City of Orange: Summary of Bid Abstracts for:
1 2 3 4
Bid No. 22-23.33; Project No. W-698
Date of Bid Opening: 6/1/2023
Tel. No. (818) 449-8920 Tel. No. (760) 728-1308 Tel. No. (949) 515-4350 Tel. No. (866) 416-4214 NO. DESCRIPTION OF WORK
QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1 Mobilization, Bonds, Demobilization, Clean-
up, and Record Drawings 1 LS $300,000 $300,000.00 $385,372.00 $385,372.00 $578,435.00 $578,435.00 $706,250.00 $706,250.00 $715,000.00 $715,000.00 2 Perform Video Survey of Existing Well 1 LS $2,000 $2,000.00 $1,430.00 $1,430.00 $2,800.00 $2,800.00 $1,495.00 $1,495.00 $1,500.00 $1,500.00 3 Cleaning of Existing Well (Option Item of
Work) 1 LS $10,000 $10,000.00 $6,600.00 $6,600.00 $9,800.00 $9,800.00 $6,900.00 $6,900.00 $7,100.00 $7,100.00 4 Minor Well Development (Option Item of
Work) 1 LS $35,000 $35,000.00 $52,800.00 $52,800.00 $64,000.00 $64,000.00 $55,200.00 $55,200.00 $56,800.00 $56,800.00 5 Disinfection of Existing Well 1 LS $20,000 $20,000.00 $10,450.00 $10,450.00 $12,500.00 $12,500.00 $10,925.00 $10,925.00 $11,200.00 $11,200.00 6 Furnish and Install Water Flush Deep Well
Turbine Pump, Pump Base,and Electric Motor 1 LS $550,000 $550,000.00 $584,500.00 $584,500.00 $650,000.00 $650,000.00 $589,950.00 $589,950.00 $673,800.00 $673,800.00 7 Furnish and Install Well and Treatment Above
Ground Piping, Valves, Appurtenances, and
Air Gap
1 LS $175,000 $175,000.00 $414,566.00 $414,566.00 $506,000.00 $506,000.00 $849,223.00 $849,223.00 $322,300.00 $322,300.00 8 Furnish and Install Well and Treatment Below
Ground Yard Piping, and Appurtenances 1 LS $200,000 $200,000.00 $477,125.00 $477,125.00 $730,000.00 $730,000.00 $895,340.00 $895,340.00 $1,018,800.00 $1,018,800.00 9 Furnish and Construct Electrical and Chemical
Storage Building 1 LS $550,000 $550,000.00 $460,838.00 $460,838.00 $800,000.00 $800,000.00 $343,631.00 $343,631.00 $548,400.00 $548,400.00 10 Furnish and Install Well Acoustical Sound
Enclosure 1 LS $150,000 $150,000.00 $130,418.00 $130,418.00 $145,000.00 $145,000.00 $136,346.00 $136,346.00 $140,400.00 $140,400.00 11 Furnish and Install Pre-Treatment Filters and
Appurtenances 1 LS $350,000 $350,000.00 $185,540.00 $185,540.00 $108,000.00 $108,000.00 $176,550.00 $176,550.00 $287,300.00 $287,300.00 12 Furnish and Install PFAS IX Vessels Sump 1 LS $750,000 $750,000.00 $534,275.00 $534,275.00 $1,185,000.00 $1,185,000.00 $585,948.00 $585,948.00 $771,500.00 $771,500.00 13 Install Pre-Purchase IX Vessels, Media,
Piping, Valves, and Appurtenances 1 LS $500,000 $500,000.00 $729,611.00 $729,611.00 $52,000.00 $52,000.00 $159,675.00 $159,675.00 $604,600.00 $604,600.00 14 Furnish and Install Disinfection System
Including Chemical Storage Tank, Meter
Pump Skid package, Piping, and
Appurtenances
1 LS $65,000 $65,000.00 $164,305.00 $164,305.00 $155,000.00 $155,000.00 $68,655.00 $68,655.00 $94,100.00 $94,100.00 15 Furnish and Install Connection to Existing 16-
inch Water Line 1 LS $13,000 $13,000.00 $6,012.50 $6,012.50 $40,000.00 $40,000.00 $33,500.00 $33,500.00 $40,600.00 $40,600.00 16 Furnish and Install Connections to Existing 36-
inch RCP Storm Drain 1 LS $20,000 $20,000.00 $13,000.00 $13,000.00 $56,000.00 $56,000.00 $181,125.00 $181,125.00 $26,400.00 $26,400.00 17 Furnish and Install 16-foot (High) Screen Wall
and Architectural Treatment 1 LS $450,000 $450,000.00 $1,107,446.00 $1,107,446.00 $1,200,000.00 $1,200,000.00 $823,513.00 $823,513.00 $1,293,600.00 $1,293,600.00 18 Final Grading and Site Improvements 1 LS $500,000 $500,000.00 $675,455.00 $675,455.00 $495,000.00 $495,000.00 $800,820.00 $800,820.00 $472,500.00 $472,500.00 19 Furnish and Install Electrical and
Instrumentation Equipment and Facilities 1 LS $2,000,000 $2,000,000.00 $1,065,786.00 $1,065,786.00 $980,000.00 $980,000.00 $1,081,732.00 $1,081,732.00 $1,125,000.00 $1,125,000.00 20 Furnish and Install Mini Park Landscape and
Irrigation 1 LS $500,000 $500,000.00 $523,417.00 $523,417.00 $600,000.00 $600,000.00 $734,250.00 $734,250.00 $710,000.00 $710,000.00 21 Traffic Control and Pedstrian Detours 1 LS $10,000 $10,000.00 $24,000.00 $24,000.00 $5,000.00 $5,000.00 $88,750.00 $88,750.00 $34,500.00 $34,500.00 22 Start-up Testing and Training 1 LS $15,000 $15,000.00 $25,000.00 $25,000.00 $40,000.00 $40,000.00 $25,000.00 $25,000.00 $47,300.00 $47,300.00 23 Prepare Operation and Maintenance Manuals 1 LS $10,000 $10,000.00 $1,500.00 $1,500.00 $2,500.00 $2,500.00 $12,500.00 $12,500.00 $2,150.00 $2,150.00 24 Furnish and Install Erosion Control Measures 1 LS $5,000 $5,000.00 $27,500.00 $27,500.00 $16,000.00 $16,000.00 $37,500.00 $37,500.00 $13,100.00 $13,100.00 25 Sheeting, Shoring and Bracing 1 LS $20,000 $20,000.00 $205,215.00 $205,215.00 $10,000.00 $10,000.00 $262,500.00 $262,500.00 $126,300.00 $126,300.00 $7,200,000.00 $7,812,161.50 $8,443,035.00 $8,667,278.00 $9,144,250.00Total
ENGINEER'S ESTIMATE
Well No. 28 Equipping Project
Environmental Construction, Inc.
Woodland Hills, CA
SWC Contracting Corporation
Fall Brook, CA
Caliagua Inc.
Anaheim, CA
Metro Builders & Engineers Group
Newport Beach, CA