1. SUBJECT
Approval of plans and specifications and authorization to advertise for bids for Steel Streetlight Pole Replacement, Fiscal Year 2021-2022.
2. SUMMARY
Plans and specifications have been prepared for the Steel Streetlight Pole Replacement, Fiscal Year 2021-2022 and are ready to be advertised for bids. The total estimated construction cost, including 15% for contingencies and construction engineering is $470,000.
3. RECOMMENDED ACTION
Approve plans and specifications and authorize advertising for bids; Bid No. 21-22.36, SP-4196.
4. FISCAL IMPACT
The total expenditure for this contract is $470,000 and will be funded in Streetlight Pole Replacement Program (20374) through Capital Projects (500).
5. STRATEGIC PLAN GOALS
Goal 1: Provide for a safe community
b: Provide and maintain infrastructure necessary to ensure the safety of the public.
Goal 4: Provide outstanding public service
b: Provide facilities and services to meet customer expectations.
6. DISCUSSION AND BACKGROUND
As an energy cost-saving measure in 2017, the City acquired 4,359 streetlight poles from Southern California Edison (SCE). About 2,024 of the acquired poles are steel poles of varying condition, some of which are connected by way of overhead electrical wires. As part of the SCE light pole acquisition, a portion of the annual savings ($120,000) has been programmed to identify and replace the steel poles that have shown sign of deterioration and in areas of high overhead maintenance.
Based on the ability to accumulate funding, a varying number of steel streetlight poles will be replaced with City standard LED-retrofitted concrete poles and existing overhead wires will be converted to underground conduits. At the time of the acquisition many of the steel poles were sampled to check their condition. The majority of the poles were found to be in fair to good condition, so at this time, the City can selectively replace these poles as needed with the available funding.
However, as the condition of the steel poles continues to deteriorate over time and as construction City of Orange Printed on 5/5/2022Page 1 of 2
powered by Legistar™
Item #: 3.18. 5/10/2022 File #: 22-0222
However, as the condition of the steel poles continues to deteriorate over time and as construction costs escalate, additional funding will likely be needed in future years to further augment the replacement program.
The poles to be replaced are dispersed throughout the City. The 22 poles selected for replacement for this year’sproject were identified and prioritized based on their condition and proximity to parkway trees. These poles and wires are at higher risk of damage and ensuing need for maintenance/repair due to falling tree branches.
7. ATTACHMENTS
· Location Maps