City of Orange: Summary of Bid Abstracts for:
1 2 3 4 5
Bid No. 22-23.13
Date of Bid Opening: 10/20/22
Tel. No. (909) 629-8000 Tel. No. (909) 275-3354 Tel. No. (909) 330-1128 Tel. No. (909) 590-2626 Tel. No. (562) 599-5841 NO. DESCRIPTION OF WORK QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1 Traffic Control 1 LS 30,000.00$ $30,000.00 $4,500.00 $4,500.00 $22,000.00 $22,000.00 $27,682.61 $27,682.61 $75,901.00 $75,901.00 $123,000.00 $123,000.00 2 Sawcut and Remove Existing 4"
Concrete Paving (Contains 6"x6"
#10/#10 Welded Wire Mesh)
480 SF 8.00$
$3,840.00 $8.00 $3,840.00 $15.00 $7,200.00 $13.20 $6,336.00 $10.00 $4,800.00 $10.00 $4,800.00 3 Sawcut and Remove Existing 8"
Concrete Paving (Contains 6"x6"
#10/#10 Welded Wire Mesh)
1,750 SF 10.00$
$17,500.00 $12.00 $21,000.00 $18.00 $31,500.00 $18.04 $31,570.00 $13.00 $22,750.00 $21.00 $36,750.00 4 Construct 8" PCC Sidewalk with Old
Towne Finish 1,270 SF 15.00$
$19,050.00 $22.00 $27,940.00 $22.00 $27,940.00 $32.76 $41,605.20 $93.00 $118,110.00 $38.00 $48,260.00 5 Install City Furnished Crash Rated
Shallow Mounted Bollards, Complete
in Place (Frame, Sleeve, Concrete) 1 LS 80,000.00$
$80,000.00 $8,000.00 $8,000.00 $80,000.00 $80,000.00 $58,577.08 $58,577.08 $40,067.00 $40,067.00 $139,000.00 $139,000.00 6 Retrofit 4" Bollard Complete In Place
(Rebar Dowel, PVC, PCC, Welding) 20 EA 1,000.00$
$20,000.00 $900.00 $18,000.00 $4,000.00 $80,000.00 $682.42 $13,648.40 $2,511.00 $50,220.00 $1,300.00 $26,000.00 7 Remove and Reconstruct Access
Ramp 2 EA 8,000.00$
$16,000.00 $5,200.00 $10,400.00 $12,500.00 $25,000.00 $8,532.04 $17,064.08 $8,426.00 $16,852.00 $8,000.00 $16,000.00 8 Furnish and Install Landscape
Lighting, Complete in Place 1 LS 80,000.00$
$80,000.00 $100,285.00 $100,285.00 $35,000.00 $35,000.00 $121,588.00 $121,588.00 $149,093.00 $149,093.00 $146,000.00 $146,000.00 9 Furnish and Install Flag Pole Lighting,
Complete in Place 1 LS 15,000.00$
$15,000.00 $11,965.00 $11,965.00 $4,000.00 $4,000.00 $12,712.50 $12,712.50 $17,788.00 $17,788.00 $19,000.00 $19,000.00 $281,390.00 $205,930.00 $312,640.00 $330,783.87 $495,581.00 $558,810.00TOTAL

ENGINEER'S ESTIMATE
SP-4230 Plaza Park Safety Enhancements
CT&T Concrete Paving Inc. Leonida Builders, Inc. C.S. Legacy Construction, IncGentry General Engineering, Inc PALP, Inc DBA Excel Paving Company

Page 1 of 1 ends