Traffic Study Reimbursement Agreement with Chapman University.
2. SUMMARY
On behalf of Chapman University, the City will administer a focused traffic study to determine the feasibility of a traffic signal on Walnut Avenue at Orange Street. The study will be performed by one of the City’son-call traffic engineering consultants, and the cost will be reimbursed by Chapman University through this Agreement.
3. RECOMMENDED ACTION
Approve the Traffic Study Reimbursement Agreement with Chapman University in the amount of $9,965; and authorize the Mayor and City Clerk to execute on behalf of the City.
4. FISCAL IMPACT
None.
5. STRATEGIC PLAN GOALS
Goal 1. Provide for a Safe Community
b. Provide and maintain infrastructure necessary to ensure the safety of the public.
6. DISCUSSION AND BACKGROUND
The intersection of Walnut Avenue and Orange Street (Walnut/Orange) provides direct access to Chapman University’s Anderson Parking Structure. Because of the structure’s capacity, central location relative to key campus facilities, and benefits of improving accessibility, Chapman has indicated a desire to fund a new city-owned traffic signal at this intersection.
However, while a traffic signal at Walnut/Orange may be beneficial to Chapman and justified by engineering standards, the intersection’s extreme proximity to an existing traffic signal (at Walnut/Glassell) warrants a focused traffic study be conducted before any decisions are made.
Specifically, the study would identify the operational feasibility of having two closely spaced and highly constrained intersections working in concert together; and determine whether the benefits of signalizing Walnut/Orange outweigh any potential drawbacks to surrounding streets.
AGA Engineers, currently under contract with the City, has agreed to perform said traffic study at a cost of $9,965. The City would administer the study, with Chapman University providing City of Orange Printed on 12/7/2023Page 1 of 2
powered by Legistar™
Item #: 3.4. 12/12/2023 File #: 23-0814
cost of $9,965. The City would administer the study, with Chapman University providing reimbursement under the terms of the attached Agreement.
7. ATTACHMENTS