City of Orange: Summary of Bid Abstracts for:
1 2
Bid No. 23-24.04; Project No. SP-4220
Date of Bid Opening: 8/24/23
Tel. No. (562) 802-7227 Tel. No. (714) 532-6699
NO. DESCRIPTION OF WORK QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1 2" Cold Plane Existing AC Pavement 9,400 SY 3.50 $ $32,900.00 $2.90 $27,260.00 $3.00 $28,200.00 2 Remove Asphalt Concrete/Subgrade (4"
Unclassified Excavation)
30 CY 170.00$ $5,100.00 $260.00 $7,800.00 $200.00 $6,000.00 3 Asphalt Concrete Pavement - Base Course60 TON 190.00$ $11,400.00 $235.00 $14,100.00 $272.00 $16,320.00 4 Asphalt Rubberized Hot Mix (ARHM) -
Surface Course (1/2" Class ARHM-GG-C)
1,100 TON 160.00$ $176,000.00 $155.50 $171,050.00 $142.00 $156,200.00 5 Adjust/Remove & Replace Water Valves Box
per OWD Standard No. 101
10 EA 1,300.00$ $13,000.00 $1,500.00 $15,000.00 $1,300.00 $13,000.00 6 Adjust Manhole Frame & Cover to Grade per
City Std. No. 408
11 EA 1,300.00$ $14,300.00 $1,300.00 $14,300.00 $1,300.00 $14,300.00 7 Inventory and Install Traffic Signing and
Striping, Legends, RPM's (Thermoplastic) per
MUTCD
1 LS 3,000.00$ $3,000.00 $3,000.00 $3,000.00 $2,630.00 $2,630.00 8 Traffic Control & Construction Phasing 1 LS 30,000.00$ $30,000.00 $36,500.00 $36,500.00 $123,000.00 $123,000.00 9 Sawcut & Remove Existing and Construct
Concrete Curb and Gutter, Type A per City
Std. Plan 117 (8" or Variable Curb Face)
2,300 LF 100.00$ $230,000.00 $88.00 $202,400.00 $76.00 $174,800.00 10 Horizontally Saw-Cut Curb, or Remove
Existing Curb and Sidewalk Access Ramp,
and Construct New Ramp Per City Std.
Plan No. 121 With Detectable Warning
Surface (Truncated Dome 4' X 3')
18 EA 7,500.00$ $135,000.00 $8,000.00 $144,000.00 $6,900.00 $124,200.00 11 Remove Existing and Construct Concrete
Cross Gutter and Spandrel per City Std. Plan
119
1,250 SF 38.00 $ $47,500.00 $30.00 $37,500.00 $31.00 $38,750.00 12 Remove And Construct Concrete Driveway
Per City Std. Plan No. 116a 1,400 SF 32.00 $ $44,800.00 $19.50 $27,300.00 $24.00 $33,600.00 13 Remove Existing and Construct Concrete
Sidewalk per City Std. Plan 118 & 120 400 SF 22.00$ $8,800.00 $16.00 $6,400.00 $15.00 $6,000.00 $751,800.00 $706,610.00 $737,000.00Grand Total
ENGINEER'S ESTIMATE
Lomita Neighborhood Street Improvement Project
Sequel Contractors, Inc.
Santa Fe Springs, CA
Onyx Paving Company, Inc.
Anaheim, CA
City of Orange: Summary of Bid Abstracts for:
Bid No. 23-24.04; Project No. SP-4220
Date of Bid Opening: 8/24/23
NO. DESCRIPTION OF WORK QUANTITY
1 2" Cold Plane Existing AC Pavement 9,400 SY
2 Remove Asphalt Concrete/Subgrade (4"
Unclassified Excavation)
30 CY
3 Asphalt Concrete Pavement - Base Course60 TON 4 Asphalt Rubberized Hot Mix (ARHM) -
Surface Course (1/2" Class ARHM-GG-C)
1,100 TON
5 Adjust/Remove & Replace Water Valves Box
per OWD Standard No. 101
10 EA
6 Adjust Manhole Frame & Cover to Grade per
City Std. No. 408
11 EA
7 Inventory and Install Traffic Signing and
Striping, Legends, RPM's (Thermoplastic) per
MUTCD
1 LS
8 Traffic Control & Construction Phasing 1 LS 9 Sawcut & Remove Existing and Construct
Concrete Curb and Gutter, Type A per City
Std. Plan 117 (8" or Variable Curb Face)
2,300 LF
10 Horizontally Saw-Cut Curb, or Remove
Existing Curb and Sidewalk Access Ramp,
and Construct New Ramp Per City Std.
Plan No. 121 With Detectable Warning
Surface (Truncated Dome 4' X 3')
18 EA
11 Remove Existing and Construct Concrete
Cross Gutter and Spandrel per City Std. Plan
119
1,250 SF
12 Remove And Construct Concrete Driveway
Per City Std. Plan No. 116a 1,400 SF
13 Remove Existing and Construct Concrete
Sidewalk per City Std. Plan 118 & 120 400 SF Grand Total
Lomita Neighborhood Street Improvement Project 3 4
Tel. No. (714) 444-1851 Tel. No. (951) 934-3231
UNIT PRICE AMOUNT UNIT PRICE AMOUNT
$2.77 $26,038.00 $5.00 $47,000.00
$382.00 $11,460.00 $95.00 $2,850.00
$276.00 $16,560.00 $240.00 $14,400.00
$131.00 $144,100.00 $160.00 $176,000.00
$1,220.00 $12,200.00 $1,100.00 $11,000.00
$1,030.00 $11,330.00 $1,300.00 $14,300.00
$2,060.00 $2,060.00 $8,000.00 $8,000.00
$107,292.00 $107,292.00 $30,000.00 $30,000.00
$105.00 $241,500.00 $65.00 $149,500.00
$9,320.00 $167,760.00 $14,500.00 $261,000.00
$34.00 $42,500.00 $40.00 $50,000.00
$26.00 $36,400.00 $38.00 $53,200.00
$17.00 $6,800.00 $25.00 $10,000.00
$826,000.00 $827,250.00
Hardy & Harper, Inc.
Lake Forest, CA
LCR Earthwork & Engineering, Corp.
Jurupa Valley, CA
City of Orange: Summary of Bid Abstracts for:
Bid No. 23-24.04; Project No. SP-4220
Date of Bid Opening: 8/24/23
NO. DESCRIPTION OF WORK QUANTITY
1 2" Cold Plane Existing AC Pavement 9,400 SY
2 Remove Asphalt Concrete/Subgrade (4"
Unclassified Excavation)
30 CY
3 Asphalt Concrete Pavement - Base Course60 TON 4 Asphalt Rubberized Hot Mix (ARHM) -
Surface Course (1/2" Class ARHM-GG-C)
1,100 TON
5 Adjust/Remove & Replace Water Valves Box
per OWD Standard No. 101
10 EA
6 Adjust Manhole Frame & Cover to Grade per
City Std. No. 408
11 EA
7 Inventory and Install Traffic Signing and
Striping, Legends, RPM's (Thermoplastic) per
MUTCD
1 LS
8 Traffic Control & Construction Phasing 1 LS 9 Sawcut & Remove Existing and Construct
Concrete Curb and Gutter, Type A per City
Std. Plan 117 (8" or Variable Curb Face)
2,300 LF
10 Horizontally Saw-Cut Curb, or Remove
Existing Curb and Sidewalk Access Ramp,
and Construct New Ramp Per City Std.
Plan No. 121 With Detectable Warning
Surface (Truncated Dome 4' X 3')
18 EA
11 Remove Existing and Construct Concrete
Cross Gutter and Spandrel per City Std. Plan
119
1,250 SF
12 Remove And Construct Concrete Driveway
Per City Std. Plan No. 116a 1,400 SF
13 Remove Existing and Construct Concrete
Sidewalk per City Std. Plan 118 & 120 400 SF Grand Total
Lomita Neighborhood Street Improvement Project 5 6 7
Tel. No. (714) 637-1550 Tel. No. (714) 522-7754 Tel. No. (951) 736-7600
UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT
$3.36 $31,584.00 $5.30 $49,820.00 $2.92 $27,448.00
$622.00 $18,660.00 $375.00 $11,250.00 $415.00 $12,450.00 $283.00 $16,980.00 $245.00 $14,700.00 $215.00 $12,900.00 $135.85 $149,435.00 $233.00 $256,300.00 $138.00 $151,800.00 $1,300.00 $13,000.00 $1,200.00 $12,000.00 $1,400.00 $14,000.00 $1,225.00 $13,475.00 $1,200.00 $13,200.00 $1,700.00 $18,700.00 $2,140.00 $2,140.00 $4,200.00 $4,200.00 $2,750.00 $2,750.00 $101,000.00 $101,000.00 $58,250.00 $58,250.00 $234,274.00 $234,274.00 $105.00 $241,500.00 $94.00 $216,200.00 $85.00 $195,500.00 $10,880.00 $195,840.00 $8,200.00 $147,600.00 $10,000.00 $180,000.00 $28.00 $35,000.00 $35.00 $43,750.00 $28.00 $35,000.00
$21.50 $30,100.00 $28.00 $39,200.00 $14.00 $19,600.00
$13.20 $5,280.00 $22.00 $8,800.00 $17.00 $6,800.00
$853,994.00 $875,270.00 $911,222.00
COPP Contracting, Inc.
Buena Park, CA
R.J. Noble Company
Orange, CA
All American Asphalt
Corona, CA