City Fees - Proposed Changes
Fee
Full Cost
Recovery Fee Current Fee
Current Cost
Recovery %
Proposed
Fee
Proposed Cost
Recovery %
Document Certification $30 $5 16% $10 33%
Inspection/Annual Report $112 $30 27% $35 31%
Temporary Use Permit (non-recurring) $2,619 $791 30% $1,000 38% SB9 Application $739 $0 0% $541 73%
Code Compliance Fees
No change, moved from
BLDG division to
Community Dev
Special Promotion (Banner) Permit $122 $105 86% $105 86% Special Event Application/Permit $728 $105 14% $105 14% Violation & Reinspection Fee $542 $452 83% $452 83%
Paramedic Services
Annual Paramedic Subscription Program N/A $48 N/A $60 N/A Resolution 11373 effect.
3/1/2022
Additional 10 employees/residents for businesses and congregate living facilites (11-100 persons) N/A $0 N/A $60 N/A
Resolution 11373 effect.
3/1/2022
Additional 10 employees/residents for businesses and congregate living facilites (over 100 persons) N/A $0 N/A $50 N/A
Resolution 11373 effect.
3/1/2022
Transport Fees N/A $1,106.10 N/A $1,381.75 N/A
Based on OCEMS CPI
analysis
Oxygen N/A $89.17 N/A $96.95 N/A
Based on OCEMS CPI
analysis
Mileage N/A $18.19 N/A $19.77 N/A
Based on OCEMS CPI
analysis
Basic Medical Supplies N/A $35.20 N/A $38.27 N/A
Based on OCEMS CPI
analysis
Flammable or Combustible / Liquid Pipeline Operation / Excavation (2 hour min) $316 $318 101% $316 100%
After Hours Work Hazardous Materials Specialist (2 hour min) - per hour $158 $159 101% $158 100% Standby Time Hazardous Materials Specialist (2 hour min) - per hour $158 $159 101% $158 100% Hazardous Materials - Disclosure Fees:
1 material $266 $267 100.3% $266 100%
2-4 materials $424 $425 100.2% $424 100%
5-9 materials $582 $585 100.4% $582 100%
10-15 materials $661 $664 100.4% $661 100%
21-25 materials $978 $980 100.2% $978 100%
26-30 materials $1,096 $1,100 100.4% $1,096 100%
31-44 materials $1,215 $1,220 100.4% $1,215 100%
45+ materials $1,373 $1,379 100.5% $1,373 100%
Underground Tanks:
2 tanks $849 $850 100.2% $849 100%
3 tanks $1,007 $1,010 100.3% $1,007 100%
4 tanks $1,165 $1,170 100.4% $1,165 100%
5 tanks $1,323 $1,328 100.4% $1,323 100%
Class I or II liquids Removal $316 $318 101% $316 100%
To install, alter, remove, abandon, or temporarily place out of service $158 $159 101% $158 100% To change type of contents to a material other than designed for - 2 hour min - per hour $158 $159 101% $158 100%
Plan Check Hazmat Fee - hourly $158 $159 101% $158 100% Existing Tank Monitoring System Restart $632 $635 100.4% $632 100% FIRE CONSTRUCTION PERMITS:
Fire Protection Systems:
New:
1-5 devices $948 $950 100.2% $948 100%
6-15 devices $1,186 $1,190 100.4% $1,186 100%
16-30 devices $1,581 $1,588 100.5% $1,581 100%
31-50 devices $2,213 $2,215 100.1% $2,213 100%
Each additional 50 devices or portion thereof $316 $318 101% $316 100% Modifications: $0
1-5 devices $632 $635 100.4% $632 100%
6-15 devices $711 $715 101% $711 100%
16-30 devices $1,027 $1,030 100.2% $1,027 100%
31-50 devices $1,186 $1,190 100.4% $1,186 100%
Each additional 50 devices or portion thereof $316 $318 101% $316 100% Fire Sprinklers - 13 / 13D / 13R:
New Construction:
Up to 50 Heads $1,423 $1,429 100.4% $1,423 100%
50-100 Heads $1,976 $1,980 100.2% $1,976 100%
Each additional 50 heads or portion thereof $316 $318 101% $316 100% Tenant Improvements / Modifications:
Up to 50 Heads $790 $794 100.5% $790 100%
50-100 Heads $1,027 $1,030 100.2% $1,027 100%
Each additional 50 heads or portion thereof $316 $318 101% $316 100% Preaction Fire Sprinklers:
New Construction:
COMMUNITY DEVELOPMENT
CITY CLERK
FIRE DEPARTMENT
City Fees - Proposed Changes
Fee
Full Cost
Recovery Fee Current Fee
Current Cost
Recovery %
Proposed
Fee
Proposed Cost
Recovery %
Up to 50 Heads $1,897 $1,900 100.2% $1,897 100%
50-100 Heads $2,213 $2,215 100.1% $2,213 100%
Each additional 50 heads or portion thereof $316 $318 101% $316 100% Tenant Improvements / Modifications:
Up to 50 Heads $1,027 $1,030 100.2% $1,027 100%
50-100 Heads $1,423 $1,429 100.4% $1,423 100%
Each additional 50 heads or portion thereof $316 $318 101% $316 100% Underground Private Fire Service Line $1,818 $1,820 100.1% $1,818 100% Automatic Fire Extinguishing Systems (Hoods, spray booths, etc.) $632 $635 100.4% $632 100% Spraying or Dipping Flammable or Combustble Liquids Booths $790 $794 100.5% $790 100% Clean Agent Systems $1,106 $1,110 100.3% $1,106 100%
Smoke Control Systems $2,845 $2,850 100.2% $2,845 100%
Fire Pumps $1,581 $1,588 100.5% $1,581 100%
Standpipe System $869 $870 100.1% $869 100%
High Piled Storage $948 $950 100.2% $948 100%
Dry Cleaning $632 $635 100.4% $632 100%
Dust Production $790 $794 100.5% $790 100%
Industrial Ovens $790 $794 100.5% $790 100%
High Rise Building - Base (includes 6 floors) $3,161 $3,170 100.3% $3,161 100% High Rise Building - per additional floor $316 $318 101% $316 100% Temporary Membrane Structures and Tents $711 $715 100.5% $711 100% Tanks:
Underground Tanks:
First Tank $2,529 $2,541 100.5% $2,529 100%
Each additional tank $474 $475 100.2% $474 100%
Aboveground Tanks
First Tank $948 $953 100.5% $948 100%
Each additional tank $316 $318 101% $316 100%
Vegetation Management Fuel Modifications $1,106 $1,110 100.3% $1,106 100% Miscellaneous Plan Review - per hour $158 $159 100.6% $158 100% After Hours Work Fire Plan Examiner (2 hour min) - per hour $160 $161 100.8% $160 100% Local History Reproduction - Commercial Use $39 $60 154% $35 90% Extended Use
Books, Magazines, CDs, Kits $13 $0.25 2% $0 0% Recommend Elimination DVDs $14 $1.00 7% $0 0% Recommend Elimination
Inter-Library Loan $6 $1.00 16% $0 0% Recommend Elimination Laptop $6 $10.00 158% $0 0% Recommend Elimination
Ukelele $13 $2 15% $0 0% Recommend Elimination
BUILDING - MEP
Inspection outside of normal business hours $128 $115 90% $121 95% Inspection/Re-inspection fees during business hours $128 $115 90% $121 95% Inspection for which no fee is indicated $128 $115 90% $121 95% Plan review for changes, additions, and revisions to plan $140 $125 89% $132 94% Change of Occupancy, requiring new and temporary C. of O. $144 $138 96% $141 98% Security Plan Check $140 $125 89% $132 94%
Alternate Materials or Methods Request $144 $138 96% $141 98% Records Research $58 $53 91% $56 96%
Waste Management Plan $139 $50 36% $95 68%
Electrical:
Service or Panel:
Up to 1,000 amp $128 $115 90% $121 95%
1,000+ amps $256 $230 90% $243 95%
Outlets - Per Item $13 $11 86% $12 94%
Lights - Per Item $13 $11 86% $12 94%
Switches - Per Item $13 $11 86% $12 94%
New Construction $64 $57 89% $60 94%
Power Equipment:
Up to 1 HP or to 1kva $64 $57 89% $60 94%
Over 1 HP $128 $115 90% $121 95%
Sign & Circuit (electrical portion only) $128 $115 90% $121 95% Temporary Power - (main pole of equipment) $64 $57 89% $60 94% Temporary Power - distance poles - per pole $64 $57 89% $60 94% Busways $128 $115 90% $121 95%
Private street Light $128 $115 90% $121 95%
Issuance Fee $58 $47 81% $53 91%
Plan Review - 1/2 hr min $77 $71 92% $74 96%
Inspection of Solar Panel System - 1/2 hr min. $64 $57 89% $60 94% Inspection of items not listed - 1/2 hr min $64 $57 89% $60 94% Re-inspection fee - 1/2 hr min $64 $57 89% $60 94%
Plumbing:
Water Closet $64 $57 89% $60 94%
Urinal $64 $57 89% $60 94%
Bathtub (including shower head) $64 $57 89% $60 94%
Shower Stall $64 $57 89% $60 94%
Kitchen Sink $64 $57 89% $60 94%
Dishwasher $64 $57 89% $60 94%
Garbage Disposal $64 $57 89% $60 94%
LIBRARY
PUBLIC WORKS
City Fees - Proposed Changes
Fee
Full Cost
Recovery Fee Current Fee
Current Cost
Recovery %
Proposed
Fee
Proposed Cost
Recovery %
Clothes Washer $64 $57 89% $60 94%
Water Heater $64 $57 89% $60 94%
Sewer (new, add, alter, repair) $64 $57 89% $60 94%
Water Softener $64 $57 89% $60 94%
Clothes Dryer $64 $57 89% $60 94%
Gas Piping - per outlet $26 $22 86% $24 94%
Miscellaneous Fixtures $64 $57 89% $60 94%
Industrial Waste Receptors $64 $57 89% $60 94%
Drainage Piping (alter, repair) $64 $57 89% $60 94%
Drinking Fountain $64 $57 89% $60 94%
Roof Drainage System $64 $57 89% $60 94%
Cesspool $64 $57 89% $60 94%
Septic Tank $141 $125 88% $133 94%
Backflow Devices - per device $64 $57 89% $60 94%
Solar Systems (plumbing portion) $141 $128 91% $135 96% Issuance Fee $58 $47 81% $53 91%
Plan Review - 1/2 hr min $77 $71 92% $74 96%
Inspection of Solar Panel System - 1/2 hr min. $64 $57 89% $60 94% Inspection of items not listed - 1/2 hr min $64 $57 89% $60 94% Re-inspection fee - 1/2 hr min $64 $57 89% $60 94%
Mechanical:
Heater - less than 100,000 BTU $128 $115 90% $121 95%
Heater - greater than 100,000 BTU $192 $172 90% $182 95% Air Conditioner:
0-100,000 BTU $128 $115 90% $121 95%
100,000-1,000,000 BTU $192 $172 90% $182 95%
1,000,000+ BTU $256 $230 90% $243 95%
Air Handler - 10,000 CFM or less $128 $115 90% $121 95% Air Handler - over 10,000 CFM $192 $172 90% $182 95%
Evaporative Cooler $96 $86 90% $91 95%
Fan Coil $64 $57 89% $60 94%
Ventilation Fan $64 $57 89% $60 94%
Grease Hoods $256 $230 90% $243 95%
Mechanical Firebox (metal Fireplace) $128 $115 90% $121 95% Registers (inlet or outlet) $13 $11 86% $12 94%
Issuance Fee $58 $47 81% $53 91%
Plan Review - 1/2 hr min $77 $71 92% $74 96%
Inspection of Solar Panel System - 1/2 hr min. $64 $57 89% $60 94% Inspection of Items not listed - 1/2 hr min $64 $57 89% $60 94% Re-inspection fee - 1/2 hr min $64 $57 89% $60 94%
Pool / Spa Equipment $256 $230 90% $236 92%
BUILDING - MISCELLANEOUS
Antenna—Telecom Facility
Cellular/Mobile Phone, free-standing $236 $219 93% $227 96% Cellular/Mobile Phone, attached to building $236 $219 93% $227 96% Arbor/Trellis $373 $347 93% $360 96%
Chimney Repair $213 $197 93% $205 96%
Demolition
Commercial $469 $274 58% $372 79%
Residential $269 $246 92% $257 96%
Disabled Access Compliance Inspection $340 $316 93% $328 97% Door
New door (non structural) $201 $185 92% $193 96%
New door (structural shear wall/masonry) $201 $185 92% $193 96% Fence
Over 6 ft. in height $201 $185 92% $193 96%
Each addl 100 lf $23 $20 88% $21 93%
Fireplace
Masonry $394 $361 92% $377 96%
Pre-Fabricated/Metal $292 $269 92% $280 96%
Flag pole (over 20 feet in height) $292 $269 92% $280 96% Foundation Repair $405 $372 92% $389 96%
Garage (detached)
Wood frame up to 1,000 sf $514 $474 92% $494 96%
Masonry up to 1,000 sf $616 $566 92% $591 96%
Modular Structures
Partition—Commercial, Interior (up to 30 lf) $137 $127 93% $132 96% Additional partition $51 $47 91% $49 95%
Partition—Residential, Interior (up to 30 lf) $137 $127 93% $132 96% Additional partition $51 $47 91% $49 95%
Patio Cover $372 $316 85% $344 92%
Photovoltaic System
Residential $372 $344 92% $358 96%
Commercial $646 $595 92% $620 96%
Commercial, each additional 1 kilowatt $69 $64 93% $66 96% Pile Foundation
Cast in Place Concrete (first 10 piles) $689 $642 93% $665 97% Additional Piles (increments of 10) $689 $642 93% $665 97% Driven (steel, pre-stressed concrete) $689 $642 93% $665 97% Additional Piles (increments of 10) $689 $642 93% $665 97% Product Review $140 $134 96% $137 98%
Re-roof
City Fees - Proposed Changes
Fee
Full Cost
Recovery Fee Current Fee
Current Cost
Recovery %
Proposed
Fee
Proposed Cost
Recovery %
Residential $200 $182 91% $191 96%
Multi-Family Dwelling $440 $406 92% $423 96%
Commercial $440 $406 92% $423 96%
Commercial Addition $440 $406 92% $423 96%
Retaining Wall (concrete or masonry)
Standard (up to 3' high/50 lf) $458 $424 93% $441 96%
Additional retaining wall $69 $64 93% $66 96%
Over 3-10' high/50 lf $498 $462 93% $480 96%
Additional retaining wall $69 $64 93% $66 96%
Over 10' high/50 lf $517 $482 93% $499 97%
Additional retaining wall $69 $64 93% $66 96%
Gravity/Crib Wall, 0-10' high (up to 50 lf) $235 $216 92% $225 96% Additional Gravity/Crib Wall $70 $65 92% $68 97%
Gravity/Crib Wall, over 10' high (up to 50 lf) $372 $344 92% $358 96% Additional Gravity/Crib Wall $70 $65 92% $68 97%
Roof Structure Replacement $257 $237 92% $247 96%
Additional roof structure replacement $51 $47 91% $49 95% Sauna—steam $206 $190 92% $198 96%
Siding
Stone and Brick Veneer (interior or exterior) $172 $159 93% $165 96% All Other $201 $185 92% $193 96%
Additional siding $69 $63 92% $66 96%
Signs
Directional $258 $238 92% $248 96%
Ground/Roof/Projecting Signs $200 $182 91% $191 96%
Rework of any existing Ground Sign $166 $152 92% $159 96% Other Sign $166 $152 92% $159 96%
Wall/Awning Sign, Non-Electric $235 $216 92% $225 96%
Wall, Electric $235 $216 92% $225 96%
Skylight
Less than 10 sf $103 $95 92% $99 96%
Greater than 10 sf or structural $172 $159 93% $165 96% Stairs—First Flight $206 $190 92% $198 96%
Each additional flight $57 $53 93% $55 96%
Storage Racks
0-8' high (up to 100 lf) $138 $128 93% $133 97%
each additional 100 lf $69 $64 93% $66 96%
over 8' high (up to 100 lf) $206 $190 92% $198 96%
each additional 100 lf $69 $64 93% $66 96%
Supplemental Plan Check Fee (after 3rd review) $140 $133 95% $136 97% Supplemental Inspection Fee $136 $123 91% $129 95%
Swimming Pool/Spa
Vinyl-lined (up to 800 sf) $376 $346 92% $361 96%
Fiberglass $646 $595 92% $620 96%
Gunite (up to 800 sf) $646 $595 92% $620 96%
Additional pool (over 800 sf) $276 $257 93% $266 97%
Commercial pool (up to 800 sf) $687 $636 93% $661 96%
Commercial pool (over 800 sf) $687 $636 93% $661 96%
Spa or Hot Tub (Pre-fabricated) $274 $250 91% $262 95%
Window or Sliding Glass Door
Replacement $132 $121 92% $126 96%
New Window (non structural) $166 $152 92% $159 96%
New window (structural shear wall/masonry) $372 $344 92% $358 96% Bay Window (structural) $372 $344 92% $358 96%
ENGINEERING
Lot Line Adjustment $2,289 $1,956 85% $2,122 93%
Certificate of Compliance $2,289 $1,956 85% $2,122 93%
Certificate of Correction / Amended Map $2,289 $1,956 85% $2,122 93% Process Grading Application $321 $225 70% $273 85%
Encroachment Permits:
Process Encroachment Application $309 $201 65% $255 83% Driveways - non-arterial $591 $461 78% $526 89%
Driveways - arterial $1,065 $873 82% $969 91%
Sidewalk $525 $404 77% $465 89%
Streetwork / Trench Repair:
0-100 feet $861 $697 81% $779 90%
100-300 feet $1,196 $988 83% $1,092 91%
300-500 feet $1,884 $1,586 84% $1,735 92%
500-1000 feet $2,685 $2,275 85% $2,480 92%
1000-1500 feet $3,355 $2,838 85% $3,097 92%
1500-2000 feet $3,912 $3,307 85% $3,610 92%
Minor Encroachment Permit $395 $289 73% $342 87%
Utility Lateral for house connection on residential streets $935 $760 81% $847 91% Fire Service Connection $1,718 $1,444 84% $1,581 92%
Grease Interceptor $1,240 $1,000 81% $1,120 90%
Flood Zone Written Notice $367 $268 73% $317 86%
Street Addressing $750 $583 78% $666 89%
Summary Abandonment $1,660 $1,416 85% $1,538 93%
Full Abandonment $1,660 $1,416 85% $1,538 93%
Quit Claims $1,660 $1,416 85% $1,538 93%
Simple Research & CD Prep $252 $152 60% $202 80%
Map Sheets $196 $118 60% $157 80%
City Fees - Proposed Changes
Fee
Full Cost
Recovery Fee Current Fee
Current Cost
Recovery %
Proposed
Fee
Proposed Cost
Recovery %
Sewer Frontage Charges - per l.f. $137 $128 93% $137 100%
MAINTENANCE
Initial Inspection & Application - Mail Carriers, Newspaper Racks, Drop Off Boxes, Recycling Bins, etc.$111 $97 87% $104 94% Renewal Inspection - all boxes $56 $49 88% $52 93%
Removal of Abandoned Shopping Cart $54 $45 83% $50 93%
Banner Installation & Removal $250 $220 88% $235 94%
Graffiti Removal
0-50 square feet $140 $122 87% $131
Each addl square foot $0.72 $0.63 88% $0.68
Old Town Plaza Sidewalk Cleaning $1.57 $1.30 83% $1.44
Tree Removal $43 $41 95% $42 98%
Tree Planting $293 $280 96% $287 98%
TRAFFIC
Neighborhood Permit Parking Program Application $4,179 $2,622 63% $3,400 81% WATER
Plan Check & Inspection Fee
Water Service, no on-site water facilities $480 $444 92% $462 96% Broken Curb Stop $243 $210 86% $227 93%
Pull Water Meter $173 $150 87% $161 93%
Utility Account Establishment $63 $50 80% $56 90%
As of Last Read Establishment Fee $26 $20 77% $23 88%
Reconnection Fee - during business hours $106 $70 66% $88 83% After Hours Reconnection Surcharge $143 $50 35% $96 67% Meter Testing - deposit $218 $198 91% $208 96%
Research Fee $32 $25 79% $28 89%
Backflow Prevention Inspection $309 $216 70% $262 85%
Monitoring Well Permit $166 $136 82% $151 91%
Returned Payment Processing Charge $55 $25 46% $40 73%
Service Call / Door Hanger $106 $35 33% $70 66%
Delinquent Surcharge $33 $30 91% $32 97%
Animal Control and Shelter Fees - All Fee Increase
Full Cost
Recovery Fee Current Fee Current Cost
Recovery %
Proposed
Fee
Proposed Cost
Recovery %
I. Fees for Animal Licenses
Annual Dog Licenses (12 months)
a. Non-neutered $159 $159 100.0% $159 100.0%
b. Neutered (Note 1) $51 $36 70.6% $38 74.5%
c. Neutered, Sr. Citizen and Military discout (Note 2) $51 $18 35.3% $19 37.3% d. Puppy, 6 months old or younger $51 $36 70.6% $38 74.5% Cat License (12 months)
a. Non-neutered $9 $9 100.0% $9 100.0%
b. Neutered $9 $9 100.0% $9 100.0%
Other
a. Reissue of lost dog or cat license tag $9 $9 100.0% $9 100.0% b.Transfer of dog or cat licence $9 $9 100.0% $9 100.0% c. Assistance dog licence $11 $11 100.0% $11 100.0%
d. Police / Law Enforcement $11 $11 100.0% $11 100.0%
e. Exotic Animal Permit
Per Aviary $691 $450 65.1% $500 72.4%
Per Species $997 $450 45.1% $500 50.2%
f. Animal Permit (per household per year)
more than three (3) animals $627 $627 100.0% $627 100.0% more than three (3) animals - Nonprofit $627 $627 100.0% $627 100.0% Late Fee $48 $48 100.0% $48 100.0%
Non-Compliance Fee- Collections $58 $58 100.0% $58 100.0% Non-Compliance Fee $150 $150 100.0% $150 100.0%
Rabies Vaccination Exemption Fee-New $65 $65 100.0% $65 100.0% 4-1-95 Declared Dog
a. 4-1-95 Declared Dog Permit $692 $692 100.0% $692 100.0% II. Fees For Animal Business Licences
Application Fee (Note 3) $138 $138 100.0% $138 100.0%
Penalty Fee (Note 4) 25%
Re-inspection Fee $466 $466 100.0% $466 100.0%
Commercial Kennels Permit-Modified
a. under 30 animals $874 $650 74.4% $650 74.4%
b. over 30 animals $933 $750 80.4% $750 80.4%
Pet Shop
a. Aquatic Only $1,219 $850 69.7% $1,000 82.0%
b. Pet Shop $1,160 $800 69.0% $1,000 86.2%
Fixed Locations Grooming Parlor (per year) $608 $525 86.3% $525 86.3% Mobile Groomers
a. Field Inspection $585 $450 76.9% $500 85.5%
b. OCAC Inspection $500 $400 80.0% $400 80.0%
Animal Rental Establishment (per year) $531 $500 94.2% $500 94.2% Permanent Animal Exhibition (per year) $707 $700 99.0% $707 100.0% Temporary Animal Exhibition
a. First day $161 $150 93.2% $150 93.2%
b. Additional day (not to exceed per year max) $80 $75 93.8% $75 93.8% Commercial Stable (per year)
a. 1-49 horses $1,120 $750 67.0% $750 67.0%
b. 50-99 horses $1,238 $900 72.7% $900 72.7%
c. 100 or more $2,073 $1,500 72.4% $1,500 72.4%
Circus (billed as hourly rate) (Note 5)
Business Licensing Hourly Rate $145 $145 100.0% $145 100.0% Vet Services Hourly Rate $123 $123 100.0% $123 100.0%
Rodeo (billed as hourly rate) (Note 6) $145 $145 100.0% $145 100.0% III. Fees For Animals Impounded
Daily Feed and Care
a. Large animal $155 $155 100.0% $155 100.0%
b. Medium animal $101 $100 99.0% $101 100.0%
C.Dog or Cat $136 $68 50.0% $68 50.0%
d. All other animals $72 $50 69.4% $50 69.4%
Veterinary Services
a. Rabies Vaccination $10 $10 100.0% $10 100.0%
b. Services performed by County staff, per qtr. Hr. $31 at cost at cost C. Emergency services performed by other than County $100 $100 100.0% $100 100.0% staff, per treatment (Note 10)
d. Other procedures (Note 7) N/A N/A N/A
e. Owner Requested Euthanasia $132 $132 100.0% $132 100.0% Health Related Grooming
a. Minor (Note 8) $21 $21 100.0% $21 100.0%
b. Major $90 $90 100.0% $90 100.0%
Health Related Bath
a. Small $24 $24 100.0% $24 100.0%
b. Medium $33 $33 100.0% $33 100.0%
c. Large $50 $50 100.0% $50 100.0%
Disposal Options
Rendering $19 $19 100.0% $19 100.0%
Impound Fees- Modified
Brought in by Field Officers
a. Large animal (horse, cow, etc.) $171 $171 100.0% $171 100.0% b. Medium animal (pig, sheep, etc.) $134 $134 100.0% $134 100.0% c.Dog, cat or other small animal* $205 $150 73.2% $175 85.4% Brought in by Citizens/ Over the Counter
a. Large animal (horse, cow, etc.) $126 $126 100.0% $126 100.0% b. Medium animal (pig, sheep, etc.) $99 $99 100.0% $99 100.0% c.Dog, cat or other small animal* $134 $134 100.0% $134 100.0% Owner Requested Disposal from Field
a. Large animal (horse, cow, etc.) $232 $232 100.0% $232 100.0% Animal Control and Shelter Fees - All Fee Increase
Full Cost
Recovery Fee Current Fee Current Cost
Recovery %
Proposed
Fee
Proposed Cost
Recovery %
b. Medium animal (pig, sheep, etc.) $138 $138 100.0% $138 100.0% c.Dog, cat or other small animal* $32 $32 100.0% $32 100.0% Placement Fees
a. Dog
Days 1-5 after being made available $53 $50 94.3% $53 100.0% Days 6-30 after being made available $53 $20 37.7% $20 37.7% Day 31 and over after being made available $53 $0 0.0% $0 0.0% b. Cat
Days 1 after being made available $53 $50 94.3% $53 100.0% Days 2 after being made available $53 $0 0.0% $0 0.0%
c. Exotic animals, including birds and reptiles $53 $50 94.3% $51 96.2% d. Other animals (except livestock) N/A N/A N/A
e. Livestock N/A
Lower of
actual cost or
market value
Lower of
actual cost
or market
value
f. Sr. Animal for Sr. Citizen - Dog
Dog $53 $0 0.0% $0 0.0%
Cat $53 $0 0.0% $0 0.0%
Microchip
a. Implant & Registration Fee $14 $14 100.0% $14 100.0% b. Home Again Re-Registration Only Fee (Note 9) $0 $0 $0 c. Home Again New Registration Only Fee (Note 9) $0 $0 $0 d. Avid Registration Only Fee $1 $1 100.0% $1 100.0%
Canine Spay / Neuter Fee $209 $65 31.1% $75 35.9%
Feline / Rabbit Spay Neuter Fee $417 $65 15.6% $75 18.0% Relinquishment Fee (Owner Surrender) $34 $34 100.0% $34 100.0% Deceased Animal Disposal (at shelter) Fee $13 $13 100.0% $13 100.0% Quarantine Fee $145 $145 100.0% $145 100.0%
Animal Delivery Fee $54 $54 100.0% $54 100.0%
Vicious Declaration Fee $1,571 $1,571 100.0% $1,571 100.0% 4-1-95 Non- Compliance Fee $899 $899 100.0% $899 100.0% Taxable Sales
a. Cat carrier fee $4 $4 100.0% $4 100.0%
b. Animal leash fee $1 $1 100.0% $1 100.0%
c. Pet ID tag (Unlicensed) $2 $2 100.0% $2 100.0%
Sedation Fee $15 $15 100.0% $15 100.0%
Notes:
Note 1 - Per CA Food and Agri. Code § 30804.5, fees for sterilized animals shall be issued at no more than 50% of the fee for unsterilized animals.
Note 2 - Sr. Citizen and Military (active and veteran) fee for sterilized animals is equal to 50% of the regular fee for sterilized animals (see Note 1).
Note 3 - The Application fee is a non-refundable deposit toward the license fee.
Note 4 - Penalty Fee is 25% of fee for animal business licenses not renewed within 30 days after expiration of the previous license, or for licenses not timely obtained.
Note 5 - Circus fee is an hourly rate; the fee will be a billing by hour or portion thereof at an hourly rate of $145 for Business License staff time; and at a rate of $123.00 for Veterinary Services staff time.
Note 6 - Rodeo fee is an hourly rate; the fee will be a billing by hour or portion thereof at an hourly rate of $145 for Business License staff time; Note 7 - Vet Services - Other Procedures (Column G amount) is an estimate based on the current fees and fee units reported in Chameleon Sys. Account Code Summary Report (FY 2014-15).
Vet Services - Other Procedures (Column H amount) is the sum total of a separate fee calculation for each of these fees, using the Vet Services hourly rate plus actual cost of supplies.
Note 8 - Per program staff, there is no S&EB or S&S related cost relating to this fee.
Currently Minor grooming is performed by volunteers.
Note 9 - Per program staff, there is no staff program related cost associated with this fee.
Note 10 - Program plans to charge the emergency veterinarian service at actual cost. The $100 rate is only for the estimates, subject to change during contract negotiations with vendors.
Note 11 - The total does not agree to the $17,244,201 of User Fee Related Service Costs in Attachment A. This is due to the various methodologies in the fee calculations. Variance is within a reasonable amount.
New Construction
Plan Check Fees
Construction Type Construction Type Construction Type
IA, IB IIA, IIB, IIIA, IIIB, IV VA, VB
IBC
Class IBC Occupancy Type
Project
Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
A-1 Assembly—Fixed Seating 500 $1,775 $88.7325 $1,479 $73.9438 $1,183 $59.1550 - Theater, Concert Hall 2,500 $3,549 $42.5900 $2,958 $35.4917 $2,366 $28.3933 - - 5,000 $4,614 $28.4000 $3,845 $23.6667 $3,076 $18.9333 - - 10,000 $6,034 $7.0900 $5,028 $5.9083 $4,023 $4.7267 - - 25,000 $7,098 $22.7100 $5,915 $18.9250 $4,732 $15.1400 - - 50,000 $12,775 $25.5500 $10,646 $21.2917 $8,517 $17.0333 A-2 Assembly—Food & Drink 500 $1,977 $98.8650 $1,648 $82.3875 $1,318 $65.9100 - Restaurant, Night Club, Bar 2,500 $3,955 $47.4600 $3,296 $39.5500 $2,637 $31.6400 - - 5,000 $5,141 $31.6350 $4,284 $26.3625 $3,428 $21.0900 - - 10,000 $6,723 $7.9050 $5,603 $6.5875 $4,482 $5.2700 - - 25,000 $7,909 $25.3050 $6,591 $21.0875 $5,273 $16.8700 - - 50,000 $14,235 $28.4700 $11,863 $23.7250 $9,490 $18.9800 A-3 Assembly—Worship, Amusement 500 $2,282 $114.0863 $1,901 $95.0719 $1,521 $76.0575 - Arcade, Church, Community Hall 2,500 $4,563 $54.7650 $3,803 $45.6375 $3,042 $36.5100 - - 5,000 $5,933 $36.5100 $4,944 $30.4250 $3,955 $24.3400 - - 10,000 $7,758 $9.1300 $6,465 $7.6083 $5,172 $6.0867 - - 25,000 $9,128 $29.1900 $7,606 $24.3250 $6,085 $19.4600 - - 50,000 $16,425 $32.8500 $13,688 $27.3750 $10,950 $21.9000 A-4 Assembly—Indoor Sport Viewing 500 $1,825 $91.2690 $1,521 $76.0575 $1,217 $60.8460 - Arena, Skating Rink, Tennis Court 2,500 $3,651 $43.8120 $3,042 $36.5100 $2,434 $29.2080 - - 5,000 $4,746 $29.2080 $3,955 $24.3400 $3,164 $19.4720 - - 10,000 $6,206 $7.3040 $5,172 $6.0867 $4,138 $4.8693 - - 25,000 $7,302 $23.3520 $6,085 $19.4600 $4,868 $15.5680 - - 50,000 $13,140 $26.2800 $10,950 $21.9000 $8,760 $17.5200 A-5 Assembly—Outdoor Activities 1,000 $1,065 $26.6138 $887 $22.1781 $710 $17.7425 - Amusement Park, Bleacher, Stadium 5,000 $2,129 $12.7950 $1,774 $10.6625 $1,420 $8.5300 - - 10,000 $2,769 $8.5200 $2,308 $7.1000 $1,846 $5.6800 - - 20,000 $3,621 $2.1300 $3,018 $1.7750 $2,414 $1.4200 - - 50,000 $4,260 $6.8100 $3,550 $5.6750 $2,840 $4.5400 - - 100,000 $7,665 $7.6650 $6,388 $6.3875 $5,110 $5.1100 A Commercial Tenant Improvements 150 $456 $76.0650 $456 $76.0650 $456 $76.0650 - - 750 $913 $36.4950 $913 $36.4950 $913 $36.4950
- - 1,500 $1,186 $24.3450 $1,186 $24.3450 $1,186 $24.3450 - - 3,000 $1,552 $6.0950 $1,552 $6.0950 $1,552 $6.0950
- - 7,500 $1,826 $19.4550 $1,826 $19.4550 $1,826 $19.4550 - - 15,000 $3,285 $21.9000 $3,285 $21.9000 $3,285 $21.9000 B Business—Professional Office 1,000 $1,977 $49.4325 $1,648 $41.1938 $1,318 $32.9550 - - 5,000 $3,955 $23.7450 $3,296 $19.7875 $2,637 $15.8300 - - 10,000 $5,142 $15.8100 $4,285 $13.1750 $3,428 $10.5400 - - 20,000 $6,723 $3.9650 $5,603 $3.3042 $4,482 $2.6433 - - 50,000 $7,913 $12.6450 $6,594 $10.5375 $5,275 $8.4300 - - 100,000 $14,235 $14.2350 $11,863 $11.8625 $9,490 $9.4900 B Commercial Tenant Improvements 150 $456 $76.0650 $456 $76.0650 $456 $76.0650 - - 750 $913 $36.4950 $913 $36.4950 $913 $36.4950
- - 1,500 $1,186 $24.3450 $1,186 $24.3450 $1,186 $24.3450 - - 3,000 $1,552 $6.0950 $1,552 $6.0950 $1,552 $6.0950
- - 7,500 $1,826 $19.4550 $1,826 $19.4550 $1,826 $19.4550 - - 15,000 $3,285 $21.9000 $3,285 $21.9000 $3,285 $21.9000 E Educational—Group Occupancy 1,000 $3,575 $89.3625 $2,979 $74.4688 $2,383 $59.5750 - 6+ persons, up to the 12th Grade 5,000 $7,149 $42.9000 $5,958 $35.7500 $4,766 $28.6000 - - 10,000 $9,294 $28.5900 $7,745 $23.8250 $6,196 $19.0600 - - 20,000 $12,153 $7.1400 $10,128 $5.9500 $8,102 $4.7600 - - 50,000 $14,295 $22.8900 $11,913 $19.0750 $9,530 $15.2600 100,000 $25,740 $25.7400 $21,450 $21.4500 $17,160 $17.1600 E Commercial Tenant Improvements 150 $456 $76.0650 $456 $76.0650 $456 $76.0650 - - 750 $913 $36.4950 $913 $36.4950 $913 $36.4950
- - 1,500 $1,186 $24.3450 $1,186 $24.3450 $1,186 $24.3450 - - 3,000 $1,552 $6.0950 $1,552 $6.0950 $1,552 $6.0950
- - 7,500 $1,826 $19.4550 $1,826 $19.4550 $1,826 $19.4550 - - 15,000 $3,285 $21.9000 $3,285 $21.9000 $3,285 $21.9000 F-1 Factory Industrial—Moderate Hazard 4,000 $1,819 $3.9600 $1,516 $3.3000 $1,213 $2.6400 - - 20,000 $2,453 $3.1680 $2,044 $2.6400 $1,635 $2.1120 - - 40,000 $3,086 $0.7800 $2,572 $0.6500 $2,058 $0.5200 - - 80,000 $3,398 $1.1880 $2,832 $0.9900 $2,266 $0.7920 - - 200,000 $4,824 $0.5640 $4,020 $0.4700 $3,216 $0.3760 400,000 $5,952 $1.4880 $4,960 $1.2400 $3,968 $0.9920
F-2 Factory Industrial—Low Hazard 3,000 $1,635 $13.6163 $1,363 $11.3469 $1,090 $9.0775 - - 15,000 $3,269 $6.5550 $2,724 $5.4625 $2,180 $4.3700 - - 30,000 $4,253 $4.3650 $3,544 $3.6375 $2,835 $2.9100 - - 60,000 $5,562 $1.0950 $4,635 $0.9125 $3,708 $0.7300 - - 150,000 $6,548 $3.4950 $5,456 $2.9125 $4,365 $2.3300 New Construction
Plan Check Fees
Construction Type Construction Type Construction Type
IA, IB IIA, IIB, IIIA, IIIB, IV VA, VB
IBC
Class IBC Occupancy Type
Project
Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
- - 300,000 $11,790 $3.9300 $9,825 $3.2750 $7,860 $2.6200 F Commercial Tenant Improvements 150 $456 $76.0650 $456 $76.0650 $456 $76.0650 - - 750 $913 $36.4950 $913 $36.4950 $913 $36.4950
- - 1,500 $1,186 $24.3450 $1,186 $24.3450 $1,186 $24.3450 - - 3,000 $1,552 $6.0950 $1,552 $6.0950 $1,552 $6.0950
- - 7,500 $1,826 $19.4550 $1,826 $19.4550 $1,826 $19.4550 - - 15,000 $3,285 $21.9000 $3,285 $21.9000 $3,285 $21.9000 H-1 High Hazard Group H-1 1,000 $1,597 $39.9350 $1,331 $33.2792 $1,065 $26.6233 - Pose a detonation hazard 5,000 $3,195 $19.1700 $2,662 $15.9750 $2,130 $12.7800 - - 10,000 $4,153 $12.7700 $3,461 $10.6417 $2,769 $8.5133 - - 20,000 $5,430 $3.2000 $4,525 $2.6667 $3,620 $2.1333 - - 50,000 $6,390 $10.2200 $5,325 $8.5167 $4,260 $6.8133 - - 100,000 $11,500 $11.5000 $9,583 $9.5833 $7,667 $7.6667 H-2 High Hazard Group H-2 2,000 $1,612 $20.1510 $1,344 $16.7925 $1,075 $13.4340 - Pose a deflagration hazard 10,000 $3,224 $9.6840 $2,687 $8.0700 $2,150 $6.4560 - - 20,000 $4,193 $6.4440 $3,494 $5.3700 $2,795 $4.2960 - - 40,000 $5,482 $1.6040 $4,568 $1.3367 $3,654 $1.0693 - - 100,000 $6,444 $5.1720 $5,370 $4.3100 $4,296 $3.4480 - - 200,000 $11,616 $5.8080 $9,680 $4.8400 $7,744 $3.8720 H-3 High Hazard Group H-3 1,000 $1,540 $38.5050 $1,283 $32.0875 $1,027 $25.6700 - Readily support combustion 5,000 $3,080 $18.4950 $2,567 $15.4125 $2,054 $12.3300 - - 10,000 $4,005 $12.3000 $3,338 $10.2500 $2,670 $8.2000 - - 20,000 $5,235 $3.0750 $4,363 $2.5625 $3,490 $2.0500 - - 50,000 $6,158 $9.8550 $5,131 $8.2125 $4,105 $6.5700 - - 100,000 $11,085 $11.0850 $9,238 $9.2375 $7,390 $7.3900 H-4 High Hazard Group H-4 1,000 $1,917 $47.9220 $1,597 $39.9350 $1,278 $31.9480 - Pose health hazards 5,000 $3,833 $23.0040 $3,195 $19.1700 $2,556 $15.3360 - - 10,000 $4,984 $15.3240 $4,153 $12.7700 $3,322 $10.2160 - - 20,000 $6,516 $3.8400 $5,430 $3.2000 $4,344 $2.5600 - - 50,000 $7,668 $12.2640 $6,390 $10.2200 $5,112 $8.1760 - - 100,000 $13,800 $13.8000 $11,500 $11.5000 $9,200 $9.2000 H-5 High Hazard Group H-5 1,000 $1,917 $47.9220 $1,597 $39.9350 $1,278 $31.9480 - Semiconductor Fabrication, R&D 5,000 $3,833 $23.0040 $3,195 $19.1700 $2,556 $15.3360 - - 10,000 $4,984 $15.3240 $4,153 $12.7700 $3,322 $10.2160 - - 20,000 $6,516 $3.8400 $5,430 $3.2000 $4,344 $2.5600 - - 50,000 $7,668 $12.2640 $6,390 $10.2200 $5,112 $8.1760 - - 100,000 $13,800 $13.8000 $11,500 $11.5000 $9,200 $9.2000 H Commercial Tenant Improvements 150 $456 $76.0650 $456 $76.0650 $456 $76.0650 - - 750 $913 $36.4950 $913 $36.4950 $913 $36.4950
- - 1,500 $1,186 $24.3450 $1,186 $24.3450 $1,186 $24.3450 - - 3,000 $1,552 $6.0950 $1,552 $6.0950 $1,552 $6.0950
- - 7,500 $1,826 $19.4550 $1,826 $19.4550 $1,826 $19.4550 - - 15,000 $3,285 $21.9000 $3,285 $21.9000 $3,285 $21.9000 I-1 Institutional—7+ persons, ambulatory 1,000 $2,525 $63.1290 $2,104 $52.6075 $1,683 $42.0860 - - 5,000 $5,050 $30.3000 $4,209 $25.2500 $3,367 $20.2000 - - 10,000 $6,565 $20.1960 $5,471 $16.8300 $4,377 $13.4640 - - 20,000 $8,585 $5.0440 $7,154 $4.2033 $5,723 $3.3627 - - 50,000 $10,098 $16.1640 $8,415 $13.4700 $6,732 $10.7760 - - 100,000 $18,180 $18.1800 $15,150 $15.1500 $12,120 $12.1200 I-2 Institutional—6+ persons, non-ambulatory 1,000 $3,156 $78.9113 $2,630 $65.7594 $2,104 $52.6075 - - 5,000 $6,313 $37.8750 $5,261 $31.5625 $4,209 $25.2500 - - 10,000 $8,207 $25.2450 $6,839 $21.0375 $5,471 $16.8300 - - 20,000 $10,731 $6.3050 $8,943 $5.2542 $7,154 $4.2033 - - 50,000 $12,623 $20.2050 $10,519 $16.8375 $8,415 $13.4700 - - 100,000 $22,725 $22.7250 $18,938 $18.9375 $15,150 $15.1500 I-3 Institutional—6+ persons, restrained 1,000 $3,080 $77.0063 $2,567 $64.1719 $2,054 $51.3375 - - 5,000 $6,161 $36.9600 $5,134 $30.8000 $4,107 $24.6400 - - 10,000 $8,009 $24.6450 $6,674 $20.5375 $5,339 $16.4300 - - 20,000 $10,473 $6.1650 $8,728 $5.1375 $6,982 $4.1100 - - 50,000 $12,323 $19.7250 $10,269 $16.4375 $8,215 $13.1500 100,000 $22,185 $22.1850 $18,488 $18.4875 $14,790 $14.7900 I-4 Institutional—6+ persons, day care 1,000 $2,320 $57.9975 $1,933 $48.3313 $1,546 $38.6650 - - 5,000 $4,640 $27.8400 $3,866 $23.2000 $3,093 $18.5600 - - 10,000 $6,032 $18.5550 $5,026 $15.4625 $4,021 $12.3700 - - 20,000 $7,887 $4.6350 $6,573 $3.8625 $5,258 $3.0900 - - 50,000 $9,278 $14.8350 $7,731 $12.3625 $6,185 $9.8900 100,000 $16,695 $16.6950 $13,913 $13.9125 $11,130 $11.1300 I Commercial Tenant Improvements 150 $456 $76.0650 $456 $76.0650 $456 $76.0650 - - 750 $913 $36.4950 $913 $36.4950 $913 $36.4950
- - 1,500 $1,186 $24.3450 $1,186 $24.3450 $1,186 $24.3450 - - 3,000 $1,552 $6.0950 $1,552 $6.0950 $1,552 $6.0950
- - 7,500 $1,826 $19.4550 $1,826 $19.4550 $1,826 $19.4550 15,000 $3,285 $21.9000 $3,285 $21.9000 $3,285 $21.9000
New Construction
Plan Check Fees
Construction Type Construction Type Construction Type
IA, IB IIA, IIB, IIIA, IIIB, IV VA, VB
IBC
Class IBC Occupancy Type
Project
Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
L Labs (California ONLY) 2,000 $2,799 $34.9890 $2,332 $29.1575 $1,866 $23.3260 - - 10,000 $5,598 $16.7880 $4,665 $13.9900 $3,732 $11.1920 - - 20,000 $7,277 $11.1840 $6,064 $9.3200 $4,851 $7.4560 - - 40,000 $9,514 $2.8040 $7,928 $2.3367 $6,342 $1.8693 - - 100,000 $11,196 $8.9640 $9,330 $7.4700 $7,464 $5.9760 200,000 $20,160 $10.0800 $16,800 $8.4000 $13,440 $6.7200 M Mercantile—Retail or wholesale store 150 $761 $126.7613 $634 $105.6344 $507 $84.5075 - - 750 $1,521 $60.8550 $1,268 $50.7125 $1,014 $40.5700 - - 1,500 $1,978 $40.5450 $1,648 $33.7875 $1,318 $27.0300 - - 3,000 $2,586 $10.1400 $2,155 $8.4500 $1,724 $6.7600 - - 7,500 $3,042 $32.4600 $2,535 $27.0500 $2,028 $21.6400 - - 15,000 $5,477 $36.5100 $4,564 $30.4250 $3,651 $24.3400 M Commercial Tenant Improvements 150 $456 $76.0650 $456 $76.0650 $456 $76.0650 - - 750 $913 $36.4950 $913 $36.4950 $913 $36.4950
- - 1,500 $1,186 $24.3450 $1,186 $24.3450 $1,186 $24.3450 - - 3,000 $1,552 $6.0950 $1,552 $6.0950 $1,552 $6.0950
- - 7,500 $1,826 $19.4550 $1,826 $19.4550 $1,826 $19.4550 - - 15,000 $3,285 $21.9000 $3,285 $21.9000 $3,285 $21.9000 R-1 Residential—Transient 2,000 $6,780 $16.9538 $5,650 $14.1281 $4,520 $11.3025 - Boarding Houses, Hotels, Motels 10,000 $8,136 $13.5600 $6,780 $11.3000 $5,424 $9.0400 - - 20,000 $9,492 $6.7800 $7,910 $5.6500 $6,328 $4.5200 - - 40,000 $10,848 $5.6450 $9,040 $4.7042 $7,232 $3.7633 - - 100,000 $14,235 $6.1050 $11,863 $5.0875 $9,490 $4.0700 - - 200,000 $20,340 $10.1700 $16,950 $8.4750 $13,560 $6.7800 R-2 Residential—Permanent, 2+ Dwellings 1,500 $6,780 $22.6050 $5,650 $18.8375 $4,520 $15.0700 - Apartment, Dormitory, Timeshare 7,500 $8,136 $18.0900 $6,780 $15.0750 $5,424 $12.0600 - - 15,000 $9,493 $9.0450 $7,911 $7.5375 $6,329 $6.0300 - - 30,000 $10,850 $7.5400 $9,041 $6.2833 $7,233 $5.0267 - - 75,000 $14,243 $8.1300 $11,869 $6.7750 $9,495 $5.4200 - - 150,000 $20,340 $13.5600 $16,950 $11.3000 $13,560 $9.0400 R-3 Dwellings—Custom Homes 1,500 $1,978 $39.5475 $1,648 $32.9563 $1,318 $26.3650 - - 2,500 $2,373 $39.5325 $1,978 $32.9438 $1,582 $26.3550 - - 3,500 $2,768 $39.5400 $2,307 $32.9500 $1,846 $26.3600 - - 4,500 $3,164 $49.4400 $2,636 $41.2000 $2,109 $32.9600 - - 6,500 $4,153 $50.8564 $3,460 $42.3804 $2,768 $33.9043 - - 10,000 $5,933 $59.3250 $4,944 $49.4375 $3,955 $39.5500 R-3 Dwellings—Production Phase 1,500 $989 $19.7850 $824 $16.4875 $659 $13.1900 - of Master Plan (repeats) 2,500 $1,187 $19.7925 $989 $16.4938 $791 $13.1950 - - 3,500 $1,384 $19.7775 $1,154 $16.4813 $923 $13.1850 - - 4,500 $1,582 $24.7275 $1,319 $20.6063 $1,055 $16.4850 - - 6,500 $2,077 $25.3929 $1,731 $21.1607 $1,385 $16.9286 - - 10,000 $2,966 $29.6550 $2,471 $24.7125 $1,977 $19.7700 R-4 Residential—Assisted Living (6-16 persons) 1,500 $4,237 $14.1263 $3,531 $11.7719 $2,825 $9.4175 - - 7,500 $5,085 $11.3100 $4,238 $9.4250 $3,390 $7.5400 - - 15,000 $5,933 $5.6550 $4,944 $4.7125 $3,956 $3.7700 - - 30,000 $6,782 $4.7050 $5,651 $3.9208 $4,521 $3.1367 - - 75,000 $8,899 $5.0850 $7,416 $4.2375 $5,933 $3.3900 150,000 $12,713 $8.4750 $10,594 $7.0625 $8,475 $5.6500
R R Occupancy Remodel 150 $706 $23.5388 $589 $19.6156 $471 $15.6925 - - 750 $847 $18.8250 $706 $15.6875 $565 $12.5500
- - 1,500 $989 $9.4200 $824 $7.8500 $659 $6.2800
- - 3,000 $1,130 $7.8400 $942 $6.5333 $753 $5.2267
- - 7,500 $1,483 $8.4900 $1,236 $7.0750 $989 $5.6600
- - 15,000 $2,120 $14.1300 $1,766 $11.7750 $1,413 $9.4200 S-1 Storage—Moderate Hazard, Repair Garage 500 $1,460 $73.0110 $1,217 $60.8425 $974 $48.6740 - Motor Vehicles (not High Hazard) 2,500 $2,921 $35.0520 $2,434 $29.2100 $1,947 $23.3680 - - 5,000 $3,797 $23.3520 $3,164 $19.4600 $2,531 $15.5680 - - 10,000 $4,964 $5.8440 $4,137 $4.8700 $3,310 $3.8960 - - 25,000 $5,841 $18.6840 $4,868 $15.5700 $3,894 $12.4560 - - 50,000 $10,512 $21.0240 $8,760 $17.5200 $7,008 $14.0160 S-2 Storage—Low Hazard, Parking Garages 1,000 $2,190 $54.7560 $1,825 $45.6300 $1,460 $36.5040 - Open or Enclosed 5,000 $4,381 $26.2920 $3,651 $21.9100 $2,920 $17.5280 - - 10,000 $5,695 $17.5200 $4,746 $14.6000 $3,797 $11.6800 - - 20,000 $7,447 $4.3760 $6,206 $3.6467 $4,965 $2.9173 - - 50,000 $8,760 $14.0160 $7,300 $11.6800 $5,840 $9.3440 - - 100,000 $15,768 $15.7680 $13,140 $13.1400 $10,512 $10.5120 S S Commercial Tenant Improvements 500 $456 $76.0650 $456 $76.0650 $456 $76.0650 - - 2,500 $913 $36.4950 $913 $36.4950 $913 $36.4950
- - 5,000 $1,186 $24.3450 $1,186 $24.3450 $1,186 $24.3450 - - 10,000 $1,552 $6.0950 $1,552 $6.0950 $1,552 $6.0950 - - 25,000 $1,826 $19.4550 $1,826 $19.4550 $1,826 $19.4550 50,000 $3,285 $21.9000 $3,285 $21.9000 $3,285 $21.9000
U Accessory—Private Garage 200 $228 $28.5188 $190 $23.7656 $152 $19.0125 New Construction
Plan Check Fees
Construction Type Construction Type Construction Type
IA, IB IIA, IIB, IIIA, IIIB, IV VA, VB
IBC
Class IBC Occupancy Type
Project
Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
- - 1,000 $456 $13.6800 $380 $11.4000 $304 $9.1200
- - 2,000 $593 $9.1350 $494 $7.6125 $395 $6.0900
- - 4,000 $776 $2.2700 $647 $1.8917 $517 $1.5133
- - 10,000 $912 $7.3200 $760 $6.1000 $608 $4.8800
- - 20,000 $1,644 $8.2200 $1,370 $6.8500 $1,096 $5.4800 R-3 Residential Room Addition 150 $706 $23.5388 $589 $19.6156 $471 $15.6925 - - 750 $847 $18.8250 $706 $15.6875 $565 $12.5500
- - 1,500 $989 $9.4200 $824 $7.8500 $659 $6.2800
- - 3,000 $1,130 $7.8400 $942 $6.5333 $753 $5.2267
- - 7,500 $1,483 $8.4900 $1,236 $7.0750 $989 $5.6600
- - 15,000 $2,120 $14.1300 $1,766 $11.7750 $1,413 $9.4200
SHELL BUILDINGS
- All Shell Buildings 1,000 $608 $15.2100 $507 $12.6750 $406 $10.1400 - - 5,000 $1,217 $7.2960 $1,014 $6.0800 $811 $4.8640
- - 10,000 $1,582 $4.8720 $1,318 $4.0600 $1,054 $3.2480 - - 20,000 $2,069 $1.2240 $1,724 $1.0200 $1,379 $0.8160 - - 50,000 $2,436 $3.8880 $2,030 $3.2400 $1,624 $2.5920 - - 100,000 $4,380 $4.3800 $3,650 $3.6500 $2,920 $2.9200 * Each additional 100 square feet, or portion thereof, up to the next highest project size threshold.
New Construction
Inspection Fees
Construction Type Construction Type Construction Type
IA, IB IIA, IIB, IIIA, IIIB, IV VA, VB
IBC
Class IBC Occupancy Type
Project
Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
A-1 Assembly—Fixed Seating 500 $2,260 $113.0150 $1,884 $94.1792 $1,507 $75.3433 - Theater, Concert Hall 2,500 $4,521 $90.4000 $3,767 $75.3333 $3,014 $60.2667 - - 5,000 $6,781 $135.6100 $5,650 $113.0083 $4,520 $90.4067 - - 10,000 $13,561 $30.1433 $11,301 $25.1194 $9,041 $20.0956 - - 25,000 $18,083 $9.0300 $15,069 $7.5250 $12,055 $6.0200 - - 50,000 $20,340 $40.6800 $16,950 $33.9000 $13,560 $27.1200 A-2 Assembly—Food & Drink 500 $3,390 $169.5225 $2,825 $141.2688 $2,260 $113.0150 - Restaurant, Night Club, Bar 2,500 $6,781 $135.6000 $5,651 $113.0000 $4,521 $90.4000 - - 5,000 $10,171 $203.4150 $8,476 $169.5125 $6,781 $135.6100 - - 10,000 $20,342 $45.2150 $16,951 $37.6792 $13,561 $30.1433 - - 25,000 $27,124 $13.5450 $22,603 $11.2875 $18,083 $9.0300 - - 50,000 $30,510 $61.0200 $25,425 $50.8500 $20,340 $40.6800 A-3 Assembly—Worship, Amusement 500 $3,390 $169.5225 $2,825 $141.2688 $2,260 $113.0150 - Arcade, Church, Community Hall 2,500 $6,781 $135.6000 $5,651 $113.0000 $4,521 $90.4000 - - 5,000 $10,171 $203.4150 $8,476 $169.5125 $6,781 $135.6100 - - 10,000 $20,342 $45.2150 $16,951 $37.6792 $13,561 $30.1433 - - 25,000 $27,124 $13.5450 $22,603 $11.2875 $18,083 $9.0300 - - 50,000 $30,510 $61.0200 $25,425 $50.8500 $20,340 $40.6800 A-4 Assembly—Indoor Sport Viewing 500 $2,712 $135.6180 $2,260 $113.0150 $1,808 $90.4120 - Arena, Skating Rink, Tennis Court 2,500 $5,425 $108.4800 $4,521 $90.4000 $3,616 $72.3200 - - 5,000 $8,137 $162.7320 $6,781 $135.6100 $5,424 $108.4880 - - 10,000 $16,273 $36.1720 $13,561 $30.1433 $10,849 $24.1147 - - 25,000 $21,699 $10.8360 $18,083 $9.0300 $14,466 $7.2240 - - 50,000 $24,408 $48.8160 $20,340 $40.6800 $16,272 $32.5440 A-5 Assembly—Outdoor Activities 1,000 $2,034 $50.8650 $1,695 $42.3875 $1,356 $33.9100 - Amusement Park, Bleacher, Stadium 5,000 $4,069 $40.6650 $3,391 $33.8875 $2,713 $27.1100 - - 10,000 $6,102 $61.0200 $5,085 $50.8500 $4,068 $40.6800 - - 20,000 $12,204 $13.5700 $10,170 $11.3083 $8,136 $9.0467 - - 50,000 $16,275 $4.0800 $13,563 $3.4000 $10,850 $2.7200 - - 100,000 $18,315 $18.3150 $15,263 $15.2625 $12,210 $12.2100 A Commercial Tenant Improvements 150 $407 $67.8113 $407 $67.8113 $407 $67.8113 - - 750 $814 $54.2550 $814 $54.2550 $814 $54.2550
- - 1,500 $1,221 $81.3750 $1,221 $81.3750 $1,221 $81.3750 - - 3,000 $2,441 $18.0750 $2,441 $18.0750 $2,441 $18.0750 - - 7,500 $3,255 $5.4150 $3,255 $5.4150 $3,255 $5.4150
- - 15,000 $3,661 $24.4050 $3,661 $24.4050 $3,661 $24.4050 B Business—Professional Office 1,000 $5,085 $127.1325 $4,238 $105.9438 $3,390 $84.7550 - - 5,000 $10,171 $101.7150 $8,476 $84.7625 $6,781 $67.8100 - - 10,000 $15,257 $152.5650 $12,714 $127.1375 $10,171 $101.7100 - - 20,000 $30,513 $33.9150 $25,428 $28.2625 $20,342 $22.6100 - - 50,000 $40,688 $10.1550 $33,906 $8.4625 $27,125 $6.7700 - - 100,000 $45,765 $45.7650 $38,138 $38.1375 $30,510 $30.5100 B Commercial Tenant Improvements 150 $407 $67.8113 $407 $67.8113 $407 $67.8113 - - 750 $814 $54.2550 $814 $54.2550 $814 $54.2550
- - 1,500 $1,221 $81.3750 $1,221 $81.3750 $1,221 $81.3750 - - 3,000 $2,441 $18.0750 $2,441 $18.0750 $2,441 $18.0750 - - 7,500 $3,255 $5.4150 $3,255 $5.4150 $3,255 $5.4150
- - 15,000 $3,661 $24.4050 $3,661 $24.4050 $3,661 $24.4050 E Educational—Group Occupancy 1,000 $3,390 $84.7613 $2,825 $70.6344 $2,260 $56.5075 - 6+ persons, up to the 12th Grade 5,000 $6,781 $67.8150 $5,651 $56.5125 $4,521 $45.2100 - - 10,000 $10,172 $101.7150 $8,476 $84.7625 $6,781 $67.8100 - - 20,000 $20,343 $22.5900 $16,953 $18.8250 $13,562 $15.0600 - - 50,000 $27,120 $6.7800 $22,600 $5.6500 $18,080 $4.5200 - - 100,000 $30,510 $30.5100 $25,425 $25.4250 $20,340 $20.3400 E Commercial Tenant Improvements 150 $407 $67.8113 $407 $67.8113 $407 $67.8113 - - 750 $814 $54.2550 $814 $54.2550 $814 $54.2550
- - 1,500 $1,221 $81.3750 $1,221 $81.3750 $1,221 $81.3750 - - 3,000 $2,441 $18.0750 $2,441 $18.0750 $2,441 $18.0750 - - 7,500 $3,255 $5.4150 $3,255 $5.4150 $3,255 $5.4150
- - 15,000 $3,661 $24.4050 $3,661 $24.4050 $3,661 $24.4050 F-1 Factory Industrial—Moderate Hazard 4,000 $1,733 $2.6970 $1,444 $2.2475 $1,156 $1.7980 - - 20,000 $2,165 $3.0000 $1,804 $2.5000 $1,443 $2.0000 - - 40,000 $2,765 $1.5600 $2,304 $1.3000 $1,843 $1.0400 - - 80,000 $3,389 $0.7360 $2,824 $0.6133 $2,259 $0.4907 - - 200,000 $4,272 $0.7440 $3,560 $0.6200 $2,848 $0.4960 New Construction
Inspection Fees
Construction Type Construction Type Construction Type
IA, IB IIA, IIB, IIIA, IIIB, IV VA, VB
IBC
Class IBC Occupancy Type
Project
Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
- - 400,000 $5,760 $1.4400 $4,800 $1.2000 $3,840 $0.9600 F-2 Factory Industrial—Low Hazard 3,000 $870 $7.2450 $725 $6.0375 $580 $4.8300 - - 15,000 $1,739 $5.8050 $1,449 $4.8375 $1,160 $3.8700 - - 30,000 $2,610 $8.7000 $2,175 $7.2500 $1,740 $5.8000 - - 60,000 $5,220 $1.9250 $4,350 $1.6042 $3,480 $1.2833 - - 150,000 $6,953 $0.5850 $5,794 $0.4875 $4,635 $0.3900 - - 300,000 $7,830 $2.6100 $6,525 $2.1750 $5,220 $1.7400 F Commercial Tenant Improvements 150 $407 $67.8113 $407 $67.8113 $407 $67.8113 - - 750 $814 $54.2550 $814 $54.2550 $814 $54.2550
- - 1,500 $1,221 $81.3750 $1,221 $81.3750 $1,221 $81.3750 - - 3,000 $2,441 $18.0750 $2,441 $18.0750 $2,441 $18.0750 - - 7,500 $3,255 $5.4150 $3,255 $5.4150 $3,255 $5.4150
- - 15,000 $3,661 $24.4050 $3,661 $24.4050 $3,661 $24.4050 H-1 High Hazard Group H-1 1,000 $569 $14.2225 $474 $11.8521 $379 $9.4817 - Pose a detonation hazard 5,000 $1,138 $11.3800 $948 $9.4833 $759 $7.5867 - - 10,000 $1,707 $17.0700 $1,423 $14.2250 $1,138 $11.3800 - - 20,000 $3,414 $3.8033 $2,845 $3.1694 $2,276 $2.5356 - - 50,000 $4,555 $1.1300 $3,796 $0.9417 $3,037 $0.7533 - - 100,000 $5,120 $5.1200 $4,267 $4.2667 $3,413 $3.4133 H-2 High Hazard Group H-2 2,000 $683 $8.5320 $569 $7.1100 $455 $5.6880 - Pose a deflagration hazard 10,000 $1,366 $6.8400 $1,138 $5.7000 $910 $4.5600 - - 20,000 $2,050 $10.2480 $1,708 $8.5400 $1,366 $6.8320 - - 40,000 $4,099 $2.2680 $3,416 $1.8900 $2,733 $1.5120 - - 100,000 $5,460 $0.6840 $4,550 $0.5700 $3,640 $0.4560 - - 200,000 $6,144 $3.0720 $5,120 $2.5600 $4,096 $2.0480 H-3 High Hazard Group H-3 1,000 $854 $21.3338 $711 $17.7781 $569 $14.2225 - Readily support combustion 5,000 $1,707 $17.0700 $1,423 $14.2250 $1,138 $11.3800 - - 10,000 $2,561 $25.6050 $2,134 $21.3375 $1,707 $17.0700 - - 20,000 $5,121 $5.7050 $4,268 $4.7542 $3,414 $3.8033 - - 50,000 $6,833 $1.6950 $5,694 $1.4125 $4,555 $1.1300 - - 100,000 $7,680 $7.6800 $6,400 $6.4000 $5,120 $5.1200 H-4 High Hazard Group H-4 1,000 $683 $17.0670 $569 $14.2225 $455 $11.3780 - Pose health hazards 5,000 $1,366 $13.6560 $1,138 $11.3800 $910 $9.1040 - - 10,000 $2,048 $20.4840 $1,707 $17.0700 $1,366 $13.6560 - - 20,000 $4,097 $4.5640 $3,414 $3.8033 $2,731 $3.0427 - - 50,000 $5,466 $1.3560 $4,555 $1.1300 $3,644 $0.9040 - - 100,000 $6,144 $6.1440 $5,120 $5.1200 $4,096 $4.0960 H-5 High Hazard Group H-5 1,000 $683 $17.0670 $569 $14.2225 $455 $11.3780 - Semiconductor Fabrication, R&D 5,000 $1,366 $13.6560 $1,138 $11.3800 $910 $9.1040 - - 10,000 $2,048 $20.4840 $1,707 $17.0700 $1,366 $13.6560 - - 20,000 $4,097 $4.5640 $3,414 $3.8033 $2,731 $3.0427 - - 50,000 $5,466 $1.3560 $4,555 $1.1300 $3,644 $0.9040 - - 100,000 $6,144 $6.1440 $5,120 $5.1200 $4,096 $4.0960 H Commercial Tenant Improvements 150 $407 $67.8113 $407 $67.8113 $407 $67.8113 - - 750 $814 $54.2550 $814 $54.2550 $814 $54.2550
- - 1,500 $1,221 $81.3750 $1,221 $81.3750 $1,221 $81.3750 - - 3,000 $2,441 $18.0750 $2,441 $18.0750 $2,441 $18.0750 - - 7,500 $3,255 $5.4150 $3,255 $5.4150 $3,255 $5.4150
- - 15,000 $3,661 $24.4050 $3,661 $24.4050 $3,661 $24.4050 I-1 Institutional—7+ persons, ambulatory 1,000 $854 $21.3600 $712 $17.8000 $570 $14.2400 - - 5,000 $1,709 $17.0880 $1,424 $14.2400 $1,139 $11.3920 - - 10,000 $2,563 $25.6320 $2,136 $21.3600 $1,709 $17.0880 - - 20,000 $5,126 $5.6920 $4,272 $4.7433 $3,418 $3.7947 - - 50,000 $6,834 $1.7160 $5,695 $1.4300 $4,556 $1.1440 - - 100,000 $7,692 $7.6920 $6,410 $6.4100 $5,128 $5.1280 I-2 Institutional—6+ persons, non-ambulatory 1,000 $1,068 $26.7000 $890 $22.2500 $712 $17.8000 - - 5,000 $2,136 $21.3600 $1,780 $17.8000 $1,424 $14.2400 - - 10,000 $3,204 $32.0400 $2,670 $26.7000 $2,136 $21.3600 - - 20,000 $6,408 $7.1150 $5,340 $5.9292 $4,272 $4.7433 - - 50,000 $8,543 $2.1450 $7,119 $1.7875 $5,695 $1.4300 - - 100,000 $9,615 $9.6150 $8,013 $8.0125 $6,410 $6.4100 I-3 Institutional—6+ persons, restrained 1,000 $1,068 $26.7000 $890 $22.2500 $712 $17.8000 - - 5,000 $2,136 $21.3600 $1,780 $17.8000 $1,424 $14.2400 - - 10,000 $3,204 $32.0400 $2,670 $26.7000 $2,136 $21.3600 - - 20,000 $6,408 $7.1150 $5,340 $5.9292 $4,272 $4.7433 - - 50,000 $8,543 $2.1450 $7,119 $1.7875 $5,695 $1.4300 - - 100,000 $9,615 $9.6150 $8,013 $8.0125 $6,410 $6.4100 New Construction
Inspection Fees
Construction Type Construction Type Construction Type
IA, IB IIA, IIB, IIIA, IIIB, IV VA, VB
IBC
Class IBC Occupancy Type
Project
Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
I-4 Institutional—6+ persons, day care 1,000 $1,068 $26.7000 $890 $22.2500 $712 $17.8000 - - 5,000 $2,136 $21.3600 $1,780 $17.8000 $1,424 $14.2400 - - 10,000 $3,204 $32.0400 $2,670 $26.7000 $2,136 $21.3600 - - 20,000 $6,408 $7.1150 $5,340 $5.9292 $4,272 $4.7433 - - 50,000 $8,543 $2.1450 $7,119 $1.7875 $5,695 $1.4300 - - 100,000 $9,615 $9.6150 $8,013 $8.0125 $6,410 $6.4100 I Commercial Tenant Improvements 150 $407 $67.8113 $407 $67.8113 $407 $67.8113 - - 750 $814 $54.2550 $814 $54.2550 $814 $54.2550
- - 1,500 $1,221 $81.3750 $1,221 $81.3750 $1,221 $81.3750 - - 3,000 $2,441 $18.0750 $2,441 $18.0750 $2,441 $18.0750 - - 7,500 $3,255 $5.4150 $3,255 $5.4150 $3,255 $5.4150
- - 15,000 $3,661 $24.4050 $3,661 $24.4050 $3,661 $24.4050 L Labs (California ONLY) 2,000 $5,424 $67.8090 $4,520 $56.5075 $3,616 $45.2060 - - 10,000 $10,849 $54.2520 $9,041 $45.2100 $7,233 $36.1680 - - 20,000 $16,274 $81.3720 $13,562 $67.8100 $10,850 $54.2480 - - 40,000 $32,549 $18.0720 $27,124 $15.0600 $21,699 $12.0480 - - 100,000 $43,392 $5.4240 $36,160 $4.5200 $28,928 $3.6160 - - 200,000 $48,816 $24.4080 $40,680 $20.3400 $32,544 $16.2720 M Mercantile—Retail or wholesale store 150 $1,356 $226.0238 $1,130 $188.3531 $904 $150.6825 - - 750 $2,712 $180.8250 $2,260 $150.6875 $1,808 $120.5500 - - 1,500 $4,068 $271.2300 $3,390 $226.0250 $2,712 $180.8200 - - 3,000 $8,137 $60.2800 $6,781 $50.2333 $5,425 $40.1867 - - 7,500 $10,850 $18.0900 $9,041 $15.0750 $7,233 $12.0600 - - 15,000 $12,206 $81.3750 $10,172 $67.8125 $8,138 $54.2500 M Commercial Tenant Improvements 150 $407 $67.8113 $407 $67.8113 $407 $67.8113 - - 750 $814 $54.2550 $814 $54.2550 $814 $54.2550
- - 1,500 $1,221 $81.3750 $1,221 $81.3750 $1,221 $81.3750 - - 3,000 $2,441 $18.0750 $2,441 $18.0750 $2,441 $18.0750 - - 7,500 $3,255 $5.4150 $3,255 $5.4150 $3,255 $5.4150
- - 15,000 $3,661 $24.4050 $3,661 $24.4050 $3,661 $24.4050 R-1 Residential—Transient 2,000 $13,561 $33.9038 $11,301 $28.2531 $9,041 $22.6025 - Boarding Houses, Hotels, Motels 10,000 $16,274 $40.6950 $13,561 $33.9125 $10,849 $27.1300 - - 20,000 $20,343 $20.3250 $16,953 $16.9375 $13,562 $13.5500 - - 40,000 $24,408 $9.0450 $20,340 $7.5375 $16,272 $6.0300 - - 100,000 $29,835 $10.8450 $24,863 $9.0375 $19,890 $7.2300 - - 200,000 $40,680 $20.3400 $33,900 $16.9500 $27,120 $13.5600 R-2 Residential—Permanent, 2+ Dwellings 1,500 $13,561 $45.1988 $11,301 $37.6656 $9,041 $30.1325 - Apartment, Dormitory, Timeshare 7,500 $16,273 $54.2550 $13,561 $45.2125 $10,849 $36.1700 - - 15,000 $20,342 $27.1350 $16,952 $22.6125 $13,562 $18.0900 - - 30,000 $24,413 $12.0500 $20,344 $10.0417 $16,275 $8.0333 - - 75,000 $29,835 $14.4600 $24,863 $12.0500 $19,890 $9.6400 - - 150,000 $40,680 $27.1200 $33,900 $22.6000 $27,120 $18.0800 R-3 Dwellings—Custom Homes 1,500 $2,034 $40.6650 $1,695 $33.8875 $1,356 $27.1100 - - 2,500 $2,441 $61.0425 $2,034 $50.8688 $1,627 $40.6950 - - 3,500 $3,051 $61.0575 $2,543 $50.8813 $2,034 $40.7050 - - 4,500 $3,662 $40.6688 $3,052 $33.8906 $2,441 $27.1125 - - 6,500 $4,475 $46.4786 $3,729 $38.7321 $2,984 $30.9857 - - 10,000 $6,102 $61.0200 $5,085 $50.8500 $4,068 $40.6800 R-3 Dwellings—Production Phase 1,500 $2,034 $40.6650 $1,695 $33.8875 $1,356 $27.1100 - of Master Plan (repeats) 2,500 $2,441 $61.0425 $2,034 $50.8688 $1,627 $40.6950 - - 3,500 $3,051 $61.0575 $2,543 $50.8813 $2,034 $40.7050 - - 4,500 $3,662 $40.6688 $3,052 $33.8906 $2,441 $27.1125 - - 6,500 $4,475 $46.4786 $3,729 $38.7321 $2,984 $30.9857 - - 10,000 $6,102 $61.0200 $5,085 $50.8500 $4,068 $40.6800 R-4 Residential—Assisted Living (6-16 persons) 1,500 $13,561 $45.1988 $11,301 $37.6656 $9,041 $30.1325 - - 7,500 $16,273 $54.2550 $13,561 $45.2125 $10,849 $36.1700 - - 15,000 $20,342 $27.1350 $16,952 $22.6125 $13,562 $18.0900 - - 30,000 $24,413 $12.0500 $20,344 $10.0417 $16,275 $8.0333 - - 75,000 $29,835 $14.4600 $24,863 $12.0500 $19,890 $9.6400 - - 150,000 $40,680 $27.1200 $33,900 $22.6000 $27,120 $18.0800 R R Occupancy Remodel 150 $1,356 $45.1988 $1,130 $37.6656 $904 $30.1325 - - 750 $1,627 $54.2550 $1,356 $45.2125 $1,085 $36.1700 - - 1,500 $2,034 $27.1350 $1,695 $22.6125 $1,356 $18.0900 - - 3,000 $2,441 $12.0500 $2,034 $10.0417 $1,628 $8.0333 - - 7,500 $2,984 $14.4600 $2,486 $12.0500 $1,989 $9.6400 - - 15,000 $4,068 $27.1200 $3,390 $22.6000 $2,712 $18.0800 S-1 Storage—Moderate Hazard, Repair Garage 500 $1,356 $67.8090 $1,130 $56.5075 $904 $45.2060 New Construction
Inspection Fees
Construction Type Construction Type Construction Type
IA, IB IIA, IIB, IIIA, IIIB, IV VA, VB
IBC
Class IBC Occupancy Type
Project
Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
- Motor Vehicles (not High Hazard) 2,500 $2,712 $54.2520 $2,260 $45.2100 $1,808 $36.1680 - - 5,000 $4,069 $81.3720 $3,391 $67.8100 $2,712 $54.2480 - - 10,000 $8,137 $18.0720 $6,781 $15.0600 $5,425 $12.0480 - - 25,000 $10,848 $5.4240 $9,040 $4.5200 $7,232 $3.6160 - - 50,000 $12,204 $24.4080 $10,170 $20.3400 $8,136 $16.2720 S-2 Storage—Low Hazard, Parking Garages 1,000 $6,509 $162.7350 $5,425 $135.6125 $4,340 $108.4900 - Open or Enclosed 5,000 $13,019 $130.2000 $10,849 $108.5000 $8,679 $86.8000 - - 10,000 $19,529 $195.2880 $16,274 $162.7400 $13,019 $130.1920 - - 20,000 $39,058 $43.3880 $32,548 $36.1567 $26,038 $28.9253 - - 50,000 $52,074 $13.0200 $43,395 $10.8500 $34,716 $8.6800 - - 100,000 $58,584 $58.5840 $48,820 $48.8200 $39,056 $39.0560 S S Commercial Tenant Improvements 500 $407 $67.8113 $407 $67.8113 $407 $67.8113 - - 2,500 $814 $54.2550 $814 $54.2550 $814 $54.2550
- - 5,000 $1,221 $81.3750 $1,221 $81.3750 $1,221 $81.3750 - - 10,000 $2,441 $18.0750 $2,441 $18.0750 $2,441 $18.0750 - - 25,000 $3,255 $5.4150 $3,255 $5.4150 $3,255 $5.4150 - - 50,000 $3,661 $24.4050 $3,661 $24.4050 $3,661 $24.4050 U Accessory—Private Garage 200 $745 $93.1500 $621 $77.6250 $497 $62.1000 - - 1,000 $1,490 $74.5200 $1,242 $62.1000 $994 $49.6800 - - 2,000 $2,236 $111.7800 $1,863 $93.1500 $1,490 $74.5200 - - 4,000 $4,471 $24.8300 $3,726 $20.6917 $2,981 $16.5533 - - 10,000 $5,961 $7.4700 $4,968 $6.2250 $3,974 $4.9800 - - 20,000 $6,708 $33.5400 $5,590 $27.9500 $4,472 $22.3600 R-3 Residential Room Addition 150 $814 $27.1200 $678 $22.6000 $542 $18.0800 - - 750 $976 $32.5650 $814 $27.1375 $651 $21.7100
- - 1,500 $1,221 $16.2750 $1,017 $13.5625 $814 $10.8500 - - 3,000 $1,465 $7.2250 $1,221 $6.0208 $977 $4.8167
- - 7,500 $1,790 $8.6850 $1,492 $7.2375 $1,193 $5.7900
- - 15,000 $2,441 $16.2750 $2,034 $13.5625 $1,628 $10.8500
SHELL BUILDINGS
- All Shell Buildings 1,000 $814 $20.3370 $678 $16.9475 $542 $13.5580 - - 5,000 $1,627 $16.2720 $1,356 $13.5600 $1,085 $10.8480 - - 10,000 $2,441 $24.4080 $2,034 $20.3400 $1,627 $16.2720 - - 20,000 $4,882 $5.4280 $4,068 $4.5233 $3,254 $3.6187 - - 50,000 $6,510 $1.6200 $5,425 $1.3500 $4,340 $1.0800 - - 100,000 $7,320 $7.3200 $6,100 $6.1000 $4,880 $4.8800 * Each additional 100 square feet, or portion thereof, up to the next highest project size threshold.
Transportation Advisory Committee
Informational Item Only
April, 2022
Authority
As specified in Division 9, Title 4 of the Codified Ordinances of the County of Orange (Ambulance Ordinance 3517), the Board of Supervisors establishes the maximum Basic Life Support (BLS) emergency ground ambulance rates applicable within the County’s unincorporated area and cities that have agreed with the Ordinance for the provision of licensing and regulation of ambulance services. Ordinance 3517 also establishes the authority to adjust the maximum Advanced Life Support (ALS) Paramedic Assessment and Transport rate applicable for the Orange County Fire Authority’s (OCFA) jurisdictional areas, with the exception of three cities that establish their own ALS rate.
Orange County Emergency Medical Services (OCEMS) policy #715.00 Ground Emergency Ambulance Service Rates – Adjustment identifies the process for annual rate adjustments. On August 8, 2017, the Orange County Board of Supervisors passed Board Resolution No. 17-094 which approved the revision of the ambulance rates and adopted the recommended methodology for calculation and application of future annual adjustments. The Board authorized the Health Care Agency (HCA) to make an annual adjustment effective July 1
st of each year. Data is appointed from the US Department of Labor’s Bureau of Labor Statistics (www.bls.gov) to determine the percentage from the prior year and applied to the current rate.
2022 Maximum 911 Emergency Basic Life Support Rates FY 2022-23
Due to the discontinuation of the Los Angeles-Riverside-Orange Counties “all items” CPI index by the US Department of Labor’s Bureau of Labor Statistics in 2018, the Health Care Agency currently uses the Los Angeles-Long Beach-Anaheim “all items” CPI index to adjust the rates for mileage, oxygen, standby, and medical supplies for 2019 and thereafter. The emergency base rate continues to be adjusted using the percentage adjustment of State or Federal minimum wage increases. The Ambulance Association of Orange County agreed to the change of the new CPI method in 2019.
Description
2021
Rates
Effects of
Minimum
Wage1
CPI %
change $ increase
2022 Rates
(effective
7/1/22)
Emergency Base Rate $1,290.15 7.1% $91.60 1,381.75
Mileage $ 19.05 3.8% $ 0.72 19.77
Oxygen $ 93.40 3.8% $ 3.55 96.95
Standby $ 45.76 3.8% $ 1.74 47.50
Expendable Medical Supplies $ 36.87 3.8% $ 1.40 38.27
1Effects of Minimum Wage
2CPI (Los Angeles-Long Beach-Anaheim “all items”)
New Minimum Wage Phase in Requirement 2017-2023
SB 3 (Leno, Chapter 4, Statutes of 2016)
Date
Minimum Wage for
Employers with 26
Employees or More
Percentage Increase in
Minimum Wage
January 1, 2017 $10.50/hour
January 1, 2018 $11.00/hour
January 1, 2019 $12.00/hour
January 1, 2020 $13.00/hour
January 1, 2021 $14.00/hour 7.7%
January 1, 2022 $15.00/hour 7.1%
$15.00 - $14.00 = $1 = .0714 or 7.1% $14.00 $14.00
Databases, Tables & Calculators by Subject
Data extracted on: March 23, 2022 (12:40:02 PM)
CPI for All Urban Consumers (CPI-U)
Series Id: CUURS49ASA0,CUUSS49ASA0
Not Seasonally Adjusted
Series
Title:
All items in Los Angeles-Long Beach-Anaheim, CA, all urban consumers, not seasonally adjusted
Area: Los Angeles-Long Beach-Anaheim, CA
Item: All items
Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Annual HALF1 HALF2 2012 233.441 234.537 236.941 236.866 237.032 236.025 235.776 237.222 238.104 240.111 237.675 236.042 236.648 235.807 237.488 2013 238.015 239.753 239.995 239.043 239.346 239.223 238.920 239.219 239.611 239.940 238.677 238.742 239.207 239.229 239.185 2014 239.857 241.059 242.491 242.437 243.362 243.528 243.727 243.556 243.623 243.341 241.753 240.475 242.434 242.122 242.746 2015 239.724 241.297 243.738 243.569 246.093 245.459 247.066 246.328 245.431 245.812 245.711 245.357 244.632 243.313 245.951 2016 247.155 247.113 247.873 248.368 249.554 249.789 249.784 249.700 250.145 251.098 250.185 250.189 249.246 248.309 250.184 2017 252.373 253.815 254.525 254.971 255.674 255.275 256.023 256.739 257.890 258.883 259.135 259.220 256.210 254.439 257.982 2018 261.235 263.012 264.158 265.095 266.148 265.522 266.007 266.665 268.032 269.482 268.560 267.631 265.962 264.195 267.730 2019 269.468 269.608 271.311 273.945 274.479 274.380 274.682 274.579 276.054 278.075 277.239 275.553 274.114 272.199 276.030 2020 277.755 278.657 276.589 275.853 276.842 278.121 279.899 280.116 279.366 279.947 280.102 279.560 278.567 277.303 279.832 2021 280.178 281.347 282.648 285.808 287.620 289.218 290.890 291.333 292.209 294.961 296.790 297.925 289.244 284.470 294.018
Source: https://data.bls.gov/pdq/SurveyOutputServlet?data_tool=dropmap&series_id=CUURS49ASA0,CUUSS49ASA0
289.244-278.567 = 10.677 = .3.83 or 3.8%