Whereas, the MND was not legally challenged and thus is presumed valid in accordance with Public Resources Code section 21167.2 and section 15367 of the State CEQA Guidelines (Cal. Code Regs., Title. 14, § 15000 et seq.); and Whereas, the City is the lead agency for purposes of the project pursuant to Public Resources Code section 21067; and
Whereas, pursuant to CEQA, when taking subsequent discretionary actions in furtherance of a project for which an MND has been approved, the Lead Agency is required to prepare an Addendum to a previously approved MND if some changes or additions to the MND are necessary but none of the conditions described in State CEQA Guidelines Section 15162 calling for preparation of a subsequent MND have occurred; and Whereas, the Planning Division evaluated the project by preparing an Addendum, and based on that Addendum, and all other information in the administrative record, has determined that none of the circumstances identified in State CEQA Guidelines Section 15162 have arisen as a result of the project, and that an Addendum to the Final MND 2004-11 for the Dunkirk Drive project is appropriate to analyze the reasonably foreseeable environmental impacts of the modified project; and
Whereas, Addendum No. 1 to Final MND 2004-11 is attached to the staff report in is incorporated by reference; and
Whereas, Addendum No. 1 to Final MND 2004-11 has been provided to and has been reviewed by the City Council in connection with the previously approved MND 2004- 11, which is available for inspection at City Hall and is posted on the City’s website, and are incorporated herein by reference; and
Whereas, pursuant to State CEQA Guidelines section 15164, subdivision (c), the Addendum is not required to be circulated for public review, but can be attached to the adopted MND 2004-11; and
Whereas, in accordance with CEQA, the City Council considered the proposed Addendum to the previously adopted Final MND 2004-11, finds on the basis of the whole record before it (including the initial study and adopted mitigated negative declaration) that with Mitigation Monitoring/Reporting Program and imposition of mitigation measures as conditions of approval, there is no substantial evidence that the project will have a significant effect on the environment, further finds that the Addendum to the previously adopted MND 2004-11 reflects the independent judgment of the City, and adopts the Addendum to the previously adopted MND 2004-11; and
Whereas, the Development Advisory Committee (DAC) reviewed the plans on December 18, 2019, February 24, 2021 and May 12, 2021 and provided conditions of approval for the project; and
WHEREAS, on November 18, 2021, the Planning Commission of the City of Oxnard conducted a duly noticed public hearing and recommended that the City Council adopt the Addendum to the MND 2004-11; and
WHEREAS, on February 10, 2022, the Oxnard Airport Authority reviewed the project and determined the project is an acceptable land use and is consistent with the adopted Ventura County Airport Comprehensive Land Use Plan; and 678
Resolution No. 2021-XX – [Addendum No. 1 to Final MND 2004-11] City Council Hearing Date: April 19, 2022
WHEREAS, on March 4, 2022, the Airport Land Use Commission reviewed the project and determined the project is consistent with the adopted Ventura County Airport Comprehensive Land Use Plan; and
WHEREAS, on April 19, 2022, the City Council of the City of Oxnard conducted a duly noticed public hearing to consider adopting the Addendum to the MND 2004-11; and WHEREAS, the City Council finds after due study and deliberation that the public interest and general welfare require the adoption of the Addendum to the MND 2004-11; and
WHEREAS, the Applicant agrees as a condition of this Resolution that at its own expense, to indemnify and defend the City of Oxnard and its agents, officers and employees from and against any claims, actions or proceedings to attack, set aside, void or annul the approval of this Resolution or any actions or proceedings, acts or determinations taken, done or made before the approval of this Resolution that were part of the approval process.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OXNARD:
SECTION 1. The Recitals above are true and correct and incorporated herein by this reference.
SECTION 2. In adopting Addendum to MND 2004-11, the City Council finds and determines the project is in compliance with the California Environmental Quality Act because an Addendum to the Mitigated Negative Declaration (MND 2004-11) that was prepared for the 2004 Dunkirk Drive Project was considered by the City Council at the public hearing for the Portofino Place project. The Addendum to the Final MND was prepared pursuant to the requirements of the California Environmental Quality Act (CEQA, Public resources Code §§ 21000, et seq.), the regulations promulgated thereunder (14 California Code of Regulations, §15000, et seq., CEQA Guidelines), and the City’s Environmental Review Guidelines. The City of Oxnard is the Lead Agency. The Addendum is appropriate pursuant to CEQA Guidelines § 15164 since only minor changes and additions to the MND are necessary to address the Project changes and no circumstances exist calling for the preparation of a subsequent negative declaration pursuant to CEQA Guidelines § 15162 and 15163. With implementation of the MND 2004-11 mitigation measures, there is no substantial evidence that the proposed project will have a significant effect upon the environment.
//
//
//
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of adopts an Addendum to MND 2004-11, attached to the staff report and incorporated by reference.
PASSED AND ADOPTED this 19th day of April, 2022, by the following vote:
679
Resolution No. 2021-XX – [Addendum No. 1 to Final MND 2004-11] City Council Hearing Date: April 19, 2022
AYES:
NOES:
ABSENT:
ABSTAIN:
RECUSED:
John Zaragoza, Mayor
ATTEST:
Rose Chaparro, City Clerk
APPROVED AS TO FORM:
Stephen M. Fischer, City Attorney
680
ATTACHMENT R
RESOLUTION NO. 2021-XX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF OXNARD
APPROVING GENERAL PLAN AMENDMENT PZ 20-620-02 CHANGING THE LAND USE DESIGNATION OF THE SUBJECT PROJECT SITE (APNs: 185-0-221- 025, 185-0-221-265, AND 185-0-223-015) FROM BUSINESS RESEARCH PARK TO RESIDENTIAL MEDIUM IN THE 2030 GENERAL PLAN LAND USE DESIGNATION MAP. FILED BY THE LAW OFFICE OF K.M. NEISWENDER, P.O. BOX 1225, BLUE JAY, CA 92317, THE APPLICANT.
WHEREAS, the Law Offices of K.M. Neiswender filed entitlement applications with the City of Oxnard on November 7, 2019, General Plan Amendment (PZ 20-620-02), Zone Change (PZ 20-570-02), Special Use Permit (PZ 19-500-04), and a Tentative Subdivision Map (PZ 20-300-02); and
WHEREAS, if the aforementioned entitlement applications are collectively approved by the City of Oxnard, the project would be permitted to develop a 7.61 acre project site with 90, two-story condominium dwelling units each with attached 2-car garages, 214 total visitor parking spaces, common swimming pool and playground area, 3,281 squarefoot recreation building, entry gates and perimeter walls, private roads, detention basins, landscaping and associated site improvements at the subject project site (APNs: 185-0-221- 025, 185-0-221-265, AND 185-0-223-015) (“Project”); and WHEREAS, the proposed General Plan Amendment would change the land use designation of the subject project site from Business Research Park to Residential Medium; and
WHEREAS, the Project was initially reviewed by the City Council as a PreApplication (PZ 18-600-02) on March 19, 2019, where the City Council discussed the ability for the project to incorporate inclusionary housing on the project site instead of requesting to pay the affordable housing in-lieu fee payment; and
WHEREAS, the Project applicant mailed notices to all property owners within the Seaview Estates neighborhood and presented the project at the April 20, 2020 Community Workshop; and
WHEREAS, in accordance with the California Environmental Quality Act, the Planning Commission considered the proposed Addendum to a previously adopted Mitigated Negative Declaration (MND 2004-11) before making its recommendation, finds on the basis of the whole record before it (including the initial study and adopted MND 2004- 11) that with the previously adopted Mitigation Monitoring/Reporting Program is included in MND 2004-11 document and incorporated by reference in this and related resolutions and permits and imposition of mitigation measures as conditions of approval, there is no substantial evidence that the project will have a significant effect on the environment, further finds that the Addendum to the previously adopted MND 2004-11 reflects the independent judgment of the City, and recommends that the City Council adopt the Addendum to the previously adopted MND 2004-11; and
WHEREAS, on November 18, 2021, the Planning Commission conducted a duly noticed public hearing and approved a Special Use Permit (PZ 19-500-04) to develop a 7.61 acre project site with 90, two-story condominium dwelling units each with attached 2-car garages, 214 total visitor parking spaces, common swimming pool and playground area, 3,281 square-foot recreation building, entry gates and perimeter walls, private roads, 681
Resolution No. 2021-XX – PZ 20-620-02 [General Plan Amendment] City Council Hearing Date: April 19, 2022
detention basins, landscaping and associated site improvements subject to approval of the related actions as specified within the Special Use Permits conditions of approval, respectively; and
WHEREAS, on November 18, 2021, the Planning Commission of the City of Oxnard conducted a duly noticed public hearing and recommended to the City Council of the City of Oxnard approval of Planning and Zoning Permit No. 20-620-02 (General Plan Amendment) to change the land use designation of the subject project site from Business Research Park to Residential Medium; a Zone Change for the project site from Business Research Park to Multiple-Family (R-2) (PZ 20-570-02); and a Tentative Subdivision Map (Tract No. 6064) for condominium purposes and to combine three existing lots into two lots (PZ 20-300-02)
WHEREAS, the Project has been reviewed by the Development Advisory Committee (DAC) and the DAC has prepared conditions of approval that are incorporated within the recommended entitlements; and
WHEREAS, on February 10, 2022, the Oxnard Airport Authority reviewed the project and determined the project is an acceptable land use and is consistent with the adopted Ventura County Airport Comprehensive Land Use Plan; and WHEREAS, on March 4, 2022, the Airport Land Use Commission reviewed the project and determined the project is consistent with the adopted Ventura County Airport Comprehensive Land Use Plan; and
WHEREAS, on April 19, 2022, the City Council of the City of conducted a duly noticed public hearing to consider Planning and Zoning Permit No. 20-620-02 (General Plan Amendment) in accordance with the City’s 2030 General Plan and Oxnard City Code; and WHEREAS, the City Council is concurrently considering approving a Zone Change for the project site from Business Research Park to Multiple-Family (R-2) (PZ 20-570-02), and a Tentative Subdivision Map (Tract No. 6064) for condominium purposes and to combine three existing lots into two lots (PZ 20-300-02) WHEREAS, the City Council finds after due study and deliberation that the public interest and general welfare require the approval of a General Plan Amendment changing the 2030 General Plan land use map designation of the project site from Business Research Park to Residential Medium; and
WHEREAS, the pursuit of the General Plan Amendment is a reasonable exercise of the City’s police powers to ensure the continued health, safety, and welfare of the public by providing housing opportunities for the residents of the City of Oxnard; and WHEREAS, the proposed General Plan Amendment is consistent with the policies and directives in the 2030 General Plan and Zoning Ordinance to allow development to those areas that can be served by existing or planned utilities, transportation, and service systems.
The proposed General Plan Amendment does not represent a significant change in the 2030 General Plan and Zoning Ordinance nor does it result in significant new environmental impacts that have not been previously evaluated; and
WHEREAS, the Applicant agrees as a condition of this Resolution that at its own expense, to indemnify and defend the City of Oxnard and its agents, officers and employees from and against any claims, actions or proceedings to attack, set aside, void or annul the 682
Resolution No. 2021-XX – PZ 20-620-02 [General Plan Amendment] City Council Hearing Date: April 19, 2022
approval of this resolution or any actions or proceedings, acts or determinations taken, done or made before the approval of this resolution that were part of the approval process.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OXNARD:
SECTION 1. The Recitals above are true and correct and incorporated herein by this reference.
SECTION 2. The City Council finds that the General Plan Amendment is internally consistent with all other provisions of the City of Oxnard 2030 General Plan SECTION 3. The City Council finds that the General Plan Amendment will not be detrimental to the public interest, health, safety, convenience, or welfare of the City.
SECTION 4. The City Council finds that the project site associated with the General Plan Amendment is physically suitable in terms of design, location, operating characteristics, shape, size, topography, and the provision of public and emergency vehicle access, and public services and utilities and is served by highways and streets adequate in width and improvement to carry the kind and quantity of traffic the proposed use would likely generate, to ensure that the proposed use(s) and/or development will not endanger, jeopardize, or otherwise constitute a hazard to the property or improvements in the vicinity in which the property is located.
SECTION 5. The City Council determines that the proposed change in land use designation from Business Research Park to Residential Medium is the best use for the subject project site.
SECTION 6. The City Council determines that the General Plan Amendment is in the best interests and welfare of the City and its residents.
SECTION 7. In adopting this Resolution for the General Plan Amendment, the City Council finds and determines the project is in compliance with the California Environmental Quality Act because an Addendum to the Mitigated Negative Declaration (Final MND 2004- 11) that was prepared for the 2004 Dunkirk Drive Project was considered by the City Council at the public hearing for the Portofino Place project. The Addendum to the Final MND was prepared pursuant to the requirements of the California Environmental Quality Act (CEQA, Public resources Code §§ 21000, et seq.), the regulations promulgated thereunder (14 California Code of Regulations, §15000, et seq., CEQA Guidelines), and the City’s Environmental Review Guidelines. The City of Oxnard is the Lead Agency. The Addendum is appropriate pursuant to CEQA Guidelines § 15164 since only minor changes and additions to the MND are necessary to address the Project changes and no circumstances exist calling for the preparation of a subsequent negative declaration pursuant to CEQA Guidelines § 15162 and 15163. With implementation of the MND 2004-11 mitigation measures, there is no substantial evidence that the proposed project will have a significant effect upon the environment.
SECTION 8. Except as expressly amended herein, the 2030 General Plan Land Use Map shall remain in full force and effect and shall apply to the property affected by this Resolution.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Oxnard hereby approves a General Plan Amendment (PZ 20-620-02), which amends the 683
Resolution No. 2021-XX – PZ 20-620-02 [General Plan Amendment] City Council Hearing Date: April 19, 2022
City’s 2030 General Plan Land Use Map, in accordance with Exhibit “A” attached hereto and made a part of this Resolution.
PASSED AND ADOPTED this 19th day of April, 2022, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
RECUSED:
John Zaragoza, Mayor
ATTEST:
Rose Chaparro, City Clerk
APPROVED AS TO FORM:
Stephen M. Fischer, City Attorney
EXHIBIT A
684
Resolution No. 2021-XX – PZ 20-620-02 [General Plan Amendment] City Council Hearing Date: April 19, 2022
685
ATTACHMENT S
CITY COUNCIL OF THE CITY OF OXNARD
ORDINANCE NO. XXXX
ORDINANCE OF THE CITY COUNCIL OF THE CITY OF OXNARD
APPROVING A ZONE CHANGE ORDINANCE PZ 20-570-02 FOR THE
SUBJECT PROJECT SITE (APNS: 185-0-221-025, 185-0-221-265, AND 185-0- 223-015) FROM BUSINESS RESEARCH PARK (BRP) TO RESIDENTIAL MULTIPLE-FAMILY (R-2). FILED BY THE LAW OFFICE OF K.M.
NEISWENDER, P.O. BOX 1225, BLUE JAY, CA 92317, THE APPLICANT.
WHEREAS, the Law Offices of K.M. Neiswender filed entitlement applications with the City of Oxnard on November 7, 2019, General Plan Amendment (PZ 20-620-02), Zone Change (PZ 20-570-02), Special Use Permit (PZ 19-500-04), and a Tentative Subdivision Map (PZ 20-300-02); and
WHEREAS, if the aforementioned entitlement applications are collectively approved by the City of Oxnard, the project would be permitted to develop a 7.61 acre project site with 90, two-story condominium dwelling units each with attached 2-car garages, 214 total visitor parking spaces, common swimming pool and playground area, 3,281 square-foot recreation building, entry gates and perimeter walls, private roads, detention basins, landscaping and associated site improvements at the subject project site (APNs: 185-0-221-025, 185-0-221-265, AND 185-0-223-015) (“Project”); and WHEREAS, the proposed applicant requests that the City’s Zoning Ordinance Map change the zoning of the subject project site from Business Research Park (BRP) to Residential Multiple-Family (R-2); and
WHEREAS, the Project was initially reviewed by the City Council as a PreApplication (PZ 18-600-02) on March 19, 2019, where the City Council discussed the ability for the project to incorporate inclusionary housing on the project site instead of requesting to pay the affordable housing in-lieu fee payment; and WHEREAS, the Project applicant mailed notices to all property owners within the Seaview Estates neighborhood and presented the project at the April 20, 2020 Community Workshop; and
WHEREAS, the Project has been reviewed by the Development Advisory Committee (DAC) and the DAC has prepared conditions of approval that are incorporated within the recommended entitlements; and
WHEREAS, on November 18, 2021, the Planning Commission of the City of Oxnard held a public hearing, reviewed the request, and recommended that the City Council approve the requested Zone Change; and
686
Ordinance No. 2021-XX – PZ 20-570-02 [Zone Change]
City Council Hearing Date: April 19, 2022
WHEREAS, on February 10, 2022, the Oxnard Airport Authority reviewed the project and determined the project is an acceptable land use and is consistent with the adopted Ventura County Airport Comprehensive Land Use Plan; and WHEREAS, on March 4, 2022, the Airport Land Use Commission reviewed the project and determined the project is consistent with the adopted Ventura County Airport Comprehensive Land Use Plan; and
WHEREAS, the City Council has carefully reviewed Planning Commission Resolution No. 2021-42 recommending approval of a Zone Change for the subject project site; and
WHEREAS, the City Council is concurrently considering a General Plan Amendment requests that the General Plan Land Use Map change the land use designation of the subject project site from Business Research Park to Residential Medium (PZ 20- 620-02), and a Tentative Subdivision Map (Tract No. 6064) for condominium purposes and to combine three existing lots into two lots (PZ 20-300-02) WHEREAS, on April 19, 2022, the City Council has held a public hearing and received and reviewed written and oral comments related to the proposed PZ No. 20-570- 02; and
WHEREAS, the City Council finds after due study and deliberation that the public interest and general welfare require the adoption of PZ No. 20-570-02 and the Zone Change to Residential Multiple-Family (R-2) as shown on Attachment A hereto; and WHEREAS, the City Council finds that the Zone Change is consistent with the 2030 General Plan; and
WHEREAS, the pursuit of the Zone Change is a reasonable exercise of the City’s police powers to ensure the continued health, safety, and welfare of the public by providing housing opportunities for the residents of the City of Oxnard; and WHEREAS, the proposed Zone Change is consistent with the policies and directives in the 2030 General Plan if the associated General Plan Amendment (PZ No. 20- 620-02) is approved and the Zoning Ordinance to allow orderly development to those areas that can be served by existing or planned utilities, transportation, and service systems. The proposed Zone Change does not represent a significant change in the 2030 General Plan and Zoning Ordinance nor does it result in significant new environmental impacts that have not been previously evaluated; and
WHEREAS, in accordance with the California Environmental Quality Act, the Planning Commission and City Council considered the proposed Addendum to a previously adopted Mitigated Negative Declaration (Final MND 2004-11) before making its recommendation, finds on the basis of the whole record before it (including the initial 687
Ordinance No. 2021-XX – PZ 20-570-02 [Zone Change]
City Council Hearing Date: April 19, 2022
study and adopted MND 2004-11) that with the previously adopted Mitigation Monitoring/Reporting Program is included in MND 2004-11 document and incorporated by reference in this and related resolutions and permits and imposition of mitigation measures as conditions of approval, there is no substantial evidence that the project will have a significant effect on the environment, further finds that the Addendum to the previously adopted MND 2004-11 reflects the independent judgment of the City, and recommends that the City Council adopt the Addendum to the previously adopted MND 2004-11; and
WHEREAS, the Applicant agrees, as a condition of adoption of this ordinance at the Applicant’s own expense, to indemnify, defend, and hold harmless City and its agents, officers, and employees from and against any claim, action or proceeding to attack, review, set aside, void, or annul the approval of this resolution or any proceedings, acts, or determination taken, done, or made prior thereto that were part of the approval process.
WHEREAS, the City Council of the City of Oxnard makes the following Findings:
SECTION 1. The Recitals above are true and correct and incorporated herein by this reference.
SECTION 2. The City Council finds that the Zone Change is internally consistent with all other provisions of the City of Oxnard 2030 General Plan if the corresponding General Plan Amendment (PZ No. 20-620-02) is adopted.
SECTION 3. The City Council finds that the Zone Change will not be detrimental to the public interest, health, safety, convenience, or welfare of the City.
SECTION 4. The City Council finds that the project site associated with the Zone Change is physically suitable in terms of design, location, operating characteristics, shape, size, topography, and the provision of public and emergency vehicle access, and public services and utilities and is served by highways and streets adequate in width and improvement to carry the kind and quantity of traffic the proposed use would likely generate, to ensure that the proposed use(s) and/or development will not endanger, jeopardize, or otherwise constitute a hazard to the property or improvements in the vicinity in which the property is located.
SECTION 5. The City Council determines that the proposed Zone Change from Business Research Park (BRP) to Residential Multiple-Family (R-2) is the best use for the subject project site.
SECTION 6. The City Council determines that the Zone Change is in the best interests and welfare of the City and its residents.
SECTION 7. The City Council finds and determines the project is in compliance with the California Environmental Quality Act because an Addendum to the Mitigated Negative Declaration (Final MND 2004-11) that was prepared for the 2004 Dunkirk Drive Project was considered by the Planning Commission at the public hearing for the Portofino Place project. The Addendum to the Final MND was prepared pursuant to the requirements of the California Environmental Quality Act (CEQA, Public resources Code §§ 21000, et 688
Ordinance No. 2021-XX – PZ 20-570-02 [Zone Change]
City Council Hearing Date: April 19, 2022
seq.), the regulations promulgated thereunder (14 California Code of Regulations, §15000, et seq., CEQA Guidelines), and the City’s Environmental Review Guidelines. The City of Oxnard is the Lead Agency. The Addendum is appropriate pursuant to CEQA Guidelines § 15164 since only minor changes and additions to the MND are necessary to address the Project changes and no circumstances exist calling for the preparation of a subsequent negative declaration pursuant to CEQA Guidelines § 15162 and 15163. With implementation of the MND 2004-11 mitigation measures, there is no substantial evidence that the proposed project will have a significant effect upon the environment.
SECTION 8. Except as expressly amended herein, the City’s Zoning Ordinance Map shall remain in full force and effect and shall apply to the property affected by this Resolution.
NOW, THEREFORE, the City Council of the City of Oxnard does ordain as follows:
Part 1. PZ No. 20-570-02 (Zone Change) is approved, as shown on the map attached hereto as Attachment A and incorporated herein by reference.
Part 2. Within fifteen days after passage, the City Clerk shall cause this ordinance to be published one time in a newspaper of general circulation, published and circulated in the City. Ordinance No. was first read on , and finally adopted on , to become effective thirty days thereafter.
PASSED AND ADOPTED this 19th day of April, 2022, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
RECUSED:
689
Ordinance No. 2021-XX – PZ 20-570-02 [Zone Change]
City Council Hearing Date: April 19, 2022
____________________________________
John C. Zaragoza, Mayor
ATTEST:
_______________________
Rose Chaparro, City Clerk
APPROVED AS TO FORM:
___________________________
Stephen M. Fischer, City Attorney
690
Ordinance No. 2021-XX – PZ 20-570-02 [Zone Change]
City Council Hearing Date: April 19, 2022
691
ATTACHMENT T
RESOLUTION NO. 2021-XX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF OXNARD
ADOPTING A RESOLUTION APPROVING PLANNING AND ZONING
PERMIT NO. 20-300-02 (TENTATIVE SUBDIVISION MAP NO. 6064) TO SUBDIVIDE APPROXIMATELY 7.61 ACRES OF VACANT LAND INTO
TWO RESIDENTIAL LOTS FOR CONDOMINIUM PURPOSES (90
CONDOMINIUM UNITS) AND ASSOCIATED INFRASTRUCTURE,
LOCATED AT THE SOUTH SIDE OF FIFTH STREET AT THE
INTERSECTION OF PORTOFINO PLACE (APNs: 185-0-221-025, 185-0-221- 265, AND 185-0-223-015), SUBJECT TO CERTAIN FINDINGS AND CONDITIONS. FILED BY THE LAW OFFICE OF K.M. NEISWENDER, P.O.
BOX 1225, BLUE JAY, CA 92317, THE APPLICANT.
WHEREAS, the Law Offices of K.M. Neiswender filed entitlement applications with the City of Oxnard on November 7, 2019, General Plan Amendment (PZ 20-620-02), Zone Change (PZ 20-570-02), Special Use Permit (PZ 19-500-04), and a Tentative Subdivision Map (PZ 20-300-02); and
WHEREAS, if the aforementioned entitlement applications are collectively approved by the City of Oxnard, the project would be permitted to develop a 7.61 acre project site with 90, two-story condominium dwelling units each with attached 2-car garages, 214 total visitor parking spaces, common swimming pool and playground area, 3,281 square-foot recreation building, entry gates and perimeter walls, private roads, detention basins, landscaping and associated site improvements at the subject project site (APNs: 185-0-221-025, 185-0-221-265, AND 185-0-223-015) (“Project”); and WHEREAS, on November 18, 2021, the Planning Commission of the City of Oxnard (“Planning Commission”) conducted a duly noticed public hearing to consider Applicant’s request to approve Planning and Zoning Permit No. 20-300-02 (Tentative Subdivision Map) to subdivide a 7.61 acre property (three parcels) for condominium purposes into two lots (Lot 1 will be improved with 60 units, gated entry, swimming pool and playground area, parking and associated site improvements; Lot 2 will be improved with 30 units, gated entry, recreational building, parking and associated site improvements) located at the south side of Fifth Street at the intersection of Portofino Place (APNs: 185- 0-221-025, 185-0-221-265, AND 185-0-223-015) in the Oxnard Seaview Estates neighborhood in accordance with Section 16-531 of the Oxnard City Code; and WHEREAS, the project was initially reviewed by the City Council as a PreApplication (PZ 18-600-02) on March 19, 2019, where the City Council discussed the ability for the project to incorporate inclusionary housing on the project site instead of requesting to pay the affordable housing in-lieu fee payment; and WHEREAS, the project applicant mailed notices to all property owners within the Sea View Estates neighborhood and presented the project at the April 20, 2020 Community Workshop; and
Whereas, on November 9, 2004, pursuant to the California Environmental Quality Act (Pub. Res. Code § 21000 et seq.: “CEQA”) and the State Guidelines for 692
Resolution No. 2021-XX- PZ No. 20-300-02[Tentative Subdivision Map #6064] City Council Hearing Date: April 19, 2022
Implementation of CEQA (14 Cal. Code Regs. § 15000 et seq.: “State CEQA Guidelines”), the City Council adopted a Mitigated Negative Declaration for The Dunkirk Drive Project (MND 2004-11); and
Whereas, the MND adequately addressed and mitigated the potential environmental impacts associated with the Dunkirk Drive project, which included a General Plan Amendment, Zone Change, Tentative Subdivision Map and Planned Residential Group/Special Use Permit for commercial development on a 7.6-acre portion of the project site as well as residential development on an adjacent 10-acre property to the south of the site; and
Whereas, the MND was not legally challenged and thus is presumed valid in accordance with Public Resources Code section 21167.2 and section 15367 of the State CEQA Guidelines (Cal. Code Regs., tit. 14, § 15000 et seq.); and Whereas, the City is the lead agency for purposes of the project pursuant to Public Resources Code section 21067; and
Whereas, pursuant to CEQA, when taking subsequent discretionary actions in furtherance of a project for which an MND has been approved, the Lead Agency is required to prepare an Addendum to a previously approved MND if some changes or additions to the MND are necessary but none of the conditions described in State CEQA Guidelines Section 15162 calling for preparation of a subsequent MND have occurred; and Whereas, the Planning Division evaluated the project by preparing an Addendum, and based on that Addendum, and all other information in the administrative record, has determined that none of the circumstances identified in State CEQA Guidelines Section 15162 have arisen as a result of the project, and that an Addendum to the Final MND 2004- 11 for the Dunkirk Drive project is appropriate to analyze the reasonably foreseeable environmental impacts of the modified project; and
Whereas, Addendum No. 1 to Final MND 2004-11 is attached to the staff report and is incorporated by reference; and
Whereas, Addendum No. 1 to Final MND 2004-11 has been provided to and has been reviewed by the Planning Commission in connection with the previously approved MND 2004-11, which is available for inspection at City Hall and is posted on the City’s website, and are incorporated herein by reference; and
Whereas, pursuant to State CEQA Guidelines section 15164, subdivision (c), the Addendum is not required to be circulated for public review, but can be attached to the adopted MND 2004-11; and
WHEREAS, in accordance with CEQA, the Planning Commission and City Council considered the proposed Addendum to a previously adopted Final MND 2004-11 before making its determination, finds on the basis of the whole record before it (including the initial study and adopted MND 2004-11) that with the previously adopted Mitigation Monitoring/Reporting Program is included in MND 2004-11 document and incorporated by reference in this and related resolutions and permits and imposition of mitigation 693
Resolution No. 2021-XX- PZ No. 20-300-02[Tentative Subdivision Map #6064] City Council Hearing Date: April 19, 2022
measures as conditions of approval, there is no substantial evidence that the project will have a significant effect on the environment, further finds that the Addendum to the previously adopted MND 2004-11 reflects the independent judgment of the City, and recommends that the City Council adopt the Addendum to the previously adopted MND 2004-11; and
WHEREAS, on November 18, 2021, the Planning Commission conducted a duly noticed public hearing and approved a Special Use Permit (PZ 19-500-04) to develop a
7.61 acre project site with 90, two-story condominium dwelling units each with attached 2-car garages, 214 total visitor parking spaces, common swimming pool and playground area, 3,281 square-foot recreation building, entry gates and perimeter walls, private roads, detention basins, landscaping and associated site improvements subject to approval of the related actions as specified within the Special Use Permits conditions of approval, respectively; and
WHEREAS, on November 18, 2021, the Planning Commission of the City of Oxnard conducted a duly noticed public hearing and recommended to the City Council of the City of Oxnard approval of Planning and Zoning Permit No. 20-620-02 (General Plan Amendment) to change the land use designation of the subject project site from Business Research Park to Residential Medium; a Zone Change for the project site from Business Research Park to Multiple-Family (R-2) (PZ 20-570-02); and a Tentative Subdivision Map (Tract No. 6064) for condominium purposes and to combine three existing lots into two lots (PZ 20-300-02)
Whereas, the Project has been reviewed by the Development Advisory Committee (DAC) on December 18, 2019, February 24, 2021 and May 12, 2021, and the DAC provided conditions of approval for the project that are incorporated within the recommended entitlements; and
WHEREAS, on February 10, 2022, the Oxnard Airport Authority reviewed the project and determined the project is an acceptable land use and is consistent with the adopted Ventura County Airport Comprehensive Land Use Plan; and WHEREAS, on March 4, 2022, the Airport Land Use Commission reviewed the project and determined the project is consistent with the adopted Ventura County Airport Comprehensive Land Use Plan; and
WHEREAS, the City Council has held a public hearing at which it received and considered oral and written testimony on Addendum to the previously adopted Mitigated Negative Declaration No. 2004-11 for the proposed project; and WHEREAS, said Project was referred to various public utility companies, City departments and the Development Advisory Committee for recommendations; and WHEREAS, the comments of the City Councilmembers, members of the public, and interested groups and agencies have been adequately responded to; and WHEREAS, the City Council finds after due study and deliberation that it is a reasonable exercise of the City’s police powers to condition the project to ensure the 694
Resolution No. 2021-XX- PZ No. 20-300-02[Tentative Subdivision Map #6064] City Council Hearing Date: April 19, 2022
continued health, safety, and welfare of the public by providing housing opportunities inclusive of 9 affordable low income housing units for the residents of the City of Oxnard; and
WHEREAS, the City Council finds that the Tentative Map complies with all requirements of the Subdivision Map Act and the Oxnard City Code; and WHEREAS, the City Council finds that the Tentative Map, the proposed site, and the design and improvement of the development requested are consistent with the 2030 General Plan elements thereof; and
WHEREAS, the City Council finds that the proposed site is suitable for the type and density of development requested and is not likely to cause substantial environmental damage, serious public health problems or conflict with any publicly acquired easements or access; and
WHEREAS, the City Council finds that the proposed division of land complies with the requirements established by the Subdivision Map Act and Chapter 15 of the Oxnard City Code, including but not limited to requirements as to area, improvement and design, floodwater drainage control, appropriate improved public roads, sanitary disposal facilities, water supply availability and environmental protection; and WHEREAS, the City Council finds that the Applicant agrees with the necessity of and accepts all elements, requirements, and conditions of this Resolution as being a reasonable manner of preserving, protecting, providing for, and fostering the health, safety, and welfare of the citizenry in general and the persons who work, visit or live in this subdivision in particular; and
WHEREAS, the City Council finds that the Applicant agrees as a condition of this Resolution that at its own expense, to indemnify and defend the City of Oxnard and its agents, officers and employees from and against any claims, actions or proceedings to attack, set aside, void or annul the approval of this Resolution or any actions or proceedings, acts or determinations taken, done or made before the approval of this resolution that were part of the approval process; and
WHEREAS, the documents and other materials that constitute the record of proceedings upon which the decision to adopt Addendum No. 1 to Final MND 2004-11 is based are located in the Planning Division of the City of Oxnard, and the custodian of the record is the Planning Manager; and
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OXNARD:
SECTION 1. The Recitals above are true and correct and incorporated herein by this reference.
SECTION 2. The City Council finds that the Tentative Subdivision Map is internally consistent with the provisions of the City of Oxnard 2030 General Plan 695
Resolution No. 2021-XX- PZ No. 20-300-02[Tentative Subdivision Map #6064] City Council Hearing Date: April 19, 2022
SECTION 3. The City Council finds that the Tentative Subdivision Map will not be detrimental to the public interest, health, safety, convenience, or welfare of the City.
SECTION 4. The City Council finds that the Project site associated with the Tentative Subdivision Map is physically suitable in terms of design, location, operating characteristics, shape, size, topography, and the provision of public and emergency vehicle access, and public services and utilities and is served by highways and streets adequate in width and improvement to carry the kind and quantity of traffic the proposed use would likely generate, to ensure that the proposed use(s) and/or development will not endanger, jeopardize, or otherwise constitute a hazard to the property or improvements in the vicinity in which the property is located.
SECTION 5. The City Council determines that the residential project is the best use for the subject project site.
SECTION 6. The City Council determines that the Tentative Subdivision Map is in the best interests and welfare of the City and its residents.
SECTION 7. In adopting this Resolution for the Tentative Subdivision Map, the City Council finds and determines the project is in compliance with the California Environmental Quality Act because an Addendum to the Mitigated Negative Declaration (Final MND 2004-11) that was prepared for the 2004 Dunkirk Drive Project was considered by the City Council at the public hearing for the Portofino Place project. The Addendum to the Final MND was prepared pursuant to the requirements of the California Environmental Quality Act (CEQA, Public resources Code §§ 21000, et seq.), the regulations promulgated thereunder (14 California Code of Regulations, §15000, et seq., CEQA Guidelines), and the City’s Environmental Review Guidelines. The City of Oxnard is the Lead Agency. The Addendum is appropriate pursuant to CEQA Guidelines § 15164 since only minor changes and additions to the MND are necessary to address the Project changes and no circumstances exist calling for the preparation of a subsequent negative declaration pursuant to CEQA Guidelines § 15162 and 15163. With implementation of the MND 2004-11 mitigation measures, there is no substantial evidence that the proposed project will have a significant effect upon the environment.
SECTION 8. Based on the entire record before the City Council and all written and oral evidence presented, including the City Council Staff Report and all attachments thereto, the City Council finds:
Consistent with California Government Code Section 66474, a legislative body of a city or county shall deny approval of a tentative map, or a parcel map for which a tentative map was not required, if it makes any of the following findings:
(a) That the proposed map is not consistent with applicable general and specific plans as specified in Section 65451.
696
Resolution No. 2021-XX- PZ No. 20-300-02[Tentative Subdivision Map #6064] City Council Hearing Date: April 19, 2022
As described in the staff report, the project site currently has a 2030 General Plan land use designation of Business Research Park (BRP) and a zoning of Business Research Park (BRP). As part of this proposal, the project is concurrently requesting a General Plan Amendment to change the land use designation BRP to Residential Medium (RM) and a Zone Change from Business Research Park to Multiple-Family (R-2). If the aforementioned General Plan Amendment and Zone Change are approved, the proposed subdivision, inclusive of the 90, two-story condominium dwelling units each with attached 2-car garages, 214 total visitor parking spaces, common swimming pool and playground area, 3,281 square-foot recreation building, entry gates and perimeter walls, private roads, detention basins, landscaping and associated site improvements at the subject project site would be consistent with the policies and provisions of the 2030 General Plan because the proposed land use of the project is of a multi-family use, which is an allowed use pursuant to the Residential Medium (RM) land use designation of the 2030 General Plan Plan. The subject project site has an area of 7.61 acres which allows a maximum of 94 residential units; however, the project is requesting to construct 90 residential units. The project density at 90 residential units is equal to 12 units per acre which is consistent with the RM land use designation of 12 to 18 units per acre. The subdivision of the project site as proposed with 90 condominium units and associated site improvements would be consistent with the 2030 General Plan if the associated General Plan Amendment is approved. Additionally, the condominium units have been designed to meet the required development standards identified in the R-2 zone (Multiple-Family) and all of the advisory standards contained within City Council Resolution No. 7658 that are intended to encourage amenities that enhance the livability of condominiums with the exception of the required 10-foot by 10-foot dimensions for private patios; however, the land area of the project’s private patios ranges from 450 to 1,530 square feet which exceeds the minimum land area of 100 square feet provided by private patios. Therefore, the project is in conformance with the 2030 General Plan and the elements thereof and other adopted standards. No specific plan is applicable to the subject site. Therefore, the project does not meet this finding which means the Project can be supported. (b) That the design or improvement of the proposed subdivision is not consistent with applicable general and specific plans.
As described in the staff report, the design and improvement of the proposed development is consistent with applicable provisions of the City’ 2030 General Plan because the proposed subdivision and development of the multi-family residential use supports the proposed development improvements, with the required infrastructure. Additionally, the proposed subdivision has been designed to meet the required minimum lot area and density identified in the R-2 zoning (Multiple-Family) as prescribed by the 2030 General Plan land use designation of Residential Medium. No specific plan is applicable to the subject site.
Additionally, the design and improvements of the project will provide for development that furthers the intent of the Housing Element to realize the potential of neighborhood improvements that increase housing opportunities in the Sea View Estates Neighborhood.
As such, the project does not meet this finding which means the Project can be supported. 697
Resolution No. 2021-XX- PZ No. 20-300-02[Tentative Subdivision Map #6064] City Council Hearing Date: April 19, 2022
(c) That the site is not physically suitable for the type of development.
As described in the staff report, the site is physically suitable for the proposed type of development because the division of land includes a residential project that is consistent with the Multiple-Family (R-2) development standards and has been designed to be architecturally compatible with the character of the surrounding neighborhood. The site is physically suitable for the proposed type of development because the site is relatively level and an environmental assessment of the site did not find any soil or geologic conditions that would make the site physically unsuitable for development. The site is not subject to soil and/or geologic conditions indicating substrate instability. As proposed and conditioned, the project will be consistent with the 2030 General Plan land use designation of Residential Medium which the project is seeking a General Plan Amendment concurrent with the Tentative Subdivision Map, which requires residential uses to be designed pursuant to the R-2 development standards such as: parking, minimum lot area, density, side yard setback and height. The subject site is adequate in terms of size, and is designed to meet the development standards prescribed in the R-2 zone. Additionally, the project has been reviewed by the Development Advisory Committee and was determined that it would have no significant impact on the public health, safety, or welfare and the project plans have been reviewed by all applicable departments and outside agencies, which include the Oxnard Police and Fire Departments. Based on the aforementioned, this project does not meet this finding which means the Project can be supported. (d) That the site is not physically suitable for the proposed density of development.
As described in the staff report, the project is concurrently requesting a General Plan Amendment to change the land use designation BRP to Residential Medium (RM) and a Zone Change from Business Research Park (BRP) to Multiple-Family (R-2). The site is physically suitable for the proposed density of the development because the project is being designed to be in conformance with the density allowed under the 2030 General Plan land use designation of Residential Medium and the R-2 zoning. The subject project site has an area of 7.61 acres which allows a maximum of 94 residential units; however, the project is requesting to construct 90 residential units. The project density at 90 residential units is equal to 12 units per acre which is consistent with the RM land use designation of 12 to 18 units per acre. The site is physically suitable for the proposed density of development because it is located within a developed urban area and will be served by existing adequate public utilities as identified in the Addendum to the adopted Mitigated Negative Declaration 2004-11. Additionally, there are no identified physical constraints that would prohibit development of the proposed residential project. Therefore, the project does not meet this finding, which means the Project can be supported. (e) That the design of the subdivision or the proposed improvements are likely to cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat.
698
Resolution No. 2021-XX- PZ No. 20-300-02[Tentative Subdivision Map #6064] City Council Hearing Date: April 19, 2022
As described in the staff report, the design of the proposed land division and parcel improvements is not likely to cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat because it is located within a developed urban area of the City that contains no environmentally sensitive habitat and/or species as identified in Addendum No. 1 to Final MND 2004-11. The project site is not considered to be conducive to important biological resources or their habitat. Additionally, the project site does not have any natural standing bodies of water, riparian habitat, or other sensitive natural communities. Federally protected wetland communities are not thought or known to exist on the site and the project site is not located within a Biological Resources Area which is known or thought to meet habitat needs for plants and animals or promote wildlife migration or movement. Additionally, the project is not designated nor determined to be an Environmentally Sensitive Habitat Area. As such, the project does not meet this finding which means the Project can be supported.
(f) That the design of the subdivision or type of improvements is likely to cause serious public health problems.
As described in the staff report, the project would involve the construction 90, two-story condominium dwelling units, inclusive of 9 affordable units each with attached 2-car garages, 214 total visitor parking spaces, common swimming pool and playground area, 3,281 square-foot recreation building, entry gates and perimeter walls, private roads, detention basins, landscaping and associated site improvements that are not anticipated to use or store large quantities of hazardous materials. However, potentially hazardous materials such as fuels, lubricants, and solvents would be used during grading and construction of the proposed project, but their use and disposal would be to applicable standards and law so as to not create environmental or health issues. The design of the subdivision is not likely to cause serious public health problems because, as indicated by Finding 2.a above, it would utilize existing adequate public utilities, namely water and sewer.
Construction activities, anticipated uses, and development design will be subject to standard construction requirements of the Building, Fire, and Traffic Codes. Additionally, the project has been reviewed by the Development Advisory Committee and was determined that it would have no significant impact on the public health, safety, or welfare and the project plans have been reviewed by all applicable departments and outside agencies, which include the Oxnard Police and Fire Departments. Consequently, this project does not meet this finding, which means the Project can be supported. (g) That the design of the subdivision or the type of improvements will conflict with easements, acquired by the public at large, for access through or use of, property within the proposed subdivision. In this connection, the governing body may approve a map if it finds that alternate easements, for access or for use, will be provided, and that these will be substantially equivalent to ones previously acquired by the public. 699
Resolution No. 2021-XX- PZ No. 20-300-02[Tentative Subdivision Map #6064] City Council Hearing Date: April 19, 2022
This subsection shall apply only to easements of record or to easements established by judgment of a court of competent jurisdiction and no authority is hereby granted to a legislative body to determine that the public at large has acquired easements for access through or use of property within the proposed subdivision.
As described in the staff report, the design of the proposed land division and parcel improvements will not conflict with easements, acquired by the public-at-large, for access through or use of property within the subdivision because, as conditioned, no buildings would be located in the area of the existing public utilities easements, all blanket easements or other easement that are no longer needed by the City shall be abandoned, and there is no need for new or additional easement(s) for the public-at-large. The project site is currently vacant. Additionally, the land division has been configured to continue to allow for Portofino Place, which currently bisects the parcel, to provide access to the residences in the Oxnard Sea View Estates Neighborhood which is accessed off of Fifth Street and Dunkirk Drive. As such, this project does not meet this finding which means the Project can be supported.
SECTION 9 This Resolution shall not become effective unless and until the City Council adopts the Addendum to Mitigated Negative Declaration 2017-04 and approves the associated General Plan Amendment (PZ No. 20-620-02), and Zone Change (PZ No. 20-570-02). If the City Council fails to approve the General Plan Amendment or Zone Change, then this Resolution shall become null and void and be of no further force and effect.
SECTION 10. Based on the findings set forth herein, the PCity Council hereby approves Planning and Zoning Permit No. 20-300-02 (Tentative Subdivision Map), subject to the attached conditions of approval.
SECTION 11. The Secretary shall certify the adoption of this Resolution.
CONDITIONS OF APPROVAL
FOR LAND USE PERMITS
Note: The abbreviations below identify the City department or division responsible for determining compliance with these standard conditions. The first department or division listed has responsibility for compliance at plan check, the second during inspection and the third at final inspection, prior to issuance of a certificate of occupancy, or at a later date, as specified in the condition. If more than one department or division is listed, the first will check the plans or inspect the project before the second confirms compliance with the condition. The italicized code at the end of each condition provides internal information on the source of each condition: Some are standard permit conditions (e.g. G-1) while some are taken from environmental documents (e.g. MND-S2).
DEPARTMENTS AND DIVISIONS
CA City Attorney PL Planning Division
DS Dev Services/Eng Dev/Inspectors TR Traffic Division
700
Resolution No. 2021-XX- PZ No. 20-300-02[Tentative Subdivision Map #6064] City Council Hearing Date: April 19, 2022
PD Police Department B Building Plan Checker
SC Source Control FD Fire Department
PK Landscape Design CE Code Compliance
GENERAL PROJECT CONDITIONS
1. This permit is granted for the property described in the application on file with the Planning Division, and may not be transferred from one property to another. (PL, G-1).
2. This permit is granted for the plans dated April 19, 2022 (“the plans”) on file with the Planning Division. The project shall conform to the plans, except as otherwise specified in these conditions, or unless a minor modification to the plans is approved by the Planning and Environmental Services Manager (“Planning Manager”) or a major modification to the plans is approved by the Planning Commission. A minor modification may be granted for minimal changes or increases in the extent of use or size of structures or of the design, materials or colors of structures or masonry walls. A major modification shall be required for substantial changes or increases in such items. (PL, G-2)
3. This permit shall automatically become null and void 36 months from the effective date of the Zone Change (PZ No. 20-570-02) (30 days after the second reading of the Zone Change Ordinance Amendment is adopted), unless the Developer has diligently developed the proposed project, as shown by map recordation and / or the issuance of a grading, foundation, or building permit and the construction of substantial improvements. (PL, G-3)
4. All required off-site and on-site improvements for the project, including structures, paving, and landscaping, shall be completed prior to occupancy unless the Development Services Manager allows the Developer to provide security or an executed agreement approved by the City Attorney to ensure completion of such improvements. (DS, G-4)
5. By commencing any activity related to the project or using any structure authorized by this permit, Developer accepts all of the conditions and obligations imposed by this permit and waives any challenge to the validity of the conditions and obligations stated therein. (CA, G5)
6. Developer agrees, as a condition of adoption of this resolution, at Developer’s own expense, to indemnify, defend and hold harmless the City and its agents, officers and employees from and against any claim, action or proceeding to attack, review, set aside, void or annul the approval of the resolution or any condition attached thereto or any proceedings, acts or determinations taken, done or made prior to the approval of such resolution that were part of the approval process. (CA, G-6)
7. Any covenants, conditions, and restrictions (CC&Rs) applicable to the project property shall be consistent with the terms of this permit and the City Code. If there is a conflict between 701
Resolution No. 2021-XX- PZ No. 20-300-02[Tentative Subdivision Map #6064] City Council Hearing Date: April 19, 2022
the CC&Rs and the City Code or this permit, the City Code or this permit shall prevail. (CA, G-7)
8. Developer shall complete the “Notice of Land Use Restrictions and Conditions” form, using the form provided by the City, for recording with the Ventura County Recorder. Before the City issues building permits, Developer shall submit the original completed, signed and notarized document, together with the required fees to the Planning Manager. (PL, G-8)
PLANNING DIVISION STANDARD CONDITIONS
9. Prior to the close of escrow for each dwelling unit, Developer shall provide the buyer with a written guarantee that the exterior finishes of the dwelling unit will remain in good condition for at least five (5) years from the final building permit inspection and sign off. Developer shall provide a copy of the guarantee to Planning staff prior to final Planning Division inspection and sign off. (PL, PL-29)
10. Developer shall establish a homeowners association and the association shall be responsible for the maintenance of parking, landscape, recreation and other interior areas held in common by the association and for the enforcement of Conditions Covenants & Restrictions related to property maintenance. (PL/DS, PL-33)
11. Developer shall construct each dwelling unit with separate utility systems and meters.
Developer shall paint utility meter panels to match structures upon which it is located. Such panels shall be located to take advantage of screening (e.g. landscaping or other building elements) from public right-of-ways, to the maximum extent feasible. (DS/B, PL-34)
12. Developer shall include in all deeds for the project and in the Conditions Covenants & Restrictions a prohibition against parking recreational vehicles over 20 feet long in the project. (CE/PL, PL-35)
13. Developer shall pay Quimby Fees (fees for park acquisition and improvement) before issuance of building permits. The amount of the fee shall be calculated by the Planning Division, and verified by the Parks Division at the time of payment. (PK/B, PL-36)
14. In accordance with City Council Ordinance No. 2980, or the ordinance in effect at the time building permits are issued, Developer shall provide 9 affordable units. (PL, PL-37)
15. Developer shall post in the sales office of the project the latest City planning documents and maps that may affect the project and adjacent properties. At a minimum, this information shall include the 2030 Oxnard General Plan and General Plan Land Use Map showing all adjacent properties, a copy of the ordinances regulating the zone, and any specific plan that may apply to the project. Such documents may be purchased at cost from the Planning Division Manager. Developer shall require that all purchasers sign an affidavit declaring that they have familiarized themselves with the planning documents. Developer shall make 702
Resolution No. 2021-XX- PZ No. 20-300-02[Tentative Subdivision Map #6064] City Council Hearing Date: April 19, 2022
such affidavits and planning information available for review upon reasonable request of the Planning Division Manager. (PL, PL-38)
16. Where feasible, Developer shall locate individual unit plumbing within individual unit walls, as opposed to common or shared walls, and shall paint roof vents to match the roofing material. (PL/B, PL-40)
PLANNING DIVISION SPECIAL CONDITIONS
17. Developer shall provide electric meters, mailboxes and address directories, placed in decorative cabinets and clustered for efficient access for residents and service persons.
Developer shall coordinate placement and design of such items accordingly, with the Planning Division Manager, the appropriate utility service provider and the United States Postal Service, prior to issuance of building permits. (PL, PL-19 modified)
18. This permit is granted subject to the approval of a Zone Change (PZ 20-570-02) for the project property. (PL)
19. This permit is granted subject to the approval of a General Plan Amendment (PZ 20-620-02) for the project property. (PL)
20. Street parking is prohibited to ensure that the private streets are at least 26 feet wide at all times to comply with Fire Department regulations.
21. Developer shall deposit $2,000 for mitigation monitoring and reporting associated with the development project (PZ Nos. 19-500-04 and 20-300-02). Such funds shall be deposited prior to issuance of a grading permit or map recordation, whichever occurs first. Additional deposits shall be made to cover staff time required to monitor implementation of project conditions until the final Certificate of Occupancy is granted for the development.
22. These conditions of approval impose specific fees, dedications, reservations and/or other exactions. Pursuant to Government Code Section 66020, the 90-day period in which the Developer or applicant has to protest the imposed fees, dedications, reservations and/or other exations has begun as of the date that the conditions of approval are approved.
Affordable Housing Conditions
23. Inclusionary housing requirements pertaining to the sale or rental of 10% of all units constructed as part of this development are subject to inclusionary housing requirements, as set forth in Ordinance 2980.
24. Based on the unit count proposed, 9 (10% of 90= 9) of the 90 units being developed must be Affordable Units.
703
Resolution No. 2021-XX- PZ No. 20-300-02[Tentative Subdivision Map #6064] City Council Hearing Date: April 19, 2022
25. Affordable Rental Units – Fifty percent (50%) of the affordable units offered for rent must be made available to very low-income households with incomes at or below fifty percent (50%) of the Area Median Income (AMI) for Ventura County, as set forth in the California Health and Safety Code 50105 and fifty percent (50%) of the affordable units must be offered for rent to low-income households with incomes at or below eighty percent (80%)AMI for Ventura County, as set forth in the California Health and Safety Code 50079.5. For purposes of determining tenant eligibility, Owner and Developer or Property Manager shall use the annual income limits for Low Income and Very Low-Income Households, respectively, published by the California Department of Housing and Community Development (HCD).
26. Affordable Rent (Low Income Units)– For Low Income Households, "Affordable Rent" shall be inclusive of a reasonable utility allowance and not exceed one- twelfth (1/12) times the product of thirty percent (30%) times eighty percent (80%) of Area Median Income (AMI) adjusted for family size appropriate to the Affordable Unit for households earning less than or equal to eighty percent (80%) of the AMI for the Ventura County Metropolitan Statistical Area as set forth in the sections 6918 and 6932 of Title 25 of the California Code of Regulations, unless another subsidy program is used, in which case the stricter requirement shall be applied.
For purposes of calculating Affordable Rent, Owner and Developer or Property Manager shall use the Area Median Income for Ventura County for Low Income Households, published annually by the California Department of Housing and Community Development (HCD).
27. Affordable Rent (Very Low-Income Units) – For Very-Low Income Households, “Affordable Rent” shall be inclusive of a reasonable utility allowance and not exceed one- twelfth (1/12) times the product of thirty percent (30%) times fifty percent (50%) of area median income adjusted for family size appropriate to the Affordable Unit for households earning less than or equal to fifty percent (50%) of the AMI for Ventura County Metropolitan Statistical Area as set forth in the sections 6918 and 6932 of Title 25 of the California Code of Regulations, unless another subsidy program is used, in which case the stricter requirement shall be applied. For purposes of calculating Affordable Rent, Owner and Developer or Property Manager shall use the Area Median Income for Ventura County for Very Low-Income Households, published annually by the California Department of Housing Community Development (HCD), as opposed to HCD’s annual published income limits, which are used to determine tenant eligibility.
28. The Affordable Rental units must include: Three (3) three-bedroom units and two (2) twobedroom units offered for rent or sale to households with annual incomes at or below fifty percent (50%) of AMI for Ventura County. Two (2) two-bedroom units and two (2) threebedroom units must be offered for rent or sale to households with annual incomes at or below eighty percent (80%) AMI for Ventura County.
29. Prior to offering the Affordable Units for rent, the Developer and Owner must submit to the Housing Director the proposed rental amounts for the affordable rental units for review and approval.
30. Affordable Rental Units (Eligible Tenants) - All prospective tenants must be income-eligible to rent any of the Affordable Units. Developer shall maintain a copy of the selected tenant’s rental application including information on household size, total Annual Income, rent to be 704
Resolution No. 2021-XX- PZ No. 20-300-02[Tentative Subdivision Map #6064] City Council Hearing Date: April 19, 2022
charged, and the unit to be rented, including the unit’s bedroom count and size (the “Application”). Upon request, the Developer shall provide the Application to the Housing Director to review the prospective tenant’s eligibility for the unit to be rented. Income eligibility documentation for occupants of the affordable units must be made available by the Developer for review, upon request by the Housing Director. This provision applies throughout the duration of this Agreement and applies to any change in the tenancy of the Affordable Units.
31. Affordable Rental Units (Management Plan) - Prior to issuance of a certificate of occupancy, Developer and Owner shall obtain a clearance form from the Housing Department certifying that the required number of affordable units are being provided at Affordable Rents and that a Management Plan, prepared by the Developer and Owner, for the operation and management of the Affordable Rental Units has been submitted to the Housing Department and approved by the Housing Director. Developer and owner shall provide a copy of the clearance form issued by the Housing Department to the project planner prior to issuance of the certificate of occupancy.
32. Affordable Rental Units (Annual Report) - Owner shall maintain complete and accurate records pertaining to (1) the occupancy of each Affordable Unit, and (2) the maintenance, management, operation, preservation and repair of each Affordable Unit. Owner agrees to permit the Housing Director or designee to inspect and audit the books and records of Owner pertaining to the Affordable Units. In furtherance of this requirement, Owner shall require tenants or property managers to submit to the Housing Director an annual report (the "Annual Report") in the format approved by the Housing Department and providing the specific information and documentation (including documentation from each tenant) reasonably required by the City and Housing Director to ensure that the Affordable Units are being rented to eligible tenants.
33. Affordable Rental Units (Compliance) - Upon City's request, Owner shall demonstrate that the Affordable Rental units are continually in compliance with the terms of Affordability Covenants and Conditions of Approval pertaining to Affordable Rental Units. Upon thirty (30) days’ notice, City may perform an audit to determine compliance with the terms of this Agreement or any affordability restrictions placed on the property. Owner agrees to pay a reasonable fee, which may be adjusted from time to time, for the purpose of paying the actual costs associated with the City's obligation to monitor Owner's compliance with the affordability restrictions contained in this Agreement.
34. Affordable Units Offered for Sale: Ten percent (10%) of all units offered for sale must be made available for purchase to low-income households with incomes at or below eighty percent (80%) AMI for Ventura County, as set forth in the California Health and Safety Code 50079.5.
For purposes of determining buyer eligibility, Owner and Developer shall use the annual income limits for Low-Income Households, published by the California Department of Housing Community Development (HCD).
35. Affordable Housing Cost for Affordable Units Offered for Sale: The term Affordable “Housing Cost” includes the costs described in Title 25 of the California Code of Regulations Section 6920, except that when determining affordable housing cost the amount paid for maintenance 705
Resolution No. 2021-XX- PZ No. 20-300-02[Tentative Subdivision Map #6064] City Council Hearing Date: April 19, 2022
and utilities shall not be included. For purposes of calculating Affordable Housing Cost, Owner and Developer shall use the Area Median Income for Ventura County for Low Income Households, published annually by the California Department of Housing Community Development (HCD), as opposed to HCD’s annual published income limits, which are used to determine buyer eligibility.
36. Affordable housing cost must include the sum of the following and may not exceed the product of thirty percent (30%) of eighty percent (80%) AMI for Ventura County as set forth in Part 5 (a) of Ordinance Number 2980:
(a) Mortgage loan payments
(b) Mortgage insurance payments
(c) Property taxes and assessments
(d) Homeowner association fees
(e) Insurance premiums
(f) Space rent
37. Affordable Units Offered for Sale: Must Include at least five (5) three-bedroom units and four (4) two-bedroom units.
38. Owner and Developer must record affordability covenants approved as to form by the Housing Director and City Attorney prior to submitting their first building permit application. Units shall remain affordable for at least 20 years from the date the first unit in the development is offered for rent or sale. Owner and Developer must contact the Housing Department for review and approval of affordability covenants prior to recordation.
39. Prior to offering any of the Affordable Units for sale or converting any of the Affordable Rental Units into Affordable Units offered for sale, within the initial 20 Year term of Affordability discussed in Condition No. 37, Developer and Owner must:
(a) Adhere to any applicable state and local laws, including but not limited to California Assembly Bill 1521, and applicable tenant relocation requirements for existing tenants of the Affordable Rental Units that may become displaced as result of the conversion from Affordable Rental Units to Affordable Units offered for Sale. This also includes, notification to tenants and prospective tenants 3 years prior to the termination of the lease of the Affordable Rental Units, as set forth in Government Code 65863.10 et seq. Adherence to any and all applicable state and local laws means those state and local laws effective at the time of the conversion. (b) Submit to the Housing Director the proposed sale amounts, for review and approval, the proposed date the affordable units will be offered for sale, the location of the affordable units within the project, and any other information requested by the Housing Director. Thereafter, if the Developer and Owner desires to change the sales price or location of any of the affordable units, the Developer and Owner must obtain the approval of the Housing Director prior to offering any Affordable Unit for sale.
706
Resolution No. 2021-XX- PZ No. 20-300-02[Tentative Subdivision Map #6064] City Council Hearing Date: April 19, 2022
(c) Require any purchaser of an Affordable Unit in the development to execute a Resale Restriction Agreement for a minimum term equivalent to years remaining on the initial 20-year term of affordability covenants recorded by the owner and developer as part of Condition No 164. A separate Resale Restriction Agreement, to be executed between each buyer of an Affordable Unit and the City, must be approved as to form by the Housing Director and City Attorney prior to the sale of any Affordable Unit and must be recorded in the County Recorder’s Office.
40. Owner and Developer must offer existing eligible tenants of the Affordable Rental Units the first opportunity to purchase an Affordable Unit offered for sale within the Development.
41. A City fee may be collected as necessary to enforce the provisions of the affordability covenants, and fees (paid by the owner/seller) to cover City costs associated with the sale of affordable units including the City’s obligation of verification of proposed sale price applicable to the Affordable Units that are offered for sale; income eligibility of the prospective household or family to occupy Affordable Units that are to be sold, inspection of Affordable units that are offered for sale, and completion of a resale restriction agreement for all buyers of affordable units that are offered for sale. The City shall set these fees and adjust it as needed from time to time.
42. Prior to the purchase of an Affordable Unit, the buyer’s eligibility for purchase of the Affordable Unit must be demonstrated to the Housing Director, the Housing Director must approve the eligibility of all buyers before they may purchase an Affordable Unit.
43. Affordable Rent and Affordable Housing Cost for 2-bedroom units will be based on a threeperson household income and affordability calculations for 3-bedroom units will be based on a four-person household, as set forth in Health and Safety Code 52102(a)(1)(B) and 50052.5 (b)(h).
44. The Affordable Units must be designed and constructed to be architecturally consistent with and qualitatively similar to other unrestricted units in the project.
45. Developer is required to notify the Naval Base Ventura County Housing Service Center of the project and the unit’s anticipated sales prices.
46. Developer is required to coordinate with the City of Oxnard’s Housing Department to provide early advertisement to local residents in compliance with fair housing law.
Addendum Mitigated Negative Declaration 2004-11 Mitigation Measures Developer shall comply with the mitigation measures identified in the Final Mitigated Negative Declaration (MND) 2004-11, as modified by Addendum No. 1 to Final MND 2004-11 associated with the development project (PZ Nos. 19-500-04 and 20-300-02).
Air Quality
707
Resolution No. 2021-XX- PZ No. 20-300-02[Tentative Subdivision Map #6064] City Council Hearing Date: April 19, 2022
47. Developer shall ensure that all construction equipment is maintained and tuned to meet applicable Environmental Protection Agency (EPA) and California Air Resources Board (CARB) emission requirements. At such times as new emission control devices or operational modifications are found to be effective, the Developer shall immediately implement such devices or operational modifications on all construction equipment. (MND, C-1)
48. During smog season (May through October), developer shall lengthen the construction period so as to minimize the number of vehicles and equipment operating at the same time. (MND, C-2)
49. At all times during construction activities, Developer shall minimize the area disturbed by clearing, grading, earth moving, or excavation operations to prevent excessive amounts of dust. (MND, C-3)
50. During construction, Developer shall water the area to be graded or excavated prior to commencement of grading or excavation operations. Such application of water shall be at least twice per day and shall penetrate sufficiently to minimize fugitive dust during grading activities. (MND, C-4)
51. During construction, Developer shall control dust by the following activities:
(a) All trucks hauling graded or excavated material offsite shall be required to cover their loads as required by California Vehicle Code §23114, with special attention to Sections 23114(b)(F), (e)(2) and (e)(4) as amended, regarding the prevention of such material spilling onto public streets and roads.
(b) All graded and excavated material, exposed soils areas, and active portions of the construction site, including unpaved onsite roadways, shall be treated to prevent fugitive dust. Treatment shall include, but not necessarily be limited to, periodic watering, application of environmentally-safe soil stabilization materials, and/or roll-compaction as appropriate. Watering shall be done as often as necessary and reclaimed water shall be used whenever possible. (MND, C-5)
52. During construction, Developer shall post and maintain onsite signs, in highly visible areas, restricting all vehicular traffic to 15 miles per hour or less. (MND, C-6)
53. During periods of high winds (i.e. wind speed sufficient to cause fugitive dust to impact adjacent properties), Developer shall cease all clearing, grading, earth moving, and excavation operations to prevent fugitive dust from being a nuisance or creating a hazard, either onsite or offsite. (MND, C-7)
54. Throughout construction, Developer shall sweep adjacent streets and roads at least once per day, preferably at the end of the day, so that any visible soil material and debris from the construction site is removed from adjacent roadways. (MND, C-8) 708
Resolution No. 2021-XX- PZ No. 20-300-02[Tentative Subdivision Map #6064] City Council Hearing Date: April 19, 2022
55. Prior to grading permit approval, Developer shall include on the grading plans a reproduction of all conditions of this permit pertaining to dust control requirements. (PL) Cultural Resources
56. Developer shall contract with a qualified archaeologist to conduct a Phase I cultural resources survey of the project site prior to issuance of any grading permits. The survey shall include:
(1) an archaeological and historical records search through the California Historical Resources Information System at CalState Fullerton; and (2) a field inspection of the project site. Upon completion, the Phase I survey report shall be submitted to the Planning Division for compliance verification. A copy of the contract for these services shall be submitted to the Planning Division Manager for review and approval prior to initiation of the Phase I activities.
The contract shall include provisions in case any cultural resources are discovered onsite. In the event that any historic or prehistoric cultural resources are discovered, work in the vicinity of the find shall be halted immediately. The archaeologist shall evaluate the discovery and determine the necessary mitigations for successful compliance with all applicable regulations. Developer or its successor in interest shall be responsible for paying all salaries, fees and the cost of any future mitigation resulting from the survey. (MND, E-1)
57. Developer shall contract with a Native American monitor to be present during all subsurface grading, trenching or construction activities on the project site. The monitor shall provide a monthly report to the Planning Division summarizing the activities during the reporting period. A copy of the contract for these services shall be submitted to the Planning Division Manager for review and approval prior to issuance of any grading permits. The monitoring report(s) shall be provided to the Planning Division prior to approval of the final building permit signature. (MND, E-1)
Geology and Soils
58. Developer shall submit a site-specific soils investigation, which shall be prepared by a licensed geotechnical engineer. At a minimum, such study shall include liquefaction and compressible soil characteristics on the subject site, and shall identify any necessary construction techniques or other mitigation measures to prevent significant liquefaction/compressible soils impacts upon the proposed project. all recommendations of said report shall be incorporated into the project. The Developer shall submit the report to the Building Official for review and approval prior to issuance of building permits. (MND, F-1)
Land Use and Planning
59. Prior to the issuance of building permits, the Developer shall file a Form 7460, “Notice of Proposed Construction with the Federal Aviation Administration (FAA), and provide a copy 709
Resolution No. 2021-XX- PZ No. 20-300-02[Tentative Subdivision Map #6064] City Council Hearing Date: April 19, 2022
to the Planning Division that enables the FAA to review the development for any hazard to airport/aviation operations. (MND, G-2)
Noise
60. The applicant shall provide a notice to potential homebuyers and renters disclosing the presence of the Oxnard Airport and a helicopter flight path along West Fifth Street and the potential expansion of the Oxnard Airport. The applicant shall provide such notice to each homebuyer and renter and obtain signatures acknowledging the presence of the Oxnard Airport and helicopter flight path along West Fifth Street. (MND, K-1)
DEVELOPMENT SERVICES DIVISION STANDARD CONDITIONS
61. Developer shall pay plan check and processing fees in effect at the time of construction plan submittal and shall pay development fees, encroachment permit fees, and other applicable fees in effect at permit issuance. (DS-1)
62. Developer shall enter into an agreement, approved as to form by the City Attorney, to install and construct all public improvements required by this permit and by the City Code.
Developer shall post security satisfactory to the Finance Director, guaranteeing the installation and construction of all required improvements within the time period specified in the agreement or any approved time extension. (DS-14)
63. Developer agrees, as a condition of approval of this resolution, to indemnify, defend and hold harmless, at Developer’s expense, City and its agents, officers and employees from and against any claim, action or proceeding commenced within the time period provided for in Government Code Section 66499.37, to attack, review, set aside, void or annul the approval of this resolution or to determine the reasonableness, legality or validity of any condition attached thereto. The City shall promptly notify the Developer of any such claim, action or proceeding of which the City receives notice, and the City will cooperate fully with the Developer in the defense thereof. Developer shall reimburse City for any court costs and attorney's fees that City may be required to pay as a result of any such claim, action or proceeding. The City may, in its sole discretion, participate in the defense of any such claim, action or proceeding, but such participation shall not relieve the Developer of the obligations of this condition. Developer’s acceptance of this resolution or commencement of construction or operations under this resolution shall be deemed to be acceptance of all conditions thereof. (DS-18)
64. Developer shall provide all necessary easements for streets, highways, alleys, sidewalks, parkways, landscaping, utilities, drainage facilities, or other improvements as required by City. If such easements cannot be obtained from the property owner by negotiation, the City may acquire them at the expense of the Developer by exercise of the power of eminent domain. Developer shall bear all costs of eminent domain proceedings, including appraisal, 710
Resolution No. 2021-XX- PZ No. 20-300-02[Tentative Subdivision Map #6064] City Council Hearing Date: April 19, 2022
acquisition, attorney’s fees, and court costs. Before the City issues a site improvement permit, the Developer shall dedicate all required easements to the City. (DS-19)
65. The conditions of this resolution shall prevail over all omissions, conflicting notations, specifications, dimensions, typical sections, and the like, that may or may not be shown on the improvement plans. (DS-21)
66. Prior to approval of the final map or parcel map, Developer shall provide the City Engineer with written evidence from the Ventura County Clerk's Office that Developer has executed and filed with the Clerk all certificates, statements and securities required by Government Code Sections 66492 and 66493. (DS-26)
67. Developer shall dedicate to the City all water rights for the project property by title sheet dedication on the final map or parcel map. (DS-39)
68. Prior to release of the final map or parcel map for recordation, the Developer shall provide the City Engineer with a 100‑scale base map for addressing purposes. The map shall be drawn on 18‑inch by 24‑inch mylar and shall show the standard address map title block, north arrow, street names, tract number, phase boundary and lot numbers. The City will assign all addresses. (DS-56)
69. Prior to release of the final map or parcel map for recordation, Developer shall post security satisfactory to the City Attorney guaranteeing that all survey monuments will be set as required by the Government Code and the City Code. (DS-57)
DEVELOPMENT SERVICES DIVISION SPECIAL CONDITIONS
70. Developer shall place existing overhead utility lines on and adjacent to the project underground in accordance with City Code in effect at the time City issues a grading/site improvement permit. The current City Code does not require the placement of lines conducting in more than 33kv underground. Prior to recordation of the final map or issuance the grading/site improvement permit, Developer shall post security satisfactory to the Finance Director guaranteeing utility relocation including the cost of any required pole relocation.(DS)
71. Developer shall process the final map associated with this permit concurrent with the site improvement plans for Planning and Zoning Permit 19-500-04. The final map shall be processed for recordation concurrent with the approval of the PZ 19-500-04 site improvement plans. (DS)
72. The final map shall indicate the vacation of existing City easements that are determined by the City Engineer to no longer be necessary, including but not necessarily limited to, the existing 10-foot landscape easement along the project’s southern boundary. The vacation(s) shall be processed under section 66434(g) of the Subdivision Map Act. If easement vacations 711
Resolution No. 2021-XX- PZ No. 20-300-02[Tentative Subdivision Map #6064] City Council Hearing Date: April 19, 2022
are required to be processed separately from the final map, the Developer shall be responsible for all costs associated with the vacation including, but not limited to, fees associated with the hearing(s), easement vacation document preparation, and review by the City. (DS)
73. Prior to recordation of the final map, Developer shall coordinate with Public Works Department Maintenance District No. 55 and pay all fees associated with the hearing, easement vacation document preparation, and review by the City to vacate the 10-foot landscape easement. Developer shall assign the landscape maintenance responsibility of the 10-foot landscape easement in perpetuity to the Homeowner’s Association(s) (HOA).
Developer may remove and replace the trees inside the easement in accordance with City policy if permitted by the Community Development Planning Division and Public Works Department Maintenance District No. 55 as the result of vacationing the 10-foot landscape easement. (DS)
74. Developer shall coordinate with the Public Works Maintenance District No. 55 and acquire all maintenance responsibility for on-going landscaping and hardscape (sidewalk) maintenance along the project frontages on Portofino Place that are being maintained by the maintenance district. A Declaration of Covenants, Conditions, and Restrictions (CC&Rs) shall be prepared to legally bind all landscape and hardscape maintenance previously performed by the Maintenance District No. 55 to the HOA. Prior to final map recordation, Developer shall submit a copy of the CC&Rs to the City for review and approval. Final approved copy shall be recorded with the Ventura County Recorder’s Office concurrent with the final map recordation. (DS)
TRAFFIC DIVISION SPECIAL CONDITIONS
75. Except for the proposed two driveways, the project shall dedicate all vehicle access rights to the City along West Fifth Street on the final map. (TR) PASSED AND ADOPTED this 19th day of April, 2022, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
RECUSED:
John Zaragoza, Mayor
712
Resolution No. 2021-XX- PZ No. 20-300-02[Tentative Subdivision Map #6064] City Council Hearing Date: April 19, 2022
//
//
ATTEST:
Rose Chaparro, City Clerk
APPROVED AS TO FORM:
Stephen M. Fischer, City Attorney
713
Portofino Place
90, Two-Story Condominium Dwelling Units and Associated Site Improvements on a 7.61-Acre site
Planning and Zoning Permit Nos.
19-500-04 (Special Use Permit - Residential)
20-300-02 (Tentative Subdivision Map)
20-570-02 (Zone Change)
20-620-02 (General Plan Amendment)
South Side of Fifth Street at the Intersection of Portofino Place Scott Kolwitz, Planning & Environmental Services Manager Vyto Adomaitis, Community Development Director
City Council Meeting
April 19, 2022
Portofino Place
2 714
● General Plan Amendment (PZ 20-620-02)
➢ Change the land use designation of the project site from Business Research Park (BRP) to Residential Medium (RM) ● Zone Change (PZ 20-570-02)
➢ Change the zoning of the project site from Business
Research Park to Multiple-Family (R-2)
● Tentative Subdivision Map
➢ Create condominiums on a 7.61-acre vacant site
● Special Use Permit (PZ 19-500-04)
➢ Development of 90, two-story condominiums
3 Project Description Existing & Surrounding Land Uses
4 ● South side of Fifth Street at
intersection of Portofino Place
within the Sea View Estates
Neighborhood
● North: Industrial/ Oxnard
Airport
● South: Residential
Subdivisions
● West: Carwash
● East: Juan Lagunas Soria
Elementary School
715
2030 General Plan & Zoning
5 Aerial Map
6 NORTH
716
Aerial Map w/
Project
7 NORTH
Background
● Part of a larger 17-acre project
● In 2004, the Council approved a General Plan Amendment and Zone Change to designate 7.885 acres residential, remainder of the project site was BRP
● A Mitigated Negative Declaration was adopted by the City Council
● March 19, 2019, the City Council reviewed a Pre-Application and found the General Plan Amendment and Zone Change generally acceptable
● Preferred affordable housing units built onsite
8 717
Background
● November 18, 2021, the Planning Commission approved the SUP recommended the City Council approve the MND, GPA, ZC & TSM
● On February 10, 2022, the Oxnard Airport Authority and on March 4, 2022, the Airport Land Use Commission reviewed the project and determined the project is consistent with the adopted Ventura County Airport Comprehensive Land Use Plan
9 Oxnard Airport
10 718
Oxnard Airport
● Project located within Oxnard Airport Sphere of Influence ● Limits the structural coverage to 25 percent and total height to 25 feet
● Project is designed to be consistent with the 25 percent allowable site coverage and 25 feet maximum height limit ● Mitigation Measures require buffers as well as review by the Federal Aviation Administration.
11 General Plan Amendment & Zone Change
● GPA request is to change the general land use designation from Business Research Park to Residential Medium (RM) to allow for a residential project
● Project site is located on Fifth Street- a designated scenic corridor ● Project as designed complies with new RM land use designation and General Plan policies
● Zone Change request to change zoning from BRP to Residential Multiple-Family (R-2) to be consistent with GPA request (RM) ● Project designed to meet R-2 development standards
12 719
GPA & ZC
13 North
Tract Map
14 720
Circulation
● Project accessed by Fifth Street and bisected by Portofino Place ● The project is conditioned to provide for offsite improvements such as:
➢ Pedestrian safety enhancement along Fifth St. by retrofitting existing street lights along the project frontage with 4000k LED lights.
➢ Project shall construct two (2) traffic calming devices on Portofino Place- Fifth Street and Dunkirk Drive
➢ All internal drive aisles shall be designed and maintained as Fire Lanes for parking regulatory and enforcement purposes. ● Addendum MND 2004-11 analyzed vehicle miles travelled (VMT) as required by the California Environmental Quality Act ➢ Commercial project: 5,172,230 VMT/annually
➢ Proposed project: 1,812,497 VMT/annually
15 Inclusionary Ordinance
● Inclusionary Ordinance requires 10 percent of the units as affordable
● Project has been conditioned to offer to:
➢ Rent or sale to households with annual incomes at or below fifty percent (50%) of AMI for Ventura County
■ Three (3) three-bedroom units
■ Two (2) two-bedroom units
➢ Rent or sale to households with annual incomes at or below eighty percent (80%) AMI for Ventura County.
■ Two (2) two-bedroom units
■ Two (2) three-bedroom units
● City and Developer have negotiated agreement to ensure units will be offered to appropriate households
16 721
Community Workshop
● April 20, 2020 Community Workshop
● Public Comments focused on:
➢ Traffic along Fifth Street
➢ Traffic generated by nearby school during the drop-off and pick-up
➢ Traffic signal at the intersection of Fifth Street and Portofino Place
➢ Airport proximity
➢ Additional traffic to Dunkirk Drive
● Petition in Opposition to the project Received
➢ 71 signatures
➢ Developer added vehicular access to 5th Street
➢ Traffic Division didn’t support a traffic signal
17 Prior Environmental Review
● In 2004, an MND (No. 04-11) evaluated Commercial
development on the project site
● Project site was found to be suitable for commercial
development
● 10-acre adjoining site was found suitable for residential development.
● There were no Significant and Unavoidable Impacts identified in the 2004 MND
● Mitigation measures were incorporated into conditions of approval
18 722
Current Environmental Review
● An Addendum to MND 2004-11 was prepared
● Residential project is a less intensive use than the commercial project analyzed in the previous MND
➢ Less traffic volume.
● Addendum concludes that the proposed project would
➢ not create any new significant impacts or increase the severity of impacts
➢ No new significant effects identified
● All mitigation measures included as conditions of approval in the Special Use Permit Resolution.
19 Current Environmental Review - Mitigation Measures
● Air Quality
➢ Emissions and dust control
➢ Street sweeping during construction
● Cultural Resources and Tribal Cultural Resources
➢ Monitoring
● Geology and Soils
➢ Geotechnical - liquefaction & compressible soil
● Land Use and Planning
➢ FAA Notifications
● Noise
➢ Airport Noise Disclosure
20 723
Recommendation
That the City Council:
a) Adopt a Resolution adopting Addendum No. 1 to previously adopted Mitigated Negative Declaration (MND) 2004-11; and
b) Adopt a Resolution approving Planning and Zoning Permit No. 20-620-02 (General Plan Amendment) to change the land use designation of the project site from Business Research Park (BRP) to Residential Medium (RM), and
c) Introduce an Ordinance (by title only, waiving further reading) approving Planning and Zoning Permit No. 20-570-02 (Zone Change) to change the zoning of the project site from Business Research Park to Multiple-Family (R-2) and set the date of the second reading to occur on May 3, 2022, and
21 Recommendation
That the City Council:
d) Adopt a Resolution approving Planning and Zoning Permit No. 20-300-02 (Tentative Subdivision Map for Tract No. 6064), subject to certain findings and conditions, and
e) Approve an Affordable Housing Agreement.
22 724
End of Presentation
725
CITY COUNCIL AGENDA REPORT
PUBLIC HEARINGS
AGENDA ITEM NO. L.3
DATE: April 19, 2022
TO: City Council
FROM: Emilio Ramirez, Housing Director, (805) 385-8094, [email protected] SUBJECT: First Amendment to the 2021-22 Annual Action Plan and the Second Amendment to the 2020- 21 Annual Action Plan for the CARES Act. (10/20/20)
RECOMMENDATION
That the Community Services, Public Safety, Housing & Development Committee recommend that the City Council:
1. Conduct a public hearing and receive public comments relating to the following documents to be submitted to the United States Department of Housing and Urban Development for the First Amendment to the 2021- 2022 Annual Action and Funding Plan to close and reallocate slow- or no-spending activities within the Community Development Block Grant program to projects moving forward between now and the close of the fiscal year, and to further define activities within the Emergency Shelter Grant – CARES Act program with specific funding awards both described in Attachment 1;
2. Approve the updated changes in activities pertinent to this Mid-Year Reallocation as described in Attachment 1, and the 2021 Amendment to the Annual Action Plan, and the 2020 Amendment to the Annual Action Plan.
3. Authorize the City Manager and his designees, to execute the required applications, certifications, and other pertinent documents for the submission of the 2021 Annual Action Plan Amendment to the United States Department of Housing and Urban Development, and the Second Amendment to the 2020 Annual Action Plan relating to the Emergency Solutions Grant – CARES Act;
4. Authorize the City Manager and his designees, to execute the appropriate agreements with Community Development Block Grant and Emergency Shelter Grant-CV partners, consultants and contractors, and the ability to adjust any future funding of the Mid-Year activities not to exceed $50,000, if the programs require more or less funding to meet their objectives;
5. Authorize the City Manager and his designees, to incorporate any recommended changes resulting from public input to the First Amendment of the 2021 Annual Action Plan, and the Second Amendment to the 2020 Annual Action Plan, as directed by the City Council, including amending any budget appropriations approved by the City Council; and
6. Authorize the Finance Department to make the necessary revenue and expenditure changes to the fiscal year 2022 budget reflecting the amended budgets for the Community Development Block Grant and the Emergency Shelter Grant-CARES Act reallocations described in the 2020 and 2021 Mid-Year budgets.
Please click the following link to view the required Measure M pre-recorded presentation video: https://youtu.be/gKryXW2RCZw
BACKGROUND
As an entitlement city, the City of Oxnard receives formula grant funding from the United States Department of Housing and Urban Development, Community Planning and Development grants for Community Development Block Grant (CDBG), HOME Investment Partnerships Act (HOME) and Emergency Solutions Grant (ESG) every year. To receive 726
these Entitlement Grants the City of Oxnard must prepare, submit, and receive approval of a five-year Consolidated Plan, Annual Action Plan and Analysis of Impediments to Fair Housing. On occasion, amendments and substantial amendments of these plans are required pursuant to the criteria set forth in the Code of Federal Regulations, Title 24 CFR 91 and the City of Oxnard’s Citizen Participation.
Plan. Amendments to an Annual Action Plan require that the Plan be amended whenever the following occurs:
1. A change in its allocation priorities or a change in the method of distribution of funds occurs;
2. A decision to carry out an activity using funds not previously described in an action plan covered by the consolidated plan (including program income, reimbursements, repayment, recaptures, or reallocations from HUD); or
3. A change in the purpose, scope, location, or beneficiaries of an activity occurs.
Amendments will be considered substantial changes and require official action if:
1. Grant funds are allocated to a new activity for the first time;
2. A funding increase in a current activity, or a change in the use of funding from one eligible activity to another, of more than $100,000 in CDBG or HOME funding, or more than $30,000 in ESG funding; or if;
3. A funded activity is cancelled during the program year.
Amendments may also occur when the City of Oxnard has too many slow-moving projects with high dollar amounts.
This causes a timeliness concern, where HUD requires each city to expend funds within each fiscal year and not have more than 1.5 times of the annual award in its CDBG account.
For purposes of this amendment, funding new or shovel-ready projects would support lowering the amount of funds in the CDBG account.
Community Development Block Grant Amendments – Projects Closing There are a total of five projects or programs that are slow-moving, and therefore the funds will be closed and reallocated to projects ready to proceed between now and the close of the fiscal year. Those projects/programs are:
Thrive Mentorship House: The Thrive Mentorship House was unable to submit the initial documentation to comply with the preliminary requirements of the City and HUD.
Park Playgrounds: The three playground projects – Johnson Creek Playground, Sierra Linda Park Playground, and Thompson Park Playground – will be unallocated because 1) the projects awarded in 2021-2022 have not started, despite being in the third quarter of the fiscal year and 2) Public Works has been awarded a total of nine projects between 2018 and 2021, and none have been completed to date. The three projects total $700,953. There are six remaining funded Public Works projects.
Rehabilitation Loan Program: The Affordable Housing and Rehabilitation Division (AHRD) was successfully able to complete eight down payment assistance loans, however the rehabilitation program was on hold due to the HUD monitoring review, therefore no funds were spent for the year.
Community Development Block Grant Amendments – New Projects The funds from the above five projects/programs will be allocated to two projects:
1. Cuesta Del Mar - The amendment to the 2021 Annual Action Plan includes the newly proposed project, Cuesta del Mar, a long-term, time-limed pocket park within the Southwinds neighborhood that will provide various workshops, create gardens, and hold community events – all organized by the LUCHA organization. The request was initiated by neighborhood representatives and with some help from the city in navigating through the permits process and a few 727
corporate sponsors. The property will be developed with storage freights, garden spaces, and event spaces for community-led activities. The project has been approved by Council in the past, whereas now funding has been identified to support it. The LUCHA organization has asked for $20,000 for assistance through CDBG funding.
2. Acquisition – The amendment would also add $700,953 for the acquisition of residential property to offer housing opportunities for otherwise homeless persons. It is anticipated that the acquisition will occur prior to June 30, 2022.
Consistent with the Council Priority to revitalize the "Hueneme/Saviers/Pleasant Valley/Channel Islands Corridors" staff is pursuing sites in South Oxnard.
Emergency Solutions Grant Amendments-CV – CARES Act Funds On October 6, 2020 City Council approved ESG-CV funding totaling $5,255,005, to support homeless programs such as shelter operations, street outreach, homeless prevention, rapid re-housing to prevent, prepare, and responsive to COVID19 (2020 Annual Action Plan). The $651,589 in unallocated funds were made available for emergency shelter services and operations, inclusive of City of Oxnard participants. No additional applications were received for those funds.
To facilitate the spending of the funds by the September 30, 2022 deadline, the funding will continue to be allocated to support homeless programs and services but in different amounts and with different partners. The main change in this mid-year budget is that the "Administration and Planning" category of funds will be substantially reduced to $51,090 with the balance provided for the operation of the homeless shelter (Mercy House). Ventura County Health Services Agency will receive the unallocated funding that was part of the October 6, 2020 budget, in the amount of $651,589, for a grand total of $1,200,000, in addition to Turning Point Foundation receiving $52,549, both for emergency shelter services. For additional details on projects please see Attachment 1.
The PowerPoint presentation lists the projects and budget amounts for each ESG-CV program. There is a variation to the budget from the Committee presentation to the Council presentation. It reflects funds from the Administration and Planning line item to the emergency shelter programs, due to the Homeless Division assessing the need for more funds to these operations. Approximately $474,410 went to the emergency shelter category.
STRATEGIC PRIORITIES
This agenda item supports the Quality-of-Life strategy. The purpose of the Quality-of-Life strategy is to restore and increase quality services and programs that enrich Oxnard's diverse community, promotes safe neighborhoods, encourages community engagement, and supports our residents in their efforts to improve their quality of life.
FINANCIAL IMPACT
There are no financial impacts to the City’s General Funds. The funds are provided within the CDBG and ESG-CV programs, respectively. There are no increases or decreases of the overall funding amounts, and the funds are being moved from slow- or no-performing activities to activities that are able to meet program objectives and utilize the funds.
COMMITTEE OUTCOME
The Community Services, Public Safety, Housing & Development Committee approved 2-0 on March 22, 2022, to approve the staff recommendation and to forward the item for Council approval.
Prepared by: Emilio Ramirez, Housing Director
ATTACHMENTS
1. Mid-Year Reallocation Budget
2. Agenda Report City Council Amendment_10.6.20
3. 2020 Annual Action Plan Amendment
4. PowerPoint Presentation
728
CITY OF OXNARD HOUSING ‐ GRANTS DIVISION
2021‐2022 MID‐YEAR REALLOCATION BUDGET
Program Prior Activity Award Amount New Activity Proposed Amount Reason for Reallocation CDBG
Thrive Mentorship House 20,000.00 $ Cuesta Del Mar $ 20,000.00 Subtotal: 20,000.00 $
Johnson Creek Playground 107,951.00 $ Housing Acquisition $ 107,951.00 Sierra Linda Park Playground 171,751.00 $ Housing Acquisition $ 171,751.00 Thompson Park Playground 221,251.00 $ Housing Acquisition $ 221,251.00 AHRD Rehabilitation Loan Program $ 200,000.00 Housing Acquisition $ 200,000.00 Subtotal: 700,953.00 $
Total Reallocation CDBG: $ 720,953.00
ESG‐CV ESG‐CV Administration and Planning ($525,500)
Administration and Planning $ 525,500.00 Homeless Assistance Program Coord $ 21,090.00 Homeless Assistance Intern $ 30,000.00 Administrative/Grants Management $ ‐ $ 525,500.00 Subtotal: 51,090.00 $
Emergency Shelter ($3,477,916)
Homeless Expansion Shelter FY 2019‐20 & FY 2020‐21 477,916.00 $ Mercy House ‐ Armory Shelter $ 1,500,000.00 Temporary Homeless Shelter at K St FY 2020‐21 & FY 2021‐22 $ 2,400,000.00 Mercy House ‐ PAL $ 700,020.00 Temporary Emergency Shelter at 2nd Street 600,000.00 $ Mercy House ‐ Maintenance $ 20,000.00 Turning Point Foundation $ 52,549.00
Ventura Co. Health Services Agency ‐ $ 548,411.00 Subtotal 3,477,916.00 $ Subtotal: 2,820,980.00 $ Street Outreach ($400,000)
Homeless Encampment Response ‐ Outreach $ 150,000.00 Ventura Co. Health Services Agency ‐
Outreach $ 120,000.00
Street Outreach 250,000.00 $ The Salvation Army $ 143,484.00 Subtotal 400,000.00 $ Subtotal: 263,484.00 $ Tenant‐Based Rental Assistance (TBRA) ($200,000)
TBRA ‐ Case Management & Rapid Re‐Housing 200,000.00 $ United Way ‐ Forward Home $ 200,000.00 Subtotal 200,000.00 $ $ 200,000.00 Unallocated ($651,589)
Unallocated 651,589.00 $ $ 651,589.00 Subtotal 651,589.00 $ Subtotal: 651,589.00 $ $ 5,255,005.00 Total Reallocation ESG‐CV (CARES Act): $ 3,987,143.00 Expended Funds $ 1,267,862.00
Total ESG‐CV 5,255,005.00 $
Identified projects for ESG‐CV (CARES
Act) funding
Identified projects for ESG‐CV (CARES
Act) funding
Prior activities could not progress
before June 30, 2022 deadline.
Identified projects for ESG‐CV (CARES
Act) funding
Identified projects for ESG‐CV (CARES
Act);
Identified projects for ESG‐CV (CARES
Act) funding
Thrive Mentorship was unable to
fulfill compliance requirements to
proceed with an agreement.
Ventura Co. Health Services Agency ‐
Emergency Shelter
729
CITY COUNCIL AGENDA REPORT
PUBLIC HEARINGS
AGENDA ITEM NO. M.1
DATE: October 6, 2020
TO: City Council
FROM: Emilio Ramirez, Housing Director, (805) 385-8094, [email protected] SUBJECT: First Amendment of the 2020 Annual Action Plan CARES Act for Coronavirus Response Grants and Adoption of an addendum to the Citizen Participation Plan. (10/10/10)
RECOMMENDATION
That the City Council:
1. Conduct a public hearing to receive comments from the public relating to the following documents to be submitted to the United States Department of Housing and Urban Development, Office of Community Planning and Development; a. 2020 Annual Action Plan CARES Act Amendment;
b. Addendum to the Citizen Participation Plan;
2. Approve the 2020 Annual Action Plan CARES Act Amendment, inclusive of proposed activities that conform with Community Development Block Grant and Emergency Solutions Grant requirements, as well as CARES Act requirements described below;
3. Authorize the City Manager to incorporate any recommended changes resulting from public input to the Annual Action Plan CARES Act Amendment and Addendum to the Citizen Participation Plan as directed by the City Council;
4. Authorize the City Manager to execute the required applications, certifications, and other pertinent documents for the submission of the Annual Action Plan CARES Act Amendment to the United States Department of Housing and Urban Development; and
5. Authorize the City Manager to execute HUD agreements and sign all agreements for the implementation of the Annual Action Plan Substantial Amendment including subrecipients, interdepartmental, and intradepartmental agreements.
BACKGROUND
Coronavirus Aid, Relief, and Economic Security Act (CARES Act) In response to the coronavirus pandemic, the United States Congress approved the Coronavirus Aid, Relief, and Economic Security Act (CARES Act) bill to assist states, counties, cities, individuals and families with the economic impacts resulting from the Coronavirus. The bill was signed into law on March 27, 2020. Community Development Block Grant (CDBG-CV) and Emergency Solutions Grant (ESG-CV) are funded by United States Department of Housing and Urban Development (HUD), Community Planning and Development (CPD). The CARES Act requires that CDBG-CV funds be used to prevent, prepare for, and respond to the coronavirus with activities that are based on public health needs, risk of transmission of coronavirus, number of coronavirus cases compared to the national average, economic and housing disruptions, and other factors as determined by HUD Secretary. ESG-CV funds must be targeted to prevent, prepare for, and respond to the coronavirus pandemic among individuals and families who are homeless or receiving homeless prevention activities to mitigate the impacts of COVID-19.
City of Oxnard Allocations
730
To support the City of Oxnard’s responses to the coronavirus pandemic the United States Department of Housing and Urban Development (HUD) has awarded the following CARES Act grant allocations totaling $8,343,372. Total expected resources for each of the City of Oxnard grant programs from CARES Act funds are $3,088,367 for Community Development Block Grants (CDBG-CV) and $5,255,005 for Emergency Solutions Grants (ESG-CV).
The CARES Act grant allocations by the United States Department of Housing and Urban Development (HUD) require a deliberative procedure set forth by HUD that will merge the CARES Act funding with the City of Oxnard’s annual action plan, in either Plan Year 2019 or 2020.
CARES Act for Coronavirus Response Require a Substantial Amendment to the Annual Action Plan The purpose of this amendment is to apply for the allocated CARES Act funding. The City of Oxnard must prepare, submit, and receive approval of a substantial amendment. The amendment herein, will relate to the 2020 Annual Action Plan. Staff deliberated and coordinated identification of effective activities that will comply with the CARES Act requirements as well as the requirements of the United States Department of Housing and Urban Development programs, CDBG-CV and ESG-CV. The amendment will be known as the “City of Oxnard CARES Act Amendment”. This amendment will be merged with the 2020 Annual Action Plan. The resulting coronavirus response “proposed activities” meet the mandates of the CARES Act as well as the compliance requirements of the applicable HUD programs.
On June 16, 2020, the City Council approved the 2020-24 Ventura County Regional Consolidated Plan and the 2020 Annual Action Plan. Both plans are expected to be approved by the United States Department of Housing and Urban Development (HUD) in 1st quarter of fiscal year 2020-21. Immediately upon HUD’s approval of the 2020 Annual Action Plan, and City Council’s approval of this “City of Oxnard CARES Act Amendment”, the merged 2020 Annual Action Plan with CARES Act Amendment will be submitted online.
In accordance with the City's Citizen Participation Plan, a public hearing is scheduled to receive public comments. The public hearing is scheduled for October 6, 2020 to receive public comments on the Plan Year 2020 Annual Action Plan CARES Act Amendment, which became available to the public for a 19-day review period beginning September 17, 2020 (and ending on October 6, 2020). Notice of the Public Hearing date were published in the VIDA Newspaper on September 17, 2020 in Spanish and English. The Annual Action Plan is available is available electronically on the City's website.
Waivers to Facilitate CARES Act Funding from HUD.
To facilitate the amendment and eventual reimbursement of CARES Act grant funds, the United States Department of Housing and Urban Development announced that it will provide grantees program flexibility, waivers, and alternative requirements applicable to Coronavirus Response grants.
Staff requested from the United States Department of Housing and Urban Development, an approval for the use of the CARES Act waivers, regulatory flexibilities, and alternative requirements that will facilitate CARES Act related procedures. The waivers were approved effective September 5, 2020. The City of Oxnard is employing two regulatory waivers to expedite the CARES Act grant amendment process:
1.The Secretary of Housing and Urban Development has temporarily waived the requirement that a substantial action plan amendment requires an amendment to the consolidated plan for 2019 and 2020 CARES Act amendments. Thus, we are not required to seek to amend the 2020-24 County of Ventura Regional Consolidated Plan.
2.One of the waivers is employed in the CARES Act amendment process, that is, a waiver that suspends the 30-day noticing requirements in the City of Oxnard Citizen Participation Plan and allows a 5-day noticing period for the 2020 CARES Act amendment. To utilize this waiver, staff proposes the addendum herein to the City of Oxnard Citizen Participation Plan.
2020 Annual Action Plan CARES Act Proposed Activities
731
Available ESG-CV funding of $5,255,005, to support homeless programs such as shelter operations, street outreach, homeless prevention, rapid re-housing to prevent, prepare, and responsive d to COVID-19, totaling $5,255,005. CDBGCV funding is available to support eligible activities such as public facilities and improvements, public service activities to prevent, prepare, and respond to COVID-19, totaling $3,088,367.
Staff proposes activities that meet both United States Department of Housing & Urban Development program requirements and CARES Act COVID-19 requirements to prevent, prepare, and respond to activities that will benefit low to moderate income residents of the City of Oxnard. Staff consulted with Community, Housing and Economic Development Committee. The “Proposed Activities” are in Attachment 2.
Any amounts that are unallocated will be made available for other eligible activities to non-profit organizations and other eligible affordable housing, shelter and other program operators, inclusive of City of Oxnard participants.
Citizen Participation Plan Amendment
The U.S. Department of Housing & Urban Development (HUD) requires that Grantees provide opportunities for the public to comment on the proposed amendment of the Annual Action Plan. The plan must provide a summary of citizen comments or views on the plan, a written explanation of comments not accepted and the reasons why these comments were not accepted. In accordance with HUD’s regulatory requirement, the City of Oxnard City Council approved on July 10, 2018, the effective Citizen Participation Plan.
The Addendum to the Oxnard Citizen Participation Plan herein, incorporates the waiver suspending HUD’s 30-day noticing requirement and temporarily allowing an expedited 5 day noticing period for our 2020 CARES Act amendments, current and subsequent amendments. The Addendum to the 2020 Addendum to the Citizen Participation Plan allows City of Oxnard 5 day noticing period for the 2020 CARES Act amendments.
Since the notice period for this 2020 Amendment is 17 days, rather than the previously required 30 days, the 2020 Addendum to the Citizen Participation Plan ratifying HUD’s temporary allowance of a 5-day noticing period is necessary to meet the public notice requirements for annual action plan amendments. The 2020 Addendum to the Citizen Participation Plan is located on the Oxnard Housing Grants Management Division website: https://www.oxnard.org/citydepartment/housing/grants-management/.
Conclusion
The draft 2020 Annual Action Plan CARES Act Amendment and Addendum to the Citizen Participation Plan have been posted for public review, and the October 6, 2020 public hearing is for the purpose of providing members of the public with the opportunity to comment. The full reports are accessible at City of Oxnard Housing Department, Grants Management website: https://www.oxnard.org/city-department/housing/grants-management/.
STRATEGIC PRIORITIES
This agenda item supports the Quality of Life strategy. The purpose of the Quality of Life strategy is to build relationships and create opportunities within the community for safe and vibrant neighborhoods, which will showcase the promising future of Oxnard. This item supports the following goals and objectives:
Goal 1. Improve community safety and quality of life through a combination of prevention, intervention, and suppression efforts that address crime and underlying issues.
Objective 1b. Explore alternatives for youth through recreation programs and intervention services. Goal 2. Address homelessness through the development and implementation of a multi-tiered strategy. 732
Objective 2a. Identify the City’s homelessness mission and create a 5-year plan to address homelessness. Goal 3.
Strengthen neighborhood development, and connect City, community and culture.
Objective 3a. Create a renewed focus on establishing a positive outlook and orientation of our City, neighborhoods and overall community.
Objective 3b. Empower and connect our Inter-Neighborhood Council Organizations (INCOs), Community Advisory Groups (CAGs) and Neighborhood Watch Program.
FINANCIAL IMPACT
The First Amendment of the 2020 Annual Action Plan will outline how the City plans to allocate Cares Act Coronavirus Response grant, CDBG-CV and ESG-CV. This includes CARES Act funds for HUD grant allocations of $3,088,367 in CDBG-CV and $5,255,005 for ESG-CV. The grand total of available resources is $8,343,372. When this item was presented to HEDC had only been notified of $1,514,428 in CDBG-CV funding, but a new allocation has just increased the total CDBG-CV allocation to $3,088,367. No additional ESG-CV funds were allocated since this was presented to HEDC. Following the public input to the Annual Action Plan CARES Act Amendment and Addendum to the Citizen Participation Plan, staff will return to City Council to amend the FY 2020-21 Budget.
COMMITTEE OUTCOME
The Housing and Economic Development Committee, on September 8, 2020, approved forwarding the recommended actions to the City Council with a vote of 3-0.
Prepared by: Emilio Ramirez, Housing Director
ATTACHMENTS
1. 2020 Annual Action Plan CARES Act Amendment DRAFT
2. 2020 Annual Action Plan CARES Act Funding Recommendation List
3. PRESENTATION Annual Action Plan CARES Act Amendment
733
City of Oxnard
2020 Annual Action Plan
CARES Act Amendment
(1stAmendment)
DRAFT
Prepared by:
City of Oxnard – Housing Department – Grants Management 435 South D Street, Oxnard, California, 93030
734
Annual Action Plan CARES Act Amendment
2020
2 Table of Contents
Executive Summary.......................................................................................................................................3 AP-05 Executive Summary - 24 CFR 91.200(c), 91.220(b).......................................................................3 PR-05 Lead & Responsible Agencies – 91.200(b)....................................................................................10 AP-10 Consultation – 91.100, 91.200(b), 91.215(l).................................................................................12 AP-12 Participation – 91.105, 91.200(c) ................................................................................................24 Expected Resources....................................................................................................................................33 AP-15 Expected Resources – 91.220(c)(1,2) ..........................................................................................33 AP-20 Annual Goals and Objectives......................................................................................................41 Projects ...................................................................................................................................................47 AP-35 Projects – 91.220(d).....................................................................................................................47 AP-38 Project Summary .........................................................................................................................49 AP-50 Geographic Distribution – 91.220(f).............................................................................................60 Affordable Housing .....................................................................................................................................62 AP-55 Affordable Housing – 91.220(g) ...................................................................................................62 AP-60 Public Housing – 91.220(h)...........................................................................................................64 AP-65 Homeless and Other Special Needs Activities – 91.220(i)............................................................66 AP-75 Barriers to affordable housing – 91.220(j) ...................................................................................69 AP-85 Other Actions – 91.220(k) ............................................................................................................71 Program Specific Requirements..................................................................................................................75 735
Annual Action Plan CARES Act Amendment
2020
3 Executive Summary
AP-05 Executive Summary - 24 CFR 91.200(c), 91.220(b)
1. Introduction
The City of Oxnard is within Ventura County, California, located northwest of Los Angeles and southwest of Santa Barbara. Oxnard is the largest city in the county with the population of 209,877, according to the United States Census Bureau population estimates in 2018. The regulations of the United States Department of Housing and Urban Development (HUD) require that an Annual Action Plan (AAP) be submitted for each plan year within an agency's Consolidated Plan.
The City of Oxnard (City) joined the Ventura County Regional Consolidated Plan (Regional ConPlan) is a five year plan document covering five plan years from 2020-2024. The Ventura County Regional Consolidated Plan is a collaborative document between all incorporated cities and the unincorporated areas of Ventura County, California. Collaborating in the development of the Regional Consolidated Plan are the Cities of Camarillo, Fillmore, Moorpark, Ojai, Oxnard, Port Hueneme, Santa Paula, San Buenaventura (City of Ventura), Simi Valley, and Thousand Oaks. The Regional ConPlan document is to comply with the HUD requirement to submit the City of Oxnard's Annual Action Plan for plan year 2020.
In the Regional ConPlan, the priorities that need to be addressed for community development and housing needs of the City of Oxnard are identified. The AAPs annually identify the resources available to address those needs identified in the Regional ConPlan, describe the activities that will be undertaken designed to meet the annual goals and objectives that relate to the identified needs as determined in the Regional ConPlan, describe the geographic areas targeted for assistance, include the Citizen Participation Plan, and set the basis for performance monitoring whereby results are measured as goals accomplished and outcome indicators.
Goals and objectives of the community needs identified in the Regional ConPlan will be accomplished by activities specified by the City’s AAPs. With the 2020 AAP, the City will implement activities that continue to strive to derive positive outcomes that were set forth as goals for the Regional ConPlan period, Plan Year 2020. The current AAP will cover the period of July 1, 2020 to June 30, 2021 (plan year 2020). Herein are described the expected federal, state and local resources, the priorities and specific objectives the City desires to achieve, and the activities that will be undertaken throughout the 2020 plan year.
In recent years, the City’s allocation of entitlement grant funds from HUD has either increased or remained relatively unchanged. The Plan year 2020 allocations are; Community Development Block Grant (CDBG) $2,574,388 an increase of 2.3%, HOME Investment Partnerships (HOME), $776,134 a increase of 6.8% and Hearth Emergency Solutions Grant (HESG), $221,083 an increase of 4.1%. Total HUD entitlement grant funds increased by 3.3%, to $3,571,605. 736
Annual Action Plan CARES Act Amendment
2020
4 The City's goals, as identified in the Regional ConPlan, can be found throughout this AAP, and are designed to principally serve extremely-low, low-, and moderate-income residents by addressing the following:
• Improve the Supply of Affordable Housing
• Enhance Economic Stability
• Increase Social Services
• Work to End Homelessness
• Create Quality Neighborhoods
• Effective Administration
The AAP describes the resources expected to be available in the coming program year from federal, state, local and private sources, and also includes a description of the activities that will be undertaken to meet the specific objectives.
2020 Annual Action Plan CARES Act Amendment
The City is amending the 2020 Annual Action Plan to allocate the CDBG-CV and ESG-CV funds under the CARES Act. The Substantial Amendment is consistent with the City of Oxnard’s Citizen Participation Plan, as revised on the same date. A summary of modifications is as follows:
AP-05
• Summary of Citizen Participation Process and consultation process • Summary of public comments
AP-12 Participation
• Citizen Participation Outreach Table; Public Hearing and Internet Outreach added AP-15 Expected Resources
• Introduction; narrative added
• Anticipated Resources Table; CDBG-CV and ESG-CV funding added AP-20 Annual Goals and Objectives
• Goal Summary Table; COVID-19 Pandemic Response CDBG and COVID-19 Pandemic Response CDBG goals added
AP-35 Projects
737
Annual Action Plan CARES Act Amendment
2020
5 • Project Information Table; three projects added
• Narrative: Describe the reasons for allocation priorities and any obstacles to addressing underserved needs; description added
AP-38 Project Summary
• Project Summary Information Table; three projects added
2. Summarize the objectives and outcomes identified in the Plan This could be a restatement of items or a table listed elsewhere in the plan or a reference to another location. It may also contain any essential items from the housing and homeless needs assessment, the housing market analysis or the strategic plan.
The City is being guided by HUD's Office of Community Planning Development Outcome Performance Measurement System to address the high priority needs stated in its Regional ConPlan. When funding an activity, the City determines which of three HUD objectives best describes the purpose of the activity.
The three objectives are:
• Suitable Living Environment (SL) - In general, this objective relates to activities that are designed to benefit communities, families, or individuals by addressing issues in their living environment. • Decent Housing (DH) - The activities that typically would be found under this objective are designed to cover the wide range of housing programs possible under HOME, CDBG or HESG.
This objective focuses on housing programs where the purpose of the program is to meet individual family or community needs and not programs where housing is an element of a larger effort, since such programs would be more appropriately reported under Suitable Living Environment.
• Creating Economic Opportunities (EO) - This objective applies to the types of activities related to economic development, commercial revitalization, or job creation.
Once the objective for the activity is identified, the City determines which of the three HUD outcome categories best reflects what the City seeks to achieve by funding the activity. The three outcome categories are:
738
Annual Action Plan CARES Act Amendment
2020
6 • Availability/Accessibility - This outcome category applies to activities that make services, infrastructure, public services, public facilities, housing, or shelter available or accessible to lowand moderate-income (LMI) people, including persons with disabilities. In this category, accessibility does not refer only to physical barriers, but also to making the affordable basis of daily living available and accessible to LMI people in the area in which they live. • Affordability - This outcome category applies to activities that provide affordability in a variety of ways to LMI people. It can include the creation or maintenance of affordable housing, basic infrastructure hook-ups, or services such as day care.
• Sustainability - Promoting Livable or Viable Communities. This outcome applies to projects where the activities are aimed at improving communities or neighborhoods, helping to make them livable or viable by providing benefit to LMI persons or by removing or eliminating slums or blighted areas, through multiple activities or services that sustain communities or neighborhoods.
3. Evaluation of past performance
This is an evaluation of past performance that helped lead the grantee to choose its goals or projects.
The City combines the information reported to HUD in the FY 2019-20 Consolidated Annual Performance and Evaluation Report (CAPER) and the directives from HUD in the determination and recommendation of the FY 2020-21 AAP proposed projects.
The FY 2020-21 AAP is the first year of implementing the Regional ConPlan. Accomplishments achieved during the program year (PY) 2018 (July 1, 2018 through June 30, 2019) were evaluated in detail in the PY 2018 CAPER. The CAPER was completed and submitted to HUD on September 30, 2019.
The three major program areas underlining CDBG, HESG and HOME entitlement grants, such as (1) Decent and Affordable Housing, (2) Suitable Living Environment, and (3) Economic Opportunities, coupled with the Continuum of Care (CoC) of Homelessness have received a high priority in the 2020-24 Regional ConPlan. The goals and accomplishments for Plan year 2020 are summarized in the attached table.
4. Summary of Citizen Participation Process and consultation process Summary from citizen participation section of plan.
As part of the AAP development, the City staff scheduled two public hearings: (1) March 17, 2020 and (2) June 16, 2020:
First Public Hearing-March 17, 2020 provided the opportunity for the public to comment on unmet needs and the City Council to make recommendations to staff regarding the priorities and objectives for 739
Annual Action Plan CARES Act Amendment
2020
7 FY 2020-21 AAP. As part of the development process of the AAP, City Staff developed a mailing list of more than 70 addresses consisting of organizations, the faith community, service providers; Oxnard Wilson Senior Center-Special Population Services for persons with disabilities, Oxnard Housing Authority, Multi Service Center-Resident Services in Oxnard Colonia neighborhood, Oxnard Senior Centers and cities within Ventura County were provided a copy of the public hearing in English and Spanish. The public hearing notices in English and Spanish were included in the Neighborhood News packets which were distributed weekly for a month prior to the public meeting to approximately 231 Oxnard residents. The public hearing notice was published in the Vida newspaper in English and Spanish, posted on City website, broadcasted on the public viewing TV Channels 10/35 and posted in public buildings such as the Main Library, City Clerk's Office and Housing Department Administration building in English and Spanish. The public comment period started February 13, 2020 and ended on March 17, 2020. During the public comment period there were no written public comments submitted and no public comments were received during the public hearing.
Pursuant to Governor Newsom’s Executive Order N-25-20, members of the City Council or staff may participate in this meeting via a teleconference.
Due to social distancing measures, the Oxnard Council Chambers only accommodated seating for up to 15 members of the public. Overflow areas were located at the Oxnard Human Resource Activity Room and Oxnard Public Library Meeting Room B with social distancing seating arrangements. The overflow areas were located across the street from the Oxnard Council Chambers. Oxnard residents were encouraged to participate remotely by viewing the meeting on the City's website at oxnard.org, broadcasted on Spectrum Channel 10 and Frontier Channel 35, or the city's YouTube Channel at youtube.com/oxnardnews. Oxnard residents were encouraged to submit comments via email before 3 p.m. to [email protected] and the comments will be provided to the City Council.
Second public hearing –June 16, 2020 (1) to provide the opportunity to the public to comment on the projects recommended for funding as submitted by the Grant Application Review Panel for FY 2020-21 AAP; and (2) to receive recommendations and direction from City Council regarding the FY 2020-21 AAP grant funding. The notices of the public hearing were mailed to more than 70 addresses consisting of organizations, the faith community, service providers; Oxnard Senior Center-Special Population Services for persons with disabilities, Oxnard Housing Authority, Multi Service Center-Oxnard Colonia neighborhood and cities within Ventura County. The public hearing notices in English and Spanish were included in the Neighborhood News packets which were distributed weekly prior to the Hearing to approximately 231 Oxnard residents. The public hearing notice was advertised in the Vida newspaper, posted on the City website, broadcasted on the public viewing TV channel 10/35 and posted in public buildings such as the Main Library, City Clerk's Office and Housing Department Administration building in English and Spanish. Vida published the notice of hearing in English and Spanish on Thursday, May 14, 2020. The public review and written comment period began on May 14, 2020 and concluded on June 16, 2020. During the public comment period there were no written public comments submitted and two (2) public comments were received during the public hearing. 740
Annual Action Plan CARES Act Amendment
2020
8 2020 Annual Action Plan CARES Amendment is scheduled public hearing: October 6, 2020:
Public hearing will be conducted to provide the opportunity to the public to comment on CARES Act CDBG-CV and ESG-CV funds the 2020 Annual Action Plan. The public hearing notice was advertised in the Ventura County Vida newspaper, posted on City website, broadcasted on the public viewing TV channel 10/35 in English and Spanish. Vida published the notice of public hearing in English and Spanish on September 17, 2020. The public review and written comment period began on September 20, 2020 and concluded on October 6, 2020.
5. Summary of public comments
This could be a brief narrative summary or reference an attached document from the Citizen Participation section of the Con Plan.
First Public Hearing: March 17, 2020
During the first Public Hearing, there were no oral comments submitted. In addition, no written comments were submitted during the public comment period.
Second Public Hearing: June 16, 2020
During the second Public Hearing, the oral comments were received from two (2) Oxnard Residents: (1) Resident stated workers are being paid minimum wage through CDBG and is not in line with City Policy Living Wage ordinance; (2) Resident stated emphasized affirmatively furthering fair housing law and asked for an analysis of Code Enforcement. Also stated she was involved in a code enforcement case with a client. In addition, no written comments were submitted during the public comment period. 2020 Annual Action Plan CARES Act Amendment- First Public Hearing: October 6, 2020 Public comments will be updated after public hearing.
6. Summary of comments or views not accepted and the reasons for not accepting them All written and oral public comments have been accepted.
7. Summary
The City is committed to provide funds that serve the most disadvantaged residents while following HUD’s directives. The City increased awareness of the Annual Action Plan’s public review activities and process by providing the public notice in various ways.
The City sent notices of the public hearing to more than 70 addresses consisting of organizations, the 741
Annual Action Plan CARES Act Amendment
2020
9 faith community, service providers and cities within Ventura County. The public hearing notices in English and Spanish were included in the Neighborhood News packets which were distributed weekly prior to the Hearing to approximately 231 Oxnard residents and broadcasted on the public viewing TV channel 10/35.
The Public Hearings are in compliance with the Americans with Disabilities Act. If the public requires special assistance to participate in a meeting, the individual would contact the City Clerk’s Office. Notice at least 72 hours prior to the meeting will enable the City to reasonably arrange for persons accessibility to the meeting. This notation is included on all city Agenda’s. 742
Annual Action Plan CARES Act Amendment
2020
10 PR-05 Lead & Responsible Agencies – 91.200(b)
1. Agency/entity responsible for preparing/administering the Consolidated Plan Describe the agency/entity responsible for preparing the Consolidated Plan and those responsible for administration of each grant program and funding source.
Agency Role Name Department/Agency
Lead Agency OXNARD
CDBG Administrator OXNARD Housing Department
HOPWA Administrator
HOME Administrator OXNARD Housing Department
ESG Administrator OXNARD Housing Department
HOPWA-C Administrator
Table 1 – Responsible Agencies
Narrative (optional)
The City of Oxnard has designated the Housing Department’s Grants Management Division to develop the Annual Action Plan, the Comprehensive Annual Performance and Evaluation Report, and the Regional Consolidated Plan. The Housing Department‘s Grant Management Division will also act as grants management of several public and private agencies that will implement and administer programs and activities under the Plan.
Consolidated Plan Public Contact Information
City of Oxnard
Housing Department
435 South D Street Oxnard CA 93030
Phone: (805) 385-8096
E-mail: [email protected]
743
Annual Action Plan CARES Act Amendment
2020
11 744
Annual Action Plan CARES Act Amendment
2020
12 AP-10 Consultation – 91.100, 91.200(b), 91.215(l)
1. Introduction
Federal regulations require that a participating jurisdiction consult extensively with community service providers, other jurisdictions and other entities with a potential interest in or knowledge of that jurisdiction's housing and non-housing community development issues. Staff have developed and followed a detailed schedule which provides for and encourages citizen participation emphasizing the participation of persons of low- and moderate-income
The regional consolidated plan and the annual action plan represent a comprehensive planning effort mainly led by Housing Department-Grants Management Division staff, with involvement of (1) local government experts; (2) the social service community; (3) residents; and, (4) consultation with other local HUD entitlement communities. The following items are examples of the consultations efforts:
• Grants Management Division staff work closely with other City staff members such as:
Affordable Housing and Rehabilitation; Homeless Assistance Program; Development Services; Utilities; Treasury; Oxnard Housing Authority; Community Development Services; Code Compliance; Geographical Information System; Recreation and Community Services; and Finance to ensure that careful consideration is given to the City's identified needs, and that programs and services are cost-effective and meet specific goals and objectives in order to develop and implement the Regional ConPlan and the AAP. • City staff members in the Department and/or Divisions; Affordable Housing and Rehabilitation, Homeless Assistance Program, Development Services, Utilities, Treasury, Oxnard Housing Authority, Community Development Services, Code Compliance, Geographical Information System, Recreation and Community Services and Finance provide supportive services as needed to accomplish ConPlan development efforts, • Housing staff during the fiscal year cycle continue to provide HUD program workshops to social service agencies and the opportunities for the residents to participate in the public hearings, • The process of preparing a Joint Assessment of Fair Housing (AFH) for the City of Oxnard and the Oxnard Housing Authority, which had been due on October 4, 2020, has been modified due to a change in the HUD regulations. The AFH has been replaced with a requirement to produce an Analysis of Impediments to Fair Housing (AI). In January of 2019, the City and the County of Ventura agreed to collaborate on the production of the AI, which will be due in May of 2020. Through 2019-20, staff will be engaged in the necessary community outreach and participation, and collaboration with the County of Ventura, in order to produce the AI for public review and comment in accordance with the HUD guidelines. The draft Regional AI was published in January 2020, and was adopted on June 16, 2020 by the Oxnard City Council, following the required public hearings and public comment period. 745
Annual Action Plan CARES Act Amendment
2020
13 Provide a concise summary of the jurisdiction’s activities to enhance coordination between public and assisted housing providers and private and governmental health, mental health and service agencies (91.215(l))
The City consulted with the agencies/organizations while preparing the AAP, through public hearings, workshops, forum meetings, and training sessions (individuals and group discussions):
• The City of Oxnard City Council conducted two (2) public hearings, on 3/17/2020 and 6/16/2020, as prescribed in the Citizen Participation Plan.
A community Fair Housing workshop, free to the public, was conducted at the Oxnard Public Library in November of 2019, and a second is scheduled for May of 2020.
Frequent consultations with representatives of Oxnard's three certified CHDOs (Cabrillo Economic Development Corporation, Habitat for Humanity, and Many Mansions) were held throughout the year;
Attended the regional Continuum of Care (CoC) meetings to discuss the application, homeless needs and program directions and strategies;
The City of Oxnard Commission on Homelessness conducted 7 meetings in 2019-20, and plans to conduct two more prior to June 30, 2020. Since January of 2018, the Commission has adopted resolutions which presented a total of fifteen (15) policy recommendations to City Council. On September 10, 2018, the Commission formally approved submission of a Five-Year Homeless Plan with recommendation that it be adopted by the Oxnard City Council; Homeless Services staff worked in partnership with the County of Ventura and the City of Ventura to establish a Shelter Committee for developing two permanent emergency shelters in West Ventura County;
The City of Oxnard has executed an agreement with Mercy House for the full time operation of the Oxnard Navigation Center, which is a 110-bed overnight shelter; Assisted the Point-in-Time count of the homeless persons in Ventura County and especially in Oxnard on January 29, 2020 resulted in a final count of 379 unsheltered homeless individuals.
This is an increase of 76 individuals counted from last year; Homeless Services staff successfully submitted a state Homeless Emergency Aid Program grant awarding the City of Oxnard 1.5 million dollars for shelter capital and direct human services; Requested representation for the Grants Application Review Panel from Inter Neighborhood Council Organization executive board members and Neighborhood Council chairpersons.
Describe coordination with the Continuum of Care and efforts to address the needs of homeless persons (particularly chronically homeless individuals and families, families with children, veterans, and unaccompanied youth) and persons at risk of homelessness.
The Ventura County Continuum of Care Alliance (CoC) is a regional consortium covering all communities in Ventura County. The CoC is a collaborative group dedicated to promoting a safe, desirable and thriving community by ending homelessness in Ventura County. The CoC is comprised of a Board of 746
Annual Action Plan CARES Act Amendment
2020
14 Directors and five sub committees (Homeless Management Information System (HMIS) Steering Committee, Data Performance and Evaluation, Public Information and Outreach, Coordinated Intake, and Housing Service and Coordination). Within these standing committees and the CoC body, are representatives from local housing authorities, homeless service providers, homeless health care, mental health, veterans' services, law enforcement, education, local homeless task forces, business leaders and city/county government representatives.
The coordination of housing assistance and services for homeless persons continues to be implemented through a broad range of public and private funding and service providers that reach: chronically homeless individuals and families with children, veterans, unaccompanied youth, the recently homeless and those at risk of becoming homeless. City staff participate as well on the City's Affordable Housing Team, OHA, the Homeless Committee, which is comprised of the Mayor Pro Tem and another City Council member. Other entities involved in the development of policy and implementation of the provision of services include the City Council-appointed Commission on Homelessness, regional bodies such as the Ventura County Housing and Homeless Coalition, the South Coast Collaborative Regional HMIS implementation committee, the Southern California Regional CoC Collaborative, and the Ventura County CoC Alliance. The City's Housing Department also oversees the Fair Housing Program. An example of how the City directly provides funding and staff support to coordinate housing assistance include such interventions as a City Police Department implemented program that combines a ride along case manager with officers patrolling areas frequented by chronically homeless and recently homeless individuals and families allows for immediate needs assessments and referrals to appropriate agencies.
Describe consultation with the Continuum(s) of Care that serves the jurisdiction's area in determining how to allocate ESG funds, develop performance standards for and evaluate outcomes of projects and activities assisted by ESG funds, and develop funding, policies and procedures for the operation and administration of HMIS The CoC's Data Performance and Evaluation Sub Committee is tasked with establishing performance measures and new policies and procedures for all homeless grant funds and activities. The HMIS Steering Committee is tasked with developing the policies and procedures that govern HMIS, which is administered by the County of Ventura.
City staff continue to work with the CoC to develop performance standards for and evaluation of outcomes for ESG-funded projects and activities. Through participation on regional sub-committees staff also continue to inform HMIS policies, procedures, operations and administration. 747
Annual Action Plan CARES Act Amendment
2020
15 2. Describe Agencies, groups, organizations and others who participated in the process and describe the jurisdiction’s consultations with housing, social service agencies and other entities
748
Annual Action Plan CARES Act Amendment
2020
16 Table 2 – Agencies, groups, organizations who participated 1 Agency/Group/Organization CITY OF OXNARD
Agency/Group/Organization Type PHA
Services - Housing
Services-homeless
Service-Fair Housing
Grantee Department
What section of the Plan was addressed by
Consultation?
Housing Need Assessment
Public Housing Needs
Homeless Needs - Chronically homeless
Homeless Needs - Families with children
Homelessness Needs - Veterans
Homelessness Needs - Unaccompanied youth
Homelessness Strategy
Non-Homeless Special Needs
Market Analysis
Economic Development
Anti-poverty Strategy
Lead-based Paint Strategy
Briefly describe how the Agency/Group/Organization
was consulted. What are the anticipated outcomes of
the consultation or areas for improved coordination?
The City of Oxnard Public Housing Authority and the Affordable Housing Division are under the direction of the Housing Director of the City of Oxnard, as is the Grants Management Division. A bi-monthly management meeting was held for all Housing staff, including OHA staff. The topics were comprehensive and specific with detailed instructions on handling the issues which can be related to housing, homelessness and/or community partnership. Because the OHA is a component unit of the City and a Division of the City Housing Department, coordination occurs on a daily basis.
749
Annual Action Plan CARES Act Amendment
2020
17 2 Agency/Group/Organization Turning Point Foundation Agency/Group/Organization Type Services-homeless
What section of the Plan was addressed by
Consultation?
Homeless Needs - Chronically homeless
Briefly describe how the Agency/Group/Organization
was consulted. What are the anticipated outcomes of
the consultation or areas for improved coordination?
The outreach for the mentally ill homeless will be handled within the City and referrals will be made to the Turning Point shelter.
3 Agency/Group/Organization MERCY HOUSE
Agency/Group/Organization Type Services-homeless
What section of the Plan was addressed by
Consultation?
Homeless Needs - Chronically homeless
Briefly describe how the Agency/Group/Organization
was consulted. What are the anticipated outcomes of
the consultation or areas for improved coordination?
Discussed outreach, case management and homeless services provided by Mercy House to support overnight shelter for the homeless. 4 Agency/Group/Organization Habitat for Humanity of Ventura County Agency/Group/Organization Type Non-Profit CHDO
What section of the Plan was addressed by
Consultation?
Housing Need Assessment
Briefly describe how the Agency/Group/Organization
was consulted. What are the anticipated outcomes of
the consultation or areas for improved coordination?
Habitat for Humanity completed construction of 6 single family homes for sale to low income families, located at First and Hayes last fiscal year with the use of HOME and In-Lieu funds. During the current fiscal year Habitat for Humanity requested a HOME program funding application for development of a new project. However, Habitat for Humanity has not provided further details on the proposed project or submitted an application yet.
750
Annual Action Plan CARES Act Amendment
2020
18 5 Agency/Group/Organization Many Mansions
Agency/Group/Organization Type Non-Profit CHDO
What section of the Plan was addressed by
Consultation?
Housing Need Assessment
Market Analysis
Briefly describe how the Agency/Group/Organization
was consulted. What are the anticipated outcomes of
the consultation or areas for improved coordination?
Many Mansions received HOME and affordable housing in-lieu funds to construct 5 HOME units and 2 in-lieu units in a 40-unit rental development for low income veterans and families. The development completed construction in August 2019. Many Mansions is in the process of preparing an Oxnard HOME Program funding application for two new development projects in Downtown Oxnard that will produce a total of 175 affordable housing units. 6 Agency/Group/Organization Cabrillo Economic Development Corporation Agency/Group/Organization Type Non-Profit CHDO
What section of the Plan was addressed by
Consultation?
Housing Need Assessment
Briefly describe how the Agency/Group/Organization
was consulted. What are the anticipated outcomes of
the consultation or areas for improved coordination?
Cabrillo applied for HOME CHDO development assistance funds to construct 42- rental units for farmworker families, located at the corner of Pleasant Valley Road and Etting Road, Oxnard, CA 93033. The Housing Department has issued a conditional letter of approval to Cabrillo, final commitment of HOME funds will occur after Cabrillo has secured all other funding sources and meet all HOME funding requirements.
7 Agency/Group/Organization THE KINGDOM CENTER
Agency/Group/Organization Type Services - Housing
Services-Children
Services-Victims of Domestic Violence
Services-homeless
751
Annual Action Plan CARES Act Amendment
2020
19 What section of the Plan was addressed by
Consultation?
ADA compliance and resource development
Briefly describe how the Agency/Group/Organization
was consulted. What are the anticipated outcomes of
the consultation or areas for improved coordination?
The Kingdom Center was toured by staff and determined areas of the facility that could be upgraded, enhanced and modified to promote greater access for persons with disabilities. In 2019, ADA improvements through an architectural design and development contract was completed. The contract was amended for the next phase of ADA construction costs.
8 Agency/Group/Organization County of Ventura Human Services Agency Agency/Group/Organization Type Services-homeless
Services-Health
Other government - County
What section of the Plan was addressed by
Consultation?
Homeless Needs - Chronically homeless
Homeless Needs - Families with children
Homelessness Needs - Veterans
Homelessness Needs - Unaccompanied youth
Lead-based Paint Strategy
752
Annual Action Plan CARES Act Amendment
2020
20 Briefly describe how the Agency/Group/Organization
was consulted. What are the anticipated outcomes of
the consultation or areas for improved coordination?
Planning, coordination and implementation of Homeless Point in Time count; count was conducted on January 29, 2020 resulted in a final count of 567 unsheltered homeless individuals in the City of Oxnard. This is an increase of 19 individuals counted from last year. The City conferred with the Ventura county Public Health Department regarding addresses of housing units wherein children have been identified as lead-poisoned in the City of Oxnard. Prior to implementation of the 2018 Annual Action Plan, the City will receive a list of addresses if such a list exists. Any rehabilitation activities on housing units constructed prior to 1978 will have lead hazards identified and actions taken to remove the hazard. The City's Affordable Housing Division does not own or manage any housing units. All units for which HOME and CDBG assistance is provided for homebuyer assistance or homeowner rehabilitation are administered in compliance with HUD's HOME or CDBG regulations for leadbased paint, as applicable inspections requirements. With respect to units owned or assisted by the Oxnard Housing Authority, there have been no cases of Public Housing tenants and/or Section 8 participant households reporting or having been discovered to have poisoned children or any child with "Environmental Intervention Blood Lead Level"(EBLL). OHA staff provides a brochure related to lead based paint hazards to all new program participants and tenants. Maintenance staff attends training and seminars to stay current with the State of California Lead Awareness Training requirements. 9 Agency/Group/Organization Housing Rights Center
Agency/Group/Organization Type Service-Fair Housing
What section of the Plan was addressed by
Consultation?
Fair Housing, Discrimination
753
Annual Action Plan CARES Act Amendment
2020
21 Briefly describe how the Agency/Group/Organization
was consulted. What are the anticipated outcomes of
the consultation or areas for improved coordination?
The City contracts with a professional fair housing service provider, the Housing Rights Center (HRC). The HRC provides fair housing counseling, discrimination complaint investigation, complaint processing, and dispute resolutions services for Oxnard tenants, home seekers, and housing providers. In addition, twice every year the HRC staff provides free fair housing training seminars for the public, along with an bi-annual training presented to the staff of the Oxnard Housing Authority and city housing staff on their fair housing obligations and responsibilities.
10 Agency/Group/Organization City of Oxnard
Agency/Group/Organization Type Other government - Local Grantee Department
What section of the Plan was addressed by
Consultation?
Broadband Internet
Briefly describe how the Agency/Group/Organization
was consulted. What are the anticipated outcomes of
the consultation or areas for improved coordination?
The Citys Information Technology Department is planning to expand internet usage and bandwidth capacity by upgrading to high speed fiber optic network communications technology to improve the Oxnard low to moderate income community residents, by working with developers of new affordable housing developments, contractors providing improvements to City facilities, parks and recreation facilities.
Identify any Agency Types not consulted and provide rationale for not consulting Not Applicable
754
Annual Action Plan CARES Act Amendment
2020
22 Other local/regional/state/federal planning efforts considered when preparing the Plan Name of Plan Lead Organization How do the goals of your Strategic Plan overlap with the goals of each plan? Continuum of
Care
Ventura County CEO's
Office
The goals of the Strategic Plan overlap with the goals of each plan by ensuring homeless persons have access to adequate services to help reduce the incidence of homelessness.
Oxnard Housing
Authority Agency
Plan
Oxnard Housing
Authority
OHA Plan presents the program procedures related to Public Housing and Section 8 housing units, which overlaps with the AAP for delivering and providing affordable housing units to Oxnard residents. OHA is currently administering 15 set aside homeless preference vouchers per fiscal year, and 67 VASH vouchers
City of Oxnard
Housing Element
State of California
Housing and Community
Development (HCD)
HCD approves the City's Housing Element. The City's updated Housing Element indicates that as of March 2017, 2,497 of 4,199 affordable housing units remain to be built as indicated on the Southern California Association of Governments (SCAG) and Regional Housing Needs Allocation (RHNA)
Regional Housing
Needs Allocation
(RHNA)
Southern California
Association of
Governments (SCAG)
SCAG RHNA sets the low and moderate income housing needs allocations for the City as City is within the SCAG boundaries. The City's Housing element relies on the allocations by SCAG to develop local affordable housing needs. The 2014-2021 SCAG RHNA determined that 4,199 affordable housing units would be required in the City of Oxnard from 2014-2021. The updated Housing Element indicates that as of March 2017, 2,497 affordable housing units remain to be built
Table 3 – Other local / regional / federal planning efforts Narrative (optional)
Implementation of the 2020 Action Plan requires coordination and compliance with the local and regional needs established by the City of Oxnard, County of Ventura, Southern California Council of Governments and the State of California.
The Southern California Association of Governments (SCAG), the nation’s largest metropolitan planning organization (MPO), representing six counties, 191 cities and more than 18 million residents in Southern California, is mandated by federal and state law to research and draw up plans for transportation, growth management, hazardous waste management and air quality. SCAG undertakes a variety of planning and policy initiatives that regulate housing development.
755
Annual Action Plan CARES Act Amendment
2020
23 One of these planning tools is the Regional Housing Needs Allocation (RHNA), it establishes the need for affordable housing development in cities and counties within its region.
City of Oxnard’s general plan contains a housing element that makes “adequate provision for the existing and projected housing needs of all economic segments of the community.” The housing element must be revised and updated every eight years after 2010 due to SB 375. A community is not obligated to actually provide housing to all in need but the Regional Housing Needs Allocation (RHNA) is a “distribution of housing development capacity” that each city and county must zone for in a planning period. It is not a “construction need allocation,” and is integral to the development of a Sustainable Community Strategy. The housing element is a planning document, requiring the City to plan for meeting its “fair share” of regional housing market need. The RHNA will set local housing and land use capacity goals to support future growth, including transit oriented, mixed use and infill development.
The time frame during which housing accomplishments towards the Regional Housing Needs Allocation (RHNA) can be counted (RHNA cycle) is January 1, 2014 through October 31, 2021. The City seeks to conserve and rehabilitate existing housing as well as provide opportunities for new development. The 2014-2021 SCAG RHNA determined that 4,199 affordable housing units would be required in the City of Oxnard. The City’s updated Housing Element indicates that as of March 2017, 2,497 affordable housing units remain to be built.
The City Housing Department’s mission is to promote the general welfare of the City by remedying unsafe and substandard housing, and by relieving the shortage of affordable housing for City residents. This mission is consistent with the City’s General Plan and laws governing our housing funds and resources. The purpose of the Housing Department is to provide decent, safe, attractive, sanitary, and well maintained housing for eligible low and very low income families in a manner that promotes commitment, exemplary customer service, economy, efficiency, and the social well-being of the residents.
All City housing projects undertaken with federal funds from HUD or other state or federal funding source must comply with the requirements of the City’s Housing Element, General Plan, SCAG, State of California Housing and Community Development Department (HCD) and HUD. 756
Annual Action Plan CARES Act Amendment
2020
24 AP-12 Participation – 91.105, 91.200(c)
1. Summary of citizen participation process/Efforts made to broaden citizen participation Summarize citizen participation process and how it impacted goal-setting The City of Oxnard follows the guidance established in the Oxnard Citizen Participation Plan (OCPP) approved on July 10, 2018, which updates the local procedures pursuant to the requirements of Title 24, CFR Section 91.105(a).
The Oxnard Citizen Participation Plan sets forth the procedures for the development of the annual action plan, the consolidated plan, and any substantial amendments to these plans, as well as procedures for the preparation of the comprehensive annual performance and evaluation and the assessment of fair housing. (See Appendix 1.)
The City of Oxnard encourages citizen participation by consulting with citizens, public service organizations, City staff and allows public comments and public input throughout the development process of the plans addressed in the citizen participation plan. City of Oxnard provides assistance to citizens that are unable to speak English, minorities and those with disabilities to participate in the process of developing the plans addressed in the citizen participation plan. The 2020 AAP was developed in conjunction with residents and organizations through a public participation process that included workshops and public hearings conducted by City staff:
1) Two public hearings before City of Oxnard City Council where citizen's public comments were allowed are required by the citizen participation plan;
2) Four community meetings were conducted to gather input from the residents on the community needs and two workshops for CDBG, HOME and HESG programs conducted by Housing Department staff, followed up by multiple consultations, as well as, providing technical assistance to the community and agencies (service providers) through emails, phone conversations, and meeting; the community meeting were held on 1/22/20, 2/6/20, 2/26/20 and 3/5/20 during the evening; locations were Oxnard Main Public Library, South Oxnard Center, Wilson Senior Center, and Community Room at Terraza De Las Cortes in the La Colonia neighborhood; the workshops were held on 1/22/20 and 2/20/20 during the day at the Oxnard Main Public Library;
3) All applications for funding were reviewed by Housing - Grants Management staff for eligibility and grants compliance and then forwarded to the Review Panel, which consisted a member from the citizen advisory group; 757
Annual Action Plan CARES Act Amendment
2020
25 4) Meetings were conducted by Housing – Grant management staff for sub-recipients awardees; 5) Other workshops and meetings were handled by Affordable Housing staff and Fair Housing staff; 6) Meetings attended and participated by Homeless Assistance Program staff related to CoC and Emergency Solutions Grant; 7) Meetings with other Community Consortium groups throughout the year; Meeting dates Commission on Homelessness attended by Housing Department staff: August 5, 2019; October 7, 2019; November 4, 2019; December 2, 2019; January 6, 2020; February 3, 2020; and March 2, 2020. Meetings are scheduled for June 1, 2020.
8) 2020 Annual Action Plan CARES Act Amendment Public Hearing before City of Oxnard City Council where citizen's public comments were allowed are required by the citizen participation plan. 758
Annual Action Plan CARES Act Amendment
2020
26 Citizen Participation Outreach
Sort Ord
er
Mode of Outrea
ch
Target of Outrea
ch
Summary of
response/attenda
nce
Summary of
comments receiv
ed
Summary of comme
nts not accepted
and reasons
URL (If applicable)
1 Public Hearing
Minorities
Non-English
Speaking -
Specify other
language:
Spanish
Persons with
disabilities
Nontargeted/broad
community
Residents of
Public and
Assisted Housing
Low/mod
income Oxnard
Residents
3/17/20 Published
in English and
Spanish Notice of
1st Public Hearing
notice in VIDA
newspaper;
English and
Spanish versions of
Notices were
broadcasted on
Public Channel
10/35, Public
Notices regarding
Public Hearings
sent out to Oxnard
Residents for first
Public Hearing, 65
notices mailed out,
and Notices were
posted on the City
of Oxnard website
both in Spanish
and English.
1st Public
Hearing
comment - no
oral or written
comments
submitted
All comments
accepted
759
Annual Action Plan CARES Act Amendment
2020
27 Sort Ord
er
Mode of Outrea
ch
Target of Outrea
ch
Summary of
response/attenda
nce
Summary of
comments receiv
ed
Summary of comme
nts not accepted
and reasons
URL (If applicable)
2 Entitlement
Grant
Community
Meetings &
Workshops
Minorities
Non-English
Speaking -
Specify other
language:
Spanish
Persons with
disabilities
Nontargeted/broad
community
Residents of
Public and
Assisted Housing
Interested
parties/applicati
on for grant
funds
20 people
attended the
Community
Meeting &
Workshop for
CDBG, HOME and
HESG
Comments were
need rental
assistance &
affordable
apartments;
need homeless
assistance in
community;
need services
and programs for
seniors; need
recreation
services for
youth. Several
questions were
raised: What
affordable
housing projects
in city?; What
are the current
income limits?;
How do i find the
census tract for
my project?
All comments
accepted
NA
760
Annual Action Plan CARES Act Amendment
2020
28 Sort Ord
er
Mode of Outrea
ch
Target of Outrea
ch
Summary of
response/attenda
nce
Summary of
comments receiv
ed
Summary of comme
nts not accepted
and reasons
URL (If applicable)
3 Resident Survey
Minorities
Non-English
Speaking -
Specify other
language:
Spanish
Persons with
disabilities
Nontargeted/broad
community
Residents of
Public and
Assisted Housing
11 people
submitted
Resident survey to
provide need in
the community.
Survey provided in
English & Spanish.
Comments are
need affordable
housing for
rental and
purchase,
expanded
resources to
address
homelessness
and economic
development;
increase public
service; provide
homeless
services/homeles
s liaison for high
school age
students; fix
sidewalks; grants
for homeowner
yards; childcare
services;
homeownership
assistance
All comments
accepted
NA
761
Annual Action Plan CARES Act Amendment
2020
29 4 Public Hearing
Minorities
Non-English
Speaking -
Specify other
language:
Spanish
Persons with
disabilities
Non-
targeted/broad
community
Residents of
Public and
Assisted Housing
Low/mod
income Oxnard
residents
5/14/20 Published
in English and
Spanish Notice of
2nd Public Hearing
in VIDA
newspaper;
English and
Spanish versions of
Notices were
broadcasted on
Public Channel
10/35, Public
Notices regarding
Public Hearings
sent out to Oxnard
Residents for first
Public Hearing, 65
notices mailed out,
and Notices were
posted on the City
of Oxnard website
both in Spanish
and English.
2nd Public
Hearing
comments - (2)
Oxnard
Residents: (1)
Resident stated
workers are
being paid
minimum wage
through CDBG
and is not in line
with City Policy
Living Wage
ordinance; (2)
Resident stated
emphasized
affirmatively
furthering fair
housing law and
asked for an
analysis of Code
Enforcement.
Also, stated she
was involved in a
code
enforcement
case with a
client.
All comments
accepted
NA
762
Annual Action Plan CARES Act Amendment
2020
30 Sort Ord
er
Mode of Outrea
ch
Target of Outrea
ch
Summary of
response/attenda
nce
Summary of
comments receiv
ed
Summary of comme
nts not accepted
and reasons
URL (If applicable)
5 Program
Coordinating
Committee
meetings
Minorities
Non-English
Speaking -
Specify other
language:
Spanish,
Mixteco
Persons with
disabilities
Nontargeted/broad
community
Residents of
Public and
Assisted Housing
Cross-section of
community
General meeting
of community nonprofits that serve
various segments
of the community
Round table
discussion- No
Comments
Received
No Comments
Received
NA
6 Internet
Outreach
Nontargeted/broad
community
Not Measured
No Comments
Received
No Comments
Received
https://www.oxnard.org/
citydepartment/housing/gra
nts-management/
763
Annual Action Plan CARES Act Amendment
2020
31 Sort Ord
er
Mode of Outrea
ch
Target of Outrea
ch
Summary of
response/attenda
nce
Summary of
comments receiv
ed
Summary of comme
nts not accepted
and reasons
URL (If applicable)
7 Public Hearing
Minorities
Non-English
Speaking -
Specify other
language:
Spanish
Persons with
disabilities
Nontargeted/broad
community
Residents of
Public and
Assisted Housing
Low/mod
income Oxnard
Residents
10/6/20 Public
Hearing will be
conducted before
the City Council to
adopt a
Substantial
Amendment to the
2020-21 Annual
Action Plan.
9/17/2020
Published Notice
of 1st Public
Hearing in VIDA in
English & Spanish;
English and
Spanish versions of
Notices were
broadcasted on
Public Channel
10/35; and Notices
were posted on
the City of Oxnard
website both in
Spanish and
English.
Comments to be
updated after
public hearing
Updated will occur
after the Public
Hearing
NA
764
Annual Action Plan CARES Act Amendment
2020
32 Sort Ord
er
Mode of Outrea
ch
Target of Outrea
ch
Summary of
response/attenda
nce
Summary of
comments receiv
ed
Summary of comme
nts not accepted
and reasons
URL (If applicable)
8 Internet
Outreach
Nontargeted/broad
community
A draft of the 2020
Annual Action Plan
CARES Act
Amendment was
made available for
public review on
the City website
from September
20, 2020 through
October 6, 2020.
Comments to be
updated after
the Public
Hearing.
Updated will occur
after the Public
Hearing
https://www.oxnard.org/
citydepartment/housing/gra
nts-management/
Table 4 – Citizen Participation Outreach
765
Annual Action Plan CARES Act Amendment
2020
33 Expected Resources
AP-15 Expected Resources – 91.220(c)(1,2)
Introduction
In Plan year 2020, the formula grant calculations of HUD allocations to City of Oxnard are CDBG $2,574,388, HOME $776,134 and HESG $221,083, a total of $3,571,065 in entitlement grants from HUD. In addition, estimated program income of $100,000 for CDBG programs and $100,000 for HOME programs. This will increase total available resources from the 2020 Plan year to $3,771,605. The source of program income comes principally from repayment of loans and recaptures from defaults. Those funds will be used towards meeting the goals and objectives of the 2020 AAP.
CDBG funds will leverage city funds and subrecipients funded with CA state grants, private foundations and contributions from individuals, corporations and private foundations that provide services and public facilities to low/moderate income residents of City of Oxnard. HOME affordable housing loans for down payment assistance or rehabilitation will leverage affordable housing loan programs, funded by State of CA, such as BEGIN and CAL-HOME. HOME development financing assistance will leverage development funds from State of CA, developer equity, private financing, and tax credit financing. HESG grant funds leverage subrecipents' funds from donations from individuals, corporations and private foundations, which support non-profit agencies sub-recipients and in the case of government HESG contractors, City of Oxnard funding from CA a state grant source and General Funds are two sources of matching funds.
Although not in the Priority Table below, additional resources for 2020 also include leverage and match funds by the HOME and HESG projects.
Those are described in AP-10 agencies listed, AP-15 Introduction, AP-20, Narrative of Goal 7, Reduce Homelessness and AP-55 Introduction.
The Substantial Amendment of October 6, 2020, includes additional funding for the CDBG-CV and ESG-CV grant, to be used to prevent, prepare for, and respond to coronavirus. The City of Oxnard CARES Act grant allocations total $8,343,372; Community Development Block Grants (CDBGCV) will be $3,088,367 and Emergency Solutions Grants (ESG-CV) will be $5,255,005. In addition, the ESG-CV amount of $651,589 is unallocated and will be utilized for ESG eligible activities.
For the ESG-CV remaining balance of $651,589 the city is working in partnership with Ventura County to develop a COVID Response Coordinated 766
Annual Action Plan CARES Act Amendment
2020
34 Investment Plan (CIP). The CIP is being developed throughout a 5 week intensive workshop led by external facilitators. Upon completion of the course, the city in coordination with the county will use the CIP report and begin implementation.
Anticipated Resources
Program Source
of
Funds
Uses of Funds Expected Amount Available Year 1 Expected Amount
Available
Remainder
of ConPlan
$
Narrative Description
Annual
Allocation:
$
Program
Income:
$
Prior Year
Resources:
$
Total:
$
CDBG public -
federal
Acquisition
Admin and
Planning
Economic
Development
Housing
Public
Improvements
Public Services
2,574,388 100,000 0 2,674,388 0
2020 CDBG Allocation and Program
income is $2,674,388; the total available
resources from CDBG Plan year 2020.
Uses of the available resources will be
according to the funding priorities set
forth in the ConPlan. The specific
Activities will be setup in IDIS. The uses
of funds will be capped according to the
HUD regulations for: (1) Admin and
Planning - no more than 20%, or
$534,877, (2) Public Services up to 15%,
or $401,158. The 2020 balance will be
distributed as Public Improvements &
Other City Programs as detailed by the
City during the AAP process.
767
Annual Action Plan CARES Act Amendment
2020
35 Program Source
of
Funds
Uses of Funds Expected Amount Available Year 1 Expected Amount
Available
Remainder
of ConPlan
$
Narrative Description
Annual
Allocation:
$
Program
Income:
$
Prior Year
Resources:
$
Total:
$
HOME public -
federal
Acquisition
Homebuyer
assistance
Homeowner
rehab
Multifamily
rental new
construction
Multifamily
rental rehab
New
construction for
ownership
TBRA 776,134 100,000 0 876,134 0
In plan year 2020, HOME allocation is
$776,134 and expected program income
is $100,000; total of $876,134. Uses of
funds are; (1) Administration - no more
than 10% or $87,613 and (2) CHDO Set
Asides - at 15% or $131,420. In addition,
$675,101 is available for housing
development and homeowner loans. In
addition to the CHDO set aside of
$131,420.
768
Annual Action Plan CARES Act Amendment
2020
36 Program Source
of
Funds
Uses of Funds Expected Amount Available Year 1 Expected Amount
Available
Remainder
of ConPlan
$
Narrative Description
Annual
Allocation:
$
Program
Income:
$
Prior Year
Resources:
$
Total:
$
ESG public -
federal
Conversion and
rehab for
transitional
housing
Financial
Assistance
Overnight
shelter
Rapid re-housing
(rental
assistance)
Rental
Assistance
Services
Transitional
housing 221,083 0 0 221,083 0
Plan year 2020 Available resources for
HESG is $221,083. The limited availability
of HESG resources is spread across the
uses identified in this table. 1) HESG
Administration and Planning costs is no
more than 7.5% or $16,581 those are
included in HESG Project 2. (2)
Emergency Shelter and Street Outreach
cost is no more than 60%, or $132,649.
The 2020 balance will be distributed as
Homeless Prevention, HMIS, & Rapid ReHousing eligible activities as detailed by the City during the AAP process.
769
Annual Action Plan CARES Act Amendment
2020
37 Program Source
of
Funds
Uses of Funds Expected Amount Available Year 1 Expected Amount
Available
Remainder
of ConPlan
$
Narrative Description
Annual
Allocation:
$
Program
Income:
$
Prior Year
Resources:
$
Total:
$
Other
CDBGCV
PublicfederalPlanning and
Administration
Public Services
Economic
Development
3,088,367 0 0 3,088,367 0
CDBG-CV funds to be used to prevent,
prepare for and respond to coronavirus.
CARES Act resources for CDBG-CV total is
$3,088,367. The resources are CDBGCV1: $1,514,428 and CDBG-CV3: $ 1,573,939. The CDBG-CV resources is
spread across the uses identified in this
table, those are included in CDBG-CV
Project 13 & 14. 1) CDBG Administration
and Planning costs is no more than 20%
or $617,673 and (2) CDBG activities are
$2,470,694.
770
Annual Action Plan CARES Act Amendment
2020
38 Program Source
of
Funds
Uses of Funds Expected Amount Available Year 1 Expected Amount
Available
Remainder
of ConPlan
$
Narrative Description
Annual
Allocation:
$
Program
Income:
$
Prior Year
Resources:
$
Total:
$
OtherESG-CVPublicfederalPlanning and
Administration
Overnight
shelter
Rapid re-housing
(rental
assistance)
Street Outreach
5,255,005 0 5,255,005 0
ESG-CV funds to be used to prevent,
prepare for and respond to coronavirus.
CARES Act resources for ESG-CV total is
$5,255,005. The resources are ESG-CV1:
$ 762,355 and ESG-CV2: $ 4,492,650.
The ESG-CV resources is spread across
the uses identified in this table, those
are included in ESG-CV Project 15. 1) ESG
Administration and Planning costs is no
more than 10% or $525,500 and (2)
Emergency Shelter, Street Outreach and
Rapid Re-Housing are $4,077,916. The
ESG-CV balance of $651,589 is
unallocated and will be distributed to
ESG eligible activities.
Table 5 - Expected Resources – Priority Table
Explain how federal funds will leverage those additional resources (private, state and local funds), including a description of how matching requirements will be satisfied
CDBG funds are leveraged by city and subrecipients providers with government agency, in-kind, private foundations and contributions monies who provide services to low/moderate income persons. Affordable housing developments utilizing HOME funds typically use HOME monies to leverage millions of dollars in state, federal, and private financing. HESG funds are leveraged by non-profit agencies providers with government agency, in-kind, private foundations, Ventura County Continuum of Care monies who provide critical services such as assisted housing, services and shelter to vulnerable populations who are at-risk of becoming homelessness or homeless persons and families. HOME funds are matched at 771
Annual Action Plan CARES Act Amendment
2020
39 a greater than 25% level by recipients of HOME funds, city, and other participants. HESG funds are matched dollar for dollar by subrecipients’ providers. The city matched for Administration portion only. 772
Annual Action Plan CARES Act Amendment
2020
40 If appropriate, describe publically owned land or property located within the jurisdiction that may be used to address the needs identified in the plan The city property leased for homeless shelter at 1450 S. Rose Ave, Oxnard, CA Temporary Emergency Shelter at 351 South K Street, Oxnard, CA Oxnard Housing Authority Public Housing Sites
Discussion
The resources for 2020 AAP will accomplish more activities but will not meet all the needs prevalent throughout the city.
773
Annual Action Plan CARES Act Amendment
2020
41 Annual Goals and Objectives
AP-20 Annual Goals and Objectives
Goals Summary Information
Sort
Order
Goal Name Start
Year
End
Year
Category Geographic
Area
Needs Addressed Funding Goal Outcome Indicator
1 Improve Supply
of Affordable
Housing
2020 2024 Affordable
Housing
New Rental Housing
Housing Support
and Stability
Homeownership
Opportunities
Rehabilitation &
Preservation of
Existing Housing
Assistance for Senior
Residents
Disaster Planning
and Recovery
CDBG:
$1,030,153
HOME:
$788,521
Rental units constructed: 5
Household Housing Unit
Rental units rehabilitated: 8
Household Housing Unit
Direct Financial Assistance to
Homebuyers: 10 Households
Assisted
Housing Code
Enforcement/Foreclosed Property
Care: 2000 Household Housing
Unit
2 Enhance
Economic
Stability
2020 2024 Non-Housing
Community
Development
Increase Job Skills
Facade
Improvements
Local
Entrepreneurship
774
Annual Action Plan CARES Act Amendment
2020
42 Sort
Order
Goal Name Start
Year
End
Year
Category Geographic
Area
Needs Addressed Funding Goal Outcome Indicator
3 Increase Social
Services
2020 2024 Non-Homeless
Special Needs
Housing Support
and Stability
Assistance for Senior
Residents
Social Services
Youth Activities and
Services
Disaster Planning
and Recovery
CDBG:
$401,158
Public service activities other than
Low/Moderate Income Housing
Benefit: 2300 Persons Assisted
Public service activities for
Low/Moderate Income Housing
Benefit: 150 Households Assisted
4 Work to End
Homelessness
2020 2024 Homeless Housing Support
and Stability
Homelessness
ESG:
$221,083
Tenant-based rental assistance /
Rapid Rehousing: 15 Households
Assisted
Homeless Person Overnight
Shelter: 155 Persons Assisted
Homelessness Prevention: 20
Persons Assisted
Other: 100 Other
775
Annual Action Plan CARES Act Amendment
2020
43 Sort
Order
Goal Name Start
Year
End
Year
Category Geographic
Area
Needs Addressed Funding Goal Outcome Indicator
5 Create Quality
Neighborhoods
2020 2024 Non-Housing
Community
Development
Housing Support
and Stability
Assistance for Senior
Residents
Streets and
Streetscapes
Parks and
Community Space
Disaster Planning
and Recovery
Utilities and Public
Infrastructure
CDBG:
$708,200
Public Facility or Infrastructure
Activities other than
Low/Moderate Income Housing
Benefit: 125000 Persons Assisted
776
Annual Action Plan CARES Act Amendment
2020
44 Sort
Order
Goal Name Start
Year
End
Year
Category Geographic
Area
Needs Addressed Funding Goal Outcome Indicator
6 Effective
Administration
2020 2024 Planning and
Administration
New Rental Housing
Housing Support
and Stability
Homeownership
Opportunities
Rehabilitation &
Preservation of
Existing Housing
Assistance for Senior
Residents
Increase Job Skills
Facade
Improvements
Local
Entrepreneurship
Social Services
Youth Activities and
Services
Homelessness
Streets and
Streetscapes
Parks and
Community Space
Disaster Planning
and Recovery
Utilities and Public
Infrastructure
CDBG:
$534,877
HOME:
$87,613
Other: 0 Other
777
Annual Action Plan CARES Act Amendment
2020
45 Sort
Order
Goal Name Start
Year
End
Year
Category Geographic
Area
Needs Addressed Funding Goal Outcome Indicator
7 CDBG COVID
Pandemic
Response
2020 2022 COVID Pandemic
Response
Citywide
based on
income
(Low/Mod)
COVID-19 Impact CDBG-CV:
$3,088,367
Public Services-area benefit:
approx. 125,000 Persons Assisted
Public Services- 400 persons
assisted
Economic Development: 20
Business assisted
Rental Assistance: 500 assisted
8 ESG COVID
Pandemic
Response
2020 2022 COVID Pandemic
Response
Citywide
based on
income
(Low/Mod)
COVID-19 Impact ESG-CV:
$5,255,005
Tenant-based rental assistance /
Rapid Rehousing: 30 Households
Assisted
Homeless Person Overnight
Shelter: 350 Persons Assisted
Street Outreach/Other: 200 Other
Table 6 – Goals Summary
Goal Descriptions
1 Goal Name Improve Supply of Affordable Housing
Goal
Description
Create and preserve stable, safe, and resilient affordable housing opportunities for homeowners and renters including special needs groups such as farmworkers, persons with disabilities, and the elderly throughout Ventura County. 2 Goal Name Enhance Economic Stability
Goal
Description
Enhance economic stability and prosperity by increasing economic opportunities for residents through job skills training and promotion of local entrepreneurship.
778
Annual Action Plan CARES Act Amendment
2020
46 3 Goal Name Increase Social Services
Goal
Description
Increase access to health and wellness services, youth activities, senior activities, and social service activities for residents. 4 Goal Name Work to End Homelessness
Goal
Description
Work alongside the Ventura County Continuum of Care to end homelessness within Ventura County by providing housing, emergency shelter, and social services to homeless persons or those at risk of homelessness. 5 Goal Name Create Quality Neighborhoods
Goal
Description
Enhance access to quality, resilient, and livable neighborhoods by improving publicly owned facilities and infrastructure such as parks, streets, sidewalks, and community buildings, including improving accessibility to meet Americans with Disabilities Act (ADA) standards.
6 Goal Name Effective Administration
Goal
Description
Create and maintain effective housing and community development programs that address the priority needs listed within the Consolidated Plan, comply with all U.S. Housing and Urban Development (HUD) requirements, and achieve the goals and objectives set out by each Ventura County jurisdiction. 7 Goal Name CDBG COVID Pandemic Response
Goal
Description
Subject to the CARES Act and emergency policy from HUD, including program regulations and waivers.
CDBG-CV funds will be used to prevent, prepare for and respond to coronavirus 8 Goal Name ESG COVID Pandemic Response
Goal
Description
Subject to the CARES Act and emergency policy from HUD, including program regulations and waivers.
ESG-CV funds will be used to prevent, prepare for and respond to coronavirus 779
Annual Action Plan CARES Act Amendment
2020
47 Projects
AP-35 Projects – 91.220(d)
Introduction
These are 2020 Plan year Projects designed to accomplish the goals and objectives of the 2020 AAP. The 2020 Projects will organize Activities in IDIS under the Projects setup in this section of AAP. The Projects are New Rental Housing, Housing Support and Stability, Homeownership Opportunities, Rehabilitation and Preservation, Assistance for Senior Residents, Other Public Services, Youth Activities and Services, Homelessness, Parks and Community Space, Public Facilities and Improvements, Public Facilities -Fire Protection Equipment and Administration and Planning.
Substantial Amendment to 2020 Annual Action Plan includes three new Projects: CDBG-CV COVID Response, CDBG-CV Administration, and ESG-CV COVID Response Projects
# Project Name
1 NEW RENTAL HOUSING
2 HOUSING SUPPORT AND STABILITY
3 HOMEOWNERSHIP OPPORTUNITY
4 REHABILITATION AND PRESERVATION
5 ASSISTANCE FOR SENIOR RESIDENTS
6 OTHER PUBLIC SERVICES
7 YOUTH ACTIVITIES AND SERVICES
8 HOMELESS ASSISTANCE
9 PARKS AND COMMUNITY SPACE
10 PUBLIC FACILITIES AND IMPROVEMENTS
11 PUBLIC FACILITIES -FIRE PROTECTION EQUIPMENT
12 ADMINISTRATION
13 CDBG-CV COVID Response
14 CDBG- CV Administration
15 ESG-CV COVID Response
Table 7 - Project Information
Describe the reasons for allocation priorities and any obstacles to addressing underserved needs
The allocation priorities are based on the annual needs identified in coordination with other city departments. Public service allocations are determined by the participation from other providers to 780
Annual Action Plan CARES Act Amendment
2020
48 meet the goals of the ConPlan. HOME funds are balanced between development projects and single family housing needs. HESG allocation are targeted exclusively for the needs of the homeless population.
The October 6, 2020 Substantial Amendment adds three new Projects, all designed to prevent, prepare for, and respond to coronavirus. The specific activities are identified in AP-38 Project Summary. 781
Annual Action Plan CARES Act Amendment
2020
49 AP-38 Project Summary
Project Summary Information
782
Annual Action Plan CARES Act Amendment
2020
50 1 Project Name NEW RENTAL HOUSING
Target Area
Goals Supported Improve Supply of Affordable Housing
Needs Addressed New Rental Housing
Funding HOME: $788,521
Description PARTICIPATION IN HOUSING DEVELOPMENT FUNDING ASSISTANCE Target Date 6/30/2021
Estimate the number
and type of families
that will benefit from
the proposed
activities
5 LOW INCOME HOUSEHOLDS
Location Description CITY OF OXNARD, CALIFORNIA
Planned Activities FINANCIAL ASSISTANCE TO A COMMUNITY HOUSING DEVELOPMENT ORGANIZATION FOR THE DEVELOPMENT OF 5 HOUSING UNITS FOR LOW INCOME HOUSEHOLDS IN OXNARD. THIS PROJECT INCLUDES 15% OF HOME ALLOCATION SET ASIDE FOR CHDO'S, OR $131,420.
2 Project Name HOUSING SUPPORT AND STABILITY
Target Area
Goals Supported Improve Supply of Affordable Housing
Needs Addressed Housing Support and Stability
Funding CDBG: $200,000
Description HOUSING SERVICES
Target Date 6/30/2021
Estimate the number
and type of families
that will benefit from
the proposed
activities
5 HOUSING UNIT, 8 HOUSEHOLDS (REHABILITATION ), 10 HOUSING UNITS- HOUSING SERVICE; TOTAL OF 23 HOUSEHOLDS
Location Description VARIOUS LOCATIONS THROUGHOUT CITY OF OXNARD Planned Activities HOUSING SERVICES FOR LOW-MODERATE INCOME HOUSING
HOUSEHOLDS
Project Name HOMEOWNERSHIP OPPORTUNITY
783
Annual Action Plan CARES Act Amendment
2020
51 3 Target Area
Goals Supported Improve Supply of Affordable Housing
Needs Addressed Homeownership Opportunities
Funding CDBG: $125,000
Description HOMEOWNERSHIP ASSISTANCE
Target Date 6/30/2021
Estimate the number
and type of families
that will benefit from
the proposed
activities
10 HOUSEHOLDS ASSISTED
Location Description VARIOUS LOCATIONS THROUGHOUT CITY OF OXNARD Planned Activities HOMEOWNERSHIP ASSISTANCE FOR LOW-MODERATE INCOME
HOUSING HOUSEHOLDS
4 Project Name REHABILITATION AND PRESERVATION
Target Area
Goals Supported Improve Supply of Affordable Housing
Needs Addressed Rehabilitation & Preservation of Existing Housing Funding CDBG: $705,153
Description AFFORDABLE HOUSING RENTAL UNITS; CODE ENFORCEMENT AND
COMPLIANCE
Target Date 6/30/2021
Estimate the number
and type of families
that will benefit from
the proposed
activities
8 HOUSEHOLDS HOUISNIG UNITS
2,000 HOUSEHOLD HOUSING UNITS (CODE COMPLIANCE)
Location Description VARIOUS LOCATIONS THROUGHOUT CITY OF OXNARD Planned Activities AFFORDABLE HOUSING RENTAL UNITS FOR LOW-MODERATE INCOME HOUSEHOLDS; SUPPORT THE CODE ENFORCEMENT ACTIVITIES OF THE
CITY OF OXNARD DEVELOPMENT SERVICES TO IMPROVE QUALITY OF
LIFE AND PROPERTY ISSUES
Project Name ASSISTANCE FOR SENIOR RESIDENTS
784
Annual Action Plan CARES Act Amendment
2020
52 5 Target Area
Goals Supported Increase Social Services
Needs Addressed Assistance for Senior Residents
Funding CDBG: $47,500
Description PUBLIC SERVICES SUBJECT TO 15% CAP OF 2020 CDBG ALLOCATION AND PROGRAM INCOME. FUNDING FOR SENIOR SERVICES TO INCREASE
THE QUALITY OF LIFE
Target Date 6/30/2021
Estimate the number
and type of families
that will benefit from
the proposed
activities
300 PERSONS WILL BE ASSISTED WITH SENIOR SERVICES
Location Description CITY-WIDE
Planned Activities 1) ASSISTING WITH DAILY NEEDS FOR SENIORS BY CAREGIVERS
VOLUNTEERS ASSISTING THE ELDERLY, CITY OF OXNARD
RECREATION AT 2) PALM VISTA SENIOR CENTER
6 Project Name OTHER PUBLIC SERVICES
Target Area
Goals Supported Increase Social Services
Needs Addressed Social Services
Funding CDBG: $149,358
Description PUBLIC SERVICES SUBJECT TO 15% CAP OF 2020 CDBG ALLOCATION AND PROGRAM INCOME. FUNDING FOR FAIR HOUSING COUNSELING, HEALTH CARE SERVICES, HOMELESS SHELTER AND SERVICES.
Target Date 6/30/2021
Estimate the number
and type of families
that will benefit from
the proposed
activities
125 LOW-INCOME INDIVIDUALS WILL BE ASSISTED WITH SUBSIDIZED HEALTH CARE SERVICES, FAIR HOUSING SERVICES WILL ASSIST 150 HOUSEHOLDS, AND 150 HOMELESS INDIVIDUALS WILL BE ASSISTED WITH EMERGENCY SHELTER AND SERVICES.
Location Description VARIOUS LOCATIONS THROUGHOUT CITY OF OXNARD 785
Annual Action Plan CARES Act Amendment
2020
53 Planned Activities 1) CITY OF OXNARD FAIR HOUSING PROGRAM, 2) EMERGENCY SHELTER
FOR HOMELESS BY COUNTY OF VENTURA HUMAN SERVICES AGENCY RAIN PROGRAM, 3) HOMELESS SERVICES BY SHELTER CARE
RESOURCES, 4) SUBSIDIZED HEALTH CARE SERVICES BY LIVINGSTON
MEMORIAL VISITING NURSES ASSOCIATION
7 Project Name YOUTH ACTIVITIES AND SERVICES
Target Area
Goals Supported Increase Social Services
Needs Addressed Youth Activities and Services
Funding CDBG: $204,300
Description PUBLIC SERVICES SUBJECT TO 15% CAP OF 2020 CDBG ALLOCATION AND PROGRAM INCOME. FUNDING FOR YOUTH RECREATIONAL AND
EDUCATIONAL PROGRAMS; YOUTH FROM LOW- AND MODERATEINCOME HOUSEHOLDS.
Target Date 6/30/2021
Estimate the number
and type of families
that will benefit from
the proposed
activities
1700 YOUTH WILL BE ASSISTED WITH YOUTH SERVICES/RECREATIONAL
AND EDUCATIONAL PROGRAMS IN LOW-MOD NEIGHBORHOODS
Location Description VARIOUS LOCATIONS THROUGHOUT CITY OF OXNARD Planned Activities CITY OF OXNARD RECREATION AT 1) COLONIA GYM, 2) COLONIA BOXING GYM, 3) COLONIA RECREATION CENTER, 4) POLICE ACTIVITIES LEAGUE, 5) RECREATION ON THE GO AND 6) COLONIA LIBRARY
EDUCATIONAL PROGRAM
8 Project Name HOMELESS ASSISTANCE
Target Area
Goals Supported Work to End Homelessness
Needs Addressed Homelessness
Funding ESG: $221,083
786
Annual Action Plan CARES Act Amendment
2020
54 Description ADMINISTRATION AND PLANNING COSTS SUBJECT TO 7.5% CAP, OR $16,581. FOR HESG, HEARTH EMERGENCY SOLUTIONS GRANT FUNDS
TO PROVIDE FINANCIAL ASSISTANCE TO VARIOUS SERVICE PROVIDERS FOR EMERGENCY SHELTER AND STREET OUTREACH SUBJECT TO 60% CAP; HOMELESS PREVENTION, RAPID RE-HOUSING, AND HMIS
ACTIVITIES TO SERVE HOMELESS INDIVIDUALS AND FAMILIES, AND THOSE AT-RISK OF BECOMING HOMELESS. STREET OUTREACH AND EMERGENCY SHELTER ACTIVITIES WILL BE LIMITED TO 60% OF HESG ALLOCATION, OR $132,649. ALL HESG SUBRECIPIENTS ARE REQUIRED BY
CITY OF OXNARD TO PROVIDE MATCHING FUNDS ON A DOLLAR FOR DOLLAR MATCH REQUIREMENT FOR HESG PROGRAM. TOTAL HESG
SUBRECIPIENT MATCHING FUNDS WILL BE $221,083
Target Date 6/30/2021
Estimate the number
and type of families
that will benefit from
the proposed
activities
KINGDOM CENTER WILL PROVIDE EMERGENCY SHELTER TO 140
INDIVIDUALS; TURNING POINT WILL PROVIDE EMERGENCY SHELTER TO 15 MENTALLY-ILL PERSONS; CITY OF OXNARD HOUSING DEPARTMENT, HOMELESS DIVISION WILL PROVIDE STREET OUTREACH TO 100
INDIVIDUALS; RAPID RE-HOUSING TO 15 HOMELESS HOUSEHOLDS and HOMELESS PREVENTION ASSISTANCE TO 20 HOMELESS PERSONS
Location Description VARIOUS LOCATIONS THROUGHOUT CITY OF OXNARD Planned Activities 1) ADMINISTRATION OF HESG BY CITY OF OXNARD, 2) KINGDOM CENTER WILL PROVIDE EMERGENCY SHELTER AND , 3) EMERGENCY
SHELTER FOR MENTALLY ILL BY TURNING POINT FOUNDATION, CITY OF
OXNARD HOUSING DEPARTMENT, HOMELESS DIVISION WILL PROVIDE 4) STREET OUTREACH, 5) RAPID RE-HOUSING, AND 6) HOMELESS
PREVENTION
9 Project Name PARKS AND COMMUNITY SPACE
Target Area
Goals Supported Create Quality Neighborhoods
Needs Addressed Parks and Community Space
Funding CDBG: $118,000
Description PUBLIC IMPROVEMENTS OF PUBLIC PARKS AND COMMUNITY SPACE
WITHIN LOW- AND MODERATE INCOME AREAS
Target Date 6/30/2021
787
Annual Action Plan CARES Act Amendment
2020
55 Estimate the number
and type of families
that will benefit from
the proposed
activities
THIS PROJECT WILL ACCOUNT FOR TANGIBLE IMPROVEMENTS TO
PUBLIC IMPROVEMENTS IN LOW-MOD CENSUS TRACT
NEIGHBORHOODS. THE ACTIVITIES WILL TARGET LOW-MOD CENSUS TRACT NEIGHBORHOODS, ESTIMATED AT 60,000
Location Description LOW AND MODERATE INCOME AREAS
Planned Activities 1) PLEASANT VALLEY PARK BALL COURT AND 2)LA COLONIA GREEN ALLEYS
10 Project Name PUBLIC FACILITIES AND IMPROVEMENTS
Target Area
Goals Supported Create Quality Neighborhoods
Needs Addressed Utilities and Public Infrastructure
Funding CDBG: $395,200
Description PUBLIC FACILITIES AND IMPROVEMENTS
Target Date 6/30/2021
Estimate the number
and type of families
that will benefit from
the proposed
activities
THIS PROJECT IS CITY-WIDE AND WILL ACCOUNT FOR IMPROVEMENTS TO CITY FACILITIES. THE CITY-WIDE ACTIVITIES WILL ASSIST APPROX 209,000 PERSONS, OF WHICH OVER 60% ARE LOW/MOD INCOME
RESIDENTS, ESTIMATED AT 125,000 PERSONS
Location Description CITY-WIDE
Planned Activities 1) HOMELESS SHELTER PORTABLE FACILITIES, 2) MULTI SERVICE CENTER REHABILITATION, 3) ONE STOP FACILITY AND 4) POLICE ACTIVITY
LEAGUE (PAL) REHABILITATION
11 Project Name PUBLIC FACILITIES -FIRE PROTECTION EQUIPMENT Target Area
Goals Supported Create Quality Neighborhoods
Needs Addressed Disaster Planning and Recovery
Utilities and Public Infrastructure
Funding CDBG: $195,000
Description PUBLIC FACILITIES -FIRE PROTECTION EQUIPMENT Target Date 6/30/2021
788
Annual Action Plan CARES Act Amendment
2020
56 Estimate the number
and type of families
that will benefit from
the proposed
activities
THIS PROJECT IS CITY-WIDE AND WILL ACCOUNT FOR IMPROVEMENTS TO PUBLIC FACILITIES-FIRE PROTECTION EQUIPMENT. THE CITY-WIDE ACTIVITIES WILL ASSIST APPROX 209,000 PERSONS, OF WHICH OVER 60% ARE LOW/MOD INCOME RESIDENTS, ESTIMATED AT 125,000
PERSONS.
Location Description CITYWIDE
Planned Activities 1) EMERGENCY OPERATIONS CENTER
12 Project Name ADMINISTRATION
Target Area
Goals Supported Effective Administration
Needs Addressed New Rental Housing
Housing Support and Stability
Homeownership Opportunities
Rehabilitation & Preservation of Existing Housing
Assistance for Senior Residents
Increase Job Skills
Facade Improvements
Local Entrepreneurship
Social Services
Youth Activities and Services
Homelessness
Streets and Streetscapes
Parks and Community Space
Disaster Planning and Recovery
Utilities and Public Infrastructure
Funding CDBG: $534,877
HOME: $87,613
Description ADMINISTRATION AND PLANNING COSTS SUBJECT TO CAPS FOR EACH FUNDING SOURCE; CDBG (20% of Allocation & PI) AND HOME (10% of Allocation & PI)
Target Date 6/30/2021
Estimate the number
and type of families
that will benefit from
the proposed
activities
ADMINISTRATION AND PLANNING ACTIVITIES WILL BENEFIT FAMAILIES CITYWIDE. AN ESTIMATED 209,000 PERSONS WILL BENEFIT FROM THIS AVTIVITY OF WHICH OVER 60% ARE LOW- AND MODERATE- INCOME
RESIDENTS
Location Description CITYWIDE
789
Annual Action Plan CARES Act Amendment
2020
57 Planned Activities COORDINATION OF ALL CDBG AND HOME ADMINISTRATION AND PLANNING ACTIVITIES.
13 Project Name CDBG-CV COVID RESPONSE
Target Area
Goals Supported CDBG COVID Pandemic Response
Needs Addressed Social Services
Youth Activities and Services
Homelessness
Disaster Planning and Recovery
Increase Job Skills
Local Entrepreneurship
Funding CDBG-CV1: $1,211,543
CDBG-CV3: $1,259,151
Total CDBG-CV Project: $ 2,470,694
Description CDBG activities to prevent, prepare for and respond to coronavirus.
Subject to the CARES Act and emergency policy from HUD, including program regulations and waivers. The CDBG-CV activities total $2,470,694. The CDBG-CV1 activities are $1,211,543 and CDBG-CV3 activities are $1,259,151.
Target Date 9/30/22
Estimate the number
and type of families
that will benefit from
the proposed
activities
An estimated 209,000 person will benefit from the Fire Paramedicine activity of which over 60% are low and moderate income residents, estimated at 125,000 persons. 21,000 persons will be assisted with Food Share activity; 14,000 persons will be assisted with Health Sanitation activity; 250 homeless individuals will be assisted with emergency shelter and services; 150 youth will be assisted with youth services and educational programs; 10 persons will be assisted by job development and training; rental assistance program will assist 500; and technical assistance activity will assist 20 businesses. These activities are in lowmoderate income neighborhoods.
Location Description CITYWIDE & LOW AND MODERATE INCOME AREAS 790
Annual Action Plan CARES Act Amendment
2020
58 Planned Activities City of Oxnard Fire Department will provide 1) Fire Paramedicine & PPE; City of Oxnard Cultural & Community Services will provide 2) Food Share, 3) Health-Sanitation Program, 4) Homeless Shelter Expansion, 5) Homework Center at Colonia Gym, South Oxnard Center, Durley Park Youth Center; City of Oxnard Housing Department will provide 6) Homeless Outreach, 7) Homeless Encampment Response, 8) Vocational Job Development & Training, 9) Business Improvement-South Oxnard; City of Oxnard Housing Authority will provide 10) Rental Assistance Program; and Community of Action of Ventura County will provide 11) Oxnard Homeless Services.
14 Project Name CDBG-CV Administration
Target Area
Goals Supported CDBG COVID Pandemic Response
Needs Addressed Social Services
Youth Activities and Services
Homelessness
Disaster Planning and Recovery
Increase Job Skills
Local Entrepreneurship
Funding CDBG-CV1: $302,885
CDBG-CV3: $314,788
Total CDBG-CV Project: $617,673
Description Administrative tasks supporting activities to prevent, prepare for and respond to coronavirus. (20% cap of Allocation)
Subject to the CARES Act and emergency policy from HUD, including program regulations and waivers. The CDBG-CV Administration total is $617,673
Target Date 9/30/22
Estimate the number
and type of families
that will benefit from
the proposed
activities
Administration and planning activities will benefit families citywide. An estimated 209,000 persons will benefit from this activity of which over 60% are low- and moderate- income residents.
791
Annual Action Plan CARES Act Amendment
2020
59 Location Description CITYWIDE
Planned Activities Coordination of all CDBG-CV Administration and planning activities. 15 Project Name ESG-CV COVID RESPONSE
Target Area
Goals Supported ESG COVID Pandemic Response
Needs Addressed Homelessness
Funding ESG-CV1: $ 762,355
ESG-CV2: $ 4,492,650
Total ESG-CV Project: $ 5,255,005
Description ESG-CV activities to prevent, prepare for and respond to coronavirus.
Administration cost subject to 10% cap, or $525,500. The ESG-CV activities total $4,077,916. The ESG-CV remaining balance of $651,589 is unallocated and will be distributed to ESG eligible activities.
Subject to the CARES Act and emergency policy from HUD, including program regulations and waivers.
Target Date 9/30/22
Estimate the number
and type of families
that will benefit from
the proposed
activities
City of Oxnard Housing Department, Homeless Division will provide Emergency Shelter to 350 homeless persons; Rapid Rehousing to 30 individuals and Street Outreach to 200 individuals.
Location Description VARIOUS LOCATIONS THROUGHOUT CITY OF OXNARD Planned Activities City of Oxnard, Homeless Division will provide 1) Homeless Expansion Shelter, 2) Temporary Homeless Shelter at K Street, 3) Temporary Emergency Shelter at 2nd Street, 4) Case Management & Rapid ReHousing, 5) Homeless Encampment Response-Outreach, 6) Street Outreach; City of Oxnard will provide 7) Administration of ESG-CV 792
Annual Action Plan CARES Act Amendment
2020
60 AP-50 Geographic Distribution – 91.220(f)
Description of the geographic areas of the entitlement (including areas of low-income and minority concentration) where assistance will be directed The primary national objectives of the ConPlan programs are to benefit LMI residents, therefore, the City’s CDBG funds will be targeted to extremely low, low, and moderate-income persons. The City has traditionally dedicated 100 percent of its CDBG resources to activities that exclusively benefit LMI persons. CDBG funds will be used to serve the LMI persons Citywide and in Low-Moderate Areas (LMA).
This trend is expected to continue in PY 2020. Also, the City will continue to assist the low-income persons citywide with HOME and HESG funds. The target areas are: (1) Citywide, with 89 percent of the total entitlement funds; and, (2) the LMA Census Tract, 11 percent. The total entitlement includes the administration and planning funding.
Geographic Distribution
Target Area Percentage of Funds
Table 8 - Geographic Distribution
Rationale for the priorities for allocating investments geographically The need for affordable housing (funded from CDBG and HOME) is present throughout the City. CDBG funds for direct benefit category-capital improvements and code enforcement are allocated based on the percentage of LMI persons within the LMA neighborhoods. Regarding the Public Services category of the CDBG funds, the proposed projects will focus on the basic needs of the residents such as health care, essential and supportive services, as well as housing services. The special population such as seniors, homeless and youth will continue to receive their funding for the healthcare needs, nutrition needs, education needs, shelter support and recreational needs.
HESG allocations are based on the limited clientele are distributed citywide.
HOME funds are distributed based on the income eligibility of the clients and citywide basis. These allocations also cover designated areas targeted by Code Compliance efforts to reduce and eliminate the deterioration of the areas through the Homeownership program as well as the Housing Rehabilitation program: homeowners will improve the beautiful appearance of the home and the safety of the 793
Annual Action Plan CARES Act Amendment
2020
61 neighborhood.
Discussion
As always, the City of Oxnard will continue to look for available public and private resources and creative ways to fund the needy programs.
794
Annual Action Plan CARES Act Amendment
2020
62 Affordable Housing
AP-55 Affordable Housing – 91.220(g)
Introduction
HOME affordable housing loans for down payment assistance or rehabilitation will leverage affordable housing loan programs, funded by State of CA, such as BEGIN and CAL-HOME. HOME development financing assistance will leverage development funds from State of California, developer equity, private financing, and tax credit financing.
Lower-income households continue to pay a high percentage of their income for housing, compared to other income groups. A large percentage of lower-income renters tend to experience overcrowding and inadequate housing conditions as housing problems. In order to help provide decent and affordable housing, and improve the social and economic status for LMI households in Oxnard, the following programs will be available during the next program year:
1. First time Homebuyer Loan Program
2. Homeownership Assistance Program
3. Rehabilitation of Single-Family and Mobile home Housing Units
4. Rehabilitation of Housing Rental Units
5. Construction of new affordable dwelling units
6. Preservation of 520 public housing rental units and 1,840 Section 8 vouchers (including 15 set aside vouchers for homeless persons and 67 VASH vouchers for veterans) One Year Goals for the Number of Households to be Supported Homeless 50
Non-Homeless 2,360
Special-Needs 250
Total 2,660
Table 9 - One Year Goals for Affordable Housing by Support Requirement One Year Goals for the Number of Households Supported Through Rental Assistance 2,145
The Production of New Units 5
Rehab of Existing Units 6
Acquisition of Existing Units 10
795
Annual Action Plan CARES Act Amendment
2020
63 One Year Goals for the Number of Households Supported Through Total 2,166
Table 10 - One Year Goals for Affordable Housing by Support Type Discussion
City of Oxnard's Affordable Housing Division (AHRD) offers HOME grant funds to finance homebuyer assistance and rehabilitation of owner-occupied single family housing for local residents. AHRD will also continue to provide financial assistance to Community Housing Development Organizations (CHDO) to develop affordable housing units throughout the City subject to available funding and as permitted by the funding source. Loan information is provided to interested residents at homeownership fairs, workshops, and on the City of Oxnard's Housing Department website 796
Annual Action Plan CARES Act Amendment
2020
64 AP-60 Public Housing – 91.220(h)
Introduction
Oxnard Housing Authority (OHA) currently administers 520 public housing units, 1,840 Section 8 rental assistance vouchers, which includes 67 VASH vouchers and provides support services through its Resident Services program and Family Self-Sufficiency (FSS) program. The needs of public housing residents are supported with a Resident Services program which offers a variety of services to families and youth on-site. The FSS program supports and promotes public housing and Section 8 families with homeownership opportunities and economic self-sufficiency. The FSS Program provides one-on-one counseling and individual assistance to families that participate in this program. Marking flyers for the residential rehabilitation program and the home buyer program are also available in the City's Housing Department lobby.
Actions planned during the next year to address the needs to public housing Modernization projects for the public housing units, where most needed, are funded through its Capital Fund program. Every 5 years the Capital Fund program conducts a PNA (Physical Need Assessment) throughout the entire housing units and sends out survey questionnaires to the residents to assess the physical deficiencies in their units. It also collects input from Maintenance and Public Housing Staff. All the collected deficiencies get translated into capital improvement projects and get tabulated into a 5 year action plan. Each year, in its Annual Plan and Statement, Capital Fund re-prioritizes those projects identified in the 5 year plan.
For Fiscal year 2020/21, the following capital improvement projects for public housing units are planned:
Cal 31-2 (Felicia Court) Roofing $250,000
Exterior Doors $220,000
Cal 31-8 (Palm Vista) Boiler Replacement $ 10,000
Cal 31-5 (Plaza Vista) Kitchen Cabinets $175,000
Cal 31-7 (Scattered sites) Kitchen Cabinets $350,000
Building Improvements $ 10,000
Total Planned projects for 2020 $1,015,000
In 2019, the Oxnard Housing Authority retired 144 public housing units, the impacted public housing residents were issued Section 8 Project Based Vouchers for the Las Cortes Project and any remaining families were given Section 8 tenant based vouchers to relocate to a unit in the private market.
Actions to encourage public housing residents to become more involved in management and 797
Annual Action Plan CARES Act Amendment
2020
65 participate in homeownership
Homeownership opportunities are promoted by offering public housing families homeownership counseling services by Ventura County Community Development Corporation (VCCDC). In addition, families are informed of these services through its Family Self-Sufficiency Program and distribution of fliers to all households.
Public housing residents are encouraged to participate in public housing tenant associations that advocate on behalf of tenants to support efforts to improve public housing stock and living conditions.
If the PHA is designated as troubled, describe the manner in which financial assistance will be provided or other assistance
Not Applicable
Discussion
In order to respond to the increasing need for affordable housing units within the community, OHA and the Housing Department will continue to seek new resources of financing new housing development projects and partnering with developers, owners, and CHDO's. 798
Annual Action Plan CARES Act Amendment
2020
66 AP-65 Homeless and Other Special Needs Activities – 91.220(i) Introduction
Jurisdictions that receive federal funds for homeless assistance are required to conduct a Point In Time Count (PIT) of homeless persons each year. The 2020 PIT count was conducted on January 29, 2020.
The "Ventura County 2020 Homeless Count and Subpopulation Survey: Final Report", published in April 2020. The report is at the following website:
https://s33020.pcdn.co/wp-content/uploads/2020/04/2020-VC-Homeless-Count-Report-Final.pdf In summary, the PIT count is a snapshot of homeless people who could be enumerated on one specific day. The 2020 PIT counted a total of 379 unsheltered homeless persons in Oxnard.
Describe the jurisdictions one-year goals and actions for reducing and ending homelessness including
Reaching out to homeless persons (especially unsheltered persons) and assessing their individual needs
In the previous twelve months the City of Oxnard established a year around homeless shelter and navigation center located on K Street in Oxnard. The City of Oxnard contracted Mercy House to operate the navigation center. The navigation center will continue its operation for the next twelve-month period and beyond. Oxnard has launched an effort to develop a new construction mixed-use development that will include a new and replacement navigation center and 110-bed homeless shelter plus other support services and fifty-four units of permanent supportive housing. We expect that this new project will be in operation within thirty-six months and will maintain the interim operation on K Street until relocation is possible.
During the next year, Oxnard will engage a new street outreach team to offer navigation for basic needs, services and shelter. The street outreach team will coordinate with Mercy House and the Oxnard Navigation Center as well as the Homeless Liaison Officers with the Oxnard Police Department.
Addressing the emergency shelter and transitional housing needs of homeless persons The emergency shelter and transitional housing needs of homeless persons are currently being addressed by several service providers throughout Ventura County. The emergency shelter needs in the area are met by the following providers: Mercy Housing in operation of the Oxnard Navigation Center, Ventura County Rescue Mission - single men over the age of 18 with rotating stay schedule, 10 nights in/5 nights out; Kingdom Center - emergency shelter for single women and women with children; Lighthouse Mission for Women and Children - single women and women with children; and Turning 799
Annual Action Plan CARES Act Amendment
2020
67 Point Foundation - mentally ill individuals.
Transitional housing needs are currently being met by the following providers: Kingdom Center - single women and women with children; Khepera House - single men; Many Mansions - transition aged youth, single women and women with children; Turning Point Foundation - single mentally ill persons; Salvation Army - families, single parents and single persons; VC-HSA - families, single parents and children, and single persons; Project Understanding - families and single parent households.
Helping homeless persons (especially chronically homeless individuals and families, families with children, veterans and their families, and unaccompanied youth) make the transition to permanent housing and independent living, including shortening the period of time that individuals and families experience homelessness, facilitating access for homeless individuals and families to affordable housing units, and preventing individuals and families who were recently homeless from becoming homeless again
There are many providers that are working diligently to assist homeless persons from not only finding housing, but also to prevent further incidents of homelessness. The Oxnard Housing Authority has created a homeless preference in issuance of Housing Choice Vouchers and is actively offering permanent housing opportunities. During the 2019 – 2020 fiscal year the Oxnard Housing Authority expects to house fifty otherwise homeless families with the use of Housing Choice Vouchers.
The Ventura County Human Services Agency utilizes both County General Funds and the City's Emergency Solutions Grant to provide eviction prevention and rapid re-housing services to all of these populations; they will continue to do this in the forthcoming operating year. Additionally, Ventura County Veterans Services, Homeless Health Care and Ventura County Behavioral Health all work closely with the service providers to provide other supportive services to assist in reducing the incidence of homelessness as they have also done in the recent past.
OHA works in conjunction with the Veteran Administration to administer 67 housing vouchers for homeless veterans under the VASH program. This program targets chronically homeless veterans.
Helping low-income individuals and families avoid becoming homeless, especially extremely low-income individuals and families and those who are: being discharged from publicly funded institutions and systems of care (such as health care facilities, mental health facilities, foster care and other youth facilities, and corrections programs and institutions); or, receiving assistance from public or private agencies that address housing, health, social services, employment, education, or youth needs.
The CoC has documented discharge policies of all of the above mentioned services that spell out various directions to ensure persons are not discharged into homelessness. Additionally, as stated earlier, HSA works with qualifying low-income persons and families to avoid homelessness. This is done with the 800
Annual Action Plan CARES Act Amendment
2020
68 utilization of HESG and Ventura County allocated general fund dollars. Under the CoC discharge policy, in fulfilling the State Mandated Policy (state law related to the discharge protocol), the following are found:
1. Health Care Facilities: the County health care system describes the discharge policy as interdisciplinary responsibility. For the persons who require ongoing medical and nursing care and who have no identifiable address they may be discharged to a respite program at the RAIN project, a County operated transitional housing project. Others, upon discharge routinely go to group homes, board and care facilities, or reunite with families and friends.
2. Mental Health Facilities: the Ventura County Medical Center Psychiatric Inpatient Unit with the collaboration of Ventura County Behavioral Health and various community agencies provide discharge planning and placement assistance to patients, when leaving the mental health facilities.
3. Foster care and other youth facilities: the goal is to provide assisted services to eligible youth and young adults between the ages of 16 and 21 in making a successful transition from foster care to independent living and achieve self-sufficiency. In addition to the County Children and Family Services, a Transitional Age Youth (TAY) center, operated by Pacific Clinic is also available.
4. Corrections programs and institutions: upon release, inmates are able to obtain housing in transitional and permanent housing programs, group homes, and sober living homes as well as with family and friends.
Discussion
The CoC has incorporated each of the following goals of Opening Doors into its 20-year plan to end homelessness:
1. Ending chronic homelessness through targeted street outreach (CDBG-Community Action-One Stop Shelter, CoC-Oxnard Homeless Outreach Program, VCHSA-Rapid Re-housing, HESG-Winter Warming Shelter), discharge planning and implementation of a housing first approach.
2. Preventing and ending homelessness among veterans by providing permanent supportive housing beds, in addition to Section 8 HUD VASH vouchers.
3. Preventing and ending homelessness for families, youth, and children by 2020 through rapid rehousing program and homeless prevention activities. The CoC set a path to ending all types of homelessness in its 10-year plan by implementing a coordinated assessment system-Pathways to Home. As a result, the number of chronic homeless, veterans, families, and youth continue to demonstrate positive results.
4. All of the above objectives are still in progress and will be folded into a regional plan and strategy lead by the County of Ventura.
801
Annual Action Plan CARES Act Amendment
2020
69 AP-75 Barriers to affordable housing – 91.220(j)
Introduction:
Barriers or constraints to the affordability of housing exist in many forms. A particular building code that to one sector might be interpreted as a “negative” public policy that acts as a barrier to affordable housing may to another sector be seen as a life-saving necessity – for example, seismic safety construction requirements. The same can be said for zoning and land use regulations. It should be noted that in Ventura County, local growth limitations have been adopted by direct ballot measures. Some of these measures entail costs which can affect housing supply and the cost of housing that is produced.
Barriers to exit homelessness include the lack of a permanent, year round shelter and the lack of housing units for those at the very low- and low- income spectrum. Because of the high cost to develop housing for these populations and limited public funding to subsidize the development of new affordable housing units, developers often do not have the resources to develop the number of units necessary to house this population. When this occurs, badly needed units go undeveloped, thus further limiting housing opportunities for those hardest to house.
Actions it planned to remove or ameliorate the negative effects of public policies that serve as barriers to affordable housing such as land use controls, tax policies affecting land, zoning ordinances, building codes, fees and charges, growth limitations, and policies affecting the return on residential investment
Environmental review, general planning, zoning, and related local land use regulations and development standards are all extensions of local government police powers to protect life and property, minimize nuisances, and achieve a desired quality of life as expressed through a participatory democratic process.
Certain barriers to affordability are imposed by the mandates created by State Law (such as preparing and adopting a General Plan and conducting environmental reviews), are adopted for safety or civil rights reasons (such as the imposition of seismic construction standards in quake-prone areas, or requiring compliance with accessibility or visitability design standards), or enacted to remedy or prevent a specific local issue (such as requiring landscaping to deter graffiti). The term “barrier” should not be interpreted in the context that local development standards and development review procedures are inhibiting the provision of quality affordable housing that would otherwise be developed, but are the cumulative effect of the development requirements imposed by the layers of government regulations and laws that impact residential development.
Discussion:
The City strives to consistently implement all policies and procedures, to review local development standards and development review procedures in such a way as to avoid and ensure that such do not have unintended negative consequences, and to improve policies and procedures so as to increase the opportunities and feasibility of developing affordable housing, especially for special needs and very lowand low-income units). The City will continue to engage in these efforts to identify and minimize any 802
Annual Action Plan CARES Act Amendment
2020
70 barriers over which the City has legal authority, in accordance with applicable law. 803
Annual Action Plan CARES Act Amendment
2020
71 AP-85 Other Actions – 91.220(k)
Introduction:
The City will implement the goals and strategies of the Consolidated Plan to achieve the other actions listed in the next section
Actions planned to address obstacles to meeting underserved needs The City will continue to utilize available resources to fund administrative support activities to meet the underserved needs in the community. The City will continue to work with the appropriate state agencies to administer the assets of the former redevelopment agency in the appropriate manner, and to the benefit of the LMI community whenever possible and feasible. Limited availability of funding from federal, state and other sources;
High cost of housing and provisions in the area which increases the difficulty of meeting affordable housing needs;
Reduced or frozen funding from state and other sources due to inadequate state revenue; the housing and credit crisis causing a negative effect;
A tight job market has produced an increased demand for production of new housing which is not being met, increasing home prices. Salaries are not commensurate with the high cost of housing in this market. These two factors combine to exacerbate the affordability crisis; and, Credit crisis has limited the availability of capital to develop housing for low-and moderate-income households and special needs groups.City staff will address the challenges of existing and new obstacles in PY 2020 by focusing on the following programmatic and administrative areas:Staff will continue to research the availability of future funding resources that leverage the development of affordable housing units, inclusive of grants, bond financing, Section 108 funding and partnering with other affordable housing developers.CDBG and other funds will be used to fund administrative support for programs that serve the needs of LMI citizens citywide. This is especially critical now that no redevelopment agency funding is available, given that redevelopment agencies no longer exist in California.Staff will continue to collaborate with private-sector partners when appropriate in the development and construction of affordable housing.Staff will continue to collaboratively work with the service provider community, non-profit organizations, and neighboring cities and local governmental agencies within the County of Ventura to identify projects that also meet federal community development program eligibility and which can comply with timely draw-down requirements.
Actions planned to foster and maintain affordable housing The City utilizes its Inclusionary Housing Program to provide significant numbers of affordable housing units. To ensure that Oxnard has enough opportunity sites suitable for residential development and to meet the remaining RHNA affordable allocation of 2,497 lower income and moderate units and 53 804
Annual Action Plan CARES Act Amendment
2020
72 above moderate income units, the City is relying on the following:
• The All Affordable Housing Opportunity Program (AAHOP) and Affordable Housing (AH) additive zone (see Supplement 2) with an inventory of 2,067 units on 38 AAHOP sites • 66 Vacant and Underutilized Sites (see Supplement 2)
The City of Oxnard has adopted several ordinances that establish inclusionary affordable housing requirements for new developments. Relevant ordinances are City Council Ordinances 2721 and 2615. The Inclusionary Housing Program provides for in-lieu fee payments that can replace the on-site units within a development subject to approval by the City Council. The City is currently in the process of completing a study to increase the City's in-lieu fee. In-lieu fees for development project are as follows:
For-Sale Units: If the in-lieu request is granted, the developer is required to make a payment of 1 percent of the sales price of each for sale unit in the project based on increments of $50,000, with a minimum payment of $5,000 for each unit.
Rental Units: A payment is required for each rental unit. The price is adjusted every six months by the percentage increase or decrease for the previous six months as determined by the Los Angeles Riverside-Orange County Consumer Price Index for all urban consumers.
The City Council generally prefers on-site affordable housing as opposed to payment of in-lieu fees. A project that is approved for in-lieu payments has usually agreed to another public benefit through a Development Agreement that justifies the in-lieu payment. In-lieu payments are made when the developer applies for building permits for the approved units. The in-lieu fees collected provide funding support in the form of developer loans to new affordable housing projects and are almost always leveraged with other funding sources. The current in-lieu fund balance is approximately $2.8 million.
Possible incentives may include, but are not limited to, the following:
• Assistance with accessing and applying for funding (based on availability of federal, state, local foundations, and private funds)
• Mortgage-subsidy or down payment assistance programs to assist first- time homebuyers and other qualifying households, when such funds are available • Expedited/streamlined application processing and development review • Modification of development requirements, such as reduced setbacks and parking standards on 805
Annual Action Plan CARES Act Amendment
2020
73 a case-by-case basis
• Density bonus
Actions planned to reduce lead-based paint hazards
The City will coordinate activities with the County of Ventura Department of Health and Human Services to reduce lead-based paint hazards in accordance with federal regulations. Any rehabilitation activities on housing units constructed prior to 1978 will have lead hazards identified and actions taken to remove the hazard. The City's Affordable Housing Division does not own or manage any housing units. All units for which HOME and CDBG assistance is provided for homebuyer assistance or homeowner rehabilitation are administered in compliance with HUD's HOME or CDBG regulations for lead-based paint, as applicable. With respect to units owned or assisted by the Oxnard Housing Authority, there have been no cases of Public Housing tenants and/or Section 8 participant households reporting or having been discovered to have poisoned children or any child with “Elevated Blood Lead Level”. OHA staff provides a brochure related to lead based paint hazards to all new tenants and program participants. Maintenance staff attends training and seminars to stay current with the State of California Lead Awareness Training requirements.
Actions planned to reduce the number of poverty-level families Eliminating poverty is a clear concern in Oxnard and Ventura County in general. Efforts are constantly underway to improve the quality of life and economic well-being of the residents through collaborative efforts of the following agencies and their programs to provide needed skills for individuals seeking jobs and thereby getting them out of poverty:
• City Corp
• Community Action of Ventura County
• Oxnard Housing Authority
• County of Ventura-Human Services Agency
• City's youth programs such Police Activities League programs, Colonia Gymnasium, Colonia Recreation Center and Boxing programs
Actions planned to develop institutional structure
Extensive public and private partnerships have been established and organized to address the City's housing, homeless, and community development needs: Entitlement Grants workshops and training, Affordable Housing workshops for homeowners, Relocation meetings for residents, Fair Housing training and other scheduled meetings (such as Pre-construction meetings, Commission on Homelessness meetings, and meetings with County Continuum of Care Council, Housing Committee meetings).
Actions planned to enhance coordination between public and private housing and social 806
Annual Action Plan CARES Act Amendment
2020
74 service agencies
The City will continue to collaborate with public and private housing and social service agencies to meet the goals and objectives of the Consolidated Plan. This could be from ongoing meetings, special meetings and task force.
Discussion:
The City anticipates significant numbers of inclusionary affordable housing to be developed within several proposed specific plans and other new projects. Based on a thorough review, the City does not believe that the current inclusionary housing program is a constraint to the development of housing in addition to the incentives and concessions currently being offered and conversations with local developers who have been able to work within the requirement of the inclusionary housing program and produce housing. To further ensure the program does not pose a constraint, the City has included a monitoring process.
Other actions that the the City of Oxnard will continue to improve compliance assessment for all its HUD funded programs and projects by 1) monitoring program and financial performance; 2) compliance with Environmental review: each project is reviewed for compliance with the National Environmental Protection Act. The City has a consulting agreement with Rincon to assist and perform the environmental reviews for housing developments and facility improvement projects, more complicated, and time consuming projects; 3) Labor Compliance Act: the City reviews and perform the contract administration of all CDBG-funded construction projects; 4) Section 3 Compliance: this function is also performed by the City; 5) Procurement and Purchasing: The City has its own procurement and purchasing policies managed by staff in the Finance Department; 6) Partnerships with Citizen Advisory Groups: Inter-Neighborhood Council Forum, Commission on Homelessness, Parks and Recreation and Community Services Commission, Mobilehome Park Rent Review Board, and Senior Services Commission.
807
Annual Action Plan CARES Act Amendment
2020
75 Program Specific Requirements
AP-90 Program Specific Requirements – 91.220(l)(1,2,4)
Introduction:
In addition to the 20% cap for Administration, the City of Oxnard also allocates 15% of 2020 CDBG funds for public services such as recreation programs for youth, homeless services, senior services and fair housing activities. The balance of the funds will be allocated to housing activities, code compliance and public facilities and improvements. In the event of an emergency (such as an earthquake, flooding, or hurricane ...) the City will cut the non-committed funds from other existing projects in order to fund the urgent need within the allowable range. However, the urgent need to meet the following tests: (1) the existing conditions pose a serious and immediate threat to the health and welfare of the community, (2) the existing conditions are recent or recently became urgent, generally 18 months, (3) the City cannot finance on its own, (4) and when other funding sources are not available.
Community Development Block Grant Program (CDBG)
Reference 24 CFR 91.220(l)(1)
Projects planned with all CDBG funds expected to be available during the year are identified in the Projects Table. The following identifies program income that is available for use that is included in projects to be carried out.
1. The total amount of program income that will have been received before the start of the next program year and that has not yet been reprogrammed 0
2. The amount of proceeds from section 108 loan guarantees that will be used during the year to address the priority needs and specific objectives identified in the grantee's strategic plan. 0
3. The amount of surplus funds from urban renewal settlements 0
4. The amount of any grant funds returned to the line of credit for which the planned use has not been included in a prior statement or plan 0
5. The amount of income from float-funded activities 0
Total Program Income: 0
Other CDBG Requirements
1. The amount of urgent need activities 0
2. The estimated percentage of CDBG funds that will be used for activities that benefit persons of low and moderate income.Overall Benefit - A consecutive period of one, two or three years may be used to determine that a minimum overall benefit of 70% of CDBG funds is used to benefit persons of low and moderate income. Specify the years covered that include this Annual Action Plan. 100.00% 808
Annual Action Plan CARES Act Amendment
2020
76 HOME Investment Partnership Program (HOME)
Reference 24 CFR 91.220(l)(2)
1. A description of other forms of investment being used beyond those identified in Section 92.205 is as follows:
Other forms of local investments for housing that may be available to projects include financing from the City’s in-lieu fees, CDBG funding. Additionally, the City also provides homebuyer assistance through the use of program income received from BEGIN and CALHOME State funded grant programs.
2. A description of the guidelines that will be used for resale or recapture of HOME funds when used for homebuyer activities as required in 92.254, is as follows:
Refer to Questions # 3 for Resale Provisions & procedures.
Recapture:
Provisions
• “In the event that the homebuyer fails to satisfy the requirements during the term of the loan, or otherwise defaults, the City shall exercise its legal rights, as set forth in the promissory note and deed of trust, in order to recover the monetary assistance previously provided to the maximum extent permitted by law.”
• “If the recapture provisions are triggered by a sale of the housing unit, (whether voluntary or involuntary –such as foreclosure) or other default, the City shall take all necessary steps to recover the full amount of HOME funds from the net proceeds. The phrase ‘net proceeds’ is defined as the sales price, minus the loan repayment of the first trust deed (other than HOME funds) and any closing costs.”
The HOME Program regulations allow the City to recapture the entire HOME Subsidy, in the event the loan recipient violates the affordability and or term period requirements. However, should the ‘net proceeds’ not cover the entire HOME Subsidy or not cover any of the HOME Subsidy, the City is required to forgive the remaining balance of the direct HOME Subsidy. • During the term of the loan, the homeowner must repay the loan if it is sold, transferred or refinanced without the City’s permission and/or with cash out to the homeowner or the homeowner does not occupy the residence as a primary residence.
Procedures
The City utilizes an agreement which includes restrictions, and a promissory note secured by a deed 809
Annual Action Plan CARES Act Amendment
2020
77 of trust which is recorded with the Ventura County Recorder’s Office.
Staff monitors and requires certification annually by the homeowner that the property is owneroccupied to determine if recapture provisions shall be invoked upon discovery of violations for owner-occupancy or unauthorized transfers.
The City will exercise the rights stipulated in the promissory note, secured by the deed of trust that was recorded with the County Recorder’s Office.
Should Borrower transfer (as that term is defined in the Note) the Property during the occupancy period, City shall require that Borrower pay from the net proceeds the full amount of the Loan. For purposes of this Loan Agreement, “net proceeds” shall mean the sales price minus loan repayment (other than CDBG funds) and closing costs.
In the event net proceeds are not sufficient to discharge the full amount of the Loan during the occupancy period plus enable the Borrower to recover his or her initial investment in the Property and documented costs of any capital improvements, Borrower shall share the net proceeds with City. The City’s share of the net proceeds shall be calculated as follows:
(Amount of Loan / Amount of Loan + Borrower’s Investment) = % of Net Proceeds that City is entitled to.
Should the net proceeds not discharge the full amount of the Loan, City shall forgive the remaining balance.
3. A description of the guidelines for resale or recapture that ensures the affordability of units acquired with HOME funds? See 24 CFR 92.254(a)(4) are as follows:
Refer to Question #2 for Recapture provisions and procedures.
Resale
Provisions
During the affordability period, the homeowner must resell to another low-income homebuyer if the property is refinanced without the City’s permission and/or with cash out to the homeowner or the homeowner does not occupy the residence as a primary residence.
The original homebuyer receives a fair return on investment, (i.e., the homebuyer’s down payment plus capital improvements made to the house. It is important to note that in certain circumstances, such as a declining housing market where home values are depreciating, the original homebuyer may not receive a return on his or her investment because the home sold for less or the same price as the original purchase price); and
810
Annual Action Plan CARES Act Amendment
2020
78 In the event that the homebuyer fails to satisfy the requirements during the term, or otherwise defaults, the City shall exercise its legal rights, as set forth in the Resale Restriction Agreement.
Procedures
The City utilizes a Resale Restriction Agreement (RRA) secured by a deed of trust which is recorded with the Ventura County Recorder’s Office.
Staff monitors and requires certification annually by the homeowner that the property is owneroccupied to determine if resale provisions shall be invoked upon discovery of violations for owneroccupancy or unauthorized transfers.
If the homeowner defaults or fails to satisfy requirements during the term, the City will exercise the rights stipulated in the Resale Restriction Agreement.
Property must be sold to an eligible low-income homebuyer which shall acquire the unit subject to the continuation of restrictions provided in the RRA through an assumption agreement.
The purchase price must be affordable for a low-income household who earns up to 80% of the area median income, provided by HUD. The monthly cost for principal, interest, taxes, insurance, HOA fees, utilities, and maintenance should not be more than 30% of the monthly income for the household or otherwise stated in the RRA. There is no preference to a particular segment of the lowincome population.
The resale price is calculated using one of two ways methods described below. The method used is identified in the RRA:
Determined as the affordable housing cost for a family at 80% of AMI paying no more than 30% of the monthly income for the household or in accordance of California Health And Safety Code 50025.5, whichever is lesser, but not less than the original price paid by homebuyer, or Determination using a CPI method to calculate the increase (or decrease) in value of the property.
The U.S. Bureau of Labor Statistics Consumer Price Index – All Urban Consumers for the Los AngelesRiverside- Orange Counties Area (all items based 1982-1984=100) provides the CPI on the date of the calculation and the CPI on the purchase date. The calculation is the CPI on the date of the calculation minus the CPI on the purchase date, plus the cost of improvements to property evidenced with receipts, less 7% depreciation, plus the costs of bringing the housing unit up to current building codes and in a salable condition.
4. Plans for using HOME funds to refinance existing debt secured by multifamily housing that is rehabilitated with HOME funds along with a description of the refinancing guidelines required that will be used under 24 CFR 92.206(b), are as follows:
The City currently does not have any plans to invest HOME funds in this type of activity. 811
Annual Action Plan CARES Act Amendment
2020
79 Emergency Solutions Grant (ESG)
Reference 91.220(l)(4)
1. Include written standards for providing ESG assistance (may include as attachment) The City does not provide any direct assistance under the HESG program any longer. All written standards vary by service providers and assistance type. However, all providers must ensure recipients meet the minimum qualifications established by HUD for each eligible funded activity.
HESG Policies and Handbook are provided to all HESG subrecipients.
2. If the Continuum of Care has established centralized or coordinated assessment system that meets HUD requirements, describe that centralized or coordinated assessment system.
The Regional Ventura County Continuum of Care Alliance has established centralized or coordinated assessment system, Pathways to Home, that provides coordination intake as well as systems to avoid duplication of effort and redundancies.
Pathways to Home is centralized to provide identical information and system-wide tracking through HMIS, of all homeless individuals who seek and /or receive assistance at any one of the various service providers, or through the County directly.
3. Identify the process for making sub-awards and describe how the ESG allocation available to private nonprofit organizations (including community and faith-based organizations).
The process for making all sub-awards for HESG recipients are as follows:
a. The City formally posts the Notice of Available Funds (NOFA) in the regional newspaper, on the City's website, and emails and paper mail are sent to all existing and potential service providers from Santa Barbara to Los Angeles.
b. All interested agencies attend information workshop/application training on the process, which includes all deadline dates and times.
c. Interested agencies then submit their application, project overview and qualifications d. The Review Panel included representatives from City Advisory Groups. e. The Review Committee reviews all proposals and provides a scores for each eligible application.
The funding recommendations are derived based on the scores. f. The funding recommendation are adjusted to meet the available resources and cap requirements; reviewed by management and then submitted to the City Council for approval. g. All applicants are contacted and urged to attend the City Council meeting in which the items fall on the agenda. All supporting comments and grievances are done at this time. h. The Mayor and City Council directs the City Manager and staff to move forward with final processing.
812
Annual Action Plan CARES Act Amendment
2020
80 i. Staff prepare all contracts for execution. Additionally, all internal processes are completed in order to encumber funds to each individual agency.
j. Contracts are completed and services can begin on July 1. k. All HESG contracts are awarded for two years.
4. If the jurisdiction is unable to meet the homeless participation requirement in 24 CFR 576.405(a), the jurisdiction must specify its plan for reaching out to and consulting with homeless or formerly homeless individuals in considering policies and funding decisions regarding facilities and services funded under ESG.
The City meets the homeless participation requirement by having a homeless and formerly homeless person serve on the City's Commission on Homelessness. In addition, each entity receiving city HESG funding is also asked to provide information as to how they involve the homeless.
5. Describe performance standards for evaluating ESG.
PERFORMANCE MEASURES
Performance measures are in place to ensure the efficient administration of all HESG funded activities. Additionally, along with the utilization of the HMIS, these measures will hopefully help to reduce the length of time of family and individuals remain homelessness, reduce the overall incidence of homelessness, and monitor the overall use of emergency shelters. Some of the activity measures are as follows:
• Emergency Shelters: Excluding winter shelters, must be able to document placement of a minimum of 10 percent of the homeless persons or households served in the Program Year into transitional or permanent housing.
• Transitional Housing: must be able to document placement of a minimum of 50 percent of the households who completed the transitional housing program in the Program Year into permanent housing. "Household" is defined as all clients including single individuals and families. • Rapid Re-housing: must show continued housing of clients receiving assistance for at least three months after receiving assistance. This should be done via case management of clients, documentation and HMIS entry and exit dates.
• Eviction Prevention: must show continued housing of clients receiving assistance for at least three months. This should be done via case management of clients, documentation and HMIS entry and exit dates.
• All clients, with the exception of victims of domestic violence, must be entered into the Regional HMIS within 15 days of receiving service(s), and must be exited from the system within 30 day of program completion or termination.
• MINIMUM STANDARDS: Sub-grantees are expected to have taken steps to meet the Minimum Standards for Homeless Programs within thirty days of executing the Program Year contract. 813
Annual Action Plan CARES Act Amendment
2020
81 • BUILDING AND HABITABILITY STANDARDS: Any building for which HESG funding is used for renovation, major rehabilitation or conversion must meet local government safety and sanitation standards. In addition, the Sub-Grantee must meet a number of basic standards to ensure that shelter and housing facilities funded through the HESG program are safe, sanitary and adequately maintained.
• MONITORING: City staff will monitor the use of grant funds through a combination of a thorough review of all submitted reports, review of audit or financial statements, and monitoring and site visits.
The City will continue to develop and implement eligible activities using the grant funds and through the monitoring and review processes and techniques in order to comply with the federal specific requirements.
Homeless Assistance Division continues to fund all the activities prescribed in the HEARTH act. With the sub-recipients cooperation, the City's HESG will continue to provide substantial additional leverage funds to invest in the various programs in order to assist the homeless population toward the goal of reduction and ending homelessness. Also, HESG limits the cost categories for administration and planning to 7.5% or $16,581 and 60% for street outreach and emergency shelter $132,649; total $149,230 for those cost categories. The City's 2020 action plan allows the maximum toward $16,581 administration and planning, and a total of $71,853 or 32.5% toward other activities such as homeless prevention and rapid re-housing support.
814
MID-YEAR REALLOCATION
CARES ACT EMERGENCY SOLUTIONS GRANT
AND
COMMUNITY DEVELOPMENT BLOCK GRANT
Emilio Ramirez, Director
Housing Department
City Council
April 19, 2022
815
Purpose of Mid-Year Reallocation
1. Funds are subject to timeliness requirements and
spending deadlines, therefore evaluation of projects
must be considered
2. CDBG Partners have an average of 12 months to
complete activities
3. ESG-CV has until September 30, 2022 to expend all
funds
816
2 Purpose of Mid-Year Reallocation
1. Council Action Required for Changes to Activities or Changes in Funding
2. Slow- or no-performing projects must be identified, as projects that are able to utilize funds to meet timeliness requirements and spending deadlines
3. Higher performing projects that can use funds have been identified and are located in Attachment 1 for review and consideration
817
3 Community Development Block Grant Reallocation
Prior Activity Award
Amount New Activity Proposed Amount Reason for Reallocation Thrive Mentorship $20,000 Cuesta Del Mar $20,000
Thrive Mentorship
House unable to comply
with documentation
requirements.
Johnson Creek
Playground $107,951 Housing Acquisition $107,951
Prior activities could not
progress before June 30,
2022 deadline.
Sierra Linda Park
Playground $171,751 Housing Acquisition $171,751
Prior activities could not
progress before June 30,
2022 deadline.
Thompson Park
Playground $221,251 Housing Acquisition $221,251
Prior activities could not
progress before June 30,
2022 deadline.
Rehabilitation Loan
Program $200,000 Housing Acquisition $200,000
Prior activities could not
progress before June 30,
2022 deadline.
Total Reallocation CDBG: $720,953
818
4 Emergency Solutions Grant Reallocation
819
5 1. $5,255,005 in ESG-CV was
awarded to the City
2. Over $1.2 million already
expended to COVID-19
emergency shelter services
3. The approximate $4 million
balance is proposed to go to
specific organizations and
projects that prepare,
prevent, and respond to
impact related to COVID
Emergency Solutions Grant Reallocation
6 This Photo by Unknown Author is licensed under CC BY
820
ESG-CV – Budget Overview
7 ESG-CV Categories Proposed Amount
Administration & Planning $51,090
Emergency Shelter $3,472,569
Street Outreach $263,484
Tenant Based Rental Assistance $200,000
Total Re-Allocation ESG-CV: $3,987,143
821
ESG-CV – Administration and Planning
Identified Activity Proposed Amount
Homeless Assistance Coordinator $21,090
Homeless Assistant $30,000
Total Allocation ESG-CV: $51,090
822
8 Emergency shelter
Identified Activity Proposed Amount
Mercy House 1,500,000
Mercy House PAL $700,020
Mercy House – Maintenance $20,000
Turning Point Foundation $52,549
Ventura County Health Services
Agency – Emergency Shelter $548,411
Total Allocation ESG-CV: $2,820,980
823
9 Street Outreach
Identified Activity Proposed Amount
Ventura County Health Services
Agency – Outreach $120,000
The Salvation Army $143,484
Total Allocation ESG-CV: $263,484
824
10 Tenant Based Rental Assistance
Identified Activity Proposed Amount
United Way – Forward Home $200,000
Total Allocation ESG-CV: $200,000
11 825
Unallocated
Identified Activity Proposed Amount
Ventura County Health Services
Agency – Emergency Shelter $651,589
Total Allocation ESG-CV: $651,589
826
12 Requests that the City Council:
1. Conduct a public hearing and receive public comments relating to the following documents to be submitted to the United States Department of Housing and Urban Development for the First Amendment to the 2021-2022 Annual Action and Funding Plan to close and reallocate slow- or no-spending activities within the Community Development Block Grant program to projects moving forward between now and the close of the fiscal year, and to further define activities within the Emergency Shelter Grant – CARES Act program with specific funding awards both described in Attachment 1;
2. Approve the updated changes in activities pertinent to this Mid-Year Reallocation as described in Attachment 1, and the 2021 Amendment to the Annual Action Plan, and the 2020 Amendment to the Annual Action Plan.
Recommendation
13 827
3. Authorize the City Manager and his designees, to execute the required applications, certifications, and other pertinent documents for the submission of the 2021 Annual Action Plan Amendment to the United States Department of Housing and Urban Development, and the Second Amendment to the 2020 Annual Action Plan relating to the Emergency Solutions Grant – CARES Act;
4. Authorize the City Manager and his designees, to execute the appropriate agreements with Community Development Block Grant and Emergency Shelter Grant-CV partners, consultants and contractors, and the ability to adjust any future funding of the Mid-Year activities not to exceed $50,000, if the programs require more or less funding to meet their objectives;
14 Recommendation
828
5. Authorize the City Manager and his designees, to incorporate any recommended changes resulting from public input to the First Amendment of the 2021 Annual Action Plan, and the Second Amendment to the 2020 Annual Action Plan, as directed by the City Council, including amending any budget appropriations approved by the City Council; and
6. Authorize the Finance Department to make the necessary revenue and expenditure changes to the fiscal year 2022 budget reflecting the amended budgets for the Community Development Block Grant and the Emergency Shelter Grant-CARES Act reallocations described in the 2020 and 2021 Mid-Year budgets
15 Recommendation
829
CITY COUNCIL AGENDA REPORT
REPORTS
AGENDA ITEM NO. M.1
DATE: April 19, 2022
TO: City Council
FROM: Michael Wolfe, Public Works Director, (805) 385-8055, [email protected] SUBJECT: First Amendment to Agreement A-8332 with Separation Processes, Inc. for the Groundwater Desalter Improvement Project PW 21-44. (0/5/5)
RECOMMENDATION
That the City Council approve and authorize the Mayor to:
1. Execute a First Amendment to Agreement A-8332 with Separation Processes, Inc. (SPI) in the amount of $263,702 for a new not to exceed contract amount of $1,063,656 for additional design work required for the Groundwater Desalter Improvement Project PW 21-44 (Project No. 216508) and
2. Approve a budget transfer in the amount of $263,702 from the Water Metering Operations (601-6003) to the Existing Desalter Upgrades Water Capital Project No. 216508.
(This item did not originate in Committee as this is a capital improvement project specifically listed in the City's Capital Improvement Program budget, which was previously approved by the City Council.) Please click the following link to view the required Measure M pre-recorded presentation video: https://youtu.be/_UmqeFFrwQ
BACKGROUND
On June 15, 2021, the City Council approved Agreement A-8332 with Separation Processes, Inc. (SPI), in the amount of $799,954 for design services for the Desalter Improvement Project. The initial scope of work included:
Replacing Train 1 reverse osmosis membranes at the plant Pipework modifications to allow for full saturation of membranes during non-operation Assessing, repairing, or replacing actuators and valves Plant modifications associated with heavy equipment access Reliability associated with available parts and equipment Studying the potential of brine minimization
Brine minimization pilot study
Providing design drawings and documentation for permanent brine minimization equipment CIP Reference
Project No. 216508 - Groundwater Desalter Improvement Project - CIP 2021-2026 - Adopted May 18, 2021 – Page 180
DISCUSSION
830
As part of the original scope of work SPI developed a Preliminary Design Report (PDR) that included a basis for design, treatment and equipment options, life cycle costs, and a preliminary construction cost estimate. Two workshops were held with the Water Division, Public Works Engineering, and SPI. Through the PDR process additional design parameters were identified as follows:
Clean-in-place process is labor intensive, requiring multiple operators, and manual dosing of cleaning solution. Clean-in-place tank volume is not adequate to perform the process for more than one reverse osmosis membrane train at a time.
A variable frequency drive that is part of the clean-in-place process is at the end of its useful life and required repair over the last 6-months.
Clean-in place is the process by which the reverse osmosis membranes are treated with a solution and flushed. This process prevents fouling, restores operational efficiency, and prolongs the useful life of the membranes. The current clean-in-place process is labor intensive, requires multiple water treatment operators, and manual mixing of the cleaning solution. SPI provided a proposal for the additional work required to deliver a fully integrated design that will allow for:
Full automation of the clean-in-place process
Replacement of aged equipment and tanks
The design and integration of a fully automated clean-in-place process will reduce the number of staff hours required to complete the process, allowing for the process to occur more frequently with less coordination. This process change will result in an overall improvement in system reliability and increase in operational efficiency.
The proposal was reviewed by the City Engineer, the Water Division Manager, and the Supervising Civil Engineer.
STRATEGIC PRIORITIES
This agenda item supports the Infrastructure and Natural Resources strategy. The purpose of the Infrastructure and Natural Resources strategy is to preserve and improve our roads, utilities, parks, trees, water supply and natural resources through effective planning, prioritization, and an equitable and efficient use of available funding.
FINANCIAL IMPACT
The total amount of this First Amendment to Agreement A-8332 with SPI shall not exceed $263,702 with a new not to exceed contract amount of $1,063,656 for professional design services. The Existing Desalter Upgrade Project No. 216508 has a current project budget balance of $47,478 as of March 22, 2022. A budget transfer in the amount of $263,702 is needed from available appropriations in the Water Meter Operations Repair Parts (account no. 601-6003- 843.81-21) to the Existing Desalter Upgrade Water Capital Project 216508 to provide sufficient funds to execute this Amendment.
COMMITTEE OUTCOME
This item did not originate in Committee as this is a capital improvement project specifically listed in the City's Capital Improvement Program budget, which was previously approved by the City Council.
Prepared by: Tatiana Arnaout, City Engineer
ATTACHMENTS
1. First Amendment To SPI Agreement A-8332 w Exhibits
2. Oxnard GDIP.CIP System Upgrade Proposal
3. Separation Processes Inc. A-8332
4. Budget Appropriation SPI 216508
5. Presentation
831
832
Agreement No. A-8332
FIRST AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT (V-01-17-19))
FIRST AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT
This First Amendment (“First Amendment”) to the Agreement for Professional Services (“Agreement”) is made and entered into in the County of Ventura, State of California, this 19th day of April, 2022, by and between the City of Oxnard, a municipal corporation (“City”), and Separation Processes, Inc. (“Consultant”). This First Amendment amends the Agreement entered into on June 15, 2021, by City and Consultant.
City and Consultant agree as follows:
1. The Schedule of Services in Section 4 of the Cover Page of the Agreement is hereby amended to “See Schedule of Services Exhibit, which is attached hereto and incorporated herein.”
2. The date in Section 5 of the Cover Page of the Agreement is hereby amended to “December 31, 2024.”
3. The amount in Section 6 of the Cover Page of the Agreement is hereby amended to “$1,063,656.00”
4. The following is attached hereto and incorporated herein by this reference into the Agreement: Schedule of Services Exhibit.
5. The reference to the Scope of Services Exhibit everywhere it is listed both on the Cover Page and in the Agreement is hereby amended to add also the Scope of Services as of April 19, 2022 Exhibit. The Scope of Services as of April 19, 2022 Exhibit is attached hereto and incorporated herein by this reference.
6. The reference to the Rates and Costs Exhibit everywhere it is listed both on the Cover Page and in the Agreement is hereby amended to add also the Rates and Costs as of April 19, 2022 Exhibit. The Rates and Costs as of April 19, 2022 Exhibit is attached hereto and incorporated herein by this reference.
7. The following Section 38 Iran Contracting Act Certification shall be added to the Agreement.
“In accordance with Public Contract Code Section 2200 et seq., the City requires that any person that submits a bid or proposal or otherwise proposes to enter into or renew a contract with the City with respect to goods or services of one million dollars ($1,000,000) or more, must certify at the time an Agreement is signed or renewed, that the person is not identified on a list created pursuant to subdivision (b) of Public Contract Code Section 2203 as a person engaging in investment activities in Iran described in subdivision (a) of Public Contract Code Section 2202.05 as applicable. The form of such Iran Contracting Certificate is included with this Agreement and must be signed and dated under penalty of perjury.”
8. The following is attached hereto and incorporated herein by this reference into the Agreement: Iran Contracting Act Certification.
833
2 9. As so amended, the Agreement remains in full force and effect. [Signatures on next page]
834
Agreement No. A-8332
FIRST AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT (V-01-17-19)) IN WITNESS WHEREOF, the parties hereto have executed the Amendment on the date first written above.
CITY OF OXNARD SEPARATION PROCESSES, INC.
☒ John C. Zaragoza, Mayor1 Date James C. Vickers, P.E, CEO2 Date ☐ Alexander Nguyen, City Manager
☐ _______, Purchasing Manager
☐ ___________, Buyer
Alex E. Wesner, P.E, Secretary Date
ATTEST:
Rose Chaparro, City Clerk Date
(only if Mayor signs)
APPROVED AS TO FORM:
Stephen M. Fischer, City Date
Attorney (always required)
1The City Council must authorize and the Mayor must sign the amendment if the original contract and all amendments collectively total over $200,000 annually. The City Manager may authorize and sign the amendment if the original contract and all amendments collectively total over $100,000 but up to $200,000 annually. The Purchasing Manager may authorize and sign the amendment if the original contract and all amendments collectively total up to $100,000 annually. A Buyer may authorize and sign the amendment if the original contract and all amendments collectively total up to $25,000 annually. 2 The City requires the following for any contract:
• For a corporation, the signatures of the Board President, CEO or Vice President and of the Board Secretary, Assistant Secretary, CFO or Assistant Treasurer;
• For an LLC, the signatures of at least two managers of the LLC (company directors, not lower-level managers); or • For a partnership, the signature of a partner. If the partnership is a limited partnership, the signer must be a general partner.
If the company has a different structure, or if the above-listed persons are not the appropriate signers, please submit to the City Attorney legally-binding documentation stating who can sign and bind your company. 835
SCHEDULE OF SERVICES EXHIBIT
836
837
SCOPE OF SERVICES AS OF APRIL 19, 2022 EXHIBIT
Consultant will perform additional design work that will allow for the demolition and replacement of the existing RO CIP and Neutralization system equipment, pipework and valves and replace it with new equipment, including automation of the system pumps and valves to allow automated and/or remote-manual cleanings. The scope of work is further defined as follows:
1. An update the plant upgrade preliminary design report to include the new proposed system equipment. The information will include a preliminary P&ID and mechanical layout for the proposed new system equipment. An updated cost estimate will be prepared as well.
2. Complete construction drawings, including demolition drawings for the existing equipment.
3. Construction specifications for the proposed equipment including control descriptions for the automated system.
4. Existing electrical and instrumentation system infrastructure will be expanded to accommodate the new system equipment, including additional automated valves.
5. It is assumed the existing CIP system may be taken out of service and construction of the new system completed without provision of temporary facilities. 838
RATES AND COSTS AS OF APRIL 19, 2022 EXHIBIT
839
AGREEMENT FOR PROFESSIONAL SERVICES (V01/29/15)
12 IRAN CONTRACTING ACT CERTIFICATION
(TO BE EXECUTED AND SUBMITTED WITH THE AGREEMENT)
Public Contract Code Sections 2202-2208
Pursuant to Public Contract Code 2204.(a) A public entity shall require a person that is submits a bid or proposal to, or otherwise proposes to enter into or renew a contract with, a public entity with respect to a contract for goods or services of one million dollars ($1,000,000) or more to certify, at the time an Agreement is signed or renewed, that the person is not identified on a list created pursuant to subdivision (b) of Section 2203 as a person engaging in investment activities in Iran described in subdivision (a) of Section 2202.5 or as a person described in subdivision 9b) of Section 2202.5, as applicable.
To comply with this requirement, please insert your company/entity and Federal ID number (if available) and complete one of the options below. Please note, California law established penalties for providing false certifications, including civil penalties equal to the greater of $250,000 or twice the amount of the contract for which the false certification was made, contract termination and three-year ineligibility to bid on contract in accordance with Public Contract Code section 2205.
OPTION No.1 – CERTIFICATION
I, the official named below, certify I am duly authorized to execute this certification on behalf of the company/entity identified below, and the company/entity identified below is not on the current list of persons engaged in investment activities in Iran created by DGS and is not a financial institution extending twenty million dollars ($20,000,000) or more in credit to another person or entity, for 45 days or more, if that other person or company/entity will use the credit to provide goods or services in the energy sector in Iran and is identified on the current list of persons engaged in investment activities in Iran created by DGS in accordance with subdivision (b) of Public Contract Code 2203.
Company Name/Financial Institution (printed): Federal ID Number (or n/a):
By (Authorized Signature):
___________________________________________
Printed Name & Title of Person Signing: Date Executed
_____________________________________________ __________________________ Executed in the County of________________________________ in the State of __________________ OPTION No.2 – EXEMPTION
Pursuant to Public Contract Code sections 2203(c) and (d), a public entity may permit a vendor/financial institution engaged in investment activities in Iran, on a case-by-case basis, to be eligible for, or to bid on, submit a proposal for, or enters into or renews, a contract for goods and services. If you have obtained an exemption from the certification requirement under the Iran Contracting Act, please fill out the information below and attach documentation demonstrating the exemption approval.
Company Name/Financial Institution (printed): Federal ID Number (or n/a):
By (Authorized Signature):
_____________________________________________
Printed Name & Title of Person Signing: Date Executed
____________________________________________ ________________________ Executed in the County of_____________________________________ in the State of ____________ 840
Separation Processes, Inc.
3152 Lionshead Ave.
Carlsbad, CA 92010
Tel: 760-400-3660
Fax: 760-400-3661
www.spi-engineering.com
December 7, 2021
Tim Beaman
Public Works Department, Engineering
6001 Perkins Road
Oxnard, CA 93033
Subject: CIP System Upgrade and Automation Project
Separation Processes, Inc. (SPI) in association with GHD is pleased to submit this Proposal for Professional Services for the City of Oxnard’s Groundwater Desalter Improvement CIP System Automation and Upgrade Project. The work would be conducted as an amendment to our existing plant upgrade scope of services.
The proposed work is generally described as demolition and replacement of the existing RO CIP and Neutralization system equipment, pipework and valves and replace it with new equipment, including automation of the system pumps and valves to allow automated and/or remote-manual cleanings. The scope of work is further defined as follows:
1. An update the plant upgrade preliminary design report to include the new proposed system equipment. The information will include a preliminary P&ID and mechanical layout for the proposed new system equipment. An updated cost estimate will be prepared as well.
2. Complete construction drawings, including demolition drawings for the existing equipment.
3. Construction specifications for the proposed equipment including control descriptions for the automated system.
4. Existing electrical and instrumentation system infrastructure will be expanded to accommodate the new system equipment, including additional automated valves.
5. It is assumed the that existing CIP system may be taken out of service and construction of the new system completed without provision of temporary facilities.
With the expanded scope we have updated the project schedules (attached). We request that the current Agreement Ending Date be extended to 700 days as a consequence of this amendment.
The attached cost proposal includes all labor, transportation, administrative, overhead, and incidentals and all other items as listed in the scope of work. We have submitted the cost by task, to include the number of hours, level of team member performing the task and any direct costs. This is a time and materials, not-to-exceed cost to deliver the scope of work. 841
December 7, 2021
City of Oxnard
Subject: CIP System Upgrade and Automation Project
If you should have any questions, please do not hesitate to contact me.
Sincerely,
Alex E Wesner, P.E.
Vice President
Attach
842
ID Task Name Duration Start Finish
1 2. Data Gathering, Site Visit, and Preliminary
Design Report
157 days Tue 7/13/21 Wed 2/16/22
2 Preliminary Design Report (PDR) 64 days Tue 7/13/21 Fri 10/8/21 11 Deliverable: Draft PDR 0 days Fri 10/8/21 Fri 10/8/21 12 Draft PDR City Review and Comment 6 days Mon 10/11/21 Mon 10/18/21 13 Develop Updated Draft PDR (Including Replacement
CIP System)
66 days Tue 10/19/21 Tue 1/18/22
14 Deliverable: Updated Draft PDR (Including
Replacement CIP System)
0 days Tue 1/18/22 Tue 1/18/22
15 Updated Draft PDR City Review and Comment 6 days Wed 1/19/22 Wed 1/26/22 16 Develop Final PDR 15 days Thu 1/27/22 Wed 2/16/22
17 Deliverable: Final PDR 0 days Wed 2/16/22 Wed 2/16/22 18 3. 75% Design Services 32 days Thu 2/17/22 Fri 4/1/22 19 75% Design 27 days Thu 2/17/22 Fri 3/25/22
26 Deliverable: 75% Design Package 0 days Fri 3/25/22 Fri 3/25/22 27 75% Design Package City Review and Comment 5 days Mon 3/28/22 Fri 4/1/22 28 4. Final Design Services 24 days Mon 4/4/22 Thu 5/5/22 29 4.1 90% Design 12 days Mon 4/4/22 Tue 4/19/22
30 Deliverable: 90% Design Package 0 days Tue 4/19/22 Tue 4/19/22 31 90% Design Package City Review and Comment 4 days Wed 4/20/22 Mon 4/25/22 32 4.2 Final Design 8 days Tue 4/26/22 Thu 5/5/22
33 Deliverable: Final Design Submittal 0 days Thu 5/5/22 Thu 5/5/22 34 5. Bid Phase Services 65 days Fri 5/6/22 Thu 8/4/22
35 Bid Phase Assistance 65 days Fri 5/6/22 Thu 8/4/22
39 6. Construction Phase Services 65 days Fri 8/5/22 Thu 11/3/22 40 Construction Phase Assistance 65 days Fri 8/5/22 Thu 11/3/22 47 Deliverable: Record Drawings and Standard
Operating Procedures
0 days Thu 10/27/22 Thu 10/27/22
10/8
1/18
2/16
3/25
4/19
5/5
10/27
Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2, 2021 Qtr 3, 2021 Qtr 4, 2021 Qtr 1, 2022 Qtr 2, 2022 Qtr 3, 2022 Qtr 4, 2022 Qtr 1, 2023 Qtr 2, 2023 Qtr 3, 2023 Qtr 4, 2023 Qtr 1, 2024 Qtr 2, 2024 843
ID Task Name Duration Start Finish
1 7. Brine Minimization Feasibility Study 155 days Tue 7/13/21 Mon 2/14/22 2 7.1 Technical Memorandum (TM-1) 145 days Tue 7/13/21 Mon 1/31/22 3 Deliverable: Draft TM-1 0 days Mon 1/31/22 Mon 1/31/22 4 Draft TM-1 City Review and Comment 5 days Tue 2/1/22 Mon 2/7/22 5 Develop Final TM-1 5 days Tue 2/8/22 Mon 2/14/22
6 Deliverable: Final TM-1 0 days Mon 2/14/22 Mon 2/14/22 7 8. Brine Minimization Pilot Study 143 days Tue 2/15/22 Thu 9/1/22 8 8.1 Pilot Design Drawings and Bid Documents 10 days Tue 2/15/22 Mon 2/28/22 9 Deliverable: Draft Pilot Design Drawings and Bid
Documents
0 days Mon 2/28/22 Mon 2/28/22
10 Draft Pilot Design Drawings and Bid Documents City
Review and Comment
4 days Tue 3/1/22 Fri 3/4/22
11 Develop Final Pilot Design Drawings and Bid
Documents City Review and Comment
4 days Mon 3/7/22 Thu 3/10/22
12 Deliverable: Final Pilot Design Drawings and Bid
Documents
0 days Thu 3/10/22 Thu 3/10/22
13 Pilot Construction and Operation 90 days Fri 4/15/22 Thu 8/18/22 16 8.4 Technical Memorandum (TM-2) 7 days Fri 8/12/22 Mon 8/22/22 17 Deliverable: Draft TM-2 0 days Mon 8/22/22 Mon 8/22/22 18 Draft TM-2 City Review and Comment 4 days Tue 8/23/22 Fri 8/26/22 19 Develop Final TM-2 4 days Mon 8/29/22 Thu 9/1/22
20 Deliverable: Final TM-2 0 days Thu 9/1/22 Thu 9/1/22 21 9. Brine Minimization Preliminary Design Report 28 days Fri 9/2/22 Tue 10/11/22 22 Preliminary Design Report (PDR) 17 days Fri 9/2/22 Mon 9/26/22 30 Deliverable: Draft Brine Minimization PDR 0 days Mon 9/26/22 Mon 9/26/22 31 Draft Brine Minimization PDR City Review and Comment 5 days Tue 9/27/22 Mon 10/3/22 32 Develop Final Brine Minimization PDR 6 days Tue 10/4/22 Tue 10/11/22 33 Deliverable: Final Brine Minimization PDR 0 days Tue 10/11/22 Tue 10/11/22 34 10. 75% Design Services 39 days Wed 10/12/22 Mon 12/5/22 35 75% Design 34 days Wed 10/12/22 Mon 11/28/22
43 Deliverable: 75% Design Package 0 days Mon 11/28/22 Mon 11/28/22 44 75% Design Package City Review and Comment 5 days Tue 11/29/22 Mon 12/5/22 45 11. Final Design Services 24 days Tue 12/6/22 Fri 1/6/23 46 11.1 90% Design 12 days Tue 12/6/22 Wed 12/21/22
47 Deliverable: 90% Design Package 0 days Wed 12/21/22 Wed 12/21/22 48 90% Design Package City Review and Comment 4 days Thu 12/22/22 Tue 12/27/22 49 11.2 Final Design 8 days Wed 12/28/22 Fri 1/6/23
50 Deliverable: Final Design Submittal 0 days Fri 1/6/23 Fri 1/6/23 51 12. Bid Phase Services 65 days Mon 1/9/23 Fri 4/7/23 52 Bid Phase Assistance 65 days Mon 1/9/23 Fri 4/7/23
56 13. Construction Phase Services 130 days Mon 4/10/23 Fri 10/6/23 57 Construction Phase Assistance 130 days Mon 4/10/23 Fri 10/6/23 64 Deliverable: Record Drawings and Standard
Operating Procedures
0 days Fri 9/29/23 Fri 9/29/23
1/31
2/14
2/28
3/10
8/22
9/1
9/26
10/11
11/28
12/21
1/6
9/29
Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2, 2021 Qtr 3, 2021 Qtr 4, 2021 Qtr 1, 2022 Qtr 2, 2022 Qtr 3, 2022 Qtr 4, 2022 Qtr 1, 2023 Qtr 2, 2023 Qtr 3, 2023 Qtr 4, 2023 Qtr 1, 2024 Qtr 2, 2024 844
Rate ($/Hr.) $ 255 $ 243 $ 255 $ 162 $ 140 $ 128 $ 124 $ 77 $ 255 $ 235 $ 215 $ 170 $ 215 $ 170 $ 110 $ 90 $ 195 $ 195 Ph Task Description PIC QC PM PE2 E2 E1 CAD Admin QC PE3 EE2 EE1 SE CAD Est. Civil Admin SCADA Total Hrs ODC ODC Assoc Cost Total Cost 1 Program Management 0 0 18 9 0 0 0 16 10 24 8 0 8 0 0 2 8 8 111 $ 400 $ - $ - $ 22,780 2 30% Design/PDR 0 4 21 48 0 0 40 0 2 8 18 12 18 32 8 2 12 32 301 $ 400 $ - $ - $ 54,343 3 75% Design Services 0 9 33 51 0 0 124 6 2 8 16 30 16 40 8 4 8 40 467 $ - $ - $ - $ 79,092 4 Final Design Services 0 9 42 89 0 0 116 6 2 8 8 16 10 24 8 0 4 20 408 $ - $ - $ - $ 68,581 5 Bid Phase Services 0 0 0 0 0 0 0 0 4 12 2 6 8 0 0 2 4 4 50 $ - $ - $ - $ 10,300 6 Const. Phase Services 0 0 20 44 0 0 12 0 2 8 12 0 16 0 0 0 8 8 150 $ - $ - $ - $ 28,606 0 22 134 241 0 0 292 28 22 68 64 64 76 96 24 10 44 112 1487 $ 800 $ - $ - $ 263,702 SPI Hours GHD Hours SPI GHD
Phase 1
Phase 1 Sub Total
845
846
847
848
849
850
851
852
853
854
855
856
857
858
859
860
861
862
863
864
865
866
867
868
869
870
871
872
Department: Date:
Project/Program
Manager: Phone:
Reason for Appropriation:
Accounts and Descriptions AMOUNT
Fund:
Expenditures/Transfers Out
263,702
Sub-total Expenditures 263,702
Net Change to Fund Balance (263,702)
Net Appropriation Change 263,702
Approvals
Department Director
Chief Financial Officer
City Manager
601 WATER OPERATING FUND
PROJECT 216508 EXISTING DESALTER UPGRDS
601-6551-821.82-09 SVCS - OTHER PROFESSIONAL
REQUEST FOR BUDGET APPROPRIATION
Public Works/Engineering March 22, 2022
Tim Beaman (805)385-8141
Budget appropriation to fund the First Amendment to Agreement A-8332 with Separation Processes, Inc. for the Groundwater Desalter Plant (Project No. 216508).
REQUIRES CITY COUNCIL AUTHORIZATION
BA# (Finance Use Only)______________
BA Doc# (Finance Use Only)___________
Revised : 2/23/2012
DocuSign Envelope ID: 45A1A774-F505-44CB-9B5B-9E77AB16F470 873
AGREEMENT: A-8332
PW 21-44
CIP SHEET 180
Tatiana Arnaout, PE, City Engineer
GROUNDWATER DESALTER IMPROVEMENT
PROJECT PRESENTATION TO CITY
COUNCIL
April 19, 2022
874
RECOMMENDATION 2
That the City Council approve and authorize the Mayor to:
1. Execute a First Amendment to Agreement A-8332 with
Separation Processes, Inc. (SPI) in the amount of $263,702 for a new not to exceed contract amount of $1,063,656 for
additional design work required for the Groundwater Desalter Improvement Project PW 21-44 (Project No. 216508) and
2. Approve a budget
appropriation transfer in the
amount of $263,702 from the
Water Operations Fund to
the Water Capital Project
No. 216508.
875
BACKGROUND 3
• The original scope of work for the design phase included solutions to operational issues including:
• Submerging the RO membranes
• Hydraulic restrictions
• Valves and actuators
• Air release valves
• Traffic rated grating
• Meetings were held with operators as part of development of the Preliminary Design Report, during which shortfalls within the RO membrane clean-in-place process were
identified.
876
GOALS AND OBJECTIVES – DESALTER CLEAN-IN-PLACE 4
• Automation of clean-inplace process
• Replacement of aged
equipment and tanks
• Increased solution &
neutralization tank
capacity
• SCADA and integration
877
DISCUSSION 5
By adding the above scope of work to the Groundwater Desalter Improvement Project we are proactively addressing operational issues and prioritizing the replacement of equipment that has reached the end of it’s useful life.
878
FINANCIAL IMPACT 6
AGREEMENT A-8243
Agreement A-8332 $799,954
Amendment No. 1 $263,702
Total Project Cost: $1,063,656
• The Groundwater Desalter Improvement Project No. 216508 has a current project budget balance of $47,478 as of March 22, 2022 • A budget appropriation transfer in the amount of $263,702 from available appropriations in the Water Operations Fund to the Water Capital Fund in Project No. 216508 is needed to provide sufficient funds to execute this Amendment
879
QUESTIONS
880
7 CITY COUNCIL AGENDA REPORT
REPORTS
AGENDA ITEM NO. M.2
DATE: April 19, 2022
TO: City Council
FROM: Michael Wolfe, Public Works Director, (805) 385-8055, [email protected] SUBJECT: Agreement A-8456 with ELS Architecture and Urban Design for South Oxnard Aquatic Center Professional Design Services. (0/15/15)
RECOMMENDATION
That the City Council approve and authorize the Mayor to execute Agreement A-8456 with ELS Architecture and Urban Design, in an amount of $3,900,057 for professional design services for the South Oxnard Aquatic Center Improvement Project (Project No. 225502).
(This item did not originate in Committee as this is a capital improvement project specifically listed in the Capital Improvement Program budget, which was previously approved by the City Council.) Please click the following link to view the required Measure M pre-recorded presentation video: https://youtu.be/Sm357l99-FQ
BACKGROUND
In July 2021, the City, with the assistance of State Senator Monique Limón, was awarded $5,000,000 from the State of California (State) to design and construct the South Oxnard Aquatic Center in the current vacant City-owned property adjacent to College Park . The grant funds will allow the City to conduct community outreach and the architectural/engineering design of the aquatic center.
Following the grant award, the City sought a consultant team to provide architecture and engineering design services for the South Oxnard Aquatic Center Improvement Project (Project No. 225502). The project scope involves public outreach and participatory community design, cost analysis, architectural and engineering design, and preparation of plans and specifications for the proposed improvements.
The proposed Aquatics Center will service the City’s youth, adults, and seniors and provide for expansion of recreation, water fitness, and competitive aquatics opportunities. The Aquatic Center will equip the residents of Oxnard, a coastal community, with water safety knowledge and provide a family-friendly environment for the residents of Oxnard.
The overarching goal is to design and construct a community-based aquatics center that provides a variety of features which meets the needs of residents of all ages. At this time the detailed programming has not been established and the design consultant will assist the City in honing in on the programming through community, stakeholder, and City staff engagement as well as factoring in cost of construction and subsequent operation and maintenance.
Capital Improvement Project (CIP) Reference:
Project No. 225502 – Oxnard Aquatic Center - CIP 2021-2026 - Adopted May 18, 2021 – Page 51. 881
DISCUSSION
The notice inviting request for proposals (RFP) from qualified consultants for architecture and engineering design services for the project was published on November 5, 2021, and all proposals were due on December 15, 2021. The specific work for this contract includes Community Outreach, Architecture and Engineering Design Services, Development of an Operations & Maintenance Manual and Construction Coordination services to ensure that the construction being performed is in conformance with the contract specifications. The selected consultant team is to work closely with the City’s Project Manager and staff to successfully complete the project and protect the interest of the City.
The City received a total of seven proposals which included ELS Architecture and Urban Design (ELS), Barker Rinker Seacat Architecture, IBI Group, Little Diversified Architectural Consulting, Inc., LPA, Inc., RJM Design Group, and Roesling Nakamura Terada Architects, Inc. Staff scored all seven proposals using a standardized scoring sheet pursuant to the Oxnard Municipal Code. The top three highest scored firms were then interviewed on January 19, 2022 for final selection.
City staff consisting of the Assistant Cultural & Community Services Director, City Engineer, and Supervising Civil Engineer evaluated qualifications for all consultants. In addition to the aforementioned staff, the Assistant City Manager, Public Works Director, and Cultural & Community Services Director participated in the interview of the top three firms. The selection group ultimately recommended ELS as the most qualified firm to satisfactorily provide architecture and engineering design services for the project. Following this determination, staff reviewed all documentation received from ELS and verified and approved possession of the required currently valid certificate of insurance. Based upon the available information and research performed to date, staff believes that the consultant is capable of satisfactorily completing the project. Thus, staff recommends that the contract for this scope be awarded to ELS. This is a major step forward in achieving one of the City Council's 5-Year Priorities, Build an Aquatics Center in South Oxnard.
The community engagement phase will commence as soon as the contract is executed and the project kick-off meeting is completed. The outreach phase is anticipated to take approximately three (3) months and will consist of three (3) community workshops each of which will progressively gather input from the community based on an initial conceptual design effort and continue until a preferred, consensus concept is developed. Following the community engagement and final selection of programming for the Aquatic Center, the design team will take approximately ten (10) months to complete the plans, specifications and estimates for this project.
STRATEGIC PRIORITIES
This agenda item supports the Quality of Life strategy. The purpose of the Quality of Life strategy is to restore and increase quality services and programs that enrich Oxnard's diverse community, promotes safe neighborhoods, encourages community engagement, and supports our residents in their efforts to improve their quality of life.
FINANCIAL IMPACT
The total cost for this agreement with ELS shall not exceed $3,900,057. There is sufficient funding available from an existing appropriation of $5.0 million in State grant funds (Fund #219-5595) in the South Oxnard Aquatic Center Improvement Project (Project No. 225502) for this phase of the project.
COMMITTEE OUTCOME
This item did not originate in Committee as this is a capital improvement project specifically listed in the Capital Improvement Program budget, which was previously approved by the City Council.
Prepared by: Tatiana Arnaout, City Engineer
ATTACHMENTS
1. A-8456 ELS PW 22-55_S Oxnard Aquatic Center
2. Presentation
882
Agreement No. A-8456
AGREEMENT FOR PROFESSIONAL SERVICES
COVER PAGE
(1) Agreement Start Date: April 25, 2022
(2) Consultant: ELS
(3) Services: Professional Architecture and Engineering Services for the South Oxnard Aquatic Center Improvement Project, Specification No. PW 22-55. (4) Schedule of Services: The services must be completed within four (4) years of the Agreement Start Date stated above.
(5) Agreement Ending Date: April 24, 2026
(6) Total Agreement Amount: shall not exceed three million, nine hundred thousand, and fifty-seven dollars ($3,900,057.00) during the Agreement Term. (7) City’s Project Manager: Tatiana Arnaout, P.E., City Engineer (8) Consultant’s Project Manager: Clarence Mamuyac, Jr., FAIA, LEED APBD+C, NCARB President and CEO/Project Principal
(9) Insurance Coverage: INS-A
(10) Addresses for Notice:
FOR CONSULTANT: FOR CITY:
ELS Architecture and Urban Design City of Oxnard Public Works Engineering 2040 Addison Street 305 West Third Street, 2nd Floor East Berkeley, CA 94704 Oxnard, CA 93030
Attn: Clarence Mamuyac Attn: Tatiana Arnaout, P.E., City Engineer (11) Contact Emails:
CONSULTANT’S PROJECT CITY’S PROJECT MANAGER:
MANAGER:
[email protected] [email protected]
The Agreement for Professional Services is attached hereto and incorporated herein by this reference. The following exhibits are also attached hereto and incorporated herein by this reference into the Agreement:
☒ Scope of Services Exhibit
☒ Rates and Costs Exhibit
☒ Prevailing Wages Exhibit
☒ Insurance Exhibit (INS-A)
☒ Iran Contracting Act Certification Form (signature required) 883
Agreement No. A-8456