of fireworks, both on public and private property; and
WHEREAS, the City of Ontario and the County of San Bernardino have experienced serious injuries and property destruction by all types of fireworks; and WHEREAS, thousands of pounds of illegal or dangerous fireworks flow into the City of Ontario and San Bernardino County from neighboring jurisdictions; and WHEREAS, it costs the taxpayers in the City of Ontario thousands of dollars for response, investigation, and disposal of illegal or dangerous fireworks and explosives; and
WHEREAS, illegal and dangerous fireworks, especially "safe and sane" class fireworks, are being used to construct dangerous improvised explosive devices (IED's); and
WHEREAS, the possession, use, transport and discharge of illegal or dangerous fireworks and explosives creates a burden and threat upon the lives and property of the citizens of Ontario, as well as those visiting and traveling through the City of Ontario; and WHEREAS, the use of illegal fireworks continue to be a significant public safety concern due to the risks of injury, property damage, and risk of fire; and WHEREAS, Government Code section 53069.4 authorizes the City of Ontario to make any violation of any ordinance enacted by the City subject to an administrative fine or penalty.

NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF ONTARIO, CALIFORNIA, DOES ORDAIN AS FOLLOWS:

SECTION 1. REGARDING 4-21.05 Administrative Fines Subsection (a) shall be amended to read as follow:
1144
“The amount of the fees and fines set forth in this section shall be specified in the City Fee Schedule, which may only be revised by a duly-adopted resolution of the City Council.”
SECTION 2. The Mayor shall sign this Ordinance, and the City Clerk shall certify as to the adoption and shall cause a summary thereof to be published at least once, in a newspaper of general circulation in the City of Ontario, California within fifteen (15) days of the adoption. The City Clerk shall post a certified copy of this ordinance, including the vote for and against the same, in the Office of the City Clerk, in accordance with Government Code Section 36933.

PASSED, APPROVED, AND ADOPTED this ___ day of July 2026. _____________________________________
PAUL S. LEON, MAYOR
ATTEST:
_________________________________

SHEILA MAUTZ, CITY CLERK
APPROVED AS TO FORM:
_______________________________

BEST BEST & KRIEGER LLP

CITY ATTORNEY
1145

STATE OF CALIFORNIA )

COUNTY OF SAN BERNARDINO )

CITY OF ONTARIO )
I, SHEILA MAUTZ, City Clerk of the City of Ontario, DO HEREBY CERTIFY that foregoing Ordinance No. ____ was duly introduced at a regular meeting of the City Council of the City of Ontario held July 7, 2026 and adopted at the regular meeting held July 21, 2026 by the following roll call vote, to wit:

AYES: MAYOR/COUNCIL MEMBERS:

NOES: COUNCIL MEMBERS:

ABSENT: COUNCIL MEMBERS:
_________________________________

SHEILA MAUTZ, CITY CLERK
(SEAL)
I hereby certify that the foregoing is the original of Ordinance No. ____ duly passed and adopted by the Ontario City Council at their regular meeting held January 21, 2026 and that Summaries of the Ordinance were published on _______ and _________, in the Inland Valley Daily Bulletin newspaper.
__________________________________

SHEILA MAUTZ, CITY CLERK
1146