4150 S.W. 19 Street
Ocala, FL 34474
p: (800) 609-6066 | f: (352) 237-2256
www.shadesystemsinc.com
Sales Order
Bill To: City of Orange
300 East Chapman Avenue
Orange, California 92866
Nathan Bluhm
[email protected]
Project Name: Hart Park - HGAC
Prepared By:
Quote No.:
Quote Date:
Expires On:
Matt Johnson (ext. 106)
(800) 609-6066
[email protected]
Q-14322
3/4/2025
6/2/2025
Thank you for your interest in Shade Systems. We are happy to quote the following product(s):
QTY DESCRIPTION EACH TOTAL
8 Model No. SAT2514A - Add another triangular up to 25' per side with 1 column - max. 14'
CoolNet™ Color:_________________________
Powder-Coat Color:_________________________
$8,094.00 $64,752.00
1 Model No. SAT2520 - Up to 25' per side triangular canopy with 3 support columns - Max 20'
CoolNet™ Color:_________________________
Powder-Coat Color:_________________________
$20,237.00 $20,237.00
1 Model No. SAT3514 - Up to 35' per side triangular canopy with 3 support columns - Max 14'
CoolNet™ Color:_________________________
Powder-Coat Color:_________________________
$15,739.00 $15,739.00
12 Model No. PMT6 - Pier Mount Column - Over 6" $683.00 $8,196.00 2 California Professional Engineer Sealed Drawings $0.00 $0.00 2 California Professional Engineer Sealed Calculations $0.00 $0.00 1 Less: Discount per HGAC Contract PR11-20R $-3,812.34 $-3,812.34 1 Shipping / Handling Charge to Orange, California 92866 $15,200.00 $15,200.00 TOTAL: $120,311.66
IMPORTANT TERMS & CONDITIONS:
• All products quoted are per standard Shade Systems specifications per our catalog with column type(s) indicated. • Please note that our Pier Mount columns (if applicable) are designed to be fastened to a concrete pier poured to the specifications shown in our engineering drawings, and not to an existing concrete slab, sidewalk, or floor. • Above includes the cost of powder-coating metal parts with standard Shade Systems colors as shown in our catalog. Special optional colors are available upon request at additional cost.
• Quotation does not include any applicable taxes. Please provide your sales tax exemption certificate at time of order. • Prices do not include any concrete supplies, anchoring hardware (if applicable), truck unloading or installation. • Current shipping schedule is estimated at 6 to 8 weeks after receipt of order. • To place this order, please indicate desired colors in the space above and return signed copy of this Sales Order along with your official municipal purchase order. Payment terms are Net 30 Days.
ABOVE APPROVED AND ACCEPTED:
By signing below, Buyer accepts the terms and conditions of this Sales Order and directs Shade Systems to provide the products listed for the amounts shown. Buyer agrees this order is not cancelable.
BY: _____________________________________________________ TITLE: ________________ DATE: ________________