Cities Index.
Prepay HGAC FS12-19

Orange City Council
August 22, 2023

Document
Prepay HGAC FS12-19
Meeting
August 22, 2023
Body
Orange City Council
Original file
26 KB
Text extracted from the city's file for reading and search. Open the original on cityoforange.legistar1.com. That file is the official record.

Contract
No.: FS12-19 Date
Prepared: 06/27/23
Buying
Agency: Contractor:

Contact
Person:

Prepared
By:

Phone: Phone:

Fax: Fax:

Email: Email:

Product
Code: FS19VC07 Description:
$683,552.00
Cost Cost
$335,450.00
Subtotal B: $335,450.00
Cost Cost
$174,937.00
Subtotal C: $174,937.00
$0.17
1 1193939 = Subtotal D: $1,193,939.00
Subtotal E: $2,000.00
Cost Cost
$87,117.24 $10.50
$2,686.36 -$69,846.00
Subtotal F: $19,968.10
$1,215,907.10G. Total Purchase Price (D+E+F):Delivery Date: 40-43 months Subtotal From Additional Sheet(s):

Quantity Ordered:

For this transaction the percentage is:Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit Price plus Published Options (A+B).

Description Description
Prepayment discount
Tire feeSales tax
performance bond

CONTRACT PRICING WORKSHEET
For MOTOR VEHICLES Only
Pierce Enforcer, 4-Door, Full-Tilt, Aluminum Cab, Aluminum Body, Single Axle, 1250 GPM Pump, Mid-Mounted Pumper A. Product Item Base Unit Price Per Contractor's H-GAC Contract:

This Worksheet is prepared by Contractor and given to End User. If a PO is issued, both documents MUST be faxed to H-GAC @ 713-993-4548. Therefore please type or print legibly.

City of Orange
Mike Watum
714-418-6024
[email protected]
South Coast Fire Equipment/Pierce Manufacturing
Kevin Newell
9096739900
B. Published Options - Itemize below - Attach additional sheet(s) if necessary - Include Option Code in description if applicable. (Note: Published Options are options which were submitted and priced in Contractor's bid.) [email protected]
E. H-GAC Order Processing Charge (Amount Per Current Policy) D. Total Cost Before Any Applicable Trade-In / Other Allowances / Discounts (A+B+C) F. Trade-Ins / Other Allowances / Special Discounts / Freight / Installation X Subtotal of A + B + C:

Description

SEE ATTACHED OPTIONS TAB
Description
Subtotal From Additional Sheet(s):

See attached options tab
Description Description
C. Unpublished Options - Itemize below / attach additional sheet(s) if necessary. (Note: Unpublished options are items which were not submitted and priced in Contractor's bid.)

← All documents from this meeting