Text extracted from the city's file for reading and search. Open the original on cityoforange.legistar1.com. That file is the official record.

Agenda Item
City Council
Item #: 3.14. 2/8/2022 File #: 22-0025
TO: Honorable Mayor and Members of the City Council
THRU: Thomas R. Hatch, Interim City Manager
FROM: Christopher Cash, Public Works Director

1. SUBJECT
Approval of plans and specifications for Community Development Block Grant El Modena Branch Library Restroom Remodel, and authorization to advertise for bids.

2. SUMMARY
Plan and specifications have been completed and the project is ready to advertise for bids. The total estimated construction cost, including 15% contingencies and construction management, is $151,000.

3. RECOMMENDED ACTION
Approve plans and specifications and authorize advertising for bids for El Modena Branch Library Restroom Remodel Project; Bid No. 21-22.26.

4. FISCAL IMPACT
The estimated expenditure for this project is $151,000 and will be funded in El Modena Restroom Remodel (30161) through Community Development Block Grant (310). A request for further allocation may be requested at the time of awarding the project.

5. STRATEGIC PLAN GOALS
Goal 1: Provide for a safe community
b: Provide and maintain infrastructure necessary to ensure the safety of the public.

Goal 4: Provide outstanding public service
b: Provide facilities and services to meet customer expectations.

6. DISCUSSION AND BACKGROUND
The Federal Community Development Block Grant Program (CDBG) provides grant funds to enable eligible localities to construct public improvements in Low and Moderate Income Areas within their jurisdiction. Eligible activities include infrastructure upgrades such as restroom improvements to comply with Americans with Disability Act (ADA). The El Modena Branch Library was built in 1977.

Minimal improvements have been done to the restrooms at this branch library since its construction.

Due to aging infrastructure and the necessity to accommodate ADA regulations, two public restrooms are recommended to be improved at this facility.

This project will provide for the accessibility improvement of two ADA restrooms at El Modena branch Library. As part of this project, actuator devices will be installed along with a mechanical door opener City of Orange Printed on 2/3/2022Page 1 of 2
powered by Legistar™
Item #: 3.14. 2/8/2022 File #: 22-0025
Library. As part of this project, actuator devices will be installed along with a mechanical door opener to allow the door to be opened with ease. Construction is scheduled to begin in April 2022 and is expected to be completed within 60 calendar days.

The proposed project is categorically exempt from the provisions of the California Quality Act (CEQA) under CEQA guidelines Section 15301 “Existing Facilities” Class 1(c). The Notice of exemption will be filed with the County Recorder’s Office upon Council’s approval of the plans and specifications.

Specifications and cost estimate are available for review through the Public Works Department.

7. ATTACHMENTS
· Location Map
City of Orange Printed on 2/3/2022Page 2 of 2