Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Erika Garcia <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Monday, December 5, 2022 5:14:58 PM GMT-08:00 Date Received: Monday, December 5, 2022 5:15:12 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision. 1 / 81
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely and thank you,
Erika Garcia
2 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Katya Acuña <[email protected]>
To: "[email protected]" <[email protected]>
Cc: "[email protected]" <[email protected]>, "[email protected]" <[email protected]>, "[email protected]" <[email protected]>, "[email protected]" <[email protected]>, "[email protected]" <[email protected]>, "[email protected]" <[email protected]> Date Sent: Monday, December 5, 2022 4:20:07 PM GMT-08:00 Date Received: Monday, December 5, 2022 4:20:10 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to 3 / 81
Exported using Save Emails to PDF by cloudHQ
families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely, Sent from my iPhone
4 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: ARMY 875 <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Monday, December 5, 2022 4:11:25 PM GMT-08:00 Date Received: Monday, December 5, 2022 4:11:38 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk.
The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front 5 / 81
Exported using Save Emails to PDF by cloudHQ
the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely,
6 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Marty Chapman <[email protected]>
To: "[email protected]" <[email protected]>
Cc: "[email protected]" <[email protected]>, "[email protected]" <[email protected]>, "[email protected]" <[email protected]>, "[email protected]" <[email protected]>, "[email protected]" <[email protected]>, "[email protected]" <[email protected]>
Date Sent: Monday, December 5, 2022 3:07:49 PM GMT-08:00 Date Received: Monday, December 5, 2022 3:07:56 PM GMT-08:00 To: [email protected]
CC: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected] Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme – Temporary Outdoor Vehicle Storage Facility Project
Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion. The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250-acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes. This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our 7 / 81
Exported using Save Emails to PDF by cloudHQ
air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk.
The 34-acre GLOVIS Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime.
Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice!
Sincerely,
Marty Chapman
Marty Chapman (He, Him and His)
Patagonia, Inc.
Global Repair Operations Manager
259 W. Santa Clara St
Ventura, Ca 93001
Cell.805.320.8564
Wk Desk 805.667.4750
8 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Beatriz Basurto <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Monday, December 5, 2022 3:00:06 PM GMT-08:00 Date Received: Monday, December 5, 2022 3:00:30 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision. 9 / 81
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely, Beatriz Basurto
10 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Alexandre Muise <[email protected]>
To: "[email protected] " <[email protected]>
Date Sent: Monday, December 5, 2022 2:35:14 PM GMT-08:00 Date Received: Monday, December 5, 2022 2:35:21 PM GMT-08:00
Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion. The FEIR fails to include an accurate project description including long- term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long- term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250-acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes. This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
11 / 81
Exported using Save Emails to PDF by cloudHQ
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero- emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice!
Sincerely,
Alex Muise
MSW- Ventura County
12 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Hollie Pennington <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Monday, December 5, 2022 2:28:57 PM GMT-08:00 Date Received: Monday, December 5, 2022 2:29:09 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion. The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250-acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes. This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to 13 / 81
Exported using Save Emails to PDF by cloudHQ
enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice!
Sincerely,
Hollie Pennington
14 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme – Temporary Outdoor Vehicle Storage Facility Project
From: Melissa DeStefano <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Monday, December 5, 2022 2:00:55 PM GMT-08:00 Date Received: Monday, December 5, 2022 2:01:09 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion. The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250-acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes. This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to 15 / 81
Exported using Save Emails to PDF by cloudHQ
enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice!
Sincerely,
Melissa DeStefano
Oxnard Resident
16 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: Written comments - City Council meeting December 6, 2022 - Agenda Item G.1 From: Louise Lampara <[email protected]>
To: "[email protected]" <[email protected]>
Date Sent: Monday, December 5, 2022 1:13:18 PM GMT-08:00 Date Received: Monday, December 5, 2022 1:13:58 PM GMT-08:00 Attachments: December 6 2022 CoLAB comments to Oxnard City Council_Pt of H_temporary vehicle parking project.pdf Wri en comments for agenda item G.1 (Port of Hueneme temporary vehicle parking project) for tomorrow's City Council mee ng. Thank you.
Louise
“Collaboration for Sensible Regulatory Solutions”
Louise Lampara
Executive Director
Ventura County Coalition of Labor Agriculture and Business C (805)797-5679
Email: [email protected]
Website: www.colabvc.org
17 / 81
Ventura County Coalition of Labor, Agriculture and Business / 1672 Donlon Street, Ventura, CA 93003 / 805-633-2260 / [email protected] Ventura County CoLAB
Board of Directors & Officers
Mark Mooring, Buon Gusto Farms
Chairman
Patrick Loughman,
Lowthorp Richards Attorneys
Vice Chairman
Bud Sloan, Sloan Ranches
President
John Hecht, Sespe Consulting
Vice President
Lynn Gray Jensen,
Jensen Design and Survey
Secretary/Treasurer
Richard Atmore, R.A. Atmore & Sons
Director
Bill Camarillo, Agromin
Director
Melinda Carmichael,
UBS Financial Services
Director
Tim Cohen, Rancho Temescal
Director
Maureen Cottingham, CamLam Farms
Director
Jane Farkas, Carbon California
Director
Alex Teague, Limoneira
Director
Andy Waters, Waters Family Farms
Director
Lisa Woodburn, Jensen Design and Survey
Director
www.colabvc.org
December 6, 2022
Oxnard City Council
City of Oxnard
300 West 3rd Street
Oxnard, CA 93030
via email: [email protected]
Re: Agenda Item G.1 - Port of Hueneme, Temporary Vehicle Storage Facility Project
Dear Mayor Zaragoza and Honorable Members of the Council:
Thank you for the opportunity to provide comments supporting the approval of the Port of Hueneme (Port) temporary vehicle storage facility project. As outlined in the project description, the Port proposes constructing and operating a temporary outdoor vehicle storage facility at the southwest corner of Hueneme Road and Perkins Road in Oxnard.
The Ventura County Coalition of Labor, Agriculture, and Business is a non-profit advocacy organization representing over 550 individuals, businesses, and industries throughout Ventura County and Southern California. Our diverse membership includes business owners, farmers, ranchers, agricultural support services, and property owners who support efforts to improve Ventura County’s economy and local quality of life.
VC CoLAB strongly supports the Port’s proposed project. This project will both create much-needed, high-wage local jobs and assist the City of Oxnard (city) with achieving future greenhouse gas emissions reduction goals by reducing overall freight vehicle miles traveled. The Port has continuously demonstrated its commitment to the local community and environment throughout the permitting process by actively engaging in the public comment process and working proactively with the city to identify, reduce, and mitigate any potential impacts on environmental resources.
We urge the Council to deny the appeal and vote to uphold the Planning Commission’s decision to grant the Port’s application for a Special Use Permit for the temporary vehicle facility.
Sincerely,
Louise Lampara
Executive Director
18 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Janice Talley <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Monday, December 5, 2022 11:53:58 AM GMT-08:00 Date Received: Monday, December 5, 2022 11:54:09 AM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description, including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250-acre expansion project, over seven times as big as th3 34-acre project, all of which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes. This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country, but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant, and long-term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space, and the coast is lined by a wall of polluting industry, making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to 19 / 81
Exported using Save Emails to PDF by cloudHQ
enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road, making it even harder for families to safely access this beach. We must protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front of the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to examine the negative impacts of this project accurately. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice!
Sincerely,
Janice Talley
Ventura County Resident
20 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Gouichi Tanaka <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Monday, December 5, 2022 11:48:56 AM GMT-08:00 Date Received: Monday, December 5, 2022 11:49:35 AM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision. 21 / 81
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely,
Gouichi Tanaka
22 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: [email protected]
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Monday, December 5, 2022 11:42:02 AM GMT-08:00 Date Received: Monday, December 5, 2022 11:42:21 AM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion. The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods.
This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250-acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes. This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks.
This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic 23 / 81
Exported using Save Emails to PDF by cloudHQ
along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast.
Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely,
Francisco Tapia
24 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: scott hooper <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Monday, December 5, 2022 7:00:24 AM GMT-08:00 Date Received: Monday, December 5, 2022 7:00:56 AM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk.
The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front 25 / 81
Exported using Save Emails to PDF by cloudHQ
the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely,
Scott Hooper
333 Rossmore Dr
Oxnard, CA 93035
26 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: Port of Hueneme Temporary Vehicle Storage Project From: Steven Nash <[email protected]>
To: "[email protected]" <[email protected]>,Kenneth Rozell <[email protected]>,Joe Pearson II <[email protected]>,CITY Jay Dobrowalski <[email protected]>,John Zaragoza <[email protected]>,Bryan MacDonald <[email protected]>,"[email protected]" <[email protected]>,"[email protected]" <[email protected]>,Gabe Teran <[email protected]>,"[email protected]" <[email protected]> Date Sent: Monday, December 5, 2022 5:31:12 AM GMT-08:00 Date Received: Monday, December 5, 2022 5:31:18 AM GMT-08:00 Port of Hueneme Temporary Vehicle Storage Project
I would like to submit my comments about this project for your thoughtful consideration. City attorney Ken Rozell has given the planning commissioners his ok to provide our opinions as this project has already been decided by the planning commission and we are thus free to provide verbal and written testimony.
I was the lone “no” vote on the Planning Commission and here are the reasons for my denial of the special use permit No. 18-500-02.
Note: the references pertain to the Planning Commission agenda packet. The City Council packet may have slightly different numbering.
Attachment D - General Plan Consistency Page 1 of 7, Policy CD-1.2 “The proposed project is surrounded by urban development and therefore is infill development.” Comment: I feel this is an incorrect statement as the project is bounded on much of the south by an upper wetlands interface.
Attachment D - General Plan Consistency Page 3 of 7, Policy CD-5.4 “The proposed project would reduce pollution and noise from the current conditions of the operator which transports vehicles to and from the Port at a greater distance than the proposed project location.” Comment: It is my opinion that this is not an “Environmentally Friendly and “Green” Industry”. Saying so doesn’t make it so.
From pg. 4-1 of the FEIR, “As indicated above, a cumulative impact involves two or more individual effects. Per CEQA Guidelines Section 15130(b), the discussion of cumulative impacts shall be guided by the standards of practicality and reasonableness, and should include the following elements:
1. Either: A list of past, present and probable future projects producing related or cumulative impacts, including, if necessary, those projects outside the control of the Agency . . .” Comment: Why aren’t we looking at the cumulative project scenario?
2.3.7.1 TRANSPORTATION IMPACTS ASSOCIATED WITH INADEQUATE EMERGENCY ACCESS, Pg. 14, MM PP-1
“Prior to construction, the Applicant shall prepare a Traffic Control Plan for implementation during the construction phase, as deemed necessary by the City Traffic Engineer. The Plan may include the following provisions, among others: At any time only a single lane is available, the Applicant shall provide a temporary traffic signal, signal carriers (i.e., flag persons), or other appropriate traffic controls to allow travel in both directions.”
Comment: It is my opinion that this is unacceptable as Perkins Road is the only roadway available to the industrial uses located there. Perkins Rd. must remain a 2-lane roadway at all times and emergency vehicles must not experience delays in responding to emergency calls. 27 / 81
Exported using Save Emails to PDF by cloudHQ
Pg 6-3, 6.4.2 Electric Car Carrier Trucks Alternative
“Additionally, to the knowledge of the Port Customer, there are no commercially available electric car carrier trucks.”
~ Volvo, Hyundai and Daimler are developing hydrogen fuel cell trucks. ~ Nicola One is developing a hydrogen fuel cell battery truck.
Comment: What many groups and individuals are trying to tell you is that they are tired of South Oxnard being a sacrifice zone. The Harbor District has done much to reduce GHG and I really appreciate their efforts. But transitioning to this type of truck is important and should be done ASAP in the interest of the health, safety and welfare of the residents of south Oxnard. I understand that there is a high cost for doing this. My feeling is that every west coast port is under similar pressure to be as near zero-emission as possible. So this is just another cost of doing business. This lack of consideration for a truly green alternative renders the EIR inadequate.
3.0 FINDINGS ON PROJECT ALTERNATIVES, ELECTRIC CAR CARRIER TRUCKS ALTERNATIVE, Pg. 18,
ALTERNATIVE LOCATIONS,
“The City is mostly developed, with the exception of some undeveloped land to the south of the project site, where the Ormond Lagoon and various undeveloped parcels are located.” Comment: It is my opinion that this is a false statement and renders the EIR inadequate.
3.2.2 Alternative Two: Two Existing Off-Port Vehicle Storage Locations, Pg. 20, “Alternative Two would result in reduced impacts to aesthetics, biological resources, cultural and tribal cultural resources, geology and soils, wildfire and fire protection, police protection, water, and solid waste, as Alternative Two would not result in development of an undeveloped site. Comment: Therefore, it is my opinion that Alternative Two would be environmentally superior to the proposed project in regard to these environmental issue areas.”
Resolution No. 2022-XX (PZ 18-500-02; Port Temporary Vehicle Storage), Attachment H - Resolution (Special Use Permit) Page 2 of 26 “WHEREAS, the Planning Commission finds after due study and deliberation that the applicant agrees with the necessity of and accepts all elements, requirements, and conditions of this Resolution as being a reasonable manner of preserving, protecting, providing for, and fostering the health, safety, and welfare of the citizenry in general and the persons who work, visit or live in this development in particular.” Comment: I do not find this project “as being a reasonable manner of preserving, protecting, providing for, and fostering the health, safety, and welfare of the citizenry in general and the persons who work, visit or live in this development in particular.”
Pg 5.15-2, Policy ICS-23.5, Resident Access to Scenic Areas and Ormond Beach. “Work with appropriate organizations and agencies to provide Oxnard residents with access and possibly interpretive and/or visitor centers to natural/scenic areas such as the Santa Clara River Greenbelt, Ormond Beach, and Oxnard Dunes consistent with resource protection objectives.” Comment: General Plan Policy needs no further explanation.
CD-22.2, Develop an Ormond Beach Visitor Access Develop and implement, as resources allow, an Ormond Beach visitor access plan that includes a gateway park and visitor center near the southern terminus of Saviers Road, several levels of visitor interaction that include interpretive information displays, observation walks and platforms, trails and walkways, and other appropriate facilities and programs.
Comment: General Plan Policy needs no further explanation. 28 / 81
Exported using Save Emails to PDF by cloudHQ
There is no arguing that the Port is an extremely valuable partner to the entire County of Ventura, and to the residents of Oxnard and Port Hueneme. I fully support their continuing success. However, it is my opinion that the City of Oxnard and the Port of Hueneme have not agreed upon a plan for Port expansion that would not be exploitative of south Oxnard residents who have borne the brunt of industrialization and the negative environmental impacts associated with that sort of development for many decades, including burn dumps, the Halaco Superfund site, the wastewater treatment plant, the Ormond Beach Generating Station and, of course, the Port of Hueneme itself with diesel emissions, extra traffic and rail movement disruptions.
I believe the Port would make the entire length of Hueneme Road into Port-serving businesses if allowed. I believe there are alternatives and I strongly urge a true collaborative effort led by the council members representing this area to arrive at an agreement with the Port that doesn’t continue to make south Oxnard a sacrifice zone.
Thank you for your time and consideration.
Best,
Steve Nash
29 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: Fw: Just In Case You Missed It! Thanks.
From: Irene <[email protected]>
To: "[email protected]" <[email protected]>,"[email protected]" <[email protected]>,Larry Godwin <[email protected]>
Cc: "[email protected]" <[email protected]>, SRDT Steve Nash <[email protected]> Date Sent: Sunday, December 4, 2022 4:31:10 PM GMT-08:00 Date Received: Sunday, December 4, 2022 4:31:18 PM GMT-08:00 RE: Ormond issue,
I received this le er from an unknown person, a David A. Badgley.
It appears to be an Adver sement from a company call PODenergy. (see bo om of the page).
I don’t know weather Oxnard or the Coastal Conservancies are involved in this, but seems mely considering the Superfund Site at Ormond Beach that should be removed. … more reason to prohibit a car park! Irene Rauschenberger
Sent from Windows Mail
From: David A. Badgley
Sent: Sunday , December 4 , 2022 2 : 17 PM
To: m hasan
30 / 81
Exported using Save Emails to PDF by cloudHQ
31 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Lorena Marquez <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Sunday, December 4, 2022 3:39:24 PM GMT-08:00 Date Received: Sunday, December 4, 2022 3:39:38 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion. The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250-acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes. This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and 32 / 81
Exported using Save Emails to PDF by cloudHQ
State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice!
Sincerely,
Lorena Marquez
33 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Eric Martinez <[email protected]>
To: [email protected]
Date Sent: Sunday, December 4, 2022 2:59:20 PM GMT-08:00 Date Received: Sunday, December 4, 2022 2:59:44 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion. The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250-acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes. This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely 34 / 81
Exported using Save Emails to PDF by cloudHQ
access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice!
Sincerely
Eric Martinez
35 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Dena Montague <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Sunday, December 4, 2022 2:34:12 PM GMT-08:00 Date Received: Sunday, December 4, 2022 2:34:25 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion. The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods.
This project also does not align with the community's vision for green space and coastal access and long- term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250-acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes. This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks.
This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to 36 / 81
Exported using Save Emails to PDF by cloudHQ
restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front of the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely,
Dena Montague
--
Dena Montague, Ph.D.
Research Associate
Global Environmental Justice Project
University of California, Santa Barbara
Co-Founder ÉnergieRich
www.energierich.org
37 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment OPPOSING The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Irene Cooke <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Sunday, December 4, 2022 2:20:02 PM GMT-08:00 Date Received: Sunday, December 4, 2022 2:20:17 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion. The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250-acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes. This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely 38 / 81
Exported using Save Emails to PDF by cloudHQ
access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice!
Respectfully submitted,
Irene Cooke
374 Moreton Bay Lane #2
Goleta, CA 93117
39 / 81
Exported using Save Emails to PDF by cloudHQ
Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion. The FEIR fails to include an accurate prdescription including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucksavoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with thecommunities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit exhas been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants toto a much bigger 250-acre expansion project, over seven times as big as the 34-acre project, all which was left out of the FEIR. You cannot certify or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impactshave on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollutshipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased sfrom this project. Both the FEIR and the applicant are presenting contradicting outcomes. This project will only bring 14 jobs, all of which are conGLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laWe want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEInot consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more ccausing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residhealth risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annualexhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experisome of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communitcolor, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rcancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coSouth Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry makOrmond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to incrgreen space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangeroutraffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make themore accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond BeWetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and moSouth Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like uspace in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use PeOxnard deserves clean air and environmental justice! Sincerely,
Joe and Julie Salas
our communities
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility ProjectFrom: J S <[email protected]>To: [email protected]: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected] Sent: Sunday, December 4, 2022 12:01:06 PM GMT-08:00Date Received: Sunday, December 4, 2022 12:01:20 PM GMT-08:00 40 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: Dec. 6, 2022 - Item G1 - Reject the 4,000 car Hyundai Glovis import storage facility blocking Nature Conservancy restored beachfront wetlands
From: Andrew Kish <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Sunday, December 4, 2022 8:09:54 AM GMT-08:00 Date Received: Sunday, December 4, 2022 8:10:10 AM GMT-08:00 As a local resident, I appeal to your sense of reason, science and the law to reject the Hyundai Glovis facility blocking restored beachfront wetlands. These transitional uplands are critical to restoring this last corridor of nature that is vital to public health. As Oxnard residents, we value these wetlands, and deserve natural access to the beach and uplifting vistas and experiences it offers. The land Hyundai Glovis seeks is not any parcel. It is the last piece of green space, what should be a Gateway Park offering Oxnard residents renewal and rejuvenation with access to a restored Pacific beach.
South Oxnard residents have endured more than their share of deadly industrial pollution and deserve to experience the natural wonder of this corridor to the Pacific Ocean. Vote for restoration, renewal and recreation, not an ocean view for 4,000 cars.
Andrew and Jennifer Kish
4942 Marlin Way
OXNARD CA 93035
Sent from my iPhone
41 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Nicole <[email protected]>
To: [email protected]
Date Sent: Sunday, December 4, 2022 4:53:17 AM GMT-08:00 Date Received: Sunday, December 4, 2022 4:53:29 AM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion. The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. CEQA requires that the whole of a project be evaluated and they it cannot be piecemeal. In addition, CEQA requires that significant impacts be mitigated to the maximum extent feasible. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250-acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes. This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to 42 / 81
Exported using Save Emails to PDF by cloudHQ
enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice!
Sincerely,
Nicole Lieu
43 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: Reject car storage at the AWPF.
From: Irene <[email protected]>
To: "[email protected]" <[email protected]>,"[email protected]" <[email protected]>,"[email protected]" <[email protected]>,"[email protected]" <[email protected]>,"[email protected]" <[email protected]>,"[email protected]" <[email protected]>,"[email protected]" <[email protected]> Cc: "[email protected]" <[email protected]>, "[email protected]" <[email protected]>, Larry Godwin <[email protected]>, "[email protected]" <[email protected]>, Greater Oxnard Dems <[email protected]> Date Sent: Sunday, December 4, 2022 12:57:26 AM GMT-08:00 Date Received: Sunday, December 4, 2022 12:57:30 AM GMT-08:00 To: [email protected]
cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected] Subject: Dec. 6, 2022 - Item G1 - Reject the 4,000 car Hyundai Glovis import storage facility blocking Nature Conservancy restored beachfront wetlands Dear Mayor Zaragoza and Councilmembers:
Please reject car storage at Oxnard’s Advanced Water Purifica on Facility (AWPF) requested by the Port of Hueneme. The info. below is very convincing for an environmentally compa ble project adjacent to the (AWPF).
Ormond Beach Feasibility Study:
h ps://scc.ca.gov/webmaster/ p/pdf/ormond/Rec_Edu_OC_Report_2005.pdf
RECREATION AND EDUCATION OPPORTUNITIES AND CONSTRAINTS REPORT FOR THE ORMOND BEACH WETLANDS RESTORATION FEASIBILITY STUDY Prepared for California State Coastal Conservancy 1330 Broadway, Suite 1100 Oakland, California 94612-2530 Prepared by Aspen Environmental Group Contract No. 03-153 July 2005
Respec ully,
Irene Rauschenberger
Resident
Sent from Windows Mail
44 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: Reject the 4,000 car Hyundai Glovis import storage facility blocking Nature Conservancy restored beachfront wetlands
From: Jennifer Johnson <[email protected]>
To: [email protected],[email protected]
Date Sent: Saturday, December 3, 2022 9:52:35 PM GMT-08:00 Date Received: Saturday, December 3, 2022 9:53:15 PM GMT-08:00 Dear Mayor Zaragoza and Councilmembers:
As a local resident, I appeal to your sense of reason, science and the law to reject the Hyundai Glovis facility blocking restored beachfront wetlands. These transitional uplands are critical to restoring this last corridor of nature that is vital to public health. As Oxnard residents, we value these wetlands, and deserve natural access to the beach and uplifting vistas and experiences it offers. The land Hyundai Glovis seeks is not any parcel. It is the last piece of green space, what should be a Gateway Park offering Oxnard residents renewal and rejuvenation with access to a restored Pacific beach. South Oxnard residents have endured more than their share of deadly industrial pollution and deserve to experience the natural wonder of this corredor to the Pacific Ocean. Vote for restoration, renewal and recreation, not an ocean view for 4,000 cars.
Jennifer Johsnon
22051 Pennisula Rd.
Oxnard, 93035
--
________________________
Jennifer K. Johnson, Ph.D.
Continuing Lecturer, Writing Program
UC Santa Barbara
Santa Barbara, CA 93106-3010
[email protected]
Office: Girvetz 1309
Pronouns: she, her, hers
45 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: Item G1 - Reject the 4,000 car Hyundai Glovis import storage facility blocking Nature Conservancy restored beachfront wetlands
From: Melissa Langdell <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Saturday, December 3, 2022 8:50:20 PM GMT-08:00 Date Received: Saturday, December 3, 2022 8:50:33 PM GMT-08:00 Dear Friends,
I definitely want to promote business in our area but I think it is unwise for the Hyundai Glovis facility to encroach on native wetlands that should be protected.
Thank you for all you do and wishing you a happy holiday season, Melissa Campbell-Langdell
--
Melissa Campbell-Langdell
[email protected]
805.890.3468
46 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Stanton Kaye <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Saturday, December 3, 2022 6:03:03 PM GMT-08:00 Date Received: Saturday, December 3, 2022 6:03:07 PM GMT-08:00 Dear Oxnard City Council Members,
The letter that follows is a form letter from the population of Oxnard concerned citizens. However , my preface commentsry here besides tacitly approving and congruent , come from my years of living and playing here for over three decades . I am concerned for the birds and the fish and the insects and reptiles and the flora you take for granted ; and I find their habitat needs their wetlands restored and extended not further degraded. ♀ I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even 47 / 81
Exported using Save Emails to PDF by cloudHQ
more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely, Stanton Kaye , nearby resident .
Sent from my iPhone
48 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: G1. Parking for Vehicles
From: Linda Calderon <[email protected]>
To: [email protected]
Date Sent: Saturday, December 3, 2022 5:38:03 PM GMT-08:00 Date Received: Saturday, December 3, 2022 5:25:42 PM GMT-08:00 I am against this "project" due to the following reasons: noise, bright, high lights at night and just the closeness to the proposed Wetlands development site and how it can adversely affect the birds, etc. Plus, it may end up being more than "temporary" so should be located in another area and I feel it will also cause the Wetlands' development as a world tourist attraction to be put on hold once again. So many have passed on already that wanted, and worked for, that site to be developed into a natural site that will attract all ages and be a wonderful asset for our area. Our City too often looks at what things will bring us immediately and does not look to the future to have something very unique that no other cities around us have nor many areas in our entire State. The Port and this company should be able to find another area not on top of this Wetlands site. Let us think out of the box for a change and not just look at $$ signs. Every time we do that, Oxnard loses its opportunity to be unique in a great way.
--
The Lord is my strength and my hope, Glory to His Name, Linda Calderon 49 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: Dec. 6, 2022 - Item G1 - Reject the 4,000 car Hyundai Glovis import storage facility blocking Nature Conservancy restored beachfront wetlands
From: Daniel Reder <[email protected]>
To: [email protected]
Date Sent: Saturday, December 3, 2022 4:46:42 PM GMT-08:00 Date Received: Saturday, December 3, 2022 4:46:55 PM GMT-08:00 Subject: Dec. 6, 2022 - Item G1 - Reject the 4,000 car Hyundai Glovis import storage facility blocking Nature Conservancy restored beachfront wetlands Dear Mayor Zaragoza and Councilmembers:
As a local resident, I appeal to your sense of reason, science and the law to reject the Hyundai Glovis facility blocking restored beachfront wetlands. These transitional uplands are critical to restoring this last corridor of nature that is vital to public health. As Oxnard residents, we value these wetlands, and deserve natural access to the beach and uplifting vistas and experiences it offers.
The land Hyundai Glovis seeks is not any parcel. It is the last piece of green space, what should be a Gateway Park offering Oxnard residents renewal and rejuvenation with access to a restored Pacific beach. South Oxnard residents have endured more than their share of deadly industrial pollution and deserve to experience the natural wonder of this corredor to the Pacific Ocean. Vote for restoration, renewal and recreation, not an ocean view for 4,000 cars.
Daniel Reder
3606 Dunkirk Dr.
Oxnard, CA 93035
50 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: 'margot davis' via City Clerk <[email protected]> To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Saturday, December 3, 2022 4:10:25 PM GMT-08:00 Date Received: Saturday, December 3, 2022 4:10:29 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision. 51 / 81
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely, Margot Davis
148 west simpson
Ventura ca 93001
Sent from Margot's iPad
52 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Stephen Reyes <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Saturday, December 3, 2022 3:40:56 PM GMT-08:00 Date Received: Saturday, December 3, 2022 3:41:10 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision. 53 / 81
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely,
Stephen Reyes
54 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: Dec. 6, 2022 - Item G1 - Reject the 4,000 car Hyundai Glovis import storage facility blocking Nature Conservancy restored beachfront wetlands
From: "N. Doner" <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], "[email protected]" <[email protected]>, [email protected] Date Sent: Saturday, December 3, 2022 3:12:12 PM GMT-08:00 Date Received: Saturday, December 3, 2022 3:12:25 PM GMT-08:00 Dear Mayor Zaragoza and Councilmembers:
As a local resident, I appeal to your sense of reason, science and the law to reject the Hyundai Glovis facility blocking restored beachfront wetlands. These transitional uplands are critical to restoring this last corridor of nature that is vital to public health. As Oxnard residents, we value these wetlands, and deserve natural access to the beach and uplifting vistas and experiences it offers. The land Hyundai Glovis seeks is not any parcel. It is the last piece of green space, what should be a Gateway Park offering Oxnard residents renewal and rejuvenation with access to a restored Pacific beach.
South Oxnard residents have endured more than their share of deadly industrial pollution and deserve to experience the natural wonder of this corredor to the Pacific Ocean. Vote for restoration, renewal and recreation, not an ocean view for 4,000 cars.
Nicole Doner
219 S E Street
Oxnard CA
55 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: 'D A' via City Clerk <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Saturday, December 3, 2022 9:51:27 AM GMT-08:00 Date Received: Saturday, December 3, 2022 9:51:40 AM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion. The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250-acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes. This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to 56 / 81
Exported using Save Emails to PDF by cloudHQ
enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice!
Sincerely,
Daniela Aguilar
57 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Alejandro Lopez <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Saturday, December 3, 2022 7:41:53 AM GMT-08:00 Date Received: Saturday, December 3, 2022 7:41:56 AM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion. The FEIR fails to include an accurate project description including long- term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long- term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250-acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes. This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
58 / 81
Exported using Save Emails to PDF by cloudHQ
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero- emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice!
Sincerely,
Alejandro Lopez
59 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Karina Aragon <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Saturday, December 3, 2022 7:37:32 AM GMT-08:00 Date Received: Saturday, December 3, 2022 7:37:47 AM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision. 60 / 81
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely, Karina Aragon
61 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Kim Avitud <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Friday, December 2, 2022 5:00:39 PM GMT-08:00 Date Received: Friday, December 2, 2022 5:00:54 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision. 62 / 81
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely, Sent from my iPhone
63 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Margo Porras <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], "[email protected]" <[email protected]>, [email protected], [email protected], [email protected] Date Sent: Friday, December 2, 2022 2:35:18 PM GMT-08:00 Date Received: Friday, December 2, 2022 2:35:33 PM GMT-08:00 Dear Oxnard City Council Members,
As someone who has lost a parent and many loved ones to cancer, which could be linked to prolonged exposure to dangerous chemicals they experienced because they were born and raised in Oxnard, I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion. The FEIR fails to include an accurate project description, including long- term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250-acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes. This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long- term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and 64 / 81
Exported using Save Emails to PDF by cloudHQ
State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
Oxnard's financial health should not come at the cost of the health of its most vulnerable residents. This FEIR fails to accurately examine the negative impacts of this project, putting generations of Oxnard families in grave danger. I’m asking that you do not certify the FEIR and deny the Special Use Permit, and urge you to fight for the environmental justice all Oxnard families deserve.
Sincerely,
Margo Porras
Margo Porras, author
Growing Up in La Colonia
Twitter
Instagram
Facebook
65 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Valeria Resendiz <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Friday, December 2, 2022 12:11:42 PM GMT-08:00 Date Received: Friday, December 2, 2022 12:11:46 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the community’s vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long- term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250-acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes. This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
66 / 81
Exported using Save Emails to PDF by cloudHQ
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero- emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and that you deny the Special Use Permit. Oxnard deserves clean air and environmental justice!
Sincerely,
Valeria Resendiz (She/Her)
67 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Alex Garcia <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Friday, December 2, 2022 10:04:00 AM GMT-08:00 Date Received: Friday, December 2, 2022 10:04:06 AM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision. 68 / 81
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely, Alex Garcia
Sent from my iPhone
69 / 81
Exported using Save Emails to PDF by cloudHQ
Subject:
From: Anthony Singh-Reynoso <[email protected]>
To: [email protected]
Cc: "[email protected]" <[email protected]>, "[email protected]" <[email protected]>, "[email protected]" <[email protected]>, "[email protected]" <[email protected]>, "[email protected]" <[email protected]>, "[email protected]" <[email protected]> Date Sent: Thursday, December 1, 2022 7:56:38 PM GMT-08:00 Date Received: Thursday, December 1, 2022 7:56:50 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion. The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250-acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes. This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non- union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks 70 / 81
Exported using Save Emails to PDF by cloudHQ
onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk.
The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer- causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy- duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast.
Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice!
Sincerely,
Anthony
71 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: 'Bryan Vazquez' via City Clerk <[email protected]> To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Thursday, December 1, 2022 7:10:01 PM GMT-08:00 Date Received: Thursday, December 1, 2022 7:10:05 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision. 72 / 81
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely, Jovanni Bryan
Sent from my iPhone
73 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Caory Flores <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Thursday, December 1, 2022 7:05:04 PM GMT-08:00 Date Received: Saturday, December 3, 2022 12:22:50 AM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk.
The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front 74 / 81
Exported using Save Emails to PDF by cloudHQ
the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely,
Caory flores
75 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: 'Nancy Ortega' via City Clerk <[email protected]> To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Thursday, December 1, 2022 6:57:54 PM GMT-08:00 Date Received: Thursday, December 1, 2022 6:58:07 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision. 76 / 81
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely, Nancy Ortega
77 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: 'Crisantos Racon' via City Clerk <[email protected]> To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Thursday, December 1, 2022 6:20:12 PM GMT-08:00 Date Received: Thursday, December 1, 2022 6:20:26 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision. 78 / 81
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely, Crisantos Rascon
79 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Amalia Cortez <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Thursday, December 1, 2022 10:19:22 AM GMT-08:00 Date Received: Friday, December 2, 2022 8:36:05 AM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk.
The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front 80 / 81
Exported using Save Emails to PDF by cloudHQ
the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely,
Quiero un Aire limpio
81 / 81
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Hedy <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Thursday, December 1, 2022 11:34:32 AM GMT-08:00 Date Received: Thursday, December 1, 2022 11:34:46 AM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision. 1 / 64
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely, Hedy Juarez
Sent from my iPhone
2 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Victoria Placencia <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Thursday, December 1, 2022 10:42:51 AM GMT-08:00 Date Received: Thursday, December 1, 2022 10:42:56 AM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision. 3 / 64
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely, Victoria Placencia
Sent from my iPhone
4 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: 'Jean Ziesenhenne' via City Clerk <[email protected]> To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Thursday, December 1, 2022 10:18:42 AM GMT-08:00 Date Received: Thursday, December 1, 2022 10:18:58 AM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision. 5 / 64
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely, Jean Ziesenhenne
Sent from my iPhone
6 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: Reject the Final EIR (FEIR) + vote NO on the 34-Acre GLOVIS Port Expansion 12/6 From: Danielle Perret <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Thursday, December 1, 2022 9:43:45 AM GMT-08:00 Date Received: Thursday, December 1, 2022 9:44:00 AM GMT-08:00 Once again– Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250-acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes. This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union.
The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision. 7 / 64
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic.
Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Thank you for listening
Dani Perret
→ D & NI
dni.cargo
8 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Gabriel Sanchez <[email protected]>
To: "[email protected]" <[email protected]>
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Thursday, December 1, 2022 3:42:12 AM GMT-08:00 Date Received: Thursday, December 1, 2022 3:42:25 AM GMT-08:00 Dear Oxnard City Council Members,
I am wri ng to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion. The FEIR fails to include an accurate project descrip on including long-term plans a er the temporary permit expires, does not consider impacts to air quality and pollu on from diesel trucks, and avoids considera on of alterna ves to alleviate the pollu on burden on South Oxnard neighborhoods. This project also does not align with the communi es vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage a er the 3-5 year permit expires. It has been submi ed to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250-acre expansion project, over seven mes as big as th3 34-acre project, all which was le out of the FEIR. You cannot cer fy the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollu on from shipments, at the same me, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presen ng contradic ng outcomes. This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construc on jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, pollu ng our air with more cancer-causing diesel exhaust. Our community is figh ng hard for clean air in Oxnard and working to minimize diesel pollu on, which is pu ng our residents at health risk.
The 34-acre Glovis Port expansion project is es mated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a life me. Oxnard experiences some of the highest levels of diesel pollu on in the state. Residents living near ports, warehouses, and busy roads, typically located in communi es of color, are exposed to such high rates of heavy-duty vehicle pollu on that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Addi onally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communi es of color- has minimal access to green space and the coast is lined by a wall of pollu ng industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more pollu ng, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 addi onal cars directly in front the Ormond Beach Wetlands restora on area goes against this community vision.
9 / 64
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more pollu ng trucks to our neighborhoods, the FEIR should consider other op ons like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the nega ve impacts of this project. I’m asking that you do not cer fy the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental jus ce! Sincerely,
Gabriel Sainez
10 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Evin Phoenix <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Thursday, December 1, 2022 1:50:46 AM GMT-08:00 Date Received: Thursday, December 1, 2022 1:50:59 AM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion. The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250-acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes. This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and 11 / 64
Exported using Save Emails to PDF by cloudHQ
State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice!
Sincerely,
Evin Eldridge Phoenix
12 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Yesenia Ponce <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Wednesday, November 30, 2022 11:46:12 PM GMT-08:00 Date Received: Wednesday, November 30, 2022 11:46:26 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision. 13 / 64
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely, Yesenia ponce
Sent from my iPhone
14 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Cristal Gutierrez <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Wednesday, November 30, 2022 10:30:54 PM GMT-08:00 Date Received: Wednesday, November 30, 2022 10:31:07 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion. The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250-acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes. This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely 15 / 64
Exported using Save Emails to PDF by cloudHQ
access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice!
Sincerely,
Cristal Gutierrez
16 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: 'Sandra Arroyo' via City Clerk <[email protected]> To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Wednesday, November 30, 2022 10:06:13 PM GMT-08:00 Date Received: Wednesday, November 30, 2022 10:06:27 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision. 17 / 64
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely, Sandra
Sent from my iPhone
18 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Ryan Mendez <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Wednesday, November 30, 2022 10:03:59 PM GMT-08:00 Date Received: Wednesday, November 30, 2022 10:04:12 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion. The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250-acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes. This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to 19 / 64
Exported using Save Emails to PDF by cloudHQ
enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice!
Sincerely,
Ryan Mendez, a concerned city member.
20 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: roni vivaldi <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Wednesday, November 30, 2022 9:49:09 PM GMT-08:00 Date Received: Wednesday, November 30, 2022 9:49:23 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion. The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250-acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes. This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry 21 / 64
Exported using Save Emails to PDF by cloudHQ
making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice!
Sincerely,
Roni Valdivia
22 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: 'Maria Mendez' via City Clerk <[email protected]> To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Wednesday, November 30, 2022 9:30:49 PM GMT-08:00 Date Received: Wednesday, November 30, 2022 9:30:54 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision. 23 / 64
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely, Maria Mendez
24 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Pearl Shing-Roth <[email protected]>
To: [email protected],[email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Wednesday, November 30, 2022 9:07:43 PM GMT-08:00 Date Received: Wednesday, November 30, 2022 9:07:57 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion. The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250-acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes. This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, 25 / 64
Exported using Save Emails to PDF by cloudHQ
and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice!
Sincerely,
Pearl Shing-Roth, Ventura County resident
26 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Evan <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Wednesday, November 30, 2022 8:42:05 PM GMT-08:00 Date Received: Wednesday, November 30, 2022 8:42:22 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision. 27 / 64
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely, a person who loves my home town and the quality that it deserves -Evan Reyes Sent from my iPhone
28 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Lyric Aebi <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Wednesday, November 30, 2022 7:40:57 PM GMT-08:00 Date Received: Wednesday, November 30, 2022 7:41:10 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk.
The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front 29 / 64
Exported using Save Emails to PDF by cloudHQ
the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely,
Lyric Aebi
30 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Yoana Ibanez <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Wednesday, November 30, 2022 7:38:12 PM GMT-08:00 Date Received: Wednesday, November 30, 2022 7:38:17 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision. 31 / 64
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely, Sent from my iPhone
32 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Antonio Magana <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Wednesday, November 30, 2022 7:34:44 PM GMT-08:00 Date Received: Wednesday, November 30, 2022 7:34:59 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision. 33 / 64
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely, Sent from far away, where they serve tacos
34 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Claudia Garibay <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Wednesday, November 30, 2022 7:18:42 PM GMT-08:00 Date Received: Wednesday, November 30, 2022 7:18:56 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion. The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250-acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes. This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to 35 / 64
Exported using Save Emails to PDF by cloudHQ
enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice!
Sincerely,
Claudia Garibay
36 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: 'alicia gallegos' via City Clerk <[email protected]> To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Wednesday, November 30, 2022 7:04:03 PM GMT-08:00 Date Received: Wednesday, November 30, 2022 7:04:12 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision. 37 / 64
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely concerned Port Hueneme Home owner, Alicia Gallegos & Family Sent from my iPhone
38 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Jess Dlc <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Wednesday, November 30, 2022 6:53:09 PM GMT-08:00 Date Received: Thursday, December 1, 2022 2:08:30 AM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk.
The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front 39 / 64
Exported using Save Emails to PDF by cloudHQ
the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely,
Jessica Delacruz
40 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Paola Lorenzo <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Wednesday, November 30, 2022 6:47:09 PM GMT-08:00 Date Received: Wednesday, November 30, 2022 6:47:12 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision. 41 / 64
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely,
Paola Lorenzo, RN
Sent from my iPhone
42 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: 'Christopher Torres' via City Clerk <[email protected]> To: [email protected]
Date Sent: Wednesday, November 30, 2022 6:31:32 PM GMT-08:00 Date Received: Wednesday, November 30, 2022 6:31:49 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion. The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250-acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes. This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely 43 / 64
Exported using Save Emails to PDF by cloudHQ
access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice!
Sincerely,
Christopher Torres
44 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: 'Sofia Ayala' via City Clerk <[email protected]> To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Wednesday, November 30, 2022 6:00:31 PM GMT-08:00 Date Received: Wednesday, November 30, 2022 6:00:53 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision. 45 / 64
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely, Sofia Ayala
46 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: David Lopez <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Wednesday, November 30, 2022 5:40:59 PM GMT-08:00 Date Received: Wednesday, November 30, 2022 5:41:18 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk.
The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front 47 / 64
Exported using Save Emails to PDF by cloudHQ
the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely,
48 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: 'arianna macias' via City Clerk <[email protected]> To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Wednesday, November 30, 2022 5:14:30 PM GMT-08:00 Date Received: Wednesday, November 30, 2022 5:14:47 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision. 49 / 64
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely, Arianna Macias
Sent from my iPhone
50 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Erik Fruth <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Wednesday, November 30, 2022 4:44:42 PM GMT-08:00 Date Received: Wednesday, November 30, 2022 4:45:18 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision. 51 / 64
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely,
Erik Fruth
52 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: Concerned Citizen
From: Eric Martinez <[email protected]>
To: [email protected]
Date Sent: Monday, November 28, 2022 9:30:04 PM GMT-08:00 Date Received: Monday, November 28, 2022 9:30:07 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion. The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250-acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes. This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible 53 / 64
Exported using Save Emails to PDF by cloudHQ
to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice!
Sincerely,
[your name Sent from my iPhone
54 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Torrie Cutbirth <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Monday, November 28, 2022 8:28:19 PM GMT-08:00 Date Received: Monday, November 28, 2022 8:28:33 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision. 55 / 64
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely,
Torrie Cutbirth
56 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Marie Martin <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Saturday, November 26, 2022 10:36:11 PM GMT-08:00 Date Received: Saturday, November 26, 2022 10:36:26 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision. 57 / 64
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely,
Marie Martin
Sent from my iPhone
58 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Toni Zamora <[email protected]>
To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Saturday, November 26, 2022 10:22:04 PM GMT-08:00 Date Received: Saturday, November 26, 2022 10:22:08 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion. The FEIR fails to include an accurate project description including long- term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long- term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250-acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes. This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
59 / 64
Exported using Save Emails to PDF by cloudHQ
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero- emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice!
Sincerely,
Toni Zamora
60 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: Alejandra Castellanos <[email protected]> To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], "[email protected]" <[email protected]>, [email protected] Date Sent: Saturday, November 26, 2022 6:19:52 PM GMT-08:00 Date Received: Saturday, November 26, 2022 6:20:05 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion. The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250-acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes. This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry 61 / 64
Exported using Save Emails to PDF by cloudHQ
making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision.
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice!
Sincerely,
Alejandra Castellanos
62 / 64
Exported using Save Emails to PDF by cloudHQ
Subject: 12/6 G1 Public Hearing-Public comment to Vote NO on The Port of Hueneme –Temporary Outdoor Vehicle Storage Facility Project
From: 'Jessica Yacoub' via City Clerk <[email protected]> To: [email protected]
Cc: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected]
Date Sent: Saturday, November 26, 2022 5:37:03 PM GMT-08:00 Date Received: Saturday, November 26, 2022 5:37:11 PM GMT-08:00 Dear Oxnard City Council Members,
I am writing to urge you to reject the Final EIR (FEIR) and vote NO on the 34-Acre GLOVIS Port Expansion.
The FEIR fails to include an accurate project description including long-term plans after the temporary permit expires, does not consider impacts to air quality and pollution from diesel trucks, and avoids consideration of alternatives to alleviate the pollution burden on South Oxnard neighborhoods. This project also does not align with the communities vision for green space and coastal access and long-term high-paying union jobs in our community.
The project is inaccurately described as temporary because it fails to say what the long-term plans are for Port Storage after the 3-5 year permit expires. It has been submitted to the record that the Port of Hueneme and GLOVIS already have plans to expand, started contracts, and applied for grants to expand to a much bigger 250- acre expansion project, over seven times as big as th3 34-acre project, all which was left out of the FEIR. You cannot certify the FEIR or grant special use permits for this project without a real study on the long-term plans for Port storage and the environmental and health impacts they will have on South Oxnard.
The FEIR states the project will not be expanding shipments into the port, but it also states the project will allow more shipments from GLOVIS to create more jobs at the port. While the Port has been telling the community the project will not be expanding shipments into the Port or increasing pollution from shipments, at the same time, the Port has been telling workers there will be more jobs available for longshoremen and truckers due to increased shipments from this project. Both the FEIR and the applicant are presenting contradicting outcomes.
This project will only bring 14 jobs, all of which are contracted by GLOVIS that pay around minimum wage and are non-union. The temporary construction jobs will end very quickly once the fence and gravel are laid out. We want long-term high-paying union jobs in our community.
The Port has said cars stored at the 34-acre site will be picked up by diesel trucks to transport them to dealerships around the country but the FEIR does not consider impacts to air quality from diesel trucks. This project will bring more diesel trucks onto Hueneme Road, polluting our air with more cancer-causing diesel exhaust. Our community is fighting hard for clean air in Oxnard and working to minimize diesel pollution, which is putting our residents at health risk. The 34-acre Glovis Port expansion project is estimated to bring 60,000 more trucks and cars through our neighborhood streets annually. Diesel exhaust is the #1 cancer-causing air pollutant and long term exposure can result in lung damage in children that will last a lifetime. Oxnard experiences some of the highest levels of diesel pollution in the state. Residents living near ports, warehouses, and busy roads, typically located in communities of color, are exposed to such high rates of heavy-duty vehicle pollution that these areas have been labeled “diesel death zones” - because asthma rates and cancer risks are greatly higher.
Additionally, the 34-acre expansion project will be located on the last piece of undeveloped land between South Oxnard neighborhoods and the coast. South Oxnard- like many other communities of color- has minimal access to green space and the coast is lined by a wall of polluting industry making Ormond Beach inaccessible. The city has been working with The Nature Conservancy and State Coastal Conservancy to restore this beach to increase green space for the community to enjoy and bring their families. This proposed 34-acre project will bring even more polluting, loud, and dangerous port traffic along Hueneme Road making it even harder for families to safely access this beach. We need to protect our community’s vision to make the beach more accessible to families and deindustrialize the coast. Placing a parking lot that will store 5,000 additional cars directly in front the Ormond Beach Wetlands restoration area goes against this community vision. 63 / 64
Exported using Save Emails to PDF by cloudHQ
Right now, the port is using 31 acres of extra storage at the naval base to help the Port of LA during the pandemic. Instead of turning more and more land in South Oxnard into port storage which brings more and more polluting trucks to our neighborhoods, the FEIR should consider other options like using space in the navy base and the use of zero-emission trucks.
This FEIR fails to accurately examine the negative impacts of this project. I’m asking that you do not certify the FEIR and deny the Special Use Permit. Oxnard deserves clean air and environmental justice! Sincerely, 64 / 64