Agenda Item
City Council
Item #: 3.12. 1/10/2023 File #: 23-0002
TO: Honorable Mayor and Members of the City Council
THRU: Tom Kisela, Interim City Manager
FROM: Christopher Cash, Public Works Director

1. SUBJECT
Approval of plans and specifications for the Water Division Bin Storage Construction and authorization to advertise for bids.

2. SUMMARY
Plans and specifications have been completed for the Water Division Bin Storage Construction Project (W-724). The project is ready to be advertised for bids. The preliminary cost estimate for the construction is $512,000.

3. RECOMMENDED ACTION
Approve the plans and specifications and authorize advertising for Bid No. 22-23.24.

4. FISCAL IMPACT
The total expenditure is $512,000 and will be funded in South Water Yard Storage Replacement (20429) through the Water Fund (600).

5. STRATEGIC PLAN GOALS
Goal 1: Provide for a safe community
b: Provide and maintain infrastructure necessary to ensure the safety of the public Goal 4.Provide outstanding public service
b. Provide facilities and services to meet customer expectations

6. DISCUSSION AND BACKGROUND
In August 2020, the Water Division entered an agreement with IDS Group, Inc. for the design of a warehouse to replace the existing warehouse which was utilized for the construction of the City’snew Fire Department headquarters. In addition to the design of the new warehouse in the existing yard at 1130 E. Almond Ave., the request for proposal also calls for the design of a covered structure over the existing outdoor materials storage area. Currently, the existing outdoor material storage bins have no cover and are used to store materials such as asphalt, backfill, gravel, and spoils. The covered structure is essential to comply with the National Pollutant Discharge Elimination System (NPDES).

Covering the materials would help minimizing erosion runoff into the storm drain system.

Due to recent unavailability and cost increase of construction materials, the new warehouse and bin storage construction has become cost prohibitive and is anticipated to be delayed until additional funding is available. The Water Division has decided to bid and construct the structures separately.

This approach would allow the project to progress forward within the approved budget. The total City of Orange Printed on 1/5/2023Page 1 of 2
powered by Legistar™
Item #: 3.12. 1/10/2023 File #: 23-0002
This approach would allow the project to progress forward within the approved budget. The total estimated construction cost for the bin storage construction is $512,000.

The project was determined to be categorically exempt from the provisions of the California Environmental Quality Act (CEQA) per State CEQA Guidelines 15303 (Class 3 - New Construction or Conversion of Small Structures).

7. ATTACHMENTS