Text extracted from the city's file for reading and search. Open the original on pacificacityca.iqm2.com. That file is the official record.

4866-2656-6648 v1 - 1 -

AGREEMENT FOR PROFESSIONAL CONSULTANT SERVICES
This Agreement for Consultant Services (the "Agreement") is made and entered into this 11th day of May 2026, by and between THE CITY OF PACIFICA, a municipal corporation (hereinafter referred to as "CITY") and BKF (hereinafter referred to as "CONSULTANT").

CITY and CONSULTANT may be referred to individually as “Party” and collectively as the “Parties.”

RECITALS
WHEREAS, CITY requires services in connection with the City Council strategic planning facilitation;
WHEREAS, CONSULTANT is qualified to perform such services; and WHEREAS, CONSULTANT has agreed to provide CITY with such services on the terms and conditions set forth herein.

NOW, THEREFORE, for the considerations hereinafter set forth, CONSULTANT and CITY agree as follows:

ARTICLE 1 - SCOPE OF SERVICES

1.1. Scope of Work. CONSULTANT agrees to furnish the services set forth in Exhibit A, Scope of Work, which is attached hereto and incorporated herein (the "Services").

1.2. Compliance with Law. The Services shall be performed in accordance with all applicable federal, state and local laws, ordinances, rules, regulations and orders.

1.3. Professional Competence. CONSULTANT represents that it has the professional skills necessary to perform the Services and that it will perform the Services in a skillful and professional manner. CONSULTANT represents that it has all the necessary licenses to perform the Services and shall maintain them throughout the term of this Agreement.

CONSULTANT agrees that the Services shall be performed consistent with the professional skill and care ordinarily provided by practicing in the same or similar locality under the same or similar circumstances. CITY and CONSULTANT agree that CONSULTANT is in responsible charge of the Services. Acceptance by CITY of the Services does not operate as a release of CONSULTANT from professional responsibility for the Services performed.

1.4. Independent Contractor. CONSULTANT is an independent contractor and not an employee of CITY. CONSULTANT expressly warrants that it will not represent that it is an employee of CITY.

1.5. Confidentiality. CONSULTANT agrees to maintain in confidence and not disclose to any person, firm, governmental entity, or corporation, without CITY's prior written consent, any trade secret or confidential information, knowledge or data relating to the 4866-2656-6648 v1 - 2 -
products, process, or operation of CITY. CONSULTANT further agrees to maintain in confidence and not to disclose to any person, firm, governmental entity, or corporation any data, information, technology, or material developed or obtained by CONSULTANT during the performance of the Services. The covenants contained in this Section 1.6 shall survive the termination of this Agreement for whatever cause.

1.6. Ownership of Material. Any reports and other material prepared by or on behalf of CONSULTANT under this Agreement (collectively, the "Documents") and provided to the CITY shall be and remain the property of CITY. All Documents not already provided to CITY shall be delivered to CITY on the date of termination of this Agreement for any reason. The Documents may be used by CITY and its agents, employees, representatives, and assigns, in whole or in part, or in modified form, for all purposes CITY may deem appropriate without further employment of or payment of any compensation to CONSULTANT.

1.7. Documentation. CONSULTANT shall keep and maintain full and complete documentation and accounting records, employee time sheets, and correspondence pertaining to the performance of the Services, and CONSULTANT shall make such documents available for review and/or audit by CITY and CITY's representatives at all reasonable times for at least four years after the termination of this Agreement or completion of the Services.

1.8. Testimony. CONSULTANT agrees to testify at CITY's request if litigation is brought against CITY in connection with the Services. Unless the action is brought by CONSULTANT or is based upon CONSULTANT's negligence, CITY will compensate CONSULTANT for the preparation and the testimony at CONSULTANT's standard hourly rates.

ARTICLE 2 - COMPENSATION

2.1. Compensation. Compensation for the Services shall be in accordance with Exhibit B, Compensation, attached hereto and incorporated herein. It is agreed that the compensation for the Services shall not exceed $91,446.00 ("Cost Ceiling").

2.2. Invoices. CONSULTANT shall submit monthly invoices in a form satisfactory to CITY on or before the tenth day of each month for Services provided during the preceding month. CONSULTANT shall submit time and cost records as necessary to substantiate performance of the Services. Within 35 days after receipt of each such invoice, CITY shall verify the accuracy of the invoice, correct the charges where appropriate and as discussed and mutually agreed with CONSULTANT, and make payment to CONSULTANT in an amount equal to the amount of such invoice, as verified or corrected by CITY. No payment hereunder shall be construed as evidence of acceptance of any of CONSULTANT's work. CITY reserves the right to withhold payment from CONSULTANT on account of Services not performed satisfactorily, delays in CONSULTANT's performance of Services, or other defaults hereunder. CONSULTANT shall not stop or delay performance of the Services under this Agreement on account of payment disputes with CITY.
4866-2656-6648 v1 - 3 -

2.3. Status Reports. Together with each monthly invoice, CONSULTANT shall submit a status report detailing the amount expended on the Services to that date and the remaining amount to be expended before the Cost Ceiling is reached. CONSULTANT shall notify CITY in writing when payments have reached 90 percent of the Cost Ceiling.

2.4. Withholding. In lieu of holding retention, CITY shall withhold CONSULTANT's final payment until the Services are complete and CITY has received all Documents.

CONSULTANT shall diligently continue and complete performance of the Services if the Services are not complete at the time CONSULTANT has performed services up to the Cost Ceiling.

ARTICLE 3 - TIME OF PERFORMANCE

3.1. Effective Date. This Agreement shall become effective upon execution of the second signature and shall remain in full force and effect until the Services are completed (the "Term"). CONSULTANT agrees to complete all services by December 31, 2027.

3.2. Termination. This Agreement may be terminated at any time by CITY upon written notice to CONSULTANT.

3.3. Final Payment. CONSULTANT shall be entitled to compensation for Services performed up to the time of such termination, it being understood that any payments are full compensation for the Services rendered under this Agreement.

3.4. Other Remedies. Nothing in this Article 3 shall be deemed to limit the respective rights of the parties to terminate this Agreement for cause or otherwise to exercise any rights or pursue any remedies which may accrue to them.

ARTICLE 4 - DESIGNATED CONTACTS

4.1. CITY Contact. CITY designates Roland Yip, PE, DPW Deputy Director/City Engineer, as its contact who shall be responsible for administering and interpreting the terms and conditions of this Agreement, for matters relating to CONSULTANT's performance under this Agreement, and for liaison and coordination between CITY and CONSULTANT. In the event CITY wishes to make a change in CITY 's representative, CITY will notify CONSULTANT of the change in writing.

4.2. CONSULTANT Contact. CONSULTANT designates Dan Shafer, Principal-inCharge/Vice President as its contact, who shall have immediate responsibility for the performance of the Services and for all matters relating to performance under this Agreement. Any change in CONSULTANT's designated contact shall be subject to written approval by CITY.

ARTICLE 5 - INDEMNIFICATION AND INSURANCE

5.1. Indemnification. To the fullest extent allowed by law, CONSULTANT hereby agrees to defend, indemnify, and save harmless CITY, its Council, boards, commissions, officers, 4866-2656-6648 v1 - 4 -
employees, directors, volunteers and agents, from and against claims, suits, actions liability, loss, damage, expense, injury (including, without limitation, economic harm, injury to or death of any person, including an employee of CONSULTANT or its Subconsultants), cost (including, without limitation reasonable, costs and fees of litigation) of every nature, kind or description, at law or equity, which may be brought against, or suffered or sustained by, City of Pacifica, its Council, boards, commissions, officers, employees, directors, volunteers or agents that arise out of, pertain to, or relate to any negligence, recklessness, or willful misconduct of CONSULTANT, any Subconsultant, anyone directly or indirectly employed or retained by them, or anyone that they control. In the event one or more defendants is unable to pay its share of defense costs due to bankruptcy or dissolution of the business, the CONSULTANT shall meet and confer with other parties regarding unpaid defense costs.

The duty of CONSULTANT to indemnify and save harmless, as set forth herein, shall include the duty to defend as set forth in Section 2782.8 of the California Civil Code; provided, however, that nothing herein contained shall be construed to require CONSULTANT to indemnify City of Pacifica, its Council, boards, commissions, officers, employees and agents against any responsibility or liability in contravention of Section 2782 of the California Civil Code.

CONSULTANT’s responsibility for such defense and indemnity obligations shall survive the termination or completion of this Agreement for the full period of time allowed by law.

The defense and indemnification obligations of this agreement are undertaken in addition to, and shall not in any way be limited by, the insurance obligations contained within this Agreement.

If CONSULTANT is a “design professional,” as defined in California Civil Code Section 2782.8(c), CONSULTANT shall indemnify, defend, and hold the Indemnitees harmless against Liability only to the extent such Liability arises out of, pertains to, or relates to CONSULTANT’s negligence, recklessness, or willful misconduct. In such an event, the cost to defend charged to CONSULTANT shall not exceed CONSULTANT’s proportionate percentage of fault.

5.2. Health and Safety. CONSULTANT may perform part of the Services at sites which contain unknown working conditions and contaminated materials. CONSULTANT shall be solely responsible for the health and safety of CONSULTANT's employees during the performance of the Services.

5.3. Insurance. CONSULTANT and all of CONSULTANTS employees, subcontractors, consultants and other agency shall procure, provide and maintain at all times during the performance of this Agreement, and for such additional periods as described herein, the insurance listed below with insurers licensed to do business in the State of California and with a Best's rating of no less than A:VII.
4866-2656-6648 v1 - 5 -
A. Commercial Automobile Liability Insurance. Commercial Automobile Liability Insurance providing bodily injury liability and property damage, to protect against all liability arising out of the use of any owned, leased, passenger or commercial automobile at a minimum amount of $1,000,000 combined single limit and $2,000,000 aggregate. Coverage shall apply to hired and non-owned autos.

B. Commercial General Liability Insurance. Commercial General Liability Insurance, with limits providing a minimum amount of $1,000,000 combined single limit coverage for each occurrence, $2,000,000 general aggregate and $2,000,000 products/completed operations aggregate. The insurance shall cover all operations including but not limited to the following: (1) premises, operations and mobile equipment liability; (2) completed operations and products liability; (3) contractual liability insuring the obligations assumed by CONSULTANT in this Agreement; (4) broad form property damage liability; (5) personal injury liability endorsement, including death; and (6) automobile bodily injury and property damage insurance, including all owned, hired and non-owned equipment.

C. Workers Compensation Insurance. Workers Compensation insurance, occupational disease insurance and employer’s liability insurance shall be required with minimum limits as required by law, covering all workplaces involved in this Agreement.

D. Policy Terms. Concurrently with execution of this Agreement, CONSULTANT shall provide CITY with Certificates of Insurance evidencing that CONSULTANT has obtained or maintains the insurance required by this Section

5.3. The Certificates shall be on forms acceptable to CITY. CONSULTANT shall also furnish CITY with original endorsements with the following documentation:
• Precluding cancellation or reduction in coverage before the expiration of thirty (30) days after CITY shall have received written notification thereof from CONSULTANT by United States mail;
• Providing that CONSULTANT's insurance shall apply separately to each insured against whom claim is made or suit is brought, and include a “separation of insureds” or “severability” clause which treats each insured separately, except with respect to the limits of the insurer's liability (cross-liability endorsement);
• Excepting CONSULTANT’S professional liability insurance, naming CITY, its City Council, boards, commissions, committees, officers, employees and agents as additional insureds (“Additional Insureds”); and • Providing that for any claims relating to CONSULTANT's services hereunder, CONSULTANT's insurance coverage shall be primary insurance with respect to CITY, its City Council, boards, commissions, committees, officers, employees and agents, and that any insurance or self-insurance maintained by CITY for itself, its City Council, boards, commissions, committees, officers, employees and agents shall be in excess of CONSULTANT's insurance and shall not be contributory with it.
4866-2656-6648 v1 - 6 -
• It shall be a requirement under this Agreement that any available insurance proceeds broader than or in excess of the specified minimum insurance coverages requirements and/or limits shall be available to the Additional Insured, including but not limited to any umbrella or excess insurance.

Furthermore, the requirements for coverage and limits shall be the greater of:
(a) the minimum coverage and limits specified in this Agreement; or (b) the broader coverage and maximum limits of coverage of any insurance policy or proceeds available to the named insured.

E. Material Breach. If CONSULTANT fails to maintain insurance coverage or provided insurance documentation which is required pursuant to this Agreement, it shall be deemed a material breach of this Agreement. CITY, at its sole option, may terminate this Agreement and obtain damages from CONSULTANT resulting from said breach. Alternatively, CITY may purchase the required insurance coverage, and without further notice to CONSULTANT, may deduct from sums due to CONSULTANT any premium costs advanced by CITY for such insurance. These remedies shall be in addition to any other remedies available to CITY.

ARTICLE 6 - NOTICES
All notices or other communications required or permitted hereunder shall be in writing, and shall be personally delivered or sent by facsimile or reputable overnight courier and shall be deemed received upon the earlier of: (1) if personally delivered, the date of delivery to the address of the person to receive such notice; (2) if delivered by Federal Express or other overnight courier for next business day delivery, the next business day; (3) if sent by facsimile, with the original sent on the same day by overnight courier, the date on which the facsimile is received, provided it is before 5:00 P.M. Pacific Time; or (4) if sent electronically, the date of delivery on the confirmed read receipt. Notice of change of address shall be given by written notice in the manner described in this Article 6. Rejection or other refusal to accept or the inability to deliver because of a change in address of which no notice was given shall be deemed to constitute receipt of the notice or communication sent. Unless changed in accordance herewith, the addresses for notices given pursuant to this Agreement shall be as follows:

If to CITY: Sean Charpentier, City Manager
170 Santa Maria Avenue
Pacifica, CA 94404
Phone: (650) 738-7409
Email: [email protected]
If to CONSULTANT: Dan Schaefer
225 Shoreline Drive, Suite 200
Redwood City, CA 94065
Phone: (925)396-7750
Email: [email protected]
4866-2656-6648 v1 - 7 -
ARTICLE 7 - MISCELLANEOUS

7.1. Entire Agreement. This Agreement represents the entire understanding of CITY and CONSULTANT as to those matters contained herein. No prior oral or written understanding shall be of any force or effect with respect to those matters covered hereunder. This Agreement may only be modified by an amendment in writing signed by each party.

7.2. No Assignment. The Services are deemed unique and neither party shall assign, transfer, subcontract or otherwise substitute its interest in this Agreement or any of its obligations hereunder without the prior written consent of the other party. As limited by this Section

7.2, this Agreement is to be binding on the successors and assigns of the parties hereto.

7.3. Severability. If any part of this Agreement is determined to be unconstitutional, invalid or beyond the authority of either party, such decision shall not affect the validity of the remainder of this Agreement, which shall continue in full force and effect, provided that the remainder of this Agreement can be interpreted to give effect to the intentions of the parties.

7.4. Counterparts. This Agreement may be signed in counterparts and, when fully signed, such counterparts shall have the same effect as if signed in one document.

7.5. Choice of Law. This Agreement and all matters relating to it shall be governed by the laws of the State of California without reference to its choice of laws principles and venue shall be in the appropriate court in San Mateo County, California.

7.6. Waiver. No failure on the part of either Party to exercise any right or remedy hereunder shall operate as a waiver of any other right or remedy that party may have hereunder. A waiver by either CITY or CONSULTANT of any breach of this Agreement shall not be binding upon the waiving party unless such waiver is in writing. In the event of a written waiver, such a waiver shall not affect the waiving party's rights with respect to any other further breach.

7.7. Mediation. In the event the parties are unable to resolve a dispute arising under this Agreement through good faith negotiations, the parties agree to submit the matter to mediation with a mutually agreeable mediator. Prior to the mediation, the parties shall exchange any documents reasonably necessary to resolve the matter to be mediated.

Interpretation. In the event this Agreement is ever construed in any dispute between the parties, it and each of its provisions shall be construed without regard to the party or parties responsible for its preparation and shall be deemed to have been prepared jointly by the parties.

The rule of construction to the effect that ambiguities are to be resolved against the drafting party shall not be employed in interpreting this Agreement.

7.8. Authority. Each individual executing this Agreement on behalf of one of the parties represents that he or she is duly authorized to sign and deliver the Agreement on behalf of such party and that this Agreement is binding on such party in accordance with its terms. 4866-2656-6648 v1 - 8 -

7.9. Third Parties. Nothing contained in this Agreement shall create a contractual relationship with, or cause of action in favor of, a third party against either the CITY or CONSULTANT. CONSULTANT’s Services hereunder are being performed solely for the benefit of CITY.

7.11 Entire Agreement. This Agreement, including Exhibits A, B and B1 comprise the entire Agreement.
[Signature on Next Page]
4866-2656-6648 v1 - 9 -

7.10. IN WITNESS WHEREOF, the parties have executed this Agreement as of the date set forth above.

CITY OF PACIFICA
By:_________________________________________
Sean Charpentier, City Manager
Date:________________________________________
Approved As To Form
By:_________________________________________
Michelle Marchetta Kenyon, City Attorney
Date:________________________________________

CONSULTANT
BKF Engineers
By:_________________________________________
Dan Schaefer, Senior Vice President
Date:________________________________________

EXHIBIT A

SCOPE OF WORK
BKF Engineers
255 Shoreline Drive, Suite 200
Redwood City, CA 94065
www.bkf.com
City of
Pacifica
Proposal to Provide Professional
Engineering Services for Planning
and Design of The Oceana Bike
Lanes Project
January 14, 2026
Contact
Dan Schaefer, PE, QSD, LEED AP Assoc. DBIA
650-280-0309
[email protected]
January 14, 2026
Bryan Bautista
Project Manager
City of Pacifica
170 Santa Maria Ave.

Pacifica, CA 94044
Subject: Oceana Bike Lanes Project
Dear Mr. Bautista,
The key decision facing the City on the Oceana Bike Lanes Project is how to deliver meaningful bicycle improvements without creating unintended impacts to parking, operations, utilities, and adjacent properties.

Oceana Boulevard presents a constrained corridor with limited roadway width, existing utilities, transit stops, and segments of Caltrans right of way near Oceana High School and the adjacent school frontage. Decisions made during early feasibility will directly affect project cost, public acceptance, and the City’s ability to advance the project efficiently into PS&E.

BKF’s value to the City is our ability to guide these decisions early and defensibly. Our approach focuses on developing clear design alternatives, identifying trade-offs, and providing realistic cost and constructability input so the City can make informed decisions before committing to final design. This front-end clarity reduces risk and supports smoother delivery through environmental review and PS&E.

The project will be led by Jason Mansfield, PE, supported by BKF’s in-house roadway, traffic, surveying, stormwater, and utility specialists, with environmental services provided by David J. Powers & Associates. This integrated team structure allows us to maintain continuity from feasibility through final design while responding efficiently to City input and community considerations.

BKF has extensive experience delivering bicycle, pedestrian, and complete streets projects throughout San Mateo County and the Bay Area, including work for the City of Pacifica. Our familiarity with local processes, agency coordination, and corridor-level constraints allows us to provide practical solutions that align with funding, schedule, and community expectations.

As an authorized representative of BKF Engineers, I confirm that we have reviewed and understand the requirements of the RFP and are prepared to enter into an agreement with the City under the stated terms.

We appreciate the opportunity to support the City of Pacifica on this project and look forward to working with you.

Sincerely,

BKF ENGINEERS
Dan Schaefer, PE, QSD, LEED AP, Associate DBIA
Principal-in-Charge/Vice President (Point of Contact)
255 Shoreline Drive, Suite 200,
Redwood City, CA 94065
(w) 925-940-2214 | (m) 650-280-0309
(e) [email protected]

BKF ENGINEERS
255 Shoreline Drive, Suite 200, Redwood City, CA 94065 | t. 650.482.6300

TABLE OF CONTENTS
SECTION 7.1. COVER LETTER
SECTION 7.2. PROPOSAL
SECTION 7.3. PRICE PROPOSAL
SECTION 7.4. COMPLETED REPORTS
SECTION 7.5. MODIFICATIONS TO AGREEMENT
SECTION 7.6 EXCEPTIONS TO THE RFP
SECTION 7.7. VALUE ADDED SERVICES
SECTION 7.8. TYPE OF BUSINESS
SECTION 7.9. LEGAL COMPANY NAME
A. STATEMENT OF UNDERSTANDING AND APPROACH
B. COMPANY INFORMATION
C. COMPANY PERSONNEL
D. DISCLOSURE
E. EXPERIENCE AND REFERENCES
City of Pacifica, Oceana Bike Lanes Project 1

7.2 Proposal
A. STATEMENT OF UNDERSTANDING AND APPROACH

PROJECT UNDERSTANDING
Oceana Boulevard, generally with a 50-foot right of way, was dedicated to the City in 1966 from the State of California (based on Caltrans record maps). Most of the Oceana vehicular pavement within the project limits is approximately 32’ wide, with a travel lane along the majority of the southbound side of the centerline, and a travel lane with parking along the majority of the northbound side of the centerline.

Sidewalks are intermittent on either side of the roadway, typically focused on significantly used frontage or to serve east-west connections and bus stops.

In order to accommodate Class II bike lanes on one or more sides of the street (south and northbound), it will be required to either remove parking and/or widen the roadway by relocating the existing curb line(s) in some locations. Where that occurs and how, and the attendant impact on adjacent infrastructure (utilities, residences, businesses, etc.) and parking availability, will be determined early in the planning/design process (feasibility study and concept design phase).

This determination will be based on the City evaluating, informing the appropriate entities, and making decisions regarding the project design before proceeding to formal PS&E development.

A small portion of the Oceana right of way near Oceana High School, and the majority of the area west of the western curb line, is owned by Caltrans.

While it is an objective of the project to provide dedicated Class 2 bike lanes throughout as much of the project area as feasible, it is likely that some sections may require bicyclists to share the road with vehicles due to a variety of physical and parking constraints.

PROJECT APPROACH
Right-of-Way Usage
The City’s Bicycle and Pedestrian Master Plan (adopted February 2020) identifies potential for shared-use pathways along this corridor. With 50-feet of right of way and 32-feet dedicated to vehicles, this appears to be a potential future option, particularly with the west side back of curb within Caltrans right of way. There are locations where 10-foot wide sidewalks exist on either side (frequently at bus stops) which demonstrates the potential for this throughout the corridor. Given a limited project budget assumed to be $1.5mil, shared-use
pathways would likely not be affordable.

Improvements with this project could lay
the groundwork for shared-use pathways
in the future and should not preclude
implementation of that design in the future.

On the left, an example
existing cross section for 50-
foot right of way from South
San Francisco demonstrates
existing utilities can be an
important constraint.

Stormwater Treatment
With the recent changes in MRP 3.0, projects like these with parallel bicycle and pedestrian improvements are more likely no longer exempt from stormwater treatment requirements. Given the large tributary areas ultimately comingling with improvements from this project, stormwater treatment areas will need to be larger than required for this project alone. That means that strategic locations for stormwater treatment measures could consider alternative compliance, for a practical solution that provides effective results. For purposes of this proposal, we have included budget for two (2) stormwater treatment planters (one at the north end and one at the south end) to intercept runoff from the more impervious developed areas on the east side.

City of Pacifica, Oceana Bike Lanes Project 2

7.2 Proposal
A. STATEMENT OF UNDERSTANDING AND APPROACH
Topographic Survey / Basemap
The overall basis starting with the Feasibility Study and Concept design will be an aerial topographic survey. This will provide reliable and consistent linework throughout the corridor. The flight price and scheduling will be impacted because it’s in class B airspace. In concert with the aerial, we will delineate the right of way based on record maps.

Once a preferred alternative is identified, we will perform conventional topographic survey with a 2-or-3- person survey crew. This is anticipated to target up to 29 curb ramp locations and 10 bus stop locations.

Depending on how critical certain constraints might be, this time may be allocated to other features such as existing retaining walls or important utilities.

OPTIONAL SERVICES
Given the exact nature of the project is not yet defined, we wanted to offer optional services that could add value to the project development process and the final built results.

Grant funding services: We understand budgets often define the scope of a project, we can provide services that expand the budget and scope. We have successfully delivered projects that source grant funding outside of the local MPO fund programming by applying for federal or state grant money directly. With a “money is no object” visioning exercise, we can imagine Oceana being a welcoming corridor for bicyclists and pedestrians. This would provide a safe and easy east side commuting option along this critical north-south corridor, potentially removing vehicles from the frequently congested highway 1 corridor.

Public outreach: With a project that can transform the look and feel of an important corridor like Oceana, public stakeholder ownership of the changes can make the development process much easier. Additionally, the local representatives on Council or Commissions prefer to hear praise rather than criticisms. Our subconsultant, Callander Associates, can provide these optional services to engage the community and get buyoff on the changes. Sometimes, as we found on the Sidewalks on Santa Cruz Ave, the residents or frequent users of the project area can provide meaningful and preferable alternative design ideas.

Landscape design: Callander Associates can also provide optional services for landscape and irrigation design, as well as placemaking such as furniture, lighting, and hardscape design. This can create the welcoming environment that encourages multi-modal commute options.

PROJECT TASKS
The scope of services is anticipated to include, but not necessarily be limited to, the following tasks:

A. Feasibility Study and Concept Design

1. Consultant shall prepare concept design plans and a feasibility study report including the following tasks and addressing at minimum the following project factors. Consultant shall assume in its proposal the evaluation including the tasks below of at least three project options/alternatives to be evaluated in the feasibility report:
a. Proposed location of bike lane(s), vehicle lanes, parking stalls, etc. as reflected in concept plans to be prepared by the consultant.
b. Changes to curb line(s). Include in the feasibility report and concept drawings the impact to adjacent infrastructure.
c. Assessment of impact on parking of proposed bike lane(s) including a study evaluating the existing level of use (by performing counts at various times/days), determine number of existing and proposed spaces.
d. Concept level cost estimates of the three project options/alternatives.

B. Development of Biddable Plans, Specifications, and Estimate (PS&E)

2. Project Development shall include, but not be limited:
a. Schedule meetings with City staff to discuss the project before commencing work. b. Assemble and review existing plans, surveys, studies and other information regarding the project. c. Visit the project site to assess current conditions, identify potential opportunities and constraints, and confirm the location of existing facilities.

City of Pacifica, Oceana Bike Lanes Project 3

7.2 Proposal
A. STATEMENT OF UNDERSTANDING AND APPROACH
d. Collaborate with both public and private utility owners within the project area(s) to minimize or prevent any potential damage to existing facilities in the vicinity. It is very likely that the project design will require relocation of PG&E and other utility owners’ utilities within the public right of way in order to accommodate the project improvements. Prepare notices to owners of required relocation under the Streets and Highways Code.
e. Perform additional topographic survey work as necessary to produce complete and accurate base sheets for the development of construction documents.
f. Perform utility location and depth verification potholing as warranted; City will horizontally locate City-owned utilities, sanitary sewer and storm drain mains, upon request.

3. Prepare 60% plans, specifications, and cost estimates in a format approved by the City for review.

Ensure that each component is clearly separated and presented in a manner acceptable to the City, with specifications distinct from the plans. The consultant will meet with City staff as necessary, typically on a biweekly basis, to address any concerns or details regarding plan development. a. Review project deliverables with City staff and incorporate any requested revisions. The City will provide feedback within two (2) working weeks upon receiving a complete set of 60% deliverables. b. Documented unit costs for the estimate should align with the anticipated construction schedule and must be updated periodically throughout the project’s design phase.

4. Environmental Document
a. The consultant will draft an environmental document for the project, to be filed with the City at the County of San Mateo. It’s anticipated that this project will qualify for a Categorical Exemption.

5. The finalization of PS&E for the project is required. Each element must be organized into components approved by the City. The consultant is responsible for conducting a comprehensive review of the plans, estimates, and specifications to guarantee coherence, comprehensiveness, and full coordination of all sections and references across the drawings, estimates, and specifications. a. Prepare Plans, Specifications, and Estimates (PS&Es) with submittals at the following percentages:
i. 60% Plans & Estimate (P&E)
ii. 95% Plans, Specifications, and Estimate (PS&E)
iii. 100% Bid Documents
b. The 100% Submittal shall include completely detailed and comprehensively specific information sufficient for construction and for the achievement of a high-quality project as well as the designer’s estimate of the number of working days required for construction. The bid package shall include bid alternatives which may be added to or deleted from the project depending upon bid prices and available budget.
c. Arrange meetings with City staff to discuss and address any comments on the 100% submittal.

Revise construction documents as needed before the City issues a Notice Inviting Bids. The City will provide feedback within two (2) working weeks upon receiving a complete 100% submittal. d. Consultant shall assume attendance at one public meeting. e. Prepare and submit Final Bid documents
i. All items identified in the 100% submittal reviewed by City staff and any applicable comments by staff, Planning Commission, or City Council shall be documented as responded to.

C. Bidding Assistance

1. Provide technical assistance to staff during the bidding process to review and respond to inquiries related to the referenced project.

2. Prepare bid addenda as may be necessary.

3. Prepare Conformed Sets of plans and specifications after Notice of Award is issued by the City to the construction contractor.

City of Pacifica, Oceana Bike Lanes Project 4
ID Task Name Duration Start Finish Predecessors
1 Notice To Proceed 0 days Tue 2/17/26 Tue 2/17/26
2 Kick-off Meeting 0 days Mon 3/2/26 Mon 3/2/26 1FS+10 days 3 Holiday Break 6 days Fri 12/25/26 Fri 1/1/27
4 Surveying 50 days Tue 3/3/26 Mon 5/11/26
5 Utility Requests 30 days Tue 3/3/26 Mon 4/13/26 2
6 Topographic Survey 40 days Tue 3/3/26 Mon 4/27/26 2
7 Basemap Preparation 10 days Tue 4/28/26 Mon 5/11/26 5,6 8 Boundary Retracement 5 days Tue 4/28/26 Mon 5/4/26 2,6 9 Feasibility Study 80 days Tue 5/12/26 Mon 8/31/26
10 Concept Plan Alternatives 40 days Tue 5/12/26 Mon 7/6/26 7,8FF-5 days 11 Stakeholder Coordination 10 days Tue 7/7/26 Mon 7/20/26 10 12 Alternatives Evaluation 10 days Tue 7/21/26 Mon 8/3/26 11 13 Preferred Alternative 15 days Tue 8/4/26 Mon 8/24/26 12 14 Feasibility Study 20 days Tue 8/4/26 Mon 8/31/26 13FF+5 days 15 PS&E 140 days Tue 9/1/26 Mon 3/15/27
16 60% PS&E 40 days Tue 9/1/26 Mon 10/26/2614
17 QC Check, Revisions, and 60% Submittal10 days Tue 10/27/26 Mon 11/9/26 16 18 City Review 15 days Tue 11/10/26 Mon 11/30/2617
19 95% PS&E 40 days Tue 12/1/26 Mon 1/25/27 18
20 QC Check, Revisions, and 90% Submittal10 days Tue 1/26/27 Mon 2/8/27 19 21 City Review 10 days Tue 2/9/27 Mon 2/22/27 20
22 100% PS&E 15 days Tue 2/23/27 Mon 3/15/27 21
23 Final PS&E & Ready To List 15 days Tue 3/16/27 Mon 4/5/27 22 24 Bidding and Award 35 days Tue 4/13/27 Mon 5/31/27 23FS+5 days 25 Construction 120 days Tue 6/15/27 Mon 11/29/2724FS+10 days 26 Record Drawings 15 days Tue 11/30/27 Mon 12/20/2725
2/17
3/2
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter Task
Split
Milestone
Summary
Project Summary
External Tasks
External Milestone
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
Deadline
Critical
Critical Split
Progress
Manual Progress

OCEANA BIKE LANES PROJECT

CITY OF PACIFICA
Tentative Schedule
January 14, 2026

Page 1 ends

BKF #20241578-002
J.Mansfield

7.2 Proposal
A. STATEMENT OF UNDERSTANDING AND APPROACH

7.2 Proposal
City of Pacifica, Oceana Bike Lanes Project 5
B. COMPANY INFORMATION
255 Shoreline Drive
Suite 200
Redwood City, CA 94065
650.482.6300

PRIMARY OFFICE

SUBMITTING THE

PROPOSAL

TYPE OF

ORGANIZATION
C Corporation
Dan Schaefer, PE, LEED
AP, QSD, Associate DBIA
Principal-In-Charge/Vice
President
(o) 925-940-2214
(m) 650-280-0309
(e) [email protected]
255 Shoreline Drive,
Suite 200, Redwood City,
CA 94065

POINT OF CONTACT
175
Professional
Engineers &
Surveyors
Founded in
1915
500+
Employees
18 West Coast
Offices
BKF Engineers
BKF Engineers is a leading civil
engineering and surveying firm
serving the western United States
since 1915. Our transportation
business sector is focused on
connecting communities, designing and
delivering infrastructure that supports
safe, efficient, and equitable movement for
people and goods. This includes roadways,
highways, trails, seaports, airports, and rail
systems used by passenger vehicles, buses,
trucks, motorcycles, bicycles, pedestrians, boats,
trains, and airplanes.

Our team supports transportation projects of all sizes
and types, from neighborhood improvements and
safety enhancements to regional corridor upgrades
and multi-jurisdictional infrastructure programs.

We deliver planning, design, environmental, and
construction-phase services across a full range of
public infrastructure.

We bring extensive experience navigating complex
regulatory, environmental, and funding landscapes,
including projects that involve Caltrans, the
Federal Highway Administration (FHWA), Federal
Rail Administration (FRA), CPUC, Union Pacific
Railroad (UPRR), and the California Transportation
Commission. Our engineers regularly coordinate with these and other agencies on permitting, approvals, and funding authorizations to move projects forward.

When improvements are required within the State right-of-way or when federal funding is involved, BKF is a trusted advisor. Our engineers understand the expectations and procedures of Caltrans’ functional units, including Local Assistance, Permits, Project Management, Environmental, Design, and Right-of-Way. Our experience spans all phases of delivery: from planning and PID, to environmental (PA/ ED), design (PS&E), and construction support.

BKF Engineers affirms that it is independent of the City of Pacifica as defined by the U.S. Government Accountability Office’s Government Auditing Standards (1994).

City of Pacifica, Oceana Bike Lanes Project 6

7.2 Proposal
B. COMPANY INFORMATION
▪ Planning, Grants, and
Funding Strategy
▪ Local Government Capital
Projects
▪ Local Roadways / State
Highways
▪ Pavement Rehabilitation and
Preservation
▪ ADA / PROWAG Accessibility
Improvements
▪ Complete Streets / Active
Transportation
▪ PID, PA&ED, PS&E Services
▪ Roundabouts and
Intersection Safety
▪ Rail and Grade Separations
▪ Traffic Signals and Lighting
▪ Right-of-Way Engineering
and Support
▪ Local Assistance / E-76 /
Funding Authorization
▪ Caltrans Facilitation Services
& Permit Support
▪ DEER and Design
Exception Preparation

SERVICES
▪ Redwood City
▪ Fresno
▪ Modesto
▪ Newport
Beach
▪ Oakland
▪ Pleasanton
▪ Portland
▪ Riverside
▪ Roseville
▪ San Francisco
▪ Sacramento
▪ Salinas
▪ San Diego
▪ San Jose
▪ San Luis
Obispo
▪ San Rafael
▪ Santa Rosa
▪ Walnut Creek

OFFICE LOCATIONS
BKF has proudly been serving the City of Pacifica, County of San Mateo, and surrounding communities, providing civil engineering and surveying services across various local projects. Our deep understanding of regional issues, permitting requirements, and agency needs, gained through frequent collaboration with the City, the County and other agencies, has been key to our continued success. With established relationships and proven familiarity with local processes, we bring insight that supports streamlined project delivery and practical solutions. BKF’s local presence allows us to mobilize quickly and allocate dedicated staff to meet tight timelines and evolving project needs.

EXPERIENCE WITH THE CITY OF PACIFICA AND COUNTY OF SAN MATEO In addition to key reference
projects listed in this proposal,
BKF has extensive experience
delivering similar services, with
hundreds of projects located
within the Bay Area. Our team’s
experience and expertise,
paired with our familiarity of
City of Pacifica, gives us greater
insight into regional challenges
to deliver custom-fit solutions
for the project needs under
this contract.
▪ Belmont Alameda de las
Pulgas Corridor
▪ Daly City John Daly Boulevard
▪ Belmont Old County Bike/Ped
▪ Wavecrest Coastal Trail
▪ Sharon Road Sidewalk Project
▪ Bicycle Safety Improvements with
Alpine Road/ 280 Interchange
▪ Belmont Safe Routes to School
▪ Devil’s Slide Trail Engr. Design
▪ Menlo Park Ravenswood
Resurfacing Project
▪ MROSD_Alpine Road Trail
▪ Bayfront Expressway
Pedestrian Overcrossing

SELECTION OF ADDITIONAL SIMILAR PROJECT EXPERIENCE IN THE BAY AREA 255 Shoreline Drive
Suite 200
Redwood City,
CA 94065
t. 650.482.6300
f. 650.482.6399

OFFICE SUBMITTING

THE PROPOSAL
City of Pacifica, Oceana Bike Lanes Project 7

7.2 Proposal
B. COMPANY INFORMATION

LITIGATION
BKF Engineers has over 110 years of being financially conservative and is in excellent financial condition.

We strive to control risk through education and being prudent in providing our professional services. We thoroughly evaluate each and every assignment and assess potential risk factors that could be present. As a consequence of engaging in any business, there is always the potential for assertions of fault or claims which may or may not give rise to litigation, mediation, or arbitration.

Year 2021
Project Name Montecito Vista Project
Claim Name Lucky Nellen LLC vs. BKF Engineers
Description BKF Engineers is currently a defendant in an active civil litigation matter in Marin County Superior Court involving allegations of professional negligence related to services performed at 200 Nellen Avenue. The matter is ongoing and BKF is actively defending the case.

Status Pending

BKF ENGINEERS, SURVEYORS, PLANNERS
500+ SUPPORT STAFF

QUALITY CONTROL

PROJECT MANAGEMENT
Dan Schaefer, PE, QSD, LEED AP,
Associate DBIA
Principal-in-Charge

BKF ENGINEERS
Jason Mansfield, PE
Project Manager

BKF ENGINEERS
Jonathan Tang, PE LEED AP, QSD/P
QA/QC Manager

BKF ENGINEERS

ADDITIONAL SUPPORT SERVICES
Cuong Tran, PE, CPII, LEED AP
Project Engineer

BKF ENGINEERS
Ben Santos, PLS
Survey Lead

BKF ENGINEERS
Steven Dauterman, PE, TE,
PTOE, RSP1
Traffic Lead

BKF ENGINEERS
Will Burns, AICP
Environmental Lead
DAVID J. POWERS & ASSOCIATES
Brian Fletcher, PLA, ASLA, LEED AP
Landscape Architecture & Outreach Lead
(Optional)

CALLANDER
Arturo Gomez
Potholing Lead
(Optional)

BESS TESTLABS

SUBCONSULTANT TEAM
Key Personnel
Nellie Moussa PE, QSD/P
Utility Lead

BKF ENGINEERS
Erik Moreno, PE, QSD/P
Stormwater Lead

BKF ENGINEERS
Marley Mueller, JD
Grants Funding Lead

BKF ENGINEERS
C. COMPANY PERSONNEL

7.2 Proposal

COMPANY PERSONNEL
City of Pacifica, Oceana Bike Lanes Project

EXPERIENCE
- Bay Trail Gap Closures, Alameda & Contra Costa County - Cross Alameda Trail, Alameda
- Ironhorse Trail Extension and Highway 4 Undercrossing, Concord - California State Parks Trails & Access, California Coast (multiple locations)

DAN SCHAEFER, PE, QSD, LEED AP, ASSOCIATE
DBIA
Principal-In-Charge

REGISTRATION
Professional Civil Engineer, CA No. 51158,
OR No. 96877PE, WA No. 20100278,
UT No. 11644474-2202
PHONE NUMBER |
650-280-0309

AFFILIATIONS
LEED Accredited
Professional, U.S. Green
Building Council

TOTAL YEARS EXPERIENCE
37 years, 36 with firm
Dan Schaefer, PE, QSD, LEED AP, Assoc. DBIA will serve as Principal-in-Charge for the Oceana Bike Lanes Project and provide senior oversight throughout planning and design. His role will focus on overall accountability, quality assurance, and strategic guidance at key decision points, including feasibility and concept development, selection of a preferred alternative, and readiness to advance into PS&E. Dan will support the Project Manager by reviewing alternatives, evaluating tradeoffs related to parking, utilities, transit stops, and right-of-way constraints, and confirming that recommendations presented to the City are clear, defensible, and aligned with City objectives, funding, and schedule. With more than three decades of experience delivering bicycle, pedestrian, and complete streets projects throughout California, Dan brings seasoned judgment on corridor-level challenges similar to those along Oceana Boulevard, including constrained widths, community sensitivities, and multi-agency coordination.

Jason Mansfield, PE will serve as Project Manager and be responsible for day-to-day coordination and delivery of the Oceana Bike Lanes Project. Jason will lead the project team, manage schedule and scope, oversee technical deliverables, and serve as the City’s primary point of contact throughout planning and design.

Jason has extensive experience managing bicycle, pedestrian, and complete streets projects, including roadway design, signing and striping, traffic modifications, utility coordination, and active transportation improvements. He has led projects that require evaluation of alternatives, coordination with community members and multiple agencies, and resolution of corridor-level constraints. Jason focuses on clear communication, organized decision-making, and practical design solutions that support timely delivery and alignment with City goals.

EXPERIENCE
- Sharon Road Sidewalk Project Civil Engineering Services, Menlo Park - Redwood Avenue Sidewalk Curb & Gutter Improvement Project, Redwood City - Midcoast Multimodal Trail, El Granada
- Middlefield Road Re-Striping Project, Menlo Park
- Sidewalks on Santa Cruz Avenue, Menlo Park
- Bicycle Safety Improvements with Alpine Road/ 280 Interchange, County of San Mateo

JASON MANSFIELD, PE
Project Manager

REGISTRATION
Professional Civil Engineer, CA No. 59567
PHONE NUMBER | 650-482-6422
TOTAL
YEARS

EXPERIENCE
29 years, 24
with firm

7.2 Proposal

COMPANY PERSONNEL
City of Pacifica, Oceana Bike Lanes Project
Cuong Tran, PE, CPII, LEED AP will serve as Project Engineer and support day-to-day technical execution of the Oceana Bike Lanes Project. Cuong will be responsible for developing design documents, tracking and resolving technical issues, and coordinating design inputs across disciplines under the direction of the Project Manager. His experience includes roadway and trail design, utility coordination, signing and striping, and active transportation improvements on projects with similar corridor constraints. Cuong’s role is focused on maintaining organized documentation, supporting informed decision-making, and advancing design work efficiently in alignment with project scope, schedule, and City direction.

EXPERIENCE
- Midcoast Multimodal Trail, El Granada
- Stevens Creek Blvd & Phar Lap Dr Crosswalk Improvements, Cupertino - Alpine Road Trail Improvements, Portola Valley/Menlo Park - City of East Palo Alto Pedestrian Improvements, East Palo Alto - East Side Connect San Carlos, San Carlos
- Oyster Point and East Grand Avenue, South San Francisco

CUONG TRAN, PE, CPII, LEED AP
Project Engineer

REGISTRATION
Professional Civil Engineer, CA No. 74953
Certified Public Infrastructure Inspector
PHONE NUMBER | 650-482-6362

AFFILIATIONS
LEED AP, U.S. Green
Building Council

TOTAL YEARS

EXPERIENCE
19 years, 19 with firm
Steven Dauterman, PE, TE, PTOE will serve as Traffic Lead for the Oceana Bike Lanes Project and provide traffic engineering and operations support during planning and design. Steven will support development and evaluation of design alternatives related to lane configurations, striping, signage, transit stop interfaces, and multimodal safety considerations. His experience includes traffic analysis, safety assessments, traffic calming, and complete streets projects on constrained corridors similar to Oceana Boulevard. Steven will coordinate closely with the Project Manager and design team to ensure traffic-related elements are integrated clearly and support safe, implementable project solutions.

EXPERIENCE
- Lincoln Avenue/Middlefield Road Safety Audit, Palo Alto* - Hellen Drive Pedestrian Improvement Assessment, Millbrae* - South San Francisco On-Call Traffic Engineering and Transportation, South San Francisco - Canada College Traffic Improvements, San Mateo
- ELCO Yards Caltrans Processing, Redwood City
- S16250 Capitol Expressway Light Rail Project, San Jose - Mountain View SB-1 Streets, Mountain View
- Hamilton Avenue Resurfacing Design Project, Campbell

STEVEN MATTHEW DAUTERMAN, PE, TE,
PTOE, RSP1
Traffic Lead

REGISTRATION
PE (Traffic) - CA (TR3088)PE (Civil) - CA (95938) PE (Civil) - FL (96193), PE (Civil) - VA (063662)PE (Civil) - TX (147797) PHONE NUMBER | 925-396-7726 EXT:12472

AFFILIATIONS
Society of PTOE

TOTAL YEARS

EXPERIENCE
8 years, 1 with firm
*Projects completed with a previous firm

7.2 Proposal

COMPANY PERSONNEL
City of Pacifica, Oceana Bike Lanes Project
Ben Santos, PLS will serve as Survey Lead for the Oceana Bike Lanes Project and be responsible for managing all field and office survey activities. Ben will oversee preparation of topographic surveys and base mapping needed to support feasibility analysis, curb line evaluation, utility coordination, and development of PS&E. His role includes delineating existing right of way limits, including localized Caltrans-owned segments near Oceana High School, to support informed design decisions.

Ben brings extensive experience supporting roadway, sidewalk, and active transportation projects for local agencies, with a focus on delivering accurate, reliable survey data that enables efficient and coordinated project delivery.

Erik Moreno, PE, QSD/P will serve as Stormwater Lead for the Oceana Bike Lanes Project and provide stormwater and drainage engineering support during feasibility and design. Erik will evaluate drainage implications associated with curb relocation, roadway resurfacing, and bike lane improvements, and will support development of practical design solutions that maintain or improve existing drainage performance. His role includes coordination with the roadway and survey teams to confirm existing conditions, identify potential conflicts, and integrate stormwater considerations into concept alternatives and PS&E. Erik brings extensive experience supporting local agency roadway and active transportation projects throughout the Bay Area, with a focus on implementable designs that align with City standards and regulatory requirements.

EXPERIENCE
- San Jose Water-West Valley Construction, San Jose
- Lindsay Tract Roadway, Newark
- Coyote Valley Ridge Trail Connection Study, San Jose
- El Camino Real ADA Ramp Improvements, Palo Alto
- Stierlin Road Intersection Mountain View, Mountain View - Sharon Road Sidewalk Project, Menlo Park

EXPERIENCE
- Menlo Park Stormwater Master Plan, Menlo Park
- Alpine Trail Slip-Out, Portola Valley
- Dublin Storm Drain Master Plan, Dublin
- Redwood City Storm Drain Master Plan, Redwood City
- Santa Clara Hope Dr - Green Stormwater Inf., Santa Clara - East Meadow Circle C.3 Review, Palo Alto

BEN SANTOS, PLS
Survey Lead

REGISTRATION
Professional Land Surveyor, CA No. 9251
PHONE NUMBER | 408 467-9171

ERIK MORENO, PE, QSD/P
Stormwater Lead

REGISTRATION
Professional Civil Engineer, CA No. 81983
Qualified SWPPP Developer No. 26096
PHONE NUMBER | 650-482-6403

TOTAL YEARS

EXPERIENCE
25 years, 9 with
firm

TOTAL YEARS

EXPERIENCE
15 years, 10 with
firm

7.2 Proposal
C. COMPANY PERSONNEL
City of Pacifica, Oceana Bike Lanes Project 8
DAVID J. POWERS &

ASSOCIATES
The BKF project team includes subconsultants to bring the right resources to this project, even if team members are not all working under the same roof. Our approach hinges on treating subconsultants as integral members, fostering robust relationships, and promoting open collaboration. Our core and optional subconsultants added for this project effort include the following:

SUBCONSULTANTS
David J. Powers & Associates
(DJP&A) is a San Jose-based,
UDBE-certified, firm that has
been preparing environmental
documents to comply with
NEPA and CEQA since 1972.

The firm also has a secondary
office in Oakland that provides
staffing on transportation
projects. A specialty of the firm
is preparing environmental
documents on federally-funded
bridge, roadway, and bicycle
and pedestrian projects under
the direction of Caltrans.

BKF and DJPA has worked
together + 27 years on multiple
projects such as Ped/bike/trails,
street improvements, road
rehabilitations, highways, and
Interchanges.
(CALA) has been dedicated to
helping public clients design
and create meaningful outdoor
spaces that foster a strong
sense of place. With over 50
years of expertise, CALA offers
a comprehensive suite of
services that span from preproject feasibility and funding to construction management for
complete streets, trails, transit
systems, urban plazas, parks,
and other public works projects.

BKF and Callandar has worked
together + 27 years on multiple
projects such as Ped/bike/trails,
roadways, parks and grade
separations.

Bess Testlab is a certified
UNION Underground Utility
Service Company established
in 1995 as a privately
owned C-Corporation. BESS
provides a complete range
of underground utility
designation and utility
mapping services to both
private and public companies
throughout California,
Nevada, and Arizona. BESS is
committed to providing quality
service that exceeds our
client’s needs and expectations
using the most advanced
technologies available.

BKF and Bess Testlab has
worked together + 5 years
on multiple projects such as
Ped/bike/trails, roadways,
streetscape and highways.

ENVIRONMENTAL

LANDSCAPE ARCHITECTURAL

OUTREACH POTHOLING

CALLANDER ASSOCIATES

LANDSCAPE ARCHITECTURE BESS TESTLAB

OPTIONAL OPTIONAL
Callander Associates
Landscape Architecture
BKF Engineers confirms that neither the firm nor any key personnel proposed for this project have any business, financial, or personal relationships with current City of Pacifica elected officials, appointed officials, or City staff that would create a conflict of interest. All proposed team members are properly licensed, in good standing, and have no disciplinary actions.

DISCLOSURE

EXPERIENCE AND REFERENCES
BKF Engineers has extensive experience delivering bicycle, pedestrian, and complete streets projects for cities and counties throughout the Bay Area. Our work includes planning, feasibility analysis, design, and PS&E for projects involving constrained corridors, parking tradeoffs, utility conflicts, and coordination with multiple agencies. These projects are often delivered within complex regulatory and environmental settings typical of coastal and urban corridors in California. BKF also has a strong understanding of working within state right of way where required. Our experience includes coordinating improvements within Caltrans owned corridors and supporting City led projects that require Caltrans Encroachment Permits, including work within Caltrans District 4. We understand the importance of early identification of state right of way limits, clear documentation of proposed improvements, and practical coordination to support permit review without expanding the process beyond what is necessary for the project. For the Oceana Bike Lanes Project, BKF brings direct experience delivering similar corridor improvements where early evaluation of alternatives, clear documentation of impacts, and practical design solutions were critical to project success.

The following examples highlight relevant projects that reflect the scale, complexity, and delivery approach anticipated for this project.

E. EXPERIENCE AND REFERENCES
City of Pacifica, Oceana Bike Lanes Project 9

7.2 Proposal
The Redwood Avenue Sidewalk Curb and Gutter Improvement Project was intended to fix several deficiencies along Redwood Avenue between El Camino Real and Fairview Avenue. The City’s goal was to increase safety and accessibility for pedestrians by constructing City Standard improvement and eliminating localized low points while meeting project schedule and budget.

The sidewalk, curb and gutter between El Camino Real and Hudson Street had a curb that was significantly shorter than the City’s standard 6” curb for many portions of this section. This made it easier for vehicles to park partially on the sidewalk or in the landscape strip. During a site walk of the segment, staff saw that the existing slopes coming from the properties do not give much flexibility in raising the curb line while maintaining driveway access. However, combined with some grinding of the street pavement section, and some drainage improvements, the 6” standard curb was achievable. This required detailed surveying of existing conditions to determine what could be done to meet that standard.

PERIOD OF WORK
2022-2023

REFERENCE
James O’Connell
Senior Civil Engineer
City of Redwood City
joconnell@
redwoodcity.org
650-780-7000

REDWOOD AVENUE SIDEWALK CURB & GUTTER IMPROVEMENT
PROJECT Redwood City, CA
The Midcoast Multi-Modal Trail in El Granada, California, is a new, paved trail that runs along the east (inland) side of Highway 1 entirely within Caltrans right of way in unincorporated San Mateo County. The eight-foot-wide asphalt surface features two-foot-wide decomposed granite jogging paths on each side.

BKF served as the prime consultant, responsible for civil engineering, coordinating with the County and regulatory agencies, and leading the subconsultant team. The trail is 3/4-mile-long and provides residents with a safe route for commuting by bicycle or foot between El Granada and the east side of Miramar. The primary objective of the project was to create a safe transportation alternative that would reduce highway congestion, as well as associated carbon emissions and pollution. The project also aimed to provide a safe route to school for students by incorporating a secondary trail connecting to El Granada Elementary School. The design focused on minimizing environmental impact and enhancing safety for bicyclists and pedestrians, particularly where the trail intersects with driveways and roads.

PERIOD OF WORK
2015-2023

REFERENCE
Wency Ng
Senior Engineer
County of San Mateo
[email protected]
650-363-4100

MIDCOAST MULTIMODAL TRAIL
El Granada, CA
This sidewalk project spans Sharon Road between Alameda de las Pulgas and Altshul Ave in Menlo Park. The scope included installation of new sidewalk, driveways, curb and gutter, ramps, signing and striping, landscaping, and inlet modifications. The goal of the project was to create a defined walking path and minimize ponding issues along the project limits. The project aimed to improve pedestrian safety and the connection to La Entrada Middle School.

BKF prepared preliminary design for alignment of proposed curb and gutter, sidewalks, driveways, ramps, lane widths, asphalt overlays, and impact to frontage features. Concurrently, BKF prepared exhibits showing the frontage of each individual adjacent property to review potential impacts and improvements affecting each property owner. Final construction plans were prepared, as well as signing and striping plan, site construction details, an erosion control plan, an irrigation plan, and a planting plan.

PERIOD OF WORK
2021-2022

REFERENCE
Michael Fu
Associate Civil Engineer
City of Menlo Park
[email protected]
650-330-6706

SHARON ROAD SIDEWALK PROJECT CIVIL ENGINEERING SERVICES Menlo Park, CA

BKF PROJECTS EXPERIENCE
4866-2656-6648 v1 - 2 -

EXHIBIT B

COMPENSATION
Consulting Fees

OCEANA BIKE LANES PROJECT

CITY OF PACIFICA
January 14, 2026
PrincipalDan Schaefer
Project Manag
er/Ex
ecutiv
e
Jason Mansfield
Lead Engine
er/P
M
Cuong TranSenior Project Engine
er
TBD
D
esign Engine
er
TBD
Associate/P
M (Surv
e
y)
Ben Santos
Project Surv
e
y
or
TBD
Surv
e
y
Cre
w (2-p
erson)
Varies
Task $333 $301 $287 $245 $188 $301 $215 $403 Hours Fee TOTAL A Feasibility Study and Concept Design 414 $91,446
Concept Designs and Costs of up to 3 Alternatives 2 24 12 80 240 358 $76,054 Feasibility Study 32 8 8 8 56 $15,392
B Development of PS&E 1,102 $258,018
Site visit and meetings 24 8 32 $9,184
Utility Coordination 2 16 24 24 66 $15,586
Topographic Survey 2 2 4 8 24 128 120 288 $86,764
Environmental Document 2 2 2 6 $1,666
60% PS&E 8 8 40 240 296 $59,624
95% PS&E 2 8 8 40 240 298 $60,290
100% Bid Documents 4 4 24 40 72 $15,752
Final Bid Package 2 2 8 32 44 $9,152
C Bidding Assistance 70 $15,058
Technical Assistance 2 8 4 16 30 $6,886
Conform Plan Set 2 2 4 32 40 $8,172
SUBTOTAL FEES $1,332 $33,712 $20,664 $60,270 $165,440 $7,224 $27,520 $48,360 $364,522 Reimbursable Expenses $1,000
Subconsultant (David J Powers & Associates) $11,550
Subconsultant (Aerial Survey) $13,200
Suggested Design Contingency - Additional Work (as-needed, 10% budget) $39,000 GRAND TOTAL $429,272
NOTES:
[1] BKF manager roles may also be served by others as needed to meet project needs, and as approved by the City. [2] BKF Project Engineer role may also be served by others as needed to meet project needs, including a combination of Project and Design Engineers. [3] Assumes project scope remains similar to initial concept. Changes to project limits, or revised concept, may require revisiting the number of hours required. [4] Subconsultant fee and expenses includes additional BKF 10% markup. [5] Reimbursable expense may include reproduction of plans, mileage, parking, and other directly related project expenses. [6] Optional Services (NOT IN CONTRACT) include public outreach, potholing, landscape design, electrical design, grant services.

BKF Engineers
Project Management, Surveying, and Civil Engineering Note: This scope and tasks may be tailored to match the budgets as needed. We anticipate that through
collaborative discussions with the City and project
development, the scope, tasks, and budget may be revisited to appropriately service the project. We have suggested a design contingency to account for project development and ease of City Staff administration of the contract. BKF's flexibility is a signfiicant strength when project scope needs to adjust with a project as it develops.

K:\2024\241578_Pacifica_On-Call_Civil_Engineering_2025-2027\241578-002_Oceana Bike Lanes Project\DOC\00-Pursuit\B-Proposal\02-Working_Docs\Project Cost, Fees and Charges\BKF-proposed-fees-Oceana-2026-01-14.xls Page 1 of 1

7.3 Price Proposal

PRICE PROPOSAL
City of Pacifica, Oceana Bike Lanes Project 10