Agenda packet

Public Works & Transportation Committee
March 12, 2024

Document
Agenda packet
Meeting
March 12, 2024
Body
Public Works & Transportation Committee
Original file
35.6 MB
Text extracted from the city's file for reading and search. Open the original on oxnardca.api.civicclerk.com. That file is the official record.

Written materials relating to an item on this agenda that are distributed to the legislative bodies within 72 hours before the item is to be considered at its regularly scheduled meeting will be made available for public inspection at the City Clerk’s Office, 300 West Third Street 4th Floor during customary business hours. Agenda reports are also on the City of Oxnard web site at www.oxnard.org.

In compliance with the Americans with Disabilities Act, if you require special assistance to participate in a meeting, please contact the City Clerk’s Office at 385-7803. Notice at least 72 hours prior to the meeting will enable the City to reasonably arrange for your accessibility to the meeting.

Agenda Item Time Estimates include: (Minutes for Presentation + Council Discussion + Public Comment)

AGENDA

OXNARD CITY COUNCIL

PUBLIC WORKS AND TRANSPORTATION COMMITTEE
Council Chambers, 305 West Third Street
March 12, 2024
Regular Meeting - 8:30 to 10:00 PM

Zoom details to call-in for public comment during a meeting:

1. Dial Phone Number: (888) 475-4499

2. Enter Meeting ID: 848 8347 9768

3. Passcode: 486458

If you wish to speak during public comments or a particular item on the agenda, please sign-on by following the zoom call-in steps listed above. Once the presiding officer calls for public speakers, press *9 to raise your hand to inform the City Clerk you would like to speak during the public speaking section for that particular item on the agenda, while in the zoom waiting room. Press *6 when asked to unmute. Listen to the instructions provided virtually on the phone while on hold in the zoom waiting room. Please note that there is a slight time delay when viewing the meeting via television.

IN ACCORDANCE WITH ASSEMBLY BILL 2449, MEMBERS OF THE LEGISLATIVE BODY MAY MEET IN- PERSON OR REMOTELY. TO PARTICIPATE REMOTELY VISIT WWW.OXNARD.ORG.

To find out how you may provide public comment, please refer to the instructions below or at www.https://www.oxnard.org/city-meetings/.

The public may view the meeting from home on Spectrum channel 10, Frontier channel 35, or YouTube at Youtube.com/oxnardnews.

Video recordings of the meeting are typically available online following the meeting at the City’s website at www.oxnard.org/city- meetings.

*Please see the link for the Measure M pre-recorded presentation video for each item listed on this agenda.

YOU MAY PARTICIPATE IN THE MEETING IN THE FOLLOWING WAYS:

1. ATTEND THE MEETING AT THE LOCATION LISTED ABOVE: Submit a speaker card to the City Clerk.

2. EMAIL COMMENTS OR SIGN UP TO SPEAK REMOTELY BEFORE THE MEETING

a. Submit a request to speak remotely by no later than 3 p.m. on the day of the meeting by using the form available at www.oxnard.org/citymeetings.
b. Submit an email to [email protected] no later than 3 p.m. on the day of the meeting (indicate the agenda item number in the subject line). All email correspondence will be forwarded to the legislative body prior to the start of the meeting and made part of the legislative record.
c. Contact the City Clerk’s Office at (805) 385-7803 to submit your request.

3. PROVIDING PUBLIC COMMENTS REMOTELY DURING THE MEETING

1 OXNARD CITY COUNCIL: PUBLIC WORKS AND TRANSPORTATION COMMITTEE March 12, 2024 - Page 2

a. To provide public comment during the meeting dial (888) 475-4499 and enter the Meeting ID and Passcode listed above as the Zoom details for this meeting. When the presiding officer announces the particular item on the agenda you want to speak on, press *9 to raise your hand while in the zoom waiting room. Once called on, press *6 to unmute your phone.
b. Public comments on agenda items will be taken following the announcement of the item. After the item is announced, members of the public may register or otherwise be recognized for the purpose of providing public comment.

Please review the Zoom instructions on the registration page to help ensure there are no technical difficulties during your comments and help you understand public comment procedures using Zoom. Detailed participation instructions can be found at www.oxnard.org/city-meetings.

In the event of a disruption which prevents a legislative body of the City of Oxnard from broadcasting a meeting using a call-in option or internet- based service option, or in the event of a disruption within the City’s control which prevents members of the public from offering public comment using the call-in option or internet-based service option, the legislative body shall take no further action on items appearing on a meeting agenda until public access to the meeting via the call-in option or internet-based service option is restored. However, if any of the broadcast options are disrupted, but any of the other broadcast options is still available to the public, the legislative body may take further action on items appearing on a meeting agenda without waiting for the disrupted broadcast option(s) to be restored.

A. ROLL CALL, POSTING OF AGENDA, FLAG SALUTE
Consideration of Teleconference Participation pursuant to Assembly Bill 2449.

B. PUBLIC COMMENTS ON ITEMS NOT ON THE AGENDA

A person may address the legislative body only on matters not appearing on the agenda and within the subject matter jurisdiction of the legislative body. Speaker requests shall be submitted as set forth on the first page of this agenda. Speakers are limited to three minutes. After 30 minutes, if all speakers have not had the opportunity to speak, the remaining speakers will be given an opportunity to speak prior to adjournment of the meeting. The legislative body cannot enter into a detailed discussion or take action on any items presented during public comments at this time. Such items may only be referred to the City Manager/Executive Director/Secretary for administrative action or scheduled on a subsequent agenda for discussion. Persons wishing to speak on public hearing items should do so at the time of the hearing.

C. CONSENT AGENDA

1. City Clerk Department
SUBJECT: Approval of Minutes.

RECOMMENDATION: That the Public Works & Transportation Committee approve the minutes of the February 27, 2024 regular meeting as presented.

Contact: Rose Chaparro, (805) 385-7805
D. REPORTS

1. Public Works Department
SUBJECT: Citywide Pavement Management Program Overview. (20 minutes)

RECOMMENDATION: That the Public Works and Transportation Committee provide comments and recommend that the City Council receive and file a report on the Citywide Pavement Management Program Overview.

Please click the following link to view the required Measure M pre-recorded presentation video: https://youtu.be/7vayGo9kLmM
Contact: Michael Wolfe, (805) 385-8055
E. ITEMS FOR FUTURE AGENDAS

F. ADJOURNMENT
2 OXNARD CITY COUNCIL: PUBLIC WORKS AND TRANSPORTATION COMMITTEE March 12, 2024 - Page 3

3 PUBLIC WORKS AND TRANSPORTATION COMMITTEE

AGENDA REPORT

CONSENT AGENDA
AGENDA ITEM NO. C.1

DATE: March 12, 2024

TO: Public Works and Transportation Committee

FROM: Rose Chaparro, City Clerk, (805) 385-7805, [email protected]

SUBJECT: Approval of Minutes.

RECOMMENDATION

That the Public Works & Transportation Committee approve the minutes of the February 27, 2024 regular meeting as presented.

BACKGROUND

Approval of Minutes.

STRATEGIC PRIORITIES

This agenda item is a routine operational item.

FINANCIAL IMPACT

There is no financial impact.

Prepared by: Rose Chaparro, City Clerk

ATTACHMENTS

1. MINUTES 02 27 2024 Public Works & Transportation

4 MINUTES

OXNARD CITY COUNCIL

PUBLIC WORKS AND TRANSPORTATION COMMITTEE
Regular Meeting
February 27, 2024

A. ROLL CALL, POSTING OF AGENDA, FLAG SALUTE
At 8:30 p.m., Chair Bert E. Perello called to order the regular meeting of the Oxnard City Council Public Works & Transportation Committee in the City Hall Council Chambers at 305 W. Third Street, Oxnard, California. The City Clerk called the roll and announced the posting of the agenda. Chair Bert Perello, Member Arthur Valenzuela, and Member John C. Zaragoza were present in person.

Consideration of Teleconference Participation pursuant to Assembly Bill 2449.

B. PUBLIC COMMENTS ON ITEMS NOT ON THE AGENDA (None received.)

C. CONSENT AGENDA

1. City Clerk Department
SUBJECT: Approval of Minutes.

RECOMMENDATION: That the Public Works & Transportation Committee approve the minutes of the January 23, 2024 regular meeting as presented.

It was moved by Member Valenzuela, seconded by Member Zaragoza, to approve the meeting minutes as presented. VOTE: Perello, Valenzuela, and Zaragoza voted in favor, the motion carried 3-0.

D. REPORTS

1. Public Works Department
SUBJECT: Environmental Resources (Solid Waste) Rates Update Report.

RECOMMENDATION: That the Public Works & Transportation Committee recommend that the City Council receive and file the Solid Waste Rates Update Report.

Brian Yanez, Assistant Public Works Director and Eric Zetz, Environmental Resources Manager presented and an swered the Committee’s questions. Public comments were received from Charles McLaughlin.

It was moved by Member Valenzuela, seconded by Member Zaragoza , to approve the
recommended action as presented. VOTE: Perello, Valenzuela, and Zaragoza voted in favor, the motion carried 3-0.

5 FEBRUARY 27, 2024 OXNARD CITY COUNCIL PAGE 2

PUBLIC WORKS & TRANSPORTATION COMMITTEE

2. Public Works Department
SUBJECT: Purchase Order to McLaughlin Waste Equipment, Inc. for Metal Refuse Containers for the Environmental Resources Division.

RECOMMENDATION: That the Public Works and Transportation Committee recommend that the City Council authorize the Mayor to execute a Purchase Order with McLaughlin Waste Equipment, Inc. for an amount not to exceed $2,500,000 for a three-year term ending June 30, 2027, for metal refuse containers.

Eric Zetz, Environmental Resources Man ager presented and answered the Committee’s questions. No public comments were received.

It was moved by Member Zaragoza, seconded by Member Valenzuela , to approve the
recommended action as presented. VOTE: Perello, Valenzuela, and Zaragoza voted in favor, the motion carried 3-0.

3. Public Works Department
SUBJECT: General Fund Reimbursement of Service Charges to Special Districts.

RECOMMENDATION: That the Public Works and Transportation Committee recommend that the City Council approve and authorize the City Manager to approve a transfer in the amount of $168,247.67 for reimbursement of sidewalk service charges, including interest, to 21 Landscape Maintenance Districts (Fund 120) from the General Fund (101), with the corresponding budget appropriation adjustments.

Eric L. Storrie, CPRP , Special Districts Manager presented and answered the Committee’s questions. No public comments were received.

It was moved by Chair Perello , seconded by Member Valenzuela , to approve the
recommended action as presented. VOT E: Perello, Valenzuela, and Zaragoza voted in favor, the motion carried 3-0.

E. ITEMS FOR FUTURE AGENDAS (No requests were made.)

F. ADJOURNMENT
There being no further business on the agenda, and without objection, Chair Perello adjourned the meeting at 9:01 p.m.

ROSE CHAPARRO BERT E. PERELLO
City Clerk Chair

6 PUBLIC WORKS AND TRANSPORTATION COMMITTEE

AGENDA REPORT

REPORTS
AGENDA ITEM NO. D.1

DATE: March 12, 2024

TO: Public Works and Transportation Committee

FROM: Michael Wolfe, Public Works Director, (805) 385-8055, [email protected]

SUBJECT: Citywide Pavement Management Program Overview. (20 minutes)

RECOMMENDATION

That the Public Works and Transportation Committee provide comments and recommend that the City Council receive and file a report on the Citywide Pavement Management Program Overview.

Please click the following link to view the required Measure M pre-recorded presentation video: https://youtu.be/7vayGo9kLmM

BACKGROUND

Oxnard’s streets and alleyways are among its most valuable assets, with a present replacement value of approximately $988.9M. Because of this high value, combined with the need to address continuous pavement wear and degradation, it is imperative to perform corrective and preventive maintenance via a strategic multi- year, multi-phase plan. This plan is implemented through individual construction projects utilizing a “toolbox” of paving methods. Such treatments generally include removal and replacement (R&R), cold milling with asphalt concrete (A/C) overlays, portland cement concrete (PCC) patching and reconstruction, and sealing (crack, slurry, cape, and micro-surfacing). Seals are typically seen as preventive maintenance (also commonly termed pavement preservation) techniques, as they do not add structural capacity to the existing pavement.

The City currently owns and maintains approximately 440.5 total centerline miles across all functional street classifications, as follows:
• Arterial and Collector – 128.6 centerline miles
• Residential – 246.8 lane miles centerline miles
• Alley – 65.1 centerline miles

This equates to a total of 95,450,658 square feet of pavement in the City’s network, as calculated by the City’s pavement management software, StreetSaver. This application, sourced from and managed by the Metropolitan Transportation Commission (MTC), is a planning tool used to monitor, analyze, and forecast Oxnard’s overall Pavement Management Program (PMP) and is critical to establishing a proper, phased multi-year paving cycle.

Projections and computations regarding change in pavement condition versus annual funding investment are typically made over a 10-year span; for budget planning and capital project programming purposes, staff develops a phased paving project plan based on a rolling 5-year horizon, termed the Citywide Pavement Management Program.
7 It should be noted that the current lawsuit against the City filed by Aaron Starr and his political corporation “Moving Oxnard Forward” precludes the use of lease revenue bonds for funding pavement projects. Such bonding, commonly used for high-cost projects like street paving, is a financing mechanism traditionally used by all American cities, counties, and states, that provide for funding consistency and predictability necessary for the development of a strategic, multi-year paving program. A funding source like this allows for both corrective and preventive paving work to be planned and executed predictably, with the goal of stretching the limited available funding as far as possible.

DISCUSSION

The key pavement health metric used by Oxnard is the Pavement Condition Index (PCI), which provides a snapshot of the pavement health of a road through a surface condition-based visual analysis algorithm. It is reported on a scale of 0 to 100 (0 being worst, 100 best). Oxnard’s PCI assessments are made yearly by a contracted pavement engineering consultant. According to the most recent PMP report (utilizing inspections from 2023), the average PCI of the City’s entire road network is 67; broken into roadway functional classifications, this equates to PCIs of 73 for Arterials, 69 for Collectors, 68 for Residential, and 29 for Alleys.

The Citywide Pavement Management Program is a planning and project programming roadmap for Oxnard’s paving needs over a rolling multi-year horizon, and is further broken down into project phases. Each phase is a collection of street locations that is determined by prioritization (explained below), anticipated budget, grouping of locations for construction efficiency, and other technical factors. The phases are implemented mainly through three discrete projects within the present Capital Improvement Program (CIP). Projects are separated into alleys, residential streets, and arterial streets as discussed in more detail below.

Planning over a multi-year horizon is critical for budgeting resources – both staff and financial. Adopting a capital pavement program allows Engineering staff to schedule projects according to anticipated revenues and staff workload capacity. This also makes the Council’s priorities clear to staff as grant opportunities arise that may be applicable to the planned projects.

Being a multi-year funding roadmap, there is flexibility such that new projects or street segments could be added as unforeseen year-to-year circumstances arise such as funding amounts, materials costs, accelerated pavement degradation, etc.

Prioritization

Since there are more needs than funding or staff resources to meet those needs, projects must be prioritized. A further consideration for prioritization is moving the overall pavement condition forward toward “good” (generally considered a PCI value of at least 70) and, once there, maintaining at least that level over time. City staff has developed a methodology for prioritizing and programming paving projects to meet these constraints. Generally, projects are divided into three subcategories, namely residential streets, arterial streets, and alleyways; these generally correspond with the three named paving projects in the CIP. Each subcategory has somewhat different prioritization parameters, as follows:

Project priorities for residential streets are determined by:

The average PCI and the number of lane miles are calculated for each neighborhood (Only for poor- condition streets, i.e. PCI<55). High priority is given to neighborhoods with low average Pavement Condition Index (PCI), a high number of lane miles, and a high concentration of pothole repair work.

Project priorities for arterial streets are determined by,

8 Average PCI and Average Daily Traffic (ADT), representing the number of vehicles using the street each day are calculated for each arterial project. High priority is given to arterial streets with low PCI, high ADT, and high number of pothole repairs.

Project priorities for alleys are determined by:

Low PCI, high population density, schools, parks, businesses, and the number of potholes repaired.

A high priority is given to alleys with low PCI, high pothole repair count, high population density, and close proximity to schools, parks, and businesses.

A special case exists for the above prioritization system, namely locations where there are aging, buried cast iron pipes that are historically troublesome and prone to failure. These tend to be located in alleyways, and in these places the pipe ideally should be removed and replaced before the paving work occurs. For the present multi-phase paving plan, a number of the project locations (see attachments) for the first two phases recommend the replacement of cast iron pipe ahead of the paving work. To accomplish this, funding will need to be identified and programmed separately for the CIP project titled “Water Distribution: Neighborhood Street Cast Iron Pipe Replacement”.

A high degree of weight will be placed on locations requiring a significant amount of pothole repair work. The City’s pothole repair team is the same staff that does sidewalk repair, curb/gutter repair, street sign maintenance and repair, street striping, right-of-way clean-up, etc. Pothole repair work is temporary, costly, and requires dedicated resources (i.e. staffing and equipment) for little long-term benefit. As such, the more street segments with a high pothole repair need that can be addressed with long-term corrective/preventive paving work, the better the Public Works team can leverage its limited resources. As mentioned above, there are a range of pavement treatments available, and a “mix of fixes” is usually the ideal way to proceed with a given year’s paving project. Staff has determined that, for this present multi-phase plan, the most effective paving budget split will be approximately 80% for rehabilitation (A/C mill-and-overlays, PCC concrete) and 20% for preventive maintenance (also called pavement preservation, such as slurry seals, cape seals, and micro- surfacing). Over time, as the City’s overall PCI goes up, this split will change to reflect less of a “worst first” approach that prioritizes rehabilitation, to one of “keeping good pavements good” that emphasizes maintenance and preservation.

The concept of “mix of fixes” is important to elaborate on since at first glance it may seem counter-intuitive. It is easy to think that the best way to address paving work is to fix the worst street segments (that is, streets with the lowest PCI) first. However, that approach is flawed for two general reasons. First, the degradation of asphalt concrete is not linear. As PCI scores approach around 70-65 or less, asphalt concrete degrades exponentially. Second, the cost to do corrective work such as R&R and mill-and-overlay (generally used when the PCI is less than 65-70) is 6-10 times more than the cost to do preventive/preservation work such as seals and microsurfacing (normally used where the PCI is greater than 70). Said another way, if the worst streets are the only ones done in each phase, then the streets with higher PCIs will continue to degrade untreated down past a PCI of 70, and cost 6-10 times more to fix in the future. Therefore, it’s imperative to maximize the use of pavement preservation techniques in every phase; this approach results in the least-cost per square foot, and stretches the limited amount of funding for maximum benefit. This is why Public Works staff will make recommendations to conduct paving work on several street segments in each phase with higher PCIs than other streets that have lower PCIs.

Pavement Maintenance Program Phasing

A traditional pavement management program (PMP) is separated by fiscal years to include the identification of the total amount of paving work (e.g. street segments) that can be done in each fiscal year with the known or required funding amount. However, with the Aaron Starr lawsuit, bonding is not currently available to Oxnard. The City prevailed in the lawsuit at the trial court level, but Aaron Starr immediately filed an appeal. 9 The appeal process could take a year for the case to be briefed and argued, and for the court to issue a ruling. As such, planning for street paving work must be modified until such time the lawsuit process is complete.

The City’s 2023 pavement management report indicates that $19.4M dollars (hard construction costs) should be spent each fiscal year to maintain the current PCI. When adding in the soft costs (design, inspection, material testing, etc) the estimated total amount per year is $23.3M dollars. However, with bond funding unavailable, the long-term planning for pavement rehabilitation and maintenance is hampered. The amount of new annual Gas Tax for CIP paving projects, in addition to the anticipated Measure O funding for alley work, amounts to $6.25M for next Fiscal Year instead of the $23.3M per year to maintain the current PCI. Therefore, Public Works has organized the PMP into phases rather than fiscal years. Using a phased approach allows for the flexibility to adjust funding amounts (higher or lower) to avoid unrealistic expectations from the public about when streets will be paved. It should be noted that any funds remaining once current paving construction projects are completed will be carried over to next fiscal year and can be used for Phase 1 work.

STRATEGIC PRIORITIES

This agenda item supports the Infrastructure and Natural Resources strategy. The purpose of the Infrastructure and Natural Resources strategy is to preserve and improve our roads, utilities, parks, trees, water supply and natural resources through effective planning, prioritization, and an equitable and efficient use of available funding.

FINANCIAL IMPACT

There is no direct financial impact to receive and file this report and provide input. Depending on input and direction from the City Council during the annual Operating and CIP budget process, there are several issues to address. Presently, due to the City’s current inability to bond for projects resulting from the Aaron Starr lawsuit, the new funding specifically available for street paving for next Fiscal Year is solely from gas tax and anticipated Measure O revenue in the amount of approximately $6.25M. With this amount, the City can pave only one residential street project and a few alleyways identified in Phase 1. Should there be an opportunity to provide more funding, additional streets from Phase 1 may be included in this year’s project scope.

Prepared by: Morgan Kessler, City Engineer

ATTACHMENTS

1. Proposed Arterial Street Construction Projects Phase I & Phase II

2. Proposed Arterial Street Construction Projects Phase III, Phase IV and Phase V

3. Proposed Alley Construction Projects Phase I and Phase II

4. Proposed Alley Construction Projects Phase III, Phase IV and Phase V

5. Proposed Residential Street Construction Projects Phase I & Phase II

6. Proposed Residential Street Construction Projects Phase III, Phase IV and Phase V

7. Presentation

10 FREMONT

NORTH CARRIAGE
SQUARE

EAST VILLAGE

ROSE PARK

SEA VIEW

ESTATES

VIA MARINA

REDWOOD
BRYCE
CANYON
NORTH

BLACKSTOCK
NORTH

COLLEGE

ESTATES

BLACKSTOCK

SOUTH BRYCE
CANYON
SOUTH

TERRACE

ESTATES PLEASANT
VALLEY

ESTATES
SILVER
STRAND

PLEASANT
VALLEY

VILLAGE

SOUTHWINDS

GOLF COURSE

VICTORIA

ESTATES

WINDSOR NORTH

RIVER RIDGE SIERRA LINDA

ORCHARD

CABRILLO

TEAL CLUB

FREMONT

SOUTH WILSON

FIVE POINTS

NORTHEAST

SEA AIR
HOBSON

PARK WEST HOBSON

PARK EAST

MARINA WEST BARTOLO
SQUARE
NORTH

CAL-GISLER

BARTOLO
SQUARE
SOUTH

CYPRESS

RIVERPARK
EL RIO
WEST

SOUTH BANK

WAGON WHEEL
OXNARD
SHORES

HOLLYWOOD

BY THE SEA

CHANNEL

ISLANDS
OXNARD
DUNES
VILLA
CAPRI

SOUTHSHORE

ORMOND BEACH

COMMERCIAL AREA
EL RIO

RIO LINDO

AUTO CENTER

NYELAND ACRES

RICE AVENUE

COMMERCIAL AREA

LEMONWOOD

EASTMONT

PACIFIC AVENUE

COMMERCIAL
AREA

TIERRA VISTA

MAR VISTA

COLLEGE PARK
OXNARD

PACIFIC

DIAMOND BAR

WEST VILLAGE

LA COLONIA

KAMALA PARK
Proposed Arterial Street Construction Projects Phase I & Phase II Phase I
No Cast Iron Water Main
Cast Iron Water Main
Phase II
No Cast Iron Water Main
Cast Iron Water Main
Oxnard Neighborhoods
.
0 0.5 10.25 Miles
11 FREMONT

NORTH CARRIAGE
SQUARE

EAST VILLAGE

ROSE PARK

SEA VIEW

ESTATES

VIA MARINA

REDWOOD
BRYCE
CANYON
NORTH

BLACKSTOCK
NORTH

COLLEGE

ESTATES

BLACKSTOCK

SOUTH BRYCE
CANYON
SOUTH

TERRACE

ESTATES PLEASANT
VALLEY

ESTATES
SILVER

STRAND PLEASANT
VALLEY

VILLAGE

SOUTHWINDS

GOLF COURSE

VICTORIA

ESTATES

WINDSOR NORTH

RIVER RIDGE SIERRA LINDA

ORCHARD

CABRILLO

TEAL CLUB

FREMONT

SOUTH WILSON

FIVE POINTS

NORTHEAST

SEA AIR
HOBSON

PARK WEST HOBSON

PARK EAST

MARINA WEST BARTOLO
SQUARE
NORTH

CAL-GISLER

BARTOLO
SQUARE
SOUTH

CYPRESS

RIVERPARK
EL RIO
WEST

SOUTH BANK

WAGON WHEEL
OXNARD
SHORES

HOLLYWOOD

BY THE SEA

CHANNEL

ISLANDS
OXNARD
DUNES
VILLA
CAPRI

SOUTHSHORE

ORMOND BEACH

COMMERCIAL AREA
EL RIO

RIO LINDO

AUTO CENTER

NYELAND ACRES

RICE AVENUE

COMMERCIAL AREA

LEMONWOOD

EASTMONT

PACIFIC AVENUE

COMMERCIAL
AREA

TIERRA VISTA

MAR VISTA

COLLEGE PARK
OXNARD

PACIFIC

DIAMOND BAR

WEST VILLAGE

LA COLONIA

KAMALA PARK
Proposed Arterial Street Construction Projects Phase III, Phase IV & Phase V Phase III
No Cast Iron Water Main
Cast Iron Water Main
Phase IV
No Cast Iron Water Main
Cast Iron Water Main
Phase V
No Cast Iron Water Main
Cast Iron Water Main
Oxnard Neighborhoods
.
0 0.5 10.25 Miles
12 FREMONT

NORTH CARRIAGE
SQUARE

EAST VILLAGE

ROSE PARK

SEA VIEW

ESTATES

VIA MARINA

REDWOOD
BRYCE
CANYON
NORTH

BLACKSTOCK
NORTH

COLLEGE

ESTATES

BLACKSTOCK
SOUTH
BRYCE
CANYON
SOUTH

TERRACE

ESTATES PLEASANT
VALLEY

ESTATES
SILVER

STRAND PLEASANT
VALLEY

VILLAGE

SOUTHWINDS

GOLF COURSE

VICTORIA

ESTATES WINDSOR NORTH

RIVER RIDGE SIERRA LINDA

ORCHARD

CABRILLO

TEAL CLUB

FREMONT

SOUTH WILSON

FIVE POINTS

NORTHEAST

SEA AIR
HOBSON

PARK WEST HOBSON

PARK EAST

MARINA WEST BARTOLO
SQUARE
NORTH

CAL-GISLER BARTOLO
SQUARE
SOUTH

CYPRESS

RIVERPARK
EL RIO
WEST

SOUTH BANK
WAGON
WHEEL
OXNARD
SHORES

HOLLYWOOD

BY THE SEA

CHANNEL

ISLANDS
OXNARD
DUNES

VILLA CAPRI

SOUTHSHORE

ORMOND BEACH

COMMERCIAL AREA
EL RIO

RIO LINDO

AUTO CENTER

NYELAND ACRES

RICE AVENUE

COMMERCIAL
AREA

LEMONWOOD

EASTMONT

PACIFIC AVENUE

COMMERCIAL AREA

TIERRA VISTA

MAR VISTA

COLLEGE PARK OXNARD

PACIFIC

DIAMOND BAR

WEST VILLAGE

LA COLONIA

KAMALA PARK
Phase I
No Cast Iron Water Main
Phase II
No Cast Iron Water Main
Oxnard Neighborhoods
.
0 0.5 10.25 Miles
Proposed Alley Construction Projects Phase I & Phase II 13 FREMONT

NORTH CARRIAGE
SQUARE

EAST VILLAGE

ROSE PARK

SEA VIEW

ESTATES

VIA MARINA

REDWOOD
BRYCE
CANYON
NORTH

BLACKSTOCK
NORTH

COLLEGE

ESTATES

BLACKSTOCK
SOUTH
BRYCE
CANYON
SOUTH

TERRACE

ESTATES PLEASANT
VALLEY

ESTATES
SILVER

STRAND PLEASANT
VALLEY

VILLAGE

SOUTHWINDS

GOLF COURSE

VICTORIA

ESTATES WINDSOR NORTH

RIVER RIDGE SIERRA LINDA

ORCHARD

CABRILLO

TEAL CLUB

FREMONT

SOUTH WILSON

FIVE POINTS

NORTHEAST

SEA AIR
HOBSON

PARK WEST HOBSON

PARK EAST

MARINA WEST BARTOLO
SQUARE
NORTH

CAL-GISLER BARTOLO
SQUARE
SOUTH

CYPRESS

RIVERPARK
EL RIO
WEST

SOUTH BANK
WAGON
WHEEL
OXNARD
SHORES

HOLLYWOOD

BY THE SEA

CHANNEL

ISLANDS
OXNARD
DUNES

VILLA CAPRI

SOUTHSHORE

ORMOND BEACH

COMMERCIAL AREA
EL RIO

RIO LINDO

AUTO CENTER

NYELAND ACRES

RICE AVENUE

COMMERCIAL
AREA

LEMONWOOD

EASTMONT

PACIFIC AVENUE

COMMERCIAL AREA

TIERRA VISTA

MAR VISTA

COLLEGE PARK OXNARD

PACIFIC

DIAMOND BAR

WEST VILLAGE

LA COLONIA

KAMALA PARK
Phase III
No Cast Iron Water Main
Cast Iron Water Main
Phase IV
No Cast Iron Water Main
Cast Iron Water Main
Phase V
No Cast Iron Water Main
Cast Iron Water Main
Oxnard Neighborhoods
.
0 0.5 10.25 Miles
Proposed Alley Construction Projects Phase III, Phase IV & Phase V 14 FREMONT

NORTH CARRIAGE
SQUARE

EAST VILLAGE

ROSE PARK

SEA VIEW

ESTATES

VIA MARINA

REDWOOD
BRYCE
CANYON
NORTH

BLACKSTOCK
NORTH

COLLEGE

ESTATES

BLACKSTOCK

SOUTH BRYCE
CANYON
SOUTH

TERRACE

ESTATES PLEASANT
VALLEY

ESTATES
SILVER

STRAND PLEASANT
VALLEY

VILLAGE

SOUTHWINDS

GOLF COURSE

VICTORIA

ESTATES WINDSOR NORTH

RIVER RIDGE SIERRA LINDA

ORCHARD

CABRILLO

TEAL CLUB

FREMONT

SOUTH WILSON

FIVE POINTS

NORTHEAST

SEA AIR HOBSON

PARK WEST HOBSON

PARK EAST

MARINA WEST BARTOLO
SQUARE
NORTH

CAL-GISLER BARTOLO
SQUARE
SOUTH

CYPRESS

RIVERPARK
EL RIO
WEST

SOUTH BANK
WAGON
WHEEL
OXNARD
SHORES

HOLLYWOOD

BY THE SEA

CHANNEL

ISLANDS
OXNARD
DUNES

VILLA CAPRI

SOUTHSHORE

ORMOND BEACH

COMMERCIAL AREA
EL RIO

RIO LINDO

AUTO CENTER

NYELAND ACRES

RICE AVENUE

COMMERCIAL AREA

LEMONWOOD

EASTMONT

PACIFIC AVENUE

COMMERCIAL AREA

TIERRA VISTA

MAR VISTA

COLLEGE PARK OXNARD

PACIFIC

DIAMOND BAR

WEST VILLAGE

LA COLONIA

KAMALA PARK
Phase I
No Cast Iron Water Main
Cast Iron Water Main
Neighborhoods
Phase II
No Cast Iron Water Main
Cast Iron Water Main
Neighborhoods
.
0 0.5 10.25 Miles
Proposed Residential Street Construction Projects Phase I & Phase II 15 FREMONT

NORTH CARRIAGE
SQUARE

EAST VILLAGE

ROSE PARK

SEA VIEW

ESTATES

VIA MARINA

REDWOOD
BRYCE
CANYON
NORTH

BLACKSTOCK
NORTH

COLLEGE

ESTATES

BLACKSTOCK

SOUTH BRYCE
CANYON
SOUTH

TERRACE

ESTATES PLEASANT
VALLEY

ESTATES
SILVER

STRAND PLEASANT
VALLEY

VILLAGE

SOUTHWINDS

GOLF COURSE

VICTORIA

ESTATES WINDSOR NORTH

RIVER RIDGE SIERRA LINDA

ORCHARD

CABRILLO

TEAL CLUB

FREMONT

SOUTH WILSON

FIVE POINTS

NORTHEAST

SEA AIR HOBSON

PARK WEST HOBSON

PARK EAST

MARINA WEST BARTOLO
SQUARE
NORTH

CAL-GISLER BARTOLO
SQUARE
SOUTH

CYPRESS

RIVERPARK
EL RIO
WEST

SOUTH BANK
WAGON
WHEEL
OXNARD
SHORES

HOLLYWOOD

BY THE SEA

CHANNEL

ISLANDS
OXNARD
DUNES

VILLA CAPRI

SOUTHSHORE

ORMOND BEACH

COMMERCIAL AREA
EL RIO

RIO LINDO

AUTO CENTER

NYELAND ACRES

RICE AVENUE

COMMERCIAL AREA

LEMONWOOD

EASTMONT

PACIFIC AVENUE

COMMERCIAL AREA

TIERRA VISTA

MAR VISTA

COLLEGE PARK OXNARD

PACIFIC

DIAMOND BAR

WEST VILLAGE

LA COLONIA

KAMALA PARK
Phase III
Neighborhoods
Phase IV
Neighborhoods
Phase V
Neighborhoods
.
0 0.5 10.25 Miles
Proposed Residential Street Construction Projects Phase III, Phase IV & Phase V 16 CITYWIDE PAVEMENT MANAGEMENT

PROGRAM OVERVIEW
Public Works and Transportation Committee, March 12, 2024 City Council, April 2, 2024
Morgan Kessler
City Engineer
17 RECOMMENDATION

FOR PUBLIC WORKS AND TRANSPORTATION
COMMITTEE:

That the Public Works and Transportation Committee provide comments and recommend that the City Council receive and file a report on the Citywide Pavement Management Program Overview
2 18

RECOMMENDATION

FOR CITY COUNCIL:

That the City Council receive and file a report on the Citywide Pavement Management Program Overview
3 19

BACKGROUND

• For budget planning and capital project programming purposes, staff developed a phased paving project plan, termed the Citywide Pavement Management Program.
• Pavement is valuable: Oxnard’s streets and alleyways are have a present replacement value of approximately $988.9 M.
• Oxnard currently owns and maintains approximately 440.5 total centerline miles (including both streets and alleys)
• This plan uses a “toolbox” of paving methods which generally include removal and replacement (R&R), cold milling with asphalt concrete (A/C) overlays, portland cement concrete (PCC) repair, and sealing (crack, slurry, cape, and micro-surfacing)
4 20

BACKGROUND
Bonding to Pay for Paving Projects
• Bonding is commonly used for high-cost projects like street paving, and is used by all American cities, counties, and states. • Such bonding allows for both corrective and preventive paving work to be planned and executed predictably.
• The City of Oxnard is unable to bond for paving projects, due to the current lawsuit against the City filed by Aaron Starr and his political corporation “Moving Oxnard Forward”.
5 21

DISCUSSION
Pavement Health and Assessment
• The key pavement health metric used by Oxnard is the Pavement Condition Index (PCI)
• PCI is reported on a scale of 0 to 100 (0 being worst, 100 best) • As of the most recent report, the average PCI of the City’s entire road network is 67. This is a 1-point increase from last year. 6 22

DISCUSSION
Prioritization
• To meet staffing and funding constraints, projects must be prioritized • Oxnard paving projects are divided into three subcategories:
residential streets, arterial streets, and alleys
• Prioritization is determined by analyzing:
• Average Daily Traffic (ADT), Low PCI, high population density, schools, parks, businesses, and the number of potholes repaired.
• Staff recommends the replacement of troublesome, aging buried utilities, including cast iron pipe, ahead of paving work, where needed
7 23

DISCUSSION
Work Approach and “Mix of Fixes”
• Asphalt pavement degrades exponentially (see Figure 1, below) • Fixing only the worst street segments first is not the best way to conduct pavement management
• This is because corrective work is 6-10 times more expensive than preventive/preservation work (see Figure 2, below)
• The idea is to keep “good roads good” by using a “mix of fixes” • For the present recommended phase of work, the most effective paving budget split will be approximately 80% for corrective work and 20% for preservation work.
8 24

DISCUSSION
• Figure 1) This graphic shows how asphalt pavement exponentially degrades over time without preservation intervention
9 25

DISCUSSION
• Figure 2) This graphic shows how “keeping good pavements good” is much less expensive over time
10 26

DISCUSSION
Project Phasing
• A traditional pavement management program (PMP) is separated by fiscal years to include specific work areas per FY
• Because of the Aaron Starr lawsuit, paving planning must be modified into phases until such time the lawsuit process is complete. • The City’s latest pavement report indicates that $23.3M dollars should be spent each fiscal year to maintain the current PCI • Without bonding ability, for next fiscal year the only paving funding available is Gas Tax and anticipated Measure O funding amounting to $6.25 M
• A phased approach allows for flexibility to adjust funding amounts (higher or lower) to avoid unrealistic expectations from the public about when streets will be paved
11 27

FINANCIAL IMPACT

• There is no direct financial impact to receive and file this report and provide input
•
• Because of the Aaron Starr lawsuit and resulting inability to bond, funding specifically available next fiscal year for street paving is solely from gas tax and anticipated Measure O revenue in the amount of approximately $6.25M
•
• With this amount, the City can pave only one residential street project and a few alleyways identified in Phase 1
•
• Staff intends to request additional funding to supplement gas tax and Measure O funds (for alleys) for next year’s budget. •
• Should there be an opportunity to provide more funding, additional streets from Phase 1 may be included in next year’s project scope.

12 28
QUESTIONS?
29