CITY OF
OXNARD
Lopez, Luly <[email protected]>
July 30, 2026 City Council Agenda Item L.6. Request for Approval 3 messages
Debbie Mitchell <debbie Mon, Jul 20, 2026 at 10:00 AM
Reply-To:
To: [email protected]
Cc: Luis McArthur < Gabe Teran < 1. Bert <
Aaron Starr r, Gabriela Rodriguez <1 •. Gabriela Basua
*, Michela Perez < , Alexander <a
Michael Wolfe < Anthony Miller / r, KJ May h
Morgan Kessler < p, Abe Anbessaw <
Channel Islands Waterfront Homeowners Association
7/19/2026
Letter of Support
Agenda Item L.6 - July 30, 2026
Approve Additional Contract Funds for the West Hemlock Street Seawall Repairs Project Honorable Mayor, Members of the City Council, and City Staff:
On behalf of the Channel Islands Waterfront Homeowners Association (CIWHA), we respectfully request your approval of Agenda Item L.6 authorizing the additional funding necessary to complete the foundation repairs for the West Hemlock Street seawall rehabilitation project.
This request represents a sound investment in public infrastructure and responsible stewardship of one of Oxnard's most unique waterfront communities.
Residents have experienced the temporary inconveniences associated with this project, including construction impacts, dock relocations, and limited access. Completing the foundation repairs while the contractor is already mobilized is both fiscally responsible and operationally efficient. It avoids unnecessary remobilization costs, minimizes future disruption to residents, and ensures that critical work is completed while permits and construction resources are already in place.
The West Hemlock project has also been many years in the making. This seawall repair R & D project was originally approved and funded in 2018 but was subsequently paused while the City undertook "Value Engineering" as recommended by the Public Works Director at that time. That extensive effort ultimately resulted in confirming the original concept now being implemented. As a result, residents have patiently waited through years of engineering evaluation, permitting, inflation, and rising construction costs before seeing construction begin.
According to the staff report, this project serves as a pilot program to evaluate repair methods, constructability, durability, and long-term cost effectiveness before expanding similar repairs to other Mandalay Bay seawalls. CIWHA supports this thoughtful approach. The engineering knowledge gained from this project should provide valuable guidance for future rehabilitation efforts throughout the City's waterfront infrastructure.
For decades, waterfront residents have partnered with the City in maintaining this unique public resource. The canals, seawalls, parks, public walkways, docks, and waterways provide benefits enjoyed not only by adjacent homeowners, but by the entire Oxnard community and countless visitors who enjoy Channel Islands Harbor.
As this pilot project progresses toward completion, we respectfully encourage the City Council to direct staff to begin the next phase of planning for the remaining Mandalay Bay seawalls. The engineering lessons learned from West Hemlock should now be used to develop a comprehensive rehabilitation program, an implementation schedule, and a sustainable long-term funding strategy that addresses the City's aging waterfront infrastructure before additional failures occur.
CIWHA also encourages the City to continue honoring its longstanding commitment to an equitable partnership between the public and benefiting property owners. As future funding mechanisms are evaluated, we hope the City will preserve a fair public-private cost sharing approach while identifying stable funding that allows seawall rehabilitation to proceed in a planned and cost-effective manner.
We appreciate the dedication of Public Works staff, the engineering consultants, and the City Council for advancing this important project. We respectfully ask for your approval of Agenda Item L.6 so construction can continue without unnecessary delay.
Thank you for your continued commitment to preserving one of Oxnard's most valuable public waterfront assets.
Respectfully,
William Clark, President
Debbie Mitchell, VP & Seawall Team
Channel Islands Waterfront Homeowners Association (CIWHA) Debbie Mitchell
E Oxnard_City_Council_JULY_30_Request-for-approval_Agenda_Item-L_6_CIWHA.pdf 156K
Lopez, Luly <[email protected]> Tue, Jul 21, 2026 at 2:58 PM To: [email protected]
Cc: [email protected], Luis McArthur < P, Gabe Teran < 7, Bert Gabriela Basua 4 , Aaron Starr , Gabriela Rodriguez S
•, Micheala Perez < , Alexander
>, Michael Wolfe < F. Anthony Miller <
KJ May 4 Morgan Kessler < T, Abe Anbessaw
<
Hello,
Your written comment is received for the City Council meeting of July 30th. It will be forwarded to the City Council. (Quoted text hidden]
Mail Delivery Subsystem <[email protected]> Tue, Jul 21, 2026 at 2:59 PM To: [email protected]
Address not found
?
Your message wasn't delivered to
because the address couldn't be found, or is unable to receive mail.
LEARN MORE
Channel Islands Waterfront Homeowners Association (CIWHA) CIWHA Representing Homeowners in Mandalay
Channel Islands Waterfront Homeowners Association
7/19/2026
Letter of Support
Agenda Item L.6 - July 30, 2026
Approve Additional Contract Funds for the West Hemlock Street Seawall Repairs Project Honorable Mayor, Members of the City Council, and City Staff:
On behalf of the Channel Islands Waterfront Homeowners Association (CIWHA), we respectfully request your approval of Agenda Item L.6 authorizing the additional funding necessary to complete the foundation repairs for the West Hemlock Street seawall rehabilitation project.
This request represents a sound investment in public infrastructure and responsible stewardship of one of Oxnard's most unique waterfront communities.
Residents have experienced the temporary inconveniences associated with this project, including construction impacts, dock relocations, and limited access. Completing the foundation repairs while the contractor is already mobilized is both fiscally responsible and operationally efficient. It avoids unnecessary remobilization costs, minimizes future disruption to residents, and ensures that critical work is completed while permits and construction resources are already in place.
The West Hemlock project has also been many years in the making. This seawall repair R & D project was originally approved and funded in 2018 but was subsequently paused while the City undertook "Value Engineering" as recommended by the Public Works Director at that time. That extensive effort ultimately resulted in confirming the original concept now being implemented. As a result, residents have patiently waited through years of engineering evaluation, permitting, inflation, and rising construction costs before seeing construction begin.
According to the staff report, this project serves as a pilot program to evaluate repair methods, constructability, durability, and long-term cost effectiveness before expanding similar repairs to other Mandalay Bay seawalls. CIWHA supports this thoughtful approach. The engineering knowledge gained from this project should provide valuable guidance for future rehabilitation efforts throughout the City's waterfront infrastructure.
For decades, waterfront residents have partnered with the City in maintaining this unique public resource. The canals, seawalls, parks, public walkways, docks, and waterways provide benefits enjoyed not only by adjacent homeowners, but by the entire Oxnard community and countless visitors who enjoy Channel Islands Harbor.
Channel Islands Waterfront Homeowners Association (CIWHA) CIWHA Representing Homeowners in Mandalay
As this pilot project progresses toward completion, we respectfully encourage the City Council to direct staff to begin the next phase of planning for the remaining Mandalay Bay seawalls. The engineering lessons learned from West Hemlock should now be used to develop a comprehensive rehabilitation program, an implementation schedule, and a sustainable long-term funding strategy that addresses the City's aging waterfront infrastructure before additional failures occur.
CIWHA also encourages the City to continue honoring its longstanding commitment to an equitable partnership between the public and benefiting property owners. As future funding mechanisms are evaluated, we hope the City will preserve a fair public-private cost sharing approach while identifying stable funding that allows seawall rehabilitation to proceed in a planned and cost-effective manner.
We appreciate the dedication of Public Works staff, the engineering consultants, and the City Council for advancing this important project. We respectfully ask for your approval of Agenda Item L.6 so construction can continue without unnecessary delay.
Thank you for your continued commitment to preserving one of Oxnard's most valuable public waterfront assets.
Respectfully,
William Clark, President
Debbie Mitchell, Vice President & Seawall Team
Channel Islands Waterfront Homeowners Association (CIWHA) Channel Islands
Waterfront Homeowners Association
REPRESENTING MANDALAY BAY HOMEOWNERS
CITY 04
OXNARD
Lopez, Luly <[email protected]>
CALIFORNIE
City Council July 30, 2026 Agenda Item L.6 Please Approve! 1 message
Connie Heagy < Mon, Jul 20, 2026 at 10:13 AM
To: [email protected]
Honorable Mayor, Members of the City Council, and City Staff:
I support Agenda Item L.6 authorizing the additional funding needed to complete the West Hemlock Street seawall foundation repairs. Completing this work now will save money, reduce future disruption to residents, and help move forward with long-term seawall rehabilitation throughout Mandalay Bay. Please vote YES.
Thank you.
Connie Heagy
Resident of Mandalay Waterways 1
citY or
OXNARD
Lopez, Luly <[email protected]>
CALLORALA
City Council July 30, 2026 Agenda Item L.6. Please approve! 2 messages
Steven Nahigian Mon, Jul 20, 2026 at 10:24 AM
To: [email protected]
Honorable Mayor, Members of the City Council, and City Staff:
I support Agenda Item L.6 authorizing the additional funding needed to complete the West Hemlock Street seawall foundation repairs. Completing this work now will save money, reduce future disruption to residents, and help move forward with long-term seawall rehabilitation throughout Mandalay Bay. We have already been disrupted enough already! Please vote YES.
Thank you,
Steve Nahigian
Lopez, Luly <[email protected]> Tue, Jul 21, 2026 at 2:57 PM To: Steven Nahigian •
Cc: [email protected]
Hello,
Your written comment is received for the City Council meeting of July 30th. It will be forwarded to the City Council. [Quoted text hidden]
OXNARD
Lopez, Luly <[email protected]>
City Council July 30, 2026 Agenda Item L.6. Please approve! 2 messages
Steven Nahigian < Mon, Jul 20, 2026 at 10:27 AM
To: [email protected]
Honorable Mayor, Members of the City Council, and City Staff:
I support Agenda Item L.6 authorizing the additional funding needed to complete the West Hemlock Street seawall foundation repairs. Completing this work now will save money, reduce future disruption to residents, and help move forward with long-term seawall rehabilitation throughout Mandalay Bay. We have already been disrupted enough already! Please vote YES.
Thank you,
Steve Nahigian
Resident of Mandalay Waterways 1
Lopez, Luly <[email protected]> Tue, Jul 21, 2026 at 2:57 PM To: Steven Nahigian <
Cc: [email protected]
Hello,
Your written comment is received for the City Council meeting of July 30th It will be forwarded to the City Council. [Quoted text hidden)
CITY DI
OXNARD
Lopez, Luly <[email protected]>
CALIFORNIA
Agenda L6 PLEASE APPROVE
2 messages
Angie Wiggins 4 Mon, Jul 20, 2026 at 10:29 AM
To: "[email protected]"
Honorable Mayor, Members of the City Council, and City Staff:
/ support Agenda Item L.6 authorizing the additional funding needed to complete the West Hemlock Street seawall foundation repairs. Completing this work now will save money, reduce future disruption to residents, and help move forward with long-term seawall rehabilitation throughout Mandalay Bay. Please vote YES. Thank you.
Angie Wiggins
2305 Monaco Drive
Oxnard, 93035
Lopez, Luly <[email protected]> Tue, Jul 21,2026 at 2:55 PM To: Angie Wiggins <
Cc: "[email protected]" <[email protected]>
Hello,
Your written comment is received for the City Council meeting of July 30th. It will be forwarded to the City Council. [Quoted text hidden
CITY OF
OXNARD
City Council July 30, 2026 Agenda Item L.6. Please approve! 1 message
Vikrum Nanda < Mon, Jul 20, 2026 at 10:47 AM
To: [email protected],
Honorable Mayor, Members of the City Council, and City Staff:
/ support Agenda Item L.6 authorizing the additional funding needed to complete the West Hemlock Street seawall foundation repairs. Completing this work now will save money, reduce tuture disruption to residents, and help move forward with long-term seawall rehabilitation throughout Mandalay Bay. Please vote YES. Thank you.
Vikrum Nanda
(Resident of Mandalay Waterways 1)
Vikrum Singh Nanda DMD, MS
Orthodontist
CITY.OF
OXNARD Lopez, Luly <[email protected]>
CALIFOANIA
City Council July 30, 2026 Agenda Item L.6. Please approve 1 message
Holly Kessler < Mon, Jul 20, 2026 at 11:34 AM
To: [email protected]
Honorable Mayor, Members of the City Council, and City Staff:
/ support Agenda Item L.6 authorizing the additional funding needed to complete the West Hemlock Street seawall foundation repairs. Completing this work now will save money, reduce future disruption to residents, and help move forward with long-term seawall rehabilitation throughout Mandalay Bay. Please vote YES. Thank you.
Holly Kessler
Resident of Mandalay Waterways 1
OXNARD
Lopez, Luly <luly [email protected]>
CACIFOENIA
Agenda Item L.6
2 messages
william hopper Tue, Jul 21, 2026 at 11:50 AM
To: [email protected]
Honorable Mayor, Members of the City Council, and City Staff:
1 support Agenda Item L.6 authorizing the additional funding needed to complete the West Hemlock Street seawall foundation repairs. Completing this work now will save money, reduce future disruption to residents, and help move forward with long-term seawall rehabilitation throughout Mandalay Bay. Please vote YES.
Thank you.
William & Christiana Hopper
Oxnard, Ca. 93035
Lopez, Luly <[email protected]> Tue, Jul 21, 2026 at 2:47 PM To: william hopper <
Cc: [email protected]
Hello,
Your written comment is received for the City Council meeting of July 30, 2026. It will be forwarded to the City Council. [Quoted text hidden]
CITY OF
OXNARD
Lopez, Luly <[email protected]>
CALIFORNIA
City Council July 30, 2026 Agenda Item L.6. Please approve! 2 messages
Eric Dersom < Mon, Jul 20, 2026 at 12:07 PM
To: [email protected]
Honorable Mayor, Members of the City Council, and City Staff:
My wife and I have lived @ for the past 23 years and the seawall work is presently progressing at our house.
1 support Agenda Item L.6 authorizing the additional funding needed to complete the West Hemlock Street seawall foundation repairs. Completing this work now will save money, reduce future disruption to residents, and help move forward with long-term seawall rehabilitation throughout Mandalay Bay. Please vote YES.
Thank you,
Eric and Paula Dersom
Lopez, Luly <[email protected]> Tue, Jui 21, 2026 at 2:54 PM To: Eric Dersom <
Cc: [email protected]
Hel,
Your written comment is received for the City Council meeting of July 30th. It will be forwarded to the City Council. (Quoted text hidden
OXNARD
Lopez, Luly <[email protected]>
CALITORNIA
Support for Agenda Item L.6
2 messages
'Edan Scott Goldenberg' via City Clerk <[email protected]> Mon, Jul 20, 2026 at 3:19 PM Reply-To: Edan Scott Goldenberg <
To: "[email protected]" <[email protected]>
Honorable Mayor, Members of the City Council, and City Staff:
I support Agenda Item L.6 authorizing the additional funding needed to complete the West Hemlock Street seawall foundation repairs. Completing this work now will save money, reduce future disruption to residents, and help move forward with long-term seawall rehabilitation throughout Mandalay Bay. Please vote YES. Thank you.
I reside at in Oxnard and am a resident of Mandalay Waterways.
Regards,
Edan Scott Goldenberg
Oxnard, CA 93035
m:
Lopez, Luly <[email protected]> Tue, Jul 21, 2026 at 2:50 PM To: Edan Scott Goldenberg <
Cc: "[email protected]" < [email protected]>
Hello,
Your written comment is received for the City Council meeting of July 30th. It will be forwarded to the City Council. (Quoted text hidden]
OXNARD
Lopez, Luly <[email protected]>
CALITOENTA
Agenda Item L.6
2 messages
'Chris Bryson' via City Clerk <[email protected]? Mon, Jul 20, 2026 at 4:27 PM Reply-To: Chris Bryson <
To: [email protected]
Cc:
Honorable Mayor, Members of the City Council, and City Staff:
I support Agenda Item L.6 authorizing the additional funding needed to complete the West Hemlock Street seawall foundation repairs. Completing this work now will save money, reduce future disruption to residents, and help move forward with long-term seawall rehabilitation throughout Mandalay Bay. Please vote YES. Thank you.
Chris Bryson
Oxnard, CA 93035
Lopez, Luly <[email protected]> Tue, Jul 21, 2026 at 2:49 PM To: Chris Bryson 4
Cc: [email protected], CIWHA <[email protected]> Hello,
Your written comment is received for the City Council meeting of July 30th. It will be forwarded to the City Council. (Quoted text hidden]
OXNARD
Lopez, Luly <[email protected]>
City Council July 30 2026 Agenda Item L.6.
2 messages
'Dan & Patty' via City Clerk <[email protected]> Mon, Jul 20, 2026 at 7:18 PM Reply-To: Dan & Patty <
To: "[email protected]"<[email protected]>
Honorable Mayor, Members of the City Council and City Staff We support Agenda Item L.6 authorizing the additional funding needed to complete the West Hemlock Street seawall foundation repairs. Completing this work now will save money, reduce future disruptions to the residents and help move forward with long-term seawall rehabilitation throughout Mandalay Bay. We have lived in the marina for 48 years and are looking forward to continued progress on seawall repairs. Please vote YES.
Thank you
Dan & Patty Mcinnes
Dan & Patty McInnes
Dan: 805)
Patty: (805)
email:
Tue, Jul 21, 2026 at 2:49 PM
To: Dan & Patty <
Cc: "[email protected]" <cityclerk @oxnard.org:
Hello,
Your written comment is received for the City Council meeting of July 30th. It will be forwarded to the City Council. (Quoted text hidden
OXNARD
Lopez, Luly <[email protected]>
(no subject)
1 message
Maria Bover Wed, Jul 22, 2026 at 3:37 PM
To: [email protected]
City Council 7/30/26 Agenda Item L.6 Please Approve!
Honorable Mayor, City Council Members and City Staff
I support Agenda Item L.6 authorizing the additional funding needed to complete West Hemlock Street seawall foundation repairs. Completing this work will save money, reduce future disruption to residents and help move forward with long-term seawall rehabilitation throughout Mandalay Bay. Please vote YES.
Thank you,
Maria Bover
Oxnard 93035
OXNARD
Lopez, Luly <[email protected]>
CAUTDENIA
City Council July 30, 2026 Agenda Item L.6. Please approve 2 messages
Jim Cowell - Sun, Jul 26, 2026 at 12:51 PM
To: "[email protected]" <[email protected]>
Cc: Debbie Mitchell <
Dear Honorable Mayor, Members of the City Council, and City Staff:
We support Agenda Item L.6 authorizing the additional funding needed to complete the West Hemlock Street seawall foundation repairs. Completing this work now will save limited funds, reduce future disruption to the community and the environment.
The timely completion of this project is a big step forward and building support for the long-term seawall renewal needed throughout Mandalay Bay.
Please vote YES.
Thank you.
Jim Cowell and Judi Cowell
Mandalay Waterways 1
30 year residents of the Harbor
Jim Cowell, PE
Debbie Mitchell < Sun, Jul 26, 2026 at 1:05 PM
Reply-To:
To: Jim Cowell •, Public Works and Transportation Committee <[email protected]> Hi Jim, thanks so much!
I am very curious to see if they shape up now that KJ is back! Also how they manage the quake wrap.
If we have a call first week of August it would be great to hear from you! Debbie Mitchell
CITY OF
OXNARD
Lopez, Luly <[email protected]>
FULL SUPPORT for Agenda Item N.2
2 messages
Steven Nash < Mon. Jul 27.2026 at 11:05 AM
To: City Clerk <[email protected]>, Steven Nash < "Perello, Bert" < 7-27-26
Written Comment for Public Record
To: Honorable Mayor Luis A. McArthur, Members of the Oxnard City Council, and City Clerk From: Steve Nash
Resident of District 1, Windsor North/RiverRidge Fairways Subject: FULL SUPPORT for Agenda Item N.2 - Resolution Authorizing the City Manager to Execute Necessary Budget Appropriations for Developer Fair Share Contributions and Grant Funds Transfer to the Ventura County Watershed Protection District for the SC3 Construction Project.
Statement of Support
I am writing as a proud resident of Windsor North/RiverRidge Fairways to express my full and unequivocal support for Agenda Item N.2 on tonight's Special City Council agenda. I want to specifically urge Councilmember Perello to vote in favor of this critical measure.
This item marks a monumental step forward for our local infrastructure, authorizing the transfer of developer fair-share contributions and $1 million in critical state grant funding to the Ventura County Watershed Protection District. These funds are directly tied to the essential SC3 Santa Clara River Levee construction project, an infrastructure development that is absolutely vital to safeguarding our homes, local businesses, and regional economy from devastating flood risks.
Support for the Interconnected SCR-1 Levee Project
Furthermore, as we authorize funding for SC3, it is crucial to emphasize my community's full backing of the adjacent, much-needed SCR-1 levee project. Spanning roughly 2.6 miles upstream of Highway 101, the SCR-1 levee improvements will correct long-standing structural deficiencies to bring the system into mandatory FEMA compliance. This upgrade is desperately needed to protect nearly 2,000 local homes and businesses within the 100-year flood zone. Crucially, the project's design also lays the groundwork for the future Santa Clara River Trail Master Plan bikeway, delivering an incredible dual benefit of climate resilience and public recreation directly to the residents of Oxnard.
Infrastructure projects of this scale highlight why efficient local government is so essential to our daily lives.
At its core, the most fundamental responsibility of government is to undertake large-scale building projects that protect the health, safety, and welfare of local residents. Individual citizens cannot build flood walls or reinforce major river basins on their own. It takes structural collaboration, public vision, and strategic resource allocation-exactly like these levee projects-to shield our communities from natural disasters, stabilize property values, and secure long-term public wellness.
A project of this complexity does not happen without intense dedication and cooperative planning across different agencies. I would like to extend my deepest thanks to the specific public servants who have championed this effort:
• To the City of Oxnard leadership team, specifically City Manager Alexander Nguyen, the Public Works Department and the engineering staff, thank you for successfully managing the developer fair-share contributions and securing the critical state grant funding from the California Department of Water Resources. Your fiscal oversight and advocacy ensure Oxnard continues to maximize regional and state resources effectively. • To the Ventura County Watershed Protection District, specifically Director Earthea Nance, and Manager, Strategic Resiliency Group, Gerard Kapuscik and the engineering division, thank you for your technical expertise, your steadfast collaboration with our city, and your dedication to executing the SC3 construction plan seamlessly. • To Council Member Bert Perello who has shepherded this project from its very beginning to its (soon to be) completion.
The alignment between Oxnard's administration and the Ventura County Watershed Protection District represents public service at its absolute best.
I urge the City Council to vote YES on Agenda Item N.2 to advance this vital safety initiative without delay.
Thank you for your time, your leadership, and your continued commitment to a safer, more resilient Oxnard.
Steve Nash
Oxnard, CA 93036
Gonzalez, Marisol < Tue, Jul 28, 2026 at 3:18 PM
To: Luly Lopez <[email protected]>
[Quoted text hidden]
Thank you,
Marisol Gonzalez/ Office Assistant I/
City Clerk's Office
City of Oxnard
300 West Third Street
Oxnard, CA 93030
Main Line: (805) 385-7803