City of Orange
300 E. Chapman Avenue
Orange, CA 92866
Sold To: Installation Site:

City of Orange
300 E. Chapman Avenue
Orange, CA 92866
Mike Dering
Project Manager
Mobile: (714) 658-2037
Mike Dering
Project Manager
Mobile: (714) 658-2037

QUOTATION
DATE: 1/23/2023
13742QUOTE NO.:
27202 Burbank Foothill Ranch, CA 92610
(949) 462-9000 Fax: (949) 462-9785
[email protected] [email protected]
www.markivinc.com
Project Name:

Civic Center MPOE:

Remove old ROLM phone system and all connecting feed cables.

Remove all unused 66 blocks.

Remove unused Bogen system.

Remove unused T1's.

Clear out all dead jumper cables from 66 blocks.

City Attorneys Hallway closet:

Trace out all unused cables and remove.

Finance Closet:

Remove remaining 66 blocks.

Community Service:

Remove all unused services from Basement IDF.

Human Resources:

Determine after prior removal at other locations.

Water Plant:

Main MDF clean out all unused cabling.

Library:

No cable removal required.

Statement:

Work will be completed during regular business hours
All work will be completed in a clean and professional manner.

All cabling will be properly labeled and tested.

Cable materials and labor carry a (15) Fifteen-year warranty. * Quote Valid for 90 Days
Electronics carry manufacture warranty, customer responsibility. 40% Down Payment Required to start work, remaining balance due upon project completion.

MPOE and Telco Cable Removal Project
Service Requested:

Page 1 of 3 ends

- continued from previous page -
13742QUOTE NO.:

Unit $ Extended $TaxLabor Charge:_________________________________________________________ Labor to complete.56 12,040.00215.00Hrs N
Labor Charge: $12,040.00
Unit $ Extended $TaxProject Management Fee Charge:_________________________________________ General condition, project management,overhead.1 301.00301.00Lot Y Project Management Fee Charge: $301.00
12,341.00TOTAL NON-TAXABLE

0.00TOTAL TAXABLE
$12,341.00SUBTOTAL
MAT. TAX @
$12,341.00GRAND TOTAL

7.75%
To: Total

Page 2 of 3 ends

- continued from previous page -
13742QUOTE NO.:

To:

Description Of Work:

Per Quote #13742
All material is guaranteed to be as specified in quote and the above work to be performed in accordance with the drawings and specifications submitted and completed in a workmanlike manner for the sum of Twelve Thousand Three Hundred Forty One Dollars and Zero Cents ($12341).

ACCEPTANCE OF PROPOSAL
MARK IV COMMUNICATIONS, INC.

State Contractors License No. 459316
The above prices, terms, specifications and conditions are satisfactory and are hereby accepted.

CITY OF ORANGE
Signature Date
Monday, January 23, 2023
Date

Page 3 of 3 ends
← All documents from this meeting