Agenda Item
City Council
Item #: 3.4. 7/25/2023 File #: 23-0477
TO: Honorable Mayor and Members of the City Council
THRU: Tom Kisela, City Manager
FROM: Christopher Cash, Public Works Director
1. SUBJECT
Approval of plans and specifications for Annual Slurry Seal at Various Locations, Fiscal Year 2023- 2024; authorization to advertise for bids; and finding of CEQA exemption.
2. SUMMARY
Plans and specifications have been completed and the Annual Slurry Seal at Various Locations, Fiscal Year 2023-2024 is ready to be advertised for bids. The total estimated construction cost including 15% for contingencies and construction engineering is $590,000.
3. RECOMMENDED ACTION
Approve plans and specifications and authorize advertising for Bid No. 23-24.03; SP-4259.
4. FISCAL IMPACT
The total expenditure for this contract is $590,000 and will be funded in Pavement Management Program (13120) through Road Maintenance Rehabilitation Account (274).
5. STRATEGIC PLAN GOALS
Goal 1: Provide for a safe community
b: Provide and maintain infrastructure necessary to ensure the safety of the public.
Goal 4: Provide outstanding public service
b: Provide facilities and services to meet customer expectations.
6. DISCUSSION AND BACKGROUND
The Annual Slurry Seal Project at Various Locations Fiscal Year 2023-2024 (FY 24) is part of the City’sFY 24 Annual Street Maintenance activities and is designed to prolong pavement life of city streets. Rehabilitation methods vary depending on the sustained damage, but in general, consist of slurry seal with localized areas of pavement reconstruction as needed. The rehabilitated pavement will have a longer service life and will provide a safe and smooth ride for the public.
The streets selected for maintenance in accordance with the City’sPavement Management Plan, generally fall into the “fair”category and require work at this time to prevent pavement deterioration and higher cost for asphalt concrete overlay in the future.
The total cost for street slurry seal is estimated at $590,000, including 15% for construction engineering and contingency. Upon receipt of public bids, staff will return to the City Council and City of Orange Printed on 7/20/2023Page 1 of 2
powered by Legistar™
Item #: 3.4. 7/25/2023 File #: 23-0477
engineering and contingency. Upon receipt of public bids, staff will return to the City Council and recommend any funding adjustments and award of contracts based on the outcome of the public bid.
If the unit price for slurry seal is determined to be below the estimate, additional streets may be added for rehabilitation.
Construction is scheduled to begin in October 2023 and is expected to be completed by December 2023. Specifications and cost estimates are available for review in the Public Works Department.
7. ENVIRONMENTAL REVIEW
The proposed project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under CEQA guidelines Section 15301 “ExistingFacilities”Class 1 (c) because it is a maintenance activity that does not involve the creation of additional traffic lanes. The CEQA Notice of Exemption will be filed with the County Recorder’sOffice upon Council’sapproval of the plans and specifications.
8. ATTACHMENTS
· Location Maps
City of Orange Printed on 7/20/2023Page 2 of 2