CITY OF PACIFICA

VALLEMAR AND ROCKAWAY BEACH AREAS SEWER REHABILITATION & REPAIR PROJECT - PHASE II, C0050
CONTRACT CHANGE ORDER NUMBER 001
DATE OF ISSUANCE: 2/10/2026 ORIGINAL CONTRACT DATE: 11/14/2025 PROJECT NAME: Vallemar and Rockaway Beach Areas Sewer
Rehabilitation and Repair Project
CITY CONTRACT NO. C0050
CONTRACTOR: Ranger Pipelines Inc.

CONTRACT FOR: Vallemar and Rockaway Beach Areas Sewer Rehabilitation and Repair Project, C0050
You are directed to proceed promptly with the following change(s):

DESCRIPTION (Attach additional sheets, if necessary):

PURPOSE OF CHANGE ORDER:

This Change Order addresses the costs impacts detailed under Change Order Request No. 001, which addresses the Design Change Notice No.1 in receipt of RFI No.8.

ATTACHMENTS:

1. Change Order Request 001

CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME
Original contract price: $1,178,590
Original contract time: 60 Days
Net increase in contract price: $ 12,000 Net increase in days: 0 Days New contract price with all Change Orders: $1,190,590
New contract time with all Change Orders: 60 Days
RECOMMENDED: APPROVED:

Matt Kelly Melissa R.Tec
By By
Matt Kelly, Project Manager Melissa Tigbao, Dir. Public Works 11/02/2026 12/02/2026
Date Date
APPROVED:

Upon execution by representatives authorized to bind the parties, this Change Order will become a part of the contract. The consideration specified in this Change Order (whether an adjustment of the contract price, an adjustment of time, and/or other consideration) is the full and sole compensation owed to the contractor as a result of the changes and issues described in this Change Order. Such consideration includes, but is not limited to, any and all direct and indirect costs incurred by the contractor as a result of the changes and issues described in this Change Order for any labor, equipment, materials, overhead (additional, extended, field and home office), profit, or time adjustments. By signing this Change Order the contractor waives and releases the owner from any and all claims for additional compensation concerning and of the changes and issues specified in this Change Order.

The undersigned, being the _ONTRACTS ANAGER (Title) of the Contractor, by signing this Changer Order declares under penalty of perjury under the laws of the State of California, and does personally certify and attest that: the undersigned has thoroughly reviewed the attached request for change order and knows its contents, and said request for change order is made in good faith; that it is supported by truthful and accurate data; that the amount requested et seq., pertaining to false claims, and further knows and understands that the submission or certification of a false claim may lead to fines, imprisonment, or other severe legal consequences.

By Date: 2/10/2026
Ruairi Bradley, Ranger Pipelines Inc. (Contractor)
RANGER PIPELINES INC.

GENERAL ENGINEERING CONTRACTORS
LICENSE NUMBER 417996
February 10, 2026
City of Pacifica - Public Works - Wastewater Division
170 Santa Maria Blvd,
Pacifica,
CA 94044
Attn: Matt Kelly
Project Manager
Re: Vallemar and Rockaway Beach Blvd
Ranger Job No. 771
PCO No. 1 - Pipe supports increased vertical footage
Description of COR No. 1:

This PCO outlines the additional costs associated with the alterations to the pipe supports for both creek crossing as described in DCN No. 1 following receipt of response to RFI No. 8:

Average increase = 2VF per support
Additional $3,000 per support
4EA supports = $12,000
This estimate is in the amount of $ 12,000.00
Contract Time Extension Request: Q WD
Please provide a change order for the amount and time described above after your review and approval.

Justin Devaney
Project Manager
P.O. BOX 24109 • 1790 YOSEMITE AVENUE • SAN FRANCISCO, CA 94124 TEL. (415) 822-3700 • FAX (415) 822-3703
FREYER
FL LAURETA, INC.

Civil Engineers - Surveyors - Construction Managers
City of Pacifica, Vallemar and Rockaway Beach Areas Sanitary Sewer Rehabilitation & Repair Project Phase Il Instructional Bulletin #1
November 17, 2025
Revisions as described below have been made to the Project Drawings:

Sheet 15
Revised new concrete supports in profile to extend to a minimum of 6 feet below the adjacent slope.

Sheet 18
Revised new concrete supports in profile to extend to 3 feet below the point of a 5-foot horizontal setback.

Sheet 24
Revised Detail 3A to reflect that the depth of the concrete support shall either extend to a minimum of 6 feet below the adjacent slope or extend to 3 feet below the point of a 5-foot horızontal setback, whichever is greater.

APA
-063936
/30/2026
CIV 1600000 ALIFORNIA
Headquarters North Bay Office East Bay Office South Bay Office 150 Executive Park Blvd. Ste 4200 505 San Marin Dr, Ste A220 1101 Marina Village Pkwy, Ste 10% 20863 Stevens Creek Blvd, Ste 275 San Francisco, CA 94134 Novato, CA 94945 Alameda, CA 9450* Cupertino, CA 95014 (415) 534-7070 (415) 534-7070 (510) 937-2310 (408) 516-1090 показ -на

GRAPHIC SCALE

ONEONTA AVENUE,
OH: E/CURA

AERIAL BARRERS

PROTECTS SE -
1+008
* STRUCTURE TO CENTEA OF STRENTER OF

2. NOT USED.

PROTECT SUH PNOTA * CONTRACTOR ON BE SHALL BE SON TONED BY

ONCRETE PIPE SUPPORTS

PLAN VIEW

8. DO SHE BARRERS REFER TO DETAILS 1A 18, AND 1C

NOW SANITARY SENDE
10")
INV=133.54 N (NEW 10" STALL CASE WV=134.38 S (NEW
i5ve133.21
34,55

ELEVATION (FT) ELEVATION (FT)
City Of Pacifico\018 Vallamar And Rockoway Bach\ALA Latest\Phose 2\SHEET 15 - Plan & Profile - Oneonto Ave.darg 199469- 300177
0+00 1+50

STATION

PROFILE VIEW
AS NOTED 11/17/25 INSTRUCTIONAL BULLETIN NO.

DESIONED: FREYER VALLBAR AND ROCKAWAY BRACH AREAS SEVER REIABLITATION A REPAIR PROJECT - PIASE E

DRAINE PIPELINE PLAN & PROFILE
CHECKED: I LAURETA, INC. CITY OF PACIFICA 15
7 rainces? ENGR: JJT ONEONTA AVENUE CREEK CROSSING
"MI-N' STA 0+00 TO 1+08 JOB NO
OF REVISION: CITY OF PACIPICA, CALIPORNIA 240018

BERENDOS AVENUE

GRAPHIC SCALE
CAUTION: OVERHEAD

PROTECT SA DH VAS -
" SET ONE OF STRUCT ENTER OF
* CONTRNTOR ON SET SHALL BE FOREMEO DY

PLAN VIEW

NEV SANITARY SEWEI
- Plan & Proflie - Borendes Are.cmg SCa.
10202750 (NEW 10) STAT ONESER #V=213.00
(FT)

ELEVATION (FT) ELEVATION
SoLF • S40.003

0.56 Z: Projects\240 City Of Pacifico\018 Vollemar And Rockaway Beach\All Lotea/\Ph

SUPPORT (TYP
0+50

STATION

PROFILE VIEW

AS NOTED
ESTENED: FREYER VALLAR AND ROCKADAY PEACH ARZAD SEWER REAILITATION & REPUR PROJECT - PIASE R SHEST DRAWN: Ory on PAcky

PIPELINE PLAN & PROFILE

CHECKED
LAURETA, INC. CITY OF ACIDICA BERENDOS AVENUE CREEK CROSSING 'BE' STA 0+00 TO 0+56 JOB NO.

CITY OF PACIFICA, CALIPORNIA 240018
TENSION WIRE, S2°

SPICASINO
HOTES:

2. ALL ANNULAR SPACE WITH SAND.

AERA CROSSING BARBIARE -ISOMETR
2 AERIAL CROSSING GANG DETAIL
4'.5" ALUNINUM BARRIER
**STANDAR PIPE

SIC CASING PER - NEW HOPE PIPE

NEW HOPE PIPE

RECORD FORGET AS
ALL CROSSING BARUCADE ERAME ELEVATION NOTES:

A CREE SUPPORT. - SECTION VIEW
"THE CENTER POINT HT GRADE
- 12 8 40 5
•3'-0 MIN
3A NEW CONGRETE SUPPORT
AAR ROSSING BARRICADE FRAME 3C NAD CONCRETE SUPPORT - SECTION VIEW SCALE:

E FREYER Sy or Pic VALLIMAR AND ROCKARAY BEACH AREAS SEWER RENABLITATION A REPAIR PROJECT - RASE I SHEET CHECKED: 24
| LAURETA, INC. CITY OF PACIFICA DETAIL SHEET
PROJ._ENGR:

CITY OF PACIFICA, CALIFORNIA 240018
2026-02-10_190906 CCO #1 Signed
Final Audit Report 2026-02-12
Created: 2026-02-11 (Pacific Standard Time)
By: Naomi Fuson ([email protected])
Status: Signed
Transaction ID: CBJCHBCAABAAme7pwf2ECQPz9egp6_MCbd7BRTsq0jvl "2026-02-10_190906 CCO #1 Signed" History
• Document created by Naomi Fuson ([email protected]) 2026-02-11 - 7:26:39 AM PST
Document emailed to Matt Kelly ([email protected]) for signature 2026-02-11 - 7:26:48 AM PST
* Document emailed to Melissa Tigbao ([email protected]) for signature 2026-02-11 - 7:26:48 AM PST
Email viewed by Melissa Tigbao ([email protected])
2026-02-11 - 7:26:56 AM PST
2 Email viewed by Matt Kelly ([email protected]) 2026-02-11 - 7:26:57 AM PST
So Document e-signed by Matt Kelly ([email protected]) Signature Date: 2026-02-11 - 7:51:13 AM PST - Time Source: server De Document e-signed by Melissa Tigbao ([email protected]) Signature Date: 2026-02-12 - 10:55:25 AM PST - Time Source: server • Agreement completed.
2026-02-12 - 10:55:25 AM PST
Adobe Acrobat Sign

← All documents from this meeting