Narrative Summary: Impacts Analyzed in the GP PEIR (b)
Less Than Significant Impacts. The GP PEIR examined potential impacts of the General Plan relative to Hazardous Materials to the public and environment.
Commercial uses such as dry cleaners and vehicle maintenance facilities, industrial uses and hospitals throughout the planning area may use, dispose of, or transport hazardous materials. Future development associated with the implementation of the General Plan that is in proximity to these uses could be exposed to hazardous materials related to the use, disposal, and transport of hazardous materials. Mitigation Measure 5.7-7 requires the City to adopt, review and implement the EOP according to requirements and provisions of the State Emergency Management System and National Incident Management System.
The EOP would be reviewed and updated responding to the changing conditions within the planning area over the course of the General Plan implementation.
With adherence to existing regulations and plans, impacts associated with emergency plans would be reduced to a level less than significant.
Impacts Associated with the Proposed Project (b)
No New Impacts. The Property Owner/Developer would be required to comply with all applicable federal, state, and local laws and regulations pertaining to the transport, use, disposal, handling, and storage of hazardous waste during the construction phase to reduce the likelihood and severity of accidents during transit. Additionally, removal of any unknown USTs from the Project Site would be subject to all applicable federal, state, and local laws and regulations pertaining to their removal.
Proper handling of the use and disposal of hazardous materials associated with residential uses would reduce the potential for exposure. Operation of the Proposed Project would not involve the transport, use, or disposal of copious quantities of hazardous materials. The use of hazardous materials on the Project Site post-construction would consist of those commonly used in a residential setting for routine maintenance and cleaning. Proper handling of the use and disposal of hazardous materials would reduce the potential for exposure.
Therefore, no new impacts to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment would occur, and no new mitigation is required. c) Would the project emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school?
Narrative Summary: Impacts Analyzed in the GP PEIR (c)
Less than Significant Impacts. The GP PEIR discusses how new development mentioned in the General Plan would involve infill and/or redevelopment of existing land uses. The implementation of the General Plan and its policies and Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
programs is not expected to result in the accidental release of hazardous materials or substances into the environment or within one-quarter mile of a school; however, future development could emit hazardous materials into the environment and may also subject existing development, including schools, to hazardous emissions and waste. Mitigation Measure 5.7-6 and 5.7-7 would reduce these impacts to existing or proposed schools to a less than significant level.
Impacts Associated with the Proposed Project (c)
No New Impacts. The Proposed Project involves site preparation and the development of 11 dwelling units, ranging from 2,425 sq. ft. to 2,724 sq. ft.. During the construction phases of the Proposed Project, the transport of construction waste for disposal could result in accidental release of hazardous materials.
The nearest school to the Project Site is Santiago Charter Middle School, located less than 0.1-mile from the Project Site. The Property Owner/Developer would be required to comply with all applicable federal, state, and local laws and regulations pertaining to the transport, use, disposal, handling, and storage of hazardous waste during the construction phase to reduce the likelihood and severity of accidents during transit. Required standards would be subject to review and regulation by each applicable jurisdiction. Proper handling of the use and disposal of hazardous materials associated with residential uses would reduce the potential for exposure of any school in proximity to the Project Site to hazardous materials. Therefore, no new impacts associated with the emission of hazardous or handling of hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school would occur, and no new mitigation is required.
d) Would the project be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code § 65962.5 and, as a result, would it create a significant hazard to the public or the environment?
Narrative Summary: Impacts Analyzed in the GP PEIR (d)
No Impacts. The GP PEIR determined that any future development project that occurs be pursuant to Government Code § 65962.5 on a project-by-project basis.
New Development would mostly occur as infill development and/or redevelopment on existing land uses, however, new residential and mixed-use development in areas previously zoned for commercial and industrial uses could lead to increased potential for residential exposure to hazardous materials.
Mitigation Measure 5.7-1 requires the city to continue to assess risks associated with hazardous materials and future development, where individual projects would develop Mitigation Measures accordingly, as well as at a City level. For projects associated with the General Plan implementation, any significant hazard Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
to the public or environment related to Project Site location and Government Code § 65962.5 would be reduced to a less than significant level.
Impacts Associated with the Proposed Project (d)
No New Impacts. A site-specific Phase I Environmental Site Assessment (ESA) was completed to determine potential impacts associated with hazards and hazardous materials (Appendix E – Phase I Environmental Site Assessment – 647 North Rancho Santiago Boulevard, Partner Engineering and Science, March 5, 2021). No evidence of the use of reportable quantities of hazardous substances was observed on the subject property. Small quantities of general maintenance/cleaning supplies and pool equipment were found to be properly labeled and stored at the time of the assessment with no signs of leaks, stains, or spills. The storage and use of these supplies do not appear to pose a significant threat to the environmental integrity of the subject property at the time of the Phase I ESA.
Partner Engineering and Science obtained historical aerial photographs of the Project Site form Environmental Data Resources on February 22, 2021, that indicate the site was used for agricultural uses with a single-family residence from as early as 1938 through 1952. All surrounding properties are shown to be developed with what appears to be agricultural land. In 1963 and 1966, the Project Site was developed with an additional residential structure. The property directly south was developed with what appears to be the current single-family residence. Photographs from 1972 show no significant changes on the Project Site, whereas the site directly north was developed with the current church building and the property to the west was developed with the current single- family residences across Rancho Santiago Blvd. In 1977, what appears to be additional small buildings and shade coverings were developed on the eastern portion of the Project Site. The site directly north was developed with a commercial or industrial building adjacent to the church, which appears to be the current greenhouse as of 1985. The property to the east of the subject site began construction of what appears to be the current single-family residences.
In images from 1989 through 2016, the Project Site developed additional small buildings and horse stalls dispersed east of the single-family residences up to the eastern property line. In 2002, a pool was developed near the single-family residences. The latest image provided in the Phase I Assessment is from 2016, where the site is developed with two single-family residences on the western portion of the Project Site, a private pool adjacent to the single-family residences, and small buildings and horse stalls dispersed throughout the rest of the site.
Google Earth imagery, accessed November 7th, 2024, shows all development demolished and the pool removed and filled with dirt as of 2022. 2023 Google Earth imagery shows the site was overgrown with what appears to be native shrubs and the building footprint in the northwest corner. In 2024, the shrubs Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
appear to have been removed, with little regrowth, and the remainder of the site covered with dirt and the building footprint in the northwest corner of the Property Site.
Based on information obtained by Partner from the USDA Natural Resources Conservation Service Web Soil Survey online database, the Project Site is mapped as Cropley clay (82%) and Myford sandy foam, thick surface (18%). The Cropley clay consists of deep, well-drained soils that formed in alluvial fans and terraces from alluvium derived from calcareous shale. The Myford sandy loam, thick surface consists of deep, well-drained soils that formed in terraces from alluvium derived from mixes. Albus Associates completed a Geotechnical Report (Preliminary Geotechnical Investigation, Proposed Residential; Development, 647 North Rancho Santiago Boulevard, August 9th, 2022). The study reported that the Project Site is underlain by terrace deposits, with artificial fills encountered within to an approximate depth of 6 feet, which is associated with the backfilled pool.
Additional fill materials were not encountered but are anticipated onsite within the footprints of previous structures. Therefore, no new impacts associated with the Proposed Project associated with hazardous materials would occur, and no new mitigation is required.
e) For a Project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the Project result in a safety hazard or excessive noise for people residing or working in the Project area?
Narrative Summary: Impacts Analyzed in the GP PEIR (e)
No Impacts. The GP PEIR did not discuss potential impacts associated with an airport land use plan, as the City area is not within or adjacent to an airport land use plan. The nearest airport to the City of Orange is John Wayne International Airport, approximately 6.5 miles west of the City’s southwestern city boundary.
Therefore, there would be no safety hazard impacts associated with airports or airstrips for people residing or working in the project limits, and no mitigation is required.
Impacts Associated with the Proposed Project (e)
No New Impacts. The Project Site is not located within an airport land use plan.
The John Wayne International Airport is located approximately 8.6 miles from the Project Site. The Fullerton Municipal Airport is approximately 11.2 miles from the Project Site. Therefore, no new impacts associated with a safety hazard or excessive noise for people residing or working in the project area would occur, and no mitigation is required.
f) Would the project impair implementation of, or physically interfere with, an adopted emergency response plan or emergency evacuation plan? Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
Narrative Summary: Impacts Analyzed in the GP PEIR (f)
Less than Significant Impact: The GP PEIR examined this issue and determined that new development associated with the OGP has the potential to impede existing emergency access to some portions of the planning area in the event of a disaster. Mitigation Measure 5.7-3 would require the City to continually maintain, equip and update the Emergency Operations Center to improve public safety and agencies responsible, as well as mitigate potential impacts to the interference of an adopted emergency response plan or emergency evacuation plan. The City implements the EOP according to requirements and provisions of the State Emergency Management System and National Incident Management System. The EOP would be reviewed and updated responding to the changing conditions within the planning area over the course of the General Plam implementation. With adherence to existing regulations, plans as well as Mitigation Measures 5.7-1, 5.7-3, and 5.7-7, impacts associated with emergency plans would be reduced to a level less than significant. Implementation of these Mitigation Measures would reduce the impacts of airport noise to a less than significant level.
Impacts Associated with the Proposed Project (f)
No New Impacts. The Proposed Project would allow emergency access to the Project Site through the western driveway. The closest fire station to the Project Site is Orange County Fire Authority Station 23, located approximately 0.82 miles north. The proposed on-site accessways and interior roadways meet the turning radii and driveway width requirements of the Orange County Fire Authority. In addition, as part of the plan check process, the Project Site plan would undergo a fire, life, and safety review to ensure adequate infrastructure for emergency response and access. Therefore, no impacts associated with an adopted emergency response plan or emergency evacuation plan would occur and no new mitigation would be required.
g) Expose people or structures, either directly or indirectly, to a significant risk of loss, injury or death involving wildland fires?
Narrative Summary: Impacts Analyzed in the GP PEIR (g)
Less than Significant Impact. The GP PEIR discusses that development associated with the OGP implementation may occur within or adjacent to fire hazard severity zones. No General Plan land use focus areas are located within wildland areas.
New development in undeveloped areas, especially in the hillsides and canyons of the eastern portion of the planning area, could increase risk of exposure to wildfires. Mitigation Measure 5.7-6 and 5.7-7 would mitigate these impacts through education and updating master plans, standards and guidelines. Mitigation Measure 5.7-4 requires the City to update building and fire code to reduce natural disaster event impacts and Mitigation Measure 5.7-5 requires the City to continue Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
to evaluate and regulate information available to the City regarding potential fire hazards and hazard areas. With adherence to existing policies and regulations, and implementation of Mitigation Measures 5.7-4, 5.7-5, 5.7-6, and 5.7-7, impacts associated with wildland fire hazards would be reduced to a level less than significant.
Impacts Associated with the Proposed Project (g)
Less than Significant Impact. According to the 2025 CAL FIRE Fire Hazard Severity Zones (FHSZ) Map Viewer, the Project Site is located in a Very High Fire Hazard Severity Zone (VHFHSZ) in a Local Responsibility Area (LRA) (Figure 7 – Fire Hazard Severity Zones). This means that the Proposed Project is required to comply with Chapter 7A of the CBC/the Wildland-Urban Interface (WUI) Code as well as the City’s local fire procedures and regulations. As part of the plan check process, the Project Site plan would undergo a fire, life, and safety review and would be required to comply with all fire regulations applicable to the project area.
Therefore, no new impacts associated with wildland fires would occur, and no new mitigation is required.
Conclusion
No new impacts associated with hazards and hazardous materials would occur.
The Proposed Project would not result in any impacts beyond those identified in the GP PEIR. The Proposed Project contains no substantial changes to the implementation of the General Plan, there have been no substantial changes in circumstances, and no new information has become available, not known and could not have been known, at the time of certification, which would require major revisions to the PEIR. The Hazards and Hazardous Materials impacts of the Proposed Project would be less than significant, and no Project-specific mitigation would be required. With regards to the issue of Hazards and Hazardous, the following findings can be made:
1. No peculiar impacts to the Project or its site have been identified.
2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the GP PEIR.
3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the GP PEIR.
4. No new Mitigation Measures would be required because Project- specific impacts would be less than significant. GP PEIR Mitigation Measures and uniformly applied development policies and standards have been implemented through the Proposed Project.
Rancho Ridge Residential
Initial Study/CEQA Analysis under CEQA § 15183 Exemption Figure 6: Agricultural Designation Map
Source: CA Department of Conservation
Project Location
-Not to Scale
Rancho Ridge Residential
Initial Study/CEQA Analysis under CEQA § 15183 Exemption Figure 7: 2025 Fire Hazard Severity Map
Source: California Department of Forestry and Fire Protection
Project Location
- Not to Scale
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
4.10 Hydrology and Water Quality
Impact Analysis
CEQA THRESHOLDS
Project
Peculiar
Impact that is
not
Substantially
Mitigated by
Uniform
Applied
Policies
Significan
t Impact
not
Analyzed
as
Significan
t in the
GP PEIR
Potentially
Significant
Offsite or
Cumulative
Impact not
Discussed
in the GP
PEIR
Adverse
Impact More
Severe Based
on
Substantial
New
Information
No
New
Impact
from
GP
PEIR
X. HYDROLOGY AND WATER
QUALITY:
Would the project:
a) Violate any water quality
standards or waste discharge
requirements or otherwise
substantially degrade surface or
ground water quality?
X
b) Substantially decrease
groundwater supplies or interfere
substantially with groundwater
recharge such that the project may
impede sustainable groundwater
management of the basin?
X
c) Substantially alter the existing
drainage pattern of the site or area,
including through the alteration of
the course of a stream or river, or
through the addition of impervious
surfaces, in a manner which would:
X
result in substantial erosion
or siltation onsite or offsite; X
substantially increase the
rate or amount of surface
water runoff in a manner
which would result in
flooding on or offsite;
X
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
CEQA THRESHOLDS
Project
Peculiar
Impact that is
not
Substantially
Mitigated by
Uniform
Applied
Policies
Significan
t Impact
not
Analyzed
as
Significan
t in the
GP PEIR
Potentially
Significant
Offsite or
Cumulative
Impact not
Discussed
in the GP
PEIR
Adverse
Impact More
Severe Based
on
Substantial
New
Information
No
New
Impact
from
GP
PEIR
create or contribute to
runoff water which would
exceed the capacity of
existing or planned
stormwater drainage
systems or provide
substantial additional
sources of polluted runoff; or
X
impede or redirect flood
flows? X
d) In flood hazard, tsunami, or
seiche zones, risk release of
pollutants due to project
inundation?
X
e) Conflict with or obstruct
implementation of a water quality
control plan or sustainable
groundwater management plan?
X
General Plan PEIR Mitigation Measures
General Plan PEIR Mitigation Measure Applicable/Not Applicable
5.8-1 Support efforts by the Orange County
Flood Control District (OCFCD) to regularly
maintain flood control channels and structures
owned by the OCFCD, and to complete
necessary repairs in a timely manner. Work with
the OCFCD and USACE to identify new flood
control improvements and establish installation
programs for improvements as needed. Work
with the OCFCD to identify opportunities to
enhance the natural qualities of Santiago
Creek to protect habitat and reintroduce
Mitigation Measure is not applicable.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
General Plan PEIR Mitigation Measure Applicable/Not Applicable native plants, animals, and fish.
(Implementation Program V-11)
5.8-2 Continue to inspect storm drains, remove
debris from catch basins as needed, and
evaluate and monitor water storage facilities
to determine if they pose a water inundation
hazard. (Implementation Program I-32)
Mitigation Measure is not applicable.
5.8-3 Before making land use decisions, the
City will utilize available methods to estimate
increases in pollutant loads and flows resulting
from projected future development.
The City will follow the most current NPDES
Permit and County of Orange DAMP to ensure
that the City complies with applicable federal
and state regulations. Applicants for new
development and redevelopment projects
shall demonstrate accomplishment of the
following:
Use structural and nonstructural BMPs to
mitigate projected increases in
pollutant loads and flows;
Control the velocity of pollutant loading
flows during and after construction;
Limit areas of impervious surface and
preserve natural areas;
Limit directly connected areas of
impervious surfaces;
Use natural treatment systems such as
wetlands and bioswales to treat storm
runoff where technically and
economically feasible;
Provide on-site infiltration and
temporary on-site retention areas;
Limit disturbance of natural water
bodies, natural drainage systems, and
highly erodable areas; and
Use pollution prevention methods,
source controls, and treatment with
small collection strategies located at or
as close as possible to the source.
Mitigation Measure is applicable. The
Proposed Project would comply with
all applicable federal and state
regulations, including compliance
with the NPDES permit and
preparation of a SWPPP. The Proposed
Project’s PWQMP lists BMPs to mitigate
projected increases in pollutant loads
and flows. The Proposed Project’s
SWPPP would comply with the
Construction General Permit, which
includes pollution prevention
methods, BMPs, and discussion of the
Project’s impervious surface, pollutant
loading flows, applicable stormwater
runoff treatment systems, and more.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
General Plan PEIR Mitigation Measure Applicable/Not Applicable In addition, applicants for large development
projects are required to meet site
predevelopment hydrologic conditions and to
retain runoff on-site where technically feasible.
(Implementation Program III-8)
5.8-4 Comply and implement all provisions of
the NPDES permit and support regional efforts
by the Santa Ana RWQCB to improve and
protect water quality.
(Implementation Program V-9)
Mitigation Measure is applicable. The
Project Site is over one-acre and will
prepare a SWPPP and follow the
Construction General Permit as part of
the NPDES permit.
Discussion
a) Violate any water quality standards or waste discharge requirements, or otherwise substantially degrade surface or ground water quality? Narrative Summary: Impacts Analyzed in the GP PEIR (a)
Less than Significant Impact with Mitigation. The GP PEIR states that construction activities related to the implementation of the OGP could contribute additional pollutants, including sediments from grading activities and contaminants associated with construction materials, construction waste, vehicles, and equipment, among others. Future infill development in the City’s existing urban areas is not expected to substantially increase the amount of existing impervious surfaces and, in fact, site redevelopment may provide opportunities to create new pervious surfaces through new landscaping and use of porous pavements, which could reduce the amount of runoff and associated pollutants. However, since storm drains are designed to carry only storm water, these drains typically are not equipped with filters or cleaning systems and, consequently, can deliver polluted urban runoff directly into local flood control channels and the receiving water bodies affecting their beneficial use. Many of the pollutants found in this runoff are toxic to marine and aquatic life. Thus, implementation of the OGP has the potential to violate water quality standards and waste discharge requirements and the impacts would be potentially significant.
Impacts related to pollutants associated with impervious surfaces are reduced primarily by City implementation of Regional Water Quality Control Board (RWQCB) waste discharge permits and through preparation and implementation of a SWPPP, including identification of required BMPs. A WQMP would be required to identify permanent BMPS that would control discharges to MS4s postconstruction. Additionally, because much of the new development with implementation of the OGP would be infill and redevelopment, site conditions and runoff filtration measures would improve through retrofitting and the Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
development review process. With adherence to and implementation of these permits, proposed regulations, and policies, and implementation of Mitigation Measures 5.8-3 and 5.8-4, program-level water quality impacts would be less than significant. Individual development projects would be required to undergo project-specific environmental review. If project-level significant impacts are identified, specific Mitigation Measures would be required under CEQA.
Impacts Associated with the Proposed Project (a)
No New Impacts. A Preliminary Hydrology Analysis (Appendix F – Preliminary Hydrology Analysis for Rancho Ridge Tentative Tract Map No. 19279, Hunsaker & Associates, Inc., May 15, 2024) and a Preliminary Priority Water Quality Management Plan (PWQMP) (Appendix G – Preliminary Water Quality Management Plan – Rancho Ridge – Tentative Parcel Map No. 19279, Hunsaker & Associates, Inc., March 23, 2023) were prepared for the Proposed Project. The Proposed Project would be subject to local, state, and federal water quality requirements. The Proposed Project would comply with the City’s local procedures (Orange Municipal Code), as well as requirements of the National Pollutant Discharge Elimination System (NPDES) permit program of the Federal Clean Water Act to control storm water runoff and prevent violations of regional water quality standards. The Proposed Project’s Geotechnical Report studied the geologic and geotechnical conditions to provide recommendations for site grading, construction, foundation design, and other relevant aspects of the proposed development. Groundwater was not encountered during the geotechnical investigation’s subsurface investigation. Groundwater is not expected to have a significant impact on the proposed development and vice versa. Additionally, the PWQMP states that the Proposed Project would use infiltration BMPs that would capture and treat runoff. Runoff and stormwater would not have an impact of the water quality standards and waste discharge requirements, or substantially degrade surface and/or groundwater quality. b) Would the project substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the basin?
Narrative Summary: Impacts Analyzed in the GP PEIR (b)
Less Than Significant Impacts. The GP PEIR states that development associated with the OGP has the potential to develop in areas where groundwater recharge would naturally occur, such as the eastern portion of the City’s planning area. The GP PEIR discusses that the Orange County Groundwater Basin has been identified as overdrafted because production was exceeding natural replenishment of the basin. However, Orange County Water District (OCWD) has studied the basin and replenishment needs and potential projects to address growth in demand.
Additionally, a completed Ground Water Replenishment System was designed to provide sufficient additional drinking supplies to accommodate an estimated Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
300,000 to 500,000 residents in north and central Orange County, which includes the City’s projected population increase. Based on this availability of increased water supply and the OGP’s designation of land within the Santa Ana River and Santiago Creek floodways as open space in order to preserve these areas for groundwater recharge, impacts related to groundwater resources would be less than significant (GP PEIR, page 5.8-22). Additionally, the proposed OGP buildout population, at a point in time after 2030, is estimated to be 194,543. Based on historical water use, approximately 46,800 AFY would be needed at buildout while the City’s estimated available water supply in 2030 would have increased to approximately 85,062 AFY (49,079 AFY from groundwater and 35,983 AFY from imported water). Therefore, impacts to water supply availability to serve the OGP buildout would be less than significant. Therefore, the GP PEIR concludes impacts related to groundwater supplies would be less than significant.
Impacts Associated with the Proposed Project (b)
No New Impacts. According to the Geotechnical Investigation, groundwater was not encountered during the geotechnical subsurface exploration to a maximum depth of 51.5 feet. Review of the CDMG Special 011 indicates that historic groundwater for the Project Site has not been mapped. However, projecting the historic groundwater contours available and given geologic conditions of the Project Site, groundwater for the Project Site is anticipated to be below a depth of 50 feet. Furthermore, the Geotechnical Investigation reviewed the Department of Water Resources groundwater level data for nearby wells and found that no relevant wells exist near the Project Site. Additionally, the Proposed Project would coordinate with the City of Orange Public Works to obtain the applicable connections for domestic water, sanitary sewer, and recycled water services.
Groundwater is not expected to have a significant impact on the proposed development and vice versa. Therefore, no new impacts associated with the depletion of groundwater supplies or interference with groundwater recharge would occur.
c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, or through the addition of impervious surfaces, in a manner which would:
result in substantial erosion or siltation onsite or offsite; substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site?
create or contribute to runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff; or
impede or redirect flood flows?
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
Narrative Summary: Impacts Analyzed in the GP PEIR (c)
Less Than Significant Impacts. The GP PEIR states that implementation of the OGP would not involve the alteration of existing streams or rivers. Future infill development in the City’s existing urban areas is not expected to substantially increase the amount of existing impervious surfaces or substantially change the flow velocity or volume of storm water runoff. In fact, site redevelopment may provide opportunities to create new pervious surfaces to facilitate groundwater infiltration through new landscaping and use of porous pavements.
Development in the eastern portion of the planning area on currently undeveloped land would convert existing natural areas into impervious surfaces such as buildings, roads, sidewalks, and parking lots. This planned development could potentially increase the volume and velocity of runoff flowing into Santiago Creek and drainage channels leading into the Santiago Creek Recharge Basin. Construction in existing and new development areas would be required to comply with the City’s LIP to ensure that this runoff is properly mitigated and conveyed to the Santa Ana River or to the Santiago Creek.
Therefore, impacts to surface hydrology/water bodies are expected to be less than significant.
Impacts Associated with the Proposed Project (c)
No New Impacts. According to the Hydrology Analysis, the Project Site’s existing stormwater conditions flow on surface toward Rancho Santiago Boulevard, and then flow southerly on the west side of the street, and discharged into an existing catch basin, which is about 300 feet southerly from the Project Site. The Proposed Project’s stormwater condition does not substantially alter the existing drainage pattern of the Project Site. Peak storm runoffs produced from the Project Site under proposed conditions shall also slow on surface toward Rancho Santiago Boulevard, and then flow southerly on the west side of the street, and discharged into the existing catch basin (200 feet southerly from the Project Site). Low flows up to 2-year storm event produced from the Project Site are collected in two proposed inlets, then are detained in a proposed storage, 48” reinforced concrete pipe (RCP), before discharging into a proposed Maxwell Plus System, with a pre-treatment chamber, to be treated. Per the Proposed Project’s Hydrology Analysis for the 2-year storm, the post development runoff volume for the 2-yr, 24-hr storm exceeds the pre-development runoff volume for the 2-yr, 24- hr storm by more than five percent. However, the PWQMP includes hydromodification control BMPs to address any hydrologic conditions of concerns (HCOC) impacts. Therefore, the impacts would be less than significant.
Therefore, no new impacts associated with the alteration of an existing drainage pattern of or area of site in a manner that would cause the alteration of the course of a stream or river or through the addition of impervious surface would occur.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
d) Would the project in flood hazard, tsunami, or seiche zones, risk release of pollutants due to project inundation?
Narrative Summary: Impacts Analyzed in the GP PEIR (d)
Less Than Significant Impact with Mitigation. The GP PEIR discusses that the OGP would not involve the alteration of existing streams or rivers. The OGP designated land along floodway corridors of the Santa Ana River, Santiago Creek, and Handy Creek as open space. Stream drainage areas along the Santa Ana River and Santiago Creek are located with the FEMA 100-year floodplain. The western portion of the planning area bounded by the Santa Ana River and the City boundary are also located within 100-year flood areas. Additionally, backwater into Santiago Creek, Limestone Creek, and immediately adjacent to Santiago Reservoir tributary drainage are classified as 100-year storm event areas due to their water surface elevations. Development associated with the OGP implementation in the hillside and basin areas would contribute to the potential for flood hazards by altering existing runoff and absorption rates. This is a potentially significant impact.
Additionally, the GP PEIR states that portions of Orange, such as the Villa Park Dam, Santiago Dam, and Peters Canyon Dam, are susceptible to flood events related to dam failure resulting from a significant earthquake. The OGP land use focus areas are not located in the vicinity of the dams. However, areas below the dams have a high potential for inundation. This is a potentially significant impact.
The OGP requires that appropriate flood control measures be implemented to reduce the risks from localized flooding. Additional flood prevention methods such as provision of detention basins and on-site storm water drainage would be required of developers to reduce runoff into the City’s drainage facilities and to provide adequate drainage for new developments. In addition to water quality benefits, Mitigation Measure 5.8-3 also provides an opportunity for the City to promote development that incorporates permeable surfaces within site design.
To mitigate flood hazards to existing structures within flood zones, the City would host educational programs for the public and its staff regarding flood hazards.
Due to the City’s location being approximately 12 miles inland from the Pacific Ocean, the City would not be affected by tsunamis. Although seiches have not historically occurred within the planning area, it is possible that a seiche could occur within the Santiago Creek Recharge Basin or Irvine Lake. Due to the absence of historical data, no local mapping is available for areas adjacent to these water bodies that might be affected by a seiche. There would be a potential for mudflows and associated erosion during land development activities in and adjacent to hillsides in the eastern portion of the planning area due to removal of natural vegetation and creation of steep graded slopes. However, standard erosion-prevention practices during grading and avoidance of over Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
steepened slopes near existing development would reduce the potential for mudflow impacts to a less than significant level.
With adherence to and implementation of the proposed regulations and policies and implementation of Mitigation Measures 5.8-1 and 5.8-2, program-level flooding impacts would be less than significant. Individual development projects would be required to undergo project specific environmental review. If project- level significant impacts are identified, specific Mitigation Measures would be required under CEQA.
Impacts Associated with the Proposed Project (d)
No New Impacts. As indicated in the General Plan PEIR, inundation hazards in the City are less than significant due to policies and Mitigation Measures proposed in the OGP and GP PEIR. The Proposed Project does not include any development that would increase the risk of exposure of people or structures to dam inundation hazards beyond those identified in the GP PEIR. The Project Site is not immediately adjacent to any body of water. However, the Santiago Creek Recharge Basin is located approximately 0.-34-mile northwest of the Project Site. The area surrounding Santiago Creek is analyzed in the GP PEIR as one of the areas that are susceptible to inundation. The GP PEIR analyzed that implementation of the policies, regulations, and Mitigation Measures listed in the OGP and GP PEIR as well as implementation of existing federal, state, and local regulations would reduce the impacts to less than significant for areas in the City that are at risk of inundation. Therefore, the Project Site does not propose any new impacts beyond what is already analyzed in the GP PEIR. No new impacts associated with the release of pollutants due to flood, hazard, tsunami, or seiche zones would occur. e) Would the project conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan? Narrative Summary: Impacts Analyzed in the GP PEIR (e)
Less Than Significant Impact with Mitigation. The GP PEIR states that implementation of the OGP could contribute to additional pollutants, including sediments from grading activities and contaminants associated with construction materials, construction waste, vehicles, and equipment, among others. Future infill development in the City’s existing urban areas is not expected to substantially increase the amount of existing impervious surfaces and, in fact, site redevelopment may provide opportunities to create new pervious surfaces through new landscaping and use of porous pavements, which could reduce the amount of runoff and associated pollutants. However, since storm drains are designed to carry only storm water, these drains typically are not equipped with filters or cleaning systems and, consequently, can deliver polluted urban runoff directly into local flood control channels and the receiving water bodies affecting their beneficial use. Many of the pollutants found in this runoff are toxic to marine Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
and aquatic life. Thus, implementation of the OGP has the potential to violate water quality standards and waste discharge requirements, and the impacts would be potentially significant. As discussed above, the City has a GWR System that is designed to provide sufficient additional drinking supplies to accommodate the overdraft of the Orange County Groundwater Basin. Based on this availability of increased water supply and the OGP’s designation of land within the Santa Ana River and Santiago Creek floodways as open space in order to preserve these areas for groundwater recharge, impacts related to groundwater resources would be less than significant. Therefore, implementation of the OGP would have a less than significant effect on a water quality control plan and sustainable groundwater management plan with implementation of Mitigation Measures.
Impacts Associated with the Proposed Project (e)
No New Impacts. The Proposed Project includes a Water Quality Management Plan, a Geotechnical Report, and a Hydrology Report, which all comply with NPDES. The Proposed Project would be consistent with the GP PEIR development standards and design guidelines, as well as the City’s Municipal Code. The Proposed Project would be subject to local, state, and federal water quality requirements. Therefore, no new impacts associated with the conflict or obstruction of a water quality control plan or sustainable groundwater management plan would occur.
Conclusion
No new impacts associated with hydrology and water quality would occur. The Proposed Project would not result in any impacts beyond those identified in the GP PEIR. The Proposed Project contains no substantial changes to the implementation of the General Plan, there have been no substantial changes in circumstances, and no new information has become available, not known and could not have been known, at the time of certification, which would require major revisions to the GP PEIR. With regards to the issue of Hydrology and Water Quality, the following findings can be made:
1. No peculiar impacts to the Project or its site have been identified.
2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the GP PEIR.
3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the GP PEIR.
4. No new Mitigation Measures would be required because Project- specific impacts would be less than significant. GP PEIR Mitigation Measures and uniformly applied development policies and standards have been implemented through the Proposed Project.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
4.11 Land Use Planning
Impact Analysis
CEQA THRESHOLDS
Project
Peculiar
Impact
that is not
Substanti
ally
Mitigated
by
Uniform
Applied
Policies
Significant
Impact
not
Analyzed
as
Significant
in the GP
PEIR
Potentiall
y
Significan
t Offsite
or
Cumulativ
e Impact
not
Discussed
in the GP
PEIR
Adverse
Impact
More
Severe
Based on
Substanti
al New
Informati
on
No New
Impact
from GP
PEIR
XI. LAND USE AND PLANNING:
Would the project:
a) Physically divide an established
community? X
b) Cause a significant environmental
impact due to a conflict with any land
use plan, policy, or regulation adopted
for the purpose of avoiding or
mitigating an environmental effect?
X
General Plan PEIR Mitigation Measures
General Plan PEIR Mitigation Measure Applicable/Not Applicable No GP PEIR Mitigation Measures were required. -
Discussion
a) Physically divide an established community?
Narrative Summary: Impacts Analyzed in the GP PEIR (a)
Less Than Significant: The GP PEIR evaluated the potential for the implementation of the General Plan to physically divide an established community. The GP PEIR states that most new development in the City would occur through infill development and adaptive reuse in the OGP land use focus areas. Those parcels anticipated to accommodate development are generally surrounded by existing development and are not large enough to physically divide areas within the City.
The OGP identified Metropolitan Drive as a roadway that may need to be Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
extended as well as the addition of an interchange at Meats Avenue and SR-55.
Roadway widening and intersection improvements may also occur throughout the City to accommodate the additional growth allowed under the General Plan.
However, division of established communities would not occur with the extension of Metropolitan Drive because the primary use of the area is commercial activities and public facilities. Roadway widening would not divide established communities because roadway widening would occur to existing facilities. The addition of the Meats Avenue/SR 55 interchange would impact some single- family residences and mobile homes but would not create barriers to or divide the surrounding area. The OGP contains policies that emphasize increasing connectivity between land uses via a multimodal mobility network and do not support incompatible development or infrastructure that could divide established communities.
New growth in the eastern portion of the planning area would occur on undeveloped land and would not result in the division of established communities.
Therefore, implementation of the OGP would have a less than significant impact in relation to the division of an established community.
Impacts Associated with the Proposed Project (a)
No New Impacts. The Proposed Project would occur on a site that is currently vacant, but historically, has appeared to have been used for residential and agricultural uses. The Proposed Project proposes to construct 11 two-story single- family homes that range from 2,425 sq. ft. to 2,724 sq. ft. and include attached private garages and driveways, interior street, surface parking spaces, and common open space. The Proposed Project is consistent with the surrounding residential development. The Proposed Project would not physically divide an established community. Therefore, the Proposed Project would not result in any physical division of an established community and no impacts would occur and no mitigation is required
b) Cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect?
Narrative Summary: Impacts Analyzed in the GP PEIR (b)
Less Than Significant with Mitigation Measures: Implementation of the General Plan may impact the existing land use plans, policies, and regulations that have been adopted to avoid or mitigate an environmental effect. The General Plan is consistent with the Southern California Association of Governments' (SCAG) Regional Comprehensive Plan and Guide (RCPG) and the included Regional Transportation Plan (RTP). SCAG’s goals are considered for consistency, resulting in a less than significant impact on land use plan consistency. The PEIR discusses General Plan consistency with SCAG Regional Policies in relation to consistency, Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
improving the regional standard of living, improving the regional quality of life, providing social, political and cultural equity and more. As shown on Table 5.9-2 of the GP PEIR (GP PEIR page 5.9-9), the OGP is consistent with SCAG’s RCPG and RTP The Orange County General Plan identifies certain spaces in the eastern portion of the City’s planning area to be open space, where the City of Orange knows these areas as Santiago Hills and East Orange, designated to be Low, Medium Low, and Medium Density Residential space, as well as Recreational Commercial land. Impacts to developing these areas and being consistent with the County General Plan have been assessed in EIRs, where Mitigation Measures were required as part of the East Orange development plan approval. The General Plan Land Use Element contains a number of policies addressing land use and consistency. The Growth Management Element of the OGP contains policies that promote development that integrates with and minimizes impacts to surrounding uses. Implementation of the OGP would be consistent with applicable adopted plans, regulations, and policies; therefore, impacts associated with any potential inconsistencies would be less than significant.
Impacts Associated with the Proposed Project (b)
No New Impacts. The Proposed Project would not conflict with any applicable land use plan, policy, or regulation adopted for the purposes of avoiding or mitigating an environmental effect. The general plan land use designation of the subject site is LDR, which provides for typical single-family residential neighborhoods. The Low Density Residential designation permits a density of two to six dwelling units permit acre. The Proposed Project is 5.6 units per acre. Low Density Residential uses make up the majority of land uses in Orange, and are found throughout the City in both older, established areas, such as Old Towne, and newer development areas, including east Orange.”
The Proposed Project would also establish a Planned Unit Development (PUD) with approval of a Conditional Use Permit (CUP) and subdivide the lot for single-family residential development. According to the general plan, “Table LU-3 indicates the corresponding zone district that applies to each General Plan land use designation.” The Proposed Project would comply with the R-1-10 and PUD standards, as applicable. Therefore, the Proposed Project is consistent with the existing Low Density Residential (LDR) General Plan Designation and Single-Family Residential (R-1-10) Zoning applicable to the Project Site and would have no impact to due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect. No mitigation is required.
Conclusion
Following compliance with the General Plan Final PEIR Mitigation Measures and General Plan policies, the Project would not result in new significant impacts or a substantial increase in the severity of previously identified significant impacts due Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect beyond those identified in the General Plan Final PEIR. With regards to the issue of Land Use Planning, the following findings can be made:
1. No peculiar impacts to the Project or its site have been identified.
2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the GP PEIR.
3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the GP PEIR.
4. No new Mitigation Measures would be required because Project- specific impacts would be less than significant. GP PEIR Mitigation Measures and uniformly applied development policies and standards have been implemented through the Proposed Project.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
4.12 Mineral Resources
Impact Analysis
CEQA THRESHOLDS
Project
Peculiar
Impact that
is not
Substantially
Mitigated by
Uniform
Applied
Policies
Signific
ant
Impact
not
Analyze
d as
Signific
ant in
the GP
PEIR
Potentially
Significant
Offsite or
Cumulative
Impact not
Discussed in
the GP PEIR
Adverse
Impact
More
Severe
Based on
Substantia
l New
Informatio
n
No
New
Impact
from
GP
PEIR
XII. MINERAL RESOURCES:
Would the project:
a) Result in the loss of availability of a
known mineral resource that would be
of value to the region and the residents
of the state?
X
b) Result in the loss of availability of a
locally important mineral resource
recovery site delineated on a local
general plan, specific plan or other land
use plan?
X
General Plan PEIR Mitigation Measures
PEIR Mitigation Measure Applicable/Not Applicable
No GP PEIR Mitigation Measures were required. -
Discussion
a) Would the project result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state?
b) Would the project result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan?
Narrative Summary: Impacts Analyzed in GP PEIR (a-b):
No Impacts. The City distributed a Notice of Preparation (NOP) and an Initial Study (IS) to identify agency and public concerns regarding potential impacts of the Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
OGP and to focus the preparation of the EIR on effects determined to be significant. The IS determined that the preparation of an EIR was required for the OGP but found that no impacts would occur to mineral resources. Therefore, mineral resources are not discussed in the GP PEIR. Mineral Resources are also discussed in Section 4.9, Hazards and Hazardous Materials, of this document.
Therefore, there are no potential impacts on mineral resources from the implementation of the OGP.
Impacts Associated with the Proposed Project (a-b)
No New Impacts. The Proposed Project would be to establish a Planned Unit Development (PUD) and subdivide the lot into 11 parcels, each improved with a single-family residence ranging from 2,425 sq. ft to 2,724 sq. ft. The Project Site is located on the east side of Rancho Santiago Blvd, approximately 323 feet south of the Bond Avenue centerline. The Project Site is currently vacant, but historical uses have included agricultural and residential developments. The planning area contains an alluvial plain that underlies the central and western portions of the planning area, and a series of low hills found in the eastern and northern portions of the planning area.
The City of Orange holds planning areas located within Mineral Resource Zone 1 (MRZ-1), Mineral Resource Zone 2 (MRZ-2) and Mineral Resource Zone 3 (MRZ-3).
MRZ-1 is defined as areas where adequate information indicates that no significant mineral deposits are present, or where it has been determined that little likelihood exists for their presence. MRZ-2 zones are defined as an area with evidence of significant mineral deposits or a high likelihood of them being present, and development should be controlled. MRZ-3 zones are defined as an area containing mineral deposits of which the significance cannot be evaluated from the available data.
The Project Site is located within an MRZ-3 zone, where mineral deposits of significance cannot be evaluated from the available data (Figure 8 – Mineral Resource Map). No mineral resource areas exist in the immediate vicinity.
Development pursuant to the Proposed Project would not result in the loss of a known mineral resource. Therefore, no new impacts associated with the loss of availability of a known mineral resource that would be of value to the region and the residents of the state, and no new impacts associated with the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan would occur.
Conclusion
No new impacts associated with mineral resources would occur. The Proposed Project would not result in any impacts beyond those identified in the previous PEIR. The Proposed Project contains no substantial changes to the implementation of the General Plan, there have been no substantial changes in Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
circumstances, and no new information has become available, not known and could not have been known, at the time of certification, which would require major revisions to the GP PEIR. With regards to the issue of Mineral Resources, the following findings can be made:
1. No peculiar impacts to the Project or its site have been identified.
2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the GP PEIR.
3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the GP PEIR.
4. No new Mitigation Measures would be required because Project- specific impacts would be less than significant. GP PEIR Mitigation Measures and uniformly applied development policies and standards have been implemented through the Proposed Project.
Rancho Ridge Residential
Initial Study/CEQA Analysis under CEQA § 15183 Exemption Figure 8: Mineral Resource Zone
Source: California Department of Conservation
Project Location
-Not to Scale
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
4.13 Noise
The following best management practices shall be provided on the Project plans and in contract specifications to minimize construction noise and vibration emanating from the Proposed Project.
1. All equipment whether fixed or mobile, would be equipped with properly operating and maintained mufflers, consistent with manufacturer standards.
2. All stationary construction equipment would be placed so that emitted noise is directed away from the noise sensitive receptors nearest the Project Site.
3. As applicable, all equipment shall be shut off and not left to idle when not in use.
4. To the degree possible, equipment staging would be located in areas that create the greatest distance between construction-related noise and vibration sources and existing sensitive receptors.
5. Jackhammers, pneumatic equipment, and all other portable stationary noise sources would be directed away and shielded from existing residences in the vicinity of the Project Site. Either one-inch plywood or sound blankets can be utilized for this purpose. They should reach up from the ground and block the line of sight between equipment and existing residences. The shielding should be without holes and cracks.
6. No amplified music and/or voice would be allowed on the Project Site.
7. Haul truck deliveries would not occur outside of the hours presented as exempt for construction per OMC Section 8.24.050.
8. The use of vibratory rollers, or other similar vibratory equipment, would be prohibited within 20 feet of residential structures surrounding the Project Site.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
Impact Analysis
CEQA THRESHOLDS
Project
Peculiar
Impact that is
not
Substantially
Mitigated by
Uniform
Applied
Policies
Significant
Impact not
Analyzed
as
Significant
in the GP
PEIR
Potentially
Significant
Offsite or
Cumulative
Impact not
Discussed
in the GP
PEIR
Adverse
Impact
More
Severe
Based on
Substantial
New
Information
No
New
Impact
from
GP PEIR
XIII. NOISE:
Would the project result in:
a) Generation of a substantial
temporary or permanent increase
in ambient noise levels in the
vicinity of the Project Site in excess
of standards established in the
local general plan or noise
ordinance, or applicable
standards of other agencies?
X
b) Generation of excessive
groundborne vibration or
groundborne noise levels?
X
c) For a project located within the
vicinity of a private airstrip or an
airport land use plan or, where
such a plan has not been
adopted, within two miles of a
public airport or public use airport,
would the project expose people
residing or working in the project
area to excessive noise levels?
X
General Plan PEIR Mitigation Measures
GP PEIR Mitigation Measure Applicable/Not
Applicable
5.10-1 Comply with all provisions of CEQA. In addition to thresholds that may be established or adopted by the City in the future, use the following thresholds and procedures for CEQA analysis of proposed projects, consistent with policies adopted within the General Plan:
Mitigation Measure is
applicable. The
Proposed Project would
comply with all
provisions of CEQA,
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
GP PEIR Mitigation Measure Applicable/Not
Applicable
The City shall apply the noise standards specified in Table N-3 and N-4 of the Noise Element to proposed
projects analyzed under CEQA.
In addition to the foregoing, an increase in ambient
noise levels is assumed to be a significant noise
impact if a proposed project causes ambient noise
levels to exceed the following:
o Where the existing ambient noise level is less
than 60 dBA, a project related permanent
increase in ambient noise levels of 5 dBA
CNEL or greater.
o Where the existing ambient noise level is
greater than 60 dBA, a project-related
permanent increase in ambient noise levels
of 3 dBA CNEL or greater.
(Implementation Program III-1)
including preparing this
CEQA Section 15183
analysis and
associated technical
studies to examine the
Proposed Project’s
impacts in regard to
CEQA.
5.10-2 Review development proposals to ensure that the
noise standards and compatibility criteria set forth in the Noise Element are met. Consult Noise Element guidelines and standards for noise compatible land uses to determine the suitability of proposed developments relative to existing and forecasted noise levels. Enforce the California Noise Insulation Standards to ensure an acceptable interior noise level of 45 dBA CNEL in habitable rooms. Amend the Noise Ordinance to implement the noise standards presented in Tables N-3 and N-4 of the Noise Element. Develop noise
impact analysis guidelines that describe the City’s desired procedure and format for acoustical studies. Acoustical studies will be required for all discretionary projects where any of the following apply:
The project includes a noise sensitive land use that is located within the existing or future 65 dBA CNEL
contour for transportation noise sources.
The project will cause future traffic volumes to
increase by 25 percent or more on any roadway that
fronts residential, institutional, or open space land
uses.
The project will expose a noise sensitive land use to a stationary noise source or vibration source exceeding
the standards outlined in Table N-4 of the Noise
Mitigation Measure is
applicable. A Noise
Impact Analysis by
Ganddini Group,
dated March 27, 2023,
was prepared for the
Proposed Project.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
GP PEIR Mitigation Measure Applicable/Not
Applicable
Element. Such stationary sources may include
mechanical equipment operations, entertainment
venues, industrial facilities, and property
maintenance.
The project includes a noise sensitive land use in the vicinity of existing or proposed commercial and
industrial areas.
The project is a mixed use development that includes
a residential component. The focus of this type of
acoustical study is to determine likely interior and
exterior noise levels and to recommend appropriate
design features to reduce noise.
An acoustical analysis prepared in accordance with the
Noise Element shall:
be the financial responsibility of the applicant seeking City approval of a project;
be prepared by a qualified person experienced in
the fields of environmental noise assessment and
architectural acoustics;
include representative noise level measurements with
sufficient sampling periods and locations to
adequately describe local conditions and
predominant noise sources;
estimate existing and projected cumulative (20
years) noise in terms of CNEL or Leq, and compare
those noise levels to the adopted standards and
policies of the Noise Element;
recommend appropriate mitigation to achieve
compliance with the adopted policies and standards
of the Noise Element. Where the noise source in
question consists of intermittent single events, the
report must address the effects of maximum noise
levels in sleeping rooms in terms of possible sleep
disturbance;
estimate noise exposure after the prescribed
Mitigation Measures have been implemented; and
describe a post-project assessment program that
could be used to evaluate the effectiveness of the
proposed Mitigation Measures.
(Implementation Program I-34)
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
GP PEIR Mitigation Measure Applicable/Not
Applicable
5.10-3 The City shall require construction contractors to implement the following measures during construction
activities through contract provisions and/or conditions of approval as appropriate:
Construction equipment shall be properly maintained
per manufacturers’ specifications and fitted with the
best available noise suppression devices (i.e.,
mufflers, silencers, wraps, etc).
Shroud or shield all impact tools, and muffle or shield all intake and exhaust ports on power equipment.
Construction operations and related activities
associated with the proposed project shall comply
with the operational hours outlined in the City of
Orange Municipal Code Noise Ordinance, or
mitigate noise at sensitive land uses to below Orange
Municipal Code standards.
Construction equipment should not be idled for
extended periods of time in the vicinity of noise
sensitive receptors.
Locate fixed and/or stationary equipment as far as
possible from noise sensitive receptors (e.g.,
generators, compressors, rock crushers, cement
mixers). Shroud or shield all impact tools, and muffle
or shield all intake and exhaust ports on powered
construction equipment.
Where feasible, temporary barriers shall be placed as close to the noise source or as close to the receptor
as possible and break the line of sight between the
source and receptor where modeled levels exceed
applicable standards. Acoustical barriers shall be
constructed material having a minimum surface
weight of 2 pounds per square foot or greater, and a
demonstrated Sound Transmission Class (STC) rating
of 25 or greater as defined by American Society for
Testing and Materials (ASTM) Test Method E90.
Placement, orientation, size, and density of
acoustical barriers shall be specified by a qualified
acoustical consultant.
Mitigation Measures
are applicable. The
Proposed Project shall
implement any
conditions of approval
that are assigned to
the Proposed Project.
The Proposed Project
would comply with the
latest Orange
Municipal Code Nosie
Ordinance.
5.10-4 Implement the following strategies to reduce
vehicular traffic noise throughout the City:
Review and designate local truck routes to reduce
Mitigation Measure is
not applicable.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
GP PEIR Mitigation Measure Applicable/Not
Applicable
truck traffic in noise sensitive land uses areas.
Consider the use of traffic calming devices, to reduce traffic speed in residential zones.
Consider the use of alternative paving materials, such as open graded asphalt, to reduce traffic noise
where determined feasible and cost efficient.
5.10-5 Establish train-horn “quiet zones” consistent with the federal Train Horn Rule along the Burlington Northern Santa Fe rail line. Coordinate with rail agencies and operators, OCTA, SCRRA, and the Federal Railroad Administration (FRA) in the planning of noise abatement along rail corridors. (Implementation Program I-28)
Mitigation Measure is
not applicable.
5.10-6 Update the Noise Ordinance to incorporate the new point-source noise standards presented in Table N-4 in the Noise Element. Revise the City’s Noise Ordinance to achieve the following:
Limit the hours of deliveries to commercial, mixed use, and industrial uses adjacent to residential and other
noise sensitive land uses.
Limit the hours of operation for
commercial/retail/entertainment uses to limit noise
intrusion into nearby residential and other noise
sensitive land uses.
Limit noise levels generated by commercial and
industrial uses.
Limit outdoor industrial activities or operations to
control excessive noise at adjacent residential
properties.
Limit the hours of operation of high noise-generating industrial equipment.
Limit the hours of operation for refuse vehicles and
parking lot sweepers if their activity results in an
excessive noise level that adversely affects adjacent
residential uses.
Require the placement of loading and unloading
areas so that commercial buildings shield nearby
residential land uses from noise generated by loading
dock and delivery activities. If necessary, additional
sound barriers shall be constructed on the
commercial sites to protect nearby noise sensitive
uses.
Mitigation Measure is
not applicable.
However, the Proposed
Project would follow
the City’s latest Noise
Ordinance.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
GP PEIR Mitigation Measure Applicable/Not
Applicable
Require the placement of all commercial HVAC
machinery to be placed within mechanical
equipment rooms wherever possible. (Equipment
manufacturer’s specifications for venting and access
to outside air shall be maintained.)
Require the provision of localized noise barriers or
rooftop parapets around HVAC, cooling towers, and
mechanical equipment so that line-of-sight to the
noise source from the property line of the noise
sensitive receptors is blocked. (Equipment
manufacturer’s specifications for venting and access
to outside air shall be maintained).
5.10-7 Continue to enforce the City’s Noise Ordinance limits for industrial uses to limit the effect of noise on adjacent land uses. Update the Noise Ordinance to incorporate the new noise standards presented in Tables N-3 and N-4 in the Noise Element and to ensure effectiveness in controlling noise sources.
Mitigation Measure is
not applicable.
5-10-8 When the City exercises discretionary review,
provides financial assistance, or otherwise facilitates residential development within a mixed use area, make
providing written warnings to potential residents about noise intrusion a condition of that approval, assistance, or
facilitation. The following language is provided as an
example: “All potential buyers and/or renters of residential property within mixed use districts in the City of Orange are hereby notified that they may be subject to audible noise levels generated by business and entertainment related
operations common to such areas, including amplified
sound, music, delivery and passenger vehicles, mechanical noise, pedestrians, and other urban noise sources.”
Mitigation Measure is
not applicable.
5.10-9 Continue to work with the Orange County ALUC to
increase safety and reduce noise associated with aircraft overflights and helicopter operations within the City by achieving the following objectives:
Work with the FAA and local airports (John Wayne
Airport, Long Beach Airport, Los Alamitos Army Air
Base) to determine appropriate aircraft altitude
standards for aircraft flying over the City, taking into account public health and safety.
Mitigation Measure is
not applicable.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
GP PEIR Mitigation Measure Applicable/Not
Applicable
Continue to regulate the siting and operation of
heliport/helistops through the Conditional Use Permit
process in conjunction with the Orange County ALUC
and Caltrans Division of Aeronautics.
Work with the heliport/helistop operators (police, fire, hospital, and private) to implement flight profiles,
tracks, and operating parameters for noise control.
(Implementation Program V-18)
5.10-10 Implement the following measures to reduce the
potential for human annoyance and achitectural/structural damage resulting from elevated groundborne noise and
vibration levels.
Construction-Induced Vibration. The City shall
implement or require implementation of the following
measures through contract provisions and/or
conditions of approval as appropriate:
o Pile driving required within a 50-foot radius of
historic structures shall utilize alternative
installation methods where possible (e.g., pile
cushioning, jetting, pre-drilling, cast-in-place
systems, resonance-free vibratory pile drivers).
Specifically, geo pier style cast-in-place
systems or equivalent shall be used where
feasible as an alternative to pile driving to
reduce the number and amplitude of impacts
required for seating the pile.
o The preexisting condition of all buildings within
a 50-foot radius and of historic buildings within
the immediate vicinity of proposed
construction activities shall be recorded in the
form of a preconstruction survey. The
preconstruction survey shall determine
conditions that exist before construction
begins for use in evaluating damage caused
by construction activities. Fixtures and finishes
within a 50-foot radius of construction activities
susceptible to damage shall be documented
(photographically and in writing) prior to
construction. All damage will be repaired
back to its preexisting condition.
o Vibration monitoring shall be conducted prior
to and during pile driving operations occurring
Mitigation Measure is
applicable. The
Proposed Project shall
implement all
applicable measures
listed. However, there
are no historic buildings
or railroads
immediately adjacent
to the Project Site.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
GP PEIR Mitigation Measure Applicable/Not
Applicable
within 100 feet of the historic structures. Every
attempt shall be made to limit construction-
generated vibration levels in accordance with
Caltrans recommendations during pile driving
and impact activities in the vicinity of the
historic structures.
o Provide protective coverings or temporary
shoring of on-site or adjacent historic features
as necessary, in consultation with the
Community Development Director or
designee.
Railroad-Induced Vibration:
o Vibration sensitive uses shall be located a
minimum of 100 feet from the railroad
centerline, where feasible. To ensure
compliance with FTA and Caltrans
recommended guidelines, a site-specific
groundborne noise and vibration assessment
should be conducted. For sensitive uses
located within 100 feet of the railroad
centerline, the acoustical noise and vibration
assessment shall demonstrate that potential
impacts will be below the level of significance.
If specific project-level impacts are identified,
Mitigation Measures reducing the impacts to
below the level of significance will be required.
o A groundborne vibration assessment shall be
conducted at proposed building pad
locations within 200 feet of railroad rights-of-
way, prior to project approval. Vibration
monitoring and assessment shall be
conducted by a qualified acoustical
consultant. The assessment will demonstrate
that rail-associated groundborne vibration
and noise levels comply with recommended
FTA and Caltrans guidance of 80 VdB and 0.2
in/sec PPV, respectively, or propose project-
specific Mitigation Measures such as site
design, building isolation, etc. to achieve that
standard.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
Discussion
a) Would the project result in generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies?
Narrative Summary: Impacts Analyzed in the GP PEIR (a)
Less Than Significant Impact with Mitigation. Construction Noise: According to the GP PEIR, implementation of the OGP would result in additional development within the City, which would generate noise during construction activity.
Construction activity would have the potential to impact noise sensitive uses.
Although construction activities would result in a substantial noise increase, this impact would be short term and would cease upon completion of construction (GP PEIR, page 5.10-40). The City’s Municipal Code exempts construction- generated noise that occurs between the areas of 7 a.m. to 8 p.m. Monday through Saturday, from applicable noise standards, provided that all construction equipment is fitted with factory-installed muffling devices and are maintained in good working order. This regulatory exemption reflects the City’s acknowledgement that construction noise is a necessary part of development and does not create an unacceptable public nuisance when conducted within the least noise sensitive hours of the day. However, if construction activities were to occur during the more noise sensitive hours (e.g., evening, nighttime, and early morning) or if construction equipment is not properly equipped with noise control devices, project-generated noise levels from construction sources could exceed the applicable standards and result in substantial temporary increase in the ambient noise environment at nearby noise sensitive receptors. As a result, this impact is considered potentially significant. With adherence to and implementation of the OGP policies and regulations, the OMC, and implementation of Mitigation Measures 5.10-1, 5.10-2, 5.10-3, 5.10-6, and 5.10-10, program-level impacts from construction noise would be less than significant.
Individual development projects would be required to undergo project-specific environmental review. If project-level significant impacts are identified, specific Mitigation Measures would be required under CEQA.
Traffic Noise: Implementation of the OGP would increase ambient noise levels for existing land uses along roadways. Traffic noise levels associated with the OGP were calculated for roadway segments in the City using FHWA’s Highway Noise Prediction Model (FHWA-RD-77-108). Traffic noise levels were modeled under existing and future 2030conditions, with and without implementation of the OGP.
The GP PEIR includes a table (Table 5.10-9) that summarizes modeled CNEL noise levels at 100 feet from the roadway centerline for affected roadway segments under future 2030 conditions, with and without implementation of the OGP. The GP PEIR found that implementation of the OGP under future conditions would Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
result in a change of traffic noise level ranging from -2.9 dB to +5.0 dB CNEL. As a result, long-term noise levels from traffic generated in association with OGP implementation would result in a substantial permanent increase in ambient noise levels exceeding the significance thresholds. However, of over 220 roadway segments analyzed, only two segments exceed the significance thresholds: Meats Avenue between Tustin Street and SR-55 Southbound and Rampart Street between Chapman and Orangewood Avenues. With adherence to and implementation of the OGP policies and regulations, and implementation of Mitigation Measures 5.10-1, 5.10-2, and 5.10-4, program-level traffic noise impacts would be less than significant. Individual development projects would be required to undergo project-specific environmental review. If project-level significant impacts are identified, specific Mitigation Measures would be required under CEQA.
Railroad Noise: According to the GP PEIR, for future rail activities to result in a significance level increase of 3 dB or greater, the OGP would need to directly result in a doubling of rail activities, or otherwise cause exposure of adjacent sensitive land uses to noise levels exceeding OGP standards. Implementation of the OGP does not incorporate specific development projects and is not anticipated to directly result in a significant increase in rail activity within the City.
The OGP does not plan for rail services. Rail service planning is conducted by the Southern California Regional Rail Authority, OCTA, Amtrak, and BNSF. The proposed land use designation modifications associated with the OGP would allow changing existing uses that are not noise sensitive to land uses considered to be noise sensitive. In addition, there are existing sensitive land uses, such as residential uses, already located adjacent to the rail line. Therefore, implementation of the OGP has the potential to expose existing and future noise sensitive receivers to noise levels exceeding the City’s General Plan noise standards. As a result, this impact is considered potentially significant. However, the City supports the establishment of a “quiet zone” along portions of the BNSF corridor. “Quiet zones” would reduce noise impacts at these crossings and would be supported so long as they do not increase traffic and pedestrian hazards. With adherence to and implementation of the OGP policies and regulations, and implementation of Mitigation Measures 5.10-1, 5.10-2, 5.10-5, 5.10-8, and 5.10-10, program level railroad noise impacts would be less than significant. Individual development projects would be required to undergo project-specific environmental review. If project-level significant impacts are identified, specific Mitigation Measures would be required under CEQA.
Impacts Associated with the Proposed Project (a)
No New Impacts. A Noise Impact Analysis was completed for the Proposed Project (Appendix H – Noise Impact Analysis Rancho Ridge Infill Project, Ganddini Group, March 27, 2023). The Proposed Project consists of the construction of 11 Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
single-family residential dwelling units and the associated driveways, open space, and parking spaces. Construction activities are expected to consist of demolition, grading, building construction, paving, and architectural coating. The Proposed Project would comply with the City’s Noise Ordinance, GP PEIR, and OGP as well as any applicable federal, state, and local laws and regulations.
The Project Site is surrounded by single-family residential uses to the east, Orange Hill Presbyterian Church and Santiago Greenhouse to the north, North Rancho Santiago Boulevard to the west, and single-family residential plant nursery, and tree maintenance company land uses to the south. The nearest noise-sensitive receptors to the Project Site are existing single-family residential uses located adjacent to the east and south and approximately 60 feet to the west (across North Rancho Santiago Boulevard) of the Project Site. In addition, Orange Hill Presbyterian Church is located adjacent to the north and Enderby Field/Santiago Charter Middle School is located approximately 215 feet south of the Project Site.
Accordingly, the Noise Analysis conducted five ambient noise measurements, as shown on Figure 9 – Noise Measurement Locations. Short-term ambient noise levels ranged between 46.4 and 63.2 dBA Leq.
Construction Noise Impacts:
Construction noise is regulated within Section 8.24.050 of OMC. Accordingly, the Project would result in a significant impact if project construction occurs outside the hours of 7:00 a.m. to 8:00 p.m. on any day except for Sunday or a federal holiday or the hours of 9:00 a.m. and 8:00 p.m. on Sunday or a federal holiday and exceeds the standards from 55 dBA Leq from 7:00 a.m. to 10:00 p.m. and 50 dBA Leq from 10:00 p.m. to 7:00 a.m. and 70 dBA Lmax from 7:00 a.m. to 10:00 p.m. and 65 dBA Lmax from 10:00 p.m. to 7:00 a.m. at any residential property.
Project construction noise levels at nearby sensitive receptors were calculated using the FTA methodology. Anticipated noise levels during each construction phase are presented below in Table 9. As shown in Table 9, modeled construction noise levels reach up to 93.1 dBA Leq at the nearest church property line to the north, 70 dBA Leq at the nearest residential property line to the east, 78.8 dBA Leq at the nearest residential property line to the south, 70.9 dBA Leq at the nearest recreational use property line to the south, and 75.1 dBA Leq at the nearest residential property line to the west of the Project Site.
Table 9 – Construction Noise Levels (dBA Leq)
Receptor Location
Noise
Measurement
Location
Existing
Ambient Noise
Levels (dBA
Leq)2
Construction
Noise Levels
(dBA Leq)
Phase: Demolition
Church to North (Orange Hill Presbyterian Church NM2 52.1 93.1 Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
Residential to East (636 N Ranchroad Dr) NM3 50.0 65.2
Residential to South (636 N Ranchroad Dr) NM4 46.4 78.8 Sports fields to South (Enderby Field) NM5 63.2 69.4
Residential to West (648 N Rancho Santiago Blvd) NM1 62.2 75.1 Phase: Grading
Church to North (Orange Hill Presbyterian Church NM2 52.1 83.1 Residential to East (636 N Ranchroad Dr) NM3 50.0 70.0
Residential to South (636 N Ranchroad Dr) NM4 46.4 77.8 Sports fields to South (Enderby Field) NM5 63.2 70.9
Residential to West (648 N Rancho Santiago Blvd) NM1 62.2 68.3 Phase: Building Construction
Church to North (Orange Hill Presbyterian Church NM2 52.1 80.5 Residential to East (636 N Ranchroad Dr) NM3 50.0 67.4
Residential to South (636 N Ranchroad Dr) NM4 46.4 75.2 Sports fields to South (Enderby Field) NM5 63.2 68.3
Residential to West (648 N Rancho Santiago Blvd) NM1 62.2 65.7 Phase: Paving
Church to North (Orange Hill Presbyterian Church NM2 52.1 80.3 Residential to East (636 N Ranchroad Dr) NM3 50.0 67.1
Residential to South (636 N Ranchroad Dr) NM4 46.4 75.0 Sports fields to South (Enderby Field) NM5 63.2 68.0
Residential to West (648 N Rancho Santiago Blvd) NM1 62.2 65.5 Phase: Architectural Coating
Church to North (Orange Hill Presbyterian Church NM2 52.1 71.2 Residential to East (636 N Ranchroad Dr) NM3 50.0 58.1
Residential to South (636 N Ranchroad Dr) NM4 46.4 65.9 Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
Sports fields to South (Enderby Field) NM5 63.2 59.0
Residential to West (648 N Rancho Santiago Blvd) NM1 62.2 56.5 Notes:
1. Construction noise worksheets are provided in Appendix D of the Noise Impact Analysis by Ganddini Group.
2. Per measured existing ambient noise levels, NM2 was chosen to present noise levels at the property line of the church use to the north. NM3 was chosen to represent noise levels at the property lines of the single-family residential uses to the east, NM4 was chosen to represent noise levels at the property line of the single-family residential use to the south, NM5 was chosen to represent noise levels at the property line of the sports field use to the south, and NM1 was chosen to represent noise levels at the property lines of the single-family residential uses to the west of the Project Site.
Proposed Project construction would not occur outside of the hours identified as exempt from noise ordinance standards in Section 8.24.050(A) of the City of Orange Municipal Code. Therefore, the Proposed Project would not exceed City- established standards relating to construction noise. The Proposed Project impact is less than significant; no mitigation is required.
Mobile Source Noise:
The OGP Noise Element states that, in addition to the maximum allowable noise level standards, an increase in ambient noise levels is assumed to be a significant noise impact if a project causes ambient noise levels to exceed the following:
Where the existing ambient noise level is less than 65 dBA, a project related permanent increase in ambient noise levels of 5 dBA CNEL or greater. Where the existing ambient noise level is greater than 65 dBA, a project related permanent increase in ambient noise levels of 3 dBA CNEL or greater.
Project Operational Mobile Source Noise: Roadway noise levels were calculated along Rancho Santiago Boulevard utilizing project generated vehicle traffic information obtained from Appendix C – Rancho Ridge Infill Project Transportation Study Screening Assessment (TA) Ganddini Group, Inc. (February 12, 2026) based on the FHWA Traffic Noise Prediction Model methodology. During operation, the Proposed Project is expected to generate approximately 100 average daily trips with 9 trips during the AM peak-hour and 10 trips during the PM peak-hour.
Table 10 shows the change in existing roadway noise levels with the addition of Project-generated operational trips. As shown in Table 10, the modeled existing traffic noise along Rancho Santiago Boulevard is 63 dBA CNEL and the modeled existing plus project traffic noise level along Rancho Santiago Boulevard is 63 dBA CNEL at the right-of-way. The addition of project trips is not expected to change noise levels in excess of the applicable threshold at any of the study roadway segments. Therefore, the Proposed Project impact is less than significant and no Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
mitigation is required.
Table 10 – Increase in Existing Noise Levels Along Roadways as a Result of Project (dBA CNEL)
Roadway Segment
Distance
from
roadway
centerline
to right-of-
way (feet)2
Modeled Noise Levels (dBA (CNEL)1
Existing
Without
Project
at ROW
Existing
Plus
Project
at ROW
Change
in Noise
Level
Exceeds
Standards3
Increase
of 3 dB or
More?
Rancho
Santiago
Blvd
In the
vicinity of
the
Project
Site
33 63.17 63.30 0.13 No No
Source: Rancho Ridge Infill Project Noise Impact Analysis, Ganddini Group, Inc., March 27, 2023 Notes:
1. Exterior noise levels calculated 5 feet above pad elevation, perpendicular to subject roadway.
2. Right of way per City of Orange Circulation and Mobility Element.
3. Per the City of Orange maximum noise exposure from transportation sources for single- family residential, 65 dBA CNEL.
Construction Mobile Source Noise: Construction truck trips would occur throughout the construction period. Given the Project Site’s proximity to State Route 55, it is anticipated that vendor and/or haul truck traffic would take the most direct route to the appropriate freeway ramps. Rancho Santiago Boulevard currently handles approximately 2,800 to 7,400 average daily vehicle trips in the vicinity of the Project Site.6 According to the Rancho Ridge Infill Project Air Quality, Global Climate Change, and Energy Impact Analysis (Ganddini Group, Inc., 2023), the greatest number of construction-related vehicle trips per day would be during grading at up to 17 vehicle trips per day (10 for worker trips and 7 for hauling trips). Therefore, vehicle traffic generated during Proposed Project construction is nominal relative to existing roadway volumes and would not result in the doubling of traffic volume necessary to increase noise levels by 3 dBA. The Proposed Project impact is less than significant; no mitigation is required.
Therefore, a change in noise level would be less than significant with included recommended BMPs, OGP programs and policies, and GP PEIR Mitigation Measures, and no new impacts would occur.
6 The existing average daily traffic volume was obtained from the General Plan Update Traffic Analysis for the City of Orange (PB Americas, Inc., Revised June 2009).
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
b) Would the project result in the generation of excessive groundborne vibration or groundborne noise levels?
Narrative Summary: Impacts Analyzed in the GP PEIR (b)
Less Than Significant Impact with Mitigation. The GP PEIR concluded that implementation of the OGP would result in the generation of excessive groundborne vibration or groundborne noise levels. Short-term intermittent groundborne noise and vibration may be generated by construction activities.
Groundborne vibration levels associated with light-rail transit, freight, and roadway traffic rarely exceed criteria established for evaluation of building damage or human annoyance (Caltrans 2004) (GP PEIR, page 5.10-62).
Railroad-Induced Vibration: Railroad operations may generate excessive groundborne vibration levels, depending on trail speed, load, condition of track and wheels, amount of ballast used to support the track, and soil conditions. FTA’s generalized ground-surface vibration curves and parametric modeling of locomotive-powered trains indicate that a reference groundborne vibration level of 85 VdB at a distance of 50 feet is the upper range for commuter rail lines (GP PEIR, page 5.10-63). A groundborne vibration level of 85 VdB RMS is approximately equivalent to 0.07 in/sec PPV at a distance of 50 feet, assuming a crest factor of
4. Thus, typical rail operations would not exceed the established criteria for structural damage of normal residential structures; however, it should be noted that this level approaches the recommended upper limit for the protection of old or historically significant structures. The 80 VdB equal level contour, which corresponds to the FTA recommendation for maximum acceptable human exposure, would be approximately 50 to 100 feet from the railroad track centerline. Therefore, any vibration sensitive land use located less than 50 to 100 feet from an active railroad line has the potential to be exposed to groundborne noise and vibration levels that exceed the FTA criteria of 80 VdB (GP PEIR, page
5.10-63). Buildout of the OGP would allow uses, such as mixed use development, within or partially within 100 feet of the railroad centerline. As a result, this impact is considered potentially significant. However, adherence to regulations and implementation of Mitigation Measure 5.10-10 would reduce program-level noise and vibration impacts to less than significant. Individual development projects would be required to undergo project-specific environmental review. If project- level significant impacts are identified, specific Mitigation Measures would be required under CEQA.
Construction-Induced Vibration: Construction activities have the potential to resulting varying degrees of temporary ground vibration, depending on the specific construction equipment used and operations involved. The GP PEIR concluded that sensitive receptors located in proximity to construction operations could be exposed to groundborne vibration levels exceeding the recommended FTA and Caltrans guidelines of VdB and 0.2 in/sec PPV, respectively. As a result, Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
this impact is considered potentially significant (GP PEIR, page 5.10-64). However, adherence to regulations and implementation of Mitigation Measure 5.10-10 would reduce program-level noise and vibration impacts to less than significant.
Individual development projects would be required to undergo project-specific environmental review. If project-level significant impacts are identified, specific Mitigation Measures would be required under CEQA.
Vehicular Traffic-Induced Vibration: The GP PEIR concluded that groundborne vibration levels from automobile traffic are generally overshadowed by vibration generated by heavy trucks that roll over the same uneven roadway surfaces.
Implementation of the OGP does not propose the construction or realignment of any roadway projects. Additionally, it is not anticipated that the land use changes associated with the OGP would result in the exposure of persons within the City’s planning area to groundborne vibration levels exceeding FTA and Caltrans guidelines. As a result, this impact is considered less than significant.
Light Industrial and Commercial Operations: The GP PEIR concluded that the loading and unloading operations benefit from the resiliency of the flexible suspension systems and pneumatic tires, which substantially limit the effect and transfer of energy to the ground. Heavy truck traffic passing over uneven roadway surfaces can impart energy into the ground and induce groundborne vibration; however, heavy trucks used for delivery and distribution of materials to and from industrial and commercial sites generally operate at very low speeds while on the industrial or commercial site. Therefore, the groundborne vibration induced by heavy truck traffic at industrial or commercial land uses is not anticipated to be perceptible at distances greater than 25 feet (typical distance from roadway centerline to edge of roadway right-of-way for a single-lane road).
Based on the operational characteristics of mechanical equipment and distribution methods used for general light industrial and commercial land uses, it is not anticipated that light industrial and commercial operations would result in groundborne vibration levels that approach or exceed the FTA and Caltrans guidelines of 80 VdB and 0.2 in/sec PPV. As a result, this impact is considered less than significant.
Impacts Associated with the Proposed Project:
No New Impacts. Project-specific impacts are less than significant. The City has not established thresholds of significance concerning groundborne vibration. In the absence of City-established thresholds, groundborne vibration impacts are based on guidance from the Transportation and Construction Vibration Guidance Manual (California Department of Transportation, 2020). Accordingly, the Project would result in a significant impact if:
Groundborne vibration levels generated by the Proposed Project have the potential to cause architectural damage at nearby buildings by exceeding the following PPV:
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
o 0.08 in/sec at extremely fragile historic buildings, ruins, ancient monuments
o 0.10 in/sec at fragile buildings
o 0.25 in/sec at historic and some old buildings
o 0.30 in/sec at older residential structures
o 0.50 in/sec at new residential structures and modern
industrial/commercial buildings.
Groundborne vibration levels generated by the Proposed Project have the potential to cause severe annoyance to people living or working in nearby buildings by exceeding a PPV of 0.4 in/sec.
Table 11 shows the modeled construction vibration levels at the nearest receptors.
Based on the groundborne vibration modeling, use of a vibratory roller is expected to generate a PPV of 0.452 in/sec and use of a bulldozer is expected to generate a PPV of 0.191 in/sec at the closest off-site building, a residential use located approximately 15 feet south of the Project Site. Other equipment anticipated to be used during project construction generate lower PPV.
Therefore, as shown in Table 11, the use of vibratory rollers could generate groundborne vibration that would exceed the architectural damage threshold of a PPV of 0.3 in/sec at the residential uses to the south and east. In addition, the threshold of severe annoyance to persons living or working in nearby buildings of a PPV of 0.4 in/sec would be exceeded at the residential use to the south.
However, as shown in Table 10, groundborne vibration levels associated with the use of vibratory construction equipment would not exceed the levels necessary to cause architectural damage or severe annoyance to persons living or working in nearby buildings with implementation of the Groundborne Vibration BMP included at the beginning of this section and in the Noise Impact Analysis. In addition, Proposed Project construction would occur within the exempt construction hours as identified in Section 8.24.050 of the OMC. The Proposed Project impact is less than significant; no mitigation is required.
Table 11 – Construction Vibration Levels at the Nearest Receptors Receptor Location
Distance
from
Property
Line to
Nearest
Structure
(feet) Equipment
Vibration
Level1
Threshold
Exceeded?
2 Vibrati
on
Level
with
BMPs1,3
Thresho
ld
Exceed
ed with
BMPs?2
Commercial to North
(Santiago Greenhouses,
5050 E Bond Ave)
25 Vibratory Roller 0.210 No - -
25 Large Bulldozer 0.089 No - -
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
Church to North (Orange
Hill presbyterian Church,
681 N Rancho Santiago
Blvd)
72 Vibratory Roller 0.043 No - -
72 Large Bulldozer 0.018 No - -
Residential to West (634 N
Rancho Santiago Blvd)
90 Vibratory Roller 0.031 No - -
90 Large Bulldozer 0.013 No - -
Residential to South (623 N
Rancho Santiago Blvd)
15 Vibratory Roller 0.452 Yes 0.293 No
15 Large Bulldozer 0.191 No - -
Commercial to South
(Natural Ambience Exterior
Growers, 623 N Rancho
Santiago Blvd)
80 Vibratory Roller 0.037 No - -
80 Large Bulldozer 0.016 No - -
Residential to East (636 N
Ranchoroad Drive)
18 Vibratory Roller 0.344 Yes 0.293 No
18 Large Bulldozer 0.146 No - -
Source: Rancho Ridge Infill Project Noise Impact Analysis, Ganddini Group, Inc., March 27, 2023 Notes:
1. Vibration levels are provided in PPV in/sec.
2. Caltrans identifies the threshold at which there is a risk to “architectural” damage older residential structures as 0.3 in/sec PPV and 0.5 in/sec PPV at modern industrial/commercial buildings.
3. Best Management Practices (BMPs) for architectural damage include prohibiting the use of vibratory rollers, or other similar vibratory equipment within 20 feet of residential structures to the south and east.
The most substantial sources of groundborne vibration during post-construction project operations would include the movement of passenger vehicles and trucks on paved and generally smooth surfaces. Loaded trucks generally have a PPV of
0.076 at a distance of 25 feet (Caltrans 2020), which is a substantially lower PPV than that of a vibratory roller (0.210 in/sec PPV at 25 feet). Therefore, groundborne vibration levels generated by the Proposed Project’s operation would not exceed those modeled for the Proposed Project’s construction.
c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels?
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
Narrative Summary: Impacts Analyzed in the GP PEIR:
Less than Significant Impact. The GP PEIR identifies areas of aircraft noise that may affect the City’s planning area: beneath the landing pattern for aircraft approaching John Wayne Airport in Santa Ana, military aircraft traffic along the Katella Avenue corridor, and helicopter activity from private, police, emergency medical, news, and traffic monitoring. Alterations of land use designation within the vicinity of these overflight areas may result in greater exposure to aircraft noise. The entirety of the City’s planning area is located more than 5 miles outside the established noise contours for the nearest airport (55 dB CNEL for John Wayne Airport). Therefore, proposed modifications to land use designations within the City of Orange would not result in the exposure of new or existing noise sensitive land uses to elevated aircraft noise levels. As a result, aircraft generated noise levels are a less than significant impact. This does not preclude aircraft noise from being a notable contributor to the ambient noise environment or a source for potential disturbance that can be addressed from a General Plan policy standpoint. Policies in the OGP include actions aimed at reducing noise from aircraft in the planning area.
Impacts Associated with the Proposed Project:
No New Impacts. The closest airport to the Project Site is the John Wayne Airport, with airport runways located as close as approximately 8.75 miles southwest of the Project Site. As shown on the John Wayne Airport Orange County 2021 Annual Community Noise Equivalent Level (CNEL) Contours map, the Project Site is well outside the 60 dBA CNEL noise contour for the airport. Therefore, the Proposed Project would not expose people residing or working in the area to excessive noise levels. This impact would be less than significant. No mitigation is required.
Conclusion
Impacts associated with noise would be reduced to a less than significant level with the implementation of GP PEIR Mitigation Measures 5.10-1 through 5.10-10.
The Proposed Project would not result in any impacts beyond those identified in the GP PEIR. The Proposed Project contains no substantial changes to the implementation of the GP PEIR, there have been no substantial changes in circumstances, and no new information has become available, not known and could not have been known, at the time of certification, which would require major revisions to the PEIR. With regards to the issue area of Noise, the following findings can be made:
1. No peculiar impacts to the Project or its site have been identified.
2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the GP PEIR.
3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the GP PEIR.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
4. No new Mitigation Measures would be required because Project- specific impacts would be less than significant. GP PEIR Mitigation Measures have been implemented through the Project’s BMPs.
Rancho Ridge Residential
Initial Study/CEQA Analysis under CEQA § 15183 Exemption Figure 9: Noise Monitoring Location
Source: GANDDINI GROUP, INC.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
4.14 Population and Housing
Impact Analysis
CEQA THRESHOLDS
Project
Peculiar
Impact
that is not
Substanti
ally
Mitigated
by
Uniform
Applied
Policies
Significant
Impact not
Analyzed
as
Significant
in the GP
PEIR
Potentiall
y
Significan
t Offsite
or
Cumulativ
e Impact
not
Discussed
in the GP
PEIR
Adverse
Impact
More
Severe
Based on
Substanti
al New
Informati
on
No New
Impact
from GP
PEIR
XIV. POPULATION AND HOUSING:
Would the project:
a) Induce substantial population
growth in an area, either directly (for
example, by proposing new homes
and businesses) or indirectly (for
example, through extension of roads or
other infrastructure)?
X
b) Displace substantial numbers of
existing housing, necessitating the
construction of replacement housing
elsewhere?
X
General Plan PEIR Mitigation Measures
General Plan PEIR Mitigation Measure Applicable/Not Applicable No GP PEIR Mitigation Measures were required. -
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
Discussion
a) Would the project induce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)?
Narrative Summary: Impacts Analyzed in the GP PEIR (a):
Less Than Significant: The GP PEIR analyzed the environmental impacts resulting from anticipated growth of residential and non-residential uses anticipated by 2030 using SCAG projections. According to the projections, the population in Orange would increase to 153,522 in 2030. The OGP’s population capacity is 27 percent higher than SCAG’s 2030 estimate, which is an approximate 12 percent increase over 2004. The OGP population capacity is determined based on expected levels of housing density rather than the maximum density allowed under the land use designation. Under the OGP, housing units are projected to increase by more than 23,000 units, or approximately 54 percent from 2004 to 2030. Development pursuant to the OGP land use policy would result in an increase of approximately 23,478 dwelling units, 35.7 million square feet of nonresidential building floor area over existing conditions, and a net population increase of approximately 57,844 persons. Majority of new housing opportunities would occur through infill development and adaptive reuse, primarily in the land use focus areas established within the OGP Land Use Element. The development capacity allowed by the OGP could result in a substantial increase in population and housing units over 2004 levels; however, the OGP incorporates policies and plans to ensure orderly growth of the City over time within the following elements:
Growth Management Element, Housing Element, Land Use Element, and Infrastructure Element.
Although the OGP could result in a substantial increase in population and housing units over 2004 levels, the General Plan anticipates and plans for this growth through numerous policies aimed at reducing the impacts associated with population and housing unit growth in the planning area. Additionally, the OGP policies require infrastructure and public facility improvements to be made incrementally to support anticipated growth, Therefore, impacts from population growth are considered less than significant with no mitigation required.
Impacts Associated with the Proposed Project (a)
No New Impacts. The Proposed Project involves a Tentative Tract Map Permit to permit the subdivision of the Project Site into 11 individual parcels, each developed with a single-family dwelling ranging from 2,425 sq. ft. to 2,724 sq. ft.
The GP PEIR anticipated a population of 153,522 and total housing units to be 66,850 by 2030, using SCAG 2004 Growth Forecast. According to the U.S. Census Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
Bureau, the City’s current (July 2023) population is 138,3377 and the average persons per household from 2018 through 2022 was 2.98. According to this data, the Proposed Project would increase the population by approximately 33 persons with the addition of 11 single-family dwellings. This increase is well within the overall population increase of 15,771 persons anticipated the OGP using SCAG projections (2004).
The Proposed Project involves the addition of an interior road through the Project Site to provide vehicular and emergency access. An extension of roads or other infrastructure into undeveloped areas is not required under the Proposed Project and is not considered growth-inducing in this regard. Overall, the Proposed Project would not induce substantial unplanned population growth in an area, either directly or indirectly; therefore, no new impacts associated with unplanned population growth would occur, and no mitigation is required. b) Displace substantial numbers of existing people or housing, necessitating the construction of replacement housing elsewhere?
Narrative Summary: Impacts Analyzed in the GP PEIR (b)
No Impacts: The OGP includes new development to occur where current development has not reached the potential allowed by the existing General Plan designations and for most new housing opportunities in the City to occur through infill development, adaptive reuse, and new mixed-use development through redesignations within the eight land use focus areas established within the Land Use Element of the OGP. The eastern portion of the planning area would also undergo new development on undeveloped land that has already been entitled.
The construction of the future Meats Avenue interchange at SR-55 could result in the demolition of some housing units, however, this project would not result in the substantial numbers of housing or people necessitating the construction of replacement housing elsewhere. The proposed land use changes as a result of the OGP accommodate the development of housing that did not accommodate housing development under the existing General Plan.
Additionally, the OGP policies and plans facilitate and promote a variety of rental and ownership housing types in the planning area aimed at all income levels.
Thus, the GP PEIR concludes that implementation of the General Plan would not displace substantial numbers of existing housing or people and would not result in a significant impact. No mitigation is required.
Impacts Associated with the Proposed Project (b)
No New Impacts. The Proposed Project involves a Tentative Tract Map Permit to permit the subdivision of the Project Site into 11 individual parcels, each developed with a single-family dwelling ranging from 2,425 sq. ft. to 2,724 sq. ft..
No residential units are located on the Project Site that would be displaced by
7 U.S. Census Bureau QuickFacts: Orange city, California Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
the construction of the proposed structures. Conversely, the Proposed Project would result in the development of 11 new residential units. Therefore, no impact would occur regarding the displacement of existing people or housing, and no mitigation is required.
Conclusion
Potential impacts identified for the Proposed Project would not be greater than what were identified in the GP PEIR; therefore, the Proposed Project would not create a new significant impact or a substantial increase in the severity of previously identified impacts. Additionally, no new information of substantial importance that was not known and could not have been known at the time the GP PEIR was certified is available that would change the prior finding of no impact. With regards to the issue of Population and Housing the following findings can be made:
1. No peculiar impacts to the Project or its site have been identified.
2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the GP PEIR.
3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the GP PEIR.
4. No new Mitigation Measures would be required because Project- specific impacts would be less than significant. No GP PEIR Mitigation Measures were proposed and uniformly applied development policies and standards have been implemented through the Proposed Project.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
4.15 Public Services
Impact Analysis
CEQA THRESHOLDS
Project Peculiar
Impact that is not
Substantially
Mitigated by
Uniform Applied
Policies
Significant
Impact not
Analyzed as
Significant
in the GP
PEIR
Potentially
Significant
Offsite or
Cumulative
Impact not
Discussed
in the GP
PEIR
Adverse
Impact More
Severe
Based on
Substantial
New
Information
No
New
Impact
from
GP
PEIR
XV. PUBLIC SERVICES:
a) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services:
Fire protection? X
Police protection? X
Schools? X
Recreation/Parks? X
Other public facilities? X
General Plan PEIR Mitigation Measures
General Plan PEIR Mitigation Measure Applicable/Not Applicable
5.12-1 Maintain, equip, and update the Emergency
Operations Center on an ongoing basis to improve
public safety and response by agencies, and
coordinate and incorporate changes with the Multi-
Hazard Functional Plan. (Implementation Program II-5)
Mitigation Measure is not
applicable.
5.12-2 Comply with all City procedures in the review of proposed development projects, and use the site plan
review process to ensure that applicable General Plan
policies and City standards and regulations are applied to proposals for specific development projects.
(Implementation Program III-2)
Mitigation Measure is
applicable. The Proposed
Project would be required
to comply with the City’s
review procedures.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
General Plan PEIR Mitigation Measure Applicable/Not Applicable
5.12-3 During the development application process,
consult with fire and police departments to evaluate the need for additional fire and police facilities or resources to serve new development projects and infill
development areas. During updates to the Capital
Improvement Program process, coordinate with service
providers to evaluate the level of fire and police service provided to the community. Continue to use state-of-
the-art techniques and technology to enhance public
safety and assess adequacy and plan for upgrades
during updates to the Capital Improvement Program
and updates to the City’s Operating Budget.
Adhere to requirements in the Municipal Code for
adequate street widths and clearance for emergency
access. Integrate Crime Prevention Through
Environmental Design (CPTED) techniques into
development projects during the development review
process and practice active surveillance measures in
high-risk areas such as parking lots. (Implementation
Program III-8)
Mitigation Measure is
applicable. The Proposed
Project is required to
evaluate the potential for
increased fire and police
services and potential for
additional fire and police
facilities. To ensure
adequate services are
provided and to minimize
the demands on police
services, security and
design measures which
employ defensible space
concepts shall be utilized
throughout the formation of
development and
construction plans. These
measures incorporate the
concepts of Crime
Prevention through
Environmental Design
(CPTED), which involves the
placement, and orientation
of structures, access and
visibility of common areas,
placement of doors,
windows, addressing,
lighting and landscaping.
CPTED promotes public
safety, physical security and
allows citizens the ability to
monitor activity. In addition,
the Proposed Project shall
comply with the
requirements established in
Chapter 15.52 of the
Orange Municipal Code
(Building Security
Ordinance #6-22).
Conditions related to CPTED
and the Orange Building
Security Standards will be
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
General Plan PEIR Mitigation Measure Applicable/Not Applicable included on the Proposed
Project.
5.12-4 Use public education activities to accomplish the following objectives:
Raise public awareness of public safety issues
including fire safety, flood hazards, homeland
security, and other programs.
Promote the application of CPTED to new
development projects.
Support neighborhood meetings and community
programs on crime prevention and education.
Continue to support existing “Neighborhood
Watch” programs, and support the efforts of the
City of Orange Police Department to expand
these programs.
(Implementation Program IV-3)
Mitigation Measure is not
applicable.
5.12-5 Continue to evaluate and update information
available to the City regarding potential fire hazards
and hazard areas. Provide public information on the
City’s website, at City Hall, and through other means as necessary regarding defensible space surrounding
residences and businesses. Use Wildland Fuel
Modification guidelines for controlling vegetation in
undeveloped areas, and Wildland Urban Interface
Code and weed abatement standards.
(Implementation Program I-27)
Mitigation Measure is not
applicable.
5.12-6 Adopt, review, implement, and update as
necessary the following master plans, standards, and
guidelines:
Public Library Facilities Master Plan
(Implementation Program I-4)
Mitigation Measure is not
applicable.
5.12-7 Continue to implement the City’s Public Library
Facilities Master Plan (2002-2020). Continue to work to ensure that the California State Library-recommended
standard of four volumes and 0.7 square foot per capita is maintained and that the City’s library services needs are met as future development occurs. Continue to
promote and provide additional resources for the
Orange Public Library Local History Collection. Maintain Mitigation Measure is not
applicable.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
General Plan PEIR Mitigation Measure Applicable/Not Applicable and enhance the Preservation Resource Center within
the Orange Public Library and Local History Center that provides access to information about historic
preservation regulations and benefits, technical
assistance materials, and information about research
methods and collections. (Implementation Program I-
31)
5.12-8 Adopt, review, implement, and update as
necessary the following master plans, standards, and
guidelines:
Water Master Plan
Urban Water Management Plan
(Implementation Program I-4)
Mitigation Measure is not
applicable.
5.12-9 As part of the development application and
review process, require studies as needed to determine
water infrastructure requirements for future
development projects, and require that any
recommendations be incorporated into the design of
projects. Require the dedication of necessary right-of- way and construction of water infrastructure
improvements for development projects as needed.
Developers shall also be required to pay the cost of
providing new and improved water services to project
sites. For projects that satisfy the criteria set forth in Sections 10910-10915 of the California Water Code and
Section 66473.7 of the Government Code, a water
supply assessment or water supply verification
demonstrating available water supplies exist to support development shall also be prepared. (Implementation
Program III-7)
Mitigation Measure is
applicable. The Proposed
Project would conduct
studies to determine the
water infrastructure as well
as pay any water service
fee’s required by the City.
5.12-10 Coordinate with the Irvine Ranch Water District, Santiago County Water District, Serrano Water District, MWDOC, MWD, Golden State Water Company, Orange
County Sanitation District, and East Orange County
Water District to achieve the following water supply,
distribution, and conservation objectives:
Maintain groundwater recharge areas to protect
water quality and ensure continued recharge of
local groundwater basins.
Mitigation Measure is
applicable. The Proposed
Project would be required
to confirm the appropriate
water district has capacity
for the development.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
General Plan PEIR Mitigation Measure Applicable/Not Applicable Reduce the amount of water used for
landscaping and increase use of native and
drought-tolerant plants.
Encourage the production, distribution, and use
of recycled and reclaimed water for
landscaping projects.
Maintain water quality objectives for urban
runoff.
(Implementation Program V-8)
5.12-11 Adopt, review, implement, and update as
necessary the following master plans, standards, and
guidelines:
Sewer Master Plan
(Implementation Program I-4)
Mitigation Measure is not
applicable.
5.12-12 The City shall repair and improve all areas that were identified in the 2003 Sewer Master Plan Update as having system deficiencies based on available
resources and will also continue to identify anticipated deficiencies in the system. The City shall make
improvements to areas with frequent blockages or “hot-
spots.” Developers shall also be required to pay the cost of providing new and improved wastewater services to
project sites.
Mitigation Measure is not
applicable.
5.12-13 As part of the development application and
review process, coordinate with SCE, Time Warner
Cable, Cox Communications Orange County, The Gas
Company, AT&T, cellular telephone service providers,
and other local utilities to assess capacity and
infrastructure needs to support new development or
redevelopment activities. Require that utilities be
moved underground consistent with the City’s Master
Utility Undergrounding Plan. (Implementation Program
V-1)
Mitigation Measure is
applicable. The Proposed
Project would require “Will
Serve Letters” for services
including electrical, gas,
telecommunication, and
other utility services.
5.12-14 The City strongly encourages new development
and major renovation projects to employ green building
techniques and materials. Encourage proposed
development projects throughout the City to
incorporate Leadership in Energy and Environmental
Design (LEED) Standards developed by the U.S. Green
Building Council or an equivalent program. Encourage
Mitigation Measure is
applicable. The Proposed
Project would adhere to
State Title 24 building
construction standards and
Energy Star conservation
standards as well as
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
General Plan PEIR Mitigation Measure Applicable/Not Applicable building orientations and landscaping that enhance
natural lighting and sun exposure. Prepare guidelines for sustainable development to encourage incorporation
of these practices in new development. These
guidelines will include measures to maximize soil
permeability to address related stormwater and
surface-water runoff issues. Require compliance with
State Title 24 building construction standards and Energy Star conservation standards for all development
projects. Climate change Mitigation Measures identified in the General Plan EIR shall be incorporated as
implementation programs and applied to new
development projects upon adoption of the General
Plan. (Implementation Program III-11)
incorporate applicable
climate change Mitigation
Measures.
5.12-15 Continue to contract for provision of solid waste and recycling services. Expand community outreach
and education regarding residential recycling
opportunities and household hazardous wastes by
providing information on the City’s website, at City Hall, and through other means as necessary.
(Implementation Program I-33)
Mitigation Measure is not
applicable.
5.12-16 Continue to implement waste diversion
programs as well as public education programs as
outlined in the City’s Source Reduction and Recycling
Element required by AB 939 (1989). Work to expand
recycling pickup to all residential addresses in the City.
Conduct a waste characterization study to identify the
major constituents in the City’s solid waste stream. The results of the study will be used to guide development of the recycling and outreach program, and possible
revisions to waste handler contracts. The City will also consider anticipated waste associated with the land
use types of future development. (Implementation
Program IV-5)
Mitigation Measure is not
applicable.
Discussion
a) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services:
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
Narrative Summary: Impacts Analyzed in the GP PEIR (a)
Less Than Significant: The OGP's implementation would result in a net population increase of approximately 57,844 persons.
Fire Protection and Emergency Services: The City of Orange is served by the Orange City Fire Department (OCFD), providing services for fire prevention, fire administration, fire and arson investigation, disaster and emergency preparedness, terrorist prevention and response, as well as community emergency response. The City is served the eight existing fire stations dispersed around the city, located on Chapman Ave., E. Collins Ave., N Shaffer St., S Esplanade St., W Maple Ave., City Dr. South, E Ford Rd., and E Carver Lane.
Intensification of development and additional population in the land use focus areas would lead to increased demand for fire protection services in these areas.
Additionally, new development in the eastern portion of the planning area (primarily from the entitled East Orange development) may require additional fire protection services and facilities. It should be noted that mitigation for increased demand for fire services due to the East Orange development (including a new fire station to serve the area) was required at the time of the project approval.
Adequacy of fire personnel and facilities is monitored on a consistent basis by the Fire Chief and management staff and service needs are budgeted for on an annual basis. The Operating Budget is updated to maintain current levels of public facilities and infrastructure, and to coordinate development of community facilities and amenities and capital projects. The City uses a 7-year Capital Improvement Program process to prioritize, finance and complete various infrastructure and other projects identified in the Capital Improvement Program, which may include fire protection facilities and services.
Mitigation Measures 5.12-1 through 5.12-5 would require the City to continue to update and maintain the Emergency Operations Center, procedures for review of proposed development projects, fire facilities and resources to serve new development, education opportunities, and information regarding potential fire hazards and hazard areas. Therefore, impacts associated with the provision of new or physically altered fire protection and emergency service facilities would be reduced to a less than significant level with Mitigation Measures.
Pursuant to Section 15145 of CEQA, analysis of the physical changes in the planning area that may occur from future construction of fire station facilities would be speculative and no further analysis of the impact is required at this time.
However, construction of fire protection facilities would be subject to CEQA.
Environmental documentation prepared pursuant to CEQA would identify potentially significant impacts and appropriate Mitigation Measures.
Police Protection: The City of Orange is served by the Orange Police Department (OPD), providing field services, investigative services, and support services. The Orange Police Department is served by approximately 160 sworn officers and 120 Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
support staff employees. The Orange Police Department headquarters is located at 1107 N. Batavia Street. The implementation of the General Plan would increase the population and new development in the Planning Area, raising the demand for police protection and services. Despite this, the overall level of police protection would not decline. Even though the City does not use an officer-to- population ratio standard to measure the adequacy of policing levels in the City, the planning area would need over 80 new officers based on the FBI’s average ratio for western cities of 1.3 police officers per 1,000 residents. This figure is based on the net population increase of approximately 57,844 persons anticipated at buildout pursuant to the OGP. The City updates its Operating Budget to maintain current levels of public facilities and infrastructure, and to coordinate development of community facilities and amenities and capital projects. The City uses the 7-year Capital Improvement Program process to prioritize, finance, and complete various infrastructure and other projects identified in the Capital Improvement Program, which may include police facilities and services.
The GP PEIR includes Mitigation Measures 5.12-1 through 5.12-4 that require the city to update and maintain the Emergency Operations Center, procedures for review of proposed development projects, police facilities and resources to serve new development and educational opportunities to raise public awareness and safety. Therefore, impacts associated with the provision of new or physically altered police protection service facilities would be reduced to a less than significant level with Mitigation Measures.
Pursuant to Section 15145 of CEQA, analysis of the physical changes in the planning area, which may occur from future construction or expansion of police stations and/or police facilities would be speculative and no further analysis of the impact is required at this time. However, construction of the police facilities would be subject to CEQA. Environmental documentation prepared pursuant to CEQA would identify potentially significant impacts and appropriate Mitigation Measures.
School: Schools serving students in the Orange planning area operate within the Orange Unified School District (OUSD). According to OUSD^1 , the district has 3 early learning schools and preschools, 29 elementary schools, 7 intermediate schools, and 6 high schools. Additionally, the district has 4 alternative school locations and two colleges located in the planning area. Based on the OUSD student generation rates, the implementation of the OGP is expected to generate approximately 7,395 new students in the planning area.
With adoption of Senate Bill (SB) 50 and Proposition 1A in 1998, school districts that meet certain requirements now have the option of adopting alternative school fees, also known as Level 2 Fees and Level 3 Fees (Public Resources Code Sections 65995.5, 65995.6, and 65995.7). In general, alternative school fees, which are calculated for each school district, apply solely to residential construction within Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
a school district. Therefore, OUSD and the City would require developers to provide for adequate educational facilities, to the extent allowed by law.
The environmental effects of expansion, construction, and operation of additional school facilities would be evaluated under CEQA by OUSD in its efforts to plan for construction of new schools or expansion of existing facilities. The OUSD updates its Facilities Master Plan over time to evaluate demand, capacity, and plans for facility needs. SB 50 states that for CEQA purposes, payment of fees to the affected school district reduces school facility impacts of the OGP to a less than significant level but does not relieve the affected district of completing its own analysis of environmental impacts under CEQA.
Libraries: Library services in the City of Orange are provided by the Orange Public Library and Historic Center (Main Library) located at 407 E. Chapman Avenue.
The library closed in 2005 for a major construction and expansion, and reopened in 2007, adding 28,000 square feet of space and provides twice as many books as it did prior to expansion, a homework center, a Teen Zone, a Children’s Library, a literacy center, a local history room, a Friends’ of Orange Public Library bookstore, community meeting space, study room space and 100 public-use computers. Additionally, the El Modena Branch Library, located at 380 S. Hewes Street, and the Taft Branch Library, located at 740 E. Taft Avenue, also serve the planning area and operate as a community resource and gathering space to provide library materials, computer access, meeting room space, and family programs serving their respective parts of the planning area. The OGP’s new development would increase the net population, potentially increasing the level of demand for library services. Mitigation Measure 5.12-6 would require the City to continually update and the Public Library Facilities Master Plan. Mitigation Measure 5.12-7 would require the City to implement the City’s Public Library Facilities Plan to ensure that the California State Library standard of four volumes and 0.7 square feet per capita is maintained and that library services needs are met as future development occurs.
The Orange Public Library Facilities Master Plan recommends future expansions to the El Modena and Taft branch libraries, as well as the construction of a fourth branch library in the Santiago Hills area of Orange. Pursuant to development already approved for East Orange, a new library site has been reserved in the eastern portion of the planning area. With adherence to the proposed Mitigation Measures and implementation of proposed policies pertaining to library services, program-level impacts associated with the provision of library services would be reduced to a less than significant level.
Pursuant to Section 15145 of CEQA, analysis of the physical changes in the planning area that may occur from future construction of library facilities would be speculative and no further analysis of the impact is required at this time.
However, construction of libraries would be subject to CEQA. Environmental Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
documentation prepared pursuant to CEQA would identify potentially significant impacts and appropriate Mitigation Measures.
Parks and Recreation: For more detail, refer to Section 4.16 – Recreation of this document. Park and Recreation service impacts can be referred to within Section
4.16, Recreation, of this document.
Other Public Facilities: Other public facilities for the City include Water Supply and Infrastructure, Wastewater Infrastructure, Energy and Solid Waste.
Water Supply and Infrastructure: The GP PEIR analyzes existing conditions of water supply and infrastructure and potential impacts due to the OGP. The City’s primary source of domestic water is from groundwater resources supplied by City- owned wells, which provide approximately 55 percent of the City’s water supply.
The City also purchases approximately 40 percent of its domestic water supply from imported water sources as a member agency of the Municipal Water District of Orange County (MWDOC). The City also receives 3 to 5 percent of its water supply from the Serrano Water district. In addition, the Irvine Ranch Water District serves new development areas in East Orange, and the Golden State Water Company and East Orange County Water District serve small portions of the southeast area of the City.
Delivery of domestic water service in the City is provided by the Public Works Department’s Water Division. The City’s service area includes approximately 23.6 square miles and includes 16 wells, 8 imported water service connections, 18 storage tanks, 18 pump stations, 449 miles of pipelines, and 34,000 service connections. According to the City Urban Water Management Plan Update (UWMP) (City of Orange 2005), the City’s 2005 estimated groundwater production capacity was 40,371 acre-feet per year (AFY). The UWMP also noted that three additional wells were included in the City’s Capital Improvement Program. With these additional wells, the City’s estimated production capacity would be increased to 49,079 AFY. The GP PEIR determined that impacts to water supply availability to serve the General Plan’s buildout population are less than significant; however, increased population and development resulting from the OGP would create a demand for additional water infrastructure and water facilities. The City would continue to use the 7-year Capital Improvement Program to prioritize, finance, and complete various infrastructure and other projects identified in the Capital Improvement Program, which may include water infrastructure and services. Mitigation Measures 5.12-8 through 5.12-10 require the City to implement and update applicable master plans, require future development projects to contain studies and incorporated recommendations, and coordinate with applicable water districts to achieve water supply, distribution and conservation objectives. With adherence to and implementation of the OGP policies and programs and the GP PEIR Mitigation Measures, program Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
level impacts associated with water infrastructure would be reduced to a less than significant level.
Pursuant to Section 15145 of CEQA, analysis of the physical changes in the planning area that may occur from the provision of additional water infrastructure would be speculative and no further analysis of the impact is required at this time.
However, water infrastructure projects would be subject to CEQA. Environmental documentation prepared pursuant to CEQA would identify potentially significant impacts and appropriate Mitigation Measures.
Wastewater: The GP PEIR analyzes existing wastewater infrastructure and potential impacts due to the OGP implementation. The City of Orange Public Works Department is responsible for installation and maintenance of local wastewater collection facilities, which convey wastewater to Orange County Sanitation District (OCSD) trunk sewers.
The City’s Public Works Department is in charge of the daily operation and maintenance of the sewer collection system in the City. Approximately 352 miles of basic sewer collection pipeline is located within the City. Of these pipes, approximately 71 percent are 8 inches in diameter, 9 percent are 6 inches in diameter, and approximately 7 percent are 12 inches in diameter. In addition, the City operates and maintains three small sewage lift stations. The City’s 2003 Sewer Master Plan Update identified several areas that have deficient wastewater collection capabilities due to age and limited line capacity. Additionally, areas of frequent blockages or “hot-spots” were identified. In these areas, 20 to 30 overflows may occur per year. The primary causes of these overflows are lack of hydraulic capacity, root intrusion, and accumulated grease. Chronic maintenance problems occur primarily where older pipes exist and are related to root intrusion and grease buildup in pipes with a diameter of 6 inches. OCSD is proposing to upgrade the level of wastewater treatment at both of its treatment plants to meet secondary treatment standards for the projected 2030 effluent flow of 261 mgd. OCSD successfully collects, conveys, and treats 221 million gallons of wastewater generated daily in its service area before discharging the treated water into the Pacific Ocean. Average flows for Reclamation Plant No. 1 and Treatment Plant No. 2 are 92 mgd and 129 mgd, respectively. The combined average flow is 221 mgd. Reclamation Plant No.1 has a design capacity of 108 mgd with average daily flow of 92 mgd. Treatment Plant No. 2 has an average daily flow of 129 mgd with a design capacity of 168 mgd.
To respond to the increased need for sewage treatment, OCSD has launched plans to expand treatment capacity. Reclamation Plant No. 1 is expected to increase capacity to 204 mgd. A portion of the sewage fee charged to developers in the City of Orange would be paid to the County for regional facilities improvements. In addition, OCSD’s Capital Facilities Capacity Charge is applied to cities and developers for new or expanded residential, commercial, Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
and industrial development and is used for improving the efficiency and effectiveness of OCSD operations. Implementation of Mitigation Measure 5.12-11 requires the City to adopt and update the Sewer Master Plan, and Mitigation Measure 5.12-12 requires the City to repair and improve identified areas in the 2003 Sewer Master Plan Update and require developers to pay the cost of new and improved wastewater services to project sites. With adherence to and implementation of proposed policies and Mitigation Measures, program level impacts associated with the provision of wastewater services would be reduced to a less than significant level.
Pursuant to Section 15145 of CEQA, analysis of the physical changes in the planning area that may occur from the provision of additional wastewater collection and treatment facilities would be speculative and no further analysis of the impact is required at this time. However, wastewater infrastructure projects would be subject to CEQA. Environmental documentation prepared pursuant to CEQA would identify potentially significant impacts and appropriate Mitigation Measures.
Energy: The GP PEIR analyzes the impact from OGP implementation on energy facilities and services. The increased population from the OGP would create a demand for additional electricity and natural gas as well as transmission infrastructure, which may exceed the capacity of these existing facilities and result in the need for new, upgraded, or expanded facilities. In 2004, the annual electricity demand in the planning area was approximately 635.9 million kilowatt hours(kWh). With the OGP buildout in 2030, annual electricity demand is estimated to increase approximately 91 percent to approximately 1,218 million kWh annually. All new development pursuant the OGP would be required to pay applicable fees assessed by SCE to extend electricity lines to serve the specific Project Site. SCE would not provide service to new developments if there are not adequate electricity supplies and infrastructure to maintain existing service levels and meet the anticipated electricity demands of the specific development requesting service. Mitigation Measure 5.12-13 and 5.12-14 require new development to coordinate with utility service providers to ensure adequate capacity and to encourage green building techniques and materials. With adherence to General Plan policies and programs and implementation of applicable Mitigation Measures, program-level impacts associated with the provision of energy in the form of electricity and natural gas would be reduced to a less than significant level.
Pursuant to Section 15145 of CEQA, analysis of the physical changes in the planning area that may occur from the construction of new electrical and gas infrastructure would be speculative and no further analysis of the impact is required at this time. However, infrastructure projects related to the provision of electricity and natural gas would be subject to CEQA. Environmental Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
documentation prepared pursuant to CEQA would identify potentially significant impacts and appropriate Mitigation Measures.
Solid Waste and Waste Diversion: The GP PEIR analyzes existing conditions of the City’s solid waste facilities and services. The increased population from the OGP would create a demand for additional solid waste collection and disposal capacity. The City of Orange contracts with Waste Management of Orange County for the collection of solid waste, green waste, and items for recycling.
Most waste collected by Waste Management is taken to any of the three landfills in Orange County: Olinda Alpha Landfill in Brea, Frank R. Bowerman Landfill in Irvine, and Prima Deshecha Landfill in San Juan Capistrano. Since solid waste from Orange is not restricted to any specific landfill, trash from the City may be disposed of at any of these landfills. Orange County Waste & Recycling, a division of the County of Orange, owns and operates these three active landfills and administers solid waste collection, recycling, and planning within the City’s planning area.
Mitigation Measure 5.12-15 requires the City to continue to contract for provision of solid waste and recycling services and Mitigation Measure 5.12-16 requires the City to continue to implement waste diversion programs and waste education programs. With adherence to and implementation of the proposed policies pertaining to solid waste described above, and implementation of Mitigation Measures 5.12-15 and 5.12-16, program-level impacts associated with solid waste services would be reduced to a less than significant level.
Impacts Associated with the Proposed Project (a)
No New Impacts. The Proposed Project involves a Tentative Tract Map Permit to permit the subdivision of the Project Site into 11 individual parcels, each developed with a single-family dwelling ranging from 2,425 sq. ft. to 2,724 sq. ft..
According to the U.S. Census Bureau, the City’s average persons per household from 2018 through 2022 was 2.988. According to this data, the Proposed Project would increase the population by approximately 33 persons with the addition of 11 single-family dwellings.
Fire Protection: Fire protection services are provided by the Orange City Fire Department. The nearest fire station to the Project Site is Fire Station No. 4, located
0.9 miles southwest of the Project Site at 210 S. Esplanade Street. The construction of a single-family residential development could incrementally increase demands for fire protection services and medical assistance provided by the fire department. However, this increased demand for fire protection services would be met with existing fire resources. Potential impacts to fire services would be adequately funded by an increase in property tax revenue, over an extended
8 U.S. Census Bureau QuickFacts: Orange city, California Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
period, relative to the increase in development intensity, as well as through development impact fees in accordance with City of Orange Development Fees.
Additional purchasing of equipment, apparatus, and vehicles for Fire Department services would be provided through the Fire Facilities Impact Fee. Department needs are assessed annually, and budget allocations revised accordingly to ensure that adequate levels of service are maintained throughout the City.
Building plans submitted for new development on the Project Site would be required to comply with fire safety requirements. As shown in Figure 5, the Proposed Project would include a fire hammerhead lane. Additionally, development of the Project Site would not result in the need for new or physically altered fire protection facilities as population increase from the Proposed Project is accounted for in the General Plan update population growth. Therefore, no impact is anticipated, and no new mitigation would be required.
Police Protection: Police Protection to the Project Site would be provided by the Orange Police Department. The police headquarters are located 3.4 miles to the west of the Project Site at 1107 N. Batavia Street. The construction of a single- family residential development could incrementally increase demand for police services. However, the increased demand for police protection services would be adequately funded by an increase in property tax revenue, over an extended period of time, as well as through development impact fees in accordance with Orange Municipal Code Chapter 3.13: Police Facility Development Fee.
Additionally, development of the Project Site would not result in the need for new or physically altered police protection facilities as population increase from the Proposed Project is accounted for in the General Plan update population growth.
Therefore, no impact is anticipated, and no new mitigation is required.
Schools: The City is served by Orange Unified School District. The school district is projecting a net decline in student enrollment over the next seven years9. The Proposed Project is the construction of 11 single-family residential dwelling units.
The construction of a single-family residential development could provide additional enrollment; however, the increased demand would be met with existing school facilities. Potential impacts to school would be adequately funded by development impact fees in accordance with City of Orange Development Fees. According to the U.S. Census, the average household size is 2.98 and 20.5% of Orange’s population are under 18-years old10. Extrapolation of this would result in approximately seven of the potential 33 persons the Proposed Project would be under 18 years old. Due to the nominal number of potential students on
9 https://www.orangeusd.org/uploaded/photos/Davis_Demographics-Orange_USD_Fall_2019_-20_FINAL_Report.pdf 10 https://www.census.gov/quickfacts/fact/table/orangecitycalifornia,orangecountycalifornia/AGE295221#AGE295221 Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
anticipated decrease in student enrollment, no impacts are anticipated to the schools, and no new mitigation is required.
Parks and Recreation: Park and Recreation service impacts from the Proposed Project can be referred to within Section 4.16, Recreation, of this document.
Other Public Facilities: Other public facilities for the City of Orange include Water Infrastructure, Wastewater Infrastructure, Storm Drain Systems, Energy, and Solid Waste and Waste Diversion.
Water Supply and Infrastructure: The City of Orange Water Division is responsible for providing a clean, safe, potable water supply to the City of Orange. The City receives water from three main sources: groundwater through 15 active wells managed by the Orange County Water District (OCWD), surface water from the Serrano Water District, and imported surface water from the Metropolitan Water District of Southern California (MWD) from the Colorado River and the State Water Project in Northern California. The 2020 Urban Water Management Program concluded that the City would have adequate supply to meet water demand during normal, single dry, and multiple dry years over the next 25 years. The Proposed Project is consistent with the General Plan and Zoning Code and was reflected in the City’s demand calculations. Therefore, no impact is anticipated.
Per Title 7, Chapter 7.01, Water Quality and Stormwater Discharges, of the City Code, the Applicant would be required to include specific design Best Management Practices to ensure that no storm water runoff generated on the Project Site would leave it without pre-treatment for urban pollutants. The Applicant has prepared a Preliminary Water Quality Management Plan (WQMP), which includes specific design features during construction and operations to ensure that no storm water runoff generated on the Project Site would leave it without pre-treatment for urban pollutants (Rancho Ridge, Hunsaker & Associates Irvine, Inc., March 23, 2023). Under proposed conditions, the developed site would gently slope to the west, with surface runoff from each lot conveyed as sheet flow to the curb and gutter. Runoff would be conveyed westerly to a catch basin where the 85th percentile storm event volume and the 2-year detention volume for hydromodification control would be detained in a subsurface detention facility prior to discharging to two (2) drywells. Flows exceeding this volume would be conveyed to Rancho Santiago Boulevard and conveyed southerly as gutter flow prior to discharging to an existing catch basin located at the northeast corner of Ranch Santiago Boulevard and East Walnut Avenue. The Property Owner/Developer would be required to comply with Title 7, Chapter 7.01.060 of the City’s code and implement all recommendations contained within the WQMP.
The Project Site is more than 1 acre; therefore, the Property Owner/Developer would be required to comply with the requirements of the NPDES MS4 Permit Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
Construction General Permit Order 2009-0009- DWQ and prepare a SWPPP. The SWPPP would generally contain a site map showing the construction perimeter, existing and proposed buildings, storm water collection and discharge points, general pre- and post-construction topography, drainage patterns across the Project Site, and adjacent roadways. For ongoing operations, in lieu of providing on site treatment, the developer would pay a Low Impact Development Fee that would apply towards the construction of an offsite mitigation project. Therefore, with compliance with Title 7, Chapter 7.01 of the OMC, potential impacts associated with water infrastructure and storm water drainage would be less than significant, and no new mitigation would be required.
Wastewater Infrastructure: The Proposed Project would be served by the City of Orange Public Works Department for wastewater (sanitary sewer) collection service. The Proposed Project is located within a developed area and there is an existing sanitary sewer main in North Rancho Santiago Blvd, adjacent to the Proposed Project. The Proposed Project would be required to connect to this existing sanitary sewer line. Due to the small size of the Proposed Project, existing wastewater infrastructure and facilities would be adequate to serve the wastewater collection requirements of the Proposed Project. Therefore, no impacts to wastewater facilities would be anticipated, and no new mitigation is required.
Energy: The Project Site is in a built-out, urban setting. The Project Site and the surrounding properties are fully served by various utility service providers, including:
Electric: Southern California Edison (SCE)
Natural Gas: Southern California Gas (SoCalGas)
Water: City of Orange Water Division
Telecommunications: Charter, AT&T, and Comcast
There are no anticipated significant services or system upgrades needed to serve the proposed single-family residential development. Therefore, no impacts are anticipated, and no new mitigation is required.
Solid Waste and Waste Diversion: The Proposed Project is the construction of 11 single-family residential dwelling units. The proposed square footage of the two- story buildings is between 2,425 and 2,724 square feet. The Proposed Project’s contribution of solid waste would be minimal and would not significantly impact solid waste collection or landfill operations. Furthermore, as with all residences in the City, the individual units are subject to curbside recycling and green waste separation requirements. No impacts are anticipated, and no new mitigation is required.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
Conclusion
Potential impacts identified for the Proposed Project would not be greater than what were identified in the Final PEIR; therefore, the Proposed Project would not create a new significant impact or a substantial increase in the severity of previously identified impacts. Additionally, no new information of substantial importance that was not known and could not have been known at the time the GP PEIR was certified is available that would change the prior finding of no impact. With regards to the issue of Public Services the following findings can be made:
1. No peculiar impacts to the Project or its site have been identified.
2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the GP PEIR.
3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the GP PEIR.
4. No new Mitigation Measures would be required because Project- specific impacts would be less than significant.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
4.16 Recreation
Impact Analysis
CEQA THRESHOLDS
Project
Peculiar
Impact that is
not
Substantially
Mitigated by
Uniform
Applied
Policies
Significan
t Impact
not
Analyzed
as
Significan
t in the
GP PEIR
Potentially
Significant
Offsite or
Cumulative
Impact not
Discussed in
the GP PEIR
Adverse
Impact
More
Severe
Based on
Substanti
al New
Informati
on
No New
Impact
from GP
PEIR
XVI. RECREATION:
a) Would the project increase
the use of existing
neighborhood and regional
parks or other recreational
facilities such that substantial
physical deterioration of the
facility would occur or be
accelerated?
X
b) Does the project include
recreational facilities or require
the construction or expansion of
recreational facilities which
might have an adverse physical
effect on the environment?
X
General Plan PEIR Mitigation Measures
GP PEIR Mitigation Measure Applicable/Not Applicable
5.13-1 Work actively to acquire, build, and
maintain approximately 122 acres of
additional parkland, in order to achieve a
minimum parkland ratio of 3 acres per 1,000
persons by 2030, working toward a desired ratio
of 5 acres per 1,000 persons by 2050. Evaluate
progress toward achieving this goal by
preparing a status report for the City Council
and community every 5 years. As a separate,
but compatible objective, support efforts by
the County of Orange or private land owners
to provide an additional 303 acres of regional
Mitigation Measure is not applicable.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
GP PEIR Mitigation Measure Applicable/Not Applicable
parkland to support an overall objective of 10
acres of parkland per 1,000 persons, inclusive
of County regional parks. Work with the private
sector to encourage use of vacant
commercial or industrial properties for
recreational purposes. (Implementation
Program IV-2)
5.13-2 Continue to implement and expand the
use of joint-use agreements to increase the
parks and open space resources available to
Orange residents. Specifically, seek to expand
joint-use agreements with OUSD and other
local schools, SCE, and the Orange County
Flood Control District. Investigate conversion or
joint-use of surplus or otherwise underutilized
lands, including railroad and public utility rights-
of-way, for open space use. (Implementation
Program I-26)
Mitigation Measure is not applicable.
5.13-3 Continue to implement and update the
City’s Capital Improvement Program to:
Address phasing and construction and
maintenance of roadway,
infrastructure, streetscape, signage,
and City-owned park improvements
throughout the City;
Acquire and expend funds from
available transportation financing and
other programs to assist in financing new
roadways and trails;
Manage construction of new parks and
improvements to current parklands and
park facilities; and
Facilitate construction of a multi-use
trails network that connects the City’s
parks and open spaces.
Use the 7-year Capital Improvement Program
process to prioritize, finance, and complete
roadway, infrastructure, and parks projects
identified in the Capital Improvement Program.
Update the Capital Improvement Program on
an annual basis to respond to changes in local
priorities and available funding sources.
Mitigation Measure is not applicable.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
GP PEIR Mitigation Measure Applicable/Not Applicable
Require future Capital Improvement Program
projects to include a public outreach
component. (Implementation Program II-1)
5.13-4 Continue efforts to prepare and adopt
a vision plan for Santiago Creek addressing
recreational trails, open space, and flood
control. Support future development of highly
visible access points to the Santa Ana River,
particularly at Lincoln Avenue, Katella Avenue,
and Chapman Avenue. Partner with the City of
Anaheim, resource agencies, and community
organizations to complete a Vision Plan for the
Santa Ana River, similar to the Plan for Santiago
Creek. (Implementation Program IV-4)
Mitigation Measure is not applicable.
Discussion
a) Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated? Narrative Summary: Impacts Analyzed in the GP PEIR (a)
Less Than Significant Impact. The GP PEIR describes the existing recreation facilities and includes potential environmental impacts resulting from the implementation of the OGP recreation programs and policies. Development pursuant to the OGP land use policy would result in an increase of approximately 23,478 dwelling units,
35.7 million square feet of nonresidential building floor area over existing conditions, and a net population increase of approximately 57,844 persons.
Orange has adopted a standard of 3.0 acres per 1,000 residents, per Section
16.60.040 of the OMC. The GP PEIR notes that the City owns and has developed 24 parks, which consist of approximately 251 acres of parkland, including neighborhood parks, community parks, and regional parks (2010). In addition, Orange also maintains Special Use Facilities such as Plaza Park, Pitcher Park, and the City’s community gardens. The future estimates would require 584 required park acres (as shown Table 12 – Existing and Future Park Acreage Needs).
Mitigation Measures 5.13-1 is implemented in the GP PEIR to require the City actively work to acquire, build and maintain an additional 241 acres of parkland in order to achieve a minimum parkland ratio of 3 acres per 1,000 persons by 2030, working toward a desired ratio of 5 acres per 1,000 persons by 2050. Mitigation Measure 5.13-2 requires the City to implement and expand the use of joint-use agreements, specifically with OUSD, SCE, and the OCFCD, to increase the parks and open space resources available to Orange residents. Mitigation Measure Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
5.13-3 requires the City to continue to implement the Capital Improvement Program, which may include additional park and recreation facilities and services or funding. Mitigation Measure 5.13-4 requires the City to continue to prepare and adopt a vision of Santiago Creek, which could increase parkland for the City. With adherence to existing regulation, as well as implementation of GP PEIR Mitigation Measures and programs and policies, programmatic level impacts to parks and recreation resources would be less than significant.
Table 12 – Existing and Future Park Acreage Needs
2007
Populationc
Park
Acreage
Requireda
Available
Acreage
from
Parklandb
Additional
Acreage per
Quimby Act
(OMC Sec.
3.40)
Ratio per
1,000
Population
Parkland
Surplus/
(Shortfall)
Existing 138,640 416 251 -- 1.81 (165)
Future 194,543d 584 43 e 168d 2.37 (122)
Source: P&D Consultants and Keyser Marston Associates, 2005; California Department of Finance, 2004 Notes:
All acreages are rounded to the nearest acre
a Based on standard of 3.0 acres per 1,000 people, as specified in City of Orange Municipal Code Section 3.40.040.
b Does not include approximately 16,000 acres of open space areas east of Orange or regional park acreage in proximity to Orange.
c Draft Natural Resources Element 2009.
d Estimated buildout population of the OGP would add 55,903 new residents between 2007 and General Plan Buildout Post 2030.
e Assumes 43 acres undeveloped parks and future development project parks are implemented per Table 5.13-3, plus existing parkland acreage.
Impacts Associated with the Proposed Project (a)
No New Impacts. The Proposed Project would provide approximately 38,079 square feet of open space, which includes 18,628 sq. ft. of private and usable space, 5,599 sq. ft. of common open space, and 13,852 sq. ft. of landscaping throughout walkways and front yards. According to the conceptual site plan, the open space plans are subject to change due to the balcony design of the elevation.
The Proposed Project is required to comply with the Implementation Program for the Park Master Plan which adopts the Quimby Act ordinance to require new development to either dedicate and improve parks or pay a fee equivalent to Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
that necessary to meet the standard of 3 acres per 1,000 residents. Therefore, no new impacts associated with recreational facilities which may have an adverse physical effect on the environment would occur.
b) Include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment?
Narrative Summary: Impacts Analyzed in the GP PEIR (b)
Less than Significant Impact. The increased population from the OGP would create a demand for additional park improvements to increase recreational opportunities within the City, which would likely require expansion or construction of existing or new facilities. The specific environmental impact from the construction of new parkland or expansion of existing park and recreation facilities in the planning area cannot be determined at the programmatic level of analysis because no designs for specific park projects are available at this time.
City programs for project design and approval as well as CEQA environmental review process require that potential impacts be addressed prior to construction or expansion of new or existing facilities. The impacts of new and expanded parks would depend upon the precise type and location of such facilities and would therefore need to be addressed in a project-level environmental review. It is anticipated that OGP programs and policies coupled with regulations and review processes would mitigate any project-level environmental impacts. Therefore, impacts would be less than significant, and no Mitigation Measures would be required at the GP PEIR level.
Impacts Associated with the Proposed Project (b)
No New Impacts. The Proposed Project would provide approximately 38,079 square feet of open space, which includes 18,628 sq. ft. of private and usable space, 5,599 sq. ft. of common open space, and 13,852 sq. ft. of landscaping throughout walkways and front yards.
The Proposed Project is required to comply with the Implementation Program for the Park Master Plan which adopts the Quimby Act ordinance to require new development to either dedicate and improve parks or pay a fee equivalent to that necessary to meet the standard of 3 acres per 1,000 residents. Therefore, no new impacts associated with construction or expansion of recreation facilities which may have an adverse physical effect on the environment would occur.
Conclusion
No new impacts associated with recreation would occur. The Proposed Project would not result in any impacts beyond those identified in the GP PEIR. The Proposed Project contains no substantial changes to the implementation of the GP PEIR, there have been no substantial changes in circumstances, and no new Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
information has become available, not known and could not have been known, at the time of certification, which would require major revisions to the GP PEIR.
With regards to the issue of Recreation the following findings can be made:
1. No peculiar impacts to the Project or its site have been identified.
2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the GP PEIR.
3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the GP PEIR.
4. No new Mitigation Measures would be required because Project- specific impacts would be less than significant. GP PEIR Mitigation Measures 5.13-1 through 5.13-4 and uniformly applied
development policies and standards have been implemented through the Project.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
4.17 Transportation
Impact Analysis
CEQA THRESHOLDS
Project
Peculiar
Impact that
is not
Substantially
Mitigated by
Uniform
Applied
Policies
Significa
nt
Impact
not
Analyzed
as
Significa
nt in the
GP PEIR
Potentially
Significant
Offsite or
Cumulative
Impact not
Discussed
in the GP
PEIR
Adverse
Impact
More Severe
Based on
Substantial
New
Information
No
New
Impac
t from
GP
PEIR
I. TRANSPORTATION:
Would the project:
a) Conflict with a program, plan,
ordinance or policy addressing
the circulation system, including
transit, roadway, bicycle and
pedestrian facilities?
X
b) Conflict or be inconsistent with
CEQA Guidelines § 15064.3,
subdivision (b)?
X
c) Substantially increase hazards
due to a geometric design
feature (e.g., sharp curves or
dangerous intersections) or
incompatible uses (e.g., farm
equipment)?
X
d) Result in inadequate
emergency access? X
General Plan PEIR Mitigation Measures
GP PEIR Mitigation Measure Applicable/Not Applicable
5.14-1 The City shall implement the Mitigation
Measures for deficient arterial segments
described in Table 5.14-10 shown of the GP PEIR.
These improvements will be added to the City’s
Capital Improvement Program and monitored,
prioritized, and funded over time through the
City’s annual budgeting process. Funds may
consist of City funds, grant funds, traffic impact
Mitigation Measure is not
applicable.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
GP PEIR Mitigation Measure Applicable/Not Applicable
fees, and fair-share contributions toward
capacity impacts required under CEQA to
mitigate project impacts for specific projects.
Timing for implementation will be determined by
the City’s Traffic Engineer based on monitoring of
operational conditions and traffic counts
demonstrating the need for the improvements.
5.14-2 The City shall complete intersection
capacity improvements and coordinate traffic
signals as necessary to improve traffic flow and
implement the Mitigation Measures for deficient
intersections. Specific improvements are
described in Table 5.14-11 shown in the GP PEIR.
These improvements will be added to the City’s
Capital Improvement Program and monitored,
prioritized, and funded over time through the
City’s annual budgeting process. Funds may
consist of City funds, grant funds, traffic impact
fees, and fair-share contributions toward
capacity impacts required under CEQA to
mitigate project impacts for specific projects.
Timing for implementation will be determined by
the City’s Traffic Engineer based on monitoring of
operational conditions and traffic counts
demonstrating the need for the improvements.
Mitigation Measure is not
applicable.
5.14-3 Require preparation of Traffic Impact
Analyses for new discretionary development
projects. For projects that increase V/C by .01 or
more on affected roadway segments or
intersections experiencing or that are projected
to experience LOS E or F conditions without the
proposed project, Traffic Impacts Analyses must
propose binding mitigation strategies to be
incorporated within the project. The City will
prepare and publish guidelines for the
preparation of Traffic Impact Analyses.
Mitigation Measure is applicable.
The Project prepared a
Transportation Study Screening
Assessment (Appendix C –
Rancho Ridge Infill Project
Transportation Study Screening
Assessment, Ganddini Group,
December 19, 2022).
5.14-4 Require major employers to institute
Transportation Demand Management (TDM)
plans (Chapter 10.83 of the City’s Municipal
Code). Such plans establish incentives to
encourage employees to carpool, take public
Mitigation Measure is not
applicable.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
GP PEIR Mitigation Measure Applicable/Not Applicable
transportation, bicycle, or use some means other
than private automobiles to get to and from work.
5.14-5 Participate in regional efforts to implement
TDM requirements and support implementation of
the employer TDM provisions of the South Coast
Air Quality Management District (SCAQMD) Air
Quality Management Plan by working with the
SCAQMD to identify employers within Orange
most suitable for participation in the TDM
programs to achieve major reduction of VMT.
5.14-6 Work closely with OCTA to achieve the
following:
Maintain consistency with the County
MPAH;
Implement provisions of Measure M;
Implement the OCTA CMP;
Expand and improve the efficiency of bus
service within the City;
Encourage the expansion of alternative
local transportation options such as a
community circulator bus service between
transit centers and major commercial,
employment, and residential areas;
Improve paratransit or other public
transportation systems that enhance the
mobility of Orange’s senior and youth
populations, and the disabled;
Encourage provision of attractive and
appropriate transit amenities;
Support and implement the OCTA
Commuter Bikeways Strategic Plan and
participate in future updates and revisions
to the Plan; and
Reduce noise impacts of OCTA operations
and facilities.
Mitigation Measure is not
applicable.
5.14-7 Work closely and coordinate with Caltrans
and TCA on all plans, activities, and projects that
may affect state roadway facilities or
transportation corridors passing through Orange.
Additionally, work with these agencies to achieve
the following:
Mitigation Measure is not
applicable.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
GP PEIR Mitigation Measure Applicable/Not Applicable
Provide appropriate screening to control
the visual impacts of transportation
facilities;
Provide landscaping within transportation
facilities;
Implement the interchange at SR-55 and
Meats Avenue;
Determine the feasibility of conversion or
joint-use of surplus or otherwise
underutilized lands under Caltrans or TCA
control for open space;
Plan for noise abatement along freeways
and highways;
Install, maintain, and update freeway and
highway rights-of way buffers and
soundwalls; and
Provide adequate visual buffers such as
berms or landscaping between freeways
and railways and adjacent land uses.
Discussion
a) Would the project conflict with a program, plan, ordinance or policy addressing the circulation system, including transit, roadways, bicycle and pedestrian facilities?
Narrative Summary: Impacts Analyzed in the GP PEIR (a)
Less Than Significant Impact. The GP PEIR analyzes the OGP with the Congestion Management Plan (CMP). According to the GP PEIR, the City contains one Orange County CMP intersection at SR-55 northbound and southbound ramps at Katella Avenue. Implementation of the OGP would not cause this intersection to degrade to an unacceptable level. The GP PEIR states that this intersection would operate at LOS C and D for the northbound SR-55 ramps in the AM and PM peak hours, respectively. The southbound ramps to SR-55 would operate at LOS E and D in the A.M. and P.M. peak periods, respectively, with implementation of the OGP. Per the CMP, LOS E is the operating standard for roadways on the CMP highway system. Therefore, impacts to CMP designated roads or highways would be less than significant.
Impacts Associated with the Proposed Project (a)
No New Impacts. The Proposed Project would provide vehicular access via a driveway from Rancho Santiago Boulevard along the western site boundary.
The VMT Analysis was conducted using a proposed 13 dwelling units, creating a Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
conservative analysis since the Proposed Project proposes development of 11 single-family residential units. The Project’s trip generation is based on data obtained from the Institute of Transportation Engineers (ITE) Trip Generation Manual (12th Edition, 2025) and the North Orange County Collaborative VMT Traffic Study Screening Tool (NOCC+, November 2020 Update). Since the NOCC+ only provides daily trip generation, the project AM and PM peak hour trip generation was calculated based on ITE rates. Based on review of the project and ITE land use definition, ITE Land Use Code 210 – Single-Family Detached Residential was determined to adequately represent the proposed use and was selected for this analysis. The Proposed Project is forecasted to generate 100 daily trips, including 9 trips during the AM peak hour and 10 trips during the PM peak hour.
The criteria for assessing the need to prepare a transportation impact study is specific in the City of Orange Traffic Impact Analysis Guidelines for Vehicle Miles Traveled and Level of Service Assessment (July 2025) (TIA Guidelines).
As specified in the City of Orange TIA Guidelines, the requirement to prepare a transportation impact analysis with LOS analysis should be based on the following criteria:
When either the AM or PM peak hour project trip generation exceeds 100 vehicle trips.
Projects that generate 1,600 or more average daily trips (ADT) on the Arterial Highway System.
Projects that generate 50 or more vehicle trips during either the AM or PM peak hour to any intersection.
The Proposed Project is forecast to generate fewer than 100 peak hour vehicle and would not contribute more than 1,600 daily vehicle trips on the Arterial Highway System nor 50 trips to an intersection during the weekday AM and PM peak hours; therefore, LOS analysis is not warranted based on the criteria established in the City’s TIA Guidelines. The Proposed Project complies with the City’s TIA Guidelines and does not propose any features that would conflict with the City’s TIA Guidelines or Circulation Element.
The City’s TIA Guidelines establish screening thresholds for certain types of projects that may be presumed to cause a less than significant VMT impact based on the substantial evidence and technical guidance provided in the Office of Planning and Research (OPR) Technical Advisory on Evaluating Transportation Impacts in CEQA (December 2018) [“OPR Technical Advisory”]. Further VMT analysis is not required for projects that satisfy at least one of the three following screening criteria:
Transit Priority Areas (TPA) Screening
Low VMT-Generating Areas Screening
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
Project Type Screening
The project VMT screening assessment was performed using the NOCC+ Version 5 tool. As established in the City’s TIA Guidelines, residential and office projects located within a low VMT-generating area may be presumed to have a less than significant impact absent substantial evidence to the contrary. Version 5 is the most recent version that implements the OCTAM that has been issued by OCTA.
The NOCC+ tool found that the Proposed Project is located within TAZ #460.
According to the OCTAM socio-economic data supporting the NOCC+ tool, TAZ #460 contains 419 residential households, most of which are single-family housing of approximately the same density as the Proposed Project. Additionally, the Proposed Project does not involved modifications to the surrounding roadway network. Therefore, the Proposed Project is consistent with existing land use within the TAZ and it is not expected to alter the existing built environment in such a way that would increase the rate or length of trips as estimated by the NOCC+ tool.
As shown in the NOCC+ tool, the Proposed Project is estimated to generate 17.6 VMT per service population, which is better than the General Plan Buildout and the City-established threshold of 31.3 VMT per service population. Therefore, the Proposed Project satisfies the City-established low VMT area screening and can be presumed to result in a less than significant VMT impact. The Proposed Project also does not propose any new transit, roadways, bicycle, or pedestrian facilities that would conflict with the City’s Circulation Element or the OMC. The Proposed Project would adhere to all applicable policies and programs listed in the OGP.
Therefore, the Proposed Project would not conflict with a program, plan, ordinance, or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities and no Mitigation Measures would be required. b) Would the project conflict or be inconsistent with CEQA Guidelines section 15064.3, subdivision (b)?
Narrative Summary: Impacts Analyzed in the GP PEIR:
Significant and Unavoidable. The City adopted the GP PEIR in 2010, several years before the modified Section 15064.3 was required under CEQA. CEQA Guidelines Section 15064.3 provides that transportation impacts of projects are, in general, best measured by evaluating the Proposed Project's VMT. Automobile delay (level of service ((LOS)) is no longer considered an environmental impact under CEQA.
The GP PEIR discusses LOS and ADT but not VMT due to its adoption in 2010. The GP PEIR concluded that implementation of the OGP would generate 1,456,700 daily trips, which is approximately 46 percent greater than 995,000 daily trips generated under existing conditions. Overall, at the OGP level, impacts to roadway segments are considered potentially significant. The OGP includes policies and actions to provide a multimodal transportation system that meets Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
forecasted demands and sustains quality of life. The OGP also includes an Implementation Plan that identifies specific Implementation Programs to achieve the goals, policies, and plans. Where a potentially significant environmental impact exists, these Implementation Programs also function as programmatic Mitigation Measures. Feasible Mitigation Measures (including physical improvements) for addressing unacceptable level of service on arterial segments have been identified. Even with adherence to and implementation of the proposed policies, and implementation of Mitigation Measures 5.14-1 and 5.14-3 through 5.14-7, program-level increased traffic impacts on arterial segment level of service would be reduced, but not to a level less than significant. Individual development projects would be required to undergo project-specific environmental review. If project-level significant impacts are identified, specific Mitigation Measures would be required under CEQA.
Impacts Associated with the Proposed Project (b)
No New Impact. The Proposed Project is forecasted to generate 100 daily trips, including 9 trips during the AM peak hour and 10 trips during the PM peak hour.
The Proposed Project is forecasted to generate fewer than 100 peak hour vehicle trips and would not contribute more than 1,600 daily vehicle trips on the Arterial Highway System nor 50 trips to an intersection during the weekday AM and PM peak hours; therefore, LOS analysis is not warranted based on the criteria established in the City’s TIA Guidelines. Furthermore, the Proposed Project satisfies the City-established low VMT area screening and can be presumed to result in a less than significant VMT impact.
A full traffic impact study is not required, and impacts are less than significant as the project complies with CEQA Guidelines Section 15064.3 subdivision (b). c) Would the project substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)?
Narrative Summary: Impacts Analyzed in the GP PEIR (c)
No Impacts. The GP PEIR notes that implementation of the OGP would not increase hazards due to design features or incompatible uses. No new roadways are planned within the planning area and those that may be proposed for expansion or alteration would be subject to existing City design standards for roadways that ensure that no hazards would result. No impacts would result with implementation of the OGP.
Impacts Associated with the Proposed Project (c)
No New Impacts. Vehicular access to the Project Site would be provided via one ingress and egress driveway connecting to Rancho Santiago Boulevard.
Vehicular traffic to and from the Project Site would utilize the existing network of Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
regional and local roadways that currently serve the Proposed Project area. The Proposed Project would not introduce any new roadways or introduce a land use that would conflict with existing urban land uses in the surrounding area. The Proposed Project includes 25-foot-wide internal driveway that would provide access to each dwelling unit. Design of the Proposed Project, including the internal private roadway, ingress, egress, and other streetscape changes are subject to the City’s development standards. As a result, impacts related to vehicular circulation design features would be less than significant, and no new impacts would occur.
d) Would the project result in inadequate emergency access? Narrative Summary: Impacts Analyzed in the GP PEIR (d)
Less Than Significant Impact with Mitigation. The GP PEIR analyzes roadway and intersection deficiencies and concluded that these deficiencies would generate traffic congestion along intersections and roadways that would also have the potential to impede emergency access. Emergency access could be hindered along the evacuation corridors of Lincoln Avenue, Katella Avenue, Chapman Avenue, and Glassel Street. With adherence to and implementation of the proposed policies described above, and implementation of Mitigation Measures
5.14-1 and 5.14-7, emergency access program-level impacts would be reduced to a less than significant level. Individual development projects would be required to undergo project-specific environmental review. If project-level significant impacts are identified, specific Mitigation Measures would be required under CEQA.
Impacts Associated with the Proposed Project (d)
No New Impacts. Access to the Proposed Project would be provided via one ingress and egress driveway connecting to Rancho Santiago Boulevard and internal access to each dwelling unit would be provided by 25-foot-wide internal driveway. Access to the Proposed Project is required to comply with all applicable OMC and City design standards. The Proposed Project would be reviewed by the City and OCFA to ensure adequate emergency access. The Proposed Project also includes a fire access roadway that Is 30’ at hammerhead at the eastern half of the Project Site. During construction, traffic lanes on Rancho Santiago Boulevard may be temporarily closed or controlled by construction personnel.
The Proposed Project would adhere to OMC Chapter 12.64 and obtain an encroachment permit from the City of Orange Public Works Department. Any closures would be temporary and emergency access to the Project Site and surrounding area would be maintained. Additionally, according to Figure 5.7-1 of the GP PEIR, the Project Site is not located in any generalized evacuation corridor.
Therefore, the Proposed Project would not result in significant impacts involving emergency access.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
Conclusion
The Proposed Project would not result in any impacts beyond those identified in the GP PEIR. Therefore, the Proposed Project’s contribution to cumulative impacts related to transportation and circulation is less than significant and impacts associated with future traffic conditions would not be cumulatively considerable.
With regards to the issue of Transportation, the following findings can be made:
1. No peculiar impacts to the Project or its site have been identified.
2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the GP PEIR.
3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the GP PEIR.
4. No new Mitigation Measures would be required because Project- specific impacts would be less than significant. GP PEIR Mitigation Measures and uniformly applied development policies and standards have been implemented through the Project.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
4.18 Tribal Cultural Resources
Impact Analysis
CEQA THRESHOLDS
Project Peculiar
Impact that is
not
Substantially
Mitigated by
Uniform
Applied
Policies
Significan
t Impact
not
Analyzed
as
Significan
t in the
GP PEIR
Potentially
Significant
Offsite or
Cumulative
Impact not
Discussed
in the GP
PEIR
Adverse
Impact
More
Severe
Based on
Substantial
New
Information
No
New
Impa
ct
from
GP
PEIR
II. TRIBAL CULTURAL RESOURCES:
Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is:
a) Listed or eligible for listing in the
California Register of Historical
Resources, or in a local register of
historical resources as defined in
Public Resources Code section
5020.1(k), or
X
b) A resource determined by the
lead agency, in its discretion and
supported by substantial
evidence, to be significant
pursuant to criteria set forth in
subdivision (c) of Public Resources
Code Section 5024.1. In applying
the criteria set forth in subdivision
(c) of Public Resources Code
Section 5024.1, the lead agency
shall consider the significance of
the resource to a California Native
American tribe.
X
General Plan PEIR Mitigation Measures
General Plan PEIR Mitigation Measure Applicable/Not Applicable No GP PEIR Mitigation Measures were required for Tribal Cultural Resources. -
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
Discussion
a) Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code section 5020.1(k)?
b) Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is a resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 5024.1. In applying the criteria set forth in subdivision (c) of Public Resources Code Section 5024.1, the lead agency shall consider the significance of the resource to a California Native American tribe?
Narrative Summary: Impacts Associated with the GP PEIR (a-b) Less Than Significant Impact with Mitigation. The City certified the GP PEIR before the above checklist items were added to the State CEQA Guidelines. However, the topic of tribal cultural resources is addressed in GP PEIR Section 5.5, Cultural Resources. The GP PEIR does not specifically discuss tribal cultural resources but discusses cultural and paleontological resources, as detailed in Section 4.5.
Development according to the OGP could result in potentially significant impacts to historic, archaeological, and paleontological resources. In addition, future development could result in disturbance of human remains. By implementing the OGP policies, applying program-level mitigation at the programmatic level of analysis, Old Town Design Standards, Secretary of Interior Standards for Rehabilitation, and utilizing the site development permit and CEQA process for individual projects, the potential impact to these cultural resources would be reduced to a less than significant level.
Impacts Associated with the Proposed Project (a):
No New Impacts. Section 21074 of CEQA Guidelines defines “tribal cultural resources” as either of the following:
1. Sites, features, places, cultural landscapes, sacred places, and objects with cultural value to a California Native American tribe that are either of the following:
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
a. Included or determined to be eligible for inclusion in the California Register of Historical Resources.
b. Included in a local register of historical resources as defined in subdivision (k) of Section 5020.1.
2. A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Section 5024.1. In applying the criteria set forth in subdivision (c) of Section 5024.1 for the purposes of this paragraph, the lead agency shall consider the significance of the resource to a California Native American tribe.
3. A cultural landscape that meets the criteria of subdivision (a) is a tribal cultural resource to the extent that the landscape is geographically defined in terms of the size and scope of the landscape.
4. A historical resource described in Section 21084.1, a unique archaeological resource as defined in subdivision (g) of Section 21083.2, or a “nonunique archaeological resource” as defined in subdivision (h) of Section 21083.2 may also be a tribal cultural resource if it conforms with the criteria of subdivision (a).
As discussed in Section 4.5 of this document, the Project Site is located within a historical archaeology sensitive area and has the potential to impact archaeological resources. However, the Proposed Project would adhere to all federal, state, and local regulations as well as GP PEIR Mitigation Measures 5.5-1 through 5.5-14 to protect archaeological resources. The Project includes BMPs that further protect any potential cultural resources. The Proposed Project would follow standard unanticipated discovery regulatory measures for archaeological resources. No additional Mitigation Measures are required. With implementation of the required regulatory measures below, impacts to archaeological and historical resources, including tribal cultural resources, would be less than significant.
Impacts Associated with the Proposed Project (b):
No Impact. According to the PRC Chapter 2.5, Section 2.5, Section 21074, Tribal Cultural Resources are sites, features, places, cultural landscapes, sacred places, and items with cultural value to a California Native American tribe that are either included or determined to be eligible for inclusion in the California Register of Historical Resources or included in a local register of historical resources as defined in Section 5020.1.
No resources are listed on or have been identified as eligible for listing on the California Register of Historic Places within or near the Project Site and no known potential impacts to Tribal Cultural Resources would occur. The Proposed Project area was determined to have sensitivity for buried prehistoric archaeological resources; thus, the possibility of tribal cultural resources that are unknown to the Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
SCCIC may elevate the cultural sensitivity of the area. The Proposed Project shall adhere to the GP PEIR Mitigation Measures as well as the Proposed Project’s BMPs for cultural resources. The Proposed Project’s BMPs for cultural resources would be implemented if any tribal cultural resources or human remains are discovered.
Implementation of these measures would ensure that Project-specific impacts would be less than significant.
Conclusion
Implementation of recommended regulatory measures would reduce the potential impacts of the Project associated with Tribal Cultural Resources to less than significant with mitigation. The Project does not result in any new significant impacts peculiar to the project or property, a substantial increase in the severity of the impacts evaluated in the EIR, or potentially significant off-site or cumulative impacts that would render Section 15183 inapplicable to the project. With regards to the issue area of Tribal Cultural Resources, the following findings can be made:
1. No peculiar impacts to the Project or its site have been identified.
2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the GP PEIR.
3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the GP PEIR.
4. Feasible Mitigation Measures and uniformly applied development policies and standards contained within the GP PEIR apply to the Project. Standard regulatory practices provide protection for tribal cultural resources and reduce potential impacts to less than significant.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
4.19 Utilities and Service Systems
Impact Analysis
CEQA THRESHOLDS
Project
Peculiar
Impact that
is not
Substantiall
y Mitigated
by Uniform
Applied
Policies
Significant
Impact
not
Analyzed
as
Significant
in the GP
PEIR
Potentially
Significant
Offsite or
Cumulative
Impact not
Discussed
in the GP
PEIR
Adverse
Impact
More
Severe
Based on
Substanti
al New
Informati
on
No
New
Impact
from
GP
PEIR
III. UTILITIES AND SERVICE SYSTEMS:
Would the project:
a) Require or result in the relocation or
construction of new or expanded
water, wastewater treatment or storm
water drainage, electric power,
natural gas, or telecommunications
facilities, the construction or relocation
of which could cause significant
environmental effects?
X
b) Have sufficient water supplies
available to serve the project and
reasonably foreseeable future
development during normal, dry and
multiple dry years?
X
c) Result in a determination by the
wastewater treatment provider which
serves or may serve the project that it
has adequate capacity to serve the
project’s projected demand in
addition to the provider’s existing
commitments?
X
d) Generate solid waste in excess of
State or local standards, or in excess of
the capacity of local infrastructure, or
otherwise impair the attainment of
solid waste reduction goals?
X
e) Comply with federal, state, and
local management and reduction X
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
CEQA THRESHOLDS
Project
Peculiar
Impact that
is not
Substantiall
y Mitigated
by Uniform
Applied
Policies
Significant
Impact
not
Analyzed
as
Significant
in the GP
PEIR
Potentially
Significant
Offsite or
Cumulative
Impact not
Discussed
in the GP
PEIR
Adverse
Impact
More
Severe
Based on
Substanti
al New
Informati
on
No
New
Impact
from
GP
PEIR
statutes and regulations related to
solid waste?
General Plan PEIR Mitigation Measures
Discussion
a) Would the project require or result in the relocation or construction of new or expanded water, wastewater treatment or stormwater drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects?
b) Would the project have sufficient water supplies available to serve the project and reasonably foreseeable future development during normal, dry and multiple dry years?
c) Would the project result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments?
d) Generate solid waste in excess of State or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals?
e) Would the project comply with federal, state, and local management and reduction statutes and regulations related to solid waste? Narrative Summary: Impacts Analyzed in the GP PEIR (a-e) Less than Significant Impact with Mitigation. The GP PEIR analyzed the impacts to utilities and service systems associated with the implementation of the OGP.
Mitigation measures are applied where appropriate in the Public Services Section (Section 4.15 of this document) and the Hydrology and Water Quality Section (Section 4.10 of this document) to applicable utilities and service systems.
General Plan PEIR Mitigation Measure Applicable/Not Applicable No GP Mitigation Measures were analyzed. -
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
Additionally, the Public Services and Hydrology and Water Quality sections of this document analyzes the impacts the OGP implementation has on utilities and service systems in the City of Orange and the Mitigation Measures required to reduce impacts to a less than significant level.
Water:
Water Supply and Infrastructure: As detailed in Section 4.15, the GP PEIR analyzed existing conditions of water supply and infrastructure and the potential impacts of OGP implementation. The GP PEIR determined that impacts to water supply availability to serve the General Plan’s buildout population are less than significant; however, increased population and development resulting from the OGP would create a demand for additional water infrastructure and water facilities. The City would continue to use the 7-year Capital Improvement Program to prioritize, finance, and complete various infrastructure and other projects identified in the Capital Improvement Program, which may include water infrastructure and services. Mitigation Measures 5.12-8 through 5.12-10 require the City to implement and update applicable master plans, require future development projects to contain studies and incorporated recommendations, and coordinate with applicable water districts to achieve water supply, distribution and conservation objectives. With adherence to and implementation of the OGP policies and programs and the GP PEIR Mitigation Measures, program level impacts associated with water infrastructure would be reduced to a less than significant level.
Wastewater:
The GP PEIR analyzes existing wastewater infrastructure and potential impacts due to the OGP implementation. As detailed in Section 4.15, buildout of the OGP would result in an increased need for wastewater and sewage treatment facilities. OCSD has launched plans to expand treatment capacity as well as OCSD’s Facilities Capacity Charge is applied to cities and developers for new or expanded residential, commercial, and industrial development.
Implementation of Mitigation Measure 5.12-11 requires the City to adopt and update the Sewer Master Plan, and Mitigation Measure 5.12-12 requires the City to repair and improve identified areas in the 2003 Sewer Master Plan Update and require developers to pay the cost of new and improved wastewater services to project sites. With adherence to and implementation of proposed policies and Mitigation Measures, program level impacts associated with the provision of wastewater services would be reduced to a less than significant level. The specific environmental impact of constructing new wastewater collection infrastructure in the planning area cannot be determined at the General Plan level of analysis.
Individual development projects would be required to evaluate the potential impacts of the proposed project in accordance with CEQA. The General Plan implements a number of programs and policies to address the potential impacts; Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
therefore, impacts associated with the construction and/or expansion of wastewater infrastructure are less than significant.
Solid Waste:
The GP PEIR analyzes existing conditions of the City’s solid waste facilities and services. The increased population from the OGP would create a demand for additional solid waste collection and disposal capacity. The City of Orange contracts with Waste Management of Orange County for the collection of solid waste, green waste, and items for recycling. Mitigation Measure 5.12-15 requires the City to continue to contract for provision of solid waste and recycling services and Mitigation Measure 5.12-16 requires the City to continue to implement waste diversion programs and waste education programs. With adherence to and implementation of the proposed policies pertaining to solid waste described above, and implementation of Mitigation Measures 5.12-15 and 5.12-16, program- level impacts associated with solid waste services would be reduced to a less than significant level
Stormwater Drainage Facilities:
The GP PEIR discusses that construction related activities related to the implementation of the OGP could contribute additional pollutants into the City’s storm drain system. Impacts related to pollutants associated with impervious surfaces are reduced primarily by City implementation of RWQCB waste discharge permits and through preparation and implementation of a SWPPP, including identification of required BMPs. A WQMP would be required to identify permanent BMPS that would control discharges to MS4s postconstruction.
Additionally, because much of the new development with implementation of the OGP would be infill and redevelopment, site conditions and runoff filtration measures would improve through retrofitting and the development review process. With adherence to and implementation of these permits, proposed regulations, and policies, and implementation of Mitigation Measures 5.8-3 and
5.8-4, program-level stormwater drainage facilities would be less than significant.
Energy:
Development pursuant to the General Plan land use policy would result in the consumption of energy resources, including nonrenewable resources, through activities such as fuel consumed by construction vehicles and equipment. Fossil fuels are typically used for construction vehicles and other equipment during site clearing, grading, paving, and building. This use would have an irreversible effect on such resources. The buildout of the General Plan represents a long-term commitment to the consumption of energy resources. Mitigation Measure 5.12-13 and 5.12-14 require new development to coordinate with utility service providers to ensure adequate capacity and to encourage green building techniques and materials. With adherence to OGP policies and programs and implementation of Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
applicable Mitigation Measures, program-level impacts associated with the provision of energy in the form of electricity and natural gas would be reduced to a less than significant level.
Impacts Associated with the Proposed Project (a-e)
No New Impacts. The Proposed Project would be serviced by Southern California Edison for electric services, SoCalGas for natural gas services, Waste Management for Orange County for trash services, the Municipal Water District of Orange County and City-owned ground wells for domestic water supply, the Orange County Sanitation District for wastewater services, as well as a number of private telecommunication providers for cable and telecommunication services.
Water Supply and Infrastructure: The City of Orange Water Division is responsible for providing a clean, safe, potable water supply to the City of Orange. The City receives water from three main sources: groundwater through 15 active wells managed by the Orange County Water District (OCWD), surface water from the Serrano Water District, and imported surface water from the Metropolitan Water District of Southern California (MWD) from the Colorado River and the State Water Project in Northern California1. The 2020 Urban Water Management Program concluded that the City would have adequate supply to meet water demand during normal, single dry, and multiple dry years over the next 25 years. The Proposed Project would replace the existing 10-inch CIP on Rancho Santiago Boulevard with a new 12-inch diameter DIP or C900 main and other minor water related improvements. The Proposed Project is consistent with the OGP and OMC and was reflected in the City’s demand calculations.
Wastewater: The Proposed Project would be served by the City of Orange Public Works Department for wastewater (sanitary sewer) collection service. The Proposed Project is located within a developed area and there is an existing sanitary sewer main in North Rancho Santiago Blvd, adjacent to the Proposed Project. The Proposed Project would be required to connect to this existing sanitary sewer line. In addition to the Proposed Project’s CIP replacement, the wastewater infrastructure and facilities would be adequate to serve the wastewater collection requirements of the Proposed Project. Therefore, no impacts to public facilities would be anticipated.
Solid Waste: The Proposed Project is the construction of 11 single-family residential dwelling units. The proposed square footage of the two-story buildings is between 2,425 and 2,724 square feet. The Proposed Project’s contribution of solid waste would be minimal and would not significantly impact solid waste collection or landfill operations. Furthermore, as with all residences in the City, the individual units are subject to curbside recycling and green waste separation requirements.
No impacts are anticipated.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
Stormwater Drainage Facilities: The Proposed Project is the construction of 11 single-family residential dwelling units. .Per Title 7, Chapter 7.01, Water Quality and Stormwater Discharges, of the OMC, the Applicant would be required to include specific design Best Management Practices to ensure that no storm water runoff generated on the Project Site would leave it without pre-treatment for urban pollutants. The Applicant has prepared a Preliminary Water Quality Management Plan (WQMP), which includes specific design features during construction and operations to ensure that no storm water runoff generated on the Project Site would leave it without pre-treatment for urban pollutants (Rancho Ridge, Hunsaker & Associates Irvine, Inc., March 23, 2023). Under proposed conditions, the developed site would gently slope to the west, with surface runoff from each lot conveyed as sheet flow to the curb and gutter. Runoff would be conveyed westerly to a catch basin where the 85th percentile storm event volume and the 2-year detention volume for hydromodification control would be detained in a subsurface detention facility prior to discharging to two (2) drywells. Flows exceeding this volume would be conveyed to Rancho Santiago Boulevard and conveyed southerly as gutter flow prior to discharging to an existing catch basin located at the northeast corner of Ranch Santiago Boulevard and East Walnut Avenue. The Property Owner/Developer would be required to comply with Title 7, Chapter 7.01.060 of the City’s code and implement all recommendations contained within the WQMP.
The Project Site is more than 1 acre; therefore, the Property Owner/Developer would be required to comply with the requirements of the NPDES MS4 Permit Construction General Permit Order 2009-0009- DWQ and prepare a SWPPP. The SWPPP would generally contain a site map showing the construction perimeter, existing and proposed buildings, storm water collection and discharge points, general pre- and post-construction topography, drainage patterns across the site, and adjacent roadways. For ongoing operations, in lieu of providing on site treatment, the developer would pay a Low Impact Development Fee that would apply towards the construction of an offsite mitigation project. Therefore, with compliance with Title 7, Chapter 7.01 of the City’s Code, potential impacts associated with storm water drainage would be less than significant.
Energy: The Proposed Project is located within the Southern California Edison (SCE) service territory. SCE would conduct utility services, where applicable, to assess whether modifications to the existing electrical infrastructure are required to serve the project.
Southern California Gas (SoCalGas) has facilities in the area of the proposed project. SoCalGas would provide natural gas services in accordance with SoCalGas policies and extension rules on file with the California Public Utilities Commission (CPUC) at the time contractual arrangements are made. AT&T, Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
Charter, and Comcast have facilities to serve the project with both cable services and telecommunication services.
Conclusion
Potential impacts of the Proposed Project associated with Utilities and Service Systems would be less than significant, and no mitigation would be required. The Proposed Project would not result in any impacts beyond those identified in the GP PEIR. The Proposed Project contains no substantial changes to the implementation of the General Plan, there have been no substantial changes in circumstances, and no new information has become available, not known and could not have been known, at the time that PEIR was certified, that would require major revisions to PEIR. With regards to the issue area of Utilities and Service Systems, the following findings can be made:
1. No peculiar impacts to the Project or its site have been identified.
2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the GP PEIR.
3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the GP PEIR.
4. No new Mitigation Measures would be required because Project- specific impacts would be less than significant. Feasible Mitigation Measures and uniformly applied development policies and standards contained within the GP PEIR apply to the Project.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
4.20 Wildfire
Impact Analysis
CEQA THRESHOLDS
Project
Peculiar
Impact that is
not
Substantially
Mitigated by
Uniform
Applied
Policies
Significant
Impact not
Analyzed as
Significant
in the GP
PEIR
Potentially
Significant
Offsite or
Cumulative
Impact not
Discussed
in the GP
PEIR
Adverse
Impact
More
Severe
Based on
Substanti
al New
Informati
on
No
New
Impact
from
GP PEIR
IV. WILDFIRE:
If located in or near state responsibility areas or lands classified as very high fire hazard severity zones, would the project:
a) Substantially impair an adopted
emergency response plan or
emergency evacuation plan?
X
b) Due to slope, prevailing winds,
and other factors, exacerbate
wildfire risks, and thereby expose
project occupants to, pollutant
concentrations from a wildfire or
the uncontrolled spread of
wildfire?
X
c) Require the installation or
maintenance of associated
infrastructure (such as roads, fuel
breaks, emergency water sources,
power lines or other utilities) that
may exacerbate fire risk or that
may result in temporary or ongoing
impacts to the environment?
X
d) Expose people or structures to
significant risks, including
downslope or downstream
flooding or landslides, as a result of
runoff, post-fire slope instability, or
drainage changes?
X
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
General Plan PEIR Mitigation Measures
General Plan PEIR Mitigation Measure Applicable/Not Applicable No GP PEIR Mitigation Measures were required. -
Discussion
a) Substantially impair an adopted emergency response plan or emergency evacuation plan?
Narrative Summary: Impacts Analyzed in the GP PEIR (a)
Less Than Significant. The City certified the GP PEIR before the above checklist items were added to the State CEQA Guidelines. However, the topic of wildfire hazards and emergency response is addressed in GP PEIR Section 5.7 – Hazards and Hazardous Materials. Mitigation Measures 5.7-1, 5.7-3, and 5.7-7 address emergency plans in the GP PEIR. According to the GP PEIR, the City has a Multi- Hazard Functional Plan. However, this plan does not indicate evacuation routes for emergency services (GP PEIR, page 5.7-4). Although the City does not have designated emergency evacuation routes, the GP PEIR lists out some of the City’s major east-west and north-south arterials as generalized evacuation routes. The City’s planning area is almost entirely developed; future development would primarily involve infill and redevelopment. Accordingly, new development is expected to be minimal and is therefore not expected to impair implementation of, or physically interfere with, the City’s Local Hazard Mitigation Plan (LHMP) or the City’s Emergency Operations Plan (EOP). The City’s LHMP was created to be consistent with the Federal Emergency Management Agency (FEMA)’s requirements and works in conjunction with the OGP and EOP. Although new development is anticipated to have minimal impact on the LHMP, the plan would be updated as necessary to reflect changes in the planning area. Adhering to existing regulations and plans ensures that impacts on emergency plans remain insignificant, requiring no mitigation.
Impacts Associated with the Proposed Project (a)
No New Impacts. The Proposed Project would allow emergency access to the Project Site through the western driveway off of Rancho Santiago Boulevard. The Proposed Project would be reviewed by the City and OCFA to ensure adequate emergency access. The Proposed Project also includes a fire access roadway that Is 30’ at hammerhead at the eastern half of the Project Site. As discussed under Section 4.17 – Transportation, the Project Site would obtain all required permits, including an encroachment permit, and comply with all applicable regulations as listed in the OMC and by OCFA to minimize any obstruction to emergency services or access. Additionally, the Proposed Project would adhere to all GP PEIR Mitigation Measures and follows the City’s Public Safety Element’s Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
policies and actions. Therefore, the Proposed Project would not substantially impair an adopted emergency response plan or emergency evacuation plan.
Therefore, there are no new impacts beyond what is analyzed in the GP PEIR, and no new mitigation is required.
b) Due to slope, prevailing winds, and other factors, exacerbate wildfire risks, and thereby expose project occupants to, pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire?
Narrative Summary: Impacts Analyzed in the GP PEIR:
Less than Significant Impact. The City certified the GP PEIR before the above checklist items were added to the State CEQA Guidelines. However, the topic of wildfire hazards is addressed in GP PEIR Section 5.7 – Hazards and Hazardous Materials. Development associated with the OGP may occur within and adjacent to wildlands, thereby exposing people or structures to a significant risk of loss, injury, or death involving wildland fires. None of the OGP land use focus areas are located within wildland areas. New development in previously undeveloped areas, especially in the hillsides and canyons of the eastern portion of the planning area, could increase risk of exposure to wildfire hazards. This represents a potentially significant impact. To prevent injury and loss due to fire hazards in undeveloped hillside areas, the City would continue to update and provide maps delineating areas that could face fire hazards, and enforce municipal code and development review that ensure minimum road widths, clearance areas, and access to adequate fire protection services. The City would also continue to provide education regarding wildland fire risks as well as fire safety strategies. The OGP also requires the City to review new developments and fire services to ensure adequate emergency services and facilities to residents and businesses.
Coordinating with adjacent local cities, and participating in regional, state, and federal programs would better prepare the City for wildfire emergencies and reduce fire-related risks.
Impacts Associated with the Proposed Project (b)
No New Impacts. According to the 2025 CAL FIRE Fire Hazard Severity Zones (FHSZ) Map Viewer, the Project Site is located in a Very High Fire Hazard Severity Zone (VHFHSZ) in a Local Responsibility Area (LRA) (Figure 7 – Fire Hazard Severity Zones).
This means that the Proposed Project is required to comply with Chapter 7A of the CBC/the Wildland-Urban Interface (WUI) Code as well as the City’s local fire procedures and regulations. The built environment surrounding the Project Site consists of residential, Church use, and commercial service uses. The Project Site is relatively flat and is not located within or immediately adjacent to any hillside areas. The Proposed Project would be subject to the standards and requirements set forth in the 2022 California Fire and Building Codes, which require structural resilience for all types of fire conditions. Therefore, no new impact would occur.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
Furthermore, a fire behavior modeling summary (Appendix I) and a conceptual fuel modification plan (Appendix J) were prepared for the Proposed Project to analyze fire behavior potential for the Proposed Project. Three fire scenarios were evaluated, including three summer, onshore weather conditions (north, northeast, and east of the Project Site). The Project Site is currently an undeveloped, vacant lot that is situated between existing development, including commercial and residential properties directly to the north and existing residential properties directly to the south, west, and east. The El Modena Open Space area is approximately 600 feet to the east and is separated by an existing residential community. The El Modena Open Space features a west-facing, relatively steep hillside that ranges from approximately 35 percent to 45 percent.
Fuels and terrain within the nearby El Modena Open Space areas east of the Project Site could produce flying embers that may affect the Proposed Project; however, the west-facing hillside slopes downwards towards the existing residential community that separates the Proposed Project site from the open space area, which acts as a benefit to the property because a fire burning uphill spreads faster than those burning on flat terrain or downhill as uphill vegetation is pre-heated and dried in advance of the flaming front, resulting in faster ignition rates.
The modeling found that wildfire behavior in the areas surrounding the Project Site during existing conditions (before the Proposed Project is developed) is expected to be primarily of moderate to high intensity through the non-maintained moderate- to high-load surface grass-shrub and chaparral dominated vegetation south of the site. Worst-case fire behavior under peak weather conditions is anticipated to be a wind-driven fire from the east/southeast during the fall. Under such conditions, expected surface flame length are expected to reach approximately 43 feet with wind speeds of 50+ miles per hour. Under this scenario, fireline intensities reach 20,575 BTU/feet/second with moderate spread rates of 6.4 mph and could have a spotting distance up to 2.4 miles away.
For post-project conditions where the Proposed Project is developed, post development fire behavior expected in the irrigated and replanted with plants that are acceptable with the City of Orange Fire Department (OFD) (FMZ Zone A – Gr1) under peak weather conditions experience a significant reduction in flame length and intensity. Fuel modification would result in approximately 4.0 feet by the time the inner portions of the FMZ are reached. During extreme Santa Ana weather conditions, a fire approaching from the east within the development footprint would have very low fire intensity and spotting distances due to the higher live and dead fuel moisture contents. These reduction of flame lengths and intensities are assumed to occur within the fuel modification that is achieved for most of the property. Therefore, fuel modification zones proposed for the Proposed Project are appropriate and would provide approximately two times the flame length of the worst-case fire scenario under peak weather conditions Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
in the hillsides to the east and would provide adequate defensible space to augment a wildfire approaching the perimeter of the Project Site. Therefore, development of the Proposed Project would improve the Project Site’s conditions for fire behavior and would not exacerbate fire risks.
c) Require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment?
Narrative Summary: Impacts Analyzed in the GP PEIR (c)
Less than Significant Impact. The City certified the GP PEIR before the above checklist items were added to the State CEQA Guidelines. However, the topic of wildfire hazards is addressed in General Plan Final PEIR Section 5.7, Hazards and Hazardous Materials. The urbanized nature of Orange and the adjacent areas significantly reduces the threat of large, catastrophic wildfires within the City.
Because the planning area is almost entirely built out, most development anticipated under the OGP would involve infill and/or redevelopment of existing uses. Accordingly, new development is expected to be limited to urban areas and would not involve expansion of urban uses onto lands located within or adjacent to wildland fire hazards areas. Additionally, the City conducts discretionary review and CEQA review of all projects and requires mitigation for any potential wildland fire hazard impacts. With adherence to existing policies and regulations, impacts associated with wildland fire hazards would be reduced to a level less than significant. No mitigation is required.
Impacts Associated with the Proposed Project (c)
No New Impacts. Because the Project Site is located within a VHFHSZ, the Proposed Project is required to comply with Chapter 7A of the CBC/the WUI Code as well as the City’s local fire procedures and regulations. The Proposed Project includes an approved fuel modification plan (see Appendix J) and a Fire Behavior Modeling summary (Appendix I – Fire Behavior Modeling Summary). The Proposed Project is surrounded by built infrastructure including roads, utilities (electricity and gas), sewer lines, and waterlines and would not necessitate the construction of new infrastructure. Development of the Proposed Project does not include any additional infrastructure improvements that increase capacity beyond what is already planned for within the existing urban area in the GP PEIR. The Proposed Project would be constructed in compliance with applicable building and fire codes. Additionally, OCFA would review all building plans for adequate fire suppression, fire access, and emergency evacuation. Therefore, no impact would occur.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
d) Expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes?
Narrative Summary: Impacts Analyzed in the GP PEIR:
Less than Significant Impact with Mitigation. The City certified the GP PEIR before the above checklist items were added to the State CEQA Guidelines. However, the topic of wildfire hazards is addressed in GP PEIR Section 5.7 – Hazard and Hazardous Materials. Development associated with OGP implementation in the hillside and basin areas would contribute to the potential for flood hazards by altering existing runoff and absorption rates. Portions of Orange are also susceptible to flood events related to dam failure resulting from a significant earthquake. Areas below the dams have high potential for inundation in the unlikely event of a catastrophic dam failure. The GP PEIR includes Mitigation Measure 5.8-1 and 5.8-2 to reduce risks related to flooding. The OGP also includes policies and actions that target flood risks, such as ensuring that new development would follow the latest building and fire codes.
The western portion of the planning area bounded by the Santa Ana River and the City boundary are also located within 100-year flood areas. Additionally, backwater into Santiago Creek, Limestone Creek, and immediately adjacent to Santiago Reservoir tributary drainage are classified as 100-year storm event areas due to their water surface elevations. Development associated with the OGP implementation in the hillside and basin areas would contribute to the potential for flood hazards by altering existing runoff and absorption rates. This is a potentially significant impact. Portions of Orange are also susceptible to flood events related to dam failure resulting from a significant earthquake. The Villa Park Dam and Santiago Dam are located along Santiago Creek in the foothills of East Orange. Peters Canyon Dam is located within Peters Canyon about 2 miles west of Irvine Lake. The land use focus areas, where the majority of growth would occur under the OGP, are not located in the vicinity of the dams. However, areas below (downstream from) the dams, including large areas within the City of Orange and some of the focus areas, have high potential for inundation in the unlikely event of catastrophic dam failure. This is a potentially significant impact.
The OGP requires that appropriate flood control measures be implemented along Santiago Creek and throughout the planning area to reduce the risks from localized flooding. Additional flood prevention methods such as provision of detention basins and on-site storm water drainage would be required of developers to reduce runoff into the City’s drainage facilities and to provide adequate drainage for new developments.
With adherence to and implementation of the proposed regulations and policies and implementation of Mitigation Measures 5.8-1 and 5.8-2, exposure of people and structures to significant risks, such as downstream flooding, would be reduced Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
to less than significant. Individual development projects would be required to undergo project specific environmental review. If project-level significant impacts are identified, specific Mitigation Measures would be required under CEQA.
Impacts Associated with the Proposed Project (d)
No New Impacts. The built environment surrounding the Project Site consists of residential, Church use, and commercial service uses. The Project Site is relatively flat and is not located within or immediately adjacent to any hillside areas. The Project Site is also not located within a floodplain. The Proposed Project would be subject to the standards and requirements set forth in the 2022 California Fire Code and 2022 CBC. Therefore, potential impacts associated with the exposure of people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes would be less than significant, and no mitigation would be required.
Conclusion
Potential impacts identified for the Proposed Project would not be greater than what were identified in the GP PEIR; therefore, the Proposed Project would not create a new significant impact or a substantial increase in the severity of previously identified impacts. Additionally, no new information of substantial importance that was not known and could not have been known at the time the GP PEIR was certified is available that would change the prior finding of no impact. With regards to the issue area of Utilities and Service Systems, the following findings can be made:
1. No peculiar impacts to the Project or its site have been identified.
2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the GP PEIR.
3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the GP PEIR.
4. No new Mitigation Measures would be required because Project- specific impacts would be less than significant. Feasible Mitigation Measures and uniformly applied development policies and standards contained within the GP PEIR apply to the Project.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
5. LIST OF PREPARERS
Sagecrest Planning + Environmental
Lindsay Ortega, AICP, Vice President
David Blumenthal, AICP, Principal
Jackie Tran, Project Manager
Kaden Likins, Assistant Planner
Emily Tragos, Operations Manager
Subconsultants
Katherine Wilson, MS, Ganddini Group, Inc.
Catherine Howe, MS, Ganddini Group, Inc.
Bryan Crawford, Ganddini Group, Inc.
Giancarlo Ganddini, PE, PTP, Ganddini Group, Inc.
Roma Stormberg, INCE, MS, Ganddini Group, Inc.
David E. Albus, Albus & Associates, Inc.
Tu Trinh, RCE, Hunsaker & Associates, Inc.
City Staff
Planning Division
Michael O’Toole, Assistant Planner
Public Works Engineering
________________
Public Works Traffic
________________
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
6. REFERENCES
The following additional reports and/or studies are applicable to development of the Project Site and are hereby incorporated by reference:
Albus & Associates, Preliminary Geotechnical Investigation, Proposed Residential Development 647 North Rancho Santiago Boulevard, August 2022.
California Department of Resources Recycling and Recovery (CalRecycle).
California’s 2019 Per Capita Disposal Rate Estimate.
https://www.calrecycle.ca.gov/lgcentral/goalmeasure/disposalrate/most recent/. Accessed November 2024.
California Department of Conservation, Office of Land Conservation (CDOC). “California Important Farmland Finder”.
https://maps.conservation.ca.gov/DLRP/CIFF/. Accessed November 2024.
Caltrans. 2020. Transportation and Construction Vibration Guidance Manual. https://dot.ca.gov/-/media/dot-media/programs/environmental- analysis/documents/env/tcvgm-apr2020-a11y.pdf.
Caltrans. 2023. California State Scenic Highway System Map. https://www.arcgis.com/apps/webappviewer/index.html?id=465dfd3d80 7c46cc8e8057116f1aacaa, accessed November 2024.
CAL FIRE. “Fire Hazard Severity Zones in State Responsibility Areas”. https://osfm.fire.ca.gov/what-we-do/community-wildfire-preparedness- and-mitigation/fire-hazard-severity-zones. Accessed November 2024.
City of Orange – General Plan Program Environmental Impact Report. Accessed November 2024.
City of Orange – 2021-2029 Housing Element. Accessed November 2024.
City of Orange – 2010 General Plan. Accessed November 2024.
Ganddini Group, Inc., Noise Impact Analysis Rancho Ridge Infill Project, March 27, 2023.
Ganddini Group, Inc., Rancho Ridge Infill Project Air Quality, Global Climate Change, and Energy Impact Study, March 31, 2023.
Ganddini Group, Inc., Rancho Ridge Infill Project Transportation Study Screening Assessment, December 19, 2022.
Gaddini Group, Inc., Preliminary Water Quality Management Plan – Rancho Ridge Infill Project, March 23, 2023.
Hunsaker & Associates, Inc., Preliminary Hydrology Analysis for Rancho Ridge Tentative Tract Map No. 19279, May 15, 2024.
Noreas, Rancho Ridge Infill Project Biological Technical Report, January 2023.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
Partner Engineering and Science, Phase I Site Assessment – 647 North Rancho Santiago Boulevard, March 5, 2021.
South Coast Air Quality Management District, 2008. Final Localized Significance Threshold Methodology, Revised.
State Water Resources Control Board Geotracker. Accessed November 2024.
State of California, Department of Conservation, Farmland Mapping and Monitoring Program. https://maps.conservation.ca.gov/DLRP/CIFF.
Accessed November 2024.
United States Census Bureau, Data Finder, 2006-2021.
Initial Study/CEQA Analysis under CEQA § 15183 Exemption February 2026 Rancho Ridge Residential Development
TTM 0052-23, Zone Change, CUP 3203-23, Major Site Plan Review 1137-23, Design Review 5119-23
Appendix A
Rancho Ridge Infill Project Air Quality, Global Climate Change, and Energy Impact Study
Ganddini Group, Inc.
March 31, 2023
/0/1/2/3/4/5/6/7/8/9/7/10/10/1/9/7/8/5/11/5/0/1/2/7/12/13/14/1/15/2/16/14/7/5/17/18/2/7/7/9/7/8/5/11/5/17/2/1/19/9/7/8/5/11/5/20/14/9/12/10/5/21/5/22/9/23/1/2/16/14/7 /24/9/1/5/25/26/2/18/9/15/27/5/11/5/28/18/14/23/2/18/5/29/18/9/30/2/15/10/5/29/31/2/7/8/10/5/11/5/32/10/2/18/15/31/5/33/9/12/19/5/24/12/12/10/12/12/30/10/7/15 /34/35/36/37/38/39 /34/40/41/42/43/40/36/44/40/45/45/46/34/39/47/43/37/48 /35/40/34/49/50/35/45/40/48/51/52/42/45/39/53/35/45/37/45/40/54/35/48/43/37/38/35/36/42/43/52 /35/36/41 /43/36/43/34/42/51/40/54/46/35/37/48/35/36/35/45/51/55/40/55 /56/57/58/59/60/61/62/63/64/65/66/67
/68/64/63/69/70/71/72/73/74/75/74/71
<UNHIDDEN>
RANCHO RIDGE INFILL PROJECT
AIR QUALITY, GLOBAL CLIMATE CHANGE,
AND ENERGY IMPACT ANALYSIS
City of Orange
March 31, 2023
prepared by
Katie Wilson, MS
Catherine Howe, MS
GANDDINI GROUP INC.
555 Park Center Drive, Suite 225
Santa Ana, CA 92705
(714) 795-3100 | ganddini.com Project No. 19594
Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis i 19594
TABLE OF CONTENTS
EXECUTIVE SUMMARY ................................................................................................................................................ IV
1. INTRODUCTION .................................................................................................................................................... 1 Purpose and Objectives ................................................................................................................................................. 1 Project Location ............................................................................................................................................................... 1 Project Description .......................................................................................................................................................... 1 Phasing and Timing ......................................................................................................................................................... 1 Sensitive Receptors in Project Vicinity....................................................................................................................... 2
2. AIR QUALITY ANALYSIS ..................................................................................................................................... 5 Existing Air Quality Conditions .................................................................................................................................... 5 Local Air Quality ................................................................................................................................................... 5 Pollutants................................................................................................................................................................ 8 Other Pollutants of Concern .......................................................................................................................... 10 Regulatory Setting ........................................................................................................................................................ 10 Federal – United States Environmental Protection Agency .................................................................. 11 State – California Air Resources Board ....................................................................................................... 11 Regional ............................................................................................................................................................... 12 Air Quality Guidance Documents ................................................................................................................. 16 Local – City of Orange .................................................................................................................................... 17 Monitored Air Quality ................................................................................................................................................. 21 Ozone ................................................................................................................................................................... 21 Carbon Monoxide ............................................................................................................................................. 21 Nitrogen Dioxide ............................................................................................................................................... 21 Particulate Matter ............................................................................................................................................. 21 Air Quality Standards ................................................................................................................................................... 24 Significance Thresholds ................................................................................................................................... 24 Regional Air Quality .......................................................................................................................................... 25 Local Air Quality ................................................................................................................................................ 25 Toxic Air Contaminants ................................................................................................................................... 25 Odor Impacts...................................................................................................................................................... 26 Short-Term Construction Emissions ........................................................................................................................ 28 Methodology ...................................................................................................................................................... 28 Construction-Related Regional Impacts ...................................................................................................... 29 Construction-Related Local Impacts ............................................................................................................ 29 Construction-Related Health Impacts ......................................................................................................... 30 Construction-Related Toxic Air Contaminant Impacts............................................................................ 30 Construction-Related Odor Impacts ............................................................................................................ 31 Long-Term Operational Emissions ........................................................................................................................... 35 Operations-Related Regional Air Quality Impacts .................................................................................... 35 Operations-Related Local Air Quality Impacts .......................................................................................... 36 Operations-Related Health Impacts ............................................................................................................. 37 Operations-Related Odor Impacts ............................................................................................................... 37 Cumulative Air Quality Impacts ................................................................................................................................ 39 Project Specific Impacts .................................................................................................................................. 39 Air Quality Compliance .................................................................................................................................... 39
3. GLOBAL CLIMATE CHANGE ANALYSIS........................................................................................................ 42 Existing Greenhouse Gas Environment .................................................................................................................. 42 Water Vapor ....................................................................................................................................................... 42 Carbon Dioxide (CO2) ...................................................................................................................................... 42 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis ii 19594
Methane (CH4) ................................................................................................................................................... 43 Nitrous Oxide (N2O) ......................................................................................................................................... 43 Chlorofluorocarbons (CFC) ............................................................................................................................ 43 Hydrofluorocarbons (HFC) ............................................................................................................................. 43 Perfluorocarbons (PFC) ................................................................................................................................... 43 Sulfur Hexafluoride (SF6) ................................................................................................................................. 44 Aerosols ............................................................................................................................................................... 44 Global Warming Potential ............................................................................................................................... 44 Greenhouse Gas Standards and Regulation .......................................................................................................... 46 International ....................................................................................................................................................... 46 Federal ................................................................................................................................................................. 46 State of California ............................................................................................................................................. 48 Regional – South Coast Air Quality Management District .................................................................... 60 Local – City of Orange .................................................................................................................................... 62 Significance Thresholds ............................................................................................................................................... 63 Appendix G of State CEQA Guidelines ....................................................................................................... 63 Thresholds of Significance for this Project ................................................................................................. 63 Methodology .................................................................................................................................................................. 63 Project Greenhouse Gas Emissions ......................................................................................................................... 64 Consistency With Applicable Greenhouse Gas Reduction Plans and Policies ............................................. 66 Cumulative Greenhouse Gas Impacts ..................................................................................................................... 70
4. ENERGY ANALYSIS ............................................................................................................................................. 71 Existing Conditions ....................................................................................................................................................... 71 Overview ............................................................................................................................................................. 71 Electricity ............................................................................................................................................................. 72 Natural Gas ......................................................................................................................................................... 72 Transportation Energy Resources ................................................................................................................ 73 Regulatory Background ............................................................................................................................................... 73 Federal Regulations .......................................................................................................................................... 73 State Regulations .............................................................................................................................................. 74 Project Energy Demands and Energy Efficiency Measures .............................................................................. 80 Evaluation Criteria ............................................................................................................................................ 80 Methodology ...................................................................................................................................................... 80 Construction Energy Demands ..................................................................................................................... 80 Operational Energy Demands ....................................................................................................................... 82 Renewable Energy and Energy Efficiency Plan Consistency ............................................................................ 83 Conclusions .................................................................................................................................................................... 84
5. EMISSIONS REDUCTION MEASURES ........................................................................................................... 94 Construction Measures ............................................................................................................................................... 94 Operational Measures ................................................................................................................................................. 94
6. REFERENCES ......................................................................................................................................................... 95
Appendices
Appendix A Glossary
Appendix B CalEEMod Model Emissions Printouts and EMFAC Data
Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis iii 19594
List of Tables
Table 1. Local Monthly Climate Data.............................................................................................................................. 7 Table 2. State and Federal Criteria Pollutant Standards ......................................................................................... 19 Table 3. South Coast Air Basin Attainment Status ................................................................................................... 20 Table 4. Air Quality Monitoring Summary .................................................................................................................. 23 Table 5. SCAQMD Air Quality Significance Thresholds ......................................................................................... 27 Table 6. Construction-Related Regional Pollutant Emissions ................................................................................ 32 Table 7. Maximum Number of Acres Disturbed Per Day ....................................................................................... 33 Table 8. Local Construction Emissions at the Nearest Receptors ....................................................................... 34 Table 9. Regional Operational Pollutant Emissions .................................................................................................. 38 Table 10. Global Warming Potentials and Atmospheric Lifetimes ......................................................................... 45 Table 11. Project-Related Greenhouse Gas Emissions .............................................................................................. 65 Table 12. Project Consistency with CARB Scoping Plan Policies and Measures ............................................... 68 Table 13. Total Electricity System Power (California 2021) ..................................................................................... 85 Table 14. SCE 2021 Power Content Mix ...................................................................................................................... 86 Table 15. Project Construction Power Cost and Electricity Usage ........................................................................ 87 Table 16. Construction Equipment Fuel Consumption Estimates .......................................................................... 88 Table 17. Construction Worker Fuel Consumption Estimates ................................................................................ 89 Table 18. Construction Vendor Fuel Consumption Estimates (MHD & HHD Trucks) ..................................... 90 Table 19. Construction Hauling Fuel Consumption Estimates (HHD Trucks) ..................................................... 91 Table 20. Estimated Vehicle Operations Fuel Consumption ................................................................................... 92 Table 21. Project Annual Operational Energy Demand Summary ......................................................................... 93
List of Figures
Figure 1. Project Location Map .......................................................................................................................................... 3 Figure 2. Site Plan .................................................................................................................................................................. 4 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis iv 19594
EXECUTIVE SUMMARY
The purpose of this air quality, global climate change, and energy impact analysis is to provide an assessment of the impacts resulting from development of the proposed Rancho Ridge Infill project and to identify measures that may be necessary to reduce potentially significant impacts.
Construction-Source Emissions
Project construction-source emissions would not exceed applicable regional thresholds of significance established by the South Coast Air Quality Management District (SCAQMD). For localized emissions, the project will not exceed applicable Localized Significance Thresholds (LSTs) established by the SCAQMD.
Project construction-source emissions would not conflict with the Basin Air Quality Management Plan (AQMP). As discussed herein, the project will comply with all applicable SCAQMD construction-source emission reduction rules and guidelines. Project construction source emissions would not cause or substantively contribute to violation of the California Ambient Air Quality Standards (CAAQS) or National Ambient Air Quality Standards (NAAQS).
Established requirements addressing construction equipment operations, and construction material use, storage, and disposal requirements act to minimize odor impacts that may result from construction activities.
Moreover, construction-source odor emissions would be temporary, short-term, and intermittent in nature and would not result in persistent impacts that would affect substantial numbers of people. Potential construction-source odor impacts are therefore considered less than significant.
Operational-Source Emissions
Project operational-sourced emissions would not exceed applicable regional thresholds of significance established by the SCAQMD. Project operational-source emissions would not result in or cause a significant localized air quality or toxic air contaminant (TAC) impacts as discussed in the Operations-Related Local Air Quality Impacts section of this report. Additionally, project-related trips will not cause or result in CO concentrations exceeding applicable state and/or federal standards (CO “hotspots). Project operational-source emissions would therefore not adversely affect sensitive receptors within the vicinity of the project.
Project operational-source emissions would not conflict with the Basin Air Quality Management Plan (AQMP).
The project's emissions meet SCAQMD regional thresholds and will not result in a significant cumulative impact. The project does not propose any such uses or activities that would result in potentially significant operational-source odor impacts. Potential operational-source odor impacts are therefore considered less than significant.
Greenhouse Gases
Project-related greenhouse gas (GHG) emissions would not exceed the SCAQMD draft screening threshold of 3,000 MTCO2e per year for all land uses.
Furthermore, the project would not conflict with the goals of AB-32, SB-32, CARB Scoping Plan; therefore, the project would not conflict with an applicable plan, policy or regulation of an agency adopted for the purpose of reducing the emissions of greenhouse gases and impacts are considered to be less than significant.
Energy
For new development such as that proposed by the Rancho Ridge Infill project, compliance with California Building Standards Code Title 24 energy efficiency requirements (CALGreen), are considered demonstrable evidence of efficient use of energy. As discussed below, the project would provide for, and promote, energy Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis v 19594
efficiencies required under other applicable federal and State of California standards and regulations, and in so doing would meet or exceed all California Building Standards Code Title 24 standards. Moreover, energy consumed by the project’s operation is calculated to be comparable to, or less than, energy consumed by other residential uses of similar scale and intensity that are constructed and operating in California. On this basis, the project would not result in the inefficient, wasteful, or unnecessary consumption of energy. Impacts are considered to be less than significant.
Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 1 19594
1. INTRODUCTION
This section describes the purpose of this air quality, global climate change, and energy impact analysis, project location, proposed development, and study area.
Figure 1 shows the project location map and Figure 2 illustrates the project site plan.
PURPOSE AND OBJECTIVES
This study was performed to address the possibility of regional/local air quality impacts and global climate change impacts, from project related air emissions. The objectives of the study include:
Documentation of the atmospheric setting
Discussion of criteria pollutants and greenhouse gases Discussion of the air quality and global climate change regulatory framework Analysis of the construction related air quality and greenhouse gas emissions Analysis of the operations related air quality and greenhouse gas emissions Analysis of the conformity of the proposed project with the SCAQMD AQMP Analysis of the project’s energy use during construction and operation Recommendations for mitigation/emissions reduction measures
The City of Orange is the lead agency for this air quality and greenhouse gas analysis, in accordance with the California Environmental Quality Act authorizing legislation. Although this is a technical report, every effort has been made to write the report clearly and concisely. To assist the reader with terms unique to air quality and global climate change, a definition of terms has been provided in Appendix A.
PROJECT LOCATION
The approximately 1.93-acre project site is located at 647 North Rancho Santiago Boulevard (APN 379-301- 05) in the City of Orange, California. The project site is currently vacant. A vicinity map showing the project location is provided on Figure 1.
PROJECT DESCRIPTION
The proposed project involves construction of 13 single-family residential dwelling units on 6,000 square foot lots. The proposed square footage of the two-story buildings is between 1,900 and 2,400 square feet. Project access is proposed via one full access driveway at Rancho Santiago Boulevard located at the southwest corner of the project site. The project proposes 62 parking spaces (26 garage parking spaces at 2 parking spaces per unit, 26 driveway parking spaces at 2 parking spaces per unit, and 10 guest parking spaces). Figure 2 illustrates the proposed site plan.
PHASING AND TIMING
The proposed project is anticipated to be operational in 2026. The project is anticipated to be built in one phase with project construction to start no sooner than the beginning of September 2024, and taking approximately two years to complete. Even if construction was to occur any time after the respective dates, the analysis represents “worst-case” since emission factors for construction decrease as time passes and the analysis year increases due to emission regulations becoming more stringent. 1
1 As shown in the California Emissions Estimator Model (CalEEMod) User’s Guide Version 2020.4.0, Section 4.3.2 “OFFROAD Equipment” as the analysis year increases, emission factors for the same equipment pieces decrease due to the natural turnover of older equipment being replaced by newer less polluting equipment and new regulatory requirements. 1 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 2 19594
SENSITIVE RECEPTORS IN PROJECT VICINITY
Those who are sensitive to air pollution include children, the elderly, and persons with preexisting respiratory or cardiovascular illness. For purposes of CEQA, the SCAQMD considers a sensitive receptor to be a location where a sensitive individual could remain for 24 hours, such as residences, hospitals, or convalescent facilities (South Coast Air Quality Management District 2008). Commercial and industrial facilities are not included in the definition because employees do not typically remain on-site for 24 hours.
The nearest sensitive receptors to the project site are the single-family residential uses located adjacent to the east and south and approximately 60 feet (~18 meters) to the west (across Rancho Santiago Boulevard) of the project site. In addition, Enderby Field/Santiago Charter Middle School is located approximately 215 feet south of the project site. Other air quality sensitive land uses are located further from the project site and would experience lower impacts.
2 Figure 1
Project Location Map
Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 19594
N
Site
WALNUT AVE
BOND AVE
RANCHO SANTIAGO BLVD
3 Figure 2
Site Plan
Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 19594
N
RANCHO SANTIAGO BLVD
Existing R-1-10
Existing R-1-10Existing R-1-6
Existing R-1-6
Existing R-1-6
Existing R-1-6
New ROWExisting ROW
Property Line
10.0'
Fire hammerhead per
City of Orange Fire
DepartmentMay require
retaining wall
(Per civil)
Lot Line Estimated PGE easement
4 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 5 19594
2. AIR QUALITY ANALYSIS
EXISTING AIR QUALITY CONDITIONS
Local Air Quality
The proposed project site is located in the northern portion of Orange County, in the City of Orange. The City of Orange is located within the South Coast Air Basin (Basin), which is surrounded by mountains trapping the air and its pollutants in the valleys or basins below. The Basin includes all of Orange County and the non- desert portions of Los Angeles, San Bernardino, and Riverside Counties. Bounded by the Pacific Ocean to the west and the San Gabriel, San Bernardino, and San Jacinto Mountains to the north and east, the Basin is an area of high air pollution potential. The regional climate within the Basin is considered semi-arid and is characterized by warm summers, mild winters, infrequent seasonal rainfall, moderate daytime onshore breezes, and moderate humidity. Air quality within the Basin is influenced by a wide range of emissions sources—such as dense population centers, heavy vehicular traffic, and industry. Climate change within the Basin is influenced by a wide range of emission sources, such as utility usage, heavy vehicular traffic, industry, and meteorology.
The annual average temperature varies throughout the Basin, ranging from the low to mid 60s to over 100 degrees during the summer, measured in Fahrenheit (°F). With a more pronounced oceanic influence, coastal areas show less variability in annual minimum and maximum temperatures than inland areas. The City of Orange is located in the Central Orange County portion of the Basin.
The Basin experiences a persistent temperature inversion, which is characterized by increasing temperature with increasing altitude. This inversion limits the vertical dispersion of air contaminants, holding them relatively near the ground. As the sun warms the ground and the lower air layer, the temperature of the lower air layer approaches the temperature of the base of the inversion (upper) layer until the inversion layer finally breaks, allowing vertical mixing with the lower layer.
Aside from a persistent temperature inversion, the vertical dispersion of air contaminants in the Basin is also affected by wind conditions. The combination of stagnant wind conditions and low inversions produces the greatest pollutant concentrations. Conversely, on days of no inversion or high wind speeds, ambient air pollutant concentrations are the lowest. During periods of low inversions and low wind speeds, air pollutants generated in urbanized areas in the Basin are transported eastward, predominantly into Riverside and San Bernardino Counties. Santa Ana winds, which are strong and dry north or northeasterly winds that occur during the fall and winter months, disperse air contaminants differently through the Basin, generally resulting in worse air conditions in the inner basin areas. Santa Ana conditions tend to last for several days at a time.
Wind speeds in the City of Orange annual average about 11.48 miles per hour (mph) (USA.com 2023).
The majority of annual rainfall in the Basin occurs between December and March. Summer rainfall is minimal and generally limited to scattered thundershowers in coastal regions. The annual average total of rainfall in the City is approximately 15.92 inches (USA.com 2023).
In the winter, light nocturnal winds result mainly from the drainage of cool air off of the mountains toward the valley floor while the air aloft over the valley remains warm. This forms a type of inversion known as a radiation inversion. Such winds are characterized by stagnation and poor local mixing and trap pollutants such as automobile exhaust near their source. While these inversions may lead to air pollution “hot spots” in heavily developed coastal areas of the basin, there is not enough traffic in inland valleys to cause any winter air pollution problems. Despite light wind conditions, especially at night and in the early morning, winter is generally a period of good air quality in the project vicinity.
The temperature and precipitation levels for the City of Anaheim, the closest monitoring station to the project site, are shown below in Table 1. Table 1 shows that August is typically the warmest month and December is 5 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 6 19594
typically the coolest month. Rainfall in the project area varies considerably in both time and space. Almost all the annual rainfall comes from the fringes of mid-latitude storms from late November to early April, with summers being almost completely dry.
6 Descriptor Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Avg. Max. Temperature 69.7 69.9 72.2 74.6 77.1 80.2 85.2 86.9 85.8 81.3 73.0 70.2 Avg. Min. Temperature 47.3 48.4 50.4 52.9 57.3 60.6 64.0 64.4 62.2 57.8 50.2 47.4 Avg. Total Precipitation (in.) 3.39 3.34 2.07 0.82 0.35 0.16 0.03 0.00 0.09 0.66 1.09 2.26 Source: https://wrcc.dri.edu/cgi-bin/cliMAIN.pl?ca0192
Data from the Anaheim, CA station (040192).
Local Monthly Climate Data
Table 1
Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 19594
7 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 8 19594
Pollutants
Pollutants are generally classified as either criteria pollutants or non-criteria pollutants. Federal ambient air quality standards have been established for criteria pollutants, whereas no ambient standards have been established for non-criteria pollutants. For some criteria pollutants, separate standards have been set for different periods. Most standards have been set to protect public health. For some pollutants, standards have been based on other values (such as protection of crops, protection of materials, or avoidance of nuisance conditions). A summary of federal and state ambient air quality standards is provided in the Regulatory Framework section.
Criteria Pollutants
The criteria pollutants consist of: ozone, nitrogen dioxide, carbon monoxide, sulfur dioxide, lead, and particulate matter. These pollutants can harm your health and the environment, and cause property damage.
The Environmental Protection Agency (EPA) calls these pollutants “criteria” air pollutants because it regulates them by developing human health-based and/or environmentally-based criteria for setting permissible levels.
The following provides descriptions of each of the criteria pollutants.
Nitrogen Dioxides
Nitrogen Oxides (NOx) is the generic term for a group of highly reactive gases which contain nitrogen and oxygen. While most NOx are colorless and odorless, concentrations of nitrogen dioxide (NO 2) can often be seen as a reddish-brown layer over many urban areas. NOx form when fuel is burned at high temperatures, as in a combustion process. The primary manmade sources of NOx are motor vehicles, electric utilities, and other industrial, commercial, and residential sources that burn fuel. NOx reacts with other pollutants to form, ground-level ozone, nitrate particles, acid aerosols, as well as NO 2, which cause respiratory problems. NOx and the pollutants formed from NOx can be transported over long distances, following the patterns of prevailing winds. Therefore, controlling NOx is often most effective if done from a regional perspective, rather than focusing on the nearest sources.
Ozone
Ozone (O3) is not usually emitted directly into the air but at ground-level is created by a chemical reaction between NOx and volatile organic compounds (VOC) in the presence of sunlight. Motor vehicle exhaust, industrial emissions, gasoline vapors, chemical solvents as well as natural sources emit NOx and VOC that help form ozone. Ground-level ozone is the primary constituent of smog. Sunlight and hot weather cause ground- level ozone to form with the greatest concentrations usually occurring downwind from urban areas. Ozone is subsequently considered a regional pollutant. Ground-level ozone is a respiratory irritant and an oxidant that increases susceptibility to respiratory infections and can cause substantial damage to vegetation and other materials. Because NOx and VOC are ozone precursors, the health effects associated with ozone are also indirect health effects associated with significant levels of NOx and VOC emissions.
Carbon Monoxide
Carbon monoxide (CO) is a colorless, odorless gas that is formed when carbon in fuel is not burned completely.
It is a component of motor vehicle exhaust, which contributes about 56 percent of all CO emissions nationwide. In cities, 85 to 95 percent of all CO emissions may come from motor vehicle exhaust. Other sources of CO emissions include industrial processes (such as metals processing and chemical manufacturing), residential wood burning, and natural sources such as forest fires. Woodstoves, gas stoves, cigarette smoke, and unvented gas and kerosene space heaters are indoor sources of CO. The highest levels of CO in the outside air typically occur during the colder months of the year when inversion conditions are more frequent.
The air pollution becomes trapped near the ground beneath a layer of warm air. CO is described as having only a local influence because it dissipates quickly. Since CO concentrations are strongly associated with motor vehicle emissions, high CO concentrations generally occur in the immediate vicinity of roadways with high 8 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 9 19594
traffic volumes and traffic congestion, active parking lots, and in automobile tunnels. Areas adjacent to heavily traveled and congested intersections are particularly susceptible to high CO concentrations.
CO is a public health concern because it combines readily with hemoglobin and thus reduces the amount of oxygen transported in the bloodstream. The health threat from lower levels of CO is most serious for those who suffer from heart disease such as angina, clogged arteries, or congestive heart failure. For a person with heart disease, a single exposure to CO at low levels may cause chest pain and reduce that person’s ability to exercise; repeated exposures may contribute to other cardiovascular effects. High levels of CO can affect even healthy people. People who breathe high levels of CO can develop vision problems, reduced ability to work or learn, reduced manual dexterity, and difficulty performing complex tasks. At extremely high levels, CO is poisonous and can cause death.
Sulfur Dioxide
Sulfur Oxide (SOx) gases (including sulfur dioxide [SO2]) are formed when fuel containing sulfur, such as coal and oil is burned, and from the refining of gasoline. SOx dissolve easily in water vapor to form acid and interacts with other gases and particles in the air to form sulfates and other products that can be harmful to people and the environment.
Lead
Lead (Pb) is a metal found naturally in the environment as well as manufactured products. The major sources of lead emissions have historically been motor vehicles and industrial sources. Due to the phase out of leaded gasoline, metal processing is now the primary source of lead emissions to the air. High levels of lead in the air are typically only found near lead smelters, waste incinerators, utilities, and lead-acid battery manufacturers.
Exposure of fetuses, infants and children to low levels of lead can adversely affect the development and function of the central nervous system, leading to learning disorders, distractibility, inability to follow simple commands, and lower intelligence quotient. In adults, increased lead levels are associated with increased blood pressure.
Particulate Matter
Particulate matter (PM) is the term for a mixture of solid particles and liquid droplets found in the air.
Particulate matter is made up of a number of components including acids (such as nitrates and sulfates), organic chemicals, metals, and soil or dust particles. The size of particles is directly linked to their potential for causing health problems. Particles that are less than 10 micrometers in diameter (PM10) are the particles that generally pass through the throat and nose and enter the lungs. Once inhaled, these particles can affect the heart and lungs and cause serious health effects. Particles that are less than 2.5 micrometers in diameter (PM2.5) have been designated as a subset of PM10 due to their increased negative health impacts and its ability to remain suspended in the air longer and travel further.
Reactive Organic Gases (ROG) and Volatile Organic Compounds (VOC)
Although not a criteria pollutant, reactive organic gases (ROGs), or volatile organic compounds (VOCs), are defined as any compound of carbon—excluding carbon monoxide, carbon dioxide, carbonic acid, metallic carbides or carbonates, and ammonium carbonate—that participates in atmospheric photochemical reactions.
Although there are slight differences in the definition of ROGs and VOCs, the two terms are often used interchangeably. Indoor sources of VOCs include paints, solvents, aerosol sprays, cleansers, tobacco smoke, etc. Outdoor sources of VOCs are from combustion and fuel evaporation. A reduction in VOC emissions reduces certain chemical reactions that contribute to the formulation of ozone. VOCs are transformed into organic aerosols in the atmosphere, which contribute to higher PM10 and lower visibility.
9 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 10 19594
Other Pollutants of Concern
Toxic Air Contaminants
In addition to the above-listed criteria pollutants, toxic air contaminants (TACs) are another group of pollutants of concern. Sources of toxic air contaminants include industrial processes such as petroleum refining and chrome plating operations, commercial operations such as gasoline stations and dry cleaners, and motor vehicle exhaust. Cars and trucks release at least forty different toxic air contaminants. The most important of these toxic air contaminants, in terms of health risk, are diesel particulates, benzene, formaldehyde, 1,3- butadiene, and acetaldehyde. Public exposure to toxic air contaminants can result from emissions from normal operations as well as from accidental releases. Health effects of toxic air contaminants include cancer, birth defects, neurological damage, and death.
Toxic air contaminants are less pervasive in the urban atmosphere than criteria air pollutants, however they are linked to short-term (acute) or long-term (chronic or carcinogenic) adverse human health effects. There are hundreds of different types of toxic air contaminants with varying degrees of toxicity. Sources of toxic air contaminants include industrial processes, commercial operations (e.g., gasoline stations and dry cleaners), and motor vehicle exhaust.
According to the 2013 California Almanac of Emissions and Air Quality, the majority of the estimated health risk from toxic air contaminants can be attributed to relatively few compounds, the most important of which is diesel particulate matter (DPM). Diesel particulate matter is a subset of PM2.5 because the size of diesel particles are typically 2.5 microns and smaller. The identification of diesel particulate matter as a toxic air contaminant in 1998 led the California Air Resources Board (CARB) to adopt the Risk Reduction Plan to Reduce Particulate Matter Emissions from Diesel-fueled Engines and Vehicles in September 2000. The plan’s goals are a 75-percent reduction in diesel particulate matter by 2010 and an 85-percent reduction by 2020 from the 2000 baseline. Diesel engines emit a complex mixture of air pollutants, composed of gaseous and solid material. The visible emissions in diesel exhaust are known as particulate matter or PM, which includes carbon particles or “soot”. Diesel exhaust also contains a variety of harmful gases and over 40 other cancer- causing substances. California’s identification of diesel particulate matter as a toxic air contaminant was based on its potential to cause cancer, premature deaths, and other health problems. Exposure to diesel particulate matter is a health hazard, particularly to children whose lungs are still developing and the elderly who may have other serious health problems. Overall, diesel engine emissions are responsible for the majority of California’s potential airborne cancer risk from combustion sources.
Asbestos
Asbestos is listed as a TAC by the ARB and as a Hazardous Air Pollutant by the EPA. Asbestos occurs naturally in mineral formations and crushing or breaking these rocks, through construction or other means, can release asbestiform fibers into the air. Asbestos emissions can result from the sale or use of asbestos-containing materials, road surfacing with such materials, grading activities, and surface mining. The risk of disease is dependent upon the intensity and duration of exposure. When inhaled, asbestos fibers may remain in the lungs and with time may be linked to such diseases as asbestosis, lung cancer, and mesothelioma. Naturally occurring asbestos is not present in Orange County. The nearest likely locations of naturally occurring asbestos, as identified in the General Location Guide for Ultramafic Rocks in California prepared by the California Division of Mines and Geology, is located at Asbestos Mountain in the San Jacinto Mountains, approximately 78 miles southeast of the project site. Due to the distance to the nearest natural occurrences of asbestos, the project site is not likely to contain asbestos.
REGULATORY SETTING
The proposed project is addressed through the efforts of various international, federal, state, regional, and local government agencies. These agencies work jointly, as well as individually, to improve air quality through 10 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 11 19594
legislation, regulations, planning, policy-making, education, and a variety of programs. The agencies responsible for improving the air quality are discussed below.
Federal – United States Environmental Protection Agency
The United States Environmental Protection Agency (EPA) is responsible for setting and enforcing the National Ambient Air Quality Standards (NAAQS) for atmospheric pollutants. It regulates emission sources that are under the exclusive authority of the federal government, such as aircraft, ships, and certain locomotives. The National Ambient Air Quality Standards (NAAQS) pollutants were identified using medical evidence and are shown below in Table 2.
The EPA and the California Air Resource Board (CARB) designate air basins where ambient air quality standards are exceeded as “nonattainment” areas. If standards are met, the area is designated as an “attainment” area. If there is inadequate or inconclusive data to make a definitive attainment designation, they are considered “unclassified.” National nonattainment areas are further designated as marginal, moderate, serious, severe, or extreme as a function of deviation from standards. Each standard has a different definition, or ‘form’ of what constitutes attainment, based on specific air quality statistics. For example, the Federal 8- hour CO standard is not to be exceeded more than once per year; therefore, an area is in attainment of the CO standard if no more than one 8-hour ambient air monitoring values exceeds the threshold per year. In contrast, the Federal annual PM2.5 standard is met if the three-year average of the annual average PM2.5 concentration is less than or equal to the standard. Attainment status is shown in Table 3.
As part of its enforcement responsibilities, the EPA requires each state with federal nonattainment areas to prepare and submit a State Implementation Plan (SIP) that demonstrates the means to attain the national standards. The State Implementation Plan (SIP) must integrate federal, state, and local components and regulations to identify specific measures to reduce pollution, using a combination of performance standards and market-based programs within the timeframe identified in the State Implementation Plan (SIP).
As indicated below in Table 3, the Basin has been designated by the EPA as a non-attainment area for ozone (O3) and suspended particulates (PM2.5). Currently, the Basin is in attainment with the ambient air quality standards for carbon monoxide (CO), lead, sulfur dioxide (SO 2), suspended particulate matter (PM-10), and nitrogen dioxide (NO2).
State – California Air Resources Board
The California Air Resources Board (CARB), which is a part of the California Environmental Protection Agency, is responsible for the coordination and administration of both federal and state air pollution control programs within California. In this capacity, the CARB conducts research, sets the California Ambient Air Quality Standards (CAAQS), compiles emission inventories, develops suggested control measures, provides oversight of local programs, and prepares the State Implementation Plan (SIP). The California Ambient Air Quality Standards (CAAQS) for criteria pollutants are shown in Table 2. In addition, the CARB establishes emission standards for motor vehicles sold in California, consumer products (e.g., hairspray, aerosol paints, and barbeque lighter fluid), and various types of commercial equipment. Furthermore, the motor vehicle emission standards established by CARB include compliance with the Safer Affordable Fuel-Efficient Vehicles (SAFE) Rule, issued by NHTSA and EPA in March 2020 (published on April 30, 2020 and effective after June 29, 2020). The SAFE Rule sets fuel economy and carbon dioxide standards that increase 1.5 percent in stringency each year from model years 2021 through 2026, and apply to both passenger cars and light trucks. CARB. It also sets fuel specifications to further reduce vehicular emissions.
The South Coast Air Basin has been designated by the CARB as a nonattainment area for ozone, PM10 and PM2.5. Currently, the South Coast Air Basin is in attainment with the ambient air quality standards for CO, lead, SO2, NO2, and sulfates and is unclassified for visibility reducing particles and Hydrogen Sulfide.
11 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 12 19594
On June 20, 2002, the CARB revised the PM10 annual average standard to 20 µg/m3 and established an annual average standard for PM2.5 of 12 µg/m3. These standards were approved by the Office of Administrative Law in June 2003 and are now effective. On September 27, 2007 CARB approved the South Coast Air Basin and the Coachella Valley 2007 Air Quality Management Plan for Attaining the Federal 8-hour Ozone and PM2.5 Standards. The plan projected attainment for the 8-hour Ozone standard by 2024 and the PM2.5 standard by 2015.
On December 12, 2008 the CARB adopted Resolution 08-43, which limits NOx, PM10 and PM2.5 emissions from on-road diesel truck fleets that operate in California. On October 12, 2009 Executive Order R-09-010 was adopted that codified Resolution 08-43 into Section 2025, Title 13 of the California Code of Regulations.
This regulation requires that by the year 2023 all commercial diesel trucks that operate in California shall meet model year 2010 (Tier 4) or latter emission standards. In the interim period, this regulation provides annual interim targets for fleet owners to meet. This regulation also provides a few exemptions including a onetime per year 3-day pass for trucks registered outside of California.
The CARB is also responsible for regulations pertaining to toxic air contaminants. The Air Toxics “Hot Spots” Information and Assessment Act (AB 2588, 1987, Connelly) was enacted in 1987 as a means to establish a formal air toxics emission inventory risk quantification program. AB 2588, as amended, establishes a process that requires stationary sources to report the type and quantities of certain substances their facilities routinely release into the South Coast Air Basin. The data is ranked by high, intermediate, and low categories, which are determined by: the potency, toxicity, quantity, volume, and proximity of the facility to nearby receptors.
AB 617 Nonvehicular air pollution: criteria air pollutants and toxic air contaminants
This bill requires the state board to develop a uniform statewide system of annual reporting of emissions of criteria air pollutants and toxic air contaminants for use by certain categories of stationary sources. The bill requires those stationary sources to report their annual emissions of criteria air pollutants and toxic air contaminants, as specified. This bill required the state board, by October 1, 2018, to prepare a monitoring plan regarding technologies for monitoring criteria air pollutants and toxic air contaminants and the need for and benefits of additional community air monitoring systems, as defined. The bill requires the state board to select, based on the monitoring plan, the highest priority locations in the state for the deployment of community air monitoring systems. The bill requires an air district containing a selected location, by July 1, 2019, to deploy a system in the selected location. The bill would authorize the air district to require a stationary source that emits air pollutants in, or that materially affect, the selected location to deploy a fence-line monitoring system, as defined, or other specified real-time, on-site monitoring. The bill authorizes the state board, by January 1, 2020, and annually thereafter, to select additional locations for the deployment of the systems. The bill would require air districts that have deployed a system to provide to the state board air quality data produced by the system. By increasing the duties of air districts, this bill would impose a state- mandated local program. The bill requires the state board to publish the data on its Internet Web site.
Regional
The SCAQMD is the agency principally responsible for comprehensive air pollution control in the South Coast Air Basin. To that end, as a regional agency, the SCAQMD works directly with the Southern California Association of Governments (SCAG), county transportation commissions, and local governments and cooperates actively with all federal and state agencies.
South Coast Air Quality Management District
The SCAQMD develops rules and regulations, establishes permitting requirements for stationary sources, inspects emission sources, and enforces such measures through educational programs or fines, when necessary. The SCAQMD is directly responsible for reducing emissions from stationary, mobile, and indirect sources. It has responded to this requirement by preparing a sequence of AQMPs.
12 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 13 19594
Air Quality Management Plan
On June 30, 2016, the SCAQMD released its Draft 2016 AQMP. The 2016 AQMP is a regional blueprint for achieving the federal air quality standards and healthful air. The 2016 AQMP includes both stationary and mobile source strategies to ensure that rapidly approaching attainment deadlines are met, that public health is protected to the maximum extent feasible, and that the region is not faced with burdensome sanctions if the Plan is not approved or if the NAAQS are not met on time. As with every AQMP, a comprehensive analysis of emissions, meteorology, atmospheric chemistry, regional growth projections, and the impact of existing control measures is updated with the latest data and methods. The most significant air quality challenge in the Basin is to reduce nitrogen oxide (NOx) emissions sufficiently to meet the upcoming ozone standard deadlines.
On March 23, 2017 the CARB approved the 2016 AQMP. The primary goal of this Air Quality Management Plan is to meet clean air standards and protect public health, including ensuring benefits to environmental justice and disadvantaged communities. Now that the Plan has been approved by the CARB, it has been forwarded to the U.S. EPA for its review. The Plan was approved by the EPA on June 15, 2017.
In May 2022, the SCAQMD completed the 2022 Draft AQMP. The 2022 Draft AQMP is focused on attaining the 2015 8-hour ozone standard (70 ppb) for the South Coast Air Basin and Coachella Valley. The Draft 2022 AQMP builds upon measures already in place from previous AQMPs. It also includes a variety of additional strategies such as regulation, accelerated deployment of available cleaner technologies (e.g., zero emission technologies, when cost-effective and feasible, and low NOx technologies in other applications), best management practices, co-benefits from existing programs (e.g., climate and energy efficiency), incentives, and other CAA measures to achieve the 2015 8-hour ozone standard. The 2022 AQMP was adopted December 2, 2022, by SCAQMD Governing Board. The 2022 AQMP was approved and adopted by CARB on January 26, 2023. The 2022 AQMP strategy includes the following: 2
Wide adoption of zero emissions technologies anywhere available. Low NOx technologies where zero emissions aren’t feasible. Federal Action.
Zero emissions technologies for residential and industrial sources such as water and space heaters in buildings and homes regionwide.
Incentive funding in environmental justice areas.
Prioritize benefits on the most disadvantaged communities.
SCAQMD Rules and Regulations
During construction and operation, the project must comply with applicable rules and regulations. The following are rules that the project may be required to comply with, either directly, or indirectly:
SCAQMD Rule 402
Prohibits a person from discharging from any source whatsoever such quantities of air contaminants or other material which cause injury, detriment, nuisance, or annoyance to any considerable number of persons or to the public, or which endanger the comfort, repose, health or safety of any such persons or the public, or which cause, or have a natural tendency to cause, injury or damage to business or property.
2 SCAQMD 2022 AQMP Infographic. http://www.aqmd.gov/home/air-quality/clean-air-plans/air-quality-mgt-plan/2022-aqmp- infographic
13 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 14 19594
SCAQMD Rule 403
Governs emissions of fugitive dust during construction and operation activities. Compliance with this rule is achieved through application of standard Best Management Practices, such as application of water or chemical stabilizers to disturbed soils, covering haul vehicles, restricting vehicle speeds on unpaved roads to 15 miles per hour, sweeping loose dirt from paved site access roadways, cessation of construction activity when winds exceed 25 mph, and establishing a permanent ground cover on finished sites.
Rule 403 requires that fugitive dust be controlled with best available control measures so that the presence of such dust does not remain visible in the atmosphere beyond the property line of the emission source. In addition, SCAQMD Rule 403 requires implementation of dust suppression techniques to prevent fugitive dust from creating a nuisance off-site. Applicable dust suppression techniques from Rule 403 are summarized below. Implementation of these dust suppression techniques can reduce the fugitive dust generation (and thus the PM10 component). Compliance with these rules would reduce impacts on nearby sensitive receptors.
Rule 403 measures may include but are not limited to the following:
Apply nontoxic chemical soil stabilizers according to manufacturers’ specifications to all inactive construction areas (previously graded areas inactive for 10 days or more). Water active sites at least three times daily. (Locations where grading is to occur will be thoroughly watered prior to earthmoving.)
Cover all trucks hauling dirt, sand, soil, or other loose materials, or maintain at least 0.6 meters (2 feet) of freeboard (vertical space between the top of the load and top of the trailer) in accordance with the requirements of California Vehicle Code section 23114.
Reduce traffic speeds on all unpaved roads to 15 miles per hour (mph) or less. Suspension of all grading activities when wind speeds (including instantaneous wind gusts) exceed 25 mph.
Bumper strips or similar best management practices shall be provided where vehicles enter and exit the construction site onto paved roads or wash off trucks and any equipment leaving the site each trip. Replanting disturbed areas as soon as practical.
During all construction activities, construction contractors shall sweep on-site and off-site streets if silt is carried to adjacent public thoroughfares, to reduce the amount of particulate matter on public streets.
All sweepers shall be compliant with SCAQMD Rule 1186.1, Less Polluting Sweepers.
SCAQMD Rule 445
Prohibits permanently installed wood burning devices into any new development. A wood burning device means any fireplace, wood burning heater, or pellet-fueled wood heater, or any similarly enclosed, permanently installed, indoor or outdoor device burning any solid fuel for aesthetic or space-heating purposes, which has a heat input of less than one million British thermal units per hour.
SCAQMD Rule 481
Applies to all spray painting and spray coating operations and equipment. The rule states that a person shall not use or operate any spray painting or spray coating equipment unless one of the following conditions is met:
(1) The spray coating equipment is operated inside a control enclosure, which is approved by the Executive Officer. Any control enclosure for which an application for permit for new construction, alteration, or change of ownership or location is submitted after the date of adoption of this rule shall be exhausted 14 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 15 19594
only through filters at a design face velocity not less than 100 feet per minute nor greater than 300 feet per minute, or through a water wash system designed to be equally effective for the purpose of air pollution control.
(2) Coatings are applied with high-volume low-pressure, electrostatic and/or airless spray equipment. (3) An alternative method of coating application or control is used which has effectiveness equal to or greater than the equipment specified in the rule.
SCAQMD Rule 1108
Governs the sale, use, and manufacturing of asphalt and limits the volatile organic compound (VOC) content in asphalt used in the South Coast Air Basin. This rule would regulate the VOC content of asphalt used during construction. Therefore, all asphalt used during construction of the project must comply with SCAQMD Rule 1108.
SCAQMD Rule 1113
Governs the sale, use, and manufacturing of architectural coating and limits the VOC content in paints and paint solvents. This rule regulates the VOC content of paints available during construction. Therefore, all paints and solvents used during construction and operation of the project must comply with SCAQMD Rule 1113.
SCAQMD Rule 1143
Governs the manufacture, sale, and use of paint thinners and solvents used in thinning of coating materials, cleaning of coating application equipment, and other solvent cleaning operations by limiting their VOC content. This rule regulates the VOC content of solvents used during construction. Solvents used during the construction phase must comply with this rule.
SCAQMD Rule 1186
Limits the presence of fugitive dust on paved and unpaved roads and sets certification protocols and requirements for street sweepers that are under contract to provide sweeping services to any federal, state, county, agency or special district such as water, air, sanitation, transit, or school district.
SCAQMD Rule 1303
Governs the permitting of re-located or new major emission sources, requiring Best Available Control Measures and setting significance limits for PM10 among other pollutants.
SCAQMD Rule 1401
New Source Review of Toxic Air Contaminants, specifies limits for maximum individual cancer risk, cancer burden, and non-cancer acute and chronic hazard index from new permit units, relocations, or modifications to existing permit units, which emit toxic air contaminants.
SCAQMD Rule 1403
Asbestos Emissions from Demolition/Renovation Activities, specifies work practice requirements to limit asbestos emissions from building demolition and renovation activities, including the removal and associated disturbance of asbestos-containing materials (ACM).
15 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 16 19594
SCAQMD Rule 2202
On-Road Motor Vehicle Mitigation Options, is to provide employers with a menu of options to reduce mobile source emissions generated from employee commutes, to comply with federal and state Clean Air Act requirements, Health & Safety Code Section 40458, and Section 182(d)(1)(B) of the federal Clean Air Act. It applies to any employer who employs 250 or more employees on a full or part-time basis at a worksite for a consecutive six-month period calculated as a monthly average.
SCAQMD Rule 2305
The Warehouse Actions and Investments to Reduce Emissions (WAIRE) Program aims to reduce nitrogen oxide and diesel emissions associated with warehouses, help meet federal standards and improve public health. The WAIRE Program is an indirect source rule that regulates warehouse facilities to reduce emissions from the goods movement industry. Owners and operators of warehouses that have 100,000 square feet or more of indoor floor space in a single building must comply with the WAIRE Program. WAIRE is a menu-based point system in which warehouse operators are required to earn a specific number of points every year. The yearly number of points required is based on the number of trucks trips made to and from the warehouse each year, with larger trucks such as tractors or tractor-trailers multiplied by 2.5. Warehouse operators may be exempt from parts of the rule if they operate less than 50,000 square feet of warehousing activities, if the number of points required is less than 10, or if the WAIRE menu action chosen under performs due to circumstances beyond the operator’s control, such as a manufacturer defect. SCAQMD Rule 316 establishes fees to fund Rule 2305 compliance activities.
Air Quality Guidance Documents
SCAQMD CEQA Handbook
Although the SCAQMD is responsible for regional air quality planning efforts, it does not have the authority to directly regulate air quality issues associated with plans and new development projects throughout the South Coast Air Basin. Instead, this is controlled through local jurisdictions in accordance with the California Environmental Quality Act (CEQA). In order to assist local jurisdictions with air quality compliance issues the CEQA Air Quality Handbook (SCAQMD CEQA Handbook) prepared by the SCAQMD (1993) with the most current updates found at http://www.aqmd.gov/ceqa/hdbk.html, was developed in accordance with the projections and programs of the AQMP. The purpose of the SCAQMD CEQA Handbook is to assist Lead Agencies, as well as consultants, project proponents, and other interested parties in evaluating a proposed project’s potential air quality impacts. Specifically, the SCAQMD CEQA Handbook explains the procedures that the SCAQMD recommends be followed for the environmental review process required by CEQA. The SCAQMD CEQA Handbook provides direction on how to evaluate potential air quality impacts, how to determine whether these impacts are significant, and how to mitigate these impacts. SCAQMD is in the process of developing an "Air Quality Analysis Guidance Handbook" to replace the CEQA Air Quality Handbook approved by the AQMD Governing Board in 1993. The 1993 CEQA Air Quality Handbook is still available but not online. In addition, there are sections of the 1993 Handbook that are obsolete. In order to assist the CEQA practitioner in conducting an air quality analysis while the new Handbook is being prepared, supplemental information regarding: significance thresholds and analysis, emissions factors, cumulative impacts emissions analysis, and other useful subjects, are available at the SCAQMD website 3. The SCAQMD CEQA Handbook and supplemental information is used in this analysis.
Southern California Association of Governments
The SCAG is the regional planning agency for Los Angeles, Orange, Ventura, Riverside, San Bernardino and Imperial Counties and addresses regional issues relating to transportation, the economy, community development and the environment. SCAG is the Federally designated MPO for the majority of the southern
3 http://www.aqmd.gov/home/regulations/ceqa/air-quality-analysis-handbook. 16 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 17 19594
California region and is the largest MPO in the nation. With respect to air quality planning, SCAG has prepared the Regional Transportation Plan and Regional Transportation Improvement Plan (RTIP), which addresses regional development and growth forecasts. These plans form the basis for the land use and transportation components of the AQMP, which are utilized in the preparation of air quality forecasts and in the consistency analysis included in the AQMP. The Regional Transportation Plan, Regional Transportation Improvement Plan, and AQMP are based on projections originating within the City and County General Plans.
On April 7, 2016, SCAG’s Regional Council adopted the 2016-2040 Regional Transportation Plan/ Sustainable Communities Strategy (2016 RTP/SCS or Plan). The Plan is a long-range visioning plan that balances future mobility and housing needs with economic, environmental and public health goals. The Plan charts a course for closely integrating land use and transportation – so that the region can grow smartly and sustainably. It outlines more than $556.5 billion in transportation system investments through 2040. The Plan was prepared through a collaborative, continuous, and comprehensive process with input from local governments, county transportation commissions, tribal governments, non-profit organizations, businesses and local stakeholders within the counties of Imperial, Los Angeles, Orange, Riverside, San Bernardino and Ventura. In June 2016, SCAG received its conformity determination from the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) indicating that all air quality conformity requirements for the 2016 RTP/SCS and associated 2015 FTIP Consistency Amendment through Amendment 15-12 have been met.
On May 7, 2020, SCAG’s Regional Council adopted Connect SoCal (2020 - 2045 Regional Transportation Plan/Sustainable Communities Strategy) for federal transportation conformity purposes only. In light of the COVID-19 pandemic, the Regional Council will consider approval of Connect SoCal in its entirety and for all other purposes within 120 days from May 7, 2020. Connect SoCal is a long-range visioning plan that builds upon and expands land use and transportation strategies established over several planning cycles to increase mobility options and achieve a more sustainable growth pattern. Connect SoCal outlines more than $638 billion in transportation system investments through 2045. It was prepared through a collaborative, continuous, and comprehensive process with input from local governments, county transportation commissions, tribal governments, non-profit organizations, businesses and local stakeholders within the counties of Imperial, Los Angeles, Orange, Riverside, San Bernardino and Ventura.
Local – City of Orange
Local jurisdictions, such as the City of Orange, have the authority and responsibility to reduce air pollution through its police power and decision-making authority. Specifically, the City is responsible for the assessment and mitigation of air emissions resulting from its land use decisions. The City is also responsible for the implementation of transportation control measures as outlined in the 2022 AQMP. Examples of such measures include bus turnouts, energy-efficient streetlights, and synchronized traffic signals. In accordance with CEQA requirements and the CEQA review process, the City assesses the air quality impacts of new development projects, requires mitigation of potentially significant air quality impacts by conditioning discretionary permits, and monitors and enforces implementation of such mitigation.
In accordance with the CEQA requirements, the City does not, however, have the expertise to develop plans, programs, procedures, and methodologies to ensure that air quality within the City and region will meet federal and state standards. Instead, the City relies on the expertise of the SCAQMD and utilizes the SCAQMD CEQA Handbook as the guidance document for the environmental review of plans and development proposals within its jurisdiction.
The City of Orange General Plan Natural Resources Element contains the following air quality-related goals and policies that are applicable to the proposed project:
Goal 2 Protect air, water, and energy resources from pollution and overuse.
17 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 18 19594
Policies
Policy 2.1 Cooperate with the South Coast Air Quality Management District (SCAQMD) and other regional agencies to implement and enforce regional air quality management plans.
Policy 2.2 Support alternative transportation modes, alternative technologies, and bicycle- and pedestrian-friendly neighborhoods to reduce emissions related to vehicular travel.
Policy 2.3 Reduce the amount of water used for landscaping through the use of native and drought- tolerant plants, proper soil preparation, and efficient irrigation systems as parks and other City facilities are built or renovated.
Policy 2.4 Encourage the production, distribution, and use of recycled and reclaimed water for landscaping projects, while maintaining urban runoff water quality objectives.
Policy 2.5 Continue to work toward local and regional waste-reduction and diversion/ recycling goals and promote public education programs.
Policy 2.6 Encourage sustainable building and site designs for new construction and renovation projects.
Policy 2.7 Coordinate with energy suppliers to ensure adequate energy supplies to meet community needs, and to promote energy conservation and public education programs for that purpose.
Policy 2.8 Encourage development that incorporates pedestrian- and transit-oriented design and landscape elements.
Policy 2.9 Promote City operations as a model for energy efficiency and green building.
Policy 2.10 Work toward replacing existing City vehicles with ultra-low or zero emission vehicles. At a minimum, new City vehicles shall be low emission vehicles as defined by the California Air Resources Board, except if certain vehicle types are not available in the marketplace. Public safety vehicles are exempted from this requirement.
18 California Standards
Federal Primary
Standards
0.09 ppm/1-hour
0.07 ppm/8-hour 0.070 ppm/8-hour
(a) Decline in pulmonary function and localized lung edema in humans and animals; (b) Risk to public health implied by alterations in pulmonary morphology and host defense in animals; (c) Increased mortality risk; (d) Risk to public health implied by altered connective tissue metabolism and altered pulmonary morphology in animals after long-term exposures and pulmonary function decrements in chronically exposed humans; (e) Vegetation damage; and (f) Property damage.
20.0 ppm/1-hour
9.0 ppm/8-hour
35.0 ppm/1-hour
9.0 ppm/8-hour
(a) Aggravation of angina pectoris and other aspects of coronary heart disease; (b) Decreased exercise tolerance in persons with peripheral vascular disease and lung disease; (c) Impairment of central nervous system functions; and (d) Possible increased risk to fetuses.
0.18 ppm/1-hour
0.03 ppm/annual
100 ppb/1-hour
0.053 ppm/annual
(a) Potential to aggravate chronic respiratory disease and respiratory symptoms in sensitive groups; (b) Risk to public health implied by pulmonary and extra-pulmonary biochemical and cellular changes and pulmonary structural changes; and (c) Contribution to atmospheric discoloration.
0.25 ppm/1-hour
0.04 ppm/24-hour
75 ppb/1-hour
0.14 ppm/annual
(a) Bronchoconstriction accompanied by symptoms which may include wheezing, shortness of breath and chest tightness, during exercise or physical activity in persons with asthma.
50 µg/m3/24-hour
20 µg/m3/annual 150 µg/m3/24-hour
12 µg/m3 / annual 35 µg/m3/24-hour
12 µg/m3/annual
25 µg/m3/24-hour No Federal Standards
(a) Decrease in ventilatory function; (b) Aggravation of asthmatic symptoms; (c ) Aggravation of cardio-pulmonary disease; (d) Vegetation damage; (e) Degradation of visibility; (f) property damage.
1.5 µg/m3/30-day 0.15 µg/m3/3-month
rolling (a) Learning disabilities; (b) Impairment of blood formation and nerve conduction.
Extinction coefficient
of 0.23 per kilometer-
visibility of 10 miles or
more due to particles
when humidity is less
than 70 percent.
No Federal Standards Visibility impairment on days when relative humidity is less than 70 percent.
Source: https://ww2.arb.ca.gov/sites/default/files/2020-07/aaqs2.pdf Table 2
Visibility
Reducing
Particles
Concentration / Averaging Time
Most Relevant Effects
(a) Exacerbation of symptoms in sensitive patients with respiratory or cardiovascular disease; (b) Declines in pulmonary function growth in children; (c) Increased risk of premature death from heart or lung diseases in elderly.
State and Federal Criteria Pollutant Standards
Air Pollutant
Ozone (O3)
Carbon
Monoxide
(CO)
Nitrogen
Dioxide (NO2)
Sulfur Dioxide
(SO2)
Suspended
Particulate
Matter (PM10)
Suspended
Particulate
Matter (PM2.5)
Sulfates
Lead
Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 19594
19 State Status National Status
Nonattainment Nonattainment (Extreme)
Attainment Attainment (Maintenance)
Attainment Unclassifable/Attainment
Attainment Unclassifiable/Attainment
Nonattainment Attainment (Maintenance)
Nonattainment Nonattainment (Serious)
Source (Federal and State Status): California Air Resources Board (2022) https://ww2.arb.ca.gov/resources/documents/maps-state-and-federal- area-designations & SCAQMD 2022 Air Quality Management Plan (December 2022) http://www.aqmd.gov/docs/default-source/clean-air- plans/air-quality-management-plans/2022-air-quality-management-plan/final-2022-aqmp/final-2022-aqmp.pdf?sfvrsn=16.
PM10
PM2.5
Table 3
South Coast Air Basin Attainment Status
Pollutant
Ozone
Carbon monoxide
Nitrogen dioxide
Sulfur dioxide
Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 19594
20 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 21 19594
MONITORED AIR QUALITY
The air quality at any site is dependent on the regional air quality and local pollutant sources. Regional air quality is determined by the release of pollutants throughout the air basin. Estimates of the existing emissions in the Basin provided in the Final 2022 Air Quality Management Plan prepared by SCAQMD (December 2022) indicate that collectively, mobile sources account for 46 percent of the VOC, 85 percent of the NOx emissions, 89 percent of the CO emissions and 29 percent of directly emitted PM2.5, with another 18 percent of PM2.5 from road dust.
The SCAQMD has divided the South Coast Air Basin into 38 air-monitoring areas with a designated ambient air monitoring station representative of each area. The project site is located in the Central Orange County Air Monitoring Source Receptor Area (SRA 17). Data was taken from the Anaheim-Pampas Lane monitoring station (Anaheim Station). The Anaheim Station is located approximately 8.33 miles northwest of the project site at 1630 W Pampas, Anaheim. Table 4 presents the monitored pollutant levels from the Anaheim Station.
However, it should be noted that due to the air monitoring stations distances from the project site, recorded air pollution levels at the air monitoring station reflect with varying degrees of accuracy, local air quality conditions at the project site.
Table 4 summarizes 2019 through 2021 published monitoring data, which is the most recent 3-year period available. The data shows that during the past few years, the project area has exceeded the ozone and particulate matter (PM10 and PM2.5) standards.
Ozone
During the 2019 to 2021 monitoring period, the State 1-hour concentration standard for ozone was exceeded for one day in 2019 and six days in 2020 at the Anaheim Station. The State 8-hour ozone standard was exceeded for one day in 2019 and 16 days in 2020 over the past three years at the Anaheim Station. The Federal 8-hour ozone standard was exceeded for one day in 2019 and 15 days in 2020 over the past three years at the Anaheim Station.
Ozone is a secondary pollutant as it is not directly emitted. Ozone is the result of chemical reactions between other pollutants, most importantly hydrocarbons and NO2, which occur only in the presence of bright sunlight.
Pollutants emitted from upwind cities react during transport downwind to produce the oxidant concentrations experienced in the area. Many areas of the SCAQMD contribute to the ozone levels experienced at the monitoring station, with the more significant areas being those directly upwind.
Carbon Monoxide
CO is another important pollutant that is due mainly to motor vehicles. The Anaheim Station did not record an exceedance of the state or federal 8-hour CO standard for the last three years.
Nitrogen Dioxide
The Anaheim Station did not record an exceedance of the State or Federal NO 2 standards for the last three years.
Particulate Matter
The State 24-hour concentration standards for PM10 were exceeded between one and five days each year over the past three years at the Anaheim Station. Over the past three years, the Anaheim Station did not record an exceedance of the Federal 24-hour standards for PM10.
The Federal 24-hour standard for PM2.5 was exceeded between four and 12 days each year over the past three years at the Anaheim Station.
21 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 22 19594
According to the EPA, some people are much more sensitive than others to breathing fine particles (PM10 and PM2.5). People with influenza, chronic respiratory and cardiovascular diseases, and the elderly may suffer worsening illness and premature death due to breathing these fine particles. People with bronchitis can expect aggravated symptoms from breathing in fine particles. Children may experience decline in lung function due to breathing in PM10 and PM2.5. Other groups considered sensitive are smokers and people who cannot breathe well through their noses. Exercising athletes are also considered sensitive, because many breathe through their mouths during exercise.
22 2019 2020 2021
Maximum 1-Hour Concentration (ppm) 0.096 0.014 0.089
Days > CAAQS (0.09 ppm) 1 6 0
Maximum 8-Hour Concentration (ppm) 0.082 0.098 0.068
Days > NAAQS (0.070 ppm) 1 15 0
Days > CAAQS (0.070 ppm) 1 16 0
Maximum 8-Hour Concentration (ppm) * * *
Days > CAAQS (9 ppm) 0 0 0
Days > NAAQS (9 ppm) 0 0 0
Maximum 1-Hour Concentration (ppm) 0.059 0.071 0.067
Days > CAAQS (0.18 ppm) 0 0 0
Maximum 24-Hour Concentration (µg/m3) 127.6 74.8 63.6
Days > NAAQS (150 µg/m3) 0 0 0
Days > CAAQS (50 µg/m3) 4 5 1
Annual Average (µg/m3) 24.6 30.8 23.4
Maximum 24-Hour Concentration (µg/m3) 37.1 64.8 54.4
Days > NAAQS (35 µg/m3) 4 12 10
Annual Average (µg/m3) 9.4 12.4 11.6
Notes:
(1) CAAQS = California Ambient Air Quality Standard; NAAQS = National Ambient Air Quality Standard; ppm = parts per million * Means there was insufficient data available to determine value.
Source: http://www.arb.ca.gov/adam/topfour/topfour1.php. Data from the Anaheim-Pampas Lane Monitoring Station, unless otherwise noted.
Year
Air Quality Monitoring Summary
Table 4
Pollutant (Standard)1
Ultra-Fine
Particulates
(PM2.5):
Ozone:
Carbon
Monoxide:
Nitrogen Dioxide:
Inhalable
Particulates
(PM10):
Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 19594
23 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 24 19594
AIR QUALITY STANDARDS
Significance Thresholds
Appendix G of the State CEQA Guidelines
Appendix G of the State CEQA Guidelines states that, where available, the significance criteria established by the applicable air quality management district or air pollution control district may be relied upon to make a significance determination. Pursuant to Appendix G, the project would result in a significant impact related to air quality if it would:
Conflict with or obstruct the implementation of the applicable air quality plan; Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is nonattainment under an applicable federal or state ambient air quality standard; Expose sensitive receptors to substantial pollutant concentrations; or Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people.
The CEQA Guidelines Section 15064.7 provides the significance criteria established by the applicable air quality management district or air pollution control district, when available, may be relied upon to make determinations of significance. The potential air quality impacts of the project are, therefore, evaluated according to thresholds developed by SCAQMD in their CEQA Air Quality Handbook, Air Quality Analysis Guidance Handbook, and subsequent guidance, which are listed below. 4 Therefore, the project would result in a potentially significant impact to air quality if it would:
AIR-1: Conflict with or obstruct the implementation of the applicable air quality plan;
AIR-2: Violate any air quality standard or contribute substantially to an existing or projected air quality violation as a result of:
Criteria pollutant emissions during construction (direct and indirect) in excess of the SCAQMD’s regional significance thresholds,
Criteria pollutant emissions during operation (direct and indirect) in excess of the SCAQMD’s regional significance thresholds.
AIR-3: Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is nonattainment under an applicable federal or state ambient air quality standard (including releasing emissions which exceed quantitative thresholds for ozone precursors);
AIR-4: Expose sensitive receptors to substantial pollutant concentrations that would:
Exceed SCAQMD’s localized significance thresholds,
Cause or contribute to the formation of CO hotspots.
4 While the SCAQMD CEQA Air Quality Handbook contains significance thresholds for lead, Project construction and operation would not include sources of lead emissions and would not exceed the established thresholds for lead. Unleaded fuel and unleaded paints have virtually eliminated lead emissions from industrial land use projects such as the Project. As a result, lead emissions are not further evaluated herein.
24 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 25 19594
AIR-5: Create objectionable odors affecting a substantial number of people.
The SCAQMD is in the process of developing an Air Quality Analysis Guidance Handbook to replace the CEQA Air Quality Handbook. In the interim, supplemental guidance has been adopted by the SCAQMD. The potential air quality impacts of the project are, therefore, evaluated according to numeric indicators developed by the SCAQMD in the CEQA Air Quality Handbook and supplemental guidance from the SCAQMD. 5
Regional Air Quality
Many air quality impacts that derive from dispersed mobile sources, which are the dominate pollution generators in the basin, often occurs hours later and miles away after photochemical processes have converted primary exhaust pollutants into secondary contaminants such as ozone. The incremental regional air quality impact of an individual project is generally very small and difficult to measure. Therefore, the SCAQMD has developed significance thresholds based on the volume of pollution emitted rather than on actual ambient air quality because the direct air quality impact of a project is not quantifiable on a regional scale. The SCAQMD CEQA Handbook states that any project in the South Coast Air Basin with daily emissions that exceed any of the identified significance thresholds should be considered as having an individually and cumulatively significant air quality impact. For the purposes to this air quality impact analysis, a regional air quality impact would be considered significant if emissions exceed the SCAQMD significance thresholds identified in Table 5.
Local Air Quality
Project-related construction air emissions may have the potential to exceed the State and Federal air quality standards in the project vicinity, even though these pollutant emissions may not be significant enough to create a regional impact to the South Coast Air Basin. In order to assess local air quality impacts the SCAQMD has developed Localized Significance Thresholds (LSTs) to assess the project-related air emissions in the project vicinity. The SCAQMD has also provided Final Localized Significance Threshold Methodology (LST Methodology), June 2003, which details the methodology to analyze local air emission impacts. The Localized Significance Threshold Methodology found that the primary emissions of concern are NO 2, CO, PM10, and PM2.5.
The significance thresholds for the local emissions of NO2 and CO are determined by subtracting the highest background concentration from the last three years of these pollutants from Table 4 above, from the most restrictive ambient air quality standards for these pollutants that are outlined in the Localized Significance Thresholds. Table 5 shows the ambient air quality standards for NO 2, CO, and PM10 and PM2.5.
Toxic Air Contaminants
Construction
Temporary TAC emissions associated with DPM emissions from heavy construction equipment would occur during the construction phase of the Project. According to the Office of Environmental Health Hazard Assessment (OEHHA) 6 and the SCAQMD Health Risk Assessment Guidance for Analyzing Cancer Risks from Mobile Source Diesel Idling Emissions for CEQA Air Quality Analysis (August 2003),7 health effects from TACs are
5 While the SCAQMD CEQA Air Quality Handbook contains significance thresholds for lead, Project construction and operation would not include sources of lead emissions and would not exceed the established thresholds for lead. Unleaded fuel and unleaded paints have virtually eliminated lead emissions from residential land use projects such as the Project. As a result, lead emissions are not further evaluated herein.
6 Office of Environmental Health Hazard Assessment, Air Toxic Hot Spots Program Risk Assessment Guidelines Guidance Manual for Preparation of Health Risk Assessment, February 2015, https://oehha.ca.gov/media/downloads/crnr/2015guidancemanual.pdf. 7 South Coast Air Quality Management District, Health Risk Assessment Guidance for Analyzing Cancer Risks from Mobile Source Diesel Idling Emissions for CEQA Air Quality Analysis, August 2003,http://www.aqmd.gov/docs/default- source/ceqa/handbook/mobile-source-toxics-analysis.doc?sfvrsn=2. 25 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 26 19594
described in terms of individual cancer risk. “Individual Cancer Risk” is the likelihood that a person exposed to concentrations of TACs over a 30-year lifetime will contract cancer based on the use of standard risk- assessment methodology. Additionally, the SCAQMD CEQA guidance does not require a HRA for short-term construction emissions. Construction activities associated with the project would be sporadic, transitory, and short-term in nature (approximately 24 months). Thus, construction of the project would not result in a substantial, long-term (i.e., 30-year) source of TAC emissions. Nonetheless, a qualitative assessment of TAC emissions associated with short-term construction TAC emissions is provided in the analysis section below.
Operation
The project proposes to develop the site with residential uses. Therefore, the project is not anticipated be a source of toxic air contaminants and sensitive receptors would not be exposed to toxic sources of air pollution.
Odor Impacts
The SCAQMD CEQA Handbook states that an odor impact would occur if the proposed project creates an odor nuisance pursuant to SCAQMD Rule 402, which states:
A person shall not discharge from any source whatsoever such quantities of air contaminants or other material which cause injury, detriment, nuisance, or annoyance to any considerable number of persons to the public, or which endanger the comfort, repose, health or safety of any such persons or the public, or which cause, or have a natural tendency to cause, injury or damage to business or property.
The provisions of this rule shall not apply to odors emanating from agricultural operations necessary for the growing of crops or the raising of fowl or animals.
If the proposed project results in a violation of Rule 402 with regards to odor impacts, then the proposed project would create a significant odor impact.
26 Construction (lbs/day) Operation (lbs/day)
100 55
75 55
150 150
55 55
150 150
550 550
3 3
TACs
Odor
GHG
Source: http://www.aqmd.gov/ceqa/handbook/signthres.pdf SCAQMD Air Quality Significance Thresholds
Table 5
Mass Daily Thresholds
Pollutant
NOx
NO2 -1-hour average
VOC
Project creates an odor nuisance pursuant to SCAQMD Rule 402 10,000 MT/yr CO2e for industrial projects
SCAQMD Standards
0.18 ppm (338 µg/m^3)
PM10
Ambient Air Quality Standards
Pollutant
Maximum Incremental Cancer Risk ≥ 10 in 1 million
Cancer Burden > 0.5 excess cancer cases (in areas ≥ 1 in 1 million) Chronic & Acute Hazard Index > 1.0 (project increment)
PM2.5
SOx
CO
Lead
Toxic Air Contaminants, Odor and GHG Thresholds
PM10 -24-hour average
Construction
Operations
PM2.5 -24-hour average
Construction
Operations
SO2
1-hour average
24-hour average
10.4 µg/m^3
2.5 ug/m^3
CO
1-hour average
8-hour average
Lead
30-day average
Rolling 3-month average
Quarterly average
10.4 µg/m^3
2.5 µg/m^3
0.25 ppm
0.04 ppm
20 ppm (23,000 µg/m^3)
9 ppm (10,000 µg/m^3)
1.5 µg/m^3
0.15 µg/m^3
1.5 µg/m^3
Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 19594
27 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 28 19594
SHORT-TERM CONSTRUCTION EMISSIONS
Construction activities associated with the proposed project would have the potential to generate air emissions, toxic air contaminant emissions, and odor impacts. Assumptions for the phasing, duration, and required equipment for the construction of the proposed project were obtained from the project applicant.
The construction activities for the proposed project are anticipated to include: demolition of an existing 2,100 square foot concrete foundation; grading of approximately 1.93 acres; construction of 13 single-family residential dwelling units totaling approximately 35,500 square feet8; paving of on-site roadways and a parking lot with 10 guest parking spaces totaling to approximately 25 percent of the site or 0.49 acres; and application of architectural coatings. Grading includes approximately 785 cubic yards of import. See Appendix B for more details.
The proposed project is anticipated to start construction no sooner than the beginning of September 2024 taking approximately two years, with completion by early September 2026. The project is anticipated to be operational in 2026.
Methodology
The following provides a discussion of the methodology used to calculate regional construction air emissions and an analysis of the proposed project’s short-term construction emissions for the criteria pollutants. The construction-related regional air quality impacts have been analyzed for both criteria pollutants and GHGs.
Emissions are estimated using the CalEEMod (Version 2022.1.1.6) software, which is a statewide land use emissions computer model designed to provide a uniform platform for government agencies, land use planners, and environmental professionals to quantify potential criteria pollutant and GHG emissions from a variety of land use projects. CalEEMod was developed in collaboration with the air districts of California.
Regional data (e.g., emission factors, trip lengths, meteorology, source inventory, etc.) have been provided by the various California air districts to account for local requirements and conditions. The model is considered to be an accurate and comprehensive tool for quantifying air quality and GHG impacts from land use projects throughout California and is recommended by the SCAQMD.9 Daily regional emissions during construction are forecasted by assuming a conservative estimate of construction activities (i.e., assuming all construction occurs at the earliest feasible date) and applying the mobile source and fugitive dust emissions factors. The input values used in this analysis were adjusted to be project-specific for the construction schedule and the equipment used was based on CalEEMod defaults. The CalEEMod program uses the EMFAC2021 computer program to calculate the emission rates specific for the northern portion of Orange County for construction-related employee vehicle trips and the OFFROAD2017 computer program to calculate emission rates for heavy truck operations. EMFAC2021 and OFFROAD2017 are computer programs generated by CARB that calculates composite emission rates for vehicles. Emission rates are reported by the program in grams per trip and grams per mile or grams per running hour. Daily truck trips and CalEEMod default trip length data were used to assess roadway emissions from truck exhaust. The maximum daily emissions are estimated values for the worst-case day and do not represent the emissions that would occur for every day of project construction. The maximum daily emissions are compared to the SCAQMD daily regional numeric indicators. Detailed construction equipment lists, construction scheduling, and emission calculations are provided in Appendix B.
The project will be required to comply with existing SCAQMD rules for the reduction of fugitive dust emissions. SCAQMD Rule 403 establishes these procedures. Compliance with this rule is achieved through application of standard best management practices in construction and operation activities, such as application of water or chemical stabilizers to disturbed soils, managing haul road dust by application of water, covering
8 Total building square footage estimated based on: two dwelling units at 1,900 square foot, six dwelling units at 2,200 square foot, five dwelling units at 2,500 square foot, and garage square footage of approximately 500 square feet for each dwelling unit. 9 South Coast Air Quality Management District, California Emissions Estimator Model, http://www.aqmd.gov/caleemod/. 28 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 29 19594
haul vehicles, restricting vehicle speeds on unpaved roads to 15 mph, sweeping loose dirt from paved site access roadways, cessation of construction activity when winds exceed 25 mph and establishing a permanent, stabilizing ground cover on finished sites. In addition, projects that disturb 50 acres or more of soil or move 5,000 cubic yards of materials per day are required to submit a Fugitive Dust Control Plan or a Large Operation Notification Form to SCAQMD. Based on the size of the Project area (approximately 1.93 acres) a Fugitive Dust Control Plan or Large Operation Notification would not be required.
SCAQMD’s Rule 403 minimum requirements require that the application of the best available dust control measures is used for all grading operations and include the application of water or other soil stabilizers in sufficient quantity to prevent the generation of visible dust plumes. Compliance with Rule 403 would require the use of water trucks during all phases where earth moving operations would occur. Compliance with Rule 403 has been included in the CalEEMod modeling for the proposed project.
Per SCAQMD Rule 1113 as amended on June 3, 2011, the architectural coatings that would be applied after January 1, 2014 will be limited to an average of 50 grams per liter or less of VOCs for building coatings and 100 grams per liter or less of VOCs for traffic coatings.
The phases of the construction activities which have been analyzed below for each phase are: (1) demolition, (2) grading, (3) building construction, (4) paving, and (5) application of architectural coatings. Details pertaining to the project's construction timing and the type of equipment modeled for each construction phase are available in the CalEEMod output in Appendix B.
Construction-Related Regional Impacts
The maximum construction-related criteria pollutant emissions are shown below in Table 6. Table 6 shows that none of the project's emissions will exceed regional thresholds. Therefore, a less than significant regional air quality impact would occur from construction of the proposed project.
Construction-Related Local Impacts
Construction-related air emissions may have the potential to exceed the State and Federal air quality standards in the project vicinity, even though these pollutant emissions may not be significant enough to create a regional impact to the South Coast Air Basin. The proposed project has been analyzed for the potential local air quality impacts created from: construction-related fugitive dust and diesel emissions; from toxic air contaminants; and from construction-related odor impacts.
Local Air Quality Impacts from Construction
The SCAQMD has published a “Fact Sheet for Applying CalEEMod to Localized Significance Thresholds” (South Coast Air Quality Management District 2011b). CalEEMod calculates construction emissions based on the number of equipment hours and the maximum daily disturbance activity possible for each piece of equipment. In order to compare CalEEMod reported emissions against the localized significance threshold lookup tables, the CEQA document should contain the following parameters:
(1) The off-road equipment list (including type of equipment, horsepower, and hours of operation) assumed for the day of construction activity with maximum emissions. (2) The maximum number of acres disturbed on the peak day. (3) Any emission control devices added onto off-road equipment. (4) Specific dust suppression techniques used on the day of construction activity with maximum emissions.
The CalEEMod output in Appendix B show the equipment used for this analysis.
29 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 30 19594
As shown in Table 7, the maximum number of acres disturbed in a day would be 2 acres during grading. The local air quality emissions from construction were analyzed using the SCAQMD’s Mass Rate Localized Significant Threshold Look-up Tables and the methodology described in Localized Significance Threshold Methodology prepared by SCAQMD (revised July 2008). The Look-up Tables were developed by the SCAQMD in order to readily determine if the daily emissions of CO, NOx, PM10, and PM2.5 from the proposed project could result in a significant impact to the local air quality. The emission thresholds were calculated based on the Central Orange County source receptor area (SRA) 17 and a disturbance value of two acre per day. According to LST Methodology, any receptor located closer than 25 meters (82 feet) shall be based on the 25-meter thresholds. The nearest sensitive receptors are the single-family residential uses located adjacent to the east and south and approximately 60 feet (~18 meters) to the west of the project site; therefore, the SCAQMD Look-up Tables for 25 meters was used. Table 8 shows the on-site emissions from the CalEEMod model for the different construction phases and the LST emissions thresholds.
The data provided in Table 8 shows that none of the analyzed criteria pollutants would exceed the local emissions thresholds at the nearest sensitive receptors. Therefore, a less than significant local air quality impact would occur from construction of the proposed project.
Construction-Related Health Impacts
Regarding health effects related to criteria pollutant emissions, the applicable significance thresholds are established for regional compliance with the state and federal ambient air quality standards, which are intended to protect public health from both acute and long-term health impacts, depending on the potential effects of the pollutant. Because regional and local emissions of criteria pollutants during construction of the project would be below the applicable thresholds, it would not contribute to long-term health impacts related to nonattainment of the ambient air quality standards. Therefore, significant adverse acute health impacts as a result of project construction are not anticipated.
Construction-Related Toxic Air Contaminant Impacts
The greatest potential for toxic air contaminant emissions would be related to diesel particulate emissions associated with heavy equipment operations during construction of the proposed project. According to the Office of Environmental Health Hazard Assessment (OEHHA) 10 and the SCAQMD Health Risk Assessment Guidance for Analyzing Cancer Risks from Mobile Source Diesel Idling Emissions for CEQA Air Quality Analysis (August 2003),11 health effects from TACs are described in terms of individual cancer risk based on a lifetime (i.e., 30-year) resident exposure duration. Given the temporary and short-term construction schedule (approximately 24 months), the project would not result in a long-term (i.e., lifetime or 30-year) exposure as a result of project construction. Furthermore, construction-based particulate matter (PM) emissions (including diesel exhaust emissions) do not exceed any local or regional thresholds.
The project would comply with the CARB Air Toxics Control Measure that limits diesel powered equipment and vehicle idling to no more than 5 minutes at a location, and the CARB In-Use Off-Road Diesel Vehicle Regulation; compliance with these would minimize emissions of TACs during construction. The project would also comply with the requirements of SCAQMD Rule 1403 if asbestos is found during the renovation and construction activities. Therefore, impacts from TACs during construction would be less than significant.
10 Office of Environmental Health Hazard Assessment, Air Toxic Hot Spots Program Risk Assessment Guidelines Guidance Manual for Preparation of Health Risk Assessment, February 2015, https://oehha.ca.gov/media/downloads/crnr/2015guidancemanual.pdf. 11 South Coast Air Quality Management District, Health Risk Assessment Guidance for Analyzing Cancer Risks from Mobile Source Diesel Idling Emissions for CEQA Air Quality Analysis, August 2003,http://www.aqmd.gov/docs/default- source/ceqa/handbook/mobile-source-toxics-analysis.doc?sfvrsn=2. 30 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 31 19594
Construction-Related Odor Impacts
Potential sources that may emit odors during construction activities include the application of materials such as asphalt pavement. The objectionable odors that may be produced during the construction process are of short-term in nature and the odor emissions are expected to cease upon the drying or hardening of the odor producing materials. Due to the short-term nature and limited amounts of odor producing materials being utilized, no significant impact related to odors would occur during construction of the proposed project. Diesel exhaust and VOCs would be emitted during construction of the project, which are objectionable to some; however, emissions would disperse rapidly from the project site and therefore should not reach an objectionable level at the nearest sensitive receptors.
31 ROG NOx CO SO2 PM10 PM2.5
9.81 16.50 17.40 0.03 3.76 2.09
75 100 550 150 150 55
No No No No No No
Notes:
Source: CalEEMod Version 2022.1.1.6.
(1)
(2) Construction, painting and paving phases may overlap.
SCAQMD Thresholds
Exceeds Thresholds?
On-site emissions from equipment operated on-site that is not operated on public roads. On-site demolition and grading PM-10 and PM-2.5 emissions show compliance with SCAQMD Rule 403.
Construction-Related Regional Pollutant Emissions
Table 6
Activity
Pollutant Emissions (pounds/day)
Maximum Daily Emissions1,2
Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 19594
32 Equipment Number Acres/8hr-day Total Acres
Rubber Tired Dozers 1 0.5 0.5
Crawler Tractors1 1 0.5 0.5
Subtotal for Phase - - 1
Graders 1 0.5 0.5
Rubber Tired Dozers 1 0.5 0.5
Crawler Tractors1 2 0.5 1
Subtotal for Phase - - 2
Notes:
Source: South Coast AQMD, Fact Sheet for Applying CalEEMod to Localized Significance Thresholds, 2011b. (1) Tractor/loader/backhoe is a suitable surrogate for a crawler tractor per SCAQMD staff.
Table 7
Maximum Number of Acres Disturbed Per Day
Activity
Grading
Demolition
Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 19594
33 NOx CO PM10 PM2.5
13.20 12.20 0.58 0.53
Grading 15.90 15.40 3.50 2.02
Building Construction 9.44 10.10 0.37 0.34
Paving 4.41 6.48 0.18 0.17
0.86 1.13 0.02 0.02
SCAQMD Thresholds1 115 715 6 4
Exceeds Threshold? No No No No
Notes:
(1)
On-Site Pollutant Emissions (pounds/day)
Note: The project will disturb up to a maximum of 2 acres a day during grading (see Table 7).
Local Construction Emissions at the Nearest Receptors
Table 8
Activity
Architectural Coating
Source: Calculated from CalEEMod and SCAQMD’s Mass Rate Look-up Tables for 2 acres, to be conservative, at a distance of 25 meters in SRA 17 Central Orange County.
Demolition
The nearest sensitive receptors to the project include the single-family residential uses located adjacent to the east and south and approximately 60 feet (~18 meters) to the west of the project site; therefore, the 25 meter threshold was used.
Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 19594
34 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 35 19594
LONG-TERM OPERATIONAL EMISSIONS
The on-going operation of the proposed project would result in a long-term increase in air quality emissions.
This increase would be due to emissions from the project-generated vehicle trips and through operational emissions from the on-going use of the proposed project. The following section provides an analysis of potential long-term air quality impacts due to: regional air quality and local air quality impacts with the on- going operations of the proposed project.
Operations-Related Regional Air Quality Impacts
The potential operations-related air emissions have been analyzed below for the criteria pollutants and cumulative impacts.
Operations-Related Criteria Pollutants Analysis
The operations-related criteria air quality impacts created by the proposed project have been analyzed through the use of the CalEEMod model. The operating emissions were based on the year 2026, which is the anticipated opening year for the project, emissions printouts from the CalEEMod model are provided in Appendix B. The CalEEMod analyzes operational emissions from area sources, energy usage, and mobile sources, which are discussed below.
Mobile Sources
Mobile sources include emissions from the additional vehicle miles generated from the proposed project. The vehicle trips associated with the proposed project have been analyzed by inputting the project-generated vehicular trips (trip generation rate) from the Rancho Ridge Infill Project Transportation Study Screening Assessment (TA) prepared by Ganddini Group, Inc. (December 19, 2022) into the CalEEMod Model. The TA found that the proposed project will generate approximately 84 daily vehicle trips with a trip generation rate of 6.46 trips per dwelling unit per day The CalEEMod program then applies the emission factors for each trip which is provided by the EMFAC2021 model to determine the vehicular traffic pollutant emissions.
Area Sources
Per the CAPCOA Appendix A Calculation Details for CalEEMod, area sources include emissions from consumer products, landscape equipment and architectural coatings. Landscape maintenance includes fuel combustion emissions from equipment such as lawn mowers, rototillers, shredders/grinders, blowers, trimmers, chain saws, and hedge trimmers, as well as air compressors, generators, and pumps. As specifics were not known about the landscaping equipment fleet, CalEEMod defaults were used to estimate emissions from landscaping equipment. No changes were made to the default area source parameters.
Energy Usage
Energy usage includes emissions from the generation of electricity and natural gas used on-site. No changes were made to the default energy usage parameters.
Project Impacts
The worst-case summer or winter criteria pollutant emissions created from the proposed project’s long-term operations have been calculated and are shown below in Table 9. The results show that none of the SCAQMD regional thresholds would be exceeded. Therefore, a less than significant regional air quality impact would occur from operation of the proposed project.
35 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 36 19594
Operations-Related Local Air Quality Impacts
Project-related air emissions may have the potential to exceed the State and Federal air quality standards in the project vicinity, even though these pollutant emissions may not be significant enough to create a regional impact to the South Coast Air Basin. The proposed project has been analyzed for the potential local CO emission impacts from the project-generated vehicular trips and from the potential local air quality impacts from on-site operations. The following analysis analyzes the vehicular CO emissions, local impacts from on- site operations per SCAQMD LST methodology, and odor impacts.
Local CO Emission Impacts from Project-Generated Vehicular Trips
CO is the pollutant of major concern along roadways because the most notable source of CO is motor vehicles.
For this reason, CO concentrations are usually indicative of the local air quality generated by a roadway network and are used as an indicator of potential local air quality impacts. Local air quality impacts can be assessed by comparing future without and with project CO levels to the State and Federal CO standards which were presented above.
To determine if the proposed project could cause emission levels in excess of the CO standards discussed above, a sensitivity analysis is typically conducted to determine the potential for CO “hot spots” at a number of intersections in the general project vicinity. Because of reduced speeds and vehicle queuing, “hot spots” potentially can occur at high traffic volume intersections with a Level of Service E or worse.
The analysis prepared for CO attainment in the South Coast Air Basin by the SCAQMD can be used to assist in evaluating the potential for CO exceedances in the South Coast Air Basin. CO attainment was thoroughly analyzed as part of the SCAQMD's 2003 Air Quality Management Plan (2003 AQMP) and the 1992 Federal Attainment Plan for Carbon Monoxide (1992 CO Plan). As discussed in the 1992 CO Plan, peak carbon monoxide concentrations in the South Coast Air Basin are due to unusual meteorological and topographical conditions, and not due to the impact of particular intersections. Considering the region’s unique meteorological conditions and the increasingly stringent CO emissions standards, CO modeling was performed as part of 1992 CO Plan and subsequent plan updates and air quality management plans. In the 1992 CO Plan, a CO hot spot analysis was conducted for four busy intersections in Los Angeles at the peak morning and afternoon time periods. The intersections evaluated included: South Long Beach Boulevard and Imperial Highway (Lynwood); Wilshire Boulevard and Veteran Avenue (Westwood); Sunset Boulevard and Highland Avenue (Hollywood); and La Cienega Boulevard and Century Boulevard (Inglewood). These analyses did not predict a violation of CO standards. The busiest intersection evaluated was that at Wilshire Boulevard and Veteran Avenue, which has a daily traffic volume of approximately 100,000 vehicles per day. The Los Angeles County Metropolitan Transportation Authority evaluated the Level of Service in the vicinity of the Wilshire Boulevard/Veteran Avenue intersection and found it to be Level of Service E during the morning peak hour and Level of Service F during the afternoon peak hour.
The TA showed that the proposed project would only generate approximately 84 daily vehicle trips. The 1992 Federal Attainment Plan for Carbon Monoxide (1992 CO Plan) showed that an intersection which has a daily traffic volume of approximately 100,000 vehicles per day would not violate the CO standard. Therefore, as the project includes only up to 84 vehicle trips per day, the intersection volumes would fall far short of 100,000 vehicles per day, and no CO “hot spot” modeling was performed. No significant long-term impact to local air quality is anticipated with the on-going use of the proposed project.
Local Air Quality Impacts from On-Site Operations
Project-related air emissions from on-site sources such as architectural coatings, landscaping equipment, on- site usage of natural gas appliances as well as the operation of vehicles on-site may have the potential to exceed the State and Federal air quality standards in the project vicinity, even though these pollutant emissions may not be significant enough to create a regional impact to the Air Basin. The nearest sensitive 36 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 37 19594
receptors that may be impacted by the proposed project are the single-family residential uses located adjacent to the east and south and approximately 60 feet (~18 meters) to the west of the project site.
According to SCAQMD LST methodology, LSTs would apply to the operational phase of a project, if the project includes stationary sources, or attracts mobile sources (such as heavy-duty trucks) that may spend long periods queuing and idling at the site; such as industrial warehouse/transfer facilities. The proposed project involves the development of the site with a residential use and does not include such uses. Therefore, due the lack of stationary source emissions, no long-term localized significance threshold analysis is warranted.
Operations-Related Health Impacts
Regarding health effects related to criteria pollutant emissions, the applicable significance thresholds are established for regional compliance with the state and federal ambient air quality standards, which are intended to protect public health from both acute and long-term health impacts, depending on the potential effects of the pollutant. Because regional and local emissions of criteria pollutants during operation of the project would be below the applicable thresholds, it would not contribute to long-term health impacts related to nonattainment of the ambient air quality standards. Therefore, significant adverse acute health impacts as a result of project operation are not anticipated.
Operations-Related Odor Impacts
Potential sources that may emit odors during the on-going operations of the proposed project would include odor emissions from the intermittent diesel delivery truck emissions and trash storage areas. Due to the distance of the nearest receptors from the project site and through compliance with SCAQMD’s Rule 402 no significant impact related to odors would occur during the on-going operations of the proposed project.
37 ROG NOx CO SO2 PM10 PM2.5
Maximum Daily Emissions 1.17 0.51 2.90 0.01 0.22 0.06
SCAQMD Thresholds 55 55 550 150 150 55
Exceeds Threshold? No No No No No No
Notes:
Source: CalEEMod Version 2022.1.1.6; the higher of either summer or winter emissions.
Pollutant Emissions (pounds/day)
Regional Operational Pollutant Emissions
Table 9
Activity
Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 19594
38 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 39 19594
CUMULATIVE AIR QUALITY IMPACTS
There are a number of cumulative projects in the project area that have not yet been built or are currently under construction. Since the timing or sequencing of the cumulative projects is unknown, any quantitative analysis to ascertain daily construction emissions that assumes multiple, concurrent construction projects would be speculative. Further, cumulative projects include local development as well as general growth within the project area. However, as with most development, the greatest source of emissions is from mobile sources, which travel well out of the local area. Therefore, from an air quality standpoint, the cumulative analysis would extend beyond any local projects and when wind patterns are considered would cover an even larger area.
The SCAQMD recommends using two different methodologies: (1) that project-specific air quality impacts be used to determine the potential cumulative impacts to regional air quality;12 and (2) that a project’s consistency with the current AQMP be used to determine its potential cumulative impacts.
Project Specific Impacts
The project area is out of attainment for ozone, PM10, and PM2.5. Construction and operation of cumulative projects will further degrade the local air quality, as well as the air quality of the South Coast Air Basin. The greatest cumulative impact on the quality of regional air cell will be the incremental addition of pollutants mainly from increased traffic volumes from residential, commercial, and industrial development and the use of heavy equipment and trucks associated with the construction of these projects. Air quality will be temporarily degraded during construction activities that occur separately or simultaneously. However, in accordance with the SCAQMD methodology, projects that do not exceed the SCAQMD criteria or can be mitigated to less than criteria levels are not significant and do not add to the overall cumulative impact. This applies to TACs as well, as the SCAQMD does not have any cumulative TAC thresholds; therefore, projects that do not exceed the SCAQMD TAC threshold criteria or can be mitigated to less than criteria levels are not significant and do not add to the overall cumulative impact. A significant impact may occur if a project would add a cumulatively considerable contribution of a federal or state non-attainment pollutant.
Project operations would generate emissions of NOx, ROG, CO, PM10, and PM2.5, which would not exceed the SCAQMD regional or local thresholds and would not be expected to result in ground level concentrations that exceed the NAAQS or CAAQS. The project will not be a source of significant TACs and will not cause and significant cancer or non-cancer-related health risks. Since the project would not introduce any substantial stationary sources of emissions, CO is the benchmark pollutant for assessing local area air quality impacts from post-construction motor vehicle operations. As indicated earlier, no violations of the state and federal CO standards are projected to occur for the project, based on the magnitude of traffic the project is anticipated to create.
Therefore, operation of the project would not result in a cumulatively considerable net increase for non- attainment of criteria pollutants or ozone precursors, or TACs. As a result, the project would result in a less than significant cumulative impact for operational emissions.
Air Quality Compliance
The California Environmental Quality Act (CEQA) requires a discussion of any inconsistencies between a proposed project and applicable General Plans and Regional Plans (CEQA Guidelines Section 15125). The regional plan that applies to the proposed project includes the SCAQMD Air Quality Management Plan (AQMP). Therefore, this section discusses any potential inconsistencies of the proposed project with the AQMP.
The purpose of this discussion is to set forth the issues regarding consistency with the assumptions and objectives of the AQMP and discuss whether the proposed project would interfere with the region’s ability to
12 South Coast Air Quality Management District, Potential Control Strategies to Address Cumulative Impacts from Air Pollution White Paper, 1993, http://www.aqmd.gov/home/regulations/ceqa/air-quality-analysis-handbook. 39 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 40 19594
comply with Federal and State air quality standards. If the decision-makers determine that the proposed project is inconsistent, the lead agency may consider project modifications or inclusion of mitigation to eliminate the inconsistency.
The SCAQMD CEQA Handbook states that "New or amended General Plan Elements (including land use zoning and density amendments), Specific Plans, and significant projects must be analyzed for consistency with the AQMP". Strict consistency with all aspects of the plan is usually not required. A proposed project should be considered to be consistent with the AQMP if it furthers one or more policies and does not obstruct other policies. The SCAQMD CEQA Handbook identifies two key indicators of consistency:
(1) Whether the project will result in an increase in the frequency or severity of existing air quality violations or cause or contribute to new violations, or delay timely attainment of air quality standards or the interim emission reductions specified in the AQMP.
(2) Whether the project will exceed the assumptions in the AQMP in 2022 or increments based on the year of project buildout and phase.
Both of these criteria are evaluated in the following sections.
Criteria 1 – Increase in the Frequency or Severity of Violations
Based on the air quality modeling analysis contained in this Air Analysis, short-term construction impacts will not result in significant impacts based on the SCAQMD regional and local thresholds of significance. This Air Analysis also found that, long-term operations impacts will not result in significant impacts based on the SCAQMD local and regional thresholds of significance.
Therefore, the proposed project is not projected to contribute to the exceedance of any air pollutant concentration standards and is found to be consistent with the AQMP for the first criterion.
Criteria 2 – Exceed Assumptions in the AQMP?
Consistency with the AQMP assumptions is determined by performing an analysis of the proposed project with the assumptions in the AQMP. The emphasis of this criterion is to ensure that the analyses conducted for the proposed project are based on the same forecasts as the AQMP. The 2020-2045 Regional Transportation/Sustainable Communities Strategy prepared by SCAG (2020) includes chapters on: the challenges in a changing region, creating a plan for our future, and the road to greater mobility and sustainable growth. These chapters currently respond directly to federal and state requirements placed on SCAG. Local governments are required to use these as the basis of their plans for purposes of consistency with applicable regional plans under CEQA. For this project, the City of Orange Land Use Plan defines the assumptions that are represented in the AQMP.
The project site has a current land use designation of Low Density Residential (LDR) on the City of Orange General Plan Land Use Policy Map. The project proposes 13 single-family residential dwelling units on approximately 1.93 acres. The proposed project is consistent with the City’s R1-6 zoning designation; however, the site is currently zoned as R1-10. The project is not requesting an amendment to the zoning map to rezone the property as R1-6. In accordance with California Government Code Section 65589.5(j)(4), “For purposes of this section, a proposed housing development project is not inconsistent with the applicable zoning standards and criteria, and shall not require a rezoning, if the housing development project is consistent with the objective general plan standards and criteria but the zoning for the project site is inconsistent with the general plan.
If the local agency has complied with paragraph (2), the local agency may require the proposed housing development project to comply with the objective standards and criteria of the zoning which is consistent with the general plan, however, the standards and criteria shall be applied to facilitate and accommodate development at the density allowed on the site by the general plan and proposed by the proposed housing development project.” The California Department of Housing and Community Development (HCD) reaffirmed that cities could not require a rezone/reclassification in the Housing Accountability Act Technical Assistance Advisory, issued on September 40 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 41 19594
15, 2020. The project would comply with the R1-6 and PUD standards, as applicable. Furthermore, the SCAQMD acknowledges that strict consistency with all aspects of the AQMP is not required in order to make a finding of no conflict. Rather, a project is considered to be consistent with the AQMP if it furthers one or more policies and does not obstruct other policies. The project would implement contemporary energy- efficient technologies and regulatory/operational programs required per Title 24, CALGreen and City standards. Generally, compliance with SCAQMD emissions reductions and control requirements also act to reduce project air pollutant emissions. In combination, project emissions-reducing design features and regulatory/operational programs are consistent with and support overarching AQMP air pollution reduction strategies. Project support of these strategies promotes timely attainment of AQMP air quality standards and would bring the project into conformance with the AQMP. Therefore, the proposed project is not anticipated to exceed the AQMP assumptions for the project site and is found to be consistent with the AQMP for the second criterion.
Based on the above, the proposed project will not result in an inconsistency with the SCAQMD AQMP.
Therefore, a less than significant impact will occur.
41 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 42 19594
3. GLOBAL CLIMATE CHANGE ANALYSIS
EXISTING GREENHOUSE GAS ENVIRONMENT
Constituent gases of the Earth’s atmosphere, called atmospheric greenhouse gases (GHG), play a critical role in the Earth’s radiation amount by trapping infrared radiation emitted from the Earth’s surface, which otherwise would have escaped to space. Prominent greenhouse gases contributing to this process include carbon dioxide (CO 2), methane (CH 4), ozone, water vapor, nitrous oxide (N 2O), and chlorofluorocarbons (CFCs). This phenomenon, known as the Greenhouse Effect, is responsible for maintaining a habitable climate.
Anthropogenic (caused or produced by humans) emissions of these greenhouse gases in excess of natural ambient concentrations are responsible for the enhancement of the Greenhouse Effect and have led to a trend of unnatural warming of the Earth’s natural climate, known as global warming or climate change.
Emissions of gases that induce global warming are attributable to human activities associated with industrial/manufacturing, agriculture, utilities, transportation, and residential land uses. Transportation is responsible for 41 percent of the State’s greenhouse gas emissions, followed by electricity generation.
Emissions of CO 2 and nitrous oxide (NOx) are byproducts of fossil fuel combustion. Methane, a potent greenhouse gas, results from off-gassing associated with agricultural practices and landfills. Sinks of CO 2, where CO2 is stored outside of the atmosphere, include uptake by vegetation and dissolution into the ocean.
The following provides a description of each of the greenhouse gases and their global warming potential.
Water Vapor
Water vapor is the most abundant, important, and variable GHG in the atmosphere. Water vapor is not considered a pollutant; in the atmosphere it maintains a climate necessary for life. Changes in its concentration are primarily considered a result of climate feedbacks related to the warming of the atmosphere rather than a direct result of industrialization. The feedback loop in which water is involved is critically important to projecting future climate change. As the temperature of the atmosphere rises, more water is evaporated from ground storage (rivers, oceans, reservoirs, soil). Because the air is warmer, the relative humidity can be higher (in essence, the air is able to “hold” more water when it is warmer), leading to more water vapor in the atmosphere. As a GHG, the higher concentration of water vapor is then able to absorb more thermal indirect energy radiated from the Earth, thus further warming the atmosphere. The warmer atmosphere can then hold more water vapor and so on and so on. This is referred to as a “positive feedback loop”. The extent to which this positive feedback loop will continue is unknown as there is also dynamics that put the positive feedback loop in check. As an example, when water vapor increases in the atmosphere, more of it will eventually also condense into clouds, which are more able to reflect incoming solar radiation (thus allowing less energy to reach the Earth’s surface and heat it up).
Carbon Dioxide (CO2)
The natural production and absorption of CO 2 is achieved through the terrestrial biosphere and the ocean.
However, humankind has altered the natural carbon cycle by burning coal, oil, natural gas, and wood. Since the industrial revolution began in the mid-1700s. Each of these activities has increased in scale and distribution. CO2 was the first GHG demonstrated to be increasing in atmospheric concentration with the first conclusive measurements being made in the last half of the 20th century. Prior to the industrial revolution, concentrations were fairly stable at 280 parts per million (ppm). The International Panel on Climate Change (IPCC Fifth Assessment Report, 2014) Emissions of CO 2 from fossil fuel combustion and industrial processes contributed about 78% of the total GHG emissions increase from 1970 to 2010, with a similar percentage contribution for the increase during the period 2000 to 2010. Globally, economic and population growth continued to be the most important drivers of increases in CO 2 emissions from fossil fuel combustion. The contribution of population growth between 2000 and 2010 remained roughly identical to the previous three decades, while the contribution of economic growth has risen sharply.
42 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 43 19594
Methane (CH4)
CH4 is an extremely effective absorber of radiation, although its atmospheric concentration is less than that of CO2. Its lifetime in the atmosphere is brief (10 to 12 years), compared to some other GHGs (such as CO 2, N2O, and Chlorofluorocarbons (CFCs). CH4 has both natural and anthropogenic sources. It is released as part of the biological processes in low oxygen environments, such as in swamplands or in rice production (at the roots of the plants). Over the last 50 years, human activities such as growing rice, raising cattle, using natural gas, and mining coal have added to the atmospheric concentration of methane. Other anthropocentric sources include fossil-fuel combustion and biomass burning.
Nitrous Oxide (N2O)
Concentrations of N 2O also began to rise at the beginning of the industrial revolution. In 1998, the global concentration of this GHG was documented at 314 parts per billion (ppb). N 2O is produced by microbial processes in soil and water, including those reactions which occur in fertilizer containing nitrogen. In addition to agricultural sources, some industrial processes (fossil fuel-fired power plants, nylon production, nitric acid production, and vehicle emissions) also contribute to its atmospheric load. It is also commonly used as an aerosol spray propellant, (i.e., in whipped cream bottles, in potato chip bags to keep chips fresh, and in rocket engines and in race cars).
Chlorofluorocarbons (CFC)
CFCs are gases formed synthetically by replacing all hydrogen atoms in methane or ethane (C 2H6) with chlorine and/or fluorine atoms. CFCs are nontoxic, nonflammable, insoluble, and chemically unreactive in the troposphere (the level of air at the Earth’s surface). CFCs have no natural source, but were first synthesized in 1928. It was used for refrigerants, aerosol propellants, and cleaning solvents. Due to the discovery that they are able to destroy stratospheric ozone, a global effort to halt their production was undertaken and in 1989 the European Community agreed to ban CFCs by 2000 and subsequent treaties banned CFCs worldwide by 2010. This effort was extremely successful, and the levels of the major CFCs are now remaining level or declining. However, their long atmospheric lifetimes mean that some of the CFCs will remain in the atmosphere for over 100 years.
Hydrofluorocarbons (HFC)
HFCs are synthetic man-made chemicals that are used as a substitute for CFCs. Out of all the GHGs, they are one of three groups with the highest global warming potential. The HFCs with the largest measured atmospheric abundances are (in order), HFC-23 (CHF 3), HFC-134a (CF 3CH2F), and HFC-152a (CH 3CHF2).
Prior to 1990, the only significant emissions were HFC-23. HFC-134a use is increasing due to its use as a refrigerant. Concentrations of HFC-23 and HFC-134a in the atmosphere are now about 10 parts per trillion (ppt) each. Concentrations of HFC-152a are about 1 ppt. HFCs are manmade for applications such as automobile air conditioners and refrigerants.
Perfluorocarbons (PFC)
PFCs have stable molecular structures and do not break down through the chemical processes in the lower atmosphere. High-energy ultraviolet rays about 60 kilometers above Earth’s surface are able to destroy the compounds. Because of this, PFCs have very long lifetimes, between 10,000 and 50,000 years. Two common PFCs are tetrafluoromethane (CF4) and hexafluoroethane (C2F6). Concentrations of CF4 in the atmosphere are over 70 ppt. The two main sources of PFCs are primary aluminum production and semiconductor manufacturing.
43 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 44 19594
Sulfur Hexafluoride (SF6)
SF6 is an inorganic, odorless, colorless, nontoxic, nonflammable gas. SF 6 has the highest global warming potential of any gas evaluated; 23,900 times that of CO 2. Concentrations in the 1990s were about 4 ppt.
Sulfur hexafluoride is used for insulation in electric power transmission and distribution equipment, in the magnesium industry, in semiconductor manufacturing, and as a tracer gas for leak detection.
Aerosols
Aerosols are particles emitted into the air through burning biomass (plant material) and fossil fuels. Aerosols can warm the atmosphere by absorbing and emitting heat and can cool the atmosphere by reflecting light.
Cloud formation can also be affected by aerosols. Sulfate aerosols are emitted when fuel containing sulfur is burned. Black carbon (or soot) is emitted during biomass burning due to the incomplete combustion of fossil fuels. Particulate matter regulation has been lowering aerosol concentrations in the United States; however, global concentrations are likely increasing.
Global Warming Potential
The Global Warming Potential (GWP) was developed to allow comparisons of the global warming impacts of different gases. Specifically, it is a measure of how much energy the emissions of 1 ton of a gas will absorb over a given period of time, relative to the emissions of 1 ton of carbon dioxide (CO 2). The larger the GWP, the more that a given gas warms the Earth compared to CO 2 over that time period. The time period usually used for GWPs is 100 years. GWPs provide a common unit of measure, which allows analysts to add up emissions estimates of different gases (e.g., to compile a national GHG inventory), and allows policymakers to compare emissions reduction opportunities across sectors and gases. A summary of the atmospheric lifetime and the global warming potential of selected gases are summarized in Table 10. As shown in Table 10, the global warming potential of GHGs ranges from 1 to 22,800.
44 Atmospheric Lifetime
Global Warming Potential
(100 Year Horizon)
__ 2 1
12 28-36
114 298
1-270 12-14,800
2,600-50,000 7,390-12,200
740 17,200
3,200 22,800
Notes:
Source: http://www3.epa.gov/climatechange/ghgemissions/gases.html (1) Compared to the same quantity of CO 2 emissions.
(2)
Table 10
Global Warming Potentials and Atmospheric Lifetimes
Carbon dioxide's lifetime is poorly defined because the gas is not destroyed over time, but instead moves among different parts of the ocean–atmosphere–land system. Some of the excess carbon dioxide will be absorbed quickly (for example, by the ocean surface), but some will remain in the atmosphere for thousands of years, due in part to the very slow process by which carbon is transferred to ocean sediments.
Gas
Carbon Dioxide (CO2)
Methane (CH4)
Nitrous Oxide (NO)
Hydrofluorocarbons (HFCs)
Perfluorocarbons (PFCs)
Nitrogen trifluoride (NF3)
Sulfur Hexafluoride (SF6)
Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 19594
45 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 46 19594
GREENHOUSE GAS STANDARDS AND REGULATION
International
Montreal Protocol
In 1988, the United Nations established the Intergovernmental Panel on Climate Change (IPCC) to evaluate the impacts of global climate change and to develop strategies that nations could implement to curtail global climate change. In 1992, the United States joined other countries around the world in signing the United Nations’ Framework Convention on Climate Change (UNFCCC) agreement with the goal of controlling GHG emissions. As a result, the Climate Change Action Plan was developed to address the reduction of GHGs in the United States. The plan consists of more than 50 voluntary programs.
Additionally, the Montreal Protocol was originally signed in 1987 and substantially amended in 1990 and 1992. The Montreal Protocol stipulates that the production and consumption of compounds that deplete ozone in the stratosphere—CFCs, halons, carbon tetrachloride, and methyl chloroform—were to be phased out, with the first three by the year 2000 and methyl chloroform by 2005.
The Paris Agreement
The Paris Agreement became effective on November 4, 2016. Thirty days after this date at least 55 Parties to the United Nations Framework Convention on Climate Change (Convention), accounting in total for at least an estimated 55 % of the total global greenhouse gas emissions, had deposited their instruments of ratification, acceptance, approval or accession with the Depositary.
The Paris Agreement built upon the Convention and – for the first time – attempted to bring all nations into a common cause to undertake ambitious efforts to combat climate change and adapt to its effects, with enhanced support to assist developing countries to do so. As such, it charts a new course in the global climate effort.
The Paris Agreement’s central aim is to strengthen the global response to the threat of climate change by keeping a global temperature rise this century well below 2 degrees Celsius above pre-industrial levels and to pursue efforts to limit the temperature increase even further to 1.5 degrees Celsius. Additionally, the agreement aims to strengthen the ability of countries to deal with the impacts of climate change. To reach these ambitious goals, appropriate financial flows, a new technology framework and an enhanced capacity building framework will be put in place, thus supporting action by developing countries and the most vulnerable countries, in line with their own national objectives. The Agreement also provides for enhanced transparency of action and support through a more robust transparency framework.
Federal
The United States Environmental Protection Agency (USEPA) is responsible for implementing federal policy to address GHGs. The federal government administers a wide array of public-private partnerships to reduce the GHG intensity generated in the United States. These programs focus on energy efficiency, renewable energy, methane and other non-CO2 gases, agricultural practices, and implementation of technologies to achieve GHG reductions. The USEPA implements numerous voluntary programs that contribute to the reduction of GHG emissions. These programs (e.g., the ENERGY STAR labeling system for energy-efficient products) play a significant role in encouraging voluntary reductions from large corporations, consumers, industrial and commercial buildings, and many major industrial sectors.
In Massachusetts v. Environmental Protection Agency (Docket No. 05–1120), argued November 29, 2006 and decided April 2, 2007, the U.S. Supreme Court held that not only did the EPA have authority to regulate greenhouse gases, but the EPA's reasons for not regulating this area did not fit the statutory requirements. As 46 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 47 19594
such, the U.S. Supreme Court ruled that the EPA should be required to regulate CO 2 and other greenhouse gases as pollutants under the federal Clean Air Act (CAA).
In response to the FY2008 Consolidations Appropriations Act (H.R. 2764; Public Law 110-161), EPA proposed a rule on March 10, 2009 that requires mandatory reporting of GHG emissions from large sources in the United States. On September 22, 2009, the Final Mandatory Reporting of GHG Rule was signed and published in the Federal Register on October 30, 2009. The rule became effective on December 29, 2009. This rule requires suppliers of fossil fuels or industrial GHGs, manufacturers of vehicles and engines, and facilities that emit 25,000 metric tons or more per year of GHG emissions to submit annual reports to EPA.
On December 7, 2009, the EPA Administrator signed two distinct findings under section 202(a) of the Clean Air Act. One is an endangerment finding that finds concentrations of the six GHGs in the atmosphere threaten the public health and welfare of current and future generations. The other is a cause or contribute finding, that finds emissions from new motor vehicles and new motor vehicle engines contribute to the GHG pollution which threatens public health and welfare. These actions will not themselves impose any requirements on industry or other entities. However, it is a prerequisite to finalizing the EPA’s proposed GHG emission standards for light-duty vehicles, which were jointly proposed by the EPA and Department of Transportation on September 15, 2009.
Clean Air Act
In Massachusetts v. Environmental Protection Agency (Docket No. 05–1120), the U.S. Supreme Court held in April of 2007 that the USEPA has statutory authority under Section 202 of the federal Clean Air Act (CAA) to regulate GHGs. The court did not hold that the USEPA was required to regulate GHG emissions; however, it indicated that the agency must decide whether GHGs cause or contribute to air pollution that is reasonably anticipated to endanger public health or welfare. On December 7, 2009, the USEPA Administrator signed two distinct findings regarding GHGs under Section 202(a) of the CAA. The USEPA adopted a Final Endangerment finding for the six defined GHGs (CO 2, CH 4, N 2O, HFCs, PFCs, and SF 6) on December 7, 2009. The Endangerment Finding is required before USEPA can regulate GHG emissions under Section 202(a)(1) of the CAA consistently with the United States Supreme Court decision. The USEPA also adopted a Cause or Contribute Finding in which the USEPA Administrator found that GHG emissions from new motor vehicle and motor vehicle engines are contributing to air pollution, which is endangering public health and welfare. These findings do not, by themselves, impose any requirements on industry or other entities. However, these actions were a prerequisite for implementing GHG emissions standards for vehicles.
Energy Independence Security Act
The Energy Independence and Security Act of 2007 (EISA) facilitates the reduction of national GHG emissions by requiring the following:
Increasing the supply of alternative fuel sources by setting a mandatory Renewable Fuel Standard (RFS) that requires fuel producers to use at least 36 billion gallons of biofuel in 2022; Prescribing or revising standards affecting regional efficiency for heating and cooling products, procedures for new or amended standards, energy conservation, energy efficiency labeling for consumer electronic products, residential boiler efficiency, electric motor efficiency, and home appliances;
Requiring approximately 25 percent greater efficiency for light bulbs by phasing out incandescent light bulbs between 2012 and 2014; requiring approximately 200 percent greater efficiency for light bulbs, or similar energy savings, by 2020; and
While superseded by the USEPA and NHTSA actions described above, (i) establishing miles per gallon targets for cars and light trucks and (ii) directing the NHTSA to establish a fuel economy program for medium- and heavy-duty trucks and create a separate fuel economy standard for trucks. 47 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 48 19594
Additional provisions of EISA address energy savings in government and public institutions, promote research for alternative energy, additional research in carbon capture, international energy programs, and the creation of green jobs.13
Executive Order 13432
In response to the Massachusetts v. Environmental Protection Agency ruling, the President signed Executive Order 13432 on May 14, 2007, directing the USEPA, along with the Departments of Transportation, Energy, and Agriculture, to initiate a regulatory process that responds to the Supreme Court’s decision. Executive Order 13432 was codified into law by the 2009 Omnibus Appropriations Law signed on February 17, 2009.
The order sets goals in the areas of energy efficiency, acquisition, renewable energy, toxics reductions, recycling, sustainable buildings, electronics stewardship, fleets, and water conservation. Light-Duty Vehicle Greenhouse Gas and Corporate Average Fuel Economy Standards.
On May 19, 2009, President Obama announced a national policy for fuel efficiency and emissions standards in the United States auto industry. The adopted federal standard applies to passenger cars and light-duty trucks for model years 2012 through 2016. The rule surpasses the prior Corporate Average Fuel Economy standards (CAFE)14 and requires an average fuel economy standard of 35.5 miles per gallon (mpg) and 250 grams of CO2 per mile by model year 2016, based on USEPA calculation methods. These standards were formally adopted on April 1, 2010. In August 2012, standards were adopted for model year 2017 through 2025 for passenger cars and light-duty trucks. By 2025, vehicles are required to achieve 54.5 mpg (if GHG reductions are achieved exclusively through fuel economy improvements) and 163 grams of CO2 per mile.
According to the USEPA, a model year 2025 vehicle would emit one-half of the GHG emissions from a model year 2010 vehicle. 15 In 2017, the USEPA recommended no change to the GHG standards for light-duty vehicles for model years 2022-2025.
Issued by NHTSA and EPA in March 2020 (published on April 30, 2020 and effective after June 29, 2020), the Safer Affordable Fuel-Efficient Vehicles Rule would maintain the CAFE and CO2 standards applicable in model year 2020 for model years 2021 through 2026. The estimated CAFE and CO2 standards for model year 2020 are 43.7 mpg and 204 grams of CO2 per mile for passenger cars and 31.3 mpg and 284 grams of CO2 per mile for light trucks, projecting an overall industry average of 37 mpg, as compared to 46.7 mpg under the standards issued in 2012. This Rule also excludes CO2- equivalent emission improvements associated with air conditioning refrigerants and leakage (and, optionally, offsets for nitrous oxide and methane emissions) after model year 2020.16
State of California
California Air Resources Board
CARB, a part of the California Environmental Protection Agency (CalEPA), is responsible for the coordination and administration of both federal and state air pollution control programs within California. In this capacity,
13 A green job, as defined by the United States Department of Labor, is a job in business that produces goods or provides services that benefit the environment or conserve natural resources.
14 The Corporate Average Fuel Economy standards are regulations in the United States, first enacted by Congress in 1975, to improve the average fuel economy of cars and light trucks. The U.S Department of Transportation has delegated the National Highway Traffic Safety Administration as the regulatory agency for the Corporate Average Fuel Economy standards. 15 United States Environmental Protection Agency, EPA and NHTSA Set Standards to Reduce Greenhouse Gases and Improve Fuel Economy for Model Years 2017-2025 Cars and Light Trucks, August 2012, https://nepis.epa.gov/Exe/ZyPDF.cgi/P100EZ7C.PDF?Dockey=P100EZ7C.PDF. 16 National Highway Traffic Safety Administration (NHTSA) and U.S. Environmental Protection Agency (USEPA), 2018. Federal Register / Vol. 83, No. 165 / Friday, August 24, 2018 / Proposed Rules, The Safer Affordable Fuel-Efficient (SAFE) Vehicles Rule for Model Years 2021–2026 Passenger Cars and Light Trucks 2018. Available at: https://www.gpo.gov/fdsys/pkg/FR-2018-08-24/pdf/2018- 16820.pdf.
48 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 49 19594
CARB conducts research, sets state ambient air quality standards (California Ambient Air Quality Standards [CAAQS]), compiles emission inventories, develops suggested control measures, and provides oversight of local programs. CARB establishes emissions standards for motor vehicles sold in California, consumer products (such as hairspray, aerosol paints, and barbecue lighter fluid), and various types of commercial equipment. It also sets fuel specifications to further reduce vehicular emissions.
In 2004, the California Air Resources Board (CARB) adopted an Airborne Toxic Control Measure to limit heavy- duty diesel motor vehicle idling in order to reduce public exposure to diesel particulate matter and other toxic air contaminants (Title 13 California Code of Regulations [CCR], Section 2485). The measure applies to diesel- fueled commercial vehicles with gross vehicle weight ratings greater than 10,000 pounds that are licensed to operate on highways, regardless of where they are registered. This measure generally does not allow diesel- fueled commercial vehicles to idle for more than 5 minutes at any given location with certain exemptions for equipment in which idling is a necessary function such as concrete trucks. While this measure primarily targets diesel particulate matter emissions, it has co-benefits of minimizing GHG emissions from unnecessary truck idling.
In 2008, CARB approved the Truck and Bus regulation to reduce particulate matter and nitrogen oxide emissions from existing diesel vehicles operating in California (13 CCR, Section 2025, subsection (h)). CARB has also promulgated emission standards for off-road diesel construction equipment of greater than 25 horsepower such as bulldozers, loaders, backhoes and forklifts, as well as many other self-propelled off-road diesel vehicles. The regulation, adopted by the CARB on July 26, 2007, aims to reduce emissions by installation of diesel soot filters and encouraging the retirement, replacement, or repower of older, dirtier engines with newer emission-controlled models. While these regulations primarily target reductions in criteria air pollutant emission, they have co-benefits of minimizing GHG emissions due to improved engine efficiencies.
The State currently has no regulations that establish ambient air quality standards for GHGs. However, the State has passed laws directing CARB to develop actions to reduce GHG emissions, which are listed below.
Assembly Bill 1493
California Assembly Bill 1493 enacted on July 22, 2002, required the CARB to develop and adopt regulations that reduce GHGs emitted by passenger vehicles and light duty trucks. In 2005, the CARB submitted a “waiver” request to the EPA from a portion of the federal Clean Air Act in order to allow the State to set more stringent tailpipe emission standards for CO2 and other GHG emissions from passenger vehicles and light duty trucks. On December 19, 2007 the EPA announced that it denied the “waiver” request. On January 21, 2009, CARB submitted a letter to the EPA administrator regarding the State’s request to reconsider the waiver denial. The EPA approved the waiver on June 30, 2009.
Executive Order S-3-05
The California Governor issued Executive Order S-3-05, GHG Emission, in June 2005, which established the following reduction targets:
By 2010, California shall reduce GHG emissions to 2000 levels; By 2020, California shall reduce GHG emissions to 1990 levels; and By 2050, California shall reduce GHG emissions to 80 percent below 1990 levels.
The Executive Order directed the secretary of the California Environmental Protection Agency (CalEPA) to coordinate a multi-agency effort to reduce GHG emissions to the target levels. To comply with the Executive Order, the secretary of CalEPA created the California Climate Action Team (CAT), made up of members from various state agencies and commissions. The team released its first report in March 2006. The report proposed 49 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 50 19594
to achieve the targets by building on the voluntary actions of businesses, local governments, and communities and through State incentive and regulatory programs.
Assembly Bill 32 (California Health and Safety Code, Division 25.5 – California Global Warming Solutions Act of 2006)
In 2006, the California State Legislature adopted Assembly Bill (AB) 32 (codified in the California Health and Safety Code [HSC], Division 25.5 – California Global Warming Solutions Act of 2006), which focuses on reducing GHG emissions in California to 1990 levels by 2020. HSC Division 25.5 defines GHGs as CO2, CH4, N2O, HFCs, PFCs, and SF6 and represents the first enforceable statewide program to limit emissions of these GHGs from all major industries with penalties for noncompliance. The law further requires that reduction measures be technologically feasible and cost effective. Under HSC Division 25.5, CARB has the primary responsibility for reducing GHG emissions. CARB is required to adopt rules and regulations directing state actions that would achieve GHG emissions reductions equivalent to 1990 statewide levels by 2020.
Senate Bill 32 and Assembly Bill 197
In 2016, the California State Legislature adopted Senate Bill (SB) 32 and its companion bill AB 197, and both were signed by Governor Brown. SB 32 and AB 197 amends HSC Division 25.5 and establishes a new climate pollution reduction target of 40 percent below 1990 levels by 2030 and includes provisions to ensure the benefits of state climate policies reach into disadvantaged communities.
Climate Change Scoping Plan (2008)
A specific requirement of AB 32 was to prepare a Climate Change Scoping Plan for achieving the maximum technologically feasible and cost-effective GHG emission reduction by 2020 (Health and Safety Code section 38561 (h)). CARB developed an AB 32 Scoping Plan that contains strategies to achieve the 2020 emissions cap. The initial Scoping Plan was approved in 2008 and contains a mix of recommended strategies that combined direct regulations, market-based approaches, voluntary measures, policies, and other emission reduction programs calculated to meet the 2020 statewide GHG emission limit and initiate the transformations needed to achieve the State’s long-range climate objectives.
As required by HSC Division 25.5, CARB approved the 1990 GHG emissions inventory, thereby establishing the emissions limit for 2020. The 2020 emissions limit was originally set at 427 MMTCO 2e using the GWP values from the IPCC SAR. CARB also projected the state’s 2020 GHG emissions under no-action-taken (NAT) conditions – that is, emissions that would occur without any plans, policies, or regulations to reduce GHG emissions. CARB originally used an average of the state’s GHG emissions from 2002 through 2004 and projected the 2020 levels at approximately 596 MMTCO2e (using GWP values from the IPCC SAR). Therefore, under the original projections, the state must reduce its 2020 NAT emissions by 28.4 percent in order to meet the 1990 target of 427 MMTCO2e.
First Update to the Climate Change Scoping Plan (2014)
The First Update to the Scoping Plan was approved by CARB in May 2014 and builds upon the initial Scoping Plan with new strategies and recommendations. In 2014, CARB revised the target using the GWP values from the IPCC AR4 and determined that the 1990 GHG emissions inventory and 2020 GHG emissions limit is 431 MMTCO2e. CARB also updated the State’s 2020 NAT emissions estimate to account for the effect of the 2007–2009 economic recession, new estimates for future fuel and energy demand, and the reductions required by regulation that were recently adopted for motor vehicles and renewable energy. CARB’s projected statewide 2020 emissions estimate using the GWP values from the IPCC AR4 is 509.4 MMTCO 2e.
50 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 51 19594
2017 Climate Change Scoping Plan
In response to the 2030 GHG reduction target, CARB adopted the 2017 Climate Change Scoping Plan at a public meeting held in December 2017. The 2017 Scoping Plan outlines the strategies the State will implement to achieve the 2030 GHG reduction target of 40 percent below 1990 levels. The 2017 Scoping Plan also addresses GHG emissions from natural and working lands of California, including the agriculture and forestry sectors. The 2017 Scoping Plan considered the Scoping Plan Scenario and four alternatives for achieving the required GHG reductions but ultimately selected the Scoping Plan Scenario.
CARB states that the Scoping Plan Scenario “is the best choice to achieve the State’s climate and clean air goals.”17 Under the Scoping Plan Scenario, the majority of the reductions would result from the continuation of the Cap-and-Trade regulation. Additional reductions are achieved from electricity sector standards (i.e., utility providers to supply at least 50 percent renewable electricity by 2030), doubling the energy efficiency savings at end uses, additional reductions from the LCFS, implementing the short-lived GHG strategy (e.g., hydrofluorocarbons), and implementing the mobile source strategy and sustainable freight action plan. The alternatives were designed to consider various combinations of these programs, as well as consideration of a carbon tax in the event the Cap-and-Trade regulation is not continued. However, in July 2017, the California Legislature voted to extend the Cap-and-Trade regulation to 2030. Implementing this Scoping Plan will ensure that California’s climate actions continue to promote innovation, drive the generation of new jobs, and achieve continued reductions of smog and air toxics. The ambitious approach draws on a decade of successful programs that address the major sources of climate-changing gases in every sector of the economy:
More Clean Cars and Trucks: The plan sets out far-reaching programs to incentivize the sale of millions of zero-emission vehicles, drive the deployment of zero-emission trucks, and shift to a cleaner system of handling freight statewide.
Increased Renewable Energy: California’s electric utilities are ahead of schedule meeting the requirement that 33 percent of electricity come from renewable sources by 2020. The Scoping Plan guides utilities to 50 percent renewables, as required under SB 350. Slashing Super-Pollutants: The plan calls for a significant cut in super-pollutants such as methane and HFC refrigerants, which are responsible for as much as 40 percent of global warming. Cleaner Industry and Electricity: California’s renewed cap-and-trade program extends the declining cap on emissions from utilities and industries and the carbon allowance auctions. The auctions will continue to fund investments in clean energy and efficiency, particularly in disadvantaged communities. Cleaner Fuels: The Low Carbon Fuel Standard will drive further development of cleaner, renewable transportation fuels to replace fossil fuels.
Smart Community Planning: Local communities will continue developing plans which will further link transportation and housing policies to create sustainable communities. Improved Agriculture and Forests: The Scoping Plan also outlines innovative programs to account for and reduce emissions from agriculture, as well as forests and other natural lands.
The 2017 Scoping Plan also evaluates reductions of smog-causing pollutants through California’s climate programs.
2022 Climate Change Scoping Plan
CARB adopted the 2022 Scoping Plan for Achieving Carbon Neutrality on November 16, 2022. The 2022 Scoping Plan lays out the sector-by-sector roadmap for California, the world’s fifth largest economy, to achieve
17 California Air Resources Board, California’s 2017 Climate Change Scoping Plan, November 2017, https://www.arb.ca.gov/cc/scopingplan/scoping_plan_2017.pdf 51 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 52 19594
carbon neutrality by 2045 or earlier, outlining a technologically feasible, cost-effective, and equity-focused path to achieve the state’s climate target. The Plan addresses recent legislation and direction from Governor Newsom and extends and expands upon earlier plans with a target of reducing anthropogenic emissions to 85 percent below 1990 levels by 2045. The plan also takes the unprecedented step of adding carbon neutrality as a science-based guide and touchstone for California’s climate work. Specifically, this plan:
Identifies a path to keep California on track to meet its SB 32 GHG reduction target of at least 40 percent below 1990 emissions by 2030.
Identifies a technologically feasible, cost-effective path to achieve carbon neutrality by 2045 and a reduction in anthropogenic emissions by 85 percent below 1990 levels. Focuses on strategies for reducing California’s dependency on petroleum to provide consumers with clean energy options that address climate change, improve air quality, and support economic growth and clean sector jobs.
Integrates equity and protecting California’s most impacted communities as driving principles throughout the document.
Incorporates the contribution of natural and working lands (NWL) to the state’s GHG emissions, as well as their role in achieving carbon neutrality.
Relies on the most up-to-date science, including the need to deploy all viable tools to address the existential threat that climate change presents, including carbon capture and sequestration, as well as direct air capture.
Evaluates the substantial health and economic benefits of taking action. Identifies key implementation actions to ensure success.
SB 32, Pavley. California Global Warming Solutions Act of 2006
(1) The California Global Warming Solutions Act of 2006 designates the State Air Resources Board as the state agency charged with monitoring and regulating sources of emissions of greenhouse gases. The state board is required to approve a statewide greenhouse gas emissions limit equivalent to the statewide greenhouse gas emissions level in 1990 to be achieved by 2020 and to adopt rules and regulations in an open public process to achieve the maximum, technologically feasible, and cost-effective greenhouse gas emissions reductions. This bill would require the state board to ensure that statewide greenhouse gas emissions are reduced to 40% below the 1990 level by 2030. (2) This bill would become operative only if AB 197 of the 2015–16 Regular Session is enacted and becomes effective on or before January 1, 2017. AB 197 requires that the California Air Resources Board, which directs implementation of emission-reduction programs, should target direct reductions at both stationary and mobile sources. AB 197 of the 2015-2016 Regular Session was approved on September 8, 2016.
Executive Order S-1-07
Executive Order S-1-07 was issued in 2007 and proclaims that the transportation sector is the main source of GHG emissions in the State, since it generates more than 40 percent of the State’s GHG emissions. It establishes a goal to reduce the carbon intensity of transportation fuels sold in the State by at least ten percent by 2020. This Order also directs the CARB to determine whether this Low Carbon Fuel Standard (LCFS) could be adopted as a discrete early-action measure as part of the effort to meet the mandates in AB 32.
On April 23, 2009, the CARB approved the proposed regulation to implement the low carbon fuel standard.
The low carbon fuel standard is anticipated to reduce GHG emissions by about 16 MMT per year by 2020.
The low carbon fuel standard is designed to provide a framework that uses market mechanisms to spur the steady introduction of lower carbon fuels. The framework establishes performance standards that fuel 52 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 53 19594
producers and importers must meet each year beginning in 2011. Separate standards are established for gasoline and diesel fuels and the alternative fuels that can replace each. The standards are “back-loaded”, with more reductions required in the last five years, than during the first five years. This schedule allows for the development of advanced fuels that are lower in carbon than today’s fuels and the market penetration of plug-in hybrid electric vehicles, battery electric vehicles, fuel cell vehicles, and flexible fuel vehicles. It is anticipated that compliance with the low carbon fuel standard will be based on a combination of both lower carbon fuels and more efficient vehicles.
Reformulated gasoline mixed with corn-derived ethanol at ten percent by volume and low sulfur diesel fuel represent the baseline fuels. Lower carbon fuels may be ethanol, biodiesel, renewable diesel, or blends of these fuels with gasoline or diesel as appropriate. Compressed natural gas and liquefied natural gas also may be low carbon fuels. Hydrogen and electricity, when used in fuel cells or electric vehicles are also considered as low carbon fuels for the low carbon fuel standard.
Senate Bill 97
Senate Bill 97 (SB 97) was adopted August 2007 and acknowledges that climate change is a prominent environmental issue that requires analysis under CEQA. SB 97 directed the Governor’s Office of Planning and Research (OPR), which is part of the State Natural Resources Agency, to prepare, develop, and transmit to the CARB guidelines for the feasible mitigation of GHG emissions or the effects of GHG emissions, as required by CEQA, by July 1, 2009. The Natural Resources Agency was required to certify and adopt those guidelines by January 1, 2010.
Pursuant to the requirements of SB 97 as stated above, on December 30, 2009, the Natural Resources Agency adopted amendments to the state CEQA guidelines that address GHG emissions. The CEQA Guidelines Amendments changed 14 sections of the CEQA Guidelines and incorporate GHG language throughout the Guidelines. However, no GHG emissions thresholds of significance were provided and no specific mitigation measures were identified. The GHG emission reduction amendments went into effect on March 18, 2010, and are summarized below:
Climate action plans and other greenhouse gas reduction plans can be used to determine whether a project has significant impacts, based upon its compliance with the plan. Local governments are encouraged to quantify the greenhouse gas emissions of proposed projects, noting that they have the freedom to select the models and methodologies that best meet their needs and circumstances. The section also recommends consideration of several qualitative factors that may be used in the determination of significance, such as the extent to which the given project complies with state, regional, or local GHG reduction plans and policies. OPR does not set or dictate specific thresholds of significance. Consistent with existing CEQA Guidelines, OPR encourages local governments to develop and publish their own thresholds of significance for GHG impacts assessment. When creating their own thresholds of significance, local governments may consider the thresholds of significance adopted or recommended by other public agencies, or recommended by experts. New amendments include guidelines for determining methods to mitigate the effects of greenhouse gas emissions in Appendix F of the CEQA Guidelines.
OPR is clear to state that “to qualify as mitigation, specific measures from an existing plan must be identified and incorporated into the project; general compliance with a plan, by itself, is not mitigation”. OPR’s emphasizes the advantages of analyzing GHG impacts on an institutional, programmatic level.
OPR therefore approves tiering of environmental analyses and highlights some benefits of such an approach.
Environmental impact reports (EIRs) must specifically consider a project's energy use and energy efficiency potential.
53 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 54 19594
Senate Bill 100
Senate Bill 100 (SB 100) requires 100 percent of total retail sales of electricity in California to come from eligible renewable energy resources and zero-carbon resources by December 31, 2045. SB 100 was adopted September 2018.
The interim thresholds from prior Senate Bills and Executive Orders would also remain in effect. These include Senate Bill 1078 (SB 1078), which requires retail sellers of electricity, including investor-owned utilities and community choice aggregators, to provide at least 20 percent of their supply from renewable sources by 2017. Senate Bill 107 (SB 107) which changed the target date to 2010. Executive Order S-14-08, which was signed on November 2008 and expanded the State’s Renewable Energy Standard to 33 percent renewable energy by 2020. Executive Order S-21-09 directed the CARB to adopt regulations by July 31, 2010 to enforce S-14-08. Senate Bill X1-2 codifies the 33 percent renewable energy requirement by 2020.
Senate Bill 375
Senate Bill 375 (SB 375) was adopted September 2008 and aligns regional transportation planning efforts, regional GHG emission reduction targets, and land use and housing allocation. SB 375 requires Metropolitan Planning Organizations (MPO) to adopt a sustainable communities strategy (SCS) or alternate planning strategy (APS) that will prescribe land use allocation in that MPOs Regional Transportation Plan (RTP). The CARB, in consultation with each MPO, will provide each affected region with reduction targets for GHGs emitted by passenger cars and light trucks in the region for the years 2020 and 2035. These reduction targets will be updated every eight years but can be updated every four years if advancements in emissions technologies affect the reduction strategies to achieve the targets. The CARB is also charged with reviewing each MPO’s sustainable communities strategy or alternate planning strategy for consistency with its assigned targets.
The proposed project is located within the Southern California Association of Governments (SCAG) jurisdiction, which has authority to develop the SCS or APS. For the SCAG region, the targets set by the CARB are at eight percent below 2005 per capita GHG emissions levels by 2020 and 19 percent below 2005 per capita GHG emissions levels by 2035. These reduction targets became effective October 2018.
Senate Bill X7-7
Senate Bill X7-7 (SB X7-7), enacted on November 9, 2009, mandates water conservation targets and efficiency improvements for urban and agricultural water suppliers. SB X7-7 requires the Department of Water Resources (DWR) to develop a task force and technical panel to develop alternative best management practices for the water sector. In addition, SB X7-7 required the DWR to develop criteria for baseline uses for residential, commercial, and industrial uses for both indoor and landscaped area uses. The DWR was also required to develop targets and regulations that achieve a statewide 20 percent reduction in water usage.
Assembly Bill 939 and Senate Bill 1374
Assembly Bill 939 (AB 939) requires that each jurisdiction in California to divert at least 50 percent of its waste away from landfills, whether through waste reduction, recycling or other means. Senate Bill 1374 (SB 1374) requires the California Integrated Waste Management Board to adopt a model ordinance by March 1, 2004, suitable for adoption by any local agency to require 50 to 75 percent diversion of construction and demolition of waste materials from landfills.
California Code of Regulations (CCR) Title 24, Part 6
CCR Title 24, Part 6: California’s Energy Efficiency Standards for Residential and Nonresidential Buildings (Title 24) were first established in 1978 in response to a legislative mandate to reduce California’s energy consumption. The standards are updated periodically to allow consideration and possible incorporation of new 54 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 55 19594
energy efficiency technologies and methods. Although it was not originally intended to reduce GHG emissions, electricity production by fossil fuels results in GHG emissions and energy efficient buildings require less electricity. Therefore, increased energy efficiency results in decreased GHG emissions.
The Energy Commission adopted 2008 Standards on April 23, 2008, and Building Standards Commission approved them for publication on September 11, 2008. These updates became effective on August 1, 2009. 2013 Standards were approved and have been effective since July 1, 2014. 2016 Standards were adopted January 1, 2017. 2019 standards were published July 1, 2019 and became effective January 1, 2020. The 2016 residential standards were estimated to be approximately 28 percent more efficient than the 2013 standards, whereas the 2019 residential standards are estimated to be approximately 7 percent more efficient than the 2016 standards. Furthermore, once rooftop solar electricity generation is factored in, 2019 residential standards are estimated to be approximately 53 percent more efficient than the 2016 standards.
Under the 2019 standards, nonresidential buildings are estimated to be approximately 30 percent more efficient than the 2016 standards. Energy efficient buildings require less electricity; therefore, increased energy efficiency reduces fossil fuel consumption and decreases greenhouse gas emissions.
Per Section 100 Scope, the 2019 Title 24, Part 6 Building Code now requires healthcare facilities, such as assisted living facilities, hospitals, and nursing homes, to meet documentation requirements of Title 24, Part 1 Chapter 7 – Safety Standards for Health Facilities. A healthcare facility is defined as any building or portion thereof licensed pursuant to California Health and Safety Code Division 2, Chapter 1, Section 1204 or Chapter 2, Section 1250.
Section 120.1 Ventilation and Indoor Air Quality included both additions and revisions in the 2019 Code. This section now requires nonresidential and hotel/motel buildings to have air filtration systems that use forced air ducts to supply air to occupiable spaces to have air filters. Further, the air filter efficiency must be either MERV 13 or use a particle size efficiency rating specific in the Energy Code AND be equipped with air filters with a minimum 2-inch depth or minimum 1-inch depth if sized according to the equation 120.1-A. If natural ventilation is to be used the space must also use mechanical unless ventilation openings are either permanently open or controlled to stay open during occupied times. The 2019 version of the Code also completely revised the minimum ventilation requirements including DVC airflow rates within Section 120.1 Table 120.1–A. Table 120.1-A now includes air classification and recirculation limitations, these are based on either the number of occupants or the CFM/ft2 (cubic feet per minute per square foot), whichever is greater.
Section 120.1 Ventilation and Indoor Air Quality also included additions for high-rise residential buildings.
Requirements include that mechanical systems must provide air filters that and that air filters must be MERV 13 or use a particle size efficiency rating specified in the Energy Code. Window operation is no longer a method allowed to meet ventilation requirements, continuous operation of central forced air system handlers used in central fan integrated ventilation system is not a permissible method of providing the dwelling unit ventilation airflow, and central ventilation systems that serve multiple dwelling units must be balanced to provide ventilation airflow to each dwelling unit. In addition, requirements for kitchen range hoods were also provided in the updated Section 120.1.
Per Section 120.1(a) healthcare facilities must be ventilated in accordance with Chapter 4 of the California Mechanical Code and are NOT required to meet the ventilations requirements of Title 24, Part 6.
Section 140.4 Space Conditioning Systems included both additions and revisions within the 2019 Code. The changes provided new requirements for cooling tower efficiency, new chilled water-cooling system requirements, as well as new formulas for calculating allowed fan power. Section 140.4(n) also provide a new exception for mechanical system shut-offs for high-rise multifamily dwelling units, while Section 140.4(o) added new requirements for conditioned supply air being delivered to space with mechanical exhaust.
Section 120.6 Covered Processes added information in regards to adiabatic chiller requirements that included that all condenser fans for air-cooled converseness, evaporative-cooled condensers, adiabatic condensers, gas coolers, air or water fluid coolers or cooling towers must be continuously variable speed, with the speed of all 55 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 56 19594
fans serving a common condenser high side controlled in unison .Further, the mid-condensing setpoint must be 70 degrees Fahrenheit for all of the above mentioned systems.
New regulations were also adopted under Section 130.1 Indoor Lighting Controls. These included new exceptions being added for restrooms, the exception for classrooms being removed, as well as exceptions in regard to sunlight provided through skylights and overhangs.
Section 130.2 Outdoor Lighting Controls and Equipment added automatic scheduling controls which included that outdoor lighting power must be reduced by 50 to 90 percent, turn the lighting off during unoccupied times and have at least two scheduling options for each luminaire independent from each other and with a 2- hour override function. Furthermore, motion sensing controls must have the ability to reduce power within 15 minutes of area being vacant and be able to come back on again when occupied. An exception allows for lighting subject to a health or life safety statute, ordinance, or regulation may have a minimum time-out period longer than 15 minutes or a minimum dimming level above 50% when necessary to comply with the applicable law.
The 2022 Building Energy Efficiency Standards became effective on January 1, 2023.18 The core focus of the building standards has been efficiency, but the 2019 Energy Code ventured into onsite generation by requiring solar PV on new homes, providing significant GHG savings. The 2022 update builds off this progress with expanded solar standards and the move to onsite energy storage that will help Californians save on utility bills while bolstering the grid. The 2022 Energy Code update focuses on four key areas in new construction of homes and businesses:
Encouraging electric heat pump technology and use, which consumes less energy and produces fewer emissions than traditional HVACs and water heaters.
Establishing electric-ready requirements when natural gas is installed, which positions owners to use cleaner electric heating, cooking and electric vehicle (EV) charging options whenever they choose to adopt those technologies.
Expanding solar photovoltaic (PV) system and battery storage standards to make clean energy available onsite and complement the state’s progress toward a 100 percent clean electricity grid. Strengthening ventilation standards to improve indoor air quality.
The 2022 Energy Code affects homes by establishing energy budgets based on efficient heat pumps for space or water heating to encourage builders to install heat pumps over gas-fueled HVAC units; requiring homes to be electric-ready, with dedicated 240-volt outlets and space (with plumbing for water heaters) so electric appliances can eventually replace installed gas appliances; increasing minimum kitchen ventilation requirements so that fans over cooktops have higher airflow or capture efficiency to better exhaust pollution from gas cooking and improve indoor air quality; and allowing exceptions to existing solar PV standards when roof area is not available (such as for smaller homes). In addition, the effect on businesses includes establishing combined solar PV and battery standards for select businesses with systems being sized to maximize onsite use of solar energy and avoid electricity demand during times when the grid must use gas-powered plants; establishing new efficiency standards for commercial greenhouses (primarily cannabis growing); and improving efficiency standards for building envelope, various internal systems, and grid integration equipment, such as demand-responsive controls to buoy grid stability.19,20
18 California Energy Commission (CEC). 2022. Building Energy Efficiency Standards. https://www.energy.ca.gov/programs-and- topics/programs/building-energy-efficiency-standards/2022-building-energy-efficiency. 19 https://www.lightnowblog.com/2021/08/california-energy-commission-adopts-2022-building-energy-efficiency-standards/ 20 State of California Energy Commission. 2022 Building Energy Efficiency Standards Summary. https://www.energy.ca.gov/sites/default/files/2021-08/CEC_2022_EnergyCodeUpdateSummary_ADA.pdf 56 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 57 19594
California Code of Regulations (CCR) Title 24, Part 11 (California Green Building Standards)
On January 12, 2010, the State Building Standards Commission unanimously adopted updates to the California Green Building Standards Code, which went into effect on January 1, 2011. The 2016 version of the California Green Building Standards became effective January 1, 2017.
2016 CALGreen Code: The 2016 residential standards were estimated to be approximately 28 percent more efficient than the 2013 standards. Energy efficient buildings require less electricity; therefore, increased energy efficiency reduces fossil fuel consumption and decreases greenhouse gas emissions. During the 2016- 2017 fiscal year, the Department of Housing and Community Development (HCD) updated CALGreen through the 2015 Triennial Code Adoption Cycle.
HCD also increased the required construction waste reduction from 50 percent to 65 percent of the total building site waste. This increase aids in meeting CalRecycle’s statewide solid waste recycling goal of 75 percent for 2020 as stated in Chapter 476, Statutes of 2011 (AB 341). HCD adopted new regulations requiring recycling areas for multifamily projects of five or more dwelling units. This regulation requires developers to provide readily accessible areas adequate in size to accommodate containers for depositing, storage and collection of non-hazardous materials (including organic waste) for recycling. This requirement assists businesses that were required as of April 1, 2016, to meet the requirements of Chapter 727, Statutes of 2014 (AB 1826).
HCD adopted new regulations to require information on photovoltaic systems and electric vehicle chargers to be included in operation and maintenance manuals. Currently, CALGreen section 4.410.1 Item 2(a) requires operation and maintenance instructions for equipment and appliances. Photovoltaic systems and electric vehicle chargers are systems that play an important role in many households in California, and their importance is increasing every day. HCD incorporated these two terms in the existing language in order to provide clarity to code users as to additional systems requiring operation and maintenance instructions.
HCD updated the reference to Clean Air Standards of the United States Environmental Protection Agency applicable to woodstoves and pellet stoves. HCD also adopted a new requirement for woodstoves and pellet stoves to have a permanent label indicating they are certified to meet the emission limits. This requirement provides clarity to the code user and is consistent with the United States Environmental Protection Agency’s New Source Performance Standards. HCD updated the list of standards which can be used for verification of compliance for exterior grade composite wood products. This list now includes four standards from the Canadian Standards Association (CSA): CSA O121, CSA O151, CSA O153 and CSA O325. HCD updated heating and air-conditioning system design references to the ANSI/ACCA 2 Manual J, ANSI/ACCA 1 Manual D, and ANSI/ACCA 3 Manual S to the most recent versions approved by ANSI. HCD adopted a new elective measure for hot water recirculation systems for water conservation. The United States Department of Energy estimates that 3,600 to 12,000 gallons of water per year can be saved by the typical household (with four points of hot water use) if a hot water recirculation system is installed.
2019 CALGreen Code: During the 2019-2020 fiscal year, the Department of Housing and Community Development (HCD) updated CALGreen through the 2019 Triennial Code Adoption Cycle. The 2019 version of the California Green Building Standards became effective January 1, 2020.
HCD modified the best management practices for stormwater pollution prevention adding Section 5.106.2 for projects that disturb one or more acres of land. This section requires projects that disturb one acre or more of land or less than one acre of land but are part of a larger common plan of development or sale must comply with the post construction requirement detailed in the applicable National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater Discharges Associated with Construction and Land Disturbance Activities issued by the State Water Resources Control Board. The NPDES permits require post construction runoff (post-project hydrology) to match the preconstruction runoff pre-project hydrology) with installation of post construction stormwater management measures.
57 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 58 19594
HCD added sections 5.106.4.1.3 and 5.106.4.1.5 in regard to bicycle parking. Section 5.106.4.1.3 requires new buildings with tenant spaces that have 10 or more tenant-occupants, provide secure bicycle parking for 5 percent of the tenant-occupant vehicular parking spaces with a minimum of one bicycle parking facility. In addition, Section 5.106.4.1.5 states that acceptable bicycle parking facility for Sections 5.106.4.1.2 through
5.106.4.1.4 shall be convenient from the street and shall meeting one of the following: (1) covered, lockable enclosures with permanently anchored racks for bicycles; (2) lockable bicycle rooms with permanently anchored racks; or (3) lockable, permanently anchored bicycle lockers.
HCD amended section 5.106.5.3.5 allowing future charging spaces to qualify as designated parking for clean air vehicles.
HCD updated section 5.303.3.3 in regard to showerhead flow rates. This update reduced the flow rate to 1.8 GPM.
HCD amended section 5.304.1 for outdoor potable water use in landscape areas and repealed sections
5.304.2 and 5.304.3. The update requires nonresidential developments to comply with a local water efficient landscape ordinance or the current California Department of Water Resource’s’ Model Water Efficient Landscape Ordinance (MWELO), whichever is more stringent. Some updates were also made in regard to the outdoor potable water use in landscape areas for public schools and community colleges.
HCD updated Section 5.504.5.3 in regard to the use of MERV filters in mechanically ventilated buildings. This update changed the filter use from MERV 8 to MERV 13. MERV 13 filters are to be installed prior to occupancy, and recommendations for maintenance with filters of the same value shall be included in the operation and maintenance manual.
The 2022 California Green Building Standards Code became effective on January 1, 2023. 21
HCD amended Section 5.106.5.3 in regard to increasing the EV capable space percentages and adding a new requirement for installed Level 2 DCFC chargers.
HCD under Section 5.106.5.4 added new regulation for electric vehicle charging readiness requirements for new construction of warehouse, grocery stores, and retail stores with planned off-street loading spaces. 22
Executive Order B-30-15
On April 29, 2015, Governor Brown issued Executive Order B-30-15. Therein, the Governor directed the following:
Established a new interim statewide reduction target to reduce GHG emissions to 40 percent below 1990 levels by 2030.
Ordered all state agencies with jurisdiction over sources of GHG emissions to implement measures to achieve reductions of GHG emissions to meet the 2030 and 2050 reduction targets. Directed CARB to update the Climate Change Scoping Plan to express the 2030 target in terms of million metric tons of carbon dioxide equivalent.
21 California Building Standards Commission (CBSC). 2022. California Green Building Standards.
Website: https://codes.iccsafe.org/content/CAGBC2022P1. 22 https://www.dgs.ca.gov/BSC/Resources/2022-Title-24-California-Code-Changes 58 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 59 19594
Executive Order B-29-15
Executive Order B-29-15 mandates a statewide 25 percent reduction in potable water usage. EO B-29-15 signed into law on April 1, 2015.
Executive Order B-37-16
Executive Order B-37-16, continuing the State's adopted water reductions, was signed into law on May 9, 2016. The water reductions build off the mandatory 25 percent reduction called for in EO B-29-15.
Executive Order N-79-20
Executive Order N-79-20 Signed in September 2020, Executive Order N-79-20 establishes as a goal that where feasible, all new passenger cars and trucks, as well as all drayage/cargo trucks and off-road vehicles and equipment, sold in California, will be zero-emission by 2035. The executive order sets a similar goal requiring that all medium and heavy-duty vehicles will be zero-emission by 2045 where feasible. It also directs CARB to develop and propose rulemaking for passenger vehicles and trucks, medium-and heavy-duty fleets where feasible, drayage trucks, and off-road vehicles and equipment “requiring increasing volumes” of new zero emission vehicles (ZEVs) “towards the target of 100 percent.” The executive order directs the California Environmental Protection Agency, the California Geologic Energy Management Division (CalGEM), and the California Natural Resources Agency to transition and repurpose oil production facilities with a goal toward meeting carbon neutrality by 2045. Executive Order N-79-20 builds upon the CARB Advanced Clean Trucks regulation, which was adopted by CARB in July 2020.
SBX1 2
Signed into law in April 2011, SBX1 2, requires one-third of the State’s electricity to come from renewable sources. The legislation increases California’s current 20 percent renewables portfolio standard target in 2010 to a 33 percent renewables portfolio standard by December 31, 2020.
Senate Bill 350
Signed into law October 7, 2015, SB 350 increases California’s renewable electricity procurement goal from 33 percent by 2020 to 50 percent by 2030. This will increase the use of Renewables Portfolio Standard (RPS) eligible resources, including solar, wind, biomass, geothermal, and others. In addition, SB 350 requires the state to double statewide energy efficiency savings in electricity and natural gas end uses by 2030. To help ensure these goals are met and the greenhouse gas emission reductions are realized, large utilities will be required to develop and submit Integrated Resource Plans (IRPs). These IRPs will detail how each entity will meet their customers resource needs, reduce greenhouse gas emissions and ramp up the deployment of clean energy resources.
Energy Sector and CEQA Guidelines Appendix F
The CEC first adopted Energy Efficiency Standards for Residential and Nonresidential Buildings (CCR, Title 24, Part 6) in 1978 in response to a legislative mandate to reduce energy consumption in the state. Although not originally intended to reduce GHG emissions, increased energy efficiency and reduced consumption of electricity, natural gas, and other fuels would result in fewer GHG emissions from residential and nonresidential buildings subject to the standard. The standards are updated periodically (typically every three years) to allow for the consideration and inclusion of new energy efficiency technologies and methods. The 2016 update to the Energy Efficiency Standards for Residential and Nonresidential Buildings focuses on several key areas to improve the energy efficiency of renovations and addition to existing buildings as well as newly constructed buildings and renovations and additions to existing buildings. The major efficiency 59 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 60 19594
improvements to the residential Standards involve improvements for attics, walls, water heating, and lighting, whereas the major efficiency improvements to the nonresidential Standards include alignment with the American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) 90.1-2013 national standards. Furthermore, the 2016 update required that enforcement agencies determine compliance with CCR, Title 24, Part 6 before issuing building permits for any construction. 23
Part 11 of the Title 24 Building Energy Efficiency Standards is referred to as the California Green Building Standards (CALGreen) Code. The purpose of the CALGreen Code is to “improve public health, safety and general welfare by enhancing the design and construction of buildings through the use of building concepts having a reduced negative impact or positive environmental impact and encouraging sustainable construction practices in the following categories: (1) Planning and design; (2) Energy efficiency; (3) Water efficiency and conservation; (4) Material conservation and resource efficiency; and (5) Environmental air quality.”24 As of January 1, 2011, the CALGreen Code is mandatory for all new buildings constructed in the state. The CALGreen Code establishes mandatory measures for new residential and non-residential buildings. Such mandatory measures include energy efficiency, water conservation, material conservation, planning and design, and overall environmental quality. The CALGreen Code was most recently updated in 2022 to include new mandatory measures for residential and nonresidential uses; the new measures took effect on January 1, 2023.
Regional – South Coast Air Quality Management District
The project is within the South Coast Air Basin, which is under the jurisdiction of the South Coast Air Quality Management District (SCAQMD).
SCAQMD Regulation XXVII, Climate Change
SCAQMD Regulation XXVII currently includes three rules:
The purpose of Rule 2700 is to define terms and post global warming potentials. The purpose of Rule 2701, SoCal Climate Solutions Exchange, is to establish a voluntary program to encourage, quantify, and certify voluntary, high quality certified greenhouse gas emission reductions in the SCAQMD.
Rule 2702, Greenhouse Gas Reduction Program, was adopted on February 6, 2009. The purpose of this rule is to create a Greenhouse Gas Reduction Program for greenhouse gas emission reductions in the SCAQMD. The SCAQMD will fund projects through contracts in response to requests for proposals or purchase reductions from other parties.
A variety of agencies have developed greenhouse gas emission thresholds and/or have made recommendations for how to identify a threshold. However, the thresholds for projects in the jurisdiction of the SCAQMD remain in flux. The California Air Pollution Control Officers Association explored a variety of threshold approaches but did not recommend one approach (2008). The CARB recommended approaches for setting interim significance thresholds (California Air Resources Board 2008b), in which a draft industrial project threshold suggests that non-transportation related emissions under 7,000 MTCO2e per year would be less than significant; however, the ARB has not approved those thresholds and has not published anything since then. The SCAQMD is in the process of developing thresholds, as discussed below.
23 California Energy Commission, 2016 Building Energy Efficiency Standards, June 2015, http://www.energy.ca.gov/2015publications/CEC-400-2015-037/CEC-400-2015-037-CMF.pdf 24 California Building Standards Commission, 2010 California Green Building Standards Code, (2010). 60 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 61 19594
SCAQMD Threshold Development
On December 5, 2008, the SCAQMD Governing Board adopted an interim greenhouse gas significance threshold for stationary sources, rules, and plans where the SCAQMD is lead agency (SCAQMD permit threshold). The SCAQMD permit threshold consists of five tiers. However, the SCAQMD is not the lead agency for this project. Therefore, the five permit threshold tiers do not apply to the proposed project.
The SCAQMD is in the process of preparing recommended significance thresholds for greenhouse gases for local lead agency consideration (“SCAQMD draft local agency threshold”); however, the SCAQMD Board has not approved the thresholds as of the date of the Notice of Preparation. The current draft thresholds consist of the following tiered approach:
Tier 1 consists of evaluating whether or not the project qualifies for any applicable exemption under CEQA.
Tier 2 consists of determining whether the project is consistent with a greenhouse gas reduction plan. If a project is consistent with a qualifying local greenhouse gas reduction plan, it does not have significant greenhouse gas emissions.
Tier 3 consists of screening values, which the lead agency can choose, but must be consistent with all projects within its jurisdiction. A project’s construction emissions are averaged over 30 years and are added to a project’s operational emissions. If a project’s emissions are under one of the following screening thresholds, then the project is less than significant:
□ All land use types: 3,000 MTCO2e per year.
□ Based on land use type: residential: 3,500 MTCO2e per year; commercial: 1,400 MTCO2e per year; or mixed use: 3,000 MTCO2e per year.
□ Based on land type: Industrial (where SCAQMD is the lead agency), 10,000 MTCO 2e per year. Tier 4 has the following options:
□ Option 1: Reduce emissions from business as usual (BAU) by a certain percentage; this percentage is currently undefined.
□ Option 2: Early implementation of applicable AB 32 Scoping Plan measures. □ Option 3, 2020 target for service populations (SP), which includes residents and employees: 4.8 MTCO2e/SP/year for projects and 6.6 MTCO2e/SP/year for plans. □ Option 3, 2035 target: 3.0 MTCO2e/SP/year for projects and 4.1 MTCO2e/SP/year for plans. Tier 5 involves mitigation offsets to achieve target significance threshold.
The SCAQMD’s draft threshold uses the Executive Order S-3-05 goal as the basis for the Tier 3 screening level. Achieving the Executive Order’s objective would contribute to worldwide efforts to cap carbon dioxide concentrations at 450 ppm, thus stabilizing global climate. Specifically, the Tier 3 screening level for stationary sources is based on an emission capture rate of 90 percent for all new or modified projects. A 90 percent emission capture rate means that 90 percent of total emissions from all new or modified stationary source projects would be subject to a CEQA analysis, including a negative declaration, a mitigated negative declaration, or an environmental impact report, which includes analyzing feasible alternatives and imposing feasible mitigation measures. A GHG significance threshold based on a 90 percent emission capture rate may be more appropriate to address the long-term adverse impacts associated with global climate change because most projects will be required to implement GHG reduction measures. Further, a 90 percent emission capture rate sets the emission threshold low enough to capture a substantial fraction of future stationary source projects that will be constructed to accommodate future statewide population and economic growth, while setting the emission threshold high enough to exclude small projects that will in aggregate contribute a 61 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 62 19594
relatively small fraction of the cumulative statewide GHG emissions. This assertion is based on the fact that staff estimates that these GHG emissions would account for slightly less than one percent of future 2050 statewide GHG emissions target (85 MMTCO 2eq/year). In addition, these small projects may be subject to future applicable GHG control regulations that would further reduce their overall future contribution to the statewide GHG inventory. Finally, these small sources are already subject to BACT for criteria pollutants and are more likely to be single-permit facilities, so they are more likely to have few opportunities readily available to reduce GHG emissions from other parts of their facility.
SCAQMD Working Group
Since neither the CARB nor the OPR has developed GHG emissions threshold, the SCAQMD formed a Working Group to develop significance thresholds related to GHG emissions. At the September 28, 2010 Working Group meeting, the SCAQMD released its most current version of the draft GHG emissions thresholds, which recommends a tiered approach that provides a quantitative annual threshold of 10,000 MTCO2e for industrial uses.
In order to assist local agencies with direction on GHG emissions, the SCAQMD organized a working group and adopted Rules 2700, 2701, 2702, and 3002 which are described below.
SCAQMD Rules 2700 and 2701
The SCAQMD adopted Rules 2700 and 2701 on December 5, 2008, which establishes the administrative structure for a voluntary program designed to quantify GHG emission reductions. Rule 2700 establishes definitions for the various terms used in Regulation XXVII – Global Climate Change. Rule 2701 provides specific protocols for private parties to follow to generate certified GHG emission reductions for projects within the district. Approved protocols include forest projects, urban tree planting, and manure management.
The SCAQMD is currently developing additional protocols for other reduction measures. For a GHG emission reduction project to qualify, it must be verified and certified by the SCAQMD Executive Officer, who has 60 days to approve or deny the Plan to reduce GHG emissions. Upon approval of the Plan, the Executive Officer issues required to issue a certified receipt of the GHG emission reductions within 90 days.
SCAQMD Rule 2702
The SCAQMD adopted Rule 2702 on February 6, 2009, which establishes a voluntary air quality investment program from which SCAQMD can collect funds from parties that desire certified GHG emission reductions, pool those funds, and use them to purchase or fund GHG emission reduction projects within two years, unless extended by the Governing Board. Priority will be given to projects that result in co-benefit emission reductions of GHG emissions and criteria or toxic air pollutants within environmental justice areas. Further, this voluntary program may compete with the cap-and-trade program identified for implementation in CARB’s Scoping Plan, or a federal cap and trade program.
SCAQMD Rule 3002
The SCAQMD amended Rule 3002 on November 5, 2010 to include facilities that emit greater than 100,000 tons per year of CO2e are required to apply for a Title V permit by July 1, 2011. A Title V permit is for facilities that are considered major sources of emissions.
Local – City of Orange
The City of Orange has not adopted a Climate Action Plan; however, the City’s General Plan Natural Resource Element includes the following goals and policies related to Climate Change.
Goal 3.0 Prepare for and adapt to the effects of climate change and promote practices that decrease the City’s contribution to climate change.
62 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 63 19594
Policies
Policy 3.1 Evaluate the potential effects of climate change on the City’s human and natural systems and prepare strategies that allow the City to appropriately respond and adapt.
Policy 3.2 Develop and adopt a comprehensive strategy to reduce greenhouse gasses (GHGs) within Orange by at least 15 percent from current levels by 2020.
SIGNIFICANCE THRESHOLDS
Appendix G of State CEQA Guidelines
The CEQA Guidelines recommend that a lead agency consider the following when assessing the significance of impacts from GHG emissions on the environment:
The extent to which the project may increase (or reduce) GHG emissions as compared to the existing environmental setting;
Whether the project emissions exceed a threshold of significance that the lead agency determines applies to the project;
The extent to which the project complies with regulations or requirements adopted to implement an adopted statewide, regional, or local plan for the reduction or mitigation of GHG emissions. 25
Thresholds of Significance for this Project
To determine whether the project's GHG emissions are significant, this analysis uses the SCAQMD draft screening threshold of 3,000 MTCO2e per year for all land uses.
METHODOLOGY
The proposed project is anticipated to generate GHG emissions from area sources, energy usage, mobile sources, waste, water, and construction equipment. The following provides the methodology used to calculate the project-related GHG emissions and the project impacts.
CalEEMod Version 2022.1.1.6 was used to calculate the GHG emissions from the proposed project. The CalEEMod Output for year 2026 is available in Appendix B. Each source of GHG emissions is described in greater detail below.
Area Sources
Area sources include emissions from consumer products, landscape equipment and architectural coatings. No changes were made to the default area source emissions.
Energy Usage
Energy usage includes emissions from the generation of electricity and natural gas used on-site. No changes were made to the default energy usage parameters.
25 The Governor’s Office of Planning and Research recommendations include a requirement that such a plan must be adopted through a public review process and include specific requirements that reduce or mitigate the project’s incremental contribution of GHG emissions. If there is substantial evidence that the possible effects of a particular project are still cumulatively considerable, notwithstanding compliance with the adopted regulations or requirements, an EIR must be prepared for the project. 63 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 64 19594
Mobile Sources
Mobile sources include emissions from the additional vehicle miles generated from the proposed project. The vehicle trips associated with the proposed project have been analyzed by inputting the project-generated vehicular trips from the TA into the CalEEMod Model. The program then applies the emission factors for each trip which is provided by the EMFAC2021 model to determine the vehicular traffic pollutant emissions. See Section 2 for details.
Waste
Waste includes the GHG emissions generated from the processing of waste from the proposed project as well as the GHG emissions from the waste once it is interred into a landfill. AB 341 requires that 75 percent of waste be diverted from landfills by 2020. No changes were made to the default waste parameters.
Water
Water includes the water used for the interior of the building as well as for landscaping and is based on the GHG emissions associated with the energy used to transport and filter the water. No changes were made to CalEEMod default values for waste generated.
Construction
The construction-related GHG emissions were also included in the analysis and were based on a 30-year amortization rate as recommended in the SCAQMD GHG Working Group meeting on November 19, 2009.
The construction-related GHG emissions were calculated by CalEEMod and in the manner detailed above in Section 2.
PROJECT GREENHOUSE GAS EMISSIONS
The GHG emissions have been calculated based on the parameters described above. A summary of the results is shown below in Table 11 and the CalEEMod Model run for the proposed project is provided in Appendix B. Table 11 shows that the total for the proposed project’s emissions (without credit for any reductions from sustainable design and/or regulatory requirements) would be 149.53 MTCO 2e per year. According to the thresholds of significance established above, a cumulative global climate change impact would occur if the GHG emissions created from the on-going operations of the proposed project would exceed the SCAQMD draft threshold of 3,000 MTCO 2e per year for all land uses. Therefore, operation of the proposed project would not create a significant cumulative impact to global climate change.
64 Bio-CO2 NonBio-CO2 CO2 CH4 N2O CO2e
Maximum Annual Operations 1.08 137.00 138.00 0.12 0.01 142.00 Construction1
0.00 7.50 7.50 0.00 0.00 7.53
Total Emissions 1.08 144.50 145.50 0.12 0.01 149.53
3,000
Exceeds Threshold? No
Notes:
Source: CalEEMod Version 2022.1.1.6 for Opening Year 2026. (1) Construction GHG emissions CO2e based on a 30 year amortization rate.
SCAQMD Draft Screening Threshold
Category
Table 11
Project-Related Greenhouse Gas Emissions
Greenhouse Gas Emissions (Metric Tons/Year)
Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 19594
65 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 66 19594
CONSISTENCY WITH APPLICABLE GREENHOUSE GAS REDUCTION PLANS AND POLICIES
The proposed project could have the potential to conflict with any applicable plan, policy or regulation of an agency adopted for the purpose of reducing the emissions of greenhouse gases. As stated above, the City of Orange has not adopted a Climate Action Plan. Therefore, the project’s emissions have been compared to the goals of the CARB Scoping Plan.
Consistency with the CARB Scoping Plan
Emission reductions in California alone would not be able to stabilize the concentration of greenhouse gases in the earth’s atmosphere. However, California’s actions set an example and drive progress towards a reduction in greenhouse gases elsewhere. If other states and countries were to follow California’s emission reduction targets, this could avoid medium or higher ranges of global temperature increases. Thus, severe consequences of climate change could also be avoided.
The ARB Board approved a Climate Change Scoping Plan in December 2008. The Scoping Plan outlines the State’s strategy to achieve the 2020 greenhouse gas emissions limit. The Scoping Plan “proposes a comprehensive set of actions designed to reduce overall greenhouse gas emissions in California, improve our environment, reduce our dependence on oil, diversify our energy sources, save energy, create new jobs, and enhance public health” (California Air Resources Board 2008). The measures in the Scoping Plan have been in place since 2012.
This Scoping Plan calls for an “ambitious but achievable” reduction in California’s greenhouse gas emissions, cutting approximately 30 percent from business-as-usual emission levels projected for 2020, or about 10 percent from today’s levels. On a per-capita basis, that means reducing annual emissions of 14 tons of carbon dioxide for every man, woman and child in California down to about 10 tons per person by 2020.
In May 2014, CARB released its First Update to the Climate Change Scoping Plan (CARB 2014). This Update identifies the next steps for California’s leadership on climate change. While California continues on its path to meet the near-term 2020 greenhouse gas limit, it must also set a clear path toward long-term, deep GHG emission reductions. This report highlights California’s success to date in reducing its GHG emissions and lays the foundation for establishing a broad framework for continued emission reductions beyond 2020, on the path to 80 percent below 1990 levels by 2050.
In November 2017, CARB release the 2017 Scoping Plan. This Scoping Plan incorporates, coordinates, and leverages many existing and ongoing efforts and identifies new policies and actions to accomplish the State’s climate goals, and includes a description of a suite of specific actions to meet the State’s 2030 GHG limit. In addition, Chapter 4 provides a broader description of the many actions and proposals being explored across the sectors, including the natural resources sector, to achieve the State’s mid and long-term climate goals.
Guided by legislative direction, the actions identified in the 2017 Scoping Plan reduce overall GHG emissions in California and deliver policy signals that will continue to drive investment and certainty in a low carbon economy. The 2017 Scoping Plan builds upon the successful framework established by the Initial Scoping Plan and First Update, while identifying new, technologically feasible, and cost-effective strategies to ensure that California meets its GHG reduction targets in a way that promotes and rewards innovation, continues to foster economic growth, and delivers improvements to the environment and public health, including in disadvantaged communities. The Plan includes policies to require direct GHG reductions at some of the State’s largest stationary sources and mobile sources. These policies include the use of lower GHG fuels, efficiency regulations, and the Cap-and Trade Program, which constrains and reduces emissions at covered sources.
Independent studies confirm CARB’s determination that the state’s existing and proposed regulatory framework will put the state on a pathway to reduce its GHG emissions level to 40 percent below 1990 levels by 2030, and to 80 percent below 1990 levels by 2050 if additional appropriate reduction measures are 66 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 67 19594
adopted.26 Even though these studies did not provide an exact regulatory and technological roadmap to achieve the 2030 and 2050 goals, they demonstrated that various combinations of policies could allow the statewide emissions level to remain very low through 2050, suggesting that the combination of new technologies and other regulations not analyzed in the studies would allow the state to meet the 2050 target.
In November of 2022, the CARB released the 2022 Scoping Plan. The 2022 Scoping Plan lays out a path to achieve targets for carbon neutrality and reduce anthropogenic GHG emissions by 85 percent below 1990 levels no later than 2045, as directed by Assembly Bill 1279. The actions and outcomes in the plan will achieve significant reductions in fossil fuel combustion by deploying clean technologies and fuels, further reductions in short-lived climate pollutants, support for sustainable development, increased action on natural and working lands to reduce emissions and sequester carbon, and the capture and storage of carbon.
In addition, on May 22, 2014, CARB approved its first update to the AB 32 Scoping Plan (CARB’s First Update).27 CARB’s First Update “lays the foundation for establishing a broad framework for continued emission reductions beyond 2020, on the path to 80 percent below 1990 levels by 2050,” and many of the emission reduction strategies recommended by ARB would serve to reduce the Project’s post-2020 emissions level to the extent required by applicable by law. As the latest, 2022 Scoping Plan builds upon previous versions, project consistency with applicable strategies of the 2008, 2017, and 2022 Plan are assessed in Table 12. As shown in Table 12, the project is consistent with the applicable strategies within the Scoping Plan.
Therefore, the project would not conflict with any applicable plan, policy or regulation of an agency adopted for the purpose of reducing the emissions of greenhouse gases. Furthermore, the project will also comply with applicable Green Building Standards and City of Orange’s policies regarding sustainability (as dictated by the City's General Plan).
26 Energy and Environmental Economics (E3). “Summary of the California State Agencies’ PATHWAYS Project: Long-term Greenhouse Gas Reduction Scenarios” (April 2015); Greenblatt, Jeffrey, Energy Policy, “Modeling California Impacts on Greenhouse Gas Emissions” (Vol. 78, pp. 158–172). The California Air Resources Board, California Energy Commission, California Public Utilities Commission, and the California Independent System Operator engaged E3 to evaluate the feasibility and cost of a range of potential 2030 targets along the way to the state’s goal of reducing GHG emissions to 80 percent below 1990 levels by 2050.
With input from the agencies, E3 developed scenarios that explore the potential pace at which emission reductions can be achieved, as well as the mix of technologies and practices deployed. E3 conducted the analysis using its California PATHWAYS model. Enhanced specifically for this study, the model encompasses the entire California economy with detailed representations of the buildings, industry, transportation and electricity sectors. https://www.ethree.com/wp- content/uploads/2017/02/E3_Project_Overview_20150406.pdf 27 California Air Resources Board, First Update to the Climate Change Scoping Plan, May 2014; https://ww2.arb.ca.gov/sites/default/files/classic//cc/scopingplan/2013_update/first_update_climate_change_scoping_plan.pdf 67 Table 12 (1 of 2)
Project Consistency with CARB Scoping Plan Policies and Measures 2008 Scoping Plan Measures to Reduce Greenhouse Gas Emissions Project Compliance with Measure California Light-Duty Vehicle Greenhouse Gas Standards – Implement adopted standards and planned second phase of the program. Align zero-emission vehicle, alternative and renewable fuel and vehicle technology programs with long-term climate change goals.
No Conflict. These are CARB enforced standards; vehicles that access the project (that are required to comply with the standards) will comply with the strategy.
Energy Efficiency – Maximize energy efficiency building and appliance standards; pursue additional efficiency including new technologies, policy, and implementation mechanisms. Pursue comparable investment in energy efficiency from all retail providers of electricity in California.
No Conflict. The project will be compliant with the current Title 24 standards.
Low Carbon Fuel Standard – Develop and adopt the Low Carbon Fuel Standard. No Conflict. These are CARB enforced standards; vehicles that access the project (that are required to comply with the standards) will comply with the strategy.
Vehicle Efficiency Measures – Implement light-duty vehicle efficiency measures. No Conflict. These are CARB enforced standards; vehicles that access the project (that are required to comply with the standards) will comply with the strategy.
Medium/Heavy-Duty Vehicles – Adopt medium and heavy-duty vehicle efficiency measures.
No Conflict. These are CARB enforced standards; vehicles that access the project (that are required to comply with the standards) will comply with the strategy.
Green Building Strategy – Expand the use of green building practices to reduce the carbon footprint of California’s new and existing inventory of buildings.
No Conflict. The California Green Building Standards Code (proposed Part 11, Title 24) was adopted as part of the California Building Standards Code in the CCR. Part 11 establishes voluntary standards, that are mandatory in the 2019 edition of the Code, on planning and design for sustainable site development, energy efficiency (in excess of the California Energy Code requirements), water conservation, material conservation, and internal air contaminants. In addition, the 2022 edition of the Code will take effect January 1, 2023. The project will be subject to these mandatory standards.
High Global Warming Potential Gases – Adopt measures to reduce high global warming potential gases.
No Conflict. CARB identified five measures that reduce HFC emissions from vehicular and commercial refrigeration systems; vehicles that access the project that are required to comply with the measures will comply with the strategy.
Recycling and Waste – Reduce methane emissions at landfills. Increase waste diversion, composting, and commercial recycling. Move toward zero-waste.
No Conflict. The state is currently developing a regulation to reduce methane emissions from municipal solid waste landfills. The project will be required to comply with City programs, such as City’s recycling and waste reduction program, which comply, with the 75 percent reduction required by 2020 per AB 341.
Water – Continue efficiency programs and use cleaner energy sources to move and treat water.
No Conflict. The project will comply with all applicable City ordinances and CAL Green requirements.
2017 Scoping Plan Recommended Actions
to Reduce Greenhouse Gas Emissions Project Compliance with Recommended Action Implement Mobile Source Strategy: Further increase GHG stringency on all light- duty vehicles beyond existing Advanced Clean Car regulations.
No Conflict. These are CARB enforced standards; vehicles that access the project (that are required to comply with the standards) will comply with the strategy.
Implement Mobile Source Strategy: At least 1.5 million zero emission and plug-in hybrid light-duty electric vehicles by 2025 and at least 4.2 million zero emission and plug-in hybrid light-duty electric vehicles by 2030.
No Conflict. These are CARB enforced standards; vehicles that access the project (that are required to comply with the standards) will comply with the strategy.
Implement Mobile Source Strategy: Innovative Clean Transit: Transition to a suite of to-be-determined innovative clean transit options. Assumed 20 percent of new urban buses purchased beginning in 2018 will be zero emission buses with the penetration of zero-emission technology ramped up to 100 percent of new sales in 2030. Also, new natural gas buses, starting in 2018, and diesel buses, starting in 2020, meet the optional heavy-duty low-NOX standard.
No Conflict. These are CARB enforced standards; vehicles that access the project (that are required to comply with the standards) will comply with the strategy.
Implement Mobile Source Strategy: Last Mile Delivery: New regulation that would result in the use of low NOX or cleaner engines and the deployment of increasing numbers of zero-emission trucks primarily for class 3-7 last mile delivery trucks in California. This measure assumes ZEVs comprise 2.5 percent of new Class 3–7 truck sales in local fleets starting in 2020, increasing to 10 percent in 2025 and remaining flat through 2030.
No Conflict. These are CARB enforced standards; vehicles that access the project (that are required to comply with the standards) will comply with the strategy.
Implement SB 350 by 2030: Establish annual targets for statewide energy efficiency savings and demand reduction that will achieve a cumulative doubling of statewide energy efficiency savings in electricity and natural gas end uses by 2030.
No Conflict. The project will be compliant with the current Title 24 standards.
Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 19594
68 Table 12 (2 of 2)
Project Consistency with CARB Scoping Plan Policies and Measures By 2019, develop regulations and programs to support organic waste landfill reduction goals in the SLCP and SB 1383.
No Conflict. The project will be required to comply with City programs, such as City’s recycling and waste reduction program, which comply, with the 75 percent reduction required by 2020 per AB 341.
2022 Scoping Plan Priority Key Actions and Recommendations Project Compliance with Recommended Actions 100 percent of light-duty vehicle sales are ZEVs by 2035.
Not Applicable. This action is in regard to vehcile sales, with an aim to have 100 percent of light-duty vehicle sales be ZEVs by 2035. The proposed project is that of 13 single-family residential dwelling units and would not interfere with such policymaking.
VMT per capita reduced 25 percent below 2019 levels by 2030 and 30 percent below 2019 levels by 2045.
No Conflict. The Project would not result in an unmitigated impact to VMT. The Project is a residential project located in close proximity to existing public transit, including the OCTA Route 167, and residential and commercial uses. Therefore, the Project would be anticipated to contribute to a reduction in VMT per capita.
All electric appliances in new construction beginning 2026 (residential) and 2029 (commercial).
No Conflict. The California Green Building Standards Code (proposed Part 11, Title 24) was adopted as part of the California Building Standards Code in the CCR. Part 11 establishes voluntary standards, that are mandatory in the 2019 edition of the Code, on planning and design for sustainable site development, energy efficiency (in excess of the California Energy Code requirements), water conservation, material conservation, and internal air contaminants. In addition, the 2022 edition of the Code will take effect January 1, 2023. The project will be subject to these mandatory standards.
For existing residential buildings, 80 percent of appliance sales are electric by 2030 and 100 percent of appliance sales are electric by 2035 (appliances replaced at end of life).
For existing commercial buildings, 80 percent of appliance sales are electric by 2030 and 100 percent of appliance sales are electric by 2045 (appliances replaced at end of life)
Not Applicable. This action is in regard to appliance sales and the proposed residential project would not interfere with such policymaking. Furthermore, although this action is not necessarily applicable on a project-specific basis, the proposed project is subject to the California Green Building Standards Code (proposed Part 11, Title 24) which was adopted as part of the California Building Standards Code in the CCR. Part 11 establishes voluntary standards, that are mandatory in the 2019 edition of the Code, on planning and design for sustainable site development, energy efficiency (in excess of the California Energy Code requirements), water conservation, material conservation, and internal air contaminants. In addition, the 2022 edition of the Code will take effect January 1, 2023. The project will be subject to these mandatory standards.
Notes:
(1) Source: CARB Scoping Plan (2008, 2017, and 2022)
Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 19594
69 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 70 19594
CUMULATIVE GREENHOUSE GAS IMPACTS
Although the project is expected to emit GHGs, the emission of GHGs by a single project into the atmosphere is not itself necessarily an adverse environmental effect. Rather, it is the increased accumulation of GHG from more than one project and many sources in the atmosphere that may result in global climate change.
Therefore, in the case of global climate change, the proximity of the project to other GHG emission generating activities is not directly relevant to the determination of a cumulative impact because climate change is a global condition. According to CAPCOA, “GHG impacts are exclusively cumulative impacts; there are no non- cumulative GHG emission impacts from a climate change perspective.”28 The resultant consequences of that climate change can cause adverse environmental effects. A project’s GHG emissions typically would be very small in comparison to state or global GHG emissions and, consequently, they would, in isolation, have no significant direct impact on climate change.
The state has mandated a goal of reducing statewide emissions to 1990 levels by 2020, even though statewide population and commerce are predicted to continue to expand. In order to achieve this goal, CARB is in the process of establishing and implementing regulations to reduce statewide GHG emissions. Consistent with CEQA Guidelines Section 15064h(3),29 the City, as lead agency, has determined that the project’s contribution to cumulative GHG emissions and global climate change would be less than significant if the project is consistent with the applicable regulatory plans and policies to reduce GHG emissions.
As discussed in the Consistency With Applicable Greenhouse Gas Reduction Plans and Policies section above, the project is consistent with the CARB Scoping Plan.
Thus, given the project’s consistency with the CARB Scoping Plan and SCAQMD’s draft 3,000 MTCO2e per year threshold for all land uses, the project would not conflict with any applicable plan, policy, or regulation of an agency adopted for the purpose of reducing the emissions of GHGs. Given this consistency, it is concluded that the project’s incremental contribution to greenhouse gas emissions and their effects on climate change would not be cumulatively considerable.
28 Source: California Air Pollution Control Officers Association, CEQA & Climate change: Evaluating and Addressing Greenhouse Gas Emissions from Projects Subject to the California Environmental Quality Act, (2008). 29 The State CEQA Guidelines were amended in response to SB 97. In particular, the State CEQA Guidelines were amended to specify that compliance with a GHG emissions reduction program renders a cumulative impact insignificant. Per State CEQA Guidelines Section 15064(h)(3), a project’s incremental contribution to a cumulative impact can be found not cumulatively considerable if the project will comply with an approved plan or mitigation program that provides specific requirements that will avoid or substantially lessen the cumulative problem within the geographic area of the project. To qualify, such a plan or program must be specified in law or adopted by the public agency with jurisdiction over the affected resources through a public review process to implement, interpret, or make specific the law enforced or administered by the public agency. Examples of such programs include a “water quality control plan, air quality attainment or maintenance plan, integrated waste management plan, habitat conservation plan, natural community conservation plan, [and] plans or regulations for the reduction of greenhouse gas emissions.” 70 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 71 19594
4. ENERGY ANALYSIS
EXISTING CONDITIONS
This section provides an overview of the existing energy conditions in the project area and region.
Overview
California’s estimated annual energy use as of 2021 included:
Approximately 277,764 gigawatt hours of electricity;30 Approximately 2,092,612 million cubic feet of natural gas per year; 31 and Approximately 23.2 billion gallons of transportation fuel (for the year 2015). 32
As of 2020, the year of most recent data currently available by the United States Energy Information Administration (EIA), energy use in California by demand sector was:
Approximately 34 percent transportation;
Approximately 24.6 percent industrial;
Approximately 21.8 percent residential; and
Approximately 19.6 percent commercial.33
California's electricity in-state generation system generates approximately 194,127 gigawatt-hours each year.
In 2021, California produced approximately 70 percent of the electricity it uses; the rest was imported from the Pacific Northwest (approximately 12 percent) and the U.S. Southwest (approximately 18 percent). Natural gas is the main source for electricity generation at approximately 50.2 percent of the total in-state electric generation system power as shown Table 13.
A summary of and context for energy consumption and energy demands within the State is presented in “U.S.
Energy Information Administration, California State Profile and Energy Estimates, Quick Facts” excerpted below:
California was the seventh-largest producer of crude oil among the 50 states in 2021, and, as of January 2021, it ranked third in oil refining capacity.
California is the largest consumer of jet fuel and second-largest consumer of motor gasoline among the 50 states and accounted for fifteen percent of the nation’s jet fuel consumption and ten percent of motor gasoline consumption in 2020.
In 2019, California was the second-largest total energy consumer among the states, but its per capita energy consumption was less than in all other states except Rhode Island, due in part to its mild climate and its energy efficiency programs
30 California Energy Commission. Energy Almanac. Total Electric Generation. [Online] 2021. https://www.energy.ca.gov/data-reports/energy-almanac/california-electricity-data/2020-total-system-electric-generation. 31 Natural Gas Consumption by End Use. U.S. Energy Information Administration. [Online] 2021. https://www.eia.gov/dnav/ng/ng_cons_sum_dcu_SCA_a.htm.
32 California Energy Commission. Revised Transportation Energy Demand Forecast 2018-2030. [Online] 2021. https://www.energy.ca.gov/data-reports/planning-and-forecasting 33 U.S. Energy Information Administration. California Energy Consumption by End-Use Sector, 2020.
California State Profile Overview.[Online] December 20, 2022 https://www.eia.gov/state/?sid=CA#tabs-2 71 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 72 19594
In 2021, California was the nation’s top producer of electricity from solar, geothermal, and biomass energy. The state was fourth in the nation in conventional hydroelectric power generation, down from second in 2019, in part because of drought and increased water demand In 2021, California was the fourth-largest electricity producer in the nation, but the state was also the nation’s second-largest consumer of electricity, and in 2020, it received about 30% of its electricity supply from generating facilities outside of California, including imports from Mexico. 34
As indicated above, California is one of the nation’s leading energy‐producing states, and California per capita energy use is among the nation’s most efficient. Given the nature of the proposed project, the remainder of this discussion will focus on the three sources of energy that are most relevant to the project—namely, electricity and natural gas for building uses, and transportation fuel for vehicle trips associated with the proposed project.
Electricity
Electricity would be provided to the project by Southern California Edison (SCE). SCE provides electric power to more than 15 million persons, within a service area encompassing approximately 50,000 square miles. 35 SCE derives electricity from varied energy resources including: fossil fuels, hydroelectric generators, nuclear power plants, geothermal power plants, solar power generation, and wind farms. SCE also purchases from independent power producers and utilities, including out‐of‐state suppliers.36
Table 14 identifies SCE’s specific proportional shares of electricity sources in 2021. As shown in Table 14, the 2021 SCE Power Mix has renewable energy at 34.1 percent of the overall energy resources, of which biomass and waste is at 0.1 percent, geothermal is at 5.7 percent, eligible hydroelectric is at 0.5 percent, solar energy is at 14.9 percent, and wind power is at 10.2 percent; other energy sources include large hydroelectric at 2.3 percent, natural gas at 22.3 percent, nuclear at 9.2 percent, and unspecified sources of power at 34.6 percent.
Natural Gas
Natural gas would be provided to the project by Southern California Gas (SoCalGas). The following summary of natural gas resources and service providers, delivery systems, and associated regulation is excerpted from information provided by the California Public Utilities Commission (CPUC).
The CPUC regulates natural gas utility service for approximately 11 million customers that receive natural gas from Pacific Gas and Electric (PG&E), Southern California Gas (SoCalGas), San Diego Gas & Electric (SDG&E), Southwest Gas, and several smaller investor-owned natural gas utilities. The CPUC also regulates independent storage operators Lodi Gas Storage, Wild Goose Storage, Central Valley Storage and Gill Ranch Storage.
The vast majority of California's natural gas customers are residential and small commercial customers, referred to as "core" customers. Larger volume gas customers, like electric generators and industrial customers, are called "noncore" customers. Although very small in number relative to core customers, noncore customers consume about 65% of the natural gas delivered by the state's natural gas utilities, while core customers consume about 35%.
The PUC regulates the California utilities' natural gas rates and natural gas services, including in-state transportation over the utilities' transmission and distribution pipeline systems, storage, procurement, metering and billing.
34 State Profile Overview. [Online] [Cited: March 17, 2022.] https://www.eia.gov/state/?sid=CA#tabs-2 35 https://www.sce.com/about-us/who-we-are/leadership/our-service-territory 36 California Energy Commission. Utility Energy Supply plans from 2015. https://www.energy.ca.gov/almanac/electricity_data/supply_forms.html 72 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 73 19594
Most of the natural gas used in California comes from out-of-state natural gas basins. In 2017, for example, California utility customers received 38% of their natural gas supply from basins located in the U.S. Southwest, 27% from Canada, 27% from the U.S. Rocky Mountain area, and 8% from production located in California.”37
Transportation Energy Resources
The project would attract additional vehicle trips with resulting consumption of energy resources, predominantly gasoline and diesel fuel. Gasoline (and other vehicle fuels) are commercially provided commodities and would be available to the project patrons and employees via commercial outlets.
The most recent data available shows the transportation sector emits 38 percent of the total greenhouse gases in the state and about 84 percent of smog-forming oxides of nitrogen (NOx). 38,39 About 28 percent of total United States energy consumption in 2021 was for transporting people and goods from one place to another. In 2021, petroleum comprised about 77 percent of all transportation energy use, excluding fuel consumed for aviation and most marine vessels. 40 In 2021, about 134.83 billion gallons (or about 3.21 billion barrels) of finished motor gasoline were consumed in the United States, an average of about 369 million gallons (or about 8.8 million barrels) per day.41
REGULATORY BACKGROUND
Federal and state agencies regulate energy use and consumption through various means and programs. On the federal level, the United States Department of Transportation, the United States Department of Energy, and the United States Environmental Protection Agency are three federal agencies with substantial influence over energy policies and programs. On the state level, the PUC and the California Energy Commissions (CEC) are two agencies with authority over different aspects of energy. Relevant federal and state energy‐related laws and plans are summarized below.
Federal Regulations
Corporate Average Fuel Economy (CAFE) Standards
First established by the U.S. Congress in 1975, the Corporate Average Fuel Economy (CAFE) standards reduce energy consumption by increasing the fuel economy of cars and light trucks. The National Highway Traffic Safety Administration (NHTSA) and U.S. Environmental Protection Agency (USEPA) jointly administer the CAFE standards. The U.S. Congress has specified that CAFE standards must be set at the “maximum feasible level” with consideration given for: (1) technological feasibility; (2) economic practicality; (3) effect of other standards on fuel economy; and (4) need for the nation to conserve energy. 42
Issued by NHTSA and EPA in March 2020 (published on April 30, 2020 and effective after June 29, 2020), the Safer Affordable Fuel-Efficient Vehicles Rule would maintain the CAFE and CO2 standards applicable in model year 2020 for model years 2021 through 2026. The estimated CAFE and CO2 standards for model year 2020 are 43.7 mpg and 204 grams of CO2 per mile for passenger cars and 31.3 mpg and 284 grams of
37 California Public Utilities Commission. Natural Gas and California. http://www.cpuc.ca.gov/natural_gas/ 38 CARB. California Greenhouse Gas Emissions Inventory – 2022 Edition. https://www.arb.ca.gov/cc/inventory/data/data.htm 39 CARB. 2016 SIP Emission Projection Data. https://www.arb.ca.gov/app/emsinv/2017/emseic1_query.php?F_DIV=- 4&F_YR=2012&F_SEASON=A&SP=SIP105ADJ&F_AREA=CA
40 US Energy Information Administration. Use of Energy in the United States Explained: Energy Use for Transportation. https://www.eia.gov/energyexplained/?page=us_energy_transportation 41 https://www.eia.gov/tools/faqs/faq.php?id=23&t=10
42 https://www.nhtsa.gov/lawsregulations/corporate-average-fuel-economy. 73 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 74 19594
CO2 per mile for light trucks, projecting an overall industry average of 37 mpg, as compared to 46.7 mpg under the standards issued in 2012.43
Intermodal Surface transportation Efficiency Act of 1991 (ISTEA)
The Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA) promoted the development of inter‐ modal transportation systems to maximize mobility as well as address national and local interests in air quality and energy. ISTEA contained factors that Metropolitan Planning Organizations (MPOs) were to address in developing transportation plans and programs, including some energy‐related factors. To meet the new ISTEA requirements, MPOs adopted explicit policies defining the social, economic, energy, and environmental values guiding transportation decisions.
The Transportation Equity Act of the 21st Century (TEA-21)
The Transportation Equity Act for the 21st Century (TEA‐21) was signed into law in 1998 and builds upon the initiatives established in the ISTEA legislation, discussed above. TEA‐21 authorizes highway, highway safety, transit, and other efficient surface transportation programs. TEA‐21 continues the program structure established for highways and transit under ISTEA, such as flexibility in the use of funds, emphasis on measures to improve the environment, and focus on a strong planning process as the foundation of good transportation decisions. TEA‐21 also provides for investment in research and its application to maximize the performance of the transportation system through, for example, deployment of Intelligent Transportation Systems, to help improve operations and management of transportation systems and vehicle safety.
State Regulations
Integrated Energy Policy Report (IEPR)
Senate Bill 1389 requires the California Energy Commission (CEC) to prepare a biennial integrated energy policy report that assesses major energy trends and issues facing the State’s electricity, natural gas, and transportation fuel sectors and provides policy recommendations to conserve resources; protect the environment; ensure reliable, secure, and diverse energy supplies; enhance the state’s economy; and protect public health and safety. The Energy Commission prepares these assessments and associated policy recommendations every two years, with updates in alternate years, as part of the Integrated Energy Policy Report.
The 2019 Integrated Energy Policy Report (2019 IEPR) was adopted February 20, 2020, and continues to work towards improving electricity, natural gas, and transportation fuel energy use in California. The 2019 IEPR focuses on a variety of topics such as decarbonizing buildings, integrating renewables, energy efficiency, energy equity, integrating renewable energy, updates on Southern California electricity reliability, climate adaptation activities for the energy sector, natural gas assessment, transportation energy demand forecast, and the California Energy Demand Forecast.44
State of California Energy Plan
The CEC is responsible for preparing the State Energy Plan, which identifies emerging trends related to energy supply, demand, conservation, public health and safety, and the maintenance of a healthy economy. The Plan calls for the state to assist in the transformation of the transportation system to improve air quality, reduce
43 National Highway Traffic Safety Administration (NHTSA) and U.S. Environmental Protection Agency (USEPA), 2018. Federal Register / Vol. 83, No. 165 / Friday, August 24, 2018 / Proposed Rules, The Safer Affordable Fuel-Efficient (SAFE) Vehicles Rule for Model Years 2021–2026 Passenger Cars and Light Trucks 2018. Available at: https://www.epa.gov/regulations-emissions-vehicles-and- engines/safer-affordable-fuel-efficient-safe-vehicles-final-rule. 44 California Energy Commission. Final 2019 Integrated Energy Policy Report. February 20, 2020. https://www.energy.ca.gov/data- reports/reports/integrated-energy-policy-report/2019-integrated-energy-policy-report 74 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 75 19594
congestion, and increase the efficient use of fuel supplies with the least environmental and energy costs. To further this policy, the plan identifies a number of strategies, including assistance to public agencies and fleet operators and encouragement of urban designs that reduce vehicle miles traveled and accommodate pedestrian and bicycle access.
California Building Standards Code (Title 24)
The California Building Standards Code Title 24 was previously discussed in Section 3 of this report.
California Building Energy Efficiency Standards (Title 24, Part 6)
The California Building Energy Efficiency Standards for Residential and Nonresidential Buildings (California Code of Regulations, Title 24, Part 6) were adopted to ensure that building construction and system design and installation achieve energy efficiency and preserve outdoor and indoor environmental quality. The current California Building Energy Efficiency Standards (Title 24 standards) are the 2019 Title 24 standards, which became effective on January 1, 2020. The 2019 Title 24 standards include efficiency improvements to the lighting and efficiency improvements to the non-residential standards include alignment with the American Society of Heating and Air-Conditioning Engineers. For example, window operation is no longer a method allowed to meet ventilation requirements, continuous operation of central forced air system handlers used in central fan integrated ventilation system is not a permissible method of providing the dwelling unit ventilation airflow, and central ventilation systems that serve multiple dwelling units must be balanced to provide ventilation airflow to each dwelling unit. In addition, requirements for kitchen range hoods were also provided in the updated Section 120.1. Ventilation and Indoor Air Quality included both additions and revisions in the 2019 Code. This section now requires nonresidential and hotel/motel buildings to have air filtration systems that use forced air ducts to supply air to occupiable spaces to have air filters. Further, the air filter efficiency must be either MERV 13 or use a particle size efficiency rating specific in the Energy Code AND be equipped with air filters with a minimum 2-inch depth or minimum 1-inch depth if sized according to the equation 120.1- A. If natural ventilation is to be used the space must also use mechanical unless ventilation openings are either permanently open or controlled to stay open during occupied times.
New regulations were also adopted under Section 130.1 Indoor Lighting Controls. These included new exceptions being added for restrooms, the exception for classrooms being removed, as well as exceptions in regard to sunlight provided through skylights and overhangs.
All buildings for which an application for a building permit is submitted on or after January 1, 2020 must follow the 2019 standards. The 2016 residential standards were estimated to be approximately 28 percent more efficient than the 2013 standards, whereas the 2019 residential standards are estimated to be approximately 7 percent more efficient than the 2016 standards. Furthermore, once rooftop solar electricity generation is factored in, 2019 residential standards are estimated to be approximately 53 percent more efficient than the 2016 standards. Under the 2019 standards, nonresidential buildings are estimated to be approximately 30 percent more efficient than the 2016 standards. Energy efficient buildings require less electricity; therefore, increased energy efficiency reduces fossil fuel consumption and decreases greenhouse gas emissions.
The 2022 Building Energy Efficiency Standards will become effective on January 1, 2023. 45 The core focus of the building standards has been efficiency, but the 2019 Energy Code ventured into onsite generation by requiring solar PV on new homes, providing significant GHG savings. The 2022 update builds off this progress with expanded solar standards and the move to onsite energy storage that will help Californians save on utility bills while bolstering the grid. The 2022 Energy Code update focuses on four key areas in new construction of homes and businesses:
45 California Energy Commission (CEC). 2022. Building Energy Efficiency Standards. https://www.energy.ca.gov/programs-and- topics/programs/building-energy-efficiency-standards/2022-building-energy-efficiency. 75 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 76 19594
Encouraging electric heat pump technology and use, which consumes less energy and produces fewer emissions than traditional HVACs and water heaters.
Establishing electric-ready requirements when natural gas is installed, which positions owners to use cleaner electric heating, cooking and electric vehicle (EV) charging options whenever they choose to adopt those technologies.
Expanding solar photovoltaic (PV) system and battery storage standards to make clean energy available onsite and complement the state’s progress toward a 100 percent clean electricity grid. Strengthening ventilation standards to improve indoor air quality.
The 2022 Energy Code affects homes by establishing energy budgets based on efficient heat pumps for space or water heating to encourage builders to install heat pumps over gas-fueled HVAC units; requiring homes to be electric-ready, with dedicated 240-volt outlets and space (with plumbing for water heaters) so electric appliances can eventually replace installed gas appliances; increasing minimum kitchen ventilation requirements so that fans over cooktops have higher airflow or capture efficiency to better exhaust pollution from gas cooking and improve indoor air quality; and allowing exceptions to existing solar PV standards when roof area is not available (such as for smaller homes). In addition, the effect on businesses includes establishing combined solar PV and battery standards for select businesses with systems being sized to maximize onsite use of solar energy and avoid electricity demand during times when the grid must use gas-powered plants; establishing new efficiency standards for commercial greenhouses (primarily cannabis growing); and improving efficiency standards for building envelope, various internal systems, and grid integration equipment, such as demand-responsive controls to buoy grid stability.46,47
California Building Energy Efficiency Standards (Title 24, Part 11)
The 2019 California Green Building Standards Code (California Code of Regulations, Title 24, Part 11), commonly referred to as the CALGreen Code, went into effect on January 1, 2020. The 2019 CALGreen Code includes mandatory measures for non-residential development related to site development; energy efficiency; water efficiency and conservation; material conservation and resource efficiency; and environmental quality.
As previously discussed in Section 3 of this report, the Department of Housing and Community Development (HCD) updated CALGreen through the 2019 Triennial Code Adoption Cycle. HCD modified the best management practices for stormwater pollution prevention adding Section 5.106.2 for projects that disturb one or more acres of land. This section requires projects that disturb one acre or more of land or less than one acre of land but are part of a larger common plan of development or sale must comply with the postconstruction requirement detailed in the applicable National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater Discharges Associated with Construction and Land Disturbance Activities issued by the State Water Resources Control Board. The NPDES permits require postconstruction runoff (post-project hydrology) to match the preconstruction runoff pre-project hydrology) with installation of postconstruction stormwater management measures.
HCD added sections 5.106.4.1.3 and 5.106.4.1.5 in regard to bicycle parking. Section 5.106.4.1.3 requires new buildings with tenant spaces that have 10 or more tenant-occupants, provide secure bicycle parking for 5 percent of the tenant-occupant vehicular parking spaces with a minimum of one bicycle parking facility. In addition, Section 5.106.4.1.5 states that acceptable bicycle parking facility for Sections 5.106.4.1.2 through
5.106.4.1.4 shall be convenient from the street and shall meeting one of the following: (1) covered, lockable enclosures with permanently anchored racks for bicycles; (2) lockable bicycle rooms with permanently anchored racks; or (3) lockable, permanently anchored bicycle lockers.
46 https://www.lightnowblog.com/2021/08/california-energy-commission-adopts-2022-building-energy-efficiency-standards/ 47 State of California Energy Commission. 2022 Building Energy Efficiency Standards Summary. https://www.energy.ca.gov/sites/default/files/2021-08/CEC_2022_EnergyCodeUpdateSummary_ADA.pdf 76 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 77 19594
HCD amended section 5.106.5.3.5 allowing future charging spaces to qualify as designated parking for clean air vehicles.
HCD updated section 5.303.3.3 in regard to showerhead flow rates. This update reduced the flow rate to 1.8 GPM.
HCD amended section 5.304.1 for outdoor potable water use in landscape areas and repealed sections
5.304.2 and 5.304.3. The update requires nonresidential developments to comply with a local water efficient landscape ordinance or the current California Department of Water Resource’s’ Model Water Efficient Landscape Ordinance (MWELO), whichever is more stringent. Some updates were also made in regard to the outdoor potable water use in landscape areas for public schools and community colleges.
HCD updated Section 5.504.5.3 in regard to the use of MERV filters in mechanically ventilated buildings. This update changed the filter use from MERV 8 to MERV 13. MERV 13 filters are to be installed prior to occupancy, and recommendations for maintenance with filters of the same value shall be included in the operation and maintenance manual.
The 2022 California Green Building Standards Code became effective on January 1, 2023. 48
HCD amended Section 5.106.5.3 in regard to increasing the EV capable space percentages and adding a new requirement for installed Level 2 DCFC chargers.
HCD under Section 5.106.5.4 added new regulation for electric vehicle charging readiness requirements for new construction of warehouse, grocery stores, and retail stores with planned off-street loading spaces. 49
Senate Bill 100
Senate Bill 100 (SB 100) requires 100 percent of total retail sales of electricity in California to come from eligible renewable energy resources and zero-carbon resources by December 31, 2045. SB 100 was adopted September 2018.
The interim thresholds from prior Senate Bills and Executive Orders would also remain in effect. These include Senate Bill 1078 (SB 1078), which requires retail sellers of electricity, including investor-owned utilities and community choice aggregators, to provide at least 20 percent of their supply from renewable sources by 2017. Senate Bill 107 (SB 107) which changed the target date to 2010. Executive Order S-14-08, which was signed on November 2008 and expanded the State’s Renewable Energy Standard to 33 percent renewable energy by 2020. Executive Order S-21-09 directed the CARB to adopt regulations by July 31, 2010 to enforce S-14-08. Senate Bill X1-2 codifies the 33 percent renewable energy requirement by 2020.
Senate Bill 350
As previously discussed in Section 3 of this report, Senate Bill 350 (SB 350) was signed into law October 7, 2015, SB 350 increases California’s renewable electricity procurement goal from 33 percent by 2020 to 50 percent by 2030. This will increase the use of Renewables Portfolio Standard (RPS) eligible resources, including solar, wind, biomass, geothermal, and others. In addition, SB 350 requires the state to double statewide energy efficiency savings in electricity and natural gas end uses by 2030. To help ensure these goals are met and the greenhouse gas emission reductions are realized, large utilities will be required to develop and submit Integrated Resource Plans (IRPs). These IRPs will detail how each entity will meet their customers resource needs, reduce greenhouse gas emissions and ramp up the deployment of clean energy resources.
48 California Building Standards Commission (CBSC). 2022. California Green Building Standards.
Website: https://codes.iccsafe.org/content/CAGBC2022P1. 49 https://www.dgs.ca.gov/BSC/Resources/2022-Title-24-California-Code-Changes 77 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 78 19594
Assembly Bill 32
As discussed in Section 3 of this report, in 2006 the California State Legislature adopted Assembly Bill 32 (AB 32), the California Global Warming Solutions Act of 2006. AB 32 requires CARB, to adopt rules and regulations that would achieve GHG emissions equivalent to statewide levels in 1990 by 2020 through an enforceable statewide emission cap which will be phased in starting in 2012. Emission reductions shall include carbon sequestration projects that would remove carbon from the atmosphere and best management practices that are technologically feasible and cost effective. Please see Section 3 for further detail on AB 32.
Assembly Bill 1493/Pavley Regulations
As discussed in Section 3 of this report, California Assembly Bill 1493 enacted on July 22, 2002, required CARB to develop and adopt regulations that reduce GHGs emitted by passenger vehicles and light duty trucks.
In 2005, the CARB submitted a “waiver” request to the EPA from a portion of the federal Clean Air Act in order to allow the State to set more stringent tailpipe emission standards for CO 2 and other GHG emissions from passenger vehicles and light duty trucks. On December 19, 2007 the EPA announced that it denied the “waiver” request. On January 21, 2009, CARB submitted a letter to the EPA administrator regarding the State’s request to reconsider the waiver denial. The EPA approved the waiver on June 30, 2009.
Executive Order S-1-07/Low Carbon Fuel Standard
As discussed in Section 3 of this report, Executive Order S-1-07 was issued in 2007 and proclaims that the transportation sector is the main source of GHG emissions in the State, since it generates more than 40 percent of the State’s GHG emissions. It establishes a goal to reduce the carbon intensity of transportation fuels sold in the State by at least ten percent by 2020. This Order also directs CARB to determine whether this Low Carbon Fuel Standard (LCFS) could be adopted as a discrete early-action measure as part of the effort to meet the mandates in AB 32.
On April 23, 2009 CARB approved the proposed regulation to implement the low carbon fuel standard. The low carbon fuel standard is anticipated to reduce GHG emissions by about 16 MMT per year by 2020. The low carbon fuel standard is designed to provide a framework that uses market mechanisms to spur the steady introduction of lower carbon fuels. The framework establishes performance standards that fuel producers and importers must meet each year beginning in 2011. Separate standards are established for gasoline and diesel fuels and the alternative fuels that can replace each. The standards are “back-loaded”, with more reductions required in the last five years, than during the first five years. This schedule allows for the development of advanced fuels that are lower in carbon than today’s fuels and the market penetration of plug-in hybrid electric vehicles, battery electric vehicles, fuel cell vehicles, and flexible fuel vehicles. It is anticipated that compliance with the low carbon fuel standard will be based on a combination of both lower carbon fuels and more efficient vehicles.
Reformulated gasoline mixed with corn-derived ethanol at ten percent by volume and low sulfur diesel fuel represent the baseline fuels. Lower carbon fuels may be ethanol, biodiesel, renewable diesel, or blends of these fuels with gasoline or diesel as appropriate. Compressed natural gas and liquefied natural gas also may be low carbon fuels. Hydrogen and electricity, when used in fuel cells or electric vehicles are also considered as low carbon fuels for the low carbon fuel standard.
California Air Resources Board
CARB’s Advanced Clean Cars Program
Closely associated with the Pavley regulations, the Advanced Clean Cars emissions control program was approved by CARB in 2012. The program combines the control of smog, soot, and GHGs with requirements for greater numbers of zero-emission vehicles for model years 2015–2025.15 The components of the Advanced Clean Cars program include the Low-Emission Vehicle (LEV) regulations that reduce criteria 78 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 79 19594
pollutants and GHG emissions from light- and medium-duty vehicles, and the Zero-Emission Vehicle (ZEV) regulation, which requires manufacturers to produce an increasing number of pure ZEVs (meaning battery electric and fuel cell electric vehicles), with provisions to also produce plug-in hybrid electric vehicles (PHEV) in the 2018 through 2025 model years.50
Airborne Toxic Control Measure to Limit Diesel-Fueled Commercial Motor Vehicle Idling
The Airborne Toxic Control Measure to Limit Diesel-Fueled Commercial Motor Vehicle Idling (Title 13, California Code of Regulations, Division 3, Chapter 10, Section 2435) was adopted to reduce public exposure to diesel particulate matter and other air contaminants by limiting the idling of diesel-fueled commercial motor vehicles. This section applies to diesel-fueled commercial motor vehicles with gross vehicular weight ratings of greater than 10,000 pounds that are or must be licensed for operation on highways. Reducing idling of diesel-fueled commercial motor vehicles reduces the amount of petroleum-based fuel used by the vehicle.
Regulation to Reduce Emissions of Diesel Particulate Matter, Oxides of Nitrogen, and other Criteria Pollutants, form In-Use Heavy-Duty Diesel-Fueled Vehicles
The Regulation to Reduce Emissions of Diesel Particulate Matter, Oxides of Nitrogen and other Criteria Pollutants, from In-Use Heavy-Duty Diesel-Fueled Vehicles (Title 13, California Code of Regulations, Division 3, Chapter 1, Section 2025) was adopted to reduce emissions of diesel particulate matter, oxides of nitrogen (NOX) and other criteria pollutants from in-use diesel-fueled vehicles. This regulation is phased, with full implementation by 2023. The regulation aims to reduce emissions by requiring the installation of diesel soot filters and encouraging the retirement, replacement, or repower of older, dirtier engines with newer emission- controlled models. The newer emission-controlled models would use petroleum-based fuel in a more efficient manner.
Sustainable Communities Strategy
The Sustainable Communities and Climate Protection Act of 2008, or Senate Bill 375 (SB 375), coordinates land use planning, regional transportation plans, and funding priorities to help California meet the GHG reduction mandates established in AB 32.
As previously stated in Section 3 of this report, Senate Bill 375 (SB 375) was adopted September 2008 and aligns regional transportation planning efforts, regional GHG emission reduction targets, and land use and housing allocation. SB 375 requires Metropolitan Planning Organizations (MPO) to adopt a sustainable communities strategy (SCS) or alternate planning strategy (APS) that will prescribe land use allocation in that MPOs Regional Transportation Plan (RTP). CARB, in consultation with each MPO, will provide each affected region with reduction targets for GHGs emitted by passenger cars and light trucks in the region for the years 2020 and 2035. These reduction targets will be updated every eight years but can be updated every four years if advancements in emissions technologies affect the reduction strategies to achieve the targets. CARB is also charged with reviewing each MPO’s sustainable communities strategy or alternate planning strategy for consistency with its assigned targets.
The proposed project is located within the Southern California Association of Governments (SCAG) jurisdiction, which has authority to develop the SCS or APS. For the SCAG region, the targets set by CARB are at eight percent below 2005 per capita GHG emissions levels by 2020 and 19 percent below 2005 per capita GHG emissions levels by 2035. These reduction targets became effective October 2018.
50 California Air Resources Board, California’s Advanced Clean Cars Program, January 18, 2017. www.arb.ca.gov/msprog/acc/acc.htm. 79 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 80 19594
PROJECT ENERGY DEMANDS AND ENERGY EFFICIENCY MEASURES
Evaluation Criteria
In compliance with Appendix G of the State CEQA Guidelines, this report analyzes the project’s anticipated energy use to determine if the project would:
Result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources, during project construction or operation; or Conflict with or obstruct a state or local plan for renewable energy or energy efficiency.
In addition, Appendix F of the State CEQA Guidelines states that the means of achieving the goal of energy conservation includes the following:
Decreasing overall per capita energy consumption;
Decreasing reliance on fossil fuels such as coal, natural gas and oil; and Increasing reliance on renewable energy sources.
Methodology
Information from the CalEEMod 2022.1.1.6 Output contained in Appendix B, utilized for air quality and greenhouse gas analyses in Sections 2 and 3 of this report, were also utilized for this analysis. The CalEEMod outputs detail project related construction equipment, transportation energy demands, and facility energy demands.
Construction Energy Demands
Construction is anticipated to occur no sooner than early September 2024 with completion early September 2026, and be completed in one phase. Staging of construction vehicles and equipment will occur on-site. The approximately twenty-four-month schedule is relatively short, and the project site is approximately 1.93 acres.
Construction Equipment Electricity Usage Estimates
As stated previously, Electrical service will be provided by SCE. The focus within this section is the energy implications of the construction process, specifically the power cost from on-site electricity consumption during construction of the proposed project. Based on the 2021 National Construction Estimator, Richard Pray (2021)51, the typical power cost per 1,000 square feet of building construction per month is estimated to be $2.37. The project is the construction of 13 single-family residential dwelling units with a total square footage of up to approximately 35,500 square feet. Based on Table 15, the total power cost of the on-site electricity usage during the construction of the proposed project is estimated to be approximately $2,019.24.
Furthermore, the total electricity usage from project construction related activities is estimated to be approximately 20,192 kWh.52
Construction Equipment Fuel Estimates
Fuel consumed by construction equipment would be the primary energy resource expended over the course of project construction. Fuel consumed by construction equipment was evaluated with the following assumptions:
51 Pray, Richard. 2021 National Construction Estimator. Carlsbad: Craftsman Book Company, 2021. 52 Assumes the project will be under the Residential Tiered Rate Plan under SCE. https://www.sce.com/residential/rates. 80 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 81 19594
Construction schedule of 24 months
All construction equipment was assumed to run on diesel fuel Typical daily use of 8 hours, with some equipment operating from ~6-7 hours Aggregate fuel consumption rate for all equipment was estimated at 18.5 hp-hr/gallon (from CARB’s 2017 Emissions Factors Tables and fuel consumption rate factors as shown in Table D-21 of the Moyer Guidelines: (https://www.arb.ca.gov/msprog/moyer/guidelines/2017gl/2017_gl_appendix_d.pdf). Diesel fuel would be the responsibility of the equipment operators/contractors and would be sources within the region.
Project construction represents a “single-event” for diesel fuel demand and would not require on-going or permanent commitment of diesel fuel resources during long term operation.
Using the CalEEMod data input for the air quality and greenhouse gas analyses (Sections 2 and 3 of this report), the project’s construction phase would consume electricity and fossil fuels as a single energy demand, that is, once construction is completed their use would cease. CARB’s 2017 Emissions Factors Tables show that on average aggregate fuel consumption (gasoline and diesel fuel) would be approximately 18.5 hp-hr-gal.
Table 16 shows the results of the analysis of construction equipment.
As presented in Table 16, project construction activities would consume an estimated 40,886 gallons of diesel fuel. As stated previously, project construction would represent a “single‐event” diesel fuel demand and would not require on‐going or permanent commitment of diesel fuel resources for this purpose.
Construction Worker Fuel Estimates
It is assumed that construction worker trips are from light duty autos (LDA), light duty truck 1 (LDT1), and light duty truck 2 (LDT2) at a mix of 25 percent/50 percent/25 percent, respectively, along area roadways. 53 With respect to estimated VMT, the construction worker trips would generate an estimated 51,124 VMT.
Data regarding project related construction worker trips were based on CalEEMod 2022.1.1.6 model defaults.
Vehicle fuel efficiencies for construction workers were estimated in the air quality and greenhouse gas analyses (Sections 2 and 3 of this report) using information generated using CARB’s 2021 EMFAC model (see Appendix B for details). An aggregate fuel efficiency of 26.02 miles per gallon (mpg) was used to calculate vehicle miles traveled for construction worker trips. Table 17 shows that an estimated 1,965 gallons of fuel would be consumed for construction worker trips.
Construction Vendor/Hauling Fuel Estimates
Tables 18 and 19 show the estimated fuel consumption for vendor and hauling during building construction and architectural coating. With respect to estimated VMT, the vendor and hauling trips would generate an estimated 8,047 VMT. Data regarding project related construction worker trips were based on CalEEMod 2022.1.1.6 model defaults.
For the architectural coatings it is assumed that the contractors would be responsible for bringing coatings and equipment with them in their light duty vehicles. Therefore, vendors delivering construction material or hauling debris from the site during demolition, grading, and building construction would use medium to heavy duty vehicles with an average fuel consumption of 7.75 mpg for medium heavy-duty trucks and 6.05 mpg for
53 CalEEMod User's Guide Appendix C (April 2022) states that construction work trips are made by a fleet consisting of 25 percent light-duty auto (or passenger car), 50 percent light-duty truck type 1 (LDT1), and 25 percent light duty truck type 2 (LDT2). 81 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 82 19594
heavy heavy-duty trucks (see Appendix B for details).54 Tables 18 and 19 show that an estimated 1,208 gallons of fuel would be consumed for vendor and hauling trips.
Construction Energy Efficiency/Conservation Measures
Construction equipment used over the approximately twenty-four-month construction phase would conform to CARB regulations and California emissions standards and is evidence of related fuel efficiencies. There are no unusual project characteristics or construction processes that would require the use of equipment that would be more energy intensive than is used for comparable activities; or equipment that would not conform to current emissions standards (and related fuel efficiencies). Equipment employed in construction of the project would therefore not result in inefficient wasteful, or unnecessary consumption of fuel.
The project would utilize construction contractors which practice compliance with applicable CARB regulation regarding retrofitting, repowering, or replacement of diesel off-road construction equipment. Additionally, CARB has adopted the Airborne Toxic Control Measure to limit heavy-duty diesel motor vehicle idling in order to reduce public exposure to diesel particulate matter and other Toxic Air Contaminants. Compliance with these measures would result in a more efficient use of construction-related energy and would minimize or eliminate wasteful or unnecessary consumption of energy. Idling restrictions and the use of newer engines and equipment would result in less fuel combustion and energy consumption.
Additionally, as required by California Code of Regulations Title 13, Motor Vehicles, section 2449(d)(3) Idling, limits idling times of construction vehicles to no more than five minutes, thereby minimizing or eliminating unnecessary and wasteful consumption of fuel due to unproductive idling of construction equipment.
Enforcement of idling limitations is realized through periodic site inspections conducted by City building officials, and/or in response to citizen complaints.
Operational Energy Demands
Energy consumption in support of or related to project operations would include transportation energy demands (energy consumed by employee and patron vehicles accessing the project site) and facilities energy demands (energy consumed by building operations and site maintenance activities).
Transportation Fuel Consumption
Using the CalEEMod output from the air quality and greenhouse gas analyses (Sections 2 and 3 of this report), it is assumed that an average trip for autos and light trucks was assumed to be 6.1 miles and medium to heavy (2-4-axle) trucks were assumed to travel an average of 16 miles. 55 In order to present a worst-case scenario, it was assumed that vehicles would operate 365 days per year. Table 20 shows the estimated annual fuel consumption for all classes of vehicles from autos to heavy-heavy trucks. 56
The proposed project would generate a maximum of 84 trips per day. The vehicle fleet mix was used from the CalEEMod output. Table 20 shows that an estimated 10,140 of fuel would be consumed per year for the operation of the proposed project.
Trip generation and VMT generated by the proposed project are consistent with other similar residential land uses of similar scale and configuration as reflected respectively in the Institute of Transportation Engineers (ITE) Trip Generation Manual (11 th Edition, 2021). That is, the proposed project does not propose uses or
54 CalEEMod User's Guide Appendix C (April 2022) states that vendor trips are made by a fleet consisting of 50 percent medium trucks (MHDT) and 50 percent heavy trucks (HHDT) and that hauling and onsite truck trips are made by a fleet consisting of 100 percent HHDT.
55 CalEEMod default distance for H-W (home-work) is 16.03 miles; 6.08 miles for H-O (home-other). 56 Average fuel economy based on aggregate mileage calculated in EMFAC 2021 for opening year (2026). See Appendix B for EMFAC output.
82 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 83 19594
operations that would inherently result in excessive and wasteful vehicle trips and VMT, nor associated excess and wasteful vehicle energy consumption. Furthermore, the state of California consumed approximately 4.2 billion gallons of diesel and 15.1 billion gallons of gasoline in 2015. 57,58 Therefore, the increase in fuel consumption from the proposed project is insignificant in comparison to the State’s demand. Therefore, project transportation energy consumption would not be considered inefficient, wasteful, or otherwise unnecessary.
Facility Energy Demands (Electricity and Natural Gas)
Building operation and site maintenance (including landscape maintenance) would result in the consumption of electricity (provided by SCE) and natural gas (provided by Southern California Gas Company). The annual natural gas and electricity demands were provided per the CalEEMod output from the air quality and greenhouse gas analyses (Sections 2 and 3 of this report) and are provided in Table 21.
As shown in Table 21, the estimated electricity demand for the proposed project is approximately 89,637 kWh per year. In 2021, the residential sector of the County of Orange consumed approximately 7,272 million kWh of electricity. 59 In addition, the estimated natural gas consumption for the proposed project is approximately 498,360 kBTU per year. In 2021, the residential sector of the County of Orange consumed approximately 362 million therms of gas.60 Therefore, the increase in both electricity and natural gas demand from the proposed project is insignificant compared to the County’s 2021 residential sector demand.
Energy use in buildings is divided into energy consumed by the built environment and energy consumed by uses that are independent of the construction of the building such as in plug-in appliances. In California, the California Building Standards Code Title 24 governs energy consumed by the built environment, mechanical systems, and some types of fixed lighting. Non-building energy use, or “plug-in” energy use can be further subdivided by specific end-use (refrigeration, cooking, appliances, etc.). The proposed project would be required to comply with Title 24 standards.
Furthermore, the proposed project energy demands in total would be comparable to other residential projects of similar scale and configuration. Therefore, the project facilities’ energy demands, and energy consumption would not be considered inefficient, wasteful, or otherwise unnecessary.
RENEWABLE ENERGY AND ENERGY EFFICIENCY PLAN CONSISTENCY
Regarding federal transportation regulations, the project site is located in an already developed area. Access to/from the project site is from existing roads. These roads are already in place so the project would not interfere with, nor otherwise obstruct intermodal transportation plans or projects that may be proposed pursuant to the ISTEA because SCAG is not planning for intermodal facilities in the project area.
Regarding the State’s Energy Plan and compliance with Title 24 CCR energy efficiency standards, the applicant is required to comply with the California Green Building Standard Code requirements for energy efficient buildings and appliances as well as utility energy efficiency programs implemented by Southern California Edison and Southern California Gas Company.
Regarding Pavley (AB 1493) regulations, an individual project does not have the ability to comply or conflict with these regulations because they are intended for agencies and their adoption of procedures and protocols for reporting and certifying GHG emission reductions from mobile sources. However, the vehicles associated with the proposed project would be required to comply with federal and state fuel efficiency standards.
57 https://www.energy.ca.gov/data-reports/energy-almanac/transportation-energy/california-gasoline-data-facts-and-statistics 58 https://www.energy.ca.gov/data-reports/energy-almanac/transportation-energy/diesel-fuel-data-facts-and-statistics 59 California Energy Commission, Electricity Consumption by County. https://ecdms.energy.ca.gov/elecbycounty.aspx 60 California Energy Commission, Gas Consumption by County. http://ecdms.energy.ca.gov/gasbycounty.aspx 83 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 84 19594
Regarding the State’s Renewable Energy Portfolio Standards, the project would be required to meet or exceed the energy standards established in the California Green Building Standards Code, Title 24, Part 11 (CALGreen). CALGreen Standards require that new buildings reduce water consumption, employ building commissioning to increase building system efficiencies, divert construction waste from landfills, and install low pollutant-emitting finish materials.
As shown in Section 3 above, the proposed project would be consistent with the goals of the CARB Scoping Plan.
CONCLUSIONS
As supported by the preceding analyses, project construction and operations would not result in the inefficient, wasteful or unnecessary consumption of energy. The proposed project does not include any unusual project characteristics or construction processes that would require the use of equipment that would be more energy intensive than is used for comparable activities and is a residential project that is not proposing any additional features that would require a larger energy demand than other residential projects of similar scale and configuration. The energy demands of the project are anticipated to be accommodated within the context of available resources and energy delivery systems. The project would therefore not cause or result in the need for additional energy producing or transmission facilities. The project would not engage in wasteful or inefficient uses of energy and aims to achieve energy conservations goals within the State of California.
Notwithstanding, the project proposes residential uses and will not have any long-term effects on an energy provider’s future energy development or future energy conservation strategies. 84 California In-
State
Generation
(GWh)
Percent of
California In-
State
Generation
Northwest
Imports
(GWh)
Southwest
Imports
(GWh)
Total Imports
(GWh)
Percent of
Imports
Total
California
Energy Mix
(GWh)
Total
California
Power Mix
303 0.20% 181 7,788 7,969 9.50% 8,272 3.00%
97,431 50.20% 45 7,880 7,925 9.50% 105,356 37.90%
37 0.00% - - - 0.00% 37 0.00%
382 0.20% 68 15 83 0.10% 465 0.20%
16,477 8.50% 524 8756 9281 11.10% 25,758 9.30%
12,036 6.20% 12,042 1,578 13,620 16.30% 25,656 9.20%
- 0.00% 8,156 10,731 18,887 22.60% 18,887 6.80%
67,461 34.80% 11,555 14,317 25,872 30.90% 93,333 33.60% 5,381 2.80% 864 26 890 1.10% 6,271 2.30%
11,116 5.70% 192 1,906 2,098 2.50% 13,214 4.80%
2,531 1.30% 304 1 304 0.40% 2,835 1.00%
33,260 17.10% 220 5,979 6,199 7.40% 39,458 14.20%
15,173 7.80% 9,976 6,405 16,381 19.60% 31,555 11.40%
194,127 100% 32,572 51,064 83,636 100% 277,764 100%
(1)
Table 13
Total Electricity System Power (California 2021)
Geothermal
Small Hydro
Solar
Biomass
Fuel Type
Coal
Natural Gas
Oil
Other (Waste Heat/Petroleum Coke)
Nuclear
Large Hydro
Unspecified Sources of Power
Renewables
Wind
Total
Notes:
Source: California Energy Commission. 2021 Total System Electric Generation. https://www.energy.ca.gov/data-reports/energy-almanac/california- electricity-data/2021-total-system-electric-generation
Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 19594
85 2021 SCE Power Mix
31.4%
0.1%
5.7%
0.5%
14.9%
10.2%
0.0%
2.3%
22.3%
9.2%
0.2%
34.6%
100%
(1)
*
https://www.energy.ca.gov/filebrowser/download/4676
Unspecified sources of power means electricity from transactions that are not traceable to specific generation sources.
Solar
Wind
Coal
Large Hydroelectric
Natural Gas
Other
Unspecified Sources of power*
SCE 2021 Power Content Mix
Table 14
Nuclear
Total
Notes:
Energy Resources
Eligible Renewable
Biomass & Biowaste
Geothermal
Eligible Hydroelectric
Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 19594
86 Total Building Size
(1,000 Square Foot)1
Construction
Duration (months)
Total Project
Construction Power
Cost
35.500 24 $2,019.24
Notes:
(1)
(2)
Cost per kWh2
Total Project Construction Electricity Usage (kWh)
$0.10 20,192
Assumes the project will be under the Residential Tiered Rate Plan under SCE. https://www.sce.com/residential/rates
Total building square footage estimated based on: two dwelling units at 1,900 square foot, six dwelling units at 2,200 square foot, five dwelling units at 2,500 square foot, and garage square footage of approximately 500 square feet for each dwelling unit.
Table 15
Project Construction Power Cost and Electricity Usage
Power Cost
(per 1,000 square foot of building per
month of construction)
$2.37
Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 19594
87 Number
of Days Offroad Equipment Type Amount
Usage
Hours
Horse
Power
Load
Factor HP hrs/day
Total Fuel
Consumption
(gal diesel fuel)1
42 Concrete/Industrial Saw 1 8 33 0.73 193 438
42 Rubber Tired Dozers 1 8 367 0.4 1,174 2,666
42 Tractors/Loaders/Backhoes 1 8 84 0.37 249 564
15 Graders 1 8 148 0.41 485 394
15 Rubber Tired Dozers 1 8 367 0.4 1,174 952
15 Tractors/Loaders/Backhoes 2 7 84 0.37 435 353
422 Cranes 1 6 367 0.29 639 14,567
422 Forklifts 1 6 82 0.2 98 2,245
422 Generator Sets 1 8 14 0.74 83 1,891
422 Tractors/Loaders/Backhoes 1 6 84 0.37 186 4,254
422 Welders 3 8 46 0.45 497 11,332
24 Cement and Mortar Mixers 1 6 10 0.56 34 44
24 Pavers 1 6 81 0.42 204 265
24 Paving Equipment 1 8 89 0.36 256 333
24 Rollers 1 7 36 0.38 96 124
24 Tractors/Loaders/Backhoes 1 8 84 0.37 249 323
25 Air Compressors 1 6 37 0.48 107 144
40,886
Notes:
(1)
CONSTRUCTION FUEL DEMAND (gallons of diesel fuel)
Using Carl Moyer Guidelines Table D-21 Fuel consumption rate factors (bhp-hr/gal) for engines less than 750 hp. (Source: https://www.arb.ca.gov/msprog/moyer/guidelines/2017gl/2017_gl_appendix_d.pdf) Table 16
Construction Equipment Fuel Consumption Estimates
Phase
Architectural Coating
Grading
Building Construction
Demolition
Paving
Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 19594
88 Number of Days
Worker
Trips/Day
Trip Length
(miles)
Vehicle Miles
Traveled
Average Vehicle
Fuel Economy
(mpg)
Estimated Fuel
Consumption
(gallons)
42 7.5 18.5 5,828 26.02 224
15 10 18.5 2,775 26.02 107
422 4.68 18.5 36,537 26.02 1,404
24 12.5 18.5 5,550 26.02 213
25 0.94 18.5 435 26.02 17
1,965
Notes:
(1)
(2) Per CalEEMod User's Guide Appendix C (April 2022), CalEEMod assumes that construction work trips are made by a fleet consisfing of 25 percent light-duty auto (or passenger car), 50 percent light-duty truck type 1 (LDT1), and 25 percent light duty truck type 2 (LDT2).
Architectural Coating
Total Construction Worker Fuel Consumption
Assumptions for the worker trip length and vehicle miles traveled are consistent with CalEEMod 2022.1.1.6 defaults.
Grading
Table 17
Construction Worker Fuel Consumption Estimates
Phase
Building Construction
Paving
Demolition
Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 19594
89 Number of Days
Vendor
Trips/Day
Trip Length
(miles)
Vehicle Miles
Traveled
Average Vehicle
Fuel Economy
(mpg)
Estimated Fuel
Consumption
(gallons)
42 0 10.2 0 6.9 0
15 0 10.2 0 6.9 0
422 1.39 10.2 5,983 6.9 867
24 0 10.2 0 6.9 0
25 0 10.2 0 6.9 0
867
Notes:
(1)
(2) Per CalEEMod User's Guide Appendix C (April 2022), CalEEMod assumes vendor trips are made by a fleet consisting of 50 percent medium trucks (MHDT) and 50 percent heavy trucks (HHDT).
Architectural Coating
Total Construction Vendor Fuel Consumption
Assumptions for the vendor trip length and vehicle miles traveled are consistent with CalEEMod 2022.1.1.6 defaults.
Grading
Table 18
Construction Vendor Fuel Consumption Estimates (MHD & HHD Trucks) Phase
Building Construction
Paving
Demolition
Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 19594
90 Number of Days
Total Hauling
Trips
Trip Length
(miles)
Vehicle Miles
Traveled
Average Vehicle
Fuel Economy
(mpg)
Estimated Fuel
Consumption
(gallons)
42 0.1 20 84 6.05 14
15 7 20 1,980 6.05 327
422 0 20 0 6.05 0
24 0 20 0 6.05 0
25 0 20 0 6.05 0
341
Notes:
(1)
Architectural Coating
Total Construction Hauling Fuel Consumption
Assumptions for the hauling trip length and vehicle miles traveled are consistent with CalEEMod 2022.1.1.6 defaults.
Grading
Table 19
Construction Hauling Fuel Consumption Estimates (HHD Trucks) Phase
Building Construction
Paving
Demolition
Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 19594
91 Vehicle Mix
Number of
Vehicles
Average Trip
(miles)1 Daily VMT
Average Fuel
Economy
(mpg)2
Total Gallons
per Day
Total Annual
Fuel
Consumption
(gallons)
Automobile 42 6.1 256 33.51 7.65 2,791
Automobile 4 6.1 24 25.58 0.95 348
Automobile 20 6.1 122 25.64 4.76 1,737
2-Axle Truck 2 16.0 32 16.47 1.95 710
2-Axle Truck 1 16.0 16 15.61 1.03 375
Automobile 2 6.1 12 41.79 0.29 107
Automobile 12 16.0 192 21.01 9.16 3,342
-- 0 6.1 0 5.78 0.00 0
3-Axle Truck 1 16.0 16 8.01 2.00 730
-- 0 6.1 0 6.29 0.00 0
-- 0 6.1 0 6.55 0.00 0
-- 0 6.1 0 3.53 0.00 0
4-Axle Truck 0 16.0 0 6.26 0.00 0
84 -- 671 - 27.78 --
10,140
Notes:
(1) Based on the size of the site and relative location, trips were assumed to be local rather than regional. (2)
Motor Home
Medium Heavy Truck
Other Bus
Light Truck
Light Heavy Truck
Light Heavy Truck 10,000 lbs +
Motorcycle
Medium Truck
Light Truck
Table 20
Estimated Vehicle Operations Fuel Consumption
Vehicle Type
Light Auto
Based on EMFAC2021 emission rates for opening year of 2026.
School Bus
Urban Bus
Heavy Heavy Truck
Total
Total Annual Fuel Consumption
Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 19594
92 kBTU/year1,2
498,360
498,360
kWh/year
89,637
89,637
Notes:
(1) Taken from the CalEEMod 2022.1.1.6 output (Appendix B of this report).
Total
Electricity Demand
Single-Family Residential
Total
Single-Family Residential
Table 21
Project Annual Operational Energy Demand Summary
Natural Gas Demand
Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 19594
93 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 94 19594
5. EMISSIONS REDUCTION MEASURES
CONSTRUCTION MEASURES
Adherence to SCAQMD Rule 403 is required.
No construction mitigation is required.
OPERATIONAL MEASURES
No operational mitigation is required.
94 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 95 19594
6. REFERENCES
California Air Resources Board
2008 Resolution 08-43
2008 Recommended Approaches for Setting Interim Significance Thresholds for Greenhouse Gases under the California Environmental Quality Act
2008 ARB Recommended Interim Risk Management Policy for Inhalation-Based Residential Cancer Risk – Frequently Asked Questions
2008 Climate Change Scoping Plan, a framework for change.
2011 Supplement to the AB 32 Scoping Plan Functional Equivalent Document
2013 Almanac of Emissions and Air Quality.
Source: https://www.arb.ca.gov/aqd/almanac/almanac13/almanac13.htm
2014 First Update to the Climate Change Scoping Plan, Building on the Framework Pursuant to AB32, the California Global Warming Solutions Act of 2006. May.
2017 California's 2017 Climate Change Scoping Plan. November.
2022 2022 Scoping Plan for Achieving Carbon Neutrality. November 16.
2022 Historical Air Quality, Top 4 Summary
City of Orange
2010 Orange General Plan. March.
Ganddini Group, Inc.
2022 Rancho Ridge Infill Project Transportation Study Screening Assessment. December 19.
Governor’s Office of Planning and Research
2008 CEQA and Climate: Addressing Climate Change Through California Environmental Quality Act (CEQA) Review
2018 CEQA Guideline Sections to be Added or Amended
Intergovernmental Panel on Climate Change (IPCC).
2014 IPCC Fifth Assessment Report, Climate Change 2014: Synthesis Report
Office of Environmental Health Hazard Assessment
2015 Air Toxics Hot Spots Program Risk Assessment Guidelines
95 Rancho Ridge Infill Project
Air Quality, Global Climate Change, and Energy Impact Analysis 96 19594
South Coast Air Quality Management District
1993 CEQA Air Quality Handbook
2005 Rule 403 Fugitive Dust
2007 2007 Air Quality Management Plan
2008 Final Localized Significance Threshold Methodology, Revised
2012 Final 2012 Air Quality Management Plan
2016 2016 Air Quality Management Plan
2022 2022 Air Quality Management Plan. December 2.
Southern California Association of Governments
2016 2016-2040 Regional Transportation Plan/Sustainable Communities Strategy
2020 2020-2045 Regional Transportation Plan/Sustainable Communities Strategy
U.S. Environmental Protection Agency (EPA)
2017 Understanding Global Warming Potentials
(Source: https://www.epa.gov/ghgemissions/understanding-global-warming-potentials)
U.S. Geological Survey
2011 Reported Historic Asbestos Mines, Historic Asbestos Prospects, and Other Natural Occurrences of Asbestos in California