City of Orange: Summary of Bid Abstracts for:
1 2
Bid No. 22-23.42; Project No. D-179
Date of Bid Opening: 6/8/2023
Tel. No. (562) 599-5841 Tel. No. (626) 699-2380
NO. DESCRIPTION OF WORK QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1 Furnish and Install Hydrodynamic
Separator (Contech DSBB-10-20-108).

Inclusive of Sawcut, Pavement
Restoration, Aggregate Base, Striping
Restoration, Trench Repair Per City of
Orange Std. 125, 327, Breaking Into and
Removal of Existing Storm Drain, Storm
Drain Pipe Replacement, and Retooling
Upstream and Downstream Joints
1 LS 385,000.00$ $385,000.00 $488,575.00 $488,575.00 $550,099.00 $550,099.00 2 Furnish and Install 42 inch Precast
Reinforced Concrete Pipe with Bedding
Class III per City of Orange Std. 327
70 LF 1,100.00$ $77,000.00 $950.00 $66,500.00 $2,400.00 $168,000.00 3 Construct Junction Structure Type III Per
City Std 315 with Pressure
Manhole Per SPPWC Std No 328-2 and
211-2
1 EA 33,000.00$ $33,000.00 $52,000.00 $52,000.00 $102,238.00 $102,238.00 4 Construct Modified Junction Structure
Type III Per City Std 315 with Pressure
Manhole Per SPPWC Std No 328-2 and
211-2
1 EA 33,000.00$ $33,000.00 $52,000.00 $52,000.00 $105,576.00 $105,576.00 5 Furnish and Install Connector Pipe Screen
Units (Advanced Drainage Systems) with
Protective Bypass Lid at Various
Locations per Plan.
11 EA 2,200.00$ $24,200.00 $2,200.00 $24,200.00 $5,725.00 $62,975.00 $552,200.00 $683,275.00 $988,888.00Grand Total

SEWER LINE REPLACEMENT / MAINTENANCE

ENGINEER'S ESTIMATE
Chapman Avenue, Main Street, and Katella Avenue Water
Quality Storm Drain Improvement Project
PALP., dba Excel Paving
Company
GRBCON Incorporated