Cities Index.
Agenda packet, regular meeting

Orinda City Council
September 19, 2023

Document
Agenda packet, regular meeting
Meeting
September 19, 2023
Body
Orinda City Council
Pages
4
Original file
63.5 MB
Text extracted from the city's file for reading and search. Open the original on pub-orinda.escribemeetings.com. That file is the official record.

MEMBERS OF THE PUBLIC MAY PARTICIPATE IN THIS MEETING

IN PERSON, BY TELECONFERENCE, OR VIEW ON YOUTUBE AS LISTED BELOW https://www.youtube.com/@cityoforinda9535/streams
Zoom Webinar:
https://tinyurl.com/OrindaCityCouncil
Phone:669 444 9171
Webinar ID:
810 2271 2723
In Person:

Orinda Library Auditorium
26 Orinda Way
Orinda, CA 94563
(925) 351-6676

CITY COUNCIL
AGENDA
Tuesday, September 19, 2023
7:00 PM - REGULAR MEETING
City Council
Agenda Page 1 09.19.23
How to follow and/or participate in the meeting:

IN PERSON SPEAKER CARDS: If you would like to speak during the public forum or on an item listed on the agenda, you are invited to submit a speaker card to the City Clerk. You will be permitted to speak even if you elect not to submit a speaker card or decline to provide information requested on the card. After the City Council has heard from everyone who submitted speaker cards, anyone electing not to submit a speaker card may form a line at the lectern. Public comment is generally limited to 3 minutes per speaker per agenda item.

REMOTE COMMENTS: Use the Zoom “raise hand” function on your computer screen, or the *9 function on your phone to comment remotely. Public comment is generally limited to 3 minutes per speaker per agenda item. The Zoom participation option is provided to the public as a courtesy in order to facilitate participation. The City cannot, however, guarantee the adequacy of the audio/video quality or that meeting participation will be uninterrupted via Zoom. If technical difficulties arise relating to the Zoom participation option, the meeting may continue with public attendance in person only.

WRITTEN COMMENTS: You may also submit a public comment in advance of the meeting by following instructions below:

Deliver to City Hall at 22 Orinda Way or send an e-mail to [email protected] by 3pm on the day of the meeting. Those comments will be forwarded to the City Council. They will also be made a part of the public record and be available to view in the public review binder at Orinda City Hall, 22 Orinda Way. In addition, they will be available electronically by 5pm on the day of the meeting by selecting the date of the meeting in this Box account link:
https://tinyurl.com/Orinda-Public-Comments
7:00 PM - REGULAR SESSION
A. CALL TO ORDER / ROLL CALL
City Council
Agenda Page 2 09.19.23
Councilmembers: Brandyn Iverson, Latika Malkani, Janet Riley Vice Mayor Darlene Gee, Mayor Inga Miller
B. PLEDGE OF ALLEGIANCE
C. ADOPTION OF AGENDA
The City Council may take action on any item listed on the agenda.

D. ITEMS FOR THE GOOD OF THE CITY
D.1. Introduction of New Assistant Engineer, Jihawna Johnson E. PUBLIC FORUM
The public forum provides an opportunity for members of the public to speak on any item within the jurisdiction of the City Council that is not on the agenda.

Additionally, a speaker has the option of addressing the Council on an item listed on the agenda, if the speaker will not be present when that agenda item is taken up. When an item is not listed on the agenda, State law prohibits Council discussion or action. Councilmembers may only “briefly respond” to statements made and questions posed. For example, State law allows Councilmembers to ask questions for clarification and provide a reference to staff or other resources for factual information. Additionally, consistent with the “Matters Initiated” rule contained in its Policies and Procedures Manual, the Council may also direct staff to report back and/or place a matter on a future agenda for discussion.

F. CONSENT CALENDAR
F.1. City Council Minutes
Recommendation:

Approve City Council Minutes:

1. September 5, 2023 Special Meeting
F.2. City Council Meeting Schedule for 2024
Recommendation:

Adopt City Council Meeting Schedule for 2024
F.3. Quarterly Report of Cash Disbursements for the Period April 1, 2023 through June 30, 2023 and Summary of Revenue, Expenditures, and Preliminary Fund Balances for July 1, 2022 through June 30, 2023 Recommendation:

Staff recommends that the City Council receive and file this report of cash disbursements, and preliminary fund balances for the period of April-June 2023.

F.4. Authorize Contract Amendment No. 3 with Schaaf & Wheeler Consulting Civil Engineers for On-call Civil Engineering Services for the San Pablo Creek Culvert Repair Project (#4187)
City Council
Agenda Page 3 09.19.23
Recommendation:

Staff recommends that the City Council approve Contract Amendment No. 3 with Schaaf & Wheeler Consulting Civil Engineers to increase the contract value by $174,000 and extend the term of the agreement to June 30, 2026.

G. PUBLIC HEARING
G.1. (a) Discussion of a proposed dedication of a portion of the parcel at 11 Orinda Way (Chevron Station) that was part of a convenience market project approved by the Planning Commission, contingent upon City Council adoption of Ordinance 23-04; and (b) Public Hearing regarding Ordinance 23-04 which would Amend Section

17.2.3 (Definitions) and Section 17.8.5 (Downtown commercial district—Use restrictions) of the City’s Zoning Code to Update Rules Applicable to Convenience Markets and Other Ancillary Retail Uses at Service Stations (applicant: Chevron).

Recommendation:

Staff recommends that the City Council 1) consider the question of the dedication of the creek portion of 11 Orinda Way as fee or through an easement; 2) waive the full reading of the text and introduce Ordinance 23-04, amending Section 17.2.3 (Definitions) and Section 17.8.5 (Downtown commercial district-Use restrictions) to update the City’s rules regarding convenience markets and other ancillary retail uses at service stations; 3) find this ordinance is not subject to the California Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines (Title 14 of the California Code of Regulations) Sections 15060(c)(2) (the activity will not result in a direct or reasonably foreseeable indirect physical change in the environment) and 15060(c)(3) (the activity is not a project as defined in Section 15378) because it has no potential for resulting in physical change in the environment, directly or indirectly.

G.2. Annual Development Agreement Compliance Review for the Wilder Project
Recommendation:

City Council
Agenda Page 4 09.19.23
Conduct a public hearing to determine whether OG Property Owners, LLC (“OGLLC”) is in compliance with the terms of the Second Amendment and Restatement of the Development and Pre-Annexation Agreement for Gateway Valley (“DA”) and related approvals. Although OGLLC has made progress recently towards curing the Events of Default identified in 2022, Staff recommends that the City Council adopt Resolution No. 54- 23, which (1) finds that OGLLC remains out of compliance with certain requirements of the DA and related approvals; and (2) directs OGLLC to appear at a continued public hearing. To address noncompliance with certain DA requirements, Staff recommends the City Council direct City Staff to negotiate with OGLLC regarding potential DA amendments, including changes related to: the Red-Tailed Hawk Staging Area; a BART/downtown shuttle (8th DA Amendment); and the liability insurance OGLLC is required to maintain (DA § 5.2).

H. POLICY MATTERS
H.1. Moraga Orinda Fire District Ordinance 23-08
Recommendation:

Receive Report, Discuss, and Provide Direction, if any.

H.2. Policy Discussion regarding Downtown Parking Requirements, related State Legislation, and Proposed Adjustments to the Master Fee Schedule to Lower Certain Parking Variance In-Lieu Fees Recommendation:

Staff recommends that the City Council receive the presentation, take public testimony, and provide feedback regarding potential adjustments to the Master Fee Schedule.

I. COUNCILMEMBERS' REPORTS
J. CITY MANAGER'S REPORT
K. MATTERS INITIATED
L. CLOSED SESSION

1. OPEN SESSION IDENTIFICATION of Closed Session Matters

2. PUBLIC COMMENTS of Closed Session Matters

3. CLOSED SESSION

4. REPORT OUT OF CLOSED SESSION
A. CONFERENCE WITH LEGAL COUNSEL -- EXISTING LITIGATION. Pursuant to Government Code Section 54956.9(d)(1), conference with Legal Counsel regarding existing litigation: ORINDANS FOR SAFE EMERGENCY EVACUATION v. City of Orinda, Contra Costa County Superior Court Case No.

N23-0579.

City Council
Agenda Page 5 09.19.23
B. CONFERENCE WITH LEGAL COUNSEL -- ANTICIPATED LITIGATION.

Pursuant to Government Code Section 54956.9(d)(2) conference with legal counsel regarding significant exposure to litigation related to an urban lot split proposed for 6 Patrick Lane in Orinda pursuant to state law known as SB 9. Ellis Raskin, an attorney representing the existing residents of Patrick Lane, submitted a letter to the City Attorney dated September 7, 2023, threatening litigation if the urban lot split is approved. Linda Klein, an attorney representing the applicant, submitted an email to the City Attorney dated September 13, 2023, threatening litigation if the urban lot split is not approved. This correspondence will be made available for public inspection pursuant to Government Code Section 54957.5.

C. CITY MANAGER PERFORMANCE EVALUATION
Pursuant to Government Code Section 54957, annual performance evaluation of City Manager David Biggs
M. ADJOURNMENT
The next meeting of the Orinda City Council will be held on Tuesday, October 03, 2023 at 7:00 PM.

Please visit the City’s website at www.cityoforinda.org to view the City Council Calendar.

I, Sheri Marie Smith, City Clerk, declare under penalty of perjury under the laws of the State of California that this special meeting agenda has been posted at least 24 hours in advance at the Orinda City Hall, 22 Orinda Way and the Orinda Library, 26 Orinda Way.

Additional copies are available at the Orinda Library, 26 Orinda Way, and at the City’s website at www.cityoforinda.org. At least 24 hours in advance of the meeting, this agenda was also delivered to and received by each member of the City Council as well as each local newspaper, radio station and television station requesting written notice of special meetings.

I, Sheri Marie Smith, City Clerk, declare under penalty of perjury under the laws of the State of California that this regular meeting agenda has been posted at least 72 hours in advance at the Orinda City Hall, 22 Orinda Way and the Orinda Library, 26 Orinda Way. Additional copies are available at the Orinda Library, 26 Orinda Way, and at the City’s website at www.cityoforinda.org
~ Notices ~
There is a 90-day limit for the filing of a challenge in Court to certain City decisions that require a hearing by law, the receipt of evidence, and the exercise of discretion. The 90-day limit begins on the date the decision is final (Code of Civil Procedure §1094.6). Further, if you file a challenge in Court, you may be limited by California law, including but not limited to Government Code §65009, to those issues raised in connection with the public hearing. The City Council may be requested to reconsider a decision if the request is made prior to the next City Council meeting. For information on the next City Council meeting, please call 925.253.4221 or visit the website at www.cityoforinda.org. Unless otherwise noted, City Council actions include a determination that the California Environmental Quality Act (CEQA) does not apply. ~ Accessible Public Meetings ~
City Council
Agenda Page 6 09.19.23
The City of Orinda will provide special assistance for disabled citizens to participate in public meetings upon advance notice. If you need auxiliary hearing aid or sign language assistance at least two (2) working days advanced notice is necessary. Please contact the City Clerk’s Office, 22 Orinda Way, Orinda, Ca 94563 or 925.253.4221 or [email protected] with the following information: name, mailing address, phone number and type of assistance requested.

AGENDA TITLE: City Council Minutes
RECOMMENDATION:

Approve City Council Minutes:

1. September 5, 2023 Special Meeting
ATTACHMENTS:

A. City Council Minutes of September 5, 2023
Respectfully Submitted by:

Sheri Smith
City Clerk
Prepared By: Sheri Smith, City Clerk
Approved by:

F.1
Packet Pg. 7
Orinda City Council Minutes Page 1 of 19 09.05.23
SEPTEMBER 5, 2023

CITY OF ORINDA

CITY COUNCIL MINUTES
Note: Written communications received from the public prior to the start of this meeting can be viewed on the City’s website meeting calendar. They are also kept in the City Clerk’s Office as part of the public record and available upon request ([email protected]). 7:00 P.M. –REGULAR MEETING– GARDEN ROOM, ORINDA LIBRARY A. CALL TO ORDER / ROLL CALL:

Mayor Miller called the Regular Meeting to order at approximately 7:00 p.m COUNCILMEMBERS PRESENT: Brandyn Iverson, Janet Riley
Mayor Inga Miller, Vice Mayor Darlene Gee
COUNCILMEMBERS ABSENT: Latika Malkani
B. PLEDGE OF ALLEGIANCE – Led by Mayor Miller.

C. ADOPTION OF AGENDA
Councilmember Iverson requested adding a Matters Initiated item to be heard after the Public Forum, and Councilmembers concurred.

MOTION by Vice Mayor Gee, and seconded by Councilmember Iverson, to adopt the agenda, as amended. Said motion carried by unanimous (4-0) roll call vote.

D. ITEMS FOR THE GOOD OF THE CITY
D.1. Proclamation Honoring Jennie Flores for her 35 Years of Service to the City of Orinda
Mayor Miller recognized the City’s longest-serving employee, Jennie Flores, for her 35 years of service. Ms. Flores began in 1988 just after the City incorporated, and former Mayor Bobbie Landers, Laura Abrams, and Amy Worth are present to recognize her.

Mayor Miller and Councilmembers then read and presented a Proclamation to Ms. Flores.

Bobbie Landers applauded Jenny Flores and spoke of her smile and dedication. She read a letter into the record congratulating Ms. Flores on her 35 years of service to the City from Tom Sinclair, Orinda City Manager (1985-1994).

Laura Abrams spoke of Ms. Flores’ start at the old offices and then moving to the trailers.

They had dogs in the trailer and Ms. Flores would care for the dogs while staff went to meetings. She said it was a pleasure to work with Ms. Flores for so long and she thanked her for her service.

F.1.a
Packet Pg. 8
Attachment: City Council Minutes of September 5, 2023 (3208 : City Council Minutes) Orinda City Council Minutes Page 2 of 19 09.05.23
Amy Worth said she is honored to celebrate Jennie Flores for her 35 years of service to the City. She spoke about employees’ pets in the office and how much fun they were and how dedicated Ms. Flores has been. She and former Mayor Landers and Abrams then presented Ms. Flores with a gift.

City Manager Biggs then spoke of the City’s recognition of Ms. Flores’ service at the Summer Picnic where she was presented with a proclamation, a crown, and lei given the Hawaiian theme of the event.

E. PUBLIC FORUM
Michael Kirby said he has lived in Orinda for 10 years and he spoke of his declining health, stating there are only 3 disabled spaces near the theater and he suggested the City add more disabled parking spaces throughout the City.

K. MATTERS INITIATED
Councilmember Iverson said economic development and downtown revitalization are something they talk about a lot and are one of their high strategic priorities. She has heard about one space downtown on the Theater Square side has had several potential tenants and, because of the City’s parking regulations, the tenants wound up not being able to make a deal moving along.

The rules are that if it is a nail or hair salon, 2 parking spaces are needed for every station, and when they are told to either buy it out with an in-lieu fee or to provide those spaces such as for 6-8 stations, this is going to be 12 to 16 parking spaces of street parking right downtown. If those tenants or landlords cannot provide that they cannot have those businesses. What they have been told is just to have fewer stations which feels tone deaf about fixing problems downtown.

She has asked questions about what can be done about it and has been told that because they have the choice of going before the Planning Commission to get a variance on the parking requirement, the only alternative with this is to pay the in-lieu fee which can be very expensive. These businesses have to choose between either scaling down to where it is not feasible or paying a parking fee that is infeasible or finding parking that is infeasible.

She would like the Council to consider a period of time where the City might waive or significantly reduce the in-lieu parking fee in the downtown core for change of use of existing businesses. If there are vacant spaces downtown and they want to get a different use in there, if it is within the next 12-18 months the City gives them a break on the parking fee so they can go before the Planning Commission, get that change of use, and get the variance in a way that will not be a deal-killer for these types of small businesses. It should also apply to retail and restaurants as well. This can be an incentive to recruit and attract some businesses into some of the long-term vacant spaces.

F.1.a
Packet Pg. 9
Attachment: City Council Minutes of September 5, 2023 (3208 : City Council Minutes) Orinda City Council Minutes Page 3 of 19 09.05.23
Mayor Miller asked if Councilmember Iverson wanted staff to look at the handicapped spaces as well as part of the parking analysis. Councilmember Iverson said yes, and this should also be agendized.

MOTION by Councilmember Iverson, and seconded by Councilmember Riley, to schedule a Matters Initiated regarding the ability to waive or reduce in-lieu parking fees in the downtown core for change of use of existing businesses and review of handicapped spaces to be included in the parking analysis. Said motion carried by unanimous (4-0) roll call vote.

F. CONSENT CALENDAR
Mayor Miller asked if there were requests for removal of items or public comments.

Councilmember Iverson requested removal of Item F.3.

F.1. City Council Minutes
Recommendation:

Approve City Council Minutes:

1. August 15, 2023 Special Meeting

2. August 15, 2023 Regular Meeting
F.2. Consider Making one Appointment to the Finance Advisory Committee (FAC) to Fill an Existing Vacancy
Recommendation:

Appoint Brad Scott to the Finance Advisory Committee to fill one existing vacancy.

F.4. Authorize Contract Amendment No. 3 between the City of Orinda and Callander Associates
Recommendation:

Staff recommends that the City Council review Contract Amendment No. 3 between the City of Orinda and Callander Associates Landscape Architecture, Inc. to increase the contract limit by an additional $49,482 to a new total contract amount of $101,982 and authorize the City Manager and City Clerk to execute the contract amendment (Attachment 1) on behalf of the City, subject to approval as to form by the City Attorney.

F.5. Community Resilience Centers (CRC) Program Grant offered by the California Strategic Growth Council
Recommendation:

F.1.a
Packet Pg. 10
Attachment: City Council Minutes of September 5, 2023 (3208 : City Council Minutes) Orinda City Council Minutes Page 4 of 19 09.05.23
Adopt a Resolution authorizing the City Manager, or designee, to file an application with the California Strategic Growth Council of up to $5,000,000 for a “Development Grant” to make improvements to the Orinda Community Center and generate a plan to turn the Community Center into a “Community Resilience Center.” (The project will be known as the Orinda Community Center Resilience Program.). As a Community Resilience Center, the Orinda Community Center will provide shelter and resources during climate and other emergencies, such as extreme heat events and poor air quality days. The grant will also fund ongoing year-round community services and programs that build overall community resilience.

F.6. Approve Amendments to On-Call Professional Service Contracts with LSA Associates, Anchor Engineering, Inc., and Advanced Mobility Group (AMG)
Recommendation:

Staff recommends that the City Council approve Contract Amendments for LSA Associates, Anchor Engineering, Inc., and Advanced Mobility Group (AMG), to extend the on-call contract term to June 30, 2024 and increase the contract limit; and authorize the City Manager to execute the contract amendment on behalf of the City, subject to approval as to form by the City Attorney.

F.7. Hillcrest Drive Posted Speed Limit Change
Recommendation:

Staff recommend that the City Council Consider the Traffic Safety Advisory Committee recommendation to adopt Resolution 52-23 (Traffic Order #224) lowering the existing speed limit on Hillcrest Drive between Martha Road and Overhill Road and creating a Special School Zone Speed Limit on Hillcrest Drive at a distance of less than 500 feet from Glorietta Elementary School building.

F.8. Acceptance of Bay Cities Contract for 2022 Annual Pavement Rehabilitation Project (CIP No 4166 and CIP No. 4165), and Moraga Way Pedestrian Pathway Project (CIP No. 4168).

Recommendation:

Staff recommends that the City Council adopt Resolution No.48-23 Acceptance of Work for the 2022 Annual Pavement Rehabilitation Project (CIP No, 4166 and CIP No. 4165), and Moraga Way Pedestrian Pathway Project (CIP No.4168) with Bay Cities Paving & Grading, Inc. and authorize the City Clerk to sign and file the Notice of Completion with the Contra Costa County Clerk-Recorder.

F.9. Adoption of a Resolution Authorizing the Road Closure to Vehicular Traffic for the Orinda Annual Classic Car Show
Recommendation:

Staff recommends the City Council Adopt Resolution 51-23 Authorizing the Closure of a portion of Orinda Way and Avenida de Orinda for the Orinda Annual Classic Car Show (Traffic Order No. 223)
F.1.a
Packet Pg. 11
Attachment: City Council Minutes of September 5, 2023 (3208 : City Council Minutes) Orinda City Council Minutes Page 5 of 19 09.05.23
F.10. Reject all bids for the 2023 Emergency Slide Repair Project, City Project No. 5014
Recommendation:

Staff recommends that the City Council (1) reject all the bids received for the 2023 Emergency Slide Repair Project, (2) approve the repair plans, (3) establish CIP Project No. 5021 for the Camino Sobrante Wall Replacement and (4) appropriate funding thereof.

MOTION by Vice Mayor Gee, and seconded by Councilmember Iverson, to approve Consent Calendar Items F.1.1, F.1.2, F.2, F.4, F.5, F6,. F.7, F.8, F.9, and F.10. Said motion carried by unanimous (4-0) roll call vote.

Item Removed from the Consent Calendar:

F.3. Response to Grand Jury Report No. 2306, Affordable Housing Recommendation:

Approve the City of Orinda Response to Grand Jury Report No. 2306, Affordable Housing.

Councilmember Iverson commented that she thought the Grand Jury Report itself was an interesting analysis of the Housing Element and it felt more accurate than some aspects of the Housing Element. She thought the Response Letter was very thoughtful, well done, and accurate. The one thing that felt missing was the RHNA numbers themselves and it seemed like a given that those RHNA numbers were acceptable.

What the Council hears the most is how upset people are at the growth numbers that are forced upon the City. Adding density in the downtown and existing neighborhoods concerns people, especially for fire safety. While the letter did a good job of mentioning the fire safety in two places, she thought somewhere the fact of getting the RHNA numbers was done so unilaterally that the City had to work entirely within that paradigm including a portion of affordable and very affordable income levels along with the absolute numbers.

Mayor Miller opened the Public Forum, and there were no speakers.

Mayor Miller agreed with Councilmember Iverson’s comments and she asked and confirmed that Councilmember Iverson said the RHNA numbers were not mentioned at all along with the process by which they are assigned. She felt the whole premise of the report and response is about how the City deals with those numbers. And, from a wildfire safety standpoint, the numbers given are too high.

F.1.a
Packet Pg. 12
Attachment: City Council Minutes of September 5, 2023 (3208 : City Council Minutes) Orinda City Council Minutes Page 6 of 19 09.05.23
City Manager Biggs said he thinks this point is made about fire and the conflict in State law in the report. He thinks not covered at all is the RHNA allocation process. He suggested this go at the end of the introductory letter to state it was not addressed in the report of how RHNA numbers are determined and allocated, that there is not a lot of input from local government, and they do not factor the competing constraints into it. Staff can include such a paragraph. This is due on September 13th and staff could add it or delegate it to the Mayor’s finalization and signature of the transmittal letter.

Mayor Miller and Councilmember Iverson agreed to delegate it to staff as provided by the City Manager and to also comment on the appeal process. There were a certain number of RHNA units applied throughout communities and if Orinda had been successful in an appeal, those housing units would have been delegated to one of their sister communities. This was a factor with the City deciding not to appeal the number.

Mr. Biggs stated the League on a statewide basis is starting to look at the next RHNA allocation process. The State is conducting outreach and the League is engaged. There are still cities without certified Housing Element that are 3-4 years in and so Southern California will receive allocations in the next year or two. Staff will continue to weigh in on that as well.

MOTION by Councilmember Iverson, and seconded by Vice Mayor Gee, to approve Consent Calendar Items F.3, as amended, to make additions to the cover letter.

Said motion carried by unanimous (4-0) roll call vote.

G. PUBLIC HEARING – None.

H. POLICY MATTERS
H.1. Moraga Orinda Fire District Proposed Ordinance 23-08 Regarding Fuel Break Requirements on Certain Parcels in Both the State Responsibility and Local Responsibility Areas within the Fire District Recommendation:

Receive Report, Discuss, and Provide Direction, if any.

Mayor Miller explained development of the ordinance and timing for the Council to discuss comments. They have the ability for the public to provide comments and she felt MOFD board members and staff did want to hear the City’s comments but they were not able to provide it timely, and this is why she has asked that it be on the agenda.

One thing she was concerned about was the landslide potential and removing of vegetation on the hillsides because those serve as protection against erosion. Also, as they are 4-5 years into hard work on vegetation removal, many areas are left bare. Those are either getting very dry, the soils are no longer retaining water, and she is seeing many invasives sweeping around town, Lake Cascade, streets, and private properties.

F.1.a
Packet Pg. 13
Attachment: City Council Minutes of September 5, 2023 (3208 : City Council Minutes) Orinda City Council Minutes Page 7 of 19 09.05.23
The Fire Chief reviewed the comments and indicated he has no problem proposing to his board that the same requirements in the fuel ordinance that has already been in effect this year, with regard to trees less than 15 feet, he could propose they just be limbed up one-third.

Lastly, because this was not the normal process of initiating it, staff may not be able to provide much information about the ordinance. The ordinance covers all of the districts which are communities at risk. The ordinance applies differently on parcels less than 1 acre than on 1 acre or more, applies to the entirety of the parcel if the parcel is less than 1 acre. If it is applying to a parcel more than 1 acre, it is 100 foot buffer around the property.

She personally had a concern about street trees downtown which the City Manager worked to keep from the PG&E work. There are some codes whereby if a building is proposed there, the tree would have to come out as parcels are developed unless the parcel is developed and uses alternative means for purposes of getting ladders there.

She would like clarity from MOFD on where they can find that exact code and see how they can work with this or around it to ensure street trees are not removed.

Vice Mayor Gee said staff has seen a lot of correspondence the Council has received, and she suggested staff comment around the common themes.

Mr. Biggs said it was towards the end of last week when staff recognized there was going to be a special meeting of the Fire Board this week to consider introduction of this ordinance. The reason is because they are not currently enforcing Ordinance 24-04; the fuel break ordinance which has been suspended. They can only introduce a matter at a special meeting and cannot adopt. Their goal was to be able to adopt the ordinance to get provisions back in place.

Staff is not expert in these areas but have become more familiar over time. Part of what they tried to do quickly was to compare the prior ordinance which was approved in February to see if there were changes to it. There were in a number of areas and there is some new language talking about slopes and what is needed, revisions to definitions of fuels in a few other things, they have clarified and broadened a modification process, added more substantive language of what is involved in modification and how to apply, clarified modification is something that can be appealed to the Fire Board.

Often times, more detailed language is added from the State Fire Code they look to for guidance on some of these things, and the Chief has been deployed the last 10 days for fires on the Oregon border but to the extent the Council and the public have comments, they can be passed on. If the Fire Board adopts at their second meeting, there could be some modifications, and if not heard, it would be put off until October.

F.1.a
Packet Pg. 14
Attachment: City Council Minutes of September 5, 2023 (3208 : City Council Minutes) Orinda City Council Minutes Page 8 of 19 09.05.23
Councilmember Iverson said she thinks of the MOFD residential and downtown areas as voluntary home hardening and she thinks of a fire break as a perimeter that is the protective layer between the wildland and the City. This, however, defines all of Moraga and all of Orinda as a fire break, every house, every yard of both cities is a fire break.

The significance of that for all landscaping and grasses, trees, and critters is extremely significant. She asked and confirmed with Mayor Miller this is what she is saying.

Mayor Miller said this is her question as to what MOFD means as “fuel break”. This ordinance and there is Ordinance 23-03 which was used this year. There is a provision in 23-03 that says if there is a conflict between 23-03 and 23-04 or its successor, the more constrictive of the part of that law applies. So, this proposed ordinance talks about allowing vegetation on lesser sloped hillsides. For more steeper hillsides it is more constrictive. So, she was unsure of their thoughts.

Councilmember Iverson said it is a paradigm shift for a City that has so much natural beauty and animal life. There was a lot of thought put into exceptions for things like animals and streams, but it feels the default is that everything is to be cleared unless you can argue for it to be retained.

Mayor Miller said she spoke with Assistant Chief Haley today from EBRPD and he wanted to make sure that he was happy for her to let people know that if there are other public agencies that wanted to use their modification, he was happy to provide that as a template because they went back and forth with MOFD with different types of proposals as to what could be a modification, etc.

Councilmember Riley asked if the modification section is based on the State ordinance or if it is unique.

Mayor Miller said it is unique and Assistant Chief Haley said their template that EBRPD created was approved by MOFD. He shared that he was happy for their work to serve as a template because there was no template. They had to figure out how to seek a modification. The modification must achieve the same degree at least of fire protection as if it is not applied. They felt they were able to achieve that. However, EBRPD’s template would not be used for a residence because of the different public CEQA processes for that.

Mayor Miller then distributed the Fire Chief’s response to her questions. He said there is a website and he said the modification process and link to submit modification requests are included on this website. This information is included on pre-citation and citation correspondence. Modifications are included in the definition section of the ordinance and explained in Section 5.

Mayor Miller asked for any comments from Councilmembers to provide to MOFD tonight.

They can also ask questions for staff to return with, such as the downtown treescape and how that will work with development. There has been an application; the 25A example related to this.

F.1.a
Packet Pg. 15
Attachment: City Council Minutes of September 5, 2023 (3208 : City Council Minutes) Orinda City Council Minutes Page 9 of 19 09.05.23
Councilmember Riley asked if the new ordinance is based on the State ordinance.

Mayor Miller said the staff report does not make any mention of how this relates to what other agencies such as Marin, Oakland or Berkeley are implementing. She asked what communities are already implementing any of the elements of this ordinance, and which elements are taken from this ordinance and implemented there. The Chief said, “This ordinance was developed in consultation with District Counsel, environmental consultants and lawyers specializing in CEQA compliance. I defer to the AHJ’s in the communities referred above about what steps they are taking.” Mayor Miller said she spent many hours reviewing the ordinance and while she is not a land use attorney, but this did not cite other ordinances of local areas.

Mayor Miller opened the Public Forum.

Barbara Leitner said she has worked as a plant ecologist since 1975. Her concerns regarding the proposed fuel break requirements are several. One is they are so broad as to be difficult for a responsible homeowner to implement. They are not clear, her reading is there may be exceptions, but it will be sophisticated homeowners who will know to ask for that. Others may just implement the guidance and not know what they are doing and thereby cause great ecological harm. If fully implemented, she believes the fuel breaks would have a devastating effect on biodiversity in a City that claims to value its semi-rural character and natural resources.

The regulations claim they would ensure there would be no significant impact to rare and endangered species, yet homeowners are left with no information about where those species are. As a consultant to the City on stream resources, she said most homeowners have no idea what the resources are in their own backyard when it comes to streams.

The proposed guidance states there will be no impact and no environmental review which is not the way it is done. She suggested MOFD and the City look at how practical the measures to be implemented are in the way they are currently proposed.

Michael Bowen, President, Friends of Orinda Creeks, thanked the Council for placing this on the agenda. This issue is so crucial and fundamental to who we are as a community and what they are surrounded by. The opportunity to begin this dialogue is so valuable.

When asking people why they moved to Orinda they say the schools and the natural beauty. Sometimes he asks why they stay after their kids are grown, and often times he hears it is the sense of community and the natural beauty. He is happy that the Chief brought up Marin County because that could be a place that is very volatile, very polarized on some issues and, like Orinda, it is full of attorneys and highly educated people. This could make for lively and late Council meetings.

What they decided to do is try to broker a dialogue amongst all community members and encourage participation and discussion because everybody wants fire protection and a fire safe community. There are ways to do it that will leave them who they are when done and in a place they want to live in when done. He is very grateful to Councilmembers in helping to start to engage in this as a community.

F.1.a
Packet Pg. 16
Attachment: City Council Minutes of September 5, 2023 (3208 : City Council Minutes) Orinda City Council Minutes Page 10 of 19 09.05.23
Sandy Pearson echoed Mr. Bowen’s comments, said they are appreciative the Council is taking an interest in this subject, as it has been very frustrating. Fire and residents have their priorities which need to be balanced. There are two different committees the City interacts with the Fire District, and this might be helpful in this situation. On the topic of the modifications the Mayor mentioned, she followed the link in the proposed ordinance and the Chief’s answers.

In visiting their website under modifications it states if you are seeking a modification of the standards for environmental or geologic reasons, you need to hire a professional biologist or a professional geologist to evaluate one’s property, write a report, and submit that to the Fire District who will evaluate the professional’s credentials and decide whether to listen to their report. Some neighbors have received modifications and they did not go through this process. This is an example of the confusion and chaos residents are facing as they try to figure out what is going to be allowed. She would like examples from MOFD of examples of modifications made in the past, but was not sure what is technically allowed. The previous ordinance was for 30 feet so if they cannot enforce the present ordinance of 100 feet, they still have 30 feet and there is a trade-off in the severity of the treatment and width of the treatment.

Laura Abrams said she is realtor working in Orinda and she works well with the point of sale ordinance for resale with MOFD. The personnel are prompt, reasonable, and do not slow down the process and she has an excellent working relationship with staff. She applauds implementation of the program, is aware of insurance issues and the importance of reducing fuel loads, and urged consideration of the rule of unintended consequences. She thinks CEQA is great as it addresses collateral issues, but there is not the oversight of CEQA from what she can tell in this process and it is thought to be exempt. So, it falls to the elected body and staff to think ahead of the impact of what is being considered. Her concerns are irrigation of an area and which moves soils, landslides, mention of herbicide use, legal implications and liability, water usage, and an example of removal of the entire creek bank.

Mayor Miller stated the requirements apply to the entirety of the property and they allow a couple of unirrigated plants on hillsides. The other ordinance does not allow any nonirrigated plants.

Kirsty Peter said she would love to see a model of what Orinda and its neighborhoods would look like if all public and private parcels were in full compliance of the suggested ordinances. This would provide wonderful guidance to homeowners who are confused and nervous about what to implement. She is also concerned about erosion and excess irrigation, asked if MOFD has worked with EBMUD to model the increases in expected water usage and impact on supply, and whether MOFD has studied the effects of irrigating dry hillsides.

Vice Mayor Gee noted MOFD’s special meeting is tomorrow night and they are looking to hold the second reading of the ordinance on September 20th, which is a tight timeline.

She asked what realistically can the City provide by tomorrow evening for their special meeting.

F.1.a
Packet Pg. 17
Attachment: City Council Minutes of September 5, 2023 (3208 : City Council Minutes) Orinda City Council Minutes Page 11 of 19 09.05.23
Mr. Biggs said he would hope that everyone who commented tonight is also sharing their comments directly with MOFD. The City could package everything received and more importantly, the Council could engage with more of a process with MOFD to understand how this would work. This is, to a great degree, about operationalizing and implementing the ordinance. There was an example in a riparian area where a homeowner cleared this out which requires a mitigation process with regional agencies. The property owner ignored the orange fencing set up which was a “do not enter” area, and sometimes not everyone enjoys a natural setting necessarily.

MOFD has the final say and City staff does not want to give people advice. They have developed some materials with the Fire District which they have signed off on, which he described and staff is working with master gardeners to come up with information that “translates” to a certain degree, but they do not know if MOFD will accept that interpretation or not. He spoke with the Chief regarding this item and he indicated they welcome the input, as they are trying to respond to a particular issue at the moment, but over time, implementation will evolve.

The Council can also agendize a discussion for the next meeting which would be the evening prior to their adoption and report any modifications made based on community and Council input and suggestions.

Councilmember Riley said she thinks they should come up with some recommendations for MOFD for tomorrow night and did not think they should wait until the next meeting. It seems they are rushing through this because of fire season, but all year is fire season to her. They are operating off of Ordinance 23-03 now, and now they are proposing 23-08.

Mayor Miller said she believes the litigation stems from enforcement of 23-04 so it may just be suspended as a result of the lawsuit. Mr. Biggs confirmed.

Councilmember Riley said she thinks they will get a lawsuit on 23-08 if they rush through this, take comments, take into consideration points, and she would recommend they slow down, listen, and avoid another lawsuit. She is sure people will be very upset with 23-08 in addition to those here today. Also, they should have a lot more user-friendly information.

Councilmember Iverson referred to the lawsuit and observed that in reading the correspondence is when you are defending a lawsuit, there is an undercurrent in the communication of MOFD having to make sure they are being consistent with the fact they are in a defensive position. So, they always must say there is not an issue to endangered species or erosion because if anyone has a problem, they ask to come to them and they will issue a variance. It is a convenient and frankly bullet-proof response, but it makes for a difficult approach. The fire break is supposed to protect the City and not be the City. To say they will outlaw vegetation but residents can come and ask for a variance is upside down. What concerns her is the need to maintain a CEQA defense is impacting some of the tone. So, she also thinks this should slow down as heard from speakers.

F.1.a
Packet Pg. 18
Attachment: City Council Minutes of September 5, 2023 (3208 : City Council Minutes) Orinda City Council Minutes Page 12 of 19 09.05.23
Vice Mayor Gee said most of the people in this room read and look at ordinances and pay attention to this a lot more than the average resident does. She frankly found this as confusing as anything she has ever encountered in terms of trying to figure it out. It is not easy and she does not see how there can be an expectation. She would hope the MOFD Directors pay attention to how implementation could occur with all the things mentioned. The guidance is so obtuse and people cannot figure it out. One of the concerning things is everyone cares deeply about fire prevention. MOFD cares deeply about fire prevention. She thinks this actually does the opposite of incentivizing people.

The average person would have no idea of how to find a registered geologist and some of the requirements are too onerous.

Councilmember Iverson said she thinks Michael Bowen’s comments were spot on in talking about the need to balance. MOFD has one thing they are measured on which is fire prevention and suppression. The City is measured on the totality and the fact MOFD is the one passing the ordinance and while the Board cares, MOFD by its charter has only one thing to balance. So, she was not sure how the City can comment that if the City is not a partner in this they will wind up with a badly broken unenforceable, unworkable law.

Mayor Miller echoed all Council and speaker comments made. She spoke about an early talk with Fire Chief Winnacker who indicated he is here for fire and not here to look at all of these other community concerns. In her experience, MOFD does listen and is hearing that he was fighting a fire in Oregon, yet he is responding to questions. So, they are looking for input and be a partner. She thinks it would be wonderful to have more community dialogue and thinks people have a mis-impression that they are not going to be treated the same in this process where rules are mushy. There is a real concern that people will not get a variance and she does not think this is accurate. So, she thinks the Council can do some good to possibly hold a meeting with MOFD and Morage Town Council to hold a forum about these things.

Councilmember Iverson said downtown planning went on for 7 years and 40+ meetings for a Downtown Precise Plan, and here is one of the most defining issues of making a very high wildfire risk community fire-safe and a semi-rural, famous for its beauty-City preserved, and this is rushing it in 2 weeks. It just feels like a slower process and it will not be in time for this fire season. Inside of a calendar year they could get there and she suggested broadening the outreach.

Mayor Miller said during the break she drafted a proposed letter and there is a State Fire Code, Section 307 of Title 19. It has exceptions, talks about shrubs, exceptions for landslides, slope stabilization, and she leans towards providing comments to slow it down rather than make specific requests, and asked how other Councilmembers felt.

Councilmember Riley said she thinks the message should be it should be more userfriendly and bring the State regulations into the local ordinance as well to make it easier on the user.

F.1.a
Packet Pg. 19
Attachment: City Council Minutes of September 5, 2023 (3208 : City Council Minutes) Orinda City Council Minutes Page 13 of 19 09.05.23
Vice Mayor Gee asked and confirmed MOFD is doing hybrid meetings and have access for people to be remote.

Mayor Miller referred to Title 19 of the California Code of Regulations, Division 1, State Fire Marshal, Chapter 1, General Fire and Panic Safety Standards, Subchapter 1, Administration, Article 3, General Provisions. She read the section on ground clearances, fire breaks, and read, “The section does not apply to single specimens of trees, ornamental shrubbery, or similar plants which are used as groundcover if they do not form a means of rapidly transmitting fire from the native growth to any building or structure.” She said this ordinance does not apply an objective standard but applies the standard as determined by the Fire Code official which is defined as “either the Fire Chief or their appointees.” In a legal sense, it could be anyone and fire ambassadors who are volunteers. So, it is difficult for homeowners to know.

Councilmember Iverson said in listening to this, it reminds her so much of design guideline books in homeowner associations which do a good job of things a lay person has never dealt with before, taking technical standards, and then gives a few examples so people with their design professional can design their homes. So, she thinks this is a great avenue to work with the proposed ordinance and not seem they are trying to totally derail it, and then go that next layer where it gives specific illustrations and examples.

Vice Mayor Gee said she would also like to share with MOFD that the templates are important. She also thinks there needs to be resources provided that the public can tap into. MOFD should have an on-call contract with a geologist, an environmental specialist, or someone that looks at riparian habitats so that anyone with questions or concerns could ask them to help. She did not see that being so onerous for MOFD to be able to have those services as opposed to trying to impose that on individual homeowners, as well as the consistency factor. There should be some consistency in the resources that they allow people to tap into.

Mayor Miller continued reading from Title 19 regarding, “Removal of all bush, flammable vegetation, or combustible growth which is located from 30 feet to 100 feet from such building or structure, or the property line, whichever is nearer, as may be required by the enforcing agency IF he finds that because of extra hazardous conditions a fire break of only 30 feet around such building or such structure is not sufficient to provide reasonable fire safety. Grass and other vegetation located more than 30 feet from such building or structure and less than 18” in height above the ground may be maintained where necessary to stabilize the soil and prevent erosion.”
She said this defines a more typical space for a home and possibly 100 feet if a situation is extra hazardous. This tells people to not remove vegetation that is holding their hillside up. The City has produced lists of plants and other things and promoting these things.

She thinks it would be a good idea to press for a broader community meeting and discussion in order to get that next layer.

Councilmember Riley asked if the proposed ordinance is going beyond what the State is requiring and if so, whether MOFD can require more than what the State requires.

F.1.a
Packet Pg. 20
Attachment: City Council Minutes of September 5, 2023 (3208 : City Council Minutes) Orinda City Council Minutes Page 14 of 19 09.05.23
Mayor Miller said she believes that is an open, legal question and in reading the ordinance, she had serious questions about that to the extent she would advise that the Council ask the City Attorney to review this ordinance because it applies to City land.

They also have a legitimate interest from the perception of residents and thinks the City has a fiduciary position to make sure what they are promoting in doing this work and that it is a legal ordinance.

City Attorney Osa Wolff asked if the Council is requesting she analyze MOFD’s legal authority to proceed with the ordinance.

Mayor Miller said it took her a significant amount of time to review the ordinance. It describes many codes that are mostly based on the State responsibility area which she is unsure is for new housing.

Ms. Wolff said she does not have any Fire District clients and so this is not an area she has any prior experience with. She has analyzed their authority as it relates to local modifications of the State Fire Code that resides in the building standards. That comes to the City for ratification and she has familiarity with this. The Council is talking about ordinances that are not in what came to the City for ratification, and she has not reviewed that.

Councilmember Iverson said when the City was dealing with drought ordinances, the question came up of, if the City ordinance was more conservative than the State ordinance, this was the rule of thumb, and that the City cannot be less conservative than the State.

Mayor Miller said the language was talking about the “site pre-construction” so these codes were designed for development of communities post-1991 and for the very high fire severity zone post 2021 and on. So, they were not designed for communities with already established vegetation. Also, the other legal basis may have been described where MOFD was a regulator; that there is an exception to CEQA where a regulator who is acting in a performance of environmental regulation does not have to comply with CEQA. They felt that as a fire agency acting in prevention of wildfire that they constituted a regulatory agency acting in the course of protecting the environment. It appeared to her that this might be a bit of a stretch.

Her point was more for purposes of understanding the pure landscape the Council is dealing with. She asked what are Marin, Oakland, and Berkeley doing.

Councilmember Iverson said she believes Orinda was the only city that got declared an entire fire break. The City is the fire break and not the fire break for the City, so this creates the ability to regulate everything in the City, which does not make sense. She thinks this is a legitimate question—how do City resources best help get to a good outcome.

F.1.a
Packet Pg. 21
Attachment: City Council Minutes of September 5, 2023 (3208 : City Council Minutes) Orinda City Council Minutes Page 15 of 19 09.05.23
Mayor Miller said she thinks another alternative would be to have these community meetings where they could look at Marin and Berkeley and then not have to know what the landscape looks like there. They are all very active and she was on a Zoom meeting last week with an Oakland City Councilmember and Orinda is not the only ones trying to get clarity, so there is value getting buy-in so people feel heard and that they end up with a better product that makes them more fire-safe and ensure they avoid unintended consequences.

Vice Mayor Gee suggested that more than digging into the legal issues to provide comments heard from their residents, feedback received, as well as discussion tonight which had definite points of concern which they could raise as legitimate issues. She thinks there could be a lot of legal explorations but she did not think this is for their meeting tomorrow night. She thinks the Council should emphasize that the process is moving too quickly and that there is a great deal of concern in the community about the lack of real understanding, resources and concerns of other consequences to the community. She also thinks they should relay it is very difficult to understand.

Councilmember Iverson also suggested emphasizing the cost, noting that MOFD has a legal position and it is not a tax, but the cost of an unfunded mandate this imposes on people is scary and she thinks people should be provided with access to experts and guidance. It is not just respecting people’s ability to comply and to actually make people more compliant than less, but when there is a big unknown cost, people will be less compliant.

Councilmember Riley emphasized the user-friendly point and the template and the Vice Mayor’s point to provide people with an incentive to comply as opposed to reasons to run and hide and suggested keeping it broad.

Councilmember Iverson thanked the Mayor for spending the holiday weekend of mastering the subject.

Mayor Miller asked and confirmed that staff had direction. Mr. Biggs stated he would draft a letter and include the correspondence they received, thinks the Board should be able to access the recording of this meeting, and he asked and confirmed the Mayor will sign it.

H.2. Consider Appointing Additional Council Liaisons
Recommendation:

Receive Report, Discuss, and Provide Direction, if any, about Appointing Additional Council Liaisons including for CalShakes.

City Manager Biggs stated this was a Matter Initiated for the Council to consider the option of appointing additional Council Liaisons, including for CalShakes. Also attached in the staff report are other Liaison assignments, which have been to non-profits and other governmental agencies.

F.1.a
Packet Pg. 22
Attachment: City Council Minutes of September 5, 2023 (3208 : City Council Minutes) Orinda City Council Minutes Page 16 of 19 09.05.23
Mayor Miller stated she and Councilmember Riley met with Clive Worsley and learned there are grant opportunities. Councilmember Iverson had also mentioned at the time the Orinda Theater and the potential for a cultural liaison as well as other groups.

Councilmember Riley suggested the Village Starlight Players, as well.

Mayor Miller spoke about the cultural liaison role where it might include performance arts as well. Councilmember Iverson suggested it be limited to “iconic cultural institutions” to get started.

Mayor Miller opened the Public Forum.

Clive Worsley thanked Councilmembers for agendizing the item and he said he wanted to speak about how California Shakespeare Theater and the Bruns Amphitheater is continuing its transformation from being only a classical theater company into a multidisciplinary performing arts and cultural center with the CalShakes as its anchor. Going forward, rather than devoting their entire calendar just to pieces of classical theater they will produce one or two pieces of classical theater in a season and devote the rest of the calendar to other activities such as dance, comedy, live music, programming for families and youth audiences, civic events, corporate events and private events. He then spoke about his background with the theater and performing arts and their desire to improve their financial success and hope the City will join them in this success.

Councilmember Riley said the Council does not have the tradition of having a liaison for a for-profit business and have always done non-profits and she wondered about the Orinda Theater which is a for-profit business.

Councilmember Iverson said her thought was the analogy seemed very similar where they have had to branch out into live entertainment, comedy, music, a food and beverage program. They have to fundraise from the community to keep their sign lit up at times, and she thinks it is fine to start with CalShakes which she initially thought it felt very specific relative to the other list of committees.

Mayor Miller said each is located in different areas. When they began with talks about the downtown, they spoke about competition among restaurants which were struggling. She thinks it might be the same as CalShakes is further from the downtown. She recognized that Mr. Worsley has worked with other theaters, and noted critical mass is helpful.

Mr. Worsley agreed and commented that what is good for performing arts associations is good for the rest.

Mayor Miller said she believes she and Councilmember Kosla were liaisons to Friends of Orinda Creek because it was too much for one Councilmember. Similarly, here the City could have 2 liaisons that shared the task.

Councilmember Iverson suggested getting started with one liaison and an alternate.

F.1.a
Packet Pg. 23
Attachment: City Council Minutes of September 5, 2023 (3208 : City Council Minutes) Orinda City Council Minutes Page 17 of 19 09.05.23
Councilmember Riley said she thinks they want both theaters to thrive and survive and supported 2 liaisons.

Councilmember Iverson voiced support to start with CalShakes and the liaison could have the occasional conversation with the Orinda Theater as well.

Vice Mayor Gee voiced support, said she thinks it fits into the spectrum of evaluation of their economic redevelopment and attracting people. She agrees it is best to start something new simpler, and she made a motion to create a position to have a liaison to CalShakes and go from there.

Councilmember Riley agreed to volunteer to serve as Liaison.

MOTION by Vice Mayor Gee, and seconded by Councilmember Iverson, to create a position to have a Council Liaison for CalShakes and appoint Councilmember Riley. Said motion carried by unanimous (4-0) roll call vote.

H.3. City Council Meeting Schedule for 2024
Recommendation:

Review, Amend, and Adopt City Council Meeting Schedule for 2024 City Clerk Sheri Smith said at the last meeting there were 3 proposed changes. All dates were run by Councilmember Malkani. She can made 2 meetings in April and May but she cannot make the meeting on Monday, June 3rd. Therefore, staff would like direction before finalizing the calendar.

Councilmember Riley said another date could be May 28th instead of June 4th which is 1 week earlier but still 2 weeks apart. The second meeting for the budget would be June 18th. She would have to run this by Mr. Alessio.

Vice Mayor Gee asked if they would still have the meeting on May 21st, and Mayor Miller said they would have 3 May meetings and 1 June meeting.

Councilmember Riley said alternatively, they could hold 2 June meetings and switch them. She suggested adopting the changes Councilmember Malkani agreed to and then decide the June dates later.

Mayor Miller suggested continuing this item for the next meeting. City Manager Biggs stated Vice Mayor Gee will not be at the next meeting, and Vice Mayor Gee said she is fine with what is being proposed, and commented that not all 5 Councilmembers can always be at all meetings.

Mayor Miller asked and confirmed there was Council consensus for the dates scheduled for 2024.

F.1.a
Packet Pg. 24
Attachment: City Council Minutes of September 5, 2023 (3208 : City Council Minutes) Orinda City Council Minutes Page 18 of 19 09.05.23
I. COUNCILMEMBERS’ REPORTS – Councilmember Iverson reported she and Mayor Miller met with the Wilder 2x2 subcommittee and it was very well attended.

Most interesting was the discussion about the developer progress, the GHAD, the event that got a little bit out of control with lessons learned and measures taken, and they looked at some of the trails originally considered and the final trail map.

They will likely hold another subcommittee meeting in another 2 months so some of the concerns can be heard and addressed.

Mayor Miller reported today she attended a nice meeting with Assemblymember Rebecca Bauer-Kahan and Mayor and Councilmembers from other cities on ACA13 which is a Constitutional Amendment to require that any voter measure to change the threshold by which we pass local measures cannot be passed by a lesser threshold, such as changing the requirement for a 2/3 vote with a simple majority vote. Apparently, opponents are trying to make people that the ACA is a repeal of Prop 13, so she has asked Councilmembers to ensure their constituents understand the ACA has nothing to do with Prop 13.

Mayor Miller said they also heard from their Mosquito and Vector Control Manager.

There is an uptick in West Nile virus. They have needs for funding and she forwarded the information to the City Manager for a future meeting.

City Manager Biggs said many birds are testing positive with West Nile virus and precautions are asked to be taken by dump out any standing water outside, contact the District at contracostamosquito.com who can assist with eradication, recommends reducing the risk of mosquito bites and wear repellant, be active before mosquitos are out before and after sunset and sunrises, and report dead birds by calling 877-968-2473 or report it online at westnile.california.gov. He will also share this information through the City’s social media channels.

Councilmember Iverson noted there are interested people who had spoken regarding rats, and Mayor Miller stated the City Manager can discuss coming to an upcoming meeting.

J. CITY MANAGER’S REPORT – City Manager Biggs reported this weekend is the Classic Car Show and the Council had approved the Traffic Order for the event on Saturday. The event benefits the Orinda Association programs and there will be street closures downtown. Friday night the Orinda Rotary is holding the Dancing with the Cars event at the Community Center.

K. MATTERS INITIATED – Councilmember Riley said several residents have raised concerns since the Maui fire about the effective use of sirens. Recently, Berkeley installed 10 new sirens and they are planning on installing 5 more. She would like this to be a high priority and knows staff is working on this topic.

City Manager Biggs stated he has spoken with the Police Chief about this and they would invite the Director of the County’s Office of Emergency Services to come talk about the subject, and staff will circle back and look at scheduling this item.

F.1.a
Packet Pg. 25
Attachment: City Council Minutes of September 5, 2023 (3208 : City Council Minutes) Orinda City Council Minutes Page 19 of 19 09.05.23
MOTION by Councilmember Riley, and seconded by Vice Mayor Gee, to schedule a future item under Matters Initiated to discuss the City’s use of sirens during emergencies. Said motion carried by unanimous (4-0) roll call vote.

L. CLOSED SESSION
Mayor Miller announced that the Closed Session had been canceled. She also confirmed there were no members of the public present and no public comments.

1. OPEN SESSION IDENTIFICATION of Closed Session Matters

2. PUBLIC COMMENTS of Closed Session Matters – None.

3. CLOSED SESSION

4. REPORT OUT OF CLOSED SESSION
A. CITY MANAGER PERFORMANCE EVALUATION
Pursuant to Government Code Section 54957, annual performance evaluation of City Manager David Biggs
.

M. ADJOURNMENT
The Regular Meeting was adjourned at approximately 9:32 p.m. to the next Regular Council Meeting on Tuesday, September 19, 2023, at 7:00 p.m. ______________________________________
Sheri Marie Smith, City Clerk
F.1.a
Packet Pg. 26
Attachment: City Council Minutes of September 5, 2023 (3208 : City Council Minutes) City Council
Staff Report
Agenda Item: F.2
Date: September 19, 2023
Department: City Clerk
AGENDA TITLE: City Council Meeting Schedule for 2024
RECOMMENDATION:

Adopt City Council Meeting Schedule for 2024
BACKGROUND:

Each year the City Council reviews and adopts a City Council Meeting Calendar. At the August 15, 2023, and September 5, 2023, City Council Meetings a few proposed changes were proposed which are shown in redline on the attachment. Since Councilmember Malkani was not able to be present, direction was given to the City Clerk to check to make sure that Councilmember Malkani was available on the alternate dates proposed.

DISCUSSION:

Councilmember Malkani can accommodate the changes proposed.

NEXT STEPS:

Adopt the proposed 2024 City Council Calendar. This will allow the dates to be shared with the community and City employees.

FISCAL IMPACT:

None as a result of this item.

ATTACHMENTS:

A. 2024 Council Calendar (with Proposed Changes)
Respectfully Submitted by:

Sheri Smith
City Clerk
Prepared By: Sheri Smith, City Clerk
Approved by:

F.2
Packet Pg. 27
F.2
Packet Pg. 28
28th
Office of the City Clerk
Sheri Marie Smith
Phone: 925.253.4221
Fax: 925.254.2068
[email protected]
NOTICE OF CITY COUNCIL 2024 CALENDAR
Proposed 9/19/23
Regular 2024 City Council Meetings are generally held on the first and third Tuesdays of each month, with some exceptions due to holidays.

January
Tuesday, January 9, 2024 – 7pm Regular Meeting
Tuesday, January 23, 2024 – 7pm Regular Meeting
February
Tuesday, February 6, 2024 – 7pm Regular Meeting
Tuesday, February 20, 2024 – 7pm Regular Meeting
Saturday, February 24, 2024 – 9am (Commission Committee Interviews) March
Tuesday, March 5, 2024 – 7pm Regular Meeting
Tuesday, March 12, 2024 – 7pm Regular Meeting (Changed from March 19, 2023) April
Tuesday, April 16, 2024 – 7pm Regular Meeting
Tuesday, April 30, 2024 – 7pm Regular Meeting (Changed from April 9, 2023) May
Tuesday, May 7, 2024 – 7pm Regular Meeting
Tuesday, May 21, 2024 – 7pm Regular Meeting
Tuesday, May 28, 2024 – 7pm Regular Meeting (Change from Tuesday, June 4, 2023) June
Tuesday, June 18, 2024 – 7pm Regular Meeting
July
Tuesday, July 2, 2024 – 7pm Regular Meeting
Tuesday, July 16, 2024 – 7pm Regular Meeting
August
Tuesday, August 20, 2024 – 7pm Regular Meeting
September
Tuesday, September 3, 2024 – 7pm Regular Meeting
F.2.a
Packet Pg. 29
Attachment: 2024 Council Calendar (with Proposed Changes) (3203 : Review of 2024 City Council Meeting Schedule/Calendar) Tuesday, September
17, 2024– 7pm Regular Meeting
October
Tuesday, October 1, 2024– 7pm Regular Meeting
Tuesday, October 15, 2024– 7pm Regular Meeting
November
Monday, November4, 2024– 7pm Regular Meeting
Tuesday, November 19, 2024 – 7pm Regular Meeting
December
Tuesday, December 3, 2024– 7pm Regular Meeting
Tuesday, December 17, 2024– 7pm Regular Meeting
2025
January
Tuesday, January 7, 2025– 7pm Regular Meeting
Tuesday, January 21, 2025– 7pm Regular Meeting
F.2.a
Packet Pg. 30
Attachment: 2024 Council Calendar (with Proposed Changes) (3203 : Review of 2024 City Council Meeting Schedule/Calendar) City Council
Staff Report
Agenda Item: F.3
Date: September 19, 2023
Department: Finance
AGENDA TITLE: Quarterly Report of Cash Disbursements for the Period April 1, 2023 through June 30, 2023 and Summary of Revenue, Expenditures, and Preliminary Fund Balances for July 1, 2022 through June 30, 2023
RECOMMENDATION:

Staff recommends that the City Council receive and file this report of cash disbursements, and preliminary fund balances for the period of April-June 2023.

BACKGROUND:

This report combines quarterly reporting to the City Council of two separate financial benchmarks: 1) The issuance of checks and payments for obligations incurred by the City during the quarter; 2) A report of Revenue and Expenditures for the quarter and preliminary fund balances based on year-to-date activity.

State Code References to City Financial Reporting
Section 37208 of the Government Code specifies the presentation of payments made by the City to the City Council. An option is available to forgo the presentation of these lists provided the City Council ratifies an audited Annual Comprehensive Financial Report (ACFR). The City practice has been to present a quarterly listing of payments, which goes above and beyond the minimum requirements in State law. Separate from the Payment Listing, California Government Code Section 41004 requires that the City Treasurer submit a quarterly report and accounting of all receipts, disbursements, and fund balances. This is contained in the second half of the report.

DISCUSSION:

Payment Listing
The disbursement listing includes detail for the months of April through June including A) Checks and electronic fund transfers (EFT) issued for accounts payable (Listed in ascending order of the check numbers); B) A summary of purchases made with Credit Cards (US Bank Corp); and C) A listing by name of payroll checks and direct deposits.

The total payroll costs are disclosed in the aggregate.

The payment and disbursement report includes detailed itemization of City issued payments as follows:

APRIL - JUNE 2023 DISBURSEMENTS
F.3
Packet Pg. 31
Type of Transaction Check #’s $ Amount (Incl.

Wires)
General Checks / Wires 68683-69287 4,722,396.09
Payroll 9556-9565 696,468.06
53119-53407
Payroll Tax Withholding Electronic 256,184.86
Retirement/Medical/Clipper Electronic 357,982.99
TOTAL 6,033,032.00
Payments / disbursements processed for the quarter including general accounts payable plus payroll and benefits totaled approximately $6.0 million. The General Accounts Payable payments totaled about $4.7 million. Approximately 63% of the general accounts payable were comprised of the following categories of expense: 1) County contract services for Police, Library and Animal Control totaling $1,083,961, 2) Capital Project costs ($1,061,907), this included payment of $536,688 for the annual pavement projects, 3) Debt service payment of $460,122 for the Civic Center Certificate of Participation, and 4) Replacement costs of $386,432 for two police vehicles and a street sweeper.

Included in the listing of General disbursements are payments to US Bank Corporation for expenses made with purchase cards. In addition to disclosing the total payment to the bank for credit card purchases, a separate summary list detailing the charges is provided (Attachment B). The purchases were made between February 16 to May 15, 2023 and the total expenditures made with credit cards was $56,773.

Report of Revenue / Expenditures and Fund Balances as of June 30, 2023 The following Table displays the activity for the fourth quarter (April through June 2023) in the first three columns. The right side of the table reports year to date results including the preliminary beginning and ending fund balance as of June 30, 2023.

Rather than listing all the funds individually the table combines funds by common groups.

Quarterly Report of Revenue, Expenditures, and Preliminary Fund Balance (Includes Inter-fund Transfers in Revenue / Expenditures –Preliminary Unaudited) For the Period Ending June 30, 2023
F.3
Packet Pg. 32
CURRENT PERIOD 7/1/2022 YEAR TO DATE: Jul-Jun 6/30/2023 Fund Name / Group
Current
Quarter
Revenue /
Transfers In
Current
Quarter
Expenses /
Transfers Out
Beginning
Fund Balance
Year To Date
Revenue
Year To Date
Expenses
Fund Balance
End of Period
General Fund $ 7,973,837 $ 4,293,036 $ 11,938,533 $ 17,646,581 $ 15,892,960 $ 13,692,154 G.F. Measure L Sales Tax 11,262 278,127 3,127,430 43,222 2,245,544 925,107 Add-on Sales Tax Measure R 1,608,615 (502,152) 3,347,113 3,863,457 2,567,276 4,643,294 Gas Tax 742,126 105,939 569,307 1,341,241 768,228 1,142,320 Impact Fees 163,436 181,117 4,327,172 635,159 1,001,162 3,961,168 Grants 629,433 858,734 3,049,574 3,305,496 1,208,118 5,146,952 CCTA Funds 558,087 331,766 639,256 672,401 443,503 868,154 Road Maintenance Fund 331,056 9,887 881,430 1,292,812 730,995 1,443,248 Trust Funds 2,066 - 141,717 3,707 1,800 143,624
Maintenance Assessment Dist. 55,134 35,665 14,005 87,251 92,628 8,629 Stormwater Fund (53) 229,072 135,529 1,189 466,927 (330,209) Library Fund 242,645 158,886 408,571 534,543 453,147 489,967 Wilder Community Facilities Dist. 513,033 477,415 447,916 513,699 639,795 321,820 Debt 1,401,581 8,295 2,405,737 2,982,237 2,815,108 2,572,866 Internal Service Funds 31,629 467,204 2,936,711 1,400,267 1,166,466 3,170,512 Road Emergency Stabilization 8,803 229,613 759,751 313,868 393,790 679,829 Other Capital Projects 76,650 210,068 2,008,872 265,563 1,095,261 1,179,174 TOTAL ALL FUNDS $ 14,349,340 $ 7,372,672 $ 37,138,624 $ 34,902,691 $ 31,982,707 $ 40,058,609 Total revenue recorded for the fourth quarter was $14.3 million and total expenditure was approximately $7.4 million. The increase in General Fund, Library Fund, and Debt Service Fund balances reflected the semi-annual property tax revenue of $4.7 million received in April and June. Other significant revenue items included $2.2 million sales tax revenue, the receipt of a $1.4 million Property Tax In-Lieu of Vehicle License Fees payment disbursed by the County in May, and Park & Rec summer camp and rental revenue of $1.4 million.

The Stormwater Fund shows a negative balance as of June 2023, due to lag in the receipt of funds from the Contra Costa County Public Works program.

As noted in the Table above, the total fund balance across all funds as of June 30th has increased by approximately $3 million from the July 1, 2022 beginning balance of $37.1 million. The largest contributors for the increase are $2.2 million in Grants Fund for the receipt of American Rescue Plan (ARP) Federal Local Fiscal Recovery Fund in July 2022, $1.8 million in General Fund, and $1.3 million in Add-on Sales Tax Measure R, offset by a decrease of $2.2 million in Add-on Sales Tax Measure L for the Pavement projects and the Camino Sobrante Slide Project.

FISCAL IMPACT:

None
ATTACHMENTS:

A. April-June 2023 Check Listing
B. April-June 2023 Cal-Card Transactions
C. April-June 2023 Payroll Listing
F.3
Packet Pg. 33
Respectfully Submitted by:

Nancy Zhang
Prepared By: Nancy Zhang,
Approved by:

F.3
Packet Pg. 34
City of Orinda
Check/Voucher Register
From 4/1/2023 Through 6/30/2023
Check # Check Date Payee Transaction Description $Amount 2313404 6/20/2023 U.S. BANK INTEREST - COP CITY OFFICES PROJ. FINANCE 460,121.88 57720 5/18/2023 RAIFE GIOVINAZZO REFUND FOR BASKETBALL COACHING (74.00) 60327 5/4/2023 ARIEL ZHANG REC. - REFUND UNUSED BALANCE PRIOR REGISTR.

SYSTEM
(55.00)
68683 4/13/2023 SHAMROCK POOL FIBERGLASS INC REFUND PERMIT OR-2023-110, PROJECT ADDRESS 2,000.00 68684 4/13/2023 ACCESS INFORMATION MANAGEMENT MAR. 23 STORAGE DOCUMENTS 1,747.63 68685 4/13/2023 Advanced Mobility Group ON-CALL TRAFFIC ENGINEERING 3,878.70 68686 4/13/2023 ASI AIR SYSTEMS INC HVAC SERVICE REPAIR - LIBRARY 618.00 68687 4/13/2023 ASSOC OF BAY AREA GOVERNMENTS APR. 23 NATURAL GAS 5,149.93 68688 4/13/2023 AT&T 3-4/4-4-23 SVCS. 1,001.09
68689 4/13/2023 VERY NICE POOLS APR. 23 FULL SERVICE 284.42 68690 4/13/2023 BASIC PVR 4-14-23 FLEX SPENDING 1,335.52 68691 4/13/2023 Battalion One Fire Protection 5 YEAR INSPECTIONS - RANCH HOUSE, MAINT. BLDG,

ART/GARDEN
3,520.00
68692 4/13/2023 BAY ALARM COMPANY 4-1/7-1-23, LIBRARY ELEVATOR 547.05 68693 4/13/2023 BIG O TIRES OIL CHG. & TIRE ROTATION - VEHICLE 93 68.52 68694 4/13/2023 SPORTS SUPPLY GROUP INC JERSEY & HAT 10,116.11 68695 4/13/2023 California Consulting, Inc. APR. 23 GRANT WRITING SERVICES 5,000.00 68696 4/13/2023 CALIFORNIA STATE DISBURSEMENT 3-31-23 GARNISHMENT 46.14 68697 4/13/2023 CALIFORNIA STATE DISBURSEMENT 4-14-23 GARNISHMENT 356.76 68698 4/13/2023 CALIFORNIA STATE DISBURSEMENT 3-31-23 GARNISHMENT 356.76 68699 4/13/2023 CALIFORNIA STATE DISBURSEMENT 4-14-23 GARNISHMENT 46.14 68700 4/13/2023 CCC GENERAL SERVICES DEPT FEB. 23 TRAFFIC SIGNAL MAINT. 88.90 68701 4/13/2023 Treasurer of Contra Costa Coun FEB. 23 POLICE SERVICES 346,902.71 68705 4/13/2023 CINTAS CORPORATION SUPPLIES 4,935.01
68706 4/13/2023 BRADY INDUSTRIES SUPPLIES 1,024.47
68707 4/13/2023 COWAN & THOMPSON CONSTRUCTION EMERG. CALLOUT - 202 GLORIETTA BLVD. 16,210.82 68708 4/13/2023 CSG CONSULTANTS GEN'L LAND DEV. REVIEW 12,312.50 68709 4/13/2023 TRACY A. CURTIS 3-28-23 MODELING SERVICES 96.00 68710 4/13/2023 DeSilva Gates Construction, LP RETENTION RELEASE 2021 PAVING PROJECT. 162,196.60 68711 4/13/2023 DIAMOND K SUPPLY CRUSHED ROCK 180.53
68712 4/13/2023 ANDREW DIEFENBACH INSTR. CONTRACT - PICKLEBALL 2,138.56 68713 4/13/2023 JEANNE DOWELL INSTR. CONTRACT - YOGA 672.00 68714 4/13/2023 D S BAXLEY INC CARPET RESORATION - ART & GARDEN CTR. 750.00 68715 4/13/2023 JAMES DUFF REIMB. FOR MILEAGE & HOTEL STAY 452.74 68716 4/13/2023 EAGLE BUSINESS FORMS ORDER FORMS 2,461.20 68717 4/13/2023 EAST BAY BLUE PRINT MONTHLY SERVICE CONTRACT 42.50 68718 4/13/2023 EAST BAY TREE SERVICE EMERG. TREE REMOVAL - CANON DRIVE 3,100.00 68719 4/13/2023 EBMUD 1-18/3-20-23 SVCS. 3,398.05
68720 4/13/2023 ECOFERT INC MAR. 23 FERTIGATION SVCS. 383.00 68721 4/13/2023 E.E. GILBERT CONSTRUCTION INC. CAMINO SOBRANTE WALL - RETENTION RELEASE 36,010.64 68722 4/13/2023 FAST SIGNS KINDERGYM SIGN 1,031.89
68723 4/13/2023 FOLGER GRAPHICS DOOR HANGERS 7,066.36
68724 4/13/2023 FORENSIC SERVICES DIVISION JAN. 23 FORENSIC SERVICES 6,828.00 68725 4/13/2023 ANDREA GASPARI INSTR. CONTRACT - GYMNATICS 6,436.20 68726 4/13/2023 GEO OPTIONS, INC MAINT. SUPPLIES 1,106.02 68727 4/13/2023 RUEBEN GERK 4-9-23 MILEAGE 22.27
68728 4/13/2023 GHA TECHNOLOGIES, INC SURVEILLANCE CAMERA LICENSE 396.50 68729 4/13/2023 LISA HARPER MAR 21, 23, COUNCIL MEETING 315.00 68730 4/13/2023 HINDERLITER DE LLAMAS JAN-MAR. 23 CONTRACT SVCS. 1,231.38 68731 4/13/2023 IEDA APR. 23 CONSULTING FEES 1,044.32
68732 4/13/2023 ANA KASABOVA REFUND COMPLETED PROJECT - OR2015-001 5,500.00 68733 4/13/2023 Catherine Kauder APPC WEBSITE 176.00
68734 4/13/2023 KONICA MINOLTA BUSNSS SOLUTION COPIER MAINT. FOR QTR 03-31-23 1,565.40 68735 4/13/2023 KR Electric, Inc. EXTERIOR POWER DISTRIB. BOX INSTALLATION 6,483.64 68736 4/13/2023 MARION LINK REFUND SECURITY DEPOSIT - ART/GARDEN CTR. 150.00 68737 4/13/2023 Living Church of God Inc REFUND OF SECURITY DEPOSIT - ROOM 10, COMM.

CTR.
150.00
68738 4/13/2023 Maverick Networks, Inc. REMOTE SUPPORT 110.00 68739 4/13/2023 SUSAN MCALLISTER INSTR. CONTRACT - ART CLASSES 2,884.06 68740 4/13/2023 KEVIN MCCOURT NOTICE OF EXEMPTION 52.50 68741 4/13/2023 MCE CORPORATION FEB. 23 LANDSCAPE SVCS. 25,234.00 68742 4/13/2023 VIRGINIA H MEGLEY INSTR. CONTRACT - BALLET 207.00 68743 4/13/2023 Microix, Inc. ANNUAL TIMECARD SOFTWARE 2,073.75 68744 4/13/2023 MIKSIS SERVICES INC VIDEO STROM DRAIN - 202 GLORIETTA BLVD. 670.00 68745 4/13/2023 KRIS MUELLER INSTR. CONTRACT - MUSICAL THEATER 7,269.30 68746 4/13/2023 Municipal Pooling Authority APR. 23 LTD/LIFE 2,282.74 68747 4/13/2023 ORINDA ASSOCIATION INSERTS FOR ACTIVITY GUIDE - APRIL 23 750.00 Page: 1
F.3.a
Packet Pg. 35
Attachment: April-June 2023 Check Listing [Revision 1] (3154 : Quarterly Disbursements Rev Exp Fund Balance - April through June 2023) City of Orinda
Check/Voucher Register
From 4/1/2023 Through 6/30/2023
Check # Check Date Payee Transaction Description $Amount 68748 4/13/2023 OTIS ELEVATOR COMPANY APR. 23 ELEVATOR MAINT. 400.68 68749 4/13/2023 Pestfinders Pest & Termite Svc PEST CONTROL - CITY HALL 820.00 68750 4/13/2023 P G & E 2-2/3-3-23 SVCS. 4,277.26
68751 4/13/2023 PlaceWorks, Inc. DOWNTOWN PRECISE PLAN 14,193.63 68752 4/13/2023 PRECISION IT CONSULTING LABOR CHARGES 9,061.50 68753 4/13/2023 ROADSAFE TRAFFIC SYSTEMS, INC. TRAFFIC CONTROL SIGNAGE 766.72 68754 4/13/2023 VEERA SANJANA INSTR. CONTRACT - YOGA 2,100.00 68755 4/13/2023 Z SPORTZ INC INSTR. CONTRACT - SKYHAWKS 11,229.00 68756 4/13/2023 SOKOL SAN FRANCISCO REFUND OF SECURITY DEPOSIT - ORINDA COMM.

CTR. RM. 08
150.00
68757 4/13/2023 STAPLES CONTRACT & COMMERCIAL KEYBOARD/MOUSE 101.68 68758 4/13/2023 Star Sports SOFTBALLS PURCHASED 984.18
68759 4/13/2023 T-MOBILE USA INC. MAR. 23 CELL SERVICE 882.40 68760 4/13/2023 Wildland Corporation MAR. 23 CHIPPING SERVICES 5,145.50 68761 4/13/2023 TJKM TRANSPORTATION ON-CALL TRAFFIC ENGINEERING - LRSP PROJ. 23,520.62 68762 4/13/2023 PATRICIA TOMLINSON INSTR. CONTRACT - BALLET 9,270.50 68763 4/13/2023 UNIVERSAL BUILDING SERVICES CLEANING SVCS. 7,221.00 68764 4/13/2023 TED URBAN REPAIR & REPAINT ART PIECES 739.19 68765 4/13/2023 U.S. BANK 2014 SERIES A, MEASURE J, ROAD & STORM DRAIN REPAIR
1,845.75
68766 4/13/2023 VALENTINE CORPORATION PAY EST. #5, RETENTION RELEASE 39,088.92 68767 4/13/2023 VERIZON WIRELESS 2-11/3-10-23 SVCS. 943.83 68768 4/13/2023 Jeffrey Violet INSTR. CONTRACT - KARATE 310.20 68769 4/13/2023 Larry Wadford INSTR. CONTRACT - MARTIAL ARTS 1,425.00 68770 4/13/2023 Erica Danielle Washington 4-4-23 MODELING SVCS. 96.00 68771 4/13/2023 West Coast Energy Systems LLC GENERATOR REPAIR - COMM. CENTER 2,828.69 68772 4/13/2023 WORKOUTTEMPS INSTR. CONTRACT - ZUMBA 1,065.60 68773 4/21/2023 SCOTT & DIANE CUYLER REFUND REMAINING BALANCE FOR EXC-2023-002 765.19 68774 4/21/2023 ACTIVE NETWORK, LLC SOFTWARE CONTRACT COMPLETION 1,000.00 68775 4/21/2023 ADVANCE TITLE RESEARCH VESTING/LEGAL - DRAINAGE - 88 DOLORES WY 75.00 68776 4/21/2023 ANCHOR ENGINEERING INC NOV. 22 PAVEMENT REHAB. PROJECT 67,491.00 68777 4/21/2023 ASI AIR SYSTEMS INC HVAC SERVICE REPAIR - LIBRARY 2,972.00 68778 4/21/2023 BOMAC'S INC. DEADBOLT LOCK REPAIR - ARTS & GARDEN CTR. 1,630.08 68779 4/21/2023 Treasurer of Contra Costa Coun FEB. 23 FORENSIC SVCS. 4,142.50 68780 4/21/2023 BRADY INDUSTRIES TRASH LINERS 919.39
68781 4/21/2023 CONCORD UNIFORMS LLC UNIFORMS 644.95
68782 4/21/2023 COWAN & THOMPSON CONSTRUCTION EMERGENCY CALL-OUT - EL TOYONAL SLIDE 2,751.70 68783 4/21/2023 ANDREW DIEFENBACH INSTR. CONTRACT - PICKLEBALL 1,071.00 68784 4/21/2023 DOG DYNAMICS INC INSTR. CONTRACT - DOG OBEDIANCE 6,373.28 68785 4/21/2023 DOJ ACCOUNTING SERVICES MAR. 23 FINGERPRINTING APPS. 581.00 68786 4/21/2023 DEWBERRY ENGINEERS INC. 3-11/3-17-23 MINER RD OVER SAN PABLO RETROFIT 10,395.00 68787 4/21/2023 D S BAXLEY INC FLOORING PROJECT - COMM. CTR. 45,329.50 68788 4/21/2023 ESCHAT JAN-MAR. 23 MONTHLY SUBSCRIPTION 205.65 68789 4/21/2023 FAR WESTERN TROPHY AWARD SIGN 29.64
68790 4/21/2023 FASTRAK BRIDGE TOLL 7.00
68791 4/21/2023 FOLGER GRAPHICS BROCHURE PRINTING 779.23 68792 4/21/2023 GENERAL PLUMBING SUPPLY CO. SINK/TOILET/PARTS 450.35 68793 4/21/2023 LISA HARPER 4-11-23 CITY COUNCIL MINUTES 570.00 68794 4/21/2023 HARRIS & ASSOCIATES 2-26/4-1-23 ORCHARD RD. STORM DRAIN REPAIR 7,665.38 68795 4/21/2023 ARIEL HARRIST 4-11-23 MODELING SERVICES 96.00 68796 4/21/2023 HDR ENGINEERING, INC. GLORIETTA-RHEEM STORM DRAIN REPAIR 16,031.25 68797 4/21/2023 HEALTH CARE EMPLOYEES MAY 23 DENTAL PREMIUMS 3,015.28 68798 4/21/2023 REBECCA RUIZ JENAB INSTR. CONTRACT - ZENTANGLE ARTS 38.50 68799 4/21/2023 JANET KAUFMAN INSTR. CONTRACT - NIA CLASS 729.60 68800 4/21/2023 MUNICIPAL RESOURCE GROUP LLC MRG SERVICES THRU MAR. 23 7,818.75 68801 4/21/2023 ORINDA UNION SCHOOL DISTRICT ISOLA GYM USAGE & CUSTODIAL 7,876.50 68802 4/21/2023 Pestfinders Pest & Termite Svc PE4ST CONTROL - CITY HALL 820.00 68803 4/21/2023 P G & E 3-7/4-4-23 SVCS. 19,705.15
68804 4/21/2023 PLAY-WELL TEKNOLOGIES INSTR. CONTRACT - LEGO CAMPS 2,400.00 68805 4/21/2023 Restoration Management Company WATER INTRUSION - COMM. CTR. 65,411.11 68806 4/21/2023 LYNDA KAY REXROAT INSTR. CONTRACT - COOKING CAMPS 3,150.00 68807 4/21/2023 ROADSAFE TRAFFIC SYSTEMS, INC. TRAFFIC CONTROL SIGNAGE 468.02 68808 4/21/2023 ROBERT FERGUSON INSTR. CONTRACT - SKATEBOARDING 1,080.00 68809 4/21/2023 YAYOI SAKAI INSTR. CONTRACT - IKEBANA 3,611.20 68810 4/21/2023 Z SPORTZ INC INSTR. CONTRACT - SKYHAWKS 2,880.00 68811 4/21/2023 STAPLES CONTRACT & COMMERCIAL SUPPLIES 265.78 68812 4/21/2023 STEVENS PRINTING BUSINESS CARDS 84.46
68813 4/21/2023 TEAMSTERS LOCAL UNION 856 APR. 23 (PASS THRU DUES) 1,541.00 Page: 2
F.3.a
Packet Pg. 36
Attachment: April-June 2023 Check Listing [Revision 1] (3154 : Quarterly Disbursements Rev Exp Fund Balance - April through June 2023) City of Orinda
Check/Voucher Register
From 4/1/2023 Through 6/30/2023
Check # Check Date Payee Transaction Description $Amount 68814 4/21/2023 THEIS ENGINEERING & ASSOCIATES ENGINEERING SERVICES - STORM EVENT/FEMA 5,428.75 68815 4/21/2023 Tripepi, Smith and Associates APR. 23 RETAINER 7,200.00 68816 4/21/2023 U S BANK CORPORATION 2-16/3-16-23 CREDIT CARD CHGS. 13,223.93 68817 4/21/2023 WEX INC MAR. 23 GASOLINE CHARGES 11,037.69 68818 4/21/2023 J MENARY AND RICHARD WINEFIELD REFUND FEES FOR OR-2021-432, 8 SOUTHWOOD CT. 8,770.34 68819 4/21/2023 YAMAMOTO FAMILY TRUST REFUND REMAINING BALANCE FOR LLA-2020-002 7 LLA-2020-003
1,927.47
68820 4/27/2023 ABSOLUTE PLUMBING STORM EVENT - 42 TARRY LANE 5,679.00 68821 4/27/2023 ACME FILL CORPORATION CLEAN FILL - UPPER EL TOYONAL 1,033.80 68821 6/12/2023 ACME FILL CORPORATION CLEAN FILL - UPPER EL TOYONAL (1,033.80) 68822 4/27/2023 Lisa Argue 4-12-23 SSTOC MINUTES 487.50 68823 4/27/2023 Christopher Paul Beasley INSTR. CONTRACT - KIDS CARPENTRY 3,064.75 68824 4/27/2023 VIOLETTA BURWELL 1-18-23 MODELING SERVICES 96.00 68825 4/27/2023 CCC PUBLIC WORKS DEPT MAR. 23 TRAFFIC SIGNAL MAINTENANCE 89.72 68827 4/27/2023 CINTAS CORPORATION SUPPLIES 3,413.15
68828 4/27/2023 BRADY INDUSTRIES TRASH LINERS 565.58
68829 4/27/2023 Comcast Business 3-13/4-12-23 SVCS. 1,529.56 68830 4/27/2023 ALLAN DODGE INSTR. CONTRACT - UKULELE 1,512.00 68831 4/27/2023 EBMUD 2-9/4-12-23 SVCS. 180.84
68832 4/27/2023 FAR WESTERN TROPHY AWARD WOOD SIGNS 131.70 68833 4/27/2023 FASTRAK BRIDGE TOLL 14.00
68834 4/27/2023 FAST SIGNS VINYL LETTERING - RANCH HOUSE 74.61 68835 4/27/2023 GRANICUS INC 5-1/6-30-23, AGENDA MTG. SOFTWARE 104.98 68836 4/27/2023 INTERNATIONAL ASSOC. OF EATING REFUND SECURITY DEPOSIT 150.00 68837 4/27/2023 Interwest Consulting Group,Inc MAR. 23, CONTRACTOR PLANNER SERVICES 637.50 68838 4/27/2023 Jennifer Hines Design SUMMER 2023 RECREATION GUIDE 7,350.40 68839 4/27/2023 LCC ENGINEERING & SURVEYING MAR. 23 PROFESSIONAL SERVICES 2,130.00 68840 4/27/2023 THE MUSIC COMPANY MOBILE SOUND EQUIPMENT 2,591.97 68841 4/27/2023 NBC Construction & Engineering MAR. 23 ORINDA COMM. CTR. SOLAR 199,718.64 68842 4/27/2023 ORINDA ASSOCIATION INSERTS FOR ACTIVITY GUIDE 350.00 68843 4/27/2023 ASHLEY SCHULER LESSONS PLANS 3,724.00
68844 4/27/2023 STAPLES CONTRACT & COMMERCIAL SUPPLIES 200.30 68845 4/27/2023 Wildland Corporation TREE/BRUSH REMOVAL - OAKS PARK 27,900.00 68846 4/27/2023 UNIVERSAL BUILDING SERVICES MAR. 23 CLEANING SVCS. 919.00 68847 4/27/2023 Larry Wadford INSTR. CONTRACT - MARTIAL ARTS 1,521.00 68848 5/5/2023 T-MOBILE USA, Inc. 3-21/4-20-23, CELL PHONE SERVICES 882.12 68849 5/5/2023 ACME FILL CORPORATION DRAINAGE MATERIAL - CLEAN FILL 829.20 68850 5/5/2023 BASIC PVR 4-28-23 FLEX SPENDING 1,335.52 68851 5/5/2023 Battalion One Fire Protection FIRE SPRINKLER SERVICE REPAIR - LIBRARY 2,830.31 68852 5/5/2023 BAY CITIES PAVING & GRADING EMERGENCY CALL-OUT - EL TOYONAL 14,790.81 68853 5/5/2023 BAY ALARM COMPANY CAMERA SYSTEM - 5-1/7-31-23 2,763.24 68854 5/5/2023 BIG O TIRES VEHICLE MAINT. - VEHICLE 90 2,600.16 68855 5/5/2023 VIOLETTA BURWELL 4-25-23 MODELING SERVICES 96.00 68856 5/5/2023 CALIFORNIA STATE DISBURSEMENT 4-28-23, GARNISHMENT 356.76 68857 5/5/2023 Treasurer of Contra Costa Coun MAR. 23 POLICE SERVICES 332,309.43 68858 5/5/2023 CINTAS CORPORATION PW UNIFORMS 80.60
68859 5/5/2023 CODE 3 TECHNOLOGY LLC WEB CAM TABLETS 13,304.53 68860 5/5/2023 CSG CONSULTANTS 2023 ANNUAL PAVEMENT REHAB. PROJECT 13,042.50 68861 5/5/2023 DEPT. OF TRANSPORTATION JAN-MAR. 23 TRAFFIC SIGNS & LIGHTS 3,190.38 68862 5/5/2023 EBMUD 2-9/4-12-23 SVCS. 67.84
68863 5/5/2023 EMPLOYMENT DEVELOPMENT DEPT. JAN. - MAR. 23 UNEMPLOYMENT INSURANCE 341.00 68864 5/5/2023 IEDA MAY 23 LABOR RELATIONS CONSULTING FEES 1,044.32 68865 5/5/2023 Mikes Automotive Service AC REPAIR - VEHICLE 84 186.77 68866 5/5/2023 Municipal Pooling Authority 3-7-23, CPR/AED TRAINING 2,279.82 68867 5/5/2023 NBC Construction & Engineering 11-1/3-31-23 CITY HALL SLOPE STABILIZATION

PROJECT
44,459.05
68868 5/5/2023 P G & E 3-16/4-16-23 SCVS. 967.53
68869 5/5/2023 PlaceWorks, Inc. MAR. 23, HOUSING ELEMENT 5,330.82 68870 5/5/2023 PRECISION IT CONSULTING WIFI LICENSING RENEWAL 1,059.60 68871 5/5/2023 Pro Tow Co. dba B&D Towing TOWING SERVICES 1,225.00 68872 5/5/2023 PUSHING FOR PEACE INSTR. CONTRACT - TAI CHI 378.00 68873 5/5/2023 R & S ERECTION OF CONCORD INC ELECTRIC GATE REPAIRS 339.00 68874 5/5/2023 RINCON CONSULTANTANTS, INC 2-5/4-18-23, HOUSING/SAFETY ELEMENT 3,788.75 68881 5/9/2023 ACCESS INFORMATION MANAGEMENT MAY 23, STORAGE DOCUMENTS 559.19 68882 5/9/2023 AMS AMERICAN MECHANICAL SVCS FEB. 23 HVAC MAINT. 2,246.49 68883 5/9/2023 ASI AIR SYSTEMS INC RESTROOM FAN REPAIRS 5,451.97 68884 5/9/2023 ASSOC OF BAY AREA GOVERNMENTS MAY 23 NATURAL GAS SERVICE 5,149.93 68885 5/9/2023 AT&T 4-4/5-3-23 SVC. 946.57
Page: 3
F.3.a
Packet Pg. 37
Attachment: April-June 2023 Check Listing [Revision 1] (3154 : Quarterly Disbursements Rev Exp Fund Balance - April through June 2023) City of Orinda
Check/Voucher Register
From 4/1/2023 Through 6/30/2023
Check # Check Date Payee Transaction Description $Amount 68886 5/9/2023 VERY NICE POOLS APR. 23 CHLORINE 265.28
68887 5/9/2023 BOMAC'S INC. LIBRARY DOOR REPAIR 410.00
68888 5/9/2023 California Consulting, Inc. MAY 23 GRANT WRITING RETAINER 5,000.00 68889 5/9/2023 COUNTY TREASURER APR. JUN 23 ANIMAL CONTROL SERVICES 38,013.00 68890 5/9/2023 CCC PUBLIC WORKS DEPT BUSINESS CARDS 80.45 68891 5/9/2023 CINTAS CORPORATION SUPPLIES 1,028.04
68892 5/9/2023 CSG CONSULTANTS ENGR. SVCS - 88 SUNNYSIDE MINOR SUB 9,630.00 68893 5/9/2023 DC ELECTRIC GROUP INC BIKE LOOP MARKING 6,088.74 68894 5/9/2023 DEWBERRY ENGINEERS INC. MINOR RD OVER SAN PABLO CREEK SEISMIC

RETROFIT
10,241.61
68895 5/9/2023 ECOFERT INC APR. 23 FERTIGATION SERVICE 383.00 68896 5/9/2023 F J KENNEDY AND ASSOCIATES INC PROFESSIONAL SVCS. - NPDES 1,610.81 68897 5/9/2023 FOLSOM CHEVROLET GEO INC PD PATROL REPLACEMENT VEHICLE 115,700.38 68898 5/9/2023 LISA HARPER MAY 2, CITY COUNCIL MEETING 555.00 68899 5/9/2023 ARIEL HARRIST 5-2-23 MODELING SERVICES 108.00 68900 5/9/2023 HDL Software LLC CONTRACT SERVICES 693.75 68901 5/9/2023 Catherine Kauder APR. 23 APPCE WEBSITE 124.80 68902 5/9/2023 FARAH KHORASHADI NOTICE OF EXEMPTION 50.00 68903 5/9/2023 TALIA KURLAND FULL REFUND OF SECURITY DEPOSIT 150.00 68904 5/9/2023 Derrick B. Leonard INSTR. CONTRACT - SPANISH CLASS 160.00 68905 5/9/2023 MID-COUNTY OFFICIALS NETWORK JAN-MAR. 23 MID COUNTY OFFICIALS 8,176.00 68906 5/9/2023 MITYLITE INC FLIP TOP TABLES 1,826.69
68907 5/9/2023 MUNICIPAL RESOURCE GROUP LLC MRG SERVICES THRU JAN 2023 1,743.75 68908 5/9/2023 NBS GOVERNMENT FINANCE GROUP APR - JUN. 23 LIBRARY PARCEL TAX 3,224.02 68909 5/9/2023 RYAN O'KANE REIMB. FOR BOOTS 250.00
68910 5/9/2023 OTIS ELEVATOR COMPANY MAY. 23 ELEVATOR MAINT. 400.68 68911 5/9/2023 P G & E 03-07/4-4-23 SVCS. 3,803.46
68912 5/9/2023 SUSAN REEDY REIMBURSEMENT FOR NOTICE OF EXEMPTION 52.50 68914 5/9/2023 SCHAAF & WHEELER 0 9,948.73
68919 5/9/2023 PATRICIA TOMLINSON INSTR. CONTRACT - BALLET 9,275.50 68921 5/9/2023 U.S. BANK 2014, SERIES B, MEASURE J ROAD & STORM DRAIN REPAIR
3,450.00
68922 5/9/2023 VERIZON WIRELESS 3-11/4-10-23 CELL PHONE SERVICE 956.18 68923 5/9/2023 VISION SERVICE PLAN CA MAY 23 VISION PREMIUMS 572.35 68924 5/9/2023 WALNUT CREEK FORD VEHICLE REPAIR #84 2,094.33 68925 5/9/2023 WEX INC APR. 23 GASOLINE CHARGES 10,232.69 68927 5/9/2023 VEERA SANJANA INSTR. CONTRACT - YOGA 1,568.00 68928 5/9/2023 SHUTE MIHALEY & WEINBERGER MAR. 23 LEGAL FEES - MONITOR LITIGATION 30,353.41 68929 5/9/2023 STAPLES CONTRACT & COMMERCIAL MAILING SUPPLIES 21.06 68930 5/9/2023 Wildland Corporation APR. 23 CHIPPING SERVICES 7,272.50 68931 5/9/2023 U S BANK CORPORATION 3-15/4-16-23 CREDIT CARD CHGS. 31,738.41 68932 5/9/2023 ARIEL ZHANG REC. - REFUND UNUSED BALANCE PRIOR REGISTR.

SYSTEM

55.00 68933 5/18/2023 ABSOLUTE PLUMBING STORM DRAIN CLEAN-OUT - COMM. CTR. 886.00 68934 5/18/2023 ADVANCE TITLE RESEARCH TITLE RESEARCH - DRAINAGE, EL TOYONAL: 88

DOLORES WY

85.00 68935 5/18/2023 BAY AREA BARRICADE SERVICE SAFETY VESTS 43.80 68936 5/18/2023 BAY AREA NEWS GROUP EAST BAY CLASSIFIED ADS 662.20 68937 5/18/2023 SPORTS SUPPLY GROUP INC ADD'L UNIFORM 21.40 68938 5/18/2023 Brittany Budge 3-9-23 MODELING SERVICE 108.00 68939 5/18/2023 CAFFE TEATRO LIBRARY COMM. MTG. 4-11 & 5-9-23 353.50 68939 6/20/2023 CAFFE TEATRO LIBRARY COMM. MTG. 4-11 & 5-9-23 (353.50) 68941 5/18/2023 CINTAS CORPORATION CLEANING SVCS. 1,855.63 68942 5/18/2023 BRADY INDUSTRIES TRASH LINERS 425.58
68943 5/18/2023 Comcast Business 5-13/6-12-23 SVCS. 1,495.54 68944 5/18/2023 EBMUD 3-1/5-1-23 SVCS. 4,808.53
68945 5/18/2023 FISHER GEOTECHNICAL ENGR. SVCS. - EL TOYONAL 33,057.60 68946 5/18/2023 RAIFE GIOVINAZZO REFUND FOR BASKETBALL COACHING 74.00 68947 5/18/2023 GRAINGER FIRST AID KIT 306.88
68948 5/18/2023 LISA HARPER APR. 18, CITY COUNCIL MINUTES 1,335.00 68949 5/18/2023 HARRIS & ASSOCIATES ORCHARD RD. & IVY DR. STORM DRAIN REPAIRS 10,860.88 68950 5/18/2023 HEALTH CARE EMPLOYEES JUNE 23 DENTAL PREMIUMS 3,015.28 68951 5/18/2023 Ricky Hernandez 5-13/5-14-23 MILEAGE 39.30 68952 5/18/2023 STEVEN HOWARD REFUND OVERPAYMENT OF EXC2023-029 450.94 68953 5/18/2023 INSTITUTE FOR LOCAL GOVERNMENT PRIORITY SETTING WORKSHOP 23,000.00 68954 5/18/2023 INTREPID ELECTRONIC SYSTEMS 6-1-23/5-31-2024 FIRE ALARM SYSTEM MONITORING 420.00 68955 5/18/2023 JANET KAUFMAN INSTR. CONTRACT - NIA CLASS 666.00 68956 5/18/2023 LSA ASSOCIATES INC ON-CALL ENGR. SVCS. - MINER RD SINKHOLE 9,379.26 Page: 4
F.3.a
Packet Pg. 38
Attachment: April-June 2023 Check Listing [Revision 1] (3154 : Quarterly Disbursements Rev Exp Fund Balance - April through June 2023) City of Orinda
Check/Voucher Register
From 4/1/2023 Through 6/30/2023
Check # Check Date Payee Transaction Description $Amount 68957 5/18/2023 MAZE & ASSOCIATES APR. 23 SERVICES 14,125.00 68958 5/18/2023 MCE CORPORATION MAR. 23 LANDSCAPING SVCS. 48,711.35 68959 5/18/2023 MIKSIS SERVICES INC ANNUAL DRAINAGE IMPROVEMENT PROJECT 33,750.00 68960 5/18/2023 Municipal Pooling Authority APR. 23 LIABILITY DEDUCTIBLE 216.79 68962 5/18/2023 C. OVERAA & COMPANY LIBRARY TILE WORK 1,200.00 68963 5/18/2023 PRECISION IT CONSULTING APR. 23 MONTHLY SUPPORT SVCS. 8,874.00 68964 5/18/2023 ROADSAFE TRAFFIC SYSTEMS, INC. THEFT PROOF BOLTS 137.19 68965 5/18/2023 SHUTE MIHALEY & WEINBERGER MAR. 23 LEGAL SERVICES 44,023.99 68966 5/18/2023 STAPLES CONTRACT & COMMERCIAL SUPPLIES 171.25 68967 5/18/2023 THEIS ENGINEERING & ASSOCIATES ENGINEERING SVCS. - STORM EVENT/FEMA 3,332.50 68968 5/18/2023 Turbo Data Systems PERMITS PARKING SVCS. 45.91 68969 5/18/2023 UNIVERSAL BUILDING SERVICES CLEANING SVCS. 8,061.00 68970 5/24/2023 Allcal Golf & Industrial Vehic GOLF CART SERVICE & REPAIR 472.12 68971 5/24/2023 ASI AIR SYSTEMS INC APR. 23 PREVENTIVE MAINT. 9,701.00 68972 5/24/2023 BASIC PVR 5-12-23 FLEX SPENDING 1,335.52 68973 5/24/2023 Battalion One Fire Protection SPRINKLER INSPECTION - WILDER BLDGS. 1,760.00 68974 5/24/2023 BAY CITIES PAVING & GRADING RETENTION RELEASE 140,000.00 68974 6/20/2023 BAY CITIES PAVING & GRADING RETENTION RELEASE (140,000.00) 68975 5/24/2023 BAY ALARM COMPANY 6-1/8-31-23 ALARM SVCS. 2,329.77 68976 5/24/2023 SPORTS SUPPLY GROUP INC ADD'L UNIFORM ARTICLE 543.11 68977 5/24/2023 CALIFORNIA STATE DISBURSEMENT 5-12-23 GARNISHMENT 356.76 68978 5/24/2023 MANUEL CAMACHO JR 5-16-23, MODELING SERVICES 108.00 68979 5/24/2023 CINTAS CORPORATION CLEANING SVCS. 1,627.02 68980 5/24/2023 Concentra Medical Centers PRE-EMPLOYMENT PHYSICAL 654.00 68981 5/24/2023 CSG CONSULTANTS GEN'L LAND DEV. REVIEW 41,597.50 68982 5/24/2023 EBMUD 3-8/5-6-23 SVCS. 5,988.49
68983 5/24/2023 FOLGER GRAPHICS FIRE SAFETY BROCHURE 3,508.18 68984 5/24/2023 RUEBEN GERK 5-19-23 MILEAGE 44.54
68985 5/24/2023 WILSEY HAM 2022 ANNUAL PAVEMENT REHAB. 5,440.00 68986 5/24/2023 HDR ENGINEERING, INC. 9-25/10-22-22 GLORIETTA-RHEEM STORM DRAIN 16,780.75 68987 5/24/2023 Ricky Hernandez 5-21-23 MILEAGE 19.65
68988 5/24/2023 Interwest Consulting Group,Inc APR. 23 CONTRACTOR PLANNER SERVICES 37.50 68989 5/24/2023 DONG KIM FIRE FUELS INCENTIVE WORK 450.00 68990 5/24/2023 LEAGUE OF CALIFORNIA CITIES DIVISION MEETING FOR MEMBERS 200.00 68991 5/24/2023 TIMOTHY LIPMAN FIRE FUELS INCENTIVE WORK 599.00 68992 5/24/2023 GREG MAZMANIAN FIRE FUELS INCENTIVE WORK 599.00 68993 5/24/2023 Municipal Pooling Authority 4-30/6-30-23 EAP PREMIUMS 408.45 68994 5/24/2023 MUNICIPAL RESOURCE GROUP LLC APR. 23 MRG SERVICES 2,362.50 68995 5/24/2023 Pestfinders Pest & Termite Svc PEST CONTROL - CITY HALL 820.00 68996 5/24/2023 P G & E 4-5/5-4-23 SVCS. 20,936.83
68997 5/24/2023 STAPLES CONTRACT & COMMERCIAL SUPPLIES 373.85 68998 5/24/2023 SANDY TAN FIRE FUELS INCENTIVE WORK 599.00 68999 5/24/2023 Tripepi, Smith and Associates MAY 22 RETAINER 7,200.00 69000 5/24/2023 UNIVERSAL BUILDING SERVICES CLEANING SVCS. 919.00 69002 5/24/2023 UNITED SITE SERVICES INC PORTABLE RENTAL - OIS 7,122.90 69003 6/2/2023 T-MOBILE USA, Inc. 4-21/5-20-23 CELL PHONE SERVICES 1,409.67 69004 6/2/2023 ADVANCE TITLE RESEARCH TITLE RESEARCH - MORAGA WY @ WOODLAND RD 50.00 69005 6/2/2023 S F ALLIANT INSURANCE SERV LIBRARY EARTHQUAKE INSURANCE 22,080.52 69006 6/2/2023 AMS AMERICAN MECHANICAL SVCS HVAC MAINT. - CITY HALL 2,246.49 69007 6/2/2023 Lisa Argue MAY 23, SSTOC MEETING MINUTES 487.50 69008 6/2/2023 BASIC PVR 5-26-23 FLEX SPENDING 1,335.52 69009 6/2/2023 SPORTS SUPPLY GROUP INC BASE PLUGS/ANCHORS 53.24 69010 6/2/2023 BUILD YOUR OWN GARMENT CAMP STAFF GEAR 1,855.26 69011 6/2/2023 CALIFORNIA STATE DISBURSEMENT 5-26-23 GARNISHMENT 46.14 69012 6/2/2023 CALIFORNIA STATE DISBURSEMENT 5-26-23 GARNISHMENT 356.76 69013 6/2/2023 CCC LIBRARY ADMINISTRATION 3RD QTR. - JAN. 23 - MAR 23, LIBRARY HOURS & PHONE CHG.
35,036.18
69014 6/2/2023 CINTAS CORPORATION CLEANING SVCS. 1,820.99 69015 6/2/2023 COMCAST 5-15/6-14-23 TELEPHONE TRUNK LINES 354.70 69016 6/2/2023 TRACY A. CURTIS 5-23-23 MODELING SERVICE 108.00 69017 6/2/2023 EBMUD 3-4/5-6-23 SVCS. 2,299.31
69018 6/2/2023 EXPERT TREE SERVICE EMERGENCY TREE REMOVAL - 2 WOODLAND RD 4,140.00 69019 6/2/2023 ANDREA GASPARI INSTR. CONTRACT - GYMNASTICS 1,305.00 69020 6/2/2023 GURUS EDUCATION INSTR. CONTRACT - PUBLIC SPEAKING 181.30 69021 6/2/2023 LCC ENGINEERING & SURVEYING MORAGA WY & VALLEY VIEW PROJECT 8,520.00 69022 6/2/2023 SUSAN MCALLISTER INSTR. CONTRACT - ART CLASSES 1,790.14 69023 6/2/2023 OTIS ELEVATOR COMPANY 6-1/6-30-23 ELEVATOR MAINT. 400.68 69024 6/2/2023 P G & E 4-17/5-15-23 SVCS. 31.17
Page: 5
F.3.a
Packet Pg. 39
Attachment: April-June 2023 Check Listing [Revision 1] (3154 : Quarterly Disbursements Rev Exp Fund Balance - April through June 2023) City of Orinda
Check/Voucher Register
From 4/1/2023 Through 6/30/2023
Check # Check Date Payee Transaction Description $Amount 69025 6/2/2023 PlaceWorks, Inc. APR. 23, HOUSING ELEMENT 1,734.00 69026 6/2/2023 ROADSAFE TRAFFIC SYSTEMS, INC. TRAFFIC CONTROL SIGNAGE 264.60 69027 6/2/2023 YAYOI SAKAI INSTR. CONTRACT - IKEBANA 3,498.35 69028 6/2/2023 SCHAAF & WHEELER ON-CALL SERVICES - SAN PABLO CREEK CULVERT

REPAIRS
10,651.95
69029 6/2/2023 STAPLES CONTRACT & COMMERCIAL PHONE ORDER SUPPLIES 407.43 69030 6/2/2023 STATE CONTROLLERS OFFICE 2022 OFFSET PROGRAM 47.11 69031 6/2/2023 TEAMSTERS LOCAL UNION 856 MAY 23 (PASS THRU DUES) 1,541.00 69032 6/2/2023 Wildland Corporation BRUSH REMOVAL - CAMINO PABLO 2,800.00 69033 6/2/2023 TYMCO, INC. STREET SWEEPER - MODEL 435 270,731.30 69034 6/2/2023 VISION SERVICE PLAN CA JUNE 23 VISION SERVICES 572.35 69037 6/8/2023 ACCESS INFORMATION MANAGEMENT 6-1/6-30-23 STORAGE DOCUMENTS 545.16 69038 6/8/2023 All Traffic Solutions, Inc. TRAFFIC SUITE APP RENEWAL 1,500.00 69039 6/8/2023 BOMAC'S INC. VANDALIZED DOOR LATCH REPAIR 487.57 69040 6/8/2023 California Consulting, Inc. JUN. 23 GRANT WRITING SVCS. 5,000.00 69041 6/8/2023 Treasurer of Contra Costa Coun APR. 23 FORENSIC SERVICES 3,810.00 69042 6/8/2023 CONTRA COSTA HEALTH SERVICES HAZMAT 23-24, OPERATION PERMIT 569.00 69043 6/8/2023 CINTAS CORPORATION CLEANING SERVICE 501.77 69044 6/8/2023 CINTAS FAS LOCKBOX 636525 FIRE EXTINGUISHER INSPECTION - LIBRARY 2,979.03 69045 6/8/2023 Concentra Medical Centers PRE- EMPLOYMENT PHYSICAL 775.00 69046 6/8/2023 CONCORD UNIFORMS LLC UNIFORM 651.49
69047 6/8/2023 COWAN & THOMPSON CONSTRUCTION GUARDRAIL REPAIR - MINER RD. 6,240.00 69048 6/8/2023 CSW/Stuber-Stroeh Engineering ON-CALL ENGR. - MORAGA WY WALL 3,022.50 69049 6/8/2023 ANDREW DIEFENBACH INSTR. CONTRACT - PICKLEBALL 3,649.69 69050 6/8/2023 DOG DYNAMICS INC INSTR. CONTRACT - DOG OBEDIANCE 5,700.00 69051 6/8/2023 DOJ ACCOUNTING SERVICES APR. 23 FINGERPRINTING APS. 236.00 69052 6/8/2023 DEWBERRY ENGINEERS INC. MINER RD OVER SAN PABLO CREEK SEIMIC 10,422.06 69053 6/8/2023 EBMUD 3-20/5-18-23 SCVS. 10,721.20
69054 6/8/2023 Fire Aside, Inc. 2023 CHIPPER/DAY FEE 1,115.85 69055 6/8/2023 FISHER GEOTECHNICAL ENGR. SERVICES - CITY HALL SLOPE STABL. 6,586.44 69056 6/8/2023 FORENSIC SERVICES DIVISION FORENSIC SERVICES 12,489.40 69057 6/8/2023 ANDREA GASPARI INSTR. CONTRACT - YOUTH GYMNASTICS 4,680.00 69058 6/8/2023 GCS ENVIRONMENTAL EQUIPMENT SE VEHICLE MAINT. - SWEEPER 891.00 69059 6/8/2023 GHA TECHNOLOGIES, INC 3YR SURVEILLANCE CAMERA LICENSE 1,167.93 69060 6/8/2023 GRANICUS INC APR. 23 AGENDA MTG. SOFTWARE 3,115.57 69061 6/8/2023 HSI Workplace Compliance 06/23-06/27/24 ANNUAL RENEWAL 1,315.00 69062 6/8/2023 IEDA JUN 23 LABOR RELATIONS CONSULTING 1,044.32 69063 6/8/2023 JAF ASSOCIATES, INC. INSTR. CONTRACT - TENNIS 2,022.22 69064 6/8/2023 KR Electric, Inc. LIGHT POLE RELOCATION 8,340.31 69065 6/8/2023 MCE CORPORATION GUTTER INSTALL - DESCANO VALLEY GUTTER 25,193.70 69066 6/8/2023 VIRGINIA H MEGLEY INSTR. CONTRACT - BALLET 207.00 69067 6/8/2023 VALERIE MENDEZ 5-30-23 MODEL SERVICE 108.00 69068 6/8/2023 CHAT MINGKWAN INSTR. CONTRACT - ASIAN POPULAR DISHES 65.00 69069 6/8/2023 MIRAMONTE HIGH SCHOOL FULL REFUND OF SECURITY DEPOSIT 300.00 69070 6/8/2023 MOUSER LAW FIRM, MAY 23 LEGAL SERVICES 116.00 69071 6/8/2023 NBC Construction & Engineering ORINDA COMMUNITY CENTER SOLAR 61,451.89 69072 6/8/2023 ORINDA UNION SCHOOL DISTRICT RESTROOM CLEANING SUPPLIES 976.90 69073 6/8/2023 PlaceWorks, Inc. APR. 23 - CREEK RESTORATION PLNG. SVCS. 6,493.23 69074 6/8/2023 PUSHING FOR PEACE INSTR. CONTRACT - TAI CHI & ART CLASS 1,145.90 69075 6/8/2023 ROADSAFE TRAFFIC SYSTEMS, INC. TRAFFIC CONTROL SIGNAGE 1,036.76 69076 6/8/2023 Z SPORTZ INC INSTR. CONTRACT - SKYHAWKS 8,906.00 69077 6/8/2023 STEVENS PRINTING SUPPLIES 647.53
69078 6/8/2023 T-MOBILE USA INC. AREA DUMP 25.00
69079 6/8/2023 Wildland Corporation MAY 23 CHIPPING SVCS. 15,866.50 69080 6/8/2023 PATRICIA TOMLINSON INSTR. CONTRACT - BALLET 9,352.50 69081 6/8/2023 UNICO ENGINEERING INC MINER RD ov SAN PABLO SEISMIC 7,829.88 69082 6/8/2023 U S BANK CORPORATION 4-17/5-14-23 CREDIT CARD CHGS. 11,810.94 69083 6/8/2023 VERIZON WIRELESS 4-11/5-10-23 CELL SERVICES 956.18 69084 6/8/2023 Larry Wadford INSTR. CONTRACT - MARTIAL ARTS 1,377.00 69085 6/15/2023 JOHN MUIR HEALTH EMPLOYEE WELLNESS - FLU SHOT 536.00 69086 6/15/2023 ACME FILL CORPORATION CLEAN FILL - UPPER EL TOYONAL 1,033.80 69087 6/15/2023 ASSOC OF BAY AREA GOVERNMENTS JUN 23 NATURAL GAS SERVICES 5,149.93 69088 6/15/2023 AT&T 5-4/6-3-23 SVCS. 995.62
69089 6/15/2023 Atlas Technical Consultants SOILS PEER REVIEW - 2 STANTON RD 2,235.00 69090 6/15/2023 BASIC PVR 6-9-23 FLEX PLAN 1,382.52
69091 6/15/2023 BAY AREA NEWS GROUP EAST BAY MAY 23 CLASSIFIED ADVERTISING 1,381.16 69092 6/15/2023 BEHNOUSH BABZANI LLC INSTR. CONTRACT - ART CAMP 3,150.00 69093 6/15/2023 BERKELEY CHESS SCHOOL INSTR. CONTRACT - CHESS CAMP 5,152.00 Page: 6
F.3.a
Packet Pg. 40
Attachment: April-June 2023 Check Listing [Revision 1] (3154 : Quarterly Disbursements Rev Exp Fund Balance - April through June 2023) City of Orinda
Check/Voucher Register
From 4/1/2023 Through 6/30/2023
Check # Check Date Payee Transaction Description $Amount 69094 6/15/2023 BLX GROUP LLC GO BOND ARBITRAGE REPORT- 2014 SERIES B + 2016 SERIES A
1,500.00
69095 6/15/2023 JC BC Enterprises INSTR. CONTRACT - LEGO CAMPS 6,662.50 69096 6/15/2023 CALIFORNIA STATE DISBURSEMENT 6-9-23 GARNISHMENT 356.76 69097 6/15/2023 CALIFORNIA STATE DISBURSEMENT 6-9-23 GARNISHMENT 46.14 69098 6/15/2023 Treasurer of Contra Costa Coun APR. 23 POLICE SERVICES 331,699.31 69099 6/15/2023 CINTAS CORPORATION PW UNIFORMS 86.88
69100 6/15/2023 CivicPlus, Inc HOURLY DESIGN FEE 22,275.75 69101 6/15/2023 DC ELECTRIC GROUP INC SANTA MARIA @ ORINDA WY - POLARIS SYSTEM

INSTALLATION
11,569.00
69102 6/15/2023 DESIRED EFFECT, LLC CITY COUNCIL MTG. 4-11-23 6,381.86 69103 6/15/2023 ANDREW DIEFENBACH INSTR. CONTRACT - PICKLEBALL CAMP 714.00 69104 6/15/2023 ALLAN DODGE INSTR. CONTRACT - UKULELE 1,285.20 69105 6/15/2023 RUEBEN GERK 6-9-23 MILEAGE 22.27
69106 6/15/2023 LISA HARPER JUN 6, 2023 CITY COUNCIL MINUTES 705.00 69107 6/15/2023 ARIEL HARRIST 6-6-23 MODELING SERVICES 108.00 69108 6/15/2023 HDL Software LLC CONTRACT SERVICES 601.25 69109 6/15/2023 Ricky Hernandez 6-2-23 MILEAGE 19.65
69110 6/15/2023 JAF ASSOCIATES, INC. INSTR. CONTRACT - TENNIS CAMP 3,454.50 69111 6/15/2023 REBECCA RUIZ JENAB INSTR. CONTRACT - ZENTANGLE ARTS CLASS 38.50 69112 6/15/2023 JOSEPH'S LAWNMOWER & LOCK MAINT. SUPPLIES - SPOOL LINE 109.14 69113 6/15/2023 KANE GeoTech, Inc. SITE VISITS & DATA COLLECTION 1,500.00 69114 6/15/2023 JANET KAUFMAN INSTR. CONTRACT - NIA CLASS & DROP-INS 432.00 69115 6/15/2023 ARELLANO MASONRY, INC. TILE INSPECTION 3,000.00 69116 6/15/2023 MORAGA VALLEY SWIM & TENNIS CL PROJECT IS COMPLETE, REFUND THE LANDSCAPE BOND, DRA2020-052
20,000.00
69117 6/15/2023 Municipal Pooling Authority JUNE 23 LTD/LIFE INSURANCE 2,254.46 69118 6/15/2023 RYAN O'KANE OFFICE SUPPLIES - REIMBURSEMENT 34.66 69119 6/15/2023 P G & E 4-4/5-3-23 SVCS. 3,806.48
69120 6/15/2023 PRESIDIO SYSTEMS INC. CCTV/HYDRO VAC, VARIOUS LOCATIONS 18,000.00 69121 6/15/2023 Pro Tow Co. dba B&D Towing TIRE CHANGE - '17 FORD EXPLOYER 210.00 69122 6/15/2023 ROADSAFE TRAFFIC SYSTEMS, INC. TRAFFIC CONTROL SIGNAGE 49.39 69123 6/15/2023 STAPLES CONTRACT & COMMERCIAL KEYBOARD & SUPPLIES 571.60 69124 6/15/2023 STEVENS PRINTING BUSINESS CARDS 83.34
69125 6/15/2023 THEIS ENGINEERING & ASSOCIATES ENGINEERING SVCS. - STORM EVENT/FEMA 5,160.00 69126 6/15/2023 WORKOUTTEMPS INSTR. CONTRACT - ZUMBA 1,298.40 69202 6/22/2023 1ST IMPRESSION CONSTRUCTION WILDER FIELD ANNUAL MAINTENANCE 5,200.00 69203 6/22/2023 ABSOLUTE PLUMBING DRAINAGE - STORM EVENT, 28 ORINDA WY 5,920.00 69204 6/22/2023 BASIC PVR FLEX SPENDING & TRANSIT 1,382.52 69205 6/22/2023 BAY CITIES PAVING & GRADING RETENTION RELEASE 140,000.00 69206 6/22/2023 CAFFE TEATRO LIBRARY COMM. MTG. 4-11 & 5-9-23 613.50 69207 6/22/2023 CALIFORNIA STATE DISBURSEMENT 623 GARNISHMENT 356.76 69208 6/22/2023 CALIFORNIA STATE DISBURSEMENT 6-23-23 GARNISHMENT 46.14 69209 6/22/2023 MANUEL CAMACHO JR 6-13-23 MODELING SERVICES 108.00 69210 6/22/2023 CCC GENERAL SERVICES DEPT APR. 23 TRAFFIC SIGNAL MAINT. 28.83 69212 6/22/2023 CINTAS CORPORATION SUPPLIES, UNIFORM 4,044.00 69213 6/22/2023 CivicPlus, Inc ANNUAL RECR. SOFTWARE FEES 28,125.00 69214 6/22/2023 Comcast Business 6-13/7-12-23 SVCS. 1,505.87 69215 6/22/2023 Concentra Medical Centers PRE- EMPLOYMENT PHYSICAL 34.00 69216 6/22/2023 CSG CONSULTANTS GEN'L LAND DEV. REVIEW 8,495.00 69217 6/22/2023 DC ELECTRIC GROUP INC TRAFFIC SIGNAL MAINT. MAR. ROUTINE WORK 11,536.80 69218 6/22/2023 DELTA FENCE COMPANY INC. REPLACE OLD GATE ST RANCH HOUSE 2,690.00 69219 6/22/2023 DESIRED EFFECT, LLC AUDIO VISUAL/HYBRID SUPPORT 629.50 69220 6/22/2023 MORGAN DZIAD INSTR. CONTRACT - BABYSITTING CLASS 1,188.00 69221 6/22/2023 ECOFERT INC MAY 23 FERTIGATION SVCS. 383.00 69222 6/22/2023 EXPERT TREE SERVICE COMM. CTR. - FIRE ABATEMENT 12,275.00 69223 6/22/2023 FAR WESTERN TROPHY AWARD WOOD SIGNS 26.22 69224 6/22/2023 F J KENNEDY AND ASSOCIATES INC PROFESSIONAL SVCS. - NPDES 664.83 69225 6/22/2023 FOLGER GRAPHICS PRINTING & POSTAGE SERVICES 472.71 69226 6/22/2023 Habitot Children's Museum FULL REFUND OF SECURITY DEPOSIT 100.00 69227 6/22/2023 Interwest Consulting Group,Inc MAY 23, CONTRACT PLANNER SERVICES 150.00 69228 6/22/2023 DAVID & KRISTEN MANNIX PROJECT IS COMPLETED REFUND LANDSCAPE 32,750.00 69229 6/22/2023 MORGAN BONANNO DEVELOPMENT INC PAVEMENT REPAIR - 38 IRVING: 41 LA NORIA 15,385.00 69230 6/22/2023 KRISTI MUELLER INSTR. CONTRACT - MUSICAL THEATER 5,051.15 69231 6/22/2023 PARAMOUNT EDUCATION, LLC INSTR. CONTRACT - YOUTH CODING CAMP 9,490.97 69232 6/22/2023 Pestfinders Pest & Termite Svc PEST CONTROL - CITY HALL 820.00 69233 6/22/2023 P G & E 5-5/6-5-23 SVCS. 33,218.06
69234 6/22/2023 PRECISION IT CONSULTING LABOR CHGS. - FEB-APR. 23 9,249.00 Page: 7
F.3.a
Packet Pg. 41
Attachment: April-June 2023 Check Listing [Revision 1] (3154 : Quarterly Disbursements Rev Exp Fund Balance - April through June 2023) City of Orinda
Check/Voucher Register
From 4/1/2023 Through 6/30/2023
Check # Check Date Payee Transaction Description $Amount 69235 6/22/2023 Restoration Management Company 2022 WATER INTRUSION DAMAGE 28,713.23 69236 6/22/2023 LYNDA KAY REXROAT INSTR. CONTRACT - YOUTH COOKING CLASS 2,592.00 69237 6/22/2023 ROADSAFE TRAFFIC SYSTEMS, INC. TRAFFIC CONTROL SIGNAGE 729.83 69238 6/22/2023 SCHAAF & WHEELER ON-CALL - SAN PABLO CREEK CULVERT REPAIR 3,982.28 69239 6/22/2023 DELIA SCHLETTER INSTR. CONTRACT - LINE DANCE 216.00 69240 6/22/2023 Screening One, Inc. PRE-EMPLOYEE SCREENING 224.95 69241 6/22/2023 Z SPORTZ INC INSTR. CONTRACT - MINI HAWK CAMP 1,650.00 69242 6/22/2023 TEAMSTERS LOCAL UNION 856 JUN 23 DUES (PASS THRU DUES) 1,541.00 69243 6/22/2023 Wildland Corporation WEED/BRUSH REMOVAL - COMMUNITY CTR. 10,800.00 69244 6/22/2023 TJKM TRANSPORTATION ON-CALL TRAFFIC ENGR. - LRSP PROJECT 2,237.43 69245 6/22/2023 Tripepi, Smith and Associates MAY 23 RETAINER 7,200.00 69246 6/29/2023 AMS AMERICAN MECHANICAL SVCS HVAC REPAIR SVCS. - CITY HALL 370.00 69247 6/29/2023 VERY NICE POOLS JUN 23 FULL SERVICE 303.56 69248 6/29/2023 Battalion One Fire Protection SPRINKLER INSTALL./PERMIT - 10 ORINDA FIELDS 4,987.00 69249 6/29/2023 BAY ALARM COMPANY 7-1/9-30-23 ALARM SVCS. 547.14 69250 6/29/2023 Briones Plumbing WATER DAMAGED - RM #8 7,980.00 69251 6/29/2023 CAL-LINE EQUIPMENT, INC. CHIPPER REPAIRS 1,870.15 69252 6/29/2023 CALPELRA MEMBERSHIP RENEWAL - 7-1/6-30-2024 380.00 69253 6/29/2023 C. C. MAYORS' CONFERENCE ANNUAL CO. MAYORS CONFERENCE DUES 1,017.00 69254 6/29/2023 CINTAS CORPORATION PW UNIFORMS 855.12
69255 6/29/2023 CSG CONSULTANTS 2023 ANNUAL PAVEMENT REHAB. 27,000.00 69256 6/29/2023 DELTA FENCE COMPANY INC. RANCH HOUSE - REPLACE OLD FENCE & GATE 3,120.00 69257 6/29/2023 EBMUD 4-12/6-12-23 SVCS. 477.92
69258 6/29/2023 GRAINGER BATTERY RECYCLING KIT 191.43
69259 6/29/2023 GRANICUS INC JUL 23 AGENDA MEETING SOFTWARE 793.51 69260 6/29/2023 GURUS EDUCATION INSTR. CONTRACT - PUBLIC-SPEAKING CLASS 3,141.00 69261 6/29/2023 LISA HARPER 6-20-23 CITY COUNCIL MINUTES 480.00 69262 6/29/2023 HARRIS & ASSOCIATES ORCHARD & IVY DR. RD. STORM DRAIN REPAIR 981.75 69263 6/29/2023 HEALTH CARE EMPLOYEES JULY 23 DENTAL PREMIUMS 3,099.66 69264 6/29/2023 HINDERLITER DE LLAMAS APR-JUN 22 CONTRACT SERVICES 1,390.99 69265 6/29/2023 JAF ASSOCIATES, INC. INSTR. CONTRACT - TENNIS CAMP 3,553.20 69266 6/29/2023 KONE Pasadena 6-1/8-31-23 CITY HALL ELEVATOR MAINT. 648.00 69267 6/29/2023 SUSAN MCALLISTER INSTR. CONTRACT. - ART CAMP 2,640.00 69268 6/29/2023 MCE CORPORATION MAY 23 LANDSCAPING SVCS. 29,501.64 69269 6/29/2023 WAYNE MORRIS MODELING SERVICES 6-20-23 108.00 69270 6/29/2023 KRISTI MUELLER INSTR. CONTRACT - MUSICAL THEATER 4,436.90 69271 6/29/2023 TERRY NEWELL FIRE FUELS INCENTIVE WORK COSTS 599.00 69272 6/29/2023 P G & E 5-16/6-13-23 SVCS. 285.49
69273 6/29/2023 PITNEY BOWES INC. 7-1/9-30-23 POSTAGE METER RENTAL 237.06 69274 6/29/2023 PLAY-WELL TEKNOLOGIES INSTR. CONTRACT - LEGO CAMPS 2,340.00 69275 6/29/2023 LYNDA KAY REXROAT INSTR. CONTRACT - YOUTH COOKING CAMPS 2,592.00 69276 6/29/2023 ROADSAFE TRAFFIC SYSTEMS, INC. TRAFFIC CONTROL SIGNAGE 153.66 69277 6/29/2023 CATHY SCHARF FIRE FUELS INCENTIVE WORK COSTS 599.00 69278 6/29/2023 LEILA SCHLEIN FIRE FUELS INCENTIVE WORK COSTS 599.00 69279 6/29/2023 PERRY SHUSTACK FIRE FUELS INCENTIVE WORK COSTS 312.24 69280 6/29/2023 Z SPORTZ INC INSTR. CONTRACT - SKYHAWKS 4,622.40 69281 6/29/2023 STAPLES CONTRACT & COMMERCIAL SUPPLIES 585.83 69282 6/29/2023 STATE CONTROLLERS OFFICE CONFIRMATION OF PAYMENTS REPORT 150.00 69283 6/29/2023 UNIVERSAL BUILDING SERVICES MAY 23 JANITORIAL SVCS. 8,271.00 69284 6/29/2023 UNICO ENGINEERING INC MINER RD OV SAN PABLO SEISMIC RETROFIT 14,856.30 69285 6/29/2023 VISION SERVICE PLAN CA JUL 23 VISION SERVICES 599.03 69286 6/29/2023 WEX INC MAY 23 GASOLINE CHGS. 11,037.93 69287 6/29/2023 JASON WONG FIRE FUELS INCENTIVE WORK COSTS 599.00 REPORT TOTAL 4,722,396.09
Page: 8
F.3.a
Packet Pg. 42
Attachment: April-June 2023 Check Listing [Revision 1] (3154 : Quarterly Disbursements Rev Exp Fund Balance - April through June 2023) City of Orinda
Payment Summary for US Bank CalCard Payment
April 2023 (Attachment B)
U. S. BANK CORPORATION
FEBRUARY 16,2023 THRU MARCH 16, 2023
STMT. 03-16-2023
Transaction Description $Amount
ESRI SUBSCRIPTION 120.00
SURVEY MONKEY 99.00
SESAC LICENSING FEES 48.30
MOVIES FOR MOVIES IN THE PARK 420.24
ADS - ORINDA NEWS 155.00
LAMINATION FOR POSTERS 98.61

BATTERIES, FASTRAK, STAFF RESOURCE BOOK, GOAL LOCKS,

NEWSPAPER SUBSCRIPTION, PARKING FEE, MEETING SUPPLIES
162.75
MISC. HARDWARE - PARK & REC. 1,782.53
AED SUPPLIES/ACCESSORIES 2,330.00
LUNCH FOR SENIOR TRIP 3-17 206.00
SUPPLIES FOR KIDS NIGHT OUT & ACTION DAY SUPPLIES 375.56 BATS, BATTING HELMETS, BALLS & BASES 649.88
FIRST-AID SUPPLIES, SPRING T-BALL & BASEBALLS 165.62
CONCRETE MIX, TRAFFIC CONTROL SIGNAGE, 2009 FORD KEY 165.58 DOG WASTE BAGS, BATTERIES, MICRO-FIBER TOWELS, 556.08
WINDSHIELD REPAIR KIT,FLAGPOLE SET, SMART TV, HARDWARE 1,189.81 STEEL VALVES, WATERFILTERS, PLUMBING MODULES 1,213.44
FLUORESCENT TUBES & LIGHT BULBS, FLAG POLE BASE 259.63

DOOR LATCH SET, CLEANING SUPPLIES, MEMORY CARDS,

FACEMASKS
151.53
MEMORY CARDS, AIR PURIFIERS, RECORDER, DOOR STOPS 251.23 DRAINAGE MATERIALS - SAND 356.70
WADERS DURING STORM - R. GERK 163.10
PARK IRRIGATION CONTROLS - FIELDS 460.94
VEHICLE MAINT. - CHIPPER TRUCK 448.00
PRE-EMPLOYMENT BACKGROUND CHECK 29.00
JOB POSTINGS FACILITY ATTENDENT, REC. CORD. 255.00
UNIFORM - PARK & REC. 74.59
RENTAL DEPOSITS FOR CAMP FIELD TRIPS 205.48
CPRS INSTALLATION EVENT 20.00
CATERED FOOD & SUPPLIES FOR WORKSHOP 694.75
BADGE CASE, LASER POINTER, TAB FOLDERS 115.58
US BANK CHECK #68816 Issued April 21, 2023 13,223.93
Page: 1
F.3.b
Packet Pg. 43
Attachment: April-June 2023 Cal-Card Transactions (3154 : Quarterly Disbursements Rev Exp Fund Balance - April through June 2023) City of Orinda
Payment Summary for US Bank CalCard Payment
May 2023 (Attachment B)
U. S. BANK CORPORATION
MARCH 15, 2023 THRU APRIL 16, 2023
STMT. 04-17-2023
Transaction Description $Amount
SURVEY MONKEY 99.00
MINUTES FOR SSTOC MTG. 4-13 25.75
ZOOM SUBSCRIPTION 7,288.20
MEMBERSHIP - URBAN LAND INSTITUTE 680.00
ORINDA NEWS MONTHLY ADS 155.00
DRAINAGE MAINT. - CLEAN FILL 793.20
FASTRAK 25.00
PAINT SUPPLIES 328.79
PARK IRRIGATION CONTROLS SUBSCRIPTION 59.80
MICRO BIT SET,MEMORY CARD, PORT SWITCH, 252.31
PLUMBING SENSOR, DVD PLAYOR, DOOR STOPPERS, FAUCET 610.16

ROPE CANISTER, CEILING LIGHT, PAINT SUPPLIES, TEMPERED

GLASS UNIT
2,091.78
CHARCOAL PAN, AUDIO CABLE, RUST REPAIR KIT, GLOVES 480.56 SPRAY BOTTLE, PLUMBING VALVE, TRASH BAG 197.71
DISABLED PARKING SIGN, SOLAR LIGHT, NECK 208.30
MAT'L FOR FENCE & TRAFFIC SIGNAGE 111.67
FIRST AID SUPPLIES 249.68
FIELD CONES 144.54
SUPPLIES FOR KIDS NIGHT OUT 214.81
MAINT. SUPPLIES - CRACK SEAL 310.91
PEDESTAL POSTER - SIGN STAND 164.72
PHONE CASE, SUPPLIES, PARK SIGNAGE, HEX KEY SET 137.84
SOCCER GOALS & PARTS 11,143.46
AUTO MAINT. SUPPLIES 142.21
ADMIN. BILLS FOR FSA & TRANSIT PROGRAMS 127.50
JOB OPPORTUNITY - REC. COORD. & ENGR. INTERN 150.00
ACTION DAY SHIRTS 778.92
SOCCER COACH SHIRTS 933.42
QUALITY LOGO PRODUCTS 1,476.29
EAST BAY TIMES SUBSCRIPTION & PUBLIC INSTITUTE DUES 351.50 MEMBERSHIP PLG ASSOC. - C. PALMER 727.00
MEMBERSHIP FEE - SANCRA 51.50
PARKING FOR MEETING & MANAGEMENT FOR CMC CERTIFICATE 62.50 PARK & REC HARDWARE SUPPLIES 223.56
PAVING MATERIALS, MAINT. SUPPLIES, FENCING MATERIALS 940.82 US BANK CHECK # 68931 Issued 5-9-2023 31,738.41
Page: 1
F.3.b
Packet Pg. 44
Attachment: April-June 2023 Cal-Card Transactions (3154 : Quarterly Disbursements Rev Exp Fund Balance - April through June 2023) City of Orinda
Payment Summary for US Bank CalCard Payment
June 2023 (Attachment B)
U. S. BANK CORPORATION
APRIL 17, 2023 THRU MAY 14, 2023
STMT. 05-16-2023
Transaction Description $Amount
MISC. FEES 5.54
MARKING PAINT,CLOTHS, KEY MADE, HEX ANCHOR 158.48
EAST BAY TIMES SUBSCRIPTION 14.00
PARKING FOR MONTHLY MEETING 2.50
PRINTING OF POSTERS AND SIGNS - WILDFIRE FAIR 730.43
SUPPLIES, BALLOONS, FACE PAINTING FOR KIDS - WILDFIRE 504.75

SPIRAL NOTEBOOKS, COFFEE FOR KEURIG, SCOTCH TAPE

DISPENSER
114.95
GOLD CERTIFICATES, RED LASER POINTER 223.53
FACEBOOK ADS, CHILDREN'S ACTIVITIES - WILDFIRE FAIR 723.22 MAINT. SUPPLIES - CRACK SEAL 531.96
HARDWARE SUPPLIES 141.23
TARP FASTENERS, AUTO SUPPLIES, SWEEPER FLAIR KIT 214.39 CREDIT BACK FOR SWEEPER FLAIR KIT (66.85)
HARDWARE SUPPLIES & PAINT 153.44
MAINT. SUPPLIES - CLEAN FILL 448.20
MAINT. SUPPLIES - CRACK SEAL 388.63
BLOWER TOOL 581.66
PIPE/WELD KIT 110.78
FIRST AID KIT 306.88
REPAIR TOOL - STIHL 78.98
DIRECTOR MTGS. SUPPLIES 85.12
SOCCER GOAL REPLACEMENT POST 826.50
BRIDGE TOLL 7.00
SUPPLIES FOR TEEN ADVISORY COUNCIL MEETING 127.15
REGISTRATION FEE - D3 SUMMER INSTITUTE STAFF TRAINING 78.00 RETURN SHIRT (6.56)
MAILINGS FOR ED2GO CERTIFICATE 23.86
SENIOR TRIP - SLOW BURN GLASS STUDIO 300.00
SENIOR TRIP LUNCH 17.72
HARDWARE SUPPLIES 259.40
DRILL BIT 10.73
UNIFORMS 100.93
PLUMBING PARTS, CONCRETE SUPPLIES, WALL AIR 1,250.28
PORTABLE AIR FILTER, AIR CONDITIONER SUPPLIES & 469.66
ADS FOR ORINDA NEWS 155.00
MO. PARK IRRIGATION CONTROLS 59.80
SMART TV 311.89
BALLASTS, LIGHT BULBS, BATTERIES, GARDEN HOSE 383.86
ORAL BOARD SUPPLIES - REC. COORD. RECRUITMENT 84.00
WALK-N-LUNCH SUPPLIES 283.95
JOB OPPORTUNITY AD - ENGR. INTERN. 130.66
Page: 1
F.3.b
Packet Pg. 45
Attachment: April-June 2023 Cal-Card Transactions (3154 : Quarterly Disbursements Rev Exp Fund Balance - April through June 2023) City of Orinda
Payment Summary for US Bank CalCard Payment
June 2023 (Attachment B)
Transaction Description $Amount
COVID TESTING KITS 142.70
SOCIETY OF HUMAN RESOURCES MEMBERSHIP - 4-23/3-31-24 244.00 FASTRAK 50.00
AUTO PARTS FOR VEHICLE 86 25.05
JIFFY LUBE - VEHICLE 89 255.51
PROMOTIONS GIVEAWAYS, OFFICE SUPPLIES 502.40
POLICE TRAINING - CNOA 120.00
MISC. HARDWARE - PARK & REC. 145.63
US BANK CHECK #69082 Issued June 8, 2023 11,810.94
Page: 2
F.3.b
Packet Pg. 46
Attachment: April-June 2023 Cal-Card Transactions (3154 : Quarterly Disbursements Rev Exp Fund Balance - April through June 2023) City of Orinda
Summay Check/Transaction Register
Payroll Register for Apr-Jun 2023
Document # Document Date Employee Name First, MI Name
9556 4/14/2023 CaseyCynthia C.
53119 4/14/2023Alessio Douglas R.
53120 4/14/2023Amerman Jennifer K.
53121 4/14/2023Amkhamavong Christopher
53122 4/14/2023Arroyo Miguel A.
53123 4/14/2023 Baarsch Donna
53124 4/14/2023 Biggs David C.
53125 4/14/2023 Buckley Drummond F.
53126 4/14/2023 Carter Stephen M.
53127 4/14/2023 Chatman Rasha
53128 4/14/2023 ChengLy
53129 4/14/2023 Christie Scott
53130 4/14/2023 Cronin Michele B.
53131 4/14/2023 Delmartini Matthew C.
53132 4/14/2023 Duff James M.
53133 4/14/2023 Ecklund Steven C.
53134 4/14/2023 Ehrhardt Stephen D.
53135 4/14/2023 Fierner Tod D.
53136 4/14/2023 Flores Jennie
53137 4/14/2023 Gerk Rueben A.
53138 4/14/2023 Hayash Daniel T.
53139 4/14/2023 Hayden Carla L.
53140 4/14/2023 Hazel Christopher M.
53141 4/14/2023 Hernandez Ricardo
53142 4/14/2023 Hughes Darin E.
53143 4/14/2023 Karuppusamy Natarajan Sivakumar
53144 4/14/2023 Kemp Diego J.
53145 4/14/2023 Khorashad Farah
53146 4/14/2023 Leach Mark S.
53147 4/14/2023 Low Jamila
53148 4/14/2023 Mayorga David A.
53149 4/14/2023 McCourt Kevin
53150 4/14/2023 Mui Winnie
53151 4/14/2023 Needoba Roger
53152 4/14/2023 O'Kane Thomas R.
53153 4/14/2023 Palmer Celina F.
53154 4/14/2023 Perez Norma
53155 4/14/2023 Reedy Susan L.
53156 4/14/2023 Schaufler Lori B.
53157 4/14/2023 Smith Sheri
53158 4/14/2023 Staton Virginia K.
53159 4/14/2023 Tamayo Julia M.
53160 4/14/2023 Thompson Linda M.
53161 4/14/2023 Thompson Robert A.
53162 4/14/2023 Trimble Todd
53163 4/14/2023 Wellman-Miner Sheena
53164 4/14/2023 Zhang Ning
9557 4/28/2023 CaseyCynthia C.
53165 4/28/2023Alessio Douglas R.
53166 4/28/2023Amerman Jennifer K.
53167 4/28/2023Amkhamavong Christopher
53168 4/28/2023Arroyo Miguel A.
53169 4/28/2023 Baarsch Donna
Date: 9/13/2023, 5:25 PM Page: 1
F.3.c
Packet Pg. 47
Attachment: April-June 2023 Payroll Listing [Revision 1] (3154 : Quarterly Disbursements Rev Exp Fund Balance - April through June 2023) City of Orinda
Summay Check/Transaction Register
Payroll Register for Apr-Jun 2023
Document # Document Date Employee Name First, MI Name
53170 4/28/2023 Biggs David C.
53171 4/28/2023 Buckley Drummond F.
53172 4/28/2023 Chatman Rasha
53173 4/28/2023 ChengLy
53174 4/28/2023 Christie Scott
53175 4/28/2023 Cronin Michele B.
53176 4/28/2023 Delmartini Matthew C.
53177 4/28/2023 Duff James M.
53178 4/28/2023 Ecklund Steven C.
53179 4/28/2023 Ehrhardt Stephen D.
53180 4/28/2023 Fierner Tod D.
53181 4/28/2023 Flores Jennie
53182 4/28/2023 Gerk Rueben A.
53183 4/28/2023 Hayash Daniel T.
53184 4/28/2023 Hayden Carla L.
53185 4/28/2023 Hazel Christopher M.
53186 4/28/2023 Hernandez Ricardo
53187 4/28/2023 Hughes Darin E.
53188 4/28/2023 Karuppusamy Natarajan Sivakumar
53189 4/28/2023 Khorashad Farah
53190 4/28/2023 Leach Mark S.
53191 4/28/2023 Low Jamila
53192 4/28/2023 Mayorga Daniel A.
53193 4/28/2023 McCourt Kevin
53194 4/28/2023 Mui Winnie
53195 4/28/2023 Needoba Roger
53196 4/28/2023 O'Kane Thomas R.
53197 4/28/2023 Palmer Celina F.
53198 4/28/2023 Perez Norma
53199 4/28/2023 Perusse Colin J.
53200 4/28/2023 Reedy Susan L.
53201 4/28/2023 Schaufler Lori B.
53202 4/28/2023 Scheingart Katherine O.
53203 4/28/2023 Smith Sheri
53204 4/28/2023 Staton Virginia K.
53205 4/28/2023 Tamayo Julia M.
53206 4/28/2023 Thompson Linda M.
53207 4/28/2023 Thompson Robert A.
53208 4/28/2023 Trimble Todd
53209 4/28/2023 Wellman-Miner Sheena
53210 4/28/2023 Zhang Ning
9558 5/12/2023 CaseyCynthia C.
53212 5/12/2023Alessio Douglas R.
53213 5/12/2023Amerman Jennifer K.
53214 5/12/2023Amkhamavong Christopher
53215 5/12/2023Arroyo Miguel A.
53216 5/12/2023 Baarsch Donna
53217 5/12/2023 Biggs David C.
53218 5/12/2023 Buckley Drummond F.
53219 5/12/2023 Chatman Rasha
53220 5/12/2023 ChengLy
53221 5/12/2023 Christie Scott
53222 5/12/2023 Cronin Michele B.

Date: 9/13/2023, 5:25 PM Page: 2
F.3.c
Packet Pg. 48
Attachment: April-June 2023 Payroll Listing [Revision 1] (3154 : Quarterly Disbursements Rev Exp Fund Balance - April through June 2023) City of Orinda
Summay Check/Transaction Register
Payroll Register for Apr-Jun 2023
Document # Document Date Employee Name First, MI Name
53223 5/12/2023 Delmartini Matthew C.
53224 5/12/2023 Duff James M.
53225 5/12/2023 Ecklund Steven C.
53226 5/12/2023 Ehrhardt Stephen D.
53227 5/12/2023 Fierner Tod D.
53228 5/12/2023 Flores Jennie
53229 5/12/2023 Gerk Rueben A.
53230 5/12/2023 Hayash Daniel T.
53231 5/12/2023 Hayden Carla L.
53232 5/12/2023 Hernandez Ricardo
53233 5/12/2023 Hughes Darin E.
53234 5/12/2023 Karuppusamy Natarajan Sivakumar
53235 5/12/2023 Khorashad Farah
53236 5/12/2023 Leach Mark S.
53237 5/12/2023 Low Jamila
53238 5/12/2023 Mayorga Daniel
53239 5/12/2023 McCourt Kevin
53240 5/12/2023 Mui Winnie
53241 5/12/2023 Needoba Roger
53242 5/12/2023 O'Kane Thomas R.
53243 5/12/2023 Palmer Celina F.
53244 5/12/2023 Perez Norma
53245 5/12/2023 Reedy Susan L.
53246 5/12/2023 Schaufler Lori B.
53247 5/12/2023 Scheingart Katherine O.
53248 5/12/2023 Smith Sheri
53249 5/12/2023 Staton Virginia K.
53250 5/12/2023 Tamayo Julia M.
53251 5/12/2023 Thompson Linda M.
53252 5/12/2023 Thompson Robert A.
53253 5/12/2023 Trimble Todd
53254 5/12/2023 Wellman-Miner Sheena
53255 5/12/2023 Zhang Ning
9559 5/26/2023 CaseyCynthia C.
9560 5/26/2023 Hughes Darin E.
53256 5/26/2023Alessio Douglas R.
53257 5/26/2023Amerman Jennifer K.
53258 5/26/2023Amkhamavong Christopher
53259 5/26/2023Arroyo Miguel A.
53260 5/26/2023 Baarsch Donna
53261 5/26/2023 Biggs David
53262 5/26/2023 Buckley Drummond F.
53263 5/26/2023 Carter Stephen M.
53264 5/26/2023 Chatman Rasha
53265 5/26/2023 ChengLy
53266 5/26/2023 Christie Scott
53267 5/26/2023 Cronin Michele B.
53268 5/26/2023 Delmartini Matthew C.
53269 5/26/2023 Duff James M.
53270 5/26/2023 Ecklund Steven C.
53271 5/26/2023 Ehrhardt Stephen D.
53272 5/26/2023 Fierner Tod D.
53273 5/26/2023 Flores Jennie
Date: 9/13/2023, 5:25 PM Page: 3
F.3.c
Packet Pg. 49
Attachment: April-June 2023 Payroll Listing [Revision 1] (3154 : Quarterly Disbursements Rev Exp Fund Balance - April through June 2023) City of Orinda
Summay Check/Transaction Register
Payroll Register for Apr-Jun 2023
Document # Document Date Employee Name First, MI Name
53274 5/26/2023 Gerk Rueben A.
53275 5/26/2023 Hayash Daniel T.
53276 5/26/2023 Hayden Carla L.
53277 5/26/2023 Hernandez Ricardo
53278 5/26/2023 Karuppusamy Natarajan Sivakumar
53279 5/26/2023 Khorashad Farah
53280 5/26/2023 Leach Mark S.
53281 5/26/2023 Low Jamila
53282 5/26/2023 Mayorga Daniel A.
53283 5/26/2023 McCourt Kevin
53284 5/26/2023 Mui Winnie
53285 5/26/2023 Needoba Roger
53286 5/26/2023 O'Kane Thomas R.
53287 5/26/2023 Palmer Celina F.
53288 5/26/2023 Perez Norma
53289 5/26/2023 Perusse Colin J.
53290 5/26/2023 Reedy Susan L.
53291 5/26/2023 Schaufler Lori B.
53292 5/26/2023 Scheingart Katherine O.
53293 5/26/2023 Smith Sheri
53294 5/26/2023 Stanton Virginia K.
53295 5/26/2023 Tamayo Julia M.
53296 5/26/2023 Thompson Linda M.
53297 5/26/2023 Thompson Robert A.
53298 5/26/2023 Trimble Todd
53299 5/26/2023 Wellman-Miner Sheena
53300 5/26/2023 Zhang Nancy
9561 6/9/2023 CaseyCynthia C.
9562 6/9/2023 HuangKyle
53301 6/9/2023Alessio Douglas R.
53302 6/9/2023Amerman Jennifer K.
53303 6/9/2023Amkhamavong Christopher
53304 6/9/2023Arroyo Miguel A.
53305 6/9/2023 Baarsch Donna
53306 6/9/2023 Biggs David C.
53307 6/9/2023 Buckley Drummond F.
53308 6/9/2023 Callaway Mark L.
53309 6/9/2023 Carter Stephen
53310 6/9/2023 Chatman Rasha
53311 6/9/2023 ChengLy
53312 6/9/2023 Christie Scott
53313 6/9/2023 Cronin Michele B.
53314 6/9/2023 Delmartini Matthew C.
53315 6/9/2023 Duff James M.
53316 6/9/2023 Ecklund Steven C.
53317 6/9/2023 Ehrhardt Stephen D.
53318 6/9/2023 Fierner Tod D.
53319 6/9/2023 Flores Jennie
53320 6/9/2023 Gerk Rueben A.
53321 6/9/2023 Hayash Daniel T.
53322 6/9/2023 Hayden Carla L.
53323 6/9/2023 Hernandez Ricardo
53324 6/9/2023 Hughes Darin E.

Date: 9/13/2023, 5:25 PM Page: 4
F.3.c
Packet Pg. 50
Attachment: April-June 2023 Payroll Listing [Revision 1] (3154 : Quarterly Disbursements Rev Exp Fund Balance - April through June 2023) City of Orinda
Summay Check/Transaction Register
Payroll Register for Apr-Jun 2023
Document # Document Date Employee Name First, MI Name
53325 6/9/2023 Karuppusamy Natarajan Sivakumar
53326 6/9/2023 Khorashad Farah
53327 6/9/2023 Leach Mark S.
53328 6/9/2023 Low Jamila
53329 6/9/2023 Mayorga Daniel A.
53330 6/9/2023 McCourt Kevin
53331 6/9/2023 Morici Brett C.
53332 6/9/2023 Mui Winnie
53333 6/9/2023 Navarro-Marsili Valentina
53334 6/9/2023 Needoba Roger
53335 6/9/2023 O'Kane Thomas R.
53336 6/9/2023 Palmer Celina F.
53337 6/9/2023 Perez Norma
53338 6/9/2023 Reedy Susan L.
53339 6/9/2023 Schaufler Lori B.
53340 6/9/2023 Scheingart Katherine O.
53341 6/9/2023 Simon Fletcher A.
53342 6/9/2023 Smith Sheri
53343 6/9/2023 Stanton Virginia K.
53344 6/9/2023 Tamayo Julia M.
53345 6/9/2023 Thompson Linda M.
53346 6/9/2023 Thompson Robert A.
53347 6/9/2023 Trimble Todd
53348 6/9/2023 Wellman-Miner Sheena
53349 6/9/2023 Zhang Ning
9563 6/23/2023 Bafumi David A.
9564 6/23/2023 CaseyCynthia C.
9565 6/23/2023 Smith Ivan L.
53350 6/23/2023Alessio Douglas R.
53351 6/23/2023Amerman Jennifer K.
53352 6/23/2023Amkhamavong Christopher
53353 6/23/2023Arroyo Miguel A.
53354 6/23/2023 Baarsch Donna
53355 6/23/2023 Baker Emma
53356 6/23/2023 Biggs David
53357 6/23/2023 Bossut Ugarte Santiago M.
53358 6/23/2023 Buckley Drummond F.
53359 6/23/2023 Callaway Mark L.
53360 6/23/2023 Carter Stephen M.
53361 6/23/2023 Chatman Rasha
53362 6/23/2023 ChengLy
53363 6/23/2023 Christie Scott
53364 6/23/2023 Cronin Michele B.
53365 6/23/2023 Delmartini Matthew C.
53366 6/23/2023 Duff James M.
53367 6/23/2023 Ecklund Steven C.
53368 6/23/2023 Ehrhardt Stephen D.
53369 6/23/2023 Fierner Tod D.
53370 6/23/2023 Flores Jennie
53371 6/23/2023 Gerk Rueben A.
53372 6/23/2023 Hayash Daniel T.
53373 6/23/2023 Hayden Carla L.
53374 6/23/2023 Hernandez Ricardo
Date: 9/13/2023, 5:25 PM Page: 5
F.3.c
Packet Pg. 51
Attachment: April-June 2023 Payroll Listing [Revision 1] (3154 : Quarterly Disbursements Rev Exp Fund Balance - April through June 2023) City of Orinda
Summay Check/Transaction Register
Payroll Register for Apr-Jun 2023
Document # Document Date Employee Name First, MI Name
53375 6/23/2023 Huang Kyle
53376 6/23/2023 Hughes Darin E.
53377 6/23/2023 Karuppusamy Natarajan Sivakumar
53378 6/23/2023 Kemp Diego J.
53379 6/23/2023 Khorashad Farah
53380 6/23/2023 Lamison Nicole
53381 6/23/2023 Leach Mark S.
53382 6/23/2023 Low Jamila
53383 6/23/2023 Mayorga Daniel A.
53384 6/23/2023 McCourt Kevin
53385 6/23/2023 Mercer Courtney
53386 6/23/2023 Mola Darrian R.
53387 6/23/2023 Morici Brett C.
53388 6/23/2023 Mui Winnie
53389 6/23/2023 Navarro-Marsili Valentina
53390 6/23/2023 O'Kane Thomas R.
53391 6/23/2023 Palmer Celina F.
53392 6/23/2023 Perez Norma
53393 6/23/2023 Pizano Kandyce V.
53394 6/23/2023 Reedy Susan L.
53395 6/23/2023 Richtenburg Alexandra
53396 6/23/2023 Roshchyna Milana
53397 6/23/2023 Schaufler Lori B.
53398 6/23/2023 Simon Fletcher A.
53399 6/23/2023 Smith Sheri
53400 6/23/2023 Stanton Virginia K.
53401 6/23/2023 Tamayo Julia M.
53402 6/23/2023 Thompson Linda M.
53403 6/23/2023 Thompson Robert A.
53404 6/23/2023 Trimble Todd
53405 6/23/2023 Tucker Logan D.
53406 6/23/2023 Wellman-Miner Sheena
53407 6/23/2023 Zhang Ning
Payroll Payments Pay Period 04-14: 108,613.63
Pay Period 04-28: 111,538.89
Pay Period 05-12: 113,762.22
Pay Period 05-26: 113,602.42
Pay Period 06-09: 118,005.01
Pay Period 06-23: 130,945.89
Subtotal Payroll 696,468.06
Payroll Taxes 256,184.86
EE Benefits 357,982.99
Accounts Payable (See Attachment A) 4,722,396.09
Grand total 6,033,032.00
Date: 9/13/2023, 5:25 PM Page: 6
F.3.c
Packet Pg. 52
Attachment: April-June 2023 Payroll Listing [Revision 1] (3154 : Quarterly Disbursements Rev Exp Fund Balance - April through June 2023) City Council
Staff Report
Agenda Item: F.4
Date: September 19, 2023
Department: City Council
AGENDA TITLE: Authorize Contract Amendment No. 3 with Schaaf & Wheeler Consulting Civil Engineers for On-call Civil Engineering Services for the San Pablo Creek Culvert Repair Project (#4187)
RECOMMENDATION:

Staff recommends that the City Council approve Contract Amendment No. 3 with Schaaf & Wheeler Consulting Civil Engineers to increase the contract value by $174,000 and extend the term of the agreement to June 30, 2026.

BACKGROUND:

The city currently has an on-call professional services contract with Schaaf & Wheeler Consulting Civil Engineers, who specialize in civil engineering hydraulics. The city assigned them a task in 2021 to determine repair options for the 1,300 lineal foot reinforced concrete box culvert which conveys San Pablo Creek in downtown Orinda, from the Safeway Parking lot to Orinda Way. The city is the owner of this culvert, which is within accepted drainage easements which traverse the private properties.

Schaaf & Wheeler performed field inspections and provided a report of their findings and recommendations, and provided a proposal to perform design work for the repairs.

The contemplated repair work was to reline the culvert invert (floor), where abrasion has led to exposed rebar. Their preliminary engineering was authorized in contract Amendment 2, which was executed in January 2022 and increased the value of the contract from $60,000 to $348,000. The scope of work included material sampling/testing, hydraulic analysis, completing plans and specifications, and applying for regulatory permits. The scope also included investigations and survey/monitoring an out of plumb west wall in an open-channel section of the culvert. Based on the findings of that work, they evaluated repair options for the leaning wall and have provided a report with recommendations (Attachment A, Memorandum dated August 18, 2023).

Regulatory permits were recently obtained and the current project schedule is to advertise for bids in late 2023 to perform construction work in summer 2024. The repair work may take two or more construction seasons to complete, since the work will be limited to the low flow summer months and as required by the regulatory permits from May 1 to October 31. However, construction may be further restricted if any nesting birds are found in the area or if there are significant flows in the culvert.

DISCUSSION:

Schaaf & Wheeler’s proposal for design work addressing the leaning culvert wall, and other necessary services, is shown in Attachment B. (The other services are bid and F.4
Packet Pg. 53
construction/environmental support services during construction, which were not included in prior tasks or proposals). The estimated value of work is $145,000. Staff recommends approving Amendment #3 (Attachment C), which would increase the contract value by $174,000 (the estimated $145,000 plus a 20% contingency) to a new not-to-exceed contract value of $522,000. The work will be invoiced on a time and materials, actual cost basis, as is typical for Orinda’s on-call professional services contracts. Since this work will extend beyond the expiration date of the current contract (June 30, 2024), the amendment also extends the term to June 30, 2026.

Overall Project Cost Estimates
To date, approximately $250,000 has been expended with Schaaf & Wheeler for their work. A summary of overall project costs, including the cost of the subject Amendment #3 and the leaning wall repair, is shown in Attachment D. The overall estimated cost of the project is $4,334,000. The latest CIP for the San Pablo Creek Culvert Project No. 4187 has a total budget of $4,200,000. As the project progresses, cost forecasts will be updated and when construction bids are received, Staff will compare costs to the budget and determine if funding changes/appropriations are necessary.

NEXT STEPS:

Upon City Council authorization, Contract Amendment No. 3 will be executed by the parties, subject to review by the City Attorney.

FISCAL IMPACT:

There is adequate funding in the current project budget to accommodate the subject Amendment.

ATTACHMENTS:

A. Culvert Wall Repair Memo_081823
B. Wall Repair and CSS Proposal 081823
C. Amendment No 3 S&W
D. Project Phases and Cost with Amd 3 highligted
Respectfully Submitted by:

Scott Christie
Public Works Director
Prepared By: Ryan Okane,
Approved by:

F.4
Packet Pg. 54
F.4
Packet Pg. 55
2200 Range Avenue, Ste. 201
Santa Rosa, CA 95403
(707) 528-4848
[email protected]

MEMORANDUM
DATE: August 18, 2023
TO: T. Ryan O’Kane, PE, City of Orinda
FROM: Ben Shick, PE
SUBJECT: San Pablo Creek Culvert, Leaning Wall Evaluation Introduction
The City of Orinda contracted Schaaf & Wheeler to evaluate and provide recommendations for repairing of the San Pablo Creek culvert that is located on the northeast side of Camino Pablo and runs from approximately 31 Orinda Way to the outfall near 104 Camino Pablo. During field investigations it was noted that the concrete walls on the open channel section of the culvert, just downstream of Avenida de Orinda are leaning inward and significant cracking along the walls and invert were observed (see photos included as an attachment to this memorandum).

Additionally, there is pavement cracking and subsidence along the adjacent roadway, Camino Pablo. The location of the leaning walls is shown in Figure 1.

Figure 1. Location of Leaning Walls
Subsequently Schaaf & Wheeler was tasked with further investigating the leaning walls and developing recommendations for supporting and repairing the walls. Investigations include topographic surveying of the leaning wall to monitor the movement, geotechnical investigations and laboratory testing, material sampling and testing, and structural analysis. This memorandum summarizes the evaluation and provides recommendations for supporting and repairing the walls.

F.4.a
Packet Pg. 56
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) To: T. Ryan O’Kane, PE, City of Orinda August 18, 2023
Schaaf & Wheeler 2
Field Investigations & Evaluation
Schaaf & Wheeler and structural engineering subconsultant, Peoples Associates Structural Engineers (PASE), formerly Finn Design Group, conducted field investigations to evaluate the existing conditions of the leaning walls. A summary of the observations and evaluation is included herein.

The existing open portion of San Pablo Creek consists of a U-shaped concrete channel with a concrete invert and a concrete wall on each side. The channel is approximately 20 feet wide with 10-foot-tall walls. Record drawings for the channel are not available; however, BSK Associates has performed materials forensic services to determine the following:

1. The walls are approximately 10-inches thick with two layers of reinforcing steel. The vertical reinforcement is approximately 8-inches on center, and the horizontal reinforcement is approximately 18-inches on center.

2. The middle portion of the invert is approximately 9-inches thick with two layers of reinforcement in each direction at approximately 18-inches on center. Near the walls, the invert increases to approximately 12-inches thick.

3. Samples of the concrete were tested for compressive strength and found to have minimum f’c = 4,000 psi. Samples of the reinforcing steel were tested and found to be consistent with ASTM A615 Grade 40 steel (fy = 40,000 psi).

The existing walls are divided into approximately 15-foot-long panels and are leaning inward into the channel. The amount of lean varies along the length of the channel and is worse on the west side. The west walls lean a maximum of about 11¼”, and the west walls lean a maximum of about 5”. There is also damage to the channel invert in front of the walls which is again worse on the west side. The damage consists of a crack in the invert about 24 inches in front of the walls and running parallel to the walls. At the west side, the crack is up to 2¼” deep and includes loss of material.

The exact cause of the distress and damage is unknown but could be due to any or all of the following:

1. Actual loads on the walls and invert may exceed what they were originally designed for.

2. The presence of expansive soils behind the walls.

3. The drainage system behind the walls may not be functioning properly.

4. Surcharge loads on both sides from large trees.

5. Increased loads on the west side due to the nearly 1:1 backslope and possible surcharge loads from the adjacent Camino Pablo roadway. This is likely why the distress and damage to the west side is worse than the east side.

The cracking and damage to the invert is possibly due to 1) the invert not being thick enough, 2) the invert not being reinforced well enough, and/or 3) there not being enough of a heel on the invert behind the walls. It is possible that the cracking is occurring where the invert thickness F.4.a
Packet Pg. 57
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) To: T. Ryan O’Kane, PE, City of Orinda August 18, 2023
Schaaf & Wheeler 3
transitions from 12-inches thick to 9-inches thick. The invert cracking has allowed rotation of the walls and, hence, the leaning of the top of the walls.

Geotechnical Investigations
Geotechnical investigations were conducted by Schaaf & Wheeler’s subconsultant, BSK Associates, to classify the subsurface conditions adjacent to the leaning wall locations. Soil borings were performed along Camino Pablo immediately upslope of the west culvert wall and within a private property adjacent to the east culvert wall. The conclusions and recommendations are presented in the geotechnical report which is included as an attachment to this memorandum.

Materials Forensics Services
Materials Forensics Services were conducted by Schaaf & Wheeler’s subconsultant, BSK Associates, to determine concrete thicknesses, concrete compressive strength, and rebar reinforcement of the walls and invert. The results are summarized in a letter which is included as an attachment to this memorandum.

Survey Point Monitoring
Survey monitoring points were established and surveyed by Schaaf & Wheeler’s subconsultant, Kier & Wright, to determine the movement of the walls over time. The survey points were established on 2/17/2022 and were monitored for movement on 3/21/23. Both sides of the leaning walls were recorded to move 0.02 feet (1/4-inch) inward during the monitoring period.

The movement is not significant for one year of monitoring; however, over time it would result in significant defects and potential failure of the walls. The walls are slowly rotating and leaning further into the channel.

Survey monitoring points were also established on the eastern edge of pavement on Camino Pablo, adjacent to the leaning walls. The monitoring points were recorded to move between

0.01 and 0.02 feet towards the culvert. Again, this movement is not significant for one year of monitoring; however, over time it may cause significant issues to the roadway and culvert.

The survey monitoring points and results are included as an attachment to this memorandum.

Wall Repair Alternatives
Schaaf & Wheeler’s structural engineering subconsultant, PASE, evaluated several different wall repair concepts as listed below:

1. Installation of steel beams transverse across (perpendicular to) the channel. The beams would act as struts between the walls and prevent further movement of the top of the walls into the channel. This concept that has been chosen as the preferred alternative as described in the following section.

2. Installation of soil nails through the walls into the existing backfill behind the walls. The soil nails would consist of a steel tendon inserted into a hole drilled at an angle of 10 – 20 degrees below a horizontal plane and filled with concrete grout, bonding them to the surrounding soil. The tendons would be anchored to the face of the walls, holding the F.4.a
Packet Pg. 58
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) To: T. Ryan O’Kane, PE, City of Orinda August 18, 2023
Schaaf & Wheeler 4
wall back from further movement. Two rows of soil nails, each at about 5 feet on center horizontally, would be installed on each side of the channel. Soil nails were initially identified as a likely preferred alternative; however, some potential problems were identified including 1) right of way issues with installation into the open parcel on the east side and 2) possible difficult drilling conditions due to roots from the numerous trees behind the walls (including the large redwood trees on the east side).

3. Construction of continuous concrete “fillets” or buttresses inside the channel along both walls. The fillets would strengthen the wall to invert connection as well as the walls themselves. However, the fillets would reduce the cross-sectional area of the channel which, from a hydraulic perspective, was deemed to be unacceptable.

4. Combination of a top row of soil nails with a lower continuous concrete fillet.

5. Discretely spaced concrete buttress columns founded on CIDH concrete piers installed through and into the soil below the invert. The leaning tops of the walls, though, would require the piers to be drilled away from the face of walls, and the columns would extend significantly into the channel. Though they would be discretely spaced elements, this would again affect the hydraulic capacity and flow in the channel.

Recommended Wall Repairs
Steel beams installed across the channel have been identified as the preferred alternative. The beams will be installed at approximately 7.5 feet on center, two per wall panel, for a total of 10 beams. Although the beams will create new shading in the channel, it will fit within the current environmental permits for the proposed project. A continuous reinforced concrete beam element will also be required along the top of the walls in order for the existing concrete walls to be able to span vertically and horizontally between the invert and the new beams. A conceptual wall repair detail is included as an attachment to this memorandum. The new concrete beams will be doweled to the top of the existing walls, and the steel beams will be bolted in place with field-drilled holes to provide field adjustability. Repairs to the channel invert will also be performed as part of the larger channel rehabilitation project.

Hydraulic Evaluation of Proposed Repairs
The preferred repair alternative includes a 1’ x 1’ concrete beam that will extend below the top of the channel wall. Schaaf & Wheeler evaluated the hydraulic conditions of the culvert at the proposed repair location and determined that the hydraulic grade line of the 100-year flow rate is below the limits of the proposed concrete repairs. Therefore, the proposed repairs will not have a hydraulic impact on the culvert.

Conclusion
Based on the assessment and analysis discussed herein, it is recommended to repair the leaning walls of the San Pablo Creek Culvert in the near future. The repairs will include 10 steel beams spanning across the culvert and a continuous reinforced concrete beam along the top of the walls.

The estimate of probable construction cost for the proposed repairs is included in Table 1 below.

F.4.a
Packet Pg. 59
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) To: T. Ryan O’Kane, PE, City of Orinda August 18, 2023
Schaaf & Wheeler 5
Table 1. Estimate of Probable Construction Costs
Item Description Unit Quantity Unit
Cost Amount
Structural Concrete CY 16 $2,000 $32,000
Drill & Bond Dowel (Chemical
Adhesive)
LF 120 $125 $15,000
Bar Reinforcing Steel LB 4750 $3 $14,250
Structural Steel LB 20,000 $10 $200,000
Exclusions: channel invert repairs,
utility or roadway improvements,
SWPPP preparation or
implementation, water diversion, site
preparation, tree work, fees, permits,
right of way, etc.

SUBTOTAL $261,250
MOBILIZATION (10%) $26,125
SUBTOTAL STRUCTURE ITEMS $287,375
CONTINGENCIES (25%) $71,844
TOTAL (nearest $1,000) $360,000

Attachments

1. Field Photographs

2. Conceptual Detail for Preferred Repair Alternative

3. Geotechnical Engineering Investigation, San Pablo Creek Culvert Distress, Orinda, California, BSK Associates, May 20, 2022

4. Materials Forensics Services, San Pablo Creek Culvert Distress Evaluation, Orinda, California, BSK Associates, November 18, 2022

5. Orinda Culvert Monitoring, Kier & Wright, March 23, 2023

6. Orinda Street Monitoring, Kier & Wright, March 23, 2023 F.4.a
Packet Pg. 60
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) To: T. Ryan O’Kane, PE, City of Orinda August 18, 2023
Schaaf & Wheeler Attachment
ATTACHMENT 1

FIELD PHOTOGRAPHS

F.4.a
Packet Pg. 61
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) To: T. Ryan O’Kane, PE, City of Orinda August 18, 2023
Schaaf & Wheeler 1-1
Photo 1 – Middle Section, wall separating/rotating into culvert, looking upstream

F.4.a
Packet Pg. 62
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) To: T. Ryan O’Kane, PE, City of Orinda August 18, 2023
Schaaf & Wheeler 1-2
Photo 2 – Middle Section, wall separating/rotating into culvert, looking upstream F.4.a
Packet Pg. 63
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) To: T. Ryan O’Kane, PE, City of Orinda August 18, 2023
Schaaf & Wheeler 1-3
Photo 3 – Camino Pablo, pavement cracking above rotated wall, looking south F.4.a
Packet Pg. 64
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) To: T. Ryan O’Kane, PE, City of Orinda August 18, 2023
Schaaf & Wheeler Attachment
ATTACHMENT 2

CONCEPTUAL DETAIL FOR

PREFERRED REPAIR ALTERNATIVE

F.4.a
Packet Pg. 65
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) F.4.a
Packet Pg. 66
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) To: T. Ryan O’Kane, PE, City of Orinda August 18, 2023
Schaaf & Wheeler Attachment
ATTACHMENT 3
Geotechnical Engineering Investigation, San Pablo Creek Culvert Distress, Orinda, California, BSK Associates,
May 20, 2022

F.4.a
Packet Pg. 67
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3)

ENVIRONMENTAL, GEOTECHNICAL, CONSTRUCTION SERVICES AND ANALYTICAL TESTING

GEOTECHNICAL ENGINEERING INVESTIGATION

SAN PABLO CREEK CULVERT DISTRESS

ORINDA, CALIFORNIA
BSK PROJECT NO.: G22-054-11L
PREPARED FOR:

SCHAAF & WHEELER
2200 RANGE AVENUE, SUITE 201
SANTA ROSA, CALIFORNIA 95403
May 20, 2022
F.4.a
Packet Pg. 68
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) 399 Lindbergh Avenue
Livermore CA 94551
P 925.315.3151
www.bskassociates.com
Environmental, Geotechnical, Construction Services, Analytical Testing - An Employee-Owned Company May 20, 2022 BSK Project No. G22-054-11L
Mr. Ben L. Shick, PE
Vice President
Schaaf & Wheeler
Santa Rosa, CA 95403
[email protected]
SUBJECT: Geotechnical Engineering Investigation
San Pablo Creek Culvert Distress
Orinda, California
Dear Mr. Shick:

BSK Associates (BSK) is pleased to submit our geotechnical investigation report to evaluate a portion of the San Pablo Creek culvert along the eastern side of Camino Pablo, from south of the Safeway shopping center to just north of Avenida De Orinda in Orinda, California. The enclosed report describes the geotechnical investigation performed and presents our conclusions and recommendations for the project.

Our geotechnical engineering services included performing soil borings along Camino Pablo immediately upslope of the west culvert wall and within a private property adjacent to the east culvert wall to explore and classify the subsurface conditions within the distress area, collecting soil samples for laboratory testing purposes, performing engineering analysis, and preparing this report. Our scope of services were discussed in our proposal dated February 4, 2022 (BSK Proposal No. GL21-22953).

The conclusions and recommendations presented in the enclosed report are based on limited subsurface investigation and laboratory testing program. Consequently, variations between anticipated and actual subsurface soil conditions may be found in localized areas during construction. If significant variation in the subsurface conditions is encountered during construction, BSK should review the recommendations presented herein and provide supplemental recommendations, if necessary.

Additionally, design plans should be reviewed by our office prior to their issuance for conformance with the general intent of our recommendations presented in the enclosed report.

We appreciate the opportunity of providing our services to you on this project and trust this report meets your needs at this time. If you have any questions concerning the information presented, please contact us at (925) 315-3151.

Sincerely,
BSK Associates, Inc.

Omar K. Khan, GIT Cristiano Melo PE, GE #2756
Project Geologist Livermore Branch Manager
cc: Fidel T. Salamanca, PE – Senior Engineer, Schaaf & Wheeler ([email protected]) F.4.a
Packet Pg. 69
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Geotechnical Engineering Investigation BSK Project No. G22-054-11L San Pablo Creek Culvert Distress May 20, 2022
Orinda, California Page iii
Table of Contents

1. INTRODUCTION.......................................................................................................... 1

1.1 Project Understanding ................................................................................................... 1

1.2 Purpose and Scope of Services....................................................................................... 1

2. SITE INVESTIGATION................................................................................................... 2

2.1 Subsurface Investigation ................................................................................................ 2

2.2 Laboratory Testing.......................................................................................................... 3

3. SITE GEOLOGY AND SEISMICITY .................................................................................. 4

3.1 Geologic and Seismic Hazards........................................................................................ 4

3.1.1 Fault-Related Ground Surface Rupture and Ground Shaking ................................ 4

3.1.2 Expansive Soils ....................................................................................................... 5

3.1.3 Liquefaction Potential ............................................................................................ 5

3.1.4 Lateral Spread Potential......................................................................................... 6

3.1.5 Dynamic Compaction/Seismic Settlement Potential ............................................. 6

3.1.5 Slope Stability......................................................................................................... 6

4. SURFACE CONDITIONS................................................................................................ 7

5. SUBSURFACE CONDITIONS ......................................................................................... 8

6. CONCLUSIONS............................................................................................................ 9

7. RECOMMENDATIONS ............................................................................................... 10

7.1 Lateral Earth Pressures................................................................................................. 10

7.2 Seismic Wall Pressures................................................................................................. 11

7.3 Surcharge Loads ........................................................................................................... 11

7.4 Screen Wall................................................................................................................... 11

7.5 2019 CBC Mapped Seismic Design Parameters ........................................................... 12

7.6 CIDH Piers..................................................................................................................... 12

7.7 Soil Nails ....................................................................................................................... 13

7.8 Tiebacks........................................................................................................................ 14

7.9 Other Aspects of Soil Nails and Tiebacks ..................................................................... 15

7.9.1 Design and Testing............................................................................................... 15

7.9.2 Construction ......................................................................................................... 16

7.10 Earthwork ..................................................................................................................... 16

7.10.1 Site Preparation and Grading .............................................................................. 16

7.10.2 Re-Use of On-site Soil and Imported Fill Material................................................ 17

7.10.3 Weather/Moisture Considerations ...................................................................... 18 F.4.a
Packet Pg. 70
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Geotechnical Engineering Investigation BSK Project No. G22-054-11L San Pablo Creek Culvert Distress May 20, 2022
Orinda, California Page iv

7.10.4 Excavation and Backfill ........................................................................................ 18

7.11 Corrosion ...................................................................................................................... 19

7.12 Plan Review and Construction Observation................................................................. 20

8. ADDITIONAL SERVICES AND LIMITATIONS ................................................................ 21

8.1 Additional Services....................................................................................................... 21

8.2 Limitations.................................................................................................................... 21 F.4.a
Packet Pg. 71
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Geotechnical Engineering Investigation BSK Project No. G22-054-11L San Pablo Creek Culvert Distress May 20, 2022
Orinda, California Page v
Figures and Appendices

FIGURES
Figure 1 – Vicinity Map
Figure 2 – Site Plan
Figure 3 – Area Geology Map
APPENDIX A – Boring Logs
Figure A-1 – Unified Soil Classification System (ASTM D2487/2488) Figure A-2 – Soil Description Key
Figure A-3 – Log Key
Figure A-4 – Rock Description Criteria
Logs of Borings B-1 through B-3
APPENDIX B – Laboratory Test Results
Figure B-1 – Atterberg Limits (ASTM D4318)
Figure B-2 – Unconsolidated-Undrained Triaxial Tests (ASTM D2850) Figures B-3 through B-5 – Soil Sieve Analysis (ASTM D6913) Corrosion Test Results (2 pages)
APPENDIX C – Summary of Compaction Recommendations
APPENDIX D – Important Information About This Geotechnical-Engineering Report F.4.a
Packet Pg. 72
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Geotechnical Engineering Investigation BSK Project No. G22-054-11L San Pablo Creek Culvert Distress May 20, 2022
Orinda, California Page 1

1. INTRODUCTION
This report presents the results of our geotechnical investigation to evaluate a portion of the San Pablo Creek culvert along the eastern side of Camino Pablo, just north of Camino Sobrante, from south of the Safeway shopping center to just north of Avenida De Orinda in Orinda, California. A Vicinity Map showing the location of the project site (Site) is presented on Figure 1. Thisreport contains a description of our site investigation methods and findings, including field and laboratory data. It also provides conclusions and recommendations, which may only be used for this project.

1.1 Project Understanding
As shown on the Site Plan, Figure 2, the pertinent segment of the San Pablo Creek culvert being evaluated for this investigation (i.e., Site) consists of an open concrete culvert extending for about 100 linear feet in length. The portions of the San Pablo Creek culvert extending to the north and south of the Site are covered (i.e., consist of box culverts). During a recent routine inspection of the culvert by Schaaf & Wheeler, they noticed that some of the wall panels in the open segment of the culvert are leaning into the culvert. They also noticed that the reinforcing steel has been exposed and corroded for portions of the concrete slab at the bottom of the culvert. In other areas, water was observed seeping between the concrete slab joints and through the weep holes located near the bottom of the culvert walls. We understand that there are no as-built plans or previous geotechnical data/report available for this segment of the culvert.

If the actual project understanding differs significantly from that described above, we should be notified so that we can review our scope of services for applicability.

1.2 Purpose and Scope of Services
The purpose of this investigation was to explore and evaluate the subsurface conditions along the sides of the open segment of the concrete culvert to provide geotechnical input to remediate the distress. The scope of services, as outlined in our February 4, 2022, proposal (Proposal No. GL21-22953), consisted of pre-field activities, a subsurface investigation, laboratory testing, engineering analysis, and preparation of this report. BSK’s scope also includes provision of materials forensics services for this project, but these services are not covered by this report. This investigation specifically excludes the assessment of site environmental characteristics, particularly those involving hazardous substances.

F.4.a
Packet Pg. 73
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Geotechnical Engineering Investigation BSK Project No. G22-054-11L San Pablo Creek Culvert Distress May 20, 2022
Orinda, California Page 2

2. SITE INVESTIGATION

2.1 Subsurface Investigation
A subsurface investigation was performed on March 21 and 22, 2022 to evaluate the subsurface conditions along the eastern and western sides of the creek culvert. As outlined in our proposal, the subsurface investigation consisted of drilling three (3) soil borings at the approximate locations shown on Figure 2 (labeled borings B-1 through B-3). The soil borings were performed by using a truck-mounted rig equipped with solid stem augers These borings extended to depths of approximately 5 to 22½ feet below the existing ground surface (BGS). The borings were logged by a BSK geologist and soil samples were obtained from the borings at selected intervals. Taber Drilling of West Sacramento, California was subcontracted to provide drilling services.

Prior to the start of our subsurface exploration, Underground Service Alert (USA North 811) was contacted to provide utility clearance. A private utility locator was also subcontracted to clear the exploration location at 20 Avenida De Orinda. Drilling permits were obtained from the Contra Costa County Environmental Health Division (County). Upon completion of the subsurface investigation, the borings were backfilled with cement grout under the supervision of County inspector and capped with Rapid Set® concrete mix in paved areas. Excess cuttings generated during drilling were spread near the exploration locations.

The locations of the borings were estimated by our field geologist based on approximate GPS coordinates collected from a phone-based application and rough measurements from existing features at the Site.

Elevations shown on the boring logs were estimated using Google Earth Professional. As such, the elevations and locations of the borings should be considered approximate to the degree implied by the methods used.

Relatively undisturbed samples of the subsurface materials were obtained using a split spoon sampler with a 2.5-inch inside diameter (I.D.) and a 3-inch outside diameter (O.D.) fitted with stainless steel liners.

In addition, disturbed samples were obtained with a Standard Penetration Test (SPT) split spoon sampler with a 1.4-inch I.D., without stainless steel liners. The samplers were driven 18 inches using a 140-pound, automatic trip hammer falling 30 inches, and blow counts for successive 6-inch penetration intervals were recorded. The blow counts corresponding to each 6-inch interval were reported on the final boring logs.

Disturbed bulk samples of near-surface soils were also collected from the auger cuttings at some of the borings.

After the samplers were withdrawn from the boreholes, the lined samples were removed, sealed to reduce moisture loss, labeled, and returned to our laboratory. Prior to sealing the samples, strength characteristics of the cohesive soil samples recovered were evaluated using a hand-held pocket penetrometer. The results of these tests are shown adjacent to the samples on the boring logs.

F.4.a
Packet Pg. 74
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Geotechnical Engineering Investigation BSK Project No. G22-054-11L San Pablo Creek Culvert Distress May 20, 2022
Orinda, California Page 3
Soil classifications made in the field from the borings were re-evaluated in the laboratory after further examination and testing. The soils and bedrock were classified in the field in general accordance with the Unified Soil Classification System (Visual/Manual Procedure - ASTM D2488) presented on Figure A-1 and the Rock Description Criteria shown on Figure A-4 in Appendix A. Where laboratory tests were performed, the designations reflect the laboratory test results in general accordance with ASTM D2487 as presented on Figure A-1. A Soil Description Key is presented on Figure A-2 and a key to the symbols used in the boring logs is presented on the Log Key, Figure A-3. Sample classifications, blow counts recorded during sampling, and other related information were recorded on the boring logs. Logs of our borings are also presented in Appendix A. A discussion of the subsurface conditions encountered at the Site is presented in the “Subsurface Conditions” section of this report.

2.2 Laboratory Testing
Laboratory tests were performed on selected soil samples to evaluate their physical characteristics and engineering properties. The laboratory testing program included dry density and moisture content, Atterberg limits, unconsolidated-undrained triaxial compression (TXUU), and sieve analysis. Most of the laboratory test results are presented on the individual boring logs. The results of the Atterberg limits, TXUU, and sieve analysis are also presented graphically in Appendix B.

Analytical testing was performed as part of our investigation on soil samples obtained from borings B-1 and B-3 at depths of approximately 13½ and 11 feet BGS, respectively, to assist in evaluating the corrosion potential of the site soils and bedrock. The corrosivity testing and evaluation was performed by CERCO Analytical, State-certified laboratory in Concord, California for pH, resistivity, chloride content, and sulfate content in accordance with Caltrans test methods. The results of the corrosion testing are discussed in the “Corrosion” section of this report and presented at the end of Appendix B.

F.4.a
Packet Pg. 75
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Geotechnical Engineering Investigation BSK Project No. G22-054-11L San Pablo Creek Culvert Distress May 20, 2022
Orinda, California Page 4

3. SITE GEOLOGY AND SEISMICITY
The Site is located within the central, southern portion of the Briones Valley Quadrangle, which is in the central portion of the Coast Ranges Geomorphic Province of California. The Coast Ranges is a region dominated by northwest trending ridges and valleys that generally parallel the San Andreas Fault and other actives faults. Within the East Bay Hills, the Coast Ranges consist primarily of a thick sequence of Tertiary sedimentary and volcanic rocks that overlie older Mesozoic rocks. The Tertiary rocks are generally tightly folded along northerly to northwesterly fold axes. Low lying areas are generally filled with Holocene to Pleistocene alluvial and fluvial deposits.

Several geologic maps prepared by the California Geological Survey (CGS) and the United States Geological Survey (USGS) cover the Orinda area. According to the USGS (20001), the Site is mapped as late Miocene sedimentary and volcanic rocks (map symbol Tus) that includes conglomerate, sandstone, and siltstone with interbedded basalt and limestone as shown on the Area Geology Map, Figure 3. This unit is similar to the late Miocene Orinda Formation – distinctly to indistinctly bedded, nonmarine, pebble to boulder conglomerate, conglomeratic sandstone, coarse- to medium-grained lithic sandstone, and green to red siltstone and mudstone.

Several periods of tectonic deformation have occurred during Mesozoic and Cenozoic time which has led to the production of numerous faults, both active and non-active. Currently, active faulting in the San Francisco Bay Area occurs most frequently along faults associated with the San Andreas fault system, including Hayward and Calaveras faults. Seismicity in the Orinda area is related to the active Hayward and San Andreas Faults. The Hayward is located approximately 3 miles southwest of the Site and the San Andreas is about 21 miles to the southwest. The Moraga Fault is located approximately 600 feet southwest of the Site but is not considered active by the CGS. The Site is not located within an Alquist-Priolo Earthquake Fault Zone, and no active faults are known to cross or project towards the Site.

3.1 Geologic and Seismic Hazards

3.1.1 Fault-Related Ground Surface Rupture and Ground Shaking The Site is not situated within a State-designated Alquist-Priolo Earthquake Fault Zone where site-specific studies addressing the potential for surface rupture are required and no known active faults traverse the Site. Therefore, the potential for fault-related ground surface rupture at the Site is considered low.

However, active faults in the region surrounding the Site are capable of producing significant ground shaking at the Site.
1 Graymer, R.W., 2000, Geologic Map and Map Database of the Oakland Metropolitan Area, Alameda, Contra Costa, and San Francisco Counties, California: U.S. Geological Survey Miscellaneous Field Studies MF-2342.

F.4.a
Packet Pg. 76
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Geotechnical Engineering Investigation BSK Project No. G22-054-11L San Pablo Creek Culvert Distress May 20, 2022
Orinda, California Page 5
In 2015, scientists and engineers released a new earthquake forecast for the State of California2. It updates the earthquake forecast made for the greater San Francisco Bay Area by the 2007 Working Group for California Earthquake Probabilities. According to this recent study, there is a 72 percent probability that one or more magnitude M6.7 or greater earthquakes will occur in the San Francisco Bay Area between 2014 to 2044.

Based on the above information, we conclude that Site will likely be subjected to moderate to intense ground shaking from a significant earthquake on the aforementioned faults or other active faults in the San Francisco Bay Area in the future.

3.1.2 Expansive Soils
According to our Atterberg limits test results for our investigation, the site soils in the upper approximately 15 feet BGS have a moderate to high expansion potential when subjected to changes in moisture content.

Soils with a high expansion potential exert higher earth pressures on retaining walls than soils with lower expansion potential.

3.1.3 Liquefaction Potential
Liquefaction is a condition where saturated, granular soils undergo a substantial loss of strength and deformation due to pore pressure increase, resulting from cyclic stress application induced by earthquakes. In the process, the soil acquires mobility sufficient to permit both horizontal and vertical movements if the soil is not confined. Soils most susceptible to liquefaction are loose, clean, uniformly graded, silt and fine sand, as well as some lean clay deposits.

In order for liquefaction triggering to occur due to ground shaking, it is generally accepted that four conditions will exist:
• The subsurface soils are in a relatively loose state
• The soils are saturated
• The soils have low plasticity
• Ground shaking is of sufficient intensity to act as a triggering mechanism In addition, after soil liquefies, dissipation of the excess pore pressures can produce volume changes within the liquefied soil layer, which can result in ground surface settlement.

The Site is located with the Briones Valley quadrangle, which has not been mapped by the California Geological Survey for liquefaction hazard zones. Based on the composition, consistency, and relative 2 Field, E.H., and 2014 Working Group on California Earthquake Probabilities (2015), UCERF3: A new earthquake forecast for California’s complex fault system: U.S. Geological Survey 2015–3009, 6 p., https://dx.doi.org/10.3133/fs20153009.

F.4.a
Packet Pg. 77
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Geotechnical Engineering Investigation BSK Project No. G22-054-11L San Pablo Creek Culvert Distress May 20, 2022
Orinda, California Page 6
density of the soils, the depth to bedrock, and lack of free groundwater in our borings, we conclude that the potential for liquefaction to occur at the Site during a significant seismic event is low.

3.1.4 Lateral Spread Potential
Lateral spread is a potential hazard commonly associated with liquefaction where extensional ground cracking and settlement occur as a response to lateral migration of subsurface liquefiable material. These phenomena typically occur adjacent to free faces such as slopes and creek channels. Because the potential for liquefaction to occur at the Site is deemed to be low, we conclude that the potential for lateral spread to occur at the Site as a result of a future seismic event is low.

3.1.5 Dynamic Compaction/Seismic Settlement Potential
Another type of seismically induced ground failure, which can occur as a result of seismic shaking, is dynamic compaction or seismic settlement. Such phenomena typically occur in unsaturated, loose granular material or uncompacted fill soils. Based on the consistency/density of the soils and the depth to bedrock encountered in our borings, we conclude that the potential for seismic settlement to occur immediately behind the culvert walls or below the base of the culvert is low.

3.1.5 Slope Stability
Although no readily visible signs of deep-seated slope instability were observed within the slope located immediately west of the open culvert, it is possible that this slope could experience some instability during a future significant seismic event in one of the active faults in the region surrounding the Site. Further discussion about this potential is discussed in the “Conclusions” section of this report.

F.4.a
Packet Pg. 78
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Geotechnical Engineering Investigation BSK Project No. G22-054-11L San Pablo Creek Culvert Distress May 20, 2022
Orinda, California Page 7

4. SURFACE CONDITIONS
According to preliminary drawings for the project, the open culvert is approximately 20 feet wide at the base. The ground surface elevation is relatively flat on the east side of the open culvert except for the southern part where a concrete ramp is located and where the ground slopes up to match grade at Avenida de Orinda. A large redwood tree is located immediately behind the southern portion of the east side of the open culvert. The ground surface slopes upwards on the west side of the open culvert until it meets the east shoulder of Camino Pablo. According to Google Earth Pro, ground surface elevations range from about 405 to 410 feet behind the east side of the open culvert and about 420 to 425 feet immediately behind the outboard edge of the shoulder of the northbound lane of Camino Pablo. The slope gradient immediately behind the west side of the open culvert is unknown at this time but is believed to be somewhere between a 1H:1V to 3H:1V (horizontal to vertical). The slope is covered with trees and bushes.

We visited the Site with a representative from the Finn Design Group (the structural engineer for the project) on February 18, 2022. Based on our observations and approximate measurements made at the Site on that day, the open culvert wall panels are about 10 feet high and appear to be about 9½ inches thick based on measurements made through the weepholes. Two of the wall panels at both sides of the open culvert have a horizontal offset relative to each other of about 3 inches at the top. The top of the wall panels at the west side of the open culvert are leaning about 10 to 11¼ inches towards the culvert, while wall panels at the east side of the open culvert are leaning about 2 to 5 inches towards the culvert based on measurements made using a plumb bob and measuring tape. There was no water flowing through the weepholes for the open culvert wall on the west side, but there was water flowing through the weepholes for open culvert wall on the east side. Water approximately 0 to 2 inches deep was flowing through the open culvert except for an approximately 1-foot-wide zone adjacent to the west culvert wall, which was dry.

F.4.a
Packet Pg. 79
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Geotechnical Engineering Investigation BSK Project No. G22-054-11L San Pablo Creek Culvert Distress May 20, 2022
Orinda, California Page 8

5. SUBSURFACE CONDITIONS
According to our soil borings, the Site is underlain by fill, native alluvial soils, and bedrock as follows:
• Fill consisting of medium dense clayey sand with gravel and containing bedrock fragments was encountered within boring B-1 in the upper approximately 8 feet BGS. The fill was underlain by firm to hard lean clay and dense clayey gravel. Moderately weathered claystone was encountered at about 21½ feet BGS.
• Boring B-2 encountered approximately 5 feet of loose silty sand fill. An unmarked pressurized sanitary sewer line was encountered at a depth of 5 feet BGS. The boring was immediately terminated and we notified Schaaf Wheeler, the City of Orinda, the Central Contra Costa Sanitary District (CCCSD), and 911. A CCCSD crew then arrived at the Site to repair the sewer line. • Boring B-3 encountered approximately 11 feet of fill consisting of interbedded layers of loose to medium dense poorly graded gravel and clayey gravel and firm sandy silt. Beneath the fill, moderately to highly weathered bedrock consisting of shale was encountered.

Free groundwater was only observed within boring B-3 at approximately 8½ feet BGS. However, it is possible that the groundwater observed in boring B-3 is perched above the soil/bedrock contact line and its source is the adjacent culvert. Groundwater was not observed in the remaining borings. According to the State Water Resources Control Board GeoTracker website, groundwater data from the mid-2010s indicate levels ranging from about 5 to 15 feet BGS near the Site area.

The above is a general description of soil, bedrock, and groundwater conditions encountered at the Site.

For a more detailed description of the soils encountered, refer to the boring logs in Appendix A.

It should be noted that subsurface conditions can deviate from those conditions encountered at the boring locations. If significant variation in the subsurface conditions is encountered during construction, it may be necessary for BSK to review the recommendations presented herein and recommend adjustments as necessary.

F.4.a
Packet Pg. 80
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Geotechnical Engineering Investigation BSK Project No. G22-054-11L San Pablo Creek Culvert Distress May 20, 2022
Orinda, California Page 9

6. CONCLUSIONS
As previously discussed, the top of the walls for the open culvert are leaning approximately 2 to 11¼ inches towards the culvert. Without having the original design plans for the open culvert, it is difficult for us to pinpoint the exact cause(s) of this movement. However, possible causes could include the presence of expansive soils behind the walls in combination with under-designed walls, saturation of the backfill behind the walls in combination with poor drainage behind the walls, and surcharge loads imposed by large trees near the open culvert walls and by the sloping surface on the west side of the open culvert.

Based on our previous discussions with Schaaf & Wheeler and the Finn Design Group and review of conceptual remediation drawings, possible repair options to stop further movement of the open culvert walls could consist of:

1. The installation of concrete cross braces connecting the top of the walls,

2. Installation of soil nails through the walls, and

3. The installation of buttress columns in front of the walls.

If used, the buttress columns will be supported by cast-in-drilled hole (CIDH) piers. Although not considered as part the conceptual remedial drawings, tiebacks could be used in lieu of soil nails if deemed appropriate by the design team. Therefore, we included recommendations for tiebacks in the “Recommendations” section of this report. In addition, consideration should be given to adding a 3- to 5- foot-tall screen wall above the west wall of the open culvert in case the slope immediately west of the culvert experiences instability during a future significant seismic event in one of the active faults the region surrounding the Site.

Based on the results of our subsurface investigation and our experience, it is our opinion that the proposed repair options are feasible. This conclusion is based on the assumption that the recommendations presented in this report will be incorporated in the design and construction of this project. Recommendations regarding geotechnical design and construction aspects for the project are presented in the “Recommendations” section of this report.

F.4.a
Packet Pg. 81
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Geotechnical Engineering Investigation BSK Project No. G22-054-11L San Pablo Creek Culvert Distress May 20, 2022
Orinda, California Page 10

7. RECOMMENDATIONS
Presented below are recommendations for lateral earth pressures, seismic wall pressures, 2019 CBC seismic design parameters, CIDH piers, soil nails, tiebacks, and earthwork as well as associated construction considerations for this project.

7.1 Lateral Earth Pressures
The lateral earth pressures recommended for use in the design of the wall repair are presented in the table below and are expressed as equivalent fluid pressures (unit weights) in units of pcf. We provided both drained and undrained earth pressures. Undrained lateral earth pressures should be used for the wall repair unless as-built plans are located for the existing open culvert walls that show a robust drainage system behind the walls. Because free groundwater was observed at a depth of approximately 8½ feet BGS at boring B-3, we recommend using a design groundwater depth of 5 feet BGS behind the walls. A triangular lateral earth pressure distribution should be used.

RECOMMENDED LATERAL EARTH PRESSURES
Description Level Backfill up to
6H:1V1
Sloped Backfill up
to 3H:1V1
Level Backfill up to
2H:1V1
Sloped Backfill up
to 1H:1V1
Drainage
Condition
Drained
3 Undrained
4 Drained
3 Undrained
4 Drained
3 Undrained
4 Drained
3 Undrained
4 Active Earth
Pressure
(flexible
walls)2
45 pcf 85 pcf 50 pcf 85 pcf 60 pcf 90 pcf 90 pcf 105 pcf At-rest Earth
Pressure
(restrained
walls)2
60 pcf 90 pcf 80 pcf 100 pcf 90 pcf 105 pcf 100 pcf 110 pcf Notes:

1. Horizontal to vertical.

2. Expressed as an equivalent fluid pressure.

3. Does not include hydrostatic pressures that might be caused by groundwater or water trapped behind the wall.

4. Includes hydrostatic pressure. We recommend using a design groundwater depth of 5 feet BGS behind the walls.

F.4.a
Packet Pg. 82
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Geotechnical Engineering Investigation BSK Project No. G22-054-11L San Pablo Creek Culvert Distress May 20, 2022
Orinda, California Page 11

7.2 Seismic Wall Pressures
According to Section 1803.5.12 of the 2019 California Building Code (CBC), dynamic seismic lateral earth pressures need to be included in the design of foundation walls and retaining walls supporting more than 6 feet of backfill height. Based on Agusti and Sitar (2013)3 and a PGAM value of 1.009g (refer to table in the “2019 CBC Mapped Seismic Design Parameters” section of this report), we recommend using a seismic increment pressure of 43 pcf for flexible walls and a seismic increment of 74 pcf for restrained walls. The seismic increment pressure should be applied as a triangular distribution with the resultant force acting 1/3 times the wall height above the base of the wall.

7.3 Surcharge Loads
For surcharge loads imposed on culvert walls, a rectangular distribution with a uniform pressure equal to one-third of the surcharge pressure should be used for unrestrained walls (active earth pressure condition) and one-half of the surcharge pressure for restrained walls (at-rest earth pressure condition).

Surcharge loads caused by vehicular and/or construction traffic adjacent to the wall may be assumed to consist of a rectangular distributed uniform pressure of 100 psf acting from the ground surface to a depth of 10 feet BGS. Additional analyses during design may be needed to evaluate the effects of non-uniform surcharge loads such as point loads, line loads, or other such presently undefined surcharge loads. In that case, we should be consulted for supplemental geotechnical recommendations.

7.4 Screen Wall
As discussed in the “Conclusions” section of this report, consideration should be given to installing a 3- to 5-foot-tall screen wall above the west wall of the open culvert in case the slope immediately west of the culvert experiences seismic instability in the future. If this screen wall is incorporated into the wall repair, it should be designed to temporarily resist the lateral earth pressures presented in the “Lateral Earth Pressures” section of this report. We recommend reducing the earth pressures by about one-third to account for their temporary nature as we anticipate the slope to the west of the screen wall would need to be reconstructed relatively quickly in order to reestablish the shoulder of Camino Ramon. Likewise, we do not believe it would be appropriate to design this screen wall to resist seismic wall pressures because of the temporary nature of soil that could be accumulated behind it after a significant seismic event.

Also, if this screen wall is included above the west wall of the open culvert, the added lateral earth pressures imposed by the screen wall should be considered in the evaluation of the existing culvert wall. 3 Agusti, G.C. and Sitar, N.(2013), Seismic Earth Pressures on Retaining Structures in Cohesive Soils, Geotechnical Engineering Department of Civil and Environmental Engineering, University of California at Berkley, Report No.

UCB GT 13-02.

F.4.a
Packet Pg. 83
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Geotechnical Engineering Investigation BSK Project No. G22-054-11L San Pablo Creek Culvert Distress May 20, 2022
Orinda, California Page 12

7.5 2019 CBC Mapped Seismic Design Parameters
The seismicity of the region surrounding the Site is discussed in the “Site Geology and Seismicity” section of this report. From that discussion, it is important to note that the Site is in a region of high seismic activity and will likely be subjected to moderate to intense ground shaking during the life of the project.

Therefore, the wall repairshould be designed in accordance with applicable seismic provisions of the 2019 California Building Code (CBC) and the seismic parameters presented in the table below. 2019 MAPPED CBC SEISMIC DESIGN PARAMETERS
(LAT: 37.884515 °N, LON: 122.192501°W)
Seismic Design Parameter Value Reference1
Site Class C Table 20.3-1, ASCE 7-16
MCER Mapped Spectral Acceleration (g) SS = 2.007 S1 = 0.76 USGS Mapped Values based
on Figures 1613.2.1(1) and
1613.2.1(2), 2019 CBC
Site Coefficients Fa = 1.2 Fv = 1.4 Tables 1613.2.3(1) and 1613.2.3(2), 2019 CBC
MCER Mapped Spectral Acceleration
Adjusted for Site Class Effects (g) SMS = 2.408 SM1 = 1.064 Section 1613.2.3, 2019 CBC Design Spectral Acceleration (g) SDS = 1.606 SD1 = 0.709 Section 1613.2.4, 2019 CBC Seismic Design Category (SDC) E Section 1613.2.5, 2019 CBC MCEG peak ground acceleration adjusted
for Site Class effects (g) PGAM = 1.009 Section 11.8.3, ASCE 7-16 Definitions:

MCER = Risk-Targeted Maximum Considered Earthquake
MCEG = Maximum Considered Earthquake Geometric Mean
Notes:

1. When referencing ASCE 7-16, Supplement 1 must also be checked for changes to ASCE 7-16.

7.6 CIDH Piers
If used, the buttress columns will be supported by cast-in-drilled hole (CIDH) piers, which would derive their load capacity from skin friction between the concrete and the surrounding soil. An allowable skin friction of 500 pounds per square foot (psf) may be used to resist downward loads. Resistance to upward loads, if applicable, may be calculated using 2/3 of the allowable skin friction plus the weight of the piers.

These allowable values include a factor of safety of at least two and may be increased by one-third for supporting total loads, including wind and seismic loads. Piers should have a minimum diameter of 18 F.4.a
Packet Pg. 84
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Geotechnical Engineering Investigation BSK Project No. G22-054-11L San Pablo Creek Culvert Distress May 20, 2022
Orinda, California Page 13
inches and be a minimum of 15 feet deep below lowest adjacent grade. Piers should not be spaced less than 3 diameters apart (center to center) or reduction to axial capacity would apply. Settlement of CIDH piers is expected to be negligible.

Resistance to lateral loads for CIDH piers can be provided by passive resistance against the face of the piers using an allowable equivalent fluid pressure of 350 pounds per cubic foot (pcf) up to a maximum of 3,000 psf acting against the piers. The passive resistance may be applied to a width of twice the diameter of the piers. The passive pressure value includes a factor of safety of about 1½.

We recommend that drilled pier steel reinforcement and concrete be placed within about 4 to 6 hours upon completion of each drilled hole. As a minimum, the holes should be poured the same day they are drilled. If the holes cannot be backfilled the same day they are drilled, the hole needs to be checked for caving, sloughing or squeezing prior to setting the rebar cage and checked again before pouring concrete.

The steel reinforcement should be centered in the drilled hole. Concrete used for pier construction should be discharged vertically into the holes to reduce aggregate segregation. Under no circumstances should concrete be allowed to free-fall against either the steel reinforcement or the sides of the excavation during construction.

If water more than 6 inches deep is present during concrete placement, either the water needs to be pumped out or the concrete needs to be placed into the hole using tremie methods. If tremie methods are used, the end of the tremie pipe must remain below the surface of the in-place concrete at all times.

Unit prices for dewatering and/or tremie placement methods should be obtained during the bidding process.

Concrete for drilled piers should be designed and placed in general conformance with the recommendations provided in ACI 336.3R-14, Design and Construction of Drilled Piers . The recommendations provided within ACI 336.3R-14 should be followed, especially when concrete placement is necessary below groundwater level, in caving or sloughing soils, or in sand, which may necessitate casing or the slurry displacement method for concrete placement. These methods require concrete placement at higher slumps than “dry” conditions and concrete mix specifications, including the addition of concrete admixtures and consideration of consolidation methods, should be provided by the design team. If temporary casing is used, it should consist of smooth walled steel. Corrugated metal pipe (CMP) should not be used as temporary casing because it has a tendency to create voids or disturbed zones during removal.

7.7 Soil Nails
Typically, soil nails are comprised of a steel tendon that is inserted into a hole drilled at an angle of between 10 to 20 degrees below a horizontal plane into the cut face and subsequently filled with concrete grout. The entire length of soil nails is considered bonded to the surrounding soil/bedrock. Corrosion protection for the soil nail steel tendons and other corrosion sensitive components of the wall should be F.4.a
Packet Pg. 85
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Geotechnical Engineering Investigation BSK Project No. G22-054-11L San Pablo Creek Culvert Distress May 20, 2022
Orinda, California Page 14
included in the wall design. The corrosivity test results we performed are summarized in the “Corrosion” section of this report and are presented at the end of Appendix B.

Based on our interpretation of the subsurface data obtained from our borings, associated laboratory test results, and FHWA (2015)4, we recommend that the soil nail design parameters shown in the table below be used for design of the soil nails.

SOIL NAIL DESIGN PARAMETERS
Soil/Bedrock Unit Total Unit Weight
(pcf)1
Friction Angle
(degrees)1
Cohesion (psf)1
Preliminary
Ultimate Bond
Strength2(psf)
Fill/Native Soil 120 10 250 500
Bedrock 130 35 750 2,000

1. Based on our interpretation of our laboratory test results and our experience.

2. Based on typical values provided in Tables 4.4a and 4.4b of FHWA (2015). These values need to be confirmed and validated in the field via verification, proof, and creep tests during construction.

7.8 Tiebacks
Typically, tiebacks are comprised of steel tendons that are inserted into holes drilled at angles of between 15 to 30 degrees below a horizontal plane into the soil or backfill to be retained and subsequently filled with concrete grout. Only a portion of the total length (referred to as the bonded length) of the tieback tendons is bonded to the surrounding soil. Corrosion protection for the tiebacks and other corrosion sensitive components of the wall should be included in the wall design. The corrosivity test results we performed are summarized in the “Corrosion” section of this report and are presented at the end of Appendix B.

Based on our interpretation of the subsurface data obtained from our borings, associated laboratory test results, and FHWA (1999)5, we recommend that the tieback design parameters shown in the table below be used for design of the tiebacks.
4 Federal Highway Administration (2015), Geotechnical Engineering Circular No. 7 – Soil Nail Walls – Reference Manual, FHWA-NHI-14-007, dated February 2015.
5 Federal Highway Administration (1999), Geotechnical Circular No. 4 – Ground Anchors and Anchored Systems, FHWA-IF-99-015, dated June 1999.

F.4.a
Packet Pg. 86
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Geotechnical Engineering Investigation BSK Project No. G22-054-11L San Pablo Creek Culvert Distress May 20, 2022
Orinda, California Page 15

TIEBACK DESIGN PARAMETERS
Soil/Bedrock Unit Total Unit Weight
(pcf)1
Friction Angle
(degrees)1
Cohesion (psf)1
Preliminary
Ultimate Bond
Stress2(psf)
Fill/Native Soil 120 10 250 500
Bedrock 130 35 750 2,000

1. Based on our interpretation of our laboratory test results and our experience.

2. Based on typical values provided in Table 7 of FHWA (1999). These values need to be confirmed and validated in the field via proof, creep, and performance tests during construction.

7.9 Other Aspects of Soil Nails and Tiebacks

7.9.1 Design and Testing
The preliminary ultimate bond stress/strength values indicated above for soil nails and tiebacks were derived based on experience with similar subsurface conditions and typical values provided in FHWA (1999, 2015). These preliminary design values should be confirmed and validated during construction via testing as recommended below.

The wall designer will be responsible for designing the actual soil nails/tiebacks and their horizontal/vertical layout/spacing, design of the soil nail/tieback protective facing, and developing acceptance criteria for verification, proof, and creep testing (for soil nails) and proof, creep, and performance testing (for tiebacks) during construction. The layout/spacing of the soil nails/tiebacks should be modified as needed during construction based on the testing, such as adding more soil nails/tiebacks, decreasing the spacing between soil nails, adding more rows of tiebacks, etc.

For soil nail walls, at least 2 verification tests should be performed for each soil/bedrock unit and at least 5 percent of the production soil nails should be proof tested. All soil nails that undergo verification and proof testing should be creep tested.

For tiebacks, performance testing should be performed on at least the first two tiebacks installed for each soil/bedrock unit and on a minimum of 2 percent of the remaining production tiebacks thereafter. The remaining tiebacks that are not performance tested should be proof tested. All tiebacks should be creep tested.

Prior to the start of construction, the geotechnical aspects of the design calculations, plans, and specifications for these soil nails/tiebacks should be reviewed by BSK.

F.4.a
Packet Pg. 87
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Geotechnical Engineering Investigation BSK Project No. G22-054-11L San Pablo Creek Culvert Distress May 20, 2022
Orinda, California Page 16

7.9.2 Construction
The contractor selected to install soil nails or tiebacks should provide proof of at least 5 years of continuous experience designing and constructing these types of soil nails/tiebacks under similar subsurface conditions and accessibility constraints as those found at the project site.

A BSK representative should be present at the Site on a full-time basis during drilling, installation, and testing of soil nails/tiebacks.

7.10 Earthwork
We expect earthwork activities for this project to be limited to the excavation of CIDH Piers (if applicable) and possibly placement of fill and backfill for excavations. Earthwork activities should be observed by a representative from BSK. If subsurface conditions vary from those described in this report, a representative from BSK should observe and evaluate the competency of existing soils and bedrock. In general, soft/loose or unsuitable materials encountered should be overexcavated, removed, and replaced with compacted engineered fill material under the observation of a representative from BSK.

Site preparation and grading for this project should be performed in accordance with the site-specific recommendations provided below. A summary of compaction requirements for this project is presented in Appendix C. Additional earthwork recommendations are presented in related sections of this report.

7.10.1 Site Preparation and Grading
Prior to the start of grading and subgrade preparation operations, pertinent areas of the Site to be excavated or filled should first be cleared and stripped to remove all surface vegetation, organic-laden topsoil and debris within the project limits. Stripping to a minimum depth of approximately 6 inches is expected to remove a majority of organic laden surficial soils. If significant amounts of organics are encountered below this depth, additional stripping or grubbing may be required. Stripping should extend laterally a minimum of 3 feet beyond the repair limits, where feasible. Stripped topsoil, deleterious matter, and debris should be disposed of offsite; such material should not be reused for backfill. Any buried tree stumps, roots, or major root systems thicker than approximately 1-inch in diameter uncovered during site stripping and/or grading activities should be removed. During the stripping operation, it is important that a representative from BSK be present to observe whether any undesirable material is encountered in the construction area.

Following stripping and removal of deleterious materials, exposed subgrade areas and areas to receive fill should be scarified to a minimum depth of 12 inches, moisture conditioned, and recompacted as indicated in Appendix C unless otherwise indicated by BSK in the field. Scarification and recompaction should extend laterally a minimum of 3 feet beyond the repair limits, where feasible.

F.4.a
Packet Pg. 88
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Geotechnical Engineering Investigation BSK Project No. G22-054-11L San Pablo Creek Culvert Distress May 20, 2022
Orinda, California Page 17
All fill and backfill should be compacted in lifts of 8-inch maximum uncompacted thickness. A summary of compaction requirements for the project is presented in Appendix C. Laboratory maximum dry density and optimum moisture content relationships should be evaluated based on ASTM D1557.

Proper moisture conditioning is important. After subgrade soils are properly moisture conditioned, their moisture content should be maintained until they are covered by improvements. This may require periodic moisturizing of the subgrade soils if they are allowed to dry. Where aggregate base is used, it should be placed immediately over the prepared subgrade to avoid drying of the subgrade.

All site preparation and fill placement should be observed by a representative from BSK. It is important that a representative from BSK be present during the stripping and scarification process to observe and evaluate whether any undesirable material is encountered in the construction area and that exposed soils and bedrock are similar to those encountered during the field investigation.

7.10.2 Re-Use of On-site Soil and Imported Fill Material On-site soils are considered suitable for re-use as general engineered fill and backfill provided they are free of debris, vegetation, topsoil containing more than 3 percent organic content by dry unit weight, and other deleterious matter. A representative from BSK should be present on-site during grading to visually confirm the suitability of the on-site soil to be used as fill and backfill. Particles larger than 6 inches within the on-site soils should either be removed and disposed offsite or broken down to 6 inches or less prior to using the soil as engineered fill. Nesting (i.e., concentration) of larger particles should be avoided to reduce the potential that this could create voids and allow future settlement in the overlaying fill/backfill.

Maximum particle size for fill material should be limited to 6 inches, with at least 90 percent by weight passing the 1-inch sieve. Where imported fill is required, it should be granular in nature, adhere to the above gradation recommendations, and conform to the minimum criteria presented in the table below.

IMPORTED FILL CRITERIA
Plasticity Index 12 or less
Liquid Limit Less than 30%
% Passing #200 Sieve 8% – 60%
Highly pervious materials, such as “pea” gravel, should not be used as imported fill because they could allow migration of the fine-grained soils into void spaces, thus causing subsidence and settlement of the surrounding area. Imported fill material should not be classified as being more corrosive than “moderately corrosive.” Based on the May 2021 Caltrans Corrosion Guidelines (Version 3.2), we recommend that import fill material have a minimum resistivity greater than 2,000 ohm-cm (per CT 643), a Chloride concentration of less than 250 ppm (per CT 422), a sulfate concentration of less than 500 ppm (per CT 417), and a pH value of between 5.5 and 10.0 (per CT 643). Prior to transporting proposed import materials to the Site, the contractor should make representative samples of the material available to BSK at least 5 working days in advance to allow us enough time to confirm the material meets the above requirements.

F.4.a
Packet Pg. 89
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Geotechnical Engineering Investigation BSK Project No. G22-054-11L San Pablo Creek Culvert Distress May 20, 2022
Orinda, California Page 18
Additional time may be required if corrosion test results for the proposed imported materials are not readily available at the time the material is submitted to BSK for review. All on-site or imported fill material should be compacted to the recommendations provided in Appendix C.

7.10.3 Weather/Moisture Considerations
Based on our experience in the area, grading during the rainy season (usually November to May) may be extremely difficult due to the type of soil at the Site. If earthwork operations and construction for this project are scheduled to be performed during the rainy season or in areas containing saturated soils, provisions may be required for drying and/or stabilizing the soil through the use of scarification and air drying, geotextile fabric and dryer soils, and/or via admixtures, such as lime- or cement-treatment of the soil prior to compaction. If desired, we can provide recommendations for wet weather earthwork and alternatives for drying the soil prior to compaction. Conversely, additional moisture may be required during dry months. A suitable source should be made available during construction to provide adequate water during earthwork operations.

7.10.4 Excavation and Backfill
We anticipate that excavations for the project can be made with standard earthwork equipment, such as excavators, dozers, and backhoes. Where shallow bedrock is encountered during grading, we expect that it should be rippable with conventional grading equipment as well because the underlying bedrock is generally weak and moderately to highly weathered. However, strong, well-cemented zones of bedrock may be encountered in which difficult excavation may be experienced by the contractor, which may require the use of more powerful earthwork equipment, such as excavators, drill rigs, or hydraulic hammer attachments.

Excavations deeper than 5 feet may become unstable and should be evaluated to monitor stability prior to personnel entering them. All excavations should conform to the current OSHA requirements for work safety. It is the contractor’s responsibility to follow OSHA temporary excavation guidelines and grade the slopes with adequate layback or provide adequate shoring and underpinning of existing structures and improvements, as needed. Slope layback and/or shoring measures should be adjusted as necessary in the field to suit the actual conditions encountered in order to protect personnel and equipment within excavations.

Construction equipment and soil stockpiles should be set back a minimum horizontal distance of “H” away from the edge of excavations and “R” from the edge of the existing culvert walls, where “H” is equal to the depth of the excavation and “R” is equal to the height of the culvert walls. This setback distance also applies to shored excavations unless the shoring design takes into account any surcharge loads associated with the construction equipment and stockpiles.

Care should be taken during construction to reduce the impact of excavations on adjacent structures and pavements. Excavations should be located so that no structures, foundations, and slabs, existing or new, F.4.a
Packet Pg. 90
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Geotechnical Engineering Investigation BSK Project No. G22-054-11L San Pablo Creek Culvert Distress May 20, 2022
Orinda, California Page 19
are located above a plane projected 1H:1V upward from any point in an excavation, regardless of whether it is shored or unshored unless otherwise indicated by BSK in the field or by the project plans.

Free groundwater was observed in the boring B-3 at a depth of 8½ feet BGS drilled for this investigation.

However, the actual depth at which groundwater may be encountered in excavations may vary. As a minimum, provisions should be made to ensure that conventional sump pumps used in typical excavation projects are available during construction in case substantial runoff water accumulates within the excavations as a result of wet weather conditions.

Appropriate provisions should be made to prevent surface water from ponding adjacent to the top of excavations and flowing over the sides of the excavations, otherwise the excavation side walls and/or slopes could be compromised. Backfill for excavations should be compacted as noted in Appendix C.

Special care should be taken in the control of excavation backfilling under pavements. Poor compaction may cause excessive settlements resulting in damage to the improvements.

7.11 Corrosion
Soil samples were collected during our subsurface investigation at depths of approximately 13½ and 11 feet BGS at borings B-1 and B-3, respectively, and were submitted for corrosion testing. The samples were tested by CERCO Analytical, a State-certified laboratory in Concord, California, for pH, resistivity, chloride content, and sulfate content in accordance with Caltrans test methods. The test results are presented at the end of Appendix B. Also included is the evaluation by CERCO Analytical of the corrosion test results.

Based upon the resistivity measurements, the samples tested are classified as “moderately corrosive” by CERCO Analytical. The sulfate ion concentrations results were none detected to 18 mg/kg (ppm). These results are indicative of an exposure category S0 per Table 19.3.1.1 of ACI 318-19. For an S0 exposure class, Table 19.3.2.1 indicates that the minimum f’c of the concrete is 2,500 psi. All buried iron, steel, cast iron, ductile iron, galvanized steel, and dielectric coated steel or iron be properly protected against corrosion depending upon the critical nature of the structure. All buried metallic pressure piping, such as ductile iron firewater pipelines, should be protected against corrosion. Because we are not corrosion specialists, we recommend that a corrosion specialist be consulted for advice on proper corrosion protection for underground piping which will be in contact with the soils and other design details.

The above are general discussions. A more detailed investigation may include more or fewer concerns and should be directed by a corrosion expert. BSK does not practice corrosion engineering. Consideration should also be given to soils in contact with concrete that will be imported to the Site during construction, such as topsoil and landscaping materials, which typically contain fertilizers and other chemicals that can be highly corrosive to metals and concrete. Any imported soil or landscaping materials should not be any more corrosive than the on-site soils and should not be classified as being more corrosive than “moderately corrosive.” Also, on-site cutting and filling may result in soils contacting concrete that were not anticipated at the time of this investigation.

F.4.a
Packet Pg. 91
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Geotechnical Engineering Investigation BSK Project No. G22-054-11L San Pablo Creek Culvert Distress May 20, 2022
Orinda, California Page 20

7.12 Plan Review and Construction Observation
We understand BSK will be provided the opportunity to review the geotechnical aspects of the project plans and specifications before they go out to bid. It has been our experience that this review provides an opportunity to detect misinterpretation or misunderstandings of our recommendation prior to the start of construction.

Because limited subsurface investigation was conducted for this project, we recommend that BSK be retained to provide observation and testing services during construction. This will allow BSK the opportunity to observe actual conditions exposed during construction and to provide supplemental recommendations if warranted by the exposed conditions. Earthwork should be performed in accordance with the recommendations presented in this report, or as recommended by BSK during construction. BSK should be notified at least two weeks prior to the start of construction and prior to when observation and testing services are needed.

F.4.a
Packet Pg. 92
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Geotechnical Engineering Investigation BSK Project No. G22-054-11L San Pablo Creek Culvert Distress May 20, 2022
Orinda, California Page 21

8. ADDITIONAL SERVICES AND LIMITATIONS

8.1 Additional Services
The review of plans and specifications, and field observation and testing during construction by BSK are an integral part of the conclusions and recommendations made in this report. If BSK is not retained for these services, the client will be assuming BSK’s responsibility for any potential claims that may arise during or after construction due to the misinterpretation of the recommendations presented herein. The recommended tests, observations, and consultation by BSK during construction include, but are not limited to:
• review of plans and specifications, and
• observation of soil nail or tieback installation and testing (if applicable), • observation of CIDH pier excavations (if applicable), and • in-place density testing of fills, backfills, and finished subgrades.

8.2 Limitations
The recommendations contained in this report are based on our field observations and subsurface exploration, limited laboratory tests, and our present knowledge of the proposed construction. It is possible that soil conditions could vary between or beyond the points explored. If soil and bedrock conditions are encountered during construction that differ from those described herein, we should be notified immediately in order that a review may be made and any supplemental recommendations provided. If the scope of the proposed construction, including the proposed loads or structural locations, changes from that described in this report, our recommendations should also be reviewed.

We prepared this report in substantial accordance with the generally accepted geotechnical engineering practice as it exists in the Site area at the time of our study. No warranty, either express or implied, is made. The recommendations provided in this report assume that an adequate program of tests and observations will be conducted by BSK during the construction phase in order to evaluate compliance with our recommendations. Other standards or documents referenced in any given standard cited in this report, or otherwise relied upon by the author of this report, are only mentioned in the given standard; they are not incorporated into it or "included by reference", as that latter term is used relative to contracts or other matters of law.

This report may be used only by the Client and only for the purposes stated within a reasonable time from its issuance, but in no event later than two (2) years from the date of the report, or if conditions at the Site have changed. If this report is used beyond this period, BSK should be contacted to evaluate whether site conditions have changed since the report was issued.

F.4.a
Packet Pg. 93
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Geotechnical Engineering Investigation BSK Project No. G22-054-11L San Pablo Creek Culvert Distress May 20, 2022
Orinda, California Page 22
Also, land or facility use, on and off-site conditions, regulations, or other factors may change over time, and additional work may be required with the passage of time. Based on the intended use of the report, BSK may recommend that additional work be performed and that an updated report be issued.

The scope of services for this subsurface investigation and geotechnical report did not include environmental assessments or evaluations regarding the presence of hazardous substances in the soil, surface water, or groundwater at this Site.

BSK conducted subsurface exploration and provided recommendations for this project. We understand that BSK will be given the opportunity to perform a formal geotechnical review of the final project plans and specifications. In the event BSK is not retained to review the final project plans and specifications to evaluate if our recommendations have been properly interpreted, we will assume no responsibility for misinterpretation of our recommendations.

We recommend that all foundation excavations and earthwork during construction be monitored by a representative from BSK, including CIDH pier excavation (if applicable), installation of soil nails or tiebacks (if applicable), and placement of engineered fill and backfill. The purpose of these services would be to provide BSK the opportunity to observe the actual soil and bedrock conditions encountered during construction, evaluate the applicability of the recommendations presented in this report to the soil and bedrock conditions encountered, and recommend appropriate changes in design or construction procedures if conditions differ from those described herein.

F.4.a
Packet Pg. 94
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Geotechnical Engineering Investigation BSK Project No. G22 -054-11L
San Pablo Creek Culvert Distress May 20, 2022
Orinda, California

FIGURES
F.4.a
Packet Pg. 95
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3)

PROJECT SITE
The information included on this graphic representation has been compiled from a variety of sources and is subject to change without notice. BSK makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a land survey product nor is it designed or intended as a construction design document. The use or misuse of the information contained on this graphic representation is at the sole risk of the party using or misusing the information.

Approximate Scale
Not to Scale
References: 1. Esri, HERE, Garmin, Intermap, increment P Corp., GeBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community

VICINITY MAP
1 M. Romero
4/1/22
G22-054-11L
C. Melo
SitePlan&LabFigures.indd
San Pablo Creek Culvert Distress
Orlinda, California
FIGURE
F.4.a
Packet Pg. 96
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) PLAN VIEW SCALE: 1'=60'
The information included on this graphic representation has been compiled from a variety of sources and is subject to change without notice. BSK makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a land survey product nor is it designed or intended as a construction design document. The use or misuse of the information contained on this graphic representation is at the sole risk of the party using or misusing the information.

References:

1. https://www.google.com/maps, 2021

2. Plan View, City of Orinda San Pablo Creek Culvert, City Project No. XXXX, dated 10-29-21 by Schaaf & Wheeler.

Approximate Boring Location (BSK, March 2022)

SITE PLAN
2 M. Romero
4/1/22
G22-054-11L
C. Melo
SitePlan.indd
Legend
Approximate Scale 1 in. 100 ft. 0 100
Camino Pablo
San Pablo Creek Culvert Distress
Orlinda, California
Camino Sobrante
Avenida de Orinda
San Pablo Creek Culvert
Approximate
project limits
San Pablo Creek Culvert
B-1
B-2
B-3
B-1
FIGURE
F.4.a
Packet Pg. 97
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Tst
The information included on this graphic representation has been compiled from a variety of sources and is subject to change without notice. BSK makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a land survey product nor is it designed or intended as a construction design document. The use or misuse of the information contained on this graphic representation is at the sole risk of the party using or misusing the information.

AREA GEOLOGY MAP
3 FIGURE
Approximate Scale 1 in. 2500 ft. 0 2500
Legend
Tbp - Bald Peak Basalt (late Miocene)
Tst - Siesta Formation (late Miocene)
Tmb - Moraga Formation (late Miocene)
Tms - Interflow sedimentary rocks
Tor - Orinda Formation (late Miocene)
Tml - Mullholland Formation of Ham;
Lower Member (Pliocene to late Miocene)
Siteplan&labfigures.indd
References: 1. Graymer, R.W., 2000, Geologic map and map database of the Oakland metropolitan area, Alameda,
Contra Costa, and San Francisco Coun
ties, California, U.S. Geological Survey, Miscellaneous Field Studies Map MF-2342.

Note: Locations are approximate.

San Pablo Creek Culvert Distress
Orlinda, California
M. Romero
4/1/22
G22-054-11L
C. Melo

PROJECT SITE
Tus - Unamed sedimentary and
volcanic rocks (late Miocene)
Tn - Neroly Sandstone (late Miocene)
Tbr - Briones Formation (late and
middle Miocene)
Ku - Undivided Great Valley complex
rocks (Cretaceous)
Ku
F.4.a
Packet Pg. 98
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Geotechnical Engineering Investigation BSK Project No. G22-054-11L San Pablo Creek Culvert Distress May 20, 2022
Orinda, California

APPENDIX A

BORING LOGS
F.4.a
Packet Pg. 99
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) The information included on this graphic representation has been compiled from a variety of sources and is subject to change without notice. BSK makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a land survey product nor is it designed or intended as a construction design document. The use or misuse of the information contained on this graphic representation is at the sole risk of the party using or misusing the information.

UNIFIED SOIL CLASSIFICATION
SYSTEM (ASTM D2487/2488)
A-1 M. Romero
C. Melo
Legend.indd
04/05/22
G22-054-11L FIGURE
San Pablo Creek Culvert Distress
Orlinda, California
Date:

File Name:

Checked By:

Project Number:
>
_

GRAVELS
WITH >12%
FINES

SANDS WITH
5 to 12% FINES

WELL-GRADED GRAVELS, GRAVEL-SAND

MIXTURES WITH LITTLE OR NO FINES

INORGANIC CLAYS OF HIGH PLASTICITY, FAT CLAYS

INORGANIC SILTS, MICACEOUS OR DIATOMACEOUS FINE

SAND OR SILT

POORLY-GRADED SANDS, SAND-GRAVEL MIXTURES WITH

LITTLE FINES

WELL-GRADED SANDS, SAND-GRAVEL MIXTURES WITH

LITTLE CLAY FINES
GP
GM
(Liquid limit greater than 50)
GW-GM
GW-GC
GP-GM

CLEAN GRAVELS
(More than half
of material
is smaller than
(More than half
of material
is larger than
the #200 sieve)
COARSE

GRAINED

MAJOR DIVISIONS TYPICAL

DESCRIPTIONS

SILTS AND CLAYS

INORGANIC CLAYS-SILTS OF LOW PLASTICITY, GRAVELLY

CLAYS, SANDY CLAYS, SILTY CLAYS, LEAN CLAYS
GC-GM
CL-ML
OL
SOILS
SANDS
GW
GC
< _<
Cu 4 and
1 Cc 3
>
<
>
<
GP-GC
SW
>12% FINES
SP
ML
CL

SILTS AND CLAYS
coarse fraction
is smaller than
the #4 sieve)
WITH <5%
FINES

GRAVELS
WITH 5 to 12%
FINES
Cu 4 and
1 Cc 3
_
_ _
<
>
<
> >
Cu 4 and/or
1 Cc 3
<
>

CLEAN SANDS
(More than half of
is larger than
the #4 sieve)
<
> >

ORGANIC CLAYS & ORGANIC SILTS OF MEDIUM-TO-HIGH

PLASTICITY

POORLY-GRADED SANDS, SAND-GRAVEL MIXTURES WITH

LITTLE CLAY FINES
OH
CH the #200 sieve)

GRAINED
SOILS

ORGANIC SILTS & ORGANIC SILTY CLAYS OF LOW

PLASTICITY

WELL-GRADED SANDS, SAND-GRAVEL MIXTURES WITH

LITTLE FINES
MH

POORLY-GRADED SANDS, SAND-GRAVEL MIXTURES WITH

LITTLE OR NO FINES

SILTY SANDS, SAND-GRAVEL-SILT MIXTURES

CLAYEY SANDS, SAND-GRAVEL-CLAY MIXTURES

CLAYEY SANDS, SAND-SILT-CLAY MIXTURES

INORGANIC SILTS AND VERY FINE SANDS, SILTY OR

CLAYEY FINE SANDS, SILTS WITH SLIGHT PLASTICITY,

GRAVELS
WITH <5%
FINES

SANDS WITH
coarse fraction
(More than half of
FINE
Cu 6 and
1 Cc 3
(Liquid limit less than 50)

POORLY-GRADED GRAVELS, GRAVEL-SAND

MIXTURES WITH LITTLE CLAY FINES

POORLY-GRADED GRAVELS, GRAVEL-SAND

MIXTURES WITH LITTLE FINES

WELL-GRADED GRAVELS, GRAVEL-SAND

MIXTURES WITH LITTLE CLAY FINES
Cu 6 and/or
1 Cc 3

WELL-GRADED GRAVELS, GRAVEL-SAND

MIXTURES WITH LITTLE FINES

POORLY-GRADED GRAVELS, GRAVEL-SAND

MIXTURES WITH LITTLE OR NO FINES

SILTY GRAVELS, GRAVEL-SILT-SAND MIXTURES

CLAYEY GRAVELS, GRAVEL-SAND-CLAY MIXTURES
Cu 6 and
1 Cc 3
Cu 6 and/or
1 Cc 3
<
SW-SM
SW-SC
SP-SM
SP-SC
SM
SC
SC-SM

GRAPHIC
LOG
<
_
_ _
>
Cu 4 and/or
1 Cc 3
<

CLAYEY GRAVELS, GRAVEL-SAND-CLAY-SILT

MIXTURES

WELL-GRADED SANDS, SAND-GRAVEL MIXTURES WITH

LITTLE OR NO FINES
_
_
_
_
>
<
>

INORGANIC CLAYS OF LOW TO MEDIUM PLASTICITY,

GRAVELLY CLAYS, SANDY CLAYS, SILTY CLAYS, LEAN
CLAYS
UNIFIED SOIL CLASSIFICATION SYSTEM (ASTM D 2487/2488)

UNIFIED SOIL CLASSIFICATION
SYSTEM (ASTM D 2487/2488)
Entry By:

Exhibit

PLANNED BLOOM ENERGY FUELS CELLS
AT&T DATA CENTER B-1
2525 N. WATNEY WAY

FAIRFIELD, CALIFORNIA
09/24/13
B. Steen
blogs
C. Foulk
G13-161-10P
F.4.a
Packet Pg. 100 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) The information included on this graphic representation has been compiled from a variety of sources and is subject to change without notice. BSK makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a land survey product nor is it designed or intended as a construction design document. The use or misuse of the information contained on this graphic representation is at the sole risk of the party using or misusing the information.

A-2

SOIL DESCRIPTION KEY
M. Romero
C. Melo
Legend.indd
04/05/22
FIGURE G22-054-11L
San Pablo Creek Culvert Distress
Orlinda, California
Date:

File Name:

Checked By:

Project Number:

The thread cannot be rerolled after reaching Very Hard
Thumb will indent soil about 1/4 in. (6 mm)
Cohesive soil that can be broken down into small angular lumps which resist further breakdown
#10 - #4 Rock salt-sized to pea-sized
#40 - #10 0.017 - 0.079" Sugar-sized to rock salt-sized Flour-sized to sugar-sized
Weak

CRITERIA
High (H)
SR
Boulders
of sand scattered through a mass of clay; note thickness

DESCRIPTION
Inclusion of small pockets of different soils, such as small lenses It takes considerable time rolling and kneeding
Same color and appearance throughout
Thumb will penetrate soil more than 1 in. (25 mm)
Thumb will penetrate soil about 1 in. (25 mm)
Thumb wil not indent soil but readily indented with thumbnail Thumbnail will not indent soil

DESCRIPTION
Stratified
Laminated
Fissured
Slickensided
plastic limit.

Blocky
Lensed
Homogeneous
Strong
SA
A
ABBR
(# blows/ft)
Pea-sized to thumb-sized
the plastic limit. The lump or thread crumbles
limit. The lump or thread can be formed without
medium
Gravel
Particles are similar to angular description but have
Sand
Fines
coarse
fine
Passing #200
Thumb-sized to fist-sized

DESCRIPTION

DESCRIPTION
fine #200 - #10
ABBR
Angular
3/4 -3"
HP
MP
LP
NP
>12"
3/4 -3"

FIELD TEST

FIELD TEST
Alternating layers of varying material or color with layers at least 1/4 in. thick, note thickness
to reach the plastic limit. The thread can be
rerolled several times after reaching the plastic
crumbling when drier than the plastic limit

DESCRIPTION
None Larger than basketball-sized
Fist-sized to basketball-sized
<0.0029 Flour-sized and smaller
Crumbles or breaks with considerable

CALIFORNIA

CRITERIA
Medium (M)
Subangular
Loose
Very Loose

DENSITY
Rounded
Alternating layers of varying material or color with the layer Rounded
L
VL
Crumbles or breaks with handling or slight
Fracture planes appear polished or glossy, sometimes striated Breaks along definite planes of fracture with little resistance to fracturing
SIZE
>12"
3 - 12' 3 - 12"
#4 - 3/4"

DESCRIPTION
Low (L) S
F
VH
H

FIELD TEST

FIELD TEST
is required to reach the plastic limit.
<5
5 - 15
15 - 40
40 - 70
>70 85 - 100
65 - 85
ABBR
Very Dense
Dense
Medium Dense

0.19 - 0.75"
Cobbles
SIEVE
SIZE
GRAIN
SIZE

APPROXIMATE
Particles have nearly plane sides but have well-rounded corners and edges Angular
Subangular
Subrounded

SOIL DESCRIPTION KEY
Particles have sharp edges and relatively plane sides with unpolished surfaces

0.0029 - 0.017"
rounded edges
Damp but no visible water
Visible free water, usually soil is below water table
finger pressure
finger pressure
Will not crumble or break with finger pressure

DESCRIPTION

APPARENT
35 - 65
15 - 35
0 - 15
(%)

RELATIVE

SAMPLER DENSITY

CONSISTENCY
Very Soft
Soft
Firm
Hard
Subrounded
VD
D
MD
SPT
(# blows/ft)
<4
4 - 10
10 - 30
30 - 50
>50
Particles have smoothly curved sides and no edges
No visible reaction
Some reaction, with bubbles forming slowly
Violent reaction, with bubbles forming immediately

ABBR FIELD TEST
Dry
Moist
Wet
D
M
W
Non-plastic
coarse 0.079 - 0.19"
R
A 1/8-in. (3 mm) thread cannot be rolled at
The thread is easy to roll and not much time
Absence of moisture, dusty, dry to the touch
or thread cannot be formed when drier than the
any water content.

The thread can barely be rolled and the lump
Weakly
Moderately
Strongly
ABBR
VS
less than 1/4 in. thick, note thickness
when drier than the plastic limit
Penetrated only a few inches with 1/2-inch reinforcing rod driven with 5-lb. hammer Difficult to penetrate a foot with 1/2-inch reinforcing rod driven with 5-lb. hammer Difficult to penetrate with 1/2-inch reinforcing rod pushed by hand Easily penetrated a foot with 1/2-inch reinforcing rod driven with 5-lb. hammer Easily penetrated with 1/2-inch reinforcing rod by hand

SOIL DESCRIPTION KEY

FIELD TEST
>60
35 - 60
12- 35
5 - 12
<4
(# blows/ft)

SAMPLER

MODIFIED CA
Entry By:

Exhibit

GRAIN SIZE REACTION WITH HCL

CONSISTENCY - FINE-GRAINED SOIL

STRUCTURE

ANGULARITY

APPARENT / RELATIVE DENSITY - COARSE-GRAINED SOIL

MOISTURE CONTENT

CEMENTATION

PLASTICITY

PLANNED BLOOM ENERGY FUELS CELLS
AT&T DATA CENTER B-2
2525 N. WATNEY WAY

FAIRFIELD, CALIFORNIA
09/24/13
B. Steen
blogs
C. Foulk
G13-161-10P
F.4.a
Packet Pg. 101 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) The information included on this graphic representation has been compiled from a variety of sources and is subject to change without notice. BSK makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a land survey product nor is it designed or intended as a construction design document. The use or misuse of the information contained on this graphic representation is at the sole risk of the party using or misusing the information.

A-3

LOG KEY
M. Romero
C. Melo
Legend.indd
04/05/22
FIGURE G22-054-11L
San Pablo Creek Culvert Distress
Orlinda, California
Date:

File Name:

Checked By:

Project Number:

LOG KEY

GENERAL NOTES

ROCK CORE

LOG SYMBOLS

SEEPAGE
PI

CONTINUOUS CORE
-4

MC MOISTURE CONTENT
(ASTM Test Method D 2216)

BULK / BAG SAMPLE
LIQUID LIMIT LL (ASTM Test Method D 4318)

PERCENT FINER
THAN THE NO. 200 SIEVE
(ASTM Test Method C 117) -200

SHELBY TUBE

UNCONFINED COMPRESSION
(ASTM Test Method D 2166) UC

EXPANSION INDEX
(UBC STANDARD 18-2)
TXUU

UNCONSOLIDATED UNDRAINED

TRIAXIAL COMPRESSION
(EM 1110-1-1906)/ASTM Test Method D 2850

GROUNDWATER LEVEL
(encountered at time of drilling)

COL COLLAPSE POTENTIAL
Boring log data represents a data snapshot.

This data represents subsurface characteristics only to the extent encountered at the location of the boring.

The data inherently cannot accurately predict the entire subsurface conditions to be encountered at the project site relative to construction or other subsurface activities.

Lines between soil layers and/or rock units are approximate and may be gradual transitions.

The information provided should be used only for the purposes intended as described in the accompanying documents.

In general, Unified Soil Classification System designations presented on the logs were evaluated by visual methods.

Where laboratory tests were performed, the designations reflect the laboratory test results.

The Responsible Geotechnical Engineer, Professional Engineer, or Professional Geologist uses professional judgement and visual-manual procedures in general conformance with ASTM D2488 to classify soil when the full classification suite of tests per ASTM D2487 is not conducted.

EI

PLASTICITY INDEX
(ASTM Test Method D 4318)

PERCENT FINER
THAN THE NO. 4 SIEVE
(ASTM Test Method C 136)

STANDARD PENETRATION

SPLIT SPOON SAMPLER
(2 inch outside diameter)

SPLIT BARREL SAMPLER
(3 inch outside diameter)

SPLIT BARREL SAMPLER
(2-1/2 inch outside diameter)

GROUNDWATER LEVEL
(measured after drilling)
Entry By:

Exhibit

PLANNED BLOOM ENERGY FUELS CELLS
AT&T DATA CENTER B-3
2525 N. WATNEY WAY

FAIRFIELD, CALIFORNIA
09/24/13
B. Steen
blogs
C. Foulk
G13-161-10P
F.4.a
Packet Pg. 102 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) The information included on this graphic representation has been compiled from a variety of sources and is subject to change without notice. BSK makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a land survey product nor is it designed or intended as a construction design document. The use or misuse of the information contained on this graphic representation is at the sole risk of the party using or misusing the information.

A-4

ROCK DESCRIPTION CRITERIA
M. Romero
C. Melo
Legend.indd
04/05/22
FIGURE G22-054-11L
San Pablo Creek Culvert Distress
Orlinda, California
Extremely Strong Rock
Crumbles under firm blows with point of geological hammer; can be peeled by pocket knife.

Can be peeled with a pocket knife; shallow indentations made by firm blow with point of geological hammer.

Cannot be scraped or peeled with a pocket knife; specimen can be fractured with single firm blow of geological hammer.

Specimen can only be chipped with geological hammer.

Very Strong Rock
Specimen requires more than one blow with a geological hammer to fracture it.

FRACTURE SPACING
Moderately Weathered
Highly Weathered
Slightly Weathered
Criteria

WEATHERING
SYMBOL

ROCK TYPE
SYMBOL

SILTSTONE
Completely Weathered
Residual Soil

CONGLOMERATE

BRECCIA

CLAYSTONE
No visible sign of rock material weathering; perhaps slight discoloration on major discontinuity surfaces.

Discoloration indicates weathering of rock material and discontinuity surfaces. All the rock material may be discolored by weathering and may be somewhat weaker externally than in its fresh condition.

Less than half of the rock material is decomposed and/or disintegrated to a soil. Fresh or discolored rock is present either as a continuous framework or as corestones.

More than half of the rock material is decomposed and/or disintegrated to a soil. Fresh or discolored rock is present either as a discontinuos frame or as corestones.

All rock material is decomposed and/or disintegrated to soil. The original mass structure is still largely intact.

All rock material is converted to soil. The mass structure and material fabric are destroyed.

There is a large change in volume, but the soil has not been significantly transported.

GREENSTONE

BEDROCK VOLCANIC
SHALE

MUDSTONE

GRANITE

ROCK TYPE ROCK TYPE
SYMBOL

SANDSTONE
Fresh
Designation
Spacing 2 feet to 6 feet.

Extremely Weak Rock

HARDNESS/STRENGTH
Highly Fractured
Weak Rock
Medium Weak Rock
Unfractured
Slightly Fractured
Spacing greater than 6 feet.

Spacing <2 inches
Spacing 2 inches to 8 inches
Indented by thumbnail.

Designation Criteria
Spacing 8 inches to 2 feet.

Intensely Fractured
Moderately Fractured
Criteria
Strong Rock
Specimen requires many blows of geological hammer to fracture it.

Very Weak Rock
Designation

PHYLLITE
Reference:

Wyllie, D.C. and Mah, C.W. (2004), Rock Slope Engineering Civil and Mining, 4th Edition, Taylor & Francis Group, London and New York, 431p.

F.4.a
Packet Pg. 103 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) 100 24 20
99 1A
1B
1C
2A
2B
2C
3A
3B
3C
4 5A
5B
5C
6A
6B
6C
7 4.5

3.0 2.5

3.5 2.0
13 23
25 44
ASPHALT: approximately 6 to 8 inches of asphalt
FILL: approximately 4 to 6 inches of aggregate base
Clayey SAND with Gravel (SC): yellowish brown, dry to
moist, medium dense, fine to coarse sand, fine to coarse gravel up 1½" (bedrock fragments), increased clay content with depth (FILL)
dry, loose, decreased gravel content
rootlets
increased fine content
Sandy Lean CLAY with Gravel (CL): mottled reddish brown to dark olive brown, moist, hard, low to medium plasticity, medium to coarse sand, fine to coarse gravel (sandstone fragments)
fat clay seam
Lean CLAY with Sand (CL): dark bluish gray to greenish
gray to dark olive brown, moist, firm to hard, medium to high plasticity, medium to coarse sand, trace fine gravel
dark greenish gray, firm, trace fine subrounded gravel, rootlets
TXUU (see Figure B-2) c= 795 psf
decreased gravel content
Clayey GRAVEL with Sand (GC): dark greenish gray to
light greenish gray, moist, dense, fine to coarse gravel up

2.5" (basalt and sandstone fragments), fine sand
Sandy CLAYSTONE: greenish gray, moist, moderately
weathered, very weak, medium plasticity, fine sand
Boring terminated at approximately 22½ feet. No free
groundwater was observed. Boring was backfilled with
cement grout and topped with rapid set concrete.
12 10
9 7
5 4
9 5
5 5
8 13
4 6
9 4
6 9
4 5
7 20
24 30
50/
6"
Completion Depth:

Date Started:

Date Completed:

California Sampler:

SPT Sampler:

Taber Drilling Diedrich D120
Solid Flight Auger
140 lbs
4-in
30-in
automatic hammer

22.5 3/22/22
3/22/22

2.5-in inner diameter

1.5-in inner diameter
LOG OF BORING NO. B-1
Drilling Equipment:

Drilling Method:

Drive Weight:

Hole Diameter:

Drop:

Remarks:

Surface El.: 422 feet
Location: 37.884469, -122.192584
Northbound Camino Pablo Plastic Limit Plasticity Index In-Situ Dry Weight (pcf) Depth, feet
5 10
15 20
25 Graphic Log
Sample Number Pocket Penetro- meter, TSF
% Passing No. 200 Sieve In-Situ Moisture Content (%)
Liquid Limit
Project Name:

Project Number:

Project Location:

Logged by:

Checked by:

San Pablo Creek Culvert Distress
G22-054-11L
Camino Pablo, Orinda, CA
O. Khan
M. Romero

MATERIAL DESCRIPTION
Samples Penetration Blows / 6 inches
BSK Associates
399 Lindbergh Avenue
Livermore, CA 94551
Telephone: (925) 315-3151
GEO_TARGET SAN PABLO CREEK BORING LOGS.GPJ GEOTECHNICAL 08.GDT 5/20/22 F.4.a
Packet Pg. 104 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) 1A
1B
1C
ASPHALT: approximately 4 to 8 inches of asphalt
FILL: approximately 4 to 6 inches of aggregate base
Silty SAND with Gravel (SM): brown, dry, very loose, fine to coarse sand, fine gravel (FILL)
dense, increased fine and coarse gravel
unmarked sanitary sewer line encountered, boring
terminated
Boring terminated at approximately 5 feet. No free
groundwater was observed. Boring was backfilled with
cement grout and topped with rapid set concrete.
3 2
3 5
16 50
Completion Depth:

Date Started:

Date Completed:

California Sampler:

SPT Sampler:

Taber Drilling Diedrich D120
Solid Flight Auger
140 lbs
4-in
30-in
automatic hammer

5.0 3/22/22
3/22/22

2.5-in inner diameter

1.5-in inner diameter
LOG OF BORING NO. B-2
Drilling Equipment:

Drilling Method:

Drive Weight:

Hole Diameter:

Drop:

Remarks:

Surface El.: 421 feet
Location: 37.884683, -122.192706 Plastic Limit Plasticity Index In-Situ Dry Weight (pcf) Depth, feet
5 10
15 20
Graphic Log
Sample Number Pocket Penetro- meter, TSF
% Passing No. 200 Sieve In-Situ Moisture Content (%)
Liquid Limit
Project Name:

Project Number:

Project Location:

Logged by:

Checked by:

San Pablo Creek Culvert Distress
G22-054-11L
Camino Pablo, Orinda, CA
O. Khan
M. Romero

MATERIAL DESCRIPTION
Samples Penetration Blows / 6 inches
BSK Associates
399 Lindbergh Avenue
Livermore, CA 94551
Telephone: (925) 315-3151
GEO_TARGET SAN PABLO CREEK BORING LOGS.GPJ GEOTECHNICAL 08.GDT 5/20/22 F.4.a
Packet Pg. 105 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) 19 18
17 14
87 113
118
134
1A
1B
1C
2A
2B
2C
3A
3B
3C
4 5
6A
6B
6C
7 >4.5
66 26
12 13
7 8
36 32
Poorly Graded GRAVEL with Sand (GP): dark olive brown,
moist, loose, fine to coarse sand, fine subangular gravel (FILL)
Sandy SILT (ML): dark olive gray, moist, firm, fine to
medium sand, clay present (FILL)
Poorly Graded GRAVEL with Sand (GP): very dark olive
gray, moist, medium dense, fine to coarse sand, fine to coarse gravel, trace fine content (FILL)
seam of lean clay
Clayey GRAVEL with Sand (GC): dark olive brown, moist,
dense, fine to coarse sand, fine to coarse gravel (FILL) 10:00 am 03/21/22
wet, increased gravel content (bedrock fragments)
Clayey SHALE: bluish gray to medium gray, moist, weak,
friable, moderately to highly weathered, medium plasticity TXUU (see Figure B-2) c= 3,155 psf
Boring terminated at approximately 20½ feet. Free
groundwater observed at 8.5 feet. Boring was backfilled with cement grout.
5 4
7 7
9 24
17 23
50/
4"
17 24
15 16
22 22
38 47
50/
5"
50/
3"
Completion Depth:

Date Started:

Date Completed:

California Sampler:

SPT Sampler:

Taber Drilling Diedrich D120
Solid Flight Auger
140 lbs
4-in
30-in
automatic hammer

20.5 3/21/22
3/21/22

2.5-in inner diameter

1.5-in inner diameter
LOG OF BORING NO. B-3
Drilling Equipment:

Drilling Method:

Drive Weight:

Hole Diameter:

Drop:

Remarks:

Surface El.: 410 feet
Location: 37.884701, -122.192515 20
Avenida Orinda Plastic Limit Plasticity Index In-Situ Dry Weight (pcf) Depth, feet
5 10
15 20
Graphic Log
Sample Number Pocket Penetro- meter, TSF
% Passing No. 200 Sieve In-Situ Moisture Content (%)
Liquid Limit
Project Name:

Project Number:

Project Location:

Logged by:

Checked by:

San Pablo Creek Culvert Distress
G22-054-11L
Avenida De Orinda, Orinda, CA
O. Khan
M. Romero

MATERIAL DESCRIPTION
Samples Penetration Blows / 6 inches
BSK Associates
399 Lindbergh Avenue
Livermore, CA 94551
Telephone: (925) 315-3151
GEO_TARGET SAN PABLO CREEK BORING LOGS.GPJ GEOTECHNICAL 08.GDT 5/20/22 F.4.a
Packet Pg. 106 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Geotechnical Engineering Investigation BSK Project No. G22-054-11L San Pablo Creek Culvert Distress May 20, 2022
Orinda, California

APPENDIX B

LABORATORY TEST RESULTS
F.4.a
Packet Pg. 107 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) C:\Users\FSalamanca\Schaaf & Wheeler\ORIN.03.21.001 - CULVERT REPAIR - Documents\Drawings\Culvert_fts.dwg (copy) Plotted on: 04-27-22 1:14pm Plotted by: FSalamanca The information included on this graphic representation has been compiled from a variety of sources and is subject to change without notice. BSK makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a land survey product nor is it designed or intended as a construction design document. The use or misuse of the information contained on this graphic representation is at the sole risk of the party using or misusing the information.

ATTERBERG LIMITS
(ASTM D4318)
B-1 M. Romero
4/1/22
G22-054-11L
C. Melo
SitePlan.indd
San Pablo Creek Culvert Distress
Orlinda, California
0 LIQUID LIMIT (LL)
50 30
Inorganic clayey silts to very
fine sands of slight plasticity
10 100

UNIFIED SOIL CLASSIFICATION

FINE GRAINED SOIL GROUPS
20 Inorganic clays of
high plasticity
Inorganic clays of low
to moderate plasticity
Inorganic silts and
clayey silts

EXPLANATI
O
N
20 20
60 PI
Organic clays of moderate to high
plasticity, organic silts
40 or
0 PLASTICITY INDEX (PI)
80 Organic silts and organic silty
clays of low plasticity
100
50 DEPTH (ft)
40 60 70
30 80
30 DESCRIPTION
50 60 70
GROUP
SYMBOL
LEGEND: LL PL
or
10 10

U-LINE A-LINE
90 90
SOURCE
CL
MH OH
OL
OH
MH

ML-CL ML
CH
CH
OL
ML
CL
B-1 12 44 24 20 Lean CLAY with Sand (CL)
B-3 6.5-7.5 36 19 17 Clayey GRAVEL with Sand (GC)
B-3 6.5-7.5 32 18 14 Clayey Shale
FIGURE
F.4.a
Packet Pg. 108 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) The information included on this graphic representation has been compiled from a variety of sources and is subject to change without notice. BSK makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a land survey product nor is it designed or intended as a construction design document. The use or misuse of the information contained on this graphic representation is at the sole risk of the party using or misusing the information.

UNCONSOLIDATED-UNDRAINED

TRIAXIAL TESTS
(ASTM D2850)
B-2 M. Romero
4/1/22
G22-054-11L
C. Melo
SitePlan.indd
Geotechnical Engineering and Materials
Forensics Services
San Pablo Creek Culvert Distress Project
Orinda, California
Cooper Testing Labs, Inc.
937 Commercial Street
Palo Alto, CA 94303
1 2 3 4
Moisture % 24.5 8.3
Dry Den,pcf 99.4 133.6
Void Ratio 0.696 0.262
Saturation % 94.9 85.2
Height in 5.01 5.05
Diameter in 2.39 2.41
Cell psi 6.9 7.0
Strain % 15.00 15.00
Deviator, ksf 1.588 6.307
Rate %/min 1.00 1.00
in/min 0.050 0.050
Job No.:

Client:

Project:

Boring: B-1 B-3
Sample: 5C 6B
Depth ft: 16 14
Sample #
1 2
3 4
Note: Strengths are picked at the peak deviator stress or 15% strain which ever occurs first per ASTM D2850.

Remarks:

Sample Data
Visual Soil Description
Lean CLAY with Sand (CL)
Clayey Shale
664-433
BSK Associates
G22-054-11L

0.0 2.0

4.0 0.0 2.0 4.0 6.0 8.0
Shear Stress, ksf
Total Normal Stress, ksf

0.00 1.00

2.00 3.00

4.00 5.00

6.00 7.00

8.00 0.0 6.0 12.0 18.0 24.0
Deviator Stress, ksf
Strain, %
Stress-Strain Curves
Sample 1
Sample 2
Sample 3
Sample 4
Unconsolidated-Undrained Triaxial Test
ASTM D2850
FIGURE
F.4.a
Packet Pg. 109 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) The information included on this graphic representation has been compiled from a variety of sources and is subject to change without notice. BSK makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a land survey product nor is it designed or intended as a construction design document. The use or misuse of the information contained on this graphic representation is at the sole risk of the party using or misusing the information.

B-3 M. Romero
4/1/22
G22-054-11L
C. Melo
SitePlan.indd

SOIL SIEVE ANALYSIS
(ASTM D6913)
San Pablo Creek Culvert Distress
Orlinda, California
Client: Project No.:

Project: Boring Number:

Tested By: Sample ID:

Reviewed By: Sample Depth:

Date Tested:

Clay (Plastic)
Coarse Medium Fine
0 14 9 2
Description of Soil: Clayey GRAVEL with Sand (GC)
BP 6C

SOIL SIEVE ANALYSIS
(ASTM D6913)
Schaaf & Wheeler G22-054-11L
San Pablo Creek Culvert Distress Project B-1
13 RC
62 4/1/2022

PARTICLE SIZE DISTRIBUTION
Cobbles
Gravel Sand Silt (non-plastic)
21 ft

0.0 10.0

20.0 30.0

40.0 50.0

60.0 70.0

80.0 90.0
100.0
1001010.10.010.001
Percent Passing, %
Particle Size, mm
3 - in
#4
#10
#40
#200
60-min

76.2 4.76

2.00 0.425

0.0740.00

SIEVE ANALYSIS HYDROMETER ANALYSIS
CLEAR SQUARE OPENINGS U.S. STANDARD SERIES TIME READINGS FIGURE
F.4.a
Packet Pg. 110 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) The information included on this graphic representation has been compiled from a variety of sources and is subject to change without notice. BSK makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a land survey product nor is it designed or intended as a construction design document. The use or misuse of the information contained on this graphic representation is at the sole risk of the party using or misusing the information.

B-4 M. Romero
4/1/22
G22-054-11L
C. Melo
SitePlan.indd

SOIL SIEVE ANALYSIS
(ASTM D6913)
San Pablo Creek Culvert Distress
Orlinda, California
Client: Project No.:

Project: Boring Number:

Tested By: Sample ID:

Reviewed By: Sample Depth:

Date Tested:

Clay (Plastic)
Coarse Medium Fine
0 1 11 22
Description of Soil: Sandy Silt (ML)
66 RC
0 4/1/2022

PARTICLE SIZE DISTRIBUTION
Cobbles
Gravel Sand Silt (non-plastic)
2 ft
BP 1C

SOIL SIEVE ANALYSIS
(ASTM D6913)
Schaaf & Wheeler G22-054-11L
San Pablo Creek Culvert Distress Project B-3

0.0 10.0

20.0 30.0

40.0 50.0

60.0 70.0

80.0 90.0
100.0
1001010.10.010.001
Percent Passing, %
Particle Size, mm
3 - in
#4
#10
#40
#200
60-min

76.2 4.76

2.00 0.425

0.0740.0

SIEVE ANALYSIS HYDROMETER ANALYSIS
CLEAR SQUARE OPENINGS U.S. STANDARD SERIES TIME READINGS FIGURE
F.4.a
Packet Pg. 111 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) The information included on this graphic representation has been compiled from a variety of sources and is subject to change without notice. BSK makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a land survey product nor is it designed or intended as a construction design document. The use or misuse of the information contained on this graphic representation is at the sole risk of the party using or misusing the information.

B-5 M. Romero
4/1/22
G22-054-11L
C. Melo
SitePlan.indd

SOIL SIEVE ANALYSIS
(ASTM D6913)
San Pablo Creek Culvert Distress
Orlinda, California
Client: Project No.:

Project: Boring Number:

Tested By: Sample ID:

Reviewed By: Sample Depth:

Date Tested:

Clay (Plastic)
Coarse Medium Fine
0 9 9 5
Description of Soil: Clayey GRAVEL with Sand (GC)
BP 3B-3C

SOIL SIEVE ANALYSIS
(ASTM D6913)
Schaaf & Wheeler G22-054-11L
San Pablo Creek Culvert Distress Project B-3
26 RC
51 4/1/2022

PARTICLE SIZE DISTRIBUTION
Cobbles
Gravel Sand Silt (non-plastic)

6.5-7.5 ft

0.0 10.0

20.0 30.0

40.0 50.0

60.0 70.0

80.0 90.0
100.0
1001010.10.010.001
Percent Passing, %
Particle Size, mm
3 - in
#4
#10
#40
#200
60-min

76.2 4.76

2.00 0.425

0.0740.00

SIEVE ANALYSIS HYDROMETER ANALYSIS
CLEAR SQUARE OPENINGS U.S. STANDARD SERIES TIME READINGS FIGURE
F.4.a
Packet Pg. 112 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) F.4.a
Packet Pg. 113 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) F.4.a
Packet Pg. 114
Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Geotechnical Engineering Investigation BSK Project No. G22-054-11L San Pablo Creek Culvert Distress May 20, 2022
Orinda, California

APPENDIX C

SUMMARY OF COMPACTION RECOMMENDATIONS
Area Compaction Recommendations
(See Notes 1, 2, 3, 4, 5, 6)
Subgrade Preparation and
Placement of General
Engineered Fill/Backfill,
Including
Imported Fill
Compact upper 12 inches of subgrade and entire fill/backfill to a minimum of 90 percent compaction near optimum moisture content for granular soils and to a minimum of 90 percent compaction at a minimum of 2 percent over optimum moisture content for clayey soils.

Notes:
(1) Depths are below finished subgrade elevation.
(2) All compaction requirements refer to relative compaction as a percentage of the laboratory standard described by ASTM D1557.
(3) Fill material should be compacted in lifts not exceeding 8 inches in loose thickness. (4) All subgrades should be firm and stable.
(5) In landscaping areas only, the percent compaction may be reduced to 85 percent. (6) Where fills are greater than 7 feet in depth below finish grade, the portion below a depth of 7 feet should be compacted to a minimum of 95 percent compaction.

F.4.a
Packet Pg. 115 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Geotechnical Engineering Investigation BSK Project No. G22-054-11L San Pablo Creek Culvert Distress May 20, 2022
Orinda, California

APPENDIX D

IMPORTANT INFORMATION ABOUT THIS

GEOTECHNICAL-ENGINEERING REPORT
F.4.a
Packet Pg. 116 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Geotechnical-Engineering Report
Important Information about This
Subsurface problems are a principal cause of construction delays, cost overruns, claims, and disputes.

While you cannot eliminate all such risks, you can manage them. The following information is provided to help.

The Geoprofessional Business Association (GBA)
has prepared this advisory to help you – assumedly
a client representative – interpret and apply this
geotechnical-engineering report as effectively as
possible. In that way, you can benefit from a lowered
exposure to problems associated with subsurface
conditions at project sites and development of
them that, for decades, have been a principal cause
of construction delays, cost overruns, claims,
and disputes. If you have questions or want more
information about any of the issues discussed herein,
contact your GBA-member geotechnical engineer.

Active engagement in GBA exposes geotechnical
engineers to a wide array of risk-confrontation
techniques that can be of genuine benefit for
everyone involved with a construction project.

Understand the Geotechnical-Engineering Services
Provided for this Report
Geotechnical-engineering services typically include the planning, collection, interpretation, and analysis of exploratory data from widely spaced borings and/or test pits. Field data are combined with results from laboratory tests of soil and rock samples obtained from field exploration (if applicable), observations made during site reconnaissance, and historical information to form one or more models of the expected subsurface conditions beneath the site. Local geology and alterations of the site surface and subsurface by previous and proposed construction are also important considerations. Geotechnical engineers apply their engineering training, experience, and judgment to adapt the requirements of the prospective project to the subsurface model(s). Estimates are made of the subsurface conditions that will likely be exposed during construction as well as the expected performance of foundations and other structures being planned and/or affected by construction activities.

The culmination of these geotechnical-engineering services is typically a geotechnical-engineering report providing the data obtained, a discussion of the subsurface model(s), the engineering and geologic engineering assessments and analyses made, and the recommendations developed to satisfy the given requirements of the project. These reports may be titled investigations, explorations, studies, assessments, or evaluations.

Regardless of the title used, the geotechnical-engineering report is an engineering interpretation of the subsurface conditions within the context of the project and does not represent a close examination, systematic inquiry, or thorough investigation of all site and subsurface conditions.

Geotechnical-Engineering Services are Performed
for Specific Purposes, Persons, and Projects,
and At Specific Times
Geotechnical engineers structure their services to meet the specific needs, goals, and risk management preferences of their clients. A geotechnical-engineering study conducted for a given civil engineer will not likely meet the needs of a civil-works constructor or even a different civil engineer. Because each geotechnical-engineering study is unique, each geotechnical-engineering report is unique, prepared solely for the client.

Likewise, geotechnical-engineering services are performed for a specific project and purpose. For example, it is unlikely that a geotechnicalengineering study for a refrigerated warehouse will be the same as one prepared for a parking garage; and a few borings drilled during a preliminary study to evaluate site feasibility will not be adequate to develop geotechnical design recommendations for the project.

Do not rely on this report if your geotechnical engineer prepared it:
• for a different client;
• for a different project or purpose;
• for a different site (that may or may not include all or a portion of the original site); or
• before important events occurred at the site or adjacent to it; e.g., man-made events like construction or environmental remediation, or natural events like floods, droughts, earthquakes, or groundwater fluctuations.

Note, too, the reliability of a geotechnical-engineering report can be affected by the passage of time, because of factors like changed subsurface conditions; new or modified codes, standards, or regulations; or new techniques or tools. If you are the least bit uncertain about the continued reliability of this report, contact your geotechnical engineer before applying the recommendations in it. A minor amount of additional testing or analysis after the passage of time – if any is required at all – could prevent major problems.

Read this Report in Full
Costly problems have occurred because those relying on a geotechnicalengineering report did not read the report in its entirety. Do not rely on an executive summary. Do not read selective elements only. Read and refer to the report in full.

You Need to Inform Your Geotechnical Engineer
About Change
Your geotechnical engineer considered unique, project-specific factors when developing the scope of study behind this report and developing the confirmation-dependent recommendations the report conveys.

Typical changes that could erode the reliability of this report include those that affect:
• the site’s size or shape;
• the elevation, configuration, location, orientation,
function or weight of the proposed structure and
the desired performance criteria;
• the composition of the design team; or
• project ownership.

As a general rule, always inform your geotechnical engineer of project or site changes – even minor ones – and request an assessment of their impact. The geotechnical engineer who prepared this report cannot accept F.4.a
Packet Pg. 117 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) responsibility or liability for problems that arise because the geotechnical engineer was not informed about developments the engineer otherwise would have considered.

Most of the “Findings” Related in This Report
Are Professional Opinions
Before construction begins, geotechnical engineers explore a site’s subsurface using various sampling and testing procedures. Geotechnical engineers can observe actual subsurface conditions only at those specific locations where sampling and testing is performed. The data derived from that sampling and testing were reviewed by your geotechnical engineer, who then applied professional judgement to form opinions about subsurface conditions throughout the site. Actual sitewide-subsurface conditions may differ – maybe significantly – from those indicated in this report. Confront that risk by retaining your geotechnical engineer to serve on the design team through project completion to obtain informed guidance quickly, whenever needed.

This Report’s Recommendations Are
Confirmation-Dependent
The recommendations included in this report – including any options or alternatives – are confirmation-dependent. In other words, they are not final, because the geotechnical engineer who developed them relied heavily on judgement and opinion to do so. Your geotechnical engineer can finalize the recommendations only after observing actual subsurface conditions exposed during construction. If through observation your geotechnical engineer confirms that the conditions assumed to exist actually do exist, the recommendations can be relied upon, assuming no other changes have occurred. The geotechnical engineer who prepared this report cannot assume responsibility or liability for confirmation-dependent recommendations if you fail to retain that engineer to perform construction observation.

This Report Could Be Misinterpreted
Other design professionals’ misinterpretation of geotechnicalengineering reports has resulted in costly problems. Confront that risk by having your geotechnical engineer serve as a continuing member of the design team, to:
• confer with other design-team members;
• help develop specifications;
• review pertinent elements of other design professionals’ plans and specifications; and
• be available whenever geotechnical-engineering guidance is needed.

You should also confront the risk of constructors misinterpreting this report. Do so by retaining your geotechnical engineer to participate in prebid and preconstruction conferences and to perform constructionphase observations.

Give Constructors a Complete Report and Guidance
Some owners and design professionals mistakenly believe they can shift unanticipated-subsurface-conditions liability to constructors by limiting the information they provide for bid preparation. To help prevent the costly, contentious problems this practice has caused, include the complete geotechnical-engineering report, along with any attachments or appendices, with your contract documents, but be certain to note conspicuously that you’ve included the material for information purposes only. To avoid misunderstanding, you may also want to note that “informational purposes” means constructors have no right to rely on the interpretations, opinions, conclusions, or recommendations in the report. Be certain that constructors know they may learn about specific project requirements, including options selected from the report, only from the design drawings and specifications. Remind constructors that they may perform their own studies if they want to, and be sure to allow enough time to permit them to do so. Only then might you be in a position to give constructors the information available to you, while requiring them to at least share some of the financial responsibilities stemming from unanticipated conditions. Conducting prebid and preconstruction conferences can also be valuable in this respect.

Read Responsibility Provisions Closely
Some client representatives, design professionals, and constructors do not realize that geotechnical engineering is far less exact than other engineering disciplines. This happens in part because soil and rock on project sites are typically heterogeneous and not manufactured materials with well-defined engineering properties like steel and concrete. That lack of understanding has nurtured unrealistic expectations that have resulted in disappointments, delays, cost overruns, claims, and disputes.

To confront that risk, geotechnical engineers commonly include explanatory provisions in their reports. Sometimes labeled “limitations,” many of these provisions indicate where geotechnical engineers’ responsibilities begin and end, to help others recognize their own responsibilities and risks. Read these provisions closely. Ask questions.

Your geotechnical engineer should respond fully and frankly.

Geoenvironmental Concerns Are Not Covered
The personnel, equipment, and techniques used to perform an environmental study – e.g., a “phase-one” or “phase-two” environmental site assessment – differ significantly from those used to perform a geotechnical-engineering study. For that reason, a geotechnical-engineering report does not usually provide environmental findings, conclusions, or recommendations; e.g., about the likelihood of encountering underground storage tanks or regulated contaminants. Unanticipated subsurface environmental problems have led to project failures. If you have not obtained your own environmental information about the project site, ask your geotechnical consultant for a recommendation on how to find environmental risk-management guidance.

Obtain Professional Assistance to Deal with
Moisture Infiltration and Mold
While your geotechnical engineer may have addressed groundwater, water infiltration, or similar issues in this report, the engineer’s services were not designed, conducted, or intended to prevent migration of moisture – including water vapor – from the soil through building slabs and walls and into the building interior, where it can cause mold growth and material-performance deficiencies.

Accordingly, proper implementation of the geotechnical engineer’s recommendations will not of itself be sufficient to prevent moisture infiltration. Confront the risk of moisture infiltration by including building-envelope or mold specialists on the design team.

Geotechnical engineers are not building-envelope or mold specialists.

Copyright 2019 by Geoprofessional Business Association (GBA). Duplication, reproduction, or copying of this document, in whole or in part, by any means whatsoever, is strictly prohibited, except with GBA’s specific written permission. Excerpting, quoting, or otherwise extracting wording from this document is permitted only with the express written permission of GBA, and only for purposes of scholarly research or book review. Only members of GBA may use this document or its wording as a complement to or as an element of a report of any kind.

Any other firm, individual, or other entity that so uses this document without being a GBA member could be committing negligent or intentional (fraudulent) misrepresentation.

Telephone: 301/565-2733
e-mail: [email protected] www.geoprofessional.org F.4.a
Packet Pg. 118 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) To: T. Ryan O’Kane, PE, City of Orinda August 18, 2023
Schaaf & Wheeler Attachment
ATTACHMENT 4
Materials Forensics Services, San Pablo Creek Culvert
Distress Evaluation, Orinda, California, BSK Associates, November 18, 2022

F.4.a
Packet Pg. 119 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) 399 Lindbergh Avenue
Livermore CA 94551
P 925.315.3151
www.bskassociates.com
Environmental, Geotechnical, Construction Services, Analytical Testing - An Employee-Owned Company Sent via e-mail: [email protected]
November 18, 2022 BSK Project G22-054-11L
Mr. Ben Shick
Vice President
Schaaf and Wheeler
2200 Range Avenue, Suite 201
Santa Rosa, CA 95403
SUBJECT: Materials Forensics Services
San Pablo Creek Culvert Distress Evaluation
Orinda, California
Dear Mr. Shick:

At your request, BSK Associates has completed the Materials Forensics Services for the San Pablo Creek Culvert Distress Evaluation located in Orinda, California. Our services were performed as described in our proposal dated February 4, 2022 (Proposal No. GL21-22953), in accordance with the testing program provided by the project structural engineering firm for this project, Finn Design Group Inc. (FDG).

SCOPE OF SERVICES
Our scope of services, as discussed with Mr. Tim Elliott of FDG and described in our proposal was as follows:

1. Destructive Sampling and Testing – Concrete core samples were collected from locations designated by FDG. The cores were drilled completely through each concrete element to evaluate the member thickness. The extracted cores were tested at our materials laboratory for compressive strength testing in general accordance with ASTM C39 and ASTM C42 test procedures. The cores were four inches in diameter.

2. Non-Destructive Location of Reinforcing Steel – A ground penetrating radar unit was used to evaluate the location of reinforcing steel at designated locations on the existing concrete slab and walls of the channel. An approximation of reinforcing steel depth and spacing was made using the results of the scan.

3. Repair of Sampled Areas – A high-strength, non-shrink grout was used to patch all removed concrete at cored or chipped locations during our field visit for destructive sampling and testing.

4. Report - Provide a report including test results and observations related to the project.

F.4.a
Packet Pg. 120 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Materials Forensics Services BSK Project G22-054-11L
San Pablo Creek Culvert Distress Evaluation November 18, 2022 Orinda, California Page 2

PROCEDURE AND RESULTS
On August 25 & 26, 2022, BSK Associates visited the project site to perform the aforementioned scope of services. Upon arrival, we met with Mr. Elliott and reviewed and adjusted the locations where concrete core sampling and rebar scanning were selected by FDG prior to the start of services. The concrete core sampling and rebar scanning locations are shown on Figure 1 – Test Locations.

Non-destructive scanning was performed at each location using a ground penetrating radar unit in order to evaluate the presence and location of the reinforcing steel at each sample location and to avoid cutting reinforcement during the coring operation. Core samples were extracted using a water-cooled, diamondbit core drilling machine. Core samples were collected at Locations #1 through #6 as shown on Figure 1.

As directed by Mr. Elliott, reinforcing steel samples were collected at random locations where the rebar was exposed and was not connected to the concrete at one end. Patching of the cored locations was completed using a high-strength non-shrink grout.

The cores were returned to our laboratory and tested for compressive strength according to ASTM C-39 & C-42 procedures. The reinforcing steel samples were also returned to our laboratory for tensile strength testing in accordance with ASTM A-370.

The results of our observations, measurements, sampling and testing are discussed below and presented on Figure 1 and Appendix A.
 Figure 1 – Test Locations – Shows the approximate locations where observations and sampling were performed relative to the testing program plan drawings provided by FDG.  Appendix A – Test Reports – Presents the laboratory test reports for the compressive strength and reinforcing steel testing performed.

The tensile strength, yield and elongation test results of the reinforcing steel samples indicate that each of the samples tested meet the criteria for ASTM A615 Grade 40 steel.

OBSERVATIONS
Location 1 – The culvert slab was scanned to locate the steel reinforcement at this location. The reinforcement was found to be approximately six inches on-center in the transverse direction of the culvert and approximately 18 inches on-center in the longitudinal direction of the culvert. The reinforcement is a double mat with the top mat at approximately 2 inches and bottom mat approximately 7 inches from the top of the slab. A core sample was removed from this location for compressive strength testing and to check the thickness of the slab. The thickness of the slab was found to be approximately 11½ inches at this location.

Location 2 – The culvert wall was scanned to locate the steel reinforcement at this location. The reinforcement was found to be approximately eight inches on-center in the vertical direction and approximately 18 inches on-center in the horizontal direction. The reinforcement is a double mat with the mats at approximately 2 inches and approximately 7 inches from the face of the wall. A core sample was removed from this location for compressive strength testing and to check the thickness of the slab.

The thickness of the slab was found to be approximately 10 inches at this location.

F.4.a
Packet Pg. 121 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Materials Forensics Services BSK Project G22-054-11L
San Pablo Creek Culvert Distress Evaluation November 18, 2022 Orinda, California Page 3
Location 3 – The culvert slab was scanned to locate the steel reinforcement at this location. The reinforcement was found to be approximately 18 inches on-center in each direction. The reinforcement is a double mat with the top mat at approximately 2 inches and bottom mat approximately 7 inches from the top of the slab. A core sample was removed from this location for compressive strength testing and to check the thickness of the slab. The thickness of the slab was found to be approximately 9 inches at this location.

Location 4 – A core sample was removed from this location for compressive strength testing and to check the thickness of the slab. The thickness of the slab was found to be approximately 11½ inches at this location.

Location 5 – A core sample was removed from this location for compressive strength testing and to check the thickness of the slab. The thickness of the slab was found to be approximately 14 inches at this location.

Location 6 – A core sample was removed from this location for compressive strength testing and to check the thickness of the slab. The thickness of the slab was found to be approximately 18 inches at this location.

LIMITATIONS
This report summarizes our observations, materials sampling and testing services for this project which was limited to the items identified herein and as directed by the structural engineering firm for the project, Finn Design Group. Our services were performed in a manner consistent with that level of care and skill ordinarily exercised by other members of BSK’s profession practicing in the same locality, under similar conditions and at the date the services were provided. BSK makes no other representation, guarantee or warranty, express or implied, regarding the services, communication (oral or written), report, opinion, or instrument of service provided.

CLOSURE
We appreciate the opportunity to provide our services to you on this project. Should you have any questions or need any additional information, please do not hesitate to contact our office at (925) 315- 3151.

Respectfully submitted,
BSK Associates
James Auser Cristiano Melo
Senior Materials Engineer Livermore Branch Manager
Attachments: FIGURE 1 – Test Locations
APPENDIX A – Test Reports
CC: Tim Elliott, Finn Design Group ([email protected]) Omar Khan, BSK Associates ([email protected])
F.4.a
Packet Pg. 122 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) FIGURE
F.4.a
Packet Pg. 123 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) FIGURE 1
– TEST LOCATIONS
F.4.a
Packet Pg. 124 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187)

APPENDIX A
Test Reports
F.4.a
Packet Pg. 125 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
1-1 2 08/31/22 1 / 1 3.93 12.13 56,140 4,420 3 B
1-2 2 08/31/22 1 / 1 3.96 12.32 58,300 4,730 2 B
1-3 2 08/31/22 1 / 1 3.96 12.32 92,640 7,150 2 B
1-4 2 08/31/22 1 / 1 3.96 12.32 95,280 7,290 3 B
1-5 2 08/31/22 1 / 1 3.96 12.32 56,570 4,420 3 B
1-6 2 08/31/22 1 / 1 3.96 12.32 58,320 4,730 3 B
Test Age Average Strengths (psi): 2 Day - 5460
Tested By: Ireneo Bueno (1,2,3,4,5,6)
Checked In : 08/30/2022 (1,2,3,4,5,6)
Capping Methods
B: Sulfur Caps (ASTM C617)
Set #: 1
Specimen Size: Concrete Core
Specimens In Set: 6
Truck / Ticket #:

Contractor:

Technician: Cristofer Gourtzelis
Cast By: Cristofer Gourtzelis
Date Cast: 08/29/22
Sampled From: Coring
Placement Method:

Sample Details
Batched:

Sampled: 10:20 PDT
Cast: 10:25 PDT
Truck Empty:

Placement Time:

Placement Location: Not Specified
Location Details: Culvert, Location in Report
Sample Location / Notes: Culvert, Location in Report
Batch Log
Strength: 0 (psi)
Specifications
On-Site Admixtures: None
Location
Field Measurements
Plastic Unit Weight:

Air Content:

Load Volume:

Weather: Consistency: Slump
Air Temperature (F): Concrete Temp (F):

Lab Test Results
General Remarks
1-1: 60+ Years Old, 1-2: 60+ Years Old, 1-3: 60+ Years Old, 1-4: 60+ Years Old, 1-5: 60+ Years Old, 1-6: 60+ Years Old The results relate only to the items inspected or tested.

The report shall not be reproduced, except in full, without the prior written approval of BSK.

Page 1 of 1 ends

Client:

Schaaf & Wheeler Consulting Civil Engineers
Santa Clara, CA 95050
1171 Homestead Rd
Project:

San Pablo Creek Culvert Distress Project
G2205411L
Orinda, CA 99999
West end of Avenida De Orinda
Compressive Strength of Concrete
Test Method: ASTM C 39 Sample: 22697
Report #: CC-000001
Livermore
399 Lindbergh Avenue
Livermore, CA 94551
Phone: 925-315-3151
Report Date: 09/01/2022
F.4.a
Packet Pg. 126 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) Contact: Ben L Shick, PE
Client: Schaaf and Wheeler
Address: 2200 Range Avenue Suite 201, Santa Rosa, CA 95403 Sample ID: 1452 Report Date: 9/13/2022
BSK Project Name: San Pablo Creek Culvert Distress Project Received Date:

BSK Project No.: G22-054-11L
Sampled By: CG
Sample Date: Tested By: DO
Sample Source: Test Date: 9/12/2022
1 2 3 4
unknown unknown unknown
unknown unknown unknown
unknown unknown unknown
unknown unknown unknown
unknown unknown unknown

0.10 0.19 0.31
5,200 8,540 14,900
52,000 44,947 48,065

N/A N/A N/A
7,073 11,686 24,401
70,730 61,505 78,713

N/A N/A N/A

8.00 8.00 8.00

8.94 8.91 8.88

0.94 0.91 0.88

11.8% 11.4% 11.0%

N/A N/A N/A
Materials: Were
Were Not
sampled and tested in accordance with the requirements of the approved documents.

Materials: Did
Did Not
meet the requirements of the approved documents.

Signature: Date:

Distribution:

Sample No.:

Manufacturer:

Heat No.:

Bar Size:

ASTM Designation:

Grade:

Ultimate Load (lbs):

Spec. Area (in2):

Yield Point (lbs):

Yield Point (psi):

Min. Yield Point (psi):

Comments:

Bend Test:

Average Spacing (in):

Maximum Average Spacing (in):

Average Height (in):

Minimum Average Height (in):

REINFORCING STEEL LABORATORY REPORT

RESULTS
399 Lindbergh Avenue
Livermore, CA 94551
Phone (925) 315-3151
Fax (925) 315-3152
8/25/2022
removed onsite
Ultimate Strength (psi):

Min. Ultimate Strength (psi):

Gap (in):

Maximum Gap (in):

Elongation (%):

Min. Elongation (%):

Initial Gauge Length (in):

Final Gauge Length (in):

Change in Length (in):

Rev #3 Revised 3/5/2018 Page 1 of 1
The results relate only to the items inspected or tested . The report shall not be reproduced, in full, without the prior written approval of BSK.

F.4.a
Packet Pg. 127 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) To: T. Ryan O’Kane, PE, City of Orinda August 18, 2023
Schaaf & Wheeler Attachment
ATTACHMENT 5
Orinda Culvert Monitoring, Kier & Wright, March 23, 2023 F.4.a
Packet Pg. 128 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) F.4.a
Packet Pg. 129 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) STATION MP-6 MP-7 MP-8 MP-9 MP-10 MP-11 MP-12
POINT NUMBER 51006 51007 51008 51009 51010 51011 51012

DESCRIPTION PRISM PRISM PRISM PRISM PRISM PRISM PRISM

CULVERT SIDE
ORIGINAL ELEVATION 99.79 97.92 97.89 98.17 98.11 97.72 97.70 STATION MP-6 MP-7 MP-8 MP-9 MP-10 MP-11 MP-12
POINT NUMBER 50045 50046 50047 50048 50049 50050 50051
VERTICAL DIFFERENCE FROM ORIGINAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 HORIZONTAL DIFFERENCE FROM ORIGINAL -0.01 -0.02 -0.02 -0.02 -0.02 -0.02 -0.02 Vertical Negative means elevation is lower than original elevation recorded Postive means elevation is higher than original elevation recorded Horizontal Negative = towards culvert
Postivie = away from culvert
Round 1 - 03.21.2023
INITIAL SETUP - 02.17.2022
Orinda Culvert
Monitoring

WEST SIDE EAST SIDE
3/23/2023 1 OF 1
F.4.a
Packet Pg. 130 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) To: T. Ryan O’Kane, PE, City of Orinda August 18, 2023
Schaaf & Wheeler Attachment
ATTACHMENT 6
Orinda Street Monitoring, Kier & Wright, March 23, 2023 F.4.a
Packet Pg. 131 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) F.4.a
Packet Pg. 132 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) STATION MP-1 MP-2 MP-3 MP-4 MP-5
POINT NUMBER 51001 51002 51003 51004 51005

DESCRIPTION MAG MAG MAG MAG MAG
ORIGINAL ELEVATION 94.78 94.01 93.36 92.63 91.42
STATION MP-1 MP-2 MP-3 MP-4 MP-5
POINT NUMBER 50048 50047 50046 50045 50044
VERTICAL DIFFERENCE FROM ORIGINAL 0.02 0.00 -0.01 -0.01 0.01 HORIZONTAL DIFFERENCE FROM ORIGINAL 0.00 -0.01 -0.01 -0.02 0.00 Vertical Negative means elevation is lower than original elevation recorded Postive means elevation is higher than original elevation recorded Horizontal Negative = towards culvert
Postivie = away from culvert
Round 1 - 03.21.2023
INITIAL SETUP - 02.15.2022
Orinda Street
Monitoring
3/23/2023 1 OF 1
F.4.a
Packet Pg. 133 Attachment: Culvert Wall Repair Memo_081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) 2200 Range Avenue, Ste. 201
Santa Rosa, CA 95403
(707) 528-4848
[email protected]

PROPOSAL MEMO

VIA EMAIL
DATE: August 18, 2023
TO: T. Ryan O’Kane, PE, City of Orinda
FROM: Ben Shick, PE
SUBJECT: San Pablo Creek Culvert – Proposal for Wall Repair Design and Construction Support Services
Schaaf & Wheeler is pleased to provide you with this scope and fee to provide additional services for the City of Orinda, San Pablo Creek Culvert Repair Project. The additional services include preparing design documents for the recommended repairs to the leaning walls within the culvert, and to provide biological compliance support services for the project. The work will be performed in conjunction with the previously approved tasks. It is assumed that the design for the leaning wall repairs will be completed with one set of bid documents with the culvert invert repairs being designed under previously approved tasks.

Schaaf & Wheeler will provide the following tasks for the fee identified in the attached table.

Task 1: Leaning Wall Design
Schaaf & Wheeler and structural engineering subconsultant, Peoples Associates Structural Engineers (PASE, formerly Finn Design Group) will prepare construction documents for the recommended repairs to the leaning walls as outlined in the memorandum dated August 18, 2023. The repairs will include 10 steel beams spanning across the culvert and a continuous concrete beam along the top of the wall. Plans, specifications, and estimates will be submitted at the 100% draft and final bid document phases.

An additional site visit will be performed during the dry months of 2023 to document the existing conditions and to determine if any additional erosion or damage occurred during the previous winter.

Task 2: Biological Compliance Support Services (Year 1 Construction) Schaaf & Wheeler’s subconsultant, WRA Environmental Consultants, will provide the following scope of services for the anticipated biological compliance requirements of the project. This scope of services assumes that the construction contract will take two construction seasons to complete. This task covers the anticipated scope for year 1 of the construction contract.

Task 2A: WEAP Training Session for Personnel
Per Measure 6 of the USFWS Concurrence Letter, a qualified biologist from WRA will develop a Worker Environmental Awareness Program (WEAP). The WEAP will include a discussion of the biology and general behavior of any sensitive species that may be in the area, how they may be encountered within the work area, and procedures to follow when they are encountered.

Translation into any other language will be provided by a member of the crew; if translation into F.4.b
Packet Pg. 134 Attachment: Wall Repair and CSS Proposal 081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) To: T. Ryan O’Kane, PE, City of Orinda August 18, 2023
Schaaf & Wheeler 2
Spanish is required, WRA can provide this service for an additional fee. This task will require one (1) site visit to provide the WEAP in person to construction personnel no later than the first morning prior to the start of work.

Task 2B: California Red-legged Frog, Alameda Whipsnake, and Nesting Bird Survey Per Measure 7 of the USFWS Concurrence Letter, a qualified biologist from WRA will conduct a survey for California red-legged frog (CRLF) and Alameda whipsnake (AWS). The survey will be conducted at least 14 days prior to the commencement of ground-disturbing activities. This survey will cover the Project area and 200-feet upstream and downstream of the Project area for CRLF and AWS individuals. If CRLF or AWS are observed at any time during the preconstruction survey efforts or the biological monitoring, they shall be allowed to move off site on their own volition and USFWS will be contacted for next steps. Following the survey, the qualified biologist will establish 12 photo points and take the pre-construction photos as required by RWQCB Measure 13.

Per Measure 5 of the USFWS Concurrence Letter and the CEQA Project Description, if construction is scheduled between February 1 to August 31, a qualified biologist from WRA will conduct a nesting bird survey within 14 days of the start of construction. To reduce costs, this survey will be conducted during the same site visit as the CRLF and AWS survey. The survey area will include a 500-foot buffer of the project site. Per Measure 5 of the USFWS Concurrence Letter, if active nests are detected, the qualified biologist will set an appropriate buffer distance or “No Work Zone” until the chicks have fledged or the nest otherwise becomes inactive. The buffer distance will be established by the biologist based on factors such as the species observed, type of adjacent disturbance, and sensitivity of the nesting bird to disturbance. This task does not include separate site visits to monitor the nests, should separate site visits be necessary, WRA can conduct these efforts for an additional fee.

One letter report will be prepared following the survey to document the methods and results of the CRLF, AWS, and nesting bird (if conducted) surveys. The survey will be sent to the City for compliance records.

Task 2C: As-Needed Agency and Client Coordination
WRA will conduct agency notifications and coordination, including the RWQCB commencement of construction notice per Measure 12. This task also includes coordination with the Schaaf & Wheeler and City, scheduling, coordination with the construction contractor, invoicing, and other project management tasks. One site visit is included in this task for a post-construction site walk and photo point documentation (RWQCB Measure 13) at the end of the Year 1 work season. In addition to the site meeting and agency notifications, this task assumes up to 20 additional hours of project management and communications may be needed. No annual postconstruction report is required by RWQCB, but a final post-construction report will be completed following the full project completion and is included in Phase 5 Task 3. If additional needs arise that will require time commitments greater than this amount, these can be addressed for an additional fee.

Task 3: Biological Compliance Support Services (Year 2 Construction) Schaaf & Wheeler’s subconsultant, WRA Environmental Consultants, will provide the following scope of services for year 2 of the construction contract.

F.4.b
Packet Pg. 135 Attachment: Wall Repair and CSS Proposal 081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) To: T. Ryan O’Kane, PE, City of Orinda August 18, 2023
Schaaf & Wheeler 3
Task 3A: WEAP Training Session for Personnel
This task includes one (1) site visit to provide the WEAP in person to construction personnel as described in Task 2A.

Task 3B: California Red-legged Frog, Alameda Whipsnake, and Nesting Bird Survey Each year prior to the start of construction, a CRLF and AWS survey will be required to be conducted. If construction is scheduled to be reinitiated between February 1 to August 31, a nesting bird survey will be conducted simultaneously as the CRLF and AWS survey. Following the surveys, the biologist will take photos at the established photo points for use in the postconstruction report. One letter report will be prepared describing the methods and results of the surveys. The surveys and letter report will be conducted as described above in Task 2B.

Task 3C: Agency Coordination and Post-Construction Reports WRA will conduct agency notifications and coordination, including the RWQCB annual commencement of construction notice per Measure 12. One site visit is included in this task for a post-construction site walk and photo point documentation (RWQCB Measure 13) at the end of the Year 2 work season. Following completion of construction in Year 2, an as-built report including the pre- and post- photo documentation will be prepared in accordance with RWQCB Measures 13 and 14. This task will require coordination with the project construction contractor and/or engineer for the final plan set with mark-up on changes during construction.

Separate notices of completion are required for RWQCB (Measure 15) and for the Corps, and WRA will coordinate and submit these notices.

Task 3D: Project Management and Coordination
This task includes coordination with Schaaf & Wheeler and City, scheduling, coordination with the construction contractor, invoicing, and other project management tasks. Up to 20 hours of project management and communications may be needed. If additional needs arise that will require time commitments greater than this amount, these can be provided for an additional fee.

Task 4: Bid Support Services
Schaaf & Wheeler will provide bid support services which may include attendance at the pre-bid meeting, responding to questions from bidders, prepare addenda, and evaluation of bids.

Task 5: Engineering Services During Construction
Schaaf & Wheeler and structural engineering subconsultant, PASE, will provide engineering services during construction to support the City as listed below:

A. Pre-construction meeting attendance;
B. Review and approve shop drawings and submittals;
C. Review contractor’s request for information (RFIs) and furnish additional drawings and/or specifications for supplementing, clarifying, and/or correcting purposes; D. Attend meetings and site visits when necessary (up eight online or telephone meetings and four on site meetings/visits are included);
F.4.b
Packet Pg. 136 Attachment: Wall Repair and CSS Proposal 081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) To: T. Ryan O’Kane, PE, City of Orinda August 18, 2023
Schaaf & Wheeler 4
E. Prepare, review, and recommend approval of change orders as required; F. Provide one set of reproducible record drawings that reflect the changes to the work during construction based upon Contractor markups, drawings and other data furnished by the Contractor, City, and Consultants. The record drawings will also be provided in AutoCAD format.

Fee Proposal
Schaaf & Wheeler proposes to complete this work on a time and materials basis for a fee not to exceed $145,025. A detailed fee estimate is included as an attachment to this proposal. If you have any questions regarding this scope and budget, do not hesitate to contact me at (707) 528-4848 or [email protected].

Best regards,

SCHAAF & WHEELER
Benjamin Shick, PE
Vice President
RCE 68813
F.4.b
Packet Pg. 137 Attachment: Wall Repair and CSS Proposal 081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) To: T. Ryan O’Kane, PE, City of Orinda August 18, 2023
Schaaf & Wheeler 5
Hourly Rate $275 $235 $195
Task 1 Leaning Wall Design 28 44 0 28,960 $ 19,000 $ - $ 1,900 $ 49,860 $ A Site Visit (1) 8 8 4,080 $ 1,500 $ 150 $ 5,730 $
B 100 % Draft Design Documents 12 24 32 15,180 $ 10,000 $ 1,000 $ 26,180 $ C Final Bid Documents 8 12 24 9,700 $ 7,500 $ 750 $ 17,950 $ Task 2
Biological Compliance Support Services
(Year 1 Construction) 0 20 0 4,700 $ - $ 13,600 $ 1,360 $ 19,660 $ A WEAP Training Session for Personnel 2 470 $ 2,400 $ 240 $ 3,110 $ B CRLF, Alameda Whipsnake, and Nesting Bird
Survey 2 470 $ 3,400 $ 340 $ 4,210 $
C As-Needed Agency and Client Coordination 16 3,760 $ 7,800 $ 780 $ 12,340 $ Task 3
Biological Compliance Support Services
(Year 2 Construction) 0 20 0 4,700 $ - $ 17,400 $ 1,740 $ 23,840 $ A WEAP Training Session for Personnel 2 470 $ 1,000 $ 100 $ 1,570 $ B CRLF, Alameda Whipsnake, and Nesting Bird
Survey 2 470 $ 3,600 $ 360 $ 4,430 $
C Agency Coordination and Post-Construction
Reports 8 1,880 $ 7,500 $ 750 $ 10,130 $
D Project Management and Coordination 8 1,880 $ 5,300 $ 530 $ 7,710 $ Task 4 Bid Support Services 6 12 0 4,470 $ - $ - $ - $ 4,470 $ A Bid Support Services 6 12 4,470 $ - $ 4,470 $
Task 5 Construction Support 53 60 16 31,795 $ 14,000 $ - $ 1,400 $ 47,195 $ A Pre-Construction Meeting 4 4 2,040 $ - $ 2,040 $
B Review Submittals 8 40 11,600 $ 6,000 $ 600 $ 18,200 $ C Review RFIs 8 8 4,080 $ 1,500 $ 150 $ 5,730 $
D Attend Site Visits/Meetings 28 7,700 $ 2,000 $ 200 $ 9,900 $ E Review Change Orders 4 4 2,040 $ 1,500 $ 150 $ 3,690 $ F Record Drawings 1 4 16 4,335 $ 3,000 $ 300 $ 7,635 $
TOTAL 87 156 16 74,625 $ 33,000 $ 31,000 $ 6,400 $ $ 145,025 City of Orinda
San Pablo Creek Culvert - Wall Repair
Design and Construction Support
Schaaf & Wheeler
Fee Proposal - August 18, 2023
Assistant Engineer
Schaaf & Wheeler SubtotalTotal
Project ManagerSenior Engineer
PASE, Structural EngineeringWRA, Environmental Subconsultant Markup (10%) F.4.b
Packet Pg. 138 Attachment: Wall Repair and CSS Proposal 081823 (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) 1 CITY OF ORINDA
AMENDMENT No. 3 TO SERVICES CONTRACT
Schaaf & Wheeler Consulting Civil Engineers (“Provider”) and the City of Orinda (“City”), a municipal corporation, previously entered into a contract with an effective date of June 19, 2019 relating to a professional services contract for on-call civil engineering. Section 18 of that agreement provides that “No waiver, modification or termination of this agreement is valid unless made in writing.”
City and Provider mutually agree to amend the agreement as follows:

1. Replace Section 3.c “Time of Performance” as follows:
c. The services of Provider shall begin no sooner than the effective date and shall continue until all work is approved by City. All work shall be completed no later than June 30, 2026.

2. Replace Section 4.a “Compensation” as follows:
c. City agrees to pay Provider at the rates described in Exhibit A, not to exceed a maximum contract price of $522,000 for all services performed under this agreement.

In all other respects, the agreement shall remain unchanged and in full force and effect.

City of Orinda
________________ ________________
City Manager Date
Attest
___________________________________
City Clerk
Approved as to form
___________________________________
City Attorney
Schaaf & Wheeler Consulting Civil
Engineers
___________________ _______________
Date
__________________________________
Printed Title
__________________________________
Printed Name
F.4.c
Packet Pg. 139 Attachment: Amendment No 3 S&W (3210 : San Pablo Creek Culvert Repair Project (#4187) Amd. No. 3) San Pablo Creek Culvert Repair - Cost Estimate/Phasing Summary 09/11/2023 Project phase Priority FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 Total Engineering & Permitting
Scope study (including permit
reqts.), S&W Amd. #1
$57,000 $57,000
Culvert structural slab repair plans
(abrasion, exposed rebar in slab)
Included
above
Environmental/obtain permits, etc.
(slabs and wall) S&W Amd. #2
$95,000 $20,000 $115,000
Section 2 wall evaluation
S&W Amd. #2
$105,000 $43,000 $148,000
Section 2 wall repair plans -S&W
Amd. #3
$50,000 $50,000
Bid & Construction Support
Bid & Construction Support -RFI’s
Submittals -S&W Amd. #3
$25,000 $20,000 $6,000 $51,000
Construction Support -Biological
Support Services -S&W Amd. #3
$20,000 $20,000 $4,000 $44,000
Contingency for Amd. #3 $29,000 $29,000
Construction
Section 1 slab repair construction
(Level 3)* Very High
$1,200,000 $1,200,000
Section 3 slab repair construction
(Level 2)
High $800,000 $800,000
Section 2 wall repair construction High to Very
High
$400,000 $400,000
Section 2 slab repair construction
(Level 1)
Medium $250,000 $250,000
Leaning wall repair $350,000 $350,000
Inflation (5%) $150,000 $150,000
Contingency (15%) $450,000 $450,000
Construction Mgmt. (8%) $150,000 $70,000 $20,000 $240,000 TOTALS $57,000 $200,000 $3,108,000 $939,000 $30,000 $4,334,000 Amendment #3 work estimated total is $145,000, plus $29,000 contingency F.4.d
Packet Pg. 140 Attachment: Project Phases and Cost with Amd 3 highligted (3210 : San Pablo Creek Culvert Repair City Council
Staff Report
Agenda Item: G.1
Date: September 19, 2023
Department: Planning Department
AGENDA TITLE: (a) Discussion of a proposed dedication of a portion of the parcel at 11 Orinda Way (Chevron Station) that was part of a convenience market project approved by the Planning Commission, contingent upon City Council adoption of Ordinance 23-04; and (b) Public Hearing regarding Ordinance 23-04 which would Amend Section 17.2.3 (Definitions) and Section 17.8.5 (Downtown commercial district— Use restrictions) of the City’s Zoning Code to Update Rules Applicable to Convenience Markets and Other Ancillary Retail Uses at Service Stations (applicant: Chevron).

RECOMMENDATION:

Staff recommends that the City Council 1) consider the question of the dedication of the creek portion of 11 Orinda Way as fee or through an easement; 2) waive the full reading of the text and introduce Ordinance 23-04, amending Section 17.2.3 (Definitions) and Section 17.8.5 (Downtown commercial district-Use restrictions) to update the City’s rules regarding convenience markets and other ancillary retail uses at service stations; 3) find this ordinance is not subject to the California Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines (Title 14 of the California Code of Regulations) Sections 15060(c)(2) (the activity will not result in a direct or reasonably foreseeable indirect physical change in the environment) and 15060(c)(3) (the activity is not a project as defined in Section 15378) because it has no potential for resulting in physical change in the environment, directly or indirectly.

BACKGROUND:

Service station convenience markets are a conditionally-permitted use in the Downtown Commercial District but may not exceed 40 square feet in size pursuant to Orinda Municipal Code (OMC) Subsection 17.8.5-H.2. This Zoning Text Amendment, sponsored by Chevron Products Company, would allow convenience markets larger than this as a conditionally-permitted use at service stations, subject to a use permit with new required criteria. Highlights of the proposed changes include:

1. Eliminate the 40 square-foot limitation to convenience market sizes at service stations as well as minimum distances to other land uses such as churches and schools.

2. Allow convenience markets at service stations subject to the following:
a. Require a noticed public hearing for a commercial use permit; b. Be 2,250 – 3,000 square feet (but no more than 20% of a lot size); c. Contain a pedestrian entrance within 35’ of public right-of-way (ROW); d. Provide at least 25’ of frontage to the ROW; and
e. Require the inclusion of “fresh food”

3. Change the definition of liquor store to clarify that a liquor store primarily sells alcoholic beverages for off-site consumption.

G.1
Packet Pg. 141
This Zoning Text Amendment was initially presented to the Planning Commission in conjunction with a proposed development project at 11 Orinda Way (the Chevron service station). This project included the conversion of the existing service bay area into a convenience market. Proposed changes include interior and exterior remodel of the building, modification of the fuel canopy, construction of an observation deck, site improvements, installation of an additional fueling station, and installation of an electric charging station. The property owner also proposed to dedicate a portion of the site to the City that contains San Pablo Creek for future restoration and public access. The Commission approved this project and no appeal was filed.

Following is a brief timeline of the project:
• February 9, 2021: An early version of the project was presented to a joint meeting of the Orinda Planning Commission and City Council. The minutes of this meeting are included as an attachment to the July 12, 2023 agenda (Weblink - Attachment D)
• November 29, 2022: A second iteration of the Chevron proposal was presented to the Planning Commission and continued for changes. The minutes of this meeting are included as an attachment to the July 12, 2023 agenda (Weblink - Attachment D)
• March 24, 2023: The applicant withdrew and resubmitted the project to benefit from AB-2097 state legislation that went into effect on January 1, 2023. AB-2097 eliminates automobile parking requirements for most development projects located within ½ mile of public transit.
• July 12, 2023: The project was presented to the Planning Commission. During the public testimony portion of the hearing, 12 members of the public spoke in favor of the project and the code amendment and one member of the public spoke in opposition. The Planning Commission adopted a Statement of Official Action (Attachment C) approving the entitlements for the project. Additionally, with 5 Commissioners voting in favor, one against, and one absence, the Planning Commission adopted PC Resolution 23-03 recommending the City Council adopt an Ordinance for Zoning Text Amendment ZTA-2023-001 (Attachment B). Action on the project is contingent on City Council approval of the proposed text amendment to Orinda Municipal Code Section 17.8.5.

DISCUSSION:

The discussion is arranged in three sections: Section 1: Zoning Text Amendment description; Section 2: General Plan Consistency, applicability & additional impact, and OMC intent; and Section 3: Staff discussion of the Chevron-proposed dedication.

Section 1: Zoning Text Amendment description
The applicant is seeking a Zoning Text Amendment to the definition of “Convenience Market.” Under the existing Orinda Municipal Code (OMC), a convenience market is a conditionally-permitted use in the DC district, provided that it complies with the additional requirements as stipulated in Subsection 17.8.5H.2 of the OMC, including:

G.1
Packet Pg. 142
• A maximum size of 40 square feet;
• A prohibition within the immediate vicinity of a church or hospital, or within 600 feet of a school, public playground, or nonprofit youth facility; and • A prohibition on any variance permit for these standards.

To expand the definition/requirements of a convenience market, the applicant is proposing changes to:
• OMC Section 17.2.3 – Definitions
• OMC Section 17.8.5 – Downtown commercial district – Use restrictions OMC Section 17.2.3 – Definitions
The applicant is proposing an amendment to OMC Section 17.2.3 – Definitions to change the definition of Liquor Store as follows:
"Liquor store" means an establishment primarily engaged in the sale of alcoholic beverages for off-site consumption and incidental sale of general merchandise.

This classification includes wine tasting rooms as an incidental use to wine sales.

The sale of nonalcoholic beverages and food items is incidental to a liquor store.

OMC Section 17.8.5 – Downtown commercial district – Use restrictions The applicant proposes to amend OMC Section 17.8.5 as follows:

G. Supplemental Restrictions for Specific Uses. The following specific uses are also permitted in the downtown commercial district, subject to the contents of the chart above and subject to obtaining a commercial use permit under Chapter

17.36. Those uses marked by an asterisk are subject to additional regulations set forth in Section 17.8.5H:

1. Adult business;*

2. Animal sales and services;

3. Bar and tavern;

4. Commercial recreation and entertainment;

5. Convenience market;

6. Convenience market and other ancillary retail at a service station;*

7. Farmer's market;

8. Game center;*

9. Liquor store;

10.Live entertainment;*

11.Maintenance and repair services;

12.Outdoor sales;*

13.Service stations;*

14.Vehicle sales and services;

15.Visitor accommodations;

16.Ancillary retail uses.*
* Uses marked by an asterisk in subsection G. of this section are subject to additional regulations set forth in subsection H. of this section.

G.1
Packet Pg. 143
The applicant also proposes to amend OMC 17.8.5H.2. as follows:

Convenience Markets and Other Ancillary Retail Uses at a Service Station.

Ancillary retail use, including a convenience market, may be permitted at a service station if a noticed hearing is held under Chapter 17.42 in conjunction with the application under Chapter 17.36 for a commercial use permit (or commercial use permit amendment) for a service station. The proposed use may be approved if findings of fact are made to support each of the listed criteria and use permit conditions are imposed consistent with the listed requirements:
a. Criteria:
i. The existence of the proposed use will not significantly and adversely alter the impact and the character of the primary service station use; ii. The proposed use will enhance the pedestrian environment in the vicinity of the service station;
iii. The proposed use will enhance the availability of food in the City, including fresh food;
iv. The proposed use will not adversely impact any of the policies set forth in Section 17.8.1;
v. The proposed use will substantially further City goals for downtown Orinda as identified in adopted plans, including but not limited to the ConnectOrinda Streetscape Master Plan and the Downtown Precise Plan.
b. Requirements:
i. The proposed use shall occupy only ground floor space and not exceed 20 percent of the total lot area;
ii. The proposed use shall provide and maintain one or more seating areas (minimum of 8 aggregate seats) to accommodate food and/or beverage consumption;
iii. The building containing the proposed use shall include a pedestrian entrance from a sidewalk in the public right of way. This entrance shall be located:

1. no more than 35 feet from the public sidewalk;

2. on an exterior primary wall that runs roughly parallel to the public sidewalk for a distance of at least 25 feet.
iv. The proposed use must be at least 2,250 square feet and no larger than 3,000 square feet;
v. To the extent that outdoor seating is provided, it shall comply with all outdoor dining requirements contained in Section 17.8.5(I)(1) except for any outdoor dining permit requirement;
G.1
Packet Pg. 144
vi. To the extent the proposed use comes within the definition of take-out restaurant, it shall comply with all take out restaurant requirements contained in Section 17.8.5(I)(2).
a. The area for nonautomotive retail sales within a service station shall be completely enclosed and no larger than forty (40) square feet. b. A service station convenience market shall not be within the immediate vicinity of a church or hospital or within six hundred (600) feet or less of a school, public playground or nonprofit youth facility, as measured pursuant to the rules of the Department of Alcoholic Beverages.
c. No variance may be granted for the requirements in subsections (H)(2)(a) and (H)(2)(b) of this section.

The applicant also proposes to amend OMC 17.8.5H.7. as follows:

Ancillary Retail Use. An ancillary retail use is permitted in the downtown commercial district if a noticed hearing is held under Chapter 17.42 in conjunction with the application for a commercial use permit and findings of fact are made to support each of the following criteria:
a. The existence of the ancillary retail use will not significantly and adversely alter the impact and the character of the primary retail use, b. The ancillary use will not adversely affect the use of more than twenty (20) percent of the existing floor area,
c. The ancillary use will not create a significant adverse impact on parking and pedestrian and vehicular traffic,
d. The ancillary use will not adversely impact any of the policies set forth in Section 17.8.1.

For special rules applicable to ancillary retail uses at service stations, see subsection 2, above.

Section 2: General Plan Consistency, applicability & additional impact, and OMC intent
General Plan Consistency
The proposed Zoning Text Amendment would be consistent with and promote the following policies identified below:
• 2.1.3 Downtown: Guiding Policies
o (B) Favor retail services needed frequently by residents by limiting the amount of office space in predominantly retail areas. Office space in retail areas should serve Lamorinda uses and generally not exceed retail space on any one lot.
o (E) Make downtown shopping more attractive by diverting through traffic off local streets in the business district, providing more convenient circulation for shopping traffic, managing the parking supply more efficiently, creating safe and pleasant pedestrian routes, and developing and maintaining sufficient landscaping.
• 2.1.4 Downtown: Implementing Policies
G.1
Packet Pg. 145
o (E) Enact regulations that will ensure that the central business area will be predominantly retail and which permit only a limited amount of offices that favor local use needs.

Applicability & additional impact
The proposed amendments may be applicable to the existing service stations in Orinda, as indicated in Table 1.

Table 1: Existing Service Stations in Orinda
Address Service Station Lot Size (Sq. Ft.)
11 Orinda Way Chevron 35,118
9 Orinda Way Shell 28, 750
67 Moraga Way 76 14,375
22 Bryant Way Mash Gas & Food 14,289
Additional impact on alcohol sales
The State of California grants local government wide latitude to regulate alcohol sales through discretionary permitting processes such as conditional use permits. In addition, alcohol sales are regulated by the Department of Alcoholic Beverage Control (ABC).

However, in the mid-1990s, the state legislature amended part of the ABC code to limit local authority over off-premise sale of beer and wine at service stations. The new law stated, in part, that “no city, county, or city and county shall, by ordinance or resolution adopted on or after January 1, 1988, legislatively prohibit the concurrent retailing of motor vehicle fuel and beer and wine for off-sale consumption in zoning districts where the zoning ordinance allows motor vehicle fuel and off-sale beer and wine to be retailed on separate sites” (Alcoholic Beverages Code, Chapter 5, Article 1, 23790.5(2)). The same state regulation also establishes the minimum 5-foot distance between a cashier or front door and any alcohol displayed for sale. In adopting the prohibition on convenience markets over 40 square feet, the Orinda City Council also ensured that alcohol sales would not take place at service stations.

Although the State preempts local control of alcohol sales at convenience markets, ABC has its own permitting process that still applies, based on the type of alcohol sales proposed and the location of the business; proximity to schools and churches is one of the factors ABC considers. Although ABC allows a person to protest the issuance of a liquor license based on location, according to ABC staff there is no guarantee that a license will not be issued because of the proximity to a business to a church, school, public playground, or nonprofit youth facility.

Amending the 40 square-foot limit on convenience markets at service stations to allow larger markets limits the City’s ability to control alcohol sales at these establishments.

G.1
Packet Pg. 146
Currently alcohol sales are technically permitted, however the maximum size of 40 square feet effectively bans alcohol sales as it would be difficult to meet a state requirement that prohibits alcohol sales within 5 feet of a front door or a cash register at service stations.

Conformance to OMC Downtown Districts intent
The proposed text amendment requires that a convenience market at a service station be consistent with the OMC intent section at the beginning of the Downtown Districts chapter of the zoning ordinance. The Downtown intent section in its entirety is as follows:

17.8.1 Intent.

In addition to the general purposes listed in Chapter 17.1, the specific purposes of the downtown district regulations are to:

A. Create every opportunity for the downtown area to function as a vital, thriving yet traditional Main Street area, serving local needs and providing for specialty retail activities, consistent with the general plan;
B. Create a vibrant community center by encouraging a variety of businesses which will create pedestrian interaction and pedestrian-scale activities. Emphasize uses which involve pedestrian spaces, including outdoor dining, garden settings, walkways and seating areas;
C. Encourage areas of distinctive character by identifying preferred uses and development standards unique to these locations;
D. Regulate development so as to achieve a vibrant community center over time. All development, including incremental development, small building additions or increases in intensity of existing land uses, shall be consistent with this goal; E. Establish incentives, such as additional building height, higher floor area or broader range of permitted uses to help achieve a vibrant community center; F. Discourage and eventually terminate nonconforming office uses in retail spaces; G. Establish development standards which define desired character, but which allow and encourage flexibility in how this character is to be achieved, including standards involving building heights, setbacks, site planning, building bulk/mass, landscaping, parking, lighting and architecture, as presented in the downtown design guidelines;
H. Protect adjoining residential areas from inappropriate or disruptive commercial or office activities;
I. Encourage parking solutions which will serve long-term needs and will minimize the adverse effects of parking, traffic and circulation on the function and viability of downtown;
J. Encourage activities and development which will showcase the creek, where possible, for low-intensity pedestrian-oriented activities and strolling; K. Provide for multifamily housing, including affordable housing, in downtown areas, consistent with the housing element of the general plan.

G.1
Packet Pg. 147
Section 3: Staff discussion of a Chevron-proposed dedication The proposed remodel of Chevron includes a discretionary Zone Text Amendment to change the City’s code to allow for the Convenience Store proposed. The Planning Commission has recommended that Zoning Text Amendment to the City Council. In a related action, the Planning Commission also approved the Conditional Use Permit and other entitlements for the project, contingent on Council approval of the proposed Zoning Text Amendment. The CUP and related entitlements were not appealed by the deadline; however, the Zoning Text Amendment does require a separate City Council consideration and action.

As part of the project consideration, Chevron has offered a portion of their property along the creek for dedication to the City in fee, along with an easement for access from Orinda Way. Staff supported the easement for access from Orinda Way, but recommended at the Planning Commission that the City should ultimately accept an easement that would allow for public access along the creek, not fee title. Chevron did not agree to Staff’s recommendation that access along the creek be addressed through an easement, and the Planning Commission opted to approve the project as requested by Chevron with an offer of a fee dedication.

City staff opted to not appeal the CUP and other entitlements approved by the Commission as we knew that there was the discretionary Zoning Text Amendment pending, and that Council could consider the matter as part of that item, and we did not want to give rise to any broader considerations as would have occurred through an appeal. This is because Staff is very supportive of the Chevron project and the sole area of disagreement is the form in which public access along the creek would be handled. As such, Staff would recommend that if the Council approves the Zoning Text Amendment then it provide direction to Chevron that the City will ultimately only accept an offer of dedication for public access to the creek via easement, not fee title.

The City already has an easement on a portion of the subject property for flood control purposes, however, the underlying fee remains in the ownership of Chevron.

Easements are quite commonplace for the trails and open space. Advantages for the City in the easement approach include:
• The City’s liability is limited to that related to the public use of the parcel, issues like soils contamination (this is a service station site), and possible issues associated with flooding or land subsidence would remain with the property owner;
• The property stays on the tax rolls and will generate property tax; • The desired public use and access can be fully accommodated through an easement with the property owner provided with indemnity language from the City for that use;
• Grant of other funds can be secured through an easement as well as through ownership approach;
• There is no need to undertake any type of lot line adjustment or parcel split; G.1
Packet Pg. 148
• The property owner (Chevron) would remain responsible for annual fire fuels reduction and basic maintenance of the parcel;
• Regional Regulatory Agencies like Fish & Wildlife, the Regional Water Quality Control Board, and others, would look to the property owner to meet their requirements.

It should be noted that acceptance of an offer of dedication (of either fee or easement) would be a discretionary action of a City Council at a future date and in keeping the current approval intact does not commit the City to accepting any offer of dedication. An offer of dedication would also require that at the time of dedication, if accepted, that the appropriate language regarding indemnification for the City and other concerns be addressed through the appropriate instruments, together with any necessary adjustment of the parcel lines being completed through the correct vehicle. The main difference in approach, is which entity to assuming the greater risk/responsibility.

From staff’s perspective, the property along the creek is not being offered for dedication by Chevron to the City because it is a prime parcel without any encumbrances or constraints, but rather because it is transferring certain types of liability and cost issues to the public via the City.

At the time of a project’s approval, these types of concerns often don’t rise to the forefront of the decision maker minds. However, a few years down the line, or sometimes even decades later, when something occurs or the City is exposed to unanticipated costs, it is important that there be a record of these considerations having been identified and factored into the decision making process.

PUBLIC COMMENT:

During the previous entitlement process for this project, the City received 26 written public comments on the project during the noticed meetings leading up to and including the Planning Commission public hearing on July 12, 2023. Thirteen oral comments were also provided at the July 12, 2023 public hearing. Since the Planning Commission meeting (as of the writing of this report), two additional written comments have been received.

All written public correspondence received to date is attached to this report (Attachments E & F) and the oral comments received at the July 12, 2023 Planning Commission meeting are in the Planning Commission’s Draft Action Minutes (Attachment G).

NEXT STEPS:

If the Council introduces Ordinance 23-04 at the September 19 meeting, the ordinance will return to the City Council’s agenda under Consent Calendar for adoption at the October 3, 2023 Council meeting, and will not be effective until 30 days after adoption.

Entitlements for the project at 11 Orinda Way shall not be effective unless/until Ordinance 23-04 is approved by the City Council and takes effect.

FISCAL IMPACT:

G.1
Packet Pg. 149
There is no material fiscal impact resulting from the introduction of Ordinance 23-04. If adopted, it is anticipated that future fiscal impacts include an increase in sales tax revenue generated.

ATTACHMENTS:

A. Draft Ordinance 23-04
B. Planning Commission Resolution 23-03
C. Planning Commission Statement of Official Action 2023-014 D. July 12, 2023 Planning Commission Agenda & Recording E. Written Public Comments through July 12, 2023
F. Written Public Comments for September 19, 2023
G. Draft Action Minutes for July 12, 2023 Planning Commission (Item 6A) Respectfully Submitted by:

Drummond Buckley
Director of Planning
Prepared By: Darin Hughes,
Approved by:

G.1
Packet Pg. 150

Page 1 of 3 ends
← All documents from this meeting