Cities Index.
Agreement with AGA Engineers, Inc.

Orange City Council
June 10, 2025

Document
Agreement with AGA Engineers, Inc.
Meeting
June 10, 2025
Body
Orange City Council
Pages
10
Original file
25.4 MB
Text extracted from the city's file for reading and search. Open the original on cityoforange.legistar1.com. That file is the official record.

PROFESSIONAL SERVICES AGREEMENT
[On-Call Signal Timing and Traffic Engineering Services] THIS PROFESSIONAL SERVICES AGREEMENT (the "Agreement") is made at Orange, California, on this day of → 2025 (the "Effective Date") by and between the CITY OF ORANGE, a municipal corporation ("City"), and AGA ENGINEERS, INC., a California corporation ("Contractor"), who agree as follows:

1. Services. Subject to the terms and conditions set forth in this Agreement, Contractor shall provide to the reasonable satisfaction of City the services set forth in Exhibit "A," which is attached hereto and incorporated herein by reference. As a material inducement to City to enter into this Agreement, Contractor represents and warrants that it has thoroughly investigated and considered the scope of services and fully understands the difficulties and restrictions in performing the work. The services which are the subject of this Agreement are not in the usual course of City's business and City relies on Contractor's representation that it is independently engaged in the business of providing such services and is experienced in performing the work.

Contractor shall perform all services in a manner reasonably satisfactory to City and in a manner in conformance with the standards of quality normally observed by an entity providing such services to a municipal agency. All services provided shall conform to all federal, state and local laws, rules and regulations and to the best professional standards and practices. The terms and conditions set forth in this Agreement shall control over any terms and conditions in Exhibit "A" to the contrary.

Larry Tay, City Traffic Engineer ("City's Project Manager"), shall be the person to whom Contractor will report for the performance of services hereunder. It is understood that Contractor's performance hereunder shall be under the supervision of City's Project Manager (or his/her designee), that Contractor shall coordinate its services hereunder with City's Project Manager to the extent required by City's Project Manager, and that all performances required hereunder by Contractor shall be performed to the satisfaction of City's Project Manager and the City Manager.

Compensation and Fees.
a. Contractor's total compensation for all services performed under this Agreement, shall not exceed SIXTY THOUSAND DOLLARS and 00/100 ($60,000.00) without the prior written authorization of City.
b. The above compensation shall include all costs, including, but not limited to, all clerical, administrative, overhead, insurance, reproduction, telephone, travel, auto rental, subsistence and all related expenses.

Payment.
a. As scheduled services are completed, Contractor shall submit to City an invoice for the services completed, authorized expenses and authorized extra work actually performed or incurred.
b. All such invoices shall state the basis for the amount invoiced, including services completed, the number of hours spent and any extra work performed C. City will pay Contractor the amount invoiced within thirty (30) days of receipt of all deliverables.

Payment shall constitute payment in full for all services, authorized costs and authorized extra work covered by that invoice.

Change Orders. No payment for extra services caused by a change in the scope or complexity of work, or for any other reason, shall be made unless and until such extra services of work, extension of time, and/or adjustment of the compensation to be paid by City to Contractor and shall be signed by the City's Project Manager, City Manager or City Council, as applicable.

Licenses. Contractor represents that it and any subcontractors it may engage, possess any and all licenses which are required under state or federal law to perform the work contemplated by this Agreement and that Contractor and its subcontractors shall maintain all appropriate licenses, including a City of Orange business license, at its cost, during the performance of this Agreement.

6. Independent Contractor. At all times during the term of this Agreement, Contractor shall be an independent contractor and not an employee of City. City shall have the right to control Contractor only insofar as the result of Contractor's services rendered pursuant to this Agreement. City shall not have the right to control the means by which Contractor accomplishes services rendered pursuant to this Agreement. Contractor shall, at its sole cost and expense, furnish all facilities, materials and equipment which may be required for furnishing services pursuant to this Agreement. Contractor shall be solely responsible for, and shall indemnity, defend and save City harmless from all matters relating to the payment of its subcontractors, agents and employees, including compliance with social security withholding and all other wages, salaries, benefits, taxes, exactions, and regulations of any nature whatsoever.

Contractor acknowledges that it and any subcontractors, agents or employees employed by Contractor shall not, under any circumstances, be considered employees of City, and that they shall not be entitled to any of the benefits or rights afforded employees of City, including, but not limited to, sick leave, vacation leave, holiday pay, Public Employees Retirement System benefits, or health, life, dental, long-term disability or workers' compensation insurance benefits.

7. Contractor Not Agent. Except as City may specify in writing, Contractor shall have no authority, express or implied, to act on behalf of City in any capacity whatsoever as an agent. Contractor shall have no authority, express or implied, to bind City to any obligation whatsoever.

Designated Persons. Only those qualified persons authorized by City's Project Manager, or as designated in Exhibit "A," shall perform work provided for under this Agreement. 2 It is understood by the parties that clerical and other nonprofessional work may be performed by persons other than those designated.

9. Assignment or Subcontracting. No assignment or subcontracting by Contractor of any part of this Agreement or of funds to be received under this Agreement shall be of any force or effect unless the assignment has the prior written approval of City. City may terminate this Agreement rather than accept any proposed assignment or subcontracting. Such assignment or subcontracting may be approved by the City Manager or his/her designee.

Time of Completion. Except as otherwise specified in Exhibit "A," Contractor shall commence the work provided for in this Agreement within five (5) days of the Effective Date of this Agreement and diligently prosecute completion of the work in accordance with the time period set forth in Exhibit "A" hereto or as otherwise agreed to by and between the representatives of the parties.

11. Time Is of the Essence. Time is of the essence in this Agreement. Contractor shall do all things necessary and incidental to the prosecution of Contractor's work.

12. Reserved.

13. Delays and Extensions of Time. Contractor's sole remedy for delays outside its control, other than those delays caused by City, shall be an extension of time. No matter what the cause of the delay, Contractor must document any delay and request an extension of time in writing at the time of the delay to the satisfaction of City. Any extensions granted shall be limited to the length of the delay outside Contractor's control. If Contractor believes that delays caused by City will cause it to incur additional costs, it must specify, in writing, why the delay has caused additional costs to be incurred and the exact amount of such cost at the time the delay occurs. No additional costs can be paid that exceed the not to exceed amount stated in Section 2.a, above, absent a written amendment to this Agreement.

Products of Contractor. The documents, studies, evaluations, assessments, reports, plans, citations, materials, manuals, technical data, logs, files, designs and other products produced or provided by Contractor for this Agreement shall become the property of City upon receipt. Contractor shall deliver all such products to City prior to payment for same. City may use, reuse or otherwise utilize such products without restriction.

15. Equal Employment Opportunity. During the performance of this Agreement, Contractor agrees as follows:
a. Contractor shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, national origin, mental or physical disability, or any other basis prohibited by applicable law. Contractor shall ensure that applicants are employed, and that employees are treated during employment, without regard to their race, color, religion, sex, national origin, mental or physical disability, or any other basis prohibited by applicable law.

Such actions shall include, but not be limited to the following: employment, upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination, rates of pay or other forms 3 of compensation and selection for training, including apprenticeship. Contractor agrees to post in conspicuous places, available to employees and applicants for employment, a notice setting forth provisions of this non-discrimination clause.

Contractor shall, in all solicitations and advertisements for employees placed by, or on behalf of Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, mental or physical disability, or any other basis prohibited by applicable law.

Contractor shall cause the foregoing paragraphs (a) and (b) to be inserted in all subcontracts for any work covered by this Agreement, provided that the foregoing provisions shall not apply to subcontracts for standard commercial supplies or raw materials.

16. Conflicts of Interest. Contractor agrees that it shall not make, participate in the making, or in any way attempt to use its position as a consultant to influence any decision of City in which Contractor knows or has reason to know that Contractor, its officers, partners, or employees have a financial interest as defined in Section 87103 of the Government Code.

Contractor further agrees that it shall not be eligible to work as the design/build firm for the project that is the subject of this Agreement.

17. Indemnity.
a. To the fullest extent permitted by law, Contractor agrees to indemnify, defend and hold City, its City Council and each member thereof, and the officers, officials, agents and employees of City (collectively the "Indemnitees") entirely harmless from all liability arising out of:
(1) Any and all claims under workers' compensation acts and other employee benefit acts with respect to Contractor's employees or Contractor's subcontractor's employees arising out of Contractor's work under this Agreement, including any and all claims under any law pertaining to Contractor or its employees' status as an independent contractor and any and all claims under Labor Code section 1720 related to the payment of prevailing wages for public works projects; and
(2) Any claim, loss, injury to or death of persons or damage to property caused by any act, neglect, default, or omission of Contractor, or person, firm or corporation employed by Contractor, either directly or by independent contract, including all damages due to loss or theft sustained by any person, firm or corporation including the Indemnitees, or any of them, arising out of, or in any way connected with the work or services which are the subject of this Agreement, including injury or damage either on or off City's property; but not for any loss, injury, death or damage caused by the active negligence or willful misconduct of City. Contractor, covered by this subparagraph, and shall pay or satisfy any judgment that may be rendered against the Indemnitees, or any of them, in any action, suit or other proceedings as a result of coverage under this subparagraph.
4 b. To the fullest extent permitted by law, and as limited by California Civil arding 0328 any tractor los, is to indoor dead pold ind ornaces ha to les fry to the city caused by its negligent professional act or omission in the performance of professional services pursuant to this Agreement.

Except for the Indemnitees, the indemnifications provided in this Agreement shall not be construed to extend any third party indemnification rights of any kind to any person or entity which is not a signatory to this Agreement. d. The indemnities set forth in this section shall survive any closing, rescission, or termination of this Agreement, and shall continue to be binding and in full force and effect in perpetuity with respect to Contractor and its successors.

18. Insurance.

Contractor shall carry workers' compensation insurance as required by law for the protection of its employees during the progress of the work. Contractor understands that it is an independent contractor and not entitled to any workers' compensation benefits under any City program.
b. Contractor shall maintain during the life of this Agreement the following minimum amount of comprehensive general liability insurance or commercial general liability insurance: the greater of (1) Two Million Dollars ($2,000,000) per occurrence; or (2) all the insurance coverage and/or limits carried by or available to Contractor. Said insurance shall cover bodily injury, death and property damage and be written on an occurrence basis.

C. Contractor shall maintain during the life of this Agreement, the following minimum amount of automotive liability insurance: the greater of (1) a combined single limit of Two| Million Dollars ($2,000,000); or (2) all the insurance coverage and/or limits carried by or available to Contractor. Said insurance shall cover bodily injury, death and property damage for all owned, non-owned and hired vehicles and be written on an occurrence basis. d. Any insurance proceeds in excess of or broader than the minimum required coverage and/or minimum required limits which are applicable to a given loss shall be available to City. No representation is made that the minimum insurance requirements of this Agreement are sufficient to cover the obligations of Contractor under this Agreement.

Each policy of general liability and automotive liability shall provide that City, its officers, officials, agents, and employees are declared to be additional insureds under the terms of the policy, but only with respect to the work performed by Contractor under this Agreement. A policy endorsement to that effect shall be provided to City along with the certificate of insurance. In lieu of an endorsement, City will accept a copy of the policy(ies) which evidences that City is an additional insured as a contracting party. The minimum coverage required by Subsection 18.b and c, above, shall apply to City as an additional insured. Any umbrella liability insurance that is provided as part of the general or automobile liability minimums set forth herein shall be maintained for the duration of the Agreement.
f. Contractor shall maintain during the life of this Agreement professional liability insurance covering errors and omissions arising out of the performance of this Agreement with a minimum limit of Two Million Dollars ($2,000,000) per claim. Contractor agrees to keep such policy in force and effect for at least five (5) years from the date of completion of this Agreement.

The insurance policies maintained by Contractor shall be primary insurance nd no insurance held or owned by City shall be called upon to cover any loss under the polic "'ontractor will determine its own needs in procurement of insurance to cover liabilities other tha as stated above.
h. Before Contractor performs any work or prepares or delivers any materials, Contractor shall furnish certificates of insurance and endorsements, as required by City, evidencing the aforementioned minimum insurance coverages on forms acceptable to City, which shall provide that the insurance in force will not be canceled or allowed to lapse without at least ten (10) days' prior written notice to City.

Except for professional liability insurance coverage that may be required by this Agreement, all insurance maintained by Contractor shall be issued by companies admitted to conduct the pertinent line of insurance business in California and having a rating of Grade A or better and Class VII or better by the latest edition of Best Key Rating Guide. In the case of professional liability insurance coverage, such coverage shall be issued by companies either licensed or admitted to conduct business in California so long as such insurer possesses the aforementioned Best rating.

Contractor shall immediately notify City if any required insurance lapses or is otherwise modified and cease performance of this Agreement unless otherwise directed by City.

In such a case, City may procure insurance or self-insure the risk and charge Contractor for such costs and any and all damages resulting therefrom, by way of set-off from any sums owed Contractor.

Contractor agrees that in the event of loss due to any of the perils for which it has agreed to provide insurance, Contractor shall look solely to its insurance for recovery.

Contractor hereby grants to City, on behalf of any insurer providing insurance to either Contractor or City with respect to the services of Contractor herein, a waiver of any right to subrogation which any such insurer may acquire against City by virtue of the payment of any loss under such insurance.

1. Contractor shall include all subcontractors, if any, as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor to City for review and approval. All coverages for subcontractors shall be subject to all of the requirements stated herein.
6 19. Termination. City may for any reason terminate this Agreement by giving Contractor not less than five (5) days' written notice of intent to terminate. Upon receipt of such notice, Contractor shall immediately cease work, unless the notice from City provides otherwise.

Upon the termination of this Agreement, City shall pay Contractor for services satisfactorily provided and all allowable reimbursements incurred to the date of termination in compliance with this Agreement, unless termination by City shall be for cause, in which event City may withhold any disputed compensation. City shall not be liable for any claim of lost profits.

20. Maintenance and Inspection of Records. In accordance with generally accepted accounting principles, Contractor and its subcontractors shall maintain reasonably full and complete books, documents, papers, accounting records, and other information (collectively, the "records") pertaining to the costs of and completion of services performed under this Agreement.

City and its authorized representatives shall have access to and the right to audit and reproduce any of Contractor's records regarding the services provided under this Agreement. Contractor shall maintain all such records for a period of at least three (3) years after termination or completion of this Agreement. Contractor agrees to make available all such records for inspection or audit at its offices during normal business hours and upon three (3) days' notice from City, and copies thereof shall be furnished if requested.

21. Compliance with all Laws/Immigration Laws
Contractor shall be knowledgeable of and comply with all local, state and federal laws which may apply to the performance of this Agreement. b. If the work provided for in this Agreement constitutes a "public works," as that term is defined in Section 1720 of the California Labor Code, for which prevailing wages must be paid, to the extent Contractor's employees will perform any work that falls within any of the classifications for which the Department of Labor Relations of the State of California promulgates prevailing wage determinations, Contractor hereby agrees that it, and any subcontractor under it, shall pay not less than the specified prevailing rates of wages to all such workers. The general prevailing wage determinations for crafts can be located on the website of the Department of Industrial Relations (www.dir.ca.gov/DLSR). Additionally, to perform work under this Contract, Contractor must meet all State registration requirements and criteria, including project compliance monitoring.
c. Contractor represents and warrants that it:
(1) Has complied and shall at all times during the term of this Agreement comply, in all respects, with all immigration laws, regulations, statutes, rules, codes and orders, including, without limitation, the Immigration Reform and Control Act of 1986 (IRCA); and
(2) Has not and will not knowingly employ any individual to perform services under this Agreement who is ineligible to work in the United States or under the terms of this Agreement; and
7 (3) Has properly maintained, and shall at all times during the term of this Agreement properly maintain, all related employment documentation records including, without limitation, the completion and maintenance of the Form I-9 for each of Contractor's employees; and
Has responded, and shall at all times during the term of this Agreement respond, in a timely fashion to any government inspection requests relating to mmigration law compliance and/or Form I-9 compliance and/or worksite enforcement by the Department of Homeland Security, the Department of Labor, or the Social Securit d. Contractor shall require all subcontractors or subconsultants to make the same representations and warranties as set forth in Subsection 21.c. e. Contractor shall, upon request of City, provide a list of all employees working under this Agreement and shall provide, to the reasonable satisfaction of City, verification that all such employees are eligible to work in the United States. All costs associated with such verification shall be borne by Contractor. Once such request has been made, Contractor may not change employees working under this Agreement without written notice to City, accompanied by the verification required herein for such employees.
f. Contractor shall require all subcontractors or sub-consultants to make the same verification as set forth in Subsection 21.e.

If Contractor or subcontractor knowingly employs an employee providing work under this Agreement who is not authorized to work in the United States, and/or fails to follow federal laws to determine the status of such employee, that shall constitute a material breach of this Agreement and may be cause for immediate termination of this Agreement by City.

Contractor agrees to indemnify and hold City, its officers, officials, agents and employees harmless for, of and from any loss, including but not limited to fines, penalties and corrective measures City may sustain by reason of Contractor's failure to comply with said laws, rules and regulations in connection with the performance of this Agreement.

22. Governing Law and Venue. This Agreement shall be construed in accordance with and governed by the laws of the State of California and Contractor agrees to submit to the jurisdiction of California courts. Venue for any dispute arising under this Agreement shall be in Orange County, California.

Integration. This Agreement constitutes the entire agreement of the parties. No other agreement, oral or written, pertaining to the work to be performed under this Agreement shall be of any force or effect unless it is in writing and signed by both parties. Any work performed which is inconsistent with or in violation of the provisions of this Agreement shall not be compensated.
8 24. Notice. Except as otherwise provided herein, all notices required under this Agreement shall be in writing and delivered personally, by e-mail, or by first class U.S. mail, postage prepaid, to each party at the address listed below. Either party may change the notice address by notifying the other party in writing. Notices shall be deemed received upon receipt of same or within three (3) days of deposit in the U.S. Mail, whichever is earlier. Notices sent by e- "CONTRACTOR" "CITY"
AGA Engineers, Inc. City of Orange
211 Imperial Hwy, Suite 208 300 E. Chapman Avenue
Fullerton, CA 92835 Orange, CA 92866-1591
Attn.: Chalap K. Sadam, President Attn.: Larry Tay
Telephone: (714) 992-4592 Telephone: (714) 744-5534
E-Mail: [email protected] E-Mail: [email protected] Counterparts. This Agreement may be executed in one or more counterparts, each of which shall be deemed an original, but all of which together shall constitute one and the same instrument. Signatures transmitted via facsimile and electronic mail shall have the same effect as original signatures.
[Remainder of page intentionally left blank; signatures on next page] 9 IN WITNESS of this Agreement, the parties have entered into this Agreement as of the year and day first above written.
"CONTRACTOR" "CITY"
AGA ENGINEERS, INC., CITY OF ORANGE, a municipal corporation a California corporation
*By:_ By:_
Printed Nai c: Chalap K. Sadam Daniel R. Slater, Mayor
Title: President & Secretary
*By:_ ATTEST:

Printed Name: Ruben Perales
Title: Vice President
Pamela Coleman, City Clerk
APPROVED AS TO FORM:

Nathalie Adourian
Senior Assistant City Attorney
*NOTE: City requires the following signature(s) on behalf of the Contractor:
(1) the Chairman of the Board, the President or a Vice-President, AND (2) the Secretary, the Chief Financial Officer, the Treasurer, an Assistant Secretary or an Assistant Treasurer. If only one corporate officer exists or one corporate officer holds more than one corporate office, please so indicate. OR -- The corporate officer named in a corporate resolution as authorized to enter into this Agreement. A copy of the corporate resolution, certified by the Secretary close in time to the execution of the Agreement, must be provided to City.

V
10 EXHIBIT "A"

SCOPE OF SERVICES
[Beneath this sheet.]

PROPOSAL
On-Call
Traffic Engineering Services
City of January 10, 2025
Orange

CALIFORNIA
SAGA
, Engineers, Inc.

SAGA
Engineers, Inc.

January 10, 2025
Mr. Larry Tay, P.E., T.E., P.T.O.E.

City Traffic Engineer
City of Orange
Public Works Department
300 E. Chapman Avenue
Orange, California 92866
RE: Proposal for On-Call Traffic Engineering Services for the City of Orange Dear Mr. Tay:

AGA Engineers, Inc. (AGA) is responding to the City of Orange's Request for Proposal for On-Call Traffic Engineering Services. This proposal is based on previous projects AGA staff has completed for the City and our extensive experience providing on-call traffic engineering services for many agencies in Southern California.

AGA was founded in 2020 by Mr. Chalap K. Sadam, former Vice President and co-founder of Albert Grover & Associates, which was founded in 1993. The new company was formed after the passing of the founder and CEO, Mr. Albert Grover. After acquiring certain assets from Albert Grover & Associates, and under the leadership of Mr. Sadam, AGA has retained a similar culture and the practices that made our transition seamless to all our clients - largely due to retention of our core team of senior and professional staff who worked under the former company. Our engineers bring more than 30 years of their expertise and experience to AGA allowing us to continue to successfully work for our clients.

We are a full-service traffic engineering consulting firm whose engineering staff has been providing on-call traffic engineering and field support services to municipalities for nearly 30 years and to the City of Orange since 2021. We have the ability to provide all traffic and transportation engineering services the City may need in an expeditious and cost-effective manner. AGA can provide the City with assistance in the areas of traffic signal design, various types of traffic studies and analyses, plan checking services, grant application support and project administration, traffic signal and communications design, ITS design, traffic signal timing and coordination studies, traffic counts and data collection, and other associated traffic engineering services.

AGA's key staff members are seasoned professionals who have worked for public agencies which provides them with a unique understanding of the desires and needs of a city so that we "get it right" the first time. The attached proposal describes the AGA team's traffic, transportation and civil engineering knowledge and background, highlights our municipal experience, provides agency references, staff resumes, and details our understanding of the types of traffic engineering services that the City may need.

In addition, to providing traditional on-call traffic engineering services to municipalities, we are recognized for our considerable expertise in the planning, design, and operation of complex traffic control and ITS systems.

Over the past few years, AGA staff has created synchronized traffic signal timing plans for thousands of traffic signals and arterial corridors in Orange County while working for OCTA as well as most cities in Orange County.

AGA Engineers, Inc.
211 Imperial Highway, Suite 208, Fullerton, CA 92835
(714) 992-4592 Email: [email protected]
January 10, 2025

Page 2 of 2 ends

We have also designed and installed various Intelligent Transportation System (ITS) elements including CCTV cameras, fiber optic communication systems, wireless interconnect systems, and upgraded multiple centralized control systems. AGA's engineers and technicians don't just monitor and maintain traffic signal systems and timing. Our staff is trained to identify traffic control system issues and flow problems and recommend improvements and adjustments accordingly.
1, Chalap Sadam, President of AGA, will be the City's primary contact person during the proposal review process, and will manage, direct and provide all traffic engineering and transportation planning services arising out of a contract with the City. I am also duly authorized to negotiate scope and fee with the City and contractually bind the company. I will be assisted in my role by Mr. Ruben Perales, P.E., T.E., Vice President, who will serve as my alternate should I be unavailable due to illness or vacation.

AGA is very excited to continue working with the City of Orange. If you have any questions or require clarification on any aspect of this submittal, please don't hesitate to give me a call at (714) 992-4592.

Respectfully submitted,
AGA Engineers, Inc.

Chalap K. Sadam, P.E., T.E.

President
AGA
ngineers, Inc.

HALONORAN
On-Call Traffic Engineering Services
Firm Background
AGA Engineers, Inc. (AGA) has extensive experience providing on-call traffic engineering services to municipalities across Southern California. Our engineers and technicians possess all of the necessary qualifications and skills to ensure successful outcomes for the City, be it a simple traffic investigation, a politically charged development project, a multi-agency project, or a complex traffic systems challenge.

Firm Profile
AGA is a California S Corporation with 17 employees, many of whom have worked together for at least five years and the executives have worked together for over 20 years, which is a respectable indication of the stability and compatibility of our team. All work performed under this contract with the City will be performed by employees located out of AGA's offices in Fullerton.

AGA is a multidiscipline engineering firm specializing in municipal and transportation engineering. Through the utilization of today's most sophisticated computer-aided equipment by highly skilled and talented professional engineers and technicians, AGA is able to provide its clients with quality, cost-effective, professional services in a timely manner. Our success can be attributed to our commitment to provide clients with personalized, quality service. AGA's services are not just routine, but rather the application of experience and knowledge to first properly identify a problem, then provide the most appropriate and cost- effective solution. Each project is unique and carried out with the highest degree of pride and professionalism with a dedication to satisfy the client's needs. We offer professional services ranging from the planning and conceptual design stage through the construction supervision and "as-built" stage, placing us among the forerunners in the full-circle service concept.

AGA's wide range of services offered can be divided into six primary areas of expertise: traffic engineering, day-to-day traffic signal operations, transportation planning, traffic signal Transportation Intelligent communication design, operational control of traffic signal Systems Traffic Engineering systems, and City Traffic Engineer staffing. While we are well known and respected for our work in all six of these areas, we Traffic Signal Traffic Signal
are perhaps best known for our widespread knowledge and Communication Operations
Design
experience in the field of design and multijurisdictional traffic signal coordination. It should also be noted that AGA operates over 400 traffic signals on behalf of four jurisdictions in Contract Traffic Engineer Planning Transportation Southern California. Those traffic signals are remotely monitored and controlled from the Traffic Management Center located in AGA's Fullerton office.

AGA personnel, of whom are former governmental employees, have provided services to clients ranging trom design and construction management of full freeway interchanges at costs exceeding a million dollars, to minor traffic impact studies costing only a few thousand dollars. Whatever the project, our management approach is to complete the project to the satisfaction of the client in as quick a time frame as possible while still producing quality work products. The AGA approach to the provision of professional services and projects is to do more than simply provide labor or prepare design plans and study reports - we actually improve traffic operations and safety in everything we touch. AGA's unique blend of Civil Engineers, Traffic AGA Page 1
Engineers, Inc.

A OF ORAN
On-Call Traffic Engineering Services
Engineers, and skilled traffic signal system and communications technicians provides a synergy which results in successful projects beyond client expectations.

The AGA Team possesses all of the necessary qualifications and skills required to successfully provide the services anticipated by the City. We fully understand the importance of dealing with traffic related problems.

Staff at AGA have completed many tasks similar or identical to those anticipated under this contract, and have completed such tasks on time, within budget, and in a manner that meets all the requirements of the agency for which the work was completed, while at the same time placing minimal time and effort requirements on agency staff.

Consultant Team
The members of AGA's staff are constantly collaborating and working together seamlessly, completing for both government agencies and developers many different types of projects covering all areas of transportation engineering. Our proposed team will be headed by Mr. Chalap Sadam who will serve as the Project Manager for all work conducted for this project. As such, he will remain in charge throughout the contract period and he will be the primary point of contact with the City.

Mr. Chalap Sadam, P.E., T.E., President, is a registered Civil and Traffic Engineer with 35 years of experience in managing and successfully completing multi-agency traffic signal coordination and synchronization projects on time and within budget.

He has expertise in preparing traffic impact studies, developing transportation planning models to evaluate long range impacts, recommending practical mitigation measures, designing intersection improvements, designing traffic signal improvements, and preparing freeway interchange feasibility studies and major investment studies.

Over the years, Mr. Sadam has completed numerous traffic impact and transportation planning studies for both private developers and municipal clients. In recent years, he developed a keen interest in, and has become one of the region's foremost experts of, the development of signal coordination master plans, preparation of traffic signal coordination timing plans, design and operation of traffic signal systems, and implementation of various ITS strategies and programs.

Mr. Sadam's additional experience includes the development of traffic circulation studies and corridor improvement studies, accident analyses, parking feasibility studies, street lighting master plans, traffic engineering software development, and project management. His computer skills include experience in the usage of transportation planning and traffic engineering software such as Synchro, Vissim, TruTraffic, HCS and WEBSTER. He is also familiar with relational database management systems and has used Microsoft Access and Oracle databases along with programming languages such as Visual Basic and C/C++.

In recent years, Mr. Sadam has served as Project Manager for many RTSSP Projects including Alton Parkway, Adams Avenue, and Antonio Parkway in Orange County. All three projects were concurrently managed by him and have recently been completed on time within budget to the satisfaction of our clients.

Over the course of his career, Mr. Sadam has successfully directed and managed the evaluation, development, and implementation of thousands of coordinated traffic signals throughout Southern AGA Page 2
Engineers, Inc.

HALONORAN
On-Call Traffic Engineering Services
California. There simply isn't a project manager available with more hands-on local experience successfully managing and delivering on multi-agency traffic signal coordination and synchronization projects.

Additionally, Mr. Sadam was Project Manager for the San Bernardino Valley Coordination Traffic Signal On-Call System Support project, as well as the Project Manager for design and implementation of San Bernardino County Transportation Authority's Tier 1 and Tier 2 Traffic Signal Coordination Projects. He was Project Manager for the Buena Park Citywide ITS Project and citywide signal retiming projects in the cities of La Habra, Fullerton, Fountain Valley, and Santa Ana. He successfully managed more than a dozen projects for OCTA, including traffic signal coordination master plan projects, traffic signal coordination demonstration projects, Traffic Light Synchronization Program (TLSP) projects, Traffic Signal Synchronization Program (TSSP) projects, and Regional Traffic Signal System Program (RTSSP) projects.

Mr. Krishna Patel, Principal Transportation Engineer, will provide project oversight and quality control for all projects/work products. His attention to detail and valuable insights makes him an excellent overseer of our work products. He has over 40 years of extensive experience with multiple facets of municipal administration, engineering, operations, and maintenance.

As Director of Public Works at the City of San Dimas, Mr. Patel was responsible for the overall direction, coordination, and management of the department's programs and services. Some of his duties included approval of engineering plans, providing plan checks and inspection of land development projects, inspection of major capital improvement projects including street maintenance, traffic signals, bikeways, sewers, and storm drains. He also supervised the Street Division, overseeing approximately 125 miles of city streets, streetlights, traffic signals and other various public infrastructures. Mr. Patel also oversaw the implementation of the Bonita Avenue Traffic Signal Synchronization Project.

Mr. Ruben Perales, P.E., T.E., Vice President, has been working on conceptual improvement plans, intersection level of service analyses, signal design and signal modification plans, fiber optic communication plans, signal coordination plans, citywide speed surveys, signing and striping plans, and street lighting plans. He has prepared plans for Caltrans and other government agencies such as counties and cities, and for various private developers. He has conducted field topographic surveys required to develop design plans to improve intersection safety and update signal hardware to current standards. He is very familiar with AutoCAD, MicroStation, Crossroads software, and various Microsoft applications.

Mr. Greg Wong, P.E., Vice President, is a registered Civil Engineer has experience conducting traffic signal timing, transportation planning, capacity and level of service analysis, environmental impact report review and analysis, parking studies, and traffic impact study preparation and review. He has worked extensively on timing plan development utilizing a variety of traffic engineering software, including PASSER, WEBSTER and Synchro.

Mr. Wong was instrumental in developing hundreds of signal timing plans for the cities of La Habra, Fountain Valley, Santa Ana, and Fullerton; hundreds of signal timing plans for various AGA

Page 3 ends

Engineers, Inc.

HALONORAN
On-Call Traffic Engineering Services
agencies under the OCTA traffic synchronization program, and for approximately 650 intersections in the San Bernardino Valley Coordinated Traffic Signal System Project for SBCTA. In addition to his timing development projects, he has provided transportation planning services for a variety of projects such as land developments, site analyses, traffic impact studies/analyses, parking and circulation analyses, and traffic forecasting and modeling. He has also been responsible for annual CMP monitoring in both Montclair and Upland.

Ms. Jessica Reyes, P.E., Senior Transportation Engineer I, has been instrumental in the design efforts for several multi-million-dollar traffic signal safety and communications improvement projects. She performs coordination signal timing analyses, sight distance analyses and traffic signal warrants, and field studies including crossing guard studies, traffic impact studies, and traffic operations analysis.

She has conducted topographic surveys required to develop design plans for improving intersection safety and updating signal hardware to current standards. Her expertise includes traffic signal designs and modifications, fiber communications design, signing and striping, street lighting, design and implementation of bike lanes, and traffic control.

She also contributes in the preparation of plans, specifications and estimates, intersection analysis, sight distance analysis, and traffic signal warrants along with other field studies including crossing guard studies, traffic impact studies, traffic operations analysis, and signal coordination timing.

Mr. Phillip Fuentes, Senior Signal Systems Specialist, has been responsible for conducting field reviews of hundreds of signalized intersections, and physically opening controller cabinets and pull boxes to assess the condition and usability of existing equipment. He is a certified Level 3 Technician with extensive experience in traffic signal maintenance. Mr. Fuentes has technical skills that include everything from installing detector loops and conducting preventative maintenance to installing traffic signal equipment (i.e., intersection cabinets, Opticom EVP, controllers, video detection systems, CCTV cameras, fiber optic communications, Ethernet switches), from troubleshooting and providing technical assistance to contractors and the construction of signal and roadway improvement projects on a daily basis. He creates signal timing charts for new or complex intersections and is highly proficient with all types of signal controllers and interconnect communications systems.

The AGA Team Organization Chart is shown on the following page. Full resumes for the Project/Task Leads are provided in Appendix A
AGA Page 4
Engineers, Inc.

On-Call Traffic Engineering Services

TOP CANTY CATE
Project Manager QA/QC Manager
Chalap K. Sadam, PE, TE Krishna Patel
President Principal Transportation Engineer
Transportation Design & Traffic Studies, Signal Timing Plan Checking & Traffic Field Review & Traffic Signal Operations & Coordination Control Plans Operations
Ruben Perales, PE, TE Greg Wong, PE Jessica Reyes, PE Phillip Fuentes Vice President Vice President Senior Transportation Engineer / Senior Signal Systems Specialist Support Staff
Henry Hernandez, PE Dowling Tsai, PE, TE
Principal Transportation Engineer / Senior Transportation Engineer I orge Sanchez, E Sohan Sadam
sociate Transportation Enginee Systems Engineer
iselle Hernande Vannessa Pedroza
sociate Transportation Engineer Associate Transportation Engineer / Lucy Ott Phillip J. Fuentes
Assistant Engineer Signal Technician /
Approach & Methodology
We believe that the most effective way to practice municipal traffic engineering is to have seasoned senior level staff members be hands-on in the assessment and direction of work tasks. It is more efficient and cost effective to have an experienced traffic engineer who can quickly observe and assess situations on-site to provide the City with quick and accurate advice or to set a course of study or design. Many other firms rely on junior or mid-level staff to attend meetings, speak with constituents, conduct field investigations, and set direction on designs or studies, while senior level staff primarily remain in the office in more of a contract management or oversight role. Such an arrangement can have an initial low cost but typically results in delays, less than optimum design, a lack of innovation, and rework costing significantly more in the long term. We approach municipal traffic engineering by getting our senior experienced staff out of the office to interact with City staff and the public to quickly get to the root of safety, planning, design, or operational issues and concerns. By putting our best and most experienced people front and center, issues and concerns are quickly addressed and good decisions can be made without the need for delay for less experienced staff to research or study the problem or potential solutions.

Project and Work Task Management
Strong results-oriented leadership is a key element of AGA's project management approach to fully leverage the expertise and experience of our team members. As such, Mr. Sadam will be responsible for the daily management of work tasks and servcies provided to the City and he will direct staff in their duties.

AGA Page 5
Engineers, Inc.

SALON ORAC
On-Call Traffic Engineering Services
He will arrange/chair all formal meetings that are required as a part of work tasks peformed on behalf of the City, and he will make any and all required presentations to the City Council, City staff, other agencies, and the public. Both he and Mr. Hizon will be responsible for adherence to deadlines and project schedules, as well as maintaining quality control of all work products. They will do everything necessary to ensure that project assignments are completed on time, within budget, and in a manner which fulfills the goals and objectives of the City.

For each work task or project provided to AGA by the City, Mr. Sadam will conduct a project kick-off meeting where the project objectives, priorities and specific schedule will be finalized and any relevant documents and/or information will be obtained from the City. He will also discuss the specifics of the approach and performance of the work with the purpose of gaining any additional insight from City staff in order to efficiently and appropriately conduct the work requested. In most cases as the work progresses, it will be typical that a written synopsis of the work completed will be provided once a month along with a billing summary. As necessary, he will communicate either by phone, e-mail, or in person key findings and outcomes of the work so City staff is apprised of the progress and can provide input as needed. Once the work is complete, the final work products will be submitted and Mr. Sadam will be prepared to present the work, if need be, to staff and other interested parties. Once the work project submittal is finalized and accepted by the City, the final billing summary will be prepared and the project or work task will be closed out.

Balancing Practical Engineering with Creativity and Innovation AGA's approach to providing traffic engineering and transportation services involves far more than simply providing contract labor on an hourly basis. We consider it our function to serve as an extension of City staff and expert advisors, forming an integrated team to creatively provide solutions to traffic engineering and transportation planning problems. While Mr. Sadam will provide the majority of the advice and expertise required, our entire staff will be available and on-call at all times to serve the City. This includes not only scheduled meetings at City Hall or off-site, but also attendance at lunch-time or evening meetings with businesses or the public as required. Staff members will also be available to conduct field investigations, traffic studies and analyses as needed.

Unlike most engineering work, which is highly regimented with standards and requirements, traffic engineering is much more focused on human behavior. It is commonplace for politicians and the public to have an emotional investment not only with the outcome of traffic investigations and studies, but also the process by which the work is conducted. Therefore, our experienced senior level staff can clearly articulate to our assistant and associate level staff what needs to be done, actively direct staff in performing the work, and communicate progress regularly to the City and the public as appropriate. In all of our communications, be it written or orally, we strive to communicate clearly to serve both City staff and the public alike. It is this clear communication of our progress, findings/results, and recommendations which eliminate issues and problems that cause inefficient project delays and rework.

Another key factor in providing services to the City is to stay attuned to both the overall direction and the specific requirements of City staff and the City Council. Utilizing our team's extensive experience in providing similar services to other cities and our staff's knowledge of our client's standards, technical preferences and practices, we can avoid recommending strategies and solutions which are not viable.

Because of our team's attendance and presentations at local professional organization meetings, and at AGA

Page 6 ends

Engineers, Inc.

SALON ORAC
On-Call Traffic Engineering Services
national meetings such as at the Institute of Transportation Engineers (ITE) conferences, we bring fresh ideas and best practices to the City for consideration. We pride ourselves on being aware of state-of-the-art traffic engineering approaches and methodologies and how they could be applied. By combining our local and national knowledge of the latest products and approaches in the traffic engineering industry, we can optimize the service we provide to the City.

Our knowledge of and sensitivity to public needs and concerns, combined with our real world (as opposed to textbook) approach to safety issues, will ensure that alternative solutions to specific problems can be achieved, while at the same time compromising neither safety nor public needs and desires.

Traffic and Transportation Plan Checking
AGA planners and engineers have produced countless traffic impact study reports and design plans of large and small-scale developments for public and private sector clients across Southern California.

Having conducted such studies and engineering design plans gives us a unique perspective on the most efficient way to review, analyze and comment on work conducted by others. This vast experience will in turn provide the City with quality reviews where every aspect of the work is considered in a cost-efficient and timely manner.

Plan Check Turnaround Times
Work Request
First Plan Check Submittal
Second Plan Check Submittal
Third Plan Check Submittal
Mylar Review
Major Change Design Stage
Major Change in the Field
Expedited Reviews Requested by City
With this proposal AGA hereby commits to provide plan check services in accordance with the schedule outlined above, with plan checks not expected to exceed three (3) total plan check cycles.

Roles and Responsibilities of Key Personnel
Mr. Sadam, our proposed Project Manager, will be available in person to the City Engineer and city staff and he will attend all meetings as requested by the City Engineer. He will also make all presentations to political bodies, agencies, and the public as necessary to inform, advice, and articulate the City's position on traffic and transportation matters. In order to provide the City with the most efficient and effective traffic engineering service, AGA has also identified key senior staff members who will be responsible for each of the "work-types". He will remain the responsible engineer for the day-to-day direction of all work conducted under the contract.

Mr. Sadam will be supported by the following individuals in the completion of work assigned by the City:

AGA Page 7
Engineers, Inc.

A OF ORAN
On-Call Traffic Engineering Services
Anticipated Work Task Key Staff Member
Traffic Signal Design Ruben Perales, P.E., T.E.

Traffic Studies for Capital Projects Greg Wong, P.E.

Traffic Study Review for Private Developments Greg Wong, P.E.

Plan Check for Capital/Development Projects Jessica Reyes, P.E Review and Creation of Traffic Control Plans Jessica Reyes, P.E.

Technical Support for Funding and Grant Applications Jorge Sanchez, E.I.T.

Intelligent Transportation Systems Design Ruben Perales, P.E., T.E.

Traffic Signal Timing and Coordination Studies Greg Wong, P.E.

Program Management / Construction Management Ruben Perales, P.E., T.E.

Grant Funding Oversight Jorge Sanchez, E.L.T.

Traffic Signal Construction Inspection / NPDES Compliance Ruben Perales, P.E., T.E.

Traffic Counts and Data Collection National Data & Surveying Services Special Studies / Transportation Analysis Greg Wong, P.E.

On-site Support Services Ruben Perales, P.E., T.E.

Technical Presentations / Training Greg Wong, P.E
Statewide Planning Efforts Greg Wong, P.E.

Simulation & Modeling Greg Wong, P.E.

Research & Outreach Chalap K. Sadam, P.E., T.E.

Company's Additional Traffic Engineering Services Available to the City In addition to the typical professional traffic engineering services requested by the City, we would like to highlight additional specialty areas that set our company apart from other traffic engineering firms providing on-call services. These specialty areas are outlined below and can be a part of the services provided to the City under the proposed contract.

Traffic Signal System Monitoring and Support Services
A popular service AGA provides to a number of public agencies is real-time monitoring of a City's traffic signal system and its traffic signal timing performance. For several years, we have monitored and operated traffic signal and camera systems from our Traffic Management Center (TMC) located within our Fullerton office. AGA's contractual responsibilities include daily monitoring of signal operations, updating and fine- tuning signal timing, and responding to construction activities, emergencies, and citizen complaints.

Development, implementation and maintenance of coordination timing plans are critical to optimizing the efficiency of the existing infrastructure. Since traffic patterns change when construction or additional development occurs, adjustments to timing plans are often required. Only by frequent monitoring of traffic operations can these timing plans be kept current.

In addition to AGA's expert traffic engineering staff, the company also employs several experienced traffic signal technicians who can troubleshoot and repair complex communications and traffic signal timing problems. These technicians are highly skilled and well versed on all types of traffic signal control hardware AGA

Page 8 ends

Engineers, Inc.

HALONORAN
On-Call Traffic Engineering Services
and systems, video equipment and control systems, communications, networking, and security systems.

AGA can tailor a traffic signal monitoring and support services arrangement with the City to assist staff in keeping its traffic signal system functioning at its best and safe from cyber-attack.

Quality Assurance/Quality Control
An effective quality assurance/quality control (QA/QC) review will minimize or eliminate additional costs to the City related to reengineering or contractor claims during construction and liability after project completion. Delivering a quality product that is right the first time is the primary focus of AGA's comprehensive QA/QC process. It is an integral part of our regular engineering design and study processes and the delivery of every investigation, study, report, or document we produce. This added layer of independent work product review will be conducted at no additional cost to the City.

Our QA/QC program requires that all deliverables leaving our office be reviewed prior to submittal to the client. All personnel performing work on this project are responsible to ensure its implementation. We have the philosophy that QA/QC is a continuous process to be utilized on plan preparation from conceptual design to final PS&E, as well as when conducting various other professional engineering tasks. Our technical staff is trained to always review work products prior to finalization. Our experienced QC Manager, will conduct an objective review of the work product. When several disciplines are involved in a project, the QC Manager may also seek review assistance from other individuals specializing in those disciplines to verify that all project concepts are being met and all constructability issues are addressed prior to delivery of the project.

Comparable Work for Other Agencies
The AGA approach to on-call professional services and projects is to do more than simply provide labor or prepare design plans and traffic signal timing - we actually improve traffic operations and safety in everything we touch. AGA is not a company that simply provides engineering labor to complete client designated tasks; rather, AGA provides a high level of intellectual support to accomplish client objectives.

AGA's unique blend of Civil Engineers, Traffic Engineers, and skilled traffic signal system and communications technicians provides a synergy resulting in successful projects where other consulting firms have faltered or failed. Typically, AGA completed projects result in success beyond client expectations.

AGA has extensive experience in providing similar services to other cities throughout Southern California.

The following is list of governmental agencies for which AGA staff has provided professional traffic engineering and design services similar to those which have been requested by the City of Orange, over the last five years:

Orange County Transportation Authority (OCTA) • City of Cost Mesa • City of Montclair City of Fountain Valley
• County of Los Angeles City of Huntington Beach
• City of Buena Park • City of Irvine
• City of Glendora • City of La Habra
• City of Brea • City of Placentia
AGA Page 9
Engineers, Inc.

SALON ORAC
On-Call Traffic Engineering Services
References
The AGA engineering professionals have worked for and with almost a hundred cities in Orange, Los Angeles, San Bernardino, and Riverside counties. We have included six references - comprised of two at the county level and four at the city level - for consideration by the City. If the City has any doubts about AGA's technical or project management capabilities, we strongly urge a phone call to any of the persons listed as a reference to ask questions about their experiences working with us.

Orange County Regional Traffic Signal Synchronization Program (RTSSP) Mr. Anup Kulkarni, Section Manager, Regional Modeling and Traffic Operations OCTA
550 S Main St, Orange, CA 92863
OCTA (714) 560-5867 || [email protected]
AGA is under contract to provide professional design and implementation services for traffic signal synchronization projects across Orange County. Our staff has completed five corridor projects over the last five years and will be completing our sixth this year. Each project involves the design of signal interconnect and communication and control systems; construction management; system integration; development, implementation, and fine-tuning coordinated traffic signal timing plans; monitoring and maintaining timing plans; and preparing a final report identifying the work performed, benefits achieved, and recommendations for improvements.

On-Call Traffic Engineering Services
Mr. Raja Sethuraman, Director of Public Works
City of Costa Mesa
77 Fair Drive, 4th Floor, Costa Mesa, CA 92628
(714) 754-5343 || [email protected]
AGA is a primary on-call traffic engineering service provider to the City for more than five years. Staff regularly conducts field investigations and plan checks, prepares signal timing plans, and monitors the traffic signal system. Our technicians are responsible for responding to emergency traffic signal control and communications issues and have assisted the City in developing a state-of-the-art Ethernet communications network and converting from a legacy VMS traffic signal control system to Centracs ATMS. The AGA team has also completed regional traffic signal synchronization projects for the City along the following three corridors: Placentia Avenue/Baker Street, Adams Avenue, and Sunflower Avenue. We are also currently under contract to complete the Bear Street RTSSP project.

Contract City Engineer and On-Call Traffic Engineering Services Ms. Shari Garwick, Director of Public Works
SẤN City of San Dimas
DIMAS 245 E Bonita Ave, San Dimas, CA 91773
Endefami
909) 394-6248 || [email protected]
AGA provides an on-site City Traffic Engineer for approximately one day per month and performs various on-call traffic engineering services on a task order basis. Task orders have included conducting traffic studies, speed surveys, and project reviews; preparing traffic control reports and pedestrian route to school plans; responding to citizen, business and City Council requests and suggestions; and providing construction management services. We have also provided traffic signal design services, developed traffic signal timing plans, and provided field support to trouble shoot traffic signal and communications issues.

AGA

Page 10 ends

Engineers, Inc.

APPENDIX A
Resumes of Key Personnel
Chalap K. Sadam, PE, TE
President
centralized traffic signal systems and video
Education
management systems.

University of Southern California
Master of Business Administration, 2002
In addition to his expertise and technical
Virginia Polytechnic Institute acumen, which ensure successful projects, our and State University clients most appreciate his commitment to Master of Science, Civil Engineering establishing the most effective and interactive (Transportation), 1990 systems possible for both large and small projects. Whether facilitating award-winning,
Jawaharlal Nehru Technological University multi-million-dollar, multi-jurisdictional Bachelor of Engineer, Civil Engineering, 1988
transportation communications projects, or
applying his expertise to single intersection
Professional Registrations
CA Registered Civil Engineer - CE #74080 traffic operations, Mr. Sadam stands out as a CA Registered Traffic Engineer - TE #1813 meticulous, innovative planner/designer, and an outstanding leader of the AGA team.

Professional Associations
American Society of Civil Engineers Relevant Experience Institute of Transportation Engineers
Intelligent Transportation System Council Regional Traffic Signal Synchronization Transportation Planning Council
Program (RTSSP) Projects, OCTA
Orange County Traffic Engineers Council
OCTA developed a signal coordination plan to
optimize traffic flow and travel conditions in
Mr. Sadam is the President of AGA Engineers, Orange County, including the timing plan Inc., founding the company in 2020. He has development, implementation, fine tuning, and performed traffic studies, feasibility studies, monitoring for all signalized intersections along safety studies, Major Investment Studies, long- each arterial project corridor. Tasks included term roadway improvement studies, and coordination between agencies, field reviews, transportation-related Master Plan studies for developing design plans and signal coordination countless cities and counties throughout timing, and monitoring traffic flow. Mr. Sadam Southern California. served as Project Manager. for the following corridors:

Mr. Sadam is well-known for his studies
involving Regional Traffic Signal Synchronization Portola Pkwy/Santa MacArthur Blvd/Talbert Ave Programs (RTSSP), working effectively to Margarita wy
Lake Forest Drive Harbor Blvd
promote multijurisdictional cooperation
between State (Caltrans), county, and city Lambert Rd Bear St entities to synchronize traffic signals for Orangethorpe Gilbert St/ldaho St Ave/Esperanza Rd
multiple major corridors in Orange County, Los Malvern Ave/Chapman Ave Birch St Angeles County and the San Bernardino Valley.

Imperial Highway Alicia Pkuy
He is a recognized expert of traffic signal
Sunflower St Irvine Center Dr/Edinger Ave
communications, Intelligent Transportation Adams Ave Antonio Pkwy Systems, Traffic Management Centers,
AGA 211 Imperial Hwy, Ste 208, Fullerton, CA 92835
Engineers, Inc. (714) 992-4592 email: [email protected] Mr. Chalap Sadam, PE, TE

Page 2 ends

Alton Pkwy La Paz Rd applications, and design/ implementation of Baker St/Placentia Ave La Habra Blvd/Central Ave multiple State funded projects.

Bolsa Ave/First St Tustin Ave/Rose Dr • Assisted multiple agencies in successful re- Lambert Rd Placentia Ave imbursements of local, State and Federal Brea Blvd Commonwealth Ave grant funds.

Lemon St/Anaheim Blvd Euclid St
Bastanchury Rd Orangethorpe Ave TLSP Citywide Traffic Analysis, Torrance Euclid St Demonstration As Project Manager, Mr. Sadam supervised the Chapman Ave TLSP Project
review of 184 intersections within the City of
Torrance that included review of the traffic
I-405 Freeway Improvement Projects, Costa signal infrastructure, level-of-service analyses Mesa and Fountain Valley for existing, near term and long-term Mr. Sadam was Project Manager for three conditions, comparison of historical traffic related projects on the I-405 Freeway (SR-73 to volumes, traffic index calculations for all truck 1-605) which included interchanges and arterials routes, and traffic safety analysis of the City's in the immediate vicinity of the freeway. The high collision intersections. Detailed cost three projects were: estimates were also conducted for the traffic • I-405 Major Investment Study signal and communication, intersection capacity • I-405 Project Study Report/Project improvements and traffic safety improvements.

Development Support
• I-405 Project Approval/Environmental Citywide Traffic Operation and Traffic Document. Management Study, Irvine
Tasks included identifying required freeway and Mr. Sadam was Project Manager. As part of the interchange improvements, lane configurations, traffic operational analysis, 130 critical and arterial intersection improvements to intersections were evaluated for existing and accommodate future 2040 traffic. near-term conditions utilizing the Highway Capacity Manual procedures. The analyses
Plans for a Major Investment Study and included identification of any capacity subsequent PSR/PDS and PA/ED were constraints, excessive queuing and available completed with significant attention to detail. storage, approved near term developments Tasks for the Study included field reviews, (project trip generation impacts), evaluation of project improvement plans, traffic management the appropriate signal operation and plans and reports, and evaluation of detour coordination signal timing. Improvements were plans, street lighting plans, and construction developed and ranged from low-cost solutions plans. Those plans were subsequently used to (adding protected/permissive-Flashing Yellow implement freeway widening and interchange Arrow traffic signal phasing) to major improvements. improvements of widening an arterial.

Traffic Safety Studies: Citywide Protected/Permissive Left-Turn • Systemic Safety Analysis Report Program for Phasing Study, Lake Forest the Cities of Fountain Valley, Placentia and Mr. Sadam served as Project Manager. He Redlands. supervised the analysis of existing traffic signals • Office of Traffic Safety funded citywide citywide to determine if converting to safety improvements for the cities of La protected/permissive left-turn phasing was Habra, Montclair, Palm Springs, Downey feasible and appropriate. Mr. Sadam also and Inglewood. provided task management support.
• Preparation of Highway Safety
Improvement Project (HSIP) grant
AGA 211 Imperial Hwy, Ste 208, Fullerton, CA 92835
Engineers, Inc. (714) 992-4592 email: [email protected] Krishna Patel
Principal Transportation Engineer
Education traffic signal synchronization along Bonita
Kingston Polytechnic, London, United Kingdom Avenue, and integration of a video Bachelor of Science, Civil Engineering, 1979 management system for the City.

Professional Associations Gold Line Railroad. This project involved nearly Institute of Civil Engineers
10 miles of light rail project. Mr. Patel was the
prime leader/liaison for development and
Mr. Patel is a team player who embraces a review of the EIR, as well as in charge of civil "hands on" style of management. He is a
design for City related issues including right-of-
results-oriented professional with a working
way for 6 crossings, grade separation, Park &
knowledge of multiple facets of municipal
Ride and City Maintenance yard.
administration, operations, and maintenance
who is able to bring a flexible and situational Bonita Avenue Downtown. Mr. Patel took the approach to every project. He is innovative, lead in the design and construction creative, and able to build positive relationships management of the renovation of the with consultants, contractors, state agencies, downtown area which required coordination city departments and divisions, city staff, with the architect, several other consultants, various committees, and residents. and the business owners affected by the reconstruction project.

As Director of Public Works at the City of San
Safe Route to School Program. Mr. Patel
Dimas, he was responsible for the overall obtained state funding for this program of direction, coordination, and management of the major safety improvements which benefited the department's programs and services. Some of community and elementary schools. his duties included providing plan checks and
inspection of land development projects, Horsethief Canyon Park. Mr. Patel prepared inspection of major capital improvement contract bid documents. He worked with projects including street maintenance, traffic consultants on engineering designs by directing signals, bikeways, sewers, and storm drains. He changes to major grading, street and storm also supervised the Street Division, overseeing drain improvements and major utilities. He approximately 125 miles of city streets, coordinated right-of-way and easement streetlights, traffic signals and other various acquisitions and coordinated with public infrastructures. environmental agencies.

Target Commercial Site Development Project.

Relevant Experience Mr. Patel coordinated the engineering design with consultants for the development company
Mr. Patel led the following projects for the City
and governmental agencies. He prepared
of San Dimas:
various documents and administered contracts.

He maintained a tight schedule for major
Bonita Avenue Signal Synchronization. This
grading, installation of storm drains and
project involved the design, construction and
retaining wall, widening of the freeway off
management of upgraded traffic signals,
ramp, and installation of a traffic signal.
installation of traffic signal communications,
AGA 211 Imperial Hwy, Ste 208, Fullerton, CA 92835
Engineers, Inc. (714) 992-4592 email: [email protected] Ruben Perales, PE, TE
Vice President
He utilizes multiple traffic engineering software
Education
California State Polytechnic University, Pomona programs, including AutoCAD, MicroStation, Bachelor of Science, Civil Engineering, 2005 Crossroads, and Synchro. He conducts intersection Level of Service (LOS)
Professional Registrations analysis to identify geometric improvements CA Registered Civil Engineer - CE #83169
needed to achieve acceptable LOS and prepares
CA Registered Traffic Engineer - TE #2838
geometric conceptual plans to illustrate
Professional Associations required improvements and their impacts to American Society of Civil Engineers
adjacent properties. In addition, he is adept at
Institute of Transportation Engineers
signal design and modification, fiber optic
Orange County Traffic Engineers Council
communications, signal coordination, signing,
striping, and street lighting.

Mr. Perales performs a wide variety of traffic
engineering tasks, as well as providing Relevant Experience leadership on many projects. Whether he is
coordinating large interjurisdictional projects Contract Traffic Engineer, San Dimas which include working with Caltrans and As contact person, Mr. Perales reviewed multiple cities or counties, or is patiently proposed development site and circulation mentoring junior staff, he is known for his plans, traffic signal plans, and traffic impact ability to see through complex problems, studies; he responds to resident concerns promote positive working relationships, and regarding parking, red curb/sight distance provide clarity for successful projects. requests, school traffic, day-to-day traffic signal monitoring and operations. He currently is a
He has been a Project Manager for many traffic member of the San Dimas Traffic Safety signal design/modification projects. He Committee.
prepares plans for fiber optic and wireless
communication, designs traffic management Traffic Signal System Master Plans, Cities of centers, develops CCTV and video detection Costa Mesa, Glendora, Rancho Cucamonga systems, develops traffic detour plans, and These types of Master Plans serve as a conducts plan checking. framework for traffic signal coordination. They provide a roadmap for implementing and
Mr. Perales also designs communications maintaining signal coordination based on systems, interconnect and conceptual technical considerations, infrastructure improvement plans; he provides intersection limitations, and funding. Tasks include Level of Service analyses, signal coordination preparation of comprehensive Traffic Signal plans, citywide speed surveys, signing & striping Communications Master Plans detailing short and street lighting plans. He conducts field term cost-effective improvements to the traffic topographic surveys required to design plans signal communications system, as well as long for improving intersection safety; he also term improvements to be implemented in competently updates signal hardware to phases throughout several years. New internet current standards. protocol (IP) network schemes are prepared to accommodate existing and future traffic signal
AGA 211 Imperial Hwy, Ste 208, Fullerton, CA 92835
Engineers, Inc. (714) 992-4592 email: [email protected] Mr. Ruben Perales, PE, TE

Page 2 ends

and ITS equipment. Mr. Perales led our team in developing design plans, preparing signal detailing the existing infrastructure as well as coordination timing plans, and monitoring the future infrastructure requirements for traffic flow. Mr. Perales served as a Project several corridors throughout these cities in Design Lead for the following corridors:
anticipation of local grant funding. • Portola Pkwy/Santa Margarita Pkwy • MacArthur Blvd/Talbert Ave
Citywide Traffic Engineering, Speed Surveys, Lake Forest Dr Speed Zone Maps and Traffic Volume Maps Alicia Pkwy
Along with the AGA team, Mr. Perales has La Paz Road
provided these services for innumerable cities, Antonio Pkwy including Palm Springs, Buena Park, Chino, Adams Ave
Cerritos, Lancaster, Santa Ana, Huntington Bear St
Beach, Long Beach and Fountain Valley. Bolsa Ave/First Str • Tustin Ave/Rose Dr
Traffic Signal Plans, Signing and Striping Plans, Sunflower St •
Street Lighting Plans
• Alton Pkwy
Mr. Perales has provided plans for cities
• Irvine Center Dr/Edinger Ave
throughout the Southland, including the cities
• Baker St/Placentia Ave
of Calimesa, Carson, Fullerton, Indio, Redondo
Beach, and Victorville.

Traffic Signal Synchronization Projects (TSSP),
Los Angeles County
HSIP Federal Funded Projects, Huntington
The goal of these projects is to improve safety
Beach
The federal government provides funding to and traffic flow by developing and implementing signal synchronization timing and
cities to update their traffic signal infrastructure
with safety improvements to reduce traffic designing improvements to the traffic signal fatalities and serious injuries on public roads. infrastructure. The projects include upgrading traffic signals to the latest CA MUTCD
Tasks included preparation of traffic signal
modification plans to provide protected left guidelines, Caltrans standards, and ADA turn phasing. Work included conducting field requirements at many of the study intersections. The corridor projects also
reviews of project intersections, traffic signal
included upgrading traffic signals to the latest
cabinet inventory to identify equipment
required to provide upgrades, and traffic signal CA MUTCD guidelines, Caltrans standards and communication plans for communications to ADA requirements. Mr. Perales served as a Project Task Leader for corridors of Manhattan
adjacent signals. Mr. Perales served as Project
Beach Blvd, Redondo Beach Blvd, and Valley
Manager for work on the intersections of
Goldenwest St/Heil Ave, Newland St/Ellis Ave, Blvd/Holt Ave. and Newland St/Slater Ave.

Signal Synchronization Project, Buena Park
Mr. Perales provided field inventory of existing
Regional Traffic Signal Synchronization
signal and controller cabinet equipment along
Program (RTSSP) Projects
Valley View Street, Knott Avenue and La Palma
OCTA developed a signal coordination plan to
Avenue; he coordinated with Caltrans for
optimize traffic flow and travel conditions in
installation of GPS time source receiver units
Orange County, including the timing plan
development, implementation, fine tuning, and and developed the application for a Caltrans Encroachment Permit.
monitoring for all signalized intersections along
each arterial project corridor. Tasks included
coordination between agencies, field reviews,
SAGA 211 Imperial Hwy, Ste 208, Fullerton, CA 92835
Engineers, Inc. (714) 992-4592 email: [email protected] Greg Wong, PE
Vice President
Education traffic impact fees. As a skilled traffic signal University of California, Irvine designer, he provides workable improvements Bachelor of Science, Civil Engineering, 1996 to traffic systems and operations and is knowledgeable in city, state, and federal
Westech College standards and regulations. He is well versed in Certified Geographical Information Systems, evaluating the components of the traffic signal 1997 design such as the traffic signal standards,
vehicle detection, pedestrian accessibility and
Professional Registrations
providing solutions for a more cost efficient and
CA Registered Civil Engineer - CE #64349
feasible traffic signal improvement.

Professional Associations
Institute of Transportation Engineers Development, implementation, and fine-tuning Orange County Traffic Engineers Council of coordination timing plans are also all under Mr. Wong's purview. He has developed
Mr. Wong has over 25 years of experience and hundreds of signal timing plans throughout the completed numerous projects that involve Orange, Los Angeles, Riverside and San state, local, and private agencies - including Bernardino Counties, including plans for almost Traffic Signal Synchronization Program (TSSP) every city in Orange County under the OCTA projects, street and highway improvement traffic synchronization program. He was also projects, local city projects, and private responsible for preparing and implementing development projects. His duties included traffic signal timing (local signal timing and preparing traffic signal coordination timing coordination signal timing) for approximately plans, traffic signal design, traffic impact studies 650 intersections for the San Bernardino Valley and analyses, design and implementation Coordinated Traffic Signal System Project, a projects, and parking circulation analyses. He valley-wide signal coordination project covering has extensive experience in a variety of about 150 miles of arterial highway. transportation planning and traffic engineering
software, such as Synchro, Tru-Traffic and Relevant Experience Highway Capacity Software (HCS); additionally,
he is experienced in the operational use of On-Call Traffic Engineering Support, Cities of La AutoCAD, MicroStation, as well as Microsoft Habra and Montclair and Adobe Creative Suite applications. As contact person, Mr. Wong reviewed proposed development site and circulation plans, traffic
Mr. Wong has also been instrumental in signal plans, and traffic impact studies; he developing transportation safety studies, sight responds to resident concerns regarding parking, distance analyses, traffic signal and stop sign red curb/sight distance requests, school traffic, warrant analyses, capacity and level of service day-to-day traffic signal monitoring and analysis, and environmental impact report operations. He currently is a member of La review and analysis. He performs reviews for Habra's Traffic Committee. project development traffic signals and site
plans, conducts traffic studies, and assesses
AGA 211 Imperial Hwy, Ste 208, Fullerton, CA 92835
Engineers, Inc. (714) 992-4592 email: [email protected] Mr. Greg Wong, PE

Page 2 ends

Los Angeles County Traffic Signal Metro Gold Line Foothill Construction Synchronization Projects (TSSP) Authority
The goal of TSSP projects is to improve traffic Mr. Wong worked with the Gold Line Foothill conditions and traffic flow through timing plan Construction team on temporary signal timing development, implementation, and fine tuning. plans for the Metro Gold Line construction Mr. Wong analyzed, provided detour plans. The tasks involved review of recommendations and designs for upgrading various proposed detour plans, updating local traffic signals on 9 corridor projects that signal timings (per agency request) and the included 160 intersections, as well as providing development of the temporary signal timing multijurisdictional signal timing and plans.
coordination of signals. The TSSP corridor
projects include upgrading traffic signals to the Citywide Traffic Operation and Traffic latest CA MUTCD guidelines, Caltrans standards, Management Study, City of Irvine ADA requirements and recently upgrading the As part of the traffic operational analysis, Mr. vehicle detection to the new hybrid radar/video Wong evaluated 130 critical intersections in the detection at many of the study intersections. City of Irvine for existing and near-term conditions utilizing the Highway Capacity
OCTA, Orange County Traffic Signal Manual procedures. The analyses included Coordination Program identification of any capacity constraints, Mr. Wong was instrumental in this project to excessive queuing and available storage, improve Orange County arterial signal approved near term developments (project trip progression, providing signal timing and generation impacts), evaluation of the coordination for over 60 arterials, and involving appropriate signal operation and coordination interjurisdictional coordination of 34 cities, the signal timing. Improvements were developed County and Caltrans District 12. Many of the and ranged from low cost solutions (adding multijurisdictional traffic signal timing projects protected/permissive-Flashing Yellow Arrow that have been completed or are underway traffic signal phasing) to major improvements of now in Orange County are a direct result of widening an arterial. recommendations of the master plan provided
by AGA. Traffic Signal Synchronization Projects (TSSP), Los Angeles County
Citywide Traffic Study, City of Torrance The goal of TSSP projects is to improve traffic Mr. Wong evaluated 184 intersections within conditions and traffic flow through timing plan the City of Torrance that included review of the development, implementation, and fine tuning. traffic signal infrastructure, level-of-service Mr. Wong served as both Project Manager and analyses for existing, near term and long term Project Task Leader. Tasks include analyzing conditions, comparison of historical traffic traffic patterns and reviewing existing volumes, traffic index (TI) calculations for all conditions, preparing designs for upgrading truck routes, and traffic safety analysis of the traffic signals, developing recommendations, City's high collision intersections. Detailed cost and providing multijurisdictional signal timing estimates were also conducted for the traffic and coordination. The projects also include signal and communication, intersection capacity upgrading traffic signals to the latest CA MUTCD improvements and traffic safety improvements. guidelines, Caltrans standards and ADA requirements on 9 corridors.

AGA 211 Imperial Hwy, Ste 208, Fullerton, CA 92835
Engineers, Inc. (714) 992-4592 email: [email protected] Jessica Reyes, PE
Senior Transportation Engineer I
signal controllers, countdown pedestrian head
Education indications, and signal poles to enhance safety California State University, Fullerton at the project intersections. Ms. Reyes is Bachelor of Science, Civil Engineering, 2016
currently working on the traffic signal
Professional Registrations improvements and traffic signal modification CA Registered Civil Engineer - CE #96452 plans, as well as preparing specifications and cost estimates, and preparing the
Professional Associations Authorization-to Proceed (E-76) package.

Institute of Transportation Engineers
Orange County Traffic Engineers Council Signal System Design, Signal Modifications, and Bus Stop Improvements, Ontario
Ms. Reyes participates in a wide variety of The scope of this project includes transportation engineering functions and has improvements at several intersections worked with government agencies throughout surrounding a bus stop, as well as Southern California. Her duties include improvements to the bus stop. Ms. Reyes is designing both new and modified traffic signals, currently designing the traffic signal modification plans for this multi-stage project.
fiber communications, signing and striping,
street lighting, and implementation of both bike
lanes and traffic control. She also prepares Artesia Boulevard Safety Enhancements, plans, specifications and estimates. She Redondo Beach
The City decided to convert several
conducts sight distance analyses and traffic
signal warrants, along with other field studies intersections to Flashing Yellow Arrow (FYA) signal phasing, as well as improving sight
such as crossing guard studies, traffic impact
distance for drivers by making various roadway
studies, and traffic operations analyses.
modifications. Ms. Reyes conducted
topographic surveys to verify the existing
Relevant Experience
conditions of traffic signals, designed traffic
signal modifications and signing and striping
Project P Marguerite Parkway Traffic Signal
plans, and prepared project specifications and
Synchronization Program (TSSP), Mission Viejo cost estimates. She is currently providing The goal of this project is to improve safety and
support during the bid and construction phases.
traffic flow by developing and implementing
signal synchronization timing and designing
HSIP Cycle 11 Edinger Avenue and Heil Avenue
improvements to the traffic signal
infrastructure. Ms. Reyes is currently preparing Corridors, Huntington Beach The project entails safety improvements to
traffic signal improvement plans as well as
traffic signal modification design plans. traffic signals such as retroreflective backplates, improvements to roadway markings, changes to
HSIP Cycle 11 Citywide Traffic Signal Upgrades, and pedestrian signal timing, etc. Ms. Reyes is Buena Park currently designing signing and striping plans, as well as preparing project specifications and cost
This is a grant related project to improve traffic
signals with upgrades to vehicle heads, traffic estimates.

AGA 211 Imperial Hwy, Ste 208, Fullerton, CA 92835
Engineers, Inc. (714) 992-4592 email: [email protected] Ms. Jessica Reyes

Page 2 ends

HSIP Cycle 11 Iris Avenue Corridor Safety communications plans. She also prepared Improvements, Moreno Valley specifications, cost estimates, and Caltrans The objective of this project is to design safety encroachment permits for the following improvements such as retroreflective corridor projects:
backplates, improvements to pavement • Arrow Highway
markings, changes to pedestrian timing, etc. • Holt Boulevard Ms. Reyes designed o the traffic signal • Monte Vista Avenue improvements and signing and striping plans.

Fiber Optic Communications Design, City of
Regional Traffic Signal Synchronization Yorba Linda
Program (RTSSP) Projects, OCTA The goal of this project was to connect fiber OCTA developed a signal coordination plan to optic communications from City Hall to various optimize traffic flow and travel conditions in community buildings in the City. Ms. Reyes Orange County, including the timing plan conducted field reviews of the project corridor, development, implementation, fine tuning, and designed fiber optic communications plans, as monitoring for all signalized intersections along well as prepared specifications and cost each arterial project corridor. Tasks Ms. Reyes estimates. conducted for this project include providing the
components necessary to improve and enhance HSIP Cycle 9 Traffic Signal Modification signal timing, synchronization, and coordinated Improvements, Fountain Valley operations for all signalized intersections. Ms. Ms. Reyes conducted topographic surveys to Reyes conducted topographic surveys of the verify the existing conditions of traffic signals, project intersections, prepared base plans, and designed traffic signal modifications. She developed traffic signal modifications, prepared prepared project specifications, cost estimates, fiber communication design plans, and assisted and the Authorization-to-Proceed (E-76) with the final signal design. She has worked package. She also provided support during the on the following corridors: bid and construction phases. • Portola Pkwy/Santa Margarita Pkwy
• Lake Forest Dr Regional Traffic Signal Synchronization Program Project, Fullerton
Traffic Signal Synchronization Projects (TSSP), The City led these projects with the goal of Los Angeles County improving traffic flow and safety by developing The goal of TSSP projects is to improve traffic signal timing plans, implementing and fine conditions and traffic flow through timing plan tuning them, then conducting monitoring services. Ms. Reyes prepared traffic signal
designs and fiber optic communications plans,
for both the Manhattan Beach Boulevard and as well as specifications, cost estimates, and Redondo Beach Boulevard corridors. The Caltrans encroachment permits. She provided projects included upgrading traffic signals to the support during the bid and construction phases latest CA MUTCD guidelines, Caltrans standards, for the following corridors:

ADA requirements, and upgraded the vehicle • Harbor Boulevard detection to the new hybrid radar/video • Orangethorpe Avenue/Esperanza Road detection at many of the intersections. • Malvern Avenue/Chapman Avenue • Gilbert Street/Idaho Street
Traffic Signal Improvements, Montclair • Imperial Highway Ms. Reyes prepared signing and striping plans, • Lambert Road traffic signal designs, and fiber optic
AGA 211 Imperial Hwy, Ste 208, Fullerton, CA 92835
Engineers, Inc. (714) 992-4592 email: [email protected] Phillip Fuentes
Senior Signal Systems Specialist
procedures and personnel, means that projects
Education
have superior support in the implementation,
Signal Technician
IMSA Level III Training and Safety fine-tuning, operation, and monitoring of a wide variety of signal systems. He routinely monitors
Professional Registrations signal operations and coordination - from both Certified General Electrician our Traffic Management center and in the field - (DIR-NEC) No. 1219960 looking for both hardware-related and timing- related problems. He quickly responds to
Contractor's State License
municipal clients on an as-needed basis.

C-10 Electrical #1057389
Mr. Fuentes is a valuable part of the team when
it comes to preparation and implementation of
Mr. Fuentes brings his invaluable experiences
improvements and timing for the Regional Traffic
and technical skills to everything from
Signal Synchronization Programs for the OCTA
conducting preventative maintenance to
funded Projects throughout Orange County. His
installing traffic signal equipment (i.e., signal
tasks include detailed field inventory, preparing
traffic poles, intersection cabinets, Opticom,
local timing (including pedestrian and bicycle
controllers), troubleshooting and supervising to
timing), implementing, fine-tuning and
overseeing contractors and the construction of
monitoring the signal operation for these
signal and roadway improvement projects on a
projects.
day-to-day basis.

Relevant Experience
Mr. Fuentes provides citywide assessments and
inventory of infrastructure and communications.

Onsite and Remote Support
He is highly proficient with all types of
Mr. Fuentes provides both onsite and remote
communications systems, including QuiNet,
support, administration, repair, hardware
Transparity, Tactics, Centracs, and Kinetic
implementation, and product maintenance for
software, making him an extremely valuable AGA's clients. He is responsible for purchasing member of the AGA team and a welcome
and installing hardware and software in local
support to our municipal clients.
agencies' Traffic Management Centers, including
a wide range of central control systems. He
He regularly resolves client problems by phone,
provides signal timing implementation and fine
email and onsite visits-he gathers information,
analyzes and/or reproduces the problem in a lab tuning, both remotely and in the field. environment, and provides pertinent solutions.

Mr. Fuentes monitors signal systems from the
He is unparalleled in his ability to establish
AGA Traffic Management Center in our Fullerton
positive working relationships with local
office (where we regularly monitor more than
agencies, both with engineers and field
250 signals and CCTVs daily), or remotely
technicians.
monitor city intersections on an on-call basis.

The monitoring requested by our clients
Mr. Fuentes' experience in the field, as well as
includes: observing traffic, checking controller
his familiarity with CSC and Team Econolite
times and making coordination timing changes
AGA 211 Imperial Hwy, Ste 208, Fullerton, CA 92835
Engineers, Inc. (714) 992-4592 email: [email protected] Mr. Phillip Fuentes

Page 2 ends

as needed to keep traffic flowing optimally. He • Portola Parkway/Santa Margarita Parkway can also adjust timing as needed per changes in • MacArthur Boulevard/Talbert Avenue traffic volumes and conditions. • Lake Forest Drive
• Alicia Parkway
Central Traffic Signal Systems Orangethorpe Avenue/Esperanza Road Monitors and provides as-needed support to
maintain and/or improve traffic signal Traffic Signal Synchronization Projects operations at the following cities' central Tasks included preparation/implementation of signal systems: improvements to traffic signal timing.
• Laguna Niguel - Econolite Centracs Provided detailed field inventories, prepared • Montclair - Transparity local timing (including pedestrian and bicycle • Highland - QuicNet timing) and implemented, fine-tuned and • Fountain Valley - Qfree/Intelight MaxView monitored traffic signal operation. • La Habra - Ofree Kinetic
• Huntington Beach: Goldenwest St/Heil
Ave, Newland St/Slater Ave, Newland
On behalf of AGA, Mr. Fuentes provides training
St/Ellis Ave Traffic Signal Modifications
for city staff on how to properly maintain and
Projects
use newly installed traffic system.
• Downey: Stewart & Gray Road Fiber-Optic
Central Avenue Corridor Traffic Signal Traffic Signal Communications and Improvements, Montclair Upgrades Project
Project involves preparation and installation of
• Rialto: Protected Left-Turn Signal Phasing
both local and coordination signal timing,
Project.
converting existing timing charts to the new
controller format, developing traffic signal • Indio: Jackson Street, Monroe Street, and modification plans, fiber optic communication Highway 111 projects plans, and signing and striping plans, system
• Fountain Valley: Left Turn Phasing at 8
integration, and construction engineering
Intersections
support.

Holt Boulevard Improvements, Montclair
Project involves intersection level of service
analyses, preparation of coordination signal
timing, converting existing timing charts to the
new controller format, developing traffic
signal modification plans, developing fiber
optic communication plans, providing
construction engineering support, and
providing system integration.

Regional Traffic Signal Synchronization
Program (RTSSP) Projects
Tasks include detailed field inventory, traffic
signal system evaluations, preparing local
timing (including pedestrian and bicycle timing),
implementing, fine-tuning and monitoring the
signal operation for the following projects:

AGA 211 Imperial Hwy, Ste 208, Fullerton, CA 92835
Engineers, Inc. (714) 992-4592 email: [email protected] SAGA
Engineers, Inc.

Billing Rates
January 2025
President / Executive Vice President $ 295
Vice President $ 270
Director of Project Development $ 250
Principal Transportation Engineer / Principal Engineer $ 250 Senior Design Engineer / Senior Transportation Engineer I| $ 230 Senior Transportation Engineer l $ 220
Senior Project Engineer & Project Manager 210
Senior Project Engineer / Senior Associate $ 200
Transportation Engineer III / Advanced System Integrator $ 200 Transportation Engineer I| $ 190
Transportation Engineer 1 / Senior System Integrator $ 180 Senior Signal Systems Specialist / Construction Inspector $ 180 Design Engineer/Signal Systems Specialist III $ 170
Associate Transportation Engineer I|I / Systems Engineer I| $ 165 Associate Transportation Engineer II / Signal System Specialist I| $ 155 Signal System Specialist I / Project Coordinator $ 145
Associate Transportation Engineer 1 / Associate Engineer II / Systems Engineer I $ 145 Associate Engineer 1 / Signal Technician I| $ 135
Assistant Engineer / Assistant Project Coordinator $ 130 Signal Technician I $ 120
Transportation Engineering Assistant $ 110
Engineering Aide III $ 100
Traffic Enumerator / Engineering Aide Il $ 85
Engineering Aide I $ 75
Council/Commission Meetings, Hearings, etc. (Billing Rate + $50 Surcharge) $ 1,000 Subconsultants will be billed at cost plus 20%
Our rates are all inclusive and will remain firm for the duration of the contract. All direct and indirect costs (i.e., mileage, equipment, materials, reproduction and printing, etc.) are included in our fees.

Conditions of Usage: The above rates are typically effective for a 12-month period, but AGA maintains the right to change the billing rates at any time for convenience of record keeping. Therefore, all billings will always be at the then current billing rates. This will not affect any agreed upon total or not-to-exceed fees.

AGA Engineers, Inc.
211 Imperial Highway, Suite 208, Fullerton, CA 92835
(714) 992-4592 Email: [email protected]

← All documents from this meeting