Agenda Item
City Council
Item #: 3.10. 11/15/2022 File #: 22-0658
TO: Honorable Mayor and Members of the City Council
FROM: Christopher Cash, Public Works Director
1. SUBJECT
Agreement with R. Jensen Co. Inc. and RJ Noble Inc. to move a modular building from the former Fire Headquarters to 517 W. Struck Ave. and complete necessary pavement improvements at the site.
2. SUMMARY
This Agreement with R. Jenson Co. Inc. and Amendment No. 1 to an existing Contract with RJ Noble Company, would authorize R. Jensen Co. Inc. to disassemble, transport, and reassemble the Fire Headquarters modular building at the 517 W. Struck Ave. location and would authorize RJ Noble Company to improve the site pavement to support services provided by The Hub OC (“The HUB”).
3. RECOMMENDED ACTION
1. Approve the agreement with R. Jensen Co., Inc., in the amount of $87,308, and authorize the Mayor and City Clerk to execute on behalf of the City.
2. Approve Amendment No. 1 with RJ Noble, Inc., for $63,980, and authorize the Mayor and City Clerk to execute on behalf of the City.
3. Authorize the appropriation of $151,288 from the General Fund unreserved fund balance to 100.000.51670.30200 General Fund, 517 W. Struck Transition.
4. FISCAL IMPACT
The total expenditure total expenditure for this agreement is $151,288 and will be funded through General Fund (100).
5. STRATEGIC PLAN GOALS
Goal 1: Provide for a safe community
b: Provide and maintain infrastructure necessary to ensure the safety of the public.
6. DISCUSSION AND BACKGROUND
Pursuant to an agreement reached in federal court, the City has partnered with The HUB to oversee and manage the onsite operations and services previously provided by Mary’sKitchen. Currently, temporary facilities operate in the street and sidewalk on Struck Ave, adjacent to the City's Corporate Yard. In an effort to reclaim the use of the street, avoid issues related to the rainy season, and create additional space for services requested by The HUB, staff developed a plan for moving services off the street and onto the 517 W. Struck Avenue site.
Staff recommends that the City move the modular building currently located at the former Fire Headquarters to the Struck Avenue site. With the opening of the new Fire Headquarters, the modular building is no longer needed. Moving the building to the Struck Ave. site would replace the long-term City of Orange Printed on 11/10/2022Page 1 of 2
powered by Legistar™
Item #: 3.10. 11/15/2022 File #: 22-0658
building is no longer needed. Moving the building to the Struck Ave. site would replace the long-term rental trailers located in the street and serve as necessary office and meeting space for The HUB services. The relocation would allow the City to reduce monthly operating expenses associated with the rentals while alleviating any health and safety concerns of operating in the street.
To accomplish the relocation staff contacted a variety of different modular trailer movers for assistance. The only local contractor who was equipped to move the sizeable double-wide modular trailer in the timeframe necessary to perform the essential services was R. Jensen Co. Inc. As such, staff recommends awarding the project to R. Jensen Co. Inc. in an amount not to exceed $87,308 ($75,920, plus 15% contingency for unforeseen conditions).
Additionally, after evaluating the Struck site for the modular trailer, staff determined the existing pavement on-site was uneven, in poor condition, and not appropriately suited to accept the modular building. As such, staff recommends resurfacing the asphalt pavement on-site for the relocated building. For this, RJ Noble Inc. was the lowest responsive bid for the Annual Pavement Project (SP- 4183) and is currently under contract to perform street improvements city-wide. They have agreed to construct a 2-inch layer of asphalt over the existing pavement to create an acceptable building pad.
Staff recommends contract Amendment No. 1 to increase the approved contract with RJ Noble Inc. by $63,980 to cover the costs.
In total, staff requests an appropriation of $151,288 to fund these activities through the General Fund (100). Should other funding become available, staff will reallocate the expenses to the appropriate fund and return to the City Council with any proposed recommendations. It is anticipated work will be completed by January 2023, thus allowing The HUB to move off the street and operate all services from the 517 W. Struck Avenue site.
7. ATTACHMENTS
· Agreement with R. Jensen Co., Inc.
· Amendment No. 1 with RJ Noble, Inc.