1 TASK ORDER NO. 1

CITY OF PACIFICA
AND
GHIRARDELLI ASSOCIATES, INC.

SECTION 1 – PURPOSE
The purpose of this Task Order is to authorize and direct GHIRARDELLI ASSOCIATES, INC. to proceed with the work specified in SECTION 2 below, in accordance with the provisions of the Master Agreement for Consultant Services between the City of Pacifica (“CITY”) and GHIRARDELLI ASSOCIATES, INC. (“CONSULTANT”) hereto dated 3 March 2022 (“MASTER AGREEMENT”) SECTION 2 – SCOPE OF WORK
The items authorized by this Task Order are presented in Attachment “A” – Scope of Services, which is attached hereto and incorporated by this reference.

SECTION 3 – COMPENSATION AND PAYMENT
Compensation shall be as provided in the MASTER AGREEMENT. Compensation for services as set forth in SECTION 2 shall be as set forth in Attachment “B” – Compensation, which is attached hereto and incorporated by this reference. Total compensation for all services provided under this Task Order shall not exceed _Two Hundred Twenty Thousand Six Hundred_($_220,600) (“Cost Ceiling”).

SECTION 4 – TIME OF PERFORMANCE
The services described in SECTION 2 of this Task Order shall be completed by December 31, 2023, or as extended in writing by the City Manager.

SECTION 5 – ITEMS AND CONDITIONS
All terms and conditions contained in the MASTER AGREEMENT are incorporated by reference and remain in full force and effect.

Approved this 3rd day of March, _2022__.
[Signatures on Next Page]

ATTACHMENT F
2 CITY OF PACIFICA
By: Date
Kevin Woodhouse, City Manager
Approved As To Form
By:

Michelle Marchetta Kenyon, City Attorney

CONSULTANT
Ghirardelli Associates, Inc.

By: Date
3 ATTACHMENT “A”

SCOPE OF SERVICES
1970 Broadway Suite 1220, Oakland, CA 94612
www.ghirardelliassoc.com
File No. 21104.P01
March 4, 2022
City of Pacifica
ATTN: Nelson Schlater, Senior Engineer
Calara Creek Water Recycling Plant
700 Coast Highway
Pacifica, CA 94044
[email protected]
RE: Construction Management for Anza Pump Station Rebuild Project (C036) for the City of Pacifica, Public Works Department Wastewater Division
Dear Mr. Schlater,
Ghirardelli Associates, Inc. (Ghirardelli) is pleased to submit this proposal to serve the City of Pacifica (City) on the Anza Pump Station Rebuild Project. The team has proven construction management (CM) experience; intimate knowledge of the Pacifica community, work environment, and site conditions; and qualified personnel to deliver this project.

Ghirardelli is a proven Bay Area leader in effectively/successfully delivering local agency projects.

Our proposed team will be led by Project Manager Charlie Krueger, PE, QSD. Mr. Krueger is a professional engineer with 30 years of experience in project management, with a proven record of delivering multiple projects on schedule and within budget. His experience includes public works and local transportation agencies, as well as working with the State of California. He is personally committed to support the City in the successful delivery of this project. Our Construction Manager/Resident Engineer Jaime Heredia, PE, Bonnie Holt, our office engineer, and our Construction Inspector, Mike Williams, will provide the quality construction management and Inspection services demonstrated during previous projects for the City of Pacifica. These individuals will ensure that the City and residents are informed of ongoing operations and will respond to concerns in a timely manner. All key members of our team have a proven partnership that will bring added value to the effective and successful construction and completion of the City’s Anza Pump Station Rebuild Project.

The team has the leadership, available resources, proven record, and strong commitment to undertake resident engineering, inspection, and materials testing services for the Anza Pump Station Rebuild Project. The following proposal outlines how the team will assist the City during construction and deliver on our commitment to meet the City’s project delivery goals and objectives.

Ghirardelli understands that we will be bound by the City’s As-Needed Services Master Services Agreement when selected for this project. Ghirardelli acknowledges the receipt of Addendum 1 dated August 26, 2021 via email.

As a principal of the firm, I have the authority to bind the firm/team. Mr. Krueger can be contacted directly during the evaluation via email at [email protected] or via cell at 510. 867.4452.

Sincerely,
Ghirardelli Associates, Inc.

Raewyn Lelo-Butcher
Executive Vice President
M| 510.708.7442 E| [email protected]
Construction Management for Anza Pump Station Rebuild Project (C036) for the City of Pacifica www.ghirardelliassoc.com

PROPOSED TEAM AND EXPERIENCE
Ghirardelli has assembled a highly qualified team of professionals to provide resident engineering, construction inspection, and materials testing services for the Anza Pump Station Rebuild Project. Below are brief bios for our proposed team. Full resumes of these individuals are provided at the end of this proposal.

Charlie Krueger, PE, QSD – Project Manager
Mr. Krueger has extensive experience in the planning, development, design and construction of public works, transportation and infrastructure improvement projects. His skillset includes construction management and contract administration, coordination with owners, contractors, engineers, architects, outside agencies, utilities, public relations, partnering, and dispute resolution boards. His expertise includes structures, roadway, utilities, and transit facilities.

Jaime Heredia, PE – Resident Engineer
Mr. Heredia has over 21 years of experience in administering the design, construction and project management of teams completing major capital improvement projects that include slide restoration, emergency roadway repair, paving, and streetscapes. As Supervising Civil Engineer for the City of Oakland, Mr. Heredia was responsible for administration, project management, and design of the City’s Capital Improvement Program (CIP) including transportation infrustructure projects such as bridge seismic retrofits, bridge replacements, street resurfacing, sidewalk repair, stair & path repair, slide restoration, and emergency roadway repair. As a Ghirardelli Resident Engineer, he has been instrumental in the successful execution of several projects including projects for the County of Alameda, and the City of Los Altos.

Scott Buckley, PE, PMP – Structural Inspector
Mr. Buckley has 30+ years of professional project, design, construction, and program management experience on construction projects throughout California. He is an innovative, passionate, and dynamic leader who uses creativity, and teamwork to develop solutions providing customer value. Mr. Buckley will be our structural inspector for the Anza Pump station project and has been the Resident Engineer for the City of Concord citywide bridge repair project and Structure Representative for the Fair Oaks Bridge project in Sunnyvale.

Bonnie Holt – Office Engineer
Ms. Holt has worked in various areas of business for more than 21 years. For the past 17 years, she has provided fulltime office engineering and administrative support for a variety of transportation and construction projects. She is very experienced with construction administration requirements and thoroughly understands Caltrans procedures.

Ms. Holt has worked on a number of large and complex past contracts, including 1-80/North Texas Street Overcrossing and Interchange and North Texas Street/Nelson Road Realignments and Manual Campos Parkway Extension in Fairfield; the Leisure Town Road Overcrossing and Interchange in Vacaville; and the San Francisco-Oakland Bay Bridge Self-Anchored Suspension Bridge project. Her office engineer project experience includes the City of Sunnyvale, Fair Oaks Bridge, Sonoma County Public Works, Boyes Blvd Bridge Replacement, Caltrans, Stormwater Field Compliance and City of Sacramento, 7th Street Extension.

Michael Williams – Construction Inspector
Mr. Williams’ is an experienced civil and electrical inspector. He is proficient in construction administration, as well as project management, estimating, coordinating subcontractors and acting as liaison between the client and owners. He has a proactive approach, excellent communication skills (verbal and written) and a proven track record supervising and training staff. His projects with Ghirardelli include City of Pacifica, FY 2020-21 & 2021-22 Concrete and Curb Ramps Improvement, San Francisco Municipal Transportation Agency, Central Subway Project, Bay Area Rapid Transit (BART), Transbay Tube CP Anode Sled Replacement, Oakland International Airport, Runway 12-30 Rehabilitation and City of Oakland, Oakland Army Base.

Construction Management for Anza Pump Station Rebuild Project (C036) for the City of Pacifica www.ghirardelliassoc.com

PROJECT UNDERSTANDING
The City is seeking an experienced consultant from the on-call list to provide construction management, inspection and materials testing services for the Anza Pump Station Rebuild Project. Construction activities will include replacement of natural gas engines, new drive shafts connecting engines to existing propeller pumps, new steel roof, irrigation pumps, electrical system and controls, new gas service in coordination with PG&E and other work as specified in the plans. Ghirardelli understands the project was designed by Bellecci & Associates, Inc. with an overall engineer’s estimate of approximately $770,000.

Ghirardelli understands that the we will be working closely with the rest of the project team which includes the Design Engineers, the City’s Project Manager and the City Inspector.

SCOPE OF WORK
Ghirardelli is proud to bring its experience with similar repair projects to the City. Our approach for this type of project is built around the qualifications and experience of our staff and lessons learned from previous projects. Ghirardelli realizes that the success of any construction project depends on the ability of the construction management team to proactively identify and anticipate problems before they become major issues and to resolve issues promptly before they impact the project budget and schedule.

Ghirardelli will provide resident engineering (part time) and construction inspection (full time).

PRE-CONSTRUCTION
Ghirardelli’s Resident Engineer will organize a pre-construction conference with the Contractor, subcontractors, City staff, Designer, construction management (CM) team members, and other interested parties to discuss the project and the work involved. This conference will provide a forum for answering questions from the Contractor and other interested parties as well as addressing issues and coordination that need to be performed before work commences.

Ghirardelli’s Resident Engineer will prepare an agenda and meeting minutes.

CONSTRUCTION PHASE
Ghirardelli’s Resident Engineer will manage the day-to-day administration of the project. The Resident Engineer, as appropriate, will be the first point of contact with the Contractor, representing the City and the CM team. The Resident Engineer will:
• Provide written field direction in memorandum form to the Contractor, when necessary. • Prepare letters to the Contractor giving formal direction and instruction. • Prepare letters and memorandum to the City, providing informational updates, requesting opinions and assistance, as needed.
• Manage and perform project inspection, as required.
• Coordinate, manage and review materials sampling and testing activities. • Verify grades, staking and marks set by the Contractor. • Coordinate field observation of daily reports recording work performed, labor and equipment, issues and resolutions, conversations, materials sampling and testing, grades/ controls checked, item quantities, field measurements and extra work performed.
• Verify photographic records of the construction operations and site conditions are secured. • Review inspectors' daily reports.
• Help to ensure project safety reviews are performed and compliance with laws, orders and regulations. • Document progress and operations with photographs, including pre-construction photographs. • Review labor compliance documents.
• EEO and DBE interviews, tracking and reports.
• Prepare punch lists, as necessary.

Construction Management for Anza Pump Station Rebuild Project (C036) for the City of Pacifica www.ghirardelliassoc.com
Project Administration
The Resident Engineer will review and respond to submittals and RFIs in coordination with the City’s Project Manager; review and monitor the Contractor’s schedule; review of traffic control plans and inspection of traffic control measures; review the Contractor’s compliance with all permits, stormwater regulations and permits (SWPPP), and environmental documents; review the Contractor’s compliance with health and safety standards and regulations and reporting of non-compliance; and monitor record documents to ensure proper maintenance and completion by the Contractor. At the conclusion of each week's work, a Weekly Statement of Working Days (WSWD) will be submitted to both the Contractor and City staff.

Project Coordination/Meetings
Ghirardelli with coordinate with City’s Transportation Division to review traffic control plan submittals; coordinate progress meetings with the Contractor; coordinate with utility agencies, as needed; and coordinate project issues with the City Project Manager and third parties, as needed. Ghirardelli’s Resident Engineer will hold weekly meetings with the Contractor, City staff and other interested parties. The Resident Engineer will prepare and distribute weekly project meeting agendas and minutes to attendees, District staff, and Designer.

Scheduling
Ghirardelli’s Resident Engineer will review the Contractor's baseline schedule and determine its conformance with the plans and specifications. We will constantly review the plans and specifications to determine whether the Contractor is constructing the project correctly and in accordance with the intent of the City. We will "look ahead" to prepare for specific project tasks to protect the City against defects and deficiencies resulting from inferior workmanship and materials. Close adherence to the plans, details and all applicable specifications is required in order to properly construct and administer the project. Activities include, but are not limited to, maintaining continuous agency coordination, issuing notices of non-compliance, maintaining strict adherence to all local policies, conducting a daily review of the construction operations, conducting reviews of all disputes and potential claims, and adhering to all City and State standards and construction guidelines.

Safety Meetings
Safety Meetings (tailgate) will be scheduled for the CM staff. Regular attendees will be the resident engineer, inspector, and other interested parties. The purpose of the meeting is to discuss safety aspects with regard to currently project operations and site conditions as well as public and personal safety and any concerns. We will also require weekly (at minimum) safety meetings by the construction contractor’s crew and will monitor their compliance with this requirement. Whenever possible, the Ghirardelli resident engineer and inspector will attend the Contractor's safety meetings. A written record of attendance and the subjects discussed as well as recommendations and actions will be prepared and filed in the project records.

Contractor Requests for Information
As the work progresses, the Contractor may submit RFIs or RFCs. These requests will be forwarded to the appropriate party(s) for review and the response provided to the Contractor in a timely manner. Document control logs will be utilized to document and monitor the request until completed. The key to success is prompt review and timely response so that the City’s interest in cost and schedule are kept in consideration. By Ghirardelli’s close monitoring of and coordinating the follow-up of all RFls, we will help to prevent potential delays and/or changes to the project schedule or scope. Document logs will be maintained for correspondence, submittals/shop drawings, RFls, RFCs, change orders and disputes and potential claims.

Construction Inspection
Close adherence to the plans, details, and all applicable specifications is required in order to properly construct and administer the project. Activities include, but are not limited to, maintaining continuous City coordination, issuing notices of non-compliance, maintaining strict adherence to all local policies, conducting a daily review of the Construction Management for Anza Pump Station Rebuild Project (C036) for the City of Pacifica www.ghirardelliassoc.com
construction operations, and adhering to all applicable contract specifications and standards to include City, State and Federal.

Ghirardelli’s inspector will prepare a daily report for each construction day. The inspector’s daily reports (including the reports from material testers) will be provided to the Resident Engineer. This information will be used for the preparation and evaluation of the monthly progress estimates, non-compliance issues, construction delays, compliance tests, CPM schedule review, liquidated damages, and claims. The daily reports will be reviewed for the following factual information:
• Date, project identification, contractor’s name, subcontractor’s name(s), and time of inspections. • Conditions (weather, moisture, soil, etc.); any inclement weather conditions that hampered or delayed the contractor’s operations.
• Activities detail. Scheduled activities including starting and completion dates. Bid item numbers of all activities should be listed in the daily report.
• Difficulties encountered by the contractor.
• Construction issues (disputes, questions in the field, etc.). • Deficiencies and violations (including construction work, safety, labor, etc.). • Major material and equipment deliveries to the site (type, quantity, means of delivery, and condition of materials).
• Record of manpower, construction equipment, and materials testing locations and results.

Material Test Data and Certificate of Compliance
The resident engineer will review all Contractor-provided manufacturers' shop or mill test certificates, including test reports from independent materials testing laboratories to verify compliance with the Contract specifications.

Certificate of compliance will be obtained for all materials for which the specifications require their submittal as well as for the basis of acceptance of materials which are to be inspected and released at the project site.

POST CONSTRUCTION
Our project team will work closely with the design engineer, City staff and other stake holders to help to ensure that the project closeout proceedings are performed quickly, accurately and consistently, in accordance with all pertinent policies and procedures. We will review and monitor the Contractor's submittal information respective to the closeout, such as "as-built" information, final progress payment, warranties, guarantees, bond reduction, punch list preparation, etc. Our inspector will perform a final inspection and assure all items from the punch list are completed.

Under the direction of the Resident Engineer, our inspector will provide City staff with an original set of construction documents, cataloged in accordance with the Caltrans file management system, which includes all documented correspondence, diaries, reports, photos, correspondence, contract documents, labor compliance, materials, material tests, change orders, progress payment and survey records, etc. for storage by the City. All contract documents will be digitized and filed electronically.

Construction Management for Anza Pump Station Rebuild Project (C036) for the City of Pacifica www.ghirardelliassoc.com

FEE PROPOSAL
Below is the estimated fee for the Anza Pump Station Rebuild Project based on our review and understanding of the plans and specifications along with our correspondence with the City.

Ghirardelli estimates that our fee will be $220,600.00. The fee includes part time hours for our Resident Engineer (Jaime Heredia, PE), Office Engineer (Bonnie Holt), and full time hours for our Lead Inspector (Michael Williams)

PW BILL RATE
First Shift Second Shift

NAME ST OT DT ST OT DT
Jaime Heredia PE (Resident Engineer) $233.44 $343.90 $458.55 $234.91 $343.90 $458.55 Michael Williams (Alternate
Inspector) $167.72 $247.09 $329.46 $168.78 $247.09 $329.46 Scott Buckley (Structural Inspector) $241.36 $355.58 $474.12 $242.89 $355.58 $474.12 Bonnie Holt (Office Engineer) $172.34 $233.00 $293.62 $187.51 $255.75 $323.96 1970 Broadway Suite 1220, Oakland, CA 94612
www.ghirardelliassoc.com
Fee Assumptions:

1. Resident Engineer will work part time throughout the project.

2. Office Engineer will work part time throughout the project.

3. Lead inspector work 3 days/week during construction.

4. Alternate Inspector, Structural Inspector and Electrical Inspector will work as required.

5. Rates and fees are valid for the duration of the project.

6. Rates include the cost of Inspector's normal equipment and PPE, vehicles, computers, phones and office equipment.

Associate Hours Rates April May June July August September October November December ST
Heredia PM/RE $233.44 14 40 40 40 20 40 40 20
Holt OE $172.34 6 24 24 24 10 24 24 10
Buckley Struct. Insp. $241.36 8 8 8 8 16 24 4
Williams Lead Insp. $164.72 4 100 100 100 80 80 100 8
TBD Alt Insp $164.72 16
Wong Specialty $168.19 8 16 8 16 24 40 16
3 21.5 21.5 21.5 14.8005738 20 25.5 5.25

4.7 4.7 4.7 16.0 3.7 4.7 0.4
Davis PM $3,268.10 $9,337.44 $9,337.44 $9,337.44 $4,715.41 $9,337.44 $9,337.44 $4,668.72 Holt OE $1,034.04 $4,136.16 $4,136.16 $4,136.16 $1,723.40 $4,136.16 $4,136.16 $1,723.40 Buckley Struct. Insp. $0.00 $1,930.91 $1,930.91 $1,930.91 $1,980.29 $3,861.82 $5,792.72 $965.45 Williams Lead Insp. $658.88 $16,472.00 $16,472.00 $16,472.00 $13,177.60 $13,177.60 $16,472.00 $640.00 TBD Alt Insp $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,635.52 $0.00 Wong Specailty $0.00 $1,345.52 $2,691.04 $1,345.52 $2,691.04 $4,036.56 $6,727.60 $2,691.04 $4,961.02 $33,222.03 $34,567.55 $33,222.03 $24,287.74 $34,549.58 $45,101.44 $10,688.61 $220,600.00
Working days (Staff Days)
Hrs/day Lead for Insp
Electrical/Controls & Mechanical
Total:

Charlie Krueger, PE, QSD
Project Manager
Mr. Krueger, PE, QSD, has extensive experience in the planning, development, design and construction of public works, transportation and infrastructure improvement projects. His skillset includes construction management and contract administration, coordination with owners, contractors, engineers, architects, outside agencies, utilities, public relations, partnering, and dispute resolution boards. Charlie has overseen the construction management of various public works, transportation, modernization, and rehabilitation projects. His expertise includes roadway, utilities, and transit facilities.

In addition to successful structural projects, he has also overseen light-rail construction including at-grade and elevated light rail and at-grade bus rapid transit stations. His management and dedication to successful project completion has helped many public agencies achieve their goals of transportation modernization and community improvement initiatives.

Project Experience
Fair Oaks Bridge
City of Sunnyvale; Sunnyvale, CA
Project Manager | Located between Kifer Road and Evelyn Avenue, the Fair Oaks Bridge crosses over the Caltrain tracks and Hendy Avenue. The bridge was built in 1967, retrofitted in 1981 and 1993, and will undergo several improvements to address: Severe deck cracking/spalling, Inadequate bike lane width, No sidewalk on bridge, Structural deficiencies with Sufficiency Rating of 47., Existing pedestrian overcrossing non-compliance with Construction activities will encompass: Bridge widening along the east side, New sidewalk on east side of the bridge and widen bike lanes, Removal of existing pedestrian overcrossing, Hendy Avenue realignment and improvement, Realignment of roadway along Fair Oaks connecting Hendy and Kifer, Intersection improvement, Water and sewer main replacements, Landscaping/guardrails/streetlights installation.

The City’s goal is to maintain one travel lane and one bike lane in each direction during this time. However, some short-term lane closures may be required. In addition, the Hendy Avenue underpass area will be closed during early construction phases (approximately 8-10 months) to help expedite the overall construction schedule. Pedestrian access over the Caltrain corridor will be maintained until bridge construction is complete.

Kato Road Grade Separation (C222)
Santa Clara Valley Transportation Authority; Fremont and Milpitas, CA Structures Representative | This was a grade separation project for the Bay Area Rapid Transit (BART) extension to Silicon Valley, and Union Pacific Railroad (UPRR). Site work involved the construction of a two-span structural steel UPRR bridge, a cast-in-place two-span UPRR access bridge, and a cast-in-place post-tensioned two-span BART bridge, over Kato Road. Deep soil-mix retaining walls were constructed to lower the road profile. The project included a shoofly for UPRR and constructed a box culvert adjacent to a new housing development, within a few feet of an existing home. The project also included a pump station, bio-swale, tree-well filters, irrigation and landscaping.

Utilities requiring protection included Kinder Morgan and Chevron pipelines. Mr. Krueger managed the field inspection staff for the civil and structures work, resolved technical issues and interpreted specifications. He also assisted with public relations with the adjacent businesses and homeowners association.

Lower Berryesa Creek Project, Phase I & II
Santa Clara Valley Water District
Project Manager | Phase 1 includes work on Lower Berryessa Creek from Penitencia Creek to Abel Street, which is EXPERIENCE 30+ Years
TENURE W/GA 15 Years

EDUCATION
B.S. Civil Engineering, San Jose
State University, 1987

REGISTRATIONS
CA Professional Civil Engineer,
#47496

CERTIFICATIONS
• Quality Storm Water Developer/
Practitioner (QSD/P), #20677

CHARLIE KRUEGER, PE, QSD

PROJECT MANAGER
divided into two reaches (A and B) for a total length of 2,400 feet. Phase 1 – Lower Berryessa Creek (Penitencia Creek to Abel Street): Raises the existing levee on the southwest bank, replaces the existing levee on the northeast bank with concrete floodwalls, constructs new headwalls, and raises and reconstructs a pedestrian bridge.

Phase 2 will consist of improvements to Berryessa Creek from Abel Street to Calaveras Boulevard, which is divided in five reaches (C, D, E, F, and G) for a total of 6,000 feet. Phase 2 also includes improvements on the lower reaches of Calera Creek and Tularcitos Creek for a total of 3,000 feet. Lower Berryessa Creek (Abel Street to Calaveras Boulevard) raises levees, constructs floodwalls including spread footing and cast-in-drilled-hole (CIDH) piles foundation on both sides of the creek, reconstructs pedestrian bridge (Town Center), constructs transitions structures and headwalls, constructs access roads and on-ramp and off ramps from access roads, including Armorflex paving, removes vegetation and re-vegetation, utility relocation, and outfall repairs.

Lower Calera Creek reconfigures and widens the channel, and constructs new floodwalls and headwalls. Tularcitos Creek constructs a new stormwater pump station with masonry building and diesel pumps, short floodwalls, and new headwalls, and reconstructs two pedestrian bridges.

Alum Rock Bus Rapid Transit
Santa Clara Valley Transportation Authority; San Jose, CA Resident Engineer | This project constructed 16 new station platforms with custom stainless-steel shelters incorporating integral electrical and communications cabinets, LED lighting, CCTV, real-time information signage, lighted ad panels and attractive art enhancements along Santa Clara Street in Downtown San Jose, Alum Rock Avenue and Capitol Expressway. The project constructed a busway in the median by widening Alum Rock Avenue, which required new sidewalk and handicap ramps at multiple intersections. The project reconstructed portions of the roadway on Alum Rock Avenue between U.S. 101 and Capitol Avenue and included construction of 12 new signalized intersections to accommodate the median busway. Mr. Krueger was the main point of contact between the VTA and the contractor and was responsible for preparing letters and other correspondence to the contractor. He coordinated construction activities with regulatory and local agencies including the City of San Jose and the County of Santa Clara, as well as with Caltrans. He also worked with VTA’s utility coordinator to manage utility relocations and new services by PG&E, AT&T, and San Jose Water Company. Additionally, He supervised a project engineer, a scheduler, four civil/structural inspectors, an electrical inspector, project controls staff, and an engineering aide.

Jerrold Avenue Bridge Replacement
Caltrain/Peninsula Corridor Joint Powers Board (JPB); San Francisco, CA Resident Engineer | This Joint Powers Board project replaced the existing intermediate three (3)-spans with a single span, steel-fabricated bridge, and included the installation of two (2) jump-spans to conform to the present bridge layout. Also involved was the reconstruction of the tracks that were impacted by the new structures, travel way and sidewalks. Mr. Krueger provided contract administration, reviewed submittals, managed inspections and testing, and monitored the schedule. He also reviewed, recommended, and negotiated change orders, as well as coordinated with the stakeholders.

The bridge replacement took place over a 12-hour period on a Friday night after the last scheduled train crossed the old bridge. This required extensive coordination with JPB and Caltrain staff over a 6-month period in order to develop a site specific work plan that covered every aspect of the process, including construction of 9’ diameter CIDH pile foundations while the old bridge was still in service, bridge demolition and replacement, trackwork and contingency plans.

Jaime Heredia, PE
Resident Engineer
Mr. Heredia has over 21 years of experience in administering the design, construction and project management of teams completing major capital improvement projects that include slide restoration, emergency roadway repair, paving, and streetscapes.

Project Experience
On-Call Construction Management Services
Alameda County Public Works; Alameda County, CA
Resident Engineer/Inspector | Mr. Heredia completed and/or assisted the County on the following projects: Castro Valley Resurfacing; Safety Improvements on Fairmont Drive; Palomares and Redwood Road Safety Improvements; The Miller Sweeney Bridge Fender System Repair; East 14th Street/162nd Avenue Sidewalk; and Caltrans new Federal projects.

The work included AC Milling and AC overlay, tree planting, and installing guardrail and, streetlights. Mr. Heredia’s duties included daily reports using Virtual Project Manager software, weekly meetings, coordination of submittal review, inspection, coordination of field testing, field measurements, review of extra work cost proposals, preparation of progress payments and change orders, and coordination with various stakeholders and utility providers. He also assisted County staff in preparing award packages for federally funded projects and compiling documentation for Caltrans audits.

Many of the projects were on residential streets requiring thoughtful coordination with residents to maintain safe access to driveways and adequate notices for parking restrictions.

Snake Road Slide Repair
City of Oakland; Oakland, CA
Resident Engineer | As part of the City of Oakland’s Civil Capital Improvement projects which included slide repairs, streetscapes, street widenings, and emergency roadway repair projects, Mr. Heredia served as the Resident Engineer for the Snake Road slide repair project. The project involved repair along 120 linear feet of roadway and involved 20 soldier piles with 30’ high timber lagging and two tiers of tiebacks that held back engineered backfill beneath the new road construction.

Design and Construction Services Division
City of Oakland; Oakland, CA
Supervising Civil Engineer | Mr. Heredia was responsible for administration, project management, and design of the City’s Capital Improvement Program (CIP) consisting of transportation, bicycle, and pedestrian improvement projects, including streetscapes, bridge maintenance & rehabilitation, bridge seismic retrofit, bridge replacement, street resurfacing, sidewalk repair, stair & path repair, slide restoration, and emergency roadway repair. He was responsible for managing and administering CIP budget of $100 million and staffing of 9 FTE’s. Mr. Heredia was responsible for managing and administering 37 multi-tiered as-needed professional services contracts for civil, structural and geotechnical engineering services totaling $11.7 million. He was also responsible for managing and administering “design/build” contracts for major redevelopment funded CIP projects.

Infrastructure Maintenance Division
City of Oakland; Oakland, CA
Acting Operations Manager/Supervising Civil Engineer | Mr. Heredia acted as operations manager for the Infrastructure Maintenance Division, consisting of streets and sidewalks, sewer and storm drainage, and tree maintenance. He was responsible for managing and administering an annual operating budget of $15.8 million and staffing of approximately 156 employees. He assisted in Fiscal Year 2005-07 budget development for Public Works Agency, Infrastructure Maintenance Division.

EXPERIENCE 21 Years
TENURE W/GA 1 Years

EDUCATION
M.S., Civil Engineering, University
of California, Berkeley
B.S., Civil Engineering, University
of California, Berkeley

REGISTRATIONS
Professional Civil Engineer, CA,
No. 42244
Michael Williams
Construction Inspector
Mr. Williams is an experienced civil and electrical inspector. He is proficient in construction administration, as well as project management, estimating, coordinating subcontractors and acting as liaison between the client and owners.

He has a proactive approach, excellent communication skills (verbal and written) and a proven track record supervising and training staff.

Skills: Estimating for projects in excess of $1M, cost-control for client retention, RFP/RFI vendor management, proposal writing and review, supervising 10-person teams, training, vast experience using Xactimate (estimating software), and familiarity with AlacNet (estimating software).

Project Experience
FY2020-21 & 2021-22 Concrete and Curb Ramp Improvement Project City of Pacifica; Pacifica, CA
Construction Inspector | Ghirardelli provided resident engineering, construction inspection, and materials testing services for the City’s project repairing and constructing new concrete sidewalks, ADA curb ramps, driveways and a storm drain in various locations within the City’s neighborhoods. Work included installing hot mix asphalt plugs, and other miscellaneous work. The project lasted 54 construction working days. Ghirardelli implemented a strict quality control regimen to confirm that the contractor understood the intent of the design and built the new curb ramps and sidewalks to ADA requirements. Ghirardelli worked with the contractor and the City to identify critical issues when laying out pull boxes, ramps, and street furnishings. Our team worked closely with the City, contractor and designers to maintain compliance with ADA requirements despite the steep hills, grade changes at corners and, existing infrastructure that did not always match plans.

I-80/Central Avenue Operational Improvements, Phase 1
City of Richmond; Richmond, CA
Construction Inspector | This project improved the traffic operations at the I-80/Central Avenue interchange and along Central Avenue between Rydin Road and San Pablo Avenue. The project was completed in two phases. Phase I redirected left turns from westbound Central Avenue onto I-80 WB to the adjacent I-580 eastbound on-ramp at Rydin Road during weekend peak hours, and installed traffic signals at the I-580 ramps. The project also included installing 17 new ADA curb ramps along Central Avenue between Highways 80 and 580.

Oakland Army Base
City of Oakland; Oakland, CA
Construction Inspector | The project work included demolition of old Army logistics center followed by infrastructure construction for new intermodal container terminal and associated supporting facilities. Construction activities included deep dynamic compaction, wick drain installations, joint and other utilities and storm drain installations across property, easement and jurisdictional boundaries; road construction, storm drain outfall; temporary and permanent traffic signage and signals and traffic control in a highly industrialized operating seaport area. As construction inspector, Mike monitored and reported on the contractor’s field activities. He managed and ordered QA special inspection and material testing lab staff as required to confirm construction compliance with the plans and specifications. Enforcement extended to environmental and safety elements of the construction work.

Oakland Airport Connector
BART; Oakland, CA
Construction Inspector | The Oakland Airport Connector provided a high-quality link between BART's regional rail system, and the Oakland Airport, using a direct and exclusive aerial guide-way for transit vehicles departing to, and from the existing Coliseum station. Mr. Williams provided quality assurance of contractor’s work, prepared daily diaries, EXPERIENCE 15 Years
TENURE W/GA 5 Years

EDUCATION
B.S., Civil Engineering, College of
Alameda, Alameda, CA (In
Progress)

CERTIFICATIONS
BART Badge #66474
RWP Training
SSI Clearance
TWIC

MICHAEL WILLIAMS

CONSTRUCTION INSPECTOR
assisted with monthly pay estimates, contract administration, photo documentation, tracked and verified all work, paid close attention to public and worker safety. He also tracked hazardous materials and recyclable materials, recorded work progress, and documented contractor activities to verify the project was completed in accordance with the contract documents, and regulatory agency requirements. Mr. Williams also monitored the work to help ensure that dust control, SWPPP, haul-routes and all other plans were followed.

Central Subway Project
San Francisco Municipal Transportation Agency; San Francisco, CA Quality Control Inspector | The Central Subway Project extended the Muni Metro T Third Line to provide a direct transit link between the Bayshore and Mission Bay areas to SoMa, downtown, and Chinatown. Once the Central Subway is completed, T Third Line trains will travel mostly underground from the 4th Street Caltrain Station to Chinatown, bypassing heavy traffic on congested 4th Street and Stockton Street. Mr. Williams completed daily logs and inspection reports along with calculations for quantities of materials, monitored construction activities for contract compliance and performed controlled inspections, and reviewed and interpreted drawings, contract specifications, material lists and samples of materials for compliance with contract requirements and codes. He also worked with project managers and Inspectors of Records to verify work and materials meet code and plan specifications.

Transbay Tube CP Anode Sled Replacement
BART; Oakland, CA
Construction Inspector | The work includes demolition of 15 existing rectifier alarm assemblies and one existing junction box. The scope includes removal of old and installation of 12 new permanent reference cells, four new electrical resistance corrosometer probes, and installation of 16 new cathodic protection monitoring panels. Work also includes providing associated conduits, cabling, electrical connections, and monitoring equipment required for a complete system. This project is being performed in the Transbay Tube Upper and Lower Gallery. This project is a Security Sensitive Information Project. Mr. Williams is working on the barge in the Bay and in the Transbay Tube. He is responsible for verifying conditions of the anode cable; inspecting splicing and conducting continuity tests for the anode cable; verifying the coordinates of the cable replacement; documenting project photos; providing written documentation of work being performed; verifying replacement of drain valves; and coordinating between the contractor, divers and the Resident Engineer on the project.

Traction Power Substation Replacement - ASL
BART; San Leandro, CA
Construction Inspector | The work included installation and testing of BART traction power substation (TPSS) equipment at five locations. The major TPSS equipment was procured and delivered under a separate Procurement Contract No. 15EK-210. Mr. Williams monitored the contractor’s work for compliance with the contract documents and verified that the work was performed per the approved SSWP. He also prepared daily reports to document the contractor’s activities.

Bonnie Holt
Office Engineer
Ms. Holt has worked in various areas of business for more than 23 years. For the past 18 years, she has provided full-time office engineering and administrative support for a variety of transportation and construction projects.

She is very experienced with construction administration requirements and thoroughly understands Caltrans procedures. Ms. Holt has worked on a number of large and complex past contracts, including 1-80/North Texas Street Overcrossing and Interchange and North Texas Street/Nelson Road Realignments and Manual Campos Parkway Extension in Fairfield; the Leisure Town Road Overcrossing and Interchange in Vacaville; and most recently supporting Caltrans on the new San Francisco-Oakland Bay Bridge SelfAnchored Suspension Bridge project.

Project Experience
Richmond Ferry Terminal
San Francisco Water Emergency Transportation Authority; Richmond, CA
Office Engineer | The facility is located at the southern point of the Ford Peninsula in Richmond, adjacent to the Ford Assembly Plant building. The project will launch a new ferry service between Richmond and San Francisco. The service will provide a critical expansion to regional ferry operations, help alleviate traffic congestion and increase WETA’s emergency response capabilities. The project includes the construction of an ADA-compliant gangway and ramping system, float and piles, passenger shelter, and development and reconfiguration of a 362-space paved parking lot. WETA will also install a new ADA-compliant kayak launch ramp.

Police Department Headquarters
City of Vacaville; Vacaville, CA
Office Technician | Construction of a new 39,000-square-foot, 2-story state-of-the-art essential service facility in the Vacaville City Hall complex. New parking included secured spaces for police vehicles, a visitor parking area and additional general employee parking. Ms. Holt's services included preparing monthly project progress reports, managing documentation and correspondence, filing, maintaining project photo and submittal logs, performing change order support, preparing O&M manuals, and performing labor compliance duties for this and other Vacaville projects.

Fair Oaks Bridge
City of Sunnyvale; Sunnyvale, CA
Office Engineer | Located between Kifer Road and Evelyn Avenue, the Fair Oaks Bridge crosses over the Caltrain tracks and Hendy Avenue. The bridge was built in 1967, retrofitted in 1981 and 1993, and will undergo several improvements to address: severe deck cracking/spalling, inadequate bike lane width, no sidewalk on bridge, structural deficiencies with sufficiency rating of 47.7, existing pedestrian overcrossing non-compliance with ADA. The city’s goal is to maintain one travel lane and one bike lane in each direction during this time. However, some short-term lane closures may be required.

In addition, the Hendy Avenue underpass area will be closed during early construction phases (approximately 8-10 months) to help expedite the overall construction schedule. Pedestrian access over the Caltrain corridor will be maintained until bridge construction is complete. Ms. Holt maintained construction diaries that included documentation of the work progress, materials tested, and any other pertinent information in a daily diary for permanent record of events.

EXPERIENCE 23 Years
TENU RE W/GA 6 Years

EDUCATION
AS, Construction Management,
Diablo Valley College
SKILLS
• Field Inspection
• Daily Reporting
• Documentation and Tracking
Quantities
• Field Interviews
• Assisting Resident Engineer

BONNIE HOLT

OFFICE ENGINEER
7th Street Extension
City of Sacramento; Sacramento, CA
Office Engineer | The project connected Sacramento's Union Pacific Railyards and Richards Blvd, via a complicated railroad underpass, to downtown Sacramento via 7th Street. The more than one-mile-long project involved building a two-lane arterial roadway with a 900-foot-long grade-separated underpass bridge, which carries the new arterial roadway beneath two existing mainline tracks and two future tracks. Also involved were storm drainage, utility relocations, a pumps station and street reconstruction. The Railyards is a state Superfund site and there was potential for soil and groundwater contamination due to the highwater table. Public relations with neighboring businesses were also critical. She was responsible for documentation/correspondence, the project photo log, change order support, project reporting, submittal control and progress payment processing, among other tasks. The project won several industry awards.

Boyes Boulevard Bridge Replacement
Sonoma County Public Works; Sonoma, CA
Office Engineer | The new bridge will be a single span precast girder bridge, built to current standards including accommodating a 100-year storm event. The bridge is in a busy suburban corridor so construction will progress over two seasons. In 2019, removal and replacement of the old bridge was completed including the permanent relocation of utilities to the new structure. Ms. Holt maintained construction diaries that included documentation of the work progress, materials tested, and any other pertinent information in a daily diary for permanent record of events.

Photographs of project progress were regularly taken and kept for permanent records to support disputes and verify quality for acceptance.

San Pablo Dam Road Walkability Project
County of Contra Costa Public Works Department; El Sobrante, CA Office Engineer | This project improved the pedestrian and bicycle safety and mobility of a segment of San Pablo Dam Road between El Portal Drive and Appian Way in the community of El Sobrante. The scope of construction included:
sidewalk, curb, and gutter replacement to meet current ADA standards; installation of irrigations systems as well as trees and plants; install and adjustment of existing utility boxes and vaults by the construction contractor and utility agencies; installation of new public benches and garbage receptacles at AC Transit bus stops; and installation of new traffic detector loops. Ms. Holt’s responsibilities included full construction management to: inspection of construction operations; submittal review and approval; review of CPM progress schedules; preparation of monthly progress pay estimates; preparation of weekly statements of working days; preparation and administration of contract change orders; materials sampling and testing; photograph documentation of the work; coordination with the various utilities and transit agencies; and public outreach and attendance of chamber of commerce meetings.

Stormwater Field Compliance
Caltrans District 4; Northern CA
Administrative Assistant | The contract identified best management practices and corrective measures to bring projects throughout Northern CA into contract and regulatory compliance with National Pollutant Discharge Elimination System permit requirements. Her duties included administrative support for specific contract issues, taking monthly meeting minutes, preparing clear and comprehensive reports, maintaining hard copy and electronic office records, preparing correspondence such as memoranda, letters and reports, including confidential documents, and filing project files. She also set up new construction project files, managed branch data and submitted weekly reports.

Scott Buckley, PE, PMP
Structural Inspector
Mr. Buckley has 30+ years of professional project, design, construction, and program management experience on transportation infrastructure projects throughout California. He is an innovative, passionate, and dynamic entrepreneur who utilizes creativity, leadership, and teamwork to develop solutions that provide customer value. He is an effective communicator with the ability to build and motivate teams to pursue, capture, and successfully deliver large complex infrastructure projects. Mr. Buckley is able to identify and implement strategies to reduce costs, increase revenue, and strengthen customer relationships. He has broad-based management skills, with strong planning, communication, organizational and decision-making ability to successfully direct concurrent projects. Mr. Buckley mentors staff and encourages a team environment for high levels of employee confidence and satisfaction.

Project Experience
Castro Ranch Boulevard
City of Richmond, Richmond, CA
Resident Engineer | This project is the pavement rehabilitation of Castro Ranch Road from Olinda Road to the Richmond City Limit in Richmond, California. The work includes, traffic control, environmental protection, removal and replacement of concrete curbs, removal of sidewalk, removal and replacement of AC dike, cold milling of asphalt pavement, wedge and conform grinding, pavement repairs. Thermoplastic traffic striping and traffic markings for new bike lanes, traffic dividers, pedestrian push buttons, removing and placing of signs and signposts, median landscaping, and as shown on the project plans. Mr. Buckley’s duties include management of the construction contract. This includes scope, schedule, budget, risk, communications, and quality management. Reviewing and responding to Contractor’s RFIs, technical submittals, and change order requests. Keeping the project files in accordance with Caltrans Construction Manual and Local Assistance Procedures Manual. Reviewing Contractor’s progress pay estimates, reviewing and writing contract change orders, manage project staff, inspection oversight, material testing, and project closeout.

Concord Bridges
City of Concord, Concord, CA
Resident Engineer/Structures Representative | This project rehabilitated 6 bridges throughout the City of Concord.

Work included a polyester overlay, bridge deck spall repair, ground anchors, soil nails, shotcrete, excavation around bridge piers and rock slope protection placement around the same bridge piers. All of the bridges were located over creeks, and required a risk level 2 SWPPP with multiple types of BMPs including dewatering a 100 foot section of Walnut Creek. Temporary traffic control was consistently changing depending on the work being performed during the closure and required adaptation of the closures performed for the task. Mr. Buckley’s duties include management of the construction contract. This includes scope, schedule, budget, risk, communications, and quality management.

Reviewing and responding to Contractor’s RFIs, technical submittals, and change order requests. Keeping the project files in accordance with Caltrans Construction Manual and Local Assistance Procedures Manual. Reviewing Contractor’s progress pay estimates, reviewing and writing contract change orders, manage project staff, inspection oversight, material testing, and project closeout.

Fair Oaks Bridge
City of Sunnyvale; Sunnyvale, CA
Resident Engineer | Located between Kifer Road and Evelyn Avenue, the Fair Oaks Bridge crosses over the Caltrain EXPERIENCE 30+ Years
TENURE W/GA <1 Years

EDUCATION
MBA, Golden Gate University,
San Francisco
BS, Civil Engineering (minor in
Engineering Management), Tufts
University, Medford, MA

REGISTRATION/CERTIFICATION
• Professional Civil Engineer, CA,
No. C52110
• Certified Project Management
Professional (PMP)

SCOTT BUCKLEY, PE, PMP

STRUCTURAL INSPECTOR
tracks and Hendy Avenue. The bridge was built in 1967, retrofitted in 1981 and 1993, and will undergo several improvements to address: Severe deck cracking/spalling, Inadequate bike lane width, No sidewalk on bridge, Structural deficiencies with Sufficiency Rating of 47.7, Existing pedestrian overcrossing non-compliance with ADA.

Construction activities will encompass: Bridge widening along the east side, New sidewalk on east side of the bridge and widen bike lanes, Removal of existing pedestrian overcrossing, Hendy Avenue realignment and improvement, Realignment of roadway along Fair Oaks connecting Hendy and Kifer, Intersection improvement, Water and sewer main replacements, Landscaping/guardrails/streetlights installation. 3rd Street Bridge Rehabilitation Project
City of San Francisco; San Francisco, CA
Project Principal | Mr. Buckley was the Project Principal responsible for leading a team to perform a condition assessment and rehabilitation design for an historic bascule bridge that was designed and built by Strauss in 1936. His primary responsibility included deck structural system redesign.

San Francisco-Oakland Bay Bridge Replacement
Caltrans; San Francisco/Oakland, CA
Contract Manager/Project Administrator | Mr. Buckley was the Contract Manager and Project Administrator for a $239.5 million contract with the State of California and MTC to design a replacement for the San Francisco – Oakland Bay Bridge. The work of this contract included design and construction support for ten separate construction contracts worth an estimated $6.8 billion. He represented the primary consultant, a Joint Venture of T.Y.Lin International and Moffatt & Nichol and worked on the project for 15 years. The team was comprised of 158 firms (approximately 1,300 people). Mr. Buckley’s responsibilities included writing, negotiating, and managing all contracts with the client (Caltrans) and subconsultants; preparation / analysis of financial statements and reports; coordinating, preparing for, and leading the discussion for each Board of Director’s meeting; control of budgets and the invoicing process; management of all bank accounts (authorized signatory); contractual reporting to the client; development and maintenance of project procedure; providing occasional guidance or interpretation of engineering/specification issues; management of accounting and administrative staff; Organization of staffing levels project-wide (new hires, transfers, layoffs etc…); and coordination of legal, insurance, and claim related issues.

Alemany 280/101 Interchange Phase II Retrofit
Caltrans; San Francisco, CA
Structures Representative | Mr. Buckley was the Structures Representative for the $24 million contract to seismically retrofit 6 C.I.P. box girder connector ramps. His responsibilities included contractor compliance with the contract documents, review/approval of shop drawings, and the preparation of contract change orders and monthly pay estimates. This contract was completed under budget and ahead of schedule.

James Donlon Boulevard Extension
City of Pittsburg; Pittsburg, CA
Structures Task Lead | Mr. Buckley developed the Project Study Report and Advanced Planning Studies following the 2012 Environmental Impact Report. The project consisted of constructing an approximately 1.7-mile long section of new roadway from Kirker Pass Road to the western property line of the planned Sky Ranch residential development, consisting of a two-lane rural arterial roadway in the undeveloped hills south of the city. The project also includes upgrading the adjoining Kirker Pass Road to a four-lane divided highway to urban standards. The construction cost is estimated at $220 million.
4 ATTACHMENT “B”

COMPENSATION
(Documented in Attachment A)