Cities Index.
Staff Report

Orange City Council
April 25, 2023

Document
Staff Report
Meeting
April 25, 2023
Body
Orange City Council
Original file
153 KB
Text extracted from the city's file for reading and search. Open the original on cityoforange.legistar1.com. That file is the official record.

Agenda Item
City Council
Item #: 3.12. 4/25/2023 File #: 23-0274
TO: Honorable Mayor and Members of the City Council
THRU: Tom Kisela, City Manager
FROM: Christopher Cash, Public Works Director

1. SUBJECT
Approval of plans and specifications for D-179; Chapman Avenue, Main Street, and Katella Avenue Water Quality Storm Drain Improvement project; authorization to advertise Bid No. 22-23.42; and finding of CEQA exemption.

2. SUMMARY
Plans and specifications for the Chapman Avenue, Main Street, and Katella Avenue Water Quality Storm Drain Improvement project have been completed, and the project is ready to be advertised for bids. The total estimated construction cost including a 10% contingency and 5% for construction engineering is $370,000.

3. RECOMMENDED ACTION
Approve plans and specifications and authorize advertising for bids for the Chapman Avenue, Main Street, and Katella Avenue Water Quality Storm Drain Improvement project Bid No. 22-23.42; D-179.

4. FISCAL IMPACT
The estimated total expenditure for this project including contingencies and construction engineering is $370,000 and will be funded in Chapman Ave Bioclean Installation (30163) through:

Sewer (220) $ 61,197
Reimbursable Capital Projects (550) 308,803
Total: $370,000

5. STRATEGIC PLAN GOALS
Goal 1: Provide for a safe community
b: Provide and maintain infrastructure necessary to ensure the safety of the public.

Goal 4: Provide outstanding public service
b: Provide facilities and services to meet customer expectations.

6. DISCUSSION AND BACKGROUND
The Chapman Avenue, Main Street, and Katella Avenue Water Quality Storm Drain Improvement project is part of the Public Works Department’s successful efforts to acquire funding from the Environmental Cleanup Tier 1 Grant Program managed by the Orange County Transit Authority (OCTA). This program makes funds available to soliciting cities to help protect Orange County City of Orange Printed on 4/20/2023Page 1 of 2
powered by Legistar™
Item #: 3.12. 4/25/2023 File #: 23-0274
(OCTA). This program makes funds available to soliciting cities to help protect Orange County beaches and waterways from transportation-generated pollution and improve overall water quality.

The project collects drainage from a total of 196 acres composed of commercial, manufacturing, industrial, bus stop locations, multi-family homes, and single-family residences of Orange. These areas combine to generate potentially significant amounts of leaves, trash, and other debris. The City has looked at various options to control trash and debris. Through the Orange Municipal Code, the City can enforce sections related to littering and nuisances and its weekly street sweeping program picks up a large amount of trash and debris. However, anything not collected by the street sweepers has the potential to enter the storm drain system and impact the downstream water bodies. The proposed Debris Separating Baffle Box (DSBB) helps address this deficiency by capturing trash and debris and other gross pollutants via its trash screens, sediment chambers, and the use of an oil skimmer and hydrocarbon boom filters. The DSBB will be placed on Chapman Avenue approximately 100 feet west of Eckhoff Street. The proposed connector pipe screens (CPS) units also help solve this deficiency by capturing trash and debris and other pollutants within each catch basin. The CPS will be installed in 13 catch basins on Chapman Avenue, Katella Avenue, Main Street, and Brian Street.

The total project cost is estimated at $370,000, including 5% for construction engineering and 10% for contingency. Upon receipt of public bids, staff will return to the City Council and recommend any funding adjustments, if necessary, and award of contract.

Construction is scheduled to begin in September 2023 and is expected to be completed by October 2023.

Specifications and cost estimates are available for review in the Public Works Department.

7. ENVIRONMENTAL REVIEW
Categorical Exemption: The proposed project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) per State CEQA Guidelines Section 15301 “Existing Facilities” Class 1 and Section 15308 “Actions by Regulatory Agencies for Protection of the Environment” Class 8 because the project involves installation of storm water treatment features to the existing storm drain system and does not increase system capacity or otherwise expand the existing use. No public review is required.

The CEQA Notice of Exemption will be filed with the County Recorder’s Office upon Council’s approval of the plans and specifications.

8. ATTACHMENTS
· Location Maps
City of Orange Printed on 4/20/2023Page 2 of 2
powered by Legistar™

← All documents from this meeting