Text extracted from the city's file for reading and search. Open the original on cityoforange.legistar1.com. That file is the official record.

Agenda Item
City Council
Item #: 3.51. 6/14/2022 File #: 22-0360
TO: Honorable Mayor and Members of the City Council
THRU: Rob Houston, City Manager
FROM: Christopher Cash, Public Works Director

1. SUBJECT
Authorization to apply for a grant under the Orange County Transportation Authority’sMeasure M2 Environmental Cleanup Tier 1 Program. Resolution No. 11403.

2. SUMMARY
Resolution No. 11403 authorizes the City of Orange to apply for a $400,000 grant under the Orange County Transportation Authority’sMeasure M2 Environmental Cleanup Program Tier 1 Program. The total project cost estimate is $500,000, inclusive of the required 20% match.

3. RECOMMENDED ACTION
Adopt Resolution No. 11403. A Resolution of the City Council of the City of Orange authorizing an application for funds for the Environmental Cleanup, Tier 1 Grant Program under Orange County Local Transportation Ordinance No. 3 for the installation of a Continuous Deflection Separator, Connector Pipe Screens.

4. FISCAL IMPACT
None.

5. STRATEGIC PLAN GOALS
Goal 1: Provide for a safe community
b: Provide and maintain infrastructure necessary to ensure the safety of the public.

Goal 4: Provide outstanding public service
b: Provide facilities and services to meet customer expectations.

6. DISCUSSION AND BACKGROUND
Renewed Measure M (M2) approved by the voters in 2006 is a 30-year, multi-billion dollar program extension of the original Measure M (approved in 1990) with a new slate of planned projects and programs. These include improvements to the county freeway system, streets and roads network, expansion of the Metrolink system, more transit services for seniors and the disabled, as well as funding for the cleanup of roadway storm water runoff.

Orange County Local Transportation Ordinance No.3, dated July 24, 2006, known and cited as the Renewed Measure M Transportation Ordinance and Investment Plan, makes funds available through the Environmental Cleanup Program to help protect Orange County beaches and waterways from City of Orange Printed on 6/9/2022Page 1 of 2
powered by Legistar™
Item #: 3.51. 6/14/2022 File #: 22-0360
transportation-generated pollution (urban runoff) and improve overall water quality.

The Public Works Department has identified Taft Avenue and O’DonnellWay intersection as a good location for the installation of a Continuous Deflection Separator (CDS) off-line with the existing 36” reinforced concrete pipe storm drain line. This storm drain line collects runoff from commercial shops, restaurants, single family and multiple family residence areas and is experiencing a heavy volume of trash and debris. Installing a CDS Unit will effectively capture trash and debris that may adversely impact receiving waters and impair beneficial uses such as recreation, swimming, and fishing.

The project also proposes to install seven (7) connector pipe screen (CPS) units in various catch basins located on Taft Avenue, and Lewis Street. The CPS will capture trash and debris from the nearby priority land uses such as restaurants, hospitals, bus stops, and other commercial sites. The City is seeking a competitive grant of $400,000 that would require $100,000 in matching funds, for a total project cost estimate of approximately $500,000. If successful, Public Works staff would most likely request an appropriation of $100,000 from Sanitation and Sewer (220) to provide the matching funds.

7. ATTACHMENTS
· Resolution No. 11403
City of Orange Printed on 6/9/2022Page 2 of 2