Cities Index.
Agenda packet

Orange City Council
December 13, 2022

Document
Agenda packet
Meeting
December 13, 2022
Body
Orange City Council
Pages
16
Original file
22.2 MB
Text extracted from the city's file for reading and search. Open the original on cityoforange.legistar.com. That file is the official record.

as well as other devices designed to remove the aforementioned pollutants. Projects must demonstrate a direct nexus to the reduction of transportation-related pollution, as developed and defined by OCTA’s Environmental Cleanup Allocation Committee (ECAC).

To date, t he Board has approved funding for 199 Tier 1 projects, totaling approximately $30 million. It is estimated that more than 45 million gallons of trash have been captured since the inception of the ECP in 2011. Over time, the volume of trash captured is expected to increase. On March 14, 2022, the Board approved the issuance of the current 2022 ECP Tier 1 call for projects (call), making available approximately $3 million to support a 12 th call for the ECP Tier 1 program.

Discussion

The ECP Tier 1 call application deadline was June 16, 2022. As of that date, 14 applications were submitted to OCTA from 14 local jurisdictions. However, one application was withdrawn during the evaluation process. The 13 remaining applications were reviewed and evaluated by an application review committee consisting of OCTA staff and the ECAC Chairman. Project applications were evaluated based on Board-approved selection criteria, which include the following:

• Effectiveness at removing trash and debris;
• Cost/benefit analyses;
• Pollution reducing benefits;
• Project readiness;
• Adequacy of proposed operations and maintenance plans; and • Submission of clear and detailed work plans with specific implementation timing documented

On October 6, 2022, the ECAC met and concurred with the application review committee’s conclusions and recommend ed that 13 projects in the amount of $3,120,217 be considered by the Board for funding (Attachment A). While the recommended award amount is higher than the Board-authorized target of $3 million, the funding recommendation aligns with award recommendation s from previous cycles, which may be slightly below or above the Board-authorized target. It should also be noted that funding in excess of call target amounts is offset by previous ECP Tier 1 unallocated call balances, including approximately $102,000 from the 2021 call.

228
Comprehensive Transportation Funding Programs –
Project X Tier 1 2022 Call for Projects Programming
Recommendations

Page 3 ends

The projects being recommended for funding consist of catch basin debris screen devices, including 1,508 connector pipe screens (CPS), 288 automatic retractable screens (ARS), 170 grated inlet trash screens (GITS), one debris separating baffle box (DSBB), and one in-line trash trap unit.

More detailed project descriptions and visual examples are provided in Attachment B and Attachment C, respectively. A brief overview of these project types is provided below.

• Catch basin debris screen devices: These metal screen devices cover catch basins and prevent debris from entering the storm drain system and primarily consist of CPS, ARS, and GITS type devices.
• A DSBB is an advanced stormwater treatment system utilizing a non-clogging screen technology and hydrodynamic separation to capture pollutants. The non-clogging screening system stores trash and debris in a dry state, suspended above sedimentation chamb ers that allows for easier maintenance.
• An in -line trash trap unit is a precast concrete structure designed to reduce pollutants present in stormwater and urban runoff by capturing trash and solids from incoming flows using disposable mesh nets.

The design of the trash trap unit effectively uses the energy of water flow to drive pollutants into nets to separate and capture trash, debris, and sediment. All particles larger than one millimeter are captured .

Oil absorption material can be placed inside or outside the nets to absorb oil sheen and grease.

As part of this program, local jurisdictions agree to contribute a minimum match of 20 percent of total project costs. All recommended projects meet this requirement.

Upon approval from the Board, OCTA will execute letter agreements with each awarded local jurisdiction. Construction contracts are required to be awarded by the local jurisdiction within 12 months of the letter agreement and may not be executed before the letter agreement is finalized. However, due to extenuating circumstances in securing application review committee participants this call, it has taken longer than in previous cycles to advance the project funding recommendations to the Board for approval. Therefore, to hold local jurisdictions harmless for the reduced time to meet the construction contract requirement (i.e., 12 months from execution of letter agreements), staff is recommending that pre-award authority be granted upon Board approval for the 13 projects.

Pre-award authority allows local jurisdictions to enter into construction contracts ahead of execution of letter agreements , which can take several months after Board approval for final execution by cities and OCTA.

229
Comprehensive Transportation Funding Programs –
Project X Tier 1 2022 Call for Projects Programming
Recommendations

Page 4 ends

Staff continues to engage the ECAC for the recruitment of additional application review committee members for future Tier 1 call evaluations to mitigate potential delays in the future.

Next Steps

Upon Board approval and o nce funding awards are finalized, local jurisdictions will be required to ex ecute a letter amendment to their M2 master agreement.

As noted above, recommended pre -award authority will help local jurisdictions avoid any delays in project delivery. OCTA will monitor and report on project status and delivery through the CTFP semi -annual review and M2 quarterly reporting processes.

Summary

OCTA’s ECP provides grant funding to local jurisdictions for projects that support water quality improvements related to transportation infrastructure. The 2022 Tier 1 call has concluded, and staff is recommending Board approval to program $3,120,217 in ECP funds to 13 local jurisdiction projects.

Attachments

A. Project X 2022 Tier 1 Call for Projects, Programming Recommendations B. Project X 2022 Tier 1 Call for Projects – Project Summaries C. Visual Samples of Recommended Best Management Practice Project Types

Prepared by:

Approved by:

Alison Army Kia Mortazavi
Principal Transportation Analyst
(714) 560-5537
Executive Director, Planning
(714) 560-5741

230

Project X 2022 Tier 1 Call for Projects
Programming Recommendations

ATTACHMENT A
Agency Project Project Description Local
Match Score
Recommended
M2 Project
Allocation
Cumulative
Funding
Laguna Hills Connector Pipe Screen and Automatic Retractable Screen Project, Phase XI
Install 62 CPS-mod systems and
129 ARS-CL Curb Screens 20% 86 200,000$ 200,000$ Stanton Stanton Catch Basin Full Trash Capture System
Installations - 2022
Install 26 CPS-mod systems and
Five GITS devices 20% 83 61,890$ 261,890$ Mission Viejo Trash and Runoff Abatement Project: Northerly Area
Install 33 CPS-mod systems and
111 ARS-CL curb screens 20% 83 160,000$ 421,890$ Seal Beach 2022 Environmental Cleanup Project Install 57 CPS-mod systems, 117 GITS devices, and 48 ARS-FX curb-opening screens 20% 80 396,000$ 817,890$ Anaheim The Catch Basin Screen Installation
Project - 2022 Install 373 CPS units 20% 80 499,366$ 1,317,256$ Fullerton Installation of Full Capture Trash Devices in Catch Basins - 2022
Install 24 CPS-mod systems and
48 GITS devices 20% 79.5 173,761$ 1,491,017$ San Juan Capistrano San Juan Capistrano High Priority CPS Screen Installation Install 100 CPS units 20% 78 147,200$ 1,638,217$ Orange Debris Separating Baffle Box and Connector Pipe
Screen BMP Installation Install One DSBB and seven CPS units 20% 78 400,000$ 2,038,217$ Costa Mesa 2022 Connector Pipe Screen Installation Project Install 300 CPS units 20% 71 160,000$ 2,198,217$ Huntington Beach Huntington Beach Trash Removal Project Phase II - Atlanta Avenue Pump Station Retrofit Install one in-line trash trap unit 33.5% 69 500,000$ 2,698,217$ Westminster 2022 Catch Basin Screen Installation Project Install 100 CPS units 20% 66 69,600$ 2,767,817$ Laguna Niguel Purchase and Installation of Trash Control Devices on Stormwater Catch Basins 2022 Install 196 CPS units 20% 65 196,000$ 2,963,817$ Irvine Citywide Catch Basin Connector Pipe Screen
Installation Project - Phase 3 Install 230 CPS units 20% 65 156,400$ 3,120,217$ Agency Project Project Description
Newport Beach Newport Bay Trash Boom System Install one trash boom system Acronyms
ARS - Automatic Retractable Screen M2 - Measure M2
BMP - Best Management Practice N/A - Not Applicable
CPS - Connector Pipe Screen
DSBB - Debris Separating Baffle Box
GITS - Grated Inlet Trash Screen
Projects Recommended for Funding
Withdrawn by Applicant
M2 Funding Request
150,000$
Score
N/A
231
Project X 2022 Tier 1 Call for Projects – Project Summaries ATTACHMENT B Project Descriptions
Agency Project Title Project Highlights
Anaheim The Catch Basin Screen Installation
Project - 2022
The City of Anaheim proposes to install 373 CPS units at existing storm drain catch basins at strategic high-traffic sites located throughout the Anaheim watershed and storm drain system, protecting the Carbon Creek, Westminster, and Santa Ana River Watersheds.

Costa Mesa 2022 Connector Pipe Screen Installation
Project
The City of Costa Mesa proposes to install 300 CPS units along priority land use drainage areas, downstream of bus stops and along transportation corridors. The project area falls within two principal watersheds, the Newport Bay watershed and the Santa Ana River watershed.

Fullerton Installation of Full Capture Trash Devices in Catch Basins - 2022
The City of Fullerton proposes to install 24 CPS-mod systems and 48 GITS devices, prioritizing high-traffic areas with heavy pedestrian and vehicle traffic, such as industrial zones, commercial plazas, and apartments. The project area is expected to reduce the amount of transportation-related pollution entering Orange County’s surface and groundwater systems.

Huntington
Beach
Huntington Beach Trash Removal Project
Phase II - Atlanta Avenue Pump Station
Retrofit
The City of Huntington Beach proposes to install one in-line trash trap unit that would be located entirely within the City-owned Atlanta Avenue pump station yard, next to the Huntington Channel. The project area receives storm flows and runoff from a 247-acre watershed, of which 187 acres is a priority land use area.

Irvine
Citywide Catch Basin Connector Pipe Screen
Installation
Project - Phase 3
The City of Irvine proposes to install 230 CPS units at various locations throughout Irvine in order to protect the Upper Newport Bay. The specific locations were selected considering development areas, increased vehicle/pedestrian traffic, the absence of stormwater treatment by a natural treatment system, drainage from priority land use areas, and drainage to downstream receiving waters listed on the Clean Water Act List of Impaired Water Bodies.

Laguna Hills Connector Pipe Screen & Automatic
Retractable Screen Project, Phase XI
The City of Laguna Hills proposes to install 62 CPS-mod systems and 129 ARS-CL curb screens in catch basins in the northwest, central and south, and east side of Laguna Hills. These devices receive stormwater runoff from 234 total acres, of which 172 acres are in priority land use areas. The proposed project will protect water quality in three watersheds.

Laguna
Niguel
Purchase and Installation of Trash Control
Devices on Stormwater Catch Basins 2022
The City of Laguna Niguel proposes to install 196 CPS units that currently do not have trash control devices or have a trash control device that does not meet state requirements, largely in alternative land use areas.

Mission Viejo Trash and Runoff Abatement
Project: Northerly Area
The City of Mission Viejo proposes to install 33 CPS-mod systems and 111 ARS-CL curb screens in the northern area of Mission Viejo, protecting two watersheds, the San Juan Creek and Aliso Creek watersheds. All proposed project areas are considered priority land use areas, reducing stormwater pollution in commercial and high-density residential areas.

Orange
Debris Separating Baffle Box and Connector
Pipe Screen Best Management Practice
Installation
The City of Orange proposes to install one DSBB and seven CPS units. The DSBB would be located in the existing storm drain system that ultimately discharges into Buckeye Channel, collecting runoff from watershed 6 as described in the City of Orange Master Plan of Drainage. The CPS units would be installed within the City of Orange watersheds 6, 11, and 30.

San Juan
Capistrano
San Juan Capistrano High Priority CPS Screen
Installation
The City of San Juan Capistrano proposes to install 100 CPS units in catch basins located in high-density residential and commercial areas with high concentrations of industrial and commercial uses, as well as bus stops and driving routes that have a direct nexus to transportation-related activities affecting the San Juan Creek watershed.

Seal Beach 2022 Environmental Cleanup Project The City of Seal Beach proposes to install 57 CPS-mod systems, 117 GITS devices, and 48 ARS-FX curb-opening screens in the not-yet-protected priority land use area of Leisure World Seal Beach, preventing pollution runoff for the San Gabriel watershed.

Stanton Stanton Catch Basin Full
Trash Capture System Installations - 2022
The City of Stanton (City) proposes to install 26 CPS-mod systems and five GITS devices in 31 City-owned catch basins, prioritizing those that do not already have a full trash capture device installed. The City proposes to target areas predominantly featuring high pedestrian and vehicular traffic, such as apartments, schools, and commercial zones.

Westminster 2022 Catch Basin Screen Installation Project The City of Westminster proposes to install 100 CPS units servicing priority land use areas. The first priority is 31 catch basins in priority land use areas, and the second priority is for 69 residential catch basins to offset a portion of the trash from catch basins in priority land use areas that are not able to be equipped with CPS units.

Acronyms
ARS - Automatic Retractable Screen
CPS - Connector Pipe Screen
DSBB - Debris Separating Baffle Box
GITS - Grated Inlet Trash Screen
232

1 Visual Samples of Recommended Best Management Practice Project Types*

Connector Pipe Screen

Automatic Retractable Screen

ATTACHMENT C
233

2 Visual Samples of Recommended Best Management Practice Project Types*

Grate Inlet Trash Screen Unit

Debris Separating Baffle Box

234

3 Visual Samples of Recommended Best Management Practice Project Types*

In-Line Trash Trap

*Photographs are for visualization purposes. Actual final devices installed may be different depending on final procurement, site characteristics, final specs, etc.

235
Agenda Item
City Council
Item #: 3.7. 12/13/2022 File #: 22-0690
TO: Honorable Mayor and Members of the City Council
THRU: Tom Kisela, Interim City Manager
FROM: Dave Curtis, Library Services Director

1. SUBJECT
Appropriation of $30,000 in designated grant funding received from California State Library.

2. SUMMARY
Grant funds from California State Library will be used to enhance and expand the Orange Public Library’s environmental education collections and programming for all ages.

3. RECOMMENDED ACTION

1. Accept into the City’sbudget $30,000 in grant funds from California State Library into revenue account number 100.2001.45290.30213, General Fund - Sustainable Orange Grant.

2. Authorize the appropriation of $30,000 in grant funds into expenditure account number 100.2016.53340.30213, General Fund - Sustainable Orange Grant.

4. FISCAL IMPACT
The total appropriation for this grant is funded by the additional revenue received from the State of California.

5. STRATEGIC PLAN GOALS
Goal 3: Enhance and promote quality of life in the community e: Develop and strengthen collaborative partnerships to enhance and promote quality of life programs, projects and services

6. DISCUSSION AND BACKGROUND
The Orange Public Library has been awarded a Sustainable California Libraries Grant for Fiscal Year 2022-2023 (FY23). California State Library has generously provided support in Federal Library Services and Technology Act (LSTA) funds to expand and enhance the Library’s environmental education collections and programming for all ages. Orange Public Library is one of only twenty California library systems to receive this funding.

The Sustainable California Libraries Grant supports library projects focused on environmental education, sustainability, climate resilience, and conservation. To implement its Sustainable Orange:

Preserving Our Future project, the Library will reach out to potential local partners on programming including the UCCE Master Gardeners of Orange County, UCCE Master Food Preservers of Orange County, OC Beekeepers, and CR & R Inc. Storytimes and programs will focus on water conservation, food preservation, sustainable gardening, seed preservation, beekeeping, and organic waste recycling. Program attendees will receive take & make seed growing kits, so they can start and grow City of Orange Printed on 12/8/2022Page 1 of 2
powered by Legistar™
236
Item #: 3.7. 12/13/2022 File #: 22-0690
recycling. Program attendees will receive take & make seed growing kits, so they can start and grow their own sustainable gardens at home. Programs will be presented from January through June 2023.

The Library will continue its collaboration with Orange Home Grown and the Orange Public Library Foundation on their Seed Lending Libraries by adding a new seed library at Taft Branch Library. Over the past six years, library patrons have checked out over 30,000 seed packets from the Orange Public Library & History Center and El Modena Branch Library, and over 1,750 gardens have sprouted in Orange.

The patio adjacent to the El Modena Branch Library Community Room will be enhanced through the addition of raised beds, plants, and furniture to create a teaching garden area and attractive and functional space for future outdoor programs and activities.

All funds must be spent or encumbered by the end of June 2023 and will be used for new books, speaker fees, and supplies and furniture for the teaching garden and seed library.

7. ATTACHMENTS
· Sustainable Orange Grant Award Letter
City of Orange Printed on 12/8/2022Page 2 of 2
powered by Legistar™
237
Agenda Item
City Council
Item #: 3.7. 12/13/2022 File #: 22-0690
TO: Honorable Mayor and Members of the City Council
THRU: Tom Kisela, Interim City Manager
FROM: Dave Curtis, Library Services Director

1. SUBJECT
Appropriation of $30,000 in designated grant funding received from California State Library.

2. SUMMARY
Grant funds from California State Library will be used to enhance and expand the Orange Public Library’s environmental education collections and programming for all ages.

3. RECOMMENDED ACTION

1. Accept into the City’sbudget $30,000 in grant funds from California State Library into revenue account number 100.2001.45290.30213, General Fund - Sustainable Orange Grant.

2. Authorize the appropriation of $30,000 in grant funds into expenditure account number 100.2016.53340.30213, General Fund - Sustainable Orange Grant.

4. FISCAL IMPACT
The total appropriation for this grant is funded by the additional revenue received from the State of California.

5. STRATEGIC PLAN GOALS
Goal 3: Enhance and promote quality of life in the community e: Develop and strengthen collaborative partnerships to enhance and promote quality of life programs, projects and services

6. DISCUSSION AND BACKGROUND
The Orange Public Library has been awarded a Sustainable California Libraries Grant for Fiscal Year 2022-2023 (FY23). California State Library has generously provided support in Federal Library Services and Technology Act (LSTA) funds to expand and enhance the Library’s environmental education collections and programming for all ages. Orange Public Library is one of only twenty California library systems to receive this funding.

The Sustainable California Libraries Grant supports library projects focused on environmental education, sustainability, climate resilience, and conservation. To implement its Sustainable Orange:

Preserving Our Future project, the Library will reach out to potential local partners on programming including the UCCE Master Gardeners of Orange County, UCCE Master Food Preservers of Orange County, OC Beekeepers, and CR & R Inc. Storytimes and programs will focus on water conservation, food preservation, sustainable gardening, seed preservation, beekeeping, and organic waste recycling. Program attendees will receive take & make seed growing kits, so they can start and grow City of Orange Printed on 12/8/2022Page 1 of 2
powered by Legistar™
238
Item #: 3.7. 12/13/2022 File #: 22-0690
recycling. Program attendees will receive take & make seed growing kits, so they can start and grow their own sustainable gardens at home. Programs will be presented from January through June 2023.

The Library will continue its collaboration with Orange Home Grown and the Orange Public Library Foundation on their Seed Lending Libraries by adding a new seed library at Taft Branch Library. Over the past six years, library patrons have checked out over 30,000 seed packets from the Orange Public Library & History Center and El Modena Branch Library, and over 1,750 gardens have sprouted in Orange.

The patio adjacent to the El Modena Branch Library Community Room will be enhanced through the addition of raised beds, plants, and furniture to create a teaching garden area and attractive and functional space for future outdoor programs and activities.

All funds must be spent or encumbered by the end of June 2023 and will be used for new books, speaker fees, and supplies and furniture for the teaching garden and seed library.

7. ATTACHMENTS
· Sustainable Orange Grant Award Letter
City of Orange Printed on 12/8/2022Page 2 of 2
powered by Legistar™
239
240
Agenda Item
City Council
Item #: 3.8. 12/13/2022 File #: 22-0674
TO: Honorable Mayor and Members of the City Council
THRU: Tom Kisela, Interim City Manager
FROM: Christopher Cash, Public Works Director

1. SUBJECT
Award of Contract to Tess Electric, Inc. for electrical improvements at Wells 23 and 24.

2. SUMMARY
Three contractors were solicited, and Tess Electric, Inc. of Riverside was the only responsive bid with a proposal to complete the work for $35,532.

3. RECOMMENDED ACTION
Approve the contract with Tess Electric, Inc. in the amount of $35,532 for electrical improvements at Wells 23 and 24; and authorize the Mayor and City Clerk to execute on behalf of the City.

4. FISCAL IMPACT
The total expenditure for this contract is $35,532 and will be funded through Water Fund (600).

5. STRATEGIC PLAN GOALS
Goal 1: Provide for a safe community
b: Provide and maintain infrastructure necessary to ensure the safety of the public.

Goal 4: Provide outstanding public service
b: Provide facilities and services to meet customer expectations.

6. DISCUSSION AND BACKGROUND
Both Wells 23 and 24 were out of service for over a year to accommodate the installation of PFAS treatment systems. As a precautionary practice, a thorough inspection was conducted prior to the wells being put back in service. Upon meeting with three electrical contractors who have been working with the Public Works Water Division over the years, it was recommended that the soft starters for the boosters at Well 24 be replaced, and new soft starters be installed at Well 23, which was originally constructed without these units. These soft starters are equipped to help enable a smooth startup of the motor by eliminating stresses on the motor and electrical cable and help prolong the life of the motors.

Through an informal bid process, the Public Works Water Division met with three electrical contractors at the sites and requested for bids for these improvements. Two contractors: Halcyon Electric and Electrical Service Solutions, Inc. were unable to submit a bid due to scheduling conflicts.

City of Orange Printed on 12/8/2022Page 1 of 2
powered by Legistar™
241
Item #: 3.8. 12/13/2022 File #: 22-0674
Tess Electric Inc.’s bid came in at $35,532, which is considered reasonable.

The Water Division has worked with Tess Electric, Inc. on several projects in past years and has found them to be very responsive to our calls, as well as very familiar with our equipment and safety requirements.

7. ATTACHMENTS
· Contract with Tess Electric, Inc.

City of Orange Printed on 12/8/2022Page 2 of 2
powered by Legistar™
242
Agenda Item
City Council
Item #: 3.8. 12/13/2022 File #: 22-0674
TO: Honorable Mayor and Members of the City Council
THRU: Tom Kisela, Interim City Manager
FROM: Christopher Cash, Public Works Director

1. SUBJECT
Award of Contract to Tess Electric, Inc. for electrical improvements at Wells 23 and 24.

2. SUMMARY
Three contractors were solicited, and Tess Electric, Inc. of Riverside was the only responsive bid with a proposal to complete the work for $35,532.

3. RECOMMENDED ACTION
Approve the contract with Tess Electric, Inc. in the amount of $35,532 for electrical improvements at Wells 23 and 24; and authorize the Mayor and City Clerk to execute on behalf of the City.

4. FISCAL IMPACT
The total expenditure for this contract is $35,532 and will be funded through Water Fund (600).

5. STRATEGIC PLAN GOALS
Goal 1: Provide for a safe community
b: Provide and maintain infrastructure necessary to ensure the safety of the public.

Goal 4: Provide outstanding public service
b: Provide facilities and services to meet customer expectations.

6. DISCUSSION AND BACKGROUND
Both Wells 23 and 24 were out of service for over a year to accommodate the installation of PFAS treatment systems. As a precautionary practice, a thorough inspection was conducted prior to the wells being put back in service. Upon meeting with three electrical contractors who have been working with the Public Works Water Division over the years, it was recommended that the soft starters for the boosters at Well 24 be replaced, and new soft starters be installed at Well 23, which was originally constructed without these units. These soft starters are equipped to help enable a smooth startup of the motor by eliminating stresses on the motor and electrical cable and help prolong the life of the motors.

Through an informal bid process, the Public Works Water Division met with three electrical contractors at the sites and requested for bids for these improvements. Two contractors: Halcyon Electric and Electrical Service Solutions, Inc. were unable to submit a bid due to scheduling conflicts.

City of Orange Printed on 12/8/2022Page 1 of 2
powered by Legistar™
243
Item #: 3.8. 12/13/2022 File #: 22-0674
Tess Electric Inc.’s bid came in at $35,532, which is considered reasonable.

The Water Division has worked with Tess Electric, Inc. on several projects in past years and has found them to be very responsive to our calls, as well as very familiar with our equipment and safety requirements.

7. ATTACHMENTS
· Contract with Tess Electric, Inc.

City of Orange Printed on 12/8/2022Page 2 of 2
powered by Legistar™
244

CONTRACT
[Soft Starters Replacement for Wells 23 and 24]

THIS CONTRACT (the “Contract”) is made and ente red into as of ___ ___________, 2022 (“Effective Date”) by and between the CITY OF ORANGE, a municipal corporation (“City”), and TESS ELECTRIC INC. , a California corporation (“Contractor”), who agree as follows.

ARTICLE 1
Work Performed

a. For and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by City, and under the conditions expressed in the two (2) bonds presented to City with this Contract and incorporated herein by this reference, Contrac tor hereby agrees to and shall do all the work and furnish all the labor, materials, tools and equipment, except such as are mentioned in the specifications to be furnished by City to Contractor, necessary to complete in good workmanship and substantial manner the work (the “Work”) described in:

(1) The latest edition of the "City of Orange Standard Plans and Specifications" (the “Orange Book”) with the term "Engineer," as used in the Orange Book and in this Contract, to specifically include the City Engineer (or designee);

(2) The "Standard Specifications for Public Works Construction ” (the “Greenbook”), and all amendments thereto, except the definition of “Subcontractor” in Section 1.2 (General – Terms and Definitions) of Part 1 (General Provisions) of the Greenbook, which is hereby amended in its entirety to read as follows: “Subcontractor – An individual, firm, or corporation having a direct contract with the Contractor for the performance of a part of the Work;”

(3) Contractor’s Proposal, which is on file with City’s Department of Public Works.

b. Contractor acknowledges that it has received the Plans from City and that a complete copy of the Plans is in its possession and are hereby specifically referred to and by such reference made a part hereof. The Orange Book, Greenbook and City of Orange Standard Special Provisions and Standard Plans are on file with City’s Public Works Director and are hereby specifically referred to and by such reference made a part hereof. Contractor hereby acknowledges that it has read, reviewed and understands the Plans, the Orange Book, the Greenbook, the Special Provisions, the Standard Plans, and the Encroachment Permit as they relate to the Work, all of which documents shall be referred to herein collectively as the “Plans and Specifications.”

c. Contractor acknowledges the provisions of Chapter 8.28 of the Orange Municipal Code which requires, among other things, that Contractor utilize City’s exclusive solid waste hauler for the rental of bins for trash and debris removal and imposes mandatory recycling requirements for self-hauled construction and demolition waste. The terms and conditions set forth in this Contract shall control over any terms and conditions in the Plans and Specifications to the contrary.
245
2 d. The Work shall be performed in conformity with the Plans and Specifications and the Bid Proposal and all applicable laws, including any and all applicable federal and state labor laws and standards and applicable prevailing wage requirements and any and all state, federal and local statutes, regulations and ordinances relating to the protection of human health or the environment.

e. Unless and until otherwise notified in writing by City’s Public Works Director, City’s Senior Civil Engineer, Tuan Cao (“Authorized City Representative”), shall be the person to whom Contractor will report for the performance of the Work hereunder. It is understood that Contractor’s performance hereunder shall be under the direction and supervision of the Authorized City Representative or such other person as City’s Public Works Director may designate from time to time, that Contractor shall coordinate the Work hereunder with the Authorized City Representative to the extent required by the Authorized City Representative, a nd that all performances required hereunder by Contractor shall be performed to the satisfaction of the Authorized City Representative or City’s Public Works Director.

f. It is expressly agreed by and between the parties hereto that should there be any conflict between the terms of this instrument and Contractor’s Bid Proposal, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said Bid Proposal conflicting herewith.

ARTICLE 2
Commencement of Work

Contractor shall commence the Work provided for in this Contract within fifteen (15) days of the date of the issuance by City of a Notice to Proceed and diligently prosecute completion of the Work within thirty (30) calendar days from such date, unless legal extension is granted in accordance with the terms set forth in the Greenbook. Time is of the essence in this Contract.

Contractor shall do all things necessary and incidental to the prosecution of Contractor's Work.

ARTICLE 3
Compensation

a. Contractor agrees to receive and accept an amount not to exceed THIRTY-FIVE THOUSAND FIVE HUNDRED THIRTY-TWO DOLLARS and 00/100 ($ 35,532.00) as compensation for furnishing all materials and doing all the Work contemplated and embraced in this Contract. Said compensation covers (1) all loss or damage arising out of the nature of the Work, from the acts of the elements; (2) any unforeseen diffic ulties or obstructions which may arise or be encountered in the prosecution of the Work until its acceptance by City, other than as provided below ; (3) all risks of every description connected with the Work; (4) all expenses incurred by or in consequence of the suspension or discontinuance of the Work; and (5) well and faithfully completing the Work, and for the whole thereof, in the manner and according to the Plans and Specifications, and requirements of the Authorized City Representative under them.

Retention amounts shall be withheld from progress payments as required by law unless Contractor provides securities in lieu of retention.
246
3 ARTICLE 4
Licenses

Contractor represents that it and any subcontractors it may engage, possess any and all licenses which are required under state or federal law to perform the Work contemplated by this Contract and that Contractor and subcontractors shall maintain all appro priate licenses, including a City of Orange business license, at its cost, during the performance of this Contract.

ARTICLE 5
Guarantees

a. Contractor guarantees the construction and installation of all Work included in the Plans and Specifications for which Contractor has been awarded this Contract.

b. Should any of the materials or equipment installed pursuant to this Contract prove defective or should the Work as a whole prove defective, due to faulty equipment, workmanship, materials furnished or methods of installations, or should said Work or any part thereof fail to function properly, as designed, due to any of the above causes within twelve (12) months after the date on which said Work is accepted by City, Contractor shall make rep airs and furnish such materials and equipment as are necessary to be furnished and installed within fifteen (15) calendar days after the receipt of a demand from City.

c. Said Work will be deemed defective within the meaning of this guarantee in the event that it fails to function as originally intended either by the Plans and Specifications of this Contract or by the manufacturer(s) of the equipment incorporated into the Work.

d. In the event repairs are not made within fifteen (15) calendar days after Contractor's receipt of a demand from City, City shall have the unqualified option to make any needed repairs or replacements itself or by any other contractor. Contractor shall reimburse City, upon demand, for all expenses incurred in restoring said Work to the condition contemplated in this Contract, including the cost of any equipment or materials replaced.

e. It is understood that emergency repairs may, by necessity, be made by City.

Therefore, when defective equipment, materials or workmanship result in emergency repairs by City, Contractor shall reimburse City, upon demand, for all expenses incurred. Emergency repairs will be deemed as those repairs determined by City’s Director of Public Works to be necessary due to an immediate detriment to the he alth, safety, welfare or convenience of the residents of City.

ARTICLE 6
Water Quality

a. The Santa Ana Regional Water Quality Control Board (“RWQCB”) has issued National Pollutant Discharge Elimination System (“NPDES”) Permit No. R8 -2009-0030 (the “Permit”), which governs storm water and non -storm water discharges resulting from municipal 247
4 activities performed by City or its contractors. In order to comply with the Permit requirements, the County of Orange has prepared a Drainage Area Management Plan (“DAMP”), containing Model Maintenance Procedures with Best Management Practices (“BMPs”) that City and its contractors must adhere to. The Model Maintenance Procedures contain pollution prevention and source control techniques to minimize the impact of those activities upon dry -weather urban runoff, storm water runoff, and receiving water quality. Examples include: wash water from cleaning of sidewalks or parking lots must be collected and disposed of in the sewer or landscaped areas.

b. The Permit, the DAMP and the Model Maintenance Procedures are on file in the office of City’s Director of Publ ic Works. Contractor hereby acknowledges that it has read, reviewed and understands the Permit, the DAMP and the Model Maintenance Procedures, as they relate to the Work and hereby shall perform the Work in conformance therewith.

ARTICLE 7
Independent Contractor; Contractor not Agent

a. At all times during the term of this Contract, Contractor shall be an independent contractor and not an employee of City. City shall have the right to control Contractor only insofar as the result of Contractor’s service s rendered pursuant to this Contract. City shall not have the right to control the means by which Contractor accomplishes services rendered pursuant to this Contract. Contractor shall, at its sole cost and expense, furnish all facilities, materials and equipment which may be required for furnishing services pursuant to this Contract. Contractor shall be solely responsible for, and shall indemnify, defend and save City harmless from all matters relating to the payment of its subcontractors, agents and emp loyees, including compliance with social security, withholding and all other wages, salaries, benefits, taxes, exactions, and regulations of any nature whatsoever. Contractor acknowledges that Contractor and any subcontractors, agents or employees employe d by Contractor shall not, under any circumstances, be considered employees of City, and that they shall not be entitled to any of the benefits or rights afforded employees of City, including, but not limited to, sick leave, vacation leave, holiday pay, Pu blic Employees Retirement System benefits, or health, life, dental, long -term disability or workers' compensation insurance benefits.

b. Except as City may specify in writing, Contractor shall have no authority, express or implied, to act on behalf of City in any capacity whatsoever as an agent. Contractor shall have no authority, express or implied, to bind City to any obligation whatsoever.

ARTICLE 8
Public Work; Prevailing Wage

a. The Work which is the subject of this Contract is a “public work,” as that term is defined in Section 1720 of the California Labor Code, for which prevailing wages must be paid.

To the extent Contractor’s employees will perform any work that falls within any o f the classifications for which the Department of Labor Relations of the State of California promulgates prevailing wage determinations, Contractor hereby agrees that Contractor, and any subcontractor under it, shall pay not less than the specified prevail ing rates of wages to all such workers . The 248
5 general prevailing wage determinations for crafts can be located on the website of the Department of Industrial Relations ( www.dir.ca.gov/DLSR). Additionally, to perform work under this Contract, Contractor must meet all State registration requirements and criteria, including project compliance monitoring.

b. Attached hereto as Attachment No. 1 and incorporated herein by this reference is a copy of the provisions of Sections 1725.5, 1771, 1771.1, 1771.4, 1775, 1776, 1777.5, 1813 and 1815 of the California Labor Code. Contractor hereby acknowledges that it has read, reviewed and understands those provisions of the Labor Code and shall prosecute and complete the Work under this Contract in strict compliance with all of those terms and provisions.

c. Contractor shall secure the payment of compensation to its employees in accordance with the provisions of Section 3700 of the California Labor Code. Accordingly, and as required by Section 1861 of the California Labor Code, Contractor hereby certifies as follows:

“I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with suc h provisions before commencing the performance of the work of this contract.”

d. Contractor shall indemnify, protect, defend and hold harmless City and its officers, employees, contractors and agents, with counsel reasonably acceptable to City, from and a gainst any and all loss, liability, damage, claim, cost, expense, and/or “increased costs” (including reasonable attorney’s fees, court and litigation costs, and fees of expert witnesses) which result or arise in any way from the noncompliance by Contractor of any applicable local, state and/or federal law, including, without limitation, any applicable federal and/or state labor laws (including, without limitation, the requirement to pay state prevailing wages). It is agreed by the parties that, in connection with the construction of the W ork which is the subject of this Contract, Contractor shall bear all risks of payment or non -payment of state prevailing wages. “Increased costs” as used in this paragraph shall have the meaning ascribed to it in Labor Code Section 1781, as the same may be enacted, adopted or amended from time t o time. The foregoing indemnity shall survive termination of this Contract.

ARTICLE 9
Equal Employment Opportunity

During the performance of this Contract, Contractor agrees as follows:

a. Contractor shall not discriminate against any employee or appl icant for employment because of race, color, religion, sex, national origin, mental or physical disability, or any other basis prohibited by applicable law. Contractor shall ensure that applicants are employed and that employees are treated during employm ent, without regard to their race, color, religion, sex, national origin, mental or physical disability, or any other basis prohibited by applicable law.

Such actions shall include, but not be limited to the following: employment, upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination, rates of pay or other forms 249
6 of compensation and selection for training, including apprenticeship. Contractor shall post in conspicuous places, available to employees and applicants fo r employment, a notice setting forth provisions of this non-discrimination clause.

b. Contractor shall, in all solicitations and advertisements for employees placed by, or on behalf of Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, mental or physical disability, or any other basis prohibited by applicable law.

c. Contractor shall cause the foregoing paragraphs (a) and (b) to be inserted in al l subcontracts for any Work covered by this Contract, provided that the foregoing provisions shall not apply to subcontracts for standard commercial supplies or raw materials.

ARTICLE 10
Conflicts of Interest

Contractor agrees that it shall not make, pa rticipate in the making, or in any way attempt to use its position as a contractor to influence any decision of City in which Contractor knows or has reason to know that Contractor, its officers, partners, or employees have a financial interest as defined in Section 87103 of the Government Code. Contractor further agrees that it shall not be eligible to work as the builder for any project for which the design work is part of this Contract.

ARTICLE 11
Indemnity

Contractor shall defend, indemnify and hold harmless City and its officers, officials, agents, and employees from and against:

a. Any and all claims, liabilities, losses, damages, penalties, costs or expenses (including reasonable attorneys' fees and court costs) which City may directly or indirectly sustain or suffer arising from or as a result of the death of any person or any accident, injury, loss or damage whatsoever caused to any person or the property of any person which shall occur on or adjacent t o the real property which is the subject of this Contract, or in connection with performance of this Contract which may be directly or indirectly caused by the acts or omissions of Contractor or its officers, employees, contractors or agents, or as a conse quence of any use, generation, manufacture, storage, disposal, release or threatened release of a hazardous waste or substance. Contractor shall not be responsible for (and such indemnity shall not apply to) any willful misconduct, negligence or breach of this Contract by City or its officers, officials, agents, and employees. The foregoing indemnity shall survive termination of this Contract.

b. Any and all claims under workers’ compensation acts and other employee benefit acts with respect to Contractor’s employees or Contractor’s subcontractor’s employees arising out of Contractor’s Work under this Contract, including any and all claims under any law pertaining to Contractor’s status as an independent contractor.

250
7 ARTICLE 12
Insurance

a. Contractor shall procure and maintain for the duration of this Contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the Work hereunder and the results of that Work by Contractor, its agents, representatives, employees or subcontractors. Any umbrella liability insurance that is provided as part of the general or automobile liability minimums set forth below shall be maintained for the duration of the Contract.

b. Contractor shall maintain the following minimum amount of insurance: the greater of either the limits set forth in (1) through (4), below; or all of the insurance coverage and/or limits carried by or available to Contractor.

(1) General Liability $2,000,000 per occurrence for bodily injury, personal injury and property damage. If
Commercial General Liability insurance
or other form with a general aggregate
limit is used, either the general aggregate
limit shall apply separately to this
project/location or the general aggregate
limit shall be twice the required
occurrence limit.

(2) Automobile Liability $1,000,000 per accident for bodily injury and property damage.

(3) Workers’ Compensation as required by the State of California.

(4) Employer’s Liability $1,000,000 per accident for bodily injury or disease.

c. Any insurance proceeds in excess of or broader than the minimum required coverage and/or minimum required limits which are applicable to a given loss shall be available to City. No representation is made that the minimum insurance requirements of this Contract are sufficient to cover the obligations of Contractor under this Contract.

d. Any deductibles or self -insured retentions must be declared to and approved by City. At the option of City, either: the insurer shall reduce or eliminate such deductibles or self - insured retentions with respect to City, its officers, officials, agents and employees; or Contractor shall provide a financial guarantee satisfactory to City guaranteeing payment of losses and related investigations, claim administration, and defense expenses.

e. Each policy of general liability and automotive liability insurance shall contain, or be endorsed to contain, the following provisions:

251
8 (1) City, its officers, officials, agents, and employees are declared to be additional insureds under the terms of the policy, with respect to liability arising out of automobiles owned, leased, hired or borrowed by or on behalf of Contractor (any auto), and with respec t to liability arising out of Work or operations performed by or on behalf of Contractor, including materials, parts or equipment furnished in connection with such Work or operations. A policy endorsement to that effect shall be provided to City along with the certificate of insurance. In lieu of an endorsement, City will accept a copy of the policy(ies) which evidences that City is an additional insured as a contracting party. The minimum coverage required by Subsection 12.b, above, shall apply to City as an additional insured.

(2) For any claims related to this Contract, Contractor’s insurance coverage shall be primary insurance with respect to City, its officers, officials, agents and employees. Any insurance or self-insurance maintained by City, i ts officers, officials, agents and employees shall be excess of Contractor’s insurance and shall not contribute with it.

(3) Coverage shall not be canceled, except after thirty (30) days’ prior written notice has been provided to City.

f. Contractor shall furnish City with original certificates of insurance and endorsements effecting coverage required by this Article 12. The endorsements shall be on forms acceptable to City. All certificates and endorsements are to be received and approve d by City before the Work commences. However, failure to do so shall not operate as a waiver of these insurance requirements. City reserves the right to require complete, certified copies of all required insurance policies, including endorsements effecting the coverage required by these specifications at any time.

g. All insurance procured and maintained by Contractor shall be issued by insurers admitted to conduct the pertinent line of insurance business in California and having a rating of Grade A or better and Class VII or better by the latest edition of Best Key Rating Guide.

h. Contractor shall immediately notify City if any required insurance lapses or is otherwise modified and cease performance of this Contract unless otherwise directed by City. In such a case, City may procure insurance or self-insure the risk and charge Contractor for such costs and any and all damages resulting therefrom by way of set-off from any sums owed Contractor.

i. Contractor agrees that in the event of loss due to any of the perils for which it has agreed to provide insurance, Contractor shall look solely to its insurance for recovery. Contractor hereby grants to City, on behalf of any insurer providing insurance to either Contractor or City with respect to the service s of Contractor herein, a waiver of any right to subrogation which any such insurer may acquire against City by virtue of the payment of any loss under such insurance.

The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favo r of City for all Work performed by Contractor, its employees, agents and subcontractors. Contractor shall obtain any other endorsement that may be necessary to effect this waiver of subrogation.

j. Contractor shall require and verify that all subcontrac tors maintain insurance meeting all of the requirements stated herein.
252
9 ARTICLE 13
Termination

City, acting through its City Manager or designee, reserves the right to terminate this Contract for any reason by giving five (5) days’ written notice of intent to terminate to Contractor.

Upon receipt of notice, Contractor shall immediately cease work, unless the notice provides otherwise. Should City terminate this Contract, City shall pay Contractor for services satisfactorily provided and all allowable reimbursements incurred to the date of termination in compliance with this Contract, unless such te rmination shall be for cause, in which event City may withhold any disputed compensation. City shall not be liable for any claim of lost profits.

ARTICLE 14
Maintenance and Inspection of Records

In accordance with generally accepted accounting principle s, Contractor and its subcontractors shall maintain reasonably full and complete books, documents, papers, accounting records and other information (collectively, the “records”) pertaining to the costs of and completion of services performed under this Contract. During the term of this Contract and for a period of three (3) years after termination or completion of this Contract, City shall have the right to inspect and/or audit Contractor's records pertaining to the performance of this Contract at Contractor's office. Contractor shall make available all such records for inspection or audit at its offices during normal business hours and upon three (3) days’ notice from City, and copies thereof shall be furnished if requested.

ARTICLE 15
Compliance with Laws

a. Contractor shall be knowledgeable of and comply with all local, state and federal laws pertaining to the subject matter hereof or in any way regulating the activities undertaken by Contractor or any subcontractor hereunder.

b. Contractor represents and warrants that it:

(1) Has complied and shall at all times during the term of this Contract comply, in all respects, with all immigration laws, regulations, statutes, rules, codes, and orders, including, without limitation, the Immigration Reform and Control Act of 1986 (IRCA); and

(2) Has not and will not knowingly employ any individual to perform services under this Contract who is ineligible to work in the United States or under the terms of this Contract; and

(3) Has properly maintained, and shall at all times during the term of this Contract properly maintain, all related employment documentation records including, without limitation, the completion and maintenance of the Form I -9 for each of Contractor’s employees ; and
253
10 (4) Has responded, and shall at all times during the term of this Contract respond, in a timely fashion to any government inspection requests relating to immigration law compliance and/or Form I -9 compliance and/or worksite enforcement by the Depart ment of Homeland Security, the Department of Labor, or the Social Security Administration.

c. Contractor shall require all subcontractors and/or subconsultants to make the same representations and warranties required by this Article 15 when hired to per form services under this Contract.

d. Contractor shall, upon request of City, provide a list of all employees working under this Contract and shall provide, to the reasonable satisfaction of City, verification that all such employees are eligible to work in the United States. All costs associated with such verification shall be borne by Contractor. Once such request has been made, Contractor may not change employees working under this Contract without written notice to City, accompanied by the verification required herein for such employees. Contractor shall require all subcontractors and/or sub-consultants to make the same verification when hired to perform services under this Contract.

e. If Contractor, or a subcontractor or subconsultant, knowingly employs an employee providing Work under this Contract who is not authorized to work in the United States, and/or fails to follow federal laws to determine the status of such employee , such shall constitute a material breach of this Contract and may be cause for immediate termination of this Contract by City.

f. Contractor shall indemnify and hold City, its officials and employees harmless for, of and from any loss, including but not limite d to fines, penalties and corrective measures, City may sustain by reason of Contractor’s failure to comply with said laws, rules and regulations in connection with the performance of this Contract.

ARTICLE 16
Governing Law and Venue

This Contract shall be construed in accordance with and governed by the laws of the State of California and Contractor shall submit to the juri sdiction of California courts. Venue for any dispute arising under this Contract shall be in Orange County, California.

ARTICLE 17
Integration and Amendment

a. This Contract constitutes the entire agreement of the parties. No other agreement, oral or written, pertaining to the Work to be performed under this Contract shall be of any force or effect unless it is in writing and signed by both parties. Any Work performed which is inconsistent with or in violation of the provisions of this Contract shall not be compensated.

254
11 b. Amendments to this Contract must be in writing and signed by both parties. The City Manager is authorized to execute amendments to this Contract up to the amounts specified in Chapter 3.08 of the Orange Municipal Code.

ARTICLE 18
Notice

Except as otherwise provided herein, all notices required under this Contract shall be in writing and delivered personally, by e-mail, or by first class m ail, postage prepaid, to each party at the address listed below. Either party may change the notice address by notifying the other party in writing. Notices shall be deemed received upon receipt of same or within three (3) days of deposit in the U.S. Mail, whichever is earlier. Notices sent by e-mail shall be deemed received on the date of the e-mail transmission.

“CONTRACTOR” “CITY”

Tess Electric Inc. City of Orange
12142 Severn Way 300 E. Chapman Avenue
Riverside, CA 92503 Orange, CA 92866-1591

Attn: Michael Beebe/President Attn: Jose Diaz/Water Manager

Telephone: (951) 427-1735 Telephone: (714) 288-2475 E-Mail: [email protected] E-Mail: [email protected]

ARTICLE 19
Claim Resolution

City and Contractor agree that the claim resolution process applicable to any claim by Contractor in connection with the Work provided herein shall be subject to the procedures set forth in California Public Contract Code Section 9204, attached hereto as Attachment No. 2, and incorporated herein by this reference.

ARTICLE 20
Counterparts

This Contract may be executed in one or more counterparts, each of which shall be deemed an original, but all of which together shall constitute one and the same instrum ent. Signatures transmitted via facsimile and electronic mail shall have the same effect as original signatures.

[Signatures on next page]
255
12 “CITY”

CONTRACT, BONDS AND INSURANCE
APPROVED BY:

Mary E. Binning
Senior Assistant City Attorney

CITY OF ORANGE, a municipal corporation

By:

Mark A. Murphy
Mayor of the City of Orange

ATTEST:

Pamela Coleman, City Clerk

“CONTRACTOR”

TESS ELECTRIC INC., a California corporation

[Note: Signature of Chairman of the By:

Board, President or Vice President is Printed Name:
required] Title:

[Note: Signature of Secretary, Assistant By:

Secretary, Chief Financial Officer or Printed Name:

Assistant Treasurer is also required] Title:

256

Attachment No. 1

Page 1 of 13 ends

ATTACHMENT NO. 1

CALIFORNIA LABOR CODE
SECTIONS 1725.5, 1771, 1771.1, 1771.4, 1775, 1776, 1777.5, 1813 and 1815

Section 1725.5. Registration of contractors; mandatory registration; qualifications and application; fees; exempt contractors
A contractor shall be registered pursuant to this section to be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any public work contract that is subject to the requirements of this chapter. For the purposes of this section, “contractor” includes a subcontractor as defined by Section 1722.1. (a) To qualify for registration under this section, a contractor shall do all of the following:
(1)(A) Register with the Department of Industrial Relations in the manner prescribed by the department and pay an initial nonrefundable application fee o f four hundred dollars ($400) to qualify for registration under this section and an annual renewal fee on or before July 1 of each year thereafter. The annual renewal fee shall be in a uniform amount set by the Director of Industrial Relations, and the initial registration and renewal fees may be adjusted no more than annually by the director to support the costs specified in Section 1771.3. (B) Beginning June 1, 2019, a contractor may register or renew according to this subdivision in annual increments up to three years from the date of registration. Contractors who wish to do so will be required to prepay the applicable nonrefundable application or renewal fees to qualify for the number of years for which they wish to preregister.
(2) Provide evidence, disclosures, or releases as are necessary to establish all of the following:
(A) Workers' compensation coverage that meets the requirements of Division 4 (commencing with Section 3200) and includes sufficient coverage for any worker whom the contractor employs to perform work that is subject to prevailing wage requirements other than a contractor who is separately registered under this section.

Coverage may be evidenced by a current and valid certificate of workers' compensation insurance or certification of self-insurance required under Section 7125 of the Business and Professions Code. (B) If applicable, the contractor is licensed in accordance with Chapter 9 (commencing with Section 7000) of the Business and Professions Code.
(C) The contractor does not have any delinquent liability to an employee or the state for any assessment of back wages or related damages, interest, fines, or penalties pursuant to any final judgment, order, or determination by a court or any federal, state, or local administrative agency, including a confirmed arbitration award. However, for purposes of this paragraph, the contractor shall not be disqualified for any judgment, order, or determination that is under appeal, provided that the contractor has secured the payment of any amount eventually found due through a bond or other appropriate means. (D) The contractor is not currently debarred under Section 1777.1 or under any other federal or state law providing for the debarment of contractors from public works. (E) The contractor has not bid on a public works contract, been listed in a bid proposal, or engaged in the performance of a contract for public works without being lawfully registered in accordance with this section, within the preceding 12 months or since the effective date of the requirements set forth in subdivision (e), whichever is earlier. If a contractor is found to be in violation of the requirements of this paragraph, the period of disqualification shall be waived if both of the following are true:
257

Attachment No. 1

Page 2 of 13 ends

(i) The contractor has not previously been found to be in violation of the requirements of this paragraph within the preceding 12 months.
(ii) The contractor pays an additional nonrefundable penalty registration fee of two thousand dollars ($2,000). (b) Fees received pursuant to this section shall be deposited in the State Public Works Enforcement Fund established by Section 1771.3 and shall be used only for the purposes specified in that section. (c) A contractor who fails to pay the renewal fee required under paragraph (1) of subdivision (a) on or before the expiration of any prior period of registration shall be prohibited from bidding on or engaging in the performance of any contract for public work until once again registered pursuant to this section. If the failure to pay the renewal fee was inadvertent, the contractor may renew its registration retroactively by paying an additional nonrefundable penalty renewal fee equal to the amount of the renewal fee within 90 days of the due date of the renewal fee.
(d) If, after a body awarding a contract accepts the contractor's bid or awards the contract, the work covered by the bid or contract is determined to be a public work to which Section 1771 applies, either as the result of a determination by the director pursuant to Section 1773.5 or a court decision, the requirements of this section shall not apply, subject to the following requirements:
(1) The body that awarded the contract failed, in the bid specification or in the contract documents, to identify as a public work that portion of the work that the determination or decision subsequently classifies as a public work.
(2) Within 20 days following service of notice on the awarding body of a determination by the Director o f Industrial Relations pursuant to Section 1773.5 or a decision by a court that the contract was for public work as defined in this chapter, the contractor and any subcontractors are registered under this section or are replaced by a contractor or subcontractors who are registered under this section. (3) The requirements of this section shall apply prospectively only to any subsequent bid, bid proposal, contract, or work performed after the awarding body is served with notice of the determination or d ecision referred to in paragraph (2).
(e) The requirements of this section shall apply to any bid proposal submitted on or after March 1, 2015, to any contract for public work, as defined in this chapter, executed on or after April 1, 2015, and to any work performed under a contract for public work on or after January 1, 2018, regardless of when the contract for public work was executed.
(f) This section does not apply to work performed on a public works project of twenty -five thousand dollars ($25,000) or less when the project is for construction, alteration, demolition, installation, or repair work or to work performed on a public works project of fifteen thousand dollars ($15,000) or less when the project is for maintenance work.

Section 1771. Payment of general prevailing rate

Except for public works projects of one thousand dollars ($1,000) or less, not less than the general prevailing rate of per diem wages for work of a similar character in the locality in which the public work is performed, and no t less than the general prevailing rate of per diem wages for holiday and overtime work fixed as provided in this chapter, shall be paid to all workers employed on public works.

This section is applicable only to work performed under contract, and is not applicable to work carried out by a public agency with its own forces. This section is applicable to contracts let for maintenance work. 258

Attachment No. 1

Page 3 of 13 ends

Section 1771.1 . Registration as a contractor or subcontractor required prior to bid submission; exceptions; violations; penalties
(a) A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistere d contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code , provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.
(b) Notice of the requirement described in subdivision (a) shall be included in all bid invitations and public works contracts, and a bid shall not be accepted nor any contract or subcontract entered into without proof of the contractor or subcontractor's current registration to perform public work pursuant to Section 1725.5. (c) An inadvertent error in listing a subcontractor who is not registered pursuant to Section 1725.5 in a bid proposal shall not be grounds for filing a bid protest or grounds for considering the bid nonresponsive, provided that any of the following apply:
(1) The subcontractor is registered prior to the bid opening. (2) Within 24 hours after the bid opening, the subcontractor is registered and has paid the penalty registration fee specified in subparagraph (E) of paragraph (2) of subdivision (a) of Section 1725.5. (3) The subcontractor is replaced by another registered subcontr actor pursuant to Section 4107 of the Public Contract Code.
(d) Failure by a subcontractor to be registered to perform public work as required by subdivision (a) shall be grounds under Section 4107 of the Public Contract Code for the contractor, with the consent of the awarding authority, to substitute a subcontractor who is registered to perform public work pursuant to Section 1725.5 in place of the unregistered subcontractor.
(e) The department shall maintain on its Internet Web site a list of contractors who are currently registered to perform public work pursuant to Section 1725.5.
(f) A contract entered into with any contractor or subcontractor in violation of subdivision (a) shall be subject to cancellation, provided that a contract for public work shall not be unlawful, void, or voidable solely due to the failure of the awarding body, contractor, or any subcontractor to comply with the requirements of Section 1725.5 or this section.
(g) If the Labor Commissioner or his or her designee determines that a contractor or subcontractor engaged in the performance of any public work contract without having been registered in accordance with this section, the contractor or subcontractor shall forfeit, as a civil penalty to the state, one hundred dollars ($100) for each day of work performed in violation of the registration requirement, not to exceed an aggregate penalty of eight thousand dollars ($8,000) in addition to any penalty registration fee assessed pursuant to clause (ii) of subparagraph (E) of paragraph (2) of subdivision (a) of Section 1725.5. (h)(1) In addition to, or in lieu of, any other penalty or sanction authorized pursuant to this chapter, a higher tiered public works contractor or subcontractor who is found to have entered into a subcontract with an unregistered lower tier subcontractor to perform any public work in violation of the requirements of Section 1725.5 or this section shall be subject to forfeiture, as a civil penalty to the state, of one hundred dollars ($100) 259

Attachment No. 1

Page 4 of 13 ends

for each day the unregistered lower tie r subcontractor performs work in violation of the registration requirement, not to exceed an aggregate penalty of ten thousand dollars ($10,000). (2) The Labor Commissioner shall use the same standards specified in subparagraph (A) of paragraph (2) of subdivision (a) of Section 1775 when determining the severity of the violation and what penalty to assess, and may waive the penalty for a first time violation that was unintentional and did not hinder the Labor Commissioner's ability to monitor and enforce compliance with the requirements of this chapter. (3) A higher tiered public works contractor or subcontractor shall not be liable for penalties assessed pursuant to paragraph (1) if the lower tier subcontractor's performance is in violatio n of the requirements of Section 1725.5 due to the revocation of a previously approved registration. (4) A subcontractor shall not be liable for any penalties assessed against a higher tiered public works contractor or subcontractor pursuant to paragraph (1). A higher tiered public work s contractor or subcontractor may not require a lower tiered subcontractor to indemnify or otherwise be liable for any penalties pursuant to paragraph (1).
(i) The Labor Commissioner or his or her designee shall issue a civil wage and penalty assessment, i n accordance with the provisions of Section 1741, upon determination of penalties pursuant to subdivision (g) and subparagraph (B) of paragraph (1) of subdivision (h). Review of a civil wage and penalty assessment issued under this subdivision may be requested i n accordance with the provisions of Section 1742 . The regulations of the Director of Industrial Relations, which govern proceedings for review of civil wage and penalty assessments and the withholding of contract payments under Article 1 (commencing with Section 1720) and Article 2 (commencing with Section 1770), shall apply. (j)(1) Where a contractor or subcontractor engages in the performance of any public work contract without having been registered in violation of the requirements of Section 1725.5 or this section, the Labor Commissioner shall issue and serve a stop order prohibiting the use of the unregistered contractor or the unregistered subcontractor on all public works until the unregistered contractor or unregistered subcontractor is registered. The stop order shall not apply to work by registered contractors or subcontractors on the public work.
(2) A stop order may be personally served upon the contractor or subcontractor by either of the following methods:
(A) Manual delivery of the order to the contractor or subcontractor personally. (B) Leaving signed copies of the order with the person who is apparently in charge at the site of the public work and by thereafter mailing copies of the order by first class mail, postage prepaid to the con tractor or subcontractor at one of the following:
(i) The address of the contractor or subcontractor on file with either the Secretary of State or the Contractors' State License Board.
(ii) If the contractor or subcontractor has no address on file with the Secretary of State or the Contr actors' State License Board, the address of the site of the public work. (3) The stop order shall be effective immediately upon service and shall be subject to appeal by the party contracting with the unregistered contractor or subcontractor, by the unregistered contractor or subcontractor, or both. The appeal, hearing, and any further review of the hearing decision shall be governed by the procedures, time limits, and other requirements specified in subdivision (a) of Section 238.1. 260

Attachment No. 1

Page 5 of 13 ends

(4) Any employee of an unregistered contractor or subcontractor who is affected by a work stoppage ordered by the commissioner pursuant to this subdivision shall be paid at his or her regular hourly prevailing wage rate by that employer for any hours the employee would have worked but for the work stoppage, not to exceed 10 days.
(k) Failure of a contractor or subcontractor, owner, director, officer, or managing agent of the contractor or subcontractor to observe a stop order issued and served upon him or her pursuant to subdivision (j) is guilty of a misdemeanor punishable by imprisonment in county jail not exceeding 60 days or by a fine not exceeding ten thousand dollars ($10,000), or both.
(l) This section shall apply to any bid proposal submitted on or afte r March 1, 2015, and any contract for public work entered into on or after April 1, 2015. This section shall also apply to the performance of any public work, as defined in this chapter, on or after January 1, 2018, regardless of when the contract for public work was entered.
(m) Penalties received pursuant to this section shall be deposited in the State Public Works Enforcement Fund established by Section 1771.3 and shall be used only for the purposes specified in that section. (n) This section shall not apply to work performed on a public works project of twenty -five thousand dollars ($25,000) or less when the project is for construction, alteration, demolition, installation, or repair work or to work performed on a public works project of fifteen thousand dollars ($15,000) or less when the project is for maintenance work.

Section 1771.4. Additional requirements when bidding and awarding public works contracts

(a) All of the following are applicable to all public works projects that are otherwise subject to the requirements of this chapter:
(1) The call for bids and contract documents shall specify that the project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. (2) The awarding body shall post or require the prime contractor to post job site notices, as prescribed by regulation.
(3) Each contractor and subcontractor shall furnish the records specified in Section 1776 directly to the Labor Commissioner, in the following manner:
(A) At least monthly or more frequently if specified in the contract with the awarding body. (B) In a format prescribed by the Labor Commissioner.
(4) If the contractor or subcontractor is not registered pursuant to Section 1725.5 and is performing work on a project for which registration is not required because of subdivision (f) of Section 1725.5, the unregistered contractor or subcontractor is not required to furnish the records specified in Section 1776 directly to the Labor Commissioner but shall retain the records specified in Section 1776 for at least three years after completion of the work.
(5) The department shall undertake those activities it deems necessary to monitor and enforce compliance with prevailing wage requirements.
261

Attachment No. 1

Page 6 of 13 ends

(b) The Labor Commissioner may exempt a public works project from compliance wi th all or part of the requirements of subdivision (a) if either of the following occurs:
(1) The awarding body has enforced an approved labor compliance program, as defined in Section 1771.5, on all public works projects under its authority, except those deemed exempt pursuant to subdivision (a) of Section 1771.5, continuously since December 31, 2011.
(2) The awarding body has entered into a collective bargaining agreement that binds all contractors performing work on the project and that includes a mechanism for resolving disputes about the payment of wages. (c) The requirements of paragraph (1) of subdivision (a) shall only apply to contracts for public works projects awarded on or after January 1, 2015.
(d) The requirements of paragraph (3) of subdivision (a) shall apply to all contracts for public work, whether new or ongoing, on or after January 1, 2016.

Section 1775. Penalties for violations

(a)(1) The contractor and any subcontractor under the contractor shall, as a penalty to the state or political subdivision on whose behalf the contract is made or awarded, forfeit not more than two hundred dollars ($200) for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rates as determined by the direct or for the work or craft in which the worker is employed for any public work done under the contract by the contractor or, except as provided in subdivision (b), by any subcontractor under the contractor.
(2)(A) The amount of the penalty shall be determined by the Labor Commissioner based on consideration of both of the following:
(i) Whether the failure of the contractor or subcontractor to pay the correct rate of per diem wages was a good faith mistake and, if so, the error was promptly and voluntarily corrected when brought to the attention of the contractor or subcontractor.
(ii) Whether the contractor or subcontractor has a prior record of failing to meet its prevailing wage obligations.
(B)(i) The penalty may not be less than forty dollars ($40) for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rate, unless the failure of the contractor or subcontractor to pay the correct rate of per diem wages was a good faith mistake and, if so, the error was promptly and vo luntarily corrected when brought to the attention of the contractor or subcontractor. (ii) The penalty may not be less than eighty dollars ($80) for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rate, if the cont ractor or subcontractor has been assessed penalties within the previous three years for failing to meet its prevailing wage obligations on a separate contract, unless those penalties were subsequently withdrawn or overturned. (iii) The penalty may not be l ess than one hundred twenty dollars ($120) for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rate, if the Labor Commissioner determines that the violation was willful, as defined in subdivision (c) of Section 1777.1. (C) If the amount due under this section is collected from the contractor or subcontractor, any outstanding wage claim under Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 against that contractor 262

Attachment No. 1

Page 7 of 13 ends

or subcontractor shall be satisfied before applying that amount to the penalty imposed on that contractor or subcontractor pursuant to this section.
(D) The determination of the Labor Commissioner as to the amount of the penalty shall be reviewable only for abuse of discretion.
(E) The difference between the prevailing wage rates and the amount paid to each worker for each calendar day or portion thereof for which each worker was paid less than the prevailing wage rate shall be paid to each worker by the contractor or subcontractor, and the body awarding the contract shall cause to be inserted in the contract a stipulation that this section will be complied with. (b) If a worker employed by a subcontractor on a public works project is not paid the general prevailing rate of per diem wages by the subcontractor, the prime contractor of the project is not liable for any penalties under subdivision (a) unless the prime contractor had knowledge of that failure o f the subcontractor to pay the specified prevailing rate of wages to those workers or unless the prime contractor fails to comply with all of the following requirements:
(1) The contract executed between the contractor and the subcontractor for the perform ance of work on the public works project shall include a copy of the provisions of this section and Sections 1771, 1776, 1777.5, 1813, and 1815.
(2) The contractor shall monitor the payment of the specified general prevailing rate of per diem wages by the subcontractor to the employees, by periodic review of the certified payroll records of the subcontractor. (3) Upon becoming aware of the failure of the subcontractor to pay his or her workers the specified prevailing rate of wages, the contractor shall diligently take corrective action to halt or rectify the failure, including, but not limited to, retaining sufficient funds due the subcontractor for work performed on the public works project. (4) Prior to making final payment to the subcontractor for work performe d on the public works project, the contractor shall obtain an affidavit signed under penalty of perjury from the subcontractor that the subcontractor has paid the specified general prevailing rate of per diem wages to his or her employees on the public works project and any amounts due pursuant to Section 1813. (c) The Division of Labor Standards Enforcement shall notify the contractor on a public works project within 15 days of the receipt by the Division of Labor Standards Enforcement of a complaint of the failu re of a subcontractor on that public works project to pay workers the general prevailing rate of per diem wages.

Section 1776. Payroll records; retention; inspection; redacted information; agencies entitled to receive nonredacted copies of certified records; noncompliance penalties; rules

(a) Each contractor and subcontractor shall keep accurate payroll records, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with the public work. Each payroll record shall contain or be verified by a written declaration that it is made under penalty of perjury, stating both of the following:
(1) The information contained in the payroll record is true and correct. (2) The employer has complied with the requirements of Sections 1771 , 1811, and 1815 for any work performed by his or her employees on the public works project. 263

Attachment No. 1

Page 8 of 13 ends

(b) The payroll records enumerated under subdivision (a) shall be certified and shall be available for inspection at all reasonable hours at the principal office of the contractor on the following basis:
(1) A certified copy of an employee's payroll record shall be made available for inspection or furnished to the employee or his or her authorized representative on request. (2) A certified copy of all payroll records enumerated in subdivision (a) shall be made available for inspection or furnished upon request to a representative of the body awarding the contract and the Division of Labor Standards Enforcement of the Department of Industrial Relations. (3) A certified copy of all payroll records enumerated in subdivision (a) shall be made available upon request by the public for inspection or for copies thereof. However, a request by the public shall be made through either the body awarding the contract or the Division of Labor Standards Enforcement. If the requested payroll records have not been provided pursuant to paragraph (2), the requesting party shall, prior to being provided the records, reimburse the costs of preparation by the contractor, subcontractors, and the entity through which the request was made. The public may not be given access to t he records at the principal office of the contractor.
(c) Unless required to be furnished directly to the Labor Commissioner in accordance with paragraph (3) of subdivision (a) of Section 1771.4, the certified payroll records shall be on forms provided by the Division of Labor Standards Enforcement or shall contain the same information as the forms provided by the division.

The payroll records may consist of printouts of payroll data that are maintained as computer records, if the printouts contain the same information as the forms provided by the division and the printouts are verified in the manner specified in subdivision (a).
(d) A contractor or subcontractor shall file a certified copy of the records enumerated in subdivision (a) wi th the entity that requested the records within 10 days after receipt of a written request. (e) Except as provided in subdivision (f), any copy of records made available for inspection as copies and furnished upon request to the public or any public agency by the awarding body or the Division of Labor Standards Enforcement shall be marked or obliterated to prevent disclosure of an individual's name, address, and social security number. The name and address of the contractor awarded the contract or the subcontractor performing the contract shall not be marked or obliterated. Any copy of records made available for inspection by, or furnished to, a multiemployer Taft -Hartley trust fund ( 29 U.S.C. Sec. 186(c)(5) ) that requests the records for the purposes of allocating contributions to participants shall be marked or obliterated only to prevent disclosure of an individual's full social security number, but shall provide the last four digits of the social security number. Any copy of records made available for inspection by, or furnished to, a joint labor- management committee established pursuant to the federal Labor Management Cooperation Act of 1978 (29 U.S.C. Sec. 175a) shall be marked or obliterated only to prevent disclosure of an individual's social security number.
(f)(1) Notwithstanding any other provision of law, agencies that are included in the Joint Enforcement Strike Force on the Underground Economy established pursuant to Section 329 of the Unemployment Insurance Code and other law enforcement agencies investigating violations of law shall, upon request, be provided nonredacted copies of certified payroll records. Any copies of records or certified payroll made available for inspection and furnished upon request to the public by an agency incl uded in the Joint Enforcement Strike Force on the Underground Economy or to a law enforcement agency investigating a violation of law shall be marked or redacted to prevent disclosure of an individual's name, address, and social security number. 264

Attachment No. 1

Page 9 of 13 ends

(2) An employer shall not be liable for damages in a civil action for any reasonable act or omission taken in good faith in compliance with this subdivision.
(g) The contractor shall inform the body awarding the contract of the location of the records enumerated under subdivision (a), including the street address, city, and county, and shall, within five working days, provide a notice of a change of location and address.
(h) The contractor or subcontractor has 10 days in which to comply subsequent to receipt of a wri tten notice requesting the records enumerated in subdivision (a). In the event that the contractor or subcontractor fails to comply within the 10-day period, he or she shall, as a penalty to the state or political subdivision on whose behalf the contract is made or awarded, forfeit one hundred dollars ($100) for each calendar day, or portion thereof, for each worker, until strict compliance is effectuated. Upon the request of the Division of Labor Standards Enforcement, these penalties shall be withheld f rom progress payments then due. A contractor is not subject to a penalty assessment pursuant to this section due to the failure of a subcontractor to comply with this section.
(i) The body awarding the contract shall cause to be inserted in the contract s tipulations to effectuate this section.
(j) The director shall adopt rules consistent with the California Public Records Act (Chapter 3.5 (commencing with Section 6250) of Division 7 of Title 1 of the Government Code ) and the Information Practices Act of 1977 (Title 1.8 (commencing with Section 1798) of Part 4 of Division 3 of the Civil Code) governing the release of these records, including the establishment of reasonable fees to be charged for reproducing copies of records required by this section.

Section 1777.5. Em ployment of registered apprentices; wages; standards; number; apprenticeable craft or trade; exemptions; contributions; compliance program

(a)(1) This chapter does not prevent the employment upon public works of properly registered apprentices who are active participants in an approved apprenticeship program. (2) For purposes of this chapter, “apprenticeship program” means a program under the jurisdiction of the California Apprenticeship Council established pursuant to Section 3070. (b)(1) Every apprentice employed upon public works shall be paid the prevailing rate of per diem wages for apprentices in the trade to which he or she is registered and shall be employed only at the work of the craft or trade to which he or she is registered.
(2) Unless otherwise provided by a collective bargaining agreement, when a contractor requests the dispatch of an apprentice pursuant to this section to perform work on a public works project and requires the apprentice to fill out an application or undergo t esting, training, an examination, or other preemployment process as a condition of employment, the apprentice shall be paid for the time spent on the required preemployment activity, including travel time to and from the required activity, if any, at the prevailing rate of per diem wages for apprentices in the trade to which he or she is registered. Unless otherwise provided by a collective bargaining agreement, a contractor is not required to compensate an apprentice for the time spent on preemployment activities if the apprentice is required to take a preemployment drug or alcohol test and he or she fails to pass that test.
(c) Only apprentices, as defined in Section 3077, who are in training under apprenticeship standards that have been approved by the Chief of the Division of Apprenticeship Standards and who are parties to written 265

Attachment No. 1

Page 10 of 13 ends

apprentice agreements under Chapter 4 (commencing with Section 3070) of Division 3 are eligible to be employed at the apprentice wage rate on public works. The employment and training of each apprentice shall be in accordance with either of the following:
(1) The apprenticeship standards and apprentice agreements under which he or she is training. (2) The rules and regulations of the California Apprenticeship Council. (d) If the contractor to whom the contract is awarded by the state or any political subdivision, in performing any of the work under the contract, employs workers in any apprenticeable craft or trade, the contractor shall employ apprentices in at least the ratio set forth in this section and may apply to any apprenticeship program in the craft or trade that can provide apprentices to the site of the public work for a certificate approving the contractor under the apprenticeship standards for the employment and training of apprent ices in the area or industry affected. However, the decision of the apprenticeship program to approve or deny a certificate shall be subject to review by the Administrator of Apprenticeship. The apprenticeship program or programs, upon approving the contractor, shall arrange for the dispatch of apprentices to the contractor. A contractor covered by an apprenticeship program's standards shall not be required to submit any additional application in order to include additional public works contracts under t hat program. “Apprenticeable craft or trade,” as used in this section, means a craft or trade determined as an apprenticeable occupation in accordance with rules and regulations prescribed by the California Apprenticeship Council. As used in this section , “contractor” includes any subcontractor under a contractor who performs any public works not excluded by subdivision (o).
(e) Before commencing work on a contract for public works, every contractor shall submit contract award information to an applicable apprenticeship program that can supply apprentices to the site of the public work.

The information submitted shall include an estimate of journeyman hours to be performed under the contract, the number of apprentices proposed to be employed, and the approximate dates the apprentices would be employed. A copy of this information shall also be submitted to the awarding body, i f requested by the awarding body. Within 60 days after concluding work on the contract, each contractor and subcontractor shall submit to the awarding body, if requested, and to the apprenticeship program a verified statement of the journeyman and apprentice hours performed on the contract. The information under this subdivision shall be public. The apprenticeship programs shall retain this information for 12 months. (f) The apprenticeship program supplying apprentices to the area of the site of the publ ic work shall ensure equal employment and affirmative action in apprenticeship for women and minorities. (g) The ratio of work performed by apprentices to journeymen employed in a particular craft or trade on the public work may be no higher than the ratio stipulated in the apprenticeship standards under which the apprenticeship program operates if the contractor agrees to be bound by those standards. However, except as otherwise provided in this section, in no case shall the ratio be less than one hour of apprentice work for every five hours of journeyman work.
(h) This ratio of apprentice work to journeyman work shall apply during any day or portion of a day when any journeyman is employed at the jobsite and shall be computed on the basis of the hours worked during the day by journeymen so employed. Any work performed by a journeyman in excess of eight hours per day or 40 hours per week shall not be used to calculate the ratio. The contractor shall employ apprentices for the number of hours computed as a bove before the end of the contract or, in the case of a subcontractor, before the end of the subcontract. However, the contractor shall endeavor, to the greatest extent possible, to employ apprentices during the same time period that the journeymen in th e same craft or trade are employed at the jobsite. When an hourly apprenticeship ratio is not feasible for a particular craft or trade, the Administrator 266

Attachment No. 1

Page 11 of 13 ends

of Apprenticeship, upon application of an apprenticeship program, may order a minimum ratio of not le ss than one apprentice for each five journeymen in a craft or trade classification. (i) A contractor covered by this section who has agreed to be covered by an apprenticeship program's standards upon the issuance of the approval certificate, or who has bee n previously approved for an apprenticeship program in the craft or trade, shall employ the number of apprentices or the ratio of apprentices to journeymen stipulated in the applicable apprenticeship standards, but in no event less than the 1 -to-5 ratio re quired by subdivision (g).
(j) Upon proper showing by a contractor that he or she employs apprentices in a particular craft or trade in the state on all of his or her contracts on an annual average of not less than one hour of apprentice work for every five hours of labor performed by journeymen, the Administrator of Apprenticeship may grant a certificate exempting the contractor from the 1-to-5 hourly ratio, as set forth in this section for that craft or trade. (k) An apprenticeship program has the discretion to grant to a participating contractor or contractor association a certificate, which shall be subject to the approval of the Administrator of Apprenticeship, exempting the contractor from the 1-to-5 ratio set forth in this section when it finds that any one of the following conditions is met:
(1) Unemployment for the previous three-month period in the area exceeds an average of 15 percent. (2) The number of apprentices in training in the area exceeds a ratio of 1 to 5. (3) There is a showing that the apprenticeable craft or trade is replacing at least one-thirtieth of its journeymen annually through apprenticeship training, either on a statewide basis or on a local basis. (4) Assignment of an apprentice to any work performed under a public works contrac t would create a condition that would jeopardize his or her life or the life, safety, or property of fellow employees or the public at large, or the specific task to which the apprentice is to be assigned is of a nature that training cannot be provided by a journeyman.
(l) If an exemption is granted pursuant to subdivision (k) to an organization that represents contractors in a specific trade from the 1-to-5 ratio on a local or statewide basis, the member contractors shall not be required to submit individual applications for approval to local joint apprenticeship committees, if they are already covered by the local apprenticeship standards.
(m)(1) A contractor to whom a contract is awarded, who, in performing any of the work under the contract, employs journeymen or apprentices in any apprenticeable craft or trade shall contribute to the California Apprenticeship Council the same amount that the director determines is the prevailing amount of apprenticeship training contributions in the area of the p ublic works site. A contractor may take as a credit for payments to the council any amounts paid by the contractor to an approved apprenticeship program that can supply apprentices to the site of the public works project. The contractor may add the amoun t of the contributions in computing his or her bid for the contract. (2)(A) At the conclusion of the 2002 -03 fiscal year and each fiscal year thereafter, the California Apprenticeship Council shall distribute training contributions received by the council under this subdivision, less the expenses of the Department of Industrial Relations for administering this subdivision, by making grants to approved apprenticeship programs for the purpose of training apprentices. The grant funds shall be distributed as follows:
267

Attachment No. 1

Page 12 of 13 ends

(i) If there is an approved multiemployer apprenticeship program serving the same craft or trade and geographic area for which the training contributions were made to the council, a grant to that program shall be made.
(ii) If there are two or more approved multiemployer apprenticeship programs serving the same craft or trade and county for which the training contributions were made to the council, the grant shall be divided among those programs based on the number of apprentices from that county registered in each program. (iii) All training contributions not distributed under clauses (i) and (ii) shall be used to defray the future expenses of the Department of Industrial Relations for the administration and enforcement of apprenticeship and preapprenticeship standards and requirements under this code. (B) An apprenticeship program shall only be eligible to receive grant funds pursuant to this subdivision if the apprenticeship program agrees, prior to the receipt of any grant funds, to keep adequate records that document the expenditure of grant funds and to make all records available to the Department of Industrial Relations so that the Department of Industrial Relations is able to verify that grant funds were used s olely for training apprentices. For purposes of this subparagraph, adequate records include, but are not limited to, invoices, receipts, and canceled checks that account for the expenditure of grant funds. This subparagraph shall not be deemed to require an apprenticeship program to prov ide the Department of Industrial Relations with more documentation than is necessary to verify the appropriate expenditure of grant funds made pursuant to this subdivision.
(C) The Department of Industrial Relations shall verify that grants made pursuant to this subdivision are used solely to fund training apprentices. If an apprenticeship program is unable to demonstrate how grant funds are expended or if an apprenticeship program is found to be using grant funds for purposes other than training apprentices, then the apprenticeship program shall not be eligible to receive any future grant pursuant to this subdivision and the Department of Industrial Relations may initiate the process to rescind the registration of the apprenticeship program.
(3) All training contributions received pursuant to this subdivision shall be deposited in the Apprenticeship Training Contribution Fund, which is hereby created in the State Treasury. Upon appropriation by the Legislature, all moneys in the Apprenticeship Training Con tribution Fund shall be used for the purpose of carrying out this subdivision and to pay the expenses of the Department of Industrial Relations. (n) The body awarding the contract shall cause to be inserted in the contract stipulations to effectuate this section. The stipulations shall fix the responsibility of compliance with this section for all apprenticeable occupations with the prime contractor.
(o) This section does not apply to contracts of general contractors or to contracts of specialty contractor s not bidding for work through a general or prime contractor when the contracts of general contractors or those specialty contractors involve less than thirty thousand dollars ($30,000). (p) An awarding body that implements an approved labor compliance program in accordance with subdivision (b) of Section 1771.5 may, with the approval of the director, assist in the enforcement of this section under the terms and conditions prescribed by the director.

Section 1813. Forfeiture for violations; contract stipulation; report of violations

The contractor or subcontractor shall, as a penalty to the state or political subdivision on whose behalf the contract is made or awarded, forfeit twenty- five dollars ($25) for each worker employed in the execution of 268

Attachment No. 1

Page 13 of 13 ends

the contract by the respective contra ctor or subcontractor for each calendar day during which the worker is required or permitted to work more than 8 hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of this article. In awarding any contract f or public work, the awarding body shall cause to be inserted in the contract a stipulation to this effect. The awarding body shall take cognizance of all violations of this article committed in the course of the execution of the contract, and shall report them to the Division of Labor Standards Enforcement.

Section 1815. Overtime

Notwithstanding the provisions of Sections 1810 to 1814, inclusive, of this code, and notwithstanding any stipulation inserted in any contract pursuant to the requirements of sa id sections, work performed by employees of contractors in excess of 8 hours per day, and 40 hours during any one week, shall be permitted upon public work upon compensation for all hours worked in excess of 8 h ours per day at not less than 1 ½ times the basic rate of pay.
269

Attachment No. 2

Page 1 of 3 ends

ATTACHMENT NO. 2

CALIFORNIA PUBLIC CONTRACT CODE SECTION 9204

Section 9204. Legislative findings and declarations regarding timely and complete payment of contractors for public works projects; claims process (Eff: January 1, 2017)

(a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure that all construction business performed on a public works project in the state that is complete and not in dispute is paid in full and in a timely manner.
(b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100) of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3, this section shall apply to any claim by a contractor in connection with a public works project.
(c) For purposes of this section:
(1) “Claim” means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following:
(A) A time extension, including, without limitation, for relief from damages or penalties for de lay assessed by a public entity under a contract for a public works project. (B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled. (C) Payment of an amount that is disputed by the public entity. (2) “Contractor” means any type of contractor within the meaning of Chapter 9 (commencing with Se ction 7000) of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project.
(3)(A) “Public entity” means, without limitation, except as provided in subparagraph (B), a state agency, department, office, division, bureau, board, or commission, the California State University, the University of California, a city, including a charter city, county, including a charter county, city and county, including a charter city and county, district, special district, public authority, political subdivision, public corporation, or nonprofit transit corporation wholly owned by a public agency and formed to carry out the purposes of the public agency.
(B) “Public entity” shall not include the following:
(i) The Department of Water Resources as to any project under the jurisdiction of that department. (ii) The Department of Transportation as to any project under the jurisdiction of that department. (iii) The Department of Parks and Recreation as to any project under the jurisdiction of that department. (iv) The Department of Corrections and Rehabilitation with respect to any project under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part 3 of the Penal Code. 270

Attachment No. 2

Page 2 of 3 ends

(v) The Military Department as to any project under the jurisdiction of that department. (vi) The Department of General Services as to all other projects. (vii) The High-Speed Rail Authority.
(4) “Public works project” means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind. (5) “Subcontractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor.
(d)(1)(A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision.
(B) The claimant shall furnish reasonable documentation to support the claim. (C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the dispu ted portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested , the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion. (D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply.
(2)(A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute. (B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that r emains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section. 271

Attachment No. 2

Page 3 of 3 ends

(C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section.
(D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.
(E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties’ dispute.
(3) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requ irements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant. (4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum. (5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on their own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behal f of the subcontractor. The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontrac tor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so. (e) The text of this section o r a summary of it shall be set forth in the plans or specifications for any public works project that may give rise to a claim under this section. (f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section. (g) This section applies to contracts entered into on or after January 1, 2017. (h) Nothing in this section shall impose liability upon a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations. (i) This section shall remain in effect only until January 1, 2027, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2027, deletes or extends that date. 272
1 Tess Electric Inc.
12142 Severn Way, Riverside, Ca 92503
Phone 951-427-1735
From: Gregory Beebe Lic. 1057586 [email protected]
Sales tax is additional if applicable. Prices are good for 30 days, subject to change without notice. Please note that this is not an offer to contract, but merely a quotation of current prices for your convenience and information. Orders based on this quotation are subject to our acceptance on the terms and conditions stated in our written acknowledgement of order. We make no representations with respect to compliance with job specifications.

Quote Number# 0000142
September 28, 2022

To: Mark Oellette, City of Orange
[email protected]

Project: 350HP, 460V, Soft Starter Retrofit for Well 23

Tess Electric is pleased to offer the following quote to supply and install a Weg SSW900 series soft starter into the existing A/B MCC sections. The existing RVAT controller will be removed. The new starter is rated for 412 amps @ 460V and the existing control logic will be modified to work with the unit. The soft starter has the shunting contactor built into the device. The soft starter’s HMI Keypad will be mounted onto the door front for easy access and motor reads. The unit will be programmed to operate with the existing control logic.

The city is to assist Tess Electric in removing the RVAT autotransformer with their crane truck. The city will decide on disposal of the old equipment for the recyclers.

Currently the soft starter is stock at the factory.

Total Cost .................................................................................................................. $ 15,235.00 Sales tax and inbound freight charges are included.

EXCLUSIONS:
1) Permits.
2) Performance Bonds.

All material is guaranteed to be as specified. All work to be completed in a substantial workmanlike manner according to specifications submitted, per standard practices. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, and other necessary insurance. Our workers are fully covered by Workmen’s Compensation Insurance. Quote valid for 15 days. This quote is for a prevailing wage project and all employees of Tess Electric employees shall receive the set prevailing wage compensation per DIR standards.

273
1 Tess Electric Inc.
12142 Severn Way, Riverside, Ca 92503
Phone 951-427-1735
From: Gregory Beebe Lic. 1057586 [email protected]

Sales tax is additional if applicable. Prices are good for 30 days, subject to change without notice. Please note that this is not an offer to contract, but merely a quotation of current prices for your convenience and information. Orders based on this quotation are subject to our acceptance on the terms and conditions stated in our written acknowledgement of order. We make no representations with respect to compliance with job specifications.

Quote Number# 0000143A
Date: October 10, 2022

To: Mark Ouellette, City of Orange

Project: Well 24 Boosters Soft Starter Retrofit Revised Quote.

Dear Mark:

Tess Electric is pleased to offer the following alternative quote to supply and install 100HP, 460V Weg SSW900 series soft starter and a door mounted HIM keypad kit on the outer door. The existing control logic will be modified to accommodate the new starter. Start up and programming is included. The door mounted keypad will allow for safe access of motor information (such as voltage & current) and starter programming.

Total Cost for all 3 sections ...................................................................................... $ 20,297.00 (Sales tax and inbound freight charges included)

EXCLUSIONS:
1) Permits.
2) Performance Bonds.

All material is guaranteed to be as specified. All work to be completed in a substantial workmanlike manner according to specifications submitted, per standard practices. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, and other necessary insurance. Our workers are fully covered by Workmen’s Compensation Insurance. Quote valid for 30 days. This quote is for a prevailing wage project and all employees of Tess Electric employees shall receive the set prevailing wage compensation per DIR standards.

274
Agenda Item
City Council
Item #: 3.9. 12/13/2022 File #: 22-0681
TO: Honorable Mayor and Members of the City Council
THRU: Tom Kisela, Interim City Manager
FROM: Pamela Coleman, City Clerk

1. SUBJECT
Second Reading and adoption of an Ordinance of the City Council of the City of Orange approving a development agreement with Old Town Gateway, LLC for a project on a site located at 401 W.

Chapman Avenue and 135 N. Atchison Street. Development Agreement No. 0008-22. Ordinance No. 08-22.

2. SUMMARY
The Introduction and First Reading of the above-entitled Ordinance was approved at an adjourned Regular Council Meeting on November 15, 2022.

The Ordinance is now presented for Second Reading by title only, and adoption.

Vote at First Reading: AYES: Murphy, Nichols, Dumitru, Tavoularis NOES: Barrios, Gutierrez
ABSENT: Monaco

3. RECOMMENDED ACTION
Adopt Ordinance No. 08-22.

4. ATTACHMENTS
· Ordinance No. 08-22.

City of Orange Printed on 12/8/2022Page 1 of 1
powered by Legistar™
275
Agenda Item
City Council
Item #: 3.9. 12/13/2022 File #: 22-0681
TO: Honorable Mayor and Members of the City Council
THRU: Tom Kisela, Interim City Manager
FROM: Pamela Coleman, City Clerk

1. SUBJECT
Second Reading and adoption of an Ordinance of the City Council of the City of Orange approving a development agreement with Old Town Gateway, LLC for a project on a site located at 401 W.

Chapman Avenue and 135 N. Atchison Street. Development Agreement No. 0008-22. Ordinance No. 08-22.

2. SUMMARY
The Introduction and First Reading of the above-entitled Ordinance was approved at an adjourned Regular Council Meeting on November 15, 2022.

The Ordinance is now presented for Second Reading by title only, and adoption.

Vote at First Reading: AYES: Murphy, Nichols, Dumitru, Tavoularis NOES: Barrios, Gutierrez
ABSENT: Monaco

3. RECOMMENDED ACTION
Adopt Ordinance No. 08-22.

4. ATTACHMENTS
· Ordinance No. 08-22.

City of Orange Printed on 12/8/2022Page 1 of 1
powered by Legistar™
276
ORDINANCE NO. 08-22

AN ORDINANCE OF THE CITY COUNCIL OF

THE CITY OF ORANGE APPROVING A

DEVELOPMENT AGREEMENT WITH OLD

TOWN GATEWAY, LLC FOR A PROJECT ON A
SITE LOCATED AT 401 W. CHAPMAN AVENUE
AND 135 N. ATCHISON STREET.

DEVELOPMENT AGREEMENT NO. 0008-22
APPLICANT: OLD TOWN GATEWAY, LLC
WHEREAS, the Planning Commission conducted a duly advertised public hearing on October 17, 2022, at which time interested persons had an opportunity to testify either in support of or opposition to a project consisting of rehabilitation of two historic buildings, demolition of non-historic sheds, construction of two new commercial buildings with floor areas of 3,470 sq. ft. and 4,140 sq. ft., construction of a public pedestrian walkway, and lot consolidation on a 30,300 square foot site located at 401 W. Chapman Avenue and 135 N. Atchison Street, including Major Site Plan Review No. 1013-20, Tentative Parcel Map No. 0017-20 and Design Review No. 5011-20 (the “Project”); and
WHEREAS, in conjunction with the Project, a Development Agreement application was filed by OLD TOWN GATEWAY, LLC as authorized by the City of Orange Municipal Code; and
WHEREAS, the Development Agreement application was processed in the time and manner consistent with state and local law; and
WHEREAS, the Planning Commission unanimously recommended approval of the Project and the Development Agreement and determined that the Project is categorically exempt from the provisions of the California Environmental Quality Act (“CEQA”) per State CEQA Guidelines Section 15331 (Class 31 – Historical Resource Rehabilitation/Restoration) and 15332 (Class 32 – Infill Development Projects) and no public review is required; and WHEREAS, the City Council conducted a duly advertised public hearing on November 15, 2022, at which time interested persons had an opportunity to testify either in support of or opposition to the Project and the Development Agreement.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF ORANGE DOES ORDAIN AS FOLLOWS:

SECTION I:

1. The Development Agreement is consistent with the objectives, policies, general land uses, and programs specified in the General Plan and any applicable specific plan or redevelopment plan.
277
2 The Development Agreement and related enhanced public benefits offered in conjunction with the Project are consistent with the objectives, policies, general land uses, and programs specified in the General Plan and any applicable specific plan or redevelopment plan.

The General Plan Economic Development Element calls for the City to strengthen the City’s economic base and stimulate employment through new commercial and industrial development and expansion.

2. The Development Agreement is compatible with the uses authorized in the district or planning area in which the real property is located.

The Development Agreement and related enhanced public benefits offered in conjunction with the Project are compatible with the uses authorized in the district or planning area in which the real property is located.

3. The Development Agreement is in conformity with the public necessity, public convenience, general welfare, and good land use practices.

The Development Agreement and related enhanced public benefits offered in conjunction with the Project are consistent with public necessity, public convenience, and general welfare through the improvement of vacant property, the expansion of employment opportunities, increased sales tax revenues, and improved pedestrian access to and from the Santa Fe Depot.

4. The Development Agreement will be beneficial to the health, safety, and general welfare consistent with the policy of the City with respect to development agreements as provided in Section 17.44.200.

The development of the site replaces an underutilized and unrehabilitated property with a modern, attractive commercial development that is beneficial to the local economy and generates revenue to support local government services that improve the quality of life for the community.

5. The Development Agreement will not adversely affect the orderly development of property in the City.

The Development Agreement and related enhanced public benefits offered in conjunction with the Project will ensure that it is compatible with the existing development of the surrounding area.

SECTION II:

The Development Agreement for the Project is approved and adopted as shown in Exhibit “A,” attached hereto and incorporated herein by reference.

SECTION III:

The Development Agreement described in Section II is consistent with the finding of categorical exemption pursuant to CEQA Guideline 15331 (Class 31 – Historical Resource 278
3 Rehabilitation/Restoration) and 15332 (Class 32 – Infill Development Projects) for Major Site Plan Review No. 1013-20, Tentative Parcel Map No. 0017-20 and Design Review No. 5011-20 and no further environmental analysis is necessary because technical studies were prepared and found no impact to environmental issues related to traffic, noise, air quality, energy, greenhouse gas emissions, and water quality. No environmental public review is required because:

1. The structures on the site have been closely evaluated in the Cultural Resource Assessment and Addendum, with the buildings confirmed as contributors to the historic district planned for restoration and rehabilitation. While the assorted structures constructed outside of the period of significance for the historic district are over 50 years old, their modifications, dates of construction, and characteristics do not support their classification as contributors to the historic district. As non-contributors, their demolition does not represent an adverse effect on the historic district; and

2. The project site is less than 5 acres in size, is located in an urbanized area served by infrastructure, and on a site where the General Plan and zoning allow the proposed uses.

SECTION IV:

If any section, subdivision, paragraph, sentence, clause or phrase of this Ordinance is for any reason held to be invalid or unconstitutional, such decision shall not affect the validity of the remaining portions of this Ordinance. The City Council hereby declares that it would have passed this Ordinance, and each section, subdivision, paragraph, sentence, clause and phrase thereof, irrespective of the fact that any one (or more) section, subdivision, paragraph, sentence, clause or phrase had been declared invalid or unconstitutional.

SECTION V:

The City Clerk is hereby directed to certify the adoption of this Ordinance and cause the same to be published as required by law. This Ordinance shall take effect thirty (30) days from and after the date of its final passage.

ADOPTED this ____ day of ________________, 2022.
________________________________________
Mark A. Murphy, Mayor, City of Orange
ATTEST:
________________________________________
Pamela Coleman, City Clerk, City of Orange
279
4 STATE OF CALIFORNIA )

COUNTY OF ORANGE )

CITY OF ORANGE )
I, PAMELA COLEMAN, City Clerk of the City of Orange, California, do hereby certify that the foregoing Ordinance was introduced at an adjourned regular meeting of the City Council held on the 15th day of November, 2022, and thereafter at the regular meeting of said City Council duly held on the ___ day of ____________, 2022 was duly passed and adopted by the following vote, to wit:

AYES: COUNCILMEMBERS:

NOES: COUNCILMEMBERS:

ABSENT: COUNCILMEMBERS:

ABSTAIN: COUNCILMEMBERS:
________________________________________
Pamela Coleman, City Clerk, City of Orange
280
EXHIBIT “A”

DEVELOPMENT AGREEMENT
[Beneath this sheet.]
281
EXEMPT FROM RECORDER’S FEES
Pursuant to Government Code §§ 6103 and 27383
Recording requested by and when recorded return to:

City Clerk
City of Orange
300 East Chapman Avenue
Orange, CA 92866
(SPACE ABOVE FOR RECORDER’S USE)

DEVELOPMENT AGREEMENT

BY AND BETWEEN

CITY OF ORANGE,
a California Municipal Corporation,
and

OLD TOWN GATEWAY, LLC,
a California Limited Liability Company
282

DEVELOPMENT AGREEMENT
THIS DEVELOPMENT AGREEMENT (the “Agreement”) is entered into as of _____________________, 2022 (“Effective Date”), by and between OLD TOWN GATEWAY, LLC (“OWNER”), and the CITY OF ORANGE, a municipal corporation, organized and existing under the laws of the State of California (“CITY”), pursuant to the authority of California Government Code Sections 65864 et seq. (“Development Agreement Law”) and California Constitution Article XI, Section 7 as implemented through Orange Municipal Code Chapter 17.44.

RECITALS
This Agreement is predicated upon the following facts:

A. These Recitals refer to and utilize certain capitalized terms which are defined in this Agreement. The parties intend to refer to those definitions in conjunction with the use thereof in these Recitals.

B. Development Agreement Law authorizes CITY to enter into binding development agreements with persons having legal or equitable interests in real property for the development of such property in order to, among other matters, ensure high quality development in accordance with comprehensive plans; provide certainty in the approval of development projects so as to avoid the waste of resources and the escalation in the cost of development to the consumer; provide assurance to the applicants for development projects that they may proceed with their projects in accordance with existing policies, rules and regulations and subject to conditions of approval, in order to strengthen the public planning process and encourage private participation in comprehensive planning and reduce the private and public economic costs of development; and provide for benefits to OWNER for the construction and financing of certain public improvements and public benefits.

C. OWNER has a legal and equitable interest in and plans to rehabilitate two historic buildings for restaurant uses, demolish non-historic sheds, and construct two new buildings for commercial uses totaling 7,610 square feet on the property located at 401 W. Chapman Avenue (the “Project”).

D. OWNER has applied for, and CITY has approved the Project with Major Site Plan Review No. 1013-20, Design Review No. 5011-20, and Tentative Parcel Map No. 0017-20 (the “Existing Project Approvals”), and adopts this Agreement in order to create a Project and a physical environment that will conform to and complement the goals of CITY, consistent with the elements and policies of CITY’s General Plan.

E. In consideration of the substantial public improvements and benefits to be provided by OWNER and the Project, and in order to strengthen the public financing and planning process and reduce the economic costs of development, by this Agreement CITY intends to give OWNER assurance that OWNER can proceed with the development of the Project for the Term of this Agreement pursuant to the terms and conditions of this Agreement and in accordance with CITY’s General Plan, ordinances, policies, rules and regulations existing as of the Effective Date. In reliance on CITY’s covenants in this Agreement concerning the Development of the Property, 283
2 OWNER has and will in the future incur substantial costs in site preparation and the construction and installation of major infrastructure and facilities in order to make the Project feasible.

F. Pursuant to Section 65867.5 of the Development Agreement Law, the City Council has found and determined that: (i) this Agreement and the Existing Project Approvals implement the goals and policies of CITY’s General Plan, provide balanced and diversified land uses and impose appropriate standards and requirements with respect to land development and usage in order to maintain and improve the overall quality of life and the environment within CITY; (ii) this Agreement is in the best interests of and not detrimental to the public health, safety and general welfare of CITY and its residents; (iii) adopting this Agreement is consistent with CITY’s General Plan and constitutes a present exercise of CITY’s police power; and (iv) this Agreement is being entered into pursuant to and consistent with the requirements of Section 65867 of the Development Agreement Law and Orange Municipal Code Chapter 17.44.

G. CITY and OWNER agree that it may be beneficial to enter into additional agreements or to modify this Agreement with respect to the implementation of the separate components of the Project when more information concerning the details of each component is available, and that this Agreement should expressly allow for such contemplated additional agreements or modifications to this Agreement.

NOW, THEREFORE, pursuant to the authority contained in Development Agreement Law, as it applies to CITY, pursuant to California Constitution Article XI, Section 7, and in consideration of the foregoing recitals of fact, all of which are expressly incorporated into this Agreement, the mutual covenants set forth in this Agreement and for other consideration, the receipt and adequacy of which are hereby acknowledged, the parties agree as follows:

1. Definitions. The following words and phrases are used as defined terms throughout this Agreement, and each defined term shall have the meaning set forth below.

1.1 Authorizing Ordinance. The “Authorizing Ordinance” means Ordinance No. 08- 22 approving this Agreement.

1.2 City Council. “City Council” means the duly elected and constituted city council of CITY.

1.3 Development. “Development” means the improvement of 401 W. Chapman Avenue in the City of Orange (the “Property”) for purposes of completing the Project, including, without limitation: grading, the construction of infrastructure and public facilities related to the Project (whether located within or outside the Property), the construction of structures and buildings and the installation of landscaping.

1.4 Development Plan . The “Development Plan” consists of the Existing Project Approvals, the Existing Regulations, and those Future Project Approvals (such as precise development plans) contemplated, necessary, and requested by OWNER to implement the Project Approvals.
284
3 1.5 Development Transferee . “Development Transferee” means an assignee or transferee from OWNER of all or a portion of OWNER’s interest in the Property pursuant to Section 3 and the successors and assigns of any such transferee.

1.6 Effective Date. “Effective Date” means the date that the Authorizing Ordinance becomes effective.

1.7 Existing Project Approvals . “Existing Project Approvals” are those Project Approvals, including Major Site Plan Review No. 1013-20, Design Review No. 5011-20, and Tentative Parcel Map No. 0017-20 which have been approved by the CITY on October 17, 2022, consistent with the Existing Regulations.

1.8 Existing Regulations . “Existing Regulations” means those ordinances, rules, regulations, policies, requirements, guidelines, constraints or other actions of CITY, other than site-specific Project Approvals, which purport to affect, govern or apply to the Property or the implementation of the Development Plans in effect on October 17, 2022.

1.9 On-Site Improvements. “On-Site Improvements” means physical infrastructure improvements or facilities that are or will be located on the Property.

1.10 OWNER. “OWNER” is Old Town Gateway, LLC, a California limited liability company and successors and assigns.

1.11 Project Approvals. “Project Approvals” means Major Site Plan Review No. 1013- 20, Design Review No. 5011-20, and Tentative Parcel Map No. 0017-20 and any future Project- related entitlements approved by CITY.

2. Term and Termination.

2.1 The Term of this Agreement shall commence on the Effective Date and shall extend for a period of three (3) years thereafter, terminating at the end of the day preceding the third anniversary of the Effective Date, subject to specific extensions, revisions and termination provisions of this Agreement. The Existing Project Approvals are valid and shall not expire for the Term of this Agreement (as such Term may be extended). If construction has commenced within such three (3) year period, the Term of this Agreement shall automatically be extended until the completion of the events specified in Section 2.2.2. Once an occupancy permit has been issued for the Project, or the Project is otherwise vested pursuant to California law, the Existing Project Approvals and OWNER Obligations shall be deemed permanently vested and control the use of the Property.

2.2 This Agreement shall be deemed terminated and of no further effect upon the occurrence of either of the following events:

2.2.1 If termination occurs pursuant to any specific provision of this Agreement; or

2.2.2 Completion of the total build-out of the Project pursuant to the terms of this Agreement and CITY’s issuance of all required occupancy permits and acceptance of all dedications and improvements required to complete Development of the Project. 285
4 2.3 The termination of this Agreement shall not affect any right or duty arising independently from entitlements issued by CITY or other land use approvals approved concurrently or subsequent to the approval of this Agreement.

3. Transfers and Assignments.

3.1 Right to Assign. OWNER shall have the right to sell, assign or otherwise transfer all or any portion of its interests in the Property together with all its right, title and interest in this Agreement, or the portion thereof which is subject to transfer (the “Transferred Property”) to a Development Transferee at any time during the Term of this Agreement. In the event of any such sale, assignment, or other transfer (i) OWNER shall notify CITY thirty (30) days prior to such event of the name of the Development Transferee, together with the corresponding entitlements being transferred to such Development Transferee; and (ii) the agreement between OWNER and such Development Transferee pertaining to such transfer shall provide that either OWNER or the Development Transferee shall be liable for the performance of those obligations of OWNER under this Agreement which relate to the Transferred Property, if any. Each Development Transferee and OWNER shall notify CITY in writing which entity shall be liable for the performance of each respective obligation hereunder within thirty (30) days prior to the date of any sale, assignment or transfer pursuant to this subsection. OWNER shall be released from any obligations assumed by a Development Transferee.

3.2 Effect of Noncompliance. From and after the assumption of obligations under this Agreement by a Development Transferee pursuant to Section 3.1, noncompliance by any such Development Transferee with the terms and conditions of this Agreement assumed by such Development Transferee shall entitle CITY to pursue any and all ofits rights under this Agreement so assumed against such Development Transferee, but such noncompliance shall not be deemed a default or grounds for termination hereof with respect to, or constitute cause for CITY to initiate enforcement action against, other persons then owning or holding interest in the Property or any portion thereof and not themselves in default hereunder. Similarly, noncompliance by OWNER with respect to any terms and conditions of this Agreement not assumed by such Development Transferee shall entitle CITY to pursue any and all of its rights under this Agreement retained by OWNER against OWNER, but such noncompliance by OWNER shall not be deemed a default or grounds for termination hereof with respect to, or constitute cause for CITY to initiate enforcement action against, such Development Transferee or other persons then owning or holding interest in the Property or any portion thereof and not themselves in default hereunder.

3.3 Rights of Successors and Assigns . Except as otherwise set forth in this Agreement, a Development Transferee shall have all of the same rights, benefits and obligations of OWNER under this Agreement.

4. Revisions to Development Agreement.

4.1 Initiation of Amendment . Either party may propose an amendment to this Agreement when that party believes it would be beneficial to enter into additional agreements or modification of this Agreement in connection with the implementation of the separate components of the Project.
286
5 4.2 Procedure. Except as set forth in Section 4.5 below, the procedure for proposing and adopting an amendment to this Agreement shall be the same as the procedure followed for entering into this Agreement in the first instance.

4.3 Cancellation. Either party may propose cancellation of this Agreement.

4.4 Consent. Except as expressly provided in this Agreement, any amendment to or cancellation of this Agreement shall require the written consent of both parties. No amendment to or cancellation of all or any provision of this Agreement shall be effective unless set forth in writing and signed by duly authorized representatives of each party.

4.5 Consent of OWNER. Where an assignee of OWNER applies for an amendment to this Agreement, the written consent of OWNER shall always be required before CITY approval of the amendment unless the Development Transferee has assumed all obligations under this Agreement. Further, an assignee shall not be required to approve an amendment to this Agreement.

The recordation of this Agreement shall serve as notice to all assignees of the provisions of this Agreement.

4.6 Operating Memoranda. The parties acknowledge that refinements and further development of the Project may demonstrate that changes are appropriate with respect to the details and performance of the parties under this Agreement. The parties desire to retain a certain degree of flexibility with respect to the details of the Project Development and with respect to those items covered in general terms under this Agreement. If and when the parties mutually find that changes, adjustments, or clarifications are appropriate to further the intended purposes of this Agreement, they may, unless otherwise required by law, effectuate such changes, adjustments, or clarifications without amendment to this Agreement as specified in the Project Approvals, and through operating memoranda mutually approved by the parties. The Orange City Manager or designee, and any corporate officer or other person designated for such purpose in a writing signed by a corporate officer on behalf of OWNER, are authorized to execute said operating memoranda. After execution, said operating memoranda shall be attached hereto as addenda and become a part hereof and may be further changed and amended from time to time as necessary, with further approval by the parties. Unless otherwise required by law or by the Project Approvals, no such changes, adjustments, or clarifications shall require prior notice or hearing.

4.7 This Section shall not limit CITY’s or OWNER’s remedies as provided by Section

10. 5. Description of Development.

5.1 Development and Control of Development.

5.1.1 Project. During the Term of this Agreement, OWNER shall have the vested right to implement the Development pursuant to this Agreement and the Project Approvals and CITY shall have the right to control the Development of the Project in accordance with the terms and conditions of this Agreement.

5.1.2 Permits and Future Project Approvals . CITY shall accept and timely process, in the normal and legal manner for processing such matters, all applications for Future 287
6 Project Approvals called for or required under this Agreement. The Existing Project Approvals are in full force and effect and the expiration of such Existing Project Approvals shall not occur unless the Term of this Agreement expires, and vested rights have not been achieved under California law.

5.2 Rules, Regulations and Official Policies . Except as otherwise specified in this Agreement and the Project Approvals, the rules, regulations and official policies governing the permitted uses of the Property, the density and intensity of use of the Property, the provisions for reservation or dedication of land for public purposes and the design, improvement and construction standards and specifications applicable to Development of the Property shall be the Existing Regulations and the Existing Project Approvals. In connection with any subsequent approval or action which CITY is permitted or has the right to make under this Agreement relating to the Project, CITY shall exercise its discretion or take action in a manner which complies and is consistent with the Project Approvals, the Existing Regulations and such other standards, terms and conditions contained in this Agreement.

5.3 Reserved Authority.

5.3.1 Uniform Codes. This Agreement shall not prevent CITY from applying new rules, regulations and policies relating to uniform codes (such as the Uniform Building Code, National Electrical Code, Uniform Mechanical Code or Uniform Fire Code, as amended) adopted by the State of California, which new rules and regulations are necessary to preserve the health and safety of the residents of CITY or which CITY is required by state law to apply.

5.3.2 State and Federal Laws and Regulations.

5.3.2.1 Precedence of State and Federal Laws. In the event that state or federal laws or regulations prevent or preclude compliance with one or more of the provisions of this Agreement, such provisions of this Agreement shall be modified or suspended as may be necessary to comply with such state or federal laws or regulations; provided, however, that this Agreement shall remain in full force and effect to the extent it is not inconsistent with such laws or regulations and to the extent such laws or regulations do not render such remaining provisions impractical to enforce.

5.3.2.2 Subsequent Amendment to Authorizing Statutes . This Agreement has been entered into in reliance upon the provisions of the Development Agreement Legislation in effect as of the Effective Date. Accordingly, to the extent that subsequent amendments to the Government Code would affect the provisions of this Agreement, such amendments shall not be applicable to this Agreement unless necessary for this Agreement to be enforceable or required by law or unless this Agreement is modified pursuant to the provisions set forth in this Agreement and Government Code Section 65868 as in effect on the Effective Date.

5.3.3 Regulation for Health and Safety . Notwithstanding anything to the contrary in this Agreement, CITY shall have the right to apply regulations (including amendments to the Existing Regulations) adopted by CITY after the Effective Date, in connection with any Project Approvals, or deny, or impose conditions of approval on, any Project Approvals provided that such application to the Development is required to protect the physical health and safety of 288
7 existing or future residents or occupants of the Property, or any portion thereof or any lands adjacent thereto. OWNER may protest the imposition of any such regulations or conditions to the City Council or as otherwise provided by CITY rules or regulations while continuing to construct the Development.

5.3.4 Procedure For Application of New Regulations . CITY shall not apply to the Project any regulation, law, program, ordinance or action under Section 5.3.1, 5.3.2, or 5.3.3 (except for emergency ordinances adopted to protect health and welfare as set forth therein) which is not an Existing Regulation (“New Regulation”) without providing at least thirty (30) days’ prior written notice to OWNER of CITY’s intent to apply such New Regulation to the Project. OWNER shall have thirty (30) days from the date of such notice to review and evaluate the New Regulation and to serve CITY with a written protest (“Protest”) against the application of the New Regulation to the Project. If OWNER timely provides the Protest to CITY, then CITY will not apply the New Regulation to the Project until the City Council makes a finding, after a duly noticed public hearing, that such New Regulation does not conflict with the Existing Regulations as applied to the Project and is required (as opposed to permitted) to comply with state or federal laws or regulations after taking into consideration all reasonable alternatives. Should OWNER elect to continue to construct the Development after receipt of notice of the applicability of any New Regulation described in Section 5.3.3 to such construction, OWNER does so at its own risk.

5.4 Vested Rights. By entering into this Agreement and relying thereon, OWNER obtains vested rights to proceed with the Project in accordance with the terms and conditions of this Agreement, and in accordance with, and to the extent of, the Project Approvals. By entering into this Agreement and relying thereon, CITY secures significant public benefits and facilities which enhance the public health, safety and welfare, a partial listing of which benefits is set forth in Section 6.

5.5 Consistency Between This Agreement and Current Laws. CITY represents that there are no rules, regulations, ordinances, policies or other measures of CITY in force as of the Effective Date that would interfere with Development and use of all or any part of the Project according to the Project Approvals and this Agreement. The parties understand and acknowledge that the Agreement is consistent with CITY’s General Plan and zoning for the Property.

5.6 Future Amendments to Development Plan. The following rules apply to future amendments to the Development Plan:

5.6.1 Compliance. Any Development Plan amendment which is not in compliance with Section 4 of this Agreement shall not apply to the Property or the Project while this Agreement is in effect.

5.6.2 Concurrent Development Agreement Amendment. Any Development Plan amendment requiring amendment of this Agreement shall be processed concurrently with an amendment to this Agreement

5.6.3 Effect of Amendment . Except as expressly set forth within this Agreement or in any amendment to this Agreement, a Development Plan amendment will not alter, 289
8 affect, impair or otherwise impact the rights, duties and obligations of the parties under this Agreement.

6. CITY and OWNER Benefits and Obligations.

6.1 CITY Benefits. The direct and indirect benefits CITY, its existing and future residents, will receive pursuant to the implementation of the Agreement include, but are not limited to, the following:

6.1.1 Rehabilitation of Property . The Development will result in the rehabilitation of a blighted property and restoration of historic buildings.

6.1.2 Sales Tax Revenue. The Development will generate sales tax revenue to support City services that improve the quality of life for residents.

6.1.3 Public Access Paseo . The dedication and maintenance by OWNER of a public access pedestrian walkway across the property between N. Atchison Street and N. Cypress Street (see Attachment 1), will connect the train depot to the Plaza area and create a more walkable Old Towne. This will help achieve a key objective identified in the Santa Fe Depot Specific Plan by creating a pedestrian connection between the train depot and Metrolink Parking Structure to compensate for the narrow sidewalks along those blocks of Chapman Avenue.

6.2 OWNER Benefits. The direct and indirect benefits OWNER and its transferees or assigns will receive pursuant to the implementation of the Agreement include, but are not limited to, the following:

6.2.1 Parking. In recognition of OWNER’s dedication and maintenance of a public access pedestrian walkway, the Development will only be required to provide two parking spaces, both of which are ADA compliant.

6.2.2 Development Assurances. In recognition of the public benefits provided by OWNER, CITY provides OWNER with assurances that the Property may be developed in accordance with the Project Approvals and this Agreement. CITY agrees that it will not further restrict or limit the development of the Property in violation of this Agreement except in strict accordance with the Reserved Authority.

6.3 CITY Obligations. In recognition of the direct and indirect benefits to CITY by OWNER as provided in this Section 6, CITY agrees that it will not further restrict or limit the development of the Property in violation of this Agreement except in strict accordance with the Reserved Authority.

6.4 OWNER Obligations. In recognition of the direct and indirect benefits to OWNER by CITY as provided in this Section 6, OWNER agrees as follows:

6.4.1 To provide a public access pedestrian walkway (paseo) in a location as depicted in the Existing Project Approvals.
290
9 6.4.2 To maintain in perpetuity the public access pedestrian walkway in good condition, free from any accumulation of debris and waste materials, and in compliance with all applicable laws.

7. Indemnification.

7.1 Defense Obligations . Except to the extent of the gross negligence or willful misconduct of the Indemnified Parties (as defined below), OWNER, and with respect to the portion of the Property transferred to them, the Development Transferees, agree during the term of this Agreement, to, at CITY’s request, defend CITY and its agents, officers, and employees (the “Indemnified Parties”) from and against any claims, including claims for attorneys’ fees, or proceeding against the Indemnified Parties to set aside, void or annul the approval of this Agreement or the Project Approvals.

7.2 Notification Obligation . CITY agrees to timely take all actions necessary or required to uphold the validity and enforceability of this Agreement and the Existing Regulations and shall promptly notify OWNER of any claim, action or proceeding brought challenging any provision of this Agreement or the Project Approvals. Should CITY fail to promptly and timely notify OWNER or cooperate fully or decide to terminate this Agreement, OWNER shall be relieved of its defense and indemnity obligations hereunder as to that specific claim, action or proceeding.

7.3 Selection of Counsel; Costs of Defense . OWNER and CITY shall jointly select legal counsel to conduct such defense which legal counsel shall represent both OWNER and CITY in defense of such action. OWNER and CITY shall meet and confer to determine the reasonable estimate of the costs of defense of any such claim or action and OWNER shall deposit a sufficient portion of said amount with CITY to ensure CITY that it will have sufficient funds to pay the costs of defense until a further deposit is required, if any. CITY will draw down on such funds to pay for costs of defense and may require additional deposits if it appears that the costs of defense will exceed the amount on deposit. CITY shall refund, without interest, any unused portions of the deposit once the claim or action is finally concluded.

7.4 Defense and Settlement. OWNER shall have the right to direct the prosecution, strategy and settlement of any defense hereunder in consultation with CITY, provided however, that CITY and OWNER agree not to unreasonably withhold or delay approval of the settlement of any claim or action which does not significantly impair the rights and obligations of either party under this Agreement or the Project Approvals.

7.5 Survival of Provisions. The indemnities set forth in this Section shall survive any closing, rescission, or termination of this Agreement, and shall continue to be binding and in full force and effect in perpetuity with respect to the Indemnified Parties and their successors.

8. Relationship of Parties. The contractual relationship between CITY and OWNER is such that OWNER is independent from and not an agent or employee of CITY. CITY and OWNER hereby renounce the existence of any form of joint venture or partnership between them, and agree that nothing contained in this Agreement or in any document executed in connection with the Project shall be construed as making CITY and OWNER joint venturers or partners. 291
10 9. Periodic Review of Compliance with Agreement.

9.1 Periodic Review. CITY and OWNER shall review this Agreement at least once every twelve (12) month period from the Effective Date. CITY shall notify OWNER in writing of the date for review at least thirty (30) days prior thereto. Such periodic review shall be conducted in accordance with Government Code Section 65865.1.

9.2 Good-Faith Compliance. During each periodic review, OWNER shall be required to demonstrate good faith compliance with the terms of this Agreement. OWNER agrees to furnish such reasonable evidence of good faith compliance as CITY, in the exercise of its reasonable discretion, may require. If requested by CITY, CITY agrees to provide to OWNER, a Development Transferee or any party designated by OWNER or a Development Transferee, an estoppel certificate that OWNER or a Development Transferee is in compliance with the terms of this Agreement, provided OWNER reimburses CITY for all reasonable and direct costs and fees incurred by CITY with respect thereto.

9.3 Failure to Conduct Annual Review . The failure of CITY to conduct the annual review shall not be an OWNER default and OWNER shall not be entitled to any remedy for CITY failure to conduct the annual review.

9.4 Initiation of Review by City Council . In addition to the annual review, the City Council may at any time, but not more than once in any twelve (12) month period, initiate a review of this Agreement by giving written notice to OWNER. Within thirty (30) days following receipt of such notice, OWNER shall submit evidence to the City Council of OWNER’s good faith compliance with this Agreement and such review and determination shall proceed in the same manner as provided for the annual review.

9.5 Availability of Documents. If requested by OWNER, CITY agrees to provide to OWNER copies of any documents, reports or other items reviewed, accumulated or prepared by or for CITY in connection with any periodic compliance review by CITY, provided OWNER reimburses CITY for all reasonable and direct costs and fees incurred by CITY with respect thereto.

10. Events of Default; Remedies. Unless amended or canceled as provided in Section 4, or modified or suspended pursuant to Government Code Section 65869.5, or terminated pursuant to this Section 10, this Agreement is enforceable by either party hereto.

10.1 Defaults by OWNER . If CITY determines on the basis of substantial evidence that OWNER has not complied in good faith with the terms and conditions of this Agreement, CITY shall, by written notice to OWNER, specify the manner in which OWNER has failed to so comply and state the steps OWNER must take to bring itself into compliance (“First Default Notice”). CITY and OWNER shall meet in good faith for the purpose of resolving any disputes within fifteen (15) days of OWNER’s receipt of written notice of default from CITY. If CITY determines that following these meetings, OWNER is not taking necessary steps to cure such default, it shall provide notice of same to OWNER (“Second Default Notice”) and if, within thirty (30) days after the effective date of such notice OWNER has failed to so comply or OWNER does not commence all steps reasonably necessary to bring itself into compliance as required and 292
11 thereafter diligently pursue such steps to completion, then OWNER may be deemed to be in default under the terms of this Agreement and CITY may initiate the process to terminate this Agreement pursuant to Development Agreement Legislation. In event of default by OWNER, except as provided in Section 10.3, CITY’s sole remedy for any breach of this Agreement by OWNER shall be CITY’s right to terminate this Agreement.

10.2 Defaults by CITY . If OWNER determines on the basis of substantial evidence that CITY has not complied in good faith with the terms and conditions of this Agreement, OWNER shall, by written notice to CITY, specify the manner in which CITY has failed to so comply and state the steps CITY must take to bring itself into compliance. CITY and OWNER shall meet in good faith for the purpose of resolving any disputes within fifteen (15) days of CITY’s receipt of written notice of default from OWNER. If OWNER determines that following these meetings, CITY is not taking necessary steps to cure such default, it shall provide notice of same to CITY and if, within thirty (30) days after the effective date of such notice, CITY has failed to so comply or CITY does not commence all steps reasonably necessary to bring itself into compliance as required and thereafter diligently pursue such steps to completion, then CITY shall be deemed to be in default under the terms of this Agreement and OWNER may initiate the process to terminate this Agreement and, in addition, may pursue any other remedy available at law or equity, including specific performance as long as such remedy is consistent with Section 10.3.

10.3 Specific Performance Remedy.

10.3.1 OWNER’s Remedies. Due to the size, nature and scope of the Project, it will not be practical or possible to restore the Property to its natural condition once implementation of this Agreement and the Project Approvals have begun. After such implementation, OWNER may be foreclosed from other choices it may have had to utilize the Property and provide for other benefits. OWNER has invested significant time and resources and performed extensive planning and processing of the Project in agreeing to the terms of this Agreement and will be investing even more significant time and resources in implementing the Project in reliance upon the terms of this Agreement, and it is not possible to determine the sum of money which would adequately compensate OWNER for such efforts. For the above reasons, CITY and OWNER agree that damages alone would not be an adequate remedy if CITY fails to carry out its obligations under this Agreement and that, in addition to any all other remedies OWNER may have at law or in equity, including, without limitation, claims for general, special or compensatory damages for any default under this Agreement, OWNER shall have the right to seek and obtain specific performance or injunctive relief as a remedy for any breach of this Agreement. OWNER may seek to enjoin any threatened or attempted violation of this Agreement, seek to enjoin any threatened or attempted violation hereof, or enforce by specific performance the obligations and rights of OWNER.

10.3.2 CITY’s Remedies. CITY’s remedy of terminating this Agreement shall be sufficient if OWNER fails to carry out its obligations hereunder. Notwithstanding the above, CITY may not seek specific performance to require OWNER to construct the Development except to the extent that OWNER becomes otherwise obligated under this Agreement to construct any or all of the public facilities identified in the Development Plan. Nothing contained in this Agreement shall prevent OWNER from enforcing the right to seek a refund or return of a deposit made, or a fee paid, to CITY in accordance with the provisions of the Existing Rules. 293
12 10.4 Institution of Legal Action . OWNER may institute legal action to cure, correct or remedy any default, to enforce any covenants or agreements herein, to enjoin any threatened or attempted violation hereof, or to obtain any other remedies consistent with this Agreement. Such legal action shall be heard by a referee approved by the Orange County Superior Court pursuant to the applicable procedures of California Code of Civil Procedure (“CCP”) Sections 638, et seq.

OWNER and CITY shall agree upon a single referee who shall then try all issues, whether of fact or law, and report a finding and judgment thereon and issue all legal and equitable relief appropriate under the circumstances of the controversy before it. If OWNER and CITY are unable to agree on a referee within ten (10) days of a written request to do so by either party hereto, either party may seek to have one appointed pursuant to CCP Section 640. The cost of such proceeding shall initially be borne equally by the parties. Any referee selected pursuant to this Section 10.4 shall be considered a temporary judge appointed pursuant to California Constitution Article VI, Section 21.

10.5 Estoppel Certificates. Either party may at any time deliver written notice to the other party requesting an estoppel certificate (“Estoppel Certificate”) stating:

10.5.1 The Agreement is in full force and effect and is a binding obligation of the parties.

10.5.2 The Agreement has not been amended or modified either orally or in writing or, if so amended, identifying the amendments.

10.5.3 No default in the performance of the requesting party’s obligations under the Agreement exists or, if a default does exist, the nature and amount of any default.

A party receiving a request for an Estoppel Certificate shall provide a signed certificate to the requesting party within thirty (30) days after receipt of the request. The City Manager or designee may sign the Estoppel Certificate on behalf of CITY. Any officer of OWNER may sign on behalf of OWNER. An Estoppel Certificate may be relied on by assignees and mortgagees. In the event that one party requests an Estoppel Certificate from the other, the requesting party shall reimburse the other party for all reasonable and direct costs and fees incurred by such party with respect thereto.

11. Waivers and Delays.

11.1 No Waiver. Failure by a party to insist upon the strict performance of any of the provisions of this Agreement by the other party, and failure by a party to exercise its rights upon a default by the other party hereto, shall not constitute a waiver of such party’s right to demand strict compliance by such other party in the future.

11.2 Third Parties. Non-performance shall not be excused because of a failure of a third person, except as provided in Section 11.3.

11.3 Force Majeure. OWNER and CITY shall not be deemed to be in default where failure or delay in performance of any of their obligations under this Agreement is caused by floods, earthquakes, epidemics, other Acts of God, fires, wars, riots, or similar hostilities, strikes and other labor difficulties beyond OWNER or CITY control, including government regulations 294
13 (including, without limitation, local, state and federal environmental and natural resource regulations), voter initiative or referenda, moratoria (including, without limitation, any “development moratorium” as that term is applied in Government Code Section 66452.6) or judicial decisions.

11.4 Extensions. The Term of this Agreement and the time for performance by OWNER or CITY of any of its obligations hereunder or pursuant to the Project Approvals shall be extended by the period of time that any of the events described in Section 11.3 or this Section 11.4 exist and/or prevent performance of such obligations; provided that, in no event shall any such extension exceed a total of twenty-four (24) months without the prior approval, in their sole and complete discretion, of both OWNER and CITY. Subject to this limit the Term shall be extended for delays arising from the following events for a time equal to the duration of each delay which occurs during the Term.

11.4.1 Litigation. The period of time after the Effective Date during which litigation related to the Project Approvals, which has the actual effect of delaying implementation of the Project, is pending, including any litigation pending on the Effective Date. This period shall include any time during which appeals may be filed or are pending.

11.4.2 Referenda. Any referendum or petition initiative which would invalidate or delay the implementation of the Project Approvals.

11.4.3 Government Agencies. Any delay resulting from the acts or omissions of CITY or any other governmental agency or public utility and beyond the reasonable control of OWNER.

11.5 Notice of Delay. Each party shall give notice to the other of any delay that either party believes to have occurred as a result of the occurrence of any of the events described in Section 11.3 or 11.4. Such notice shall be provided as soon as either party becomes aware of any such delay, and in no event shall notice of a delay of any length be given later than sixty (60) days after the end of the delay or it shall be deemed waived.

12. General Provisions.

12.1 Binding Covenants. The provisions of this Agreement, to the extent permitted by law, shall constitute covenants which shall run with the Property for the benefit thereof, and the benefits and burdens of this Agreement shall bind and inure to the benefit of the parties and all successors in interest to the parties hereto.

12.2 Notices. All notices required or provided for under this Agreement shall be in writing and either (i) delivered in person; or (ii) sent by certified mail, postage prepaid, return receipt requested; or (iii) sent by independent courier service or overnight delivery service.

Notices required to be given to CITY shall be addressed as follows:

City of Orange, City Manager
300 E. Chapman Avenue
Orange, CA 92866
Attn: City Manager
295
14 With a copy to:

City of Orange
300 E. Chapman Avenue
Orange, CA 92866
Attn: City Attorney
Notices required to be given to OWNER shall be addressed as follows:

Old Town Gateway, LLC
606 E. Chapman Avenue
Orange, CA 92866
Attn: Al Ricci
Any notice given as required herein shall be deemed given only if in writing and upon delivery by one of the methods set forth above. A party may change its address for notices by giving notice in writing to the other party as required herein and thereafter notices shall be addressed and transmitted to the new address.

12.3 Attorneys’ Fees. If legal action is brought by either party against the other for breach of this Agreement or to compel performance under this Agreement, the prevailing party shall be entitled to an award of its costs, including reasonable attorneys’ fees, and shall also be entitled to recover its contribution for the costs of the referee referred to in Section 10.4 above as an item of damage and/or recoverable costs. If CITY is the prevailing party and uses in-house counsel in the litigation, it shall be entitled to recover attorneys’ fees at the hourly rate that OWNER is being charged by its attorney or at the in-house counsel’s fully burdened rate, whichever is higher.

12.4 Recording. This Agreement and any amendment or cancellation hereto shall be recorded by the City Clerk, in the Official Records of Orange County within ten (10) days after the Effective Date, as provided in Section 65868.5 of the Development Agreement Legislation.

12.5 Severability of Terms . If any term, provision, covenant or condition of this Agreement shall be determined invalid, void or unenforceable, the remainder of this Agreement shall not be affected thereby to the extent such remaining provisions are not rendered impractical to enforce.

12.6 Rules of Construction and Miscellaneous Terms.

12.6.1 Interpretation and Governing Law . The language in all parts of this Agreement shall, in all cases, be construed as a whole and in accordance with its fair meaning.

This Agreement and any dispute arising hereunder shall be governed and interpreted in accordance with the laws of the State of California. The parties understand and agree that this Agreement is not intended to constitute, nor shall be construed to constitute, an impermissible attempt to contract away the legislative and governmental functions of CITY, and in particular, CITY’s police powers. 296
15 In this regard, the parties understand and agree that this Agreement shall not be deemed to constitute the surrender or abnegation of CITY’s governmental powers over the Property.

12.6.2 Section Headings. All section headings and subheadings are inserted for convenience only and shall not affect any construction or interpretation of this Agreement.

12.6.3 Gender. The singular includes the plural; the masculine gender includes the feminine; “shall” is mandatory, “may” is permissive.

12.6.4 Joint and Several Liability . If there is more than one signatory to this Agreement, their obligations are joint and several.

12.6.5 Time of Essence. Time is of the essence regarding each provision of this Agreement of which time is an element.

12.6.6 Recitals. All Recitals set forth herein are incorporated in this Agreement as though fully set forth herein.

12.6.7 Entire Agreement. This Agreement together with the Development Plan constitutes the entire agreement between the parties with respect to the subject matter hereof, and the Agreement supersedes all previous negotiations, discussion and agreements between the parties, and no parol evidence of any prior or other agreement shall be permitted to contradict or vary the terms hereof.

12.6.8 Not for Benefit of Third Parties . This Agreement and all provisions hereof are for the exclusive benefit of CITY and OWNER and its Development Transferees and shall not be construed to benefit or be enforceable by any third party.

13. Effect of Agreement on Title.

13.1 Effect on Title. OWNER and CITY agree that this Agreement shall not continue as an encumbrance against any portion of the Property as to which this Agreement has terminated.

13.2 Encumbrances and Lenders’ Rights.

13.2.1 OWNER and CITY hereby agree that this Agreement shall not prevent or limit any owner of any interest in the Property, or any portion thereof, at any time or from time to time in any manner, at its or their sole discretion, from encumbering the Property, the improvements thereon, or any portion thereof with any mortgage, deed of trust sale and leaseback arrangement or other security device. CITY acknowledges that any Lender (as hereinafter defined) may require certain interpretations of or modifications to the Agreement or the Project and CITY agrees, upon request, from time to time, to meet with the property owner(s) and/or representatives of such Lenders to negotiate in good faith any such request for interpretation or modification.

CITY further agrees that it will not unreasonably withhold its consent to any such requested interpretation or modification to the extent such interpretation or modification is consistent with the intent and purpose of this Agreement. A default under this Agreement shall not defeat, render invalid, diminish or impair the lien of any Lender.
297
16 13.2.2 The mortgagee of a mortgage, or beneficiary of a deed of trust, or holder of any other security interest in the Property or any portion thereof and their successors and assigns, including without limitation the purchaser at a judicial or non-judicial foreclosure sale, or a person or entity which obtains title by deed-in-lieu of foreclosures (“Lender”) shall be entitled to receive a copy of any First Default Notice, as defined in Section 10.1, at the name and address Lender has provided to the City Clerk of CITY. As a pre-condition to the institution of any legal proceedings or termination proceedings, CITY shall deliver to all such Lenders written notification of any Second Default Notice. The Second Default Notice shall specify in detail the alleged default and the suggested means to cure it. Each such Lender shall have the right, at its sole option, to cure such default within seventy-five (75) days of receipt of the Second Default Notice or, if such default cannot be reasonably cured within seventy-five (75) days, to commence and diligently pursue a cure of such default, in which case CITY shall not terminate this Agreement or otherwise institute legal proceedings. Within twenty (20) days of receipt of the Second Default Notice, such Lenders shall provide written notice to CITY as to whether such Lender intends to cure the default.

If CITY does not receive such notice within twenty (20) days, the Lender shall be deemed to have elected not to cure and CITY may pursue all available remedies provided to it under this Agreement.
[Remainder of page intentionally left blank; signatures on next page] 298
17 IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the day and year dated below.

Dated: , 2022 “CITY”

THE CITY OF ORANGE,
a municipal corporation,
By:

Mark A. Murphy, Mayor
ATTEST:

Pamela Coleman, City Clerk
APPROVED AS TO FORM:

Gary A. Sheatz, City Attorney
Dated: , 2022 “OWNER”

OLD TOWN GATEWAY, LLC,
a California limited liability company,
By:
[Notary Acknowledgments Attached]
299
ATTACHMENT 1
[Exhibits A and B – Legal Description and Sketch]
300
Agenda Item
City Council
Item #: 3.10. 12/13/2022 File #: 22-0683
TO: Honorable Mayor and Members of the City Council
THRU: Tom Kisela, Interim City Manager
FROM: Pamela Coleman, City Clerk

1. SUBJECT
Second Reading and adoption of an Ordinance of the City Council of the City of Orange creating the Neighborhood Preservation Overlay Zone; providing development standards to regulate the addition of bedrooms or bathrooms to a primary residence within specified boundaries; revising or adding definitions pertaining to residential additions and student housing; and updating provisions for reviewing body approval of specified matters. Ordinance No. 10-22.

2. SUMMARY
The Introduction and First Reading of the above-entitled Ordinance was approved at an adjourned Regular Council Meeting on November 15, 2022.

The Ordinance is now presented for Second Reading by title only, and adoption.

Vote at First Reading: AYES: Murphy, Nichols, Barrios, Dumitru, Tavoularis, Gutierrez
NOES: None
ABSENT: Monaco

3. RECOMMENDED ACTION
Adopt Ordinance No. 10-22.

4. ATTACHMENTS
· Ordinance No. 10-22.

City of Orange Printed on 12/8/2022Page 1 of 1
powered by Legistar™
301
Agenda Item
City Council
Item #: 3.10. 12/13/2022 File #: 22-0683
TO: Honorable Mayor and Members of the City Council
THRU: Tom Kisela, Interim City Manager
FROM: Pamela Coleman, City Clerk

1. SUBJECT
Second Reading and adoption of an Ordinance of the City Council of the City of Orange creating the Neighborhood Preservation Overlay Zone; providing development standards to regulate the addition of bedrooms or bathrooms to a primary residence within specified boundaries; revising or adding definitions pertaining to residential additions and student housing; and updating provisions for reviewing body approval of specified matters. Ordinance No. 10-22.

2. SUMMARY
The Introduction and First Reading of the above-entitled Ordinance was approved at an adjourned Regular Council Meeting on November 15, 2022.

The Ordinance is now presented for Second Reading by title only, and adoption.

Vote at First Reading: AYES: Murphy, Nichols, Barrios, Dumitru, Tavoularis, Gutierrez
NOES: None
ABSENT: Monaco

3. RECOMMENDED ACTION
Adopt Ordinance No. 10-22.

4. ATTACHMENTS
· Ordinance No. 10-22.

City of Orange Printed on 12/8/2022Page 1 of 1
powered by Legistar™
302
ORDINANCE NO. 10-22

AN ORDINANCE OF THE CITY COUNCIL OF THE

CITY OF ORANGE CREATING THE

NEIGHBORHOOD PRESERVATION OVERLAY
ZONE; PROVIDING DEVELOPMENT STANDARDS

TO REGULATE THE ADDITION OF BEDROOMS

OR BATHROOMS TO A PRIMARY RESIDENCE
WITHIN SPECIFIED BOUNDARIES ; REVISING OR

ADDING DEFINITIONS PERTAINING TO

RESIDENTIAL ADDITIONS AND STUDENT
HOUSING; AND UPDATING PROVISIONS FOR

REVIEWING BODY APPROVAL OF SPECIFIED

MATTERS

WHEREAS, the City Council of the City of Orange, pursuant to its police powers afforded under the California Constitution, Article XI, Section 7, California Government Code 37100, et seq., may adopt regulations to protect the peace, health, safe ty and welfare of the community, and may declare that certain uses and conditions constitute a public nuisance; and

WHEREAS, California Government Code 38771 authorizes the City, through its legislative body, to declare actions and activities that consti tute a public nuisance in its community; and

WHEREAS, the City in general, and the neighborhoods in proximity to Chapman University in particular, have experienced a surge of construction activity and new applications for additions to and/or interior ren ovations to single -family dwellings (primary residences) in which numerous bedrooms and bathrooms are added, many with exterior doors and wet bars in each bedroom, in some cases transforming two or three bedroom homes into seven or eight bedroom and bathroom structures; and

WHEREAS, the mansionization of former single -family dwellings has in many cases been promoted as “student housing properties,” with the goal of “creating a student housing assemblage” on specific streets; and

WHEREAS, those mansionized single -family dwellings already constructed have caused numerous deleterious effects on the families residing nearby, including parking on front lawns, illegal street parking, unsafe vehicle speed demonstrations, trampled landscaping, loud music, unruly parties, congregation of crowds from outside the neighborhoods in the front yards over and above the number of occupants, confrontational interactions with neighbors, public drinking, late night disturbances, litter including bottles and cups visible to the neighborhood, overflowing trash cans, police responses to resident complaints, party call prosecutions, and what has been described by neighbors as a “fraternity” atmosphere, all of which effects constitute a public nuisance to the community; and

303
WHEREAS, on February 16, 2021, the City Council adopted interim Ordinance No. 02- 21, prohibiting the addition of three or more bedrooms or three or more bathrooms to a primary residence use on lots less than 12,000 square feet, and adding or revising certain related definitions; on March 23, 2021, the City Council extended interim Ordinance No. 02-21-A until February 15, 2022; and on February 8, 2022, the City Council extended interim Ordinance No. 02-21-B until February 15, 2023; and

WHEREAS, since adoption of the interim Ordinance, the City has reviewed and studied the development standards contained in its Zoning Code to examine under what circumstances and to what extent primary residences may be expanded in the number of bedrooms and number of bathrooms, along with other remodeling development standards, in a manner that does not deteriorate the neighborhood character; and

WHEREAS, the City has also studied the required procedure for evaluating applications for the expansion of single-family dwellings to determine the proper level of review required to protect the peace, health, safety and welfare of the neighborhood and the public at large and mitigate the specific adverse impacts; and

WHEREAS, the City has also studied the definitions of bedroom, dormitory and student housing to achieve a fair balance between accommodation of property owners’ rights and the negative effects of unregulated increases in bedrooms and bathrooms in single-family residential neighborhoods; and

WHEREAS, the City has examined the areas within the Ci ty where the additional bedrooms and bathrooms have been most prevalent and contributed most of the detrimental effects; and

WHEREAS, City staff has determined that an overlay zone applicable to that area of the City most prone to home expansions, and containing specific requirements for the addition of bedrooms and bathrooms , will provide clear and reasonable regulations allowing property owners to expand their residences while ensuring orderly growth and elimination of the known detrimental effects from mansionization; and

WHEREAS, at a public hearing held on November 7, 2022, the City of Orange Planning Commission considered proposed Ordinance No. 10-22 and recommended approval of said Ordinance to the City Council; and

WHEREAS, Ordinance No. 10-22 is necessary to achieve the goals and policies of the General Plan Land Use Element for balancing economic gains from new development while preserving the character and densities of residential neighborhoods, minimizing effects of new development on the privacy and character of surrounding neighborhoods, preserving historic resources, both individual and cumulatively in neighborhoods, and ensuring contextuall y appropriate infill development that contributes positively to the quality of the surrounding neighborhood.

304

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF ORANGE DOES HEREBY ORDAIN AS FOLLOWS:

SECTION I:

This Ordinance is not subject to the California Environmental Quality Act (CEQA) pursuant to (1) Section 15061(b)(3) of the state CEQA Guidelines (Common Sense Exemption) because it can be seen with certainty that there is no possibility that it would have a significant effect on the environment; and (2) Guideline Section 15378 because it will not have a direct or reasonably foreseeable indirect physical change on the environment and is not a "project." For this reason, no further CEQA documentation is required.

SECTION II:

The definition of “BATHROOM” is hereby added to Section 17.04 .021 of the Orange Municipal Code, “Zoning – Definitions – “B” Definitions,” to read as follows:

BATHROOM, FULL and HALF - A full bathroom contains one bathtub, tub or shower compartment; one water closet or lavatory or other similar approved facilities, and up to two sinks. It includes a compartmented bathroom in which the fixtures are distributed among interconnected rooms. A half -bathroom omits a bathtub, tub, or shower compartment.

SECTION III:

The definition of “BEDROOM” in Section 17.04.021 of the Orange Municipal Code, “Zoning – Definitions – “B” Definitions,” is hereby revised to read as follows:

BEDROOM - Any habitable room in a dwelling unit other than a bathroom, kitchen, dining room or living room with the following features: an interior door that can be closed or an opening into the room in which an interior door or double door can be easily installed; a window; and a closet or room for a wardrobe in addition to a bed.

SECTION IV:

The definition of “DORMITORY” in Section 17.04.023 of the Orange Municipal Code, “Zoning – Definitions – “D” Definitions,” is hereby revised to read as follows:

DORMITORY, DORMITORY-STYLE HOUSING, See also STUDENT
HOUSING – A structure used for group accommodations, containing a number of private or semiprivate bedrooms with or without a private bathroom, usually with common recreation and kitchen areas, primarily advertised to and exclusively occupied by students of a provider of higher education. A dormitory may be owned or operated by a university, college, or private owner.

305
SECTION V:

The definition of “LIVING AREA, COMMON” is hereby added to Section 17.04.031 of the Orange Municipal Code, “Zoning – Definitions – “L” Definitions,” to read as follows:

LIVING AREA, COMMON - The interior habitable area of a dwelling unit, other than the kitchen, bedrooms, bathrooms, utility rooms, garage, and basement, that is of sufficient size to be shared by all occupants of the dwelling unit with no oth er specific purpose other than shared gathering area.

SECTION VI :

The definition of “OPEN SPACE, USABLE” in Section 17.04.03 4 of the Orange Municipal Code, “Zoning – Definitions – “O” Definitions,” is hereby revised to read as follows:

OPEN SPACE, USABLE - Any space on a lot not enclosed by buildings and intended for recreation and leisure uses. Usable open space includes yards , courtyards, balconies, decks, porches, and patios but does not include front yard setbacks, driveways, parking spaces or side yards less than eight feet in width. In multiple-family developments, indoor recreation areas may count toward the usable open space requirement.

SECTION VII:

The definition of “STUDENT HOUSING” in Section 17.04.038 of the Orange Municipal Code, “Zoning – Definitions – “S” Definitions,” is hereby revised to read as follows:

STUDENT HOUSING, See also DORMITORY , DORMITORY -STYLE
HOUSING -- A structure designed, primarily advertised to and exclusively used for long-term stay by students of an educational facility for group accommodations usually with common recreation and kitchen areas, primarily advertised to and exclusively occupied by students of a provider of higher education . This may include a dormitory or fraternity/sorority house or apartment. Student housing may be owned or operated by a university, college, or private owner.

SECTION VIII:

Table 17.06.020 of the Orange Municipal Code, “Zoning – Zoning Districts and Map – Districts Established,” is hereby revised to read as follows:

Table 17.06.020
Use
District
Symbol

Use Classification

Chapter
R1-R Single Family Residential District 17.14
R1-40 Single-Family Residential District 17.14
306
R1-20 Single-Family Residential District 17.14
R1-15 Single-Family Residential District 17.14
R1-12 Single-Family Residential District 17.14
R1-10 Single-Family Residential District 17.14
R1-8 Single-Family Residential District 17.14
R1-7 Single-Family Residential District 17.14
R1-6 Single-Family Residential District 17.14
R1-5 Single-Family Residential District 17.14
R2-8 Duplex Residential District 17.14
R2-7 Duplex Residential District 17.14
R2-6 Duplex Residential District 17.14
R-3 Multiple-Family Residential District 17.14
R-4 Multiple-Family Residential District 17.14
MH Mobile Home Residential District 17.14
OP Office Professional District 17.18
CP Commercial Professional District 17.18
C1 Limited Business District 17.18
C-TR Limited Business District—Tustin Redevelopment Project Area 17.18 C2 General Business District 17.18
C3 Commercial District 17.18
OTMU-15S Old Towne Mixed Use District - 15S 17.19
OTMU-15 Old Towne Mixed Use District - 15 DU/AC 17.19
OTMU-24 Old Towne Mixed Use District - 24 DU/AC 17.19
NMU-24 Neighborhood Mixed Use District - 24 DU/AC 17.19 UMU Urban Mixed Use District 17.19
M1 Light Industrial District 17.20
M2 Industrial Manufacturing District 17.20
SG Sand and Gravel Extraction District 17.32
A-1 Agricultural District 17.22
RO Recreation Open Space District 17.22
SH Slope Hazard District 17.22
PI Public Institution District 17.24
PC Planned Community District 17.26
FP Flood Plain Overlay District 17.28
A Single-Story Overlay District 17.28
E Equestrian Overlay District 17.28
P Parking Overlay District 17.28
NP Neighborhood Preservation Overlay District 17.28
PUD Planned Unit Development District 17.16
307

SECTION IX:

Table 17.08.020 of the Orange Municipal Code, “Zoning – General Administrative Procedures – Reviewing Bodies,” is hereby revised to add the following:

Table 17.08.020

Type of Procedure, Permit or Hearing CDD DRC ZA PC CC
Neighborhood Preservation Overlay
Applications

A/X(1) X(1)

SECTION X:

Subsections 17.08.020.D.2 (f) and (g) are hereby added to Section 17.08.020 of the Orange Municipal Code, “Zoning – General Administrative Procedures – Reviewing Bodies – Design Review Committee – Powers and Duties,” to read as follows:

f. Make final determination on design review of applications for additional bedrooms or bathrooms in a historic district pursuant to Section 17.28.080.D.1.a.

g. Review and make recommendations to the Zoning Administrator on applications for additional bedrooms or bathrooms in a historic district pursuant to Section

17.28.080.D.1.b.

SECTION XI:

Subsections 17.08.020.E.1 of the Orange Municipal Code, “Zoning – General Administrative Procedures – Reviewing Bodies – Community Development Director – Powers and Duties,” is hereby revised to read as follows:

1. Powers and Duties. The Community Development Director, after consultation with appropriate staff as determined by the Director, shall have the authority to:

SECTION XII:

Subsections 17.08.020.E.1(i) through (m) are hereby added to Section 17.08.020 of the Orange Municipal Code, “Zoning – General Administrative Procedures – Reviewing Bodies – Community Development Director – Powers and Duties,” to read as follows:

i. Decide upon the conformity of unlisted uses to the zoning district and similar uses pursuant to Section 17.13.070.

j. Decide upon applications to install walls and fences within 5 feet of one another pursuant to Section 17.12.070.A.1.a.

k. Decide upon Neighborhood Preservation Overlay Dist rict applications pursuant to Section 17.28.080.C.
308

l. Decide upon deviations from required number of parking spaces for nonresidential land uses pursuant to Section 17.34.060.

m. Decide upon parking requirements for uses not specified pursuant to Section 17.34.070.

SECTION XIII:

Section 17.14.280 is hereby added to the Orange Municipal Code, “Zoning – Residential Districts – Bedrooms,” to read as follows:

17.14.280 Bedrooms

A bedroom may not contain facilities for a sink, refrigerator or microwave, a kitchenette, or infrastructure that can be easily converted to a kitchenette, e.g., GFCI outlets. Unless otherwise approved by the Community Development Director or designee, a bedroom may not have a door directly to the outside or contain a wet bar.

SECTION XIV:

The chart in Section 17.28.030 of the Orange Municipal Code, “Zoning – Overlay Districts – Denotation of Overlay Districts,” is hereby revised to read as follows:

District Symbol
Flood Plain 1 FP-1
Flood Plain 2 FP-2
Single Story A
Equestrian E
Parking P
Neighborhood Preservation NP

SECTION XV:

Section 17.28.080 is hereby added to the Orange Municipal Code , “Zoning – Overlay Districts – Neighborhood Preservation Overlay District,” to read as follows:

17.28.080 Neighborhood Preservation Overlay

A. Purpose and Intent. The purpose of the Neighborhood Preservation (NP) Overlay District is to provide regulations to control surges in construction of new additions and i nterior 309
renovations to primary residences concentrated in the overlay district that become multiple tenant rental properties and that result in adverse impacts to single-family neighborhoods.

B. Application. The Neighborhood Preservation Overlay District is the area bounded by Katella Avenue to the north, Main Street to the west, the SR-55 Freeway to the east, and the City’s boundaries along the SR -22 Freeway to the south. The overlay district is established on the City of Orange Zoning Map.

C. Overlay Development Standards – Ministerial Approval. Project applications from existing primary residences in the overlay district that add bedrooms or bathrooms in compliance with the City of Orange In fill Residential Design Guidelines and the following overlay development standards, shall be approved ministerially by the Community Development Director or designee.

1. A maximum of two bedrooms may be constructed onto and/or and added within a primary res idence by reconfiguring existing space. For purposes of calculating allowable additional bedrooms, the number of bedrooms existing as of January 1, 2023, shall be considered the baseline.

2. A maximum of two bathrooms, including half -bathrooms, may be constructed onto and/or added to a primary residence by reconfiguring existing space. For purposes of calculating allowable additional bathrooms, the number of bathrooms existing as of January 1, 2023, shall be considered the baseline.

3. A minimum of 100 square feet of additional usable open space beyond that required by Orange Municipal Code Table 17.14.070 must be provided for each additional bedroom being proposed to the existing primary residence.

4. A minimum of 100 square feet of additional common living area must be provided for each additional bedroom being proposed to the existing primary residence. Dwelling units that maintain a minimum of 800 square feet of common living area are exempt from the requirement.

5. A minimum of 50 cubic feet of additional unified indoor storage area must be provided for each additional bedroom being proposed to the existing primary residence. Such storage area must be in addition to cabinets and closets typically found within a dwelling unit such as bedroom closets, linen closets, or kitchen cabinets.

6. In any single -family residential district, the addition of one or two new bedrooms must comply with the following floor area ratio (FAR) standards.

Lot Area (sf) Max FAR Max FAR for One Max FAR for Two
New Bedroom New Bedrooms
<10,000 0.60 0.55 0.50
10,000-12,000 0.50 0.45 0.40

310

7. Project applications involving exterior modifications to primary residences located in a historic district shall also be subject to design review by the Design Review Committee.

D. Approval Process. Applications from existing primary residences in the overlay district that add bedrooms or bathrooms not in compliance with the overlay development standards set forth in Subsection C, and/or that are located in a historic district shall be subject to the following approval procedures:

1. Historic District Approval. An application for additional bedrooms, bathrooms and other related improvements that involve s new square footage or exterior modifications (other than roof vents), shall be subject to the design review process as follows:

a. When the property is located in a historic district but the application is otherwise in compliance with the overlay development standards contained in subsection C, the Design Review Committee shall have the final authority to review and approve the project.

b. When the property is located in a historic district but the application is not in compliance with the overlay development standards contained in subsection C, the Design Review Committee shall have the authority to review and make a recommendation to the Zoning Administrator on the design of the proposed project. The Zoning Administrator shall have the final authority to review and approve the project.

2. Approval – Not in a Historic District. When the proposal is not in compliance with the overlay development standards contained in subsection C, the Zoning Administrator shall have the final authority to review and approve the project.

3. Zoning Administrator Approval - Considerations. In approving an application for additional bedrooms, bathrooms, and/or othe r related improvements not in compliance with the overlay development standards contained in subsection C, the Zoning Administrator shall consider the following:

a. The proposal will preserve the public peace, health, safety, and welfare within those areas t hat neighbor the affected residence and other surrounding areas within the Neighborhood Preservation Overlay District.

b. The size and design of the proposal will minimize the likelihood of excessive disturbances or unruly behavior such as parking on front lawns, illegal street parking, congregation of crowds in the front yards over and above the number of occupants, and other public nuisances to the community.

c. The proposal will comply with those standards and requirements described in this Section and the entirety of Title 17 of this code.

311

4. Appeals. Final d ecisions of the Community Development Director , Design Review Comm ittee or Zoning Administrator may be appealed to the Planning Commission pursuant to Section 17.08.050.E.

E. The Community Development Director, Design Review Committee or Zoning Administrator may refer an application for which it may render a final decision to the Planning Commission for a final decision. The Planning Commission shall be subject to those approv al considerations set forth in subsection D.3.

SECTION XVI:

If any section, subdivision, paragraph, sentence, clause or phrase of this Ordinance is for any reason held to be invalid or unconstitutional, such decision shall not affect the validity of the remaining portions of this Ordinance. The City Council hereby declares that it would have passed this Ordinance, and each section, subdivision, paragraph, sentence, clause and phrase thereof, irrespective of the fact that any one (or more) section, subdivision, paragraph, sentence, clause or phrase had been declared invalid or unconstitutional.

SECTION XVII:

The City Clerk is hereby directed to certify the adoption of this Ordinance and cause a summary of the same to be published as required by law. This Ordinance shall take effect thirty (30) days from and after the date of its final passage.

APPROVED this ____ day of ________________, 2022.

_____________________________________
Mark A. Murphy, Mayor, City of Orange

ATTEST:

Pamela Coleman, City Clerk, City of Orange

312

STATE OF CALIFORNIA )

COUNTY OF ORANGE )

CITY OF ORANGE )

I, PAMELA COLEMAN, City Clerk of the City of Orange, California, do hereby certify that the foregoing Ordinance was introduced at the regular meeting of the City Council held on the 15th day of November, 2022, and thereafter at the regular meeting of said City Council duly held on the ___ day of _______________, 2022, was duly passed and adopted by the following vote, to wit:

AYES: COUNCILMEMBERS:

NOES: COUNCILMEMBERS:

ABSENT: COUNCILMEMBERS:

ABSTAIN: COUNCILMEMBERS:

Pamela Coleman, City Clerk, City of Orange
313
Agenda Item
City Council
Item #: 3.11. 12/13/2022 File #: 22-0684
TO: Honorable Mayor and Members of the City Council
THRU: Tom Kisela, Interim City Manager
FROM: Pamela Coleman, City Clerk

1. SUBJECT
Second Reading and adoption of an Ordinance of the City Council of the City of Orange amending various sections of the Orange Municipal Code to delete outdated language, update references to conform with current law and code provisions, and achieve internal consistency. Ordinance No. 09-

22. 2. SUMMARY
The Introduction and First Reading of the above-entitled Ordinance was approved at an adjourned Regular Council Meeting on November 15, 2022.

The Ordinance is now presented for Second Reading by title only, and adoption.

Vote at First Reading: AYES: Murphy, Nichols, Barrios, Dumitru, Tavoularis, Gutierrez,
NOES: None
ABSENT: Monaco

3. RECOMMENDED ACTION
Adopt Ordinance No. 09-22.

4. ATTACHMENTS
· Ordinance No. 09-22.

City of Orange Printed on 12/8/2022Page 1 of 1
powered by Legistar™
314
Agenda Item
City Council
Item #: 3.11. 12/13/2022 File #: 22-0684
TO: Honorable Mayor and Members of the City Council
THRU: Tom Kisela, Interim City Manager
FROM: Pamela Coleman, City Clerk

1. SUBJECT
Second Reading and adoption of an Ordinance of the City Council of the City of Orange amending various sections of the Orange Municipal Code to delete outdated language, update references to conform with current law and code provisions, and achieve internal consistency. Ordinance No. 09-

22. 2. SUMMARY
The Introduction and First Reading of the above-entitled Ordinance was approved at an adjourned Regular Council Meeting on November 15, 2022.

The Ordinance is now presented for Second Reading by title only, and adoption.

Vote at First Reading: AYES: Murphy, Nichols, Barrios, Dumitru, Tavoularis, Gutierrez,
NOES: None
ABSENT: Monaco

3. RECOMMENDED ACTION
Adopt Ordinance No. 09-22.

4. ATTACHMENTS
· Ordinance No. 09-22.

City of Orange Printed on 12/8/2022Page 1 of 1
powered by Legistar™
315

ORDINANCE NO. 09-22

AN ORDINANCE OF THE CITY COUNCIL OF THE

CITY OF ORANGE AMENDING VARIOUS

SECTIONS OF THE ORANGE MUNICIPAL CODE TO

DELETE OUTDATED LANGUAGE, UPDATE

REFERENCES TO CONFORM WITH CURRENT

LAW AND CODE PROVISIONS, AND ACHIEVE

INTERNAL CONSISTENCY

THE CITY COUNCIL OF THE CITY OF ORANGE DOES HEREBY ORDAIN AS FOLLOWS:

SECTION I:

1. The subject Ordinance is exempt from the provisions of the California Environmental Quality Act (CEQA) per State CEQA Guidelines (Guidelines) Sections 15060(c)(2) and 15060(c)(3) because review and evaluation of potential impact of the Ordinance demonstrate that it will not result in a direct or reasonably foreseeable indirect physical change in the environment, and it is not a "project" as defined in Guideline 15378.

2. The subject Ordinance is exempt from CEQA per Guideline 15061(b)(3) because it can be seen with certainty, after review a nd evaluation of the facts regarding the Zoning Code administrative amendments , that there is substantial evidence that adoption of this Ordinance would not have a significant effect on the environment and the common sense exemption applies.

SECTION II:

Section 2.64.040 of the Orange Municipal Code, “Administration and Personnel – Planning Commission – Meetings,” is hereby revised to read as follows:

2.64.040 Meetings.

The regular meetings of the Planning Commission shall be held in the Council Chambers, Civic Center, 300 East Chapman Avenue, Orange, California, or at such other place as may be designated by the Planning Commission, on the first and third Monday of each month and shall convene at the hour of 7:00 P.M. In the event any such Monday is a l egal holiday, such meeting shall be held the following Thursday, at the hour of 7:00 P.M.

SECTION III:

Section 5.63.010 of the Orange Municipal Code, “Business Taxes and Regulations – Plaza Banners - Definitions,” is hereby revised to read as follows:

316

A. PLAZA BANNER: means any pennant, streamer, flag, sign, picture, figure or other object regardless of the material of which it is made, which is suspended or otherwise displayed over any public street, way, or place, designed for decoration or non-profit advertisement, or to attract the attention of passersby; except, however, official warning devices, or public service or safety facilities. The term shall not include signs and billboards, the installation and maintenance of which are regulated by Chapter 17.36 of this code.

SECTION IV:

Section 5.76.020.A of the Orange Municipal Code, “Business Taxes and Regulations – Tow Trucks – Permit-Required,” is hereby revised to read as follows:

A. No person shall operate any tow truck business within the City without obtaining a proper permit therefor, as provided in this chapter.

SECTION V:

Section 16.60.100.C of the Orange Municipal Code, “Subdivisions – Park Dedications and Fees – Exemptions,” is hereby revised to read as follows:

C. In order to ensure that the imposition of fees pursuant to this chapter will not be contrary to the public interest, or prevent the development of a public service project, the City Council may waive all, or any portion of, the fees required by this chapter if the City Council finds that a subdivision will serve a public purpose or satisfy a public need and is located within a redevelopment project area, or other special district, or involves direct City of Orange participation in the residential development project. Moreover, the City Council may, from time to time, and as the need may arise, set forth, by resolution, specific limitations, which will apply to waivers of fees which may be made pursuant to this section. In this regard, this chapter sh all be considered enabling and directory.

SECTION VI:

The headings of Table 17.08.040 the Orange Municipal Code, “Zoning – General Administrative Procedures – Notice of Hearings - General,” is revised to read as follows:

Type of Procedure, Permit or
Hearing
Mail to Surrounding
Property Owners
Publication and/or
Posting
Other

SECTION VII:

Section 17.10.040.D.2.a of the Orange Municipal Code, “Zoning – Specific Administrative Procedures – Variances – Variances Reviewed by Zoning Administrator,” is hereby revised to read as follows:

a. Building setback and yard requirements for new residential development on a lot that is vacant or previous development is razed to accommodate new development;
317

SECTION VIII:

Section 17.12.070.D.1.a of the Orange Municipal Code, “ Zoning – General Regulations Applicable to All Districts – Fences and Walls – Commercial – Division Wall Required,” is hereby revised to read as follows:
a. A masonry division wall at least eight feet in height as measured from the highest elevation of land contiguo us to the fence, and not greater than ten feet in height as measured from the lowest elevation contiguous to the fence, shall be constructed on all property lines adjacent to any residential district, except in a street -facing, front, side, or rear yard se tback where the wall shall be limited to forty -two (42) inches in height. Division wall height less than eight feet or taller than ten feet as measured from the lowest elevation contiguous to the wall may be considered by the Community Development Director.

SECTION IX:

Section 17.13.040.JJ.4.c(i), “Zoning – Master Land Use Table – Special Use Regulations – Homeless Shelter,” is hereby revised to read as follows:

i. The facility shall establish and enforce a strict code of conduct.

Facility rules shall prohibit weapons and the use, sale or distribution of alcohol or illegal drugs.

SECTION X:

Section 17.14.230 of the Orange Municipal Code, “Zoning – Residential Districts – Trash Enclosures,” is hereby revised to read as follows:

17.14.230 Solid Waste Collection Areas.

All multiple-family residential and mobile home park developments comprised of five or more units sh all provide solid waste collection areas adequately and conveniently placed throughout the development. Solid waste collection areas include solid waste enclosures which shall meet or exceed the Department of Public Works standard for solid waste enclosur es. The Public Works Director (or designee) may adjust or waive these requirements. Compliance with AB 827 is required, which includes providing source-separated receptacles for residents.

SECTION XI:

Section 17.15.030.C.5 of the Orange Municipal Code, “Zoning – Density Bonus – Projects Eligible for Density Bonus – Donations of Land,” is hereby revised to read as follows:

5. The land is transferred to the City or to a housing developer approved by the City. The City may require the applicant to identify and transfer the land to the developer.

SECTION XII:

318

Section 17.15.070.C.2.d of the Orange Municipal Code, “Zoning – Density Bonus – Density Bonus Housing Agreement – Maximum Allowable Rent or Sales Price – Ownership Projects – Sale Clause,” is hereby revised to read as follows:

d. Sale Clause. The Density Bonus Housing Agreement shall stipulate that, when the terms of affordability have expired on an affordable unit, the City and/or a non - profit housing organization shall have a first right of purchase option sixty (60) days prior to the affordable unit being advertised on the market.

SECTION XIII:

Section 17.18.190 of the Orange Municipal Code, “Zoning – Commercial Districts – Trash Enclosures,” is hereby revised to read as follows:

17.18.190 Solid Waste Collection Areas.

All commercial developments shall provide solid waste collection areas adequately and conveniently placed throughout the development. Solid waste collection areas include solid waste enclosures which shall m eet or exceed the Department of Public Works standard for solid waste enclosures. The Public Works Director (or designee) may adjust or waive these requirements.

Compliance with AB 827 is required, which includes providing source -separated receptacles for customers.

SECTION XIV:

Section 17.19.080.H of the Orange Municipal Code, “Zoning – Mixed Use Districts – Mixed Use Development – Trash and Recycling Enclosures,” is hereby revised to read as follows:

H. Solid Waste Enclosures.

1. Solid waste enclosures for nonresidential uses shall be located as far as possible from residential units and shall be completely screened from view from the residential portion of the project and public right of way. Solid Waste collection areas shall meet or exceed the Department of Public Works standard for solid waste enclosures. The Public Works Director (or designee) may adjust or waive these requirements.

2. Trash and recycling storage facilities shall be integrated into and be compatible with the architectural design and details with the overall project.

3. The location and design of solid waste enclosures shall mitigate nuisances from noise and odors.

319

SECTION XV:

Section 17.19.190 of the Orange Municipal Code, “Zoning – Mixed Use Districts – Trash Enclosures,” is hereby revised to read as follows:

17.19.190 Solid Waste Collection Areas.

All developments shall provide solid waste collection areas adequately and conveniently placed throughout the development. Solid waste collection areas include soli d waste enclosures which shall meet or exceed the Department of Public Works standard for solid waste enclosures.

The Public Works Director (or designee) may adjust or waive these requirements. Compliance with AB 827 is required, which includes providing source-separated receptacles for residents or customers.

SECTION XVI:

Section 17.20.150 of the Orange Municipal Code, “Zoning – Industrial Districts – Trash Enclosures,” is hereby revised to read as follows:

17.20.150 Solid Waste Collection Areas.

All developments shall provide solid waste collection areas adequately and conveniently placed throughout the development. Solid waste collection areas include solid waste enclosures which shall meet or exceed the Department of Public Works standard for solid waste enclosures.

The Public Works Director (or designee) may adjust or waive these requirements. Compliance with AB 827 is required.

SECTION XVII:

Section 17.29.080.C.1 of the Orange Municipal Code, “Zoning – Accessory Dwelling Units and Junior Accessory Dwelling Units – ADU Setbacks,” is hereby revised to read as follows:

1. Side and rear setbacks of the zoning district shall apply for any ADU in excess of 800 square feet.

SECTION XVIII:

Section 17.36.150.H of the Orange Municipal Code, “Zoning – Sign Regulations – Special Purpose Sign Regulations – Decorative Banners,” is hereby revised to read as follows:

H. Decorative Banners. Decorative banners shall be permitted only in commercial or industrial districts and only as part of a sign program developed and sponsored by the City and approved by the Community Development Director (or designee), in which case such public bodies shall be exempt from the payment of any permit fee. Written approval from the property owner (or authorized agent) of the utility poles or street light standards to be used for the display of decorative banners shall be required as a conditi on to the approval of the sign program.

Decorative banners shall not identify any individual business or tenant name and shall not contain 320

written advertising copy. Decorative banners may be located no lower than fourteen (14) feet above grade and must enh ance the subject commercial or industrial district such that the colors, logos, materials and design of the decorative banners are appropriate to the district in which the decorative banners are to be installed.

SECTION XIX:

Section 17.44.110 of the Orange Municipal Code, “Zoning – Development Agreements – Recommendation of Orange Redevelopment Agency,” is hereby deleted in its entirety.

SECTION XX:

Section 17.44.120 of the Orange Municipal Code, “Zoning – Development Agreements – Hearing by City Council,” is hereby revised to read as follows:

17.44.120 Hearing by City Council.

After the recommendation of the Planning Commission or after the expiration of the time period specified in Section 17.44.100, the Director shall give notice of a public hearing before the City Council in the manner provided for in Sections 17.44.070 and 17.44.080.

SECTION XXI:

Section 17.44.130.A of the Orange Municipal Code, “Zoning – Development Agreements – Decision by City Council,” is hereby revised to read as follows:

A. After it completes the public hearing and considers the recommendation, if any, of the Planning Commission, the City Council may accept, modify, or deny the proposed development agreement. It may, but need not, refer the matters not previously considered by the Planning Commission during its hearing, back to the Planning Commission, who shall not be required to hold a public hearing on matters referred back to it by the City Council.

SECTION XXII:

If any section, subdivision, paragr aph, sentence, clause or phrase of this Ordinance is for any reason held to be invalid or unconstitutional, such decision shall not affect the validity of the remaining portions of this Ordinance. The City Council hereby declares that it would have passed this Ordinance, and each section, subdivision, paragraph, sentence, clause and phrase thereof, irrespective of the fact that any one (or more) section, subdivision, paragraph, sentence, clause or phrase had been declared invalid or unconstitutional.

321

SECTION XXIII:

The City Clerk is hereby directed to certify the adoption of this Ordinance and cause the same to be published as required by law. This Ordinance shall take effect thirty (30) days from and after the date of its final passage.

ADOPTED this ____ day of ___________________, 2022.

Mark A. Murphy, Mayor, City of Orange

ATTEST:

Pamela Coleman, City Clerk, City of Orange

STATE OF CALIFORNIA )

COUNTY OF ORANGE )

CITY OF ORANGE )

I, PAMELA COLEMAN, City Clerk of the City of Orange, California, do hereby certify that the foregoing Ordinance was introduced at the regular meeting of the City Council held on the 15th day of November, 2022, and thereafter at the regular meeting of said City Council duly held on the ___ day of ____________, 2022 was duly passed and adopted by the following vote, to wit:

AYES: COUNCILMEMBERS:

NOES: COUNCILMEMBERS:

ABSENT: COUNCILMEMBERS:

ABSTAIN: COUNCILMEMBERS:

Pamela Coleman, City Clerk, City of Orange
322
Agenda Item
City Council
Item #: 3.12. 12/13/2022 File #: 22-0701
TO: Honorable Mayor and Members of the City Council
THRU: Tom Kisela, Interim City Manager
FROM: Susan Galvan, Assistant City Manager

1. SUBJECT
Recognized Obligation Payment Schedule for the fiscal period covering July 1, 2023 through June 30, 2024 (ROPS 23-24). Resolution No. SAORA-036.

2. SUMMARY
Approve the Recognized Obligation Payment Schedule (ROPS) 23-24 and related Administrative Budgets for the period covering July 1, 2023, through June 30, 2024, and authorize the transmittal of ROPS 23-24 to the Orange Countywide Oversight Board.

3. RECOMMENDED ACTION

1. Adopt Resolution No. SAORA-036. A Resolution of the Governing Board of the Successor Agency to the Orange Redevelopment Agency approving a Recognized Obligation Payment Schedule for the fiscal period covering July 1, 2023, through June 30, 2024 (ROPS 23-24), pursuant to Health and Safety Code Section 34177, and taking certain related actions.

2. Direct staff to transmit ROPS 23-24 and related Administrative Budgets to the Orange Countywide Oversight Board of the Successor Agency to the Orange Redevelopment Agency.

4. FISCAL IMPACT
The preparation and submittal of the ROPS 23-24 allows the Successor Agency to pay its enforceable obligations for the period from July 1, 2023, through June 30, 2024. Items listed on the ROPS 23-24 will be included in the City’sFiscal Year 23-24 Annual Budget. The ROPS 23-24 shall become operative after it is approved by the Orange Countywide Oversight Board and the State of California Department of Finance.

5. STRATEGIC PLAN GOALS
Goal 2: Be a fiscally healthy community
a: Expend fiscal resources responsibly.

6. DISCUSSION AND BACKGROUND
With the dissolution of the Orange Redevelopment Agency (Agency) effective January 31, 2012, the City Council adopted Resolution No. 10625 authorizing the City to become the Successor Agency for the former redevelopment agency and enabling the City to fulfil the continued expenses of the Agency. A significant majority of Recognized Obligation Payment Schedule (ROPS) expenses are outstanding Agency bonds that are scheduled to be paid twice a year until they mature in the years City of Orange Printed on 12/8/2022Page 1 of 3
powered by Legistar™
323
Item #: 3.12. 12/13/2022 File #: 22-0701
ranging from 2023 - 2036.

Assembly Bill 113 (AB 113) provided additional amendments to obligations and deadlines for redevelopment wind-down activities, including specific language in Health and Safety Code (HSC) Section 34177(o)(1) with regard to preparation and approval of Annual ROPS covering the period of July 1 to June 30. The Annual ROPS lists all legally binding and enforceable agreements or contracts of the former Agency for each fiscal-year period, including those necessary for the continued administration of the Successor Agency to wind down the former Agency.

The State Department of Finance (DOF) requires submission of the Annual ROPS through the web- based application called the Redevelopment Agency Dissolution Web Application (RAD), first established in 2013. This Annual ROPS covers the period July 1, 2023 to June 30, 2024 (ROPS 23- 24). It is comprised of the following four forms:
1) Summary Report: This form summarizes funding totals carried forward from the ROPS Detail Form by funding source and reports the Current Period Funding for Enforceable Obligations of ROPS 23-24A and 23-24B in separate columns; 2) ROPS Detail Form: This form lists the Agency’s outstanding obligations, debts, and payments due for ROPS A and B separately by fund source; 3) Report of Cash Balances Form: This form requires the Successor Agency to report all cash balances for each funding source in accordance with HSC section 34177(l), and; 4) Notes Form: The completion of this form is optional and available to the Successor Agency to provide additional information associated with the ROPS Detail Form.

Overview of ROPS 23-24
Following the RAD process for ROPS 23-24, the estimated Redevelopment Property Tax Trust Fund (RPTTF) to be disbursed is $4,021,006 subject to approval of the Orange Countywide Oversight Board and the DOF.

Proposed ROPS 23-
24 Amount Requested Administrative
Budget
Estimated RPTTF
Disbursement
Amount
RPTTF $3,962,506 $58,500 $4,021,006
Along with preparing the Annual ROPS, the Successor Agency is required to prepare administrative budgets for the six-month fiscal periods from July 1, 2023 through December 31, 2023 and from January 1, 2024 through June 30, 2024. The proposed Administrative Budgets shall include estimated amounts for Successor Agency administrative costs that are to be paid from property tax revenues deposited in the RPTTF.

Deadline to submit ROPS 23-24
To comply with AB 113 and the upcoming February 1, 2023 deadline, it is recommended the Successor Agency approve ROPS 23-24 and the related Administrative Budget and transmit these documents to the Orange Countywide Oversight Board for approval. The DOF has indicated late ROPS submissions will be subject to penalties set forth in Health and Safety Code 34177(o)(1). The penalty affects the entity that created the redevelopment agency which is subject to a penalty in an amount equal to $10,000 per day for every day the ROPS is not submitted to the DOF.

City of Orange Printed on 12/8/2022Page 2 of 3
powered by Legistar™
324
Item #: 3.12. 12/13/2022 File #: 22-0701

7. ATTACHMENTS
· Resolution No. SAORA-036
City of Orange Printed on 12/8/2022Page 3 of 3
powered by Legistar™
325
Agenda Item
City Council
Item #: 3.12. 12/13/2022 File #: 22-0701
TO: Honorable Mayor and Members of the City Council
THRU: Tom Kisela, Interim City Manager
FROM: Susan Galvan, Assistant City Manager

1. SUBJECT
Recognized Obligation Payment Schedule for the fiscal period covering July 1, 2023 through June 30, 2024 (ROPS 23-24). Resolution No. SAORA-036.

2. SUMMARY
Approve the Recognized Obligation Payment Schedule (ROPS) 23-24 and related Administrative Budgets for the period covering July 1, 2023, through June 30, 2024, and authorize the transmittal of ROPS 23-24 to the Orange Countywide Oversight Board.

3. RECOMMENDED ACTION

1. Adopt Resolution No. SAORA-036. A Resolution of the Governing Board of the Successor Agency to the Orange Redevelopment Agency approving a Recognized Obligation Payment Schedule for the fiscal period covering July 1, 2023, through June 30, 2024 (ROPS 23-24), pursuant to Health and Safety Code Section 34177, and taking certain related actions.

2. Direct staff to transmit ROPS 23-24 and related Administrative Budgets to the Orange Countywide Oversight Board of the Successor Agency to the Orange Redevelopment Agency.

4. FISCAL IMPACT
The preparation and submittal of the ROPS 23-24 allows the Successor Agency to pay its enforceable obligations for the period from July 1, 2023, through June 30, 2024. Items listed on the ROPS 23-24 will be included in the City’sFiscal Year 23-24 Annual Budget. The ROPS 23-24 shall become operative after it is approved by the Orange Countywide Oversight Board and the State of California Department of Finance.

5. STRATEGIC PLAN GOALS
Goal 2: Be a fiscally healthy community
a: Expend fiscal resources responsibly.

6. DISCUSSION AND BACKGROUND
With the dissolution of the Orange Redevelopment Agency (Agency) effective January 31, 2012, the City Council adopted Resolution No. 10625 authorizing the City to become the Successor Agency for the former redevelopment agency and enabling the City to fulfil the continued expenses of the Agency. A significant majority of Recognized Obligation Payment Schedule (ROPS) expenses are outstanding Agency bonds that are scheduled to be paid twice a year until they mature in the years City of Orange Printed on 12/8/2022Page 1 of 3
powered by Legistar™
326
Item #: 3.12. 12/13/2022 File #: 22-0701
ranging from 2023 - 2036.

Assembly Bill 113 (AB 113) provided additional amendments to obligations and deadlines for redevelopment wind-down activities, including specific language in Health and Safety Code (HSC) Section 34177(o)(1) with regard to preparation and approval of Annual ROPS covering the period of July 1 to June 30. The Annual ROPS lists all legally binding and enforceable agreements or contracts of the former Agency for each fiscal-year period, including those necessary for the continued administration of the Successor Agency to wind down the former Agency.

The State Department of Finance (DOF) requires submission of the Annual ROPS through the web- based application called the Redevelopment Agency Dissolution Web Application (RAD), first established in 2013. This Annual ROPS covers the period July 1, 2023 to June 30, 2024 (ROPS 23- 24). It is comprised of the following four forms:
1) Summary Report: This form summarizes funding totals carried forward from the ROPS Detail Form by funding source and reports the Current Period Funding for Enforceable Obligations of ROPS 23-24A and 23-24B in separate columns; 2) ROPS Detail Form: This form lists the Agency’s outstanding obligations, debts, and payments due for ROPS A and B separately by fund source; 3) Report of Cash Balances Form: This form requires the Successor Agency to report all cash balances for each funding source in accordance with HSC section 34177(l), and; 4) Notes Form: The completion of this form is optional and available to the Successor Agency to provide additional information associated with the ROPS Detail Form.

Overview of ROPS 23-24
Following the RAD process for ROPS 23-24, the estimated Redevelopment Property Tax Trust Fund (RPTTF) to be disbursed is $4,021,006 subject to approval of the Orange Countywide Oversight Board and the DOF.

Proposed ROPS 23-
24 Amount Requested Administrative
Budget
Estimated RPTTF
Disbursement
Amount
RPTTF $3,962,506 $58,500 $4,021,006
Along with preparing the Annual ROPS, the Successor Agency is required to prepare administrative budgets for the six-month fiscal periods from July 1, 2023 through December 31, 2023 and from January 1, 2024 through June 30, 2024. The proposed Administrative Budgets shall include estimated amounts for Successor Agency administrative costs that are to be paid from property tax revenues deposited in the RPTTF.

Deadline to submit ROPS 23-24
To comply with AB 113 and the upcoming February 1, 2023 deadline, it is recommended the Successor Agency approve ROPS 23-24 and the related Administrative Budget and transmit these documents to the Orange Countywide Oversight Board for approval. The DOF has indicated late ROPS submissions will be subject to penalties set forth in Health and Safety Code 34177(o)(1). The penalty affects the entity that created the redevelopment agency which is subject to a penalty in an amount equal to $10,000 per day for every day the ROPS is not submitted to the DOF.

City of Orange Printed on 12/8/2022Page 2 of 3
powered by Legistar™
327
Item #: 3.12. 12/13/2022 File #: 22-0701

7. ATTACHMENTS
· Resolution No. SAORA-036
City of Orange Printed on 12/8/2022Page 3 of 3
powered by Legistar™
328
RESO NO. SAORA-036
RESOLUTION NO. SAORA- 036

A RESOLUTION OF THE GOVERNING BOARD OF THE SUCCESSOR

AGENCY TO THE ORANGE REDEVELOPMENT AGENCY APPROVING

A RECOGNIZED OBLIGATION PAYMENT SCHEDULE FOR THE
FISCAL PERIOD FROM JULY 1, 2023 THROUGH JUNE 30, 2024,
PURSUANT TO HEALTH AND SAFETY CODE SECTION 34177 AND

TAKING CERTAIN RELATED ACTIONS
WHEREAS, pursuant to Health and Safety Code Section 34177(o), the Successor Agency to the Orange Redevelopment Agency (the Successor Agency) must prepare a Recognized Obligation Payment Schedule listing the anticipated payments for enforceable obligations to be made by the Successor Agency during the fiscal period from July 1, 2023 through June 30, 2024 (ROPS 23-24) and submit ROPS 23-24 to the oversight board of the Successor Agency (the Oversight Board) for approval; and
WHEREAS, pursuant to Health and Safety Code Section 34177(1)(2)(B), at the same time that the Successor Agency submits ROPS 23-24 to the Oversight Board for approval, the Successor Agency must submit a copy of such ROPS 23-24 to the State Department of Finance (the DOF), the County administrative officer, and the County Auditor-Controller; and WHEREAS, pursuant to Health and Safety Code Section 34177(1)(2) and Section 34177 (o)(1), the Successor Agency must: (i) submit the Oversight Board-approved ROPS 23-24 to the DOF, the Office of the State Controller, and the County Auditor-Controller no later than February 1, 2023, and (ii) post a copy of the Oversight Board-approved ROPS 23-24 on the Successor Agency’s website;
NOW THEREFORE, the Governing Board of the Successor Agency to the Orange Redevelopment Agency does hereby find, determine, resolve, and order as follows:

Section 1. The above recitals are true and correct and are a substantive part of this Resolution.

Section 2. ROPS 23-24, substantially in the form attached hereto as Exhibit A, is hereby approved. The Executive Director of the Successor Agency, in consultation with the Successor Agency’s legal counsel, may modify ROPS 23-24 as the Executive Director or the Successor Agency’s legal counsel deems necessary or advisable.

Section 3. Staff is hereby authorized and directed to submit a copy of ROPS 23-24 to the Oversight Board for approval and, at the same time, transmit a copy of ROPS 23-24 to the DOF, the County Auditor-Controller and the County administrative officer as designated by the County.

Section 4. Staff is hereby authorized and directed to submit a copy of Oversight Board- approved ROPS 23-24 to the DOF, the Office of the State Controller, and the County Auditor- Controller. If the Oversight Board has not approved ROPS 23-24 by February 1, 2023, Staff is hereby authorized and directed to transmit ROPS 23-24 to the DOF, the Office of the State Controller, and the County Auditor-Controller by February 1, 2023, with a written notification regarding the status of the Oversight Board’s review. Written notice and information regarding the action of the Oversight Board shall be provided to the DOF by electronic means and in a manner of DOF’s choosing.
329
RESO NO. SAORA-036
Section 5. Staff is hereby authorized and directed to post a copy of the Oversight Board-approved ROPS 23-24 on the Successor Agency’s Internet website (being a page on the Internet website of the City of Orange).

Section 6. The officers and other Staff members of the Successor Agency are hereby authorized and directed, jointly and severally, to do any and all things which they may deem necessary or advisable to effectuate this Resolution, including but not limited to requesting additional review by the DOF and an opportunity to meet and confer on any disputed items, and making adjustments to ROPS 23-24 pursuant to the DOF’s instructions, and any such actions previously taken are hereby ratified and confirmed.

PASSED AND ADOPTED this day of December, 2022. ______________________________________________
Mark A. Murphy
Chairperson of the Successor Agency
ATTEST:
________________________________________
Pamela Coleman
Clerk of the Successor Agency
to the Orange Redevelopment Agency

STATE OF CALIFORNIA )

COUNTY OF ORANGE )

CITY OF ORANGE )
I hereby certify that the foregoing Resolution was duly and regularly adopted by Governing Board of the Successor Agency to the Orange Redevelopment Agency at a regular meeting thereof held on the ____ day of December, 2022, by the following vote:

AYES: BOARD MEMBERS:

NOES: BOARD MEMBERS:

ABSENT: BOARD MEMBERS:

ABSTAIN: BOARD MEMBERS:
______________________________________________
Pamela Coleman
Clerk of the Successor Agency
to the Orange Redevelopment Agency
330
RESO NO. SAORA-036

EXHIBIT A

SUCCESSOR AGENCY TO THE ORANGE REDEVELOPMENT AGENCY

RECOGNIZED OBLIGATION PAYMENT SCHEDULE
(July 1, 2023 – June 30, 2024)
331
23-24A Total
(July - December)
23-24B Total
(January - June)
ROPS 23-24
Total
-$ -$ -$
- - -
- - -
- - -
2,832,956$ 1,188,050$ 4,021,006$
2,803,706 1,158,800 3,962,506
29,250 29,250 58,500
2,832,956$ 1,188,050$ 4,021,006$
Name Title
Signature Date
Certification of Oversight Board Chairman:

Pursuant to Section 34177 (o) of the Health and Safety code, I hereby certify that the above is a true and accurate Recognized Obligation Payment Schedule for the aboved named successor agency.

H Current Period Enforceable Obligations (A+E)
G Administrative RPTTF

F RPTTF
E Redevelopment Property Tax Trust Fund (RPTTF) (F+G) D Other Funds
C Reserve Balance
B Bond Proceeds
A Enforceable Obligations Funded as Follows (B+C+D)
Current Period Requested Funding for Enforceable
Obligations (ROPS Detail)
Recognized Obligation Payment Schedule (ROPS 23-24) - Summary Filed for the July 1, 2023 through June 30, 2024 Period Successor Agency: Orange City
County: Orange
332

A B C D E F G H I J K Q W
Bond
Proceeds
Reserve
Balance
Other
Funds RPTTF
Admin
RPTTF
Bond
Proceeds
Reserve
Balance
Other
Funds RPTTF
Admin
RPTTF
4,021,006$ -$ -$ -$ 2,803,706$ 29,250$ 2,832,956$ -$ -$ -$ 1,158,800$ 29,250$ 1,188,050$ 2 2008 A&B and 2014A
Bonds
Fees 6/1/1997 9/1/2037 US Bank Fiscal agent fees Orange Merged
174,165 Y -$ -$ -$
3 2008 A&B and 2014A
Bonds
Fees 6/1/1997 9/1/2037 Willdan Bond disclosure fee Orange Merged
172,450 Y -$ -$ -$
4 2008 A&B and 2014A
Bonds
Fees 5/22/2012 9/1/2037 Richards,W
atson &
Gershon
Bond counsel Orange
Merged
11,500 N 2,000$ 1,000 1,000$ 1,000 1,000$
8 Orange City Mills Business
Incentive
Agreements
9/10/1996 1/20/2019 Mills Limited
Partnership
Promissory note
based on
performance
Orange
Merged
0 Y -$ -$ -$
49 Retirement Cost Obligation Unfunded
Liabilities
8/16/1983 7/5/2039 Cal PERS Future retirement cost
obligation
Orange
Merged
Y -$ -$ -$
60 2008 Tax Allocation Bonds
Series A
Bonds Issued
On or Before
12/31/10
5/1/2008 5/1/2038 US Bank To fund Orange
Merged & Amended
Orange
Merged
0 Y -$ -$ -$
61 2008 Tax Allocation Bonds
Series B
Bonds Issued
On or Before
12/31/10
5/1/2008 5/1/2038 US Bank To fund Orange
Merged & Amended
Orange
Merged
4,535,269 N 658,881$ 330,081 330,081$ 328,800 328,800$ 70 Successor Agency
Administrative Costs
Admin Costs 8/16/1983 7/5/2039 various Costs for maintaining Successor Agency
operations
Orange
Merged
250,000 N 38,100$ 19,050 19,050$ 19,050 19,050$
128 2014 Tax Allocation
Refunding Bonds Series A
Bonds Issued
After
12/31/10
12/4/2014 9/1/2023 US Bank 2014 Bond Refunding
of the 1997 Tax
Allocation Parity
Bonds, Series A and
the 2003 Tax
Allocation Refunding
Bonds, Series A.

DOF approved
Resolution No. OB-
0055 that authorized
the bond refunding
and issuance.

Orange
Merged
11,821,750 N 2,018,625$ 2,018,625 2,018,625$ 0 -$
130 2018 Tax Allocation
Refunding Bonds Series A
Bonds Issued
After
12/31/10
7/12/2018 9/1/2036 US Bank 2018 Bond Refunding
of the 2008 Tax
Allocation Bonds,
Series A. DOF
approved Resolution
No. OB-0078 that
authorized the bond
refunding and
issuance.

Orange
Merged
30,025,250 N 1,285,000$ 455,000 455,000$ 830,000 830,000$ 131 2008B, 2014A, & 2018A
Bonds
Fees 6/1/1997 9/1/2036 US Bank Fiscal agent fees Orange Merged
80,400 N 8,300$ 4,150 4,150$ 4,150 4,150$
132 2008B, 2014A, & 2018A
Bonds
Fees 6/1/1997 9/1/2036 Willdan Bonds
disclosure/arbitrage
fees
Orange
Merged
71,400 N 10,100$ 5,050 5,050$ 5,050 5,050$
Fund Sources Fund Sources

L M N O P R S T U V Orange City
Recognized Obligation Payment Schedule (ROPS 23-24) - ROPS Detail July 1, 2023 through June 30, 2024
Payee Description
Project
Area
Total
Outstanding
Debt or
Obligation Retired
Item
# Project Name
Obligation
Type
Agreement
Execution
Date
Agreement
Terminatio
n Date
ROPS
23-24
Total
ROPS 23-24A (Jul - Dec)
23-24A Total
ROPS 23-24B (Jan - Jun)
23-24B Total
N:\Accounting\ROPS\Annual ROPS\FY 23-24 ROPS\Orange City_ROPS 23-24Orange City_ROPS 23-24ROPS Detail 333

A B C D E F G H
Reserve Balance Other Funds RPTTF
Bonds issued on or
before 12/31/10
Bonds issued on or
after 01/01/11
Prior ROPS RPTTF
and Reserve
Balances retained for
future period(s)
Rent,
Grants,
Interest, etc.

Non-Admin
and
Admin
1 Beginning Available Cash Balance (Actual 07/01/20)
RPTTF amount should exclude "A" period distribution amount 2,517 129 811,986 11,363 0
E1:PPA 17-18 $180,566
PPA 18-19 $495,888
PPA 19-20 $135,532
2 Revenue/Income (Actual 06/30/21)
RPTTF amount should tie to the ROPS 17-18 total distribution from the County Auditor-Controller
5 30 0 98,892 5,451,423
G2: ROPS 20-21B RPTTF $2,820,728 + ROPS 20-
21A RPTTF $2,630,695 (#920.10100 beg bal)=
$5,451,423
3 Expenditures for ROPS 20-21 Enforceable Obligations
(Actual 06/30/21)
28 155 180,566 114,234 5,352,719
E3+G3+ G4 [ 50% of 2008B & 2014A $12,500
+85,000 ] = $5,630,785 = PPA Actual Exp
4 Retention of Available Cash Balance (Actual 06/30/21) RPTTF amount retained should only include the amounts distributed as reserve for future period(s)
0 0 631,420 1,204 97,500
G4: 50% 2008B $12,500
(435,000 20-21B - 410,000 20-21A) / 2 +
50% 2014A $85,000 (3,480,000 20-210B -
3,310,000 20-21A) / 2 =85,000
5 ROPS 20-21 RPTTF Prior Period Adjustment
RPTTF amount should tie to the Agency's ROPS 20-21 PPA form submitted to the CAC
1,204 ROPS 20-21 PPA
6 Ending Actual Available Cash Balance (06/30/21)
C to F = (1 + 2 - 3 - 4), G = (1 + 2 - 3 - 4 - 5)
2,494$ 4$ 0$ (5,183)$ 0$
No entry required
Orange City Recognized Obligation Payment Schedule (ROPS 23-24) - Report of Cash Balances July 1, 2020 through June 30, 2021
(Report Amounts in Whole Dollars)
Pursuant to Health and Safety Code section 34177 (l), Redevelopment Property Tax Trust Fund (RPTTF) may be listed as a source of payment on the ROPS, but only to the extent no other funding source is available or when payment from property tax revenues is required by an enforceable obligation. For tips on how to complete the Report of Cash Balances Form, seeCash Balance Tips Sheet.

ROPS 20-21 Cash Balances
(07/01/20 - 06/30/21)
Fund Sources
Bond Proceeds
Comments
N:\Accounting\ROPS\Annual ROPS\FY 23-24 ROPS\Orange City_ROPS 23-24Orange City_ROPS 23-24Cash Balances 334 Agenda Item
City Council
Item #: 5.1. 12/13/2022 File #: 22-0715
TO: Honorable Mayor and Members of the City Council
FROM: Councilmember Kathy Tavoularis

1. SUBJECT
Resolution supporting the Iranian-American community. (Tavoularis)

2. SUMMARY
Resolution declaring support of the Iranian-American community and condemning the violence perpetrated by the government of Iran against its people.

3. RECOMMENDED ACTION
Consider adoption of Resolution No. 11429. A Resolution of the City Council of the City of Orange declaring support of the Iranian-American community and condemning the violence perpetrated by the government of Iran against its people.

4. ATTACHMENT
· Resolution No. 11429
City of Orange Printed on 12/8/2022Page 1 of 1
powered by Legistar™
335
Agenda Item
City Council
Item #: 5.1. 12/13/2022 File #: 22-0715
TO: Honorable Mayor and Members of the City Council
FROM: Councilmember Kathy Tavoularis

1. SUBJECT
Resolution supporting the Iranian-American community. (Tavoularis)

2. SUMMARY
Resolution declaring support of the Iranian-American community and condemning the violence perpetrated by the government of Iran against its people.

3. RECOMMENDED ACTION
Consider adoption of Resolution No. 11429. A Resolution of the City Council of the City of Orange declaring support of the Iranian-American community and condemning the violence perpetrated by the government of Iran against its people.

4. ATTACHMENT
· Resolution No. 11429
City of Orange Printed on 12/8/2022Page 1 of 1
powered by Legistar™
336
RESOLUTION NO. 11429

A RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF ORANGE DECLARING SUPPORT OF

THE IRANIAN-AMERICAN COMMUNITY AND

CONDEMNING THE VIOLENCE PERPETRATED

BY THE GOVERNMENT OF IRAN AGAINST ITS
PEOPLE
WHEREAS, the rights of life, liberty, and the pursuit of happiness are endowed to all men and women by their Creator; and
WHEREAS, the circumstances surrounding the September 16th death of Mahsa Zhina Amini are inexcusable, as she was arrested and taken into custody by Iran’s Guidance Patrol, i.e., morality police, for allegedly not properly wearing her state-mandated hijab; and WHEREAS, the tragic death of Mahsa Zhina Amini has inspired numerous and ongoing protests throughout Iran, resulting in thousands of arrests to extinguish the voices of journalists, media figures, and members of the public who seek to amplify Iranians’ desire for personal freedoms, which the government of Iran has now blamed on the United States; and WHEREAS, over the last 43 years, the government of Iran has committed numerous acts of violence and human rights violations against its own people, particularly against women and students; and
WHEREAS, just since Mahsa Zhina Amini’s death, the government of Iran has been responsible for: the killing of more than 200 civilians; the gassing of those protesting for women, life, and freedom; the brutal crackdown of university students’ protests including at Sharif University of Technology; the threatening of sexual violence as a means of silencing opposition; and the burning of Evin Prison that holds political prisoners, intellectuals, reporters, and journalists; and
WHEREAS, the government of Iran has restricted the people's access to internet, phone, and other forms of communication.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Orange as follows:

SECTION 1. The City Council hereby finds and declares:

A. That the City of Orange stands with its Iranian-American community members, particularly Iranian-American women, as their relatives and associates are suffering through the current injustices in Iran.

B. That the City of Orange condemns the violent acts that are being perpetrated against the Iranian people.
337
2 C. That the City of Orange calls upon the government of Iran to end its systemic human rights violations.

D. That the City of Orange calls upon other governments to join in the support of Iranians, in Iran and abroad, and the condemnation of the government of Iran’s violent acts against its own people.

ADOPTED this 13th day of December 2022.

Mark A. Murphy, Mayor, City of Orange
ATTEST:

Pamela Coleman, City Clerk, City of Orange

STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss.

CITY OF ORANGE )
I, PAMELA COLEMAN, City Clerk of the City of Orange, California, do hereby certify that the foregoing Resolution was duly and regularly adopted by the City Council of the City of Orange at a regular meeting thereof held on the 13th day of December 2022, by the following vote:

AYES: COUNCILMEMBERS:

NOES: COUNCILMEMBERS:

ABSENT: COUNCILMEMBERS:

ABSTAIN: COUNCILMEMBERS:

Pamela Coleman, City Clerk, City of Orange
338

← All documents from this meeting