Agenda Item
City Council
Item #: 3.22. 3/8/2022 File #: 22-0098
TO: Honorable Mayor and Members of the City Council
THRU: Thomas R. Hatch, Interim City Manager
FROM: Christopher Cash, Public Works Director

1. SUBJECT
Final Acceptance of Bid No. 21-22.01; W-703 Reservoir 4 Exterior Cathodic Protection System Installation Project; and authorization to file Notice of Completion.

2. SUMMARY
The City of Orange entered into a contract with Accurate Corrosion Control, Inc. to complete the Reservoir 4 Exterior Cathodic Protection System Installation. The project scope of work includes installation of a new exterior CP system rectifier, drilling and installation of six new anode beds comprised of silicone cast iron anodes with accompanying anode junction boxes and three test stations around the reservoir perimeter. The project will also include the relocation of the existing internal CP system rectifier to the new pump building, pavement trenching and restoration for new electrical conduits, wires, and reconnection to the existing power panel and meter. The work is complete to the satisfaction of the Public Works Department.

3. RECOMMENDED ACTION
Accept Reservoir 4 Exterior Cathodic Protection System Installation as complete and authorize staff to file Notice of Completion with the County Recorder.

4. ATTACHMENTS
· Notice of Completion and Acceptance
City of Orange Printed on 3/3/2022Page 1 of 1