City Fees - Proposed Changes
Fee
Full Cost
Recovery Fee Current Fee
Current Cost
Recovery %
Proposed
Fee
Proposed Cost
Recovery %
Accessory Dwelling Unit Application $1,037 $541 52% $1,037 100% Sober Living Permit $2,134 $2,079 97% $2,134 100%
Mills Act Program
Original Application Fee $1,212 $1,000 83% $1,050 87%
Inspection/Annual Report $402 $35 9% $50 12%
Zone Clearance, Over the Counter Review $42 $41 98% $42 100% Staff Research, Information Requests - Per Hour $273 $116 42% $122 45% Temporary Use Permit (recurring) $445 $369 83% $387 87% Zoning Verifcation Letter $546 $316 58% $332 61%
SB9 Application $1,747 $541 31% $1,747 100%
Code Compliance Fees
Special Promotion (Banner) Permit $218 $105 48% $110 50% Special Event Application/Permit $903 $105 12% $110 12% Violation & Reinspection Fee $459 $452 98% $459 100%
Sidewalk Vending Permit (per applicant) $645 $0 0% $400 62% new Sidewalk Vending Permit (per employee) $169 $0 0% $100 59% new Sidewalk Vending Permit (change) $169 $0 0% $100 59% new
ANNUAL FIRE PERMITS/SPECIAL EVENT
Apartments
251-350 Units $808 $800 99% $808 100%
351-450 Units $955 $950 99% $955 100%
Waste Handling - Incl. Wrecking Yards, Junk Yards, and Waste Material Handling $280 $265 95% $280 100%
Open Burning - Excluding Recreational Fires $232 $220 95% $232 100% Open Flames & Candles $232 $220 95% $232 100%
Cellulose Nitrate Film in Group A Occupancy $47 $44 94% $47 100% Combustible Fiber Storage or Handling in Escess of 100 Cubic Feet $187 $177 95% $187 100% Cryogenics Fluids Not Requiring Hazardous Materials Disclosure $47 $44 94% $47 100% Dry Cleaning $187 $177 95% $187 100%
Dust Producing Operation - Combustible Dust $93 $88 95% $93 100% Repair Garages - Includes Associated Fuel Dispensing $47 $44 94% $47 100% High Piled Storage in Excess of 500 Square Feet $140 $133 95% $140 100% Lumber Yard or Woodworking Plant $280 $265 95% $280 100% Magnesium - Melting, Casting, Heat-Treating or Grinding an Amount in Excess of 10 Pounds $93 $88 95% $93 100%
Organic Coatings - Production in Excess of 1 Gallon per Day $140 $133 95% $140 100% Ovens, Industrial Baking or Dry $93 $88 95% $93 100%
Tank Vehicles $47 $44 94% $47 100%
Temporary Membrane Structures and Tents $232 $220 95% $232 100% Hot Work; or Cutting or Welding $47 $44 94% $47 100%
Explosives - Explosive Materials, Fireworks or Pyrotechnic Special Effects (2 hour min) $309 $294 95% $309 100%
Flammable or Combustible / Liquid Pipeline Operation / Excavation (2 hour min) - per $322 $316 98% $322 100%
Buildings Originally Constructed to High-Rise Standards - Less than 75 Ft. in Height $1,545 $1,469 95% $1,545 100%
High Rise Building $1,854 $1,762 95% $1,854 100%
Mall Buildings, Covered or Open - Placement of Fixtures, Displays or Equipment; Display of Liquid or Gas-Fired Eqiupment; or Use of Open- Flame or Flame-Producing Equipment
Temporary Kiosks $154 $147 95% $154 100%
Open flame / flame producing devices $154 $147 95% $154 100% Parade Floats $39 $36 92% $39 100%
Places of Assembly $187 $177 95% $187 100%
Spraying or Dipping - Utilization of Flammable or Combustible Liquids or Combustible Powder $93 $88 95% $93 100%
Tire Rebuilding Plant $93 $88 95% $93 100%
Care Facilities:
7-99 Occupants $348 $330 95% $348 100%
100-199 occupants $463 $440 95% $463 100%
200+ occupants $502 $475 95% $502 100%
New Facility Inspection Fee:
25 clients or less $463 $440 95% $463 100%
26+ clients $502 $475 95% $502 100%
Hospitals & Convalescent:
1-99 beds $348 $330 95% $348 100%
100-199 beds $463 $440 95% $463 100%
200+ beds $502 $475 95% $502 100%
Day Care Facilities
Non-Residential Based $232 $220 95% $232 100%
Residential Based N/A $110 N/A $0 N/A Remove due to state regulations General Use Permits - per hour $163 $154 94% $163 100%
Fireworks Display - min 2 hours $309 $294 95% $309 100% Spill Response:
Up to 5 gallons $894 $855 96% $894 100%
After Hours Work Fire Safety Specialist (2 hour min) - per hour $154 $147 95% $154 100% After Hours Work Hazardous Materials Specialist (2 hour min) - per hour $161 $158 98% $161 100%
After Hours Work Fire Plan Examiner (2 hour min) - per hour $166 $160 96% $166 100% After Hours Work Fire Captain (2 hour min) - per hour $201 $190 95% $201 100% Re-inspection Fee for Rejected Prevention Division Inspection $179 $169 94% $179 100%
COMMUNITY DEVELOPMENT
FIRE DEPARTMENT
City Fees - Proposed Changes
Fee
Full Cost
Recovery Fee Current Fee
Current Cost
Recovery %
Proposed
Fee
Proposed Cost
Recovery %
Report Fees $61 $58 95% $61 100%
Non-Criminal Cause & Origin Investigators Report - per hour $196 $186 95% $196 100% Non-Criminal Misc. Investigators Report - per hour $196 $186 95% $196 100% Non-Criminal SFD Investigators Report - per hour $196 $186 95% $196 100% Non-Criminal Commercial Occupancy Investigators Report - per hour $196 $186 95% $196 100% Standby Time Hazardous Materials Specialsit - 2 hour min - per hour $161 $158 98% $161 100% Change Hazardous Materials Contents of Underground Storage Tank - 2 hour min - per hour $561 $530 94% $561 100%
Hazardous Materials - Store, Handle, Use Sell - per hour $561 $531 95% $561 100% Review HMMP Plans - per hour $154 $147 95% $154 100%
Hazardous Materials - Disclosure Fees:
1 material $272 $266 98% $272 100%
2-4 materials $433 $424 98% $433 100%
5-9 materials $594 $582 98% $594 100%
10-15 materials $674 $661 98% $674 100%
16-20 materials $795 $780 98% $795 100%
21-25 materials $996 $978 98% $996 100%
26-30 materials $1,117 $1,096 98% $1,117 100%
31-44 materials $1,238 $1,215 98% $1,238 100%
45+ materials $1,399 $1,373 98% $1,399 100%
Underground Tanks:
1 tank $705 $690 98% $705 100%
2 tanks $866 $849 98% $866 100%
3 tanks $1,027 $1,007 98% $1,027 100%
4 tanks $1,188 $1,165 98% $1,188 100%
5 tanks $1,349 $1,323 98% $1,349 100%
Class I or II liquids Removal $322 $316 98% $322 100%
To install, alter, remove, abandon, or temporarily place out of service $161 $158 98% $161 100%
To change type of contents to a material other than designed for - 2 hour min - per hour $161 $158 98% $161 100%
Plan Check Hazmat Fee - hourly $161 $158 98% $161 100%
Existing Tank Monitoring System Restart $644 $632 98% $644 100% Aerosol Products - Level 2 or 3 in excess of 500 pounds $140 $133 95% $140 100% Amusement Building $386 $367 95% $386 100%
Aviation Facility $421 $397 94% $421 100%
Carnival or Fair - Min 2 hours (hourly) $309 $294 95% $309 100% Compressed Gas Not Requiring Hazardous Materials Disclosure $140 $133 95% $140 100% Exhibits & Trade Shows - Min 2 hours $309 $294 95% $309 100% Flammable & Combustible Liquids $140 $133 95% $140 100% Floor Finishing - in Excess of 350 Sq. Ft. Using Class I or II liquids $154 $147 95% $154 100% Fruit & Crop Ripening - Using Ethylene Gas $140 $133 95% $140 100% Fumigation & Insecticidal Fogging $77 $73 95% $77 100%
Hazardous Materials Not Requiring Hazardous Materials Disclosure $140 $133 95% $140 100% Hazardous Production Materials Facility $309 $294 95% $309 100% Liquid or Gas-Fueled Vehicle(s) in an Assembly Building $154 $147 95% $154 100% Liquid Propane Gas Not Requiring Hazardous Materials Disclosure $140 $133 95% $140 100% Miscellaneous Combustible Storage in Excess of 2,500 Cubic Feet $140 $133 95% $140 100% Open Flame or Torch - Removal of Paint or Use within a Wildfire Risk Area $77 $73 95% $77 100%
Private Fire Hydrant - Use or Removal from Service (1 hour min) $154 $147 95% $154 100% Pyrotechnic Special Effects Material - Use or Handling (1 hour min) $154 $147 95% $154 100% Pyroxylin Plastics - Storage or Handling in Excess of 25 Pounds; or Assembly or Manufacture of Products containing Pyroxylin Plastics $280 $265 95% $280 100% Mechanical Refrigeration Equipment Regulated by CFC Ch. 6 $140 $133 95% $140 100% Rooftop Heliport $140 $133 95% $140 100%
Storage of Scrap Tires & Tire Byproducts - Exterior Storage Exceeding 2,500 Cubic Feet; or Indoor Storage of Any Amount $280 $265 95% $280 100% Wood Products - Storage of Chips, Hogged Material, Lumber or Plywood in Excess of 200 Cubic Feet $140 $133 95% $140 100% Activity Related to Motion Picture, Television, or Commercial Production - Change of Building Use or Occupancy; Attendance of Live Audience; Wrap Party; Use of Pyrotechnic Special Effect; Open Flame; Use of Flammable or Combustible Liquid or Gas $154 $147 95% $154 100% 2nd and subsequent Re-Inspection for Same Violation. $292 $279 96% $292 100% FIRE CONSTRUCTION PERMITS:
Fire Protection Systems:
New:
1-5 devices $966 $948 98% $966 100%
6-15 devices $1,207 $1,186 98% $1,207 100%
16-30 devices $1,610 $1,581 98% $1,610 100%
31-50 devices $2,253 $2,213 98% $2,253 100%
Each additional 50 devices or portion thereof $322 $316 98% $322 100% Modifications:
1-5 devices $644 $632 98% $632 98%
6-15 devices $724 $711 98% $724 100%
16-30 devices $1,046 $1,027 98% $1,046 100%
31-50 devices $1,207 $1,186 98% $1,207 100%
Each additional 50 devices or portion thereof $322 $316 98% $322 100% Fire Sprinklers - 13 / 13D / 13R:
City Fees - Proposed Changes
Fee
Full Cost
Recovery Fee Current Fee
Current Cost
Recovery %
Proposed
Fee
Proposed Cost
Recovery %
New Construction:
Up to 50 Heads $1,449 $1,423 98% $1,449 100%
50-100 Heads $2,012 $1,976 98% $2,012 100%
Each additional 50 heads or portion thereof $322 $316 98% $322 100% Tenant Improvements / Modifications:
Up to 50 Heads $805 $790 98% $805 100%
50-100 Heads $1,046 $1,027 98% $1,046 100%
Each additional 50 heads or portion thereof $322 $316 98% $322 100% Preaction Fire Sprinklers:
New Construction:
Up to 50 Heads $1,932 $1,897 98% $1,932 100%
50-100 Heads $2,253 $2,213 98% $2,253 100%
Each additional 50 heads or portion thereof $322 $316 98% $322 100% Tenant Improvements / Modifications:
Up to 50 Heads $1,046 $1,027 98% $1,046 100%
50-100 Heads $1,449 $1,423 98% $1,449 100%
Each additional 50 heads or portion thereof $322 $316 98% $322 100% Underground Private Fire Service Line $1,851 $1,818 98% $1,851 100% Automatic Fire Extinguishing Systems (Hoods, spray booths, etc.) $644 $632 98% $644 100% Spraying or Dipping Flammable or Combustble Liquids Booths $805 $790 98% $805 100% Clean Agent Systems $1,127 $1,106 98% $1,127 100%
Smoke Control Systems $2,897 $2,845 98% $2,897 100%
Fire Pumps $1,610 $1,581 98% $1,610 100%
Standpipe System $885 $869 98% $885 100%
High Piled Storage $966 $948 98% $966 100%
Dry Cleaning $644 $632 98% $644 100%
Dust Production $805 $790 98% $805 100%
Industrial Ovens $805 $790 98% $805 100%
Carbon Dioxide System Exceeding 100 pounds of CO2 Used in Beverage Dispensing Application $140 $133 95% $140 100% High Rise Building - Base (includes 6 floors) $3,219 $3,161 98% $3,219 100% High Rise Building - per additional floor $322 $316 98% $322 100% Temporary Membrane Structures and Tents $724 $711 98% $724 100% Tanks:
Underground Tanks:
First Tank $2,575 $2,529 98% $2,575 100%
Each additional tank $483 $474 98% $483 100%
Aboveground Tanks
First Tank $966 $948 98% $966 100%
Each additional tank $322 $316 98% $322 100%
Vegetation Management Fuel Modifications $1,127 $1,106 98% $1,127 100% Special Events Application $121 $119 98% $121 100%
Miscellaneous Plan Review - per hour $161 $158 98% $161 100% Technology Fee (Fire Construction Permits) $60 $0 0% $5 8% new Regulatory Permit Renewal $46 $15 33% $30 65%
Business Licenses
New Business License Application $142 $56 39% $76 54%
Annual Renewal Processing Fee $98 $26 27% $41 42%
Massage Permit - includes material + inspection $253 $199 79% $250 99% Initial Regulatory Permit Review $195 $75 38% $100 51%
Seconhand Dealer Renewal Permit $56 $30 54% $40 71%
Online Business License Renewal $40 $11 28% $26 65%
Firearm Renewal Permit $111 $0 0% $40 36% New
Facility Rentals
El Modena Community Room, Orange Public Library & History Center Room A, Orange Public Library & Hisotry Center Room B, Rotary Room, Taft Community Room N/A N/A N/A N/A N/A Remove Taft Community Room Reports - Basic $39 $24 62% $0 0% Recommend elimination Reports - Redacted 58 41 71% $0 0% Rrecommend elimination Extensive Reports (more than 75 pages) $116 $82 71% $0 0% Recommend elimination Black & White Copy $1.26 $0 0% $0.15 12% Replaces Reports Fees Color Copy $1.26 $0 0% $0.25 20% Replaces Reports Fees
Business License Review $81 $151 186% $49 60%
Evidence Digital Media (Redacted) $120 $49 41% $24 20% Per evidence code 1563.b.1 Tow Truck Driver Background - Renewal $73 $0 0% $65 89% New Deposit-Based Fees
New ABC License Application N/A $7,500 N/A $5,000 N/A Billed at cost - reduce deposit
BUILDING - MEP
Inspection outside of normal business hours $137 $121 88% $137 100% Inspection/Re-inspection fees during business hours $137 $121 88% $137 100% Inspection for which no fee is indicated $137 $121 88% $137 100% Plan review for changes, additions, and revisions to plan $143 $132 92% $143 100% Change of Occupancy, requiring new and temporary C. of O. $152 $141 93% $152 100% Security Plan Check $143 $132 92% $143 100%
Alternate Materials or Methods Request $152 $141 93% $152 100% Records Research $64 $56 88% $64 100%
Waste Management Plan $148 $95 64% $148 100%
Technology Fee (Valuation) 0.13% 0.12% 92% 0.13% 100%
Technology Fee (MEP Permits) $60 $0 0% $5 8% new
Electrical:
Service or Panel:
Up to 1,000 amp $137 $121 88% $137 100%
LIBRARY
PUBLIC WORKS
FINANCE
POLICE DEPARTMENT
City Fees - Proposed Changes
Fee
Full Cost
Recovery Fee Current Fee
Current Cost
Recovery %
Proposed
Fee
Proposed Cost
Recovery %
1,000+ amps $274 $243 89% $274 100%
Outlets - Per Item $14 $12 86% $14 100%
Lights - Per Item $14 $12 86% $14 100%
Switches - Per Item $14 $12 86% $14 100%
New Construction $69 $60 87% $69 100%
Power Equipment:
Up to 1 HP or to 1kva $69 $60 87% $69 100%
Over 1 HP $137 $121 88% $137 100%
Sign & Circuit (electrical portion only) $137 $121 88% $137 100% Temporary Power - (main pole of equipment) $69 $60 87% $69 100% Temporary Power - distance poles - per pole $69 $60 87% $69 100% Busways $137 $121 88% $137 100%
Private street Light $137 $121 88% $137 100%
Issuance Fee $64 $53 83% $64 100%
Plan Review - 1/2 hr min $72 $74 103% $72 100%
Inspection of Solar Panel System - 1/2 hr min. $69 $60 87% $69 100% Inspection of items not listed - 1/2 hr min $69 $60 87% $69 100% Re-inspection fee - 1/2 hr min $69 $60 87% $69 100%
EV Charger - Per Item $69 $0 0% $69 100% new
Plumbing:
Water Closet $69 $60 87% $69 100%
Urinal $69 $60 87% $69 100%
Bathtub (including shower head) $69 $60 87% $69 100%
Shower Stall $69 $60 87% $69 100%
Kitchen Sink $69 $60 87% $69 100%
Dishwasher $69 $60 87% $69 100%
Garbage Disposal $69 $60 87% $69 100%
Clothes Washer $69 $60 87% $69 100%
Water Heater $69 $60 87% $69 100%
Sewer (new, add, alter, repair) $69 $60 87% $69 100%
Water Softener $69 $60 87% $69 100%
Clothes Dryer $69 $60 87% $69 100%
Gas Piping - per outlet $27 $24 89% $27 100%
Miscellaneous Fixtures $69 $60 87% $69 100%
Industrial Waste Receptors $69 $60 87% $69 100%
Drainage Piping (alter, repair) $69 $60 87% $69 100%
Drinking Fountain $69 $60 87% $69 100%
Roof Drainage System $69 $60 87% $69 100%
Cesspool $69 $60 87% $69 100%
Septic Tank $140 $135 96% $140 100%
Backflow Devices - per device $69 $60 87% $69 100%
Solar Systems (plumbing portion) $140 $135 96% $140 100% Issuance Fee $64 $53 83% $64 100%
Plan Review - 1/2 hr min $72 $74 103% $72 100%
Inspection of Solar Panel System - 1/2 hr min. $69 $60 87% $69 100% Inspection of items not listed - 1/2 hr min $69 $60 87% $69 100% Re-inspection fee - 1/2 hr min $69 $60 87% $69 100%
Mechanical:
Heater - less than 100,000 BTU $137 $121 88% $137 100%
Heater - greater than 100,000 BTU $206 $182 88% $206 100% Air Conditioner:
0-100,000 BTU $137 $121 88% $137 100%
100,000-1,000,000 BTU $206 $182 88% $206 100%
1,000,000+ BTU $274 $243 89% $274 100%
Air Handler - 10,000 CFM or less $137 $121 88% $137 100% Air Handler - over 10,000 CFM $206 $182 88% $206 100%
Evaporative Cooler $103 $91 88% $103 100%
Fan Coil $69 $60 87% $69 100%
Ventilation Fan $69 $60 87% $69 100%
Grease Hoods $274 $243 89% $274 100%
Mechanical Firebox (metal Fireplace) $137 $121 88% $137 100% Mini Split System (includes elect/multi-zones) $197 $0 0% $197 100% new Registers (inlet or outlet) $14 $12 86% $14 100%
Issuance Fee $64 $53 83% $64 100%
Plan Review - 1/2 hr min $72 $74 103% $72 100%
Inspection of Solar Panel System - 1/2 hr min. $69 $60 87% $69 100% Inspection of Items not listed - 1/2 hr min $69 $60 87% $69 100% Re-inspection fee - 1/2 hr min $69 $60 87% $69 100%
Pool / Spa Equipment $274 $243 89% $274 100%
BUILDING - MISCELLANEOUS
Antenna—Telecom Facility
Cellular/Mobile Phone, free-standing $345 $227 66% $345 100% Cellular/Mobile Phone, attached to building $345 $227 66% $345 100% Arbor/Trellis $415 $360 87% $415 100%
Chimney Repair $219 $205 94% $219 100%
Demolition
Commercial $546 $372 68% $546 100%
Residential $484 $257 53% $484 100%
Disabled Access Compliance Inspection $349 $328 94% $349 100% Door
New door (non structural) $238 $193 81% $238 100%
New door (structural shear wall/masonry) $238 $193 81% $238 100% Fence
Over 6 ft. in height $238 $193 81% $238 100%
Each addl 100 lf $23 $21 91% $23 100%
Fireplace
Masonry $405 $377 93% $405 100%
City Fees - Proposed Changes
Fee
Full Cost
Recovery Fee Current Fee
Current Cost
Recovery %
Proposed
Fee
Proposed Cost
Recovery %
Pre-Fabricated/Metal $301 $280 93% $301 100%
Flag pole (over 20 feet in height) $301 $280 93% $301 100% Foundation Repair $417 $389 93% $417 100%
Garage (detached)
Wood frame up to 1,000 sf $528 $494 94% $528 100%
Masonry up to 1,000 sf $632 $591 94% $632 100%
Modular Structures
Partition—Commercial, Interior (up to 30 lf) $141 $132 94% $141 100% Additional partition $53 $49 92% $53 100%
Partition—Residential, Interior (up to 30 lf) $141 $132 94% $141 100% Additional partition $53 $49 92% $53 100%
Patio Cover $415 $344 83% $415 100%
Photovoltaic System
Residential $383 $358 93% $383 100%
Commercial $664 $620 93% $664 100%
Commercial, each additional 1 kilowatt $71 $66 93% $71 100% Pile Foundation
Cast in Place Concrete (first 10 piles) $706 $665 94% $706 100% Additional Piles (increments of 10) $706 $665 94% $706 100% Driven (steel, pre-stressed concrete) $706 $665 94% $706 100% Additional Piles (increments of 10) $706 $665 94% $706 100% Product Review $143 $137 96% $143 100%
Re-roof
Residential $206 $191 93% $206 100%
Multi-Family Dwelling $453 $423 93% $453 100%
Commercial $453 $423 93% $453 100%
Commercial Addition $453 $423 93% $453 100%
Retaining Wall (concrete or masonry)
Standard (up to 3' high/50 lf) $471 $441 94% $471 100%
Additional retaining wall $71 $66 93% $71 100%
Over 3-10' high/50 lf $511 $480 94% $511 100%
Additional retaining wall $71 $66 93% $71 100%
Over 10' high/50 lf $530 $499 94% $530 100%
Additional retaining wall $71 $66 93% $71 100%
Gravity/Crib Wall, 0-10' high (up to 50 lf) $242 $225 93% $242 100% Additional Gravity/Crib Wall $73 $68 93% $73 100%
Gravity/Crib Wall, over 10' high (up to 50 lf) $383 $358 93% $383 100% Additional Gravity/Crib Wall $73 $68 93% $73 100%
Roof Structure Replacement $264 $247 94% $264 100%
Additional roof structure replacement $53 $49 92% $53 100% Sauna—steam $211 $198 94% $211 100%
Siding
Stone and Brick Veneer (interior or exterior) $207 $165 80% $207 100% All Other $207 $193 93% $207 100%
Additional siding $70 $66 94% $70 100%
Signs
Directional $297 $248 84% $297 100%
Ground/Roof/Projecting Signs $237 $191 81% $237 100%
Rework of any existing Ground Sign $203 $159 78% $203 100% Other Sign $273 $159 58% $273 100%
Wall/Awning Sign, Non-Electric $273 $225 82% $273 100%
Wall, Electric $273 $225 82% $273 100%
Skylight
Less than 10 sf $273 $99 36% $273 100%
Greater than 10 sf or structural $176 $165 94% $176 100% Stairs—First Flight $211 $198 94% $211 100%
Each additional flight $59 $66 112% $59 100%
Storage Racks
0-8' high (up to 100 lf) $141 $133 94% $141 100%
each additional 100 lf $71 $66 93% $71 100%
over 8' high (up to 100 lf) $211 $198 94% $211 100%
each additional 100 lf $71 $66 93% $71 100%
Supplemental Plan Check Fee (after 3rd review) $143 $136 95% $143 100% Supplemental Inspection Fee $140 $129 92% $140 100%
Swimming Pool/Spa
Vinyl-lined (up to 800 sf) $449 $361 80% $449 100%
Fiberglass $695 $620 89% $695 100%
Gunite (up to 800 sf) $695 $620 89% $695 100%
Additional pool (over 800 sf) $283 $266 94% $283 100%
Commercial pool (up to 800 sf) $767 $661 86% $767 100%
Commercial pool (over 800 sf) $705 $661 94% $705 100%
Spa or Hot Tub (Pre-fabricated) $283 $262 93% $283 100% Window or Sliding Glass Door
Replacement $168 $126 75% $168 100%
New Window (non structural) $203 $159 78% $203 100%
New window (structural shear wall/masonry) $415 $358 86% $415 100% Bay Window (structural) $415 $358 86% $415 100%
ENGINEERING
Lot Line Adjustment $2,393 $2,122 89% $2,393 100%
Certificate of Compliance $2,393 $2,122 89% $2,393 100% Certificate of Correction / Amended Map $2,393 $2,122 89% $2,393 100% Process Grading Application $345 $273 79% $345 100%
Encroachment Permits:
Process Encroachment Application $327 $255 78% $327 100% Driveways - non-arterial $638 $526 82% $638 100%
Driveways - arterial $1,147 $969 84% $1,147 100%
Sidewalk $567 $465 82% $567 100%
City Fees - Proposed Changes
Fee
Full Cost
Recovery Fee Current Fee
Current Cost
Recovery %
Proposed
Fee
Proposed Cost
Recovery %
Streetwork / Trench Repair:
0-100 feet $928 $779 84% $928 100%
100-300 feet $1,288 $1,092 85% $1,288 100%
300-500 feet $2,024 $1,735 86% $2,024 100%
500-1000 feet $2,887 $2,480 86% $2,887 100%
1000-1500 feet $3,608 $3,097 86% $3,608 100%
1500-2000 feet $4,202 $3,610 86% $4,202 100%
Minor Encroachment Permit $426 $342 80% $426 100%
Utility Lateral for house connection on residential streets $1,005 $847 84% $1,005 100% Fire Service Connection $1,854 $1,581 85% $1,854 100%
Grease Interceptor $1,304 $1,120 86% $1,304 100%
Flood Zone Written Notice $392 $317 81% $392 100%
Street Addressing $789 $666 84% $789 100%
Summary Abandonment $1,642 $1,538 94% $1,642 100%
Full Abandonment $1,642 $1,538 94% $1,642 100%
Quit Claims $1,642 $1,538 94% $1,642 100%
Simple Research & CD Prep $266 $202 76% $266 100%
Map Sheets $208 $157 75% $208 100%
Sewer Frontage Charges - per l.f. $155 $137 88% $155 100% Grease Interceptor License Fee $7,500 $3,000 40% $7,500 100% Waste Bins and Pods $228 $0 0% $228 100% new
FIELD SERVICES changed title from "Maintenance"
Initial Inspection & Application - Mail Carriers, Newspaper Racks, Drop Off Boxes, Recycling Bins, etc. $100 $104 104% $100 100% Renewal Inspection - all boxes $50 $52 104% $50 100%
Removal of Abandoned Shopping Cart $56 $50 89% $56 100% Banner Installation & Removal $259 $235 91% $259 100%
Graffiti Removal
0-50 square feet $146 $131 90% $146 100%
Each addl square foot $0.75 $0.68 91% $0.75 100%
Old Town Plaza Sidewalk Cleaning $1.57 $1.44 92% $1.57 100% Tree Removal $43 $42 98% $43 100%
Tree Planting $293 $287 98% $293 100%
Outdoor Dining Permit - New $385 $479 124% $385 100% moved from Community Development Outdoor Dining Permit - Renewal $205 $131 64% $205 100% moved from Community Development
TRAFFIC
Neighborhood Permit Parking Program Application $4,444 $3,400 77% $500 11% reduce per Council direction 8/2022 Neighborhood Permit Parking Program Processing Fee $1,024 $1,500 146% $500 49% reduce per Council direction 8/2022 WATER
Plan Check & Inspection Fee
Water Service, no on-site water facilities $595 $462 78% $595 100% Broken Curb Stop $273 $227 83% $225 82%
Pull Water Meter $194 $161 83% $175 90%
As of Last Read Establishment Fee $29 $20 69% $25 86%
After Hours Reconnection Surcharge $161 $50 31% $100 62% Meter Testing - deposit $239 $208 87% $239 100%
Backflow Prevention Inspection $342 $262 77% $342 100%
Animal Control and Shelter Fees - All Fee Increase
Full Cost
Recovery Fee Current Fee Current Cost
Recovery %
Proposed
Fee
Proposed Cost
Recovery %
I. Fees for Animal Licenses
Annual Dog Licenses (12 months)
a. Non-neutered $159 $159 100.0% $159 100.0%
b. Neutered (Note 1) $51 $38 74.5% $42 82.4%
c. Neutered, Sr. Citizen and Military discout (Note 2) $51 $19 37.3% $21 41.2% d. Puppy, 6 months old or younger $51 $38 74.5% $42 82.4% Cat License (12 months)
a. Non-neutered $9 $9 100.0% $9 100.0%
b. Neutered $9 $9 100.0% $9 100.0%
Other
a. Reissue of lost dog or cat license tag $9 $9 100.0% $9 100.0% b.Transfer of dog or cat licence $9 $9 100.0% $9 100.0% c. Assistance dog licence $11 $11 100.0% $11 100.0%
d. Police / Law Enforcement $11 $11 100.0% $11 100.0%
e. Exotic Animal Permit
Per Aviary $691 $500 72.4% $500 72.4%
Per Species $997 $500 50.2% $500 50.2%
f. Animal Permit (per household per year)
more than three (3) animals $627 $627 100.0% $627 100.0% more than three (3) animals - Nonprofit $627 $627 100.0% $627 100.0% Late Fee $48 $48 100.0% $48 100.0%
Non-Compliance Fee- Collections $58 $58 100.0% $58 100.0% Non-Compliance Fee $150 $150 100.0% $150 100.0%
Rabies Vaccination Exemption Fee-New $65 $65 100.0% $65 100.0% 4-1-95 Declared Dog
a. 4-1-95 Declared Dog Permit $692 $692 100.0% $692 100.0% II. Fees For Animal Business Licences
Application Fee (Note 3) $138 $138 100.0% $138 100.0%
Penalty Fee (Note 4) 25%
Re-inspection Fee $466 $466 100.0% $466 100.0%
Commercial Kennels Permit-Modified
a. under 30 animals $874 $650 74.4% $650 74.4%
b. over 30 animals $933 $750 80.4% $750 80.4%
Pet Shop
a. Aquatic Only $1,219 $850 69.7% $1,000 82.0%
b. Pet Shop $1,160 $800 69.0% $1,000 86.2%
Fixed Locations Grooming Parlor (per year) $608 $525 86.3% $525 86.3% Mobile Groomers
a. Field Inspection $585 $450 76.9% $500 85.5%
b. OCAC Inspection $500 $400 80.0% $400 80.0%
Animal Rental Establishment (per year) $531 $500 94.2% $500 94.2% Permanent Animal Exhibition (per year) $707 $700 99.0% $707 100.0% Temporary Animal Exhibition
a. First day $161 $150 93.2% $150 93.2%
b. Additional day (not to exceed per year max) $80 $75 93.8% $75 93.8% Commercial Stable (per year)
a. 1-49 horses $1,120 $750 67.0% $750 67.0%
b. 50-99 horses $1,238 $900 72.7% $900 72.7%
c. 100 or more $2,073 $1,500 72.4% $1,500 72.4%
Circus (billed as hourly rate) (Note 5)
Business Licensing Hourly Rate $145 $145 100.0% $145 100.0% Vet Services Hourly Rate $123 $123 100.0% $123 100.0%
Rodeo (billed as hourly rate) (Note 6) $145 $145 100.0% $145 100.0% III. Fees For Animals Impounded
Daily Feed and Care
a. Large animal $155 $155 100.0% $155 100.0%
b. Medium animal $101 $100 99.0% $101 100.0%
C.Dog or Cat $136 $68 50.0% $68 50.0%
d. All other animals $72 $50 69.4% $50 69.4%
Veterinary Services
a. Rabies Vaccination $10 $10 100.0% $10 100.0%
b. Services performed by County staff, per qtr. Hr. $31 at cost at cost C. Emergency services performed by other than County $100 $100 100.0% $100 100.0% staff, per treatment (Note 10)
d. Other procedures (Note 7) N/A N/A N/A
e. Owner Requested Euthanasia $132 $132 100.0% $132 100.0% Health Related Grooming
a. Minor (Note 8) $21 $21 100.0% $21 100.0%
b. Major $90 $90 100.0% $90 100.0%
Health Related Bath
a. Small $24 $24 100.0% $24 100.0%
b. Medium $33 $33 100.0% $33 100.0%
c. Large $50 $50 100.0% $50 100.0%
Disposal Options
Rendering $19 $19 100.0% $19 100.0%
Impound Fees- Modified
Brought in by Field Officers
a. Large animal (horse, cow, etc.) $171 $171 100.0% $171 100.0% b. Medium animal (pig, sheep, etc.) $134 $134 100.0% $134 100.0% c.Dog, cat or other small animal* $205 $150 73.2% $175 85.4% Brought in by Citizens/ Over the Counter
a. Large animal (horse, cow, etc.) $126 $126 100.0% $126 100.0% b. Medium animal (pig, sheep, etc.) $99 $99 100.0% $99 100.0% c.Dog, cat or other small animal* $134 $134 100.0% $134 100.0% Owner Requested Disposal from Field
a. Large animal (horse, cow, etc.) $232 $232 100.0% $232 100.0% Animal Control and Shelter Fees - All Fee Increase
Full Cost
Recovery Fee Current Fee Current Cost
Recovery %
Proposed
Fee
Proposed Cost
Recovery %
b. Medium animal (pig, sheep, etc.) $138 $138 100.0% $138 100.0% c.Dog, cat or other small animal* $32 $32 100.0% $32 100.0% Placement Fees
a. Dog
Days 1-5 after being made available $53 $50 94.3% $53 100.0% Days 6-30 after being made available $53 $20 37.7% $20 37.7% Day 31 and over after being made available $53 $0 0.0% $0 0.0% b. Cat
Days 1 after being made available $53 $50 94.3% $53 100.0% Days 2 after being made available $53 $0 0.0% $0 0.0%
c. Exotic animals, including birds and reptiles $53 $50 94.3% $51 96.2% d. Other animals (except livestock) N/A N/A N/A
e. Livestock N/A
Lower of
actual cost or
market value
Lower of
actual cost
or market
value
f. Sr. Animal for Sr. Citizen - Dog
Dog $53 $0 0.0% $0 0.0%
Cat $53 $0 0.0% $0 0.0%
Microchip
a. Implant & Registration Fee $14 $14 100.0% $14 100.0% b. Home Again Re-Registration Only Fee (Note 9) $0 $0 $0 c. Home Again New Registration Only Fee (Note 9) $0 $0 $0 d. Avid Registration Only Fee $1 $1 100.0% $1 100.0%
Canine Spay / Neuter Fee $209 $65 31.1% $75 35.9%
Feline / Rabbit Spay Neuter Fee $417 $65 15.6% $75 18.0% Relinquishment Fee (Owner Surrender) $34 $34 100.0% $34 100.0% Deceased Animal Disposal (at shelter) Fee $13 $13 100.0% $13 100.0% Quarantine Fee $145 $145 100.0% $145 100.0%
Animal Delivery Fee $54 $54 100.0% $54 100.0%
Vicious Declaration Fee $1,571 $1,571 100.0% $1,571 100.0% 4-1-95 Non- Compliance Fee $899 $899 100.0% $899 100.0% Taxable Sales
a. Cat carrier fee $4 $4 100.0% $4 100.0%
b. Animal leash fee $1 $1 100.0% $1 100.0%
c. Pet ID tag (Unlicensed) $2 $2 100.0% $2 100.0%
Sedation Fee $15 $15 100.0% $15 100.0%
Notes:
Note 1 - Per CA Food and Agri. Code § 30804.5, fees for sterilized animals shall be issued at no more than 50% of the fee for unsterilized animals.
Note 2 - Sr. Citizen and Military (active and veteran) fee for sterilized animals is equal to 50% of the regular fee for sterilized animals (see Note 1).
Note 3 - The Application fee is a non-refundable deposit toward the license fee.
Note 4 - Penalty Fee is 25% of fee for animal business licenses not renewed within 30 days after expiration of the previous license, or for licenses not timely obtained.
Note 5 - Circus fee is an hourly rate; the fee will be a billing by hour or portion thereof at an hourly rate of $145 for Business License staff time; and at a rate of $123.00 for Veterinary Services staff time.
Note 6 - Rodeo fee is an hourly rate; the fee will be a billing by hour or portion thereof at an hourly rate of $145 for Business License staff time; Note 7 - Vet Services - Other Procedures (Column G amount) is an estimate based on the current fees and fee units reported in Chameleon Sys. Account Code Summary Report (FY 2014-15).
Vet Services - Other Procedures (Column H amount) is the sum total of a separate fee calculation for each of these fees, using the Vet Services hourly rate plus actual cost of supplies.
Note 8 - Per program staff, there is no S&EB or S&S related cost relating to this fee.
Currently Minor grooming is performed by volunteers.
Note 9 - Per program staff, there is no staff program related cost associated with this fee.
Note 10 - Program plans to charge the emergency veterinarian service at actual cost. The $100 rate is only for the estimates, subject to change during contract negotiations with vendors.
Note 11 - The total does not agree to the $17,244,201 of User Fee Related Service Costs in Attachment A. This is due to the various methodologies in the fee calculations. Variance is within a reasonable amount.
New Construction
Plan Check Fees
Construction Type Construction Type Construction Type
IA, IB IIA, IIB, IIIA, IIIB, IV VA, VB
IBC
Class IBC Occupancy Type
Project
Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
A-1 Assembly—Fixed Seating 500 $1,997 $99.8325 $1,664 $83.1938 $1,331 $66.5550 - Theater, Concert Hall 2,500 $3,993 $47.9100 $3,328 $39.9250 $2,662 $31.9400 - - 5,000 $5,191 $31.9400 $4,326 $26.6167 $3,461 $21.2933 - - 10,000 $6,788 $7.9967 $5,657 $6.6639 $4,525 $5.3311 - - 25,000 $7,988 $25.5500 $6,656 $21.2917 $5,325 $17.0333 - - 50,000 $14,375 $28.7500 $11,979 $23.9583 $9,583 $19.1667 A-2 Assembly—Food & Drink 500 $2,225 $111.2475 $1,854 $92.7063 $1,483 $74.1650 - Restaurant, Night Club, Bar 2,500 $4,450 $53.4000 $3,708 $44.5000 $2,967 $35.6000 - - 5,000 $5,785 $35.5950 $4,821 $29.6625 $3,857 $23.7300 - - 10,000 $7,565 $8.8950 $6,304 $7.4125 $5,043 $5.9300 - - 25,000 $8,899 $28.4850 $7,416 $23.7375 $5,933 $18.9900 - - 50,000 $16,020 $32.0400 $13,350 $26.7000 $10,680 $21.3600 A-3 Assembly—Worship, Amusement 500 $2,567 $128.3513 $2,139 $106.9594 $1,711 $85.5675 - Arcade, Church, Community Hall 2,500 $5,134 $61.6050 $4,278 $51.3375 $3,423 $41.0700 - - 5,000 $6,674 $41.0850 $5,562 $34.2375 $4,450 $27.3900 - - 10,000 $8,729 $10.2600 $7,274 $8.5500 $5,819 $6.8400 - - 25,000 $10,268 $32.8500 $8,556 $27.3750 $6,845 $21.9000 - - 50,000 $18,480 $36.9600 $15,400 $30.8000 $12,320 $24.6400 A-4 Assembly—Indoor Sport Viewing 500 $2,054 $102.6810 $1,711 $85.5675 $1,369 $68.4540 - Arena, Skating Rink, Tennis Court 2,500 $4,107 $49.2840 $3,423 $41.0700 $2,738 $32.8560 - - 5,000 $5,339 $32.8680 $4,450 $27.3900 $3,560 $21.9120 - - 10,000 $6,983 $8.2080 $5,819 $6.8400 $4,655 $5.4720 - - 25,000 $8,214 $26.2800 $6,845 $21.9000 $5,476 $17.5200 - - 50,000 $14,784 $29.5680 $12,320 $24.6400 $9,856 $19.7120 A-5 Assembly—Outdoor Activities 1,000 $1,198 $29.9588 $998 $24.9656 $799 $19.9725 - Amusement Park, Bleacher, Stadium 5,000 $2,396 $14.3550 $1,997 $11.9625 $1,598 $9.5700 - - 10,000 $3,114 $9.6000 $2,595 $8.0000 $2,076 $6.4000 - - 20,000 $4,074 $2.3950 $3,395 $1.9958 $2,716 $1.5967 - - 50,000 $4,793 $7.6650 $3,994 $6.3875 $3,195 $5.1100 - - 100,000 $8,625 $8.6250 $7,188 $7.1875 $5,750 $5.7500 A Commercial Tenant Improvements 150 $513 $85.5638 $428 $71.3031 $342 $57.0425 - - 750 $1,027 $41.0850 $856 $34.2375 $685 $27.3900
- - 1,500 $1,335 $27.3750 $1,112 $22.8125 $890 $18.2500 - - 3,000 $1,746 $6.8350 $1,455 $5.6958 $1,164 $4.5567
- - 7,500 $2,053 $21.9150 $1,711 $18.2625 $1,369 $14.6100 - - 15,000 $3,697 $24.6450 $3,081 $20.5375 $2,465 $16.4300 B Business—Professional Office 1,000 $2,225 $55.6238 $1,854 $46.3531 $1,483 $37.0825 - - 5,000 $4,450 $26.6850 $3,708 $22.2375 $2,967 $17.7900 - - 10,000 $5,784 $17.7900 $4,820 $14.8250 $3,856 $11.8600 - - 20,000 $7,563 $4.4650 $6,303 $3.7208 $5,042 $2.9767 - - 50,000 $8,903 $14.2350 $7,419 $11.8625 $5,935 $9.4900 - - 100,000 $16,020 $16.0200 $13,350 $13.3500 $10,680 $10.6800 B Commercial Tenant Improvements 150 $513 $85.5638 $428 $71.3031 $342 $57.0425 - - 750 $1,027 $41.0850 $856 $34.2375 $685 $27.3900
- - 1,500 $1,335 $27.3750 $1,112 $22.8125 $890 $18.2500 - - 3,000 $1,746 $6.8350 $1,455 $5.6958 $1,164 $4.5567
- - 7,500 $2,053 $21.9150 $1,711 $18.2625 $1,369 $14.6100 - - 15,000 $3,697 $24.6450 $3,081 $20.5375 $2,465 $16.4300 E Educational—Group Occupancy 1,000 $4,022 $100.5488 $3,352 $83.7906 $2,681 $67.0325 - 6+ persons, up to the 12th Grade 5,000 $8,044 $48.2550 $6,703 $40.2125 $5,363 $32.1700 - - 10,000 $10,457 $32.1750 $8,714 $26.8125 $6,971 $21.4500 - - 20,000 $13,674 $8.0450 $11,395 $6.7042 $9,116 $5.3633 - - 50,000 $16,088 $25.7250 $13,406 $21.4375 $10,725 $17.1500 100,000 $28,950 $28.9500 $24,125 $24.1250 $19,300 $19.3000 E Commercial Tenant Improvements 150 $513 $85.5638 $428 $71.3031 $342 $57.0425 - - 750 $1,027 $41.0850 $856 $34.2375 $685 $27.3900
- - 1,500 $1,335 $27.3750 $1,112 $22.8125 $890 $18.2500 - - 3,000 $1,746 $6.8350 $1,455 $5.6958 $1,164 $4.5567
- - 7,500 $2,053 $21.9150 $1,711 $18.2625 $1,369 $14.6100 - - 15,000 $3,697 $24.6450 $3,081 $20.5375 $2,465 $16.4300 F-1 Factory Industrial—Moderate Hazard 4,000 $2,047 $4.4430 $1,706 $3.7025 $1,364 $2.9620 New Construction
Plan Check Fees
Construction Type Construction Type Construction Type
IA, IB IIA, IIB, IIIA, IIIB, IV VA, VB
IBC
Class IBC Occupancy Type
Project
Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
- - 20,000 $2,758 $3.5640 $2,298 $2.9700 $1,838 $2.3760 - - 40,000 $3,470 $0.9000 $2,892 $0.7500 $2,314 $0.6000 - - 80,000 $3,830 $1.3280 $3,192 $1.1067 $2,554 $0.8853 - - 200,000 $5,424 $0.6240 $4,520 $0.5200 $3,616 $0.4160 400,000 $6,672 $1.6680 $5,560 $1.3900 $4,448 $1.1120
F-2 Factory Industrial—Low Hazard 3,000 $1,840 $15.3263 $1,533 $12.7719 $1,226 $10.2175 - - 15,000 $3,679 $7.3650 $3,066 $6.1375 $2,453 $4.9100 - - 30,000 $4,784 $4.9050 $3,986 $4.0875 $3,189 $3.2700 - - 60,000 $6,255 $1.2250 $5,213 $1.0208 $4,170 $0.8167 - - 150,000 $7,358 $3.9150 $6,131 $3.2625 $4,905 $2.6100 - - 300,000 $13,230 $4.4100 $11,025 $3.6750 $8,820 $2.9400 F Commercial Tenant Improvements 150 $513 $85.5638 $428 $71.3031 $342 $57.0425 - - 750 $1,027 $41.0850 $856 $34.2375 $685 $27.3900
- - 1,500 $1,335 $27.3750 $1,112 $22.8125 $890 $18.2500 - - 3,000 $1,746 $6.8350 $1,455 $5.6958 $1,164 $4.5567
- - 7,500 $2,053 $21.9150 $1,711 $18.2625 $1,369 $14.6100 - - 15,000 $3,697 $24.6450 $3,081 $20.5375 $2,465 $16.4300 H-1 High Hazard Group H-1 1,000 $1,797 $44.9250 $1,498 $37.4375 $1,198 $29.9500 - Pose a detonation hazard 5,000 $3,594 $21.5600 $2,995 $17.9667 $2,396 $14.3733 - - 10,000 $4,672 $14.3800 $3,893 $11.9833 $3,115 $9.5867 - - 20,000 $6,110 $3.6000 $5,092 $3.0000 $4,073 $2.4000 - - 50,000 $7,190 $11.5000 $5,992 $9.5833 $4,793 $7.6667 - - 100,000 $12,940 $12.9400 $10,783 $10.7833 $8,627 $8.6267 H-2 High Hazard Group H-2 2,000 $1,814 $22.6680 $1,512 $18.8900 $1,209 $15.1120 - Pose a deflagration hazard 10,000 $3,628 $10.8840 $3,023 $9.0700 $2,418 $7.2560 - - 20,000 $4,716 $7.2600 $3,930 $6.0500 $3,144 $4.8400 - - 40,000 $6,168 $1.8200 $5,140 $1.5167 $4,112 $1.2133 - - 100,000 $7,260 $5.7960 $6,050 $4.8300 $4,840 $3.8640 - - 200,000 $13,056 $6.5280 $10,880 $5.4400 $8,704 $4.3520 H-3 High Hazard Group H-3 1,000 $1,733 $43.3238 $1,444 $36.1031 $1,155 $28.8825 - Readily support combustion 5,000 $3,466 $20.7750 $2,888 $17.3125 $2,311 $13.8500 - - 10,000 $4,505 $13.8750 $3,754 $11.5625 $3,003 $9.2500 - - 20,000 $5,892 $3.4600 $4,910 $2.8833 $3,928 $2.3067 - - 50,000 $6,930 $11.1000 $5,775 $9.2500 $4,620 $7.4000 - - 100,000 $12,480 $12.4800 $10,400 $10.4000 $8,320 $8.3200 H-4 High Hazard Group H-4 1,000 $2,156 $53.9100 $1,797 $44.9250 $1,438 $35.9400 - Pose health hazards 5,000 $4,313 $25.8720 $3,594 $21.5600 $2,875 $17.2480 - - 10,000 $5,606 $17.2560 $4,672 $14.3800 $3,738 $11.5040 - - 20,000 $7,332 $4.3200 $6,110 $3.6000 $4,888 $2.8800 - - 50,000 $8,628 $13.8000 $7,190 $11.5000 $5,752 $9.2000 - - 100,000 $15,528 $15.5280 $12,940 $12.9400 $10,352 $10.3520 H-5 High Hazard Group H-5 1,000 $2,156 $53.9100 $1,797 $44.9250 $1,438 $35.9400 - Semiconductor Fabrication, R&D 5,000 $4,313 $25.8720 $3,594 $21.5600 $2,875 $17.2480 - - 10,000 $5,606 $17.2560 $4,672 $14.3800 $3,738 $11.5040 - - 20,000 $7,332 $4.3200 $6,110 $3.6000 $4,888 $2.8800 - - 50,000 $8,628 $13.8000 $7,190 $11.5000 $5,752 $9.2000 - - 100,000 $15,528 $15.5280 $12,940 $12.9400 $10,352 $10.3520 H Commercial Tenant Improvements 150 $513 $85.5638 $428 $71.3031 $342 $57.0425 - - 750 $1,027 $41.0850 $856 $34.2375 $685 $27.3900
- - 1,500 $1,335 $27.3750 $1,112 $22.8125 $890 $18.2500 - - 3,000 $1,746 $6.8350 $1,455 $5.6958 $1,164 $4.5567
- - 7,500 $2,053 $21.9150 $1,711 $18.2625 $1,369 $14.6100 - - 15,000 $3,697 $24.6450 $3,081 $20.5375 $2,465 $16.4300 I-1 Institutional—7+ persons, ambulatory 1,000 $2,841 $71.0280 $2,367 $59.1900 $1,894 $47.3520 - - 5,000 $5,682 $34.0800 $4,735 $28.4000 $3,788 $22.7200 - - 10,000 $7,386 $22.7400 $6,155 $18.9500 $4,924 $15.1600 - - 20,000 $9,660 $5.6800 $8,050 $4.7333 $6,440 $3.7867 - - 50,000 $11,364 $18.1920 $9,470 $15.1600 $7,576 $12.1280 - - 100,000 $20,460 $20.4600 $17,050 $17.0500 $13,640 $13.6400 I-2 Institutional—6+ persons, non-ambulatory 1,000 $3,551 $88.7850 $2,959 $73.9875 $2,367 $59.1900 - - 5,000 $7,103 $42.6000 $5,919 $35.5000 $4,735 $28.4000 - - 10,000 $9,233 $28.4250 $7,694 $23.6875 $6,155 $18.9500 - - 20,000 $12,075 $7.1000 $10,063 $5.9167 $8,050 $4.7333 New Construction
Plan Check Fees
Construction Type Construction Type Construction Type
IA, IB IIA, IIB, IIIA, IIIB, IV VA, VB
IBC
Class IBC Occupancy Type
Project
Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
- - 50,000 $14,205 $22.7400 $11,838 $18.9500 $9,470 $15.1600 - - 100,000 $25,575 $25.5750 $21,313 $21.3125 $17,050 $17.0500 I-3 Institutional—6+ persons, restrained 1,000 $3,466 $86.6288 $2,888 $72.1906 $2,310 $57.7525 - - 5,000 $6,931 $41.5950 $5,776 $34.6625 $4,621 $27.7300 - - 10,000 $9,011 $27.7350 $7,509 $23.1125 $6,007 $18.4900 - - 20,000 $11,784 $6.9200 $9,820 $5.7667 $7,856 $4.6133 - - 50,000 $13,860 $22.1700 $11,550 $18.4750 $9,240 $14.7800 100,000 $24,945 $24.9450 $20,788 $20.7875 $16,630 $16.6300 I-4 Institutional—6+ persons, day care 1,000 $2,610 $65.2538 $2,175 $54.3781 $1,740 $43.5025 - - 5,000 $5,220 $31.3200 $4,350 $26.1000 $3,480 $20.8800 - - 10,000 $6,786 $20.8800 $5,655 $17.4000 $4,524 $13.9200 - - 20,000 $8,874 $5.2200 $7,395 $4.3500 $5,916 $3.4800 - - 50,000 $10,440 $16.7100 $8,700 $13.9250 $6,960 $11.1400 100,000 $18,795 $18.7950 $15,663 $15.6625 $12,530 $12.5300 I Commercial Tenant Improvements 150 $513 $85.5638 $428 $71.3031 $342 $57.0425 - - 750 $1,027 $41.0850 $856 $34.2375 $685 $27.3900
- - 1,500 $1,335 $27.3750 $1,112 $22.8125 $890 $18.2500 - - 3,000 $1,746 $6.8350 $1,455 $5.6958 $1,164 $4.5567
- - 7,500 $2,053 $21.9150 $1,711 $18.2625 $1,369 $14.6100 15,000 $3,697 $24.6450 $3,081 $20.5375 $2,465 $16.4300
L Labs (California ONLY) 2,000 $3,149 $39.3570 $2,624 $32.7975 $2,099 $26.2380 - - 10,000 $6,298 $18.8880 $5,248 $15.7400 $4,198 $12.5920 - - 20,000 $8,186 $12.6120 $6,822 $10.5100 $5,458 $8.4080 - - 40,000 $10,709 $3.1520 $8,924 $2.6267 $7,139 $2.1013 - - 100,000 $12,600 $10.0800 $10,500 $8.4000 $8,400 $6.7200 200,000 $22,680 $11.3400 $18,900 $9.4500 $15,120 $7.5600 M Mercantile—Retail or wholesale store 150 $856 $142.6088 $713 $118.8406 $570 $95.0725 - - 750 $1,711 $68.4600 $1,426 $57.0500 $1,141 $45.6400 - - 1,500 $2,225 $45.6300 $1,854 $38.0250 $1,483 $30.4200 - - 3,000 $2,909 $11.4000 $2,424 $9.5000 $1,940 $7.6000 - - 7,500 $3,422 $36.5100 $2,852 $30.4250 $2,282 $24.3400 - - 15,000 $6,161 $41.0700 $5,134 $34.2250 $4,107 $27.3800 M Commercial Tenant Improvements 150 $513 $85.5638 $428 $71.3031 $342 $57.0425 - - 750 $1,027 $41.0850 $856 $34.2375 $685 $27.3900
- - 1,500 $1,335 $27.3750 $1,112 $22.8125 $890 $18.2500 - - 3,000 $1,746 $6.8350 $1,455 $5.6958 $1,164 $4.5567
- - 7,500 $2,053 $21.9150 $1,711 $18.2625 $1,369 $14.6100 - - 15,000 $3,697 $24.6450 $3,081 $20.5375 $2,465 $16.4300 R-1 Residential—Transient 2,000 $7,628 $19.0650 $6,357 $15.8875 $5,085 $12.7100 - Boarding Houses, Hotels, Motels 10,000 $9,153 $15.2700 $7,628 $12.7250 $6,102 $10.1800 - - 20,000 $10,680 $7.6200 $8,900 $6.3500 $7,120 $5.0800 - - 40,000 $12,204 $6.3600 $10,170 $5.3000 $8,136 $4.2400 - - 100,000 $16,020 $6.8700 $13,350 $5.7250 $10,680 $4.5800 - - 200,000 $22,890 $11.4450 $19,075 $9.5375 $15,260 $7.6300 R-2 Residential—Permanent, 2+ Dwellings 1,500 $7,628 $25.4175 $6,357 $21.1813 $5,085 $16.9450 - Apartment, Dormitory, Timeshare 7,500 $9,153 $20.3400 $7,628 $16.9500 $6,102 $13.5600 - - 15,000 $10,679 $10.1700 $8,899 $8.4750 $7,119 $6.7800 - - 30,000 $12,204 $8.4800 $10,170 $7.0667 $8,136 $5.6533 - - 75,000 $16,020 $9.1500 $13,350 $7.6250 $10,680 $6.1000 - - 150,000 $22,883 $15.2550 $19,069 $12.7125 $15,255 $10.1700 R-3 Dwellings—Custom Homes 1,500 $2,225 $44.4825 $1,854 $37.0688 $1,483 $29.6550 - - 2,500 $2,670 $44.5200 $2,225 $37.1000 $1,780 $29.6800 - - 3,500 $3,115 $44.5125 $2,596 $37.0938 $2,077 $29.6750 - - 4,500 $3,560 $55.6125 $2,967 $46.3438 $2,373 $37.0750 - - 6,500 $4,672 $57.2229 $3,894 $47.6857 $3,115 $38.1486 - - 10,000 $6,675 $66.7500 $5,563 $55.6250 $4,450 $44.5000 R-3 Dwellings—Production Phase 1,500 $1,112 $22.2600 $927 $18.5500 $742 $14.8400 - of Master Plan (repeats) 2,500 $1,335 $22.2150 $1,113 $18.5125 $890 $14.8100 - - 3,500 $1,557 $22.2825 $1,298 $18.5688 $1,038 $14.8550 - - 4,500 $1,780 $27.8063 $1,483 $23.1719 $1,187 $18.5375 - - 6,500 $2,336 $28.6114 $1,947 $23.8429 $1,557 $19.0743 - - 10,000 $3,338 $33.3750 $2,781 $27.8125 $2,225 $22.2500 R-4 Residential—Assisted Living (6-16 persons) 1,500 $4,768 $15.8850 $3,973 $13.2375 $3,178 $10.5900 New Construction
Plan Check Fees
Construction Type Construction Type Construction Type
IA, IB IIA, IIB, IIIA, IIIB, IV VA, VB
IBC
Class IBC Occupancy Type
Project
Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
- - 7,500 $5,721 $12.7050 $4,767 $10.5875 $3,814 $8.4700 - - 15,000 $6,674 $6.3600 $5,561 $5.3000 $4,449 $4.2400 - - 30,000 $7,628 $5.3000 $6,356 $4.4167 $5,085 $3.5333 - - 75,000 $10,013 $5.7300 $8,344 $4.7750 $6,675 $3.8200 150,000 $14,310 $9.5400 $11,925 $7.9500 $9,540 $6.3600
R R Occupancy Remodel 150 $795 $26.4788 $662 $22.0656 $530 $17.6525 - - 750 $953 $21.1950 $795 $17.6625 $636 $14.1300
- - 1,500 $1,112 $10.5900 $927 $8.8250 $742 $7.0600
- - 3,000 $1,271 $8.8250 $1,059 $7.3542 $848 $5.8833
- - 7,500 $1,668 $9.5250 $1,390 $7.9375 $1,112 $6.3500
- - 15,000 $2,383 $15.8850 $1,986 $13.2375 $1,589 $10.5900 S-1 Storage—Moderate Hazard, Repair Garage 500 $1,643 $82.1490 $1,369 $68.4575 $1,095 $54.7660 - Motor Vehicles (not High Hazard) 2,500 $3,286 $39.4200 $2,738 $32.8500 $2,191 $26.2800 - - 5,000 $4,271 $26.2920 $3,560 $21.9100 $2,848 $17.5280 - - 10,000 $5,586 $6.5800 $4,655 $5.4833 $3,724 $4.3867 - - 25,000 $6,573 $21.0360 $5,478 $17.5300 $4,382 $14.0240 - - 50,000 $11,832 $23.6640 $9,860 $19.7200 $7,888 $15.7760 S-2 Storage—Low Hazard, Parking Garages 1,000 $2,464 $61.6140 $2,054 $51.3450 $1,643 $41.0760 - Open or Enclosed 5,000 $4,929 $29.5800 $4,108 $24.6500 $3,286 $19.7200 - - 10,000 $6,408 $19.7040 $5,340 $16.4200 $4,272 $13.1360 - - 20,000 $8,378 $4.9320 $6,982 $4.1100 $5,586 $3.2880 - - 50,000 $9,858 $15.7800 $8,215 $13.1500 $6,572 $10.5200 - - 100,000 $17,748 $17.7480 $14,790 $14.7900 $11,832 $11.8320 S S Commercial Tenant Improvements 500 $513 $85.5638 $428 $71.3031 $342 $57.0425 - - 2,500 $1,027 $41.0850 $856 $34.2375 $685 $27.3900
- - 5,000 $1,335 $27.3750 $1,112 $22.8125 $890 $18.2500 - - 10,000 $1,746 $6.8350 $1,455 $5.6958 $1,164 $4.5567 - - 25,000 $2,053 $21.9150 $1,711 $18.2625 $1,369 $14.6100 50,000 $3,697 $24.6450 $3,081 $20.5375 $2,465 $16.4300
U Accessory—Private Garage 200 $257 $32.0925 $214 $26.7438 $171 $21.3950 - - 1,000 $513 $15.4050 $428 $12.8375 $342 $10.2700
- - 2,000 $668 $10.2750 $556 $8.5625 $445 $6.8500
- - 4,000 $873 $2.5750 $728 $2.1458 $582 $1.7167
- - 10,000 $1,028 $8.2050 $856 $6.8375 $685 $5.4700
- - 20,000 $1,848 $9.2400 $1,540 $7.7000 $1,232 $6.1600 R-3 Residential Room Addition 150 $795 $26.4788 $662 $22.0656 $530 $17.6525 - - 750 $953 $21.1950 $795 $17.6625 $636 $14.1300
- - 1,500 $1,112 $10.5900 $927 $8.8250 $742 $7.0600
- - 3,000 $1,271 $8.8250 $1,059 $7.3542 $848 $5.8833
- - 7,500 $1,668 $9.5250 $1,390 $7.9375 $1,112 $6.3500
- - 15,000 $2,383 $15.8850 $1,986 $13.2375 $1,589 $10.5900
SHELL BUILDINGS
- All Shell Buildings 1,000 $685 $17.1150 $571 $14.2625 $456 $11.4100 - - 5,000 $1,369 $8.2080 $1,141 $6.8400 $913 $5.4720
- - 10,000 $1,780 $5.4840 $1,483 $4.5700 $1,186 $3.6560 - - 20,000 $2,328 $1.3600 $1,940 $1.1333 $1,552 $0.9067 - - 50,000 $2,736 $4.3920 $2,280 $3.6600 $1,824 $2.9280 - - 100,000 $4,932 $4.9320 $4,110 $4.1100 $3,288 $3.2880 * Each additional 100 square feet, or portion thereof, up to the next highest project size threshold.
New Construction
Inspection Fees
Construction Type Construction Type Construction Type
IA, IB IIA, IIB, IIIA, IIIB, IV VA, VB
IBC
Class IBC Occupancy Type
Project
Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
A-1 Assembly—Fixed Seating 500 $2,325 $116.2625 $1,938 $96.8854 $1,550 $77.5083 - Theater, Concert Hall 2,500 $4,651 $93.0000 $3,875 $77.5000 $3,100 $62.0000 - - 5,000 $6,976 $139.5100 $5,813 $116.2583 $4,650 $93.0067 - - 10,000 $13,951 $31.0100 $11,626 $25.8417 $9,301 $20.6733 - - 25,000 $18,603 $9.2900 $15,502 $7.7417 $12,402 $6.1933 - - 50,000 $20,925 $41.8500 $17,438 $34.8750 $13,950 $27.9000 A-2 Assembly—Food & Drink 500 $3,488 $174.3938 $2,907 $145.3281 $2,325 $116.2625 - Restaurant, Night Club, Bar 2,500 $6,976 $139.5000 $5,813 $116.2500 $4,651 $93.0000 - - 5,000 $10,463 $209.2650 $8,719 $174.3875 $6,976 $139.5100 - - 10,000 $20,927 $46.5150 $17,439 $38.7625 $13,951 $31.0100 - - 25,000 $27,904 $13.9350 $23,253 $11.6125 $18,603 $9.2900 - - 50,000 $31,388 $62.7750 $26,156 $52.3125 $20,925 $41.8500 A-3 Assembly—Worship, Amusement 500 $3,488 $174.3938 $2,907 $145.3281 $2,325 $116.2625 - Arcade, Church, Community Hall 2,500 $6,976 $139.5000 $5,813 $116.2500 $4,651 $93.0000 - - 5,000 $10,463 $209.2650 $8,719 $174.3875 $6,976 $139.5100 - - 10,000 $20,927 $46.5150 $17,439 $38.7625 $13,951 $31.0100 - - 25,000 $27,904 $13.9350 $23,253 $11.6125 $18,603 $9.2900 - - 50,000 $31,388 $62.7750 $26,156 $52.3125 $20,925 $41.8500 A-4 Assembly—Indoor Sport Viewing 500 $2,790 $139.5150 $2,325 $116.2625 $1,860 $93.0100 - Arena, Skating Rink, Tennis Court 2,500 $5,581 $111.6000 $4,651 $93.0000 $3,720 $74.4000 - - 5,000 $8,371 $167.4120 $6,976 $139.5100 $5,580 $111.6080 - - 10,000 $16,741 $37.2120 $13,951 $31.0100 $11,161 $24.8080 - - 25,000 $22,323 $11.1480 $18,603 $9.2900 $14,882 $7.4320 - - 50,000 $25,110 $50.2200 $20,925 $41.8500 $16,740 $33.4800 A-5 Assembly—Outdoor Activities 1,000 $2,093 $52.3275 $1,744 $43.6063 $1,395 $34.8850 - Amusement Park, Bleacher, Stadium 5,000 $4,186 $41.8350 $3,488 $34.8625 $2,791 $27.8900 - - 10,000 $6,278 $62.7750 $5,231 $52.3125 $4,185 $41.8500 - - 20,000 $12,555 $13.9500 $10,463 $11.6250 $8,370 $9.3000 - - 50,000 $16,740 $4.2000 $13,950 $3.5000 $11,160 $2.8000 - - 100,000 $18,840 $18.8400 $15,700 $15.7000 $12,560 $12.5600 A Commercial Tenant Improvements 150 $419 $69.7613 $349 $58.1344 $279 $46.5075 - - 750 $837 $55.8150 $698 $46.5125 $558 $37.2100
- - 1,500 $1,256 $83.7150 $1,046 $69.7625 $837 $55.8100 - - 3,000 $2,511 $18.5900 $2,093 $15.4917 $1,674 $12.3933 - - 7,500 $3,348 $5.5800 $2,790 $4.6500 $2,232 $3.7200
- - 15,000 $3,767 $25.1100 $3,139 $20.9250 $2,511 $16.7400 B Business—Professional Office 1,000 $5,232 $130.7850 $4,360 $108.9875 $3,488 $87.1900 - - 5,000 $10,463 $104.6550 $8,719 $87.2125 $6,976 $69.7700 - - 10,000 $15,696 $156.9600 $13,080 $130.8000 $10,464 $104.6400 - - 20,000 $31,392 $34.8850 $26,160 $29.0708 $20,928 $23.2567 - - 50,000 $41,858 $10.4550 $34,881 $8.7125 $27,905 $6.9700 - - 100,000 $47,085 $47.0850 $39,238 $39.2375 $31,390 $31.3900 B Commercial Tenant Improvements 150 $419 $69.7613 $349 $58.1344 $279 $46.5075 - - 750 $837 $55.8150 $698 $46.5125 $558 $37.2100
- - 1,500 $1,256 $83.7150 $1,046 $69.7625 $837 $55.8100 - - 3,000 $2,511 $18.5900 $2,093 $15.4917 $1,674 $12.3933 - - 7,500 $3,348 $5.5800 $2,790 $4.6500 $2,232 $3.7200
- - 15,000 $3,767 $25.1100 $3,139 $20.9250 $2,511 $16.7400 E Educational—Group Occupancy 1,000 $3,488 $87.1988 $2,907 $72.6656 $2,325 $58.1325 - 6+ persons, up to the 12th Grade 5,000 $6,976 $69.7650 $5,813 $58.1375 $4,651 $46.5100 - - 10,000 $10,464 $104.6400 $8,720 $87.2000 $6,976 $69.7600 - - 20,000 $20,928 $23.2400 $17,440 $19.3667 $13,952 $15.4933 - - 50,000 $27,900 $6.9900 $23,250 $5.8250 $18,600 $4.6600 - - 100,000 $31,395 $31.3950 $26,163 $26.1625 $20,930 $20.9300 E Commercial Tenant Improvements 150 $419 $69.7613 $349 $58.1344 $279 $46.5075 - - 750 $837 $55.8150 $698 $46.5125 $558 $37.2100
- - 1,500 $1,256 $83.7150 $1,046 $69.7625 $837 $55.8100 - - 3,000 $2,511 $18.5900 $2,093 $15.4917 $1,674 $12.3933 - - 7,500 $3,348 $5.5800 $2,790 $4.6500 $2,232 $3.7200
- - 15,000 $3,767 $25.1100 $3,139 $20.9250 $2,511 $16.7400 F-1 Factory Industrial—Moderate Hazard 4,000 $1,783 $2.7750 $1,486 $2.3125 $1,189 $1.8500 - - 20,000 $2,227 $3.0960 $1,856 $2.5800 $1,485 $2.0640 - - 40,000 $2,846 $1.5960 $2,372 $1.3300 $1,898 $1.0640 - - 80,000 $3,485 $0.7560 $2,904 $0.6300 $2,323 $0.5040 - - 200,000 $4,392 $0.7800 $3,660 $0.6500 $2,928 $0.5200 New Construction
Inspection Fees
Construction Type Construction Type Construction Type
IA, IB IIA, IIB, IIIA, IIIB, IV VA, VB
IBC
Class IBC Occupancy Type
Project
Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
- - 400,000 $5,952 $1.4880 $4,960 $1.2400 $3,968 $0.9920 F-2 Factory Industrial—Low Hazard 3,000 $895 $7.4663 $746 $6.2219 $597 $4.9775 - - 15,000 $1,791 $5.9700 $1,493 $4.9750 $1,194 $3.9800 - - 30,000 $2,687 $8.9550 $2,239 $7.4625 $1,791 $5.9700 - - 60,000 $5,373 $1.9800 $4,478 $1.6500 $3,582 $1.3200 - - 150,000 $7,155 $0.6000 $5,963 $0.5000 $4,770 $0.4000 - - 300,000 $8,055 $2.6850 $6,713 $2.2375 $5,370 $1.7900 F Commercial Tenant Improvements 150 $419 $69.7613 $349 $58.1344 $279 $46.5075 - - 750 $837 $55.8150 $698 $46.5125 $558 $37.2100
- - 1,500 $1,256 $83.7150 $1,046 $69.7625 $837 $55.8100 - - 3,000 $2,511 $18.5900 $2,093 $15.4917 $1,674 $12.3933 - - 7,500 $3,348 $5.5800 $2,790 $4.6500 $2,232 $3.7200
- - 15,000 $3,767 $25.1100 $3,139 $20.9250 $2,511 $16.7400 H-1 High Hazard Group H-1 1,000 $586 $14.6375 $488 $12.1979 $390 $9.7583 - Pose a detonation hazard 5,000 $1,171 $11.7000 $976 $9.7500 $781 $7.8000 - - 10,000 $1,756 $17.5600 $1,463 $14.6333 $1,171 $11.7067 - - 20,000 $3,512 $3.9100 $2,927 $3.2583 $2,341 $2.6067 - - 50,000 $4,685 $1.1700 $3,904 $0.9750 $3,123 $0.7800 - - 100,000 $5,270 $5.2700 $4,392 $4.3917 $3,513 $3.5133 H-2 High Hazard Group H-2 2,000 $702 $8.7840 $585 $7.3200 $468 $5.8560 - Pose a deflagration hazard 10,000 $1,405 $7.0200 $1,171 $5.8500 $937 $4.6800 - - 20,000 $2,107 $10.5360 $1,756 $8.7800 $1,405 $7.0240 - - 40,000 $4,214 $2.3360 $3,512 $1.9467 $2,810 $1.5573 - - 100,000 $5,616 $0.6960 $4,680 $0.5800 $3,744 $0.4640 - - 200,000 $6,312 $3.1560 $5,260 $2.6300 $4,208 $2.1040 H-3 High Hazard Group H-3 1,000 $878 $21.9563 $732 $18.2969 $586 $14.6375 - Readily support combustion 5,000 $1,757 $17.5500 $1,464 $14.6250 $1,171 $11.7000 - - 10,000 $2,634 $26.3400 $2,195 $21.9500 $1,756 $17.5600 - - 20,000 $5,268 $5.8650 $4,390 $4.8875 $3,512 $3.9100 - - 50,000 $7,028 $1.7550 $5,856 $1.4625 $4,685 $1.1700 - - 100,000 $7,905 $7.9050 $6,588 $6.5875 $5,270 $5.2700 H-4 High Hazard Group H-4 1,000 $703 $17.5650 $586 $14.6375 $468 $11.7100 - Pose health hazards 5,000 $1,405 $14.0400 $1,171 $11.7000 $937 $9.3600 - - 10,000 $2,107 $21.0720 $1,756 $17.5600 $1,405 $14.0480 - - 20,000 $4,214 $4.6920 $3,512 $3.9100 $2,810 $3.1280 - - 50,000 $5,622 $1.4040 $4,685 $1.1700 $3,748 $0.9360 - - 100,000 $6,324 $6.3240 $5,270 $5.2700 $4,216 $4.2160 H-5 High Hazard Group H-5 1,000 $703 $17.5650 $586 $14.6375 $468 $11.7100 - Semiconductor Fabrication, R&D 5,000 $1,405 $14.0400 $1,171 $11.7000 $937 $9.3600 - - 10,000 $2,107 $21.0720 $1,756 $17.5600 $1,405 $14.0480 - - 20,000 $4,214 $4.6920 $3,512 $3.9100 $2,810 $3.1280 - - 50,000 $5,622 $1.4040 $4,685 $1.1700 $3,748 $0.9360 - - 100,000 $6,324 $6.3240 $5,270 $5.2700 $4,216 $4.2160 H Commercial Tenant Improvements 150 $419 $69.7613 $349 $58.1344 $279 $46.5075 - - 750 $837 $55.8150 $698 $46.5125 $558 $37.2100
- - 1,500 $1,256 $83.7150 $1,046 $69.7625 $837 $55.8100 - - 3,000 $2,511 $18.5900 $2,093 $15.4917 $1,674 $12.3933 - - 7,500 $3,348 $5.5800 $2,790 $4.6500 $2,232 $3.7200
- - 15,000 $3,767 $25.1100 $3,139 $20.9250 $2,511 $16.7400 I-1 Institutional—7+ persons, ambulatory 1,000 $879 $21.9750 $733 $18.3125 $586 $14.6500 - - 5,000 $1,758 $17.5680 $1,465 $14.6400 $1,172 $11.7120 - - 10,000 $2,636 $26.3640 $2,197 $21.9700 $1,758 $17.5760 - - 20,000 $5,273 $5.8640 $4,394 $4.8867 $3,515 $3.9093 - - 50,000 $7,032 $1.7520 $5,860 $1.4600 $4,688 $1.1680 - - 100,000 $7,908 $7.9080 $6,590 $6.5900 $5,272 $5.2720 I-2 Institutional—6+ persons, non-ambulatory 1,000 $1,099 $27.4688 $916 $22.8906 $733 $18.3125 - - 5,000 $2,198 $21.9600 $1,831 $18.3000 $1,465 $14.6400 - - 10,000 $3,296 $32.9550 $2,746 $27.4625 $2,197 $21.9700 - - 20,000 $6,591 $7.3300 $5,493 $6.1083 $4,394 $4.8867 - - 50,000 $8,790 $2.1900 $7,325 $1.8250 $5,860 $1.4600 - - 100,000 $9,885 $9.8850 $8,238 $8.2375 $6,590 $6.5900 I-3 Institutional—6+ persons, restrained 1,000 $1,099 $27.4688 $916 $22.8906 $733 $18.3125 - - 5,000 $2,198 $21.9600 $1,831 $18.3000 $1,465 $14.6400 - - 10,000 $3,296 $32.9550 $2,746 $27.4625 $2,197 $21.9700 - - 20,000 $6,591 $7.3300 $5,493 $6.1083 $4,394 $4.8867 - - 50,000 $8,790 $2.1900 $7,325 $1.8250 $5,860 $1.4600 - - 100,000 $9,885 $9.8850 $8,238 $8.2375 $6,590 $6.5900 New Construction
Inspection Fees
Construction Type Construction Type Construction Type
IA, IB IIA, IIB, IIIA, IIIB, IV VA, VB
IBC
Class IBC Occupancy Type
Project
Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
I-4 Institutional—6+ persons, day care 1,000 $1,099 $27.4688 $916 $22.8906 $733 $18.3125 - - 5,000 $2,198 $21.9600 $1,831 $18.3000 $1,465 $14.6400 - - 10,000 $3,296 $32.9550 $2,746 $27.4625 $2,197 $21.9700 - - 20,000 $6,591 $7.3300 $5,493 $6.1083 $4,394 $4.8867 - - 50,000 $8,790 $2.1900 $7,325 $1.8250 $5,860 $1.4600 - - 100,000 $9,885 $9.8850 $8,238 $8.2375 $6,590 $6.5900 I Commercial Tenant Improvements 150 $419 $69.7613 $349 $58.1344 $279 $46.5075 - - 750 $837 $55.8150 $698 $46.5125 $558 $37.2100
- - 1,500 $1,256 $83.7150 $1,046 $69.7625 $837 $55.8100 - - 3,000 $2,511 $18.5900 $2,093 $15.4917 $1,674 $12.3933 - - 7,500 $3,348 $5.5800 $2,790 $4.6500 $2,232 $3.7200
- - 15,000 $3,767 $25.1100 $3,139 $20.9250 $2,511 $16.7400 L Labs (California ONLY) 2,000 $5,580 $69.7590 $4,650 $58.1325 $3,720 $46.5060 - - 10,000 $11,161 $55.8120 $9,301 $46.5100 $7,441 $37.2080 - - 20,000 $16,742 $83.7120 $13,952 $69.7600 $11,162 $55.8080 - - 40,000 $33,485 $18.5920 $27,904 $15.4933 $22,323 $12.3947 - - 100,000 $44,640 $5.5920 $37,200 $4.6600 $29,760 $3.7280 - - 200,000 $50,232 $25.1160 $41,860 $20.9300 $33,488 $16.7440 M Mercantile—Retail or wholesale store 150 $1,395 $232.5300 $1,163 $193.7750 $930 $155.0200 - - 750 $2,790 $186.0150 $2,325 $155.0125 $1,860 $124.0100 - - 1,500 $4,185 $279.0300 $3,488 $232.5250 $2,790 $186.0200 - - 3,000 $8,371 $62.0050 $6,976 $51.6708 $5,581 $41.3367 - - 7,500 $11,161 $18.6150 $9,301 $15.5125 $7,441 $12.4100 - - 15,000 $12,557 $83.7150 $10,464 $69.7625 $8,372 $55.8100 M Commercial Tenant Improvements 150 $419 $69.7613 $349 $58.1344 $279 $46.5075 - - 750 $837 $55.8150 $698 $46.5125 $558 $37.2100
- - 1,500 $1,256 $83.7150 $1,046 $69.7625 $837 $55.8100 - - 3,000 $2,511 $18.5900 $2,093 $15.4917 $1,674 $12.3933 - - 7,500 $3,348 $5.5800 $2,790 $4.6500 $2,232 $3.7200
- - 15,000 $3,767 $25.1100 $3,139 $20.9250 $2,511 $16.7400 R-1 Residential—Transient 2,000 $13,952 $34.8750 $11,626 $29.0625 $9,301 $23.2500 - Boarding Houses, Hotels, Motels 10,000 $16,742 $41.8650 $13,951 $34.8875 $11,161 $27.9100 - - 20,000 $20,928 $20.9100 $17,440 $17.4250 $13,952 $13.9400 - - 40,000 $25,110 $9.3000 $20,925 $7.7500 $16,740 $6.2000 - - 100,000 $30,690 $11.1600 $25,575 $9.3000 $20,460 $7.4400 - - 200,000 $41,850 $20.9250 $34,875 $17.4375 $27,900 $13.9500 R-2 Residential—Permanent, 2+ Dwellings 1,500 $13,952 $46.5113 $11,626 $38.7594 $9,301 $31.0075 - Apartment, Dormitory, Timeshare 7,500 $16,742 $55.8000 $13,952 $46.5000 $11,162 $37.2000 - - 15,000 $20,927 $27.9150 $17,439 $23.2625 $13,952 $18.6100 - - 30,000 $25,115 $12.3900 $20,929 $10.3250 $16,743 $8.2600 - - 75,000 $30,690 $14.8800 $25,575 $12.4000 $20,460 $9.9200 - - 150,000 $41,850 $27.9000 $34,875 $23.2500 $27,900 $18.6000 R-3 Dwellings—Custom Homes 1,500 $2,093 $41.8650 $1,744 $34.8875 $1,395 $27.9100 - - 2,500 $2,511 $62.7600 $2,093 $52.3000 $1,674 $41.8400 - - 3,500 $3,139 $62.8200 $2,616 $52.3500 $2,093 $41.8800 - - 4,500 $3,767 $41.8388 $3,139 $34.8656 $2,511 $27.8925 - - 6,500 $4,604 $47.8157 $3,837 $39.8464 $3,069 $31.8771 - - 10,000 $6,278 $62.7750 $5,231 $52.3125 $4,185 $41.8500 R-3 Dwellings—Production Phase 1,500 $2,093 $41.8650 $1,744 $34.8875 $1,395 $27.9100 - of Master Plan (repeats) 2,500 $2,511 $62.7600 $2,093 $52.3000 $1,674 $41.8400 - - 3,500 $3,139 $62.8200 $2,616 $52.3500 $2,093 $41.8800 - - 4,500 $3,767 $41.8388 $3,139 $34.8656 $2,511 $27.8925 - - 6,500 $4,604 $47.8157 $3,837 $39.8464 $3,069 $31.8771 - - 10,000 $6,278 $62.7750 $5,231 $52.3125 $4,185 $41.8500 R-4 Residential—Assisted Living (6-16 persons) 1,500 $13,952 $46.5113 $11,626 $38.7594 $9,301 $31.0075 - - 7,500 $16,742 $55.8000 $13,952 $46.5000 $11,162 $37.2000 - - 15,000 $20,927 $27.9150 $17,439 $23.2625 $13,952 $18.6100 - - 30,000 $25,115 $12.3900 $20,929 $10.3250 $16,743 $8.2600 - - 75,000 $30,690 $14.8800 $25,575 $12.4000 $20,460 $9.9200 - - 150,000 $41,850 $27.9000 $34,875 $23.2500 $27,900 $18.6000 R R Occupancy Remodel 150 $1,395 $46.5113 $1,163 $38.7594 $930 $31.0075 - - 750 $1,674 $55.8000 $1,395 $46.5000 $1,116 $37.2000 - - 1,500 $2,093 $27.9150 $1,744 $23.2625 $1,395 $18.6100 - - 3,000 $2,511 $12.3900 $2,093 $10.3250 $1,674 $8.2600 - - 7,500 $3,069 $14.8800 $2,558 $12.4000 $2,046 $9.9200 - - 15,000 $4,185 $27.9000 $3,488 $23.2500 $2,790 $18.6000 S-1 Storage—Moderate Hazard, Repair Garage 500 $1,395 $69.7590 $1,163 $58.1325 $930 $46.5060 New Construction
Inspection Fees
Construction Type Construction Type Construction Type
IA, IB IIA, IIB, IIIA, IIIB, IV VA, VB
IBC
Class IBC Occupancy Type
Project
Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
- Motor Vehicles (not High Hazard) 2,500 $2,790 $55.8120 $2,325 $46.5100 $1,860 $37.2080 - - 5,000 $4,186 $83.7120 $3,488 $69.7600 $2,790 $55.8080 - - 10,000 $8,371 $18.5920 $6,976 $15.4933 $5,581 $12.3947 - - 25,000 $11,160 $5.5920 $9,300 $4.6600 $7,440 $3.7280 - - 50,000 $12,558 $25.1160 $10,465 $20.9300 $8,372 $16.7440 S-2 Storage—Low Hazard, Parking Garages 1,000 $6,697 $167.4120 $5,581 $139.5100 $4,464 $111.6080 - Open or Enclosed 5,000 $13,393 $133.9440 $11,161 $111.6200 $8,929 $89.2960 - - 10,000 $20,090 $200.9040 $16,742 $167.4200 $13,394 $133.9360 - - 20,000 $40,181 $44.6440 $33,484 $37.2033 $26,787 $29.7627 - - 50,000 $53,574 $13.4040 $44,645 $11.1700 $35,716 $8.9360 - - 100,000 $60,276 $60.2760 $50,230 $50.2300 $40,184 $40.1840 S S Commercial Tenant Improvements 500 $419 $69.7613 $349 $58.1344 $279 $46.5075 - - 2,500 $837 $55.8150 $698 $46.5125 $558 $37.2100
- - 5,000 $1,256 $83.7150 $1,046 $69.7625 $837 $55.8100 - - 10,000 $2,511 $18.5900 $2,093 $15.4917 $1,674 $12.3933 - - 25,000 $3,348 $5.5800 $2,790 $4.6500 $2,232 $3.7200 - - 50,000 $3,767 $25.1100 $3,139 $20.9250 $2,511 $16.7400 U Accessory—Private Garage 200 $767 $95.8350 $639 $79.8625 $511 $63.8900 - - 1,000 $1,533 $76.6500 $1,278 $63.8750 $1,022 $51.1000 - - 2,000 $2,300 $114.9900 $1,917 $95.8250 $1,533 $76.6600 - - 4,000 $4,600 $25.5650 $3,833 $21.3042 $3,066 $17.0433 - - 10,000 $6,134 $7.6650 $5,111 $6.3875 $4,089 $5.1100 - - 20,000 $6,900 $34.5000 $5,750 $28.7500 $4,600 $23.0000 R-3 Residential Room Addition 150 $837 $27.9038 $698 $23.2531 $558 $18.6025 - - 750 $1,005 $33.4950 $837 $27.9125 $670 $22.3300
- - 1,500 $1,256 $16.7250 $1,046 $13.9375 $837 $11.1500 - - 3,000 $1,507 $7.4450 $1,256 $6.2042 $1,004 $4.9633
- - 7,500 $1,842 $8.9250 $1,535 $7.4375 $1,228 $5.9500
- - 15,000 $2,511 $16.7400 $2,093 $13.9500 $1,674 $11.1600
SHELL BUILDINGS
- All Shell Buildings 1,000 $837 $20.9220 $698 $17.4350 $558 $13.9480 - - 5,000 $1,674 $16.7520 $1,395 $13.9600 $1,116 $11.1680 - - 10,000 $2,512 $25.1160 $2,093 $20.9300 $1,674 $16.7440 - - 20,000 $5,023 $5.5760 $4,186 $4.6467 $3,349 $3.7173 - - 50,000 $6,696 $1.6800 $5,580 $1.4000 $4,464 $1.1200 - - 100,000 $7,536 $7.5360 $6,280 $6.2800 $5,024 $5.0240 * Each additional 100 square feet, or portion thereof, up to the next highest project size threshold.