1 2
Bid No. 22-23.29; Project No. D-180
Date of Bid Opening: 4/27/2023
Tel. No. (562) 599-5841 Tel. No. (714) 669-0072
NO. DESCRIPTION OF WORK QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1 Traffic Control 1 LS 90,000.00$ $90,000.00 $135,000.00 $135,000.00 $34,967.00 $34,967.00 2 Furnish and Install Hydrodynamic Separator (Contech
DSBB-8-16-96). Inclusive of Sawcut, AC Restoration,
Aggregate Base, Trench Repair per City Std. 125, 327,
Breaking Into and Removal of Existing Storm Drain,
and Retooling Upstream and Downstream Joints.
1 LS 215,800.00$ $215,800.00 $271,000.00 $271,000.00 $450,089.00 $450,089.00 3 Furnish and Install Connector Pipe Screen Units
(Advanced Drainage Systems) with Protective Bypass
Lids at Various Locations per Plan
7 EA 2,000.00$ $14,000.00 $1,900.00 $13,300.00 $4,251.00 $29,757.00 4 Furnish and Install 36" Reinfornced Concrete Pipe
(RCP) with Bedding Class III per City Std. 327 54 LF 800.00$ $43,200.00 $705.00 $38,070.00 $1,506.00 $81,324.00 5 Construct Junction Structure Type III per City Std. 3151 EA 50,000.00$ $50,000.00 $34,000.00 $34,000.00 $96,452.00 $96,452.00 6 Construct Modified Junction Structure Type III per
City Std. 315 1 EA 45,000.00$ $45,000.00 $38,000.00 $38,000.00 $92,548.00 $92,548.00 $458,000.00 $529,370.00 $785,137.00Grand Total
STORM DRAIN IMPROVEMENTS
ENGINEER'S ESTIMATE
City of Orange: Summary of Bid Abstracts for:
Taft Ave. & Lewis St. Water Quality Storm Drain Improvement Project PALP, INC DBA Excel Paving
Long Beach, CA
TE Roberts, Inc.
Irvine, CA