Text extracted from the city's file for reading and search. Open the original on mccmeetings.blob.core.usgovcloudapi.net. That file is the official record.

March 14, 2025
Alyssa Stutz
1735 Montgomery Street
Oroville, CA 95965
Dear Ms. Stutz:

The City of Oroville (City) is proposing to transform the Washington Avenue and Table Mountain Boulevard in to an inviting multimodal corridor that will accommodate all modes of transportation, including bicycles and pedestrians. The project area serves as a backbone to the communities within Oroville, and the proposed improvements are critical to establishing additional transportation options for the community. This project will install new 10-foot wide multi-use pathways, sidewalks, pedestrian crossing improvements, including high-visibility crosswalk markings, ADA curb ramps, pedestrian refuge islands, new Rectangular Rapid Flashing Beacons (RRFBs), and additional landscape enhancements. Mark Thomas is in a unique position to make this project a reality for the City through our knowledge of the area and our development of the previous ATP funding application for the project. This gives us an understanding of the goals of the City along with the ability to enhance the City’s application to allow for a better opportunity for ATP Cycle 8 funding.

In addition to our previous experience with the project, Mark Thomas has the experience and knowledge to deliver this project for the City. We provide the City with the following benefits:

Experience with the City of Oroville: In addition to our work on the previous grant application, Mark Thomas worked with the City on the design and construction of the recent improvements along SR 162. There were many challenges that we worked with the City to overcome. The insights gained from this experience will enhance our funding and design efforts for the Washington Avenue and Table Mountain Complete Streets Project. This includes “lessons learned” on project data needs (such as topographic and utility information) and positioning the project for future funding cycles.

Experienced Project Manager: Daniel Blomquist, PE, has 24 years of experience in the management and design of transportation and public works projects. He has recently delivered similar projects with the Cities of Stockton, Woodland, Santa Cruz, and Mill Valley. His projects include bike and pedestrian improvements, roadway improvements, complete streets, and road widenings. He has worked on multiple projects with similar elements as the Washington Avenue and Table Mountain Boulevard Complete Streets Project, and has coordinated with Caltrans Local Assistance for the delivery of numerous projects with federal funds. His participation in the grant application process gives him better understanding of what the project will entail.

Extensive Experience in Complete Streets and Active Transportation: Mark Thomas specializes in the design of complete streets and bicycle/pedestrian enhancements, and we adhere to National Association of City Transportation Officials (NACTO) and other complete street guidelines. Our experience includes delivering hundreds of complete streets and active transportation facilities, such as Class I trails, Class IV protected bikeways, Class II buffered bike lanes, ADA upgrades, and road diets. We are proficient in technologies like Transit Signal Priority (TSP) and Adaptive Traffic Signals (ATS), supporting smooth operations and improved mobility. Our projects transform communities, enhance mobility, connectivity, and transit reliability, prioritizing safety for all users.

Proven Success with Federally-Funded Projects: We have a strong track record of delivering federally-funded projects including the Paradise Transit Center, Woodland East Main Street Improvements, the Chico Downtown Complete Streets Project, and the Town of Paradise Transportation Master Plan (TMP). Our experience will be invaluable in securing funding and delivering this project on time and within budget.

Exhibit A
756
Item 10.
(916) 381-9100
701 UNIVERSITY AVENUE, SUITE 200
SACRAMENTO, CA 95825 MARKTHOMAS.COM

Page 2 of 2 ends

REQUIRED STATEMENTS
Consultant Contact: I, Matt Brogan, will be the City’s prime contact for any questions regarding this proposal, and serve as the primary contact during services. I can be reached at (916) 605-6761 or via email at [email protected]. I will be assisted by Daniel Blomquist, who will be managing the Mark Thomas team. He can be reached at (916) 215-6981 or at dblomquist@ markthomas.com. Daniel and I can be reached at our Sacramento address listed below.

Mark Thomas HQ
2833 Junction Avenue, Suite 110
San Jose, CA 95134
Mark Thomas Local Office
701 University Ave, Suite 200
Sacramento, CA 95825
Company Management/Ownership: Mark Thomas is a California Corporation founded in 1927. Our reputation is realized through more than 400 team members in offices that are strategically located to support the communities in which we live.

Originating in San Jose (corporate headquarters), we have grown to establish additional offices in Sacramento, Roseville, Cupertino, Fresno, Inland Empire, Irvine, Lakewood, Los Angeles, Oakland, and Walnut Creek. Our firm is led by principals who govern the firm through our Board of Directors. Zach Siviglia serves as President and Chairman of the Board with Matt Brogan, Sasha Dansky, and Shawn O’Keefe as Vice Presidents.

Mark Thomas provides stability that few other firms can offer, even during changing economic times. As a privately owned company, we are positioned to ride out the financial downturns and ownership changes that impact larger, publicly traded companies in our industry. We are rated financially strong by Dun & Bradstreet and have never borrowed or used our line of credit to maintain company operations.

SUBCONSULTANT FIRM INFO
Gallaway Enterprises » In business for 25 years, staff varies depending on the season from 7-12 employees » Owned by Jody Gallaway and Kevin Sevier
AIM Consulting » In business for 20 years, staff of under 15 » Under sole ownership by Katie DeMaio
Monument » In business for 6 years, staff of 63
» S Corporation, ownership includes:
– Amber Costello, Bob Morrison, and Joey Mendoza
Bennett Engineering Services » In business for 30 years, staff of 48 » S Corporation, ownership includes:
– Leo Rubio, Stacey Lynch, Jennifer Goodwin, Michael Massaro, Carlton Allen, Tony Ozanich, Brandon Michel, David Harden
Crawford & Associates » In business for 12 years, staff of 62 » Registered Small Business, ownership includes:
– Benjamin Crawford, Sarah Crawford, Eric Nichols, Shawn Leyva, Ellen Tiedemann, Keiko Lewis, Reynicole Gilbert, Johnathan Wright, Lesli Hunter
Fehr & Peers » In business for 40 years, staff of 394
» 100% employee-owned
We acknowledge receipt of Addendum 1 issued by the City and affirm that our proposal will remain valid for 90 calendar days from the submission date. As Vice President of Mark Thomas, I, Matt Brogan, have the authority to contractually obligate the firm and negotiate the contact. Thank you for the opportunity to submit our proposal. We look forward to continue working with the City on this project
Sincerely,
MARK THOMAS & COMPANY, INC.

Matt Brogan, PE
Division Manager + Associate Principal
Exhibit A
757
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

CONTENTS
EXECUTIVE SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

CONSULTANT INFORMATION,
QUALIFICATIONS AND EXPERIENCE . . . . . . . . . . . . . . . . . 2 PROJECT STAFF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 SUBCONSULTANTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 PROJECT ORGANIZATION AND APPROACH . . . . . . . . . 24
SCOPE OF WORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38 SCHEDULE OF WORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59 QUALITY ASSURANCE/QUALITY CONTROL . . . . . . . . . . 61 EXCEPTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62 CONFLICT OF INTEREST STATEMENT . . . . . . . . . . . . . . . . 64 LITIGATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64 CONTRACT AGREEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . 64 FEDERAL AID FORMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65 Exhibit A
758
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 1 ends

EXECUTIVE SUMMARY

FIRM QUALIFICATIONS
Our capabilities are well-matched to the needs of the
City. We possess robust in-house technical resources and have the expertise and capabilities to provide specialized services to efficiently deliver this project.

Mark Thomas is also well known in Butte County. We have delivered numerous bike lanes, sidewalk gap closures,
transit projects with the City of Chico, Butte County
Association of Governments (BCAG), Town of Paradise, and Butte County, including, and projects on the State Highway System. This work includes projects within downtown
Paradise, widening and adding of bike lanes on SR 32 in Chico, and the widening of SR 70, in addition to our work on SR 162.

Our team will be led by Daniel Blomquist, PE, who has
over 20 years of experience delivering bike/pedestrian
improvements, roadway improvements, and complete
streets projects. Daniel is supported by a team of in-house design specialists and subconsultants with the expertise needed to complete the project.

UNDERSTANDING
The Washington Avenue and Table Mountain Boulevard
Complete Streets Project (Project) is a high-profile
opportunity for the City to create a safer and more
comfortable environment that supports the community’s
active transportation and mobility needs. This project will improve local and regional bike connectivity, help support local businesses, and encourage land-use change along
the corridor.

This Project represents the only opportunity to support non-motorized users traveling north-south across Feather River. SR 70 is 1.23 miles west and does not permit bicycling or walking, and there are no other north-south roads
within the City limits to the east.

No other parallel route will support north-south travel for vulnerable non-motorized road users, who often are
from disadvantaged communities. Along the project limits, pedestrians and bicyclists must walk or bike alongside
vehicles to commute to their destinations. This presents significant safety issues, demonstrated by the historic trend of severe collisions in the area.

APPROACH
Having previously delivered the SR 162 Mobility
Improvements Project for the City, we have valuable insight into how best to deliver this Project for the City.

This experience enables us to address challenges that may arise during the delivery of this project, which includes:
» Developing effective pavement rehabilitation methods
to manage project costs while minimizing impacts to
residents and businesses
» Investigating design alternatives to protect
nearby residential and commercial areas
» Modifying the bridge over UPRR tracks
» Landscaping and placemaking
» Maintaining effective emergency evacuation routes
» Working within right of way constraints
and providing proactive coordination to manage risks
associated with relocations
» Effectively identifying utilities and coordinating for utility relocations where necessary
Project challenges include:
» Developing strategies to avoid impacts to potentially sensitive areas
» Effectively coordinating with Caltrans Local Assistance to maintain the project schedule and achieve
environmental clearance in the timeframe needed to
initiate right of way acquisitions for the project
» Coordinating with stakeholders including BCAG,
California Department of Water Resources (DWR),
Caltrans, California Public Utilities Commission (CPUC), and Union Pacific Railroad (UPRR)

WHY WE ARE THE IDEAL TEAM
• Our work with the City on the previous ATP
application gives us unmatched knowledge
of this complete streets project
• Our previous work for the City on
SR 162 ties directly into this project
• We are industry leaders in the design of bike/
pedestrian improvements
• We have extensive experience managing
federally-funded projects
• We are proficient in coordinating with Caltrans
Local Assistance and have delivered numerous
projects with federal funds
We have a deep understanding of the
project and the experience to deliver
this project on a fast-track schedule
Exhibit A
759
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 2 ends

C O N S U LTA N T I N F O R M AT I O N ,

QUALIFICATIONS AND EXPERIENCE

ABOUT MARK THOMAS
Mark Thomas is a full-service professional services firm specializing in transportation engineering and planning, multimodal and safety analysis, civil and structures engineering, landscape architecture, construction management, and funding and programming services to public agencies throughout California. We apply a flexible and progressive approach that balances the needs of all users with realistic construction budgets and innovative yet proven design practices.

Mark Thomas is built on providing sound, innovative engineering solutions and high-quality customer service for transportation, rail, public works, and infrastructure improvement projects. Our solutions have benefited all types of transportation improvement projects, including detailed bicycle/pedestrian, median and gateway enhancements, trail designs, community landscape master plans, complete street planning, and streetscape designs.

COMPLETE STREETS EXPERIENCE
One of our team’s key strengths is in the planning, design, and management of complete streets, active transportation facilities, and bicycle and pedestrian trail improvements and enhancements based on American Association of State Highway and Transportation Officials (AASHTO), NACTO, Caltrans Highway Design Manual (HDM), Caltrans Design Information Bulletin (DIB) 89 Class IV Bikeway Guidance, and other complete street guidelines. Through our work with multiple cities, counties, and Caltrans, we have accumulated an expansive knowledge base specifically geared toward improving access, connectivity, and safety for active modes of transportation such as walking and bicycling.

Our designers and planners provide site-responsive design focused on the community needs to make each project a success. We have the flexibility to deliver a range of projects, such as detailed bicycle/pedestrian, median and gateway enhancements, trail designs, community landscape master plans, complete street planning, and streetscape designs. The focus on public infrastructure projects allows our team to understand the regulatory environment and local preferences for landscape and aesthetic design and to implement these improvements while meeting limited capital budgets.

Our team has delivered hundreds of complete streets and active transportation facilities. Our projects range from Class I trails and paths to Class IV protected bikeways and Class II buffered bike lanes to ADA upgrades and road diets. We’re adept at technology that smooths operations such as Transit Signal Priority (TSP) and Adaptive Traffic Signals (ATS). Our projects become lively community plazas, connect major bicycle and pedestrian corridors to key destinations, and enhance mobility, connectivity, reliability, and safety. We know these projects involve robust community engagement to understand resident concerns and preferences. >
projects delivered
6K
offices statewide
11 team members
years in business
98 100
employee owned
%
400+
Our projects become lively community plazas, connect major bicycle and pedestrian corridors to key destinations, and enhance mobility, connectivity, reliability, and safety.

Exhibit A
760
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 3 ends

LOCAL, STATE AND FEDERAL PROCEDURE EXPERIENCE
Mark Thomas brings unmatched expertise to the City for the development of the proposed design improvements of the Washington Avenue and Table Mountain Boulevard Complete Streets project. Specifically, we provide the City with our depth of experience in working with Caltrans and innovative bike and pedestrian experience.

We have developed a record of excellence through direct contracts with the State and through projects sponsored by a host of public agencies, including cities, counties, and transportation authorities. As such, we intimately know the Project Initiation Document (PID), Project Study Report-Project Development Support (PSR-PDS), Project Approval & Environmental Document (PA&ED), and Plans, Specifications, & Estimates (PS&E) requirements established by Caltrans and supplemented by conditions dictated by local, state and federal funds.

Our projects have allowed us to develop relationships not only with the respective functional units within Caltrans District Offices throughout the State, but also with the staff at federal agencies, such as Federal Highway Administration (FHWA), US Army Corps of Engineers (USACE), US Fish and Wildlife Service (FWS), and state agencies, such as the California Department of Fish and Wildlife (CDFW), Department of General Services (DGS), and California Department of Water Resources (DWR).

Through our long history of completing projects within Caltrans District 3 (D3) and the surrounding areas, we are familiar with the requirements of delivering projects on Caltrans facilities. This experience puts us in a position to understand the key issues and to work towards making sure the Project is a success.

FEDERAL AID PROJECT EXPERIENCE
Mark Thomas has extensive experience managing and designing local, state and federally-funded projects for local agencies. We fully understand the administrative challenges that come along with this funding. We have an unmatched understanding of the Caltrans Local Assistance process gained through delivering more than 100 projects that required this coordination.

Through our experience working for local agencies on Caltrans/FHWAfunded projects, Mark Thomas has developed a thorough understanding of the regulations and requirements outlined in the Caltrans Local Assistance Procedures Manual (LAPM) and the Local Assistance Program Guidelines (LAPG). The collection of guidelines and instructions must be followed to obtain funding approvals for public transportation projects. These guidelines require compliance with federal and/or state laws, regulations, policies and procedures, related to design, right of way acquisition, utility relocation, construction and maintenance. To provide timely delivery of the project, it is important to understand the process associated with securing funding.

SIMILAR PROJECT EXPERIENCE
We are proud of our track record of successfully completing projects and meeting the needs of our clients. On the following pages, we highlight specific projects that demonstrate our ability to deliver projects similar to the City’s proposed project.

CONTRACT HISTORY
Mark Thomas has no contracts that were terminated (partially or completely) by clients for convenience or default within the past three years.

CALTRANS DISTRICT 3

EXPERIENCE
Mark Thomas’ expertise is
in the planning, as well as
the initial and final design of
projects governed by Caltrans.

Mark Thomas has more
experience than any
other design firm
in the region.

District 3

LOCAL ASSISTANCE

EXPERIENCE
We have an unmatched
understanding of the Caltrans
Local Assistance process
having delivered over 100
projects that required this
type of coordination. Our
team understands their
preferences and concerns.

We are able to expedite
approvals and
reduce project
schedules.

ATP GRANT

EXPERIENCE
Mark Thomas supported
the City during ATP Cycle 7
and will use this experience
to improve our application
during Cycle 8. We will
also use our existing
knowledge of
the corridor to
accelerate the
project schedule.

Exhibit A
761
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 4 ends

L
B
70 OROVILLE DAM BLVD

CONTRACTING AGENCY
City of Oroville

CONTRACTING AGENCY

PROJECT MANAGER
Fritz McKinley
(530) 538-2507
[email protected]

CONTRACT AMOUNT
$1.2M

FUNDING SOURCE
CMAQ
ATP

DATE OF CONTRACT
1/2020

DATE OF COMPLETION
12/2024

CONSULTANT

PROJECT MANAGER
Ken Doty
(916) 605-6763
[email protected]
SR 162 MOBILITY IMPROVEMENTS

OROVILLE

PROJECT OBJECTIVE
SR 162 provides a regional connection with the City of Oroville from SR 70 to the eastern portion of the City. Since 2011 there have been 24 bicycle and pedestrian involved crashes along the corridor. These crashes are attributed to sidewalk gaps, and lack of bike lane delineation and access to transit. The goal of this project was to provide safety and active transportation connectivity design improvements.

PROJECT DESCRIPTION
Mark Thomas provided preliminary engineering, environmental clearance, and design services to convert SR 162 into a complete street. Our team designed safety and active transportation connectivity improvements from the Feather River along Oro Dam Boulevard (SR 162), Olive Highway (SR 162), and Lower Wyandotte Road as well as upgrades at Lincoln Street and Feather River Boulevard.

The majority of the project is located along the State Highway System. This involved close coordination and approval from Caltrans Oversight through a Design Engineering Evaluation Report (DEER).

PROJECT OUTCOME
The project closed sidewalk gaps and provided Class II bike lanes, high-visibility crosswalks, ADA curb ramps, and streetlighting as well as multi-use paths connecting to the Feather River Trail.

Mark Thomas worked closely with the City to ensure that the project met all ATP funding and Caltrans requirements to deliver the project to construction. We also worked directly with the City and the construction management firm to overcome challenges encountered during construction. Mark Thomas will provide the same commitment that the Washington Avenue and Table Mountain Boulevard Complete Streets Project will complete design and construction.

Exhibit A
762
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 5 ends

CONTRACTING AGENCY
City of Mill Valley

CONTRACTING AGENCY

PROJECT MANAGER
Andrew Poster
(415) 384-4848
[email protected]

CONTRACT AMOUNT
$2.2M

FUNDING SOURCE
HSIP

DATE OF CONTRACT
2/2020

DATE OF COMPLETION
7/2024

CONSULTANT

PROJECT MANAGER
Shawn O’Keefe
(925) 858-8581
[email protected]
AWARDS
2024
Public Works Project of the Year for
Small Cities and Rural Communities
Northern California Chapter of the
American Public Works Association

EAST BLITHEDALE AVENUE IMPROVEMENTS

MILL VALLEY

PROJECT OBJECTIVE
Mark Thomas was tasked with preparing separate bid packages for three phases of this project to rehabilitate aging pavement, install new bike lanes, upgrade existing traffic signals, and improve access to schools, businesses, and residential areas. The project was subdivided into three phases to address funding limits and to mitigate impacts to residents and businesses during construction. » Phase 1–Highway 101 to Camino Alto
» Phase 2–Camino Alto to Elm Avenue
» Phase 3–Avenue to Sunnyside Avenue

PROJECT DESCRIPTION
Mark Thomas prepared PS&E and provided project management and design support during construction. Design elements included upgrades to existing signal infrastructure, widening existing bikeways, 43 new ADA curb ramps, new bike route signing and striping, extending curb ramps, sewer repair and lateral replacement, and improvements to pedestrian crossing paths along the corridor from Sunnyside Avenue to US 101. The project also included developing design alternatives for potential future roundabouts, new RRFBs and crossing improvements funded through HSIP Cycle 10. Utility coordination included Marin Water District, PG&E, Marin Transit District, Golden Gate Transit, commuters, and other stakeholders.

PROJECT OUTCOME
The project was completed on-time and within budget. Phase 1 construction was completed in summer 2022. Construction for Phases 2 and 3 were completed in summer 2023. The project was transformed from a basic paving project to a comprehensive complete street upgrade with new amenities enhancing safety for all users, including significant drainage and sewer system upgrades.

APWA NORTHERN CA CHAPTER
2024

PUBLIC WORKS

PROJECT OF THE YEAR
Exhibit A
763
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 6 ends

CONTRACTING AGENCY
City of Chico

CONTRACTING AGENCY

PROJECT MANAGER
Noel Carvalho
(530) 879-6935
[email protected]

CONTRACT AMOUNT
$759,695

FUNDING SOURCE
Local
Carbon Reduction Program
(CRP)

DATE OF CONTRACT
11/2024

DATE OF COMPLETION
Ongoing

CONSULTANT

PROJECT MANAGER
Aaron Silva
(916) 769-5952
[email protected]

CHICO DOWNTOWN COMPLETE STREETS PROJECT
CHICO

PROJECT OBJECTIVE
This project aims to enhance safety, accessibility, and connectivity of active transportation options in the downtown area of Chico. The Mark Thomas team will provide a PSR that explores alternatives for a gap closure, identifies a pedestrian zone, and forms the basis for future grant funding requests.

PROJECT DESCRIPTION
Mark Thomas is currently providing civil design, transportation planning, utility coordination, and grant funding assistance for improvements of a north-south gap closure from Esplanade/Memorial Way through downtown to Park Avenue to meet the community’s needs and improve safety throughout the downtown area. Improvements will also include repairing damaged pavement, enhancing the street cross-sections and sidewalks, intersection treatments for bicyclists, and considerations for existing land uses and businesses.

Our team is developing alternatives to maintain the unique character and quality of Downtown Chico while improving safety for all users. This includes accommodating existing curbside uses and reallocating space for vulnerable users including bicyclists and pedestrians. The improvements will activate the downtown core and create a space all modes can access. This project includes a community-driven design component where Alternative 1 is currently being considered to facilitate on-street parking with public and community input.

PROJECT OUTCOME
Design approval and utility relocation is anticipated to be completed in 2026– 2028, with construction in 2029–2030. At completion, this project will create a safe and accessible connection to amenities of the downtown core that include local businesses and residents, Bidwell Park, and CSU Chico. This project is currently on-time and within budget.

Exhibit A
764
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 7 ends

CONTRACTING AGENCY
City of Stockton

CONTRACTING AGENCY

PROJECT MANAGER
Rosa Alvarez
(209) 937-8134
[email protected]

CONTRACT AMOUNT
$357,748

FUNDING SOURCE
CMAQ

DATE OF CONTRACT
5/2019

DATE OF COMPLETION
12/2023

CONSULTANT

PROJECT MANAGER
Dan Blomquist
(916) 215-6981
[email protected]

BEAR CREEK/PIXLEY SLOUGH BIKE/PEDESTRIAN PATH

STOCKTON

PROJECT OBJECTIVE
The City of Stockton sought to create a new multi-use trail that increased safety for bicyclists and pedestrians that is a part of the City’s Master Bike Plan.

PROJECT DESCRIPTION
Mark Thomas prepared PS&E and environmental clearance for the Bear Creek and Pixley Slough Improvements project in the City of Stockton. The project was federally-funded and re-striped existing roadways to include Class II buffered bike lanes, widened roadway shoulders to create new bike routes, created new bicycle and pedestrian crossings at existing multi-use pathway and roadway intersections, and extended multi-use pathways to signalized intersections to improve bicycle and pedestrian access. Utility coordination included PG&E, AT&T, City of Stockton Municipal Utilities Department, and Comcast Cable Company. In addition, this project required coordination and permitting with the Central Valley Flood Protection Board (CVFPB).

Intersection and crossing improvements included new curb ramps, detection for bicycles, and installation of RRFBs. Portions of the existing roadways and pathways pavement were rehabilitated to support increased bicycle and pedestrian use. The Mark Thomas team included support for environmental clearance under CEQA and NEPA and traffic signal design.

PROJECT OUTCOME
This project was completed on-time and within budget, providing safety measures and connectivity supporting the City’s Master Bike Plan to promote safe bike and pedestrian travels through the city.

Exhibit A
765
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 8 ends

CONTRACTING AGENCY
County of Santa Cruz

CONTRACTING AGENCY

PROJECT MANAGER
Russell Chen
(831) 454-2160
[email protected]

CONTRACT AMOUNT
$761,753

FUNDING SOURCE
Clean California Grant
Measure D
HSIP

DATE OF CONTRACT
11/2022

DATE OF COMPLETION
Ongoing

CONSULTANT

PROJECT MANAGER
Dan Blomquist
(916) 215-6981
[email protected]

GREEN VALLEY ROAD MULTI-USE TRAIL IMPROVEMENTS

WATSONVILLE

PROJECT OBJECTIVE
This County of Santa Cruz sought to design a new multi-use trail to enhance safety and encourage active transportation along the well-used corridor that connects Watsonville and the rest of Santa Cruz County through the unincorporated communities of Interlaken, Amesti, and Corralitos. Green Valley Road is the only direct route from the City of Watsonville into the unincorporated counties with no other parallel routes that exist. This local road includes three schools, three parks, and 36 transit stops. This is also a corridor identified with an opportunity to serve the Latino farm-working families in this disadvantaged community where, out of financial necessity, residents walk and bike to work, school, and shopping destinations.

PROJECT DESCRIPTION
Mark Thomas provided engineering support for improvements to this multi-use trail located north of the City of Watsonville in an unincorporated area of Santa Cruz County between Airport Road and Mesa Verde Drive. The project included roadway improvements, construction of an 8-to-10-foot-wide multi-use trail and transit stop enhancements spanning two miles along a well-traveled and highspeed road with sporadic existing facilities for pedestrians and bicyclists.

PROJECT OUTCOME
This project ultimately improves the safety and connectivity for pedestrians and bicyclists, enhancing public health and promoting community connectivity.

This includes under-served communities by improving the level of service and comfort for pedestrians and bicyclists by providing a 10-foot, continuous-width path and improved pedestrian crossings with new RRFBs where limited facilities currently exist. Additionally, the project upgraded five Santa Cruz METRO bus stops with shelters.

Construction will be completed in spring 2025.

Exhibit A
766
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 9 ends

PROJECT STAFF
We have selected a team of highly-qualified and
experienced individuals and subconsultants who have
experience working within Caltrans D3. We understand
the importance of assembling a team that will be available to support the City throughout the duration of the
project. Our organization chart below depicts the Mark
Thomas team, key staff and associated disciplines, support staff, subconsultant support, staffing plan, and lines of communication.

Our proposed staff has worked together on a variety
of similar projects including:
» East Blithedale Avenue Improvements, Mill Valley
» Green Valley Road Multi-Use Trail Improvements,
Santa Cruz County
» East Main Street Improvements, Woodland
» Washington Avenue/Table Mountain Boulevard
ATP Application, Oroville
» Paradise Transit Center, Paradise
Key Staff
QA/QC
Ken Doty, PE, QSD

PRINCIPAL IN CHARGE
Matt Brogan, PE

CITY OF OROVILLE
Alyssa Stutz

PROJECT MANAGER
Dan Blomquist, PE

PROJECT STAFF

CIVIL LEAD
Jonathan Hernandez, PE

ROADWAY DESIGN
Arsalan Gharachorloo, PE
Erik Lappen, PE

GRANT SUPPORT
Amber Collins
Ryan Bissegger

ENVIRONMENTAL & PERMITTING
Kevin Sevier

GALLAWAY

RIGHT OF WAY ACQUISITION
Jeremy Nied, PMP, SR/WA
Bob Morrison, PE, Broker

MONUMENT

COMPLETE STREETS DESIGN
Aaron Silva, PE

UPRR/CPUC LEAD
Matt Magaw, PE

LANDSCAPE/AESTHETICS
Christine Anderson, PLA

SURVEYS/RIGHT OF WAY MAPPING
Sam McIntyre, PLS

TRAFFIC
Adrian Engel, PE, CASp
Sonia Anthoine

FEHR & PEERS

GEOTECHNICAL
Ben Crawford, PE, GE
Shawn Leyva, PE
Amando Castro, PE

CRAWFORD & ASSOCIATES

BIKE/PED
Aaron Silva, PE

UTILITY COORDINATION
Andy Lee, PE, QSD
Jay Yang

STORMWATER/DRAINAGE DESIGN
Austin Allen, PE
Jameela Flordeliz, PE

PUBLIC OUTREACH
Katie DeMaio
AIM

SIGNALS
Daniel Yau, PE, TE, PTOE
Kin Chan, PE
BEN|EN
Exhibit A
767
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 10 ends

MEET OUR PROJECT MANAGER

DANIEL BLOMQUIST, PE
DUTIES
» Day-to-day project management
» Manage contract budget
and schedule
» Manage staff and subconsultants
» Report to the City
» Coordinate with agencies
and stakeholders
» Help ensure design and
deliverable compliance
» Guide staff from planning stages
to final design

BACKGROUND
Daniel has 24 years of management and technical experience in delivering a broad range of transportation projects for both federal, and non-federal aid projects. He has worked with cities, counties, regional councils/commissions, and Caltrans on transportation projects including trails, pedestrian and bicycle facilities, and highway and roadway improvement projects. His combination of experience in both bike/ped projects and highway design gives him the understanding needed to balance the multimodal goals of this project.

Daniel has worked on projects under Caltrans Local Assistance Guidelines, understands the steps and documentation required, and how to work with Caltrans to gain approval to move to the next phase. He has experience successfully delivering fast-tracked projects to meet funding deadlines. He has extensive experience working in the public sector and knowledge of the public sector procurement process. He understands the nature of public sector work and its decision-making process, including projects that involve community and stakeholder involvement.

He has implemented a successful system to manage scope, budget, and schedule to deliver quality deliverables similar to the Washington Avenue and Table Mountain Boulevard Complete Streets Project.

DAN AT A GLANCE
PE
Licensed
in CA 24Years of
Experience

DELIVERED OVER
$13 MILLION

IN PROJECT VALUE

ROAD SAFETY
PROJECTS 20 DELIVERED

PROJECT SHOWCASE EAST MAIN STREET IMPROVEMENTS

WOODLAND
As Project Manager, Daniel oversaw the design
improvements for the East Main Street corridor. Among
his responsibilities, he met with the City to deliver project updates, managed the project team and subconsultants
(which included BEN|EN and Crawford), and coordinated
with Caltrans regarding work to the I-5 on-ramp.

The project includes a landscape-separated Class I
path, safety upgrades adjacent to an existing rail line, multimodal access for cyclists and pedestrians, enhanced drainage facilities, and aesthetics, all in service of achieving a complete street.

Daniel also delivered this project under strict grant funding requirements and deadlines.

Exhibit A
768
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 11 ends

MEET OUR KEY STAFF

MATT, BROGAN, PE

PRINCIPAL IN CHARGE
DUTIES
» Provides oversight and helps ensure timely
deliverables
» Provides consistency between SR 162 Project and
Washington Avenue/Table Mountain Boulevard
Complete Streets ATP Application

BACKGROUND
Matt has a strong understanding of funding
guidelines, requirements, and how to validate
project funding limits. He has extensive Caltrans D3
experience and understanding of their approval
process, as well as significant experience overseeing
transportation improvement projects from planning
through final design.

KEN DOTY, PE, QSD
QA/QC
DUTIES
» Provides oversight and helps ensure timely
deliverables
» Provides consistency between SR 162 Project and
Washington Avenue/Table Mountain Boulevard
Complete Streets ATP Application

BACKGROUND
Ken has over 37 years of in-depth experience making
him ideal to provide QA/QC on this project. He
previously worked with the City on delivering the
SR 162 Mobility Improvements Project and resolved
multiple challenges during construction.

JONATHAN HERNANDEZ, PE

CIVIL LEAD
DUTIES
» Leads preliminary engineering tasks
» Identifies potential utility conflicts, and coordinates with utility providers
» Assists in preparation of PS&E
» Oversees roadway improvements and enhancements

BACKGROUND
Jonathan has delivered a variety of corridor and local
roadway improvement projects. He works on all stages
of project delivery with various design standards
and is familiar with local agency multimodal safety,
connectivity, and mobility projects

RYAN BISSEGGER

GRANT FUNDING SUPPORT
DUTIES
» Researches additional funding opportunities
» Recommends potential funding programs
» Guides the positioning of the project to align with
funding requirements

BACKGROUND
Ryan has in-depth knowledge of federal and state
funding programs including ATP, HSIP, and SB 1. He
understands funding programs and develops/reviews
grant applications, and has secured over $1.6B in
transportation-related grant funding.

Exhibit A
769
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 12 ends

AMBER COLLINS

ATP APPLICATION SUPPORT
DUTIES
» Prepares and reviews ATP application
» Provides guidance to align project
with ATP funding requirements

BACKGROUND
Amber has an in-depth understanding and proven
track record in positioning projects for successful
funding and delivery. She has extensive experience
with programming and funding compliance for state
and federal programs, and has secured over $110
million in grant funds.

KEVIN SEVIER

ENVIRONMENTAL/PERMITTING
DUTIES
» Aligns project with NEPA/CEQA requirements
» Conducts preliminary environmental study
» Obtains necessary permits and approvals
» Identifies potential environmental risks
and mitigation strategies

BACKGROUND
Kevin has 25 years of environmental compliance
and planning experience. He develops supporting
technical documentation for CEQA/NEPA compliance,
and state/federal permitting requirements. He is skilled at assessing impacts and identifying opportunities
for avoidance, and developing environmental review
strategies.

CHRISTINE ANDERSON

LANDSCAPE/AESTHETICS
DUTIES
» Develops landscape plans
» Designs and selects appropriate plantings
» Incorporates green infrastructure solutions
» Integrates landscape elements with ADA compliance

BACKGROUND
Christine has 35 years of experience in landscape
architecture, urban design, landscape design, and master planning. She has extensive experience in all phases
of design and construction documentation, including
project management and community facilitation

KATIE DEMAIO

PUBLIC OUTREACH
DUTIES
» Develops/executes public outreach plan
» Organizes/facilitates community meetings
» Prepares outreach materials (fact sheets,
newsletters, social media content)
» Gathers input to incorporate community feedback
into project improvements

BACKGROUND
Katie provides strategic communication and
community relations experience. She develops
and implements public outreach plans to keep
communities informed and engaged. She works with
agencies to create content for ongoing messaging,
collateral, and online engagement tools.

MEET OUR KEY STAFF
Exhibit A
770
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 13 ends

DANIEL BLOMQUIST, PE

PROJECT MANAGER

EDUCATION
MS in Civil Engineering
BS in Civil Engineering

REGISTRATION
CA C65875
Daniel has of 24 years of experience in civil engineering with expertise in design and construction of roadway and transportation facilities and traffic signal operations. He has experience working on planning, design, and construction of improvements in the public right of way, requiring NEPA and CEQA documentation, compliance with federal, state and local design standards including AASHTO design guidelines, Caltrans Highway Design Manual, and the California Manual on Uniform Traffic Control Devices (MUTCD). He has extensive experience with compliance with current ADA requirements; preparing of plans, specifications and estimates; management of state and federal grants; and preparing presentations to community groups, committees, boards, and councils.

REPRESENTATIVE PROJECTS

BEAR CREEK/PIXLEY SLOUGH BIKE/PEDESTRIAN PATH,

STOCKTON
Project manager responsible for preparing PS&E and
environmental clearance for the Bear Creek and Pixley
Slough Improvements project. Intersection and crossing
improvements include new curb ramps, detection for
bicycles, and installation of rectangular rapid flashing beacons. Additional tasks include re-striping to include Class II buffered bike lanes, creating new bicycle and
pedestrian crossings at existing multi-use pathway and
roadway intersections, and extending multi-use pathways to signalized intersections to improve bicycle and
pedestrian access.

GREEN VALLEY ROAD MULTI-USE TRAIL

IMPROVEMENTS, SANTA CRUZ
Project manager responsible for improvements including
a multi-use trail located north of the City of Watsonville in the unincorporated area of Santa Cruz County between
Airport Road and Mesa Verde Drive. The project includes roadway improvements, construction of an 8-foot to
10-foot-wide multi-use trail and transit stop enhancements spanning two miles along a well-traveled and high-speed road with sporadic existing facilities for pedestrians and bicyclists.

EAST BLITHEDALE AVENUE IMPROVEMENTS,

MILL VALLEY
Civil lead for improvements on East Blithedale Avenue in the City of Mill Valley. Design elements include the use of roundabouts, upgrades to existing signal infrastructure, widening existing bikeways, and improvements to
pedestrian crossing paths along the corridor from
Sunnyside Avenue to US 101.

EAST MAIN STREET IMPROVEMENTS, WOODLAND
Project manager overseeing design improvements to the
East Main Street corridor which include safety upgrades along rail lines, multimodal access for cyclists and
pedestrians, enhanced drainage facilities, and aesthetics to achieve a complete street. Part of these improvements are located at the I-5 southbound on-ramp which requires Caltrans coordination.

SOQUEL DRIVE MULTIMODAL IMPROVEMENTS,

SANTA CRUZ COUNTY
Civil lead for the design of active transportation, bus transit, and pedestrian improvements along Soquel Drive between
La Fonda Drive and State Park Drive. This segment of the corridor serves as an alternate vehicular route to Highway 1 which leads to heavy traffic congestion, frequently by speeding vehicles associated with cut-through traffic.

Through this project, the County intends to improve
safety for all modes of transportation, increase multimodal options, reduce traffic congestion, decrease incidence of collision, and improve transit reliability along this segment.

PARADISE TRANSIT CENTER, PARADISE
Project manager overseeing preliminary engineering
and design services to support evaluation of alternative sites, public outreach for selection of a preferred site, environmental clearance and preparation of plans,
specifications and estimates for construction of a new bus transfer center. The project will provide up to three new bus bays to accommodate existing and planned B-Line
transit service with improved facilities for waiting riders including shelters, benches, lighting, ADA access, and
bicycle parking.

Exhibit A
771
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 14 ends

MATT BROGAN, PE

PRINCIPAL IN CHARGE

EDUCATION
BS in Civil Engineering

REGISTRATION
CA C63854
Matt has of 26 years of experience in municipal and transportation engineering. He serves as principal in charge and on a variety of transportation improvement projects starting with planning through final design. His project experience includes local roadway improvements, rail crossings, bicycle facilities, civil-related transit improvements, and streetscape designs.

Matt also has extensive experience with Caltrans facilities and local agency improvements ranging from completing interchanges with Caltrans approval to streetscape/infrastructure projects. Matt leads Mark Thomas’ Sacramento office and as the PIC, will provide support to ensure adequate resources are allocated to meet the project’s demands.

REPRESENTATIVE PROJECTS

WASHINGTON AVENUE/TABLE MOUNTAIN

BOULEVARD COMPLETE STREETS PROJECT, OROVILLE
Principal In Charge of the City’s previous ATP Funding
Application for the Cycle 7 funding cycle. Mark Thomas
completed focused public outreach, preliminary design
concepts, project programming costs, and schedule for
delivery of the proposed project for the City of Oroville.

EAST MAIN STREET IMPROVEMENTS, WOODLAND
Principal in charge for design improvements which include safety upgrades along rail lines, multimodal access for cyclists and pedestrians, enhanced drainage facilities, and aesthetics to achieve a complete street. Part of these improvements are located at the I-5 southbound on-ramp
which requires Caltrans coordination.

PARADISE TRANSIT CENTER, BUTTE COUNTY
Principal in charge for preliminary engineering and design services to support evaluation of alternative sites, public outreach for selection of a preferred site, environmental clearance and preparation of plans, specifications and
estimates for construction of a new bus transfer center. The project allows for improved bus operations in the downtown area and provides opportunity for enhanced connections for bicycles, pedestrians, and for a park and ride.

DONNER PASS ROAD CORRIDOR IMPROVEMENTS,

TRUCKEE
Principal in charge responsible for the corridor and safety improvement project which was funded through an
HSIP grant. The funding was obtained due to significant pedestrian safety issues along the corridor. The Town has incorporated key features including curb, gutter, sidewalk, bike lanes, landscape and mid-block crossings into the
design to improve both safety and accessibility.

FOLSOM BOULEVARD STREETSCAPE PHASE IV,

RANCHO CORDOVA
Principal in charge of Phase IV of this historic corridor beautification project that includes 3.5 miles of Folsom Boulevard improvements focusing on providing pedestrian and bicycle enhancements based on complete street
principles and ADA requirements. New curb, gutter, and
sidewalk improvements were constructed along the length of the project, changing the drainage patterns from the existing ditch flow, to being captured via a storm drain system.

SR 88/PINE GROVE CORRIDOR IMPROVEMENT

PROJECT PHASING & FUNDING STRATEGY,

AMADOR COUNTY
Principal in charge/project manager for advanced
preliminary engineering and Phase 1 improvements.

This project will improve operations, alleviate existing congestion, provide a transportation facility consistent with Caltrans standards, and enhance safety. General
improvements include widening to standard shoulders,
adding curb, gutter, and sidewalks, adding bike lanes,
formalizing parking, intersection cross slope correction (where needed), drainage facilities, bulb-out construction, new lighting, and improving pedestrian ramps.

CHICO DOWNTOWN COMPLETE STREETS, CHICO
Principal in charge for services including civil design, transportation planning, utility coordination, and grant funding assistance for improvements at the north-south gap closure from Esplanade/Memorial Way through downtown
to Park Avenue. Improvements will also include repairing damaged pavement, enhancing the street cross sections
and sidewalks, intersection treatments for bicyclists, and considerations for existing land uses and businesses.

Exhibit A
772
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 15 ends

KEN DOTY, PE, QSD
QA/QC

EDUCATION
BS in Civil Engineering

REGISTRATION
CA C47228
Ken has 37 years of experience in municipal and transportation engineering with Mark Thomas. Ken is experienced in all aspects of the preparation of PS&E specializing in transportation improvement projects, including Caltrans facilities. He has extensive specification-writing experience for local roadway and Caltrans projects.. His in-depth experience has made him an excellent QA/QC reviewer and he routinely provides this service.

REPRESENTATIVE PROJECTS
SR 162 MOBILITY IMPROVEMENTS, OROVILLE
Project manager responsible for construction support
services for this project that improved safety and active transportation connectivity along the SR 162 corridor.

Key project elements included improvements that closed
sidewalk gaps, and provided Class II bike lanes, crosswalks, street lighting, and multi-use paths to the Feather River on SR 162 between key destinations within the community.

Improvements were made along Oro Dam Boulevard (SR
162), Olive Highway (SR 162), Lower Wyandotte Road, and at Lincoln Street, and Feather River Boulevard.

STATE ROUTE 70 CORRIDOR PSR-PDS, BUTTE COUNTY
QA/QC manager responsible for reviewing the preparation of the PSR-PDS and environmental clearance effort on this project that will reduce congestion, enhance safety, and encourage future economic growth in Butte County. The
client’s focus was to develop a project that was attractive for all types of funding. The project will widen the existing highway from two to four lanes along the existing State Route 70 alignment.

EAST BLITHEDALE AVENUE IMPROVEMENTS,

MILL VALLEY
QA/QC reviewer for improvements on East Blithedale
Avenue in the City of Mill Valley. Design elements
include the use of roundabouts, upgrades to existing
signal infrastructure, widening existing bikeways, and
improvements to pedestrian crossing paths along the
corridor from Sunnyside Avenue to US 101.

LINCOLN BOULEVARD IMPROVEMENT, LINCOLN
QA/QC reviewer for the design of the Lincoln Boulevard
improvements to transform the existing highway and
downtown area into a pedestrian friendly environment.

Improvements include upgrading and replacing 11 traffic signals along the corridor and adding Class II NEV/bike lanes from Sterling Parkway to 1st Street. Funding for the project comes from an HSIP grant through Caltrans.

BERKELEY AVENUE PAVEMENT REHABILITATION

PROJECT PS&E, FULLERTON
QA/QC reviewer for the geotechnical report and
final design plans, specification and estimate for the
reconstruction of North Berkeley Avenue between
Harbor Boulevard and Valley View Drive. The project is
approximately 1,530 feet in length and will include the reconstruction of curb, gutter, sidewalk, cross gutters and various curb ramps to meet current ADA standards.

HAMMER LANE WIDENING PHASE III, KELLY DRIVE TO

THORNTON ROAD PS&E, STOCKTON
QA/QC reviewer for the specific plan on 1.7-mile
stretch of Hammer Lane, including completion of a
tiered environmental clearance, utility identification and relocation, identification of right of way needs and PS&E plan preparation. Coordination between the city and
county needs is critical to this project due to a portion of the project lying within each jurisdiction.

SR 32 WIDENING, CHICO
QA/QC reviewer or the PSR/PR, which will widen State
Route 32 from two to four lanes with a raised center
median and modify the bridge at Dead Horse Slough.

Project includes coordination with several environmentallysensitive areas along the project corridor and detailed design of 10 intersections within Caltrans’ right of way.

Coordinated with adjacent commercial development. A
portion of our work with the City was accelerated to meet a schedule for opening of the development.

Exhibit A
773
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 16 ends

JONATHAN HERNANDEZ, PE

CIVIL LEAD

EDUCATION
BS in Civil Engineering

REGISTRATION
CA C85602
Jonathan has 12 years of civil engineering experience in the design and delivery of transportation and infrastructure improvement projects. He has experience providing civil design for a variety of corridor, highway, and local roadway improvement projects. He brings experience working on all stages of project delivery with various design standards, while leading the civil design and utility coordination efforts. Jonathan has experience with the design of local agency multimodal safety, connectivity, and mobility projects.

REPRESENTATIVE PROJECTS
SR 162 MOBILITY IMPROVEMENTS, OROVILLE
Senior project engineer responsible for PS&E for this
project that improved safety and active transportation
connectivity along the SR 162 corridor. Key project elements included improvements that closed sidewalk gaps, and
provided Class II bike lanes, crosswalks, street lighting, and multi-use paths to the Feather River on SR 162 between
key destinations within the community. Improvements were made along Oro Dam Boulevard (SR 162), Olive Highway
(SR 162), Lower Wyandotte Road, and at Lincoln Street, and Feather River Boulevard.

ALMOND STREET MULTIMODAL IMPROVEMENTS,

PARADISE
Design engineer for the environmental clearance and
design of the complete street improvements along an
important downtown corridor. The project will construct bike lanes, a Class I path, sidewalks, enhanced sidewalks, bus stops, storm drain improvements, and reconfigured
parking. The improvements cross multiple driveways
requiring careful design to eliminate impacts to private facilities and drainage. Work also includes coordination with Caltrans Local Assistance.

SR 70 PA&ED, BUTTE COUNTY
Project engineer responsible for improving the SR 70
corridor. Butte County Association of Governments (BCAG) views SR 70 as the focus highway for the County for which to develop a better connection between Sacramento
and Chico. BCAG aims to improve the Butte County
economy by providing better infrastructure, supporting
development, improving safety, and adding highway
capacity.

FRUITRIDGE ROAD IMPROVEMENTS, SACRAMENTO
Project engineer providing preliminary engineering, final design, and support for the construction phases for this project. Scope of work included the rehabilitation of
the roadway pavement; reconstruction of curb ramps;
modifications to the existing signals; and analyzing a lane reduction to create an opportunity to re-stripe the facility to improve the experience for bicyclists and transit riders.

In addition, coordination included working with Caltrans Local Assistance following the LAPM to gain the necessary approvals to move this project forward to construction.

MENDEZ HISTORIC TRAIL, WESTMINSTER
Project engineer for this historic trail and Green Street bikeway project that will reduce vehicle travel lanes and create a two-mile-long Class IV bikeway along the western limits of the corridor. A raised median will be incorporated to provide separation between vehicles and bicycles,
and serve as a stormwater treatment for roadway runoff.

Additional project improvements include pedestrian-level lighting, correction of deficient driveways, pavement rehab, asphalt overlay, and curb ramps.

GARDEN GROVE BOULEVARD COMPLETE STREET,

WESTMINSTER
Project engineer for this ATP-funded bikeway project that will re-purpose Garden Grove Boulevard to include one
lane in each direction, a two-way-left-turn lane, and a Class IV protected bikeway with landscaped median. The
project also provides a road diet at Edwards Street/Trask Avenue and adds buffered bike lanes. The project requires a Caltrans encroachment permit and approval from UPRR.

Additional project improvements include pedestrianlevel lighting, correction of deficient driveways, pavement rehabilitation, and curb ramps
Exhibit A
774
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 17 ends

Ryan has 21 years of experience in the engineering and construction industry with a specialty in funding. Over the past seven years, he has focused on transportation funding. He is knowledgeable of state and federal funding policies and how it influences grant applications. He is also an instructor through the ATRC and LTAP for “Positioning for Successful Grant Applications.” Ryan works with agencies statewide to identify and pursue funding for large and small infrastructure projects.

He manages the development of grant funding applications including preparation of cost estimates, economic studies, benefit cost analyses, and supporting exhibits.

REPRESENTATIVE PROJECTS

SAFETY ACTION PLAN, BUTTE COUNTY
Grant writer assisting in the development of the
Countywide Safety Action Plan (CSAP) to advance the
County’s goals for transportation safety and support
active modes of travel. The CSAP will develop a list of recommended future priority projects identified through technical analysis and community engagement. The plan
will serve the cities of Oroville, Gridley, and Chico and the unincorporated areas of Butte County. Information
gathered will be included as part of the development
and creation of dedicated Action Plans serving the cities of Oroville, Gridley, and unincorporated Butte County,
positioning for future implementation grant pursuits.

TRANSPORTATION MASTER PLAN, PARADISE
Grant and funding support for the development of the
TMP to guide short- and long-term improvements,
and utilize public input to prioritize solutions to aid in the recovery process. The TMP includes developing a
Townwide Active Transportation Plan, LRSP, roadway
network and evacuation route analysis, updated roadway
design standards, downtown public realm/aesthetics
guidelines, and economic development assessment.

Responsibilities include project management, leading
bikeway planning, roadway network planning, and public
engagement.

ATP GRANT WRITING SERVICES, LATHROP
Project manager for the preparation of two ATP and
SJCOG supplemental grant applications. One project was
to develop an Active Transportation Plan and the other
to install four miles of Class II bikeways connecting to a commuter rail station. Services included developing grant narratives and exhibits, coordinating with stakeholders for letters of support, preparing the Active Transportation Plan scope and budget, and reviewing plans and estimates.

ATP CYCLE 6 GRANT WRITING, STOCKTON
Project manager for the preparation of multiple
applications, including four for SJCOG Measure K, two for HSIP, and one for ATP. Applications focused on multimodal accessibility and safety enhancements throughout
the City including two safe routes to schools projects
Responsibilities included review of grant narratives, letters of support, graphics and exhibits, plans, and estimates.

Application secured $7.4 million in funding.

GRANT WRITING SERVICES, RANCHO CORDOVA
Grant writer for the preparation of two SACOG grants and one ATP grant for two projects. The Mather Field Road
Complete Streets project converts the existing facility into a complete street. The Zinfandel Drive Bicycle and Pedestrian Improvements provides a grade-separated crossing
of US 50 connecting from White Rock Road to Folsom
Boulevard. Led the development of narratives and ensuring compliance with grant guidelines.

BROADWAY/OAK PARK ATP CYCLE 6, SACRAMENTO
Project manager that successfully secured funding support for the implementation of a Class III bikeway, sidewalk rehabilitation, curb extensions, and landscape features.

Grant funding support scope of work included the
preparation of the grant application with the successful award of $1.1M. The project will enhance mobility for all users including bicyclists, pedestrians, and transit riders by reducing the number of travel lanes on Broadway;
provide buffered Class II bike lanes; enhance intersection treatments between Alhambra Boulevard and Martin
Luther King Jr. Boulevard; and maintain the area’s
historic identity.

RYAN BISSEGGER

GRANT FUNDING SUPPORT

EDUCATION
Funding and Programming Transportation Projects in California Training, University of California, Berkeley - Technology Transfer
BA in International Business, Westminster College
Exhibit A
775
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 18 ends

AMBER COLLINS

ATP APPLICATION SUPPORT

EDUCATION
MS in City/Urban, Community and Regional Planning
MS in Civil Engineering
BS in Agribusiness
Amber has 17 years of experience in the public and private sectors with extensive knowledge and experience in planning, funding, and delivering transportation projects in California. She has a comprehensive background in the development of multimodal plans. Amber has an in-depth understanding and success in transportation funding and financing. She also has extensive experience with programming and funding compliance for state and federal programs.

REPRESENTATIVE PROJECTS

GRANT AND FUNDING SUPPORT FOR WASHINGTON

AVENUE/TABLE MOUNTAIN BOULEVARD, OROVILLE
Supported funding efforts for the infrastructure concept to transform Washington Avenue/Table Mountain Boulevard
into a complete street. Scope of work includes the
preparation of grant narratives for the preparation of the draft and final versions of the three parts of the application and providing analysis of existing data to support the grant narratives.

PIONEER ROAD COMPLETE STREETS, LOS BANOS
Supported the funding efforts for this regionally significant complete street project to widen Pioneer Road. The project will provide an approximately 6.5-mile, four-lane, divided arterial roadway with a Class I regional path and seven signalized intersections, including two with SR 152 and one with SR 165. In addition to design, services also include evaluating funding sources, preparing grant applications, preparing funding allocation packages, and coordination with MCAG, Caltrans, and the CTC. Responsibilities include developing a funding/financing plan, preparing ATP Cycle 5 grant, and preparing LPP Formula funding allocations
and Request for Authorization for federal funds.

ON CALL GRANT WRITING, RIVERSIDE COUNTY
Senior transportation planner responsible for developing funding strategies and presenting to RCTC leadership.

Mark Thomas prepared grant pursuit strategies for large, complex infrastructure projects; SR-91 Eastbound Corridor Operations Projects, SR-79 Realignment, and Mid County
Parkway Phase 2. The strategy for each project will identify potential grant opportunities and probability of success, grant pursuit calendar, and development of technical and political strategies to position projects to secure funds.

Responsibilities include project management, coordination with RCTC, and leading the development of grant strategies.

GRANT WRITING AND MANAGEMENT,

SAN JOAQUIN COUNTY
Project manager for a professional grant writing and
management services bench. To date, we have prepared a
grant application for Transportation Demand Management
services, including increasing subsidies for vanpools,
providing a subsidy for electric vehicles in the vanpool, and installing electric vehicle charging facilities. Primary responsibilities include leading the development of the grant application and coordinating with the client.

GRANT PREPARATION ASSISTANCE,

MONTEREY COUNTY
Project manager for the on-call grant writing contract
to support TAMC’s funding pursuits. Provided technical
support for ATP Cycle 6 and Caltrans STP grant
applications. Led the development of a LPP Competitive
and TCEP application for the SR-156/Castroville Boulevard Interchange. Responsible for project management, agency coordination, and quality control reviews.

CALTRANS SUSTAINABLE COMMUNITIES GRANTS,

CALAVERAS COUNTY
As Transportation Planner and Executive Director, was
successful in writing and securing over $1M in Caltrans Sustainable Communities Transportation Grants for six
multimodal corridor and complete streets plans. These
plans have facilitated implementation of multimodal
improvements and funding awards. Two projects were
awarded $12M in Active Transportation Program (ATP)
grant funds for sidewalk gap fill and a multi-use pathway.

Four projects are being funded through SHOPP projects on the state highways through community main streets. While several projects are being developed to shovel-ready status utilizing CMAQ and RSTP funds for future grant funds.

Exhibit A
776
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 19 ends

CHRISTINE ANDERSON, PLA

LANDSCAPE/AESTHETICS

EDUCATION
BS in Landscape Architecture
AS in Architecture

REGISTRATION
CA RLA 3377
Christine has 36 years of experience in landscape architecture, urban design, landscape design, and master planning.

While her specific forte is that of urban design and redevelopment, she has consulted on a diverse range of projects, including redevelopment streetscapes, schools, urban developments, commercial centers, municipal and private office developments, open spaces, parks and playgrounds, interpretive trails, sports facilities, and master planned communities.

Christine has extensive experience in all phases of design and construction documentation, including project management and community facilitation.

REPRESENTATIVE PROJECTS

MENDEZ HISTORIC TRAIL, WESTMINSTER
Landscape architect for this historic trail and Green Street bikeway project that will reduce vehicle travel lanes and create a two-mile-long Class IV bikeway along the western limits of the corridor. A raised median will be incorporated to provide separation between vehicles and bicycles,
and serve as a stormwater treatment for roadway runoff.

Additional project improvements include pedestrian-level lighting, correction of deficient driveways, pavement rehab, asphalt overlay, and curb ramps.

ALMOND STREET MULTIMODAL IMPROVEMENTS,

PARADISE
Landscape architect responsible for aesthetic design for the environmental clearance and design of the complete
street improvements for transportation improvement
projects in downtown Paradise. The Almond Street
Multimodal Improvements constructed Class II bike lanes, a Class I path, enhanced sidewalks, bus stops, storm
drain improvements, and formalized parking. Design was
completed on-schedule and within budget.

GOLDEN STATE CORRIDOR IMPROVEMENTS, FRESNO
Landscape architect for improvements to 14.1 miles of
Golden State Boulevard. The goals of the project are to revitalize and improve the corridor and stimulate economic development. The project includes reconfiguring medians, turn pockets, improvements to at-grade UPRR crossings,
and intersection modifications to improve traffic safety and operations, as well as extensive pavement rehabilitation.

The project also includes the addition of active
transportation elements including Class I path, Class II bike lanes, Class IV bikeways, and other innovative treatments.

GREEN VALLEY ROAD MULTI-USE TRAIL

IMPROVEMENTS, SANTA CRUZ
Landscape architect for this improvement project for a
multi-use trail located north of the City of Watsonville in the unincorporated area of Santa Cruz County between Airport Road and Mesa Verde Drive. The project includes roadway improvements, construction of an 8-foot to 10-foot-wide multi-use trail and transit stop enhancements spanning
two miles along a well-traveled and high-speed road with sporadic existing facilities for pedestrians and bicyclists.

EAST MAIN STREET IMPROVEMENTS, WOODLAND
Landscape architect responsible for aesthetic design for improvements to the East Main Street corridor which
include safety upgrades along rail lines, multimodal access for cyclists and pedestrians, enhanced drainage facilities, and aesthetics to achieve a complete street. Part of these improvements are located at the I-5 southbound on-ramp
which requires Caltrans coordination.

CHASE DRIVE/AMERICAN RIVER, RANCHO CORDOVA
Project landscape architect responsible for providing
master plan design, project stakeholder coordination,
project phasing cost estimation and recommendations,
complete street alternatives development, and creation of an opportunities and constraints plan. The project consists of upgrading and updating the primary entry to one of
the oldest and most beloved regional parks in the County, creating a stronger connection to the community and
surrounding land uses, creating additional access, visibility and parking for Soil Born Farms, upgrading access, entry gateways and parking within Hagan Park, and ultimately
connecting local City bike corridors with the American
River Bike Trail.

Exhibit A
777
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 20 ends

EDUCATION
• MS in Rural and Town
Planning, CSU Chico
• BA in Geography and
Planning, CSU Chico
• Certificate in GIS
Technologies, CSU Chico
Kevin Sevier

VICE PRESIDENT/SENIOR PLANNER
Kevin has 25 years of experience in environmental compliance and planning in northern California. His involvement with environmental compliance includes the management of biologists, botanists, arborists, acoustical engineers, cultural resource specialists, and transportation engineers to develop supporting technical documentation for acquisition of development entitlements, CEQA/NEPA compliance, state and federal environmental permitting requirements.

Kevin’s involvement with transportation planning includes, developing multi-modal, pedestrian and bikeways plans, assisting in the design and layout of pedestrian facilities, gaining CEQA and NEPA compliance for state and federally funded transportation projects, working with local agencies through the Caltrans Local Assistance procedures, developing site specific mitigation measures, and obtaining state and local environmental permits.

EXPERIENCE
South Oroville Safe Routes to School, Butte County
Project Manager for environmental compliance for the preparation of Preliminary Environmental Study, Biological Resource Assessment, Cultural Resource Assessment, CEQA clearance and permit facilitation as a consultant to the Butte County Public Works Department.

County Road 98 Bike and Safety Improvement Project, Phase II, Yolo County
Managed all environmental studies for this 4-mile bike and roadway safety project. Gallaway Enterprises contracted directly with the Yolo County Department of Community Services Public Works Division to develop the APE, NES, farmland impact assessment, wetland delineation, §7 Biological Assessment, ASR/HPSR, CEQA IS/MND and tree inventory and mitigation plan.

Eureka Sr 101 South Entry Project Study Report, City Of Eureka Sub-contractor to prepare a project study report for the section of State Route 101 that brings travelers into the city limits. Gallaway Enterprises contributed a preliminary environmental constraints and opportunities analysis for each alternative through a combination of field reconnaissance and database research. This information was shared in the form of graphics for presentation purposes as well conglomerated into a Preliminary Environmental Assessment Report (PEAR). Within the PEAR, future technical studies that are likely required were identified as well as estimated costs for environmental commitments.

Exhibit A
778
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 21 ends

916-442-1168
[email protected]
Sacramento, CA
www.aimconsultingco.com

REFERENCE

CONTACT
SKILLS
209.468.3053
[email protected]
Najee Zarif, P.E.

Phone:

Email :

San Joaquin County
Project Management
Community Relations
Stakeholder Facilitation
Time Management
Leadership
Effective Communication
Critical Thinking
Public Meetings
Transportation
Construction Management
Transit
Land Use
Community Relations
Environment

KATIE DEMAIO

COMMUNITY ENGAGEMENT SPECIALIST &

OWNER AT AIM CONSULTING

PROJECT EXPERIENCE

EDUCATION

PROFILE
Katie is a facilitation and community engagement specialist with more than 12 years of strategic communication and community relations experience. Katie develops and implements public outreach plans to keep communities informed and engaged. She assists clients with creating content for ongoing messaging, collateral materials, social media content, and interactive online engagement tools for public information and community engagement. Katie also manages and coordinates logistics for stakeholder interviews, focus groups, community meetings, traveling workshops, and special events.

Transportation
Transit
Outreach Management
Broadway Complete Streets - City of Sacramento 2024
Central City Mobility - City of Sacramento 2024
West Texas Complete Street - City of Fairfield 2024
SACOG Mobility Hub Framework - SACOG 2024
Envision Broadway Oak Park - City of Sacramento 2024
Folsom Blvd Class I Overcrossing Feasibility Study - City of Folsom 2024 Envision Hopper Ave - Santa Rosa - 2023
McKinley Interchange - City of Manteca 2024
Mendocino Transit Short Range Transit Plan - 2024
MTD Moves Ahead - Santa Barbara Short-Range Transit Plan 2022 Yuba Sutter Transit - Short-Range Transit Plan 2023
North Valley Passenger Rail Strategic Plan - BCAG 2024
General Plan Update 2040 - City of Sacramento 2024
Mills Crossing Design Charrette - City of Rancho Cordova 2023 Health Education Council - School Lunch Program Assessment 2024 Citrus Heights Arcade Cripple Creek Construction Drone Videos 2024 Parks Master Plan - El Dorado County 2023
Stormwater Utility Rate Increase - City of Rancho Cordova 2023 2000-2004 Bachelor of Arts
James Madison University, Harrisonburg VA

FOCUS AREA
Exhibit A
779
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 22 ends

SUBCONSULTANTS
Supplementing our team, we have included subconsultants specifically tailored for this project. This team brings experience working together on similar projects including SR 162 Mobility Improvements, East Main Street Improvements, and West Main Street Mobility & Safety Improvements. We have supplemented our in-house staff with firms that specialize in environmental studies, public outreach, right of way acquisition, signal improvements, geotechnical engineering, and traffic analysis. We have long standing relationships with all of our subconsultants, and we have worked together to deliver numerous similar projects within Butte County. There are no previous joint ventures between Mark Thomas and any subconsultant.

GALLAWAY ENTERPRISES (GALLAWAY)

ENVIRONMENTAL & PERMITTING
Gallaway will develop environmental studies and documentation, and obtain clearances and authorizations from approcing agenies. They have unique and extensive experience with environmental regulations, including CEQA and NEPA, and additional environmental processes associated with federally-funded projects.

Gallaway has provided environmental consulting on several multimodal, sidewalk gap, bike facility, road improvement and bridge replacement projects in the unincorporated south Oroville area and Butte County region. Most of these projects have been through the Butte County Department of Public Works, including several post-disaster roadway rehabilitation projects on Oro-Quincy Highway east of the City of Oroville.

AIM CONSULTING, INC (AIM)

PUBLIC OUTREACH
AIM will develop a public outreach plan, facilitate community meetings, prepare outreach materials, and incorporate community feedback. AIM’s public participation professionals are committed to the communities they work in a professional capacity and as volunteers.

They offer strategic communications and public participation consulting services and specialize in projects in the natural and built environment that make a positive difference within the community. Their team of professionals develops public participation programs that bring diverse community members together and creates a space for constructive dialogue that respects all individuals and leverages the positive work of the engaged community.

MONUMENT

RIGHT OF WAY ACQUISITION
Monument will assist with right of way acquisition tasks. They are a WBE, DBE, and SBE certified firm, is a full-service real estate and right of way company providing exceptional service, strategic planning, innovation, and timely delivery.

Monument is well-known for successfully completing projects on an accelerated schedule. They accomplish this with early project planning, a clear scope of work, defined project tasks and deliverables, quality control, exceptional performance, and communication with the client and project partners.

Monument previously worked with the City on the SR 162 Mobility Improvements project providing project management, project planning, appraisal coordination, waiver valuations, acquisition, title and escrow, and right of way certification.

PRINCIPALS
Jody Gallaway
President/Owner
Kevin Sevier
Vice President/Owner
DBE

PRINCIPALS
Katie DeMaio
Owner
DBE

PRINCIPALS
Amber Costello
President
Joey Mendoza
COO
Bob Morrison
Vice President
DBE
Exhibit A
780
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 23 ends

BENNETT ENGINEERING SERVICES (BEN|EN)

SIGNALS
BEN|EN will prepare PS&E for traffic signals. Their traffic/electrical engineering division is committed to providing excellent traffic engineering services to both public and private sectors throughout Northern California. The firm specializes in traffic signals, lighting, and transportation electrical systems and has completed traffic and electrical engineering plans, specifications, and construction cost estimates (PS&E) for more than 1,000 transportation projects for more than 100 public agencies, including the City of Oroville.

BEN|EN served as the City’s Engineering Consultant from April 2017 to June 2020. Assignments included transportation, water, wastewater, plan review, hydrology report review, and funding acquisition projects. Improvement plans for various projects were prepared, including RSTP (Regional Surface Transportation Program) and annual street rehabilitations, sidewalk repairs, flashing beacons at the Montgomery Roundabout projects, and multiple sanitary sewer projects.

CRAWFORD & ASSOCIATES (CRAWFORD)

GEOTECHNICAL
Crawford will perform geotechnical engineering services. Over the past 30 years, staff at Crawford have provided geotechnical engineering, design, and construction services on a variety of large-scale public works projects. They also have the ability to easily access information from previous work using subsurface and other data from nearby projects.

Crawford has completed projects within the City and throughout Butte County that include roadway widening, pavement rehabilitation, multi-use pathways, and similar transportation-related projects. Their local knowledge and experience includes numerous roadway and throughout the region. Crawford’s previous experience of complete streets projects have included design for Class I bike paths, ADA improvements, signalization and crossings, intersections, and roundabouts.

FEHR & PEERS

TRAFFIC
Fehr & Peers will manage the traffic analysis and maintain close contact with City staff and the engineering team throughout the project design phase.

For more than 20 years, Fehr & Peers has been at the forefront of the complete streets movement by providing multimodal planning and engineering services.

Their team brings national expertise in pedestrian safety, innovative bicycle design, transit planning, and Complete Streets implementation. Their staff recently developed and delivered a training course on Complete Streets design principles to public agency staff in other states.

Fehr & Peers has worked on more than 15 projects in the City of Oroville in the past 25 years, and has extensive experience working on projects in Butte County.

Previous projects include the Oroville General Plan, Oroville Hospital Expansion, Ophir Road Warehouse EIR, and the Oroville Circulation Element Update VMT Analysis.

PRINCIPALS
Benjamin D. Crawford
President, Principal
W. Eric Nichols
Vice President, Principal
Shawn Leyva
Vice President, Principal
Lesli Hunter
CFO
Sarah Crawford
Secretary

PRINCIPALS
Chris Mitchell
CEO/President
Steve Brown
Vice President
Chris Breiland
Vice President
Meghan Mitman
Vice President
Lysa Wollard
CFO/Treasurer
Christine Sheilds
Secretary

PRINCIPALS
Leo Rubio, PE
President/CEO
Stacey Lynch, PE
Vice President
Jennifer Goodwin
CFO
Michael Massaro, PE
Secretary
DBE
Exhibit A
781
Item 10.

PROJECT ORGANIZATION AND APPROACH

UNDERSTANDING
The Washington Avenue and Table Mountain Boulevard
Complete Streets Project (Project) limits include
Washington Avenue between SR 162 (Oro Dam Boulevard)
at the southern limit and Montgomery Street, and Table
Mountain Boulevard between Riverview Terrace Drive and
County Center Drive at the northern limit.

The project proposes to construct a new major northsouth multimodal walking and biking path. This path creates a new backbone connection for future expansion
of the east-west bicycle and pedestrian connectors.

There are currently no sidewalks within many
segments of the project limits. Pedestrians and
bicyclists must walk or bike on paved and unpaved
shoulders alongside vehicles to commute to their
destinations. This presents significant safety issues,
demonstrated by the historic trend of severe
collisions in the area.

SR 70 is 1.23 miles west of the project site and does not permit cycling or walking, and there are no other northsouth roads within the City limits to the east. In addition, no other parallel route will support north-south travel for vulnerable non‑motorized road users, who often are
from disadvantaged communities.

The project will create a safer and more comfortable
environment that supports the community’s multimodal
transportation and mobility needs; improve local and
regional bike connectivity; help support local businesses; and encourage land-use change along the corridor.

Improvements include:
» Class I multi-use path
» Gap closure in existing sidewalks
» New crossings with high-visibility striping
» Rectangular Rapid Flashing Beacons (RRFBs)
» Pedestrian lighting
» Curb extensions
» New landscaped medians
» Planter strips with shade trees
» New pathway lighting

PROJECT OBJECTIVES
Create a safe, comfortable environment that supports
active transportation and mobility needs
Improve local and regional bike connectivity
Support local businesses
Encourage land-use change along the corridor
WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 24 ends

Exhibit A
782
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 25 ends

OROVILLE
Feather River
UPRR
Thermalito Power Canal
70 162
162

TABLE MOUNTAIN BLVD

NELSON AVE

GRAND AVE

MONTGOMERY ST

SPENCER AVE

MYERS ST

LINCOLN ST

CHEROKEE RD

WASHINGTON AVE
O
RA
N
GE AVE
M
TI C
HELL
AVE

OBTAIN ENCROACHMENT

PERMIT FOR WORK IN
STATE R/W (SR 162)

UPRR & CPUC

PERMIT REQUIRED

FOR OVERCROSSING

MODIFICATION
Butte Co. Jail and
Juvenile Hall
Oroville City
Elementary
School
Feather River
Nature Center
Feather River
Fish Hatchery
Segment 1 - New Class I
Pathway and Sidewalk
Segment 2 - New Class I
Pathway and Sidewalk
Potential Roundabout
Install RRFB and
Pedestrian Crossing
Improvements
Signal Modification
Chico
Fairfield
Fremont
Modesto Oakland
Oroville
Project
Location
Roseville
Santa Rosa Sacramento
Stockton

PROJECT OVERVIEW
This graphic shows the proposed improvements along Table Mountain Boulevard and Washington Avenue.

The enhancements will include new pedestrian crossings, signal improvements, and potential roundabout locations.

Exhibit A
783
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 26 ends

PROJECT APPROACH
Through our understanding, we have developed a unique
strategy and approach to deliver the project to meet
the City’s aggressive project schedule. Accelerating the schedule will provide flexibility and opportunity for the City to adapt to unanticipated challenges that may arise and still meet the project’s grant funding requirements. Our technical expertise in delivering complete streets
projects, and projects involving federal funds,
will be a major benefit to the City as we can bring
important lessons learned and the latest design
innovations and Caltrans coordination procedures
to the project.

Our approach is focused on:
» Maintaining an Aggressive Delivery Schedule:

Our team will move forward with several concurrent
tasks upon receipt of Notice to Proceed (NTP) including conducting technical studies that will be needed to
complete environmental clearance, obtain City approval
on the preliminary design, and initiate ROW research
and mapping to define the ROW needs.
» Beginning the Corridor Design and
Environmental Studies Immediately: Based on our
team’s experience preparing the current preliminary
alignments, we have a unique understanding of the
project opportunities and constraints with no learning
curve, enabling our team to start work immediately.
» Identifying and Mitigate Right of Way and Utility
Impacts: Our team understands the importance of
identifying ROW and utility issues early to proactively manage coordination with property and utility owners
with the intent of avoiding last minute design changes
and schedule impacts.
» Providing Cost Certainty for the City: Our team
will develop preliminary designs and estimates by the
summer of 2025. This will allow the City to determine
the funding needs and schedule to deliver the project
to construction. This will also include a potential
approach to construction phasing and the overall
budget needed to complete project designs.

MAINTAINING

AN AGGRESSIVE SCHEDULE
This project is dependent on advancing the preliminary
engineering and environmental studies quickly to support the planned application for Active Transportation Program (ATP) Cycle 8 grant funds for PS&E, right of way, and
construction and obtain environmental clearance for CEQA and NEPA prior to June 2026. Early delivery of several
project tasks will be important to set the tone for the required pace of the project. Equally as important is a deep understanding of the grant funding requirements to best position the project for competitive ATP Grant funds and Caltrans Local Assistance process.
150-DAY

QUICK START
This project requires special attention
to early tasks in order to get into final
design and ROW acquisition as quickly
as possible. We have developed a 150-day quick start
program that identifies critical items that will need to move forward in parallel to make this a reality. Our schedule for the first 150 days includes the tasks shown in the table below.

By being aggressive and completing critical tasks within the first 150 days, we will position the project for success. As the project manager, Daniel Blomquist will actively drive the schedule forward and set bi-weekly standing meetings with the City to share information quickly and efficiently while making progress on multiple fronts. Mark Thomas is
experienced in the delivery of fast-tracked projects.

We recently completed five miles of bikeway and
sidewalk gap closure design in Santa Cruz County
with ROW acquisition and Caltrans permitting
within 18 months of NTP.

FIRST 90 DAYS (JUL 2025) FIRST 120 DAYS (AUG 2025) FIRST 150 DAYS (SEP 2025) » Complete 30% Design
» Conduct ROW Research
and Boundary Mapping
» Conduct Field Review Meeting
with Caltrans and Submit the PES
» Initiate Environmental Technical Studies
» Identify ROW Needs and Prepare
Preliminary ROW Cost Estimates
» Prepare Utility B Letters
» Obtain Preliminary Title Reports
» Initiate Preparation
of Environmental Documents
» Coordinate with Utilities for Relocations
Exhibit A
784
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 27 ends

10’

BOW BOW
3’ 8’ 11’ 11’ 8’ 3’ 5’
Multi-Use
Path Parking Parking SW
Existing retaining
wall to remain
New
retaining wall
Existing EP for parking lot
Alligator cracking and cold patches are present in the roadway

DESIGN AND SAFETY CONSIDERATIONS

PAVEMENT RESTORATION
The pavement along Table Mountain Boulevard and
Washington Avenue is observed to be in generally fair
to very poor condition, with high-severity block cracking and alligator cracking present within the wheel paths.

Potholes are present along multiple stretches of road with more being recently repaired with cold patches. As such, the project includes consideration for extensive pavement rehabilitation with reconstruction of existing pavement sections where needed.

Our experience working on the adjacent SR 162 Mobility
Improvements Project shows that large diameter cobbles
(12-inch or greater) and coarse gravel may be present
within the upper five feet of the near surface soils. Our approach to designing the most appropriate rehabilitation method heavily relies on identifying the extent of coarse material within the alignment.

Working with our geotechnical partners at Crawford
and Associates, we first want to determine the existing condition of the pavement. We are particularly interested in the extent of the pavement failure and what methods for rehabilitation we can use. Full-depth recycling could be a good strategy to increase the traffic index of the corridors while maintaining access to homes and businesses during the construction. However, the feasibility of this method will depend on properly identifying the presence and quantity of cobbles within the project alignment. Other design methods could be utilized, where pavement appears to be in fair to good condition, like cold in-place recycling, or a traditional mill and overlay.

RETAINING WALLS
After further evaluation of the site topography, we have determined constructing retaining walls may be necessary at certain locations, particularly just north of Orange Ave, to accommodate the desired cross section and avoid eliminating parking spots while minimizing impacts to adjacent properties. The need for retaining walls will be analyzed during the design process once detailed site topographic and right of way information is available to develop an optimized cross section that meets project goals while minimizing added costs and impacts to private properties.

POTENTIAL WASHINGTON AVE CROSS SECTION BETWEEN ORANGE AVE AND YARD ST Exhibit A
785
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 28 ends

SIGHT DISTANCE
The project corridor traverses hilly terrain with vertical and horizontal curves that obstruct sight distance, creating unique challenges for vehicle visibility, particularly in areas where pedestrians cross or bicyclists share the roadway.

To address these concerns, we will conduct a thorough
analysis of sight distance at locations where visibility may be an issue and incorporate appropriate design solutions to enhance safety and meet project goals.

TRAFFIC CALMING
To enhance the safety of pedestrians and bicyclists, the project will include traffic calming measures to slow vehicle speeds and improve driver awareness. Curb extensions
along Washington Avenue and a raised median along Table Mountain Boulevard will create a more constrained street feel, naturally reducing vehicle speeds, and increasing drivers’ perception-reaction time, allowing for better
response to pedestrians and bicyclists. Additionally, the installation of RRFBs at Placer Avenue, McClellan Avenue, Orange Avenue, Flying Cloud Drive, Jasmine Court, and
Orangewood Way will provide effective traffic control,
improving pedestrian visibility and regulating vehicle flow.

The addition of intersection roundabouts may also be
considered as a potential traffic calming measure. While space constraints may limit feasibility in certain locations, roundabouts can be effective in reducing vehicle speeds, improving intersection safety, and maintaining traffic flow.

Community feedback on roundabouts may be mixed,
requiring detailed traffic assessment to be completed
and further outreach and discussion. However, locations such as of the intersection of Table Mountain Boulevard and County Center Drive and intersection of Washington
Avenue and Orange Avenue could be suitable for
roundabout implementation.

A concept design, shown below, has been completed for the Table Mountain Boulevard and County Center Drive location, presenting a potential roundabout alternative. This design ensures that the bridge over Thermalito Power Canal remains unaffected while minimizing right-of-way impacts. The
roundabout is expected to slow down vehicles approaching from the north, where speeds are relatively higher, improving overall safety and traffic flow in the area. The implementation and potential roundabout design alternatives may be
evaluated further during the design process to assess their feasibility, potential benefits, and impacts.

Hilly terrain throughout the corridor obstructs sight distances

ORANGEWOOD WAY

EVANSWOOD CIRCLE

TABLE MOUNTAIN RD

WATER SERVICE RD

COUNTY CENTER DR
Concept design for potential roundabout at Table Mountain Boulevard and County Center Drive Exhibit A
786
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 29 ends

MODIFICATION TO THE BRIDGE OVER UPRR
Modification to the bridge over UPRR is necessary to accommodate the proposed multi-use pathway. The modifications will include replacing the existing bridge barriers on both sides of the bridge, as shown below. No major impacts to the bridge structure are anticipated, and the design will utilize the existing bridge deck to accommodate the lane transition from one lane south of the bridge to two lanes at the Bird Street intersection, with the bridge located within the lane transition area.
10’ 13’ 20’
Multi-Use
Path
New bridge barrier New bridge barrier
Existing bridge
UPRR

PAST PROJECT INSIGHTS FOR A MORE FOCUSED APPROACH
One of the most important things we can
do as a company is learn from our recently
constructed projects. Mark Thomas can
bring an even more focused insight to this
project based on the recent experience
along SR 162. Mark Thomas is currently working on
completing the SR 162 Mobility Improvements Project,
where we encountered similar challenges to those we
anticipate on this project.

As a result, we have compiled a focused set of design
considerations, which will be incorporated into our
approach to proactively address potential issues. By
applying these insights, we are confident in our ability to navigate challenges effectively and successfully deliver this project.

Below are the key lessons learned from our previous
experience, which will guide us in addressing potential challenges on this project:
» Use of survey methods that accurately reflect
the existing topography of the site, in lieu
of LiDAR or other technologies that produce
undesirable accuracy that potentially result in design
changes during construction
» Complete necessary geotechnical analyses/tests
to ensure the improvements can properly be
constructed per specifications
» Use more accurate methods to positively identify
the existing utilities within the project limits
(i.e., ground-penetrating radar or potholing)
» Maintain access for property owners

POTENTIAL WASHINGTON AVE CROSS SECTION AT BRIDGE OVER UPRR TRACKS Exhibit A
787
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 30 ends

LANDSCAPING
Incorporating landscape into the design of the Project will be an important addition to accomplish the complete streets goals listed in the RFP. Landscape and urban design solutions for complete streets should be grounded in the context of the place, its history, visual analysis, and through stakeholder input. Placemaking is a way to foster pride in the community by incorporating their values and cultures and creating green spaces to soften hardscapes that can also provide positive environmental impacts. We call this placemaking, and it takes “landscaping” from being icing on the cake to an urban design solution that becomes the flavor of the cake.

A project such as this presents an opportunity to incorporate placemaking through these project goals and opportunities:

ENHANCING

THE VISUAL CONTEXT
The surrounding visual context provides vast opportunities for placemaking. The project is bisected by the Feather River with its well-known and loved historic bridges,
reservoir architecture, and scenic vistas. In addition, the north end of the project opens up views to Table Mountain Ecological Reserve. These view opportunities could be
enhanced by including pedestrian plazas and viewpoints at key points within the project area, particularly to the north end of the historic Table Mountain Bridge and at the far northern limits of the project near Thermalito Canal. The City has also invested in public art along the corridor which could be expanded to other improvement areas.

CREATING SHADE

FOR PEDESTRIAN, BIKE,

AND TRANSIT USERS
Oroville, like many Central Valley and foothill communities, struggles with a hot, urban environment. Studies from the US Forest Service show that shade from natural sources, like trees, can lower ambient temperatures up to 19 degrees.

Providing shade at transit stops and at regular intervals along the pedestrian sidewalk and Class 1 bike facility would improve conditions, and ultimately safety, for all users.

BALANCING THE NEED

FOR SHADE TREES WITH

OVERHEAD POWERLINES
Approximately 1.5 miles of the corridor is encumbered
with overhead power on one side of the street and
PG&E has strict guidance for trees placed under their
powerlines. This means that existing, large shade trees impacted by construction may have to be replaced with
small trees that do not provide as much shade. Part of this project could explore funding sources that will assist with undergrounding of powerlines to alleviate this conflict.

INCORPORATING

STORMWATER PLANTERS

AND FILTRATION OF RUNOFF

FROM IMPERVIOUS SURFACES
When it comes, rainfall can be quick and intense.

Incorporating green infrastructure into complete streets can slow the water flow, allowing time for standard storm drains to catch up with the intensity of the rainfall. The proper plant material and systems can be multi-purpose, for visual appeal and improving water quality. They also can be used to clean the runoff of leaves, trash, debris, and pollutants before entering more vulnerable bodies of water.

DESIGNING WITH

LONG-TERM MAINTENANCE

STRATEGIES IN MIND
Landscape architecture uses living construction materials to design and the City is investing heavily in this infrastructure.

As such, it is key that we consider the upkeep requirements of material selections to help ensure that this living system is designed, not only for constructibility, but also with long-term maintenance in mind. This starts by engaging
stakeholders in practical conversations about the future vision for the corridor. This often includes strategically selecting inert materials as part of the design to create texture and interest but also to minimize long-term costs.

Placemaking for a complete street goes
well beyond these fundamentals. Landscaping,
if used strategically, can help separate uses
and guide users to proper crossing points
thereby improving public safety and circulation.

Intersections and mid-block crossing can also be
used to create public plazas and meeting spots.

Placemaking can also be used to enhance a corridor
through the careful addition of public art, street
furnishings (benches and trash receptacles), and
aesthetic features such as seatwalls, signage
and pedestrian lighting.

Exhibit A
788
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 31 ends

EMERGENCY EVACUATION
Emergency evacuation is an important consideration for
the community and we will incorporate essential elements in the design to support safety and efficiency. For this project, we will carefully integrate features that facilitate smooth and organized evacuations, including strategically placed median openings and a multi-use path that can
accommodate temporary emergency vehicle traffic.

Our experience includes working on the Butte
County Community Evacuation Planning Project,
where we developed comprehensive evacuation
planning strategies. By applying this expertise,
we enhance the project’s ability to support effective
emergency response and evacuation when needed, and tie
into the regional emergency evacuation plan.

We also recognize that medians may impede evacuation
plans by restricting lane reversibility, limiting emergency vehicle access, and creating potential bottlenecks. To
mitigate these challenges, we will work with the City to strategically place median openings. We will consider other options, such as using low profile medians with mountable curbs, to prevent unnecessary reduction in lane capacity or emergency maneuverability. These measures help maintain flexibility in evacuation scenarios while preserving the intended safety benefits of the separation.

The proposed multi-use path will be designed with flexibility in mind, allowing for the temporary accommodation of vehicles, including emergency responders and evacuees, during critical evacuation scenarios. The multi-use path’s structural section will be reinforced to support vehicular traffic, maintaining the path as an effective part of the overall evacuation plan when needed. We will also coordinate with utility owners to relocate facilities that may block emergency responders and the public during an evacuation.

RIGHT OF WAY
The project area presents several right of way (ROW)
challenges as discussed below.

RESIDENTIAL IMPACTS
Improvements are primarily proposed along residential
areas. Several sections of the corridor pass through older, historic neighborhoods where lots are fully developed,
with buildings built close to, or up against, the public ROW.

Many local businesses, establishments, and residences in these historic neighborhoods lack on-site parking or face ADA accessibility challenges due to topography, relying on the street for parking and access.

CALTRANS COORDINATION
The Project will encroach into Caltrans ROW at the Oro Dam Boulevard intersection (SR 162), requiring coordination with Caltrans to obtain encroachment permit and other approvals. With the federal funds involved, the project will be subject to the Caltrans ROW Certification process. A Right of Way Data Sheet (RWDS) will be prepared for Caltrans concurrence.

Our team is well versed in this process and can help guide the City from inception to authorization.

Butte County Community Evacuation Planning Project
Historic neighborhoods in the project site are fully developed against the public ROW
Exhibit A
789
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 32 ends

ROW ACQUISITION
Based on the currently available ROW mapping, the
proposed improvements will require ROW acquisition
for 60 parcels. Moreover, relocation of utility poles may require new easements. We expect the number of ROW
acquisitions will be refined during the development of
the 30% design with detailed ROW mapping. However,
the ROW acquisition process lies on the critical path of the project, and we will need to work collaboratively
with the City and property owners to identify and
evaluate potential impacts and implement avoidance or
minimization measures early to avoid schedule delays
and potentially costly rework during the ROW
acquisition and PS&E phases.

Prior to starting the ROW acquisition process, we will
collaborate with the City to optimize the cross-section to minimize the ROW impact as much as practicable.

Retaining walls will be considered at locations to reduce impacts to homes, businesses, parking lots and yards.

ROW PLANNING
Monument will work with the design and survey team
in the planning phase to make certain the area required for the project is truly necessary. Monument will evaluate the potential ROW requirements, affected parcels and
associated capital costs. At that point, we will complete a detailed per parcel budget that can be used as the basis for the ROW funds to provide cost certainty to support the ATP grant application and eventual request for ROW funds from Caltrans.

While the survey team is defining the existing property boundaries adjacent to the project area, Monument will
begin to develop a project-specific ROW plan. This plan will provide a detailed scope, cost, and schedule for the project along with the various risk and quality control expectations.

Roles and responsibilities will be defined, and key decision points and decision makers will be defined.

ROW CERTIFICATION
With all of the rights in-hand necessary for construction, Monument will prepare and submit to Caltrans, and FHWA, if necessary, a ROW certification form and other required documents in accordance with the Caltrans Right of Way
Manual and FHWA requirements.

The schedule for ROW certification is dependent
on availability of ROW funds that have yet to be
obligated. Our proposed project schedule shows
an anticipated award of grant funds for ROW and
construction with ATP Cycle 8 in December 2026.

The earliest ROW acquisition funds are anticipated
to be available is June 2027. Therefore, ROW
Certification is anticipated in August 2028 with RFA
for construction prior to December 2028.

UTILITIES
One of the key aspects of the project is identifying the utilities within the project limits to determine if any relocation or adjustments are necessary. There is a need to relocate utility poles within the limits of the new multi-use pathway and sidewalks. Also, utility pole relocation may be required to keep the evacuation route clear during an emergency
Advancing coordination with PG&E for the relocation
of utility poles in conflict with the multi-use pathway is critical, as completion of design and relocation by
PG&E can take over one year to complete. Additional
time to complete relocations of PG&E facilities can be
required during construction if PG&E work crews are
reassigned to emergency response projects elsewhere. To help save time, Mark Thomas will utilize the topographic and right of way surveys we completed during the prior phase of project development to initiate early coordination process with PG&E, as one of our early items of work.

A valuable lesson learned from our previous SR 162 Project is the importance of accurately mapping underground
utilities and identifying the need for adjustment or relocation early in the design process to avoid complications during construction. To achieve this, we will employ more accurate methods to positively identify existing utilities within the project limits. Caltrans Project Development Procedures Manual (Ch. 17, Section 2–Utility Policies) requires positive location information for underground high-priority utilities (i.e., natural gas pipelines greater than six inches in diameter, or with normal operating pressures greater than 60 psig, and high-voltage electric supply lines, conductors, or cables that have a potential to ground of greater than or equal to 60 kV) if the project involves excavations greater than six inches deep beyond the existing roadbed limits or digging beyond the limits of the existing pavement structural section within the roadbed. These procedures must be applied to all Local Assistance projects.

As an optional service, our firm has subsurface utility exploration (SUE) capabilities to scan utilities that will locate and provide horizontal locations for underground utilities along the length of the project corridor. We are proposing to conduct potholing to supplement our utility mapping
methods to provide positive identifications for underground utilities. It is anticipated that 40 potholes will be necessary.

This approach will help provide a smooth construction
process and may lead to cost savings during
construction. Coordination with Caltrans Local Assistance will be required to prepare utility certification packages, including the Notice to Owner, Reports of Investigation, and Utility Agreements, for utilities requiring relocation.

Timing preparation of utility certification documents is key and needs to be coordinated with construction funding
deadlines and anticipated timeframes to complete the
work to ensure utilities can be relocated in a timely manner.

Exhibit A
790
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 33 ends

ENVIRONMENTAL
Based on the preliminary environmental analysis
conducted for the development of this proposal, key
environmental issues to be addressed as part of this project are described below.

The environmental clearance involves completing the City’s California Environmental Quality Act (CEQA) process and providing technical assistance to Caltrans Local Assistance Environmental staff as they complete Federal Highway
Administration National Environmental Policy Act (NEPA) Delegation requirements.

Our environmental team led by Gallaway has
long-established relationships with Caltrans Local
Assistance technical reviewers, with recent experience
processing roadway and similar complete streets
projects. The project is anticipated to receive federal funds; therefore, the project will include environmental review and clearance for both CEQA and NEPA. With federal funding, the environmental process will involve the Caltrans Local Assistance Program as lead agency for NEPA. The City will act as lead agency for CEQA.

Based on our understanding, the planning and design
schedule will be accelerated to better position the project for ATP Cycle 8 Grant funds. Therefore, we anticipate
early preparation of the technical studies required for environmental review, concurrent with the preliminary
design. Close coordination with the project team will make certain that refinements to the project design can be
incorporated into the environmental analysis.

ENVIRONMENTAL TECHNICAL STUDIES
As the project runs through historic neighborhoods in
the City of Oroville and involves potential acquisition of right of way from adjacent properties, we anticipate that an Archaeological Survey Report (ASR) will be
needed to document the archaeological resources for
compliance with NEPA and Section 106. This information
would also support the CEQA Initial Study/Mitigated
Negative Declaration (IS/MND). We will prepare a Historic Property Survey Report (HPSR) that summarizes the
findings documented in the ASR and Historical Resources Evaluation Report (HRER), if required.

HISTORIC BUILT ENVIRONMENT RESOURCES
As indicated by the records search results obtained from the Northwest Information Center, built environment
resources are present along the proposed trail alignment.

Caltrans will likely require preparation of a HRER to
evaluate the historical significance of any resources
where a portion of its property boundary is included in the proposed project alignment or whose setting would
potentially be affected by the project. Our team will
prepare an Area of Potential Effects (APE) map to Caltrans standards which will include built environment resources in and adjacent to the project alignment. The project’s limited potential to affect built environment resources will be taken into consideration and, wherever possible, these resources will be excluded from the APE. If research (subject to Caltrans concurrence) indicates that there will be no effect to built environment resources, an HRER will not be required.

ARCHAEOLOGICAL RESOURCES
No previously identified built environment historic
properties are anticipated within the APE and it is
anticipated no historic properties or archaeological
resources will be identified as part of the HPSR effort.

Therefore, no Finding of Effect will be necessary.

TRIBAL CULTURAL RESOURCES
Consultation with the Native American tribal
representations will need to be conducted in compliance with Assembly Bill 52 and Section 106 of the National
Historic Preservation Act. We will conduct a records
search at the California Historical Resources Information System’s Northeast Information Center located at Chico
State University for previously conducted cultural resources studies and previously recorded resources that may occur within or adjacent to the project limits. We will contact the California Native American Heritage Commission with a
request for a search of their Sacred Lands files and contact information for local Native American representatives.

BIOLOGICAL RESOURCES
We anticipate that a Natural Environment Study (NES) and a Delineation of Aquatic Resources will be required for compliance with NEPA if jurisdictional waters appear within the APE. The analysis from these studies would also be
incorporated in the CEQA IS/MND.

Key biological topics include:

CREEKS, STREAMS AND RIPARIAN AREAS
The project alignment approaches the Feather River and
Thermalito Canal, while crossing other streams between
Oro Dam Boulevard and Mitchell Avenue that are
potentially subject to jurisdiction by the USACE, CDFW, DWR, and Regional Water Quality Control Board (RWQCB).

Permit applications from these agencies would be required for impacts to the water courses and if removal of trees and vegetation, which would be considered riparian
vegetation, are necessary. Coordination with the design team will be conducted to avoid impacts that trigger
regulatory agency permits for this project.

Exhibit A
791
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 34 ends

SEASONAL WETLANDS
In addition to the drainage crossings, it appears that
there may be waters of the United States located on
Table Mountain Boulevard in the vicinity of Mono Avenue and Jasmine Court, within the grasslands east of Table
Mountain Boulevard. Impacts to this feature would also
require permits from the Corps and/or RWQCB under
Section 404 of the Clean Water Act.

We anticipate that Caltrans may require additional technical studies to address the following resources:

CONSTRUCTION NOISE, VIBRATION,

AIR QUALITY AND COMMUNITY IMPACTS
Due to the project’s proximity of potentially sensitive receptors, it is expected Caltrans will require preparation of Construction Noise and Vibration and Construction
Air Quality Memos. A Community Impact Assessment
Memo will be prepared to briefly discuss the project’s
consistency/compatibility with the existing and future land uses and plans that apply to the project area and identify the potential for the project to result in construction and long-term community impacts within the study area on
businesses, and populations.

SECTION 4F
Section 4(f) protects publicly owned land of parks,
recreational areas, and wildlife refuges and historic sites of national, state, or local significance on public or private land. Section 4(f) specifies that sites of national, state, or local significance may be used for federally funded projects only if:
» There is no feasible and prudent avoidance alternative to the use of such land; and
» The action includes all possible planning to minimize harm to 4(f) lands resulting from such use.

There are project improvements that will be constructed adjacent to and potentially encroaching within the Feather River Fish Hatchery and Oroville City Elementary School, which are considered Section 4(f) resources. A Section 4(f) analysis is required. As the project is anticipated to result in only temporary modifications to these resources in
order to construct the proposed project improvements, we anticipate a Temporary Occupancy Memo will be required
for NEPA.

HAZARDOUS MATERIALS
Based on Caltrans guidelines and previous experience
working on similar projects with right of way acquisition, environmental concerns could pose a risk to project
development, including pesticide residues from agricultural land uses, aerially-deposited lead (ADL) associated with historical car emissions prior to the elimination of lead in gasoline, and hazardous materials associated with rail corridors. Caltrans will likely require preparation of an Initial Site Assessment and potentially a Preliminary Site Investigation, including subsurface testing of soils along the proposed trail alignment to identify and evaluated
potential effects associated with these hazardous materials.

VISUAL RESOURCES
The proposed project transverses potentially scenic
resources. The project would construct a new multi-use
pathway, sidewalks, landscape buffers and medians and
pedestrian crossing improvements. While the majority of these improvements would be at-grade and would have
limited visual impact to scenic resources along the corridor, Caltrans is anticipated to require preparation of a Visual Impact Memorandum to document visual issues associated
with the project.

ENVIRONMENTAL DOCUMENTS
We understand that the proposed project will require
preparation of a Categorical Exclusion (CE) for
environmental compliance under NEPA. We will prepare
an IS/MND for compliance under CEQA, based on the
findings and evidence from the technical studies prepared above. In compliance with the Caltrans Local Assistance guidelines and manual for Federal Aid projects. We will closely follow the guidance of the Caltrans Standard
Environmental Reference (SER) to ensure completeness
of studies, address the potential concerns of reviewing agencies, and minimize the number of revisions and
re-submittals to Caltrans to accomplish environmental
approval in a timely manner.

ENVIRONMENTAL PERMITTING
If there are any impacts (i.e., permanent or temporary fill, excavation, etc.) to state- or federally-owned water, then permits will be required. If necessary, and as an optional task, our team will assist the City in obtaining the necessary regulatory permits for project construction, including a 1602 Streambed Alteration Agreement from the CDFW,
401 Water Quality Certification from the RWQCB, and a
Nationwide Permit from the USACE in compliance with
Section 404 of the Clean Water Act.

While the proposal identified an Environmental Review
Record as a task, that is a term typically associated with NEPA CEs that are performed outside of the Caltrans Local Assistance process and we are assuming that the intent
was to request an Environmental Commitment Record
(ECR) Upon receipt of all environmental permits (if needed) and agreements, we will draft an ECR to document all
mitigation measures, AMMs, conditions and requirements
of the environmental permits. This document will be
passed on to the engineering team as a live document so that the engineering conditions and requirements can be incorporated to the final PS&E.

Exhibit A
792
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 35 ends

PERMITTING AND COORDINATION
Successful project implementation will require coordination with multiple agencies to comply with regulatory requirements and project goals. Obtaining required permits from some agencies will also be necessary. Below we identify and discuss agencies that we will coordinate with for potential permitting.

CALIFORNIA DEPARTMENT

OF WATER RESOURCES (DWR)
The Project will connect to existing bridges without
impacting the approaches to the Feather River Bridge
or the Thermalito Power Canal Bridge. However, it is
anticipated that construction is required to connect the new sidewalk to the existing sidewalk on the Thermalito Power Canal Bridge and to conform to existing sidewalks at the driveway entrance to the Feather River Fish Hatchery.

These buildings are part of the State Water Project
operated by DWR. The Project will not modify existing
hydrology, and the design will maintain the existing grade without major grading through the areas approaching the Thermalito Power Canal and Fish Hatchery driveway. Since the project impacts are minimal, an encroachment permit with DWR is anticipated.

No work is anticipated that would impact a Central Valley Flood Protection Board (CVFPB) facility. Therefore, no CVFPB permitting is anticipated for this project.

CALTRANS
The Project will encroach into Caltrans right of way at the Oro Dam Boulevard (SR 162) intersection, where proposed improvements include reconstruction of concrete curb,
gutter, curb ramps, and signal modifications to address ADA accessibility requirements. This will require coordination with Caltrans to obtain an encroachment permit for construction.

Our team has extensive experience collaborating with
Caltrans District 3 staff to successfully secure encroachment permits and obtain other necessary approvals.

UTILITY COMPANIES AND AGENCIES
The relocation and adjustment of utilities will be necessary to accommodate the proposed improvements. This
process will require close coordination with utility
companies and agencies to identify potential conflicts
and develop relocation plans. Early engagement with
utility companies and agencies will help ensure a smooth process, compliance with regulatory requirements, and
timely completion of the work.

BUTTE REGIONAL TRANSIT
Coordination with Butte Regional Transit, the operator
of the B-Line bus service, will be necessary to address temporary bus stops and finalize design elements as well as necessary coordination during construction.

The following are the bus stops that are located within the project limits:
» Washington Avenue/Oro Dam Blvd
» Washington Avenue/Yard Street
» Table Mountain Blvd/Grand Avenue
» Table Mountain Blvd /Nelson Avenue
» Table Mountain Blvd/Flying Cloud Drive
» Table Mountain Blvd/Jasmine Court
Relocation or replacement of bus shelters/stops at
Washington Avenue/Oro Dam Blvd, Table Mountain Blvd/
Grand Avenue, and Table Mountain Blvd/Flying Cloud Drive will be required to accommodate the project’s proposed
improvements. No additional bus stop amenities are
planned with the project.

UPRR AND CPUC
Modification to the bridge over UPRR is necessary
to accommodate the proposed improvements. The
modification includes widening the existing bridge barrier, which requires replacing the barrier on both sides of the bridge. This work requires coordination with UPRR and
CPUC. Coordination and approvals from UPRR can be a
challenging process. We have extensive experience
coordinating and receiving approvals from UPRR
and can anticipate the railroad’s requests during a
diagnostic meeting.

UPRR PROCESS
Approval of a General Order 88-B (GO 88-B) application
for the UPRR crossing will document the rail authority’s and CPUC’s acceptance of the project. Additionally,
to construct the improvements, a construction and
maintenance agreement between the City and UPRR will
need to be executed. The construction and maintenance
agreement finalizes approvals of all items coordinated and reviewed by UPRR. The execution of the construction
and maintenance agreement is required prior to
construction and is the highest risk to the project
schedule.

We will also work closely with the Diagnostic Team, formed of UPRR and CPUC staff, and their consultants. Mark
Thomas has built close relationships with the Diagnostic Team, and will leverage this experience to expedite railroad coordination and eliminate delays.

Exhibit A
793
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 36 ends

SUBMITTAL A
City submits a concept drawing to UPRR and the CPUC for review.

PRELIMINARY ENGINEERING (PE) AGREEMENT
UPRR requires an agreement with the City to allow UPRR staff to participate in the project and provide reviews. Based on project complexity, the reimbursement amount is expected to be $20,000 to $30,000.

FIELD DIAGNOSTIC MEETING
This meeting is required to discuss the City’s intent to construct improvements with UPRR and CPUC. The Diagnostic Team will review the concept drawings and identify any improvements that UPRR may require.

CONCEPT DRAWING REVIEW
Based on the field meeting, revisions to the proposed conceptual improvements are submitted to UPRR and CPUC for review and acceptance.

UPRR PROJECT ACCEPTANCE
After reviewing the concept, UPRR will issue a project concurrence letter, which will be required to process the GO 88-B application.

ENVIRONMENTAL DOCUMENT
An adopted environmental document (assumed CEQA IS/MND) is required as an attachment to the GO 88-B.

CONSTRUCTION AND MAINTENANCE AGREEMENT
When all reviews (engineering and right of way) are complete, UPRR will draft an agreement for City review and execution.

GO 88-B SUBMITTAL
Completion of items above will allow the submittal of the GO 88-B. After a 45-day challenge period, the application is placed on the CPUC consent calendar for approval. An approved GO 88-B has a three-year shelf life to be completely constructed.

WORKING WITH THE UPRR PROCESS
As the schedule is highly impacted by UPRR and CPUC coordination, it is critical that rail delays be minimized. The flowchart below shows the steps needed to mitigate the risk of delays.

Exhibit A
794
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 37 ends

FUNDING ALLOCATION PROCEDURES
The City received $2.3M in Congestion Mitigation and Air Quality (CMAQ) and $190,000 in Highway Infrastructure
Program (HIP) funds from BCAG for the preliminary
engineering phase. The intent of the City and BCAG is to leverage these funds to secure grant awards for PS&E,
right of way, and construction funds.

In 2024, Mark Thomas worked with the City to prepare
three ATP Cycle 7 grant applications for the project. The overall project application scored a 91. While a great score, the limited ATP dollars in Cycle 7 impacted the success of the application. BCAG and the City attended the debrief on the application and notes are available.

Mark Thomas will utilize the ATP Cycle 7 application
to pursue a Cycle 8 grant for the entire corridor. The
application will pursue PS&E, right of way, and construction funds. We will update the narratives to address comments from the California Transportation Commission (CTC),
highlight project attributes, and address new grant criteria.

We will also prepare updated maps, as necessary, to
address updated underserved communities criteria.

In addition to ATP Cycle 8, we will review other grant
programs. We will work with the City to identify and prepare an additional grant application to expand our opportunities beyond the ATP. Potential programs include the Safe Streets and Roads for All program, Better Utilizing Investments to Leverage Development (BUILD) program, Local Partnership Program (LPP), and new Proposition 4 programs.

Our experience with the previous grant application will allow our team to expeditiously prepare the grant application.

The project already has federal CMAQ and HIP funding
and is expected to include federal ATP funding. These
funding sources require that we follow LAPM and LAPG
procedures for requesting funds, which include the
following documentation:
» Exhibit 3-A – Request for Authorization (RFA) package – Federal Transportation Improvement Program (FTIP)
project listing
– NEPA document
– Exhibit 11-O – 23 CFR 667 Resiliency Evaluation
Certification (new requirement)
– Exhibit 9-D – DBE Contract Goal Methodology,
if required
» Exhibit 25-A package
– Exhibit 3-A RFA package
– CTC programming action or California Transportation
Improvement Program System (CTIPS) entry
– CEQA document
It takes approximately two months to get on the
CTC agenda for authorization of the funds. This
needs to be included in the schedule to avoid
any schedule delays. Mark Thomas has ongoing
experience providing funding allocation support for
state and federal programs, including most recently
on the Pioneer Road Improvement Project for the
City of Los Banos.

CONSTRUCTION STAGING
Construction staging is a critical component of the project and will be carefully considered throughout the preliminary corridor planning and early PS&E phases to identify the most effective staging options. AASHTO, Caltrans, NACTO, and relevant City plans will guide the development of
initial cross-section layouts and detailed views to illustrate staging concepts for public and stakeholder reviews.

A well-planned construction staging approach is essential, particularly in managing roadway and driveway access
impacts due to construction. Night work may be necessary in certain locations. Work in school zones will be planned around bell schedules to minimize disruptions to pick‑up and drop-off areas. In historic neighborhoods, where
residents depend on street parking, efforts will be made to mitigate parking loss as much as possible.

Noise impacts in residential areas will also be a key
consideration, with strategies implemented to minimize
disturbances through scheduling adjustments and
mitigation measures.

Clearly communicating with stakeholders will create a shared understanding of construction phasing and driveway access plans. In areas requiring full pavement reconstruction, specialized staging techniques will be critical to maintaining business accessibility.

Coordination with Butte Regional Transit, the operator
of the B-Line bus service, will be necessary to address temporary bus stops and finalize design elements as
well as necessary coordination during construction.

Bicycle and pedestrian accommodations or detours will
be identified and reviewed early in the design process.

Additionally, close coordination with UPRR will be crucial for modifications to the structure over the UPRR tracks.

Lessons learned from the SR 162 Mobility Improvements
Project will be incorporated to optimize staging methods, considering geotechnical recommendations and
addressing night work and noise concerns, particularly
in residential areas.

Exhibit A
795
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 38 ends

SCOPE OF WORK
Task 1 PROJECT MANAGEMENT

AND COMPLIANCE
Task 1.1 PROJECT MANAGEMENT
Mark Thomas will provide ongoing general project
management for this project, including coordinating
subconsultant activities and submittals. General project management will also include organizing and maintaining files and records to track correspondence, contractual
matters, data requests, transmittals, and other pertinent data. Mark Thomas will prepare monthly invoices including a monthly progress report and budget spreadsheet that
will show current and previously billed tasks.

Mark Thomas will coordinate design activities with
subconsultant team members and stakeholders through
regular communication via telephone calls, emails, and
other correspondence. We will also prepare, update,
maintain, and distribute a Critical Path Method (CPM)
schedule for task order activities. Schedule updates will be distributed on a monthly basis at a minimum. The initial schedule will be prepared for and approved by City staff at the outset of the project. The duration of this project is 32 months to prepare preliminary and final design packages and to provide support for public outreach efforts, utility relocations, right of way acquisition, and bidding. This duration does not include support during the construction phase of the project.

Mark Thomas will identify potential risks that could impact the project’s schedule, budget, or scope. Mitigation
strategies will be developed to minimize or eliminate
potential impacts, ensuring project continuity and efficiency.

All identified risks, assessments, and mitigation measures will be documented in a Risk Register for ongoing monitoring and management throughout the project lifecycle.

Task 1.2 MEETINGS
Mark Thomas will attend a project kick-off meeting
and monthly coordination meetings with the City as
needed. In general, it is assumed these meetings will
be attended via Microsoft Teams or another web-based
meeting application. Coordination check-in meetings
will include representatives from Mark Thomas, City
staff, and other stakeholders as directed by the City. This task includes preparation of loose agendas and a log of action items. The project CPM schedule identified below will be distributed and reviewed during coordination
meetings along with updates on various activities. Project development team (PDT) meetings with multiple project
team, City staff, and stakeholders may take the place of the monthly coordination meetings when needed.

Mark Thomas will coordinate and attend up to forty (40) coordination meetings with the City and other agencies
(i.e., Caltrans, DWR, and BCAG) to resolve technical issues.

Mark Thomas will participate and provide support for public workshops, property owner meetings, and City Council
presentations as included elsewhere in this Scope of Work.

Task 1.3 QUALITY CONTROL
The Mark Thomas Quality Control plan consists of
established procedures for performing the work (which
are re-assessed with each project), including methods
for design calculations, establishing appropriate levels of design development for intermediate submittals,
identification of required plan checks, design checklists, and methods of project documentation. Our QC/QA
Manager will implement and maintain these quality control procedures during the preparation of plans and documents throughout design.

Task 1.4 STAKEHOLDER DATABASE AND

OUTREACH MANAGEMENT
As a subconsultant to Mark Thomas, AIM will attend a
project kick-off meeting and up to 6 project team meetings.

Other project management tasks may include providing
strategic advice and counsel, attending other projectrelated meetings, monitoring team communications, and reviewing project materials and reports.

Public Engagement Plan
Before the start of the community engagement, AIM
will submit a Community Engagement Plan to City staff
for review, outlining a detailed schedule of events, social media outreach, outreach collateral, and CBO lists to meet with. AIM will ensure that the plan specifies a targeted engagement plan for disadvantaged and underrepresented
communities throughout the planning process to ensure
the project team understands their needs and incorporates their priorities into the plan.

AIM will develop and maintain a property owner/
stakeholder database throughout the project. This
database will include stakeholder names, contact
information, the preferred method of contact, and
potential key concerns and/or areas of project interest.

AIM will work with the City to identify key stakeholders and property owners as needed. AIM will document and
respond to all electronic inquiries through email and social media channels.

Exhibit A
796
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 39 ends

Brochures, fact sheets, and flyers can be issued to educate the community about the project, advertise all activities and meetings, and provide notification of upcoming
construction events. AIM will develop all materials utilizing a template consistent with the project brand, which can be easily updated, printed, and/or distributed electronically and placed on the project webpage. All materials will be translated into English, Spanish, Russian, and Ukrainian.

AIM will prepare and mail project information flyers to properties and tenants in the vicinity of the project up to two times during the project development to update the
constituents of the project. The mailer will include, but is not limited to, project description, aesthetics, access issues, schedule, anticipated date for public meetings, and schedule. AIM will mail the postcard to residences and
property owners in the vicinity identified by the City.

Task 1.5 PUBLIC WORKSHOPS
AIM will coordinate and facilitate eight in-person public outreach meetings to the local community and adjacent
residents and businesses. These stakeholders will be
contacted early in the project development so that the
appropriate modifications to the project can be included in the design. AIM proposes four (4) pop-up meetings
and four (4) community/public meetings.

Key issues to address during the public meetings:
» Provide a project design update and any associated
impacts
» Gather feedback on design
» Provide an update on the construction phase
Pop-up workshops can provide an opportunity to advertise the major touchpoints and to get early input before each engagement event. It is also an effective technique to meet the community where they are already gathering. Each
pop-up workshop will occur at a community destination,
local event, or high-pedestrian key shopping center. AIM recommends one round of two pop-up events during the
early design phase and two during the final design.

AIM will plan, provide all supplies, and coordinate all logistics for the four pop-up workshops. AIM will develop engagement activities, board displays, interactive
community engagement activities, informational fact sheets and brochures, and comment cards.

AIM will develop meeting content and format, coordinate logistics, and facilitate four community-wide in-person workshops. AIM will develop informational materials
regarding the project for the meetings. AIM will record all comments and questions from the meeting and
respond when appropriate while developing an FAQ list
for the website. Attendees will be asked to sign in and provide their contact information and will be added to the notification distribution list. AIM will compile a meeting summary within 2 weeks of each meeting.

Notifications for Community Workshops (4)
AIM will coordinate with the City and the project team to ensure that each workshop is well-advertised. In addition, AIM will work with the City’s existing communication
channels to disseminate project information and ensure
that the community is informed throughout the project’s duration. AIM will provide content to the City for posting to the project webpage, calendar, and social media channels.

Task 1.6 CITY COUNCIL PRESENTATIONS
Mark Thomas will assist City staff with the preparation for and execution of up to two (2) presentations to the City Council. City Council meetings will be scheduled to concur with development of the construction phasing plan and
environmental clearance document and with development
of the final design plan.

Anticipated team’s roles and responsibilities:
» Mark Thomas and City staff will develop the purpose
and desired outcome for the presentation
» Mark Thomas will attend the meeting and co-facilitate the discussion as needed
» Mark Thomas will prepare summary notes
Task 1.7 FUNDING APPLICATION

SUPPORT
Mark Thomas will prepare one (1) ATP Cycle 8 Grant
Application anticipated to be released in June 2026,
addressing debrief comments from the California
Transportation Commission. We will prepare one (1) other state or federal grant application to be identified at a later date. The applications will be prepared in accordance to the grant program guidelines and requirements. The documents prepared for the applications will include narratives, vicinity maps, collision diagrams, striping plans, demonstrative exhibits, letters of support, and other application
requirements. Mark Thomas will coordinate support with
stakeholders as identified by the City. We will also package and submit the grant applications on behalf of the City.

DELIVERABLES
» Monthly progress reports and invoices (up to 32)
» Monthly CPM schedule updates (up to 32)
» Monthly Project Coordination Meeting Attendance
(up to 32 meetings)
» Stakeholder Meeting Attendance (Up to 8 meetings)
» QC/QA Checklist (at milestone submittals)
» Public Engagement Plan
» Property Owner/Stakeholder Database
Exhibit A
797
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 40 ends

» Communication Collateral and Direct Mail (Up to 2)
» Pop-up Workshop Plan and Materials (Up to 4)
» Community Workshop/Public Meetings
(Assume 4 events)
» Presentation at City Council (Up to 2)
» Risk Register (Updated at project milestones)
» ATP Cycle 8 Grant Application
» State/Federal Grant Application
Task 2 DATA COLLECTION
Task 2.1 PROJECT INITIATION

AND SITE VISITS
Mark Thomas will coordinate the project kick-off meeting with the City and members of the design team to discuss the project background, scope, concepts, schedule, project management, potential stakeholders and issues, outreach opportunities, and expectations. Mark Thomas will provide a project information gathering checklist to collect data elements needed for the design, including GIS mapping
information, City-owned facility maps, utility contacts, asbuilt and planned improvement drawings, and available traffic counts and speed studies.

The data gathering process will include a review of the existing site characteristics. Mark Thomas will conduct site visits and take photographic inventory of existing conditions to reference during the design process and
make observations related to sight distance at pedestrian crossings, ADA compliance, and identify potential conflicts with existing utilities and privately-owned improvements within the public right of way. For estimating purposes, 2 days of site visits have been assumed to complete the field reviews. A photo log will be prepared and submitted to the City electronically.

Task 2.2 SURVEY AND MAPPING
Task 2.2.1 CONTROL SURVEYS
Mark Thomas will establish and set project control along Washington Avenue and Table Mountain Boulevard
between Oro Dam Boulevard and Thermalito Power Canal.

Horizontal project control will be based on the California Coordinate System of 1983 (CCS83), Zone 2, and the
vertical datum will be based on NAVD88. Durable project control will be set with the intention of being used through the construction phase. Mark Thomas field crews will set up to twenty-four (24) ground control targets to support collection of Mobile Terrestrial Lidar Scan (MTLS) data.

A control statement with point values and datums used will be provided.

Task 2.2.2 RECORD LEVEL RIGHT OF WAY

MAPPING
Mark Thomas will plot the existing right of way along
Washington Avenue and Table Mountain Boulevard
between Oro Dam Boulevard and Thermalito Power Canal
(approximately 2.25 miles) based on record information
shown on survey maps along with a sample of boundary
monuments collected in the field. This task includes research for record maps and supporting documents conducted at
the County, along with coordination with Caltrans.

Task 2.2.3 TOPOGRAPHIC SURVEYS

AND ORTHOIMAGERY
MTLS data will be collected along the project corridor
(approximately 2.25 miles, from back of walk to back of walk or 10 feet past edge of pavement where no sidewalk exists). It is assumed data will not be needed along the Feather River Bridge, only at the beginning and end of the bridge. MTLS technology allows mass collection of designlevel topography from a vehicle moving with traffic. This technology also allows a reduction in survey crew exposure to motor vehicles, thus increasing safety. From the MTLS survey, break lines and point features will be extracted and then compiled into an AutoCAD 2022 drawing with
DTM. Topography will be shown at 50 scale with 1 foot
contour intervals. As this will be a reference for design, it is assumed no sheets will be produced.

Mark Thomas has allocated up to ten (10) days (at 10
hours per day) of field crew time to conduct supplemental topographic surveys and collect data on above-ground
surface-visible utilities and manhole structure inverts and flow direction along the project corridor. Supplemental topographic survey will be limited to 5 feet past the back of walk. From the LiDAR scan data and supplemental
topographic survey, Mark Thomas will compile a
topographic base map of the project corridor and create a surface, complete with break lines, to be used for design.

Task 2.2.4 UTILITY MAPPING
Mark Thomas will perform Subsurface Utility Engineering (SUE) Quality Level D (QL-D) surveys. This will consist of retrieving a list of utility owners that may be affected by the project. Based on the list Mark Thomas will send out utility request letters (“A” letters) and conduct record research.

Mark Thomas will then create and update a utility matrix for the project to track the status of record requests.

All mapping that will be obtained for this task will be sent to the design team and the matrix will be provided. Mark Thomas will follow up once with utility companies that have not responded and provide additional mapping received
60 days after A letters.

Exhibit A
798
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 41 ends

Mark Thomas will take the utility mapping provided and
plot it into a utility base map. Underground utility mark-out and detection is excluded under this scope of work. Utilities will be drafted against above-ground surface-visible
utilities collected during topographic surveys and updated once supplemental surveys are completed.

This task includes time for Mark Thomas field staff to
collect locations of up to forty (40) potholes. Traffic control to complete recording pothole locations has been included in ODCs.

DELIVERABLES
» Photo Log of Site Conditions (provided electronically) » Topographic Base Mapping
» Control Statement, Point values, and Datums
» Right of Way Mapping
» Utility Mapping and “A” Letters
Task 3 ENVIRONMENTAL STUDIES

AND DOCUMENTATION
Task 3.1 PROJECT INITIATION,

PROJECT DESCRIPTION,

PES, AND FIELD REVIEW
As a subconsultant to Mark Thomas, Gallaway Enterprises (Gallaway) will attend a project kick-off meeting to discuss communication and information exchange protocols,
review project work schedules, and confirm current
project description applicability for use in all of the technical studies, CEQA/NEPA documentation, and permit
applications. It is our experience from working on similar projects that use of a consistent project description in all technical studies facilitates efficiency, defensible data analysis, and consistent impact determinations during the permitting process.

Gallaway will help the project team develop an Area of
Potential Effects (APE) map. Gallaway will prepare the
Preliminary Environmental Study (PES) forms and attend
the field review meetings. This task will include:
» Database research (FEMA, GeoTracker, species lists,
air quality, etc)
» Initial mapping
» Conducting field visits to each site to conduct
preliminary field investigations of environmental
resources
» Obtaining current photographs
» Developing initial determinations on the types and level of impacts required to complete a PES form
The draft PES forms will be circulated to the project team and then to Caltrans for review and approval. Some of the technical documentation that is assumed for the proposed project may be different than what is required by Caltrans.

Therefore, if there are differences between assumptions and requirements identified in the approved PES,
re-scoping may be required.

Mark Thomas will prepare Field Review forms to include
with the Field Review and PES package submitted to
Caltrans. We will prepare:
» Exhibit 7B–Field Review Form
» Exhibit 7C–Roadway Data Sheet
» Exhibit 7G–Field Review Attendance Roster
» Exhibit 13E–Preliminary Engineering Right of Way
Checklist
Field Review forms will be updated based on Caltrans
comments received from the Field Review and resubmitted with the updated PES for Caltrans’ approval.

Task 3.2 TECHNICAL STUDIES
Task 3.2.1 NATURAL ENVIRONMENTAL STUDY
Gallaway will prepare a draft Natural Environmental Study (NES) for the APE. The NES document will be prepared
taking into consideration the information obtained from the respective wetland delineations, field surveys, project specific impacts, and mitigation. Gallaway will ensure that surveys are conducted within the appropriate survey
windows even if the project description is not finalized.

Gallaway will document all vegetation communities and
plant species observed on-site. The NES report will follow Caltrans’ most recent guidance and document formats.

Project plans must be completed to the degree that
impacts to waters of the United States (WOTUS) and native trees can be accurately estimated. Gallaway assumes that Mark Thomas will identify tree locations and DBH on the design plans.

Task 3.2.2 DELINEATION

OF AQUATIC RESOURCES
Delineations of Aquatic Resources are required if
jurisdictional waters occur within the APE. It appears
that there may be WOTUS located on Table Mountain
Boulevard in the vicinity of Mono Avenue and Jasmine
Court. All WOTUS that meet the USACE criteria will be
delineated within the APE. All wetland resources will be mapped and typed according to USACE Feb 2016 standard
mapping standards. A formal Delineation of Waters of the U.S. and Aquatic Resources report per the 1987 Wetland
Delineation Manual and Regional Supplement to the
USACE Wetland Delineation Manual: Arid West Region
(2008, version 2) will be submitted to the client.

Exhibit A
799
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 42 ends

The Delineation of Waters of the U.S. will be considered draft until the USACE provides a jurisdictional
determination. The delineation report will also be
compliant with the following regulatory guidance
documents and standards:
» A Field Guide to the Identification of the Ordinary High Water Mark (OHWM) in the Arid West Region of the
Western United States, August 2008
» Map and Drawing Standards for the South Pacific
Division Regulatory Program, February 2016
» September 2008 Regional Supplement to the USACE
Wetland Delineation Manual: Arid West Region
(version 2.0)
» USACE Minimum Standards for Acceptance of Aquatic
Resource Delineation Reports, January 2016
Task 3.2.3 ARCHAEOLOGICAL SURVEY REPORT

AND HISTORIC PROPERTIES SURVEY
REPORT
Gallaway will coordinate with sub-contractor Genesis
Society to prepare the Archaeological Survey Report
(ASR) and Historic Properties Survey Report (HPSR)
documentation for the project site. This will include:
» Conducting Records Searches involving Records
maintained by the Northeast Information Center (NEIC)
at CSU, Chico
» Consulting with the Native American Heritage
Commission regarding Sacred Land listings and with
local Native American representatives for information
they may provide concerning prehistoric sites and
possible traditional use areas within or near the APEs
» Conducting pedestrian archaeological survey (for prehistoric and historic archaeological sites) within the APEs
» Preparation of an ASR and HPSR documentation,
including relevant Primary Records (State DP 523 forms) for prehistoric and historic-era archaeological sites
identified during the pedestrian field survey
» Delivery of final inventory reports to NEIC and Gallaway In the event that additional architectural documentation in the form of an Historic Resource Evaluation Report (HRER) is identified as a requirement from Caltrans during the PES process, additional scoping and task identification will be required. Gallaway will coordinate and facilitate the review of documents between Mark Thomas, Caltrans, and the City.

Task 3.2.4 VISUAL IMPACT ASSESSMENT (VIA)

TECHNICAL MEMO
Gallaway will prepare a VIA questionnaire which calculates a score based on general inputs and provides a scale to determine the appropriate VIA level. It is assumed that the resulting VIA questionnaire score will be equal to or less than 28 resulting in the applicability of the use of a VIA Memo.

Mark Thomas will prepare a draft and final VIA Memo
for improvements related to the landscape and visual
conditions of the corridor within the project limits. The memo will include a description of existing conditions
and site setting, and provide recommendations regarding plant types, placement, physical character, and visual
impacts of landscape improvements. The VIA Memo will
document the existing visual quality of the surrounding environment and will include up to two (2) key views
with two photo simulation alternatives for each key view, and up to two (2) illustrative sections. Other visualization exhibits may be required to illustrate the proposed project alternatives, evaluate the expected visual change caused by a project, assess public reaction to the expected change, identify visual impacts, and recommend measures to
avoid, minimize or mitigate adverse visual impacts. These additional exhibits may be added as an optional service.

Task 3.2.5 COMMUNITY IMPACT ASSESSMENT
MEMO
Gallaway will prepare a Community Impact Assessment
Memo (CIM) in accordance with the Caltrans Volume 1,
Chapter 24 of the Standard Environmental Reference (SER).

While similar to a Community Impact Assessment, a CIM
can be used to simply state there are no community issues or resources of concern in the project area. It can also state that community resources exist, but studies show there are no, or minimal, potential impacts from the project.

Task 3.2.6 INITIAL SITE ASSESSMENT
As a subconsultant to Mark Thomas, Crawford will prepare an Initial Site Assessment (ISA) to evaluate the Washington Avenue and Table Mountain Boulevard alignment (project
alignment) and adjacent properties for evidence of
recognized environmental conditions (RECs) and/or potential RECs that may significantly impact the project. The ISA will include Washington Avenue from Oro Dam Boulevard at the southern limit to Montgomery Street, and Table Mountain Boulevard between Riverview Terrace Drive and County
Center Drive at the northern limit. The Feather River Bridge is not included in this alignment. The ISA will be prepared in accordance with the procedures set forth in ASTM E1527‑21 and Caltrans’ Standard Environmental Reference, Chapter 10, and will include the following elements.

Physical Setting Review
The ISA review will include a summary of geologic
conditions (including faulting and naturally occurring
asbestos, if applicable) underlying the subject property or in the project site vicinity, based on readily available geologic mapping from the US Geological Survey and the California Geological Survey; and a summary of hydrogeologic
conditions (including depth to groundwater and regional groundwater flow, if readily available) based on information from websites maintained by the State of California.

Exhibit A
800
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 43 ends

Historical Land Use Review
Environmental Risk Information Service (ERIS) will provide historical aerial photographs, historical USGS topographic maps, city directories, and Sanborn fire insurance maps (where available) for the subject property and vicinity.

Crawford will review this information to develop a history of general property uses for the subject property and
surrounding parcels back to the subject property’s first development, or 1940, whichever is earlier.

Records Review
ERIS will also conduct a computerized search of
reasonable, ascertainable, federal, state, local, and tribal environmental agency database records. These database
records will be reviewed for information pertaining to the subject property, and properties within ASTM standard
search radii applicable to each database. The databases searched will include, at a minimum, all databases specified in ASTM E1527‑21.

Site Reconnaissance and Sample Collection
Crawford will perform a driving and walking reconnaissance of the subject parcel and vicinity to observe current
conditions. Conditions on adjacent parcels will be observed from the public right of way. The reconnaissance will include observations of geologic, hydrogeologic, and topographic conditions; uses and storage of hazardous materials and wastes within and adjacent to the project alignment;
and general conditions with regard to the presence of
underground and above ground storage tanks, drums, wells, electrical equipment, stockpiled soil, vegetation, odors, and sewage/waste disposal, as appropriate.

Crawford will also collect soil samples to screen for aeriallydeposited lead in soil along the shoulders of Washington Avenue and Table Mountain Boulevard. Samples of native
soil will be collected immediately adjacent to ADA ramps scheduled for replacement, or from existing sidewalk gaps.

Crawford will mark sample locations for USA/811 clearance during the ISA site reconnaissance.

A Crawford sampling technician will return to the site to collect soil samples from up to twelve locations along
Washington Avenue and twelve locations along Table
Mountain Boulevard. Soil samples will be collected at depths of 0‑6", 12"-18", and 24"-30" below ground surface (total of 54 soil samples). Samples will be collected with a hand auger. All samples will be analyzed for total lead by EPA Method 6010, and six samples (two from each street) will be analyzed for pH by EPA Method 9045. Samples with total
lead concentrations that exceed 50 milligrams/kilogram
will be further analyzed for soluble lead using the WET and TCLP methods. For budgeting purposes, we assume that 18 soil samples will require additional analysis for soluble lead.

Analytical results will be included in the ISA Report.

Interviews
Where warranted by observations and data, Crawford
will make reasonable attempts to interview current and
past property owners or tenants of adjacent properties, if from the property of the project alignment environmental impact is suspected, where names and contact information are provided. Crawford many also contact City or Butte
County Environmental Health Department to inquire
about knowledge pertaining to the project alignment or
properties in the site vicinity, as warranted by the findings and reconnaissance.

Report of Findings
An ISA report documenting our assessment will be
prepared. The report will include, but not necessarily be limited to, the following:
» Description of the subject property and vicinity
» Summary of the physical setting, local geologic
conditions, and hydrogeologic conditions
» Summary of the historical record review
and historical site usage
» Findings from the records review
» Site reconnaissance observations
» Interview results
» Photographs of significant items of environmental
concern observed during the site reconnaissance
(if any)
» Findings, Opinions, and Conclusions on potential
impacts, including a summary of RECs, and a discussion
of significant data gaps and data failures
» Recommendations, as warranted by the findings for
additional investigation and/or sampling for potentially hazardous materials
Task 3.3 CEQA/NEPA DOCUMENTATION

AND ENVIRONMENTAL

COMMITMENT RECORD
Gallaway will provide CEQA and NEPA services as well
as assistance with responding to public and agency
comments. Based on our understanding of the proposed
project a §1502(c) CEQA Categorical Exemption is the
appropriate level of CEQA review. Gallaway will provide assistance and peer review on the Categorical Exemption/ Notice of Exemption process. We see our role in this
process as providing a draft Notice of Exemption form
for City staff to sign, as the City can typically process Categorical Exemptions without outside assistance.

In regards to NEPA clearance, Caltrans, as the FHWA
designated Lead Agency, typically handles all NEPA
documentation utilizing supporting technical studies such as the NES and the ASR/HPSR. Gallaway will ensure that all technical studies comply with Caltrans and NEPA standards.

Exhibit A
801
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 44 ends

While the proposal identified an Environmental Review Record as a task, that is a term typically associated with NEPA CEs that are performed outside of the Caltrans Local Assistance process and we are assuming that the intent was to request an Environmental Commitment Record (ECR). Upon receipt
of all environmental permits and agreements, Gallaway will draft an ECR to document all mitigation measures, AMMs, conditions, and requirements of the environmental permits.

This document will be passed on to the engineering team as a live document so that the engineering conditions and requirements can be incorporated.

Task 3.4 ENVIRONMENTAL PERMITTING
(OPTIONAL)
Environmental permitting is currently not included in the scope of work for the project. If necessary, and as optional tasks to be completed for an additional fee upon approval from the City, Gallaway will provide the following tasks:

Task 3.4.1 CLEAN WATER ACT
& USACE PERMIT FACILITATION
Gallaway assumes that the proposed project will require a Clean Water Act (CWA) § 404 Permit from the USACE.

Projects of this nature are generally covered by Nationwide Permit (NWP) 14 (Linear Transportation Projects). NWP 14 applies to activities required for the construction, expansion, modification, or improvement of linear transportation
project in WOTUS. Currently, for linear transportation
projects in non-tidal waters, the discharge cannot cause the loss of greater than 1/2 acre of WOTUS. Gallaway will prepare the appropriate USACE permit application based on 60%
design and when it becomes available. In the event that impacts to WOTUS are less than 1/10 of an acre there may be the opportunity to process the §404 permit under what is referred to as a non-reporting NWP.

Task 3.4.2 CLEAN WATER ACT & 401

REGIONAL WATER QUALITY BOARD

CERTIFICATION FACILITATION
Gallaway will prepare the §401 permit application for a Water Quality Certification from the Regional Water Quality Control Board (RWQCB). The submittal will include the current §401 Certification application form, the RWQCB fee calculator spreadsheet, an alternatives analysis (see below), a copy of information that will be submitted as part of the §404 permit application, and CEQA Compliance/Notice of Determination.

Pre-application consultation will be conducted to
determine if any additional information will be required by the RWQCB. If any additional information is determined
to be required by the RWQCB (information to augment
the alternatives analysis), re-scoping may be necessary.

Gallaway will serve as the City’s representative during the application review process. Fees and scope for this task are based on current regulations in effect on the date of this proposal. If the RWCQB requests additional information
after submittal of the permit, a re-scope will be required.

The application must also demonstrate the project is the Least Environmentally Damaging Practical Alternative
(LEDPA).

To determine the LEDPA, the applicant must conduct an
alternative analysis that involves a review of both offsite and on-site alternatives (depending on the level of impacts) to demonstrate that the proposed project is the LEDPA. We assume that the project fit within the Tier 1 level of impacts and associated analysis. The City will be responsible for all RWQCB application fees, which are not included in this scope of work.

Task 3.4.3 SECTION 1602 STREAMBED

ALTERATION AGREEMENT FROM THE

CALIFORNIA DEPARTMENT OF FISH

AND WILDLIFE
Under the assumption that there are impacts to aquatic
features and/or vegetation that are regulated by CDFW,
Gallaway will prepare the §1602 Streambed Alternation
Agreement (SAA) application for submittal to CDFW via
the Environmental Permit Information Management System
(EPIMS) portal. The CDFW requires that construction
drawings, as applicable, are a minimum of 60% complete
and must accompany the permit application.

Prior to submission of the permit application, Gallaway may need to conduct a site visit with CDFW to verify that all desired information is included in our submittal. The cost of one site visit is included in our estimate. The submittal typically includes the §1602 SAA application form, copies of the USACE and RWQCB permit applications, and CEQA
Compliance/Notice of Determination. Gallaway will serve as the City’s representative during the application review process. Our cost estimate and scope for this task are based on current regulations in effect on the date of this proposal.

The City will be responsible for all CDFW application and mitigation fees, which are not included in this proposal.

Task 3.4.4 COMPENSATORY

MITIGATION FACILITATION
In order to fulfill the terms and conditions of the 404, 401, and 1602 permits and agreements, compensatory
mitigation will likely be required. Gallaway will work with Mark Thomas and the City to identify available options
to purchase credits which may be in the form of a private mitigation bank, proponent sponsored mitigation or the
National Fish and Wildlife Foundation (NFWF).

Exhibit A
802
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 45 ends

DELIVERABLES
» Draft and Final APE
» Draft and Final PES
» Draft and Final Field Review Forms
(Exhibit 7B, Exhibit 7C, Exhibit 7G, Exhibit 13E)
» Draft and Final NES
» Draft and Final Delineation of Aquatic Resources
» Draft and Final ASR/HPSR Document
» Draft and Final VIA Technical Memo, including Key View Map, Two (2) Photo Simulations, and Two (2) Illustrative Sections
» Draft and Final Community Impact Assessment Memo
» Draft and Final ISA Report
» Draft CEQA Notice of Exemption Form
» Draft ECR
» Draft and Final Permit Applications (Optional)
» 401 Pre-Application and Permit Application (Optional) » 1602 SAA Application Submitted via EPIMS (Optional)
Task 4 UTILITY COORDINATION
Task 4.1 PREPARE CONFLICT MAPPING
Mark Thomas will utilize the preliminary utility mapping developed in Task 2.2.4 to prepare utility conflict maps (“B” Plans) and coordinate relocation designs with the
affected owners and will prepare “C – Notice to Owner”
letters notifying the utilities of the pending construction.

Should any relocations of private utility facilities be required, it is assumed that these designs will be provided by the private utility company. Mark Thomas will request a claim of liability letter from utility owners with facilities within the project limits requiring relocation.

Mark Thomas will make recommendations for potholing
locations.

Task 4.2 UTILITY COORDINATION

MEETINGS
Mark Thomas will coordinate and hold Utility Coordination Meetings with the City, Design Team, and impacted utility companies.

Task 4.3 MISC. UTILITY

DOCUMENTATION
Mark Thomas will prepare a Report of Investigation and
Notice to Owner for each utility company with facilities in the project limits following Chapter 14 of the Caltrans LAPM. Mark Thomas will coordinate with Caltrans District Utility Coordinator for review and approval prior to sending documents to the utility owners. Mark Thomas will prepare any required utility agreements if funds are exchanged or the City is liable for any portion of the relocations. Mark Thomas will also complete the utility portion of the
right of way certification.

Task 4.4 POTHOLING OF UTILITIES
Utility potholing may be required to identify potential conflicts with underground facilities and allow for advance coordination for design and scheduling of utility relocations needed by others (i.e., PG&E and AT&T) to construct the project improvements. Potential conflicts requiring the raising/lowering or relocation of existing utilities include the relocation and reconstruction of existing storm drain facilities, and relocating or adjusting utility boxes and covers to grade for new sidewalks and medians. Mark Thomas will select and utilize a qualified potholing company to provide positive horizontal location and verification of depth of existing subsurface utilities at locations identified as potential conflict points with the project.

Mark Thomas will perform potholes as part of this
scope of services. For budgetary purposes, we have
estimated potholes at up to 40 locations. However, the
overall number of potholes may change due to the
presence of underground utilities identified during the utility mapping task. Due to the congested nature of the corridor, it is assumed that each pothole will cost $2,000 with needed traffic control and pavement restoration.

Positive verification of existing utilities will still need to be conducted by the contractor at the start of construction to verify the locations and depths of existing facilities.

Mark Thomas shall task a field crew to survey the location of potholed utilities and provide the horizontal and vertical location of the reference points set by others (potholer) as described in Task 2.2.4 of the Scope of Work. This data will be updated in the utility base map and provided to the
engineering team to facilitate design. It is assumed that field crews will mobilize after all potholes have been completed.

DELIVERABLES
» Utility Conflict Maps
» Utility “B” and “C” Letters
» Claim of Liability Request
» Utility Coordination Meeting Agenda and Minutes (6)
» Report of Investigation (ROI)
» Notice to Owner (NTO)
» Utility Agreements
» Right of way Certification (Utilities)
» Utility Potholes and Reports (Up to 40)
Exhibit A
803
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 46 ends

Task 5 RIGHT OF WAY PHASE
& DETERMINATION
Task 5.1 ROW REQUIREMENTS
As a subconsultant to Mark Thomas, Monument will
review the right of way analysis prepared with the 30%
design, and coordinate with the Mark Thomas team to
identify potential right of way acquisitions resulting from updated designs. Additionally, Monument will update
information about existing conditions including ownership, land use, tenants, and existing encumbrances on affected properties. This will help the design team identify, and potentially avoid costly or long-lead acquisitions where possible.

The specific steps Monument will take to determine
impacts and estimate costs are as follows:

1. Review the right of way requirements identified
by the design team

2. Use publicly available data and other real estate
resources to confirm the ownership, land use, zoning,
lot size, and improvements for each affected property

3. Calculate the fee and/or easement area that will need to be acquired for each impacted property using data
from the design team and assessor parcel boundary
information

4. Perform a desktop inspection of properties to confirm the probable acquisition type (full, partial, temporary, etc.) including identifying existing uses to be relocated (if any).

5. Estimate the total capital cost of acquisition for
all parcels including real estate costs, relocation
assistance, severance damages, loss of goodwill,
fixtures and equipment, demolition, and clearance

6. Estimate the total support cost for all parcels including appraisal fees, condemnation costs, title and escrow
fees, environmental fees, and consultant fees as
necessary

7. Escalate costs to anticipated right of way
acquisition date

8. Document proposed acquisitions and resulting
costs in a Right of Way Data Sheet (Exhibit 17-EX21 from the Caltrans Right of Way Manual) for each alternative.

9. Incorporate Utility Relocation Costs prepared by
Mark Thomas into the Data Sheets

10. Update and finalize the Data Sheets based on
feedback from the Mark Thomas Team and the City
Right of way information gathered during preparation
of the cost estimate will also be used to support
preparation of the Environmental Document as needed.

Task 5.2 ROW RETRACEMENT (OPTIONAL)
Mark Thomas will conduct boundary surveys for up to sixty (60) parcels along the right of way of Washington Avenue and Table Mountain Boulevard between Oro Dam Boulevard
and Thermalito Power Canal. The right of way and side lot lines will be delineated based on record maps, vesting deeds, and an analysis of encumbrances, easements and other
supporting documents discovered in preliminary title reports.

Field surveys will be conducted to locate monuments of
record and other physical evidence that can be used to
retrace the existing right of way and side lot lines for parcels identified for acquisition. Cost to obtain up to sixty (60) preliminary title reports has been included in ODCs.

Task 5.3 APPRAISAL EXHIBITS (OPTIONAL)
As an optional task to be completed for an additional fee upon approval by the City, Mark Thomas will draft 11”x 17” appraisal exhibits showing the existing right of way and easements, property owner and APN, acquisition lines and take area in square feet and acreage (if applicable) . Mark Thomas will draft appraisal exhibits for each of the sixty (60) parcel impacted by the project.

Task 5.4 LEGAL DESCRIPTION AND PLATS
(OPTIONAL)
As an optional task to be completed for an additional fee upon approval by the City, Up to sixty (60) legal descriptions and 8.5”x11” plat will be drafted for permanent acquisition and another sixty (60) will be drafted for temporary construction easements. Legal descriptions and plat maps will undergo two technical reviews with the City before being signed and stamped by a Mark Thomas licensed land surveyor.

Task 5.5 APPRAISALS (OPTIONAL)
As an optional task to be completed for an additional fee upon approval by the City, Monument will conduct appraisals to support property acquisitions for the project. All appraisals and appraisal reviews for the acquisition of real property will be prepared in accordance with the 49 CFR Part 24 and with the Uniform Standards of Professional Appraisal Practice (USPAP). A single “self-contained” appraisal report will be prepared for each property acquisition that will contain relevant project-related data, subject property information, market comparable, and an analysis of the appraiser’s value conclusions.

Exhibit A
804
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 47 ends

During the appraisal process, Monument will be
responsible for the following procedures:
» Prepare appraisal scope, fees, and timing on a
property-by-property basis
» Issue appraisal notices to property owners
» Conduct field reviews of property issues with appraisers » Make weekly contact with appraisers to update progress » Review appraisals for quality; request changes/additions as necessary or based on preliminary communication
with the City
» Complete memo indicating appraisal received and
forwarding for review
Appraisals will be prepared in accordance with USPAP
requirements, and, at a minimum, contain the following
requirements:
» Adequate description of the physical characteristics
of the property being appraised (and, in the case of
a partial acquisition, an adequate description of the
remaining property)
» Items identified as personal property
» Statement of the known and observed encumbrances, if
any, location, zoning, present use, an analysis of highest and best use, and at least a five-year sales history of the property
» All relevant and reliable approaches to value consistent with established federal and federally-assisted program appraisal practices. If the appraiser uses more than one approach, there is to be an analysis and reconciliation of approaches to value used that is sufficient to support the appraiser’s opinion of value.
» A description of comparable sales, including a description of all relevant physical, legal, and economic factors
such as parties to the transaction, source, and method
of financing, and verification by a party involved in the transaction.
» Statement of the value of the real property to be
acquired and, for a partial acquisition, a statement
of value of the damages and benefits, if any, to the
remaining real property where appropriate.
» The effective date of valuation, date of appraisal,
signature, and certification of the appraiser.

Task 5.6 APPRAISAL REVIEW (OPTIONAL)
As an optional task to be completed for an additional fee upon approval by the City, Monument will conduct appraisal reviews to support property acquisitions for the project.

Review appraisals will be provided for each appraisal, in accordance with state and federal law and City policy as required. The review appraiser will, as appropriate:
» Identify the reviewer’s client and intended users,
the intended use of the reviewer’s opinions and
conclusions, and the purpose of the assignment
» Identify the following:
– Subject of the appraisal review assignment
– Effective date of the review
– Property and ownership interest appraised (if any) in the work under review
– Date of the work under review and the effective date
of the opinion or conclusion in the work under review
– Appraiser(s) who completed the work under review,
unless the identity was withheld
» Identify the scope of work to be performed
» Develop an opinion as to the completeness of the
material under review, given the scope of work
applicable in the assignment
» Develop an opinion as to the apparent adequacy
and relevance of the data and the propriety of any
adjustments to the data, given the scope of work
applicable in the assignment
» Develop an opinion as to the appropriateness of
the appraisal methods and techniques used, given
the scope of work applicable in the assignment, and
develop the reasons for any disagreement
» Develop an opinion as to whether the analyses, opinions, and conclusions are appropriate and reasonable, given
the scope of work applicable in the assignment, and
develop the reasons for any disagreement
Review appraisals will be forwarded to the City for
establishment of just compensation prior to the preparation of offers to acquire the proposed land rights for the project.

Task 5.7 ACQUISITION AND

NEGOTIATION (OPTIONAL)
Based on our understanding of the project and information provided by the City, Monument assumes that the Project will require the acquisition of property rights from up to sixty (60) parcels. As an optional task to be completed for an additional fee upon approval by the City, Monument
will provide all acquisition services required for the City to purchase the right of way required to construct the Project.

All tasks will be performed in accordance with applicable federal, state and local regulations, and the City’s internal policies and procedures.

Specifically, Monument will:
» Provide all acquisition services in a timely, efficient manner and at a reasonable cost. Work shall be
performed in accordance with all applicable federal,
state, and local regulations
» Coordinate and manage the acquisition process with
the City, legal counsel, design team, property owners,
and tenants along with the title company, appraisers,
and other consultants to maintain effective
cross-discipline communications
Exhibit A
805
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 48 ends

» Review right of way plans, appraisal reports, title
reports, appraisal maps, and legal descriptions and all other pertinent documents
» Prepare acquisition offer packages consisting of
the City’s written purchase offer, appraisal summary
statement, acquisition brochure, acquisition agreement, conveying instruments (Grant Deed, Permanent and/or
Temporary Easements, etc.), Certificate of Acceptance,
recommendation of amount of Just Compensation, plat
maps and legal descriptions, and Title VI Information
» Monument’s acquisition agent will meet personally with each property owner to present the City’s purchase offer, explain the project design requirement, and inform him
or her of the City’s right of way acquisition process
» Negotiate personally in good faith with each property owner, his/her agent or representative and discuss the
valuation of the property interests, gather information for consideration, and address any questions or
concerns that may arise during the acquisition process
» Establish and maintain an acquisition file for each
property owner or property interest acquired and
maintain a file checklist pursuant to the
City’s specifications
» Promptly transmit executed documents (acquisition
agreements, executed deeds, rental agreements,
statements of information, offset statements, and the
like) to the City for acceptance and processing. A report summarizing the pertinent information relative to the
transaction will be included
» Prepare and submit a Letter of Recommendation to the
City for any proposed administrative settlements with
property owners. The letter will include a chronology
of the negotiation efforts, provide supporting evidence and documentation and an explanation of the benefits
and rationale behind the recommendation
» Coordinate opening of escrows, assist the escrow
company in obtaining additional documentation as
necessary to provide clear title to the City, supervise and review the closing of escrows, and review closing
statements for completeness and accuracy. We will
serve as liaison between the title company, escrow
holder, and the City
» Recommend condemnation action when negotiations
have reached an impasse. The required justification will be submitted in writing to the City. Our primary goal will be to reach an acceptance of the offer with each property owner. We will work with the City in recommending
solutions to achieve acceptance of the offer.
» Perform any other normal procedures and processes to
implement the acquisition assignment and provide any
other supporting information and/or correspondence
required by the City.
» Provide bilingual acquisition agents, if necessary.
» Prepare all applicable forms, secure property owner’s approval and signature and submit the forms to the City for review and acceptance.
» Upon completion of the acquisition process for each
property or property interest, or at project completion, Monument will provide the City with the original
acquisition file as well as electronic copy of files for future audit purposes.

DELIVERABLES
» Right of Way Data Sheet
» Right of Way Exhibits
» Preliminary Title Reports (Up to 60)
» Up to 60 Appraisal Exhibits (Optional)
» Up to 60 Legal Descriptions and Plats for Permanent
Takes and Up to 60 TCEs (Optional)
» Up to 60 Appraisal Reports (Optional)
» Up to 60 Appraisal Reviews (Optional)
» Up to 60 executed Agreements and Deeds/Easements
(Optional)
Task 6 PRELIMINARY

ENGINEERING STUDIES
Task 6.1 TRAFFIC ANALYSIS
As a subconsultant to Mark Thomas, Fehr & Peers will manage the traffic analysis and maintain close contact with City staff and the engineering team throughout the project design phase.

The following scope of work reflects this level of effort.

Task 6.1.1 DATA COLLECTION
Fehr & Peers will collect multimodal (auto, pedestrian, and bicycle) traffic counts to document the existing intersection and corridor volumes and to inform potential roadway
reconfiguration alternatives developed in a later phase of the project. Prior to scheduling counts, we will confirm the locations and types of data collection with City staff.

We anticipate collecting the following:
» Daily Hose Counts: Daily volume, vehicle
classification, and travel speeds for all vehicles over a 32-day weekday period and a Saturday period (a total
of 72 hours) using pneumatic hoses at up to 5 locations along the corridors.
» Peak Period Multimodal Intersection Turning
Movement Counts: Weekday AM, weekday PM, and
weekend midday peak period intersection multimodal
turning movement counts at up to 5 intersections along
the corridors.

Exhibit A
806
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 49 ends

» Big Data: Larger data sets from mobile phones and
connected vehicles can help supplement traditional
traffic counts by providing averages across weeks,
months, or seasons rather than a few days. Streetlight
Data provides connected vehicle data sourced from
cars that support location tracking via GPS to estimate vehicle volumes and origin and destination data.
» Field Observations: During weekday AM, weekday
PM, and weekend midday peak periods along the
corridor, including intersection operations, queuing,
and multimodal behavioral patterns.

Task 6.1.2 EXISTING INTERSECTION

OPERATIONS ANALYSIS
Fehr & Peers will develop an existing conditions SimTraffic microsimulation model for Washington Avenue and Table
Mountain Boulevard from County Center Drive to SR 162.

Fehr & Peers will perform a level of service analysis for the weekday AM, weekday PM, and weekend midday peak
periods using the SimTraffic software. For stop-controlled or signalized intersections, SimTraffic is the preferred analysis tool as it accounts for the effects of vehicular queuing on adjacent intersection operations, traffic signal timing, pedestrian travel, and other influences that can affect delay and queuing. We will provide PDF reports of the results and the SimTraffic files if requested by the city.

This task includes a review of the traffic signal as-built plans and existing infrastructure to determine what potential traffic signal equipment, software, and hardware upgrades may be considered as part of a preferred alternative.

Task 6.1.3 ROUNDABOUT FEASIBILITY ANALYSIS
(OPTIONAL)
Fehr & Peers will assist Mark Thomas in evaluating the
feasibility of roundabouts at up to 3 locations. We will use data collected as part of the above Data Collection effort to perform an operational analysis of the roundabouts to determine the number of approach lanes necessary for
roundabouts. This work will inform geometric feasibility to be performed by Mark Thomas. Fehr & Peers will
provide recommendations for configuration and location
of pedestrian and bicycle facilities including markings, curb ramps, splitter islands, and signage related to roundabouts.

We will utilize SIDRA software for Highway Capacity
Manual (HCM) 6th Edition and SIDRA Standard methods to
perform this analysis. We will perform this analysis for the weekday AM, weekday PM, and weekend midday
peak hour scenarios.

Task 6.1.4 PEDESTRIAN CROSSING

IMPROVEMENTS OPPORTUNITIES
(OPTIONAL)
If requested, Fehr & Peers will review the count data
collected for the crosswalks along the corridor to assess where pedestrian crossing improvements may be
recommended to address crossing pedestrians
and bicyclists.

To perform this evaluation, we will utilize Fehr & Peers’ Crosswalk+ Tool, an Excel-based tool to help guide where crossing improvements, such as high-visibility crosswalks, flashing beacons, leading pedestrian intervals and
other special features, should be employed; and where
crosswalks will not be marked due to safety concerns
resulting from volume, speed, or signal distances. Fehr & Peers’ Crosswalk+ tool contains a toolbox of elements to improve crosswalk visibility and safety at mid-block locations and signalized intersections. The tool is based on research from the National Cooperative Highway Research Program, Federal Highway Administration, and interviews with various cities throughout the country and provides guidance about the type of treatments appropriate on
various streets and under various conditions. The tool
uses simple inputs from a field survey, such as number
of lanes, posted speed, and average daily traffic, to
provide a candidate pedestrian treatment at mid-block
and signalized locations. We will also look at pedestrian volumes to help guide decisions related to pedestrian
crossing upgrades as part of this task. The cost of this effort is related to the amount of new data that needs to be collected and the number of locations and time periods to study. If this task is to be conducted, Fehr & Peers will work with the City to identify the locations and develop a data collection plan to identify key locations where collision history, geometrics (roadway curves), lighting (presence or absence of streetlights) or other factors may warrant a detailed review of pedestrian crossing improvements.

Task 6.1.5 EXISTING CONDITIONS

MEMORANDUM (OPTIONAL)
If requested, Fehr & Peers can prepare a memorandum
to include more in-depth data, findings, and analysis of existing conditions. This could include analysis of collision history. Fehr & Peers will work with the City to identify specific areas of focus.

Task 6.2 GEOTECHNICAL REPORT
Task 6.2.1 PRELIMINARY REVIEW AND

COORDINATION
As a subconsultant to Mark Thomas, Crawford will
meet with the design team to review the preliminary
approach and discuss the project needs, goals and
schedule. Crawford will review City-provided maintenance Exhibit A
807
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 50 ends

and improvement documents for the road segments,
if available. A Crawford representative will determine
exploration locations, determine site access, and will
visit the site prior to field work to mark our exploration location(s) for Underground Service Alert (USA). We will obtain a City encroachment permit for our fieldwork within the public right of way exploration locations, and schedule traffic control as needed.

Task 6.2.2 PAVEMENT CONDITION ASSESSMENT
Crawford will walk the project alignment noting the
condition of the pavement, including general notes about transverse and longitudinal cracking, rutting, and failure areas (alligator cracking). Where an overlay or slurry seal is proposed, Crawford will note (on an aerial map or
provided plan) the location and general size of the failure locations and provide this information to the design team for cost estimating purposes of dig out/repair locations.

Task 6.2.3 SUBSURFACE EXPLORATION
Crawford will perform 3 to 4 borings to depths ranging
from 15- to 25-feet deep (or to refusal on bedrock) at the planned retaining wall locations.

Our engineer/geologist will direct the sampling and log the borings. At a minimum, we will sample at 5-foot intervals.

We will deliver the samples to our laboratory for testing.

The drilling contractor will advance the borings with a rubber-tired, truck- or track- mounted drill rig using 4- to 6-inch diameter hollow stem augers, solid stem augers,
and/or mud-rotary techniques. Standard Penetration
Testing (SPT) and California-Modified sampling will be
performed within the borings to obtain samples and
blow count information. Bulk samples will be collected for R-value testing for pavement section recommendations.

To measure the existing structural pavement sections
(HMA and AB) within the roadway alignment, Crawford
will perform 8 to 10 pavement cores along Washington
Avenue and 14 to 16 pavement cores along Table Mountain Boulevard. An engineer/geologist will direct the coring and sampling. At each core location, Crawford will use a diamond tipped core bit 4 to 6 inches in diameter to core through the existing pavement. The existing pavement
sections (HMA and AB) will be measured, and subgrade
samples will be retrieved for R-value testing.

Cores will be backfilled with sand and topped with dyed black quick setting concrete to match the existing road.

Hot mix asphalt patching is not included in our scope of services since the road will be rehabilitated soon. We will work with the City encroachment permit department on
the traffic control requirements; however, we expect traffic control to consist of ‘Road Work Ahead’ signs, lane shifts, and lane closures with flaggers.

Task 6.2.4 LABORATORY TESTING
Crawford will perform the following laboratory tests (if applicable) on relatively undisturbed samples obtained
from the exploratory borings:
» Chemical Analysis
» Moisture Content and Unit Weight
» Plasticity Index
» R-Value
» Sieve Analysis
If Full Depth Reclamation/Recycling (FDR) is selected as the preferred rehabilitation strategy, we will complete two mix designs of subgrade, AB, and HMA samples to provide percent cement, unit weights, and moisture requirements for the specifications and bid package.

Task 6.2.5 ENGINEERING EVALUATION

AND ANALYSIS
Following the results of our fieldwork and laboratory
testing, Crawford will perform engineering analyses to
determine the following:
» Bearing capacity and settlement, equivalent fluid forces including passing pressures, site seismicity including, probabilistic procedures consistent with current Caltrans Seismic Design Criteria to determine the site acceleration response spectrum (ARS) and liquefaction potential; and pavement section recommendations (based on Traffic
Index values provides by the design team).
» Current traffic index based on the results of the cores, assigned gravel factors for the in-place materials,
and thickness of the existing pavement section.
» New pavement section thicknesses based on
the desired traffic index (provided by others) for
comparison purposes only.
» Various pavement rehabilitation options including mill and overlay, FDR, remove and replacement, and full
depth HMA. These options will consider the design
traffic index and a reduced traffic index for comparisons by the City and the Design Team (typically comparing
10- and 20-year design).

Task 6.2.6 GEOTECHNICAL DESIGN/MATERIALS

REPORT (GDMR)
Crawford will prepare a Draft GDMR Report generally
consistent with current Caltrans Standards for the earth retaining structures and roadway rehabilitation. The report will include:
» Scope of work and project description
» Physical setting, including topography
» Drainage and regional/local geology
» Summary of subsurface soil and groundwater
conditions
Exhibit A
808
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 51 ends

» Existing pavement condition
» Results of our pavement coring, presence of overlays
and fabric, and current traffic index
» Slope stability at the retaining walls
» Allowable bearing capacity and estimated settlement
at the retaining wall
» Corrosion evaluation
» Seismic evaluation consistent
with current Caltrans ARS standards
» Laboratory test results
» Grading recommendations
» Foundation recommendations
» Equivalent fluid weight recommendations
» Pavement recommendations
including rehabilitation options
» FDR mix design results (if selected)
» Construction considerations
» Vicinity Map; Site Plan with boring and core locations; Boring logs and legend, dig out map(s), and core photos Following receipt of all Draft Report comments,
a Final Report will be submitted.

Task 6.3 CORRIDOR LANDSCAPE

DESIGN PLAN
Mark Thomas will prepare a corridor landscape design plan that summarizes assumptions, design concepts, guidelines, criteria, and codes and regulations applied to the Project corridor including, preservation of existing trees and
plant material, new plantings, landscape design approach for stormwater treatment facilities, and irrigation design approach.

The corridor landscape design plan will include up to 8 sheets of preliminary plans at 40 scale (color-rendered, generated in CAD and Adobe Illustrator). This preliminary plan will depict trees, shrub/ground-cover areas, illustrative plant list, irrigation POCs, mainline and valve manifolds, and recommended irrigation equipment list.

The preliminary plan will also include a preliminary
estimate of probable cost and up to three (3) aesthetic hardscape treatment options at a typical location and
will identify options for street furnishings (benches, trash receptacles, bike racks, etc). These alternatives will be shown at 20 scale with indication of material options to fit within the City’s budget and maintenance expectations.

The corridor landscape design plan will be prepared in
draft form for review and comment by the City. Minor
revisions may be made to the landscape design plan based on City and stakeholder comment and the final corridor
landscape design plan will be submitted as a record of
design decisions.

Task 6.4 CORRIDOR LIGHTING ANALYSIS
As a subconsultant to Mark Thomas, BEN|EN will obtain
electronic base plans and as-builts from Mark Thomas and review existing conditions in the field as necessary. BEN|EN will coordinate with the City to select preferred pedestrian scale pole and fixture.

Based on the obtained information, BEN|EN will use VISUAL software to prepare photometric analysis for intersection lighting and pedestrian path lighting. BEN|EN will analyze intersection lighting for the intersections of Washington Avenue with Oro Dam Boulevard and with Mitchell Avenue
and the intersection of Table Mountain Boulevard with Grand Avenue. Additionally, BE|EN will analyze pedestrian lighting along the multi-use path along Washington Avenue from
Oro Dam Boulevard to Bird Street and along Table Mountain Boulevard from Riverview Terrace Drive to Country Center Drive and the limits of the photometric analysis zone
will cover the width of the multi-use path. Based on the results of the photometric analysis, BEN|EN will provide recommendation and analysis for proposed pedestrian
lighting. BEN|EN will submit the results of photometric analysis to the City, through Mark Thomas, for review and approval. Any comments by the City will be incorporated into the final photometric analysis.

In addition, BEN|EN will prepare preliminary cost estimates for electrical items.

Task 6.5 STRUCTURE LOAD RATING
The old barriers and fences on the Washington Avenue
Bridge over the UPRR tracks will be removed and replaced to meet the latest UPRR standards. The existing sidewalk has less dead load as it is narrower than the new wider sidewalk/multi-use path. The existing bridge will be loadrated to make certain the existing girder can handle the new load. The bridge overhands will also be analyzed.

A Structure Load Rating Memo will document the structure alternative strategies considered, the bridge load rating results and the necessary retrofit and structure upgrades assumed. The load rating methods used will follow the
pertinent Caltrans and AASHTO LRFD requirements.

Mark Thomas will prepare a Structure Load Rating Memo,
which will document the structure alternative strategies considered, the bridge load rating results and the
necessary retrofits, cost estimate and structure upgrades assumed. After approval from the City, the 60% plans,
specifications and estimates will begin. A General Plan sheet will be provided with the memo.

Exhibit A
809
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 52 ends

Task 6.6 STORMWATER DATA REPORT
Mark Thomas will prepare a Stormwater Data Report for
the project, which will include the collection and analysis of hydrologic and hydraulic data, assessment of existing drainage conditions, and evaluation of water quality
considerations. The report will be developed in compliance with the City’s stormwater management requirements
and applicable state and federal regulations, providing recommendations for effective stormwater management
and improvements.

Task 6.7 ROADWAY DRAINAGE MEMO
Mark Thomas will conduct a drainage study and prepare
a technical memorandum to evaluate the existing
storm drain facilities and impacts from the project. The memorandum will discuss the methodology and standards
used in the storm drain design. Analysis and design of the storm drain system will be conducted in accordance with City stormwater and improvement standards. The memo
will include exhibits showing the proposed watershed
areas, results of the hydrology and hydraulic analysis, and proposed storm drain system elements.

Mark Thomas will submit the draft roadway drainage
memo to City staff to obtain feedback on drainage
modifications proposed. City comments will be
incorporated to the Final roadway Drainage Memo. Up to
one round of review and revisions is anticipated to address City comments on the draft memo to prepare the final
roadway drainage memo.

DELIVERABLES
» Traffic Data Summary Table
» Operations Analysis Methodology and Results
Technical Memorandum
» Roundabout Feasibility Analysis Technical Memorandum
(Optional)
» Pedestrian Crossing Improvement Assessment
Technical Memorandum (Optional)
» Existing Conditions Memorandum (Optional)
» Draft and Final Geotechnical Design/Materials Report
» Draft and Final Corridor Landscape Design Plan
and Cost Estimate
» Photometric Lighting Analysis Exhibit
» Draft and Final Structure Load Rating Memo
(Including a General Plan Sheet)
» Structure Load Rating Package
» Draft and Final Stormwater Data Report
» Draft and Final Roadway Drainage Memo
Task 7 DESIGN AND

CONSTRUCTION

PREPARATION
Our scope of work encompasses civil, structure, landscape, and electrical design to prepare plans, specifications, and estimates (PS&E) for use by the City in bidding the improvements for construction.

Mark Thomas will complete final design for the project
defined in the Final Preliminary Design Plan and Final
Preliminary Landscape Design package and prepare PS&E
submittals at the 30%, 60%, 90%, and 100% (Bid Set) levels of completion. The intent of intermediate submittals is to define the project for review by the City and stakeholders, and to allow for major comments prior to investment
of significant design effort in design details. The 90% submittal will be provided as a final plan check opportunity by the City to ensure prior comments have been addressed prior to bidding.

Task 7.1 30% PLANS AND ESTIMATE
The Mark Thomas team will prepare 30% plans and
estimate for the proposed project improvements. The 30% plans will include sheets shown in the table below.

Task 7.1.1 30% PLANS AND ESTIMATE (CIVIL)
The Mark Thomas team will build upon the concept plans
provided with the RFP to prepare 30% plans, using City and Caltrans standards. The 30% Plans will be the first “plan sheet” submittal made to the City for review. The 30% plans will evaluate right of way needs and utility modifications and will be shared with the City for feedback. Refinements will be made during the 60% PS&E task.

Mark Thomas will prepare a 30% estimate based on the
30% plans.

SHEETS FOR 30% PLANS AND ESTIMATE
SHEET NAME # OF
SHEETS

DRAWING
SCALE
Title Sheet, Location Map, and
Sheet Index 1 Not to scale
General Notes and Abbreviations 1 Not to scale
Key Map 1 500
Typical Cross Sections 3 Not to scale
Layout Plans and Profile 28 20
Drainage and Utilities Plans and
Profiles 14 20
Structure General Plan 1 Not to scale
Total Sheets 49
Exhibit A
810
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 53 ends

Task 7.2 60% PS&E
Mark Thomas Team will prepare 60% plans, specifications, and estimate for the proposed project improvements.

The 60% plans will include the following sheets:

Task 7.2.1 60% PS&E (CIVIL)
Mark Thomas team will build upon the 30% plans and
prepare draft construction documents for the project.

The plans are at the level ready for a detailed quality control check and ready for the utility companies to begin relocation design (“B Plans”), if required. It is assumed that utility relocation plans will be provided by the utility companies. Mark Thomas will utilize most recent City
Standards, Caltrans Design Information Bulletin (DIB)
82-06, Butte Regional Transit (B-Line), and Manual on
Uniform Traffic Control Devices (MUTCD) standards for
the design of the project’s proposed improvements. Mark Thomas will prepare technical specifications and bid form in the City’s standard format.

It is assumed the City will provide the boilerplate contract and general provisions. The basis of the technical
specifications will be the 2024 Caltrans Standard
Specifications or as required by the City. An itemized
estimate of construction costs will be prepared using recent bid summaries for similar projects in the vicinity of the City of Oroville. Prices will be adjusted using engineering judgment that reflects the project location and the quantity of each item. Mark Thomas will coordinate 60% plan review meetings with the stakeholders. The 60% PS&E will be
submitted to the City for review and comment.

Task 7.2.2 60% PLANS AND ESTIMATE
(STRUCTURE)
Mark Thomas will prepare structural calculations and plans for the selected bridge rail replacement alternative. For the purposes of this scope of work, it is assumed that Caltrans Standard Details will be used for sidewalk and barriers. The structure design will be in accordance with AASHTO LRFD Bridge Design Specifications, 8th Edition with the California Amendments and Caltrans Seismic Design Criteria, Version

2.0. The 2024 Caltrans Standards and current versions of the Caltrans Structure Technical Policies and Bridge Design Manuals will be used. The 60% Plans and Estimate will be submitted to the City for review and comment.

Task 7.2.3 60% PS&E (LANDSCAPE)
60% plans will include planting and irrigation plans (in AutoCAD, 20-scale) and coordination with the civil team on existing trees to remain, hardscape layout, tree placement and biofiltration planting areas (if selected). Planting plans will include tree, shrub, and groundcover locations, plant list, plant callouts, and associated landscape construction details. Irrigation plans will include points of connection locations, mainline layout, preliminary pressure loss
calculations, irrigation equipment list, and associated details. Outline technical specifications for planting
and irrigation will be drafted. An estimate of probable construction cost will be included.

Task 7.3 90% PS&E
Task 7.3.1 90% PS&E (CIVIL)
Mark Thomas will coordinate and collect stakeholders’
comments and prepare a Comment Response Matrix listing
the comment, source, and proposed resolution. Prior to
starting further revisions to the designs, Mark Thomas will arrange a meeting with City Staff to review the comments received, discuss any questions and confirm the resolutions.

Once the comment resolutions are agreed upon, Mark
Thomas will update the PS&E to the 90% design level.

The 90% PS&E will be provided to the City for review
and comment.

SHEETS FOR 60% PS&E
SHEET NAME # OF
SHEETS

DRAWING
SCALE
Title Sheet, Location Map, and
Sheet Index 1 Not to scale
General Notes and Abbreviations 1 Not to scale
Key Map 1 500
Project Control 1 500
Typical Cross Sections 3 Not to scale
Demolition Plans 14 20
Layout Plans and Profile 28 20
Construction Details (Ramps,
Driveways and Bus Stops) 57 Varies
Water Pollution Control Plans 14 20
Drainage and Utilities Plans and
Profiles 28 20
Drainage and Utilities Details 2 Not to scale
Construction Area Signs 1 500
Traffic Control Plan 50 40
Detour Plan 2 500
Pavement Delineation and Sign
Plans, Notes and Details 14 20
Pavement Delineation and Sign
Details 1 Not to scale
Landscape and Irrigation Plans and
Details 56 20
Structure Plans 7 Varies
Electrical Plans 27 Varies
Total Sheets 308
Exhibit A
811
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 54 ends

Task 7.3.2 90% PS&E (STRUCTURE)
City comments from the 60% submittal will be addressed
and incorporated into the 90% design. Responses to
comments will be prepared and submitted.

Mark Thomas will perform an independent design check of the structure in conformance with Caltrans bridge design procedures. The independent check will be completed by
an engineer who was not involved in the original design of the structure. Calculations will be performed to check the bridge layouts and structural integrity. Upon completion of the independent check, discrepancies between the
designer and checker will be reconciled and plans updated.

Mark Thomas will develop project special provisions
using Caltrans Standard Special Provisions (2024 version).

The special provisions will be prepared using Microsoft Word. Special Provisions will be submitted at the 90%
and 100% submittals. It is assumed the City will provide the boilerplate contract language to be included in the specifications at the 90% submittal.

Task 7.3.3 90% PS&E (LANDSCAPE)
City comments from the 60% submittal will be addressed
and incorporated into the 90% design. Responses will be prepared and submitted. Irrigation plans will include water use (MWELO) calculations, irrigation controller schedule, manifold locations and valve callouts, irrigation head and lateral layout with pipe sizing. Administrative draft technical specifications for planting and irrigation will be provided.

The estimate will be revised based on comments and
updated unit prices.

Task 7.4 100% (BID SET) PS&E
Task 7.4.1 100% (BID SET) PS&E (CIVIL)
Mark Thomas will coordinate and collect stakeholders’
comments and prepare a Comment Response Matrix
listing the comment, source, and proposed resolution.

If necessary, Mark Thomas will arrange a meeting with
City staff to review the comments received, discuss any questions and confirm the resolutions. Once the comment resolutions are agreed upon, Mark Thomas will prepare
the 100% (Bid Set) PS&E for the City to use in bidding and constructing the project improvements.

The 100% (Bid Set) plans and specifications will be signed and sealed by a professional civil engineer in responsible charge of the work and will be submitted to the City in hard copy and electronic format. Signed plans will be
provided in PDF format. AutoCAD files for the drawings will be provided if requested. Specifications will be provided electronically in MS Word format.

Task 7.4.2 100% (BID SET) PS&E (STRUCTURE)
City comments from the 90% submittal will be addressed
and incorporated into the final design. Responses to
comments will be prepared and submitted. All final plan revisions will be made. Updates to the specifications and estimate will be completed. A 100% (Bid Set) PS&E package (Structure) will be submitted.

Mark Thomas will compile the necessary documents to
be included in the RE Pending file, including the typical information below:
» Quantity summary sheets for Bar Reinforcing, Barrier, Fencing and Partial Structure Removal. Summary sheets
are prepared in accordance with Bridge Design Aids
» Special instructions or information from the Designer to the Resident Engineer/Structure Representative.

At a minimum, this should include the following:
– The intent of the designer where misinterpretation
of contract documents is possible
– Alerts to details or sequences
– A description of construction methods anticipated
for unique or unusual designs
» As-built plans for existing structures
Task 7.4.3 100% (BID SET) PS&E (LANDSCAPE)
Final comments from the 90% submittal will be addressed and incorporated into the 100% (Bid Set) Submittal.

Responses to comments will be prepared and submitted.

All final plan revisions will be made. Updates to the
specifications and estimate will be completed. Bid items will be incorporated into a final Bid Item List.

Task 7.5 SIGNALS LIGHTING AND

ELECTRICAL DESIGN
Task 7.5.1 TRAFFIC SIGNAL DESIGN
BEN|EN will obtain electronic base plans and as-builts from Mark Thomas and prepare PS&E for traffic signal design
for the intersections of Washington Avenue with Oro Dam Boulevard and Mitchell Avenue and the intersection of
Table Mountain Boulevard with Grand Avenue. Additionally, based on the results of the intersection photometric analysis, BEN|EN will incorporate intersection lighting improvements.

Task 7.5.2 RECTANGULAR RAPID FLASHING

BEACON DESIGN
BEN|EN will prepare PS&E for solar-powered rectangular
rapid flashing beacons (RRFBs) with lighting for the
following locations:
» New pedestrian crossing of Washington Avenue north
of Placer Avenue
» New pedestrian crossing of crossing Washington
Avenue south of McClellan Avenue
Exhibit A
812
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 55 ends

» Existing pedestrian crossing of Washington Avenue at
Orange Avenue
» New pedestrian crossing of Table Mountain Boulevard
south of Flying Cloud Drive
» New pedestrian crossing of Table Mountain Boulevard
south of Jasmine Court
» New pedestrian crossing of Table Mountain Boulevard
north of Orangewood Way
Task 7.5.3 PEDESTRIAN LIGHTING DESIGN
Based on the results of the photometric analysis for the multi-use path, BEN|EN will prepare PS&E for pedestrian lighting design for installation of new pedestrian lighting along the multi-use path along Washington Avenue
from Oro Dam Boulevard to Bird Street and along Table
Mountain Boulevard from Riverview Terrace Drive to
Country Center Drive. Additionally, pedestrian lighting will include proposed lighting improvements for enhancing
lighting for project RRFB crossings. BEN|EN will coordinate with PG&E for new electrical service applications for the pedestrian lighting system.

BEN|EN will submit the electrical PS&E to the City, through Mark Thomas, for review at 60% and 90% levels. Any
comments by the City will be incorporated into the 100% (Bid Set) PS&E.

Task 7.6 PERMITS TO ENTER AND

CONSTRUCT
Mark Thomas will prepare Permit to Enter (PTE) exhibits for up to 82 PTEs along the corridor. PTEs are anticipated for the curb returns and parcels where driveway conforms will require work on private property. One round of minor revisions to the PTE exhibits is included in this scope of work.

Task 8 PERMITTING
Task 8.1 CALTRANS ENCROACHMENT
PERMIT
The project will require Caltrans review and approval of an Encroachment Permit prior to the start of construction in the state right of way. Mark Thomas will prepare
and submit an Encroachment Permit Application and
supporting documents, including the ADA Certification,
PS&E Certification, and copies of the Final Design plans and specifications for review by Caltrans. The first encroachment permit submittal is anticipated at the 60% design level. We will coordinate with Caltrans to address up to one round of plan comments received on the Encroachment Permit
Application and resubmit for final review and approval to coincide with the 90% design submittal.

Preparation of additional iterations of plan revisions and re-submittal of the Encroachment Permit materials
for Caltrans to address comments subsequent to the
90% design submittal will be additional services to be
completed for an additional fee to be negotiated prior to the start of work.

Regular coordination meetings with Caltrans are included with the project meetings task described elsewhere in this Scope of Services.

Task 8.2 DEPARTMENT OF WATER

RESOURCES (DWR)

ENCROACHMENT PERMIT
The project will require DWR review and approval of an
Encroachment Permit prior to the start of construction in the State Water Project (SWP) Right of Way. Mark Thomas will prepare and submit an Encroachment Permit Application
and supporting documents, including Site Specific Safety Plan, Environmental Document, and copies of the Final
Design plans for review by DWR. The first encroachment
permit submittal is anticipated at the 60% design level. We will coordinate with DWR to address up to one round of plan comments received on the Encroachment Permit Application and resubmit for final review and approval to coincide with the 90% design submittal.

Preparation of additional iterations of plan revisions and re-submittal of the Encroachment Permit materials for
DWR to address comments subsequent to the 90% design
submittal will be additional services to be completed for an additional fee to be negotiated prior to the start of work.

Regular coordination meetings with DWR are included
with the project meetings task described elsewhere in this Scope of Services. Payment of permit and plan review fees will be by the City.

Task 8.3 UPRR AND/OR CPUC

COORDINATION
Mark Thomas will coordinate the approval of an at-grade railroad crossing modification with UPRR and the CPUC.

The general process is as follows:
» Submittal A: The City submits a concept drawing to
UPRR and CPUC for review.
» Preliminary Engineering (PE) Agreement: UPRR
requires an agreement with the City to allow UPRR
staff to participate in the project and provide reviews.

Based on the complexity of this project, the PE
Agreement reimbursement amount is expected to be
$20,000 to $30,000. Payment of reimbursement fees
will be by the City.

Exhibit A
813
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 56 ends

» Field Diagnostic Meeting: This meeting is required to discuss the City’s intent to construct improvements with UPRR and CPUC. The Diagnostic Team will review of
the concept drawings and identify any additional safety improvements that UPRR may require from the project.
» Concept Drawing Review: Based on the field
meeting, revisions to the proposed conceptual
improvements are submitted to UPRR and CPUC for
review and acceptance.
» UPRR Project Acceptance: Upon review of the
concept drawing, UPRR will issue a project concurrence
letter, which will be required to process the GO 88-B
application.
» Environmental Document: An adopted environmental
document (assumed CEQA Categorical Exemption) is
required as an attachment to the GO 88-B.
» GO 88-B Submittal: Completion of items above will
allow the submittal of the GO 88-B. After a 30-day
challenge period, the application is placed on the CPUC consent calendar for approval. An approved GO 88-B
has a 3-year shelf life to be completely constructed.
» C&M Agreement: When all reviews (engineering
and right of way) are complete, UPRR will draft an
agreement for City review and execution.

Mark Thomas will provide support for the City throughout the process in order to obtain an Approved GO-88B and
permission to construct.

DELIVERABLES
» 30% Plans and Estimate
» 60% Plans, Specifications, and Estimate
» 90% Plans, Specifications, and Estimate
» 100% (Bid Set) Plans, Specifications, and Estimate
» Bridge Design Calculations
» Bridge Independent Check Calculations
» “Submittal A” Exhibit (PDF)
» Field Diagnostic Meeting and Minutes (PDF)
» Concept Drawing (PDF)
» Completed GO 88-B application (PDF)
» Caltrans Encroachment Permit Application
» DWR Encroachment Permit Application
» PTE Exhibits (Up to 82)
Task 9 ROW AND/OR

CONSTRUCTION PHASE

AUTHORIZATION
Task 9.1 ROW DOCUMENTATION

AND CONSTRUCTION PHASE

AUTHORIZATION
Project funds for construction are anticipated to include federal grant funds which are administered by Caltrans. Mark Thomas will assist the City to verify the project is developed in accordance with the guidelines presented in the current Caltrans Local Assistance Procedures Manual (LAPM) and
Caltrans Local Assistance Procedures Guidelines (LAPG).

This task includes any work involved in coordinating with Caltrans District 3 Local Assistance, for the development of the right of way and utility certification documents, Request for Authorization (RFA) documents to obtain the Caltrans Authorization (E-76) for Construction, and other forms
required by Caltrans Local Assistance for approval.

DELIVERABLES
» Caltrans Exhibit 13-B (Right of way Certification) or Equivalent Required Caltrans Forms
» RFA Documents (Exhibits 3-A; 9-D; 12-C; 12-D; 15-A)
Task 10 BID PROCESS
Once the project is approved for advertisement Mark
Thomas will provide services to facilitate the successful advertisement and award of the project. Since the work
is difficult to estimate at this stage, Mark Thomas has provided an estimated budget in the fee schedule which
will be billed on an as-needed time and materials basis.

Design support during construction is not included in
this Scope of Work but may be included as an additional service. This work includes:

Task 10.1 RESPONDING TO BID INQUIRIES
Mark Thomas and BEN|EN will answer questions from
the bidders during the bidding period. The actual level of effort will depend on the issues and questions that arise during advertisement. For this scope of work, a budget has been specified. After the budget is exhausted, additional assistance will be on a time and materials basis.

Task 10.2 ATTENDING PRE-BID MEETINGS
Mark Thomas will attend pre-bid meetings with the City, as needed. In general, it is assumed these meetings will be attended via Microsoft Teams or another web-based
meeting application.

Mark Thomas will coordinate and attend up to one pre-bid meeting with the City.

Exhibit A
814
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 57 ends

Task 10.3 PREPARING ADDENDA

TO PS&E DOCUMENTS
Mark Thomas and BEN|EN will prepare addenda to PS&E
during the bidding period. Additionally, prior to the
beginning of construction, Mark Thomas and BEN|EN will
prepare conform drawings to incorporate all bid addenda.

DELIVERABLES
» Addenda to PS&E Documents and Conform Drawings

PROJECT SCOPE ASSUMPTIONS
This scope of work is based on the following assumptions:
» The project will be advertised, awarded, and
administered by the City and the City will coordinate
reproductions of the bid package
» Resource agency permitting is not required as
part of this project
» This scope does not include preparation of an RE file » Construction management services will be provided
by the City
» Geotechnical services during construction will be
provided by the City
» Arborist services will be provided by the City
» Dry utility design is not required or included
» Coordination for Caltrans and DWR Encroachment
Permit during construction will be the responsibility of the contractor. Any fees for the encroachment permit
applications and plan reviews by Caltrans and DWR will
be paid by the City
» The City will lead the effort and will provide rights of entry to private property. The City will obtain and
provide encroachment permits, at no fee, for work
within public right of way
» All access will be provided, including project area
outside of right of way
» No subsurface mark and locate is included
» Monument preservation is not required or included
» Design support during construction, as-Builts and a
Record of Survey (if required) will be completed under a subsequent contract
» Signal interconnect design is not included in the project » Continuous street lighting design is not included
in the project
» PG&E coordination for new service for existing signals is not included in the project
» RRFB crossing studies or warrants are not included
in the project
» Roundabout design is not included in the project
» We assume the UPRR bridge crossing structure is in
good condition and no other bridge items will need to
be repaired (seismic retrofit, etc.)
» It is assumed the existing bridge can handle the added dead load and no bridge strengthening will be required
» It is assumed that the bridge as-builts and inspection reports will be available so we can perform an accurate load rating
Exhibit A
815
Item 10.

COST CONTROL AND BUDGETING METHODOLOGY
We use Deltek for all our accounting functions. Deltek has modules “Project Review” and “I-Access” that allow project managers to enter budgets for Mark Thomas and the
subcontractors and track spending in real-time. We use
these modules to track earned value on our project and
this will be done for each task order.

As shown in the chart to the right, we plan our work using a resource-loaded schedule, monitor the project progress, and track the planned budget vs. actuals, and we report this to the City on a monthly basis. We review and report any variations along with a corrective action plan.

For City construction budgets, we provide engineer’s
estimates for probable construction at all major
deliverables. Costs are derived using a combination of
recently completed bids within the local area, Caltrans unit cost database, City historical information, and RS Means available information. Appropriate adjustments are made to accommodate economies of scale, as necessary escalation should construction not occur immediately after design, and work with the City to derive potential soft costs. Lastly, where the City has multiple funding sources that only cover portions of the project, we routinely organize the estimate such that these each bid item’s estimated cost is associated with the appropriate funding source.

SCHEDULE CHALLENGES
Our proposed project schedule shown on the next page
includes key activities and milestones for the project
design, environmental clearance, right of way acquisitions and RFA for construction. Key to the positioning of the project for competitive ATP Cycle 8 grant funds will be the determination of environmental and right of way impacts and costs. Our schedule includes completion of the NEPA and CEQA clearance and design prior to the submittal of ATP Cycle 8 in June 2026.

Another key issue for the completion of the RFA for
construction is the potential to advance right of way
activities relative to the CEQA and NEPA clearance. If right of way funds can be obligated from sources other than ATP Cycle 8, the ROW acquisition tasks could be advanced by up to 6 months leading to a possible early start of construction.

For discussion on critical engineering design issues and critical environmental issues, and how we will adddress them, please refer to our “Project Approach” on page 26.

We use Deltek VantagePoint software for real-time reporting of expended hours versus tasks completed to ensure the
project is delivered within budget.

TOTAL HOURS EXPENDED
20,000
15,000
10,000
5,000
35% 50% 65% 95% 100%

TIME AND COMPLETION LEVEL

PROGRAMMED
ACTUAL
WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 58 ends

Exhibit A
816
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 59 ends

SCHEDULE OF WORK (PAGE 1 OF 2)
ID Task Name Duration Start Finish
1 NTP (Assumed) 0 days Mon 4/21/25 Mon 4/21/25
2 Kick-Off Meeting 0 days Fri 4/25/25 Fri 4/25/25
3 Surveys and Mapping 85 days Mon 4/28/25 Fri 8/22/25
4 Project Control 4 wks Mon 4/28/25 Fri 5/23/25
5 Mobile Terrestrial LiDAR Scan (MTLS) 5 wks Mon 4/28/25 Fri 5/30/25 6 Supplemental Topographic Survey 4 wks Mon 7/28/25 Fri 8/22/25 7 Record Right of Way 2 wks Mon 5/26/25 Fri 6/6/25
8 Preliminary Engineering 65 days Mon 4/28/25 Fri 7/25/25 9 Submit Utility "A" Letters 4 wks Mon 4/28/25 Fri 5/23/25 10 Compile Base Maps 2 wks Mon 5/26/25 Fri 6/6/25
11 Preliminary Traffic Analysis 12 wks Mon 4/28/25 Fri 7/18/25 12 Corridor Landscape Design Plan 8 wks Mon 4/28/25 Fri 6/20/25 13 Draft Geotechnical Report 12 wks Mon 4/28/25 Fri 7/18/25 14 Prepare 30% Plans 6 wks Mon 6/2/25 Fri 7/11/25
15 Preliminary Cost Estimates 1 wk Mon 7/7/25 Fri 7/11/25 16 City Review/Comments 2 wks Mon 7/14/25 Fri 7/25/25
17 Approved 30% Plans 0 wks Fri 7/25/25 Fri 7/25/25
18 Environmental Document 190 days Mon 7/14/25 Fri 4/3/26 19 Prepare PES Form 4 wks Mon 7/14/25 Fri 8/8/25
20 Caltrans Review and Approval 4 wks Mon 8/11/25 Fri 9/5/25 21 Signed PES Form 0 days Fri 9/5/25 Fri 9/5/25
22 Technical Studies 80 days Mon 9/8/25 Fri 12/26/25
47 CEQA/NEPA Documentation 8 wks Mon 12/29/25 Fri 2/20/26 48 City/Caltrans Review 6 wks Mon 2/23/26 Fri 4/3/26
49 NEPA CE 0 days Fri 4/3/26 Fri 4/3/26
50 Environmental Commitment Record 2 wks Mon 2/23/26 Fri 3/6/26 51 Public and Stakeholder Outreach 225 days Mon 4/28/25 Fri 3/6/26 52 Develop Outreach Plan 8 wks Mon 4/28/25 Fri 6/20/25
53 City Review/Comment 2 wks Mon 6/23/25 Fri 7/4/25
54 Final Outreach Plan 0 days Fri 7/4/25 Fri 7/4/25
55 Public Information Meetings 120 days Mon 7/28/25 Fri 1/9/26 56 Public Information Meeting #1 4 wks Mon 7/28/25 Fri 8/22/25 57 Public Information Meeting #2 4 wks Mon 10/20/25 Fri 11/14/25 58 Public Information Meeting #3 4 wks Mon 11/17/25 Fri 12/12/25 59 Public Information Meeting #4 4 wks Mon 12/15/25 Fri 1/9/26 60 Community Workshop Meetings 160 days Mon 7/28/25 Fri 3/6/26 61 Community Worshop Meeting #1 8 wks Mon 7/28/25 Fri 9/19/25 62 Community Workshop Meeting #2 8 wks Mon 9/22/25 Fri 11/14/25 63 Community Workshop Meeting #3 8 wks Mon 11/17/25 Fri 1/9/26 64 Community Workshop Meeting #4 8 wks Mon 1/12/26 Fri 3/6/26 65 Utility Coordination 215 days Mon 7/28/25 Fri 5/22/26 66 Prepare Conflict Mapping 4 wks Mon 7/28/25 Fri 8/22/25 67 Utility "B" Letters 2 wks Mon 8/25/25 Fri 9/5/25
68 Prepare Relocation Plans (By Others) 8 mons Mon 9/8/25 Fri 4/17/26 69 Utility "C" Letters 1 wk Mon 4/20/26 Fri 4/24/26
4/21
4/25
7/25
9/5
4/3
7/4

M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A Half 1, 2025 Half 2, 2025 Half 1, 2026 Half 2, 2026 Half 1, 2027 Half 2, 2027 Half 1, 2028 Half 2, 2028 Half 1, 2029 Mark Thomas City of Oroville
Washington Ave. and Table Mountain Blvd. Complete Streets Project Thu 3/13/25 Page 1
Completion of NEPA and CEQA clearance will
provide scope and cost certainty prior to submittal
of the ATP Cylce 8 Grant Application in June 2026
Exhibit A
817
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 60 ends

SCHEDULE OF WORK (PAGE 2 OF 2)
ID Task Name Duration Start Finish
70 Utility Certification 4 wks Mon 4/27/26 Fri 5/22/26
71 ATP Grant Cycle 8 210 days Fri 3/13/26 Thu 12/31/26
72 Call for Projects 0 days Fri 3/13/26 Fri 3/13/26
73 Prepare Grant Application 12 wks Fri 3/13/26 Thu 6/4/26 74 Grant Review and Selection 30 wks Fri 6/5/26 Thu 12/31/26 75 Notification of Grant Award 0 days Thu 12/31/26 Thu 12/31/26 76 Right of Way Certification 799 days Mon 7/28/25 Thu 8/17/28 77 ROW Planning and Property Owner Impact Exhibits 8 wks Mon 7/28/25 Fri 9/19/25 78 City Review 4 wks Mon 9/22/25 Fri 10/17/25
79 Final Property Owner Impact Exhibits and Estimates 0 days Fri 10/17/25 Fri 10/17/25 80 Prepare RFA for Right of Way 5 mons Fri 1/1/27 Thu 5/20/27 81 Caltrans Review of RFA for ROW 4 wks Fri 5/21/27 Thu 6/17/27 82 ROW RFA Approved 0 days Thu 6/17/27 Thu 6/17/27
83 Plat and Legal Descriptions 16 wks Fri 6/18/27 Thu 10/7/27 84 Apraisals and Appraisal Reviews 16 wks Fri 6/18/27 Thu 10/7/27 85 Right of Way Negotiations 10 mons Fri 10/8/27 Thu 7/13/28 86 Complete Right of Way Acquisitions 0 days Thu 7/13/28 Thu 7/13/28 87 Prepare Right of Way Certification 1 wk Fri 7/14/28 Thu 7/20/28 88 Caltrans Review 3 wks Fri 7/21/28 Thu 8/10/28
89 Revisions 1 wk Fri 8/11/28 Thu 8/17/28
90 Right of Way Certification 0 days Thu 8/17/28 Thu 8/17/28 91 Contract Bid Documents 959 days Mon 7/28/25 Thu 3/29/29 92 Prepare 60% Plans 10 wks Mon 7/28/25 Fri 10/3/25
93 Prepare Engineer's Estimate 2 wks Mon 9/22/25 Fri 10/3/25 94 QA/QC 2 wks Mon 10/6/25 Fri 10/17/25
95 Submit 60% Plans and Estimate 0 days Fri 10/17/25 Fri 10/17/25 96 City Review/Comment 4 wks Mon 10/20/25 Fri 11/14/25
97 Prepare 90% PS&E 10 wks Mon 11/17/25 Fri 1/23/26
98 Prepare Technical Specifications 2 wks Mon 1/12/26 Fri 1/23/26 99 QA/QC 2 wks Mon 1/26/26 Fri 2/6/26
100 Submit 90% PS&E 0 days Fri 2/6/26 Fri 2/6/26
101 City Review/Comment 4 wks Mon 2/9/26 Fri 3/6/26
102 Prepare 100% PS&E 6 wks Mon 3/9/26 Fri 4/17/26
103 Revise Technical Specifications 2 wks Mon 4/6/26 Fri 4/17/26 104 QA/QC 2 wks Mon 4/20/26 Fri 5/1/26
105 Submit Final Plans 4 wks Mon 5/4/26 Fri 5/29/26
106 Approved PS&E 0 days Fri 5/29/26 Fri 5/29/26
107 Prepare Construction RFA 2 wks Fri 8/18/28 Thu 8/31/28 108 CTC Scheduling and Approval 2 mons Fri 9/1/28 Thu 10/26/28 109 Con RFA Approved 0 days Thu 11/23/28 Thu 11/23/28
110 Advertise 4 wks Fri 12/8/28 Thu 1/4/29
111 Open Bids 0 days Thu 1/4/29 Thu 1/4/29
112 Contract Award 4 wks Fri 1/5/29 Thu 2/1/29
113 Begin Construction 0 days Thu 3/29/29 Thu 3/29/29
3/13
12/31
10/17
6/17
7/13
8/17
10/17
2/6
5/29
11/23
1/4

M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A Half 1, 2025 Half 2, 2025 Half 1, 2026 Half 2, 2026 Half 1, 2027 Half 2, 2027 Half 1, 2028 Half 2, 2028 Half 1, 2029 Mark Thomas City of Oroville
Washington Ave. and Table Mountain Blvd. Complete Streets Project Thu 3/13/25 Page 2
ROW Certification could be
advanced by six months with project
funding for ROW Acquisitions
Completion of final design will provide
construction cost certainty prior to submittal of
the ATP Cycle 8 Grant Application in June 2026
Early completion of ROW Acquisition
with advancement of funds could
move RFA for Construction
Exhibit A
818
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 61 ends

QUALITY ASSURANCE/QUALITY CONTROL
Mark Thomas firmly believes that QA/QC is a company-wide effort. Mark Thomas will implement a QA/QC program in accordance with our Quality Management Manual and the City’s quality standards. This document clearly defines the firm’s quality management system and “ensures implementation of the company’s quality policies at all levels.” All Mark Thomas team members and subconsultants will adhere to this plan. Each of our respective firms supports the idea that it is our responsibility to produce high-quality products that will result in developing a clearly-defined and cost-effective project.

QUALITY MANAGEMENT PLAN
At the beginning stages of our projects, we work with our agency partners to develop and implement a projectspecific Quality Management Plan (QMP) that sets objectives for quality assurance and control activities. This begins with identifying an internal project quality manager, who works with the agency project manager to set
priorities, schedules, and guidelines for quality procedures and deliverable reviews. These are developed into a Project Management Plan (PMP) that details each task, as well
as the appropriate local and Caltrans standards, CADD
standards, state and federal guidelines.

The PMPs/QMPs stipulate the deliverables and schedules
for the various levels of quality control reviews to be conducted throughout the project.
1 Our project managers perform on-going reviews as
the project develops and Quality Control Reviews/
Accuracy Checks are conducted for every completed
work product.
2 Before delivering to the client, fresh eyes are provided by Independent Technical Reviews which are conducted
by those who are knowledgeable but not involved in
the day-to-day project development.
3 Interdisciplinary reviews are conducted on projects
that bring together multiple disciplines to proof their integration.
4 As appropriate, constructibility reviews are conducted involving a construction management team.
5 Finally, the project quality manager audits the reviews to confirm their proper conduct and documentation, and
to confirm that all reviewer corrections and concerns
were addressed before the deliverable can be sent to
the client.

We have a dedicated company Quality Assurance Manager
that periodically audits our projects to show that we are following the established procedures and documentation. At Mark Thomas, the quality of our deliverables is a top priority, along with meeting the schedule and staying within budget.

The QMPs identify specific quality control/quality assurance (QA/QC) activities to be completed during the project.

Implementing these activities results in high-quality
deliverables. This includes:
» Verify that all quality control comments have been
incorporated prior to PS&E production.
» Produce quality control “check set” mark-ups for each submittal stage.
» Review project quality control materials, at a minimum, on quarterly basis, for adherence to this policy and
provide guidance or directions for corrective action and training as necessary.
» Produce quarterly quality assurance audit
memorandum – available to the client upon request.
» Conduct quality control “lessons learned” training
following each submittal with the project design team
members, including subconsultants, as appropriate.

PROJECT MANAGEMENT PLAN

PROJECT QUALITY PLAN
PROJECT ENGINEER Ongoing Reviews &
Guidance During Development
PROJECT MANAGER Quality & Accuracy Checks
Consistency & Compliance
TECHNICAL SPECIALISTS Independent Reviews

DISCIPLINE LEADS /

CONSTRUCTION MANAGER
Interdisciplinary Reviews
Constructibility Reviews

ACCURATE DELIVERABLES
Exhibit A
819
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 62 ends

EXCEPTIONS
Mark Thomas has reviewed the sample agreement provided in the RFP and we respectfully request to discuss the changes in redline below.

7. INDEMNIFICATION
With all matters related to Design Professional Services, as defined by California Civil Code 2782.8, CONSULTANT shall indemnify and hold harmless CITY from and against all liability arising out of or in connection with CONSULTANT’s negligent or wrongful acts, errors or omissions in the performance of work hereunder or its failure to comply with any of its obligations contained in this Agreement. In the event that CITY is named as a party defendant in a lawsuit alleging injury as a result of CONSULTANT’s negligent or wrongful performance under this Agreement, CONSULTANT shall defend CITY with counsel approved by CITY, which approval will not be unreasonably withheld, and bear responsibility for the reimbursement of attorney’s fees, expert fees and all other costs and expenses of litigation. Should conflict of interest principles preclude a single lawyer from representing both CITY and CONSULTANT, or should CITY otherwise find CONSULTANT’s legal counsel unacceptable, then CONSULTANT shall reimburse the CITY its costs of defense, including without limitation reasonable attorney’s fees, expert fees and all other costs and expenses of litigation.

CONSULTANT shall promptly pay any final, non-appealable judgment rendered against the CITY. Consultant has no obligation to provide an immediate defense or to pay for any of the indemnities defense related cost prior to a final determination of liability or to pay any amount that exceeds Consultant’s final determined percentage of liability based upon the comparative fault of Consultant. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California but the indemnity obligation will exclude such loss or damage which is determined to be caused by the sole negligence or willful misconduct of the CITY.

14. OWNERSHIP OF DOCUMENTS
It is understood and agreed that the CITY shall own all documents and other work product of the CONSULTANT, except the CONSULTANT’s notes and workpapers, copyright and IP which pertain to the work performed under this Agreement. The CITY shall have the sole right to use such materials in its discretion and without further compensation to the CONSULTANT. Consultant shall grant CITY an irrevocable, non-exclusive, nontransferable, royalty-free license to use the Proprietary Intellectual Property developed under this Agreement.

CITY shall indemnify, defend and hold harmless Consultant for any use or re-use of said final professional work product for any other purpose than its original intended use. Any use or re-use for another project or project location shall be at CITY’s sole risk. The CONSULTANT shall at its sole expense provide all such documents to the CITY upon request.

Exhibit A
820
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 63 ends

REFERENCES
We are proud of our track record of successfully completing projects and meeting the needs of our clients. Below is a list of our client references for projects similar to the City’s project. We are confident that you will find that the highlighted projects demonstrate our ability to deliver the services needed for this complete streets project.

Iván Garcia
Programming Director
Butte County Association of Governments
(530) 809-4603
[email protected]
Grant and Funding Support
for Washington Avenue/Table Mountain Boulevard
Mark Thomas provided grant and funding support services for the infrastructure concept to transform Washington Avenue/Table Mountain Boulevard into a Complete Street. Scope of work included the preparation of grant narratives for the preparation of the draft and final versions of the three parts of the application.

Russell Chen
Senior Civil Engineer
County of Santa Cruz
(831) 454-2160
[email protected]
Green Valley Road Multi-Use Trail Improvement
Mark Thomas provided engineering support for improvements for this multi-use trail in an unincorporated area of Santa Cruz County. The project includes roadway improvements, construction of an 8-foot to 10-foot-wide multi-use trail and transit stop enhancements spanning two miles along a well-traveled and high-speed road with sporadic existing facilities for pedestrians and bicyclists.

Andrew Poster
Director of Public Works
City of Mill Valley
(415) 384-4848
[email protected]
East Blithedale Avenue Improvements
Mark Thomas provided civil engineering services for improvements including the use of roundabouts, upgrades to existing signal infrastructure, widening existing bikeways, and improvements to pedestrian crossing paths along the corridor from Sunnyside Avenue to US 101.

Katie Wurzel
Principal Civil Engineer
City of Woodland
(530) 661-5961
[email protected]
East Main Street Improvements
Mark Thomas provided design services for improvements to East Main Street, from East Street to Pioneer Avenue. This project includes safety upgrades adjacent to the existing rail line, multimodal access for cyclists and pedestrians, enhanced drainage facilities, and aesthetics to achieve a complete street, including a landscapeseparated, Class I path.

EAST MAIN STREET IMPROVEMENTS
Exhibit A
821
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 64 ends

CONFLICT OF INTEREST STATEMENT
Mark Thomas does not have any financial, business, or other relationship with the City of Oroville that would have an impact upon the outcome of the contract. We do not foresee any of our clients having a financial interest in the outcome of this contract or any other construction project that may follow. Specifically, Mark Thomas does not have any financial interest or relationship with the owner or developer that may have future improvements or development projects with the City of Oroville.

LITIGATION
Mark Thomas has no pending bankruptcies, liens, stop payment notices, or foreclosures filed or resolved in the past seven (7) years. Mark Thomas operates throughout California and has had average annual billings over the last five years in excess of $53 million. There are no claims pending against the company that would impact its ability to discharge its contractual duties if awarded a contract. Below is summary table of litigation history.

PROJECT NAME REPORT

DATE BASIS OF CLAIM CLAIM AMOUNT STATUS RESULT
State College Blvd
Railroad Grade
Separation
1/27/2020 The lawsuit is dealing with a
car accident at the intersection
of Kimberley Drive and Acacia
Avenue.
$510,000 Closed Settlement of $510,000
on 2/24/21
Marin Sonoma
Narrows B3
10/1/2019 Suit for wrongful death due to
a construction period traffic
accident.
$15,000 Closed Settlement of $15,000
on 5/26/22

CONTRACT AGREEMENT
We have included our exceptions to the sample agreement on page 62.

The terms in this proposal shall remain in effect for 90 days following the submittal due date.

LOCAL PRESENCE
Our Sacramento and Roseville offices are ideally positioned to support projects in the City, providing quick response times and efficient collaboration with local agencies and stakeholders. We have been proudly serving Butte County and the City from these offices for over 20 years, successfully delivering projects that enhance the region’s infrastructure. With our team’s familiarity with local priorities and our ability to be on-site as needed, we are well-equipped to support this project.

Exhibit A
822
Item 10.

FEDERAL AID FORMS
Exhibit A
823
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 66 ends

Local Assistance Procedures Manual Exhibit 10-O1
Consultant Proposal DBE Commitment

1. Local Agency: 2. Contract DBE Goal

3. Project Description:

4. Project Location:

5. Consultant's Name: 6. Prime Certified DBE

10. DBE %

0.90%

6.64%

24.77%

3.46%

0.00%

17. Local Agency Contract Number:

18. Federal-Aid Project Number:

19. Contract Execution Date:

20. Consultant's Ranking after Evaluation:
3/13/2025

22. Date 13. Date
916-605-6761

24. Phone 15. Phone
DISTRIBUTION: Original – Included with consultant’s proposal to local agency.

Matt Brogan

23. Local Agency Representative's Name 14. Preparer's Name Principal + Vice President

25. Local Agency Representative's Title 16. Preparer's Title IMPORTANT: Identify all DBE firms being claimed for credit, regardless Local Agency certifies that all DBE certifications are valid and of tier. Written confirmation of each listed DBE is required. information on this form is complete and accurate.

21. Local Agency Representative's Signature 12. Preparer's Signature

35.76%
Right of Way 46456
Monument ROW
8 Cobblestone Court
Laguna Niguel, CA 92677
Amber Costello 562-260-0507
Lighting and signal design
43459
Bennett Engineering Services, Inc
1082 Sunrise Ave, Ste 100,
Roseville Ca 95661
Stacey Lynch 916-743-8722
Local Agency to Complete this Section

11. TOTAL CLAIMED DBE PARTICIPATION
Environmental consulting in support of CEQA
and NEPA 31237
Gallaway Enterprise, Inc
117 Meyers St., Ste. 120
Chico, C 95926
Jody Gallaway 530-332-9909

7. Description of Work, Service, or Materials
Supplied

8. DBE
Certification
Number

9. DBE Contact Information
Public Outreach Services 35954
AIM Consulting, Inc.
2523 J Street, Ste. 202
SACRAMENTO, CA 95816
Gladys Cornell 916-442-1186
Mark Thomas & Company, Inc.

EXHIBIT 10-O1 CONSULTANT PROPOSAL DBE COMMITMENT
City of Oroville 21%
Washington Avenue and Table Mountain Boulevard Complete Streets Project Butte County
LPP 18-01

Page 1 of 1 ends

July 23, 2015
Exhibit A
824
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 67 ends

Local Assistance Procedures Manual EXHBIT 10-Q
Disclosure of Lobbying Activities
EXHIBIT 10-Q DISCLOSURE OF LOBBYING ACTIVITIES
COMPLETE THIS FORM TO DISCLOSE LOBBYING ACTIVITIES PURSUANT TO 31 U.S.C. 1352

1. Type of Federal Action: 2. Status of Federal Action: 3. Report Type:
a. contract a. bid/offer/application a. initial
b. grant b. initial award b. material change
c. cooperative agreement c. post-award
d. loan For Material Change Only:
e. loan guarantee year ____ quarter _________
f. loan insurance date of last report __________

4. Name and Address of Reporting Entity 5. If Reporting Entity in No. 4 is Subawardee, Enter Name and Address of Prime:

Prime Subawardee
Tier _______ , if known
Congressional District, if known Congressional District, if known

6. Federal Department/Agency: 7. Federal Program Name/Description:

CFDA Number, if applicable ____________________

8. Federal Action Number, if known: 9. Award Amount, if known:

10. Name and Address of Lobby Entity 11. Individuals Performing Services (If individual, last name, first name, MI) (including address if different from No. 10) (last name, first name, MI)
(attach Continuation Sheet(s) if necessary)

12. Amount of Payment (check all that apply) 14. Type of Payment (check all that apply) $ _____________ actual planned a. retainer
b. one-time fee

13. Form of Payment (check all that apply): c. commission a. cash d. contingent fee
b. in-kind; specify: nature _______________ e deferred
Value _____________ f. other, specify _________________________

15. Brief Description of Services Performed or to be performed and Date(s) of Service, including officer(s), employee(s), or member(s) contacted, for Payment Indicated in Item 12:
(attach Continuation Sheet(s) if necessary)

16. Continuation Sheet(s) attached: Yes No

17. Information requested through this form is authorized by Title 31 U.S.C. Section 1352. This disclosure of lobbying reliance was placed by the tier above when his transaction was made or entered into. This disclosure is required pursuant to 31 U.S.C. 1352. This information will be reported to Congress
semiannually and will be available for public inspection. Any person who fails to file the required disclosure shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.

Signature: ________________________________________
Print Name: _______________________________________
Title: ____________________________________________
Telephone No.: ____________________ Date:___________
Authorized for Local Reproduction
Federal Use Only: Standard Form - LLL
Standard Form LLL Rev. 04-28-06
Distribution: Orig- Local Agency Project Files

Page 1 ends

LPP 13-01 May 8, 2013
N/A
Matt Brogan, PE
Principal + Vice President
916-605-6761 3/14/2025
Exhibit A
825
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 68 ends

Local Assistance Procedures Manual Exhibit 15-H
Proposer/Contractor Good Faith Effort
EXHIBIT 15-H: PROPOSER/CONTRACTOR GOOD FAITH EFFORTS
Cost Proposal Due Date ___________________ PE/CE
Federal-aid Project No(s). _____________________ Bid Opening Date ___________________ CON The established a Disadvantaged Business Enterprise (DBE) goal of ___% for this contract. The information provided herein shows the required good faith efforts to meet or exceed the DBE contract goal.

Proposers or bidders submit the following information to document their good faith efforts within five (5) calendar days from cost proposal due date or bid opening. Proposers and bidders are recommended to submit the following information even if the Exhibit 10-O1: Consultant Proposal DBE Commitments or Exhibit 15-G:

Construction Contract DBE Commitment indicate that the proposer or bidder has met the DBE goal. This form protects the proposer’s or bidder’s eligibility for award of the contract if the administering agency determines that the bidder failed to meet the goal for various reasons, e.g., a DBE firm was not certified at bid opening, or the bidder made a mathematical error.

The following items are listed in the Section entitled “Submission of DBE Commitment” of the Special Provisions, please attach additional sheets as needed:

A. The names and dates of each publication in which a request for DBE participation for this project was placed by the bidder (please attach copies of advertisements or proofs of publication):

Publications Dates of Advertisement
B. The names and dates of written notices sent to certified DBEs soliciting bids for this project and the dates and methods used for following up initial solicitations to determine with certainty whether the DBEs were interested (please attach copies of solicitations, telephone records, fax confirmations, etc.):

Names of DBEs Solicited Date of Initial Solicitation Follow Up Methods and Dates

Page 1 of 3 ends

May 2020
City of Oroville
21 AIM Consulting, Inc. 2/14/2025 email
Gallaway Enterprises, Inc. 2/14/2025 email
Monument ROW 2/14/2025 email
Bennett Engineering Services Inc 2/14/2025 email
N/A
Exhibit A
826
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 69 ends

Local Assistance Procedures Manual Exhibit 15-H
Proposer/Contractor Good Faith Effort
C. The items of work made available to DBE firms including those unbundled contract work items into economically feasible units to facilitate DBE participation. It is the bidder's responsibility to demonstrate that sufficient work to facilitate DBE participation in order to meet or exceed the DBE contract goal.

Items of Proposer or Bidder Breakdown of Amount Percentage Work Normally Performs Item Items ($) Of
(Y/N) Contract
D. The names, addresses and phone numbers of rejected DBE firms, the reasons for the bidder's rejection of the DBEs, the firms selected for that work (please attach copies of quotes from the firms involved), and the price difference for each DBE if the selected firm is not a DBE:

Names, addresses and phone numbers of rejected DBEs and the reasons for the bidder's rejection of the DBEs:

Names, addresses and phone numbers of firms selected for the work above:

E. Efforts (e.g. in advertisements and solicitations) made to assist interested DBEs in obtaining information related to the plans, specifications and requirements for the work which was provided to DBEs:

Page 2 of 3 ends

May 2020
Public Outreach Services Y TBD 0.9%
Environmental & Permitting Services Y TBD 6.64%
Right of Way Acquisition Y TBD 24.77%
Signals Y TBD 3.46%
N/A
N/A - Mark Thomas meets the goal
AIM Consulting, Inc.; 2523 J Street, Ste. 202; Sacramento, CA 95816; (916) 442-1168 Gallaway Enterprises, Inc.; 117 Meyers St., Suite 120; Chico, CA 95926; (530) 332-9909 Monument ROW; 8 Cobblestone Court Laguna Niguel, CA 92677; (562) 260-0507 Bennett Engineering Services Inc; 1082 Sunrise Avenue, Suite 100; Roseville, CA 95661; (916) 743-8722 Exhibit A
827
Item 10.

WASHINGTON AVE. AND TABLE MOUNTAIN BLVD. COMPLETE STREETS PROJECT City of Oroville

MARK THOMAS

Page 70 ends

Local Assistance Procedures Manual Exhibit 15-H
Proposer/Contractor Good Faith Effort
F. Efforts (e.g. in advertisements and solicitations) made to assist interested DBEs in obtaining bonding, lines of credit or insurance, necessary equipment, supplies, materials, or related assistance or services, excluding supplies and equipment the DBE subcontractor purchases or leases from the prime contractor or its affiliate:

G. The names of agencies, organizations or groups contacted to provide assistance in contacting, recruiting and using DBE firms (please attach copies of requests to agencies and any responses received, i.e., lists, Internet page download, etc.):

Name of Agency/Organization Method/Date of Contact Results H. Any additional data to support a demonstration of good faith efforts:

Page 3 of 3 ends

May 2020
N/A - Mark Thomas meets the goal
N/A - Mark Thomas meets the goal
N/A - Mark Thomas meets the goal
Exhibit A
828
Item 10.

SACRAMENTO
701 University Avenue, Suite 200
Sacramento, CA 95825 • (916) 381-9100
San José • Cupertino • Fresno • Inland Empire • Los Angeles Walnut Creek • Lakewood • Oakland • Roseville • Sacramento markthomas.com
Exhibit A
829
Item 10.

Principal
Sr. Project ManagerSr. Project Manager (Structures)Sr. Technical LeadProject ManagerSr. Project EngineerSr. Project Engineer (Structures)Sr. Resident EngineerProject EngineerProject Engineer (Structures)Sr. TechnicianSr. Technician (Structures)Design Engineer IIDesign Engineer ILAUD Division ManagerLAUD Project ManagerLandscape ArchitectLandscape Designer IILandscape Designer ISurvey Division ManagerSurvey Manager IIProject Surveyor IIIProject Surveyor IIAsst Surveyor IISurvey Specialist IIILead Survey TechnicianSurvey Technician IIISurvey Technician II2-Person Crew (OE3)Planner IIFunding ManagerSr. Funding SpecialistProject AccountantSr. Project CoordinatorSr. Graphic ManagerSr. Graphic DesignerAIM CONSULTINGCRAWFORDGALLAWAY ENTERPRISESMONUMENT ROWBENNETTFehr & Peers $506 $277 $277 $259 $233 $203 $203 $313 $168 $168 $163 $163 $142 $113 $264 $207 $132 $118 $87 $354 $250 $220 $187 $132 $187 $126 $138 $122 $325 $123 $309 $210 $129 $148 $186 $146 DBE DBE DBE DBE

1.0 PROJECT MANAGEMENT AND COMPLIANCE

1.1 Project Management 20 67 60 60 207 $45,253 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $45,253.35

1.2 Meetings 20 40 20 60 38 178 $45,940 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $45,939.58

1.3 Quality Control 30 50 30 30 30 6 30 15 221 $53,536 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $53,535.60

1.4 Stakeholder Database and Outreach
Management 16 16 32 $7,681 $9,014.39 $0.00 $0.00 $0.00 $0.00 $0.00 $16,695.85

1.5 Public Workshops 48 16 48 16 24 16 40 208 $42,085 $25,215.79 $0.00 $0.00 $0.00 $0.00 $0.00 $67,301.08

1.6 City Council Presentations 16 8 24 8 4 4 8 72 $15,276 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $15,276.12

1.7 Funding Application Support 8 8 16 8 4 90 40 90 264 $50,700 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $50,699.81 OTHER DIRECT COSTS $336 $2,400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,736.00 Subtotal Phase 1 40 225 0 50 74 186 0 30 0 0 0 0 16 0 6 100 47 0 0 0 0 0 0 0 0 0 0 0 0 90 40 90 60 60 20 48 1182 $260,807 $36,630.18 $0.00 $0.00 $0.00 $0.00 $0.00 $297,437.39

2.0 DATA COLLECTION

2.1 Project Initiation and Site Visits 8 16 20 16 16 76 $14,983 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $14,983.19

2.2 Survey and Mapping 2 4 8 16 30 $4,904 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $4,903.98

2.2.1 Controls Surveys 4 12 24 20 120 12 192 $52,365 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $52,365.21

2.2.2 Record Level Rright-of-Way Mapping 6 16 40 24 8 24 30 2 150 $31,149 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $31,148.97

2.2.3 Topographic Surveys and Orthoimagery 10 20 2 48 16 80 24 240 12 100 10 562 $106,748 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $106,748.43

2.2.4 Utility Mapping (SUE Level D) 2 2 8 16 2 10 24 12 24 12 40 30 2 184 $34,805 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $34,805.26 OTHER DIRECT COSTS $77,460 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $77,460.00 Subtotal Phase 2 0 10 0 0 18 26 0 0 32 0 0 0 48 0 0 0 0 0 0 22 58 2 136 72 104 44 264 52 280 0 0 0 0 26 0 0 1194 $322,415 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $244,955.04

3.0 ENVIRONMENTAL STUDIES AND DOCUMENTATION

3.1 Project Initiation, Project Description,
PES, and Final Review 8 4 8 8 16 24 68 $11,099 $0.00 $0.00 $25,734.17 $0.00 $0.00 $0.00 $36,833.23

3.2 Technical Studies 16 4 16 36 $8,615 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $8,614.52

3.2.1 Natural Environmental Study 0 $0 $0.00 $0.00 $17,100.08 $0.00 $0.00 $0.00 $17,100.08

3.2.2 Delineation of Aquatic Resources 0 $0 $0.00 $0.00 $8,625.09 $0.00 $0.00 $0.00 $8,625.09

3.2.3 Temporary Occupancy Memo 0 $0 $0.00 $0.00 $2,269.60 $0.00 $0.00 $0.00 $2,269.60

3.2.4 Con Noise & Air Quailty Memos 0 $0 $0.00 $0.00 $3,530.49 $0.00 $0.00 $0.00 $3,530.49

3.2.5 Water Quality Tech Memo 0 $0 $0.00 $0.00 $8,273.85 $0.00 $0.00 $0.00 $8,273.85

3.2.6 Archaeological Survey Report and
Historic Properties Survey Report 0 $0 $0.00 $0.00 $2,269.61 $0.00 $0.00 $0.00 $2,269.61

3.2.7 Visual Impact Assessment Technical 24 80 40 12 40 196 $28,312 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $28,311.82

3.2.8 Community Impact Assessment Memo 0 $0 $0.00 $0.00 $14,232.38 $0.00 $0.00 $0.00 $14,232.38

3.2.9 Initial Site Assessment 0 $0 $0.00 $20,717.93 $0.00 $0.00 $0.00 $0.00 $20,717.93

3.3 CEQA/NEPA Documentation and
Environmental Commitment Record 16 4 24 44 $10,242 $0.00 $0.00 $27,461.07 $0.00 $0.00 $0.00 $37,703.02 OTHER DIRECT COSTS $0 $0.00 $5,659.00 $114,253.11 $0.00 $0.00 $0.00 $119,912.11 Subtotal Phase 3 0 40 0 0 12 48 0 0 8 0 0 0 16 24 0 24 80 40 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 40 344 $58,267 $0.00 $26,376.93 $223,749.45 $0.00 $0.00 $0.00 $308,393.73

4.0 UTILITY COORDINATION

4.1 Prepare Conflict Mapping 8 4 20 40 80 80 232 $34,339 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $34,338.73

4.2 Utility Coordination Meetings 12 8 12 32 $7,627 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $7,627.21

4.3 Miscellaneous Utility Documentation 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

4.4 Potholing of Utilities 2 2 4 16 24 48 $7,942 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $7,941.85 OTHER DIRECT COSTS $88,000 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $88,000.00 Subtotal Phase 4 0 22 0 0 14 36 0 0 56 0 0 0 104 80 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 312 $137,908 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $137,907.79

5.0 RIGHT OF WAY PHASE & DETERMINATION

5.1 ROW Requirements 4 4 20 20 24 80 152 $21,894 $0.00 $0.00 $0.00 $13,440.00 $0.00 $0.00 $35,334.33 OTHER DIRECT COSTS $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Phase 5 0 4 0 0 4 20 0 0 20 0 0 0 24 80 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 152 $21,894 $0.00 $0.00 $0.00 $13,440.00 $0.00 $0.00 $35,334.33

6.0 PRELIMINARY ENGINEERING STUDIES

6.1 Traffic Analysis 2 2 2 6 $1,427 $0.00 $0.00 $0.00 $0.00 $0.00 $19,574.16 $21,000.87

6.2 Geotechnical Report 2 2 2 6 $1,427 $0.00 $48,721.81 $0.00 $0.00 $0.00 $0.00 $50,148.52

6.3 Corridor Landscape Design Plan 2 2 2 4 40 120 80 60 310 $41,217 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $41,217.33

6.4 Corridor Lighting Analysis 2 2 2 6 $1,427 $0.00 $0.00 $0.00 $0.00 $16,249.43 $0.00 $17,676.14

6.5 Structure Load Rating 2 18 2 2 42 32 48 146 $28,144 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $28,143.65

6.6 Stormwater Data Report 2 2 4 32 16 56 $9,016 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $9,015.95

6.7 Roadway Drainage Memo 2 2 4 24 32 48 112 $15,829 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $15,829.45 OTHER DIRECT COSTS $0 $0.00 $33,656.20 $0.00 $0.00 $0.00 $8,302.00 $41,958.20 Subtotal Phase 6 0 14 18 0 14 18 42 0 56 32 0 48 32 64 4 40 120 80 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 642 $98,487 $0.00 $82,378.01 $0.00 $0.00 $16,249.43 $27,876.16 $224,990.12

7.0 DESIGN AND CONSTRUCTION PREPARATION

7.1 30% Plans and Estimate 160 120 180 280 240 400 400 1780 $297,006 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $297,005.61

7.2 60% PS&E 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

7.2.1 60% PS&E (Civil) 280 220 440 600 160 800 720 3220 $540,198 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $540,197.60

7.2.2 60% PS&E (Structures) 16 32 32 64 144 $26,733 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $26,733.22

7.2.3 60% PS&E (Landscape) 8 60 120 240 240 668 $79,500 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $79,499.86

7.3 90% PS&E 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

7.3.1 90% PS&E (Civil) 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

7.3.2 90% PS&E (Structures) 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

7.3.3 90% PS&E (Landscape) 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

7.4 100% (Bid Set) PS&E 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

7.4.1 100% (Bid Set) PS&E (Civil) 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

7.4.2 100% (Bid Set) PS&E (Structures) 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

7.4.3 100% (Bid Set) PS&E (Landscape) 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

7.5 Signals Lighting and Electrical Design 2 4 2 8 $1,652 $0.00 $0.00 $0.00 $0.00 $32,664.10 $0.00 $34,315.94

7.6 Permits to Enter and Construct 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 OTHER DIRECT COSTS $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Phase 7 0 442 16 0 340 624 32 0 880 32 400 64 1202 1120 8 60 120 240 240 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5820 $945,088 $0.00 $0.00 $0.00 $0.00 $32,664.10 $0.00 $977,752.23

8.0 PERMITTING

8.1.1 Caltrans Encroachment Permit 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

8.1.2 Department of Water Resources (DWR)
Encroachment Permit 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

8.2 CPUC and/or UPRR Coordination 24 48 52 64 16 204 $41,456 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $41,456.02 OTHER DIRECT COSTS $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Phase 8 0 24 0 0 48 52 0 0 64 0 0 0 16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 204 $41,456 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $41,456.02

TOTAL COST
COST PROPOSAL FOR PROJECT SCOPE - City of Oroville: Washington Avenue and Table Mountain Boulevard Complete Streets Project Total MT Cost
Mark Thomas
Total
Hours
Subconsultants
*Please note that rates shown are for estimating
purpose only. See Rate Schedule for actual
rates/ranges.

Please note that the rates shown are for estimating purposes only. See rate schedule for actual rates/ranges.

MT Fee (Cost Estimate Rates)
4/30/2025 830
Item 10.

9.0 ROW AND/OR CONSTRUCTION PHASE AUTHORIZATION

9.1 ROW Documentation and Construction
Phase Authorization 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 OTHER DIRECT COSTS $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Phase 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

10.0 BID PROCESS

10.1 Responding to Bid Inquiries 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

10.2 Attending Pre-Bid Meetings 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

10.3 Preparing Addenda to PS&E 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 OTHER DIRECT COSTS $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal Phase 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTAL HOURS 40 781 34 50 524 1010 74 30 1116 64 400 112 1458 1368 18 224 367 360 300 22 58 2 136 72 104 44 264 52 280 90 40 90 60 86 32 88 9850 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Anticipated Salary Increases $21,506.58 $200.00 $694.40 $2,737.39 $500.00 $1,500.00 $200.00 $27,338.37 OTHER DIRECT COSTS $165,796.00 $2,400.00 $39,315.20 $114,253.11 $0.00 $350.00 $8,302.00 $330,416.31 TOTAL COST $20,234 $216,074 $9,407 $12,952 $122,231 $205,463 $15,054 $9,398 $187,675 $10,763 $65,097 $18,227 $207,619 $153,987 $4,760 $46,479 $48,279 $42,476 $26,039 $7,787 $14,473 $439 $25,453 $9,472 $19,464 $5,550 $36,519 $6,347 $91,136 $11,107 $12,368 $18,919 $7,730 $12,713 $5,946 $12,889 $1,907,828.95 $36,830.18 $109,449.34 $226,486.84 $13,940.00 $50,763.53 $28,076.16 $2,373,375.00 O. OPTIONAL TASKS

3.4 Environmental Permitting 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

3.4.1 Clean Water Act & USACE Permit
Facilitation 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

3.4.2 Clean Water Act & 401 Regional
Water Quality Board Certification 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

3.4.3 Section 1602 Streambed Alteration
Agreement from the California
Department of Fish and Wildlife 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

3.4.4 Compensatory Mitigation Facilitation 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

5.2 ROW Retracement 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

5.3 Appraisal Exhibits 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

5.4 Legal Descriptions and Plats 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

5.5 Appraisals 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

5.6 Appraisal Review 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

5.7 Acquisition and Negotiation 0 $0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

6.1.3 Roundabout Feasibility Analysis 8 16 40 16 80 $13,996 $0.00 $0.00 $0.00 $0.00 $0.00 $18,815.00 $32,810.88

6.1.4 Pedestrian Crossing Improvements
Opportunities 8 12 16 16 52 $9,146 $0.00 $0.00 $0.00 $0.00 $0.00 $9,609.00 $18,755.15

6.1.5 Existing Conditions Memorandum 4 4 8 $1,920 $0.00 $0.00 $0.00 $0.00 $0.00 $11,060.00 $12,980.37 Subtotal Optional Tasks 0 20 0 0 0 32 0 0 56 0 0 0 0 32 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 140 $25,062 $0.00 $0.00 $0.00 $0.00 $0.00 $39,484.00 $64,546.39 TOTAL HOURS - OPTIONAL 0 20 0 0 0 32 0 0 56 0 0 0 0 32 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 140 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Anticipated Salary Increases (5% for 2 years) $1,253.12 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,715.12 OTHER DIRECT COSTS - OPTIONAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $362.00 $362.00 TOTAL COST - OPTIONAL $0 $5,533 $0 $0 $0 $6,510 $0 $0 $9,417 $0 $0 $0 $0 $3,602 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $26,315.51 $0.00 $0.00 $0.00 $0.00 $0.00 $39,846.00 $66,623.51 Please note that the rates shown are for estimating purposes only. See rate schedule for actual rates/ranges.

MT Fee (Cost Estimate Rates)
4/30/2025 831
Item 10.

Page 1 ends

CITY OF OROVILLE

STAFF REPORT
TO: MAYOR PITTMAN & COUNCIL MEMBERS
FROM: BRIAN RING, CITY ADMINISTRATOR

CHRIS TENNS, FIRE CHIEF

RON BELSER, CODE ENFORCMENT DIRECTOR
RE: PROPSOSED UPDATES TO THE WEED ABATEMENT ORDINANCE
DATE: MAY 6, 2025

SUMMARY
As wildfire risks continue to grow, the safety of Oroville’s residents remains a top priority.

Staff is requesting the Council consider updates to the current weed abatement ordinance to strengthen fire prevention efforts and better protect our community. These updates focus on addressing fire hazards more effectively, with a key emphasis on establishing defensible space around homes to reduce the risk of wildfire damage.

DISCUSSION
With the implementation of new Fire Hazard Severity Zones (FHSZs) in Local Responsibility Areas (LRAs), including within the City of Oroville, staff believes it is essential to revise the City’s existing ordinance to reflect these changes. Incorporating updated language that identifies Very High, High, and Moderate fire hazard severity zones will help align the City’s fire prevention efforts with the State’s current risk assessment and clarify expectations for property owners. To further address the evolving nature of wildfire risk and enhance the City’s fire prevention strategies, several additional updates to the ordinance are proposed. These include revised definitions to ensure terminology aligns with modern fire safety practices, making the ordinance easier for residents, landowners, and enforcement personnel to understand and apply.

Recognizing the distinct challenges posed by larger properties, the updated ordinance introduces provisions tailored to these areas, supporting more effective hazard reduction strategies. Additionally, the ordinance establishes clear guidelines for the proper disposal of vegetation, helping to ensure that flammable debris is not left in a way that increases fire risk.

Protecting our community from wildfire is a shared responsibility. These updates are a critical step in making Oroville a safer place to live and work, but lasting progress 832
Item 11.

Page 2 ends

depends on all of us. By working together and staying proactive, we can reduce fire hazards and better protect our homes, neighborhoods, and each other.

FISCAL IMPACT
NONE

ACTION REQUESTED -

STAFF RECOMMENDS CITY COUNCIL WAIVE THE FIRST READING OF ORDINANCE

FOR WEED ABATEMENT AND DIRECT STAFF TO BRING BACK FOR ADOPTION AT THE NEXT MEETING WITH PROPOSED EFFECTIVE DATE OF JANUARY 1, 2026.

ATTACHMENTS
DRAFT ORDINANCE (Updated Weed Abatement Ordinance – 2025) 833
Item 11.

City of Oroville, CA § 13.08.170 § 13.08.200
Article 2
Yard Waste, Weeds, MSW Recyclable Material and Organic Waste, and Rubble
Purpose
It is the intent of this chapter to require the owners and occupants of real property in the within the City of Oroville to maintain said properties to:

1. Reduce the risk of uncontrolled fires and the harm they may cause to individuals.

2. Minimize the spread of any fire to other properties and buildings.

3. Reduce obstructions to fire suppression efforts if a fire does occur.

4. Increase the opportunity for firefighters to successfully protect lives, residences, and other valuable buildings from wildfires.

5. Protect populated areas, such as metropolitan areas, suburban areas, and urban and rural subdivisions from encroaching wildfires.

6. Reduce the spread of residential and other building fires into the wildland vegetation; and

7. Prevent interference with fire hazard abatement activities.

It is the duty of every owner and occupant of real property within the City of Oroville set forth in section of this chapter to comply with the firebreak requirements specified in section of this chapter and to prevent fire hazards from arising on, or existing upon, his or her property. A failure to comply with the mandatory duty set forth in this section by failing to prevent fire hazards from arising on, or existing upon, one's property is unlawful and punishable as a misdemeanor.
834
Item 11.
§ 13.08.170. Definitions
For the purposes of this chapter, the following words and phrases shall have the meanings respectively ascribed to them by this section:
• "Grass," "weeds" or "plants" means grass, weeds, or plants which when mature will attain such a large growth as to become a fire menace when dry, or which are otherwise noxious or dangerous.
• Fire Hazard Vegetation: Any plant or material that is highly flammable and can contribute to the spread of wildfire, including dry or dead grass, brush, and other combustible vegetation. • "Owner" means the legal owner of real property fronting on any street; and as used in this chapter the singular shall include the plural, and shall include an individual, a firm, an association, a corporation, a partnership and the lessees, trustees, agents, employees, and representatives of any such owner. Proof of the assessment of any real property, the subject of this chapter, to any person or legal entity on the official assessor's rolls shall constitute prima facie evidence that such person or legal entity to whom such property is so assessed is the legal owner thereof.
• Public street" or "streets" means all roads, streets, avenues, boulevards, alleys, parkways and public rights-of-way or any portions thereof of the City. • "Rubble" means any rubble, residue, structure or part or portions of a structure, remaining after the demolition or partial demolition of any building or structure in the City. • Defensible Space: A buffer zone around structures where vegetation is reduced or modified to slow or stop the spread of wildfire and protect property from fire damage. • Fire Hazard Severity Zones (FHSZ): Geographic areas that have been classified based on the risk of wildfire, considering factors such as vegetation, climate, topography, and historical fire behavior. These zones are used to establish fire safety regulations for property owners. • Moderate Fire Hazard Severity Zone: Areas with moderate wildfire risk, where defensible space is still important, but the vegetation management and other requirements may be less stringent compared to higher-risk zones.
835
Item 11.
• High-Risk Fire Zone: Areas identified as vulnerable to wildfires due to proximity to wildland areas, dry conditions, and historical fire data.
• Very High Fire Hazard Severity Zone: Areas where the risk of wildfire is the highest. These areas require the most stringent fire safety measures, including a large defensible space and specific management practices.
(Ord. 1165; Ord. 1184; Ord. 1192 § 1; Ord. 1861 § 2, 2021) § 13.08.180. Vegetation Removal and Maintenance
§ 13.08.180.

Removal
Fire Hazard Vegetation Abatement
A. Yard Waste and Weeds Etc. Every owner of real property within the corporate limits of the City shall remove and destroy all grass, weeds or plants as defined in Section.

13.08.170 from such real property and from in front of such real property from the property line thereof to the curb line of the street upon which such real property abuts.

Every owner of real property within the City limits shall remove all fire hazard vegetation, including dry grasses, weeds, plants, and brush, from such real property and from in front of such real property from the property line thereof to the curb line of the street upon which such real property abuts, unless the vegetation is properly maintained by irrigation and or spacing as not to be conducive to fire growth and propagation. It is highly recommended to remove ornamental shrubs from the property that are flammable even when cared for. Ie: juniper bushes, etc B. MSW, Recyclable Material, Organic Waste and Rubble. Every owner of real property within the corporate limits of the city shall keep such real property, and the real property in front of the same from the property line thereof to the curb line of the street upon which such real property abuts, free and clear of all MSW, recyclable material, organic waste, and rubble. Property owners in high and very high severity zones must maintain defensible space around all structures by removing fire hazard vegetation within a minimum of 30 feet of all buildings, fences, and other structures, or as determined by the Fire Chief
836
Item 11.

C. Rubble. Every owner of real property within the corporate limits of the City shall keep such real property free and clear of all rubble.

D. Additional vegetation management shall be conducted within high and very high fire hazard severity zones around structures on the property, including areas designated for ingress and egress, to ensure adequate defensible space and access for emergency vehicles

1. Property owners must also clear brush, dead trees, and overgrown vegetation that could potentially block access for emergency responders or fuel a fire.

2. Vegetation should be cut to a height not exceeding 4 inches or as determined by the Fire Chief in high-risk zones. This includes all shrubs, grasses, and brush within proximity to structures and emergency access points.

3. Remove leaves and needles from roof and rain gutters.

4. Mature tree canopy should be no closer than 10 feet to the edge of the building, roof, and chimney.

5. Clear plants and flammable items from under and around decks

6. Tall trees shall be pruned 6 feet from the ground or 1/3 of overall height.

7. Parcels with a fire hazard caused by excessive vegetation growth, are required to establish and maintain firebreaks. The primary goal of these firebreaks is to slow or stop the spread of fire during regular summer fire season conditions.

Firebreaks can consist of fire-resistant vegetation like irrigated lawns or pastures, ice plant, green ivy, and other plants approved by the Fire chief as being fireresistant. It is essential to maintain vegetation and firebreaks in a condition that impedes the spread of fire.
• Properties 1 to 5 Acres: Owners of properties ranging from 1 acre to 5 acres must establish a fire break around the entire property. This fire break should be a clear area devoid of combustible vegetation to reduce the spread of fire across the property. Required firebreaks may be created by mowing to a maximum height of four (4) inches, discing or removing the annual weeds, grass, rank growth and trimmings, and by removing obstructions. 837
Item 11.
• Properties Greater Than 5 Acres: Owners of properties greater than 5 acres must establish a fire line around the property’s perimeter. These properties will also require an addition fire break dividing the property into sections further reducing the spread of fire across large areas. This can be achieved by mechanical equipment or natural ie: rivers, creeks, riparian, or existing trail/ road. The fire line and break should be maintained regularly to ensure they remain effective. Well maintained properties will not be required to add a fire break if other defensible space requirements are met.

8. Use of Livestock for Fuel Reduction: General guidelines for the use of Livestock for fuel reduction management can vary. It is acceptable to follow this guideline for fuel reduction. The standard equation for all hoofed animals will be one (1) acre of "feed" per hoofed animal or 8 to 12 goats per 5 acres. If the number of hoofed animals or goads exceeds the number of acres in said parcel the owner and occupant may be exempt.

9. For travel ways entering and exiting the property, clear and maintain vegetation down to 4 inches or less, creating a buffer zone of at least 10 on both sides, and trim all overhanging tree branches to a minimum height of 14 feet to allow access for emergency vehicles.

10. It is not permitted to allow an accumulation of combustible material, dead or dying trees, or green waste on an unimproved parcel’s property line when it encroaches on the 100-foot defensible space requirements of a structure or building on the adjacent property.

Community Education
 Educational Campaign: The City will launch an educational campaign to help homeowners understand how to create defensible space, manage fire risk, and comply with the ordinance. This could include workshops, online resources, and community outreach.
838
Item 11.
(Ord. 1165; Ord. 1184; Ord. 1861 § 2, 2021)
§ 13.08.190. Disposal of Removed Vegetation and Waste
Upon removal, such yard waste, grass, weeds, plants, MSW, recyclable material and organic waste and rubble shall not be placed, deposited, or dumped in the public streets; or placed, deposited, or dumped between the property line and the curb line.

Proper Disposal Methods:

1. Chipping: Materials may be chipped and used as mulch on-site if safe and permissible.

2. Removal: Materials must be hauled to a designated disposal or composting site.

3. Burning: Only allowed under specific, controlled conditions and with a valid burn permit from the fire department and/or local authorities, to avoid contributing to fire risk. (Ord. 1165; Ord. 1184; Ord. 1861 § 2, 2021)
§ 13.08.200. Notice to remove Vegetation
Publication. The fire chief shall cause to be published two notices in the Oroville Mercury Register between April 1st and 20th, which notices shall in each publication provide as follows:

NOTICE TO ALL PROPERTY OWNERS IN THE OROVILLE CITY LIMITS TO

REMOVE YARD WASTE, GRASS, WEEDS OR PLANTS, MSW, RECYCLABLE MATERIALAND ORGANIC WASTE AND RUBBLE PRIOR TO JUNE 15th OF EACH YEAR.

All owners of land in the City limits of the City of Oroville are hereby notified to remove or destroy all yard waste, grass, weeds, or plants, MSW, Recyclable Material and Organic Waste and rubble thereon prior to June 15th. ADMINISTRATIVE CITATIONS WILL BE ISSUED pursuant to City Ordinance No. 1717 for violations thereof against all property owners failing to comply with this notice.

FIRE CHIEF, City of Oroville, by direction of the City Council 839
Item 11.

Failure to Comply

1. Upon the failure of the owner of any real property in the City to remove or destroy such yard waste, grass, weeds, or plants, or remove such MSW, recyclable material, organic waste, and rubble from such real property, or to remove or destroy such yard waste,
grass, weeds or plants, or to remove such MSW, recyclable material, organic waste, or rubble from in front of such real property from the property line thereof to the curb line of the street upon which such real property abuts, such owner shall be given notice by the fire chief of the City to remove or destroy the same within a period of 10 days. Such notice shall be in writing or printed and shall be dated. The fire chief shall mail written notices in substantially the same form as provided in subsection C of this section; except, that the fire chief shall sign such notice that is to be mailed to the owner to whom the real property is assessed on the last equalized assessment roll, and that is to be mailed to the address shown on the assessment roll.

2. Before the end of the period mentioned in such notice, the owner, if he or she has any objection thereto, may file with the City clerk a protest in writing setting forth the legal and factual reasons on which the objection to such notice of proposed removal or destruction is based. If, at the end of such period mentioned in such notice, such owner has failed to comply with the notice; and if he or she has failed to file a written protest with the City clerk, a citation shall be issued and duly served upon such owner for violation of this chapter. If a written protest is filed with the City clerk, and if the City clerk or the fire chief believes the protest to be without merit, then the written protest shall be referred to the City council for a hearing and decision thereon. The City council may hear the protest at a regular or special meeting, and the City clerk shall mail, at least 7 days before the hearing, a notice of the date and time of the hearing before the City council, to the owner who has filed a written protest of the proposed removal. If the City council finds the written protest and the oral testimony, if any, without merit and overrules the protest, then the City clerk shall mail to the owner a notice giving the substance of the decision of the City council, and then if the owner does not him or herself at his or her own expense make the removal within 5 days thereafter, a citation shall be duly issued and served upon such owner for the violation of this chapter. 840
Item 11.

NOTICE TO DESTROY OR REMOVE YARD WASTE, GRASS, WEEDS OR PLANTS,

AND REMOVE MSW, RECYCLABLE MATERIAL, ORGANIC WASTE AND
RUBBLE.

Notice is hereby given that the noxious and dangerous grass, weeds or plants growing upon or in front of this property, or the MSW, Recyclable Material Organic Waste and rubble upon, or in front of this property, or the rubble upon this property, constitute a public nuisance which must be abated within days of the date hereof by the destruction or removal of said Yard Waste, Grass, Weeds or Plants, or to remove such MSW, Recyclable Material, Organic Waste or Rubble. Upon your failure to comply with this notice, an administrative citation will be duly issued and served upon you. IT

WILL BE THE POLICY OF THE CITY OF OROVILLE NOT TO DISMISS CITATIONS FOR COMPLIANCE AFTER JUNE 15th. FAILURE TO COMPLY WILL RESULT IN ADDITIONAL CITATION(S) OR FINE(S). If you object to this proposed destruction and removal of Yard Waste, Grass, Weeds or Plants, or to remove such MSW, Recyclable Material, Organic Waste or Rubble, you are hereby notified to file with the City Clerk within 10 days of the date hereof a written protest setting forth the legal and factual reasons upon which the objection is based.

A brief official or City Assessment description of the premises is as follows:

A.P. #
DATED
Fire Chief, City of Oroville, by direction of the City Council 841
Item 11.
(Ord. 1165; Ord. 1184; Ord. 1717 §§ 1, 2; Ord. 1861 § 2, 2021) § 13.08.210. Right of entry of certain officials
The fire chief, his or her assistants and deputies, City employees or other public official designated by the City council may enter upon private property to perform the duties imposed by this chapter.
(Ord. 1165; Ord. 1184; Ord. 1861 § 2, 2021)

13.08.220. Costs of removal to be lien against property Upon completion of the work of destruction or removal of yard waste, grass, weeds or plants, or to remove such MSW, recyclable material, organic waste or rubble by the City, the fire chief shall notify the City clerk that such work has been completed and shall, in writing, inform the City clerk of the cost of performing the same, and the City clerk shall in turn notify the owner of the real property in writing of the cost of such work. If the owner fails or refuses to pay to the City the mount of cost of such work within a period of 30 days from the date of such notice, then the City clerk shall record in a book to be kept for that purpose the name of the owner of the property, a description of the property sufficient for identification, and the amount of the charges against such real property for doing the work, removal or destruction of yard waste, grass, weeds or plants, or to remove such MSW, recyclable material, organic waste or rubble from such property. From and after the date that such entry is so made, the amount charged against such real property, which amount shall include the cost of removing the yard waste, grass, weeds or plants, or to remove such MSW, recyclable material, organic waste or rubble from in front of such real property from the property line thereof to the curb line of the street upon which such real property abuts, shall constitute a special assessment against such real property which has been described in the posted notice, and shall be a lien against such real property; and the amount of such special assessment shall be added to the next regular bill for taxes levied against such real property for municipal purposes.
842
Item 11.
(Ord. 1165; Ord. 1184; Ord. 1861 § 2, 2021)
§ 13.08.230. Collection of assessment
The amount of the assessment shall be collected at the time and in the manner ordinary municipal taxes are collected. If delinquent, the amount is subject to the same penalties and the same procedure of foreclosure and sale provided for in ordinary municipal taxes. (Ord. 1165; Ord. 1184; Ord. 1861 § 2, 2021)
§ 13.08.240. Refunds
The City council may order refunded all or part of a special assessment paid pursuant to this chapter if it finds that all or part of the special assessment has been erroneously levied. A special assessment or portion thereof shall not be refunded unless a claim is filed with the City clerk on or before March 1st after the special assessment became due and payable. The claim shall be verified by the owner who paid the tax, or his/her guardian, executor, administrator, assignee, or successor in interest.
843
Item 11.
844
Item i.
845
Item i.

CITY OF OROVILLE

FIRE DEPARTMENT
Statistics Package
4/1/2025 to 4/30/2025
Countywide Cooperative Fire & Rescue Service
1 846
Item ii.

Definitions and Notes
Terms
Dispatched Agencies:

All agencies that are dispatched by the CAL FIRE / Butte County Fire Department Oroville Emergency Command Center First Due Station:

The jurisdicational agency station’s area where the incident happened based on the Computer Aided Dispatch Dynamic Routing First Due Station to another agency:

Agencies
· CABIG City of Biggs Fire Department
· CABTU CAL FIRE Butte Unit
· CABTC Butte County Fire Department
· CACDF CAL FIRE (Out Of Unit Activity)
· CACHI City of Chico Fire Department
· CAEMD El Medio Fire Protection District
· CAGRD City of Gridley Fire Department
· CALNF United States Forest Service Lassen National Forest · CAMAY Marysville Fire Department
· CAMTR Mooretown Rancheria
· CAORO City of Oroville Fire Department
· CAPNF United States Forest Service Plumas National Forest · CAPRA Town of Paradise Fire Department
· CASTC Sutter County Fire Department
· CATCR Tehama County Fire Department
· CAXPU Plumas County Unprotected Area
Incident Types
· MED - Medicals
· MEDFSS (Medical Flight)
· MEDA - Medical Code 2
· T/C - Traffic Collisions
· HAZ-CON - Hazardous Conditions
· P/A - Public Assists
· OTH - Other / Miscellanies
· ECC - Emergency Command Center Specific Incidents
· HAZ-MAT - Hazardous Materials
· RESCUE - Technical Rescues
· VEG - Vegetation Fires
· STR - Structure Fires
· VEH - Vehicle Fires
· OTH FIRES - Other Fire Types not categorized above
· F/A - False Alarms (Fires)
Stations
11 - CAL FIRE Butte Meadows 13 - CAL FIRE Stirling City 22 - CAL FIRE Cohasset 23 - CAL FIRE Forest Ranch 25 - Butte County Fire Butte College 33 - Butte County Fire Upper Ridge 35 - CAL FIRE Paradise 36 - CAL FIRE Jarbo Gap 41 - Butte County Fire Nord 44 - Butte County Fire South Chico 45 - Butte County Fire Durham 51 - CAL FIRE Feather Falls 54 - CAL FIRE Robinson Mill 55 - Butte County Fire Bangor 62 - CAL FIRE Harts Mill 63 - CAL FIRE Oroville 64 - Butte County Fire Kelly Ridge 71 - Butte County Fire Richvale 72 - Butte County Fire Palermo 73 - Butte County Fire Biggs 74 - Butte County Fire Gridley 81 - Paradise Birch Street 82 - Paradise South Libby Rd 91- CAL FIRE Oroville ECC - CAL FIRE Oroville Emergency Command Center
2 847
Item ii.
0 100
200
300
400
500
600
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
65 80 81 87
48 68
476
538
457
564
10 Year Incident Comparison By Year All Incidents
* DATA IS UNAVAILABLE PRIOR TO 02/11/2004
4/1/25 To 4/30/25
3 848
Item ii.

MED T/C HAZ-CON P/A OTH ECC VEG STR VEH OTH FIRE F/A HFSFS CAORO 375 20 3 40 2 2 5 1 1 9 24 1
Total 375 20 3 40 2 2 5 1 1 9 24 1
MEDICALS 375 66.5%
TRAFFIC COLLISIONS 20 3.5%
HAZARDOUS CONDITIONS 3 0.5%
PUBLIC ASSISTS 40 7.1%
OTHER INCIDENTS 2 0.4%
ECC INCIDENTS 2 0.4%
VEGETATION FIRES 5 0.9%
STRUCTURE FIRES 1 0.2%
VEHICLE FIRES 1 0.2%
OTHER FIRES 9 1.6%
FALSE ALARMS 24 4.3%
HFSFS 1 0.2%
MEDC2 61 10.8%
MVISTG 20 3.5%
Total: 564 100.0%
Incident Type Percentages (All Agencies)
Agency Activity 4/1/2025 to 4/30/2025
4 849
Item ii.

All Dispatched Agencies First Due Station Activity By Type 4/1/2025 To 4/30/2025
Total
Total 0
5 850
Item ii.

VEHICLE FIRES 100.0%
Total: 100.0%
All Dispatched Agencies Incident Activity by Type
4/1/2025 TO 4/30/2025
6 851
Item ii.
4/1/2025 TO 4/30/2025
7 852
Item ii.

Incident Activity by Type For City of Oroville FD
4/1/2025 To 4/30/2025
Total
Total 0
VEHICLE FIRES 100.0%
Total: 100.0%
Incident Activity by Type For City of Oroville FD
8 853
Item ii.

Cooperator Assitance Provided to CAL FIRE/Butte County Fire 4/1/2025 to 4/30/2025

MED T/C HAZ-CON P/A RESCUE VEG STR VEH OTH FIRE F/A HFSFS CAORO 341 33 2 39 2 4 5 1 10 29 1
Total 341 33 2 39 2 4 5 1 10 29 1
ME
Total Number of Resources Responding: 523
Total Number of Incidents: 435
MED T/C HAZ-CON P/A VEG STR VEH OTH FIRE F/A HFSFS MEDC2 MVISTG CAORO B9A 0 4 0 0 0 0 0 0 1 0 0 0
B9B 0 9 0 0 0 1 0 0 10 0 0 0
E91 242 17 0 13 3 1 1 6 16 0 44 9
E92 7 1 0 3 0 1 0 0 2 0 5 2
T91 67 13 2 23 0 0 0 2 10 1 2 5
Total 316 44 2 39 3 3 1 8 39 1 51 16
Resource Agency Response to Jurisdictional Agency
4/1/2025 to 4/30/2025
CAORO to CAORO
9 854
Item ii.

Total Number of Resources Responding: 127
Total Number of Incidents: 123
MED T/C HAZ-CON P/A VEG STR OTH FIRE F/A MEDC2 MVISTG Total CABTC E63 66 5 1 8 1 0 1 6 10 6 104
E71 0 0 0 0 0 0 0 3 0 1 4
E72 1 3 0 0 0 1 0 1 1 0 7
Others 8 1 0 0 0 1 0 1 1 0 12
Total 75 9 1 8 1 2 1 11 12 7 127
Resource Agency Response to Jurisdictional Agency
4/1/2025 to 4/30/2025
CABTC to CAORO
Total Number of Resources Responding: 103
Total Number of Incidents: 88
MED T/C P/A RESCUE STR OTH FIRE F/A MEDC2 MVISTG Total
CAORO B9A 0 3 0 1 0 0 4 0 0 8
B9B 0 3 0 0 0 0 1 0 0 4
BOAT91 0 0 0 1 0 0 0 0 0 1
E91 37 8 4 1 3 1 15 6 2 77
E92 5 1 0 0 1 0 0 0 0 7
RS91 0 0 0 1 0 0 0 0 0 1
T91 0 1 1 1 1 1 0 0 0 5
Total 42 16 5 5 5 2 20 6 2 103
Resource Agency Response to Jurisdictional Agency
4/1/2025 to 4/30/2025
CAORO to CABTC
10 855
Item ii.

Total Number of Resources Responding: 77
Total Number of Incidents: 57
MED T/C HAZ-CON P/A OTH VEG STR VEH OTH FIRE F/A MEDC2 Total CABTU B2102 0 0 0 0 0 0 0 0 0 1 0 1
B2103 0 2 0 0 0 0 0 0 0 1 0 3
B2108 0 2 0 0 0 0 0 0 0 1 0 3
B2115 0 1 0 0 0 0 0 0 0 0 0 1
B2117 0 1 0 0 0 0 0 0 0 1 0 2
B2118 1 0 0 0 0 0 0 0 0 0 0 1
D2105 0 0 0 0 0 0 0 0 0 1 0 1
D2106 0 0 0 0 0 0 0 0 0 1 0 1
E2160 0 0 0 0 0 0 0 0 0 0 1 1
E2162 2 0 0 0 0 0 0 0 0 0 0 2
E2165 1 0 0 0 0 0 0 0 0 0 0 1
E2169 10 1 0 0 0 2 0 0 0 4 0 17
E2180 10 0 1 2 0 0 0 0 0 0 3 16
E2185 0 1 0 0 0 0 0 0 0 1 0 2
E2196 3 0 0 0 0 0 0 0 0 1 1 5
P2121 0 0 0 0 0 1 0 0 0 0 0 1
P2122 0 0 0 0 1 0 0 0 0 0 0 1
PIO2150 0 0 0 0 0 0 0 0 0 1 0 1
PIOADVSE 0 0 0 0 0 2 1 0 1 3 0 7
PRVADVSE 0 0 0 0 0 2 1 1 1 3 0 8
Resource Agency Response to Jurisdictional Agency
04/01/2025 to 04/30/2025
CAL FIRE to CAORO
11 856
Item ii.

MED T/C HAZ-CON P/A OTH VEG STR VEH OTH FIRE F/A MEDC2 Total CABTU S2103 0 0 0 0 0 0 1 0 0 0 0 1
TAB1 0 1 0 0 0 0 0 0 0 0 0 1
Total 27 9 1 2 1 7 3 1 2 19 5 77
12 857
Item ii.

Battalion 9 Total Responses
4/1/2025 to 4/30/2025
Veg Fires Structure
Fires
Other
Fires
Medical Hazmat /
FMS
Public
Assists /
Total
B9A 0 1 5 9 0 0 15
B9B 1 1 14 12 0 0 28
E91 3 4 39 369 0 17 432
E92 0 2 2 21 0 3 28
T91 0 1 13 89 3 24 130
Total 4 9 73 500 3 44 633
Veg
Fires
Structure Fires
Other Fires
Medical
Hazmat / FMS
Public Assists /
Others
Veg Fires 0.6%
Structure Fires 1.4%
Other Fires 11.5%
Medical 79.0%
Hazmat / FMS 0.5%
Public Assists / Others 7.0%
Total: 100.0%
Number of Incidents / Incident Type
13 858
Item ii.

Incident Activity by Station
4/1/2025 To 4/30/2025
Total
Total 0
14 859
Item ii.