Thomas DiScipio
Vice President
William Stafford
General Manager
COMPENSATION TABLE - AGREEMENT ITEMIZATION
FY 25-26 CONTRACT TOTALS
YEAR ONE (FY 25-26) ANNUAL MAINTENANCE
Fred Barrera Park -3200 SF $2,400.00
Serrano Park -4600 SF $3,450.00
El Camino Real Park -2127 SF $1,595.00
Steve Ambriz Park -11200 SF $24,080.00
El Modena Park -3450 SF $7,420.00
SUB-TOTAL $38,945.00
Proposal #25-42450 (Steve Ambriz Surfacing Repairs) $12,439.00 YEAR ONE AGREEMENT TOTAL $51,384.00
CONTINGENCY 10% $5,138.40
CONTRACT TOTAL $56,522.40
Unless otherwise directed by the City, all services rendered by Contractor shall be completed during FY 25-26 on or before June 30, 2026. All payments shall be made in accordance with the portion of work completed per the table above and in alignment with the contract term.
Scope of work and fee description are enumerated upon in the following pages (Contractor’s Proposal; Maintenance Agreement Five (5) Parks and Steve Ambriz Memorial Park PIP Repairs)
***Continued on following pages***
EXHIBIT A
PAGE 1 OF 3
CITY OF ORANGE
Maintenance Agreement for Five (5) Parks starting August 2025 OMNIA #R230202 – Expires July 2026
SCOPES OF WORK: (Work to be completed between August and October) (A) Inspect Park, Pressure Wash Pad and Equipment and Repair up to 10 SF of PIP per Location.
(B) Inspect Park, Pressure Wash Pad and Equipment, Repair up to 10 SF of PIP per Location and provide a Tot Turf ReFresh Aromatic Roll Coat
Notes:
Robertson’s to make non-binding recommendations for any additional work not included in this agreement.
Additional Repairs over the 10 SF per location will be charged at $28 per SF for Wear Course and $35 per SF for Wear Course with Buffing Repairs. Fencing and security to be the responsibility of the City. City and RRS to confirm schedule in June of each year. 5 Parks Totaling 24,577 SF
ODD YEARS (2025 etc.)
Fred Barrera Park - 8380 E Serrano Ave. 3200 SF (A) $2,400 Serrano Park - 2399 Apache Creek Dr. 4600 SF (A) $3,450 El Camino Real - 400 N Main St. 2127 SF (A) $1,595 Steve Ambriz Park - 611 Riverbend Parkway 11200 SF (B) $24,080 El Modena Park - 4645 E. Phillips Place 3450 SF (B) $7,420 T O T A L : $ 3 8 , 9 4 5
EVEN YEARS (2026 etc.)
Fred Barrera Park - 8380 E Serrano Ave. 3200 SF (B) $6,880 Serrano Park - 2399 Apache Creek Dr. 4600 SF (B) $9,890 El Camino Real - 400 N Main St. 2127 SF (B) $4,575 Steve Ambriz Park - 611 Riverbend Parkway 11200 SF (A) $8,400 El Modena Park - 4645 E. Phillips Place 3450 SF (A) $2,585 TOTAL: $32,330
2-Year Contract = $71,275
EXHIBIT A
PAGE 2 OF 3
NOTE: CITY PROCEEDING/AUTHORIZING "ODD YEAR (2025)" ONLY; NOT "EVEN YEARS (2026)".
Proposal # 25-42450
Robertson Industries, Inc.
2140 E. Cedar Street
Tempe, AZ 85281
(800) 858-0519
FAX: (602) 340-0402
www.totturf.com
Date Issued: 06/16/2025
Project Name: Steve Ambriz City of Orange - PIP Repairs Address: 611 Riverbend Pkwy, Orange, CA 92865
Contact: Robert Ambriz
Phone: (714) 744-7283
Email: [email protected]
Sales Representative
Name: Vince Brantley
Phone: +17149048219
Email: [email protected]
PRICE EXPIRES: 09/15/2025
PRODUCT NAME DESCRIPTION QTY UNIT PRICE TOTAL
Surfacing Repairs Surfacing Repairs per below 1 $12,439 $12,439 GRAND TOTAL $12,439
CONTRACT TYPE: Omnia WAGE TYPE: State Prevailing UNION: No CA GRANT: No DETAILED SCOPE:
OMNIA Contract #R230202 – Exp. July 2026
CA DIR Registration # 1000002700 - CA Contractors Lic. #667261 C/61 - D/12 PRICE BASED ON:
Prevailing Wages and apprenticeship requirements when applicable.
There are NO Union or Labor Agreements requirements included in our proposal.
Performance and/or Payment Bonds are Not Included (add 2% if required) PIP Wear Course Repairs to be done at same time as Annual Maintenance 3 pads same area 100% Beige and 100% Std. Red – Aromatic 230 LF Perimeter Seam Repair at 4” wide = 77 SF
636 SF ½” Remove and Replace – see picture
70 Misc ½” Wear Course Repairs/Spider Cracks
Fencing Not Included - City to Secure
COMMENTS:
SECURITY:
N/A
Scheduling/Site Contact: Robert
Phone: 714-774-7283 Email: [email protected]
Estimated Install Date:
Ready
INITIALS
EXHIBIT A
PAGE 3 OF 3