FINAL DESIGN PROJECT REQUIREMENTS (Y/N)

LEGEND OF CONDUIT SYMBOLS EDISON EASEMENT REQUIRED
¡ APPROVED FOR CONSTRUCTION (CONVENTIONAL U. G.)|
PWRD 88 REQUIRED

UG CIVIL ONLY WORK ORDER

PERMIT REQUIRED
NO. CONDUIT REO'D.- - CI7E OF CONDUIT

PERMIT T
RUN No. - • LENGTH OF CONDUIT RUN

CUTAGE REQUIRED

HROUGH MN-C G
T.L.M. DATA: 5771333 TRENCH OUTAGE DATE: TIME:

M-018
SIZE KVA CUST % LOAD TRAFFIC CONTROL REQUIRED
| EXIST. - RUN NO. — |ENCTH OF TRENCHI
800 PANEL PED. TRAFFIC CONTROL REQ'D
PROP. 150 136 3 90%
122/208 270NS CONVEYANCE LETTER REQ'D
PENSI 350 - 1° CUCT VOLTAGE DROP: 0.18
FLICKER FACTOR: N/A NO. CONDUIT REO'D. - ENVIRONMENTAL REQUIREMENTS

DOCUMENT (ERD) REQUIRED
- LENGTH CF CONDUIT RUN
PRI. CIRCUIT: THELMA 12KV
027: REV. 12/10/21
STREET LIGHT CIRCUIT MAP CHANGE REQ'D (TD 203)

EASEMENT REQUIRED
10722919 KENCH
S ORANGE CI: P5771333 SLAB BOX DIG ALERT APP

TYPE OF FACUITY -
8'X10' CONCRETE RUN NO.- • TENGA RE ACITONAL
1 - S SB 8' X 10 CONC CONFIRMED
CF: - SS TAX EXCV CST FOR BD/PAD/PB/PME/SB/SOE EDISON UTLIQUEST NOTIFIED 1 - CNN HYUCS PM 3-350 1-4/0 12/16KV 30
NO. CONDUIT REQ'D. - +_ SIZE OF CONDUIT
1 - CNN BOLTS PM 4/0 AND UP 12/16KV 3P STANDARD ADHERENCS: 10/2024 Y REFERENCE RUN NO.
1 - TR PM F DE 150KVA 12KV 120/208Y 3P+ -POR CONSTRUCTIO IN GRATUTON 0124: Rev. 05/21/23
2488 TO P133 8' - CBL 3-350 1-4/0 AL 4-1/C 600V IN DUCT STREET LIGHT • 25 3-170 301 12 LEGEND CODE DEFINITIONS
10' - CB| 3-350 1-4/0 Al 4-1/C 600V IN DUCT * SIZE OF CONDUIT 4588 7-13305 08 NO. CONDUIT REG'D. -
1333 TO V2488 - 10 LE 3 - MTR XRANGE CT BAR TO 600/5 120/208 3P 4W REFERENCE RUN NO.—

FOLLOWED BY A ALOND Y AVE SABOY
DENOTES THE FOLLOWING:

HOT- TIE IN REOLIRED
TD2229191 DE CONDUIT WITHOUT ENCASEMENT IS

EASEMENT REQUIRED
EX: V5072488 VAULT
8'x22'x9'
• 1 1 RE 1 0 2004
M - NEMO INSTALL: SAKE AS I-INSTALL
MR - MEMO REMOVE: MATERIALS RENOVED BY EN SON
RU - MENO RENOV: MATERIAS REVOLEN RY FICAN
IN: 25 - CBL 1/0 AL 3-1/C 17KV CLP PJ 018: Rev. 5/08/2006 S - SUPERARY CONSTRUCT QUENSED NO INSTALED BY ERISON FOR 15' - CBL 1/0 AL 3-1/C 17KV CLP PJ
* - SHOY ERIGIE MATERNAS RENOVED Y ESON FOR TANCRURY
TR - TRANSTER ENSON LABCR REQURED TO TRASTER ASTING FACUMES.

D31: Rev. 11/8S

VICINITY MAP

CITY OF ORANGE

E CHAPMAN AVE

CONNECTING TO EXISTING SCE STRUCTURES
ina may e

TIE-IN MADE THROUGH SIDE WALL OF STRUCTURE
CALIFORNIA point o bring themer lait prete ip o ti unture bei "SANTA ANA PAN 20-00-2575 PLANE 025-00-2575 DIEZ DAVO SEDISON MSR NO. TASSOC DESGN
ANE: 1671369_001.0NC SAVE OATE:2/77/2024 10:24 AN SAVED BY:OAZ04 -LINE EXTENSION

CREW NOTES THELMA TER ASSOC DESCN
17954 CODE ASSOC DESGN
-CREW TO INSTALL NEW 15CKVA 120/208 3P TRANSFORMER ON UNDERGROUND SERVICE ALER VENTORY MAP 049-0158-9 JAP.A NO PROPOSED CONSTRUCTION (LOCATON) 8' X 10° SLAB. Contact USA
Mil 11 r 90011
NO RUMO EN 1/0 ARMAR TO FRANSORNARS WITH & WAY BAR NEW 1/0 PRIMARY www.digalert.org/contact 208 E CHAPMAN AVE

TO TRANSFORMER
TORANCE CA 02AAA
•CREW TO RUN NEW 350 SERVICE TO CUSTOMER 800A SWITCH for linderaround Inontine Two Working Days Before You Dig F 02/16/24 | D.M./SH. DIAZ D. DIAZ D.

D08. 11/13/18 DATE ApPROVED BY CHECKED BY CRAN BY PAX SHEET 16 Rev 05/28/9
Southern California Edison Company DESC 1671389 0.01