APPENDIX B

DESCRIPTION OF PROJECTS
The Project consists of the following improvements to the Wastewater System, subject to the right of the City to modify this list as provided in Section 3.5:

Initial Project
The Projects consist of the design and construction of a wet weather flow equalization (EQ) basin and associated improvements, which is intended to mitigate sanitary sewer overflows ("SSOs") from the City’s wastewater collection system and reduce peak wet weather flows into the City's wastewater treatment plant.

The Projects consist of a 2.1 million gallon rectangular-shaped EQ basin to be located in the vicinity of the Linda Mar Pump Station in the City, two diversion structures to passively divert excess flows, and a small building to house electrical and other equipment, including a ventilation and odor control system and a potable water supplied cleaning system. In addition, 170 lineal feet (LF) of new gravity sewer conveyance pipelines and 575 LF of new force main sewer conveyance pipelines will be constructed to connect the EQ basin to existing sewer main lines that are part of the Wastewater System. The EQ basin will divert excess sanitary sewer flows for temporary storage in the basin during large storm events. Following the storm event, the basin contents will be pumped to the Linda Mar Pump Station and Calera Water Recycling Plant for processing. The pumps and pipes that are contemplated as part of the Projects are sized to empty the EQ basin in one to two days. All evaluations and reports required by the California Environmental Quality Act ("CEQA") for construction of the Projects have been completed, and the appeal period has expired. On May 22, 2017, the City Council awarded a bid for the construction of the Projects to Sierra Mountain Construction, Inc., of Sonora, California. The Projects are currently anticipated to be completed by October 2018.

Additional Projects
The Anza Pump Station Repair Project (C0036) the scope of work consists of installation of the pumps, structural, process mechanical, electrical and control systems, three natural gas engines, and other appurtenances work related to the pump station.

Pump Station SCADA and PLC Upgrade (C0046) the scope of work consists of upgrade the Supervisory Control And Data Acquisition (SCADA) and Programmable Logic Controller (PLC) Systems at the Linda Mar Stormwater Pump Station and Anza Stormwater Pump Station.

Linda Mar Stormwater Pump Station Rehabilitation and Repair Project (C0047) the scope of work consists of evaluate the storm drainage system in the Linda Mar Pump Station which include replacement of existing pump system and other appurtenances affecting the pump station.

Sewer and stormwater drainage pump stations hydraulic pipe cleaning-combination cleaner vehicle purchase for on-going maintenance of the sewer and stormwater drainage system pump station wet-wells.