City of Palm Desert Staff Report
Meeting Date: October 22, 2026
Prepared By: Lucero Leyva, Senior Project Manager
Department: Capital Projects
Subject: Contract to Granite Construction Company for the Cook and Gerald Ford Drive Regional Early Action Planning 2.0 Drainage Improvements - California Environmental Quality Act Determination (Project No. GDR00001) Recommendation
1. Award a Contract to Granite Construction Company, of Watsonville, CA, for the Cook and Gerald Ford Drive Regional Early Action Planning (REAP) 2.0 Drainage Improvements (Project ID 2026-IFB-033) in the amount of $1,128,211, with a contingency of $112,821.
2. Authorize the City Attorney to make necessary non-monetary changes to the agreement.
3. Authorize the City Manager to execute the agreement and any written requests for change orders up to the contingency amount, amendments, and any other documents necessary to effectuate this action, in accordance with Palm Desert Municipal Code Section 3.30.170(B).
4. Adopt a resolution entitled “A Resolution of the Planning Commission of the City of Palm Desert, California, Adopting an Initial Study/Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program for the Cook and Gerald Ford Drive REAP
2.0 Drainage Improvements Project Pursuant to the California Environmental Quality Act (CEQA) and Authorizing the Filing of a Notice of Determination.
Background/Analysis
The Cook Street and Gerald Ford Drive REAP 2.0 Drainage Improvements (Project No.
GDR00001) were developed in response to recurring flooding at the intersection of Gerald Ford Drive and Cook Street and will improve the existing drainage infrastructure within the project area.
The project includes improvements to the existing and surrounding drainage infrastructure.
Improvements generally include regrading portions of the existing retention system; reconstructing existing weirs and outlet structures; and expanding the retention basin.
The project was advertised via the City’s procurement portal (OpenGov), and 11 bids were received on June 23, 2026:
Contractor Location Bid Amount
Granite Construction Company Watsonville $1,128,211.00
Tri-Star Contracting II, Inc. Desert Hot Springs $1,260,824.75 Jeremy Harris Construction, Inc. Riverside $1,468,982.40 Deark E&C, Inc. Fullerton $1,540,426.00
Wright Construction Engineering Corp. San Marcos $1,677,777.00 211
Danny Milo Corporation Vista $1,797,895.00
Ortiz & Son, Inc. Buena Park $2,027,154.38
Gentry General Engineering, Inc. Colton $2,275,418.00
MDB General Engineering, Inc. San Diego $2,324,585.00
Bosco Constructors, Inc. Chatsworth $2,328,579.16
The Van Dyke Corporation Twentynine Palms $2,449,926.00 Following review of the bids, staff determined that Granite Construction Company submitted the lowest responsive and responsible bid in the amount of $1,128,211. Granite Construction Company has successfully completed many projects for the City of Palm Desert and staff is confident in their ability to complete this project. Staff recommends awarding the construction contract to Granite Construction Company.
Environmental Review
Pursuant to the California Environmental Quality Act (CEQA) and the State CEQA Guidelines, the City prepared an Initial Study/Mitigated Negative Declaration (IS/MND) (SCH# 2026090497) to evaluate the potential environmental impacts of the proposed Project. The analysis concluded that the Project could result in potentially significant environmental impacts; however, all such impacts can be reduced to less-than-significant levels through the implementation of mitigation measures. As a result, the City also prepared a Mitigation Monitoring and Reporting Program (MMRP) in compliance with CEQA.
The Initial Study/Mitigated Negative Declaration (IS/MND) was circulated for public review from September 11, 2026, through October 12, 2026. A Notice of Intent to Adopt the IS/MND was filed with the State Clearinghouse and the County Clerk and posted in accordance with CEQA requirements. The City received one comment letter from the California Department of Fish and Wildlife (CDFW) during the public review period. The City's environmental consultant prepared a response addressing the comments received, and both the comment letter and the City's response are included as attachments to the Final IS/MND. The comments received did not require substantial revisions to the IS/MND pursuant to Section 15073.5 of the State CEQA Guidelines; therefore, recirculation of the environmental document is not required.
Staff recommends that the City Council adopt the IS/MND and Mitigation Monitoring and Reporting Program (MMRP) based on the findings set forth in the accompanying resolution.
The IS/MND reflects the City's independent judgment and analysis and provides a complete and adequate assessment of the Project's potential environmental impacts, as required by CEQA.
Following Project approval, a Notice of Determination will be filed with the County Clerk and the State Clearinghouse within five working days, in accordance with CEQA requirements.
Legal Review
This report has been reviewed by the City Attorney’s Office. 212
Financial Impact
Funding for this project is included in the approved Fiscal Year 2026-27 Financial Plan and Ten-Year Capital Improvement Program under Account No. 4004159-4219100 and 4204370- 4400200. The project has also been awarded funding through the Regional Early Action Planning (REAP) 2.0 Grant Program in the amount of $3,780,500, and eligible construction costs are anticipated to be reimbursed to the City in accordance with the grant agreement.
Approval of this action is not anticipated to have an impact on the General Fund.
Reap 2.0 Drainage Improvements:
Authorized Budgets
Date
Authorized Total Fund 400 Fund 420
Original Budget FY 24/25 7/1/2024 322,580 322,580 -
Additional Appropriation FY 25/26 7/1/2025 1,212,249 - 1,212,249 Additional Appropriation FY 26/27 7/1/2026 5,000,000 - 5,000,000 Total Authorized Budget to Date 6,534,829 322,580 6,212,249 Less: Authorized Expenditures
Date
Authorized Total Fund 400 Fund 420
Q3 Consulting (A47200, A46960) 4/1/2024 197,795 197,795 - The Altum Group (A47390) 4/2/2024 48,139 48,139 -
TKE Engineering (C47460) 4/5/2024 983,800 - 983,800
Misc. Costs (Fees & Staff Time) 13,383 - 13,383
Total Authorized Expenditures to
Date 1,243,116 245,933 997,183
Construction Contract:
Granite Construction Company* 10/22/2026 1,128,211 76,646 1,051,565 Contingency* 112,821 - 112,821
Remaining Project Budget Available 4,050,681 - 4,050,681 *This Request
Attachments
1. Contract Agreement
2. Payment and Performance Bonds
3. Contractor’s Bid
4. Resolution
5. Initial Study/Mitigated Negative Declaration
6. Mitigated Monitoring and Reporting Program
7. Vicinity Map
213
Conflict of Interest Awareness Checklist
Note: This checklist is informational only and does not constitute a legal determination. Each Councilmember remains responsible for identifying, disclosing, and evaluating any disqualifying interests under the Political Reform Act and applicable FPPC regulations.
1. Site-Specific Property Interest
Does this item involve a project site or other identifiable real property? ☒ Yes
☐ No
If yes, identify the project site: Cook and Gerald Ford Drive. See Attachment 5, Vicinity Map.
Councilmembers should consider whether they own, lease, or hold interests in real property within 1,000 feet of the project site. (Gov. Code § 87103(b); FPPC Reg. 18702.2).
2. SB 1439 / Gov. Code § 84308 Applicability (Campaign Contributions) Does this item involve a license, permit, other entitlement for use, or a contract or franchise agreement that is not competitively bid, a labor agreement, or a personal employment contract?
☐ Yes
☒ No
If yes, identify the applicant(s), appellant(s), party, or participant(s):
Councilmembers should review campaign contributions received within the prior 12 months from parties or participants to the proceeding and must not accept contributions over $500 from those parties for 12 months following the final decision. (Gov. Code § 84308). 214
Contract No. ___________
1 Revised 01-2026
72500.00001\44536169.1
CITY OF PALM DESERT
CONTRACT FOR CONSTRUCTION
This Agreement is made and entered into on October 22, 2026, by and between the City of Palm Desert, a municipal corporation organized under the laws of the State of California with its principal place of business at 73-510 Fred Waring Drive, Palm Desert, California 92260-2578, (“City”) and Granite Construction Company, a Corporation, with its principal place of business at 585 West Beach Street, Watsonville, CA 95076 ("Contractor").
WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other as follows:
ARTICLE 1. SCOPE OF WORK.
The Contractor shall perform all Work within the time stipulated in the Contract, and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5, below, for the following Project:
Reap 2.0 Drainage Improvements
Project No. GDR00001
(hereinafter referred to as “the Project”).
Drainage Improvements to the existing Mid Valley Channel Retention Basin, located east of Cook Street and north of Gerald Ford Drive.
Contractor is an independent contractor and not an agent of the City. The Contractor and its surety shall be liable to the City for any damages arising as a result of the Contractor’s failure to comply with this obligation.
1.1 CITY COUNCIL APPROVAL.
On October 22, 2026, City Council approved the award of this Agreement to the vendor above.
ARTICLE 2. TIME FOR COMPLETION.
Time is of the essence in the performance of the Work. The Work shall be commenced on the date stated in the City’s Notice to Proceed. The Contractor shall complete all Work required by the Contract Documents within 60 Days from the commencement date stated in the Notice to Proceed. By its signature hereunder, Contractor agrees the time for completion set forth above is adequate and reasonable to complete the Work.
ARTICLE 3. CONTRACT PRICE.
The City shall pay to the Contractor as full compensation for the performance of the Contract, subject to any additions or deductions as provided in the Contract Documents, and including all applicable taxes and costs, the sum of One Million, One Hundred Twenty-Eight Thousand, Two Hundred Eleven Dollars ($1,128,211). Payment shall be made as set forth in the General 215
Contract No. ___________
2 Revised 01-2026
72500.00001\44536169.1
Conditions. The City will pay to Contractor compensation based upon the prices set forth in the Bid Schedule.
ARTICLE 4. LIQUIDATED DAMAGES.
Contractor acknowledges that the City will sustain actual damages for each and every Day completion of the Project is delayed beyond the Contract Time. Because of the nature of the Project, it would be impracticable or extremely difficult to determine the City’s actual damages. Accordingly, in accordance with Government Code section 53069.85, it is agreed that the Contractor will pay the City the sum of $1,000.00 for each and every day of delay beyond the time prescribed in the Contract Documents for finishing the Work, as Liquidated Damages and not as a penalty or forfeiture. In the event this is not paid, the Contractor agrees the City may deduct that amount from any money due or that may become due the Contractor under the Contract. This Section does not exclude recovery of other damages specified in the Contract Documents.
Liquidated damages may be deducted from progress payments due Contractor, Project retention or may be collected directly from Contractor, or from Contractor's surety. These provisions for liquidated damages shall not prevent the City, in case of Contractor's default, from terminating the Contractor.
ARTICLE 5. COMPONENT PARTS OF THE CONTRACT.
The “Contract Documents” include the following:
Notice Inviting Bids
Instructions to Bidders
Bid Forms
Bid Acknowledgement
Bid Schedule
Bid Guarantee
Designation of Subcontractors
Information Required of Bidders
Non-Collusion Declaration Form
Iran Contracting Act Certification
Public Works Contractor DIR Registration Certification
Performance Bond
Payment (Labor and Materials) Bond
Contract for Construction
General Conditions
Special Conditions
Specifications
Addenda
Construction Plans and Drawings
Standard Specifications for Public Works Construction “Greenbook”, latest edition, Except Sections 1-9
Standard Plans of the City of Palm Desert, latest edition Standard Plans for Public Works Construction, latest edition Caltrans Standard Specifications, latest edition, Except Division 1 216
Contract No. ___________
3 Revised 01-2026
72500.00001\44536169.1
Caltrans Standard Plans, latest edition
California Manual on Traffic Control Devices for Streets and Highways (CAMUTCD), latest edition
Work Area Traffic Control Handbook, latest edition
Reference Specifications
Approved and fully executed Change Orders
Permits
Any other documents contained in or incorporated into the Contract The Contractor shall complete the Work in strict accordance with all of the Contract Documents.
All of the Contract Documents are intended to be complementary. Work required by one of the Contract Documents and not by others shall be done as if required by all. In the event of conflict, the various Contract Documents will be given effect in the order set forth in the General Conditions. This Contract shall supersede any prior agreement of the parties.
ARTICLE 6. PROVISIONS REQUIRED BY LAW AND CONTRACTOR COMPLIANCE.
Each and every provision of law required to be included in these Contract Documents shall be deemed to be included in these Contract Documents. The Contractor shall comply with all requirements of applicable federal, state, and local laws, rules, and regulations, including, but not limited to, the provisions of the California Labor Code and California Public Contract Code which are applicable to this Work.
ARTICLE 7. INDEMNIFICATION AND INSURANCE.
A.Indemnification
1. To the fullest extent permitted by law, Contractor shall immediately defend (with counsel of the City’s choosing), indemnify, and hold harmless the City, its officials, officers, agents, employees, and representatives, and each of them from and against:
(a) Any and all claims, demands, causes of action, costs, expenses, injuries, losses or liabilities, in law or in equity, of every kind or nature whatsoever, but not limited to, injury to or death, including wrongful death, of any person, and damages to or destruction of property of any person, arising out of, related to, or in any manner directly or indirectly connected with the Work or this Contract, including claims made by subcontractors for nonpayment, including without limitation the payment of all consequential damages and attorney’s fees and other related costs and expenses, however caused, regardless of whether the allegations are false, fraudulent, or groundless, and regardless of any negligence of the City or its officers, employees, or authorized volunteers (including passive negligence), except the sole negligence or willful misconduct or active negligence of the City or its officials, officers, employees, or authorized volunteers;
217
Contract No. ___________
4 Revised 01-2026
72500.00001\44536169.1
(b) Contractor’s defense and indemnity obligation herein includes, but is not limited to damages, fines, penalties, attorney’s fees and costs arising from claims under the Americans with Disabilities Act (ADA) or other federal or state disability access or discrimination laws arising from Contractor’s Work during the course of construction of the improvements or after the Work is complete, as the result of defects or negligence in Contractor’s construction of the improvements; (c) Any and all actions, proceedings, damages, costs, expenses, fines, penalties or liabilities, in law or equity, of every kind or nature whatsoever, arising out of, resulting from, or on account of the violation of any governmental law or regulation, compliance with which is the responsibility of Contractor;
(d) Any and all losses, expenses, damages (including damages to the Work itself), attorney’s fees, and other costs, including all costs of defense which any of them may incur with respect to the failure, neglect, or refusal of Contractor to faithfully perform the Work and all of Contractor’s obligations under Contract. Such costs, expenses, and damages shall include all costs, including attorney’s fees, incurred by the indemnified parties in any lawsuit to which they are a party.
2. Contractor shall immediately defend, at Contractor’s own cost, expense and risk, with the counsel of the City choosing, any and all such aforesaid suits, actions or other legal proceedings of every kind that may be brought or instituted against the City, its officials, officers, agents, employees and representatives. Contractor shall pay and satisfy any judgment, award or decree that may be rendered against the City, its officials, officers, employees, agents, employees, and representatives, in any such suit, action or other legal proceeding. Contractor shall reimburse the City, its officials, officers, agents, employees, and representatives for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. The only limitations on this provision shall be those imposed by Civil Code section 2782.
3. The provisions of this Article shall survive the termination of this Contract howsoever caused, and no payment, partial payment, or acceptance of occupancy in whole or part of the Work shall waive or release any of the provisions of this Article.
B.Insurance
1. Without limiting Contractor’s indemnification of City, and prior to commencement of Work, Contractor shall obtain, provide, and maintain at its own expense during the term of this Contract, policies of insurance of the type and amounts described below and in a form that is satisfactory to City.
218
Contract No. ___________
5 Revised 01-2026
72500.00001\44536169.1
2. General Liability Insurance. Contractor shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount not less than $2,000,000 per occurrence, $4,000,000 general aggregate, for bodily injury, personal injury, and property damage, and a $4,000,000 completed operations aggregate. The policy must include contractual liability that has not been amended. Any endorsement restricting standard ISO “insured contract” language will not be accepted.
3. Automobile Liability Insurance. Contractor shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the Contractor arising out of or in connection with Work to be performed under this Contract, including coverage for any owned, hired, non-owned or rented vehicles, in an amount not less than $1,000,000 combined single limit for each accident.
4. Umbrella or Excess Liability Insurance. Contractor may opt to utilize umbrella or excess liability insurance in meeting insurance requirements.
In such circumstances, Contractor may obtain and maintain an umbrella or excess liability insurance policy with limits that will provide bodily injury, personal injury, and property damage liability coverage at least as broad as the primary coverages set forth above, including commercial general liability, automotive liability and employer’s liability. Such policy or policies shall include the following terms and conditions:
A drop-down feature requiring the policy to respond in the event that any primary insurance that would otherwise have applied proves to be uncollectible in whole or in part for any reason;
(a) Pay on behalf of wording as opposed to reimbursement; and (b) Concurrency of effective dates with primary policies; and (c) Policies shall “follow form” to the underlying primary policies; and (d) Insureds under primary policies shall also be insureds under the umbrella or excess policies.
5. Workers’ Compensation Insurance. Contractor shall maintain Workers’ Compensation Insurance (Statutory Limits) and Employer’s Liability Insurance (with limits of at least $1,000,000) for Contractor’s employees in accordance with the laws of the State of California, Section 3700 of the Labor Code. In addition, Contractor shall require each subcontractor to similarly maintain Workers’ Compensation Insurance and Employer’s Liability Insurance in accordance with the laws of the State of California, Section 3700 for all of the subcontractor’s employees. Contractor shall submit to City, along with the certificate of insurance, a Waiver of 219
Contract No. ___________
6 Revised 01-2026
72500.00001\44536169.1
Subrogation endorsement in favor of the City, its officers, agents, employees, and volunteers.
6. Fidelity Coverage. Reserved.
7. Pollution Liability Insurance. Environmental Impairment Liability Insurance shall be written on a Contractor’s Pollution Liability form or other form acceptable to the City providing coverage for liability arising out of sudden, accidental, and gradual pollution and remediation. The policy limit shall be no less than $1,000,000 dollars per claim and in the aggregate. All activities contemplated in this Agreement shall be specifically scheduled on the policy as “covered operations”. The policy shall provide coverage for the hauling of waste from the Project site to the final disposal location, including non-owned disposal sites.
C.Other Provisions or Requirements
1. Proof of Insurance. Contractor shall provide certificates of insurance to City as evidence of the insurance coverage required herein, along with a waiver of subrogation endorsement for workers’ compensation. Insurance certificates and endorsements must be approved by City’s Risk Manager prior to commencement of performance. Current certification of insurance shall be kept on file with City at all times during the term of this contract.
City reserves the right to require complete, certified copies of all required insurance policies, at any time.
2. Duration of Coverage. Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the Work hereunder by Contractor, its agents, representatives, employees, or subcontractors. Contractor must maintain general liability and umbrella or excess liability insurance for as long as there is a statutory exposure to completed operations claims. The City and its officers, officials, employees, and agents shall continue as additional insureds under such policies.
3. Primary/Non-Contributing. Coverage provided by Contractor shall be primary and any insurance or self-insurance procured or maintained by City shall not be required to contribute with it. The limits of insurance required herein may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of City before the City’s own insurance or self-insurance shall be called upon to protect it as a named insured.
4. Products/Completed Operations Coverage. Products/completed operations coverage shall extend a minimum of three (3) years after project completion. Coverage shall be included on behalf of the insured for covered claims arising out of the actions of independent contractors. If the insured is using subcontractors, the Policy must include work performed 220
Contract No. ___________
7 Revised 01-2026
72500.00001\44536169.1
“by or on behalf” of the insured. Policy shall contain no language that would invalidate or remove the insurer’s duty to defend or indemnify for claims or suits expressly excluded from coverage. Policy shall specifically provide for a duty to defend on the part of the insurer. The City, its officials, officers, agents, and employees, shall be included as additional insureds under the Products and Completed Operations coverage.
5. City’s Rights of Enforcement. In the event any policy of insurance required under this Contract does not comply with these requirements, or is canceled and not replaced, City has the right, but not the duty, to obtain the insurance it deems necessary, and any premium paid by City will be promptly reimbursed by Contractor, or City will withhold amounts sufficient to pay premium from Contractor payments. In the alternative, City may cancel this Contract.
6. Acceptable Insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance or is on the List of Approved Surplus Line Insurers in the State of California, with an assigned policyholders’ Rating of A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best’s Key Rating Guide, unless otherwise approved by the City’s Risk Manager.
7. Waiver of Subrogation. All insurance coverage maintained or procured pursuant to this agreement shall be endorsed to waive subrogation against the City, its elected or appointed officers, agents, officials, employees, and volunteers, or shall specifically allow Contractor or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against the City, its elected or appointed officers, agents, officials, employees, and volunteers and shall require similar written express waivers and insurance clauses from each of its subcontractors.
8. Enforcement of Contract Provisions (non estoppel). Contractor acknowledges and agrees that any actual or alleged failure on the part of the City to inform Contractor of non-compliance with any requirement imposes no additional obligations on the City nor does it waive any rights hereunder.
9. Requirements Not Limiting. Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If the Contractor maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.
221
Contract No. ___________
8 Revised 01-2026
72500.00001\44536169.1
10.Notice of Cancellation. Contractor agrees to oblige its insurance agent or broker and insurers to provide to City with a thirty (30) Day notice of cancellation (except for nonpayment for which a ten (10) Day notice is required) or nonrenewal of coverage for each required coverage.
11.Additional Insured Status. General liability, automobile liability, and if applicable, pollution liability policies shall provide or be endorsed to provide that the City and its officers, officials, employees, agents, and volunteers shall be additional insureds under such policies. This provision shall also apply to any excess/umbrella liability policies. Coverage shall be at least as broad as coverage provided by ISO’s Owners, Lessees, or Contractors Additional Insured Endorsement for the ongoing (i.e. ISO Form CG 20 10 07 04) and completed operations (i.e. ISO Form CG 20 37 07 04) of Contractor.
12.Prohibition of Undisclosed Coverage Limitations. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to City and approved of in writing.
13.Separation of Insureds. A severability of interests provision must apply for all additional insureds ensuring that Contractor’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the insurer’s limits of liability. The policy(ies) shall not contain any cross-liability exclusions.
14.Pass Through Clause. Contractor agrees to ensure that its sub-consultants, sub-contractors, and any other party involved with the Project who is brought onto or involved in the project by Contractor, provide the same minimum insurance coverage and endorsements required of Contractor. Contractor agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. Contractor agrees that upon request, all agreements with consultants, subcontractors, and others engaged in the Project will be submitted to City for review.
15.City’s Right to Revise Requirements. The City or its Risk Manager reserves the right at any time during the term of the contract to change the amounts and types of insurance required by giving the Contractor ninety (90) Days advance written notice of such change. If such change results in substantial additional cost to the Contractor, the City and Contractor may renegotiate Contractor’s compensation. If the City reduces the insurance requirements, the change shall go into effect immediately and require no advanced written notice.
16.Self-Insured Retentions. Any self-insured retentions must be declared to and approved by City. City reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible. Self-insurance will not be considered to comply with these specifications unless approved by City.
222
Contract No. ___________
9 Revised 01-2026
72500.00001\44536169.1
17.Timely Notice of Claims. Contractor shall give City prompt and timely notice of claims made or suits instituted that arise out of or result from Contractor’s performance under this Contract, and that involve or may involve coverage under any of the required liability policies.
18.Additional Insurance. Contractor shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the Work.
19.Safety. Contractor shall execute and maintain its work so as to avoid injury or damage to any person or property. In carrying out its Services, the Contractor shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the work and the conditions under which the work is to be performed. Safety precautions, where applicable, shall include, but shall not be limited to: (A) adequate life protection and lifesaving equipment and procedures; (B) instructions in accident prevention for all employees and subcontractors, such as safe walkways, scaffolds, fall protection ladders, bridges, gang planks, confined space procedures, trenching and shoring, equipment and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and (C) adequate facilities for the proper inspection and maintenance of all safety measures.
ARTICLE 8. PREVAILING WAGES.
Contractor shall be required to pay the prevailing rate of wages in accordance with the Labor Code which such rates shall be made available at the City’s Office or may be obtained online at http://www.dir.ca.gov and which must be posted at the job site.
ARTICLE 9. FALSE CLAIMS.
Contractor acknowledges that if a false claim is submitted to the City, it may be considered fraud and Contractor may be subject to criminal prosecution.
Contractor acknowledges that the False Claims Act, California Government Code sections 12650, et seq., provides for civil penalties where a person knowingly submits a false claim to a public entity. These provisions include within their scope false claims made with deliberate ignorance of the false information or in reckless disregard of the truth or falsity of the information. In the event the City seeks to recover penalties pursuant to the False Claims Act, it is entitled to recover its litigation costs, including attorneys’ fees. Contractor hereby acknowledges that the filing of a false claim may the Contractor to an administrative debarment proceeding wherein Contractor may be prevented from further bidding on public contracts for a period of up to five (5) years. [SIGNATURES ON FOLLOWING PAGE]
223
Contract No. ___________
10 Revised 01-2026
72500.00001\44536169.1
SIGNATURE PAGE TO CONTRACT FOR CONSTRUCTION
BY AND BETWEEN THE CITY OF PALM DESERT
AND GRANITE CONSTRUCTION COMPANY
IN WITNESS WHEREOF, each of the Parties has caused this Agreement to be executed on the day and year first above written.
Office Use:
Quality Check Insurance Review Bonds
City Clerk Contracts Initial Final
CITY OF PALM DESERT
__________________________________
Chris Escobedo
City Manager
Attest:
__________________________________
Anthony J. Mejia
City Clerk
Approved as to form:
_________________________________
Isra Shah
City Attorney
GRANITE CONSTRUCTION COMPANY,
A CORPORATION
___________________________________
Bill Moore
Vice President, Desert Cities Region
___________________________________
Joseph P. Richardson
Regional Chief Estimator
Contractor’s License Number and
Classification
DIR Registration Number (if applicable)
224
Contract No. ___________
Revised 11-2-20
BBK 72500.00001\32374915.1
PERFORMANCE BOND
KNOW ALL PERSONS BY THESE PRESENTS:
THAT WHEREAS, the City of Palm Desert (hereinafter referred to as “City”) has awarded to Granite Construction Company, (hereinafter referred to as the “Contractor”) an agreement for Reap 2.0 Drainage Improvements, Project GDR00001 (hereinafter referred to as the “Project”).
WHEREAS, the work to be performed by the Contractor is more particularly set forth in the Contract Documents for the Project dated October 22, 2026, (hereinafter referred to as “Contract Documents”), the terms and conditions of which are expressly incorporated herein by reference; and
WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof and to furnish a bond for the faithful performance of said Contract Documents.
NOW, THEREFORE, we, Granite Construction Company, the undersigned Contractor and _____________________________________________ as Surety, a corporation organized and duly authorized to transact business under the laws of the State of California, are held and firmly bound unto the City in the sum of One Million, One Hundred Twenty-Eight Thousand, Two Hundred Eleven Dollars, ($1,128,211), said sum being not less than one hundred percent (100%) of the total amount of the Contract, for which amount well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the Contract Documents and any alteration thereof made as therein provided, on its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their intent and meaning; and shall faithfully fulfill all obligations including the one-year guarantee of all materials and workmanship; and shall indemnify and save harmless the City of Palm Desert, its elected or appointed officers, and their respective agents, officials, employees, volunteers and representatives, as stipulated in said Contract Documents, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.
As a condition precedent to the satisfactory completion of the Contract Documents, unless otherwise provided for in the Contract Documents, the above obligation shall hold good for a period of one (1) year after the acceptance of the work by the City, during which time if Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage resulting from or caused by defective materials or faulty workmanship, Surety shall undertake and faithfully fulfill all such obligations. The obligations of Surety hereunder shall continue so long as any obligation of Contractor remains. Nothing herein shall limit the City’s rights or the Contractor or Surety’s obligations under the Contract, law, or equity, including, but not limited to, California Code of Civil Procedure section 337.15.
Whenever Contractor shall be, and is declared by the City to be, in default under the Contract Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall promptly, at the City’s option:
(1) Take over and complete the Project in accordance with all terms and conditions in the Contract Documents; or
(2) Obtain a bid or bids for completing the Project in accordance with all terms and conditions in the Contract Documents and upon determination by Surety of the 225
Contract No. ___________
lowest responsive and responsible bidder, arrange for a Contract between such bidder, the Surety and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the Authority under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents. (3) Permit the City to complete the Project in any manner consistent with local, California and federal law and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the Authority under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.
Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.
Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from Contractor for completion of the Project if the City, when declaring the Contractor in default, notifies Surety of the City’s objection to Contractor’s further participation in the completion of the Project.
The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project to be performed thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project, including but not limited to the provisions of sections 2819 and 2845 of the California Civil Code.
[SIGNATURES ON NEXT PAGE]
226
Contract No. ___________
IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20____.
(Corporate Seal)
Contractor/ Principal
By _______________________________
Printed name: _______________________
Title: ______________________________
(Corporate Seal) Surety
By: _______________________________
Printed Name: ______________________
Attorney-in-Fact
(Attach Attorney-in-Fact Certificate)
Signatures of those signing for the Contractor and Surety must be notarized and evidence of corporate authority attached.
The rate of premium on this bond is ____________ per thousand. The total amount of premium charges, $_______________________________.
(The above must be filled in by corporate attorney.)
THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety)
(Name and Address of Agent or
Representative for service of
process in California, if different
from above)
(Telephone number of Surety and
Agent or Representative for
service of process in California)
NOTE: A copy of the Power-of-Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto.
227
Contract No. ___________
NOTE: This acknowledgment is to be completed for Contractor/Principal.
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally appeared ___________________________ , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of
the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT ¨
Individual
¨ Corporate Officer
Title(s) Title or Type of Document
¨ Partner(s) ¨ Limited
¨ General Number of Pages
¨ Attorney-In-Fact
¨ Trustee(s)
¨ Guardian/Conservator Date of Document
¨ Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
228
Contract No. ___________
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of-Attorney to local representatives of the bonding company must also be attached.
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally appeared _____________________________ , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of
the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT ¨
Individual
¨ Corporate Officer
Title(s) Title or Type of Document
¨ Partner(s) ¨ Limited
¨ General Number of Pages
¨ Attorney-In-Fact
¨ Trustee(s)
¨ Guardian/Conservator Date of Document
¨ Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
229
Contract No. ___________
PAYMENT BOND
KNOW ALL PERSONS BY THESE PRESENTS That
WHEREAS, the City of Palm Desert (hereinafter designated as the “City”), by action taken or a resolution passed October 22, 2026, has awarded to Granite Construction Company, hereinafter designated as the “Principal,” a contract for the work described as follows:
Reap 2.0 Drainage Improvements Project No. GDR00001 (the “Project”).; and WHEREAS, the work to be performed by the Principal is more particularly set forth in the Contract Documents for the Project dated October 22, 2026, (“Contract Documents”), the terms and conditions of which are expressly incorporated by reference; and WHEREAS, said Principal is required to furnish a bond in connection with said contract; providing that if said Principal or any of its Subcontractors shall fail to pay for any materials, provisions, provender, equipment, or other supplies used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Code or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of said Principal and its Subcontractors with respect to such work or labor the Surety on this bond will pay for the same to the extent hereinafter set forth.
NOW THEREFORE, we, the Principal and __________________________ as Surety, are held and firmly bound unto the City in the penal sum of One Million, One Hundred Twenty-Eight Thousand, Two Hundred Eleven Dollars, ($1,128,211) lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of the persons named in Section 9100 of the Civil Code, fail to pay for any materials, provisions or other supplies, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department or Franchise Tax Board from the wages of employees of the contractor and his subcontractors pursuant to Section 18663 of the Revenue and Taxation Code, with respect to such work and labor the Surety or Sureties will pay for the same, in an amount not exceeding the sum herein above specified, and also, in case suit is brought upon this bond, all litigation expenses incurred by City in such suit, including reasonable attorneys’ fees, court costs, expert witness fees and investigation expenses.
This bond shall inure to the benefit of any of the persons named in Section 9100 of the Civil Code so as to give a right of action to such persons or their assigns in any suit brought upon this bond.
It is further stipulated and agreed that the Surety on this bond shall not be exonerated or released from the obligation of this bond by any change, extension of time for performance, addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement herein above described, or pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any change or modification of any terms of payment or extension of the time for any payment pertaining or relating to any scheme or work of improvement herein above described, nor by any rescission or 230
Contract No. ___________
attempted rescission of the contract, agreement or bond, nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement or under the bond, nor by any fraud practiced by any person other than the claimant seeking to recover on the bond and that this bond be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is given, and under no circumstances shall Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of contract between the owner or City and original contractor or on the part of any obligee named in such bond, but the sole conditions of recovery shall be that claimant is a person described in Section 9100 of the Civil Code, and has not been paid the full amount of his claim and that Surety does hereby waive notice of any such change, extension of time, addition, alteration or modification herein mentioned and the provisions of sections 2819 and 2845 of the California Civil Code.
[SIGNATURES ON NEXT PAGE]
231
Contract No. ___________
IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20__.
(Corporate Seal)
Contractor/ Principal
By: _______________________________
Printed name: _______________________
Title: ______________________________
(Corporate Seal) Surety
By: _______________________________
Printed Name:_______________________
Attorney-in-Fact
(Attach Attorney-in-Fact Certificate)
Signatures of those signing for the Contractor and Surety must be notarized and evidence of corporate authority attached. A Power-of-Attorney authorizing the person signing on behalf of the Surety to do so much be attached hereto.
NOTE: A copy of the Power-of-Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto.
232
Contract No. ___________
NOTE: This acknowledgment is to be completed for Contractor/Principal.
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On _________________, 20___, before me, _______________________________, Notary Public, personally appeared _______________________________ , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of
the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT ¨
Individual
¨ Corporate Officer
Title(s) Title or Type of Document
¨ Partner(s) ¨ Limited
¨ General Number of Pages
¨ Attorney-In-Fact
¨ Trustee(s)
¨ Guardian/Conservator Date of Document
¨ Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
233
Contract No. ___________
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of-Attorney to local representatives of the bonding company must also be attached.
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On _________________, 20___, before me, _______________________________, Notary Public, personally appeared _______________________________ , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of
the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT ¨
Individual
¨ Corporate Officer
Title(s) Title or Type of Document
¨ Partner(s) ¨ Limited
¨ General Number of Pages
¨ Attorney-In-Fact
¨ Trustee(s)
¨ Guardian/Conservator Date of Document
¨ Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
234
City of Palm Desert
CP - Capital Improvement Projects
Jess Culpeper, Director of Capital Projects
73-510 Fred Waring Drive, Palm Desert, CA 92260
[GRANITE CONSTRUCTION COMPANY] RESPONSE DOCUMENT REPORT IFB No. 2026-IFB-033
Reap 2.0 Drainage Improvements
RESPONSE DEADLINE: June 23, 2026 at 2:00 pm
Report Generated: Monday, August 3, 2026
Granite Construction Company Response
CONTACT INFORMATION
Company:
Granite Construction Company
Email:
[email protected]
Contact:
Joe Richardson
Address:
38000 Monroe Street
Indio, CA 92203
Phone:
N/A
Website:
www.graniteconstruction.com
Submission Date:
Jun 23, 2026 1:48 PM (Pacific Time)
235
[GRANITE CONSTRUCTION COMPANY] RESPONSE DOCUMENT REPORT IFB No. 2026-IFB-033
Reap 2.0 Drainage Improvements
[GRANITE CONSTRUCTION COMPANY] RESPONSE DOCUMENT REPORT Invitation For Bid - Reap 2.0 Drainage Improvements
ADDENDA CONFIRMATION
Addendum #1
Confirmed Jun 19, 2026 4:03 PM by Joe Richardson
QUESTIONNAIRE
1. BID ACKNOWLEDGMENT*
Pass
To the City of Palm Desert, a municipal corporation, organized under the laws of the State of California, with its principal place of business at 73-510 Fred Waring Drive, Palm Desert, California 92260.
1. In response to the Contract Documents for project number GDR00001and in accordance with the accompanying Instructions to Bidders, the undersigned hereby proposes to the City to furnish all labor, technical and professional services, supervision, materials and equipment, other than materials and equipment specified as furnished by the City, and to perform all operations necessary and required to construct the Project in accordance with the provisions of the Contract Documents and any addenda thereto, and at the prices stated opposite the respective items set forth in the Bid Schedule.
2. This Bid constitutes a firm offer to the City which cannot be withdrawn for 90 calendar days after the date set for opening of Bids, or until a Contract is executed by the City and a third party, whichever is earlier.
3. The undersigned certifies that it has examined and is fully familiar with all of the provisions of the Contract Documents and any addenda thereto; that it has carefully checked all of the words and figures shown in its Bid Schedule; that it has carefully reviewed the accuracy of all statements in this Bid and attachments hereto; and that it understands and agrees that the City will not be responsible for any errors or omissions on the part of the undersigned in preparing this Bid.
4. If awarded a Contract, the undersigned agrees to execute and deliver to the City within ten (10) Days after date of receipt of Notice of Award, a signed Contract and the necessary Performance Bond, Payment Bond, and Certificates of Insurance and Endorsements.
236
[GRANITE CONSTRUCTION COMPANY] RESPONSE DOCUMENT REPORT IFB No. 2026-IFB-033
Reap 2.0 Drainage Improvements
[GRANITE CONSTRUCTION COMPANY] RESPONSE DOCUMENT REPORT Invitation For Bid - Reap 2.0 Drainage Improvements
5. All Bid Forms, which have been completed and executed by undersigned Bidder, are incorporated by this reference and made a part of this Bid.
6. The undersigned is hereby representing that it is and will be properly licensed both at the time that it submits a Bid as well as at the time the Contract is awarded, if the Contract is awarded to the undersigned.
A. If Individual Contractor. Undersigned certifies that it is now licensed in accordance with the provisions of the Contractor's License Law of the State of California; or
B. If Joint Venture. Undersigned certifies that the individual members of the joint venture are now licensed in accordance with the provisions of the Contractor's License Law of the State of California.
I hereby certify under penalty of perjury under the laws of the State of California that all of the information submitted in connection with this Bid and all of the representations made herein are true and correct.
Confirmed
2. BID SCHEDULE*
Pass
IMPORTANT:
THE ELECTRONIC #BID SCHEDULE MUST BE COMPLETED BY EACH BIDDER AND PROPERLY SUBMITTED ON OPENGOV PROCUREMENT.
FAILURE TO COMPLETE THE BID SCHEDULE WILL RESULT IN AN INCOMPLETE AND NON-RESPONSIVE BID.
THE ELECTRONIC BID SCHEDULE WILL BE INCORPORATED INTO THE CONTRACT DOCUMENTS.
The costs for any Work shown or required in the Contract Documents, but not specifically identified as a line item are to be included in the related line items and no additional compensation shall be due to Contractor for the performance of the Work. All blank spaces appearing in the Electronic Bid Schedule must be filled in. Failure to fill in any blank spaces may render the bid non-responsive.
The estimated quantities for Unit Price items are for purposes of comparing Bids only and the City makes no representation that the actual quantities of work performed will not vary from the estimates. Final payment shall be determined by the Engineer from measured quantities of work performed based upon the Unit Price. 237
[GRANITE CONSTRUCTION COMPANY] RESPONSE DOCUMENT REPORT IFB No. 2026-IFB-033
Reap 2.0 Drainage Improvements
[GRANITE CONSTRUCTION COMPANY] RESPONSE DOCUMENT REPORT Invitation For Bid - Reap 2.0 Drainage Improvements
If the Contract Documents specify Alternate Bid items, the City can choose to include any, all, or none of the Alternate Bid items in the Work. If the City selects any of the Alternate Bid items, the corresponding Alternate Bid prices shall be added to or deducted from Base Bid Price for the Work. The City can award/select Alternate Bid items at any time(s).
I certify that I have read, understood the above statement.
Confirmed
3. BID GUARANTEE*
Pass
IF SUBMITTING AN ORIGINAL BID BOND: Please download the Bid Bond Form under #ATTACHMENTS, and Mail or hand deliver in a sealed and labeled envelope including the Project Number, Project Title, and Project Due Date visible on the outside of the envelope to the City Clerk's Office located at 73-510 Fred Waring Drive, Palm Desert, CA 92260 before the bid submittal deadline.
IF SUBMITTING CASH OR CASHIER'S CHECK: Mail or hand deliver in a sealed and labeled envelope including the Project Number, Project Title, and Project Due Date visible on the outside of the envelope to the City Clerk's Office located at 73-510 Fred Waring Drive, Palm Desert, CA 92260 before the bid submittal deadline.
IF SUBMITTING AN E-BID BOND: follow E-Bid Bond instructions.
E-Bid Bond via Surety2000 (submitted electronically under E-Bid Bond)
4. E-Bid Bond
Pass
Please enter your Bid Bond information from Surety2000 below ONLY IF YOU ARE NOT SUBMITTING A HARD COPY BID BOND, CASH, OR CASHIER'S CHECK.
Bond ID: SCA0618791054
Vendor ID: 940519552
238
[GRANITE CONSTRUCTION COMPANY] RESPONSE DOCUMENT REPORT IFB No. 2026-IFB-033
Reap 2.0 Drainage Improvements
[GRANITE CONSTRUCTION COMPANY] RESPONSE DOCUMENT REPORT Invitation For Bid - Reap 2.0 Drainage Improvements
5. Enter Surety Company "Name" who Issued Bid Guarantee * Pass
This information will be verified against the California Department of Insurance Website.
Travelers Casualty and Surety Company of America
Click to Verify Value will be copied to clipboard
6. DESIGNATION OF SUBCONTRACTORS*
Please download the below documents, complete, and upload. • DESIGNATION_OF_SUBCONTRACTO...
R_DESIGNATION_OF_SUBCONTRACTORS.pdf
7. BIDDER INFORMATION AND EXPERIENCE FORM*
Please download the below documents, complete, and upload. • BIDDER_INFORMATION_AND_EXPE...
R_BIDDER_INFORMATION_AND_EXPERIENCE_FORM.pdf
8. NON-COLLUSION DECLARATION*
Pass
The undersigned declares:
I am an authorized representative of my company, the party making the foregoing Bid, to certify the following.
The Bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The Bid is genuine and not collusive or sham. The Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or sham bid. The Bidder has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham bid, or to refrain from bidding. The Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the Bid Price of the Bidder or any other Bidder, or to fix any overhead, profit, or cost element of the Bid Price, or of that of any other Bidder. All statements contained in the Bid are true. The Bidder has not, directly or 239
[GRANITE CONSTRUCTION COMPANY] RESPONSE DOCUMENT REPORT IFB No. 2026-IFB-033
Reap 2.0 Drainage Improvements
[GRANITE CONSTRUCTION COMPANY] RESPONSE DOCUMENT REPORT Invitation For Bid - Reap 2.0 Drainage Improvements
indirectly, submitted his or her Bid Price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.
Any person executing this declaration on behalf of a Bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the Bidder.
I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct.
Confirmed
9. IRAN CONTRACTING ACT CERTIFICATION*
(Public Contract Code section 2200 et seq.)
As required by California Public Contract Code Section 2204, the Contractor certifies subject to penalty for perjury that the option selected below relating to the Contractor’s status in regard to the Iran Contracting Act of 2010 (Public Contract Code Section 2200 et seq.) is true and correct:
Note: In accordance with Public Contract Code Section 2205, false certification of this form shall be reported to the California Attorney General and may result in civil penalties equal to the greater of $250,000 or twice the Contract amount, termination of the Contract and/or ineligibility to bid on contracts for three years.
The Contractor is not identified on the current list of person and entities engaged in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code Section 2203; or a financial instruction that extends, for 45 calendar days or more, credit in the amount of $20,000,000 or more to any other person or entity identified on the current list of persons and entities engaging in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code Section 2203, if that person or entity uses or will use the credit to provide goods or services in the energy sector in Iran. 240
[GRANITE CONSTRUCTION COMPANY] RESPONSE DOCUMENT REPORT IFB No. 2026-IFB-033
Reap 2.0 Drainage Improvements
[GRANITE CONSTRUCTION COMPANY] RESPONSE DOCUMENT REPORT Invitation For Bid - Reap 2.0 Drainage Improvements
10. PUBLIC WORKS CONTRACTOR DIR REGISTRATION CERTIFICATION* Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. See http://www.dir.ca.gov/Public-Works/PublicWorks.html for additional information.
No bid will be accepted, nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work.
Bidder hereby certifies that it is aware of the registration requirements set forth in Labor Code sections 1725.5 and 1771.1 and is currently registered as a contractor with the Department of Industrial Relations.
Unless Bidder is exempt pursuant to the small project exemption, Bidder further acknowledges:
1. Bidder shall maintain a current DIR registration for the duration of the project.
2. Bidder shall include the requirements of Labor Code sections 1725.5 and 1771.1 in its contract with subcontractors and ensure that all subcontractors are registered at the time of bid opening and maintain registration status for the duration of the project.
3. Failure to submit this form or comply with any of the above requirements may result in a finding that the bid is non-responsive.
Confirmed
11. Enter your California Department of Industrial Relations (DIR) Registration number* Please enter your Public Works Contractor DIR Number. This will be verified against the state database. 1000000085
Click to Verify Value will be copied to clipboard
12. Enter your valid CA Contractors State License Board (CSLB) number* Please enter your License Number here. This will be verified against the state database. 89 Click to Verify Value will be copied to clipboard
241
[GRANITE CONSTRUCTION COMPANY] RESPONSE DOCUMENT REPORT IFB No. 2026-IFB-033
Reap 2.0 Drainage Improvements
[GRANITE CONSTRUCTION COMPANY] RESPONSE DOCUMENT REPORT Invitation For Bid - Reap 2.0 Drainage Improvements
13. CONTRACTOR’S CERTIFICATE REGARDING WORKERS’ COMPENSATION* I am aware of the provisions of section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this Contract.
Confirmed
14. Fleet Compliance Certification*
I hereby acknowledge that I have reviewed the California Air Resources Board’s policies, rules and regulations and are familiar with the requirements of Title 13, California Code of Regulations, Division 3, Chapter 9, effective on January 1, 2024 (the “Regulation”). I hereby certify, subject to penalty for perjury, that the option checked below relating to the Bidder’s fleet, and/or that of their subcontractor(s) (“Fleet”) is true and correct:
The Fleet is subject to the requirements of the Regulation, and the appropriate Certificate(s) of Reported Compliance have been attached hereto.
15. Fleet Compliance Documentation*
Please attach supporting documentation for the selection made in the above item.
Granite_2026_CARB_DOOR_Certificate.pdf
CMB_Carb_Certificate.pdf
16. SAM.gov*
Please enter your legal entity name for SAM.gov verification.
Granite Construction Company
Click to Verify Value will be copied to clipboard
17. Type of Business*
C Corporation (if corporation, two signatures are required) 242
[GRANITE CONSTRUCTION COMPANY] RESPONSE DOCUMENT REPORT IFB No. 2026-IFB-033
Reap 2.0 Drainage Improvements
[GRANITE CONSTRUCTION COMPANY] RESPONSE DOCUMENT REPORT Invitation For Bid - Reap 2.0 Drainage Improvements
18. Type your Legal Company Name Here*
State your Company's Name Here. This will be verified against the California Secretary of State's Website.
Granite Construction Company
Click to Verify Value will be copied to clipboard
19. How many years has Bidder’s organization been in business as a Contractor? * 104
20. List the Signatory(s) Authorized to Sign and Bind an Agreement.* (If two (2) signatures are required, include the following information for both signatories)
1. Full Name
2. Title
3. Physical Business Address
4. Email Address
5. Phone Number
Corporation (C-Corp): Requires two signatures from authorized officers— one from President or Vice President, and the other from the Secretary or Treasurer.
An alternate signatory may be used if authorized by a Notarized Corporate Resolution or Article of Authority.
LLC: Usually requires one signature from an authorized member or manager. For significant contracts (e.g., over $50,000 for construction or over $25,000 for service agreements), additional approvals or signatures may be required.
Sole Proprietorship, Non-Profit, Single LLC: Only the one signature is necessary.
Bill Moore
VP Desert Cities Region
38000 Monroe Street, Indio, CA 92203
243
[GRANITE CONSTRUCTION COMPANY] RESPONSE DOCUMENT REPORT IFB No. 2026-IFB-033
Reap 2.0 Drainage Improvements
[GRANITE CONSTRUCTION COMPANY] RESPONSE DOCUMENT REPORT Invitation For Bid - Reap 2.0 Drainage Improvements
[email protected]
(760) 775-7500
Joseph P. Richardson
Regional Chief Estimator
38000 Monroe Street, Indio, CA 92203
[email protected]
(760) 578-3138
21. Nondiscrimination Certification*
The City of Palm Desert is committed to promoting equal opportunity in its contracting activities. We ensure that all individuals seeking to do business with the city treat contractors, subcontractors, and employees fairly, without discrimination based on race, color, religion, ancestry, national origin, disability, medical condition, marital status, domestic partner status, sex, gender, gender identity, gender expression, sexual orientation, or membership in any other protected class.
For any purchase exceeding $10,000, vendors must certify compliance with the City’s nondiscrimination policy (G.C. 3.30.200) before contract award. No contract will be awarded until the contractor submits this certification.
By clicking the confirmation box below, the vendor certifies that they have read the code and agree to comply with its requirements.
Failure to comply may result in termination of any agreement entered into with the vendor.
Confirmed
PRICE TABLES
GENERAL
Line Item Description Quantity Unit of
Measure
Unit Cost Total
1 MOBILIZATION 1 LS $60,000.00 $60,000.00
244
[GRANITE CONSTRUCTION COMPANY] RESPONSE DOCUMENT REPORT IFB No. 2026-IFB-033
Reap 2.0 Drainage Improvements
[GRANITE CONSTRUCTION COMPANY] RESPONSE DOCUMENT REPORT Invitation For Bid - Reap 2.0 Drainage Improvements
Line Item Description Quantity Unit of
Measure
Unit Cost Total
2 TRAFFIC CONTROL 1 LS $3,000.00 $3,000.00
3 SWPPP, BMP AND NPDES REQUIREMENTS 1 LS $30,000.00 $30,000.00 4 CLEARNING AND GRUBBING 1 LS $96,149.00 $96,149.00
TOTAL $189,149.00
SITE DEMOLITION
Line Item Description Quantity Unit of
Measure
Unit Cost Total
5 REMOVE EXISTING PCC OUTLET STRUCTURE 6 EA $4,000.00 $24,000.00 6 REMOVE EXISTING PCC WEIR 3 EA $10,000.00 $30,000.00
7 CUT AND PLUG 18” RCP WITH CONCRETE 2’ BEHIND PROPOSED BASIN
EMBANKMENT
2 EA $1,400.00 $2,800.00
TOTAL $56,800.00
SITE IMPROVEMENTS
Line Item Description Quantity Unit of
Measure
Unit Cost Total
8 EARTH WORK – EXCAVATE AND REGRADE BASIN AS SHOWN ON THE PLANS 1 LS $190,000.00 $190,000.00 9 HAUL OFF OF EXCESS EARTHWORK MATERIAL 10,160 CY $16.30 $165,608.00 245
[GRANITE CONSTRUCTION COMPANY] RESPONSE DOCUMENT REPORT IFB No. 2026-IFB-033
Reap 2.0 Drainage Improvements
[GRANITE CONSTRUCTION COMPANY] RESPONSE DOCUMENT REPORT Invitation For Bid - Reap 2.0 Drainage Improvements
Line Item Description Quantity Unit of
Measure
Unit Cost Total
10 CONSTRUCT VARIABLE HEIGHT RETAINING CURB PER DETAIL ON SHEET 17 135 LF $85.00 $11,475.00 11 MODIFY EXISTING 36” RCP AND CONSTRUCT NEW PCC HEADWALL PER HEADWALL OUTLET DETAIL ON SHEET 2
6 EA $13,500.00 $81,000.00
12 CONSTRUCT 6” THICK PCC WEIR STRUCTURE WITH 12” THICKENED EDGE AND 2’
CUTOFF WALL OVER COMPACTED FILL AS SHOWN ON PLANS AND PER DETAIL ON SHEET 16
2 EA $45,000.00 $90,000.00
13 PLACE ½ TON RIP RAP AS SHOWN ON PLANS 833 SF $32.00 $26,656.00 14 MODIFY 12” PVC OUTLET PIPES TO WORK WITH PROPOSED GRADING 10 EA $2,200.00 $22,000.00 15 CONSTRUCT PCC HEADWALL FOR TYPE X INLET RISER PER DETAIL ON SHEET 17 2 EA $17,000.00 $34,000.00 16 CONSTRUCT 48” CMP TYPE X RISER INLET PER RCFC&WCD STD CB108, MODIFIED PER DETAIL ON SHEET 17
2 EA $12,000.00 $24,000.00
17 CONSTRUCT 48” PERFORATED HDPE PIPE WITH ¾” CRUSHED GRAVEL AND MIRAFI 150N FILTER FABRIC AS SHOWN PER DETAIL ON SHEET 17
558 LF $330.00 $184,140.00
18 INSTALL TRASH RACK ON HEADWALL OUTLET STRUCTURE PER MODIFIED DETAIL OF SPPWC STD 361-1 ON SHEET 17
7 EA $3,000.00 $21,000.00
19 REMOVE EXISITNG 48” MANHOLE SHAFT INCLUDING 18” RCP WITHIN PROPOSED BASIN IMPROVEMENT LIMITS. PLUG REMAINING 18” RCP WITH CONCRETE 2’
BEHIND PROPOSED BASIN EMBANKMENT
1 EA $3,775.00 $3,775.00
20 CONSTRUCT 8”-12” GROUTED RIP RAP 596 SF $48.00 $28,608.00 TOTAL $882,262.00
246
DESIGNATION OF SUBCONTRACTORS
The subcontractor(s) listed below will perform work or labor or render service to the contractor in or about the construction of the work or improvement, or are subcontractors licensed by the State of California who will, under subcontract to the contractor, specially fabricate and install a portion of the work or improvement according to detailed drawings contained in the Contract Documents, in an amount in excess of one-half of one percent (0.5%) of the contractor’s total bid.
Notwithstanding the foregoing, if the work involves the construction of streets and highways, then the Bidder shall list each subcontractor who will perform work or labor or render service to the Bidder in or about the work in an amount in excess of one-half of one percent (0.5%) of the Bidder’s Total Bid Price or $10,000, whichever is greater. No additional time shall be granted to provide the below requested information.
In compliance with the Subletting and Subcontracting Fair Practices Act Chapter 4 (commencing at Section 4100), Part 1, Division 2 of the California Public Contract Code, the Bidder shall set forth below:
(a) The portion of the work to be done by the subcontractor; (b) The name and the location of the place of business; (c) The California contractor license number; and
(d) The DIR public works contractor registration number.
If a Bidder fails to specify a subcontractor or if a Bidder specifies more than one subcontractor for the same portion of work, then the Bidder shall be deemed to have agreed that it is fully qualified to perform that portion of work and that it shall perform that portion itself.
Portion of
Work to be
done by
Subcontractor
Percent of
Total Base
Bid
Name of
Subcontractor
Location
of
Business
CSLB
Contractor
License
No.
DIR
Registration
Number
C M B STRUCTURES
INC
ALTA LOMA,
CA 613977 1000001531
RETAINING CURB
HEADWALLS
WIER STRUCTURE
TRASH RACK
15.9%
247
248
Resolution No. 2026-____
A Resolution of the City Council of the City of Palm Desert, California, Adopting a Mitigated Negative Declaration and a Mitigation Monitoring and Reporting program pursuant to the California Environmental Quality Act for the Cook and Gerald Ford Drive Reap 2.0 Drainage Improvement Project (GDR00001).
Whereas, the City of Palm Desert (“City”) is proposing to make improvements to the Mid Valley drainage system infrastructure, located southwest of the intersections of Cook Street with Gerald Ford Drive and Interstate 10 (“Project”);
Whereas, pursuant to the California Environmental Quality Act (Public Resources Code, § 21000 et seq.) and the State CEQA Guidelines (California Code of Regulations, title 14, § 15000 et seq.) (Collectively, “CEQA”), the City is the lead agency for the proposed Project; Whereas, in accordance with State CEQA Guidelines section 15063, the City prepared an Initial Study to analyze whether the proposed Project may cause a potentially significant effect on the environment;
Whereas, based on the information contained in the Initial Study, which concluded that the proposed Project could have potentially significant impacts but that those impacts could be reduced to less than significant levels with implementation of proposed mitigation measures, the City determined that a Mitigated Negative Declaration (“MND”) should be prepared for the proposed Project;
Whereas, the Initial Study/Mitigated Negative Declaration (IS/MND) (State Clearinghouse Number [SCH] 2026090497) was prepared pursuant to CEQA and the State CEQA Guidelines;
Whereas, pursuant to CEQA, the City prepared a program for reporting on or monitoring the changes which it has either required in the proposed Project or made a condition of approval to mitigate or avoid potential significant environmental effects (the “Mitigation Monitoring and Reporting Program” or “MMRP”);
Whereas, in accordance with State CEQA Guidelines sections 15072 ad 15073, the IS/MND was circulated for public review from September 11, 2026 to October 12, 2026; Whereas, during the public review and comment period, copies of the IS/MND were available for review and inspection at the City of Palm Desert, Planning Department and on the City’s website;
Whereas, the City has reviewed the final IS/MND, and relevant information contained in the record regarding the Project, and determined that all legal prerequisites to the adoption of the resolution have been met;
249
Resolution No. 2026-____ Page 2
Whereas, on October 22, 2026, the City Council considered the Project at a duty noticed public meeting, at which all interested persons were provided an opportunity to comment; and Whereas, the City received one comment letter from the California Department of Fish and Wildlife (CDFW) during the public review period, and neither the comments received nor any additional information submitted to the City resulted in substantial new information requiring revisions or recirculation of the Initial Study/Mitigated Negative Declaration (IS/MND) or additional environmental review of the proposed Project pursuant to Section 15073.5 of the State CEQA Guidelines; and
Whereas, all other legal prerequisites to the adoption of this Resolution have occurred.
Now, therefore, be it resolved by the City Council of the City of Palm Desert, California, as follows:
Section 1. Incorporation of Recitals. The City Council hereby finds and determines that all the recitals set forth above are true and correct. The above recitals are hereby incorporated as substantive findings of this Resolution.
Section 2. Compliance with CEQA. The City Council has reviewed and considered the information contained in the IS/MND, comments received, and other documents contained in the administrative record for the Project. The City Council finds that the IS/MND has been completed in compliance with CEQA, the State CEQA Guidelines, and the City’s Local CEQA Guidelines.
Section 3. Findings. Based on the whole record before it, including the IS/MND, the administrative record and all other written and oral evidence presented to the City Council, the City Council finds that all environmental impacts of the Project are either less than significant or can be mitigated to less than significant levels with the mitigation measures outlined in the IS/MND, and the Mitigation Monitoring and Reporting Program. The City Council finds that there is no substantial evidence in the administrative record supporting a fair argument that the Project may result in any significant environmental impact. The City Council finds that the IS/MND contains complete, objective, and accurate reporting of the environmental impacts associated with the Project and reflects the independent judgment and analysis of the City.
Section 4. Adoption of The Mitigated Negative Declaration. The City hereby approves and adopts the IS/MND, which is hereby attached to this Resolution as Exhibit “A.” Section 5. Adoption of The Mitigation Monitoring And Reporting Program. The City hereby adopts the MMRP, which is hereby attached to this Resolution as Exhibit “B.” In the vent of nay inconsistencies between the mitigation measures as set forth in the IS/MND and the MMRP, the MMRP shall control.
Section 6. Notice of Determination. The City direct Staff to prepare, execute, and file 250
Resolution No. 2026-____ Page 3
a Notice of Determination with the County Clerk and the State Clearinghouse within five (5) working days of the passage and adoption of this Resolution.
Section 7. Location of Documents. The administrative record for the Project is maintained at City Hall located at 73510 Fred Waring Drive, Palm Desert, CA 92260. The custodian of records is the City Clerk.
Section 8. Execution of Resolution. The Mayor shall sign this Resolution, and the City Clerk shall attest and certify the passage and adoption thereof.
Adopted on __________________.
Evan Trubee
Mayor
ATTEST:
Anthony J. Mejia
City Clerk
I, Anthony J. Mejia, City Clerk of the City of Palm Desert, hereby certify that Resolution No. 2026-__ is a full, true, and correct copy, and was duly adopted at a regular meeting of the City Council of the City of Palm Desert on _______________________, by the following vote:
Ayes:
Noes:
Absent:
Abstain:
Recused:
In witness whereof, I have hereunto set my hand and affixed the official seal of the City of Palm Desert, California, on ___________________.
Anthony J. Mejia
City Clerk
251
252
FINAL INITIAL STUDY
FOR THE MID-VALLEY BASIN,
DRAINAGE /STORM DRAIN IMPROVEMENTS
PROJECT
Prepared for:
City of Palm Desert
73510 Fred Waring Drive
Palm Desert, California 92260
Prepared by:
Tom Dodson & Associates
P.O. Box 2307
San Bernardino, CA 92406
(909) 882-3612
October 2026
253
TABLE OF CONTENTS
Attachment A – Completion of the Mitigated Negative Declaration for The Mid-Valley Channel, Drainage/Storm Drain Improvements ( SCH# 2026090497 ) Memorandum Attachment B – Comment Letter
Attachment C – Response to Comment Letter
Attachment D – Draft Initial Study for the Mid Valley Basin, Storm Drain Improvements Project, September 2026
254
Attachment A:
Completion of the Mitigated Negative Declaration
for The Mid-Valley Channel, Drainage/Storm
Drain Improvements ( SCH# 2026090497 )
Memorandum
255
TOM DODSON & ASSOCIATES
Mailing Address: PO Box 2307, San Bernardino, CA 92406
Physical Address: 2150 N. Arrowhead Avenue, San Bernardino, CA 92405 Tel: (909) 882-3612 ✦ Email: [email protected] ✦ Web: tdaenvironmental.com
MEMORANDUM
From: Tom Dodson
To: Lucero Leyva
Date: October 15, 2026
Subj: Completion of the Mitigated Negative Declaration for The Mid-Valley Channel, Drainage/Storm Drain Improvements ( SCH# 2026090497 )
The City of Palm Desert (City) prepared and distributed an Initial Study (IS) and Mitigated Negative Declaration (MND) for the Mid-Valley Channel, Drainage/Storm Drain Improvements Project, and made it available for public review in accordance with the California Environmental Quality Act (CEQA). The Initial Study was distributed to local and regional organizations and was also available for public review at the City’s office. The State Clearinghouse was included on the distribution list for review of the Initial Study (IS) and MND as one or more state agencies may have authority over implementing the proposed project.
The City received one (1) e-mail comment letter on the proposed IS/MND for the Project by the close of the comment period on October 10, 2026. CEQA requires a Negative Declaration to consist of the Initial Study, copies of the comments, any responses to comments as compiled on the following pages, and any other project related material prepared to address issues evaluated in the Initial Study.
For this Project, the original Initial Study (IS) will be utilized as one component of the Final Mitigated Negative Declaration (MND) package. The attached responses to comments, combined with the Initial Study and the Mitigation Monitoring and Reporting Program, constitute the Final MND package that will be used by the City to consider the environmental effects of implementing the proposed Project.
The following parties submitted comments. The comments are addressed in the attached Responses to Comments:
1. California Department of Fish and Wildlife
256
Attachment B:
Comment Letter
257
Comment Letter #1
1-1
1-2
258
1-2
cont’d
1-3
1-4
1-5
cont’d
259
1-5
cont’d
1-6
1-7
1-8
1-9
cont’d
260
1-9
cont’d
1-10
cont’d
261
1-10
cont’d cont’d
262
1-10
cont’d
1-11
1-12
cont’d
263
1-12
cont’d cont’d
264
1-12
cont’d cont’d
265
1-12
cont’d
1-13
cont’d
266
1-13
cont’d cont’d
267
1-13
cont’d
1-14
1-15
cont’d
268
1-16
1-17
269
Comment
1-18
270
271
272
273
274
Attachment C:
Response to Comment Letter
275
RESPONSE TO COMMENT
LETTER #1
CALIFORNIA DEPARTMENT OF FISH AND WILDLIFE
1-1 The comment provides an introduction to the comment letter. The comment is noted and will be made available to the City decision-makers for consideration prior to a hearing on this matter.
1-2 The comment details CDFW’s status as a Trustee Agency for fish and wildlife resources.
The comment is noted and will be made available to the City decision-makers for consideration prior to a hearing on this matter. The City acknowledges the California Department of Fish and Wildlife (CDFW) role as a CEQA Trustee Agency for this project. 276
1-3 The comment details CDFW’s status as a Responsible Agency for fish and wildlife resources. The comment is noted and will be made available to the City decision-makers for consideration prior to a hearing on this matter. The City acknowledges the CDFW role as a CEQA Responsible Agency for this project.
1-4 The comment provides a description of the Project. With one exception this is an accurate, short summary of the proposed project. Please note the proper street name is “Gerald Ford Drive,” not “General Ford Drive.”
1-5 The comment details that CDFW has presented comments and recommendations related to fish and wildlife resources, and notes that the commenter believes that the MND has not adequately disclosed the Project’s impacts on biological resources. The comment is noted and will be made available to the City decision-makers for consideration prior to a hearing on this matter. However, with incorporation of these responses to comments, the City concludes that the all impacts, including biological resources can be reduced to less than significant impacts.
277
1-6 The City has incorporated most of the recommendations for revisions and additions to mitigation measures and concludes that with these changes, the Initial Study/Mitigated Negative Declaration (IS/MND) are fully adequate for this project. 1-7 The City questions whether CDFW has given adequate consideration to the proposed project’s environmental setting. The project areas consists of paved roads, a man-made drainage channel and highly disturbed desert environment. The project site is bounded on three sides by major arterials (Cook/Gerald Ford) or a four-six lane Interstate freeway, and on the fourth side (south) by urban development. Access to the site for ground dwelling animals would be very difficult at this location, but the City has agreed to augment most of the commenter’s mitigation measures as shown below. 1-8 The comment is noted and will be made available to the City decision-makers for consideration prior to a hearing on this matter. Refer to the responses below that address this comment.
1-9 The City understands the regulations protecting nesting birds and has acknowledged this by including a nesting bird mitigation measure in the published IS/MND (MM BIO-4). 278
1-10 The revised mitigation measure for nesting birds treats bird nesting has an all-year survey requirement, rather than a discrete bird nesting season. This request is not supported by any technical data or existing regulations, but in recognition of the nesting bird avoidance requirement established by State regulations, the City will accept the CDFW text for BIO-4. As such, the City proposes the following modified measure (modifications are underlined), which is hereby incorporated by reference into the Final IS/MND.
BIO-4 To the greatest extent feasible, the Project will avoid construction and any ground-disturbing activities during the peak nesting season (January 15 through September 15).
Regardless of the time of year, nesting bird surveys shall be performed by a CDFW-approved qualified avian biologist no more than 3 days prior to vegetation removal or ground-disturbing activities. Pre-construction surveys shall focus on both direct and indirect evidence of nesting, including nest locations and nesting behavior. The qualified avian biologist will make every effort to avoid potential nest predation as a result of survey and monitoring efforts. If active nests are found during the pre-construction nesting bird surveys, the qualified biologist shall establish an appropriate nest buffer to b e marked on the ground. Nest buffers are species specific and shall be at least 300 feet for passerines and 500 feet for raptors. Following documentation of baseline conditions, the qualified biologist familiar with the nesting phenology of the nesting species may choose to adjust the buffers based on nest and buffer monitoring results. fI the qualified biologist determines that Project activities may be causing an adverse reaction, the qualified biologist shall increase the buffers accordingly. Construction and any ground-disturbing activities may not occur inside the established buffers, which shall remain on-site until the qualified biologist determines the young have fledged or the nest is no longer active. Active nests and adequacy of the established buffer distance shall be monitored daily by the qualified biologist until the qualified biologist has determined the young have fledged or the Project has been completed. The qualified biologist has the authority to stop work fi nesting pairs exhibit signs of disturbance.
To avoid impacts to active nests of migratory birds, raptors, and other native bird species protected under the federal Migratory Bird Treaty Act and California Fish and Game Code Sections 3503, 3503.5, and 3513, any vegetation removal, grading, trenching or other ground-disturbing activities scheduled during the nesting bird season (generally February 1 through September 15) shall be preceded by a nesting bird survey conducted by a qualified biologist no more than seven (7) days prior to commencement of work The survey shall encompass all areas subject to disturbance and a sufficient surrounding area to identify nests that could be affected by Project activities. If no active nests are found, no further mitigation is required.
If an active nest is found, the qualified biologist shall establish a species-appropriate avoidance buffer around the nest. Buffer distances shall be based on the nesting species, sensitivity to disturbance, type and intensity of construction activities, and applicable agency guidance. At a minimum, buffers shall be consistent with current CDFW recommendations. No vegetation removal, grading, equipment operation, or other construction activity shall occur within the established buffer unless the qualified biologist determines that the activity would not result in nest abandonment, reproductive failure, injury, or mortality.
279
The qualified biologist shall monitor active nests and buffer areas at a frequency sufficient to confirm continued nest status and buffer effectiveness throughout the nesting cycle.
Buffer boundaries shall be clearly marked in the field and maintained until the qualified biologist determines the young have successfully fledged, the nest has become inactive, or the nest is no longer subject to disturbance from Project activities. Upon making such determination, the qualified biologist may authorize removal of the buffer and resumption of construction activities within the previously restricted area.
The above modification constitutes a modification to a mitigation measure that does not require recirculation pursuant to CEQA Section 15073.5(c). A written finding shall be adopted in the resolution proposed for adoption of this IS/MND that finds that the above measure is equivalent or more effective in mitigation or avoiding potential significant effects and that it in itself will not cause any potentially significant effect on the environment pursuant to CEQA Section 15074.1. The above measure would be equal to or more effective than that which was incorporated into the Initial Study. 280
1-11 The City appreciates CDFW’s input to the project’s Draft Mitigation Monitoring and Reporting Program MMRP.
1-12 The Burrowing Owl (BUOW) was only recently added as a candidate species and CDFW MMs BIO-1 and BIO-2 will be modified and incorporated into the Final IS/MND and implemented in close coordination with CDFW. As such, the City proposes the following modified measure (modifications are underlined), which is hereby incorporated by reference into the Final IS/MND.
BIO-1 Suitable burrowing owl habitat has been confirmed on the site; therefore, focused burrowing owl surveys shall be conducted by a CDFW-approved qualified biologist prior to any Project activities, including vegetation- or ground-disturbing activities. CDFW strongly recommends that focused surveys are conducted in accordance with the Staff Report on Burrowing Owl Mitigation (Staff Report; 2012 or most recent version). If burrowing owls are detected during the focused surveys, the qualified biologist and Project proponent shall begin coordination with CDFW and USFWS immediately, and shall submit the results of focused surveys to CDFW and USFWS as soon results become available and before commencement of any Project activities, including any vegetation- or ground-disturbing activities. CDFW recommends that the information included in the survey results be consistent with Appendix D of the Staff Report, including a detailed map showing locations of all burrowing owls, burrowing owl sign, potential burrows, and occupied burrows (occupied means at least one burrowing owl or its sign has been observed within the last three years; may be indicated by owl sign including feathers, pellets, prey remains, eggshell fragments, or excrement at or near a burrow entrance or perch site); a description of the behavior of burrowing owls during surveys; a description of survey methods; a n d other items listed in Appendix D of the Staff Report under "Survey Reports." Consultation with CDFW and USFWS must be completed prior to commencement of any Project activities, including vegetation- or ground-disturbing activities. If impacts to burrowing owl individuals, nests, or eggs cannot be avoided, CESA authorization (i.e., Incidental Take Permit under Fish and Game Code section 2081(b)) should be obtained from CDFW prior to commencement of Project activities, including vegetation-or ground-disturbing activities.
Preconstruction burrowing owl surveys shall be conducted no less than 14 days prior to the start of Project-related activities and again within 24 hours prior to ground disturbance.
Preconstruction surveys should be repeated when there is a pause in construction of more than 30 days. Preconstruction surveys shall be performed by a CDFW-approved qualified biologist, and CDFW strongly recommends that preconstruction surveys follow the recommendations and guidelines provided in Appendix D of the Staff Report on Burrowing Owl Mitigation. If the preconstruction surveys confirm occupied burrowing owl habitat, Project activities shall be immediately halted a n d the qualified biologist shall coordinate with CDFW and USFWS. Project activities shall not begin until consultation with CDFW and USFWS is completed.
Burrowing Owl (BUOW) Pre-Construction Surveys and Avoidance. No more than 3-days prior to any ground disturbance activities, a qualified biologist shall conduct pre-construction BUOW surveys within all areas subject to disturbance and within a minimum 500-foot buffer of the disturbance area, where access is available. Surveys shall be conducted in accordance with the most current California Department of Fish and Wildlife 281
(CDFW) Burrowing Owl Survey Staff Report and any applicable Coachella Valley Multiple Species Habitat Conservation Plan (CVMSHCP) requirements.
The survey shall identify and map all occupied burrows, suitable burrows, burrowing owl observations, nesting activity, and suitable habitat within and adjacent to the work area. A survey report shall documenting the results shall be provided to the City prior to commencement of ground-disturbing activities. If no burrowing owls or occupied burrows are identified, construction may proceed. If occupied burrows or burrowing owls are identified, then the avoidance and minimization measures identified in BIO-2 shall be implemented. No ground-disturbing activities shall occur within occupied burrowing owl avoidance buffers until the requirements of BIO-2 have been satisfied BIO-3 Burrowing Owl Mitigation Plan. If BUOW or occupied habitat are identified within or adjacent to the Project disturbance area, the City shall retain a qualified biologist to prepare and implement a Burrowing Owl Mitigation Plan in consultation with CDFW and USFWS prior to issuance of grading permits or commencement of ground-disturbing activities in the affected area. The plan shall include, at a minimum:
• Establishment of avoidance buffers around occupied burrows consistent with current CFDW, USFWS, and CVMSHCP requirements. During the breeding season (February 1 through August 31, or as otherwise determined by the qualified biologist CDFW and USFWS based on site conditions), no construction activities shall occur within occupied burrow buffers unless otherwise authorized by CDFW and USFWS. Avoidance shall be the preferred mitigation strategy.
• Measures to avoid direct mortality, nest abandonment, or reproductive failure of burrowing owls.
• Passive relocation procedures, if avoidance is infeasible, conducted only outside the breeding season and in accordance with current CDFW and USFWS guidance. • Identification of suitable recipient habitat and replacement burrows, including artificial burrows if necessary.
• Monitoring requirements before, during, and after relocation activities to verify successful relocation and continued occupancy of recipient habitat. • Procedures for adaptive management and corrective actions if relocation efforts are unsuccessful.
No occupied burrows shall be excavated, collapsed, or otherwise disturbed until the qualified biologist verifies that the burrow is unoccupied and all relocation procedures have been completed. Including approval by CDFW and USFWS. The City shall maintain documentation demonstrating compliance with the approved Burrowing Owl Mitigation Plan, including survey results, monitoring reports, and correspondence with CDFW and USFWS.
The above modifications constitute modifications to mitigation measures that does not require recirculation pursuant to CEQA Section 15073.5(c). A written finding shall be adopted in the resolution proposed for adoption of this IS/MND that finds that the above measure is equivalent or more effective in mitigation or avoiding potential significant effects and that it in itself will not cause any potentially significant effect on the environment pursuant to CEQA Section 15074.1. The above measures would be equal to or more effective than that which were incorporated into the Initial Study. 282
283
1-13 A comprehensive survey of the project site was conducted by biologists from the Firm of HDR, a highly qualified biological consulting firm. The field biologists surveyed 100% of all three project site locations with good visibility and saw no evidence of Kit Fox or Badger. Also, realize that the existing Mid-Valley Channel is completely man-made, but within an area that constrains access by a ground dwelling animal. Further in terms of establishing mitigation ratios for either species, these factors must be taken into consideration. The City concludes that due to the poor quality of habitat as the project site and the general lack of overall primary constituent elements to support these species, a 1:1 ratio is more appropriate. With this consideration, mitigation measures BIO-A and BIO-B will be accepted by the City.
BIO-A Desert Kit Fox
Preconstruction surveys for desert kit fox shall be conducted within 14 days prior to the start of construction by a CDFW-approved qualified biologist. The survey area shall include the Project disturbance areas plus a 500-foot buffer during the breeding season (January 15 through August 31 or until pups are foraging on their own) and a 250-foot buffer outside the breeding season. Pre-construction surveys should include 100-percent visual coverage of the Project area and buffers. Potentially occupied burrows in Project disturbance areas and the survey buffer shall be mapped, and the qualified biologist(s) shall utilize daily on-site monitoring, tracking stations, and wildlife cameras to determine whether the burrows are occupied. If a burrow is determined to be occupied by desert kit fox during the breeding season, the burrow shall be demarcated with a 500-foot buffer and connectivity to adjacent habitat shall be maintained. If a burrow is determined to be occupied outside the breeding season it shall be demarcated with a 250-foot buffer. Burrows determined to be unoccupied shall be demarcated with a 50-foot buffer. No disturbance of active dens shall take place when juvenile desert kit fox may be present and dependent on parental care. The biologist has the authority to halt or stop work if individuals exhibit signs of disturbance. If occupied burrows are found in Project disturbance areas and cannot be avoided, the City and Project proponent shall consult with CDFW on an appropriate path forward. The loss of desert kit fox habitat shall be mitigated at no less than a 1:1 ratio.
BIO-B American badger
No more than 30 days prior to the beginning of ground disturbance and/or construction activities, a CDFW-approved qualified biologists) shall conduct surveys to determine if potential American badger burrows are present in the Project area. Pre-construction surveys should include 100-percent visual coverage of the Project area and buffers. If American badger burrows are located, the Project proponent shall have the qualified biologists) monitor the burrows using observation and tracking material and/or trail cameras over a three (3) day period to determine the status of the burrow. If non-natal active dens can be avoided and buffered from Project activities, the biologist shall flag a minimum 100-foot disturbance-free buffer zone. A minimum 500-foot disturbance-free buffer shall be placed around any natal dens and maintained, along with connectivity to adjacent habitat, until juvenile independence is determined by the biologist. The biologist has the authority to halt
284
or stop work fi individuals exhibit signs of disturbance. Established buffers shall remain until the biologist determines the young have dispersed or the den is no longer active, or until Project activities cease. If occupied burrows are found in Project disturbance areas and cannot be avoided, the City and Project proponent shall consult with CDFW on an appropriate path forward. The loss of American badger habitat shall be mitigated at no less than a 1:1 ratio.
The above modifications are not in response to greater impacts than that which was identified in the Initial Study, no recirculation pursuant to CEQA Section 15073.5(c) is required. A written finding shall be adopted in the resolution proposed for adoption of this IS/MND that finds that the above measures are equivalent or more effective in mitigation or avoiding potential significant effects and that it in itself will not cause any potentially significant effect on the environment pursuant to CEQA Section 15074.1. The above measures would be equal to or more effective than that which were incorporated into the Initial Study.
285
1-14 The project site is a City owned public infrastructure facility and not quote-unquote a routine “development project.” Mitigation measure BIO-C is not necessary, as it is a requirement that the City will adhere to as part of Project development, if applicable. The project will be discussed with the Coachella Valley Conservation Commission after the bio-surveys are completed. The purpose of the contact will be to determine whether any payment of fees is justified.
1-15 The comment pertains to the payment of environmental filing fees related to CDFW. The City will require pertinent data to be submitted to the CNDDB, where appropriate. 286
1-16 The City will pay the environmental document filing fees as required by law. 1-17 This is a conclusory comment. The comment is noted and will be made available to the City decision-makers for consideration prior to a hearing on this matter. The contact information provided in this comment will be retained in the Project file. 287
1-18 The City appreciates CDFW’s initiative in developing an MMRP for the proposed mitigation measures. The mitigation measures will be incorporated into the MMRP for the Project as applicable, and as modified herein.
288
Attachment D:
Draft Initial Study for the Mid Valley Basin, Storm
Drain Improvements Project, September 2026
289
INITIAL STUDY
FOR THE MID-VALLEY BASIN,
DRAINAGE /STORM DRAIN IMPROVEMENTS
PROJECT
Prepared for:
City of Palm Desert
73510 Fred Waring Drive
Palm Desert, California 92260
Prepared by:
Tom Dodson & Associates
P.O. Box 2307
San Bernardino, CA 92406
(909) 882-3612
September 2026
290
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page i
TABLE OF CONTENTS
Introduction......................................................................................................................................... 1 Environmental Factors Potentially Affected ....................................................................................... 6 Determination..................................................................................................................................... 7 Evaluation of Environmental Impacts................................................................................................. 8 I. Aesthetics .......................................................................................................................... 10 II. Agricultural and Forestry Resources ................................................................................. 12 III. Air Quality .......................................................................................................................... 14 IV. Biological Resources ......................................................................................................... 26 V. Cultural Resources ............................................................................................................ 35 VI. Energy................................................................................................................................ 38 VII. Geology and Soils.............................................................................................................. 39 VIII. Greenhouse Gas Emissions .............................................................................................. 42 IX. Hazards and Hazardous Materials .................................................................................... 46 X. Hydrology and Water Quality............................................................................................. 50 XI. Land Use and Planning ..................................................................................................... 54 XII. Mineral Resources ............................................................................................................. 57 XIII. Noise.................................................................................................................................. 58 XIV. Population and Housing..................................................................................................... 70 XV. Public Services .................................................................................................................. 71 XVI. Recreation.......................................................................................................................... 73 XVII. Transportation.................................................................................................................... 74 XVIII. Tribal Cultural Resources .................................................................................................. 76 XIX. Utilities and Service Systems ............................................................................................ 79 XX. Wildfire ............................................................................................................................... 81 XXI. Mandatory Findings of Significance................................................................................... 83 Summary of Mitigation Measures ...................................................................................................... 86 References......................................................................................................................................... 91
APPENDICES
Appendix 1 – AQ/GHG
Appendix 2 – BRA / JD / CVMHSCHP
Appendix 3 – Cultural
Appendix 4 – Noise
291
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page ii
FIGURES (located at end of document)
Figure 1 Site Location
Figure 2 Project Location, USGS 7.5’ Topographic Quadrangle: Myoma, CA Figure 3 Mid Valley Basin Preliminary Improvements Phase 1 Figure 4 Mid Valley Basin Preliminary Improvements Phase 1 (part 2) Figure 5 Regional Bain Cook – Gerald Preliminary Improvements Phase 2 Alternative 1 Figure 6 Regional Bain Cook – Gerald Preliminary Improvements Phase 2 Alternative 2 Figure IV-1 Breeding Season Burrowing Owl Survey Results Figure IV-2 Jurisdictional Aquatic Resources Delineation – Mid Valley Basin Figure IV-3 Jurisdictional Aquatic Resources Delineation – Northwest End of Mid Valley Basin Figure IV-4 Jurisdictional Aquatic Resources Delineation – Middle Portion of Mid Valley Basin Figure IV-5 Jurisdictional Aquatic Resources Delineation – Southeast End of Mid Valley Basin Figure IX-1 GeoTracker
Figure IX-2 EnviroStor
Figure X-1 FEMA Flood Zones
Figure XII-1 Mineral Resource Zone
Figure XIII-1 Noise Measurement Locations
Figure XIII-2 Sensitive Receptors
Figure XIII-3 Phase 1 Construction Noise Sources and Receivers Figure XIII-4 Phase 2 Construction Noise Sources and Receivers Figure XX-1 Fire Hazard Severity Zones
TABLES
Table III-1 Maximum Daily Regional Emissions Thresholds .............................................. 15 Table III-2 Maximum Daily Localized Emissions Thresholds – Phase 1............................ 16 Table III-3 Maximum Daily Localized Emissions Thresholds – Phase 2............................ 16 Table III-4 Construction Trip Assumption – Phase 1 .......................................................... 19 Table III-5 Construction Trip Assumption – Phase 2 .......................................................... 20 Table III-6 Construction Duration – Phase 1 ...................................................................... 20 Table III-7 Construction Duration – Phase 2 ...................................................................... 20 Table III-8 Construction Equipment – Phase 1................................................................... 21 Table III-9 Construction Equipment – Phase 2................................................................... 21 Table III-10 Overall Regional Construction Emissions Summary – Phase 1 ....................... 22 Table III-11 Overall Regional Construction Emissions Summary – Phase 2 ....................... 22 Table III-12 Project Localized Construction Impacts – Phase 1........................................... 23 Table III-13 Project Localized Construction Impacts – Phase 2........................................... 24 292
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page iii
Table IV-1 Temporary Impacts to Potential Jurisdictional Aquatic Resources ................... 29 Table VIII-1 Total Project GHG Emissions............................................................................ 45 Table XI-1 City of Palm Desert General Plan Consistency Summary ................................ 55 Table XIII-1 Typical Noise Levels.......................................................................................... 59 Table XIII-2 Ambient Noise Level Measurements................................................................. 61 Table XIII-3 Phase 1 Construction Reference Noise Levels................................................. 63 Table XIII-4 Phase 2 Construction Reference Noise Levels................................................. 63 Table XIII-5 Phase 1 Daytime Construction Noise Level Summary ..................................... 65 Table XIII-6 Phase 2 Daytime Construction Noise Level Summary ..................................... 65 Table XIII-7 Phase 1 Construction Noise Level Compliance ................................................ 66 Table XIII-8 Phase 2 Construction Noise Level Compliance ................................................ 66 Table XIII-9 Phase 1 Daytime Construction Noise Level Increases ..................................... 66 Table XIII-10 Phase 2 Daytime Construction Noise Level Increases ..................................... 67 Table XIII-11 Vibration Source Levels for Construction Equipment........................................ 68 Table XIII-12 Phase 1 Construction Vibration Levels ............................................................. 69 Table XIII-12 Phase 2 Construction Vibration Levels ............................................................. 69
LIST OF ABBREVIATIONS AND ACROYNMS
AAQS Ambient Air Quality Standards
AB Assembly Bill
ACBCI Agua Caliente Band of Cahuilla Indians
APE Area of Potential Effect
AQMP Air Quality Management Plan
BACMs Best Available Control Measures
BAU Business As Usual
BMPs Best Management Practices
BRA Biological Resources Assessment
BUOW burrowing owl
CAA Clean Air Act
CAAA Clean Air Act Amendment
CAAQS California Ambient Air Quality Standards
CalEEMOD California Emissions Estimator Model
CARB California Air Resources Board
CBC California Building Code
CCAR California Climate Action Registry (now called Climate Action Reserve) CDFW California Department of Fish and Wildlife
CEQA California Environmental Quality Act
CFD Community Facilities District
CMP Congestion Management Program
CNDDB California Natural Diversity Data Base
CNEL Community Noise Equivalent Level
CNPS California Native Plant Survey
293
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page iv
CO carbon monoxide
CREC controlled recognized environmental conditions
CVMSHCP Coachella Valley Multiple Species Habitat Conservation Plan CVWD Coachella Valley Water District
CWA Clean Water Act
dB decibel
dBA A-weighted decibel
du/ac dwelling units per acre
DIF Development Impact Fees
DTSC Department of Toxic Substances Control
EIC Eastern Information Center
EIR Environmental Impact Report
ESA Environmental Site Assessment
FGC Fish & Game Code
FTA Federal Transit Association
GCC Global Climate Change
GHG Greenhouse Gas
HOA Home Owners Association
LST Localized Significance Thresholds
LUST Leaking Underground Storage Tank
MBTA Migratory Bird Treaty Act
MCEg maximum considered earthquake geometric mean
MM Mitigation Measure
MMRP Mitigation Monitoring and Reporting Program
MND Mitigated Negative Declaration
MPO Metropolitan Planning Organization
MRZ Mineral Resources Zone
NAAQS National Ambient Air Quality Standards
NAHC Native American Heritage Commission
NBP Nesting Bird Plan
NHPA National Historic Preservation Act
NOI Notice of Intent
NPDES National Pollutant Discharge Elimination System
PGA Peak Groundwater Acceleration
PR Planned Residential
REC recognized environmental conditions
RTP/SCS Regional Transportation Plan / Sustainable Communities Strategies RWQCB Regional Water Quality Control Board
SCAB South Coast Air Basin
SCAG Southern California Association of Governments
SCAQMD South Coast Air Quality Management District
SCE Southern California Edison
SDFGs significant data gaps
SIP State Implementation Plan
294
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page v
SLF Sacred Lands File
SSAB Salton Sea Air Basin
SWPPP Storm Water Pollution Prevention Plan
SWRCB State Water Resources Control Board
TCR Tribal Cultural Resources
TG Trip Generation
TTM Tentative Tract Map
USDA U.S. Department of Agriculture
USEPA U.S. Environmental Protection Agency
USFWS U.S. Fish and Wildlife Service
USGS U.S. Geological Survey
VdB vibration-velocity decibel
VMT Vehicle Miles Traveled
VOC volatile organic compounds
WoUS Waters of the United States
WQMP Water Quality Management Plan
295
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 1
ENVIRONMENTAL CHECKLIST FORM
INTRODUCTION
1. Project Title: Mid Valley Basin Drainage/Storm Drain Improvements
2. Lead Agency Name: City of Palm Desert
Address: 73510 Fred Waring Drive
Palm Desert, CA 92260
3. Contact Person: Ms. Lucero Leyva, Senior Project Manager Phone Number: 760-776-6465
E-mail: [email protected]
4. Project Location: The Improvements Project is located in Section 34, T4S, R6E, SBBM on the USGS 7.5 Topographic - Cathedral City Map, at Latitude 33° 78163" N and Longitude 116° 35052" W. Figures 1 and 2 illustrate the regional and site location, and Figure 3 is a recent aerial photograph of the site showing the individual facility locations.
5. Project Sponsor’s City of Palm Desert
Name and Address: 73510 Fred Waring Drive
Palm Desert, CA 92260
6. General Plan
Designation: Employment
7. Zoning Classification: Service Industrial/Planned Commercial: Freeway Commercial Overlay Zone
8. Project Description:
Introduction
The City of Palm Desert is proposing to make improvements to the Mid Valley drainage system infrastructure, located southwest of the intersections of Cook Street with Gerald Ford Drive and Interstate 10. Refer to the attached Figure 1. South of, and adjacent to Interstate 10, is the Mid Valley Basin (also referred to as the Mid Valley Basin) where the City proposes to regrade and widen the Basin. A new Underground Storm Drain will be installed within the Gerald Ford Drive right-of-way, as shown on Figure 3. The final component is a proposed basin on approximately four acres of property located between the Linear Basin and Gerald Ford, again as shown on Figure 3.
Background
Under current conditions the intersection of Gerald Ford Drive and Cook Street experience flooding which causes a public safety hazard. This appears to be caused by the amount of runoff 296
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 2
directed towards the intersection and the current configuration of the linear basin system. In addition, there are two locations along Gerald Ford Drive where low spots exist that drain to the Mid Valley linear basin infrastructure. During large storms the water surface elevation exceeds the elevation of the catch basin inlets which cause flooding in the street.
The proposed project has been divided into two phases. Phase 1 improvements have been designed to mitigate some of the flooding impacts. A portion of the funding is being provided by the Southern California Association of Government’s (SCAG) REAP 2.0 grant funding. Phase 2 improvements are being studied and designed as part of this effort, but will be implemented at a later date once funding is secured. After completion of both phases the Mid Valley basin drainage infrastructure will have the necessary capacity (volume) to capture the full 100-year storm volume and completely mitigate the flooding experienced at this intersection.
This proposed project supports the City of Palm Desert to deliver predevelopment and construction of linear basin improvements to reduce flooding impacts and risk at the intersection of Gerald Ford Drive and Cook Street. The proposed improvements will help divert floodwaters away from vulnerable housing sites and transit corridors in a high-risk area near this intersection during localized rain events. The proposed project will capture and divert floodwaters away from vulnerable infill housing sites, urban amenities, bike lanes and transit corridors that provide access to nearby housing sites and are frequently flooded during localized rainstorms.
Construction Scenario
The anticipated construction sequence is as follows, but may be adjusted to conform to specific conditions at the time of actual construction:
1. Clear and grub;
2. Demolition of existing onsite structures;
3. Installation of the storm drain systems; and
4. Final grading and installation of support systems.
Phase 1 of the proposed project will be focused on the Mid Valley Basin, while the new basin and underground storm drain are set for implementation in Phase 2. This document evaluates installation of both Phase 1 and 2 facilities.
Mid Valley Basin
The City owns and maintains the Mid Valley Basin, which technically operates as a series of linear basins. This basin is located on City-owned property approximately 80 feet wide and 3,700 feet long. However, There is a 30 foot wide Edison easement over the northern portion of the linear basin. This limits the width that the linear basin can expanded to 50 feet in width. About 1,500 linear feet of the existing basin is already 50-feet wide, with the remainder varying in width. This will be accomplished by removal of the three existing concrete weirs; clearing and grubbing the existing linear basin (based on annual City maintenance an estimated three truckloads of vegetation); regrade/reshape the western-most 1,500 feet; excavate/grade the eastern 2,200 feet; construct new concrete weirs to isolate/optimize flows coming into the linear basin (estimated to be 120 CY of concrete); and modify existing drainage inlets along the south basin embankment as needed to work with the proposed grading. At completion the whole 3,700 foot-long linear basin would be 50 feet wide. The linear basins existing depth varies from 7 feet to nine feet, and at 297
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 3
completion it should all be between 9 and 9.5 feet. An estimated 15,000 CY will be exported from the site.
Underground Storm Drain (Gerald Ford Drive)
The proposed new storm drain in Gerald Ford Drive will be a new drain that will be installed by trenching in the existing roadway. Depth of the proposed storm drain is anticipated to be between 6 feet to 8 feet. It will be installed to collect flows from the intersection as well as some of the flows along Gerald Ford Drive, between Cook Street and Paseo Del Corazon. Current design of this drainage infrastructure identifies it as approximately 3,800 feet long with the size of the storm drain ranging from 36 inches to 48 inches. Estimated volume of excavated trench material is about 1,800 cubic yards (CY). It is anticipated that the Storm Drain will have six inlets, but the exact location and size have not yet been established. The Storm Drain is expected to extend from the intersection to a point opposite the new basin expansion.
As discussed above, the existing facilities function as a linear basin. The proposed improvements would not be sufficient to store the full 100-year flood volume. Under present conditions when surface runoff rises to the top of the bank, the stored water will spill over to the north and flow northeasterly towards the railroad tracks from there it will flow southeasterly. For the proposed condition, the historical drainage will remain the same. With the implementation of Phase 2, the full 100-year flows will be able to be managed within the City’s Mid Valley Basin system.
New Basin
The new Basin will be implemented as a Retention Basin and based on current planning, the Basin will be designed to capture about 18 acre-feet of runoff. This will provide capacity to contain the 100-year flood runoff with some additional storage. As presently envisioned, there will be no outlet structure from the new Basin. Basin construction would be accomplished using traditional excavation equipment and techniques. Access roads around and into the Basin will be provided to facilitate City maintenance following storm events. The total volume of excavation has not yet been determined.
Schedule
Construction for the improvements to the Mid Valley Basin are proposed to be initiated in the second half of 2026, preferably in August. Construction is anticipated to be completed in 60-90 days since the export is anticipated to be relatively minor, about 15,000 CY. This project is forecast to be completed before years end.
Phase 2 (Basin Expansion and New Storm Drain) will be added to the City’s capital improvement program and will be implemented when funding is identified/secured. Construction of Phase 2 is anticipated to require about 3 months of construction. The air quality, greenhouse gas, and noise modeling found in Appendices 1 and 4 utilize a timeline of January 2027 through March of 2027.
This schedule includes linear grubbing and land clearing, linear grading and excavation, linear drainage utilities and sub-grade improvements, and linear paving.
9. Surrounding land uses and setting:
As shown on Figure 3, the land uses surrounding the project site consist of a mix of uses. 298
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 4
• To the north is the Interstate 10 Freeway Corridor
• East of the site multi-family residential uses
• South of the site is undeveloped, but disturbed open space • West of the project site is Cook street and commercial uses Immediately to the north and adjacent to the project site are two major transportation corridors:
the Union Pacific Railroad’s main east-west tracks and the Interstate 10 Freeway. There is open space immediately north of the I-10 Freeway corridor. Between the Mid Valley Basin and Gerald Ford Drive is a mix of open space, commercial and Multifamily residential uses. South east of the project area is an area of mixed residential uses. South of Gerald Ford Drive in the vicinity of the project area is a large open space area. West of Cook Street are extensive commercially developed property. Finally, the Cook Street overpass is located just north of the Mid Valley Basin.
10. Other agencies whose approval is required (e.g., permits, financing approval, or partici-pation agreement.) Based on an evaluation of the specific project location, the proposed project may require several other permits from regulatory agencies to support development of the site as proposed by the City. The amount of area to be disturbed by the project will be greater than one acre; therefore, the City will be required to file a Notice of Intent (NOI) for a General Construction permit to comply with the National Pollutant Discharge Elimination System (NPDES) requirements. The NOI is filed with the State Water Resources Control Board and enforced by the Colorado River Regional Water Quality Control Board. A Stormwater Pollution Prevention Plan (SWPPP) must be implemented in conjunction with construction activities. The biological resource assessment indicates that the Mid Valley Basin may be considered a water of the state (as defined by bed and bank) and a 1600 Streambed Alteration Agreement may be required from the California Department of Fish and Wildlife (CDFW) before construction can proceed. Also, the Colorado Regional Water Quality Control Board (Regional Board) may choose to process Waste Discharge Requirements (WDR) for the Channel modifications. The project is clearly not waters of the United States, so no federal permits will be required. Finally, it may be necessary to relocate an existing pair of Burrowing Owl and this will require consultation with CDFW and approval of a relocation plan. No other environmental resources related permits are known to be required.
11. Have California Native American tribes traditionally and cultural affiliated with the project area requested consultation pursuant to Public Resources Code section 21080.3.1? If so, has consultation begun?1
AB 52 consultation was initiated by the City in July 2026. The following tribes were contacted to be notified of the proposed project under AB 52:
1 Note: Conducting consultation early in the CEQA process allows tribal governments, lead agencies, and project proponents to discuss the level of environmental review, identify and address potential adverse impacts to tribal cultural resources, and reduce the potential for delay and conflict in the environmental review process. (See Public Resources Code section 21083.3.2.) Information may also be available from the California Native American Heritage Commission’s Sacred Lands File per Public Resources Code section 5097.96 and the California Historical Resources Information System administered by the California Office of Historic Preservation. Please also note that Public Resources Code section 21082.3(c) contains provisions specific to confidentiality. 299
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 5
• Agua Caliente Band of Cahuilla Indians
• Augustine Band of Cahuilla Indians
• Cabazon Band of Cahuilla Indians
• Cahuilla Band of Indians
• Fort Yuma Quechan Indian Tribe
• Los Coyotes Band of Cahuilla and Cupeño Indians
• Morongo Band of Mission Indians
• Ramona Band of Cahuilla
• Santa Rosa Band of Cahuilla Indians
• Soboba Band of Luiseno Indians
• Torres-Martinez Desert Cahuilla Indians
The result of the consultation was that only one tribe requested consultation from the City on this Project, the Agua Caliente Band of Cahuilla Indians (Tribe). The Tribe recommend an Agua Caliente monitor for all of Phase II ground disturbance. For Phase I, the monitoring program is also applicable but the language in the mitigation can include the discontinuation of monitoring if deemed unnecessary. Thus, mitigation measures (MMs TCR-2 through TCR-4) implementing the above principles that would protect tribal cultural resources are required to ensure that a significant tribal cultural resource impact does not occur. 300
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 6
ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED
The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a "Potentially Significant Impact" as indicated by the checklist on the following pages.
Aesthetics Agriculture and Forestry Resources Air Quality Biological Resources Cultural Resources Energy
Geology / Soils Greenhouse Gas Emissions Hazards & Hazardous Materials Hydrology & Water Quality Land Use / Planning Mineral Resources Noise Population / Housing Public Services
Recreation Transportation Tribal Cultural Resources
Utilities / Service Systems Wildfire Mandatory Findings of Significance
□ □□□□□□□ □□□□□□□ □□□□□□
301
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 7
DETERMINATION (To be completed by the Lead Agency)
On the basis of this initial evaluation, the following finding is made:
The proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared.
Although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared.
The proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required.
The proposed project MAY have a "potentially significant impact" or "potentially significant unless mitigated" impact on the environment, but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed.
Although the proposed project could have a significant effect on the environment, because all potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed upon the proposed project, nothing further is required.
Tom Dodson & Associates 9/9/26
Prepared by Date
Lead Agency (signature) Date
9/10/2026
X
•
•
302
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 8
EVALUATION OF ENVIRONMENTAL IMPACTS:
1) A brief explanation is required for all answers except "No Impact" answers that are adequately supported by the information sources a lead agency cites in the parentheses following each question. A "No Impact" answer is adequately supported if the referenced information sources show that the impact simply does not apply to projects like the one involved (e.g., the project falls outside a fault rupture zone). A "No Impact" answer should be explained where it is based on project-specific factors as well as general standards (e.g., the project will not expose sensitive receptors to pollutants, based on a project-specific screening analysis).
2) All answers must take account of the whole action involved, including off-site as well as on-site, cumulative as well as project-level, indirect as well as direct, and construction as well as operational impacts.
3) Once the lead agency has determined that a particular physical impact may occur, then the checklist answers must indicate whether the impact is potentially significant, less than significant with mitigation, or less than significant. "Potentially Significant Impact" is appropriate if there is substantial evidence that an effect may be significant. If there are one or more "Potentially Significant Impact" entries when the determination is made, an EIR is required.
4) "Negative Declaration: Less Than Significant With Mitigation Incorporated" applies where the incorporation of mitigation measures has reduced an effect from "Potentially Significant Impact" to a "Less Than Significant Impact." The lead agency must describe the mitigation measures, and briefly explain how they reduce the effect to a less than significant level (mitigation measures from "Earlier Analyses," as described in (5) below, may be cross-referenced). 5) Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, an effect has been adequately analyzed in an earlier EIR or negative declaration.
Section 15063(c)(3)(D). In this case, a brief discussion should identify the following:
a) Earlier Analysis Used. Identify and state where they are available for review. b) Impacts Adequately Addressed. Identify which effects from the above checklist were within the scope of and adequately analyzed in an earlier document pursuant to applicable legal standards, and state whether such effects were addressed by mitigation measures based on the earlier analysis.
c) Mitigation Measures. For effects that are "Less than Significant with Mitigation Measures Incorporated," describe the mitigation measures which were incorporated or refined from the earlier document and the extent to which they address site-specific conditions for the project.
6) Lead agencies are encouraged to incorporate into the checklist references to information sources for potential impacts (e.g., general plans, zoning ordinances). Reference to a previously prepared or outside document should, where appropriate, include a reference to the page or pages where the statement is substantiated. 303
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 9
7) Supporting Information Sources: A source list should be attached, and other sources used or individuals contacted should be cited in the discussion. 8) This is only a suggested form, and lead agencies are free to use different formats; however, lead agencies should normally address the questions from this checklist that are relevant to a project's environmental effects in whatever format is selected. 9) The explanation of each issue should identify:
a) the significance criteria or threshold, if any, used to evaluate each question; and b) the mitigation measure identified, if any, to reduce the impact to less than significance. 304
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 10
Potentially
Significant Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant Impact
No Impact or
Does Not Apply
I. AESTHETICS: Except as provided in Public
Resources Code Section 21099, would the project:
a) Have a substantial adverse effect on a scenic vista? b) Substantially damage scenic resources, including,
but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway?
c) In non-urbanized areas, substantially degrade the
existing visual character or quality of public views of the site and its surroundings? (Public views are those
that are experienced from publicly accessible vantage
point). If the project is in an urbanized area, would the project conflict with applicable zoning or other
regulations governing scenic quality?
d) Create a new source of substantial light or glare
which would adversely affect day or nighttime views in
the area?
SUBSTANTIATION
a. Less Than Significant Impact – Adverse impacts to scenic vistas can occur in one of two ways. First, an area itself may contain existing scenic vistas that would be altered by new development. A review of the proposed project site determined that there are no scenic vistas/values located internally within the area proposed for the improvements. Regardless, the project area is adjacent to several public viewing sites, primarily along adjacent roadways, including Cook Street, Gerald Ford Drive and Interstate 10. Refer to the aerial photo in Figure 3. Both to the west and east the immediate views are of common urban development, backed by the San Jacinto Mountains to the west and the Little San Bernardino Mountains to the east. The proposed project will have some visibility during construction as construction equipment and material will be visible above ground, but this impact is common within urban areas and no important scenic vistas/values within the project area will experience short-term significant impacts. Once construction is completed, all of the proposed facilities are designed to exist at ground level or below the ground surface, so there will be no or less than significant impacts internal to the project over the long-term.
A scenic vista impact can also occur when a scenic vista can be viewed from the project area or immediate vicinity and a proposed development may interfere with the view to a scenic vista. A scenic vista impact can also occur when a scenic vista can be viewed by the public from the project area or immediate vicinity and new proposed facilities may interfere with the existing view to a scenic vista.
The City of Palm Desert General Plan indicates that the natural scenic resources identified in the General Plan EIR consist of views to the mountain ranges to the north (San Bernardino), southwest (San Jacinto) and south-southeast (Santa Rosa). The Project site occurs in an area in which these important visual features are already compromised by the ongoing mixed development in the area surrounding the project site. These interrupted foreground views indicate that project development at this site would not add substantially to interruption of any important public views in any direction once developed. This finding is consistent with the City General Plan finding for this issue in the General Plan EIR.
□ □ 2 □
□ □ 2 □
□ □ 2 □
□ □ 2 □
305
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 11
b. Less Than Significant Impact – The project site consists of a highly disturbed native desert habitat with no distinctive features, such as trees or rock outcrops. The site has no distinctive topographic features that visually distinguish the site. The site is essentially uniformly lacking in elevation change due to its location on the alluvial deposits in the project area. No roadways within the vicinity of the project site are considered eligible for official designation as a County or State Scenic Highways. No other scenic resources are located within the project area, and as such, there are no important scenic resources within the area that would be damaged as a result of development of the proposed project.
Therefore, there is a less than significant potential to damage a scenic onsite resource and no mitigation is required.
c. Less Than Significant Impact – The project site is located within an urbanized area on the north side of the City of Palm Desert. Development of the project site ground level facilities is consistent with the existing infrastructure uses on the property (existing linear basin, roadways, an open space (basin). By re-developing or developing these infrastructure uses in accordance with the City General Plan design guidelines, the visual character of this area will remain consistent with the highly urban setting that exists at its location. Thus, implementation will be consistent with the surrounding urban setting and the potential aesthetic impacts to the site will result in a less than significant adverse aesthetic impact. The proposed changes in the drainage infrastructure at this location will not result in a substantial increase in the severity of previously identified visual impacts or in new significant visual impacts compared to the surrounding existing and anticipated land uses. Impacts under this issue are considered to be a less than significant impact. d. Less Than Significant Impact – The implementation of the proposed project will create minimal new sources of light during the operational phase of the project. It is anticipated that minimal exterior lighting will be required to support security at the basin and the newly graded linear basin. The proposed project will be developed in accordance with the City’s Development Code and General Plan. The General Plan EIR discusses the City’s requirements for maximum height of exterior lighting, the number of fixtures anticipated along roadways/infrastructure and the intensity of light, which would ensure that any building or exterior lighting would not significantly impact adjacent uses. Thus, the proposed project may introduce a new source of light into the project area, but City’s standard design requirements can limit the lighting impacts to the project facilities. Based on this finding, the potential lighting-related impacts of this proposed project would be less than significant.
As noted above, the General Plan EIR concluded that all potential aesthetic impacts would cause less than significant adverse impacts through implementation of the City’s aesthetic design requirements. The General Plan EIR determined that this impact was less than significant. This impact was adequately addressed in the prior EIR because there are no permanent scenic vistas affected by proposed development within the Project area. The proposed project would not result in a new or substantially more severe impact than what was previously analyzed. Based on this finding, the proposed project’s implementation will not contribute to a cumulatively considerable adverse aesthetic impact. No further review is required.
306
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 12
Potentially
Significant Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant Impact
No Impact or
Does Not Apply
II. AGRICULTURE AND FORESTRY RESOURCES:
In determining whether impacts to agricultural
resources are significant environmental effects, lead
agencies may refer to the California Agricultural Land
Evaluation and Site Assessment Model (1997)
prepared by the California Dept. of Conservation as an
optional model to use in assessing impacts on
agriculture and farmland. In determining whether
impacts to forest resources, including timberland, are
significant environmental effects, lead agencies may
refer to information compiled by the California
Department of Forestry and Fire Protection regarding
the state’s inventory of forest land, including the Forest and Range Assessment Project and the Forest Legacy
Assessment project; and forest carbon measurement
methodology provided in Forest Protocols adopted by
the California Air Resources Board. Would the project:
a) Convert Prime Farmland, Unique Farmland or
Farmland of Statewide Importance (Farmland), as
shown on the maps prepared pursuant to the Farmland
Mapping and Monitoring Program of the California
Resources Agency, to non-agricultural use?
b) Conflict with existing zoning for agricultural use or a Williamson Act contract?
c) Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code
section 12220(g)), timberland (as defined by Public
Resources Code section 4526), or timberland zoned
Timberland Production (as defined by Government
Code section 51104(g))?
d) Result in the loss of forest land or conversion of
forest land to non-forest use?
e) Involve other changes in the existing environment
which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use or
conversion of forest land to non-forest use?
SUBSTANTIATION
a-e. No Impact – The project site has not historically been used for agriculture or timber management purposes. Accordingly, the City has not designated this site nor zoned this site for agricultural use or timber management, as the General Plan designation and Zoning classifications are both in support of commercial land uses, including these redesigned and new infrastructure facilities. This indicates that the City intends for the project site to be developed for a use that would suit this land use designation/zoning classification which it has assigned this project site. Therefore, given that the City does not identify the project site for agricultural use, and that no Prime Farmland, Unique Farmland or Farmland of Statewide Importance has been identified within the project site, implementation of the proposed project and conversion of the project site to the proposed drainage infrastructure uses □ □ □ X
□ □ □ X
□ □ □ X
□ □ □ X
□ □ □ X
307
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 13
will not pose any significant adverse impact to or conflict with agricultural resources or values. No mitigation is required.
The City General Plan EIR concluded that all potential agricultural and forestry impacts would be less than significant. Based on this finding, the proposed project’s implementation is determined to contribute to a less than significant cumulatively considerable adverse agricultural and forestry impact within the City. The proposed installation of the improved drainage infrastructure facilities will not result any new significant impacts to agricultural resources. No further environmental review is required.
308
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 14
Potentially
Significant Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant Impact
No Impact or
Does Not Apply
III. AIR QUALITY: Where available, the significance
criteria established by the applicable air quality
management or air pollution control district may be
relied upon to make the following determinations.
Would the project:
a) Conflict with or obstruct implementation of the
applicable air quality plan?
b) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is
non-attainment under an applicable federal or state
ambient air quality standard?
c) Expose sensitive receptors to substantial pollutant
concentrations?
d) Result in other emissions (such as those leading to
odors) adversely affecting a substantial number of
people?
SUBSTANTIATION: “Technical Memorandum Mid Valley Channel Improvement Air Quality and Greenhouse Gas Assessment,” Urban Crossroads, Inc (Appendix 1), May 21, 2026.
Air Quality Setting
SALTON SEA AIR BASIN (SSAB)
The Project site is located within the Salton Sea Air Basin (SSAB) within the jurisdiction of the South Coast Air Quality Management District (SCAQMD). The SSAB (also referred to herein as “the Basin”) is aligned in a north-west-southwest orientation stretching from Banning Pass to the Mexican border. The regional climate, as well as the temperature, wind, humidity, precipitation, and amount of sunshine significantly influence the air quality in the Basin. The climate of the Coachella Valley is a continental, desert-type climate, with hot summers, mild winters, and very little annual rainfall. Precipitation is less than six inches annually and occurs mostly in the winter months from active frontal systems and in the late summer months from thunderstorms. Almost all of the annual rainfall comes from the fringes of mid-latitude storms from late November to early April with summers often being completely dry. Temperatures exceed 100 degrees Fahrenheit (°F), on average, for four months each year, with daily highs near 110°F during July and August.
Summer nights are cooler with minimum temperatures in the mid-70s. During the winter season, daytime highs are quite mild, but the dry air is conducive to nocturnal radiational cooling, with early morning lows around 40°F.
The Coachella Valley and adjacent areas are exposed to frequent gusty winds. The flat terrain of the valley and strong temperature differentials, created by intense solar heating, produce moderate winds and deep thermal convection. Wind speeds exceeding 31 miles per hour (mph) occur most frequently in April and May. On an annual basis, strong winds (greater than 31 mph) are observed 0.6 percent of the time and speeds of less than 6.8 mph account for more than one-half of the observed winds. Prevailing winds are from the northwest through southwest, with secondary flows from the southeast. The strongest and most persistent winds typically occur immediately to the east of Banning Pass, which is noted as a wind power generation resource area. Aside from this locale, the wind conditions in the remainder of the Coachella Valley are geographically distinct. Stronger winds tend to occur closer to the foothills. Less frequently, X
1 1 1 1 X 1 1
X
1 1 1 1 X 1 1
309
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 15
widespread gusty winds occur over all areas of the Valley.
Portions of the SSAB experience surface inversions almost every day of the year. Inversions in the SSAB are attributed to strong surface heating, but are usually broken, allowing pollutants to disperse more easily.
Weak surface inversions are caused by cooling of air in contact with the cold surface of the earth at night.
In the valleys and low-lying areas, this condition is intensified by the addition of cold air flowing downslope from the hills and pooling on the valley floor. In addition, inversions in the SSAB caused by the presence of the Pacific high-pressure cell can cause the air mass aloft to sink. As the air descends, compressional heating warms the air to a temperature higher than the air below. This subsidence inversion can act as a nearly impenetrable lid to the vertical mixing of pollutants. These inversions can persist for one or more days, causing air stagnation and the buildup of pollutants. Subsidence inversions are common from November through June and are relatively absent from July through October.
Within the Project area, there is a natural sand migration process, called “blowsand,” that has direct and indirect effects on air quality. Blowsand produces particulate matter (PM10) in two ways: (1) by direct particle erosion and fragmentation as natural PM10, and (2) by secondary effects, as sand deposits on road surfaces. Also, where water has already receded around the Salton Sea, the surface areas contain a salty mix of sediments that can change from a hardened salt crust to a fluffy soft layer of dust depending upon the season. Exposed sediments could elevate PM10 levels throughout the region. Almost 120,000 acres of Salton Sea lakebed could be exposed as inflows to the Sea decrease in future years. Local communities may be affected by 60,000 potentially dust-blowing acres, which will future cause PM10 levels to rise.
Please refer to Appendix 1 for a discussion of Criteria Air Pollutants and air quality regulations (federal state and local) that apply to the project area/site.
AIR QUALITY REGIONAL EMISSIONS THRESHOLDS
The SCAQMD has developed regional significance thresholds for criteria pollutants, as summarized in Table III-1. The SCAQMD’s CEQA Air Quality Significance Thresholds (March 2023) indicate that any projects in the Salton Sea Air Basin (SSAB) with daily emissions that exceed any of the indicated thresholds should be considered as having an individually and cumulatively significant air quality impact.
Table III-1
MAXIMUM DAILY REGIONAL EMISSIONS THRESHOLDS
Pollutant Construction Operations
NOX 100 lbs/day 55 lbs/day
VOC 75 lbs/day 55 lbs/day
PM10 150 lbs/day 150 lbs/day
PM2.5 55 lbs/day 55 lbs/day
SOX 150 lbs/day 150 lbs/day
CO 550 lbs/day 550 lbs/day
lbs/day – Pounds Per Day
Please refer to Appendix 1, beginning on page six, for a discussion of federal, state and local air quality regulations.
AIR QUALITY LOCALIZED EMISSIONS THRESHOLDS
For this Project, the appropriate SRA for the LST analysis is the SCAQMD T Coachella Valley monitoring station (SRA 30). LSTs apply to CO, NO2, PM10, and PM2.5. The SCAQMD produced lookup tables for projects less than or equal to 5 acres in size. The SCAQMD’s screening look-up tables are utilized in determining localized impacts. It should be noted that since the look-up tables identify thresholds at only 1 310
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 16
acre, 2 acres, and 5 acres, linear regression has been utilized to determine localized significance thresholds. Consistent with SCAQMD guidance, the thresholds presented in Tables III-2 and III-3 were calculated by interpolating the threshold values for the Project’s disturbed acreage.
The acres disturbed is based on the equipment list and days in the site preparation, trenching, and grading phase according to the anticipated maximum number of acres a given piece of equipment can pass over in an 8-hour workday. The equipment-specific grading rates are summarized in the CalEEMod user’s guide, Appendix C: Emission Calculation Details for CalEEMod. It should be noted that the disturbed area per day is representative of a piece of equipment making multiple passes over the same land area. In other words, one Rubber Tired Dozer can make multiple passes over the same land area totaling 0.5 acres in a given 8- hour day. Appendix A of the CalEEMod User Manual only identifies equipment-specific grading rates for Crawler Tractors, Graders, Rubber Tired Dozers, and Scrapers; therefore, Tractors/Loaders/Backhoes equipment that was included in the site preparation and grading phase was replaced with Crawler Tractors.
For analytical purposes, emissions associated with peak construction activities are considered for purposes of localized significance thresholds (LSTs) since this phase represents the maximum localized emissions that would occur. The Project’s construction activities could disturb a maximum of approximately 0.5 acre per day for all construction activities. Any other construction phases of development would result in lesser emissions and consequently lesser impacts than what is disclosed herein. As such, Tables III-2 and III-3 presents thresholds for localized construction emissions for both phases. It should be noted that a 1 acre per day disturbance area for all construction activities was utilized as this is the SCAQMD lookup tables minimum acreage.
Table III-2
MAXIMUM DAILY LOCALIZED EMISSIONS THRESHOLDS – PHASE 1
Construction Activity NOX CO PM10 PM2.5
Linear, Grubbing & Land Clearing 132 lbs/day 878 lbs/day 4 lbds/day 3 lbs/day Demolition 132 lbs/day 878 lbs/day 4 lbds/day 3 lbs/day Linear, Grading & Excavation 132 lbs/day 878 lbs/day 4 lbds/day 3 lbs/day Linear, Drainage, Utilities & Sub-Grade 132 lbs/day 878 lbs/day 4 lbds/day 3 lbs/day Linear, Paving 132 lbs/day 878 lbs/day 4 lbds/day 3 lbs/day Linear, Grubbing & Land Clearing 132 lbs/day 878 lbs/day 4 lbds/day 3 lbs/day Notes: Source of localized significance threshold (LSTs) is provided on page 17.
Table III-3
MAXIMUM DAILY LOCALIZED EMISSIONS THRESHOLDS – PHASE 2
Construction Activity NOX CO PM10 PM2.5
Linear, Grubbing & Land Clearing 132 lbs/day 878 lbs/day 4 lbds/day 3 lbs/day Linear, Grading & Excavation 132 lbs/day 878 lbs/day 4 lbds/day 3 lbs/day Linear, Drainage, Utilities & Sub-Grade 132 lbs/day 878 lbs/day 4 lbds/day 3 lbs/day Linear, Paving 132 lbs/day 878 lbs/day 4 lbds/day 3 lbs/day Linear, Grubbing & Land Clearing 132 lbs/day 878 lbs/day 4 lbds/day 3 lbs/day Notes: Source of localized significance threshold (LSTs) is provided on page 18.
SENSITIVE RECEPTORS
The analysis makes use of methodology included in the SCAQMD Final Localized Significance Threshold Methodology (LST Methodology). The SCAQMD has established that impacts to air quality are significant if there is a potential to contribute or cause localized exceedances of the federal and/or state ambient air quality standards (NAAQS/CAAQS). Collectively, these are referred to as Localized Significance Thresholds (LSTs). The SCAQMD established LSTs in response to the SCAQMD Governing Board’s 311
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 17
Environmental Justice Initiative I-4. LSTs represent the maximum emissions from a project that will not cause or contribute to an exceedance of the most stringent applicable federal or state ambient air quality standard at the sensitive receptor. The SCAQMD states that lead agencies can use the LSTs as another indicator of significance in their air quality impact analyses. The SCAQMD recommends that the nearest sensitive receptor be considered when determining the Project’s potential to cause an individual or cumulatively significant impact.
The nearest land use where an individual could remain for 24 hours to the Project site has been used to determine localized construction and operational air quality impacts for emissions of PM10 and PM 2 .5 (since PM10 and PM2.5 thresholds are based on a 24-hour averaging time. Consistent with LST Methodology, the nearest industrial/commercial use to the Project site is used to determine construction and operational LST air impacts for emissions of NOX and CO as the averaging periods for these pollutants are shorter (8 hours or less) and it is reasonable to assume that an individual could be present at these sites for periods of one to 8 hours.
It should be noted that the LST Methodology explicitly states that “It is possible that a project may have receptors closer than 25 meters. Projects with boundaries located closer than 25 meters to the nearest receptor should use the LSTs for receptors located at 25 meters .” Since sensitive receptors in the vicinity of the Project site are located within 25 meters of the Project site boundary, a 25-meter receptor distance was conservatively used for the evaluation of localized PM10, PM2.5, NOX, and CO.
Impact Findings
a) Less Than Significant Impact The Project site is located within the SSAB and is subject to SCAQMD’s 2022 AQMP and the 2003 Coachella Valley PM10 SIP. The SCAQMD has jurisdiction over an approximately 10,743 square-mile area consisting of the four-county Basin and the Los Angeles County and Riverside County portions of what use to be referred to as the Southeast Desert Air Basin. In these areas, the SCAQMD is principally responsible for air pollution control, and works directly with the Southern California Association of Governments (SCAG), county transportation commissions, local governments, as well as state and federal agencies to reduce emissions from stationary, mobile, and indirect sources to meet state and federal ambient air quality standards.
Currently, these state and federal air quality standards are exceeded in most parts of the SSAB. In response, the SCAQMD has adopted a series of AQMPs to meet the state and federal ambient air quality standards. AQMPs are updated regularly in order to more effectively reduce emissions, accommodate growth, and to minimize any negative fiscal impacts of air pollution control on the economy.
In December 2022, the SCAQMD released the Final 2022 AQMP (2022 AQMP). The 2022 AQMP continues to evaluate current integrated strategies and control measures to meet the NAAQS, as well as explore new and innovative methods to reach its goals. Some of these approaches include utilizing incentive programs, recognizing existing co-benefit programs from other sectors, and developing a strategy with fair-share reductions at the federal, state, and local levels (16). Similar to the 2016 AQMP, the 2022 AQMP incorporates scientific and technological information and planning assumptions, including the 2020-2045 RTP/SCS, a planning document that supports the integration of land use and transportation to help the region meet the federal CAA requirements (17). The Project’s consistency with the AQMP will be determined using the 2022 AQMP as discussed below.
SCAG adopted the 2020-2045 Regional Transportation Plan/Sustainable Communities Strategy (2020-2045 RTP/SCS), a planning document that supports the integration of land use and transportation to help the region meet the federal metropolitan planning organization (MPO) requirements under the Sustainable communities and Climate Protection Act. The proposed Project would be developed in accordance with all applicable rules and regulations contained in those plans.
It should be noted that although the 2024-2050 RTP was released after approval of the 2022 AQMP, 312
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 18
the 2022 AQMP is reliant in part upon the general plan land use designations. Criteria for determining consistency with the AQMP are defined in Chapter 12, Section 12.2 and Section 12.3 of the 1993 CEQA Handbook. These indicators are discussed below:
The proposed Project will not result in an increase in the frequency or severity of existing air quality violations or cause or contribute to new violations or delay the timely attainment of air quality standards or the interim emissions reductions specified in the AQMP.
The violations that under this criterion referred to are the CAAQS and NAAQS. CAAQS and NAAQS violations would occur if regional or localized significance thresholds were exceeded. CAAQS and NAAQS violations would occur if regional or localized significance thresholds were exceeded. As evaluated, the Project’s regional and localized construction and operational-source emissions would not exceed applicable regional significance thresholds. As such, a less than significant impact is expected.
The Project will not exceed the assumptions in the AQMP based on the years of Project build-out phase.
The 2022 AQMP demonstrates that the applicable ambient air quality standards can be achieved within the time frames required under federal law. Growth projections from local general plans adopted by cities in the SCAG’s jurisdiction are provided to the SCAG, which develops regional growth forecasts, which are then used to develop future air quality forecasts for the AQMP. The Project is a regional storm drain improvement project and would not affect the base assumptions in the AQMP.
b) Less Than Significant Impact – The Project, as evaluated herein would not exceed the regional or localized air quality significance thresholds. The CAAQS designates the Project site as nonattainment for,O3, PM10, and PM2.5 while the NAAQS designates the Project site as nonattainment for O3 and PM2.5. The SCAQMD has published a report on how to address cumulative impacts from air pollution: White Paper on Potential Control Strategies to Address Cumulative Impacts from Air Pollution. In this report the SCAQMD clearly states (Page D-3):
“…the SCAQMD uses the same significance thresholds for project specific and cumulative impacts for all environmental topics analyzed in an Environmental Assessment or EIR. The only case where the significance thresholds for project specific and cumulative impacts differ is the Hazard Index (HI) significance threshold for TAC emissions. The project specific (project increment) significance threshold is HI > 1.0 while the cumulative (facility-wide) is HI > 3.0. It should be noted that the HI is only one of three TAC emission significance thresholds considered (when applicable) in a CEQA analysis. The other two are the maximum individual cancer risk (MICR) and the cancer burden, both of which use the same significance thresholds (MICR of 10 in 1 million and cancer burden of 0.5) for project specific and cumulative impacts. Projects that exceed the project-specific significance thresholds are considered by the SCAQMD to be cumulatively considerable. This is the reason project-specific and cumulative significance thresholds are the same. Conversely, projects that do not exceed the project-specific thresholds are generally not considered to be cumulatively significant.” Therefore, this analysis assumes that individual projects that do not generate operational or construction emissions that exceed the SCAQMD’s recommended daily thresholds for project specific impacts would also not cause a cumulatively considerable increase in emissions for those pollutants for which SSAB is in nonattainment, and, therefore, would not be considered to have a significant, adverse air quality impact. Alternatively, individual project-related construction and operational emissions that exceed SCAQMD thresholds for project-specific impacts would be considered cumulatively considerable.
The Project-specific evaluation of emissions presented in the preceding analysis demonstrates that 313
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 19
proposed Project construction-source air pollutant emissions would not result in exceedances of regional thresholds.
CONSTRUCTION ACTIVITIES
CalEEMod provides a limited set of construction activity categories, which may not cover all specific activities included in a given project. To ensure comprehensive modeling, activities not directly represented in the model were reviewed and assigned to the most appropriate categories. This approach ensures the modeling remains consistent with the model’s framework while capturing the full scope of construction emissions. Construction activities associated with the Project would result in emissions of VOCs, NOX, SOX, CO, PM10, and PM2.5. Construction related emissions are expected from the following construction activities:
Phase 1
• Linear, Grubbing & Land Clearing
• Demolition
• Linear, Grading & Excavation
• Linear, Drainage, Utilities, & Sub-Grade
• Linear, Paving
Phase 2
• Linear, Grubbing & Land Clearing
• Linear, Grading & Excavation
• Linear, Drainage, Utilities, & Sub-Grade
• Linear, Paving
DEMOLITION ACTIVITIES
The Project site currently contains three existing concrete weirs, which would be removed during Phase 1, resulting in approximately 3,111 square feet of demolished material.
GRADING ACTIVITIES
Dust is typically a major concern during grading activities. Because such emissions are not amenable to collection and discharge through a controlled source, they are called “fugitive emissions.” Fugitive dust emissions rates vary as a function of many parameters (soil silt, soil moisture, wind speed, area disturbed, number of vehicles, depth of disturbance or excavation, etc.). CalEEMod was utilized to calculate fugitive dust emissions resulting from this phase of activity. Based on information provided by the Project applicant, Phase 1 would require 15,000 cubic yards (CY) of soil export, and Phase 2 would require 1,800 CY of soil export, for a Project total of 16,800 CY of export for earthwork activities.
ON-ROAD TRIPS
Construction generates on-road vehicle emissions from vehicle usage for workers, vendors, and haul trucks commuting to and from the site. The number of worker, vendor, and hauling trips per phase is presented below in Tables III-4 and III-5 and are based on CalEEMod defaults.
Table III-4
CONSTRUCTION TRIP ASSUMPTIONS – PHASE 1
Construction Activity Worker Trips Per
Day Vendor Trips Per Day Hauling Trips Per Day
Linear, Grubbing & Land Clearing 15 0 0
Demolition 8 0 4
314
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 20
Construction Activity Worker Trips Per
Day Vendor Trips Per Day Hauling Trips Per Day
Linear, Grading & Excavation 10 1 104
Linear, Drainage, Utilities & Sub-Grade 10 0 0
Linear, Paving 18 0 0
Table III-5
CONSTRUCTION TRIP ASSUMPTIONS – PHASE 2
Construction Activity Worker Trips Per
Day Vendor Trips Per Day Hauling Trips Per Day
Linear, Grubbing & Land Clearing 15 0 0
Linear, Grading & Excavation 10 1 16
Linear, Drainage, Utilities & Sub-Grade 10 0 0
Linear, Paving 18 0 0
CONSTRUCTION DURATION
For purposes of analysis, construction of Phase 1 is expected to commence in November 2026 and would last through January 2027. Construction of Phase 2 is expected to commence in January 2027 and would last through March 2027. The construction schedule utilized in the analysis represents a “worst-case” analysis scenario should construction occur any time after the respective dates since emission factors for construction decrease as time passes and the analysis year increases due to emission regulations becoming more stringent. The duration of construction activity and associated equipment represents a reasonable approximation of the expected construction fleet as required per CEQA Guidelines. See Tables III-6 and III-7.
Table III-6
CONSTRUCTION DURATION- PHASE 1
Construction Activity Start Date End Date Days
Linear, Grubbing & Land Clearing 11/2/2026 11/9/2026 5
Demolition 11/10/2026 11/23/2026 10
Linear, Grading & Excavation 11/24/2026 12/17/2026 18
Linear, Drainage, Utilities & Sub-Grade 12/18/2026 1/8/2027 16 Linear, Paving 1/9/2027 1/18/2027 6
Table III-7
CONSTRUCTION DURATION- PHASE 2
Construction Activity Start Date End Date Days
Linear, Grubbing & Land Clearing 1/19/2027 1/22/2027 4
Linear, Grading & Excavation 1/25/2027 2/11/2027 14
Linear, Drainage, Utilities & Sub-Grade 2/12/2027 3/1/2027 12 Linear, Paving 3/2/2027 3/8/2027 5
CONSTRUCTION EQUIPMENT
Equipment used for construction of both phases of the Project is shown in Tables III-8 and III-9, respectively. Consistent with industry standards and typical construction practices, each piece of equipment will operate up to a total of eight (8) hours per day, or more than two-thirds of the period 315
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 21
during which construction activities are allowed pursuant to the code.
Table III-8
CONSTRUCTION EQUIPMENT- PHASE 1
Construction Activity Equipment Quantity Hours
Linear, Grubbing & Land Clearing Off-Highway Truck 2 8
Linear, Grubbing & Land Clearing Rubber Tired Dozer 1 8 Linear, Grubbing & Land Clearing Tractors/Loaders/Backhoes 1 8 Linear, Grubbing & Land Clearing Excavators 1 8
Linear, Grubbing & Land Clearing Other General Industrial Equipment 1 8 Demolition Concrete/Industrial Saws 1 8
Demolition Excavators 1 8
Demolition Rubber Tired Dozers 1 8
Linear, Grading & Excavation Off-Highway Truck 2 8
Linear, Grading & Excavation Rubber Tired Dozer 1 8
Linear, Grading & Excavation Tractors/Loaders/Backhoes 1 8 Linear, Drainage, Utilities, & Sub-Grade Off-Highway Truck 2 8 Linear, Drainage, Utilities, & Sub-Grade Rubber Tired Dozer 1 8 Linear, Drainage, Utilities, & Sub-Grade Tractors/Loaders/Backhoes 1 8 Linear, Paving Paving Equipment 1 8
Linear, Paving Other General Industrial Equipment 1 8
Linear, Paving Off-Highway Truck 3 8
Linear, Paving Tractors/Loaders/Backhoes 1 8
Linear, Paving Plate Compactor 1 8
Table III-9
CONSTRUCTION EQUIPMENT- PHASE 2
Construction Activity Equipment Quantity Hours
Linear, Grubbing & Land Clearing Off-Highway Truck 2 8
Linear, Grubbing & Land Clearing Rubber Tired Dozer 1 8 Linear, Grubbing & Land Clearing Tractors/Loaders/Backhoes 1 8 Linear, Grubbing & Land Clearing Excavators 1 8
Linear, Grubbing & Land Clearing Other General Industrial Equipment 1 8 Linear, Grading & Excavation Off-Highway Truck 2 8
Linear, Grading & Excavation Rubber Tired Dozer 1 8
Linear, Grading & Excavation Tractors/Loaders/Backhoes 1 8 Linear, Drainage, Utilities, & Sub-Grade Off-Highway Truck 2 8 Linear, Drainage, Utilities, & Sub-Grade Rubber Tired Dozer 1 8 Linear, Drainage, Utilities, & Sub-Grade Tractors/Loaders/Backhoes 1 8 Linear, Paving Paving Equipment 1 8
Linear, Paving Other General Industrial Equipment 1 8
Linear, Paving Off-Highway Truck 3 8
316
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 22
Construction Activity Equipment Quantity Hours
Linear, Paving Tractors/Loaders/Backhoes 1 8
Linear, Paving Plate Compactor 1 8
REGIONAL CONSTRUCTION EMISSIONS
The estimated maximum daily construction emissions without mitigation for Phases 1 and 2 are summarized in Tables III-10 and III-11, respectively. Under the assumed scenarios, emissions resulting from the Project construction of both phases would not exceed thresholds established by the SCAQMD for emissions of any criteria pollutant. Project construction-source emissions impacts would therefore be less-than-significant. Detailed construction model outputs are presented in Appendices 1 and 2 of Appendix 1.
Table III-10
OVERALL REGIONAL CONSTRUCTION EMISSIONS SUMMARY - PHASE 1 Year ROG NOx CO SO2 PM10 PM2.5
Winter
2026 2.15 22.83 17.64 0.09 4.46 2.07
2027 1.91 13.90 15.20 0.04 2.39 1.41
Maximum Daily Emissions 2.15 22.83 17.64 0.09 4.46 2.07 SCAQMD Regional Thresholds 75 100 550 150 150 55
Threshold Exceeded? No No No No No No
Notes: CalEEMod construction-source (unmitigated) emissions are presented in Appendix 1.
Table III-11
OVERALL REGIONAL CONSTRUCTION EMISSIONS SUMMARY - PHASE 2 Year ROG NOx CO SO2 PM10 PM2.5
Winter
2026 2.15 22.83 17.64 0.09 4.46 2.07
2027 1.91 13.90 15.20 0.04 2.39 1.41
Maximum Daily Emissions 2.15 22.83 17.64 0.09 4.46 2.07 SCAQMD Regional Thresholds 75 100 550 150 150 55
Threshold Exceeded? No No No No No No
Notes: CalEEMod construction-source (unmitigated) emissions are presented in Appendix 1.
REGIONAL OPERATIONAL EMISSIONS
The proposed Project primarily involves construction activities associated with improvements to existing drainage infrastructure, including linear basin modifications, storm drain installation, and construction of a retention basin. The Project is intended to improve stormwater conveyance and flood control capacity within the existing drainage system, thereby reducing localized flooding at the intersection of Gerald Ford Drive and Cook Street during storm events. Aside from trips related to periodic maintenance, no operational activities are proposed and thus operational emissions would be less than significant.
Proposed Project construction-source emissions would be considered less than significant on a project-specific and cumulative basis.
The Project-specific evaluation of emissions presented in the preceding analysis demonstrates that 317
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 23
proposed Project construction- and operational-source air pollutant emissions would not result in exceedances of regional thresholds. Therefore, the proposed Project operational-source emissions would be considered less than significant on a project-specific and cumulative basis. c) Less Than Significant Impact – The potential impact of Project-generated air pollutant emissions at sensitive receptors has also been considered.
LOCALIZED CONSTRUCTION EMISSIONS
Tables III-12 and III-13 identify the localized impacts of both phases at the nearest receptor location in the vicinity of the Project. Outputs from the model runs for construction LSTs are provided in Appendices 1 and 2 of Appendix 1 to this document. For analytical purposes, emissions associated with peak construction activities are considered for purposes of LSTs since these phases represent the maximum localized emissions that would occur. Any other construction phases of development that overlap would result in lesser emissions and consequently lesser impacts than what is disclosed herein. As shown in Tables III-12 and III-13, emissions resulting from the construction of both phases will not exceed the numerical thresholds of significance established by the SCAQMD for any criteria pollutant. Thus, a less than significant impact would occur for localized Project-related construction-source emissions and no mitigation is required.
Table III-12
PROJECT LOCALIZED CONSTRUCTION IMPACTS – PHASE 1
On-Site Emissions NOX CO PM10 PM2.5
Linear, Grubbing & Land Clearing
Maximum Daily Emissions 16.05 16.89 2.33 1.45
SCAQMD Localized Threshold 132 878 4 3
Threshold Exceeded? NO NO NO NO
Demolition
Maximum Daily Emissions 10.66 9.91 0.63 0.42
SCAQMD Localized Threshold 132 878 4 3
Threshold Exceeded? NO NO NO NO
Linear, Grading & Excavation
Maximum Daily Emissions 1.45 1.45 2.30 1.41
SCAQMD Localized Threshold 132 878 4 3
Threshold Exceeded? NO NO NO NO
Linear, Drainage, Utilities, & Sub-Grade
Maximum Daily Emissions 14.47 14.90 2.29 1.41
SCAQMD Localized Threshold 132 878 4 3
Threshold Exceeded? NO NO NO NO
Linear, Paving
Maximum Daily Emissions 10.42 13.92 0.36 0.33
SCAQMD Localized Threshold 132 878 4 3
Threshold Exceeded? NO NO NO NO
318
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 24
Table III-13
PROJECT LOCALIZED CONSTRUCTION IMPACTS – PHASE 2
On-Site Emissions NOX CO PM10 PM2.5
Linear, Grubbing & Land Clearing
Maximum Daily Emissions 15.41 16.71 2.30 1.42
SCAQMD Localized Threshold 132 878 4 3
Threshold Exceeded? NO NO NO NO
Linear, Grading & Excavation
Maximum Daily Emissions 13.86 14.73 2.26 1.38
SCAQMD Localized Threshold 132 878 4 3
Threshold Exceeded? NO NO NO NO
Linear, Drainage, Utilities, & Sub-Grade
Maximum Daily Emissions 13.86 14.73 2.26 1.38
SCAQMD Localized Threshold 132 878 4 3
Threshold Exceeded? NO NO NO NO
Linear, Paving
Maximum Daily Emissions 10.42 13.92 0.36 0.33
SCAQMD Localized Threshold 132 878 4 3
Threshold Exceeded? NO NO NO NO
LOCALIZED OPERATIONAL EMISSIONS
According to SCAQMD localized significance threshold methodology, LSTs would apply to the operational phase of a proposed Project if the Project includes stationary sources or attracts mobile sources that may spend extended periods queuing and idling at the site (e.g., warehouse or transfer facilities). As previously discussed, the Project primarily involves construction activities associated with improvements to existing drainage infrastructure, including linear basin modifications, storm drain installation, and construction of a retention basin. The Project is intended to improve stormwater conveyance and flood control capacity within the existing drainage system, thereby reducing localized flooding at the intersection of Gerald Ford Drive and Cook Street during storm events. The Project will not include stationary or mobile sources other than random trips associated with periodic maintenance. Therefore, the Project would not expose sensitive receptors to substantial pollutant concentrations and impacts would be less than significant.
Results of the LST analysis indicate that the Project will not exceed the SCAQMD localized significance thresholds during construction. Therefore, sensitive receptors would not be exposed to substantial pollutant concentrations during Project construction. Additionally, the Project will not exceed the SCAQMD localized significance thresholds during operational activity. Therefore, sensitive receptors would not be exposed to substantial pollutant concentrations as the result of Project operations.
A CO hotspot is defined as a localized concentration of carbon monoxide exceeding the state one hour standard of 20 ppm or the eight-hour standard of 9 ppm. At the time the most recent CEQA Air Quality Handbook (1993) was published by SCAQMD, the air basin was designated as nonattainment, requiring projects to perform hotspot analyses to ensure they did not worsen the existing conditions. Over the last two decades, background CO concentrations have been significantly reduced due to regulatory controls on tailpipe emissions, which have culminated in the air basin achieving attainment status for CO.
319
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 25
The 2003 AQMP’s findings underscore that CO hotspots are highly unlikely due to the reduced background concentrations and the effectiveness of California's air quality management strategies.
The substantial reduction in CO levels from the vehicle fleet and the state’s attainment status for CO further diminish the need for detailed microscale hotspot analyses, reinforcing that existing monitoring and regulatory frameworks adequately address potential air quality concerns.
As summarized in the 2003 AQMP, even at one of the busiest intersections at that time, only 0.7 ppm of CO is attributable to vehicular traffic and the remaining 7.7 ppm were due to ambient background conditions. Within the Project vicinity, the background air quality 1-hour and 8-hour concentrations are well below the applicable AAQS. As such, Project-related traffic at any intersections within the air basin would not cause or contribute to a CO hotspot since the background concentrations are low and any contribution from project traffic would be negligible. The project would not significantly contribute to the formation of a CO hotspot. Therefore, the proposed project would have a less than significant potential to expose sensitive receptors to substantial pollutant concentrations. d) Less Than Significant Impact – The potential for the Project to generate objectionable odors has also been considered. Land uses generally associated with odor complaints include:
• Agricultural uses (livestock and farming)
• Wastewater treatment plants
• Food processing plants
• Chemical plants
• Composting operations
• Refineries
• Landfills
• Dairies
• Fiberglass molding facilities
The Project does not contain land uses typically associated with emitting objectionable odors.
Potential odor sources associated with the proposed Project may result from construction equipment exhaust and the temporary storage of typical solid waste (refuse) associated with construction activity. Standard construction requirements would minimize odor impacts from construction. The construction odor emissions would be temporary, short-term, and intermittent in nature and would cease upon completion of the respective phase of construction and is thus considered less than significant. Therefore, odors associated with the proposed Project construction would be less than significant and no mitigation is required.
320
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 26
Potentially
Significant Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant Impact
No Impact or
Does Not Apply
IV. BIOLOGICAL RESOURCES: Would the project:
a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S.
Fish and Wildlife Service?
b) Have a substantial adverse effect on any riparian
habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service?
c) Have a substantial adverse effect on state or
federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct
removal, filling, hydrological interruption, or other
means?
d) Interfere substantially with the movement of any
native resident or migratory fish or wildlife species or with established native resident or migratory wildlife
corridors, or impede the use of native wildlife nursery sites?
e) Conflict with any local policies or ordinances
protecting biological resources, such as a tree
preservation policy or ordinance?
f) Conflict with the provisions of an adopted Habitat
Conservation Plan, Natural Community Conservation
Plan, or other approved local, regional, or state habitat conservation plan?
SUBSTANTIATION: “Biological Resources Technical Report City of Palm Desert Mid Valley Basin & Gerald Ford Drive Drainage Improvements Project,” HDR, May 21, 2026. This document is provided as Appendix 2 of this document.
Background
The Project Area consists of approximately 3,800 linear feet (LF) of mostly unvegetated existing artificial earthen flood control linear basin (Mid Valley Basin), an 8-acre, previously tilled, vacant property adjacent the south side of the Mid Valley Basin, and approximately 3,800 LF of paved roadway (Gerald Ford Drive).
Existing disturbances within the Project Area include flood control facility operations and maintenance, Union Pacific Railroad operations and maintenance, commercial and residential development, utility infrastructure, vehicular traffic, and dumping.
Habitat
The Project site is completely disturbed and no longer supports any native habitats (see Appendix B: Site 1 1 X 1 1 1 1
1 1 1 1 1 1 X
1 1 X 1 1 1 1
1 1 X 1 1 1 1
1 1 1 1 1 1 X
1 1 1 1 1 1 X
321
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 27
Photos). The proposed detention basin site and adjacent undeveloped parcels in the surrounding area consist of previously tilled, abandoned cropland. Sparse vegetation occurring along the existing Mid Valley Basin and within the undeveloped portions of the Project Area consists mostly of non-native and ruderal native species. Native plant species observed on site include desert sand verbena (Abronia villosa), four-wing saltbush (Atriplex canescens), coyote gourd (Cucurbita palmata), sacred datura (Datura wrightii), brittlebush (Encelia farinosa), creosote bush (Larrea tridentata), and indigo bush (Psorothamnus schottii).
Non-native plant species observed on site include crete weed, (Hedypnois rhagadioloides), lantana (Lantana sp.), cheeseweed mallow (Malva parviflora), crimson bottlebrush (Melaleuca citrina), Jerusalem thorn (Parkinsonia aculeata), fountain grass (Pennisetum setaceum) leafless cassia (Senna artemisioides), London rocket (Sisymbrium irio), and athel tamarisk (Tamarix aphylla).
Wildlife
Wildlife species observed or otherwise detected during the survey included great egret (Ardea alba), burrowing owl (Athene cunicularia), verdin (Auriparus flaviceps), Canada goose (Branta canadensis), Costa's hummingbird (Calypte costae), rock pigeon (Columba livia), common raven (Corvus corax), greater roadrunner (Geococcyx californianus), house finch (Haemorhous mexicanus), house sparrow (Passer domesticus), cliff swallow (Petrochelidon pyrrhonota), black phoebe (Sayornis nigricans), Say’s phoebe (Sayornis saya), Eurasian collared-dove (Streptopelia decaocto), mourning dove (Zenaida macroura), side-blotched lizard (Uta stansburiana), coyote (Canis latrans), black-tailed jackrabbit (Lepus californicus), and desert cottontail (Sylvilagus audubonii).
Special Status Species and Habitats
According to the USFWS IPaC, CNDDB, and CNPSEI database queries, 64 sensitive species (33 plant species and 31 animal species) and one sensitive habitat have been documented in the Myoma, Cathedral City, La Quinta, and Rancho Mirage USGS 7.5-Minute Series Quadrangles. However, there is suitable habitat within the Project Area for burrowing owl (BUOW), which is a candidate species for listing as endangered under CESA, and this species does occur on site. The Project Area is not suitable for any of the other 13 state and/or federally listed or federally proposed for listing as threatened or endangered species, and/or state candidate or fully protected species listed in Table 3 (found in Appendix 2). An analysis of the likelihood for occurrence of all Information for Planning and Consultation System (IPaC), California Natural Diversity Database (CNDDB), and California Native Plant Society Electronic Inventory (CNPSEI) sensitive species documented in the Myoma, Cathedral City, La Quinta, and Rancho Mirage quads is provided in Appendix A of Appendix 2. This analysis considers species’ range as well as documentation within the vicinity of the Project site and includes the habitat requirements for each species and the potential for their occurrence on site, based on required habitat elements and range relative to the current site conditions.
Burrowing owl – Candidate Endangered (State)
The BUOW is a ground dwelling owl typically found in arid prairies, fields, and open areas where vegetation is sparse and low to the ground. The breeding season for BUOW is typically February 1 through August 31.
The BUOW is not listed under the federal ESA but is a candidate for state listing as endangered under CESA. Additionally, the BUOW is a USFWS Bird of Conservation Concern (BCC) and a migratory bird protected by the international treaty under the federal Migratory Bird Treaty Act (MBTA) of 1918 and by state law under the California FGC (FGC sections 2074.2, 2085, 3513 & 3503.5).
Findings: According to the CNDDB, BUOW have been documented within 1 mile northeast of the Project Area as recently as 2007. There is suitable BUOW habitat consisting of sparsely vegetated, abandoned cropland and existing flood control facilities (Mid Valley Basin). The BUOW habitat assessment and focused burrow survey conducted by HDR on March 27, 2026, was structured, in part, to detect BUOW. The survey area was systematically searched for potential owl burrows and suitable surrogate burrows, BUOW individuals, and sign including, molted feathers, cast pellets, prey remains, owl whitewash, and feces or other ornamentation. The result of the habitat assessment and focused burrow survey was that one potentially suitable fossorial mammal burrow and one burrow surrogate (drain pipe), both at least 3 inches 322
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 28
in diameter, were observed and recorded within the Mid Valley Basin portion of the survey area (Figure IV-1). BUOW sign observed in association with these two potential burrows included molted feathers, cast pellets, prey remains, and owl whitewash. Therefore, in accordance with CDFW’s (2012) Staff Report on Burrowing Owl, focused BUOW surveys consisting of site visits on three additional separate days were conducted on May 18, 19, and 20, 2026.
The result of the focused BUOW surveys conducted on March 27 and May 18-20, 2026, was that one additional owl burrow (fossorial mammal burrow) and two burrow surrogates (drain pipes) with sign including cast pellets, feathers, prey remains, and whitewash were observed within the Mid Valley Basin portion of the survey area. On May 18, 19, and 20, 2026, the HDR biologist observed a pair of BUOW on site. Based on the observed behavior of the pair, they are apparently nesting in a fossorial mammal burrow located within the Mid Valley Basin, near the northwest corner of the proposed detention basin property (Figure IV-1). Therefore, the Mid Valley Basin is considered occupied by BUOW at the time of survey and the Project may affect this species. No other BUOW individuals or sign were observed throughout the rest of the survey area.
Special Status Habitats
The Project Area does not contain any sensitive habitats, including any USFWS designated Critical Habitat for any federally listed species. The nearest Critical Habitat unit is approximately 0.5 mile east of the Project site. This Critical Habitat unit is the USFWS designated Critical Habitat for the federally listed as threatened Coachella Valley fringe-toed lizard. However, no portion of the Project site is within or adjacent this Critical Habitat unit, or any other Critical Habitat. Therefore, the Project will have no effect on USFWS designated Critical Habitat, or any other special status habitats.
Aquatic Resources Delineation
The Project Area is situated within the Indio Hydrologic Sub-Area (HSA 719.47), which comprises an approximately 540,057-acre drainage area within the larger Whitewater River Watershed (HUC 18100201).
The Whitewater River is the major hydrogeomorphic feature within the Whitewater River Watershed. The Whitewater River flows generally northwest to southeast through the Coachella Valley, approximately 3.2 miles south of the Project Area at its nearest point. The Whitewater River terminates at the Salton Sea, approximately 25.5 miles southeast of the Project Area.
Waters of the U.S.
The United States Army Corps of Engineers (USACE) has authority to permit the discharge of dredged or fill material in Waters of the United States (WOTUS) under Section 404 of the Clean Water Act (CWA). The Environmental Protection Agency (EPA) and USACE currently define WOTUS as:
• Paragraph (a)(1) Waters – Traditional navigable waters (TNWs) or those used either currently, previously, or susceptible to future use in interstate or foreign commerce; the territorial seas; and interstate waters (excluding interstate wetlands).
• Paragraph (a)(2) Waters – Impoundments of waters otherwise defined as WOTUS, except for impoundments of those WOTUS that are identified in Paragraph (a)(5) below. • Paragraph (a)(3) Waters – Relatively permanent, standing, or continuously flowing tributaries to the WOTUS described in Paragraphs (a)(1) and (a)(2).
• Paragraph (a)(4) Waters – Wetlands that are adjacent to waters described in Paragraph (a)(1), or relatively permanent, standing or continuously flowing bodies of water identified in Paragraphs (a)(2) or (a)(3) that have a continuous surface connection with those waters. • Paragraph (a)(5) Waters – Intrastate lakes and ponds not identified in Paragraphs (a)(1) through (a)(4) that are relatively permanent, standing, or continuously flowing bodies of water with a continuous surface connection to the waters identified in Paragraphs (a)(1) or (a)(3).
Findings: There are no wetland or non-wetland WOTUS present within the proposed Project footprint. The Mid Valley Basin is an isolated earthen flood control linear basin constructed entirely in uplands. No obligate or facultative wetland plant species were observed within the Mid Valley Basin or elsewhere within the Project Area. Given that the Mid Valley Basin is not a relatively permanent, standing, or continuously flowing 323
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 29
tributary to a WOTUS, or a wetland, pond, or lake with a continuous surface connection to a WOTUS, no aquatic resources subject to regulation by the USACE or Regional Water Quality Control Board (RWQCB) under Sections 404/401 of the CWA occur within the proposed Project Area.
CDFW Streambed and “Waters of the State”
Under Sections 1600 through 1607 of the California Fish and Game Code (FGC), the California Department of Fish and Wildlife (CDFW) has jurisdiction over lakes, rivers, streams, or other aquatic resources, stream-dependent wildlife resources, and riparian habitats.
Findings: The Mid Valley Basin is an isolated earthen flood control linear basin constructed entirely in uplands, and does not support any aquatic life, riparian vegetation, or stream-dependent terrestrial wildlife.
However, this artificial feature does have an identifiable bed and bank and may be subject to regulation by the CDFW under Section 1602 of the FGC, as well as by the RWQCB under the Porter-Cologne Water Quality Control Act (Porter-Cologne). The proposed Mid Valley Basin improvements would not result in permanent impacts or a net loss of CDFW streambed or Porter-Cologne “waters of the State.” Rather, the proposed regrading and expanding of the existing earthen flood control linear basin would result in a gain of additional basin. The anticipated temporary impacts to both CDFW jurisdictional streambed and Porter-Cologne “waters of the State” associated with the Mid Valley Basin improvements are shown on Figure IV-2. Table IV-1 (below) provides a list of the aquatic features and habitats that were identified in the Project Area, as well as the Project component(s) that may impact those waters of the State and CDFW jurisdictional streambed.
Table IV-1
TEMPORARY IMPACTS TO POTENTIAL JURISDICTIONAL AQUATIC RESOURCES Temporary Impacts to CDFW
Streambed
Temporary Impacts to “Waters of
the State”
Mid Valley Basin 3.50 acres 1.20 acres
CVMSHCP
The County of Riverside developed the CVMSHCP to enhance and maintain biological diversity and ecosystem processes while allowing future economic growth. The CVMSHCP sets Conservation Goals and Objectives to ensure the conservation of the Covered Species and conserved natural communities in the MSHCP Reserve System. In addition to setting Conservation Goals and Objectives for the Covered Species and conserved natural communities, the CVMSHCP has designated Core Habitat, Other Conserved Habitat, Essential Ecological Processes, and Biological Corridors and Linkages. The CVMSHCP area is divided into Conservation Areas based on a combination of ecological and jurisdictional factors. The CVMSHCP is intended to satisfy the legal requirements to authorize the “take” of species covered under the Plan during otherwise lawful activities, by providing for the conservation of the Covered Species.
Findings: The Project site is not within or adjacent any Conservation Areas and will not impact any Essential Ecological Processes or Biological Corridors and Linkages.
Other Nesting Birds
In general, impacts to all bird species (common and special status) can be avoided by conducting work outside of the nesting season, which is generally January 1 to September 15 for raptors and February 1 to September 1 for passerine species. However, if all work cannot be conducted outside of nesting season, the following precautionary measures are recommended to ensure MBTA and FGC compliance:
Vegetation removal, including any tree removal or pruning, and structure demolition should be conducted outside the typical nesting season (i.e., between September 15 and December 31). To avoid impacts to nesting birds (common and special status) during the nesting season, a qualified Avian Biologist should conduct preconstruction nesting bird surveys prior to Project related disturbance to suitable nesting areas to identify any active nests. The nesting bird surveys should be conducted no more than three (3) days prior to Project initiation. 324
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 30
If no active nests are found, no further action would be required. If an active nest is found, the biologist should set appropriate no‐work buffers around the nest which would be based upon the nesting species, its sensitivity to disturbance, nesting stage and expected types, intensity, and duration of disturbance. The nest(s) and buffer zones should be field checked weekly by a qualified biological monitor. The approved no‐work buffer zone should be clearly marked in the field, within which no disturbance activity should commence until the qualified biologist has determined the young birds have successfully fledged and the nest is inactive.
Impact Analysis
a) Less Than Significant With Mitigation Incorporated – Based on the biological surveys summarized above and documented in Appendix 2, BUOW was the only special-status species identified within the project area. Several active burrows and one breeding pair were observed within the Mid Valley Basin portion of the site. No other special-status plant or wildlife, and no evidence of their occupancy, were identified during biological surveys. In addition, the Project area largely consists of disturbed habitat and developed land uses that provide limited suitability for most species.
The BUOW is a Covered Species within the CVMSHCP area, and the City of Palm Desert is a signatory to the CVMSHCP. Therefore, “take” of BUOW habitat is covered through payment of a per-acre MSHCP fee, and off-site mitigation is not required. However, prior to implementation of any Project components that could impact BUOW or occupied burrows (i.e., the Mid Valley Basin improvements), the City must prepare and submit a Burrowing Owl Mitigation Plan to the CDFW. The plan would provide details about BUOW occupancy of the Project site, an assessment of Project impacts to BUOW and their habitat, and a plan for mitigating or avoiding impacts.
To maintain Project compliance with the federal Migratory Bird Treaty Act (MBTA) and applicable California FGC Sections that protect nesting birds, any potential Project related impacts to occupied burrows must be avoided during the breeding season, which is defined by the CDFW (2012) Staff Report on Burrowing Owl Mitigation as February 1 through August 31. However, the breeding season may begin earlier if there is evidence of breeding behaviors in late January or evidence that young are still dependent on adults into September or October. Per the CDFW (2012) Staff Report protocol, BUOW avoidance is accomplished through the establishment of avoidance buffers around occupied burrows within which no Project activities may occur during the breeding season. Within the CVMSHCP area, a 160-foot buffer is required around all occupied burrows during the non-breeding season and a 250-foot buffer is required during the breeding season, or a buffer to the edge of the property boundary if less than 500 feet.
Outside of the breeding season, BUOW can be passively relocated from the Project site, which allows for the removal of avoidance buffers and implementation of Project activities in the formerly occupied area. The Burrowing Owl Mitigation Plan would outline a plan for eviction of the owls from occupied burrows that accounts for conditions on and adjacent to the Project site, the number of owls occupying the site, and whether owls have recently used the site for breeding. The eviction plan will outline methods for tracking owl activity, verifying occupied and unoccupied burrows on and off-site, installing one-way doors on burrows and evicting owls, closing on-site burrows, and monitoring owls following eviction. If natural burrows suitable for BUOW occupancy are not available in adjacent, off-site areas, the Burrowing Owl Mitigation Plan may include instructions for the construction of artificial burrows.
Other aspects that may be incorporated into the plan include the use of wildlife cameras to monitor occupied burrows, continuous monitoring by biologists to track owl activities, and reporting to lead and/or responsible agencies before, during, and/or after the eviction effort.
All Project sites containing burrows or suitable habitat, whether BUOW were found during focused burrowing owl surveys or not, require pre-construction surveys that shall be conducted within 30 days prior to ground disturbance to avoid direct take of burrowing owls. Regardless of survey results and conclusions given herein, BUOW are protected by applicable state and federal laws, including but 325
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 31
not exclusive to the federal MBTA and the California FGC. As such, if BUOW are found on site during pre-construction surveys or work activities, all activities likely to affect the species should cease immediately and avoidance measures shall be developed in compliance with the CVMSHCP and in coordination with the CDFW.
Because burrowing owls occupy a portion of the Project area that would be subject to construction activities, Project implementation has the potential to affect occupied burrows, nesting activities, and burrowing owl habitat. Mitigation Measures BIO-1 and BIO-2 require pre-construction surveys, avoidance of occupied burrows where feasible, establishment of protective buffers, and implementation of avoidance and relocation procedures in coordination with CDFW, if necessary.
Avoidance of occupied burrows and burrowing owls shall be the preferred mitigation strategy, with relocation considered only where avoidance is determined to be infeasible.
BIO-1 Burrowing Owl (BUOW) Pre-Construction Surveys and Avoidance. No more than 3- days prior to any ground disturbance activities, a qualified biologist shall conduct pre-construction BUOW surveys within all areas subject to disturbance and within a minimum 500-foot buffer of the disturbance area, where access is available.
Surveys shall be conducted in accordance with the most current California Department of Fish and Wildlife (CDFW) Burrowing Owl Survey Staff Report and any applicable Coachella Valley Multiple Species Habitat Conservation Plan (CVMSHCP) requirements.
The survey shall identify and map all occupied burrows, suitable burrows, burrowing owl observations, nesting activity, and suitable habitat within and adjacent to the work area. A survey report shall documenting the results shall be provided to the City prior to commencement of ground-disturbing activities. If no burrowing owls or occupied burrows are identified, construction may proceed. If occupied burrows or burrowing owls are identified, then the avoidance and minimization measures identified in BIO-2 shall be implemented. No ground-disturbing activities shall occur within occupied burrowing owl avoidance buffers until the requirements of BIO-2 have been satisfied
BIO-2 Burrowing Owl Mitigation Plan. If BUOW or occupied habitat are identified within or adjacent to the Project disturbance area, the City shall retain a qualified biologist to prepare and implement a Burrowing Owl Mitigation Plan in consultation with CDFW prior to issuance of grading permits or commencement of ground-disturbing activities in the affected area. The plan shall include, at a minimum:
• Establishment of avoidance buffers around occupied burrows consistent with current CFDW and CVMSHCP requirements. During the breeding season (February 1 through August 31, or as otherwise determined by the qualified biologist based on site conditions), no construction activities shall occur within occupied burrow buffers unless otherwise authorized by CDFW. Avoidance shall be the preferred mitigation strategy.
• Measures to avoid direct mortality, nest abandonment, or reproductive failure of burrowing owls.
• Passive relocation procedures, if avoidance is infeasible, conducted only outside the breeding season and in accordance with current CDFW guidance. • Identification of suitable recipient habitat and replacement burrows, including artificial burrows if necessary.
• Monitoring requirements before, during, and after relocation activities to verify successful relocation and continued occupancy of recipient habitat. • Procedures for adaptive management and corrective actions if relocation efforts are unsuccessful.
326
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 32
No occupied burrows shall be excavated, collapsed, or otherwise disturbed until the qualified biologist verifies that the burrow is unoccupied and all relocation procedures have been completed. The City shall maintain documentation demonstrating compliance with the approved Burrowing Owl Mitigation Plan, including survey results, monitoring reports, and correspondence with CDFW A BRA, and floristic botanical field survey of the Project Area was conducted by HDR in March of 2026 to identify potential habitat for special status species within the Project Area. The Project Area is not suitable for any other state and/or federally listed or federally proposed for listing as threatened or endangered species, and/or any other state candidate or fully protected species. Therefore, the Project will have no effect on any federally listed species. No impacts to other special-status species are anticipated because such species were not observed during focused surveys, suitable habitat for most special-status species is limited within the Project area, and Project activities would occur within previously disturbed areas. Accordingly, with implementation of Mitigation Measures BIO-1 and BIO-2 would be avoid or substantially reduce impacts to burrowing owls, and impacts to special-status species would be less than significant through the implementation of mitigation. b) No Impact – Based on the biological information provided in Appendix 2 and above, no riparian habitat or any other sensitive natural community will be adversely impacted by the proposed project because none exist within the project footprint. Thus, there would be no impacts under this issue.
Less Than Significant With Mitigation Incorporated – Based on the biological information provided in Appendix 2 and above, the proposed project will not have any adverse impacts on federal or state wetlands of any type. The result of the jurisdictional waters assessment is that there are no wetland or non-wetland Waters of the United States (WOTUS) or waters of the State potentially subject to regulation by the United States Army Corps of Engineers (USACE) under Section 404 of the Clean Water Act (CWA). However, the Mid Valley Basin may be under the jurisdiction of the RWQCB under Section 401 of the CWA and/or Porter Cologne Water Quality Control Act, or the CDFW under Section 1602 of the California Fish and Game Code. Therefore, the project may impact RWQCB/CDFW jurisdictional waters and state jurisdictional waters permitting may be required.
The anticipated temporary impacts associated with the Mid Valley Basin improvements include approximately 3.5 acres of temporary impacts to CDFW jurisdictional streambed and 1.2 acres of temporary impacts to Porter-Cologne “waters of the State.” Temporary impacts to Mid Valley Basin may require a CDFW issued Lake or Streambed Alteration (LSA) Agreement and/or RWQCB issued Waste Discharge Requirements (WDRs). In addition to the formal application materials and fees, a copy of the appropriate CEQA documentation must be included with the applications. These temporary impacts would occur during construction, and the above regulatory permits would reduce these temporary impacts to a level of less than significant.
The proposed Mid Valley Basin improvements would not result in permanent impacts or a net loss of CDFW streambed or Porter-Cologne “waters of the State.” Rather, the proposed regrading and expanding of the existing earthen flood control linear basin would result in a gain of additional basin.
Thus, the City will likely be required to obtain the following regulatory approvals prior to impacts occurring within the identified jurisdictional areas: Corps Approved Jurisdictional Determination/Waiver; Regional Board CWA Section Report of Waste Discharge; and CDFW Section 1602 Streambed Alteration Agreement (SAA). The City shall submit the information for the proposed channel modifications to these two agencies (1600 Streambed Alteration Agreement and Waste Discharge Requirements, respectively) and shall acquire the pertinent regulatory permits if so directed by these agencies. Without the implementation of these regulatory permits and waivers, impacts to jurisdictional features could be considered a significant adverse impact. Thus, mitigation 327
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 33
is required to ensure that these permits and the mitigation identified therein, protect jurisdictional features and thereby result in a less than significant impact thereof.
BIO-3 California Department of Fish and Wildlife (CDFW) shall be notified pursuant to Fish and Game Code section 1602. If CDFW determines that the Project may substantially affect fish and wildlife resources, then CDFW shall issue a Streambed Alternation Agreement (Agreement). The Agreement shall include measures to avoid, minimize, and mitigate impacts to Fish and Game Code section 1602 resources.
Through an Agreement from CDFW and/or other agencies (USACE, RWQCB, CDFW [regulatory agencies]) with jurisdiction over impacts to jurisdictional waters, the City shall minimize discharge of fill to the extent feasible, and any discharge of fill not avoidable and all impacts to Fish and Game Code section 1602 resources shall be authorized and mitigated through compensatory mitigation in an Agreement.
Mitigation shall be provided by restoration of temporary impacts, enhancement of existing resources, or for permanent impacts as follows: purchasing into USACE, RWQCB, CDFW authorized mitigation bank; or by selecting a site near the Project site and enhancing it with a native riparian habitat or invasive species removal in accordance with a habitat mitigation plan approved by regulatory agencies; or by acquiring sufficient compensating habitat to meet regulatory agency requirements.
Impacts to jurisdictional waters shall be mitigated at a minimum 1:1 ratio, with the ultimate compensatory mitigation ratio being determined through negotiation with regulatory agency, and never at a rate of less than 1:1. The ratio will rise based on the type of habitat, habitat quality, and presence of sensitive or listed plants or animals in the affected area. This ratio will be determined by the regulatory agency, and must be deemed sufficient by the regulatory agency issuing the permit to compensate for/offset the impacts to the jurisdictional waters and supported species and habitats therein. A Habitat Mitigation and Monitoring Proposal shall be prepared by a biologist or regulatory specialist and reviewed and approved by the appropriate regulatory agencies. These agencies (USACE, RWQCB, CDFW and any other applicable regulatory agency with jurisdiction over the proposed facility improvement) can impose greater mitigation requirements in their permits, but the City will utilize the ratios outlined above as the minimum required to offset or compensate for impacts to jurisdictional waters, riparian areas or other wetlands.
Based on the analysis of this issue provided in Appendix 2 and summarized above, the City can identify the expansion of the Mid Valley Basin as sufficient mitigation to offset potential impacts of implementing the proposed project. This finding is based on the overall lack of biological resources (wetland and riparian habitats) in the Basin and the expansion of the area within the Basin, along with better ability to handle the 100-year runoff, including without breakouts from the basin during the 100 year storm event and percolating more water into the groundwater aquifer. Thus, impacts under this issue are considered less than significant through the implementation of Mitigation Measure Bio-3. d) Less Than Significant With Mitigation Incorporated – The project area does not support any wildlife corridors, but it may serve as a nursery site for nesting birds. In general, impacts to all bird species (common and special status) can be avoided by conducting work outside of the nesting season, which is generally January 1 to September 15 for raptors and February 1 to September 1 for passerine species. However, if all work cannot be conducted outside of nesting season, the following precautionary measures are recommended to ensure MBTA and FGC compliance. Thus, Mitigation Measure BIO-4 is necessary to reduce the project’s potential to adversely impact nesting birds as a result of construction occurring in close proximity to potential nesting birds. Thus, Mitigation Measure BIO-4 shall be implemented to reduce this potential impact to a less than significant level.
BIO-4 To avoid impacts to active nests of migratory birds, raptors, and other native bird species protected under the federal Migratory Bird Treaty Act and California Fish 328
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 34
and Game Code Sections 3503, 3503.5, and 3513, any vegetation removal, grading, trenching or other ground-disturbing activities scheduled during the nesting bird season (generally February 1 through September 15) shall be preceded by a nesting bird survey conducted by a qualified biologist no more than seven (7) days prior to commencement of work
The survey shall encompass all areas subject to disturbance and a sufficient surrounding area to identify nests that could be affected by Project activities. If no active nests are found, no further mitigation is required.
If an active nest is found, the qualified biologist shall establish a species-appropriate avoidance buffer around the nest. Buffer distances shall be based on the nesting species, sensitivity to disturbance, type and intensity of construction activities, and applicable agency guidance. At a minimum, buffers shall be consistent with current CDFW recommendations. No vegetation removal, grading, equipment operation, or other construction activity shall occur within the established buffer unless the qualified biologist determines that the activity would not result in nest abandonment, reproductive failure, injury, or mortality.
The qualified biologist shall monitor active nests and buffer areas at a frequency sufficient to confirm continued nest status and buffer effectiveness throughout the nesting cycle. Buffer boundaries shall be clearly marked in the field and maintained until the qualified biologist determines the young have successfully fledged, the nest has become inactive, or the nest is no longer subject to disturbance from Project activities. Upon making such determination, the qualified biologist may authorize removal of the buffer and resumption of construction activities within the previously restricted area.
Thus, impacts under this issue are considered less than significant through the implementation of mitigation.
e) No Impact – No species protected by local policies or ordinances will be impacted by this proposed project. Thus, no impacts are anticipated under this issue. f) No Impact – No area protected by habitat conservation plan will be impacted by this proposed project.
The Project is within the CVMSHCP boundary. However, the Project site is not within or adjacent any Conservation Areas and will not impact any Essential Ecological Processes or Biological Corridors and Linkages. The City should be prepared to pay the MSHCP fees and restrict all Project related impacts to existing right-of-way and/or other areas outside of the Conservation Areas. Additionally, the City must implement all CVMSHCP required avoidance, minimization and mitigation measures for BUOW. No other conservation or avoidance measures are expected, and the Project as described, would be consistent with the Conservation Goals and Objectives set forth in the CVMSHCP. Thus, no impacts are anticipated under this issue. 329
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 35
Potentially
Significant Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant Impact
No Impact or
Does Not Apply
V. CULTURAL RESOURCES: Would the project:
a) Cause a substantial adverse change in the
significance of a historical resource pursuant to
§15064.5?
b) Cause a substantial adverse change in the
significance of an archaeological resource pursuant to
§15064.5?
c) Disturb any human remains, including those interred
outside of formal cemeteries?
SUBSTANTIATION: See the cultural resources report “Cultural Assessment for the Mid-Valley Channel Drainage/Storm Drain Improvements Project, Palm Desert, Riverside County, California,” Appendix 3 of this IS/MND.
a) Less Than Significant With Mitigation Incorporation – The following conclusion is presented in Appendix 3: The entirety of the project site including the retention basin location, Mid-Valley Basin alignment, and underground storm drain alignment is highly disturbed. Because of this, it is unlikely that intact subsurface archaeological deposits would be encountered during project construction. It should be noted that ACBCI requested the presence of “an approved Agua Caliente Native American Cultural Resource Monitor(s) during any ground disturbing activities”. This request and other comments from ACBCI are outlined with their response letter which is included in Attachment A of Appendix 3 to assist the City of Palm Desert with any government-to-government consultation.
Mojave Archaeological Consulting recommends to the City of Palm Desert a finding of no impact to cultural resources. No further cultural resources work is recommended necessary for the proposed project activities. However, if buried archaeological materials are encountered during project construction, all work should be halted in the vicinity of the discovery, and a qualified archaeologist should be contacted to assess the significance and integrity of the find. If intact and significant archaeological remains are discovered, an appropriate mitigation plan should be prepared. Health and Safety Code Section 7050.5, CEQA Statute & Guidelines Section 15064.5(e), and PRC Section 5097.98 mandate the process to be followed in the event of any discovery of human remains. Lastly, if the project is expanded to include any additional areas of disturbance not addressed within this report or other recent cultural resource investigations further cultural resources work may be required.
CUL-1 If during ground-disturbance activities, unanticipated cultural resources are discovered, the following procedures shall be followed:
• All ground-disturbance activities within 50 feet of the discovered cultural resource shall be halted immediately upon discovery of the cultural resource. A meeting shall be convened between the City and the project archaeologist (a qualified Project Archaeologist who meets the U.S. Secretary of the Interior Standards (SOI) and has at least 3 years of regional experience in archaeology) to discuss the significance of the find. At the meeting with the aforementioned parties, a decision is to be mad as to the appropriate treatment (documentation, recovery, avoidance, etc.) for the cultural resource. Resource evaluations shall be limited to nondestructive analysis.
• The significance of the unanticipated find shall be determined by the project archaeologist. If the unanticipated find is determined to be significant, a qualified 1 1 X 1 1 1 1
1 1 X 1 1 1 1
X
330
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 36
Project Archaeologist shall be retained by the City. The Project Archaeologist, or qualified archaeological monitors under the direction of the Project Archaeologist, shall be present during all ground-disturbing activities to identify any known or suspected archaeological and/or cultural resources. • The Project Archaeologist shall develop a Cultural Resource Management Plan (CRMP) to address the details, timing, and responsibilities of all archaeological and cultural resource activities that occur on the project site. This Plan shall be written in consultation with the Agua Caliente Band of Cahuilla Indians and shall include the following: approved Mitigation Measures (MM)s, contact information for all pertinent parties, parties’ responsibilities, procedures for each MM, and an overview of the project schedule.
• Further ground disturbance shall not resume within the area of the discovery until the appropriate treatment has been accomplished.
CUL-2 If previously unknown cultural resources, including human remains, are identified during grading activities associated with implementing projects, a County-certified qualified archaeologist shall be retained to assess the nature and significance of the find. If human remains are encountered, State Health and Safety Code Section 7050.5 states that no further disturbance shall occur until the County Coroner has made a determination of origin and disposition pursuant to Public Resources Code Section 5097.98. The County Coroner shall be notified of the find immediately. If the remains are determined to be prehistoric, the Coroner shall notify the Native American Heritage Commission (NAHC), which shall determine and notify a Most Likely Descendant (MLD). With the permission of the landowner or his/her authorized representative, the MLD may inspect the site of the discovery. The MLD shall complete the inspection within 24 hours of notification by the NAHC. The MLD may recommend scientific removal and nondestructive analysis of human remains and items associated with Native American burials. The MLD may recommend reburial somewhere within the Project boundaries where they can be protected in perpetuity.
Based on the above, with implementation of MMs CUL-1 through CUL-2, the proposed project would have a less than significant potential to cause a substantial adverse change in the significance of a historical resource pursuant to §15064.5.
b-c) Less Than Significant With Mitigation Incorporation – The following conclusion is presented in Appendix 3: The entirety of the project site including the retention basin location, Mid-Valley Basin alignment, and underground storm drain alignment is highly disturbed. Because of this, it is unlikely that intact subsurface archaeological deposits would be encountered during project construction. It should be noted that ACBCI requested the presence of “an approved Agua Caliente Native American Cultural Resource Monitor(s) during any ground disturbing activities”. This request and other comments from ACBCI are outlined with their response letter which is included in Attachment A of Appendix 3 to assist the City of Palm Desert with any government-to-government consultation.
Mojave Archaeological Consulting recommends to the City of Palm Desert a finding of no impact to cultural resources. No further cultural resources work is recommended necessary for the proposed project activities. However, if buried archaeological materials are encountered during project construction, all work should be halted in the vicinity of the discovery, and a qualified archaeologist should be contacted to assess the significance and integrity of the find. If intact and significant archaeological remains are discovered, an appropriate mitigation plan should be prepared. Health and Safety Code Section 7050.5, CEQA Statute & Guidelines Section 15064.5(e), and PRC Section 5097.98 mandate the process to be followed in the event of any discovery of human remains. Lastly, if the project is expanded to include any additional areas of disturbance not addressed within this report or other recent cultural resource investigations further cultural resources work may be required.
MMs CUL-1 through CUL-2 shall be implemented for these two topical issues, and through 331
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 37
implementation of mitigation impacts to archaeological resources and human remains would be less than significant.
332
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 38
Potentially
Significant Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant Impact
No Impact or
Does Not Apply
VI. ENERGY: Would the project:
a) Result in a potentially significant environmental
impact due to wasteful, inefficient, or unnecessary
consumption of energy resources, during project
construction or operations?
b) Conflict with or obstruct a state or local plan for
renewable energy or energy efficiency?
SUBSTANTIATION:
a&b. Less Than Significant Impact – During construction, the proposed project will utilize construction equipment that is CARB approved, minimizing emissions generated and electricity required to the extent feasible (as outlined in Section III, Air Quality, above). As stated in Section III, Air Quality, the construction of the proposed Mid Valley Basin, Drainage/Storm Drain Improvements Project would require compliance with regulatory requirements to minimize emissions impacts from construction equipment not in use. These regulatory requirements also apply to energy resources as they require equipment not in use for 5 minutes to be turned off, and for electrical construction equipment to be used where available. for five minutes to be turned off, and for electric equipment to be used where available. These regulatory requirements would prevent a significant impact during construction due to wasteful, inefficient, or unnecessary consumption of energy resources, and would also conform to the CARB regulations regarding energy efficiency.
The proposed project consists of constructing three drainage system infrastructure facilities in the vicinity of the I-10/Cook Street Interchange in the City of Palm Desert. Energy consumption encompasses many different activities. For example, construction can include the following activities:
delivery of equipment and material to a site from some location (note it also requires energy to manufacture the equipment and material, such as harvesting, cutting and delivering wood from its source); employee trips to work, possibly offsite for lunch (or a visit by a catering truck), travel home, and occasionally leaving a site for an appointment or checking another job; use of equipment onsite (electric or fuel); and sometimes demolition and disposal of construction waste. To minimize energy costs of construction debris management, mitigation has been established to require diversion of all material capable of being recycled on these construction jobs. Energy consumption by equipment will be reduced by requiring shutdowns when equipment is not in use after five minutes and ensuring equipment is being operated within proper operating parameters (tune-ups) to minimize emissions and fuel consumption. These requirements are consistent with State and regional rules and regulations. Under the construction scenario outlined above, the proposed project will not result in wasteful, inefficient, or unnecessary energy consumption during construction.
The proposed project site is supplied power by Southern California Edison (SCE) through the power distribution system located adjacent to the project site. However, at this time it no specific facilities have been identified that will require electricity. Regardless, SCE will be able to supply sufficient electricity if such demand is generated. The project site will not require natural gas to operate.
Compliance with regulatory requirements for operational energy use and construction energy use would not be wasteful or unnecessary use of energy. Under both the operational and construction scenarios for the proposed project, the proposed project will have a less than significant potential to result in wasteful, inefficient, or unnecessary energy consumption that could result in a significant adverse impact to energy issues based on compliance with the State laws, regulations and guidelines.
1 1 1 1 X 1 1
X
333
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 39
Potentially
Significant Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant Impact
No Impact or
Does Not Apply
VII. GEOLOGY AND SOILS: Would the project:
a) Directly or indirectly cause potential substantial
adverse effects, including the risk of loss, injury, or death involving:
(i) Rupture of a known earthquake fault, as
delineated on the most recent Alquist-Priolo
Earthquake Fault Zoning Map issued by the State
Geologist for the area or based on other
substantial evidence of a known fault? Refer to
Division of Mines and Geology Special
Publication 42.
(ii) Strong seismic ground shaking?
(iii) Seismic related ground failure, including
liquefaction?
(iv) Landslides?
b) Result in substantial soil erosion or the loss of
topsoil?
c) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the
project, and potentially result in onsite or offsite land-slide, lateral spreading, subsidence, liquefaction or collapse?
d) Be located on expansive soil, as defined in Table
18-1-B of the Uniform Building Code (1994), creating
substantial direct or indirect risks to life or property? e) Have soils incapable of adequately supporting the
use of septic tanks or alternative wastewater disposal
systems where sewers are not available for the
disposal of wastewater?
f) Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature?
SUBSTANTIATION: The following Geology and Soils information is abstracted from the City’s General Plan EIR and site Biology survey and field visits.
a. (i) Ground Rupture
No Impact – Based on a review of published geologic maps, it was concluded that the subject site is not located within an Alquist-Priolo Special Studies Zone and no active faults are mapped projecting through the subject site. The possibility of damage due to ground surface rupture from earthquake fault rupture is considered very low since active faults are not known to cross the site. 1 1 1 1 1 1 B
XX
X
XX
X
1 1 1 1 X 1 1
1 1 1 1 1 1 X
1 1 1 1 1 1 X
X
334
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 40
(ii) Strong Seismic Ground Shaking
Less Than Significant Impact – The following seismic groundshaking data were abstracted from the City’s General Plan and General Plan EIR. The maximum probable earthquake is the maximum earthquake likely to occur given the known tectonic framework in the Coachella Valley. The San Andreas Fault is located approximately four miles northeast of the site and is considered to have the most significant effect at the site. Section 1803.5.12 of the 2022 California Building Code (CBC) states that the maximum considered earthquake geometric mean (MCEg) Peak Ground Acceleration (PGA) should be used for geotechnical evaluations. The estimated PGAm for the site is equal to
0.823 g. None of the proposed facilities to be constructed will house humans, so the potential impact due to groundshaking is not forecast to pose any hazard to humans. Any damage to the drainage facilities can be repaired and the facilities can remain operational with appropriate maintenance after a regional seismic event. Thus, ground shaking impacts to the proposed facilities are considered less than significant over the long-term.
Although the Project is located in an area subject to strong seismic shaking, the proposed drainage improvements will be designed and constructed in accordance with California Building Code, applicable engineering standards, and project-specific geotechnical recommendations. Compliance with these standards is intended to ensure that the facilities can withstand seismic forces without creating substantial hazards to people or properties. Because the Project does not include occupied structures and the facilities will be engineered and accommodate expected seismic conditions, impacts associated with seismic ground shaking would be less than significant. (iii) Seismic-related Ground Failure Including Liquefaction Less Than Significant Impact – Based on the findings in the General Plan EIR, the site is not exposed to significant liquefaction potential due to the depth of the groundwater table. As such and based on the site assessment, liquefaction potential is considered very low to nil hazard. Therefore, potential impacts due to liquefaction are less than significant.
(iv) Landslides
No Impact – Based on the relatively flat nature of the site and the engineered environment in which the proposed facilities will be installed and maintained, there are no indications of landslides close to or within the limits of the site and area.
b. Less Than Significant Impact – The project area consists of three separate facilities: 1) the existing Mid-Valley Basin which will be widened; a new underground Storm Drain in Gerald Ford Drive; and the proposed Basin which will be created out of about 4 acres of disturbed property between the Mid-Valley Basin and Gerald Ford Drive. City grading standards, best management practices and the Storm Water Pollution Prevention Plan (SWPPP) and Water Quality Management Plan (WQMP) are traditionally required to control the potentially significant erosion hazards from disturbing these sites from construction through future operation. The topography is generally level with a shallow slope from northwest to southeast. During project construction when soils are exposed, a potential for temporary soil erosion may occur, but project grading would be managed through the preparation and implementation of a SWPPP during construction. A WQMP will not be required for this project because it is designed as the terminal location to implement best management practices for the terminus of this drainage area. As a result, the proposed project is not forecast to cause substantial soil erosion or sedimentation. Therefore, impacts due to the potential soil erosion and loss of topsoil would be less than significant.
c. Less Than Significant Impact – The project site would be constructed to ensure it would not be subject to landslides, liquefaction or collapse based on the site geology. The site may experience some 335
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 41
limited subsidence, but the amount of differential subsidence can be minimized by construction methods to be a less than significant impact. Based on these data, overall soil or geologic instability will be less than significant.
d. No Impact – The soils within the project area are primarily sand and sandy loams which were determined not to contain any expansive clay material. Thus, there is no potential adverse impact under this issue.
e. No Impact – The proposed project will not generate any municipal wastewater that will need to be managed. Thus, there is no potential adverse impact to soils from use of septic tanks or alternative subsurface wastewater disposal systems.
f. Less Than Significant With Mitigation Incorporated ‒ The potential for discovering paleontological resources during development of the project is considered low based on the young alluvial sediments underlying the project site. No unique geologic features are known or suspected to occur on or beneath the three project sites. However, because paleontological resources are located beneath the surface and can only be discovered as a result of ground disturbance activities, the following measure shall be implemented:
GEO-1 In the event of any fossil discovery, regardless of depth or geologic formation, construction work will halt within a 50-ft. radius of the find until its significance can be determined by a Qualified Paleontologist. Significant fossils will be recovered, prepared to the point of curation, identified by qualified experts, listed in a database to facilitate analysis, and deposited in a designated paleontological curation facility in accordance with the standards of the SVP (2010) and BLM (2009). A repository will be identified and a curatorial arrangement will be signed prior to collection of the fossils. Any accredited institution may serve as a repository.
With incorporation of this contingency mitigation measure, the potential for impact to paleontological resources will be reduced to a less than significant level. No additional mitigation is required. 336
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 42
Potentially
Significant Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant Impact
No Impact or
Does Not Apply
VIII. GREENHOUSE GAS EMISSIONS: Would the
project:
a) Generate greenhouse gas emissions, either directly
or indirectly, that may have a significant impact on the environment?
b) Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of
greenhouse gases?
SUBSTANTIATION: “Technical Memorandum Mid Valley Basin Improvement Air Quality and Greenhouse Gas Assessment,” Urban Crossroads, Inc (Appendix 1).
BACKGROUND FINDINGS
CLIMATE CHANGE SETTING
Global climate change (GCC) is the change in average meteorological conditions on the earth with respect to temperature, precipitation, and storms. The majority of scientists believe that the climate shift taking place since the Industrial Revolution is occurring at a quicker rate and magnitude than in the past. Scientific evidence suggests that GCC is the result of increased concentrations of GHGs in the earth’s atmosphere, including carbon dioxide (CO2), methane (CH4), nitrous oxide (N2O), and fluorinated gases. The majority of scientists believe that this increased rate of climate change is the result of GHGs resulting from human activity and industrialization over the past 200 years.
An individual project like the proposed Project evaluated in this memo cannot generate enough GHG emissions to affect a discernible change in global climate. However, the proposed Project may participate in the potential for GCC by its incremental contribution of GHGs combined with the cumulative increase of all other sources of GHGs, which when taken together constitute potential influences on GCC. Because these changes may have serious environmental consequences, this memo will evaluate the potential for the proposed Project to have a significant effect upon the environment as a result of its potential contribution to the greenhouse effect.
GCC refers to the change in average meteorological conditions on the earth with respect to temperature, wind patterns, precipitation and storms. Global temperatures are regulated by naturally occurring atmospheric gases such as water vapor, CO2, N2O, CH4, hydrofluorocarbons (HFCs), perfluorocarbons (PFCs), and sulfur hexafluoride (SF6). These particular gases are important due to their residence time (duration they stay) in the atmosphere, which ranges from 10 years to more than 100 years. These gases allow solar radiation into the earth’s atmosphere, but prevent radiative heat from escaping, thus warming the earth’s atmosphere. GCC can occur naturally as it has in the past with the previous ice ages.
Gases that trap heat in the atmosphere are often referred to as GHGs. GHGs are released into the atmosphere by both natural and anthropogenic activity. Without the natural GHG effect, the earth’s average temperature would be approximately 61 degrees Fahrenheit (°F) cooler than it is currently. The cumulative accumulation of these gases in the earth’s atmosphere is considered to be the cause for the observed increase in the earth’s temperature.
For the purposes of this analysis, emissions of C2, CH4, and N2O were evaluated because these gases are the primary contributors to GCC from development projects. Although there are other substances such 1 1 1 1 X 1 1
1 1 1 1 X 1 1
337
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 43
as fluorinated gases that also contribute to GCC, these fluorinated gases were not evaluated as their sources are not well-defined and do not contain accepted emissions factors or methodology to accurately calculate these gases. The existing GHG regulatory setting is described in Appendix 1 beginning on page 22 of this Appendix.
In 2024, the Coachella Valley Association of Governments (CVAG) began preparation of a regional Comprehensive Climate Action Plan (CCAP), for which the City of Palm Desert would be a beneficiary. The CCAP is anticipated to provide participating jurisdictions, including the City of Palm Desert, with an updated GHG inventory and regional climate action plan. Although completion of the CCAP was anticipated in the second quarter of 2025, the plan had not been publicly released or formally adopted as of 2026.
STANDARDS OF SIGNIFICANCE
According to the CEQA Guidelines Appendix G thresholds, to determine whether impacts from GHG emissions are significant. Would the project:
• Threshold 1: Generate GHG emissions, either directly or indirectly, that may have a significant impact on the environment?
• Threshold 2: Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of GHGs?
The evaluation of an impact under CEQA requires measuring data from a project against both existing conditions and a “threshold of significance.” For establishing significance thresholds, the Office of Planning and Research’s amendments to the CEQA Guidelines Section 15064.7(c) state “[w]hen adopting thresholds of significance, a lead agency may consider thresholds of significance previously adopted or recommended by other public agencies, or recommended by experts, provided the decision of the lead agency to adopt such thresholds is supported by substantial evidence.”
CEQA Guidelines Section 15064.4(a) further states, “. . . A lead agency shall have discretion to determine, in the context of a particular project, whether to: (1) Use a model or methodology to quantify greenhouse gas emissions resulting from a project, and which model or methodology to use . . .; or (2) Rely on a qualitative analysis or performance-based standards.”
CEQA Guidelines Section 15064.4 provides that a lead agency should consider the following factors, among others, in assessing the significance of impacts from GHG emissions:
• Consideration #1: The extent to which the project may increase or reduce GHG emissions as compared to the existing environmental setting.
• Consideration #2: Whether the project emissions exceed a threshold of significance that the lead agency determines applies to the project.
• Consideration #3: The extent to which the project complies with regulations or requirements adopted to implement a statewide, regional, or local plan for the reduction or mitigation of GHG emissions. Such regulations or requirements must be adopted by the relevant public agency through a public review process and must reduce or mitigate the project’s incremental contribution of GHG emissions. In determining the significance of impacts, the lead agency may consider a project’s consistency with the State’s long-term climate goals or strategies, provided that substantial evidence supports the agency’s analysis of how those goals or strategies address the project’s incremental contribution to climate change and its conclusion that the project’s incremental contribution is not cumulatively considerable.
DISCUSSION ON ESTABLISHMENT OF SIGNIFICANCE THRESHOLDS
Based on the foregoing guidance, the City of Palm Desert has elected to rely on compliance with a local air district threshold in the determination of significance of Project-related GHG emissions. Specifically, the 338
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 44
City has selected the interim 3,000 MTCO2e per year threshold recommended by SCAQMD staff for residential and commercial sector projects against which to compare Project related GHG emissions.
The 3,000 MTCO2e per year threshold is based on a 90 percent emission “capture” rate methodology. Prior to its use by the SCAQMD, the 90 percent emissions capture approach was one of the options suggested by the California Air Pollution Control Officers Association (CAPCOA) in their CEQA & Climate Change white paper (2008). A 90 percent emission capture rate means that unmitigated GHG emissions from the top 90 percent of all GHG-producing projects within a geographic area – the SSAB in this instance – would be subject to a detailed analysis of potential environmental impacts from GHG emissions, while the bottom 10 percent of all GHG-producing projects would be excluded from detailed analysis. A GHG significance threshold based on a 90 percent emission capture rate is appropriate to address the long-term adverse impacts associated with global climate change because medium and large projects will be required to implement measures to reduce GHG emissions, while small projects, which are generally infill development projects that are not the focus of the State’s GHG reduction targets, are allowed to proceed. Further, a 90 percent emission capture rate sets the emission threshold low enough to capture a substantial proportion of future development projects and demonstrate that cumulative emissions reductions are being achieved while setting the emission threshold high enough to exclude small projects that will, in aggregate, contribute approximate 1 percent of projected statewide GHG emissions in the Year 2050.
In setting the threshold at 3,000 MTCO2e per year, SCAQMD researched a database of projects kept by the Governor’s Office of Planning and Research (OPR). That database contained 798 projects, 87 of which were removed because they were very large projects and/or outliers that would skew emissions values too high, leaving 711 as the sample population to use in determining the 90th percentile capture rate. The SCAQMD analysis of the 711 projects within the sample population combined commercial, residential, and mixed-use projects. Emissions from each of these projects were calculated by SCAQMD to provide a consistent method of emissions calculations across the sample population and from projects within the sample population. In calculating the emissions, the SCAQMD analysis determined that the 90th percentile ranged between 2,983 to 3,143 MTCO2e per year. The SCAQMD set their significance threshold at the low-end value of the range when rounded to the nearest hundred tons of emissions (i.e., 3,000 MTCO2e per year) to define small projects that are considered less than significant and do not need to provide further analysis.
The City understands that the 3,000 MTCO2e per year threshold for residential/commercial uses was proposed by SCAQMD a decade ago and was adopted as an interim policy; however, no permanent, superseding policy or threshold has since been adopted. The 3,000 MTCO2e per year threshold was developed and recommended by SCAQMD, an expert agency, based on substantial evidence as provided in the Draft Guidance Document – Interim CEQA Greenhouse Gas Significance Threshold (2008) document and subsequent Working Group meetings (latest of which occurred in 2010). SCAQMD has not withdrawn its support of the interim threshold and all documentation supporting the interim threshold remains on the SCAQMD website on a page that provides guidance to CEQA practitioners for air quality analysis (and where all SCAQMD significance thresholds for regional and local criteria pollutants and toxic air contaminants also are listed). Further, as stated by SCAQMD, this threshold “uses the Executive Order S-3-05 goal [80 percent below 1990 levels by 2050] as the basis for deriving the screening level” and, thus, remains valid for use in 2022. Lastly, this threshold has been used for hundreds, if not thousands of GHG analyses performed for projects located within the SCAQMD jurisdiction.
Thus, for purposes of analysis in this analysis, if Project-related GHG emissions do not exceed the 3,000 MTCO2e per year threshold, then Project-related GHG emissions would clearly have a less than significant impact pursuant to Threshold GHG-1. On the other hand, if Project-related GHG emissions exceed 3,000 MTCO2e per year, the Project would be considered a substantial source of GHG emissions. a&b) Less Than Significant Impact – The estimated GHG emissions for Project are summarized in Table VIII-1. The estimated GHG emissions include emissions from Carbon Dioxide (CO2), Methane (CH4), Nitrous Oxide (N2O), and Refrigerants (R). As shown in Table VIII-1, the Project would generate a 339
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 45
total of approximately 8.08 MTCO2e/yr. Detailed construction model outputs are presented in Appendices 1 and 2 of Appendix 1 to this document.
Table VIII-1
TOTAL PROJECT GHG EMISSIONS
Source Total CO2E
Annual Construction Emissions Amortized
Over 30 Years 8.08
Total 8.08
Screening Threshold 3,000
Threshold Exceeded? NO
Notes: CalEEMod construction-source (unmitigated) emissions are presented in
Appendices 3.1 and 3.2 of Appendix 1
A numerical threshold for determining the significance of GHG emissions in the SSAB has not been established by the SCAQMD for projects where it is not the lead agency. As an interim threshold based on guidance provided in the CAPCOA CEQA and Climate Change handbook, the City has opted to use a non-zero threshold approach based on Approach 2 of the handbook. Threshold 2.5 (Unit-Based Thresholds Based on Market Capture) establishes a numerical threshold based on capture of approximately 90% of emissions from future development. The latest threshold developed by SCAQMD using this method is 3,000 MTCO2e/yr for all projects. The Project would result in approximately 8.08 MTCO2e/yr; the proposed Project would not exceed the SCAQMD screening threshold of 3,000 MTCO2e/yr. Thus, the Project would result in a less than significant impact with respect to GHG emissions.
340
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 46
Potentially
Significant Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant Impact
No Impact or
Does Not Apply
IX. HAZARDS AND HAZARDOUS MATERIALS:
Would the project:
a) Create a significant hazard to the public or the
environment through the routine transport, use, or
disposal of hazardous materials?
b) Create a significant hazard to the public or the
environment through reasonably foreseeable upset
and accident conditions involving the release of
hazardous materials into the environment?
c) Emit hazardous emissions or handle hazardous or
acutely hazardous materials, substances, or waste
within one-quarter mile of an existing or proposed
school?
d) Be located on a site which is included on a list of
hazardous materials sites compiled pursuant to
Government Code Section 65962.5 and, as a result,
would it create a significant hazard to the public or the environment?
e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two
miles of a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working in the project area?
f) Impair implementation of or physically interfere with an adopted emergency response plan or emergency
evacuation plan?
g) Expose people or structures, either directly or
indirectly, to a significant risk of loss, injury or death involving wildland fires?
SUBSTANTIATION: The following information is provided based on a study a review of the GeoTracker and EnviroStor data bases, legal and regulatory requirements are provided as Figures IX-1 and IX-2.
Background Summary
There are two primary data lists of hazardous materials sites compiled pursuant to Government Code Section 65962.5. These are the GeoTracker and EnviroStor data bases maintained by the State. Copies of the aerial photos for each data base are provided in Appendix 5. There are no known contaminated sites within the project area.
Given the recent disturbances associated with constructing the Mid Valley Basin and other ground clearing and grading activities within the project area, the lack of any known contamination is consistent with these recent activities.
1 1 1 1 X 1 1
1 1 X 1 1 1 1
1 1 1 1 X 1 1
1 1 1 1 1 1 X
1 1 1 1 X 1 1
1 1 X 1 1 1 1
1 1 1 1 X 1 1
341
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 47
a. Less Than Significant Impact – The proposed project includes onsite activities that will need the routine transport of hazardous materials, such as vehicle and emergency generator fuel, and other chemicals used for landscape management. During future operations, the small quantities of hazardous materials utilized to maintain the surface drainage facilities do not pose a significant impact to people or the environment for release into the environment in an uncontrolled manner.
Mitigation measure HAZ-1 (below) will be incorporated into the project’s Storm Water Pollution Prevent Plan (SWPPP). Implementation of this measure can further reduce the potential hazards under this issue to maintain a less than significant impact level. b. Less Than Significant With Mitigation Incorporated – The proposed project may create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment during construction and future maintenance. The proposed project will involve site excavation, trenching, and grading during construction that will require some use of heavy equipment during maintenance. Thus, during construction and future operations there is a potential for accidental release of petroleum products in sufficient quantity to pose a significant hazard to the environment. There is substantial regulatory framework that has been promulgated at the federal, State, and regional level that would apply to construction and operation of uses within the project area. Compliance with these regulations would be required by the City and can reduce the proposed project’s impacts related to hazards and hazardous materials to a less than significant level. Refer to Appendix 5. While the use and storage of these materials during construction is regulated through Federal and State regulations, there is always potential for accidental spill of the materials during construction. There are several State regulations that address these concerns such as Title 29, CFR § 1926.62 for lead, and Title 40, CFR Part 61 Subpart M for asbestos removal. However, out of an abundance of caution, the following mitigation measure will be incorporated into the Storm Water Pollution Prevent Plan (SWPPP) prepared for the project and implementation of this measure, in the context of compliance with state and federal laws and regulations, can reduce hazards from a potential significant impact to a less than significant level.
HAZ-1 All accidental spills or discharge of hazardous material during construction and future operating activities greater than a few gallons shall be reported to the Certified Unified Program Agency and shall be remediated in compliance with applicable federal, State, and local regulations regarding cleanup and disposal of the contaminant released. The contaminated waste shall be collected and disposed of at a licensed disposal or treatment facility. This measure shall be incorporated into the Stormwater Pollution Prevention Plan (SWPPP or Erosion Control Plan) prepared for this project. Prior to accepting the site as remediated, the area contaminated shall be tested to verify that any residual concentrations meet the standard for future residential or public use of the site. c. Less Than Significant Impact ‒ The project site is not located within one-quarter mile of any public school. The proposed project is not anticipated to store large quantities of hazardous materials or wastes or to emit hazardous emissions. No handling of acutely hazardous materials is anticipated at any time. Based on this information, implementation of the project will not emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school. Impacts under this issue are considered less than significant. No mitigation is required.
d. No Impact – The proposed development will include mass grading or trenching of the project sites to provide the required drainage structures. The project will not be located on a site that is included on a list of hazardous materials sites that are currently under remediation. According to the Geotraker and Envirostor findings, which provides information regarding Leaking Underground Storage Tanks (LUST) and Department of Toxic Substance Control (DTSC) cleanup sites (refer to Appendix 5), there are no open historic RECs on the property. Therefore, there is a low potential for the project to 342
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 48
encounter contaminated locations at the project site. Project construction and operation of the site to support stormwater management uses will have a less than significant potential to create a significant hazard to the area population, onsite employees, or to the environment from its implementation under this issue. No mitigation is required. e. Less Than Significant Impact ‒ The project site is located over five miles from the Palm Springs Airport and more than two miles from the Bermuda Dunes Airport. The project site is located totally outside of the any overlay hazard area associated with either Airport. Given that the proposed project is located outside of any Airport influence area, the potential for the project to result in a safety hazard for people working in the project area is negligible. Therefore, construction and operation of the project facilities at this location would result in less than significant potential safety hazard for people residing or working in the project area as a result of proximity to a public airport or private airstrip. No mitigation is required.
f. Less Than Significant With Mitigation Incorporated The proposed project elements, Mid-Valley Basin and the Basin have a minimal potential to interfere with an adopted emergency response plan or emergency evacuation plan as they do not involve construction within a roadway. On the other hand, the storm drain in Gerald Ford Drive will be totally located within this roadway. The nearest emergency evacuation routes are Cook Avenue, Gerald Ford Drive and Interstate-10. Due to the volume of traffic on Gerald Ford, maintenance of access to the existing developed areas are forecast to require a construction traffic management plan to ensure emergency access and evacuation capability. The following mitigation measure shall be implemented to preserve this access during construction.
HAZ-2 Prior to issuance of any grading permit or commencement of construction activities that would require lane closures, roadway narrowing, detours, or other temporary restrictions within existing public rights-of-way, the City shall ensure preparation of a Traffic Management Plan (TMP) by a qualified traffic engineer. The TMP shall be reviewed by the City and applicable emergency service providers, including the Fire Department, prior to commencement of the applicable construction activities. At a minimum, the TMP shall:
• Maintain emergency vehicle access to all properties and roadways affected by construction activities at all times, except for temporary closures specifically approved by the City and emergency service providers.
• Maintain at least one unobstructed travel lane in each direction on affected evacuation routes to the maximum extent feasible, or provide an approved detour route that maintains equivalent emergency access and evacuation functionality.
• Identify procedures for coordinating construction activities with police, fire, ambulance, and other emergency service providers, including advance notification of planned closures, roadway restrictions, or detours. • Include measures to minimize delays to emergency response vehicles, such as temporary traffic control devices, flagging operations, construction phasing, or other traffic management techniques.
• Prohibit complete roadway closure on a designated emergency access or evacuation routes unless approved by the City and emergency service providers and accompanied by implementation of an approved alternative access route. • Provide public notification of roadway restrictions, detours, and access changes in advance of construction activities, consistent with City requirements.
The City shall verify implementation of the approved TMP throughout construction, and construction activities shall be conducted in accordance with the approved plan.
343
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 49
g. Less Than Significant Impact – The project area contains a limited vegetation fuel load due to past disturbances within the project area and the potential wildland fire hazard is identified as being moderate to low for all project areas. The proposed project is required to, and will incorporate, the most current fire protection designs to support the City’s requirements, including an adequate water supply for fire flow and fighting purposes. Given the type of project proposed and ready access to adjacent emergency evacuation routes, exposure to wildfire would have a limited potential to substantially damage human or man-made equipment (vehicles) as they could be removed from the area prior to or during a wildfire. As a result, the potential for loss of life and facilities is considered to be a less than significant impact without mitigation.
344
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 50
Potentially
Significant Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant Impact
No Impact or
Does Not Apply
X. HYDROLOGY AND WATER QUALITY: Would the
project:
a) Violate any water quality standards or waste
discharge requirements or otherwise substantially
degrade surface or groundwater quality?
b) Substantially decrease groundwater supplies or
interfere substantially with groundwater recharge such
the project may impede sustainable groundwater
management of the basin?
c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of
impervious surfaces, in a manner which would:
(i) result in substantial erosion or siltation onsite or offsite?
(ii) substantially increase the rate or amount of
surface runoff in a manner which would result in
flooding onsite or offsite?
(iii) create or contribute runoff water which would
exceed the capacity of existing or planned
stormwater drainage systems or provide
substantial additional sources of polluted
runoff?; or,
(iv) impede or redirect flood flows?
d) In flood hazard, tsunami, or seiche zones, risk
release of pollutants due to project inundation?
e) Conflict with or obstruct implementation of a water
quality control plan or sustainable groundwater
management plan?
SUBSTANTIATION:
a. Less Than Significant With Mitigation Incorporated – The proposed project is located within a developed area within the Whitewater River watershed, which is within the Colorado River Regional Water Quality Control Board’s (RWQCB) jurisdiction. The Coachella Valley Water District (CVWD) is responsible for the water supply to the City of Palm Desert. CVWD currently pumps potable water supplies from groundwater in the Indio Subbasin of the Coachella Valley and purchases water from the State Water Project and Colorado River to meet water demand within its service area, when available. CVWD is required to meet potable water quality requirements of the Division of Drinking Water, State Water Resources Control Board (SWRCB), as well as the California Department of Public Health.
1 1 X 1 1 1 1
1 1 1 1 X 1 1
1 1 1 1 X 1 1
X
1 1 1 1 X 1 1
1 1 X 1 1 1 1
XX
X
1 1 1 1 X 1 1
345
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 51
Typically, the three main sources of potential violation of water quality standards or waste discharge requirements are from generation of municipal wastewater, generation of stormwater runoff, and potential random discharges of pollutants, such as accidental spills. Municipal wastewater is delivered to CVWD’s Water Reclamation Plant No. 10 (Cook Street), through the CVWD’s sewer collection system within the City of Palm Desert and this project will not generate wastewater over the long term. Therefore, no adverse impact will be caused during future operations of these improved drainage facilities related to consumption of municipal water or generation of wastewater.
To address stormwater and accidental spills within this environment, any new project must ensure that site development implements a Storm Water Pollution Prevention Plan (SWPPP) to control potential sources of water pollution in stormwater runoff that could violate any standards or discharge requirements during construction (short term). As the terminal feature of this watershed the expanded drainage features will ensure that project-related after development surface runoff meets discharge requirements over the short- and long-term.
Because portions of the project site currently consist of pervious surfaces, the project has identified onsite drainage facilities that will generally be directed to the onsite bioretention basin that will be installed to ultimately handle 100-year storm event. This is the design objective of the proposed pr4oject, which enforces the RWQCB’s measures to protect the watershed. These measures include development of whole project that will collect and treat runoff generated within the project area. These measures can reduce potential water quality impacts to receiving waters to a less than significant level.
The SWPPP would specify the BMPs that the project would be required to implement during construction activities to ensure that all potential water pollutants of concern are prevented, minimized, and/or otherwise appropriately treated prior to being percolated within the whole of the project. As previously stated, out of an abundance of caution, MM HAZ-1 will be incorporated into the SWPPP prepared for the project and implementation of this measure, in the context of compliance with state and federal laws and regulations, can reduce water quality impacts from a potential significant impact to a less than significant level. With implementation of these mandatory plans and their BMPs, as well as MM HAZ-1, the development of the proposed project is not forecast to cause a violation of any water quality standards or waste discharge requirements. b. Less Than Significant Impact – Implementation of the proposed project will not substantially deplete groundwater supplies that would substantially affect the water availability for existing or planned land uses or biological resources. The proposed project is designed to intercept surface runoff from the upstream watershed and allow most of this of the runoff to be captured and percolated back into the regional groundwater aquifer. In particular the Mid Valley Basin constitutes a “linear” groundwater basin that when completed can handle the full 100-year runoff from the upstream watershed. The design of the drainage and retention facilities of the proposed project would offset much of the loss from the existing impervious surfaces in the upstream watershed. It is not anticipated that the proposed facilities will require substantial volumes of water for irrigation (Mid-Valley Channel and Basin) in the future. However, some water may be required for fugitive dust control. The available water supply within CVWD’s service area is anticipated to be greater than the regional demand for potable water in the future, which indicates that CVWD has available capacity to serve the proposed project with limited irrigation water without significant adverse impacts on region’s groundwater aquifers.
Development of the project is forecast to result in an unquantified increase in the amount of surface runoff recharge associated with existing runoff, this increase is expected to substantially off-set/replace losses of infiltration from the upstream impervious surfaces. The development of the project will, therefore, enhance the existing percolation to the groundwater aquifer beneath the Coachella Valley. Impacts to groundwater resources from the proposed project are forecast to be less than significant or positive from implementing the proposed project. No mitigation is required. 346
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 52
c i. Result in substantial erosion or siltation onsite or offsite? Less Than Significant Impact – Based on the SWPPP and the evaluation of soil erosion under the Geology issue, the proposed project is not anticipated to significantly change the volume of flows downstream of the project site, and would not be anticipated to change the amount of surface water in any water body in an amount that could initiate a new cycle of erosion or sedimentation downstream of the project site. The proposed drainage infrastructure facilities are being expanded to minimize damage from larger flows. A portion of the upstream flows will be captured in the proposed linear basin. If discharged, treated surface runoff will be discharged in conformance with County and City requirements. Thus, downstream drainage system will not be substantially altered given the control of future surface runoff from the project watershed; the potential for downstream erosion or sedimentation will be controlled to a less than significant impact level. ii. Substantially increase the rate or amount of surface runoff in a manner which would result in flooding onsite or offsite?
Less Than Significant Impact – The proposed project is designed to capture more of the future surface runoff which should reduce the existing runoff discharged downstream of the project site. The drainage patterns onsite will be altered to capture stormwater runoff but will maintain the existing offsite downstream drainage system through control of future discharges from the site. Thus, the implementation of the proposed drainage improvements and applicable requirements will ensure that stormwater runoff will not substantially increase the rate or volume of runoff in a manner that would result in flooding on- or off-site. Impacts under this issue are considered less than significant with no mitigation required.
iii. Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff? Less Than Significant With Mitigation Incorporated – As indicated above, the project will not substantially contribute additional runoff water that would exceed the capacity of existing or planned stormwater capacity, or provide substantial additional sources of polluted water, particularly because the site plan includes water quality control BMPs that will collect and treat upstream runoff. The project will require the implementation of a SWPPP and WQMP, and implementation of MM HAZ-1, which will ensure that discharge of polluted material does not occur or is remediated in the event of an accidental spill. As previously stated, out of an abundance of caution, MM HAZ-1 will be incorporated into the SWPPP prepared for the project and implementation of this measure, in the context of compliance with state and federal laws and regulations, can reduce stormwater drainage and polluted runoff impacts from a potential significant impact to a less than significant level. At present, the drainage facility sites are mostly pervious (except the subsurface drainage line in Gerald Ford) and runoff is either retained on site or will be directed into the new Basin; therefore, with the development of the drainage infrastructure as proposed, runoff from the watershed area would be managed more efficiently than that which exists at present. Thus, the implementation of onsite drainage improvements and applicable requirements will ensure that that drainage and stormwater will not create or contribute runoff that would exceed the capacity of existing or planned offsite stormwater drainage systems or provide substantial additional sources of polluted runoff. Impacts under this issue are considered less than significant with implementation of mitigation. iv. Impede or redirect flood flows?
Less Than Significant Impact – According to the Federal Emergency Management Agency (FEMA) Federal Insurance Rate Map (FIRM)(Figure X-1), the proposed Mid Valley Basin development area is not located in a 100-year or 500-year flood hazard area. Furthermore, development of this site is not anticipated to redirect flood flows at the project site, particularly given that surface flows on site will be directed to the onsite drainage features which will ultimately be capable of intercepting the 347
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 53
incremental increase in the 100-year flow rate from the project watershed or otherwise be detained on site and discharged in conformance with City and County requirements. Therefore, impacts under this issue are considered less than significant and no mitigation is required. d. No Impact – Please refer to response IX(c) above. The proposed development area of the project is not located within a flood hazard, tsunami, or seiche zone. The project is located more than 70 miles from the Pacific Ocean, which eliminates the potential for a tsunami to impact the project area.
Additionally, a seiche would not occur within the vicinity of the project because no lakes or enclosed bodies of water exist near or upstream of the site that could be impacted by such an event. Finally, according to the City General Plan, the proposed project is located outside of the area of inundation related to the Whitewater River channel. As such, the proposed project would have no significant potential to risk exposure to flood hazards, tsunami, or seiche zone. e. Less Than Significant Impact – Please refer to the discussion under issue X(b) above. The CVWD’s 2020 Coachella Valley Regional Urban Water Management Plan (2021) identifies sufficient water resources to meet demand in its service area under current and future conditions, including during extended drought, without damage to the groundwater basin. The CVWD replaces short-term water demand using funds to purchase additional water supplied through the State Water Project or the Colorado River. Furthermore, compliance with the State water conservation measures is enforced through CVWD and the local jurisdictions (cities and County). As such, it is not anticipated that the proposed project would have a significant potential to conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan. 348
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 54
Potentially
Significant Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant Impact
No Impact or
Does Not Apply
XI. LAND USE AND PLANNING: Would the project:
a) Physically divide an established community?
b) Cause a significant environmental impact due to a
conflict with any land use plan, policy, or regulation
adopted for the purpose of avoiding or mitigating an
environmental effect?
SUBSTANTIATION: City of Palm Desert General Plan
a. Less Than Significant Impact –The proposed project consists of the installation and expansion of drainage management facilities at the Cook Street/I-10 Freeway interchange and the Cook Street/Gerald Ford drive intersection. Most of these facilities already exist, and will be expanded by the proposed project, with one new facility, a new Basin, to be constructed between Gerald Ford and Interstate 10, as shown on Figure 3. The expansion and addition of these facilities will occupy an area that is already developed with drainage infrastructure and in the process of being developed with Service Industrial/Planned Commercial uses, in a Freeway Commercial Overlay Zone. The proposed project will not physically divide this existing community; instead, it will complete the community infrastructure and allow diversification of the uses within the upstream watershed.
Potential impacts under this proposed project are considered less than significant and will not physically divide an established community.
b. Less than Significant Impact – The proposed project consists of improvements to existing public drainage and stormwater infrastructure located south of Cook Street in the City of Palm Desert. The drainage management facilities are located within the “Public Facility-Institutional District” established by the City of Palm Desert (General Plan) and is zoned with a consistent zoning designation. The proposed project would expand the capacity of the existing Mid Valley drainage system to accommodate the 100-year storm flows affecting the Gerald Ford Drive and Cook Street intersection.
The improvements include modifications to existing drainage facilities and, as part of Phase 2, construction of a new retention basin to provide additional stormwater storage capacity.
A review of all the City General Plan Goals and Policies has been carried out to determine if any conflicts exist between the proposed project and the City land use plan and policies (General Plan).
Because the proposed project consists primarily of improvements to existing public infrastructure rather than new residential, commercial, or other private development, many of the General Plan goals and policies governing new development are not directly applicable to the project.
The General Plan goals and policies identified as applicable to the proposed project primarily address construction-related emissions, cultural and tribal cultural resources, paleontological resources, hazard resilience, flood control, site remediation, soil erosion, and infrastructure improvements. Table XI-1 summarizes the applicable General Plan goals and policies and evaluates the project's consistency with each.
XX
1 1 1 1 X 1 1
349
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 55
Table XI-1
CITY OF PALM DESERT GENERAL PLAN CONSISTENCY SUMMARY
Plan or Policy Detail Project
Consistency
Supporting
Document
Environmental
Resources
Goal 8, Policy
8.5 Construction-related emissions. Require
construction activities, including on-site
construction and transport of materials,
to limit emissions and dust.
Consistent IS/MND, Section III,
Air Quality
Environmental
Resources
Goal 9, Policy
9.3 Tribal coordination. Require notification
of California Native American tribes and
organizations for proposed projects that
have the potential to adversely impact
cultural resources.
Consistent IS/MND, Section
XVIII, Tribal Cultural
Resources; Section
V, Cultural Resources
Environmental
Resources
Goal 9, Policy
9.5 Preservation of historic resources.
Encourage preservation of historic
resources when practical and
preservation of important architectural
details where complete preservation is
infeasible.
Consistent IS/MND, Section V,
Cultural Resources
Environmental
Resources
Goal 9, Policy
9.6 Paleontological resources. Require
paleontological artifacts discovered
within the City or its Sphere of Influence
to be reported to the City and
temporarily loaned to an appropriate
local museum.
Consistent IS/MND, Section VII,
Geology and Soils
Safety Goal 1,
Policy 1.2
Local Hazard Mitigation Plan. Maintain
and regularly update the City's Local
Hazard Mitigation Plan in coordination
with Riverside County and other
participating jurisdictions.
Consistent IS/MND, Project
Description; Section
IX, Hazards and
Hazardous Materials;
Section X, Hydrology
and Water Quality
Safety Goal 1,
Policy 1.4
Critical facilities. Prepare existing critical
facilities for resilience to hazards and
develop new facilities outside hazard-prone areas.
Consistent IS/MND, Project
Description; Section
X, Hydrology and
Water Quality
Safety Goal 3,
Policy 3.4
Open space for flood control. Prioritize
open space or recreational uses as
preferred land uses within areas of high
flood risk.
Consistent IS/MND, Project
Description; Section
X, Hydrology and
Water Quality
Safety Goal 6,
Policy 6.1
Site remediation. Encourage and
facilitate adequate and timely cleanup of
contaminated sites and compatibility of
future land uses.
Consistent IS/MND, Section IX,
Hazards and
Hazardous Materials
Public Utilities
and Services
Goal 1, Policy
1.13 Soil erosion. Require prevention of
water-borne soil erosion, particularly
from sites undergoing grading or similar
ground-disturbing activities.
Consistent IS/MND, Section VII,
Geology and Soils;
Section X, Hydrology
and Water Quality
Public Utilities
and Services
Goal 3, Policy
3.7 Priority infrastructure improvements.
Prioritize water infrastructure
improvements in areas with failing,
insufficient, or end-of-useful-life
infrastructure.
Consistent IS/MND, Project
Description; Section
X, Hydrology and
Water Quality
As shown in Table XI-1, the proposed project would be consistent with the applicable General Plan goals and policies. The project would improve the capacity and resiliency of existing public drainage infrastructure, reduce existing flooding conditions, and implement applicable construction and environmental protection requirements identified throughout this IS/MND. Where mitigation is 350
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 56
required to reduce a potentially significant environmental impact, the applicable mitigation measures will be implemented and enforced by the City through the project-specific Mitigation Monitoring and Reporting Program (MMRP).
The proposed project would not introduce new residential, commercial, or employment-generating land uses and would not induce substantial population, housing, or employment growth. Accordingly, the project would not conflict with the growth assumptions underlying the applicable Air Quality Management Plan (AQMP) or SCAG's Connect SoCal Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS). No other applicable local or regional land use plan has been identified with which the limited public drainage infrastructure improvements would conflict.
Therefore, the proposed project would not cause a significant environmental impact due to a conflict with an applicable land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect; thus, the potential impacts would be less than significant or no significance. 351
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 57
Potentially
Significant Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant Impact
No Impact or
Does Not Apply
XII. MINERAL RESOURCES: Would the project:
a) Result in the loss of availability of a known mineral resource that would be of value to the region and the
residents of the state?
b) Result in the loss of availability of a locally important mineral resource recovery site delineated on a local
general plan, specific plan or other land use plan?
SUBSTANTIATION: Palm Desert General Plan; and Draft Technical Background Report a. No Impact – The City General Plan Draft Technical Background Report provides a map depicting Mineral Resource Zones in the City of Palm Desert. The data in Chapter 11 indicates that the whole of the City is identified as being in Mineral Resource Zones (MRZ) 3a and 3b, which indicates that the proposed project area is not located within an area containing identified mineral resources (Figure XII-1), but may contain some mineral resources, such as aggregate materials. Based on the actual development in the surrounding area, it appears that no aggregated resources have been encountered in the project area. Therefore, the development of drainage infrastructure at the site is not anticipated to result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state. No impacts are anticipated and no mitigation is required. b. No Impact – As indicated above, the proposed project site does not contain any signs of known mineral resources delineated by the County or the City, and is currently surrounded by a mix of transportation corridor and commercial service uses. The project site is designated for service industrial and commercial uses on the City General Plan. As such, the use of the proposed project site for drainage infrastructure support use would not result in the loss of any available locally important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan, as no such delineations of this site have occurred. No impacts under this issue are anticipated and no mitigation is required.
1 1 1 1 1 1 X
1 1 1 1 1 1 X
352
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 58
Potentially
Significant Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant Impact
No Impact or
Does Not Apply
XIII. NOISE: Would the project result in:
a) Generation of a substantial temporary or permanent
increase in ambient noise levels in the vicinity of a
project in excess of standards established in the local general plan or noise ordinance, or applicable
standards of other agencies?
b) Generation of excessive groundborne vibration or
groundborne noise levels?
c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a
plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to
excessive noise levels?
SUBSTANTIATION: “Mid Valley Channel Improvement Noise Assessment,” Urban Crossroads, August 20, 2026; a copy of this document is provided at Appendix 4.
Summary of Findings
The Noise Assessment shows that the Project will not exceed the established City of Palm Desert construction noise thresholds; therefore, Project construction noise impacts are considered less than significant at the nearby noise-sensitive receiver locations. Operational noise impacts are also expected to be limited, as maintenance activity on the drainage improvements is anticipated to be infrequent, generate no major noise sources, and remain well below the ambient noise levels produced by the adjacent I-10.
Accordingly, operational noise-level impacts are considered less than significant, and no further analysis for operational noise is warranted.
Noise Fundamentals
The proposed project consists of a Public Works drainage improvement project that will be developed within an approximate 20.7-acre site. The project is located in a mixed suburban-recreation portion of the City of Palm Desert (City). The project site consists of vacant land containing disturbed native and non-native vegetation, consistent with the remnants of the rural desert character that can be found throughout undeveloped parcels within the City. The primary existing noise sources consist of the primary adjacent roadways, Gerald Ford Drive to the west; Cook Street to the north and Interstate 10 and the Union Pacific rail corridor to the east. Noise is simply defined as "unwanted sound." Sound becomes unwanted when it interferes with normal activities, when it causes actual physical harm or when it has adverse effects on health. Noise is measured on a logarithmic scale of sound pressure level known as a decibel (dB). A-weighted decibels (dBA) approximate the subjective response of the human ear to broad frequency noise source by discriminating against very low and very high frequencies of the audible spectrum. They are adjusted to reflect only those frequencies which are audible to the human ear. Table XIII-1 presents a summary of the typical noise levels and their subjective loudness and effects that are described in more detail below.
1 1 X 1 1 1 1
X
1 1 1 1 1 1 2
353
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 59
Table XIII-1
TYPICAL NOISE LEVELS
Since the range of intensities that the human ear can detect is so large, the scale frequently used to measure intensity is a scale based on multiples of 10, the logarithmic scale. The scale for measuring intensity is the decibel scale. Each interval of 10 decibels indicates a sound energy ten times greater than before, which is perceived by the human ear as being roughly twice as loud. The most common sounds vary between 40 dBA (very quiet) to 100 dBA (very loud). Normal conversation at three feet is roughly at 60 dBA, while loud jet flyover noises equate to 110 dBA at approximately 1,000 feet, which can cause serious discomfort. Another important aspect of noise is the duration of the sound and the way it is described and distributed in time.
Because community receptors are more sensitive to unwanted noise intrusion during more sensitive evening and nighttime hours, state law requires that an artificial dBA increment be added to quiet time noise levels. The State of California has established guidelines for acceptable community noise levels that are based on the Community Noise Equivalent Level (CNEL) rating scale (a 24-hour integrated noise measurement scale). The guidelines rank noise land use compatibility in terms of "normally acceptable," "conditionally acceptable," and "clearly unacceptable" noise levels for various land use types. The State Guidelines, Land Use Compatibility for Community Noise Exposure, single-family homes are "normally acceptable" in exterior noise environments up to 60 dB CNEL and "conditionally acceptable" up to 70 dB CNEL based on this scale. Schools, libraries and churches are "normally acceptable" up to 70 dB CNEL, as are office buildings and business, commercial and professional uses with some structural noise attenuation. In the City 65 dBA is identified as the outdoor threshold of noise significance.
Existing Noise Level Measurements
To assess the existing noise level environment, 24.-hour noise level measurements were taken at four locations in the Project study area. The receiver locations were selected to describe and document the existing noise environment within the Project study area. Figure XIII-1 provides the boundaries of the Project study area and the noise level measurement locations. Appendix 1 of Appendix 4 includes study
COMMON OUTDOOR
ACTIVITIES
COMMON INDOOR
ACTIVITIES
A - WEIGHTED
SOUND LEVEL dBA
SUBJECTIVE
LOUDNESS
EFFECTS OF
NOISE
THRESHOLD OF PAIN 140
INTOLERABLE OR
DEAFENING
HEARING LOSS
NEAR JET ENGINE 130
120
JET FLY-OVER AT 300m (1000 ft) ROCK BAND 110
LOUD AUTO HORN 100
VERY NOISY
GAS LAWN MOWER AT 1m (3 ft) 90
DIESEL TRUCK AT 15m (50 ft),
at 80 km/hr (50 mph) FOOD BLENDER AT 1m (3 ft) 80
SPEECH
INTERFERENCE
NOISY URBAN AREA, DAYTIME VACUUM CLEANER AT 3m (10 ft) 70 LOUD
HEAVY TRAFFIC AT 90m (300 ft) NORMAL SPEECH AT 1m (3 ft) 60 QUIET URBAN DAYTIME LARGE BUSINESS OFFICE 50
MODERATE SLEEP
DISTURBANCE QUIET URBAN NIGHTTIME
THEATER, LARGE CONFERENCE
ROOM (BACKGROUND) 40
QUIET SUBURBAN NIGHTTIME LIBRARY 30
FAINT
MO EFFECT
QUIET RURAL NIGHTTIME
BEDROOM AT NIGHT, CONCERT
HALL (BACKGROUND) 20
BROADCAST/RECORDING
STUDIO
10 VERY FAINT
LOWEST THRESHOLD Of HUMAN
HEARING
LOWEST THRESHOLD OF HUMAN
HEARING
0 354
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 60
area photos. To fully describe the existing noise conditions, long-term noise level measurements were collected by Urban Crossroads, Inc. on Tuesday, July 14, 2026 Appendix 2 of Appendix 4 provides summary worksheets of the noise levels. Measurement procedures and criteria are described on page 6 of Appendix 4.
Noise Measurement Locations
The long-term noise-level measurements were positioned as close to the nearest sensitive receiver locations as possible to assess the existing equivalent hourly noise levels surrounding the Project site. Both Caltrans and the FTA recognize that it is not reasonable to collect noise-level measurements that can fully represent every part of a private yard, patio, deck, or balcony normally used for human activity when estimating impacts for new development projects. This is demonstrated in the Caltrans general site location guidelines, which indicate that sites must be free of noise contamination by sources other than sources of interest. Noise-level measurement sites should avoid locations near sources such as barking dogs, lawnmowers, pool pumps, and air conditioners unless it is the express intent of the analyst to measure these sources. Further, FTA guidance states that it is neither necessary nor recommended that existing noise exposure be determined by measuring at every noise-sensitive location in the project area. Rather, the recommended approach is to characterize the noise environment for clusters of sites based on measurements or estimates at representative locations in the community.
Based on recommendations from Caltrans and the FTA, it is not necessary to collect measurements at each individual building or residence, because each receiver measurement represents a group of buildings that share acoustical equivalence. In other words, if the noise-level measurement location and area represented by the receiver share similar shielding, terrain, and geometric relationships to the reference noise source, the measurement location and the receiver are acoustically equivalent locations. Receivers represent locations of noise-sensitive areas and are used to estimate the future noise level impacts.
Collecting noise-level measurements at the nearby sensitive receiver locations allows for a comparison of the before and after Project noise levels and is necessary to assess potential noise increase over the ambient noise levels due to the Project’s noise sources. This approach is necessary to calculate the temporary or permanent increase in ambient noise levels as required by the CEQA Guidelines.
Construction Vibration Standards
Construction activity can result in varying degrees of ground-borne vibration, depending on the equipment and methods used, distance to the affected structures and soil type. Construction vibration is generally associated with pile driving and rock blasting. Other construction equipment such as air compressors, light trucks, hydraulic loaders, etc., generates little or no ground vibration. To analyze vibration impacts originating from the operation and construction of Mid Valley Basin Improvement, vibration-generating activities are appropriately evaluated against standards established under a City’s Municipal Code, if such standards exist. However, the City of Palm Desert does not identify specific vibration level limits.
Therefore, the Federal Transit Administration, Transit Noise and Vibration Impact Assessment Manual, construction vibration damage criteria is used in this analysis to assess potential temporary construction-related impacts at adjacent building locations. The structural category of the buildings adjacent to the Project site can best be described as “Engineered concrete and masonry (no plaster)” with a maximum acceptable continuous vibration threshold of 0.3 PPV (in/sec). Construction activity can result in varying degrees of ground vibration, depending on the equipment and methods employed. Operation of construction equipment causes ground vibrations that spread through the ground and diminish in strength with distance. Based on the representative vibration levels presented for various construction equipment types, it is possible to estimate the potential for human response (annoyance) and building damage using the following vibration assessment methods defined by the FTA. To describe the vibration impacts the FTA provides the following equation: PPVequip = PPVref x (25D)1.5.
Impact Analysis:
355
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 61
a. Less Than Significant With Mitigation Incorporated – The Noise Assessment shows that the Project will not exceed the established City of Palm Desert construction noise or vibration thresholds; therefore, Project construction noise and vibration impacts are considered less than significant at the nearby noise-sensitive receiver locations. Operational noise impacts are also expected to be limited, as maintenance activity on the drainage improvements is anticipated to be infrequent, generate no major noise sources, and remain well below the ambient noise levels produced by the adjacent I-10.
The more detailed project analysis follows.
Noise Measurement Results
The noise measurements presented below focus on the equivalent or the hourly energy average sound levels (Leq) to describe the existing ambient conditions. Table XIII-2 provides the Leq used to describe the hourly daytime (7:00 a.m. to 10:00 p.m.) and nighttime (10:00 p.m. to 7:00 a.m.) noise levels at each noise measurement location. The Leq represents a steady state sound level containing the same total energy as a time-varying signal over a given sample period. The daytime and nighttime Leq represent the average of all hourly noise levels observed during these time periods, expressed as a single number.
Table XIII-2
AMBIENT NOISE LEVEL MEASUREMENTS
Location1 Description
Energy Average Noise
Level (dBA Leq)2
Daytime Nighttime
L1 Located west of the site near the residence at 74-764 Technology Dr. 60.1 56.3
L2 Located south of the site near the residence at 75108 Gerald Ford Dr. 67.8 65.4
L3 Located south of the site near the residence at 75400 Gerald Ford Dr. 59.7 53.4
L4 Located southeast of the site near the residence at
75700 Gerald Ford Dr. 54.9 49.1
Table XIII-2 provides the equivalent hourly noise levels used to describe the daytime and nighttime ambient conditions for each of the measurements. Appendix 2 of Appendix 4 provides summary worksheets of the noise levels for each hour as well as the minimum, maximum, L1, L2, L5, L8, L25, L50, L90, L95, and L99 percentile noise levels observed during the daytime and nighttime periods.
Receiver Locations
To assess the potential for short-term construction noise impacts, the following receiver locations, as shown in Figure XII-2 were identified as representative locations for analysis. The selection of receiver locations was based on FHWA guidelines and is consistent with additional guidance provided by Caltrans and the FTA. Sensitive receivers are generally defined as locations where people reside or where the presence of unwanted sound could otherwise adversely affect the use of the land. Noise-sensitive land uses are generally considered to include schools, hospitals, single family dwellings, mobile home parks, churches, libraries, and recreation areas. Moderately noise sensitive land uses typically include multi-family dwellings, hotels, motels, dormitories, out-patient clinics, cemeteries, golf courses, country clubs, athletic/tennis clubs, and equestrian clubs. Land uses that are considered relatively insensitive to noise include business, commercial, and professional developments. Land uses that are typically not affected by noise include: industrial, manufacturing, utilities, agriculture, undeveloped land, parking lots, warehousing, liquid and solid waste facilities, salvage yards, and transit terminals.
To describe the potential off-site Project noise levels, four receiver locations in the vicinity of the 356
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 62
Project site were identified. Other sensitive land uses in the Project study area that are located at greater distances than those identified in this noise study will experience lower noise levels than those presented in this report due to the additional attenuation from distance and the shielding of intervening structures. Distance is measured in a straight line from the Project boundary to each receiver location.
Noise Prediction Model
To fully describe the exterior operational noise levels from the Project, Urban Crossroads, Inc. developed a noise prediction model using the CadnaA (Computer Aided Noise Abatement) computer program. CadnaA can analyze multiple types of noise sources using the spatially accurate Project site plan, georeferenced Nearmap aerial imagery, topography, buildings, and barriers in its calculations to predict outdoor noise levels. Using the ISO 9613-2 protocol, CadnaA will calculate the distance from each noise source to the noise receiver locations, using the ground absorption, distance, and barrier/building attenuation inputs to provide a summary of noise level at each receiver and the partial noise level contributions by noise source. The noise level calculations provided in this noise assessment account for the distance attenuation provided due to geometric spreading, when sound from a localized stationary source (i.e., a point source) propagates uniformly outward in a spherical pattern. A default ground attenuation factor of 0.5 was used in the CadnaA noise analysis to account for mixed ground representing a combination of hard and soft surfaces.
Construction Noise Analysis
To control noise impacts associated with the construction of the proposed Project, the City of Palm Desert has established limits to the hours of operation. Section 9.24.070 (Appendix 3 of Appendix 4) of the Municipal Code indicates that No person shall perform, nor shall any person be employed, nor shall any person cause any other person to be employed to work for which a building permit is required by the city in any work of construction, erection, demolition, alteration, repair, addition to or improvement of any building, structure, road or improvement to realty except between the hours as set forth as follows: 7 a.m. to 5:30 p.m. Mondays through Fridays 5:30 a.m. to 7 p.m., 8:oo a.m. to 5 p.m. Saturdays and no activities on Sundays and government code holidays October 1st through April 30th. From May 1st through September 30th, permitted construction hours are Mondays through Fridays 5:39 a.m. to 7 p.m., Saturdays 8:oo a.m. to 5 p.m. and no activities Sundays and government code holidays. However, neither the City of Palm Desert General Plan nor Municipal Code establish numeric maximum acceptable construction source noise levels at potentially affected receivers.
Therefore, a numerical construction threshold based on Federal Transit Administration (FTA) Transit Noise and Vibration Impact Assessment Manual is used for analysis of daytime construction impacts, as discussed below.
Construction Noise Sources
Figures XIII-3 and XIII-4 show the on-site construction noise source activity in relation to the nearest sensitive receiver locations previously described in Figure XIII-2. To describe construction noise activities, this construction noise analysis was prepared using reference construction equipment Consistent with FHWA and FTA guidance for detailed construction noise assessment, Tables XIII-3 and XIII-4 present the combined noise levels for the loudest construction activities expected for each stage, noise levels from the Federal Highway Administration (FHWA), which published the Roadway Construction Noise Model (RCNM) that includes a national database of construction equipment reference noise emission levels. The RCNM equipment database provides a comprehensive list of the noise-generating characteristics of specific types of construction equipment. In addition, the database provides an acoustical usage factor to estimate the fraction of time each piece of construction equipment is operating at full power (i.e., its loudest condition) during a construction operation.
357
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 63
Table XIII-3
PHASE 1 CONSTRUCTION REFERENCE NOISE LEVELS
Construction Stage
Reference
Construction
Equipmnet1
Reference
Noise
Level @ 50
Feet
(dBA Leq)
Reference
Power
Level
(dBA Lw)2
Amount
Composite
Reference
Noise
Level (dBA
Leq)3
Reference
Power
Level
(dBA Lw)
4 Flat Bed Truck 70 101.6 2 73.0 104.7
Linear, Grubbing &
Land Clearing
Dozer
Tractor
Excavator
78 80
77 109.6
111.6
108.6
1 1
1 78.0
80.0 77.0
109.6
111.6
108.6
All Other Equip 82 113.6 1 82.0 113.6
Concrete Saw 83 114.6 1 83.0 114.6
Demolition Excavator 77 108.6 1 77.0 108.6
Dozer 78 109.6 1 78.0 109.6
Linear, Grading &
Excavation
Flat Bed Truck
Dozer
Tractor
70 78
80 101.6
109.6
111.6
1 2
1 70.0
81.0 80.0
101.6
112.7
111.6
Linear, Drainage,
& Sub-Grade
Flat Bed Truck
Dozer
Tractor
70 78
80 101.6
109.6
111.6
2 2
2 73.0
81.0 83.0
104.7
112.7
114.7
Paver 74 105.6 1 74.0 105.6
All Other Equip 82 113.6 1 82.0 113.6
Linear, Paving Flat Bed Truck
Tractor
70 80
101.6
111.6
3 1
74.8 80.0
106.4
111.6
Compactor
(ground) 76 107.6 1 76.0 107.6
1 FHWA Road Construction Noise Model.
2 The total amount of acoustical energy produced by a sound source independent of distance or surroundings. 3 Represents the combined noise level for all equipment assuming they operate at the same time. 4 Represents the combined sound power level for all equipment assuming they operate at the same time independent of distance or surroundings.
Table XIII-4
PHASE 2 CONSTRUCTION REFERENCE NOISE LEVELS
Construction Stage
Reference
Construction
Equipmnet1
Reference
Noise
Level @ 50
Feet
(dBA Leq)
Reference
Power
Level
(dBA Lw)2
Amount
Composite
Reference
Noise
Level (dBA
Leq)3
Reference
Power
Level
(dBA Lw)
4 Flat Bed Truck 70 101.6 2 73.0 104.7
Linear, Grubbing &
Land Clearing
Dozer
Tractor
Excavator
78 80
77 109.6
111.6
108.6
1 1
1 78.0
80.0 77.0
109.6
111.6
108.6
All Other Equip 82 113.6 1 82.0 113.6
Linear, Grading &
Excavation
Flat Bed Truck
Dozer
Tractor
70 78
80 101.6
109.6
111.6
1 2
1 70.0
81.0 80.0
101.6
112.7
111.6
358
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 64
Construction Stage
Reference
Construction
Equipmnet1
Reference
Noise
Level @ 50
Feet
(dBA Leq)
Reference
Power
Level
(dBA Lw)2
Amount
Composite
Reference
Noise
Level (dBA
Leq)3
Reference
Power
Level
(dBA Lw)
4 Linear, Drainage,
& Sub-Grade
Flat Bed Truck
Dozer
Tractor
70 78
80 101.6
109.6
111.6
2 2
2 73.0
81.0 83.0
104.7
112.7
114.7
Paver 74 105.6 1 74.0 105.6
All Other Equip 82 113.6 1 82.0 113.6
Linear, Paving Flat Bed Truck
Tractor
70 80
101.6
111.6
3 1
74.8 80.0
106.4
111.6
Compactor
(ground) 76 107.6 1 76.0 107.6
1 FHWA Road Construction Noise Model.
2 The total amount of acoustical energy produced by a sound source independent of distance or surroundings. 3 Represents the combined noise level for all equipment assuming they operate at the same time. 4 Represents the combined sound power level for all equipment assuming they operate at the same time independent of distance or surroundings.
According to the EPA, FTA, and FHWA, the overall construction noise level is governed primarily by the noisiest pieces of equipment. The quieter pieces do not affect the overall level, but they do reduce the magnitude of the fluctuations in the noise level. Therefore, a rough estimate of the noise level needs only to include the noisiest pieces of equipment expected at the site, assuming all equipment operates simultaneously for Phase 1 and Phase 2, respectively. Accordingly, the construction equipment assumptions used in this noise analysis are consistent with the types of equipment identified in the Mid Valley Channel Improvement Channel Air Quality Impact Analysis. However, because the noise analysis relies on the FHWA RCNM database, which categorizes equipment types using standardized nomenclature and acoustical profiles, some equipment names and classifications may differ from those presented in the AQ analysis. In such cases, the closest representative equipment type available within the RCNM database was selected based on similar operational characteristics and noise emission profiles. This approach ensures that the noise modeling remains consistent with established FHWA and FTA methodologies while also maintaining alignment, to the extent practicable, with the construction assumptions evaluated in the AQ analysis, and provides a reasonable and conservative representation of anticipated construction noise levels.
Construction Noise Level Analysis
Using the reference construction equipment noise levels and the CadnaA noise prediction model, calculations of the Project construction noise levels with all equipment operating simultaneously during the daytime hours were completed. As shown in Table XII-5 the unabated daytime construction noise levels for activities for drilling and pipeline activities for Phase 1 are expected to range from
48.6. to 66.7. dBA Leq at the nearest noise-sensitive uses. Appendix 4 of Appendix 4 includes the unabated typical construction CadnaA noise model calculations. 359
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 65
Table XIII-5
PHASE 1 DAYTIME CONSTRUCTION NOISE LEVEL SUMMARY
Receiver
Location1
Construction Noise Levels (dBA Leq)
Linear,
Grubbing &
Land
Clearing
Demolition
Linear,
Grading &
Excavation
Linear,
Drainage, &
Sub-Grade
Linear,
Paving
Highest
Levels2
R1 54.0 53.0 51.8 53.5 53.6 54.0
R2 66.1 65.1 63.9 65.6 65.7 66.1
R3 66.7 65.7 64.5 66.2 66.3 66.7
R4 48.6 47.6 46.4 48.1 48.2 48.6
1 Construction noise source and receiver locations are shown in Figure XIII-1. 2 Construction noise level calculations based on distance from the construction activity, which is measured from the Project site boundary to the nearest receiver locations. CadnaA construction noise model inputs are included in Appendix 4.
Using the reference construction equipment noise levels and the CadnaA noise prediction model, calculations of the Project construction noise levels with all equipment operating simultaneously during daytime hours were completed. As shown in Table XIII-6, the unabated construction noise levels for Phase 2 activities are expected to range from 44.6 to 67.5 dBA Leq at the nearest noise-sensitive uses.
Table XIII-6
PHASE 2 DAYTIME CONSTRUCTION NOISE LEVEL SUMMARY
Receiver
Location1
Construction Noise Levels (dBA Leq)
Linear,
Grubbing &
Land
Clearing
Linear,
Grading &
Excavation
Linear,
Drainage, &
Sub-Grade
Linear,
Paving
Highest
Levels2
R1 44.6 42.4 44.1 44.2 44.6
R2 50.0 47.8 49.5 49.6 50.0
R3 67.5 65.3 67.0 67.1 67.5
R4 56.8 54.6 56.3 56.4 56.8
1 Construction noise source and receiver locations are shown in Figure XIII-1. 2 Construction noise level calculations based on distance from the construction activity, which is measured from the Project site boundary to the nearest receiver locations. CadnaA construction noise model inputs are included in Appendix 4.
Construction Noise Compliance
To evaluate whether the Project will generate potentially significant short-term noise levels at the nearest receiver locations, a construction-related noise level threshold of 80 dBA Leq is used as a reasonable threshold to assess the daytime construction noise level impacts. As shown in Tables XIII-7 and -8, construction noise levels at the nearest receiver locations will satisfy the reasonable daytime 80 dBA Leq significance threshold during Project construction activities for both Phase 1 and Phase 2 of construction, and the construction noise level impacts are considered less than significant.
360
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 66
Table XIII-7
PHASE 1 CONSTRUCTION NOISE LEVEL COMPLIANCE
Receiver
Location1
Construction Noise Levels (dBA Leq)
Highest Construction
Noise Levels2 Threshold Threshold Exceeded?3
R1 54.0 80 No
R2 66.1 80 No
R3 66.7 80 No
R4 48.6 80 No
1 Construction noise source and receiver locations are shown in Figure XIII-3. 2 Highest construction noise level calculations based on distance from the construction noise source activity to the nearest receiver locations, as shown in Table XIII-5 3 Do the estimated Project construction noise levels exceed the construction noise level threshold? Table XIII-8
PHASE 2 CONSTRUCTION NOISE LEVEL COMPLIANCE
Receiver
Location1
Construction Noise Levels (dBA Leq)
Highest Construction
Noise Levels2 Threshold Threshold Exceeded?3
R1 44.6 80 No
R2 50.0 80 No
R3 67.5 80 No
R4 56.8 80 No
1 Construction noise source and receiver locations are shown in Figure XIII-4. 2 Highest construction noise level calculations based on distance from the construction noise source activity to the nearest receiver locations, as shown in Table XIII-6 3 Do the estimated Project construction noise levels exceed the construction noise level threshold? Temporary Construction Noise Level Increases
To describe the temporary Project construction noise level increase associated with Project construction, the Project construction noise levels were combined with the existing ambient noise level measurements at the nearest off-site receiver locations. The difference between the combined Project-construction and ambient noise levels is used to describe the construction noise level contributions. Temporary noise level increases that would be experienced at sensitive receiver locations when the Project construction-source noise is added to the ambient daytime conditions are presented in Tables XIII-9 and -10. A temporary noise level increase of 20 dBA is considered a significant impact based on the substantial noise level increase criteria, which is used to assess the Project construction noise level increases.1
Table XIII-9
PHASE 1 DAYTIME CONSTRUCTION NOISE LEVEL INCREASES
Receiver
Location1
Typical Project
Construction
Noise Level2
Measurement
Location3
Reference
Ambient Noise
Levels4
Combined
Project and
Ambient5
Project
Increase6
Increase
Criteria7
Increase
Criteria
Exceeded?
R1 54.0 L1 60.1 61.1 1.0 20 No
R2 66.1 L2 67.8 70.0 2.2 20 No
1 The City supports the 20 dBa temporary noise increase as a significant threshold as an industry standard
361
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 67
R3 66.7 L3 59.7 67.5 7.8 20 No
R4 48.6 L4 54.9 55.8 0.9 20 No
1 Construction noise source and receiver locations are shown in Figure XIII-3 2 Typical Project daytime construction noise levels as shown in Table XIII-7. 3 Reference noise level measurement locations as shown in Figure XIII-4 4 Observed daytime ambient noise levels as shown in Table 1. 5 Represents the combined ambient conditions plus the Project construction activities. 6 The noise level increase expected with the addition of the proposed Project construction activities. 7 Substantial noise level increase threshold
Table XIII-10
PHASE 2 DAYTIME CONSTRUCTION NOISE LEVEL INCREASES
Receiver
Location1
Typical Project
Construction
Noise Level2
Measurement
Location3
Reference
Ambient Noise
Levels4
Combined
Project and
Ambient5
Project
Increase6
Increase
Criteria7
Increase
Criteria
Exceeded?
R1 44.6 L1 60.1 60.2 0.1 20 No
R2 50.0 L2 67.8 67.9 0.1 20 No
R3 67.5 L3 59.7 68.2 8.5 20 No
R4 56.8 L4 54.9 59.0 4.1 20 No
1 Construction noise source and receiver locations are shown in Figure XIII-4 2 Typical Project daytime construction noise levels as shown in Table XIII-8. 3 Reference noise level measurement locations as shown in Figure XIII-1 4 Observed daytime ambient noise levels as shown in Table 1. 5 Represents the combined ambient conditions plus the Project construction activities. 6 The noise level increase expected with the addition of the proposed Project construction activities. 7 Substantial noise level increase threshold
As indicated in Table XIII-9 Phase 1 will contribute to construction noise increases ranging from 0.9 to 7.8 dBA Leq during the daytime hours at the nearest receiver locations. The unmitigated construction noise analysis shows that the nearest receiver locations will not exceed the substantial 20 dBA L eq noise level increase significance threshold during Project construction activities. As indicated in Table XIII-10, Phase 2 will contribute to construction noise increases ranging from 0.1 to
8.5 dBA L eq during the daytime hours at the nearest receiver locations. The unmitigated construction noise analysis shows that the nearest receiver locations will not exceed the substantial 20 dBA Leq noise level increase significance threshold during Project construction activities. The temporary construction noise level increase analysis shows that the noise impacts due to the Project construction noise are considered less than significant without mitigation. However, to minimize construction noise at the nearest residences, the following mitigation measures will need to be implemented. The following measures represent an interpretation of the General Plan mitigation measures that demonstrate consistence with the General Plan.
NOI-1 The City will require that all construction equipment be operated with mandated noise control equipment (mufflers or silencers). Enforcement will be accomplished by random field inspections by applicant and City personnel during construction activities.
NOI-2 Construction activities shall be restricted to the hours between 7 a.m. and 5:30 p.m.
NOI-3 Equipment not in use for five minutes shall be shut off.
NOI-4 Equipment shall be maintained and operated such that loads are secured from rattling or banging.
362
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 68
Thus, based on the existing noise circumstances within the vicinity of the project (roadway noise), short-term noise impacts are considered less than significant and the implementation of the mitigation measures above will allow compliance with the City General Plan. b. Less Than Significant Impact – Vibration is the periodic oscillation of a medium or object. The rumbling sound caused by vibration of room surfaces is called structure borne noises. Sources of groundborne vibrations include natural phenomena (e.g., earthquakes, volcanic eruptions, sea waves, landslides) or human-made causes (e.g., explosions, machinery, traffic, trains, construction equipment). Vibration sources may be continuous or transient. Vibration is often described in units of velocity (inches per second), and discussed in decibel (dB) units in order to compress the range of numbers required to describe vibration. Vibration impacts related to human development are generally associated with activities such as train operations, construction, and heavy truck movements.
The Federal Transit Association (FTA) FTA Assessment states that in contrast to airborne noise, ground-borne vibration is not a common environmental problem. Although the motion of the ground may be noticeable to people outside structures, without the effects associated with the shaking of a structure, the motion does not provoke the same adverse human reaction to people outside. Within structures, the effects of ground-borne vibration include noticeable movement of the building floors, rattling of windows, shaking of items on shelves or hanging on walls, and rumbling sounds. FTA Assessment further states that it is unusual for vibration from sources such as buses and trucks to be perceptible, even in locations close to major roads. However, some common sources of vibration are trains, trucks on rough roads, and construction activities, such as blasting, pile driving, and heavy earth-moving equipment. Ground vibration levels associated with various types of construction equipment are summarized on Table XIII-11.
Table XIII-11
VIBRATION SOURCE LEVELS FOR CONSTRUCTION EQUIPMENT
Equipment PPV (in/sec) at 25 feet
Small bulldozer 0.003
Jackhammer 0.035
Loaded Trucks 0.076
Large bulldozer 0.089
Vibratory Roller 0.210
Federal Transit Administration, Transit Noise and Vibration Impact Assessment Manual Table XIII-12 presents the expected Phase 1 related vibration levels at the nearby receiver locations.
At distances ranging from 58 to 1,150 feet from Phase 1 construction activities, construction vibration velocity levels are estimated to range from less than 0.01 to 0.06 in/sec PPV. Based on the maximum acceptable continuous vibration threshold of 0.30 PPV (in/sec), the typical Phase 1 construction vibration levels will fall below the building damage thresholds at all the noise-sensitive receiver locations. Table XIII-13 presents the expected Phase 2-related vibration levels at the nearby receiver locations. At distances ranging from 58 to 2,350 feet from Phase 2 construction activities, construction vibration velocity levels are estimated to range from less than 0.01 to 0.06 in/sec PPV. 363
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 69
Table XIII-12
PHASE 1 CONSTRUCTION VIBRATION LEVELS
Location1
Distance
to
Const.
Activity
(Feet)2
Typical Construction Vibration Levels PPV (in/sec)3
Thresholds
PPV
(in/sec)4
Thresholds
Small Exceeded?5
bulldozer
Jack-hammerLoaded
Trucks
Large
bulldozer
Vibratory
Roller
Highest
Vibration
Level
R1 462' 0.00 0.00 0.00 0.00 0.00 0.00 0.30 No
R2 74' 0.00 0.01 0.01 0.02 0.04 0.04 0.30 No
R3 58' 0.00 0.01 0.02 0.03 0.06 0.06 0.30 No
R4 1,150' 0.00 0.00 0.00 0.00 0.00 0.00 0.30 No 1 Construction noise source and receiver locations are shown on Figure XIII-1. 2 Distance from receiver building facade to Project construction boundary (Phase 1 site boundary). 3 Based on the Vibration Source Levels of Construction Equipment (Table XIII-11). 4 Federal Transit Administration, Transit Noise and Vibration Impact Assessment Manual 5 Does the peak vibration exceed the acceptable
vibration thresholds? "PPV" = Peak Particle Velocity
Table XIII-13
PHASE 2 CONSTRUCTION VIBRATION LEVELS
Location1
Distance
to
Const.
Activity
(Feet)2
Typical Construction Vibration Levels
PPV (in/sec)3 Thresholds
PPV
(in/sec)4
Thresholds
Exceeded?5 Small
bulldozer
Jack-hammerLoaded
Trucks
Large
bulldozer
Vibratory
Roller
Highest
Vibration
Level
R1 2,350' 0.00 0.00 0.00 0.00 0.00 0.00 0.30 No
R2 1,061' 0.00 0.00 0.00 0.00 0.00 0.00 0.30 No
R3 58' 0.00 0.01 0.02 0.03 0.06 0.06 0.30 No
R4 540' 0.00 0.00 0.00 0.00 0.00 0.00 0.30 No
1 Construction noise source and receiver locations are shown on Figure XIII-1. 2 Distance from receiver building facade to Project construction boundary (Phase 2 site boundary). 3 Based on the Vibration Source Levels of Construction Equipment (Table XIII-11). 4 Federal Transit Administration, Transit Noise and Vibration Impact Assessment Manual 5 Does the peak vibration exceed the acceptable
vibration thresholds? "PPV" = Peak Particle Velocity
Based on the analysis above, and the lack of any operational uses that would include vibration, the proposed project will not expose people to generation of excessive groundborne vibration or groundborne noise levels during occupancy. Impacts would be less than significant. a. No Impact – No private airports are located in the vicinity of the project. The closest public airport is the Bermuda Dunes Airport, which is located approximately 3 miles southeast of the project site; the Mid Valley Project is not located within the Bermuda Dunes Airport Planning Area and Airport Safety Review Area due to the distance from this existing airport. Additionally, the proposed project is located outside of the Airport’s noise impact area. Therefore, because the proposed project is located outside of the Airport’s noise impact area, the proposed project would have no potential to expose people residing or working in the project area to excessive noise levels from nearby airport activity.
No mitigation is required.
364
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 70
Potentially
Significant Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant Impact
No Impact or
Does Not Apply
XIV. POPULATION AND HOUSING: Would the
project:
a) Induce substantial population growth in an area,
either directly (for example, by proposing new homes
and businesses) or indirectly (for example, through
extension of roads or other infrastructure)?
b) Displace substantial numbers of existing people or
housing, necessitating the construction of replacement
housing elsewhere?
SUBSTANTIATION: Palm Desert General Plan; and Draft Technical Background Report a. No Impact – The Mid-Valley Basin, Drainage/Storm Drain Improvements Project consists of three drainage infrastructure projects that will have no direct effects on population or housing. No new residents will be added to the City’s population and no housing units will be developed or demolished in conjunction with this project. However, indirectly, the proposed project will install storm runoff facilities that may facilitate future housing developments in the surrounding area by improving drainage and reducing flood-related constraints. The nature, extent, timing, and intensity of any future development that may occur as a result of these improvements is currently unknown and would be subject to separate discretionary approvals, environmental review, market conditions, and applicable land use regulations. Therefore, it would be speculative to assume the amount of future residential or nonresidential development that could occur as a result of the proposed Project, and any such development would be evaluated independently at the time specific proposals are advanced. The proposed project will not contribute indirectly or directly to significant growth inducement. No mitigation is required.
b. No Impact – The project area is currently developed with some drainage infrastructure and adjacent commercial development, Union Pacific railroad tracks and the I-10 Freeway. Therefore, it will not displace substantial numbers of existing people or housing. No adverse impact will occur under this issue from implementing the proposed project.
1 1 1 1 1 1 X
1 1 1 1 1 1 X
365
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 71
Potentially
Significant Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant Impact
No Impact or
Does Not Apply
XV. PUBLIC SERVICES: Would the project result in
substantial adverse physical impacts associated with
the provision of new or physically altered governmental facilities, need for new or physically altered govern-mental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other
performance objectives for any of the public services:
a) Fire protection?
b) Police protection?
c) Schools?
d) Parks?
e) Other public facilities?
SUBSTANTIATION: Palm Desert General Plan EIR; and Draft Technical Background Report a. Less Than Significant Impact – The City General Plan EIR ant the Draft Technical Background Report provide an excellent summary of the public services infrastructure in the City. The net result is that the City’s fire protection services have a very good rating ISO of 3, on a scale of 1 through 10, with 1 being the highest. The City has three Fire Stations manned by the Riverside County Fire Department, with an additional three stations located in Indian Wells and Rancho Mirage capable of responding to a fire, if necessary, as part pf a regional fire protection program. The nearest fire station is located at the corner of Country Club and Portola Avenue, about two-miles distant. In 2016 the City was maintaining an average response time of 3.6 minutes, with 86.2% of responses less than five minutes.
According to the fire protection findings in the General Plan EIR, both project specific and cumulative impacts to this system are less than significant based on implementation of General Plan Policies (Safety Element (4) Utilities and Services Element (7)) which require maintaining updated Development Impact Fees (DIF) to reflect changing conditions within the City. The installation of these three drainage system improvements do not include any new structures that will be subject to fire hazards or contribute to significant new fire hazards. Thus, no addition to any new fire protection facilities will be required. Thus, the proposed project can be implemented without significant adverse impacts on the City’s fire protection system.
b. Less Than Significant Impact – The City General Plan EIR ant the Draft Technical Background Report provide an excellent summary of the public services infrastructure in the City. The net result is that the City’s law enforcement protection services have been maintained at the General Plan’s preferred ratio of sworn officers per 1,000 population at a ratio of 1.5 officers or better. The proposed project will not directly increase demand for additional law enforcement personnel. The City’s police station is located at the southeast corner of Gerald Ford and Shadow Ridge Road, approximately 1 mile from the proposed project site. The installation of these three drainage system improvements do not include any new structures or population that will contribute to demand for law enforcement services.
Thus, no addition to any new law enforcement facilities will be required. Thus, the proposed project can be implemented without significant adverse impacts on the City’s law enforcement services.
XX
XX
XX
XX
XX
366
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 72
c. Less Than Significant Impact – The City of Palm Desert is served by two school districts, the Desert Sands Unified School District and the Palm Springs Unified School District. Desert Sands serves the core of City and Palm Springs serves the northern and southern portions of the City. There are four elementary schools, 1 charter elementary, 1 middle school and 1 high school. There are also numerous private schools and post-secondary schools located in the City. The installation of these three drainage system improvements will not generate any new students. Thus, the proposed project can be implemented without significant adverse impacts on the educational system in the City. d. Less Than Significant Impact – The City of Palm Desert partners with the Desert Recreation District to provide park and recreation programs and activities. According to the General Plan EIR the City operated 163 acres of parkland; three municipally-owned golf courses; and provided access to 23,060 acres of open space and a total of 6,834 acres of golf course in 2016. At that time the City had approximately 3.23 acres of parkland per resident, with a goal of 6.25 acres of parkland (mini - parks, neighborhood parks and community parks) per resident. The installation of these three drainage system improvements will not generate any new residents. Thus, the proposed project can be implemented without significant adverse impacts on the City’s recreational resources. e. Less Than Significant Impact – The General Plan EIR identifies several other services that could be required future residents of the proposed project, but only one topic was evaluated, Library resources.
The following evaluation focuses solely on library resources. The City’s policy is to ensure adequate library resources are available for residents and students of the City. However, based on the adequacy library services/resources in the City in 2016, the General Plan EIR concluded that the future population growth within the would not exceed the capacity of library services/resources. The installation of these three drainage system improvements will not generate any residents. Thus, the proposed project can be implemented without significant adverse impacts on the library resources of the City.
367
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 73
Potentially
Significant Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant Impact
No Impact or
Does Not Apply
XVI. RECREATION:
a) Would the project increase the use of existing
neighborhood and regional parks or other recreational
facilities such that substantial physical deterioration of the facility would occur or be accelerated?
b) Does the project include recreational facilities or
require the construction or expansion of recreational
facilities which might have an adverse physical effect
on the environment?
SUBSTANTIATION: Palm Desert General Plan EIR; and Draft Technical Background Report a-b. No Impact – As indicated under issue XV.d above, the installation of these three drainage system improvements will not generate any new residents. Also, there are no recreational facilities located within the project area. Thus, the proposed project can be implemented without significant adverse impacts on the existing City’s recreational resources and will not require construction or expansion of recreational facilities which could have an indirect adverse physical effect on the environment. 1 1 1 1 1 1 X
1 1 1 1 1 1 X
368
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 74
Potentially
Significant Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant Impact
No Impact or
Does Not Apply
XVII. TRANSPORTATION: Would the project:
a) Conflict with a program, plan, ordinance or policy
addressing the circulation system, including transit,
roadway, bicycle and pedestrian facilities?
b) Conflict or be inconsistent with CEQA Guidelines
section 15064.3, subdivision (b)?
c) Substantially increase hazards due to a geometric
design feature (e.g., sharp curves or dangerous inter-sections) or incompatible uses (e.g., farm equipment)? d) Result in inadequate emergency access?
SUBSTANTIATION: Air Quality & Greenhouse Gas Assessment Mid Valley Channel Improvements,” Urban Crossroads, 2026 (Appendix 1).
a, Less Than Significant with Mitigation Incorporated – Under the present conditions the project area does not generate any routine (daily) trips or traffic. At present, periodically the City conducts random maintenance trips to the area. Once the proposed drainage system improvements are completed, maintenance trips will resume in the same manner. However, during construction employees will be onsite and trips will be generated to deliver materials (such as construction equipment, storm drain pipes, and concrete) and an estimated 15,000 CY of material may be excavated and hauled from the construction area(s) during Phase 1, and Phase 2 would require 1,800 CY of soil export, for a project total of 16,800 CY of export for earthwork activities. For planning purposes, it is assumed that the maximum number to truck trips will not exceed 104 trips per day (refer to the Air Quality and GHG Assessment provided as Appendix 1). The worker trips do not exceed 18 which can occur during the peak hour. However, with less than 25 trips during peak hour, the potential for a significant impact on the flow of traffic is less than significant. The truck hauling trips on the local roadways will occur over an 8-hour period which averages out to about 13 trips per hour. The addition of 13 truck trips per hour is not considered a significant impact. However, as circulation could result in short-term circulation changes as a result of lane closure needed to install the storm drain improvements proposed as part of Phase 2 of this project, lane closure could result in a significant circulation impact such that an adverse impact could occur. Thus, implementation of MM HAZ-2 will assist with integrating the truck trips into the local flow of traffic, and this mitigation measure would improve construction circulation such that a significant adverse impact would be avoided, and a less than significant impact would occur.
TRAN-1 The City shall require that all disturbances to public roadways be repaired in a manner that complies with the Standard Specifications for Public Works Construction (green book) or other applicable City of Palm Desert standard design requirements.
With implementation of this mitigation measure the proposed project’s impact on the area circulation system can be controlled to less than significant impact. b. Less Than Significant Impact – CEQA presently (since 2020) requires all lead agencies to adopt Vehicle Miles Traveled (VMT) as the measure for identifying transportation system impacts for land use projects. In accordance with County of Riverside’s Transportation Analysis Guidelines for Level 1 1 X 1 1 1 1
X
1 1 1 1 X 1 1
XX
369
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 75
of Serve and Vehicle Miles Traveled, projects with GHG emissions less than 3,000 MTCO2e are presumed to cause a less than significant impact. As disclosed in Appendix 1, GHG emissions related to the Project are approximately 8 MTCO2e. In addition, the proposed project is not anticipated to generate any incremental traffic on a daily basis. Therefore, VMT impacts would be less than significant.
c. Less Than Significant Impact – The proposed project will not be altering the alignment of Gerald Ford Drive or Cook Street. Therefore, the potential to create roadway hazards due to a geometric design feature or incompatible uses will not occur. Thus, the proposed project will have a less than significant adverse impact on this issue.
d. Less Than Significant With Mitigation Incorporated – The proposed project will include roadway construction on Gerald Ford Drive. Such construction can negatively impact emergency access to the project area. Construction activities could also temporarily block access to some roadways and driveways that are currently used by emergency response vehicles or in emergency evacuations.
Therefore, construction impacts related to emergency access would be potentially significant. To mitigate this potential effect on emergency access, MMs HAZ-2 and TRAN-1 shall be implemented.
These measures would require implementation of transportation control measures and coordination with emergency response providers to minimize impacts to emergency access in the program construction area(s) due to lane and/or road closures during project construction. With such implementation emergency access can be assured during construction. Thus, the proposed project will have a less than significant adverse impact on this issue. There will be no long-term conflicts with emergency access. Thus, any impacts are considered less than significant with implementation of mitigation.
370
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 76
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No Impact or
Does Not Apply
XVIII. TRIBAL CULTURAL RESOURCES: Would
the project cause a substantial change in the
significance of tribal cultural resources, defined in
Public Resources Code section 21074 as either a
site, feature, place, cultural landscape that is
geographically defined in terms of the size and
scope of the landscape, sacred place, or object with
cultural value to the California Native American
tribe, and that is:
a) Listed or eligible for listing in the California
Register of Historical Resources, or in a local
register of historical resources as defined in Public
Resources Code section 5020.1(k), or
b) A resource determined by the lead agency, in its
discretion and supported by substantial evidence, to
be significant pursuant to criteria set forth in sub-division (c) of Public Resources Code Section 5024.1. In applying the criteria set forth in
subdivision (c) of Public Resources Code Section
5024.1, the lead agency shall consider the
significance of the resource to a California Native
American tribe.
SUBSTANTIATION
A Tribal Resources is defined in the Public Resources Code section 21074 and includes the following:
• Sites, features, places, cultural landscapes, sacred places, and objects with cultural value to a California Native American Tribe that are either of the following: included or determined to be eligible for inclusion in the California Register of Historical Resources or included in a local register of historical resources as defined in subdivision (k) of Section 5020.1; • A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Section 5024.1. In applying the criteria set forth in subdivision (c) of Section 5024.1 for the purpose of this paragraph, the lead agency shall consider the significance of the resources to a California American tribe;
• A cultural landscape that meets the criteria of subdivision (a) is a tribal cultural resource to the extent that the landscape is geographically defined in terms of the size and scope of the landscape;
• A historical resource described in Section 21084.1, a unique archaeological resource as defined in subdivision (g) of Section 21083.2, or a “non-unique archaeological resource” as defined in subdivision (h) of Section 21083.2 may also be a tribal resource if it conforms with the criteria of subdivision (a).
Impact Analysis
a&b. Less Than Significant Impact With Mitigation Incorporated – AB 52 consultation was initiated by the City in July 2026. The following tribes were contacted to be notified of the proposed project under AB 52:
1 1 X 1 1 1 1
1 1 3 1 1 •
371
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 77
• Agua Caliente Band of Cahuilla Indians
• Augustine Band of Cahuilla Indians
• Cabazon Band of Cahuilla Indians
• Cahuilla Band of Indians
• Fort Yuma Quechan Indian Tribe
• Los Coyotes Band of Cahuilla and Cupeño Indians
• Morongo Band of Mission Indians
• Ramona Band of Cahuilla
• Santa Rosa Band of Cahuilla Indians
• Soboba Band of Luiseno Indians
• Torres-Martinez Desert Cahuilla Indians
The result of the consultation was that only one tribe requested consultation from the City on this Project, the Agua Caliente Band of Cahuilla Indians (Tribe). The Tribe recommend an Agua Caliente monitor for all of Phase II ground disturbance. For Phase I, the monitoring program is also applicable but the language in the mitigation can include the discontinuation of monitoring if deemed unnecessary. Thus, the following mitigation measures implementing the above principles that would protect tribal cultural resources are required to ensure that a significant tribal cultural resource impact does not occur:
TCR-1 Native American Cultural Monitor: A Native American Monitoring Agreement shall be executed by the City with the Agua Caliente Band of Cahuilla Indians-Tribal Historic Preservation Office This shall occur prior to the issuance of grading permits, wherein the City shall develop an agreement with the Agua Caliente Band of Cahuilla Indians-Tribal Historic Preservation Office for the appropriate number of Native American Cultural Monitor(s). The Native American Cultural Monitor(s) shall attend the pre-construction meeting with the contractors to provide Cultural Sensitivity Training for all construction personnel. The Native American Cultural Monitor(s) shall be on site during ground disturbing activities for all Phase II ground disturbance, including clearing, grubbing, tree removals, grading and trenching, but the need for a monitor for Phase I shall be discontinued in the event that the Tribe deems that no further monitoring is necessary. The Native American Cultural Monitor(s) have the authority to temporarily divert, redirect or halt the ground disturbance activities to allow identification, evaluation, and potential recovery of cultural resources.
TCR-2 Inadvertent Discoveries: the City or any successor in interest shall comply with the following for the life of this permit. If during ground disturbance activities, unanticipated cultural resources are discovered, the following procedures shall be followed: All ground disturbance activities within 50 feet of the discovered cultural resource shall be halted and a meeting shall be convened between the Native American tribal representative and the City to discuss the significance of the find.
At the meeting with the aforementioned parties, a decision is to be made, with the concurrence of the consulting Tribe(s), as to the appropriate treatment (documentation, recovery, avoidance etc.) for the cultural resource. A Secretary of the Interior qualified archaeologist shall be retained if deemed necessary by the parties involved. Resource evaluations shall be limited to nondestructive analysis.
Further ground disturbance shall not resume within the area of the discovery until the appropriate treatment has been accomplished.
TCR-3 Reburial Protocol: Prior to issuance of grading permits: the developer/applicant shall come to an agreement with the consulting tribes indicating an area on-site which will be used, if needed, for reburial of any artifacts that have been identified during the duration of the project and cannot be avoided. The location has to be kept 372
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 78
confidential and in an area that will not be disturbed in the future.
TCR-4 Human Remains: Pursuant to the California Health and Safety Code Section 7050.5, in the event of discovery of any human remains on the project site, there shall be no further excavation or disturbance of the site, or any nearby area reasonably suspected to overlay adjacent remains, until the County Coroner has examined the remains. If the coroner determines the remains to be Native American or has reason to believe that they are those of Native American, the coroner shall contact the NAHC within 24‐hours, and the NAHC will be responsible for identifying the Most Likely Descendant (MLD) and contacting them for ongoing consultation and resolution.
The project will be subject to these requirements during all construction and excavation activities. Compliance with the California Health and Safety Code will ensure that should there be a discovery of any human remains during project construction activities, impacts would be reduced to less than significant levels.
With the implementation of these mitigations, which require continued consultation with the Tribe, AB 52 consultation has concluded.
As previously discussed, as part of the effort to prepare the Appendix 3, and as part of the written request to the State of California Native American Heritage Commission for a records search in the commission’s SLF, the Agua Caliente Band requested the presence of “an approved Agua Caliente Native American Cultural Resource Monitor(s) during any ground disturbing activities. The mitigation measures above cover this request.
Furthermore, the mitigation identified to protect archaeological resources under Section V Cultural Resources (MM CUL-3), would require further attention to discovery and treatment of human remains. As such, through the implementation of MMs TCR-1 through TCR-4, and CUL-3, the project has a less than significant potential to cause a substantial change in the significance of tribal cultural resources, defined in Public Resources Code section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to the California Native American tribe and that is either a) Listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code section 5020.1(k), or b) A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 5024.1.
No further mitigation is required.
373
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 79
Potentially
Significant Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant Impact
No Impact or
Does Not Apply
XIX. UTILITIES AND SERVICE SYSTEMS: Would the
project:
a) Require or result in the relocation or construction of new or expanded water, wastewater treatment, or
stormwater drainage, electric power, natural gas, or
telecommunications facilities, the construction or
relocation of which could cause significant
environmental effects?
b) Have sufficient water supplies available to serve the project and reasonably foreseeable future development
during normal, dry and multiple dry years?
c) Result in a determination by the wastewater treat-ment provider which serves or may serve the project that it has adequate capacity to serve the project's
projected demand in addition to the provider's existing commitments?
d) Generate solid waste in excess of State or local
standards, or in excess of the capacity of local
infrastructure, or otherwise impair the attainment of
solid waste reduction goals?
e) Comply with federal, state, and local management
and reduction statutes and regulations related to solid waste?
SUBSTANTIATION: Palm Desert General Plan EIR; Draft Technical Background Report; and 2020 Coachella Valley Regional Urban Water Management Plan
a. Less Than Significant Impact – Aside from water and perhaps electricity, the proposed project will not require any connections to utility infrastructure because the drainage system improvements will function passively to better convey storm water and allow percolation. The connection to Southern California Edison (SCE) electricity system that already serves the site will occur at SCE’s existing facilities on Lot 67. Since onsite generators can be used to power electrical equipment, an estimate of electricity consumption from SCE is speculative. On the other hand, water use (for fugitive dust control and to assist with compaction where needed) is estimated to be one 5,000 gallon water truck per day. During Phase 1 construction an estimated 275,000 gallons of water could be consumed.
This equates to 0.84 acre-foot of water. During Phase 2 construction an estimated 175,000 gallons of water could be consumed per day. This equates to about 0.54 acre-foot of water. Total water consumed during construction of this project is about 1.4 acre-foot of water under a one-time construction scenario. Coachella Valley Water District (CVWD or District) will provide water to the site as it currently does. The project’s construction water demand can be met with either potable water or recycled water, depending of area availability. According to the Regional UWMP, the existing water system can provide sufficient water without causing a significant adverse impact. Solid waste (vegetation and/or trash) will be collected by the City or it’s contractor during maintenance and have it delivered to recycling or landfill as it presently does. No major relocation or construction of any new utility infrastructure will be required to support the expanded storm water system. This finding results in a less than significant impact from its implementation. 1 1 1 1 2 1 1
X
1 1 1 1 1 1 X
1 1 1 1 X 1 1
1 1 1 1 X 1 1
374
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 80
b. Less Than Significant Impact – Refer to a). above for a discussion of water demand. Two documents were reviewed to determine whether sufficient water supplies will be available in the future, if needed at the site. The General Plan Draft Technical Background Report summarizes water supply information for the City of Palm Desert, while the 2020 Coachella Valley Regional Urban Water Management Plan (UWMP) addresses the cumulative demand for water supplied by all the water agencies in the Coachella Valley. The CVWD serves a much larger area than just the City of Palm Desert in the Coachella Valley. Within its service area the gross water usage in acre-feet/year (AFY) between 2020 and 2045 is shown on Table 4-10 of the UWMP as ranging between 109,300 AFY (2020 and 164,966 AFY (2045). The findings for available water supply under specific scenarios are summarized on Table 4-24 of the UWMP. During Phase 1 construction an estimated 275,000 gallons of water could be consumed. This equates to 0.84 acre-foot of water. During Phase 2 construction an estimated 175,000 gallons of water could be consumed per day. This equates to about 0.54 acre-foot of water. Total water consumed during construction of this project is about 1.4 acre-foot of water under a one-time construction scenario. No operational water demand is expected to be generated by the proposed project. The data indicate that CVWD has a sufficient water supply to meet demand under average year, single-dry year, and multiple dry years (up to five). Based on the analysis in the referenced documents, the proposed project and cumulative impacts regarding water supply will be a less than significant impact.
c. No Impact – The proposed project will not generate municipal wastewater because it is limited to construction and operation of an updated stormwater system. Thus, the proposed project will no impact under this issue.
d-e. Less Than Significant Impact – The Project is not located in or near a state responsibility area or lands classified as very high fire hazard severity zone, as designated by CAL FIRE. The General Plan EIR concluded that buildout of the General Plan would not result in a significant impact on solid waste disposal capacity or meeting compliance with solid waste regulations based on implementation of existing solid waste management programs and General Plan Policies. This was based on buildout of the City to its maximum population. As noted in the previous utility discussions, the proposed project will generate solid waste only if and when vegetation growth in the basins require removal.
Most of the organic waste generated from this maintenance activity can and is required to be recycled through composting or other recycling programs. Through implementation of existing City solid waste management programs and General Plan Policies, the potential impact of the proposed project will be less than significant.
375
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 81
Potentially
Significant Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant Impact
No Impact or
Does Not Apply
XX. WILDFIRE: If located in or near state responsibility areas or lands classified as very high fire hazard
severity zones, would the project:
a) Substantially impair an adopted emergency
response plan or emergency evacuation plan?
b) Due to slope, prevailing winds, and other factors,
exacerbate wildfire risks, and thereby expose project
occupants to pollutant concentrations from a wildfire or the uncontrolled spread of wildfire?
c) Require the installation or maintenance of
associated infrastructure (such as roads, fuel breaks,
emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in
temporary or ongoing impacts to the environment?
d) Expose people or structures to significant risks,
including downslope or downstream flooding or
landslides, as a result of runoff, post-fire slope
instability, or drainage changes?
SUBSTANTIATION: Palm Desert General Plan EIR; and Draft Technical Background Report, Cal Fire Fire Hazard Severity Zone Viewer for Real Estate Inspections, https://experience.arcgis.com/experience/03beab8511814e79a0e4eabf0d3e7247/ (Accessed 06/02/26) a. Less Than Significant With Mitigation Incorporated – The proposed storm drain component of the proposed project is located within Gerald Ford Drive, an important local roadway which is considered a road that is essential to provide City-wide emergency responses or evacuations. During construction of the storm drain, the proposed project will interfere with the flow of traffic, including emergency responses during construction activities on Gerald Ford from its intersection with Cook Street. Therefore, construction impacts related to emergency access would be potentially significant.
To mitigate this potential effect on emergency response or evacuation plans, MMs HAZ-2 and TRAN-1 shall be implemented. These measures would require implementation of transportation control measures and coordination with emergency response providers to minimize impacts to emergency access in the program construction area(s) due to lane and/or road closures during project construction. MMs HAZ-2 and TRAN-1 shall be implemented to ensure that the flow of traffic during street construction activities to ensure the flow of traffic and access to all parcels adjacent to such activities. With implementation of this measure potential impacts under this issue will be less than significant.
b. Less Than Significant Impact – The project site is located within the “Urban Unzoned” area of wildfire hazards based on Figure XX-1 of the Draft Technical Background Report. The Project is not located in or near a state responsibility area or lands classified as very high fire hazard severity zone, as designated by CAL FIRE. Due to the site’s location at some distance from any high fire hazard severity areas and on relatively flat land the potential to expose project area occupants to pollutants or uncontrolled spread of a wildfire is minimal, i.e., less than significant. c. No Impact – The infrastructure that will be installed in support of the proposed project will all occur within already disturbed areas and will not exacerbate wildfire risk or cause any temporary or ongoing significant impact to the environment.
X
1 1 1 1 X 1 1
1 1 1 1 1 1 X
1 1 1 1 1 1 X
376
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 82
d. No Impact – The project site is not exposed to significant risks due to the site’s low-relief topography; and lack of exposure to wildfire hazards. The Project is not located in or near a state responsibility area or lands classified as very high fire hazard severity zone, as designated by CAL FIRE. As a result, no adverse impacts to people, structures or infrastructure will result from implementing the proposed project.
377
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 83
Potentially
Significant Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant Impact
No Impact or
Does Not Apply
XXI. MANDATORY FINDINGS OF SIGNIFICANCE:
a) Does the project have the potential to substantially degrade the quality of the environment, substantially
reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal
community, substantially reduce the number or restrict
the range of a rare or endangered plant or animal or
eliminate important examples of the major periods of
California history or prehistory?
b) Does the project have impacts that are individually
limited, but cumulatively considerable? ("Cumulatively
considerable" means that the incremental effects of a
project are considerable when viewed in connection
with the effects of past projects, the effects of other current projects, and the effects of probable future
projects)?
c) Does the project have environmental effects which
will cause substantial adverse effects on human
beings, either directly or indirectly?
SUBSTANTIATION
The analysis in this Initial Study and the findings reached indicate that the proposed project can be implemented without causing any new project specific or cumulatively considerable unavoidable significant adverse environmental impacts. Mitigation is required to control potential environmental impacts of the proposed project to a less than significant impact level. The following findings are based on the detailed analysis of the Initial Study of all environmental topics and the implementation of the mitigation measures identified in the previous text and summarized following this section. a. Less Than Significant With Mitigation Incorporated ‒ The project has no potential to cause a significant impact any biological or cultural resources. No sensitive species were observed within the project site during the reconnaissance-level field survey, but BUOW was observed within the project area, and as a result mitigation to protect this species is required to ensure a less than significant impact would result. The project footprint is completely disturbed, and the project area is likely not suitable to support any of the special status wildlife species that have been documented in the project vicinity. As such, the project has been identified as having no potential to degrade the quality of the natural environment, substantially reduce habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, or reduce the number or restrict the range of a rare or endangered plant or animal through the implementation of mitigation intended to minimize impacts to nesting birds and BUOW, and avoid significant impacts to jurisdictional features. No historical resources within or adjacent to the project area have any potential to be disturbed as they are not within the proposed area in which the project will be installed, and thus, the project as it is currently proposed will not cause a substantial adverse change to any known historical resources. Sensitive Tribal and Archaeological Resources may be located in the soils underlying the roadways within which the project will be installed. Mitigation is required to minimize any potential impacts thereof. Furthermore, because it is not known what could be unearthed upon any excavation activities, contingency mitigation measures are provided to ensure • B • 1 1
1 1 B 1 1 1 1
1 1 X 1 1 1 1
378
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 84
that, in the unlikely event that any resources are found outside of the sensitive areas, they are protected from any potential impacts. Please see biological and cultural sections of this Initial Study. b. Less Than Significant With Mitigation Incorporated ‒ Based on the analysis in this Initial Study, the proposed Mid Valley Basin, Drainage/Storm Drain Improvements Project has the potential to cause impacts that are individually or cumulatively considerable. There are no other projects in the vicinity to which this project would make a cumulatively considerable impact, furthermore improving drainage is generally viewed as a benefit to the community. The issues of Biological Resources, Cultural Resources, Geology and Soils, Hazards and Hazardous Materials, Noise, Transportation, and Tribal Cultural Resources require the implementation of mitigation measures to reduce impacts to a less than significant level and ensure that cumulative effects are not cumulatively considerable. All other environmental issues were found to have no significant impacts without implementation of mitigation.
The potential cumulative environmental effects of implementing the proposed project have been determined to be less than considerable through the implementation of mitigation and thus, less than significant impacts.
c. Less Than Significant With Mitigation Incorporated – The project will achieve long-term community goals by improving circulation, which would serve existing, planned, and future uses within the City of Palm Desert. The short-term impacts associated with the project, which are mainly construction-related impacts, are less than significant with mitigation, and the proposed project is compatible with long-term environmental protection. The issues of Geology and Soils, Hazards and Hazardous Materials, and Noise require the implementation of mitigation measures to reduce potential human impacts to a less than significant level. All other environmental issues were found to have no significant impacts on humans without implementation of mitigation. The potential for direct human effects from implementing the proposed project have been determined to be less than significant.
Conclusion
This document evaluated all CEQA issues contained in the latest Initial Study Checklist form. The evaluation determined that either no impact or less than significant impacts would be associated with the issues of Aesthetics, Agricultural and Forestry Resources, Air Quality, Energy, Greenhouse Gas Emissions, Hydrology and Water Quality, Land Use and Planning, Mineral Resources, Population/Housing, Public Services, Recreation, Utilities and Service Systems, and Wildfire. The issues of Biological Resources, Cultural Resources, Geology and Soils, Hazards and Hazardous Materials, Noise, Transportation, and Tribal Cultural Resources require the implementation of mitigation measures to reduce impacts to a less than significant level. The required mitigation has been proposed in this Initial Study to reduce impacts for these issues to a less than significant impact.
Based on the findings in this Initial Study, the City of Palm Desert proposes to adopt a Mitigated Negative Declaration (MND) for the Mid Valley Basin Drainage/Storm Drain Improvements. A Notice of Intent to Adopt a Mitigated Negative Declaration (NOI) will be issued for this project by the City of Palm Desert. The Initial Study and NOI will be circulated for 30 days of public comment because this project does involve state agencies as either a responsible or trustee agency. At the end of the 30-day review period, a final MND package will be prepared and it will be reviewed by the City of Palm Desert. The City will hold a future hearing for project adoption, the date for which has not yet been determined. If you or your agency comments on the MND/NOI for this project, you will be notified about the meeting date in accordance with the requirements in Section 21092.5 of CEQA (statute).
__________
Note: Authority cited: Sections 21083 and 21083.05, Public Resources Code. Reference: Section 65088.4, Gov. Code; Sections 21080(c), 21080.1, 21080.3, 21083, 21083.05, 21083.3, 21093, 21094, 21095, and 21151, Public Resources Code; Sundstrom v.
County of Mendocino,(1988) 202 Cal.App.3d 296; Leonoff v. Monterey Board of Supervisors, (1990) 222 Cal.App.3d 1337; Eureka Citizens for Responsible Govt. v. City of Eureka (2007) 147 Cal.App.4th 357; Protect the Historic Amador Waterways v. Amador Water Agency (2004) 116 Cal.App.4th at 1109; San Franciscans Upholding the Downtown Plan v. City and County of San Francisco (2002) 102 Cal.App.4th 656.
379
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 85
Revised 2019
Authority: Public Resources Code sections 21083 and 21083.09 Reference: Public Resources Code sections 21073, 21074, 21080.3.1, 21080.3.2, 21082.3/ 21084.2 and 21084.3 380
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 86
SUMMARY OF MITIGATION MEASURES
Biological Resources
BIO-1 Burrowing Owl (BUOW) Pre-Construction Surveys and Avoidance. No more than 3-days prior to any ground disturbance activities, a qualified biologist shall conduct pre-construction BUOW surveys within all areas subject to disturbance and within a minimum 500-foot buffer of the disturbance area, where access is available. Surveys shall be conducted in accordance with the most current California Department of Fish and Wildlife (CDFW) Burrowing Owl Survey Staff Report and any applicable Coachella Valley Multiple Species Habitat Conservation Plan (CVMSHCP) requirements.
The survey shall identify and map all occupied burrows, suitable burrows, burrowing owl observations, nesting activity, and suitable habitat within and adjacent to the work area. A survey report shall documenting the results shall be provided to the City prior to commencement of ground-disturbing activities. If no burrowing owls or occupied burrows are identified, construction may proceed. If occupied burrows or burrowing owls are identified, then the avoidance and minimization measures identified in BIO-2 shall be implemented. No ground-disturbing activities shall occur within occupied burrowing owl avoidance buffers until the requirements of BIO-2 have been satisfied.
BIO-2 Burrowing Owl Mitigation Plan. If BUOW or occupied habitat are identified within or adjacent to the Project disturbance area, the City shall retain a qualified biologist to prepare and implement a Burrowing Owl Mitigation Plan in consultation with CDFW prior to issuance of grading permits or commencement of ground-disturbing activities in the affected area. The plan shall include, at a minimum:
• Establishment of avoidance buffers around occupied burrows consistent with current CFDW and CVMSHCP requirements. During the breeding season (February 1 through August 31, or as otherwise determined by the qualified biologist based on site conditions), no construction activities shall occur within occupied burrow buffers unless otherwise authorized by CDFW. Avoidance shall be the preferred mitigation strategy. • Measures to avoid direct mortality, nest abandonment, or reproductive failure of burrowing owls.
• Passive relocation procedures, if avoidance is infeasible, conducted only outside the breeding season and in accordance with current CDFW guidance. • Identification of suitable recipient habitat and replacement burrows, including artificial burrows if necessary.
• Monitoring requirements before, during, and after relocation activities to verify successful relocation and continued occupancy of recipient habitat. • Procedures for adaptive management and corrective actions if relocation efforts are unsuccessful.
No occupied burrows shall be excavated, collapsed, or otherwise disturbed until the qualified biologist verifies that the burrow is unoccupied and all relocation procedures have been completed. The City shall maintain documentation demonstrating compliance with the approved Burrowing Owl Mitigation Plan, including survey results, monitoring reports, and correspondence with CDFW.
BIO-3 California Department of Fish and Wildlife (CDFW) shall be notified pursuant to Fish and Game Code section 1602. If CDFW determines that the Project may substantially affect fish and wildlife resources, then CDFW shall issue a Streambed Alternation Agreement (Agreement). The Agreement shall include measures to avoid, minimize, and mitigate impacts to Fish and Game Code section 1602 resources.
381
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 87
Through an Agreement from CDFW and/or other agencies (USACE, RWQCB, CDFW [regulatory agencies]) with jurisdiction over impacts to jurisdictional waters, the City shall minimize discharge of fill to the extent feasible, and any discharge of fill not avoidable and all impacts to Fish and Game Code section 1602 resources shall be authorized and mitigated through compensatory mitigation in an Agreement. Mitigation shall be provided by restoration of temporary impacts, enhancement of existing resources, or for permanent impacts as follows: purchasing into USACE, RWQCB, CDFW authorized mitigation bank; or by selecting a site near the Project site and enhancing it with a native riparian habitat or invasive species removal in accordance with a habitat mitigation plan approved by regulatory agencies; or by acquiring sufficient compensating habitat to meet regulatory agency requirements. Impacts to jurisdictional waters shall be mitigated at a minimum 1:1 ratio, with the ultimate compensatory mitigation ratio being determined through negotiation with regulatory agency, and never at a rate of less than 1:1. The ratio will rise based on the type of habitat, habitat quality, and presence of sensitive or listed plants or animals in the affected area. This ratio will be determined by the regulatory agency, and must be deemed sufficient by the regulatory agency issuing the permit to compensate for/offset the impacts to the jurisdictional waters and supported species and habitats therein. A Habitat Mitigation and Monitoring Proposal shall be prepared by a biologist or regulatory specialist and reviewed and approved by the appropriate regulatory agencies. These agencies (USACE, RWQCB, CDFW and any other applicable regulatory agency with jurisdiction over the proposed facility improvement) can impose greater mitigation requirements in their permits, but the City will utilize the ratios outlined above as the minimum required to offset or compensate for impacts to jurisdictional waters, riparian areas or other wetlands.
BIO-4 To avoid impacts to active nests of migratory birds, raptors, and other native bird species protected under the federal Migratory Bird Treaty Act and California Fish and Game Code Sections 3503, 3503.5, and 3513, any vegetation removal, grading, trenching or other ground-disturbing activities scheduled during the nesting bird season (generally February 1 through September 15) shall be preceded by a nesting bird survey conducted by a qualified biologist no more than seven (7) days prior to commencement of work
The survey shall encompass all areas subject to disturbance and a sufficient surrounding area to identify nests that could be affected by Project activities. If no active nests are found, no further mitigation is required.
If an active nest is found, the qualified biologist shall establish a species-appropriate avoidance buffer around the nest. Buffer distances shall be based on the nesting species, sensitivity to disturbance, type and intensity of construction activities, and applicable agency guidance. At a minimum, buffers shall be consistent with current CDFW recommendations. No vegetation removal, grading, equipment operation, or other construction activity shall occur within the established buffer unless the qualified biologist determines that the activity would not result in nest abandonment, reproductive failure, injury, or mortality.
The qualified biologist shall monitor active nests and buffer areas at a frequency sufficient to confirm continued nest status and buffer effectiveness throughout the nesting cycle. Buffer boundaries shall be clearly marked in the field and maintained until the qualified biologist determines the young have successfully fledged, the nest has become inactive, or the nest is no longer subject to disturbance from Project activities. Upon making such determination, the qualified biologist may authorize removal of the buffer and resumption of construction activities within the previously restricted area.
Cultural Resources
CUL-1 If during ground-disturbance activities, unanticipated cultural resources are discovered, the 382
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 88
following procedures shall be followed:
• All ground-disturbance activities within 50 feet of the discovered cultural resource shall be halted immediately upon discovery of the cultural resource. A meeting shall be convened between the City and the project archaeologist (a qualified Project Archaeologist who meets the U.S. Secretary of the Interior Standards (SOI) and has at least 3 years of regional experience in archaeology) to discuss the significance of the find. At the meeting with the aforementioned parties, a decision is to be mad as to the appropriate treatment (documentation, recovery, avoidance, etc.) for the cultural resource. Resource evaluations shall be limited to nondestructive analysis. • The significance of the unanticipated find shall be determined by the project archaeologist. If the unanticipated find is determined to be significant, a qualified Project Archaeologist shall be retained by the City. The Project Archaeologist, or qualified archaeological monitors under the direction of the Project Archaeologist, shall be present during all ground-disturbing activities to identify any known or suspected archaeological and/or cultural resources.
• The Project Archaeologist shall develop a Cultural Resource Management Plan (CRMP) to address the details, timing, and responsibilities of all archaeological and cultural resource activities that occur on the project site. This Plan shall be written in consultation with the Agua Caliente Band of Cahuilla Indians and shall include the following: approved Mitigation Measures (MM)s, contact information for all pertinent parties, parties’ responsibilities, procedures for each MM, and an overview of the project schedule.
Further ground disturbance shall not resume within the area of the discovery until the appropriate treatment has been accomplished.
CUL-2 If previously unknown cultural resources, including human remains, are identified during grading activities associated with implementing projects, a County-certified qualified archaeologist shall be retained to assess the nature and significance of the find. If human remains are encountered, State Health and Safety Code Section 7050.5 states that no further disturbance shall occur until the County Coroner has made a determination of origin and disposition pursuant to Public Resources Code Section 5097.98. The County Coroner shall be notified of the find immediately.
If the remains are determined to be prehistoric, the Coroner shall notify the Native American Heritage Commission (NAHC), which shall determine and notify a Most Likely Descendant (MLD). With the permission of the landowner or his/her authorized representative, the MLD may inspect the site of the discovery. The MLD shall complete the inspection within 24 hours of notification by the NAHC. The MLD may recommend scientific removal and nondestructive analysis of human remains and items associated with Native American burials. The MLD may recommend reburial somewhere within the Project boundaries where they can be protected in perpetuity.
Geology and Soils
GEO-1 In the event of any fossil discovery, regardless of depth or geologic formation, construction work will halt within a 50-ft. radius of the find until its significance can be determined by a Qualified Paleontologist. Significant fossils will be recovered, prepared to the point of curation, identified by qualified experts, listed in a database to facilitate analysis, and deposited in a designated paleontological curation facility in accordance with the standards of the SVP (2010) and BLM (2009). A repository will be identified and a curatorial arrangement will be signed prior to collection of the fossils. Any accredited institution may serve as a repository.
Hazards and Hazardous Materials
HAZ-1 All accidental spills or discharge of hazardous material during construction and future operating activities greater than a few gallons shall be reported to the Certified Unified Program Agency and shall be remediated in compliance with applicable federal, State, and local regulations 383
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 89
regarding cleanup and disposal of the contaminant released. The contaminated waste shall be collected and disposed of at a licensed disposal or treatment facility. This measure shall be incorporated into the Stormwater Pollution Prevention Plan (SWPPP or Erosion Control Plan) prepared for this project. Prior to accepting the site as remediated, the area contaminated shall be tested to verify that any residual concentrations meet the standard for future residential or public use of the site.
HAZ-2 Prior to issuance of any grading permit or commencement of construction activities that would require lane closures, roadway narrowing, detours, or other temporary restrictions within existing public rights-of-way, the City shall ensure preparation of a Traffic Management Plan (TMP) by a qualified traffic engineer. The TMP shall be reviewed by the City and applicable emergency service providers, including the Fire Department, prior to commencement of the applicable construction activities. At a minimum, the TMP shall:
• Maintain emergency vehicle access to all properties and roadways affected by construction activities at all times, except for temporary closures specifically approved by the City and emergency service providers.
• Maintain at least one unobstructed travel lane in each direction on affected evacuation routes to the maximum extent feasible, or provide an approved detour route that maintains equivalent emergency access and evacuation functionality. • Identify procedures for coordinating construction activities with police, fire, ambulance, and other emergency service providers, including advance notification of planned closures, roadway restrictions, or detours.
• Include measures to minimize delays to emergency response vehicles, such as temporary traffic control devices, flagging operations, construction phasing, or other traffic management techniques.
• Prohibit complete roadway closure on a designated emergency access or evacuation routes unless approved by the City and emergency service providers and accompanied by implementation of an approved alternative access route. • Provide public notification of roadway restrictions, detours, and access changes in advance of construction activities, consistent with City requirements.
The City shall verify implementation of the approved TMP throughout construction, and construction activities shall be conducted in accordance with the approved plan.
Noise
NOI-1 The City will require that all construction equipment be operated with mandated noise control equipment (mufflers or silencers). Enforcement will be accomplished by random field inspections by applicant and City personnel during construction activities.
NOI-2 Construction activities shall be restricted to the hours between 7 a.m. and 5:30 p.m.
NOI-3 Equipment not in use for five minutes shall be shut off.
NOI-4 Equipment shall be maintained and operated such that loads are secured from rattling or banging.
Transportation
TRAN-1 The City shall require that all disturbances to public roadways be repaired in a manner that complies with the Standard Specifications for Public Works Construction (green book) or other applicable City of Palm Desert standard design requirements. 384
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 90
Transportation
TCR-1 Native American Cultural Monitor: A Native American Monitoring Agreement shall be executed by the City with the Agua Caliente Band of Cahuilla Indians-Tribal Historic Preservation Office This shall occur prior to the issuance of grading permits, wherein the City shall develop an agreement with the Agua Caliente Band of Cahuilla Indians-Tribal Historic Preservation Office for the appropriate number of Native American Cultural Monitor(s). The Native American Cultural Monitor(s) shall attend the pre-construction meeting with the contractors to provide Cultural Sensitivity Training for all construction personnel. The Native American Cultural Monitor(s) shall be on site during ground disturbing activities for all Phase II ground disturbance, including clearing, grubbing, tree removals, grading and trenching, but the need for a monitor for Phase I shall be discontinued in the event that the Tribe deems that no further monitoring is necessary.
The Native American Cultural Monitor(s) have the authority to temporarily divert, redirect or halt the ground disturbance activities to allow identification, evaluation, and potential recovery of cultural resources.
TCR-2 Inadvertent Discoveries: the City or any successor in interest shall comply with the following for the life of this permit. If during ground disturbance activities, unanticipated cultural resources are discovered, the following procedures shall be followed: All ground disturbance activities within 50 feet of the discovered cultural resource shall be halted and a meeting shall be convened between the Native American tribal representative and the City to discuss the significance of the find. At the meeting with the aforementioned parties, a decision is to be made, with the concurrence of the consulting Tribe(s), as to the appropriate treatment (documentation, recovery, avoidance etc.) for the cultural resource. A Secretary of the Interior qualified archaeologist shall be retained if deemed necessary by the parties involved. Resource evaluations shall be limited to nondestructive analysis. Further ground disturbance shall not resume within the area of the discovery until the appropriate treatment has been accomplished.
TCR-3 Reburial Protocol: Prior to issuance of grading permits: the developer/applicant shall come to an agreement with the consulting tribes indicating an area on-site which will be used, if needed, for reburial of any artifacts that have been identified during the duration of the project and cannot be avoided. The location has to be kept confidential and in an area that will not be disturbed in the future.
TCR-4 Human Remains: Pursuant to the California Health and Safety Code Section 7050.5, in the event of discovery of any human remains on the project site, there shall be no further excavation or disturbance of the site, or any nearby area reasonably suspected to overlay adjacent remains, until the County Coroner has examined the remains. If the coroner determines the remains to be Native American or has reason to believe that they are those of Native American, the coroner shall contact the NAHC within 24‐hours, and the NAHC will be responsible for identifying the Most Likely Descendant (MLD) and contacting them for ongoing consultation and resolution. The project will be subject to these requirements during all construction and excavation activities.
Compliance with the California Health and Safety Code will ensure that should there be a discovery of any human remains during project construction activities, impacts would be reduced to less than significant levels.
385
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 91
REFERENCES
California Department of Fire Protection, 2026. Cal Fire Fire Hazard Severity Zone Viewer for Real Estate Inspections, https://experience.arcgis.com/experience/03beab8511814e79a0e4eabf0d3e7247/ (Accessed 06/02/26)
California Department of Water Resources, 2026. Sustainable Groundwater Management Act (SGMA). https://water.ca.gov/Programs/Groundwater-Management/SGMA-Groundwater-Management (Accessed 05/29/26)
CalRecycle, 2026. SWIS Facility/Site Activity Details Badlands Sanitary Landfill (33-AA-0006) https://www2.calrecycle.ca.gov/SolidWaste/SiteActivity/Details/2245?siteID=2367 (Accessed 05/29/26)
CalRecycle, 2026. SWIS Facility/Site Activity Details Lamb Canyon Sanitary Landfill (33-AA-0007) https://www2.calrecycle.ca.gov/SolidWaste/SiteActivity/Details/2246?siteID=2368 (Accessed 05/29/26)
California State Water Resources Control Board, 2026. GeoTracker. http://geotracker.waterboards.ca.gov/ (Accessed 06/02/26) CVWD, 2021. 2020 Coachella Valley Regional Urban Water Management Plan. https://www.mswd.org/media/1706 (Accessed 05/29/26)
CVWD, 2026. Sustainable Groundwater Management Act. https://www.cvwd.org/357/Sustainable-Groundwater-Management-Act (Accessed 05/29/26) HDR, 2026. Biological Resources Technical Report City of Palm Desert Mid Valley Basin & Gerald Ford Drive Drainage Improvements Project. (Appendix 1)
Mojave Archaeological Consulting, 2026. Cultural Resources Assessment for the Mid-Valley Channel Drainage/Storm Drain Improvements Project, Palm Desert, Riverside County, California (Appendix 2)
Office of Land Use and Climate Sustainability, 2026. Site Check. https://sitecheck.opr.ca.gov/ (Accessed 05/29/26)
Palm Desert, 2020. City of Palm Desert General Plan. https://www.palmdesert.gov/build-develop/planning (Accessed 06/02/26)
Palm Desert, 2020. City of Palm Desert General Plan Environmental Impact Report. https://www.palmdesert.gov/build-develop/planning#:~:text=2016%20General%20Plan%20Update%20Draft%20EIR (Accessed 06/02/26)
Palm Desert, 2020. City of Palm Desert Draft Environmental Impact Report Technical Background Report.
https://lfews.palmdesertegov.com/WebLink/DocView.aspx?id=734&dbid=1&repo=WEBSITE-DOCUMENTS&cr=1 (Accessed 06/02/26) Riverside County, 2005. Riverside County Airport Land Use Compatibility Plan Policy Document. https://rcaluc.org/sites/g/files/aldnop421/files/migrated/Portals-13-PDFGeneral-plan-newplan-18-- 20Vol.-201-20Palm-20Springs-20International.pdf (Accessed 05/29/26) Riverside County, 2026. Construction Demolition Debris Recyclers. 386
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 92
https://rcwaste.org/sites/g/files/aldnop376/files/migrated/Portals-0-Files-Planning-CD-DebrisRecyclers.pdf (accessed 05/29/26) SCAG, 2026. 2020-2045 Regional Transportation Plan/Sustainable Communities Strategy (2020-2045 RTP/SCS).
SCE, 2026. Meeting Demand. https://www.sce.com/about-us/reliability/meeting-demand (05/29/26) Urban Crossroads, 2026. Mid Valley Channel Improvement Air Quality and Greenhouse Gas Assessment. (Appendix 1)
Urban Crossroads, 2026. Mid Valley Channel Improvement Noise. (Appendix 4) 387
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 93
FIGURES
388
FIGURE 1
Tom Dodson & Associates
Environmental Consultants Location Site
tr ese D ml aPf o yti C
st ne mevor p mI ni ar D mort S/ egani ar D
dnegeL
) htr oNeht ot gni nedi Wl ait net oPdna gni dar ge R(l ennah Cyell aVdi M ) ni saBeht r of desu eb ot cA4 yl n O( ytr epor Pni saBdesopor P t eert Sni ni ar D mort Sdnuor gr ednU
tf 0001
N
➤
Mid Valley Basin
€
,*
' t,.
-< he
F
)
%
U* bnpd-4
t
4-
d"
w -
V.A , &
€P.
s .
. 33
"P
Q':
‘ h
e i
ie
n
ar ■
i
t
3 ||-L.
j Jmmmrra
el
l fl
; Jr,
4 4.j
aD&.
f
“f
,44—
! i
““347 a
as
389
FIGURE 2
Tom Dodson & AssociatesEnvironmental Consultants
Project Location, USGS 7.5’ Topographic
Quadrangle: Myoma, CA
VIS D EL
VIS DIL FONDA
, West Boundary Tri
THOUSAND \ (1
PALM
X
COACHELLA VALLEY
28. /s '
$
26 3
"k
5 S4sseCltJB BLVD
I
1890 4
33 . COOK ST
Calif ornia State Univershy
3 --San Bernardino Palm Desert
h
enter
CLUB DR
/ of California
Palm Desert
no aavuoa snssuuvN-i —V // 220 s X __ . LTANDiKATRiS
%
VERD£ WAY
A
)meLAKESD
BOUQUET
DR- —horz
Project Site 0 1,000 2,000
0 0.25 0.5
1 10 /s
4,000
• Feet
1 = Miles
SCALE 1:24,000
N
390
FIGURE
3 Tom Dodson & Associates
Environmental Consultants Mid Valley Basin Preliminary Improvements Phase 1 52 |&6 1 1 3/ 88 ■i "8- is 88s! MATCHLINE STA. 25+00 SEE BELOW MATCHLINE STA. 25+00 SEE ABOVE -19‘ -19‘ .81 I i 0 . 80 35 0) MATCHLINE STA. 40+00 SEE SHEET 2 # 391
FIGURE
4 Tom Dodson & Associates
Environmental Consultants Mid Valley Basin Preliminary Improvements Phase 1 (part 2) B!
Si
(
GRAPHIC SCALE
§8%l
MATCHLINE STA. 40+00
SEE SHEET 1
8 38
st
I!
lh
ale
3 392
FIGURE 2
Tom Dodson & Associates
Environmental Consultants Regional Bain Cook – Gerald Preliminary Improvements Phase 2 Alternative 1 TOLL FREE 811
2 :1 SLOPES
EXISTING 30"
DRAINAGE EASEMENT
GRAPHIC SCALE
BENCHMARK: P.D. $103
ELEVATION: 247.89 FT. DATUM: COH88
LOCATION: Sw CORNER OF cooK ST. AND FRANK SINATRA DR., ON TOPOFCB. 5.5 FT. SCUTH OF SOUTHERLY ECR, 1.2 FT. WEST CF CURB FACE, FLUSH o#£ EXISTING LOT AREA: 1.68 AC
EXISTING LOT AREA: 1.28 AC
PROPOSED LOT AREA: 1.28 AC
EXISTING LOT AREA: 2.67 AC
PROPOSED LOT AREA: 2.25 AC EXISTING LOT AREA: 2.95 AC
GERALD FORD DRIVE
TKE ENGINEERING. INC.
2305 CHICAGO AVENUE
RIVERSIDE. CA 92507
(951) 680-0440
FAX (951) 680-0490
CITY OF PALM DESERT &EET ____1_________
REGIONAL BASIN COOK - GERALD
PRELIMINARY IMPROVEMENTS
PHASE 2 ALTERNATIVE 1
SHEETS __ 1___
CI OLE NUMBER
393
FIGURE 1
Tom Dodson & Associates
Environmental Consultants Regional Bain Cook – Gerald Preliminary Improvements Phase 2 Alternative 2 2:1 SLOPES EXISTING 30‘ SCE EASEMENT
TOLL FREE
47+59
- — 1___BOTTOM OF SLOPE
EXISTING 50‘
BASIN UMITS
EXISTING LOT AREA: 1.68 AC
EXISTING LOT AREA: 1.28 AC
—==
— 20‘ ACCESS ROAD
EXISTING LOT AREA: 2.67 AC
PROPOSED LOT AREA: 1.28 AC
GERALD FORD DRIVE
EXISTING 30‘
DRAINAGE
EXISTING LOT AREA: 2.95 AC
PROPOSED LOT AREA: 3.31 AC
%
GRAPHIC SCALE
(IN FEET)
1 INCH =50F
REVISIONS TKE ENGINEERING, INC.
2305 CHICAGO AVENUE
RIVERSIDE, CA 92507
(951) 680-0440
ERING FAX (951) 680-0490
an Of PALM DESERT
DEPARTMENT OF DEVELOPMENT SERVICES
MICHAEL THORNTON, PE. PLS - TY ENGINEER ■ 44226, EXF - ■ 2026
MID VALLEY BASIN
PRELIMINARY IMPROVEMENTS
PHASE 2 ALTERNATIVE 2
394
FIGURE IV-1
Tom Dodson & Associates
Environmental Consultants Breeding Season Burrowing Owl Survey Results Mid Valley Basin Improvements
-B ) • -
V
r.S
Legend
• 8-Acr Detention Basin Site (only 4 acres to be used for basin) • Active Nesting Burrow
O BUOW Survey Area
• Satelite Burrow
2 . Underground Storm Drain in Street
s 2 ‘ 5. **
2 nt
A
s
27 (bl3@0
2. V,
ilczet
1 1''f:
V ,
y I
395
FIGURE IV-2
Tom Dodson & Associates
Environmental Consultants Jurisdictional Aquatic Resources Delineation – Mid Valley Basin Vltali trake
1 &
T. 47. I."‘S
“s
Cxre OM (50 ---------
1.5 d “av
• w t
Legend
O CDFW Streambed
P RWQCB "Waters of the State"
riE
396
FIGURE IV-3
Tom Dodson & Associates
Environmental Consultants Jurisdictional Aquatic Resources Delineation – Northwest End of Mid Valley Basin T
Legend
■ 0 CDFW Streambed
==u - P RWQCB "Waters of the State"
any
*
H
f
a. air . I--------- tai------------------ta’Eete se t f l ere
d
U
____
v
y. ’
• c
a tr f er H re ttrrorcrge.
UPEE."""E"
r ON1 Hf t»
1J
v
"LL HI nt * FHE’f ‘ 57'
— ..q.. ‘_______ g.e ’
lfc
Ur7
397
FIGURE IV-4
Tom Dodson & Associates
Environmental Consultants Jurisdictional Aquatic Resources Delineation – Middle Portion of Mid Valley Basin Vemerinl Velto
4h
we Legend
O CDFW Streambed
P RWQCB "Waters of the State'
1—‘----------
7 *----------------,
==
F —
nowsauttiff aunf" .
tl Ills
roil t
mo-mnn Bentos Ji
*
(clsED(onl[op
398
FIGURE IV-5
Tom Dodson & Associates
Environmental Consultants Jurisdictional Aquatic Resources Delineation – Southeast End of Mid Valley Basin (* Pe’le
sc. Legend
O CDFW Streambed
0 RWQCB “Waters of the State"
eg
I11-
It
♦
-aclDKOU- - -
oto)
2411 "s ; 5 . mmmmamm"le
J
suqbuaud m T: ”
a1uu15 P • z
399
FIGURE
IX-1
Tom Dodson & Associates
Environmental Consultants GeoTracker
GeoTracker Search for a Project Search for an Address A Home ± Download Data X Tools • • Contact Us CaunetsonueDeseit "WF"
ValleyC
s
Map Satellite Night Mode
t
'■W
3 Homes
1 BRRer, . i (
e 281
Gerald Ford Dr WD
3 aning,
Dre
chint
Park
I
Quinta 109 60
■ 27
T5rmra/GCOcECEI o College, Palm Desert" lu@ 2
Milan:
Palm
o I
LEGEND - CHOOSE MORE SITES
X
17 ;
A
A8
O
- FrankSinatra Dr-
=mi cou 'Man IQ
m Desert”"
T
22zee
tes
W
()
th
LUST Cleanup Sites - REMOVE pts.
■ Cleanup Program Sites - REMOVE teet
■ Military Cleanup Sites - REMOVE A
■ Military Privatized Sites - REMOVE - /
■ Military UST Sites - REMOVE g J
■ Military UST Privatized Sites - REMOVE e f'A
Wi GWI
A DTSC Cleanup Sites - REMOVE Resort*
t
Jnmffees
63 Signifies a Closed Site
ACTIVE MAP COVERAGES:
• Military Bases - - REMOVE
Desert Falls Cou “ . ClublPool‘&
—tmzorer, sal
an
e
aw
3 e
tafeyn ’’
Sites Shown on MAan:
M17 'd
CitteS Goye.
3 k Eet ’ Prz,
3 We're Focused MA+ornArHoD Uirtal
2 -
Desert BBQ Cleaning (•)
“dne L Specialize (4) . 33 Nursing Soultior
"gweTs
.97 t e 1 3
3 ( e ‘s smtr/also
FTFE
SITES VISIBLE ON MAP - CHOOSE FIELDS
A ANGEL VIEW INC - PALM DESERT UCR NO ACTION
— RESALE STORE NO ACTION
j Wall
Cour —=======================
©2026 Airbus, CNES / Airbus, Maxar Technologies ।
1 Total Sitee O n Onen Sites 6 n Closed Sitae A n Sitae w/Water Oi ialitu Data 200 mL
X
J , Terms | Report a map error
400
FIGURE
IX-2
Tom Dodson & Associates
Environmental Consultants EnviroStor
= EnviroStor ■ Q Search for a Project Q Search for an Address f Home A Download Data ” , Tools • • Contact Us
LEGEND - CHOOSE MORE SITES X
Federal Superfund - REMOVE
State Response - REMOVE
• Voluntary Cleanup - REMOVE
■ School Cleanup - REMOVE
■ Evaluation - REMOVE
D&E Non-Case Information - REMOVE
■ School Investigation - REMOVE
1 Military Evaluation - REMOVE
• Tiered Permit - REMOVE
Corrective Action - REMOVE
• Calmortgage - REMOVE
• Border Zone / Haz Waste Evaluation - REMOVE ।
F • Historical - REMOVE
• Field Points - REMOVE
Operating - REMOVE
j • Post-Closure - REMOVE
_ • Non-Operating - REMOVE
€3 Signifies a Closed Site
3llap
College Dr
U
V
%
Shadow valley DI
WD
t
Map Satellite Night Mode i
Brewing
(oGPre "TW
aule
00 ) J
08 Palm
G
• ) Stella
Suites]Ra Im
aor©
dD
a
O)
—SL.
. I. ■ —Desert
Acrisure Arena
Bookstore
wo 4,
•Classic Clu
SITES VISIBLE ON MAP - CHOOSE FIELDS x esert
STATUS SITE TYPE
UG
Berger
Riverside Palm
Desert°s
()
G
s
$
(6
3.nltt
Frank Sinatra Dr
Terms
401
FIGURE
X-1
Tom Dodson & Associates
Environmental Consultants FEMA Flood Zones
NOTES TO USERS LEGEND
JOINS PANEL 1605
|" ■
“90 s
V j
pM ip 11111 III"I
IiMlnlimqmqmyuga
III
-
[NOTE MAP AREA SHOWN ON THIS PANELIS LOCATED
THIN TOWNSHIP 4 SOUTH RANGE 6 EAST AND TOWNSHIP. 5 SOUTH RANGE 6 EAST ' 39 sl
ioc
21 JOINS PANEL 2226
J
ZONE x I4
=
*
4M
<Jml 3
/.+
TPZonek
JOINS PANEL 2227 i
“nAoi
PANEL 1615G
FIRM
FLOOD INSURANCE RATE MAP
RIVERSIDE COUNTY,
CALIFORNIA
AND INCORPORATED AREAS
PANEL 1615 OF 3805
(SEE MAP INDEX FOR FIRM PANEL LAYOUT)
MAP NUMBER
06065C1615G
EFFECTIVE DATE
AUGUST 28,2008
402
FIGURE XII-1
Tom Dodson & AssociatesEnvironmental Consultants Mineral Resource Zones Thousand Palms
Coachella Valley Preserve
Riverside County
Rancho Mirage
Grapevine St.
$ Portola Ave.
0.s
Country Club Dr 888
3 Hovley Ln
8O
L
Indian Wells
La Quinta
Legend
i . J City Boundary
2/2 Palm Desert SOI
Mineral Resource Zone 3
Sources: CA Dept of Conservation (1995); City of Palm Desert (2014); Riverside County (2014).
403
FIGURE III-1
Tom Dodson & AssociatesEnvironmental Consultants Noise Measurement Locations "CT2PT1
brritesatrao’
ith,
22530
ye wt
4) :the
t sln th
, *
ga r
f P
UP lther
kSC
»> 1
I, E
a
S.
LEGEND:
l Site Boundary
4 tataeof
N hafts fry
W GCetor Ne WL—s
△ Measurement Locations
e.
Sites.
13,
; At
. fartat
wa Lt Pheet
w.
e JI
t
Serwrw.
2-2010
-2gs heee 1179
71 N
D
vIhN
4 "5
"Tmerfy
11 404
FIGURE XII
I-1
Tom Dodson & Associates
Environmental Consultants Sensitive Receptors
2 7.
2a
aseci
n
■■ “h%
we
[
f ■
X
i
arywrote--
an
in
4. (/
Ml
weene I.—mns as th-tc-tMl ■
shl
poolin ord
vUL
Sa
A
LEGEND:
1 Site Boundary © Receiver Locations —• Distance from receiver to Project site boundary (in feet) 405
FIGURE XIII-3
Tom Dodson & AssociatesEnvironmental Consultants Phase 1 Construction Noise Sources and Receivers ‘S—TTFNTIY
: ss a tedaa". f
: 43*
fBta
Thar e,
tPnw
j lil f
di
t
D
4 te
W4
Ge,
9a13
t ' *
P"
755
es
’ seas"
1”
fesad
lg(.. $
uldil i.
"" zat ty 4
—ret.
EYe
e
S,
s
$
"
2 s f
SAt. ‘V
h
l L •
11 ■ ■ The
se
d C \
3 tee
ta
e
—
4. X/ /4
h
GeV
Mi
a
a
s
4%9
Eenmenme
*
S ■> 1
-1, - re
ak Vs
A
< .. V -
. *. 5-a I e
,"6e
sP4
LEGEND:
2 Phase 1 Construction Activity © Receiver Locations —• Distance from receiver to construction activity (in feet) 406
FIGURE XIII-4
Tom Dodson & AssociatesEnvironmental Consultants Phase 1 Construction Noise Sources and Receivers i
s.
gli.
Ihl"
1 d
/
/
■
"awy
A
(,
%
LEGEND:
22 Phase 2 Construction Activity © Receiver Locations —• Distance from receiver to construction activity (in feet) 407
FIGURE XX
-1
Tom Dodson & Associates
Environmental Consultants Fire Hazard Severity Zones
Fire Hazard Severity Zone Viewer for Real Estate Inspections CAL
FIRE FHSZ in State Responsibility Area effective April 1, 2024 SSINCE 1885 N/ FHSZ in Local Responsibility Area as recommended March 24, 2025 Q.
Clb uCC
C
GdyD
WIDg
About this Map
This map displays adopted Fire Hazard Severity Zo
the State Responsibility Area (SRA), effective April
FHSZ in Local Responsibility Area (LRA) as recom
24, 2025.
As Real Estate Inspections are only required in Hig
zones in LRA this map omits LRA areas zoned as M
To verify your Fire Hazard Severity Zone in LRA, pl
your local agency.
.. 'IL
CBn
Dave)
Pez
Marriott’s
"heep
ditb 0
1 g
h
Legend Map Layers
Fire Hazard Severity Zones
FHSZ in SRA
| Very High
h High
1 Moderate
□ 80 FHSZ in LRA
Very High
High
Moderate |
fe
Coy@i
00 7
elVe
State Responsibility Areas
n
a Federal Responsibility Area (FRA)
1 Local Responsibility Area (LRA)
_ State Responsibility Area (SRA)
408
City of Palm Desert
Mid Valley Basin, Drainage/Storm Drain Improvements Project INITIAL STUDY TOM DODSON & ASSOCIATES Page 94
APPENDIX 1
409
TECHNICAL MEMORANDUM
20341 SW Birch Street | Suite 230 | Newport Beach, CA 92660 | (949) 660-1994 | urbanxroads.com DATE: May 21, 2026
TO: Tom Dodson, Tom Dodson & Associates
FROM: Haseeb Qureshi, Urban Crossroads, Inc.
JOB NO: 17033-02 AQ & GHG Assessment
SUBJECT: MID VALLEY CHANNEL IMPROVEMENTAIR QUALITY AND
GREENHOUSE GASASSESSMENT
Urban Crossroads, Inc. is pleased to provide the following Air Quality and Greenhouse Gas Assessmentfor the Mid Valley Channel Improvement Project (Project), which is located southeast of the intersections of Cook Street with Gerald Ford Drive and Interstate 10 in the City of Palm Desert.
PROJECT OVERVIEW
The project proposes improvements to the existing Mid Valley drainage infrastructure in two phases to reduce flooding at the intersection of Gerald Ford Drive and Cook Street during storm events, as shown in Exhibits 1 through 3.
• Phase 1 consists of regrading and widening approximately 3,700 linear feet (LF) of the Mid Valley Channel to a uniform width of 50 feet and a depth of 9 to 9.5 feet, removal of 3 existing concrete weirs, and construction of 120 cubic yards (CY) of new concrete weir structures.
• Phase 2 includes installation of a 3,800 LF underground storm drain along Gerald Ford Drive and construction of a 4-acre retention basin designed to capture approximately 15 acre-feet of runoff. The Phase 2 site plan consists of two alternative configuration options for the retention basin and associated improvements.
The Project is anticipated to have an opening year of 2027.
SUMMARY OF FINDINGS
Results of the assessment indicate that the Project would result in a less than significant with respect to air quality and greenhouse gases.
410
17033-02 AQ &GHG Assessment 2 Mid Valley Channel Improvement EXHIBIT 1: SITE PLAN –PHASE 1
3AOHV 33S
00+9Z VIS 3NTHOLVW
ga
-
5 9 d
S
9 s
A
0 85
8 l
88 §
1 4
1 fu
V Y
8 s
r?
781?s
8 IF
18 GRAPHIC SCALE
-19
MATCHUNE STA. 40+00
SEE SHEET 2
S1
RS
8g
MATCHLINE STA. 25+00
SEE BELOW s/
411
17033-02 AQ &GHG Assessment 3 Mid Valley Channel Improvement EXHIBIT 2: SITE PLAN –PHASE 2
GRAPHIC SCALE
40700—
EXISTING 30 SCE EASEMENT
EXISTING so BASN UMTS —
2 :1 SLOPES
— Sto
mu
55 BASIN WDENING
L = 750 20 BASIN ACCESS ROAD
EXISTING LOT AREA: 1.68 AC
EXISTING LOT AREA: 2.67 AC
EXISTING LOT AREA: 1.28 AC
PROPOSED LOT AREA: 1.28 AC
GERALD FORD DRIVE
UF.R
_____ 46+00____________ 47+00 47+5
EXSTNG 30 —
CRAINAGE EASEMENT
PROPOSED Lor AREA: 3.20 AC
412
17033-02 AQ &GHG Assessment 4 Mid Valley Channel Improvement EXHIBIT 3: SITE PLAN –PHASE 2 ALTERNATIVE
EXISTING 30° SCE EASEMENT
Y Y Y “t"
.6
GRAPHIC SCALE
(IN FEET)
mTyrbu udmig
thh th t
BOTTOM Or SLOPE
EXISTING so’
BASN LIMITS
DISTING Lor AREA: 1.68 AC
2:1 SLOPES
EXISTING 30
DRAINAGE
s e.
GERALD FORD DRIVE
20 ACCESS ROAD
EXISINC LOT AREA: 2.95 AC
413
17033-02 AQ & GHG Assessment 5 Mid Valley Channel Improvement
PROJECT AIR QUALITY IMPACTS
AIR QUALITY SETTING
Salton Sea Air Basin
The Project site is located within Salton Sea Air Basin (SSAB) within the jurisdiction of the SCAQMD.
The SSAB (also referred to herein as “the Basin”) is aligned in a north-west-southwest orientation stretching from Banning Pass to the Mexican border. The regional climate, as well as the temperature, wind, humidity, precipitation, and amount of sunshine significantly influence the air quality in the Basin
Regional Climate
The climate of the Coachella Valley is a continental, desert-type climate, with hot summers, mild winters, and very little annual rainfall. Precipitation is less than six inches annually and occurs mostly in the winter months from active frontal systems and in the late summer months from thunderstorms. Almost all of the annual rainfall comes from the fringes of mid-latitude storms from late November to early April with summers often being completely dry. Temperatures exceed 100 degrees Fahrenheit (°F), on the average, for four months each year, with daily highs near 110 °F during July and August. Summer nights are cooler with minimum temperatures in the mid-70s.
During the winter season, daytime highs are quite mild, but the dry air is conducive to nocturnal radiational cooling, with early morning lows around 40 °F.
The Coachella Valley and adjacent areas are exposed to frequent gusty winds. The flat terrain of the valley and strong temperature differentials, created by intense solar heating, produce moderate winds and deep thermal convection. Wind speeds exceeding 31 miles per hour (mph) occur most frequently in April and May. On an annual basis, strong winds (greater than 31 mph) are observed
0.6 percent of the time and speeds of less than 6.8 mph account for more than one-half of the observed winds. Prevailing winds are from the northwest through southwest, with secondary flows from the southeast. The strongest and most persistent winds typically occur immediately to the east of Banning Pass, which is noted as a wind power generation resource area. Aside from this locale, the wind conditions in the remainder of the Coachella Valley are geographically distinct. Stronger winds tend to occur closer to the foothills. Less frequently, widespread gusty winds occur over all areas of the Valley.
Wind Patterns and Project Location
Portions of the SSAB experience surface inversions almost every day of the year. Inversions in the SSAB are attributed to strong surface heating, but are usually broken, allowing pollutants to disperse more easily. Weak surface inversions are caused by cooling of air in contact with the cold surface of the earth at night. In the valleys and low-lying areas, this condition is intensified by the addition of cold air flowing downslope from the hills and pooling on the valley floor. In addition, inversions in the SSAB caused by the presence of the Pacific high-pressure cell can cause the air mass aloft to sink.
As the air descends, compressional heating warms the air to a temperature higher than the air below.
This subsidence inversion can act as a nearly impenetrable lid to the vertical mixing of pollutants.
These inversions can persist for one or more days, causing air stagnation and the buildup of pollutants. Subsidence inversions are common from November through June and are relatively absent from July through October.
414
17033-02 AQ & GHG Assessment 6 Mid Valley Channel Improvement Within the Project area, there is a natural sand migration process, called “blowsand,” that has direct and indirect effects on air quality. Blowsand produces particulate matter (PM10) in two ways: (1) by direct particle erosion and fragmentation as natural PM10, and (2) by secondary effects, as sand deposits on road surfaces.
Also, where water has already receded around the Salton Sea, the surface areas contain a salty mix of sediments that can change from a hardened salt crust to a fluffy soft layer of dust depending upon the season. Exposed sediments could elevate PM10 levels throughout the region. Almost 120,000 acres of Salton Sea lakebed could be exposed as inflows to the Sea decrease in future years. Local communities may be affected by 60,000 potentially dust-blowing acres, which will cause PM10 levels to rise.
Criteria Pollutants
Both the U.S. Environmental Protection Agency (EPA) and the California Air Resources Board (CARB) have established ambient air quality standards for common pollutants. These ambient air quality standards are levels of contaminants representing safe levels that avoid specific adverse health effects associated with each pollutant. The ambient air quality standards cover what are called “criteria” pollutants because the health and other effects of each pollutant are described in criteria documents. The six criteria pollutants are ozone (O3) (precursor emissions include NOX and reactive organic gases (ROG), CO, particulate matter (PM), nitrogen dioxide (NO2), sulfur dioxide (SO2), and lead. Areas that meet ambient air quality standards are classified as attainment areas, while areas that do not meet these standards are classified as nonattainment areas. The Riverside County portion of the SSAB is designated as a nonattainment area for the federal O3, PM10, and PM2.5 standards and is also a nonattainment area for the state standards for O3 and PM10.
REGULATORY BACKGROUND
FEDERAL REGULATIONS
The United States Environmental Protection Agency (EPA) is responsible for setting and enforcing the national ambient air quality standards (NAAQS) for ozone (O3), carbon monoxide (CO), nitrogen oxides (NOX), sulfur dioxide (SO2), particulate matter 10 microns in diameter or less (PM10), and lead (Pb) (1). The EPA has jurisdiction over emissions sources that are under the authority of the federal government including aircraft, locomotives, and emissions sources outside state waters (Outer Continental Shelf). The EPA also establishes emission standards for vehicles sold in states other than California. Automobiles sold in California must meet the stricter emission requirements of CARB.
The Federal Clean Air Act (CAA) was first enacted in 1955 and has been amended numerous times in subsequent years (1963, 1965, 1967, 1970, 1977, and 1990). The CAA establishes the federal air quality standards, the NAAQS, and specifies future dates for achieving compliance (2). The CAA also mandates that each state submit and implement state implementation plans (SIPs) for local areas not meeting these standards. These plans must include pollution control measures that demonstrate how the standards will be met.
The 1990 amendments to the CAA that identify specific emission reduction goals for areas not meeting the NAAQS require a demonstration of reasonable further progress toward attainment and incorporate additional sanctions for failure to attain or to meet interim milestones. The sections of the CAA most directly applicable to the development of the Project site include Title I (Non-415 17033-02 AQ & GHG Assessment 7 Mid Valley Channel Improvement Attainment Provisions) and Title II (Mobile Source Provisions) (3) (4). Title I provisions were established with the goal of attaining the NAAQS for the following criteria pollutants O3, NO2, SO2, PM10, CO, particulate matter 2.5 microns in diameter or less (PM2.5), and Pb. The NAAQS were amended in July 1997 to include an additional standard for O3 and to adopt a NAAQS for PM2.5.
Mobile source emissions are regulated in accordance with Title II provisions. These provisions require the use of cleaner burning gasoline and other cleaner burning fuels such as methanol and natural gas. Automobile manufacturers are also required to reduce tailpipe emissions of hydrocarbons and NOX. NOX is a collective term that includes all forms of NOX which are emitted as byproducts of the combustion process.
CALIFORNIA REGULATIONS
CARB
The CARB, which became part of the California EPA (CalEPA) in 1991, is responsible for ensuring implementation of the California Clean Air Act (AB 2595), responding to the federal CAA, and for regulating emissions from consumer products and motor vehicles. AB 2595 mandates achievement of the maximum degree of emissions reductions possible from vehicular and other mobile sources in order to attain the state ambient air quality standards by the earliest practical date. The CARB established the California ambient air quality standards (CAAQS) for all pollutants for which the federal government has NAAQS and, in addition, establishes standards for SO4, visibility, hydrogen sulfide (H2S), and vinyl chloride (C2H3Cl). However, at this time, H2S and C2H3Cl are not measured at any monitoring stations in the MDAB because they are not considered to be a regional air quality problem. Generally, the CAAQS are more stringent than the NAAQS (5) (6).
Local air quality management districts, such as the SCAQMD, regulate air emissions from stationary sources such as commercial and industrial facilities. All air pollution control districts have been formally designated as attainment or non-attainment for each CAAQS.
Serious non-attainment areas are required to prepare Air Quality Management Plans (AQMP) that include specified emission reduction strategies in an effort to meet clean air goals. These plans are required to include:
• Application of Best Available Retrofit Control Technology to existing sources; • Developing control programs for area sources (e.g., architectural coatings and solvents) and indirect sources (e.g., motor vehicle use generated by residential and commercial development); • A District permitting system designed to allow no net increase in emissions from any new or modified permitted sources of emissions;
• Implementing reasonably available transportation control measures and assuring a substantial reduction in growth rate of vehicle trips and miles traveled; • Significant use of low emissions vehicles by fleet operators; • Sufficient control strategies to achieve a 5% or more annual reduction in emissions or 15% or more in a period of three years for reactive organic compounds(ROG)/VOC, NOX, CO and PM10.
However, air basins may use an alternative emission reduction strategy that achieves a reduction of less than 5% per year under certain circumstances.
416
17033-02 AQ & GHG Assessment 8 Mid Valley Channel Improvement AQMP
Currently, the NAAQS and CAAQS are exceeded in most parts of the SSAB. In response, the SCAQMD has adopted a series of AQMP to meet the state and federal ambient air quality standards (7). The Coachella Valley PM10 State Implementation Plan (CVSIP) establishes additional controls needed to demonstrate expeditious attainment of the PM10 standards in the Coachella Valley, located in the Salton Sea Air Basin. This area which is under South Coast AQMD's jurisdiction has been designated as a serious non-attainment area for PM10. AQMPs are updated regularly in order to more effectively reduce emissions, accommodate growth, and to minimize any negative fiscal impacts of air pollution control on the economy.
APPLICABLE REGULATORY REQUIREMENTS
SCAQMD Rules that are currently applicable during construction activity for this Project include but are not limited to Rule 403 (Fugitive Dust) (8).
SCAQMDRULE 403
This rule is intended to reduce the amount of particulate matter entrained in the ambient air as a result of anthropogenic (human-made) fugitive dust sources by requiring actions to prevent and reduce fugitive dust emissions. Rule 403 applies to any activity or human-made condition capable of generating fugitive dust and requires best available control measures to be applied to earth moving and grading activities.
Any operation or activity that might cause the emission of any smoke, fly ash, dust, fumes, vapors, gases, or other forms of air pollution, which can cause damage to human health, vegetation, or other forms of property, or can cause excessive soiling on any other parcel, shall conform to the requirements of the SCAQMD (9).
METHODOLOGY
The California Air Pollution Control Officers Association (CAPCOA) in conjunction with other California air districts, including SCAQMD, released CalEEMod 2022 in May 2022. CalEEMod periodically releases updates, as such the latest version available at the time of this report has been utilized in this analysis. The purpose of this model is to calculate construction-source and operational-source criteria pollutant (VOCs, NOX, SOX, CO, PM10, and PM2.5) and GHG emissions from direct and indirect sources; and quantify applicable air quality and GHG reductions achieved from mitigation measures (10). Accordingly, the latest version of CalEEMod has been used for this Project to determine construction and operational air quality and GHG emissions.
STANDARDS OF SIGNIFICANCE
The criteria used to determine the significance of potential Project-related air quality impacts are taken from the California Environmental Quality Act Guidelines (CEQA Guidelines) (14 CCR §§15000, et seq.). Based on these thresholds, a project would result in a significant impact related to air quality if it would (11):
• Threshold 1: Conflict with or obstruct implementation of the applicable air quality plan. 417
17033-02 AQ & GHG Assessment 9 Mid Valley Channel Improvement • Threshold 2: Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is in non-attainment under an applicable federal or state ambient air quality standard.
• Threshold 3: Expose sensitive receptors to substantial pollutant concentrations. • Threshold 4: Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people.
AIR QUALITY REGIONAL EMISSIONS THRESHOLDS
The SCAQMD has developed regional significance thresholds for criteria pollutants, as summarized at Table 1 (12). The SCAQMD’s CEQA Air Quality Significance Thresholds (March 2023) indicate that any projects in the SSAB with daily emissions that exceed any of the indicated thresholds should be considered as having an individually and cumulatively significant air quality impact.
TABLE 1:MAXIMUM REGIONAL DAILY EMISSIONS THRESHOLDS
Pollutant Construction Operations
NOX 100 lbs/day 55 lbs/day
VOC 75 lbs/day 55 lbs/day
PM10 150 lbs/day 150 lbs/day
PM2.5 55 lbs/day 55 lbs/day
SOX 150 lbs/day 150 lbs/day
CO 550 lbs/day 550 lbs/day
Pb 3 lbs/day 3 lbs/day
lbs/day = Pounds Per Day
AIR QUALITY LOCALIZED EMISSIONS THRESHOLDS
For this Project, the appropriate SRA for the LST analysis is the SCAQMD T Coachella Valley monitoring station (SRA 30). LSTs apply to CO, NO2, PM10, and PM2.5. The SCAQMD produced look-up tables for projects less than or equal to 5 acres in size. The SCAQMD’s screening look-up tables are utilized in determining localized impacts. It should be noted that since the look-up tables identify thresholds at only 1 acre, 2 acres, and 5 acres, linear regression has been utilized to determine localized significance thresholds. Consistent with SCAQMD guidance, the thresholds presented in Tables 2 and 3 were calculated by interpolating the threshold values for the Project’s disturbed acreage.
The acres disturbed is based on the equipment list and days in the site preparation, trenching, and grading phase according to the anticipated maximum number of acres a given piece of equipment can pass over in an 8-hour workday. The equipment-specific grading rates are summarized in the CalEEMod user’s guide, Appendix C: Emission Calculation Details for CalEEMod (13). It should be noted that the disturbed area per day is representative of a piece of equipment making multiple passes over the same land area. In other words, one Rubber Tired Dozer can make multiple passes over the same land area totaling 0.5 acres in a given 8-hour day. Appendix A of the CalEEMod User Manual only identifies equipment-specific grading rates for Crawler Tractors, Graders, Rubber Tired Dozers, and Scrapers; therefore, Tractors/Loaders/Backhoes equipment that was included in the site 418
17033-02 AQ & GHG Assessment 10 Mid Valley Channel Improvement preparation and grading phase was replaced with Crawler Tractors. For analytical purposes, emissions associated with peak construction activities are considered for purposes of localized significance thresholds (LSTs) since this phase represents the maximum localized emissions that would occur. The Project’s construction activities could disturb a maximum of approximately 0.5 acre per day for all construction activities. Any other construction phases of development would result in lesser emissions and consequently lesser impacts than what is disclosed herein. As such, Tables 2 and 3 presents thresholds for localized construction emissions for both phases. It should be noted that a 1 acre per day disturbance area for all construction activities was utilized as this is the SCAQMD look-up tables minimum acreage.
TABLE 2:MAXIMUM DAILY LOCALIZED EMISSIONS THRESHOLDS –PHASE 1 Construction Activity NOX CO PM10 PM2.5
Linear, Grubbing & Land Clearing 132 lbs/day 878 lbs/day 4 lbds/day 3 lbs/day Demolition 132 lbs/day 878 lbs/day 4 lbds/day 3 lbs/day Linear, Grading & Excavation 132 lbs/day 878 lbs/day 4 lbds/day 3 lbs/day Linear, Drainage, Utilities & Sub-Grade 132 lbs/day 878 lbs/day 4 lbds/day 3 lbs/day Linear, Paving 132 lbs/day 878 lbs/day 4 lbds/day 3 lbs/day Linear, Grubbing & Land Clearing 132 lbs/day 878 lbs/day 4 lbds/day 3 lbs/day Notes:
Source of localized significance threshold (LSTs) is provided on page 17.
TABLE 3:MAXIMUM DAILY LOCALIZED EMISSIONS THRESHOLDS –PHASE 2 Construction Activity NOX CO PM10 PM2.5
Linear, Grubbing & Land Clearing 132 lbs/day 878 lbs/day 4 lbds/day 3 lbs/day Linear, Grading & Excavation 132 lbs/day 878 lbs/day 4 lbds/day 3 lbs/day Linear, Drainage, Utilities & Sub-Grade 132 lbs/day 878 lbs/day 4 lbds/day 3 lbs/day Linear, Paving 132 lbs/day 878 lbs/day 4 lbds/day 3 lbs/day Linear, Grubbing & Land Clearing 132 lbs/day 878 lbs/day 4 lbds/day 3 lbs/day Notes:
Source of localized significance threshold (LSTs) is provided on page 18.
CONSTRUCTION ACTIVITIES
CalEEMod provides a limited set of construction activity categories, which may not cover all specific activities included in a given project. To ensure comprehensive modeling, activities not directly represented in the model were reviewed and assigned to the most appropriate categories. This approach ensures the modeling remains consistent with the model’s framework while capturing the full scope of construction emissions.
TABLE 4:CONSTRUCTION ACTIVITIES
Construction Activity CalEEMod Equivalent
419
17033-02 AQ & GHG Assessment 11 Mid Valley Channel Improvement Clear and grub Linear, Grubbing & Land Clearing
Demolition of existing onsite structures Demolition
Installation of the storm drain systems Linear, Grading & Excavation Final grading and installation of support systems Linear, Drainage, Utilities & Sub-Grade Final grading and installation of support systems Linear, Paving Construction activities associated with the Project would result in emissions of VOCs, NOX, SOX, CO, PM10, and PM2.5. Construction related emissions are expected from the following construction activities:
Phase 1
• Linear, Grubbing & Land Clearing
• Demolition
• Linear, Grading & Excavation
• Linear, Drainage, Utilities, & Sub-Grade
• Linear, Paving
Phase 2
• Linear, Grubbing & Land Clearing
• Linear, Grading & Excavation
• Linear, Drainage, Utilities, & Sub-Grade
• Linear, Paving
DEMOLITION ACTIVITIES
The Project site currently contains three existing concrete weirs, which would be removed during Phase 1, resulting in approximately 3,111 square feet of demolished material.
GRADING ACTIVITIES
Dust is typically a major concern during grading activities. Because such emissions are not amenable to collection and discharge through a controlled source, they are called “fugitive emissions.” Fugitive dust emissions rates vary as a function of many parameters (soil silt, soil moisture, wind speed, area disturbed, number of vehicles, depth of disturbance or excavation, etc.). CalEEMod was utilized to calculate fugitive dust emissions resulting from this phase of activity. Based on information provided by the Project applicant, Phase 1 would require 15,000 cubic yards (CY) of soil export, and Phase 2 would require 1,800 CY of soil export, for a Project total of 16,800 CY of export for earthwork activities.
ON-ROAD TRIPS
Construction generates on-road vehicle emissions from vehicle usage for workers, vendors, and haul trucks commuting to and from the site. The number of worker, vendor, and hauling trips per phase is presented below in Tables 5 and 6 and are based on CalEEMod defaults.
TABLE 5:CONSTRUCTION TRIP ASSUMPTIONS – PHASE 1
Construction Activity
420
17033-02 AQ & GHG Assessment 12 Mid Valley Channel Improvement Worker Trips
Per Day
Vendor Trips
Per Day
Hauling Trips
Per Day
Linear, Grubbing & Land Clearing 15 0 0
Demolition 8 0 4
Linear, Grading & Excavation 10 1 104
Linear, Drainage, Utilities & Sub-Grade 10 0 0
Linear, Paving 18 0 0
TABLE 6:CONSTRUCTION TRIP ASSUMPTIONS – PHASE 2
Construction Activity Worker Trips
Per Day
Vendor Trips
Per Day
Hauling Trips
Per Day
Linear, Grubbing & Land Clearing 15 0 0
Linear, Grading & Excavation 10 1 16
Linear, Drainage, Utilities, & Sub-Grade 10 0 0
Linear, Paving 18 0 0
CONSTRUCTION DURATION
For purposes of analysis, construction of Phase 1 is expected to commence in November 2026 and would last through January 2027. Construction of Phase 2 is expected to commence in January 2027 and would last through March 2027. The construction schedule utilized in the analysis represents a “worst-case” analysis scenario should construction occur any time after the respective dates since emission factors for construction decrease as time passes and the analysis year increases due to emission regulations becoming more stringent1. The duration of construction activity and associated equipment represents a reasonable approximation of the expected construction fleet as required per CEQA Guidelines (14).
TABLE 7:CONSTRUCTION DURATION- PHASE 1
Construction Activity Start Date End Date Days
Linear, Grubbing & Land Clearing 11/2/2026 11/9/2026 5
Demolition 11/10/2026 11/23/2026 10
Linear, Grading & Excavation 11/24/2026 12/17/2026 18
Linear, Drainage, Utilities & Sub-Grade 12/18/2026 1/8/2027 16 Linear, Paving 1/9/2027 1/18/2027 6
TABLE 8:CONSTRUCTION DURATION- PHASE 2
Construction Activity Start Date End Date Days
1 As shown in the CalEEMod User’s Guide Version 2022, Appendix G “Table G-11. Statewide Average Annual Offroad Equipment Emission Factors” as the analysis year increases, emission factors for the same equipment pieces decrease due to the natural turnover of older equipment being replaced by newer less polluting equipment and new regulatory requirements. 421
17033-02 AQ & GHG Assessment 13 Mid Valley Channel Improvement Linear, Grubbing & Land Clearing 1/19/2027 1/22/2027 4
Linear, Grading & Excavation 1/25/2027 2/11/2027 14
Linear, Drainage, Utilities & Sub-Grade 2/12/2027 3/1/2027 12 Linear, Paving 3/2/2027 3/8/2027 5
CONSTRUCTION EQUIPMENT
Equipment used for construction of both phases of the Project is shown in Tables 9 and 10, respectively. Consistent with industry standards and typical construction practices, each piece of equipment will operate up to a total of eight (8) hours per day, or more than two-thirds of the period during which construction activities are allowed pursuant to the code.
TABLE 9:CONSTRUCTION EQUIPMENT- PHASE 1
Construction Activity Equipment Quantity Hours
Linear, Grubbing & Land Clearing Off-Highway Truck 2 8
Linear, Grubbing & Land Clearing Rubber Tired Dozer 1 8 Linear, Grubbing & Land Clearing Tractors/Loaders/Backhoes 1 8 Linear, Grubbing & Land Clearing Excavators 1 8
Linear, Grubbing & Land Clearing Other General Industrial Equipment 1 8 Demolition Concrete/Industrial Saws 1 8
Demolition Excavators 1 8
Demolition Rubber Tired Dozers 1 8
Linear, Grading & Excavation Off-Highway Truck 2 8
Linear, Grading & Excavation Rubber Tired Dozer 1 8
Linear, Grading & Excavation Tractors/Loaders/Backhoes 1 8 Linear, Drainage, Utilities, & Sub-Grade Off-Highway Truck 2 8 Linear, Drainage, Utilities, & Sub-Grade Rubber Tired Dozer 1 8 Linear, Drainage, Utilities, & Sub-Grade Tractors/Loaders/Backhoes 1 8 Linear, Paving Paving Equipment 1 8
Linear, Paving Other General Industrial Equipment 1 8
Linear, Paving Off-Highway Truck 3 8
Linear, Paving Tractors/Loaders/Backhoes 1 8
Linear, Paving Plate Compactor 1 8
TABLE 10:CONSTRUCTION EQUIPMENT- PHASE 2
Construction Activity Equipment Quantity Hours
Linear, Grubbing & Land Clearing Off-Highway Truck 2 8
Linear, Grubbing & Land Clearing Rubber Tired Dozer 1 8 Linear, Grubbing & Land Clearing Tractors/Loaders/Backhoes 1 8 Linear, Grubbing & Land Clearing Excavators 1 8
Linear, Grubbing & Land Clearing Other General Industrial Equipment 1 8 Linear, Grading & Excavation Off-Highway Truck 2 8
Linear, Grading & Excavation Rubber Tired Dozer 1 8
422
17033-02 AQ & GHG Assessment 14 Mid Valley Channel Improvement Construction Activity Equipment Quantity Hours
Linear, Grading & Excavation Tractors/Loaders/Backhoes 1 8 Linear, Drainage, Utilities, & Sub-Grade Off-Highway Truck 2 8 Linear, Drainage, Utilities, & Sub-Grade Rubber Tired Dozer 1 8 Linear, Drainage, Utilities, & Sub-Grade Tractors/Loaders/Backhoes 1 8 Linear, Paving Paving Equipment 1 8
Linear, Paving Other General Industrial Equipment 1 8
Linear, Paving Off-Highway Truck 3 8
Linear, Paving Tractors/Loaders/Backhoes 1 8
Linear, Paving Plate Compactor 1 8
REGIONAL CONSTRUCTION EMISSIONS
The estimated maximum daily construction emissions without mitigation for Phases 1 and 2 are summarized in Tables 11 and 12, respectively. Under the assumed scenarios, emissions resulting from the Project construction of both phases would not exceed thresholds established by the SCAQMD for emissions of any criteria pollutant. Project construction-source emissions impacts would therefore be less-than-significant. Detailed construction model outputs are presented in Appendices 1 and 2.
TABLE 11:OVERALL REGIONAL CONSTRUCTION EMISSIONS SUMMARY - PHASE 1 Year ROG NOX CO SO2 PM10 PM2.5
Winter
2026 2.15 22.83 17.64 0.09 4.46 2.07
2027 1.91 13.90 15.20 0.04 2.39 1.41
Maximum Daily Emissions 2.15 22.83 17.64 0.09 4.46 2.07 SCAQMD Regional Thresholds 75 100 550 150 150 55
Threshold Exceeded? NO NO NO NO NO NO
Notes:
CalEEMod construction-source (unmitigated) emissions are presented in Appendix 1.
TABLE 12:OVERALL REGIONAL CONSTRUCTION EMISSIONS SUMMARY - PHASE 2 Year ROG NOX CO SO2 PM10 PM2.5
Winter
2027 2.11 15.48 17.41 0.05 2.71 1.52
Maximum Daily Emissions 2.11 15.48 17.41 0.05 2.71 1.52 SCAQMD Regional Thresholds 75 100 550 150 150 55
Threshold Exceeded? NO NO NO NO NO NO
Notes:
CalEEMod construction-source (unmitigated) emissions are presented in Appendix 2. 423
17033-02 AQ & GHG Assessment 15 Mid Valley Channel Improvement
REGIONAL OPERATIONAL EMISSIONS
The proposed Project primarily involves construction activities associated with improvements to existing drainage infrastructure, including channel modifications, storm drain installation, and construction of a retention basin. The Project is intended to improve stormwater conveyance and flood control capacity within the existing drainage system, thereby reducing localized flooding at the intersection of Gerald Ford Drive and Cook Street during storm events. Aside from trips related to periodic maintenance, no operational activities are proposed and thus operational emissions would be less than significant.
SENSITIVE RECEPTORS
The analysis makes use of methodology included in the SCAQMD Final Localized Significance Threshold Methodology (LST Methodology) (15). The SCAQMD has established that impacts to air quality are significant if there is a potential to contribute or cause localized exceedances of the federal and/or state ambient air quality standards (NAAQS/CAAQS). Collectively, these are referred to as Localized Significance Thresholds (LSTs). The SCAQMD established LSTs in response to the SCAQMD Governing Board’s Environmental Justice Initiative I-4 2 . LSTs represent the maximum
emissions from a project that will not cause or contribute to an exceedance of the most stringent applicable federal or state ambient air quality standard at the sensitive receptor. The SCAQMD states that lead agencies can use the LSTs as another indicator of significance in their air quality impact analyses.
The SCAQMD recommends that the nearest sensitive receptor be considered when determining the Project’s potential to cause an individual or cumulatively significant impact. The nearest land use where an individual could remain for 24 hours to the Project site has been used to determine localized construction and operational air quality impacts for emissions of PM10 and PM2.5 (since PM10 and PM2.5 thresholds are based on a 24-hour averaging time. Consistent with LST Methodology, the nearest industrial/commercial use to the Project site is used to determine construction and operational LST air impacts for emissions of NOX and CO as the averaging periods for these pollutants are shorter (8 hours or less) and it is reasonable to assume that an individual could be present at these sites for periods of one to 8 hours.
It should be noted that the LST Methodology explicitly states that “It is possible that a project may have receptors closer than 25 meters. Projects with boundaries located closer than 25 meters to the nearest receptor should use the LSTs for receptors located at 25 meters (15).” Since sensitive receptors in the vicinity of the Project site are located within 25 meters of the Project site boundary, a 25-meter receptor distance was conservatively used for the evaluation of localized PM10, PM2.5, NOX, and CO. 2 The purpose of SCAQMD’s Environmental Justice program is to ensure that everyone has the right to equal protection from air pollution and fair access to the decision-making process that works to improve the quality of air within their communities.
Further, the SCAQMD defines Environmental Justice as “…equitable environmental policymaking and enforcement to protect the health of all residents, regardless of age, culture, ethnicity, gender, race, socioeconomic status, or geographic location, from the health effects of air pollution.”
424
17033-02 AQ & GHG Assessment 16 Mid Valley Channel Improvement
LOCALIZED CONSTRUCTION EMISSIONS
Tables 13 and 14 identifies the localized impacts of both phases at the nearest receptor location in the vicinity of the Project. Outputs from the model runs for construction LSTs are provided in Appendices 1 and 2. For analytical purposes, emissions associated with peak construction activities are considered for purposes of LSTs since these phases represent the maximum localized emissions that would occur. Any other construction phases of development that overlap would result in lesser emissions and consequently lesser impacts than what is disclosed herein. As shown in Tables 13 and 14, emissions resulting from the construction of both phases will not exceed the numerical thresholds of significance established by the SCAQMD for any criteria pollutant. Thus, a less than significant impact would occur for localized Project-related construction-source emissions and no mitigation is required.
TABLE 13: PROJECT LOCALIZED CONSTRUCTION IMPACTS –PHASE 1 On-Site Emissions NOX CO PM10 PM2.5
Linear, Grubbing & Land Clearing
Maximum Daily Emissions 16.05 16.89 2.33 1.45
SCAQMD Localized Threshold 132 878 4 3
Threshold Exceeded? NO NO NO NO
Demolition
Maximum Daily Emissions 10.66 9.91 0.63 0.42
SCAQMD Localized Threshold 132 878 4 3
Threshold Exceeded? NO NO NO NO
Linear, Grading & Excavation
Maximum Daily Emissions 1.45 1.45 2.30 1.41
SCAQMD Localized Threshold 132 878 4 3
Threshold Exceeded? NO NO NO NO
Linear, Drainage, Utilities, & Sub-Grade
Maximum Daily Emissions 14.47 14.90 2.29 1.41
SCAQMD Localized Threshold 132 878 4 3
Threshold Exceeded? NO NO NO NO
Linear, Paving
Maximum Daily Emissions 10.42 13.92 0.36 0.33
SCAQMD Localized Threshold 132 878 4 3
Threshold Exceeded? NO NO NO NO
425
17033-02 AQ & GHG Assessment 17 Mid Valley Channel Improvement TABLE 14: PROJECT LOCALIZED CONSTRUCTION IMPACTS –PHASE 2 On-Site Emissions NOX CO PM10 PM2.5
Linear, Grubbing & Land Clearing
Maximum Daily Emissions 15.41 16.71 2.30 1.42
SCAQMD Localized Threshold 132 878 4 3
Threshold Exceeded? NO NO NO NO
Linear, Grading & Excavation
Maximum Daily Emissions 13.86 14.73 2.26 1.38
SCAQMD Localized Threshold 132 878 4 3
Threshold Exceeded? NO NO NO NO
Linear, Drainage, Utilities, & Sub-Grade
Maximum Daily Emissions 13.86 14.73 2.26 1.38
SCAQMD Localized Threshold 132 878 4 3
Threshold Exceeded? NO NO NO NO
Linear, Paving
Maximum Daily Emissions 10.42 13.92 0.36 0.33
SCAQMD Localized Threshold 132 878 4 3
Threshold Exceeded? NO NO NO NO
LOCALIZED OPERATIONAL EMISSIONS
According to SCAQMD localized significance threshold methodology, LSTs would apply to the operational phase of a proposed Project if the Project includes stationary sources or attracts mobile sources that may spend extended periods queuing and idling at the site (e.g., warehouse or transfer facilities). As previously discussed, the Project primarily involves construction activities associated with improvements to existing drainage infrastructure, including channel modifications, storm drain installation, and construction of a retention basin. The Project is intended to improve stormwater conveyance and flood control capacity within the existing drainage system, thereby reducing localized flooding at the intersection of Gerald Ford Drive and Cook Street during storm events. The Project will not include stationary or mobile sources other than trips associated with periodic maintenance. Therefore, the Project would not expose sensitive receptors to substantial pollutant concentrations and impacts would be less than significant.
AIR QUALITY IMPACTS – CONSISTENCY WITH THRESHOLD NO. 1
Would the Project conflict with or obstruct implementation of the applicable air quality plan? The Project site is located within the SSAB and is subject to SCAQMD’s 2022 AQMP and the 2003 Coachella Valley PM10 SIP. The SCAQMD has jurisdiction over an approximately 10,743 square-mile area consisting of the four-county Basin and the Los Angeles County and Riverside County portions of what use to be referred to as the Southeast Desert Air Basin. In these areas, the SCAQMD is principally responsible for air pollution control, and works directly with the Southern California Association of Governments (SCAG), county transportation commissions, local governments, as well as state and federal agencies to reduce emissions from stationary, mobile, and indirect sources to meet state and federal ambient air quality standards. 426
17033-02 AQ & GHG Assessment 18 Mid Valley Channel Improvement Currently, these state and federal air quality standards are exceeded in most parts of the SSAB. In response, the SCAQMD has adopted a series of AQMPs to meet the state and federal ambient air quality standards. AQMPs are updated regularly in order to more effectively reduce emissions, accommodate growth, and to minimize any negative fiscal impacts of air pollution control on the economy.
In December 2022, the SCAQMD released the Final 2022 AQMP (2022 AQMP). The 2022 AQMP continues to evaluate current integrated strategies and control measures to meet the NAAQS, as well as explore new and innovative methods to reach its goals. Some of these approaches include utilizing incentive programs, recognizing existing co-benefit programs from other sectors, and developing a strategy with fair-share reductions at the federal, state, and local levels (16). Similar to the 2016 AQMP, the 2022 AQMP incorporates scientific and technological information and planning assumptions, including the 2020-2045 RTP/SCS, a planning document that supports the integration of land use and transportation to help the region meet the federal CAA requirements (17). The Project’s consistency with the AQMP will be determined using the 2022 AQMP as discussed below.
SCAG adopted the 2020-2045 Regional Transportation Plan/Sustainable Communities Strategy (2020- 2045 RTP/SCS), a planning document that supports the integration of land use and transportation to help the region meet the federal metropolitan planning organization (MPO) requirements under the Sustainable communities and Climate Protection Act. The proposed Project would be developed in accordance with all applicable rules and regulations contained in those plans. It should be noted that although the 2024-2050 RTP was released after approval of the 2022 AQMP, the 2022 AQMP is reliant in part upon the general plan land use designations.
Criteria for determining consistency with the AQMP are defined in Chapter 12, Section 12.2 and Section 12.3 of the 1993 CEQA Handbook (18). These indicators are discussed below:
The proposed Project will not result in an increase in the frequency or severity of existing air quality violations or cause or contribute to new violations or delay the timely attainment of air quality standards or the interim emissions reductions specified in the AQMP.
The violations that under this criterion refer to are the CAAQS and NAAQS. CAAQS and NAAQS violations would occur if regional or localized significance thresholds were exceeded.
CAAQS and NAAQS violations would occur if regional or localized significance thresholds were exceeded. As evaluated, the Project’s regional and localized construction and operational-source emissions would not exceed applicable regional significance thresholds. As such, a less than significant impact is expected.
On the basis of the preceding discussion, the Project is determined to be consistent with the first criterion.
The Project will not exceed the assumptions in the AQMP based on the years of Project build-out phase.
The 2022 AQMP demonstrates that the applicable ambient air quality standards can be achieved within the timeframes required under federal law. Growth projections from local general plans adopted by cities in the district are provided to the SCAG, which develops regional growth forecasts, which are then used to develop future air quality forecasts for the AQMP. The Project is a regional storm drain improvement project and would not affect the base assumptions in the AQMP. 427
17033-02 AQ & GHG Assessment 19 Mid Valley Channel Improvement On the basis of the preceding discussion, the Project is determined to be consistent with the second criterion.
AIR QUALITY IMPACTS – CONSISTENCY WITH THRESHOLD NO. 2
Would the Project result in a cumulatively considerable net increase of any criteria pollutant for which the project region is in non-attainment under an applicable federal or state ambient air quality standard?
The Project, as evaluated herein would not exceed the regional or localized air quality significance thresholds. The CAAQS designates the Project site as nonattainment for O3, PM10, and PM2.5 while the NAAQS designates the Project site as nonattainment for O3 and PM2.5.
The SCAQMDhas published a report on how to address cumulative impacts from air pollution:White Paper on Potential Control Strategies to Address Cumulative Impacts from Air Pollution (19). In this report the SCAQMD clearly states (Page D-3):
“…the SCAQMD uses the same significance thresholds for project specific and cumulative impacts for all environmental topics analyzed in an Environmental Assessment or EIR. The only case where the significance thresholds for project specific and cumulative impacts differ is the Hazard Index (HI) significance threshold for TAC emissions. The project specific (project increment) significance threshold is HI > 1.0 while the cumulative (facility-wide) is HI > 3.0. It should be noted that the HI is only one of three TAC emission significance thresholds considered (when applicable) in a CEQA analysis. The other two are the maximum individual cancer risk (MICR) and the cancer burden, both of which use the same significance thresholds (MICR of 10 in 1 million and cancer burden of 0.5) for project specific and cumulative impacts.
Projects that exceed the project-specific significance thresholds are considered by the SCAQMD to be cumulatively considerable. This is the reason project-specific and cumulative significance thresholds are the same. Conversely, projects that do not exceed the project-specific thresholds are generally not considered to be cumulatively significant.”
Therefore, this analysis assumes that individual projects that do not generate operational or construction emissions that exceed the SCAQMD’s recommended daily thresholds for project-specific impacts would also not cause a cumulatively considerable increase in emissions for those pollutants for which SSAB is in nonattainment, and, therefore, would not be considered to have a significant, adverse air quality impact. Alternatively, individual project-related construction and operational emissions that exceed SCAQMD thresholds for project-specific impacts would be considered cumulatively considerable.
CONSTRUCTION IMPACTS
The Project-specific evaluation of emissions presented in the preceding analysis demonstrates that proposed Project construction-source air pollutant emissions would not result in exceedances of regional thresholds. Therefore, proposed Project construction-source emissions would be considered less than significant on a project-specific and cumulative basis. 428
17033-02 AQ & GHG Assessment 20 Mid Valley Channel Improvement
OPERATIONAL IMPACTS
The Project-specific evaluation of emissions presented in the preceding analysis demonstrates that proposed Project operational-source air pollutant emissions would not result in exceedances of regional thresholds. Therefore, the proposed Project operational-source emissions would be considered less than significant on a project-specific and cumulative basis.
AIR QUALITY IMPACTS – CONSISTENCY WITH THRESHOLD NO. 3
Would the expose sensitive receptors to substantial pollutant concentrations? The potential impact of Project-generated air pollutant emissions at sensitive receptors has also been considered. Results of the LST analysis indicate that the Project will not exceed the SCAQMD localized significance thresholds during construction. Therefore, sensitive receptors would not be exposed to substantial pollutant concentrations during Project construction.
Additionally, the Project will not exceed the SCAQMD localized significance thresholds during operational activity. Therefore, sensitive receptors would not be exposed to substantial pollutant concentrations as the result of Project operations.
CO“HOT SPOT” ANALYSIS
A CO hotspot is defined as a localized concentration of carbon monoxide exceeding the state one-hour standard of 20 ppm or the eight-hour standard of 9 ppm. At the time the most recent CEQA Air Quality Handbook (1993) was published by SCAQMD, the air basin was designated as non-attainment, requiring projects to perform hotspot analyses to ensure they did not worsen the existing conditions. Over the last two decades, background CO concentrations have been significantly reduced due to regulatory controls on tailpipe emissions, which have culminated in the air basin achieving attainment status for CO.
The 2003 AQMP’s findings underscore that CO hotspots are highly unlikely due to the reduced background concentrations and the effectiveness of California's air quality management strategies.
The substantial reduction in CO levels from the vehicle fleet and the state’s attainment status for CO further diminish the need for detailed microscale hotspot analyses, reinforcing that existing monitoring and regulatory frameworks adequately address potential air quality concerns.
As summarized in the 2003 AQMP, even at one of the busiest intersections at that time, only 0.7 ppm of CO is attributable to vehicular traffic and the remaining 7.7 ppm were due to ambient background conditions. Within the Project vicinity, the background air quality 1-hour and 8-hour concentrations are well below the applicable AAQS. As such, Project-related traffic at any intersections within the air basin would not cause or contribute to a CO hotspot since the background concentrations are low and any contribution from project traffic would be negligible. The project would not significantly contribute to the formation of a CO hotspot.
AIR QUALITY IMPACTS – CONSISTENCY WITH THRESHOLD NO. 4
Would the Project result in other emissions (such as those leading to odors) adversely affecting a substantial number of people?
The potential for the Project to generate objectionable odors has also been considered. Land uses generally associated with odor complaints include:
429
17033-02 AQ & GHG Assessment 21 Mid Valley Channel Improvement • Agricultural uses (livestock and farming)
• Wastewater treatment plants
• Food processing plants
• Chemical plants
• Composting operations
• Refineries
• Landfills
• Dairies
• Fiberglass molding facilities
The Project does not contain land uses typically associated with emitting objectionable odors.
Potential odor sources associated with the proposed Project may result from construction equipment exhaust and the temporary storage of typical solid waste (refuse) associated with construction activity. Standard construction requirements would minimize odor impacts from construction. The construction odor emissions would be temporary, short-term, and intermittent in nature and would cease upon completion of the respective phase of construction and is thus considered less than significant.Therefore, odors associated with the proposed Project construction would be less than significant and no mitigation is required (20).
PROJECT GHG ANALYSIS
CLIMATE CHANGE SETTING
Global climate change (GCC) is the change in average meteorological conditions on the earth with respect to temperature, precipitation, and storms. The majority of scientists believe that the climate shift taking place since the Industrial Revolution is occurring at a quicker rate and magnitude than in the past. Scientific evidence suggests that GCC is the result of increased concentrations of GHGs in the earth’s atmosphere, including carbon dioxide (CO2), methane (CH4), nitrous oxide (N2O), and fluorinated gases. The majority of scientists believe that this increased rate of climate change is the result of GHGs resulting from human activity and industrialization over the past 200 years.
An individual project like the proposed Project evaluated in this memo cannot generate enough GHG emissions to affect a discernible change in global climate. However, the proposed Project may participate in the potential for GCC by its incremental contribution of GHGs combined with the cumulative increase of all other sources of GHGs, which when taken together constitute potential influences on GCC. Because these changes may have serious environmental consequences, this memo will evaluate the potential for the proposed Project to have a significant effect upon the environment as a result of its potential contribution to the greenhouse effect.
GCC refers to the change in average meteorological conditions on the earth with respect to temperature, wind patterns, precipitation and storms. Global temperatures are regulated by naturally occurring atmospheric gases such as water vapor, CO2, N2O, CH4, hydrofluorocarbons (HFCs), perfluorocarbons (PFCs), and sulfur hexafluoride (SF6). These particular gases are important due to their residence time (duration they stay) in the atmosphere, which ranges from 10 years to more than 100 years. These gases allow solar radiation into the earth’s atmosphere, but prevent radiative heat from escaping, thus warming the earth’s atmosphere. GCC can occur naturally as it has in the past with the previous ice ages.
430
17033-02 AQ & GHG Assessment 22 Mid Valley Channel Improvement Gases that trap heat in the atmosphere are often referred to as GHGs. GHGs are released into the atmosphere by both natural and anthropogenic activity. Without the natural GHG effect, the earth’s average temperature would be approximately 61 degrees Fahrenheit (°F) cooler than it is currently.
The cumulative accumulation of these gases in the earth’s atmosphere is considered to be the cause for the observed increase in the earth’s temperature.
For the purposes of this analysis, emissions of CO2, CH4, and N2O were evaluated because these gases are the primary contributors to GCC from development projects. Although there are other substances such as fluorinated gases that also contribute to GCC, these fluorinated gases were not evaluated as their sources are not well-defined and do not contain accepted emissions factors or methodology to accurately calculate these gases.
REGULATORY SETTING
Executive Order S-3-05
Former California Governor Arnold Schwarzenegger announced on June 1, 2005, through Executive Order S-3-05, the following reduction targets for GHG emissions:
• By 2010, reduce GHG emissions to 2000 levels.
• By 2020, reduce GHG emissions to 1990 levels.
• By 2050, reduce GHG emissions to 80% below 1990 levels.
The 2050 reduction goal represents what some scientists believe is necessary to reach levels that will stabilize the climate. The 2020 goal was established to be a mid-term target. Because this is an executive order, the goals are not legally enforceable for local governments or the private sector.
Assembly Bill (AB) 32
The California State Legislature enacted AB 32, which requires that GHGs emitted in California be reduced to 1990 levels by the year 2020. “GHGs” as defined under AB 32 include CO2, CH4, N2O, hydrofluorocarbons (HFCs), perfluorocarbons (PFCs), and sulfur hexafluoride (SF6). Since AB 32 was enacted, a seventh chemical, nitrogen trifluoride, has also been added to the list of GHGs. CARB is the state agency charged with monitoring and regulating sources of GHGs. Pursuant to AB 32, CARB adopted regulations to achieve the maximum technologically feasible and cost-effective GHG emission reductions. AB 32 states the following:
“Global warming poses a serious threat to the economic well-being, public health, natural resources, and the environment of California. The potential adverse impacts of global warming include the exacerbation of air quality problems, a reduction in the quality and supply of water to the state from the Sierra snowpack, a rise in sea levels resulting in the displacement of thousands of coastal businesses and residences, damage to marine ecosystems and the natural environment, and an increase in the incidences of infectious diseases, asthma, and other human health-related problems.”
CARB approved the 1990 GHG emissions level of 427 million metric ton of CO2 equivalent per year (MMTCO2e) on December 6, 2007 (21). Therefore, emissions generated in California in 2020 are required to be equal to or less than 427 MMTCO2e. Emissions in 2020 in a “business as usual” (BAU) scenario were estimated to be 596 MMTCO2e, which do not account for reductions from AB 32 regulations (22). At that level, a 28.4% reduction was required to achieve the 427 MMTCO2e 1990 431
17033-02 AQ & GHG Assessment 23 Mid Valley Channel Improvement inventory. In October 2010, CARB prepared an updated BAU 2020 forecast to account for the recession and slower forecasted growth. The forecasted inventory without the benefits of adopted regulation is now estimated at 545 MMTCO2e. Therefore, under the updated forecast, a 21.7% reduction from BAU is required to achieve 1990 levels (23).
Progress in Achieving AB 32 Targets and Remaining Reductions Required The State has made steady progress in implementing AB 32 and achieving targets included in Executive Order S-3-05. The progress is shown in updated emission inventories prepared by CARB for 2000 through 2012 (24). The State has achieved the Executive Order S-3-05 target for 2010 of reducing GHG emissions to 2000 levels. As shown below, the 2010 emission inventory achieved this target.
• 1990: 427 MMTCO2e (AB 32 2020 target)
• 2000: 463 MMTCO2e (an average 8% reduction needed to achieve 1990 base) • 2010: 450 MMTCO2e (an average 5% reduction needed to achieve 1990 base) CARB has also made substantial progress in achieving its goal of achieving 1990 emissions levels by 2020. As described earlier in this section, CARB revised the 2020 BAU inventory forecast to account for new lower growth projections, which resulted in a new lower reduction from BAU to achieve the 1990 base. The previous reduction from 2020 BAU needed to achieve 1990 levels was 28.4% and the latest reduction from 2020 BAU is 21.7%.
• 2020: 545 MMTCO2e BAU (an average 21.7% reduction from BAU needed to achieve 1990 base) Senate Bill (SB) 32
On September 8, 2016, Governor Jerry Brown signed the SB 32 and its companion bill, AB 197. SB 32 requires the state to reduce statewide GHG emissions to 40% below 1990 levels by 2030, a reduction target that was first introduced in Executive Order B-30-15. The new legislation builds upon the AB 32 goal of 1990 levels by 2020 and provides an intermediate goal to achieving S-3-05, which sets a statewide GHG reduction target of 80% below 1990 levels by 2050. AB 197 creates a legislative committee to oversee regulators to ensure that CARB not only responds to the Governor, but also the Legislature (25).
AB 197
A condition of approval for SB 32 was the passage of AB 197. AB 197 requires that CARB consider the social costs of GHG emissions and prioritize direct reductions in GHG emissions at mobile sources and large stationary sources. AB 197 also gives the California legislature more oversight over CARB through the addition of two legislatively appointed members to the CARB Board and the establishment a legislative committee to make recommendations about CARB programs to the legislature.
Executive Order B-55-18 and SB 100
Executive Order B-55-18 and SB 100. SB 100 and Executive Order B-55-18 were signed by Governor Brown on September 10, 2018. Under the existing RPS, 25% of retail sales are required to be from renewable sources by December 31, 2016, 33% by December 31, 2020, 40% by December 31, 2024, 45% by December 31, 2027, and 50% by December 31, 2030. SB 100 raises California’s RPS requirement to 50% renewable resources target by December 31, 2026, and to achieve a 60% target 432
17033-02 AQ & GHG Assessment 24 Mid Valley Channel Improvement by December 31, 2030. SB 100 also requires that retail sellers and local publicly owned electric utilities procure a minimum quantity of electricity products from eligible renewable energy resources so that the total kilowatt hours of those products sold to their retail end-use customers achieve 44% of retail sales by December 31, 2024, 52% by December 31, 2027, and 60% by December 31, 2030. In addition to targets under AB 32 and SB 32, Executive Order B-55-18 establishes a carbon neutrality goal for the state of California by 2045; and sets a goal to maintain net negative emissions thereafter. The Executive Order directs the California Natural Resources Agency (CNRA), California Environmental Protection Agency (CalEPA), the Department of Food and Agriculture (CDFA), and CARB to include sequestration targets in the Natural and Working Lands Climate Change Implementation Plan consistent with the carbon neutrality goal.
Title 24 California Code of Regulations (CCR)
California Code of Regulations (CCR) Title 24 Part 6:The California Energy Code was first adopted in 1978 in response to a legislative mandate to reduce California’s energy consumption.
The standards are updated periodically to allow consideration and possible incorporation of new energy efficient technologies and methods. CCR, Title 24, Part 11: California Green Building Standards Code (CALGreen) is a comprehensive and uniform regulatory code for all residential, commercial, and school buildings that went in effect on August 1, 2009, and is administered by the California Building Standards Commission.
CALGreen is updated on a regular basis, with the most recent approved update consisting of the 2025 California Green Building Code Standards that went into effect on January 1, 2026. The Project would be required to comply with the applicable standards in place at the time plan check submittals are made.The Project would be required to comply with the applicable standards in place at the time plan check submittals are made.
SCAQMD
SCAQMD is the agency responsible for air quality planning and regulation in the SCAB. The SCAQMD addresses the impacts to climate change of projects subject to SCAQMD permit as a lead agency if they are the only agency having discretionary approval for the project and acts as a responsible agency when a land use agency must also approve discretionary permits for the project. The SCAQMD acts as an expert commenting agency for impacts to air quality. This expertise carries over to GHG emissions, so the agency helps local land use agencies through the development of models and emission thresholds that can be used to address GHG emissions.
In 2008, SCAQMD formed a Working Group to identify GHG emissions thresholds for land use projects that could be used by local lead agencies in the SCAB. The Working Group developed several different options that are contained in the SCAQMD Draft Guidance Document – Interim CEQA GHG Significance Threshold, that could be applied by lead agencies. The working group has not provided additional guidance since the release of the interim guidance in 2008. The SCAQMD Board has not approved the thresholds; however, the Guidance Document provides substantial evidence supporting the approaches to significance of GHG emissions that can be considered by the lead agency in adopting its own threshold. The current interim thresholds consist of the following tiered approach:
• Tier 1 consists of evaluating whether or not the project qualifies for any applicable exemption under CEQA.
433
17033-02 AQ & GHG Assessment 25 Mid Valley Channel Improvement • Tier 2 consists of determining whether the project is consistent with a GHG reduction plan. If a project is consistent with a qualifying local GHG reduction plan, it does not have significant GHG emissions.
• Tier 3 consists of screening values, which the lead agency can choose, but must be consistent with all projects within its jurisdiction. A project’s construction emissions are averaged over 30 years and are added to the project’s operational emissions. If a project’s emissions are below one of the following screening thresholds, then the project is less than significant:
o Residential and commercial land use: 3,000 metric ton of CO2 equivalent (MTCO2e/yr) o Industrial land use: 10,000 MTCO2e/yr
o Based on land use type: residential: 3,500 MTCO2e/yr; commercial: 1,400 MTCO2e/yr; or mixed use: 3,000 MTCO2e/yr
• Tier 4 has the following options:
o Option 1: Reduce Business-as-Usual (BAU) emissions by a certain percentage; this percentage is currently undefined.
o Option 2: Early implementation of applicable AB 32 Scoping Plan measures o Option 3: 2020 target for service populations (SP), which includes residents and employees: 4.8 MTCO2e per SP per year for projects and 6.6 MTCO2e per SP per year for plans;
o Option 3, 2035 target: 3.0 MTCO2e per SP per year for projects and 4.1 MTCO2e per SP per year for plans
• Tier 5 involves mitigation offsets to achieve target significance threshold.
The SCAQMD’s interim thresholds used the Executive Order S-3-05-year 2050 goal as the basis for the Tier 3 screening level. Achieving the Executive Order’s objective would contribute to worldwide efforts to cap CO2 concentrations at 450 ppm, thus stabilizing global climate.
SCAQMD only has authority over GHG emissions from development projects that include air quality permits. At this time, it is unknown if the project would include stationary sources of emissions subject to SCAQMD permits. Notwithstanding, if the Project requires a stationary permit, it would be subject to the applicable SCAQMD regulations.
SCAQMD Regulation XXVII, adopted in 2009 includes the following rules:
• Rule 2700 defines terms and post global warming potentials. • Rule 2701, Southern California (SoCal) Climate Solutions Exchange, establishes a voluntary program to encourage, quantify, and certify voluntary, high quality certified GHG emission reductions in the SCAQMD.
• Rule 2702, GHG Reduction Program created a program to produce GHG emission reductions within the SCAQMD. The SCAQMD will fund projects through contracts in response to requests for proposals or purchase reductions from other parties.
City of Palm Desert Comprehensive Climate Action Plan
In 2024, the Coachella Valley Association of Governments (CVAG) began preparation of a regional Comprehensive Climate Action Plan (CCAP), for which the City of Palm Desert would be a beneficiary. The CCAP is anticipated to provide participating jurisdictions, including the City of Palm Desert, with an updated GHG inventory and regional climate action plan. Although completion of 434
17033-02 AQ & GHG Assessment 26 Mid Valley Channel Improvement the CCAP was anticipated in the second quarter of 2025, the plan had not been publicly released or formally adopted as of 2026 (26).
PROJECT GHG IMPACTS
STANDARDS OF SIGNIFICANCE
According to the CEQA Guidelines Appendix G thresholds, to determine whether impacts from GHG emissions are significant. Would the project:
• Threshold 1: Generate GHG emissions, either directly or indirectly, that may have a significant impact on the environment?
• Threshold 2: Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of GHGs?
The evaluation of an impact under CEQA requires measuring data from a project against both existing conditions and a “threshold of significance.” For establishing significance thresholds, the Office of Planning and Research’s amendments to the CEQA Guidelines Section 15064.7(c) state “[w]hen adopting thresholds of significance, a lead agency may consider thresholds of significance previously adopted or recommended by other public agencies, or recommended by experts, provided the decision of the lead agency to adopt such thresholds is supported by substantial evidence.”
CEQA Guidelines Section 15064.4(a) further states, “. . . A lead agency shall have discretion to determine, in the context of a particular project, whether to: (1) Use a model or methodology to quantify greenhouse gas emissions resulting from a project, and which model or methodology to use . . .; or (2) Rely on a qualitative analysis or performance-based standards.” CEQA Guidelines Section 15064.4 provides that a lead agency should consider the following factors, among others, in assessing the significance of impacts from GHG emissions:
• Consideration #1: The extent to which the project may increase or reduce GHG emissions as compared to the existing environmental setting.
• Consideration #2: Whether the project emissions exceed a threshold of significance that the lead agency determines applies to the project.
• Consideration #3: The extent to which the project complies with regulations or requirements adopted to implement a statewide, regional, or local plan for the reduction or mitigation of GHG emissions. Such regulations or requirements must be adopted by the relevant public agency through a public review process and must reduce or mitigate the project’s incremental contribution of GHG emissions. In determining the significance of impacts, the lead agency may consider a project’s consistency with the State’s long-term climate goals or strategies, provided that substantial evidence supports the agency’s analysis of how those goals or strategies address the project’s incremental contribution to climate change and its conclusion that the project’s incremental contribution is not cumulatively considerable.
DISCUSSION ON ESTABLISHMENT OF SIGNIFICANCE THRESHOLDS
Based on the foregoing guidance, the City of Palm Desert has elected to rely on compliance with a local air district threshold in the determination of significance of Project-related GHG emissions.
Specifically, the City has selected the interim 3,000 MTCO2e per year threshold recommended by 435
17033-02 AQ & GHG Assessment 27 Mid Valley Channel Improvement SCAQMD staff for residential and commercial sector projects against which to compare Project-related GHG emissions.
The 3,000 MTCO2e per year threshold is based on a 90 percent emission “capture” rate methodology.
Prior to its use by the SCAQMD, the 90 percent emissions capture approach was one of the options suggested by the California Air Pollution Control Officers Association (CAPCOA) in their CEQA & Climate Change white paper (2008). A 90 percent emission capture rate means that unmitigated GHG emissions from the top 90 percent of all GHG-producing projects within a geographic area – the SSAB in this instance – would be subject to a detailed analysis of potential environmental impacts from GHG emissions, while the bottom 10 percent of all GHG-producing projects would be excluded from detailed analysis. A GHG significance threshold based on a 90 percent emission capture rate is appropriate to address the long-term adverse impacts associated with global climate change because medium and large projects will be required to implement measures to reduce GHG emissions, while small projects, which are generally infill development projects that are not the focus of the State’s GHG reduction targets, are allowed to proceed. Further, a 90 percent emission capture rate sets the emission threshold low enough to capture a substantial proportion of future development projects and demonstrate that cumulative emissions reductions are being achieved while setting the emission threshold high enough to exclude small projects that will, in aggregate, contribute approximate 1 percent of projected statewide GHG emissions in the Year 2050 (27).
In setting the threshold at 3,000 MTCO2e per year, SCAQMD researched a database of projects kept by the Governor’s Office of Planning and Research (OPR). That database contained 798 projects, 87 of which were removed because they were very large projects and/or outliers that would skew emissions values too high, leaving 711 as the sample population to use in determining the 90th percentile capture rate. The SCAQMD analysis of the 711 projects within the sample population combined commercial, residential, and mixed-use projects. Emissions from each of these projects were calculated by SCAQMD to provide a consistent method of emissions calculations across the sample population and from projects within the sample population. In calculating the emissions, the SCAQMD analysis determined that the 90th percentile ranged between 2,983 to 3,143 MTCO2e per year. The SCAQMD set their significance threshold at the low-end value of the range when rounded to the nearest hundred tons of emissions (i.e., 3,000 MTCO2e per year) to define small projects that are considered less than significant and do not need to provide further analysis.
The City understands that the 3,000 MTCO2e per year threshold for residential/commercial uses was proposed by SCAQMD a decade ago and was adopted as an interim policy; however, no permanent, superseding policy or threshold has since been adopted. The 3,000 MTCO2e per year threshold was developed and recommended by SCAQMD, an expert agency, based on substantial evidence as provided in the Draft Guidance Document – Interim CEQA Greenhouse Gas Significance Threshold (2008) document and subsequent Working Group meetings (latest of which occurred in 2010).
SCAQMD has not withdrawn its support of the interim threshold and all documentation supporting the interim threshold remains on the SCAQMD website on a page that provides guidance to CEQA practitioners for air quality analysis (and where all SCAQMD significance thresholds for regional and local criteria pollutants and toxic air contaminants also are listed). Further, as stated by SCAQMD, this threshold “uses the Executive Order S-3-05 goal [80 percent below 1990 levels by 2050] as the basis for deriving the screening level” and, thus, remains valid for use in 2022 (27). Lastly, this threshold has been used for hundreds, if not thousands of GHG analyses performed for projects located within the SCAQMD jurisdiction.
436
17033-02 AQ & GHG Assessment 28 Mid Valley Channel Improvement Thus, for purposes of analysis in this analysis, if Project-related GHG emissions do not exceed the 3,000 MTCO2e per year threshold, then Project-related GHG emissions would clearly have a less-than-significant impact pursuant to Threshold GHG-1. On the other hand, if Project-related GHG emissions exceed 3,000 MTCO2e per year, the Project would be considered a substantial source of GHG emissions.
GHG IMPACTS
The estimated GHG emissions for Project are summarized in Table 15. The estimated GHG emissions include emissions from Carbon Dioxide (CO2), Methane (CH4), Nitrous Oxide (N2O), and Refrigerants (R). As shown in Table 15, the Project would generate a total of approximately 8.08 MTCO2e/yr.
Detailed construction model outputs are presented in Appendices 1 and 2.
TABLE 15: TOTAL PROJECT GHGEMISSIONS
Source Total CO2E
Annual Construction Emissions Amortized Over
30 Years 8.08
Total 8.08
Screening Threshold 3,000
Threshold Exceeded? NO
Notes:
CalEEMod construction-source (unmitigated) emissions are presented in Appendices 3.1 and 3.2.
A numericalthreshold for determining the significance of GHG emissions in the SSAB has not been established by the SCAQMD for projects where it is not the lead agency. As an interim threshold based on guidance provided in the CAPCOA CEQA and Climate Change handbook, the City has opted to use a non-zero threshold approach based on Approach 2 of the handbook. Threshold
2.5 (Unit-Based Thresholds Based on Market Capture) establishes a numerical threshold based on capture of approximately 90% of emissions from future development. The latest threshold developed by SCAQMD using this method is 3,000 MTCO2e/yr for all projects (28).
The Project would result in approximately 8.08 MTCO2e/yr; the proposed Project would not exceed the SCAQMD screening threshold of 3,000 MTCO2e/yr. Thus, the Project would result in a less than significant impact with respect to GHG emissions.
CONCLUSION
In summary, the results of the assessment indicate that the Project would result in a less than significant with respect to air quality and GHGs. If you have any questions, please contact me directly at [email protected].
437
17033-02 AQ & GHG Assessment 29 Mid Valley Channel Improvement
REFERENCES
1. United States Environmental Protection Agency. National Ambient Air Quality Standards (NAAQS). [Online] 1990. https://www.epa.gov/environmental-topics/air-topics.
2. Environmental Protection Agency. Air Pollution and the Clean Air Act. [Online] http://www.epa.gov/air/caa/.
3. 1990 Clean Air Act Amendment Summary: Title I. [Online] https://www.epa.gov/clean-air-act-overview/1990-clean-air-act-amendment-summary-title-i.
4. United States Environmental Protection Agency. 1990 Clean Air Act Amendment Summary:
Title II. [Online] https://www.epa.gov/clean-air-act-overview/1990-clean-air-act-amendment-summary-title-ii.
5. Air Resources Board. California Ambient Air Quality Standards (CAAQS). [Online] 2009. [Cited: April 16, 2018.] http://www.arb.ca.gov/research/aaqs/caaqs/caaqs.htm.
6. Environmental Protection Agency. National Ambient Air Quality Standards (NAAQS). [Online] 1990. https://www.epa.gov/environmental-topics/air-topics.
7. Southern California Association of Governments. 2016-2040 Regional Transportation Plan/Sustainable Communities Strategy. [Online] April 2016. https://scag.ca.gov/sites/main/files/file-attachments/f2016rtpscs.pdf?1606005557.
8. South Coast Air Quality Management District. RULE 403. FUGITIVE DUST. [Online] https://www.aqmd.gov/docs/default-source/rule-book/rule-iv/rule-403.pdf?sfvrsn=4.
9. —. Rule 403. Fugitive Dust. [Online] https://www.aqmd.gov/docs/default-source/rule-book/rule-iv/rule-403.pdf?sfvrsn=88df1d61_4.
10. California Air Pollution Control Officers Association (CAPCOA). California Emissions Estimator Model (CalEEMod). [Online] May 2022. www.caleemod.com.
11. State of California. 2020 CEQA California Environmental Quality Act. 2020.
12. South Coast Air Quality Management District. SCAQMD Air Quality Significance Thresholds. [Online] https://www.aqmd.gov/docs/default-source/ceqa/handbook/south-coast-aqmd-air-quality-significance-thresholds.pdf.
13. California Air Pollution Control Officers Association (CAPCOA). Appendix C: Emission Calculation Details for CalEEMod. CalEEMod. [Online]
https://caleemod.com/documents/user-guide/04_Appendix%20C.pdf.
14. State of California. 2020 CEQA California Environmental Quality Act. 2020.
15. South Coast Air Quality Management District. Localized Significance Thresholds Methodology. s.l. : South Coast Air Quality Managment District, 2003.
16. —. Final 2016 Air Quality Management Plan (AQMP). [Online] March 2017. http://www.aqmd.gov/docs/default-source/clean-air-plans/air-quality-management-plans/2016-air-quality-management-plan/final-2016- aqmp/final2016aqmp.pdf?sfvrsn=11.
438
17033-02 AQ & GHG Assessment 30 Mid Valley Channel Improvement
17. Southern California Association of Governments. 2020-2045 Regional Transportation Plan/Sustainable Communities Strategy. [Online] September 2020. https://scag.ca.gov/sites/main/files/file-attachments/0903fconnectsocal-plan_0.pdf?1606001176.
18. South Coast Air Quality Management District. CEQA Air Quality Handbook (1993). 1993.
19. Goss, Tracy A and Kroeger, Amy. White Paper on Potential Control Strategies to Address Cumulative Impacts from Air Pollution. [Online] South Coast Air Quality Management District, 2003. http://www.aqmd.gov/rules/ciwg/final_white_paper.pdf.
20. South Coast Air Quality Management District. RULE 402 NUISANCE. [Online] http://www.aqmd.gov/docs/default-source/rule-book/rule-iv/rule-402.pdf.
21. California Air Resources Board. GHG 1990 Emissions Level & 2020 Limit. California Air Resources Board. [Online] https://ww2.arb.ca.gov/ghg-2020-limit.
22. —. Climate Change Draft Scoping Plan. 2008.
23. —. STATUS OF SCOPING PLAN RECOMMENDED MEASURES. [Online] [Cited: September 19, 2019.]
https://ww3.arb.ca.gov/cc/scopingplan/status_of_scoping_plan_measures.pdf.
24. —. First Update to the Climate Change Scoping Plan. 2014.
25. California Legislative Information. Senate Bill No. 32. [Online] September 8, 2016. https://leginfo.legislature.ca.gov/faces/billNavClient.xhtml?bill_id=201520160SB32.
26. City of Palm Desert. Environmental Initiatives Plan. [Online] https://www.engagepalmdesert.com/environmental-initiatives.
27. South Coast Air Quality Management District. Interim CEQA GHG Significnace Threshold for Stationary Sources, Rules and Plans. Diamond Bar : s.n., 2008.
28. —. Interim CEQA GHG Threshold for Stationary Sources, Rules and Plans. [Online] December 5, 2008. http://www.aqmd.gov/docs/default-source/ceqa/handbook/greenhouse-gases-(ghg)-ceqa-significance-thresholds/ghgboardsynopsis.pdf. 439
17033-02 AQ & GHG Assessment 31 Mid Valley Channel Improvement APPENDIX 1:
CALEEMOD PHASE 1 EMISSIONS MODEL OUTPUTS
440
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 1 / 35
17033 - Mid Valley Channel (Phase 1) Detailed Report
Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds
2.2. Construction Emissions by Year
2.2.1. Total Construction Emissions by Year, Unmitigated
2.2.2. Onsite Construction Emissions by Year, Unmitigated
2.2.3. Offsite Construction Emissions by Year, Unmitigated
3. Construction Emissions Details
3.1. Linear, Grubbing & Land Clearing (2026)
3.1.1. Onsite - Unmitigated
3.1.2. Offsite - Unmitigated
3.2. Linear, Grading & Excavation (2026)
441
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 2 / 35
3.2.1. Onsite - Unmitigated
3.2.2. Offsite - Unmitigated
3.3. Linear, Drainage, Utilities, & Sub-Grade (2026)
3.3.1. Onsite - Unmitigated
3.3.2. Offsite - Unmitigated
3.4. Linear, Drainage, Utilities, & Sub-Grade (2027)
3.4.1. Onsite - Unmitigated
3.4.2. Offsite - Unmitigated
3.5. Linear, Paving (2027)
3.5.1. Onsite - Unmitigated
3.5.2. Offsite - Unmitigated
3.6. Demolition (2026)
3.6.1. Onsite - Unmitigated
3.6.2. Offsite - Unmitigated
4. Operations Emissions Details
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated 442
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 3 / 35
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
5. Activity Data
5.1. Construction Schedule
5.2. Off-Road Equipment
5.2.1. Unmitigated
5.3. Construction Vehicles
5.3.1. Unmitigated
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
5.6.2. Construction Earthmoving Control Strategies
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
443
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 4 / 35
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
6.2. Initial Climate Risk Scores
6.3. Adjusted Climate Risk Scores
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
7.2. Healthy Places Index Scores
7.3. Overall Health & Equity Scores
7.4. Health & Equity Measures
7.5. Evaluation Scorecard
7.6. Health & Equity Custom Measures
8. User Changes to Default Data
8.1. Justifications
444
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 5 / 35
8.4. Construction
8.4.1. Construction Phases
8.4.2. Off-Road Equipment
445
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 6 / 35
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name 17033 - Mid Valley Channel (Phase 1)
Construction Start Date 11/2/2026
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 3.30000
Precipitation (days) 0.80000
Location 33.781071, -116.348197
County Riverside-Salton Sea
City Palm Desert
Air District South Coast AQMD
Air Basin Salton Sea
TAZ 5671
EDFZ 19
Electric Utility Imperial Irrigation District
Gas Utility Southern California Gas
App Version 2022.1.1.43
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Road Widening 0.70000 Mile 4.54000 0.00000 0.00000 — — Mid Valley Channel Other Asphalt
Surfaces
0.05000 Acre 0.05000 0.00000 0.00000 — — Concrete Weirs 446
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 7 / 35
1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 2.55166 2.14683 22.8343 17.6404 0.08852 0.72030 3.74458 4.46488 0.67374 1.39384 2.06758 — 11,440.6 11,440.6 0.24486 1.13521 0.38921 11,785.4 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.26244 0.21861 2.03713 1.81172 0.00656 0.07194 0.27093 0.34287 0.06674 0.10810 0.17485 — 810.243 810.243 0.02158 0.05920 0.33931 828.763 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.04790 0.03990 0.37178 0.33064 0.00120 0.01313 0.04944 0.06257 0.01218 0.01973 0.03191 — 134.145 134.145 0.00357 0.00980 0.05618 137.211
2.2. Construction Emissions by Year
2.2.1. Total Construction Emissions by Year, Unmitigated Includes both onsite and offsite emissions.
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
447
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 8 / 35
2026 2.55166 2.14683 22.8343 17.6404 0.08852 0.72030 3.74458 4.46488 0.67374 1.39384 2.06758 — 11,440.6 11,440.6 0.24486 1.13521 0.38921 11,785.4 2027 2.27137 1.91012 13.9049 15.1972 0.04406 0.55274 1.83432 2.38706 0.50852 0.90618 1.41471 — 4,958.25 4,958.25 0.19560 0.04680 0.01909 4,977.10 Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.26244 0.21861 2.03713 1.81172 0.00656 0.07194 0.27093 0.34287 0.06674 0.10810 0.17485 — 810.243 810.243 0.02158 0.05920 0.33931 828.763 2027 0.06929 0.05830 0.39008 0.48546 0.00135 0.01458 0.03247 0.04706 0.01342 0.01507 0.02849 — 151.648 151.648 0.00599 0.00139 0.00806 152.221 Annual — — — — — — — — — — — — — — — — — —
2026 0.04790 0.03990 0.37178 0.33064 0.00120 0.01313 0.04944 0.06257 0.01218 0.01973 0.03191 — 134.145 134.145 0.00357 0.00980 0.05618 137.211 2027 0.01264 0.01064 0.07119 0.08860 0.00025 0.00266 0.00593 0.00859 0.00245 0.00275 0.00520 — 25.1070 25.1070 0.00099 0.00023 0.00133 25.2019
2.2.2. Onsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
2026 2.48800 2.09061 16.0488 16.8873 0.04249 0.62959 1.72000 2.33320 0.57922 0.87803 1.45477 — 4,601.19 4,601.19 0.18664 0.03733 0.00000 4,616.98 2027 2.23069 1.87440 13.8575 14.7296 0.04406 0.55274 1.70361 2.25635 0.50852 0.87555 1.38407 — 4,745.86 4,745.86 0.19251 0.03850 0.00000 4,762.15 Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.24628 0.20686 1.62232 1.64623 0.00412 0.06499 0.16039 0.22539 0.05979 0.08012 0.13992 — 444.010 444.010 0.01801 0.00360 0.00000 445.534 2027 0.06740 0.05663 0.38817 0.45943 0.00135 0.01458 0.02667 0.04126 0.01342 0.01371 0.02712 — 145.887 145.887 0.00592 0.00118 0.00000 146.387 Annual — — — — — — — — — — — — — — — — — —
2026 0.04495 0.03775 0.29607 0.30044 0.00075 0.01186 0.02927 0.04113 0.01091 0.01462 0.02554 — 73.5109 73.5109 0.00298 0.00060 0.00000 73.7632 2027 0.01230 0.01033 0.07084 0.08385 0.00025 0.00266 0.00487 0.00753 0.00245 0.00250 0.00495 — 24.1532 24.1532 0.00098 0.00020 0.00000 24.2361
2.2.3. Offsite Construction Emissions by Year, Unmitigated 448
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 9 / 35
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
2026 0.25061 0.17174 8.36057 2.34905 0.04847 0.13824 2.02458 2.16282 0.13824 0.51581 0.65405 — 7,104.45 7,104.45 0.06896 1.10004 0.38921 7,434.38 2027 0.07118 0.06250 0.08295 0.81830 0.00000 0.00000 0.22874 0.22874 0.00000 0.05362 0.05362 — 212.383 212.383 0.00309 0.00829 0.01909 214.952 Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.01616 0.01174 0.41481 0.16549 0.00244 0.00695 0.11053 0.11748 0.00695 0.02798 0.03493 — 366.233 366.233 0.00357 0.05559 0.33931 383.229 2027 0.00189 0.00167 0.00190 0.02603 0.00000 0.00000 0.00580 0.00580 0.00000 0.00136 0.00136 — 5.76108 5.76108 0.00007 0.00021 0.00806 5.83360 Annual — — — — — — — — — — — — — — — — — —
2026 0.00295 0.00214 0.07570 0.03020 0.00044 0.00127 0.02017 0.02144 0.00127 0.00511 0.00637 — 60.6341 60.6341 0.00059 0.00920 0.05618 63.4480 2027 0.00034 0.00031 0.00035 0.00475 0.00000 0.00000 0.00106 0.00106 0.00000 0.00025 0.00025 — 0.95381 0.95381 0.00001 0.00003 0.00133 0.96582
3. Construction Emissions Details
3.1. Linear, Grubbing & Land Clearing (2026)
3.1.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
449
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 10 / 35
Off-Roa 2.48800 2.09061 16.0488 16.8873 0.04249 0.62959 — 0.62959 0.57922 — 0.57922 — 4,601.19 4,601.19 0.18664 0.03733 — 4,616.98 d
Dust
From
Material
Movement
— — — — — — 1.70361 1.70361 — 0.87555 0.87555 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.03408 0.02864 0.21985 0.23133 0.00058 0.00862 — 0.00862 0.00793 — 0.00793 — 63.0300 63.0300 0.00256 0.00051 — 63.2463 Dust
From
Material
Movement
— — — — — — 0.02334 0.02334 — 0.01199 0.01199 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.00622 0.00523 0.04012 0.04222 0.00011 0.00157 — 0.00157 0.00145 — 0.00145 — 10.4353 10.4353 0.00042 0.00008 — 10.4711 Dust
From
Material
Movement
— — — — — — 0.00426 0.00426 — 0.00219 0.00219 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.1.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e 450
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 11 / 35
Daily, — — — — — — — — — — — — — — — — — —
Summer
(Max)
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.06366 0.05622 0.07788 0.75315 0.00000 0.00000 0.19606 0.19606 0.00000 0.04596 0.04596 — 185.646 185.646 0.00298 0.00744 0.01811 187.955 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00091 0.00081 0.00097 0.01290 0.00000 0.00000 0.00268 0.00268 0.00000 0.00063 0.00063 — 2.71807 2.71807 0.00004 0.00010 0.00412 2.75213 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00017 0.00015 0.00018 0.00235 0.00000 0.00000 0.00049 0.00049 0.00000 0.00011 0.00011 — 0.45001 0.45001 0.00001 0.00002 0.00068 0.45565 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.2. Linear, Grading & Excavation (2026)
3.2.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
451
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 12 / 35
Off-Roa 2.26187 1.90060 14.4737 14.9048 0.04004 0.58206 — 0.58206 0.53550 — 0.53550 — 4,336.17 4,336.17 0.17589 0.03518 — 4,351.05 d
Equipm
Dust
From
Material
Movement
— — — — — — 1.72000 1.72000 — 0.87803 0.87803 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.11154 0.09373 0.71377 0.73503 0.00197 0.02870 — 0.02870 0.02641 — 0.02641 — 213.838 213.838 0.00867 0.00173 — 214.572 Dust
From
Material
Movement
— — — — — — 0.08482 0.08482 — 0.04330 0.04330 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.02036 0.01711 0.13026 0.13414 0.00036 0.00524 — 0.00524 0.00482 — 0.00482 — 35.4034 35.4034 0.00144 0.00029 — 35.5249 Dust
From
Material
Movement
— — — — — — 0.01548 0.01548 — 0.00790 0.00790 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.2.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e 452 17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 13 / 35
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.04244 0.03748 0.05192 0.50210 0.00000 0.00000 0.13071 0.13071 0.00000 0.03064 0.03064 — 123.764 123.764 0.00198 0.00496 0.01207 125.304 Vendor 0.00149 0.00107 0.03443 0.01436 0.00025 0.00045 0.00856 0.00901 0.00045 0.00236 0.00281 — 31.1028 31.1028 0.00038 0.00425 0.00211 32.3798 Hauling 0.20668 0.13320 8.27422 1.83259 0.04823 0.13779 1.88532 2.02311 0.13779 0.48281 0.62060 — 6,949.59 6,949.59 0.06660 1.09083 0.37503 7,276.69 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00219 0.00195 0.00234 0.03096 0.00000 0.00000 0.00644 0.00644 0.00000 0.00151 0.00151 — 6.52338 6.52338 0.00009 0.00023 0.00989 6.60510 Vendor 0.00008 0.00005 0.00166 0.00069 0.00001 0.00002 0.00042 0.00044 0.00002 0.00012 0.00014 — 1.53294 1.53294 0.00002 0.00021 0.00173 1.59753 Hauling 0.01065 0.00691 0.39989 0.08913 0.00238 0.00680 0.09294 0.09973 0.00680 0.02380 0.03060 — 342.540 342.540 0.00328 0.05379 0.30803 358.961 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00040 0.00036 0.00043 0.00565 0.00000 0.00000 0.00118 0.00118 0.00000 0.00028 0.00028 — 1.08002 1.08002 0.00001 0.00004 0.00164 1.09355 Vendor 0.00001 0.00001 0.00030 0.00013 <
0.000005
<
0.000005
0.00008 0.00008 <
0.000005
0.00002 0.00003 — 0.25380 0.25380 <
0.000005
0.00003 0.00029 0.26449
Hauling 0.00194 0.00126 0.07298 0.01627 0.00043 0.00124 0.01696 0.01820 0.00124 0.00434 0.00558 — 56.7114 56.7114 0.00054 0.00891 0.05100 59.4301
3.3. Linear, Drainage, Utilities, & Sub-Grade (2026)
3.3.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
453
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 14 / 35
Off-Roa 2.26187 1.90060 14.4737 14.9048 0.04004 0.58206 — 0.58206 0.53550 — 0.53550 — 4,336.17 4,336.17 0.17589 0.03518 — 4,351.05 d
Dust
From
Material
Movement
— — — — — — 1.70361 1.70361 — 0.87555 0.87555 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.06197 0.05207 0.39654 0.40835 0.00110 0.01595 — 0.01595 0.01467 — 0.01467 — 118.799 118.799 0.00482 0.00096 — 119.207 Dust
From
Material
Movement
— — — — — — 0.04667 0.04667 — 0.02399 0.02399 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.01131 0.00950 0.07237 0.07452 0.00020 0.00291 — 0.00291 0.00268 — 0.00268 — 19.6686 19.6686 0.00080 0.00016 — 19.7361 Dust
From
Material
Movement
— — — — — — 0.00852 0.00852 — 0.00438 0.00438 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.3.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e 454
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 15 / 35
Daily, — — — — — — — — — — — — — — — — — —
Summer
(Max)
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.04244 0.03748 0.05192 0.50210 0.00000 0.00000 0.13071 0.13071 0.00000 0.03064 0.03064 — 123.764 123.764 0.00198 0.00496 0.01207 125.304 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00122 0.00108 0.00130 0.01720 0.00000 0.00000 0.00358 0.00358 0.00000 0.00084 0.00084 — 3.62410 3.62410 0.00005 0.00013 0.00550 3.66950 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00022 0.00020 0.00024 0.00314 0.00000 0.00000 0.00065 0.00065 0.00000 0.00015 0.00015 — 0.60001 0.60001 0.00001 0.00002 0.00091 0.60753 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.4. Linear, Drainage, Utilities, & Sub-Grade (2027)
3.4.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
455
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 16 / 35
Off-Roa 2.23069 1.87440 13.8575 14.7296 0.04004 0.55274 — 0.55274 0.50852 — 0.50852 — 4,335.35 4,335.35 0.17586 0.03517 — 4,350.22 d
Equipm
Dust
From
Material
Movement
— — — — — — 1.70361 1.70361 — 0.87555 0.87555 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.03492 0.02934 0.21695 0.23060 0.00063 0.00865 — 0.00865 0.00796 — 0.00796 — 67.8724 67.8724 0.00275 0.00055 — 68.1053 Dust
From
Material
Movement
— — — — — — 0.02667 0.02667 — 0.01371 0.01371 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.00637 0.00536 0.03959 0.04208 0.00011 0.00158 — 0.00158 0.00145 — 0.00145 — 11.2370 11.2370 0.00046 0.00009 — 11.2756 Dust
From
Material
Movement
— — — — — — 0.00487 0.00487 — 0.00250 0.00250 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.4.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e 456 17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 17 / 35
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.04068 0.03571 0.04740 0.46760 0.00000 0.00000 0.13071 0.13071 0.00000 0.03064 0.03064 — 121.362 121.362 0.00176 0.00474 0.01091 122.829 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00066 0.00059 0.00067 0.00917 0.00000 0.00000 0.00205 0.00205 0.00000 0.00048 0.00048 — 2.03034 2.03034 0.00002 0.00007 0.00284 2.05589 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00012 0.00011 0.00012 0.00167 0.00000 0.00000 0.00037 0.00037 0.00000 0.00009 0.00009 — 0.33615 0.33615 <
0.000005
0.00001 0.00047 0.34038
Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.5. Linear, Paving (2027)
3.5.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
457
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 18 / 35
Off-Roa 1.97584 1.65970 10.4163 13.9203 0.04406 0.36080 — 0.36080 0.33194 — 0.33194 — 4,745.86 4,745.86 0.19251 0.03850 — 4,762.15 d
Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.03248 0.02728 0.17123 0.22883 0.00072 0.00593 — 0.00593 0.00546 — 0.00546 — 78.0142 78.0142 0.00316 0.00063 — 78.2819 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.00593 0.00498 0.03125 0.04176 0.00013 0.00108 — 0.00108 0.00100 — 0.00100 — 12.9161 12.9161 0.00052 0.00010 — 12.9605 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.5.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.07118 0.06250 0.08295 0.81830 0.00000 0.00000 0.22874 0.22874 0.00000 0.05362 0.05362 — 212.383 212.383 0.00309 0.00829 0.01909 214.952 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
458
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 19 / 35
Worker 0.00122 0.00108 0.00123 0.01686 0.00000 0.00000 0.00376 0.00376 0.00000 0.00088 0.00088 — 3.73075 3.73075 0.00004 0.00014 0.00522 3.77771 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00022 0.00020 0.00023 0.00308 0.00000 0.00000 0.00069 0.00069 0.00000 0.00016 0.00016 — 0.61767 0.61767 0.00001 0.00002 0.00086 0.62544 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.6. Demolition (2026)
3.6.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.41206 1.18359 10.6639 9.91030 0.01719 0.42773 — 0.42773 0.39351 — 0.39351 — 1,764.49 1,764.49 0.07158 0.01432 — 1,770.55 Demoliti
on
— — — — — — 0.20295 0.20295 — 0.03073 0.03073 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.03869 0.03243 0.29216 0.27152 0.00047 0.01172 — 0.01172 0.01078 — 0.01078 — 48.3423 48.3423 0.00196 0.00039 — 48.5082 459
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 20 / 35
Demoliti — — — — — — 0.00556 0.00556 — 0.00084 0.00084 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.00706 0.00592 0.05332 0.04955 0.00009 0.00214 — 0.00214 0.00197 — 0.00197 — 8.00362 8.00362 0.00032 0.00006 — 8.03109 Demoliti
on
— — — — — — 0.00101 0.00101 — 0.00015 0.00015 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.6.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.03183 0.02811 0.03894 0.37658 0.00000 0.00000 0.09803 0.09803 0.00000 0.02298 0.02298 — 92.8228 92.8228 0.00149 0.00372 0.00905 93.9777 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00714 0.00460 0.28596 0.06333 0.00167 0.00476 0.06516 0.06992 0.00476 0.01669 0.02145 — 240.178 240.178 0.00230 0.03770 0.01296 251.483 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00091 0.00081 0.00097 0.01290 0.00000 0.00000 0.00268 0.00268 0.00000 0.00063 0.00063 — 2.71807 2.71807 0.00004 0.00010 0.00412 2.75213 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00020 0.00013 0.00768 0.00171 0.00005 0.00013 0.00178 0.00191 0.00013 0.00046 0.00059 — 6.57677 6.57677 0.00006 0.00103 0.00591 6.89205 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00017 0.00015 0.00018 0.00235 0.00000 0.00000 0.00049 0.00049 0.00000 0.00011 0.00011 — 0.45001 0.45001 0.00001 0.00002 0.00068 0.45565 460
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 21 / 35
Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00004 0.00002 0.00140 0.00031 0.00001 0.00002 0.00033 0.00035 0.00002 0.00008 0.00011 — 1.08886 1.08886 0.00001 0.00017 0.00098 1.14106
4. Operations Emissions Details
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
461
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 22 / 35
Daily, — — — — — — — — — — — — — — — — — —
Winter
(Max)
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
462
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 23 / 35
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
5. Activity Data
5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Linear, Grubbing & Land
Clearing
Linear, Grubbing & Land
Clearing
11/2/2026 11/9/2026 5.00000 5.00000 —
Linear, Grading &
Excavation
Linear, Grading &
Excavation
11/24/2026 12/17/2026 5.00000 18.0000 —
Linear, Drainage, Utilities,
& Sub-Grade
Linear, Drainage, Utilities,
& Sub-Grade
12/18/2026 1/8/2027 5.00000 16.0000 —
Linear, Paving Linear, Paving 1/9/2027 1/18/2027 5.00000 6.00000 — Demolition Demolition 11/10/2026 11/23/2026 5.00000 10.00000 —
5.2. Off-Road Equipment
5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor 463 17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 24 / 35
Linear, Grubbing &
Land Clearing
Off-Highway Trucks Diesel Average 2.00000 8.00000 376.000 0.38000 Linear, Grubbing &
Land Clearing
Rubber Tired Dozers Diesel Average 1.000000 8.00000 367.000 0.40000 Linear, Grubbing &
Land Clearing
Tractors/Loaders/Back
hoes
Diesel Average 1.000000 8.00000 84.0000 0.37000
Linear, Grubbing &
Land Clearing
Excavators Diesel Average 1.000000 8.00000 36.0000 0.38000 Linear, Grubbing &
Land Clearing
Other General
Industrial Equipment
Diesel Average 1.000000 8.00000 35.0000 0.34000
Linear, Grading &
Excavation
Off-Highway Trucks Diesel Average 2.00000 8.00000 376.000 0.38000 Linear, Grading &
Excavation
Rubber Tired Dozers Diesel Average 1.000000 8.00000 367.000 0.40000 Linear, Grading &
Excavation
Tractors/Loaders/Back
hoes
Diesel Average 1.000000 8.00000 84.0000 0.37000
Linear, Drainage,
Utilities, & Sub-Grade
Off-Highway Trucks Diesel Average 2.00000 8.00000 376.000 0.38000 Linear, Drainage,
Utilities, & Sub-Grade
Rubber Tired Dozers Diesel Average 1.000000 8.00000 367.000 0.40000 Linear, Drainage,
Utilities, & Sub-Grade
Tractors/Loaders/Back
hoes
Diesel Average 1.000000 8.00000 84.0000 0.37000
Linear, Paving Paving Equipment Diesel Average 1.000000 8.00000 89.0000 0.36000 Linear, Paving Other General
Industrial Equipment
Diesel Average 1.000000 8.00000 35.0000 0.34000
Linear, Paving Off-Highway Trucks Diesel Average 3.00000 8.00000 376.000 0.38000 Linear, Paving Tractors/Loaders/Back
hoes
Diesel Average 1.000000 8.00000 84.0000 0.37000
Linear, Paving Plate Compactors Diesel Average 1.000000 8.00000 8.00000 0.43000 Demolition Concrete/Industrial
Saws
Diesel Average 1.000000 8.00000 33.0000 0.73000
Demolition Excavators Diesel Average 1.000000 8.00000 36.0000 0.38000 Demolition Rubber Tired Dozers Diesel Average 1.000000 8.00000 367.000 0.40000 464
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 25 / 35
5.3. Construction Vehicles
5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Linear, Grubbing & Land Clearing Worker 15.0000 18.5000 LDA,LDT1,LDT2 Linear, Grubbing & Land Clearing Vendor 0.00000 10.2000 HHDT,MHDT Linear, Grubbing & Land Clearing Hauling 0.00000 20.0000 HHDT Linear, Grubbing & Land Clearing Onsite truck — — HHDT
Linear, Grading & Excavation Worker 10.00000 18.5000 LDA,LDT1,LDT2 Linear, Grading & Excavation Vendor 1.000000 10.2000 HHDT,MHDT Linear, Grading & Excavation Hauling 104.167 20.0000 HHDT Linear, Grading & Excavation Onsite truck — — HHDT
Linear, Drainage, Utilities, &
Sub-Grade
Worker 10.00000 18.5000 LDA,LDT1,LDT2
Linear, Drainage, Utilities, &
Sub-Grade
Vendor 0.00000 10.2000 HHDT,MHDT
Linear, Drainage, Utilities, &
Sub-Grade
Hauling 0.00000 20.0000 HHDT
Linear, Drainage, Utilities, &
Sub-Grade
Onsite truck — — HHDT
Linear, Paving Worker 17.5000 18.5000 LDA,LDT1,LDT2
Linear, Paving Vendor 0.00000 10.2000 HHDT,MHDT
Linear, Paving Hauling 0.00000 20.0000 HHDT
Linear, Paving Onsite truck — — HHDT
Demolition Worker 7.50000 18.5000 LDA,LDT1,LDT2
Demolition Vendor — 10.2000 HHDT,MHDT
Demolition Hauling 3.60000 20.0000 HHDT
Demolition Onsite truck — — HHDT
465
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 26 / 35
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
Phase Name Material Imported (cy) Material Exported (cy) Acres Graded (acres) Material Demolished (Building Square Footage)
Acres Paved (acres)
Linear, Grubbing & Land
Clearing
— — 4.54000 0.00000 0.00000
Linear, Grading & Excavation — 15,000.0 4.54000 0.00000 0.00000 Linear, Drainage, Utilities, &
Sub-Grade
— — 4.54000 0.00000 0.00000
Demolition 0.00000 0.00000 0.00000 3,111.00 0.00000
5.6.2. Construction Earthmoving Control Strategies
Control Strategies Applied Frequency (per day) PM10 Reduction PM2.5 Reduction Water Exposed Area 3 74% 74%
Water Demolished Area 2 36% 36%
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
2026 0.00000 456.543 0.03300 0.00400 466
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 27 / 35
2027 0.00000 456.543 0.03300 0.00400
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.
Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 25.5500 annual days of extreme heat Extreme Precipitation 0.00000 annual days with precipitation above 20 mm Sea Level Rise — meters of inundation depth
Wildfire 0.03000 annual hectares burned 467
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 28 / 35
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events. Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 1 0 0 N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
Drought 0 0 0 N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.
6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 1 1 1 2
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
468
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 29 / 35
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
Drought 1 1 1 2
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures.
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.
Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 91.0516
AQ-PM 7.11886
AQ-DPM 74.9596
Drinking Water 45.3603
Lead Risk Housing 1.56270
Pesticides 7.06897
Toxic Releases 2.70068
Traffic 85.0250
Effect Indicators —
CleanUp Sites 0.00000
Groundwater 0.00000 469
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 30 / 35
Haz Waste Facilities/Generators 53.5142
Impaired Water Bodies 0.00000
Solid Waste 0.00000
Sensitive Population —
Asthma 16.0269
Cardio-vascular 13.8210
Low Birth Weights 14.4855
Socioeconomic Factor Indicators —
Education 18.8054
Housing 39.6958
Linguistic 19.8674
Poverty 14.7864
Unemployment 22.5664
7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
Indicator Result for Project Census Tract
Economic —
Above Poverty 74.1947902
Employed 96.48402412
Median HI 54.63877839
Education —
Bachelor's or higher 80.77762094
High school enrollment 100
Preschool enrollment 79.5072501
Transportation —
Auto Access 35.49339151
Active commuting 6.531502631
470
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 31 / 35
Social—
2-parent households 21.21134351
Voting 60.73399204
Neighborhood—
Alcohol availability 97.0101373
Park access 6.954959579
Retail density 41.28063647
Supermarket access 22.53304247
Tree canopy 16.12986013
Housing—
Homeownership 50.21172847
Housing habitability 59.19414859
Low-inc homeowner severe housing cost burden 41.01116387 Low-inc renter severe housing cost burden 71.2947517
Uncrowded housing 83.16437829
Health Outcomes—
Insured adults 92.73707173
Arthritis 0.0
Asthma ER Admissions 94.5
High Blood Pressure 0.0
Cancer (excluding skin) 0.0
Asthma 0.0
Coronary Heart Disease 0.0
Chronic Obstructive Pulmonary Disease 0.0
Diagnosed Diabetes 0.0
Life Expectancy at Birth 73.9
Cognitively Disabled 60.3
Physically Disabled 71.5
471
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 32 / 35
Heart Attack ER Admissions 93.8
Mental Health Not Good 0.0
Chronic Kidney Disease 0.0
Obesity 0.0
Pedestrian Injuries 60.8
Physical Health Not Good 0.0
Stroke 0.0
Health Risk Behaviors—
Binge Drinking 0.0
Current Smoker 0.0
No Leisure Time for Physical Activity 0.0
Climate Change Exposures—
Wildfire Risk 0.0
SLR Inundation Area 0.0
Children 68.4
Elderly 8.7
English Speaking 88.0
Foreign-born 32.0
Outdoor Workers 71.7
Climate Change Adaptive Capacity—
Impervious Surface Cover 67.9
Traffic Density 64.1
Traffic Access 23.0
Other Indices—
Hardship 17.6
Other Decision Support—
2016 Voting 84.3
472
17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 33 / 35
7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 7.00000 Healthy Places Index Score for Project Location (b) 71.0000 Project Located in a Designated Disadvantaged Community (Senate Bill 535) No Project Located in a Low-Income Community (Assembly Bill 1550) No Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
7.4. Health & Equity Measures
No Health & Equity Measures selected.
7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.
7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.
8. User Changes to Default Data
8.1. Justifications
Screen Justification
Construction: Construction Phases Phase 1 construction is expected to commence Nov 2026 and last 55 days.
Construction: Off-Road Equipment Construction equipment based on similar Projects
8.4. Construction
8.4.1. Construction Phases
Phase Type Phase Name Model Parameter Default Value New Value 473 17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 34 / 35
Linear, Grading & Excavation Linear, Grading & Excavation Start Date 11/10/2026 11/24/2026 Linear, Grading & Excavation Linear, Grading & Excavation End Date 12/5/2026 12/17/2026 Linear, Drainage, Utilities, &
Sub-Grade
Linear, Drainage, Utilities, &
Sub-Grade
Start Date 12/6/2026 12/18/2026
Linear, Drainage, Utilities, &
Sub-Grade
Linear, Drainage, Utilities, &
Sub-Grade
End Date 12/28/2026 1/8/2027
Linear, Paving Linear, Paving Start Date 12/29/2026 1/9/2027 Linear, Paving Linear, Paving End Date 1/7/2027 1/18/2027 Linear, Paving Linear, Paving Work Days per Phase 7.00000 6.00000 Demolition Demolition Start Date 11/2/2026 11/10/2026
Demolition Demolition End Date 11/16/2026 11/23/2026
8.4.2. Off-Road Equipment
Phase Name Equipment Type Model Parameter Default Value New Value Linear, Grubbing & Land Clearing Off-Highway Trucks Number per Day 1.000000 2.00000 Linear, Grubbing & Land Clearing Off-Highway Trucks Horsepower 87.0000 376.000 Linear, Grubbing & Land Clearing Off-Highway Trucks Load Factor 0.43000 0.38000 Linear, Grubbing & Land Clearing Rubber Tired Dozers Number per Day 4.00000 1.000000 Linear, Grubbing & Land Clearing Rubber Tired Dozers Horsepower 36.0000 367.000 Linear, Grubbing & Land Clearing Rubber Tired Dozers Load Factor 0.38000 0.40000 Linear, Grubbing & Land Clearing Tractors/Loaders/Backhoes Fuel Type Electric Diesel Linear, Grubbing & Land Clearing Tractors/Loaders/Backhoes Horsepower 6.00000 84.0000 Linear, Grubbing & Land Clearing Tractors/Loaders/Backhoes Load Factor 0.82000 0.37000 Linear, Grading & Excavation Off-Highway Trucks Number per Day 1.000000 2.00000 Linear, Grading & Excavation Off-Highway Trucks Horsepower 87.0000 376.000 Linear, Grading & Excavation Off-Highway Trucks Load Factor 0.43000 0.38000 Linear, Grading & Excavation Rubber Tired Dozers Number per Day 3.00000 1.000000 Linear, Grading & Excavation Rubber Tired Dozers Horsepower 36.0000 367.000 Linear, Grading & Excavation Rubber Tired Dozers Load Factor 0.38000 0.40000 474 17033 - Mid Valley Channel (Phase 1) Detailed Report, 5/19/2026 35 / 35
Linear, Grading & Excavation Tractors/Loaders/Backhoes Number per Day 4.00000 1.000000 Linear, Drainage, Utilities, &
Sub-Grade
Off-Highway Trucks Number per Day 1.000000 2.00000
Linear, Drainage, Utilities, &
Sub-Grade
Off-Highway Trucks Horsepower 37.0000 376.000
Linear, Drainage, Utilities, &
Sub-Grade
Off-Highway Trucks Load Factor 0.48000 0.38000
Linear, Drainage, Utilities, &
Sub-Grade
Rubber Tired Dozers Horsepower 14.0000 367.000
Linear, Drainage, Utilities, &
Sub-Grade
Rubber Tired Dozers Load Factor 0.74000 0.40000
Linear, Drainage, Utilities, &
Sub-Grade
Tractors/Loaders/Backhoes Number per Day 3.00000 1.000000 Linear, Paving Other General Industrial Equipment Number per Day 2.00000 1.000000 Linear, Paving Other General Industrial Equipment Horsepower 36.0000 35.0000 Linear, Paving Other General Industrial Equipment Load Factor 0.38000 0.34000 Linear, Paving Off-Highway Trucks Fuel Type Electric Diesel Linear, Paving Off-Highway Trucks Number per Day 1.000000 3.00000 Linear, Paving Off-Highway Trucks Horsepower 6.00000 376.000 Linear, Paving Off-Highway Trucks Load Factor 0.82000 0.38000 Linear, Paving Tractors/Loaders/Backhoes Number per Day 3.00000 1.000000 Demolition Excavators Number per Day 3.00000 1.000000
Demolition Rubber Tired Dozers Number per Day 2.00000 1.000000 475
17033-02 AQ & GHG Assessment 32 Mid Valley Channel Improvement APPENDIX 2:
CALEEMOD PHASE 2 EMISSIONS MODEL OUTPUT
476
17033 - Mid Valley Channel (Phase 2) Detailed Report, 5/19/2026 1 / 30
17033 - Mid Valley Channel (Phase 2) Detailed Report
Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds
2.2. Construction Emissions by Year
2.2.1. Total Construction Emissions by Year, Unmitigated
2.2.2. Onsite Construction Emissions by Year, Unmitigated
2.2.3. Offsite Construction Emissions by Year, Unmitigated
3. Construction Emissions Details
3.1. Linear, Grubbing & Land Clearing (2027)
3.1.1. Onsite - Unmitigated
3.1.2. Offsite - Unmitigated
3.2. Linear, Grading & Excavation (2027)
477
17033 - Mid Valley Channel (Phase 2) Detailed Report, 5/19/2026 2 / 30
3.2.1. Onsite - Unmitigated
3.2.2. Offsite - Unmitigated
3.3. Linear, Drainage, Utilities, & Sub-Grade (2027)
3.3.1. Onsite - Unmitigated
3.3.2. Offsite - Unmitigated
3.4. Linear, Paving (2027)
3.4.1. Onsite - Unmitigated
3.4.2. Offsite - Unmitigated
4. Operations Emissions Details
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
5. Activity Data
5.1. Construction Schedule
5.2. Off-Road Equipment
5.2.1. Unmitigated
5.3. Construction Vehicles
478
17033 - Mid Valley Channel (Phase 2) Detailed Report, 5/19/2026 3 / 30
5.3.1. Unmitigated
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
5.6.2. Construction Earthmoving Control Strategies
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
479
17033 - Mid Valley Channel (Phase 2) Detailed Report, 5/19/2026 4 / 30
6.2. Initial Climate Risk Scores
6.3. Adjusted Climate Risk Scores
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
7.2. Healthy Places Index Scores
7.3. Overall Health & Equity Scores
7.4. Health & Equity Measures
7.5. Evaluation Scorecard
7.6. Health & Equity Custom Measures
8. User Changes to Default Data
8.1. Justifications
8.4. Construction
8.4.1. Construction Phases
8.4.2. Off-Road Equipment
480
17033 - Mid Valley Channel (Phase 2) Detailed Report, 5/19/2026 5 / 30
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name 17033 - Mid Valley Channel (Phase 2)
Construction Start Date 1/19/2027
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 3.30000
Precipitation (days) 0.80000
Location 33.781071, -116.348197
County Riverside-Salton Sea
City Palm Desert
Air District South Coast AQMD
Air Basin Salton Sea
TAZ 5671
EDFZ 19
Electric Utility Imperial Irrigation District
Gas Utility Southern California Gas
App Version 2022.1.1.43
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Road Widening 0.72000 Mile 3.53000 0.00000 0.00000 — — Underground Storm Drain
481
17033 - Mid Valley Channel (Phase 2) Detailed Report, 5/19/2026 6 / 30
Other Non-Asphalt 4.00000 Acre 4.00000 0.00000 0.00000 — — Basin Surfaces
1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 2.50912 2.11066 15.4807 17.4130 0.04772 0.59498 2.13628 2.71073 0.54738 0.99051 1.52074 — 5,532.11 5,532.11 0.19560 0.21223 0.06657 5,600.13 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.21887 0.18388 1.35125 1.49969 0.00422 0.05167 0.16619 0.21785 0.04760 0.07861 0.12622 — 479.952 479.952 0.01779 0.01058 0.05578 483.606 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.03994 0.03356 0.24660 0.27369 0.00077 0.00943 0.03033 0.03976 0.00869 0.01435 0.02303 — 79.4616 79.4616 0.00295 0.00175 0.00923 80.0665
2.2. Construction Emissions by Year
2.2.1. Total Construction Emissions by Year, Unmitigated Includes both onsite and offsite emissions.
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Summer
(Max)
— — — — — — — — — — — — — — — — — —
482
17033 - Mid Valley Channel (Phase 2) Detailed Report, 5/19/2026 7 / 30
Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
2027 2.50912 2.11066 15.4807 17.4130 0.04772 0.59498 2.13628 2.71073 0.54738 0.99051 1.52074 — 5,532.11 5,532.11 0.19560 0.21223 0.06657 5,600.13 Average
Daily
— — — — — — — — — — — — — — — — — —
2027 0.21887 0.18388 1.35125 1.49969 0.00422 0.05167 0.16619 0.21785 0.04760 0.07861 0.12622 — 479.952 479.952 0.01779 0.01058 0.05578 483.606 Annual — — — — — — — — — — — — — — — — — —
2027 0.03994 0.03356 0.24660 0.27369 0.00077 0.00943 0.03033 0.03976 0.00869 0.01435 0.02303 — 79.4616 79.4616 0.00295 0.00175 0.00923 80.0665
2.2.2. Onsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
2027 2.44811 2.05709 15.4096 16.7116 0.04406 0.59498 1.70614 2.29859 0.54738 0.87593 1.42293 — 4,745.86 4,745.86 0.19251 0.03850 0.00000 4,762.15 Average
Daily
— — — — — — — — — — — — — — — — — —
2027 0.21279 0.17880 1.29867 1.42306 0.00392 0.05084 0.14012 0.19096 0.04677 0.07198 0.11875 — 424.247 424.247 0.01721 0.00344 0.00000 425.703 Annual — — — — — — — — — — — — — — — — — —
2027 0.03883 0.03263 0.23701 0.25971 0.00072 0.00928 0.02557 0.03485 0.00854 0.01314 0.02167 — 70.2390 70.2390 0.00285 0.00057 0.00000 70.4800
2.2.3. Offsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Summer
(Max)
— — — — — — — — — — — — — — — — — —
483
17033 - Mid Valley Channel (Phase 2) Detailed Report, 5/19/2026 8 / 30
Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
2027 0.07405 0.06250 1.32027 0.81830 0.00769 0.02171 0.43014 0.45185 0.02171 0.11458 0.13629 — 1,196.76 1,196.76 0.01242 0.17706 0.06657 1,249.90 Average
Daily
— — — — — — — — — — — — — — — — — —
2027 0.00608 0.00508 0.05259 0.07663 0.00029 0.00083 0.02607 0.02690 0.00083 0.00664 0.00747 — 55.7051 55.7051 0.00058 0.00714 0.05578 57.9028 Annual — — — — — — — — — — — — — — — — — —
2027 0.00111 0.00093 0.00960 0.01398 0.00005 0.00015 0.00476 0.00491 0.00015 0.00121 0.00136 — 9.22262 9.22262 0.00010 0.00118 0.00923 9.58646
3. Construction Emissions Details
3.1. Linear, Grubbing & Land Clearing (2027)
3.1.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
2.44811 2.05709 15.4096 16.7116 0.04248 0.59498 — 0.59498 0.54738 — 0.54738 — 4,600.46 4,600.46 0.18661 0.03732 — 4,616.25 Dust
From
Material
Movement
— — — — — — 1.70361 1.70361 — 0.87555 0.87555 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 484
17033 - Mid Valley Channel (Phase 2) Detailed Report, 5/19/2026 9 / 30
Average — — — — — — — — — — — — — — — — — —
Daily
Off-Roa
d
Equipm
ent
0.02683 0.02254 0.16887 0.18314 0.00047 0.00652 — 0.00652 0.00600 — 0.00600 — 50.4160 50.4160 0.00205 0.00041 — 50.5891 Dust
From
Material
Movement
— — — — — — 0.01867 0.01867 — 0.00960 0.00960 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.00490 0.00411 0.03082 0.03342 0.00008 0.00119 — 0.00119 0.00109 — 0.00109 — 8.34695 8.34695 0.00034 0.00007 — 8.37560 Dust
From
Material
Movement
— — — — — — 0.00341 0.00341 — 0.00175 0.00175 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.1.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.06101 0.05357 0.07110 0.70140 0.00000 0.00000 0.19606 0.19606 0.00000 0.04596 0.04596 — 182.043 182.043 0.00265 0.00711 0.01636 184.244 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 485
17033 - Mid Valley Channel (Phase 2) Detailed Report, 5/19/2026 10 / 30
Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00070 0.00062 0.00070 0.00963 0.00000 0.00000 0.00215 0.00215 0.00000 0.00050 0.00050 — 2.13185 2.13185 0.00003 0.00008 0.00298 2.15869 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00013 0.00011 0.00013 0.00176 0.00000 0.00000 0.00039 0.00039 0.00000 0.00009 0.00009 — 0.35295 0.35295 <
0.000005
0.00001 0.00049 0.35740
Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.2. Linear, Grading & Excavation (2027)
3.2.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
2.23069 1.87440 13.8575 14.7296 0.04004 0.55274 — 0.55274 0.50852 — 0.50852 — 4,335.35 4,335.35 0.17586 0.03517 — 4,350.22 Dust
From
Material
Movement
— — — — — — 1.70614 1.70614 — 0.87593 0.87593 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 486
17033 - Mid Valley Channel (Phase 2) Detailed Report, 5/19/2026 11 / 30
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.08556 0.07189 0.53152 0.56497 0.00154 0.02120 — 0.02120 0.01951 — 0.01951 — 166.287 166.287 0.00675 0.00135 — 166.858 Dust
From
Material
Movement
— — — — — — 0.06544 0.06544 — 0.03360 0.03360 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.01561 0.01312 0.09700 0.10311 0.00028 0.00387 — 0.00387 0.00356 — 0.00356 — 27.5308 27.5308 0.00112 0.00022 — 27.6252 Dust
From
Material
Movement
— — — — — — 0.01194 0.01194 — 0.00613 0.00613 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.2.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.04068 0.03571 0.04740 0.46760 0.00000 0.00000 0.13071 0.13071 0.00000 0.03064 0.03064 — 121.362 121.362 0.00176 0.00474 0.01091 122.829 Vendor 0.00149 0.00104 0.03277 0.01359 0.00025 0.00045 0.00856 0.00901 0.00045 0.00236 0.00281 — 30.4120 30.4120 0.00038 0.00402 0.00196 31.6218 487
17033 - Mid Valley Channel (Phase 2) Detailed Report, 5/19/2026 12 / 30
Hauling 0.03189 0.02055 1.24010 0.28274 0.00744 0.02126 0.29088 0.31214 0.02126 0.08158 0.10284 — 1,044.99 1,044.99 0.01028 0.16830 0.05371 1,095.45 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00163 0.00145 0.00164 0.02248 0.00000 0.00000 0.00501 0.00501 0.00000 0.00117 0.00117 — 4.97433 4.97433 0.00006 0.00018 0.00696 5.03694 Vendor 0.00006 0.00004 0.00122 0.00051 0.00001 0.00002 0.00033 0.00035 0.00002 0.00009 0.00011 — 1.16578 1.16578 0.00001 0.00015 0.00125 1.21335 Hauling 0.00128 0.00083 0.04657 0.01070 0.00029 0.00082 0.01115 0.01197 0.00082 0.00313 0.00394 — 40.0605 40.0605 0.00039 0.00646 0.03428 42.0283 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00030 0.00026 0.00030 0.00410 0.00000 0.00000 0.00091 0.00091 0.00000 0.00021 0.00021 — 0.82356 0.82356 0.00001 0.00003 0.00115 0.83392 Vendor 0.00001 0.00001 0.00022 0.00009 <
0.000005
<
0.000005
0.00006 0.00006 <
0.000005
0.00002 0.00002 — 0.19301 0.19301 <
0.000005
0.00003 0.00021 0.20088
Hauling 0.00023 0.00015 0.00850 0.00195 0.00005 0.00015 0.00204 0.00218 0.00015 0.00057 0.00072 — 6.63247 6.63247 0.00007 0.00107 0.00568 6.95827
3.3. Linear, Drainage, Utilities, & Sub-Grade (2027)
3.3.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
2.23069 1.87440 13.8575 14.7296 0.04004 0.55274 — 0.55274 0.50852 — 0.50852 — 4,335.35 4,335.35 0.17586 0.03517 — 4,350.22 Dust
From
Material
Movement
— — — — — — 1.70361 1.70361 — 0.87555 0.87555 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 488
17033 - Mid Valley Channel (Phase 2) Detailed Report, 5/19/2026 13 / 30
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.07334 0.06162 0.45559 0.48426 0.00132 0.01817 — 0.01817 0.01672 — 0.01672 — 142.532 142.532 0.00578 0.00116 — 143.021 Dust
From
Material
Movement
— — — — — — 0.05601 0.05601 — 0.02879 0.02879 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.01338 0.01125 0.08314 0.08838 0.00024 0.00332 — 0.00332 0.00305 — 0.00305 — 23.5978 23.5978 0.00096 0.00019 — 23.6788 Dust
From
Material
Movement
— — — — — — 0.01022 0.01022 — 0.00525 0.00525 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.3.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.04068 0.03571 0.04740 0.46760 0.00000 0.00000 0.13071 0.13071 0.00000 0.03064 0.03064 — 121.362 121.362 0.00176 0.00474 0.01091 122.829 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 489
17033 - Mid Valley Channel (Phase 2) Detailed Report, 5/19/2026 14 / 30
Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00140 0.00124 0.00141 0.01927 0.00000 0.00000 0.00430 0.00430 0.00000 0.00101 0.00101 — 4.26371 4.26371 0.00005 0.00016 0.00596 4.31738 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00025 0.00023 0.00026 0.00352 0.00000 0.00000 0.00078 0.00078 0.00000 0.00018 0.00018 — 0.70591 0.70591 0.00001 0.00003 0.00099 0.71479 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.4. Linear, Paving (2027)
3.4.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
1.97584 1.65970 10.4163 13.9203 0.04406 0.36080 — 0.36080 0.33194 — 0.33194 — 4,745.86 4,745.86 0.19251 0.03850 — 4,762.15 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
490
17033 - Mid Valley Channel (Phase 2) Detailed Report, 5/19/2026 15 / 30
Off-Roa 0.02707 0.02274 0.14269 0.19069 0.00060 0.00494 — 0.00494 0.00455 — 0.00455 — 65.0118 65.0118 0.00264 0.00053 — 65.2349 d
Equipm
ent
Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent
0.00494 0.00415 0.02604 0.03480 0.00011 0.00090 — 0.00090 0.00083 — 0.00083 — 10.7634 10.7634 0.00044 0.00009 — 10.8004 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.4.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.07118 0.06250 0.08295 0.81830 0.00000 0.00000 0.22874 0.22874 0.00000 0.05362 0.05362 — 212.383 212.383 0.00309 0.00829 0.01909 214.952 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00102 0.00090 0.00103 0.01405 0.00000 0.00000 0.00313 0.00313 0.00000 0.00073 0.00073 — 3.10895 3.10895 0.00004 0.00011 0.00435 3.14809 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00019 0.00016 0.00019 0.00256 0.00000 0.00000 0.00057 0.00057 0.00000 0.00013 0.00013 — 0.51472 0.51472 0.00001 0.00002 0.00072 0.52120 491 17033 - Mid Valley Channel (Phase 2) Detailed Report, 5/19/2026 16 / 30
Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
4. Operations Emissions Details
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
492
17033 - Mid Valley Channel (Phase 2) Detailed Report, 5/19/2026 17 / 30
Daily, — — — — — — — — — — — — — — — — — —
Winter
(Max)
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
493
17033 - Mid Valley Channel (Phase 2) Detailed Report, 5/19/2026 18 / 30
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
5. Activity Data
5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Linear, Grubbing & Land
Clearing
Linear, Grubbing & Land
Clearing
1/19/2027 1/22/2027 5.00000 4.00000 4
Linear, Grading &
Excavation
Linear, Grading &
Excavation
1/25/2027 2/11/2027 5.00000 14.0000 14
Linear, Drainage, Utilities,
& Sub-Grade
Linear, Drainage, Utilities,
& Sub-Grade
2/12/2027 3/1/2027 5.00000 12.0000 12
Linear, Paving Linear, Paving 3/2/2027 3/8/2027 5.00000 5.00000 5
5.2. Off-Road Equipment
5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor 494
17033 - Mid Valley Channel (Phase 2) Detailed Report, 5/19/2026 19 / 30
Linear, Grubbing & Off-Highway Trucks Diesel Average 2.00000 8.00000 376.000 0.38000 Land Clearing
Linear, Grubbing &
Land Clearing
Rubber Tired Dozers Diesel Average 1.000000 8.00000 367.000 0.40000 Linear, Grubbing &
Land Clearing
Tractors/Loaders/Back
hoes
Diesel Average 1.000000 8.00000 84.0000 0.37000
Linear, Grubbing &
Land Clearing
Excavators Diesel Average 1.000000 8.00000 36.0000 0.38000 Linear, Grubbing &
Land Clearing
Other General
Industrial Equipment
Diesel Average 1.000000 8.00000 35.0000 0.34000
Linear, Grading &
Excavation
Off-Highway Trucks Diesel Average 2.00000 8.00000 376.000 0.38000 Linear, Grading &
Excavation
Rubber Tired Dozers Diesel Average 1.000000 8.00000 367.000 0.40000 Linear, Grading &
Excavation
Tractors/Loaders/Back
hoes
Diesel Average 1.000000 8.00000 84.0000 0.37000
Linear, Drainage,
Utilities, & Sub-Grade
Off-Highway Trucks Diesel Average 2.00000 8.00000 376.000 0.38000 Linear, Drainage,
Utilities, & Sub-Grade
Rubber Tired Dozers Diesel Average 1.000000 8.00000 367.000 0.40000 Linear, Drainage,
Utilities, & Sub-Grade
Tractors/Loaders/Back
hoes
Diesel Average 1.000000 8.00000 84.0000 0.37000
Linear, Paving Paving Equipment Diesel Average 1.000000 8.00000 89.0000 0.36000 Linear, Paving Other General
Industrial Equipment
Diesel Average 1.000000 8.00000 35.0000 0.34000
Linear, Paving Off-Highway Trucks Diesel Average 3.00000 8.00000 376.000 0.38000 Linear, Paving Tractors/Loaders/Back
hoes
Diesel Average 1.000000 8.00000 84.0000 0.37000
Linear, Paving Plate Compactors Diesel Average 1.000000 8.00000 8.00000 0.43000
5.3. Construction Vehicles
5.3.1. Unmitigated
495
17033 - Mid Valley Channel (Phase 2) Detailed Report, 5/19/2026 20 / 30
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Linear, Grubbing & Land Clearing Worker 15.0000 18.5000 LDA,LDT1,LDT2 Linear, Grubbing & Land Clearing Vendor 0.00000 10.2000 HHDT,MHDT Linear, Grubbing & Land Clearing Hauling 0.00000 20.0000 HHDT Linear, Grubbing & Land Clearing Onsite truck — — HHDT
Linear, Grading & Excavation Worker 10.00000 18.5000 LDA,LDT1,LDT2 Linear, Grading & Excavation Vendor 1.000000 10.2000 HHDT,MHDT Linear, Grading & Excavation Hauling 16.0714 20.0000 HHDT Linear, Grading & Excavation Onsite truck — — HHDT
Linear, Drainage, Utilities, &
Sub-Grade
Worker 10.00000 18.5000 LDA,LDT1,LDT2
Linear, Drainage, Utilities, &
Sub-Grade
Vendor 0.00000 10.2000 HHDT,MHDT
Linear, Drainage, Utilities, &
Sub-Grade
Hauling 0.00000 20.0000 HHDT
Linear, Drainage, Utilities, &
Sub-Grade
Onsite truck — — HHDT
Linear, Paving Worker 17.5000 18.5000 LDA,LDT1,LDT2
Linear, Paving Vendor 0.00000 10.2000 HHDT,MHDT
Linear, Paving Hauling 0.00000 20.0000 HHDT
Linear, Paving Onsite truck — — HHDT
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.
5.5. Architectural Coatings
5.6. Dust Mitigation
496
17033 - Mid Valley Channel (Phase 2) Detailed Report, 5/19/2026 21 / 30
5.6.1. Construction Earthmoving Activities
Phase Name Material Imported (cy) Material Exported (cy) Acres Graded (acres) Material Demolished (sq. ft.) Acres Paved (acres) Linear, Grubbing & Land
Clearing
— — 3.53000 0.00000 0.00000
Linear, Grading & Excavation — 1,800.00 3.53000 0.00000 0.00000 Linear, Drainage, Utilities, &
Sub-Grade
— — 3.53000 0.00000 0.00000
5.6.2. Construction Earthmoving Control Strategies
Control Strategies Applied Frequency (per day) PM10 Reduction PM2.5 Reduction Water Exposed Area 3 74% 74%
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
2027 0.00000 456.543 0.03300 0.00400
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
497
17033 - Mid Valley Channel (Phase 2) Detailed Report, 5/19/2026 22 / 30
5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.
Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 25.5500 annual days of extreme heat Extreme Precipitation 0.00000 annual days with precipitation above 20 mm Sea Level Rise — meters of inundation depth
Wildfire 0.03000 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events. Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
6.2. Initial Climate Risk Scores
498
17033 - Mid Valley Channel (Phase 2) Detailed Report, 5/19/2026 23 / 30
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 1 0 0 N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
Drought 0 0 0 N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.
6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 1 1 1 2
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
Drought 1 1 1 2
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
499
17033 - Mid Valley Channel (Phase 2) Detailed Report, 5/19/2026 24 / 30
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures.
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.
Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 91.0516
AQ-PM 7.11886
AQ-DPM 74.9596
Drinking Water 45.3603
Lead Risk Housing 1.56270
Pesticides 7.06897
Toxic Releases 2.70068
Traffic 85.0250
Effect Indicators —
CleanUp Sites 0.00000
Groundwater 0.00000
Haz Waste Facilities/Generators 53.5142
Impaired Water Bodies 0.00000
Solid Waste 0.00000
Sensitive Population —
Asthma 16.0269
Cardio-vascular 13.8210
Low Birth Weights 14.4855
Socioeconomic Factor Indicators —
500
17033 - Mid Valley Channel (Phase 2) Detailed Report, 5/19/2026 25 / 30
Education 18.8054
Housing 39.6958
Linguistic 19.8674
Poverty 14.7864
Unemployment 22.5664
7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
Indicator Result for Project Census Tract
Economic —
Above Poverty 74.1947902
Employed 96.48402412
Median HI 54.63877839
Education —
Bachelor's or higher 80.77762094
High school enrollment 100
Preschool enrollment 79.5072501
Transportation —
Auto Access 35.49339151
Active commuting 6.531502631
Social —
2-parent households 21.21134351
Voting 60.73399204
Neighborhood —
Alcohol availability 97.0101373
Park access 6.954959579
Retail density 41.28063647
Supermarket access 22.53304247
501
17033 - Mid Valley Channel (Phase 2) Detailed Report, 5/19/2026 26 / 30
Tree canopy 16.12986013
Housing—
Homeownership 50.21172847
Housing habitability 59.19414859
Low-inc homeowner severe housing cost burden 41.01116387 Low-inc renter severe housing cost burden 71.2947517
Uncrowded housing 83.16437829
Health Outcomes—
Insured adults 92.73707173
Arthritis 0.0
Asthma ER Admissions 94.5
High Blood Pressure 0.0
Cancer (excluding skin) 0.0
Asthma 0.0
Coronary Heart Disease 0.0
Chronic Obstructive Pulmonary Disease 0.0
Diagnosed Diabetes 0.0
Life Expectancy at Birth 73.9
Cognitively Disabled 60.3
Physically Disabled 71.5
Heart Attack ER Admissions 93.8
Mental Health Not Good 0.0
Chronic Kidney Disease 0.0
Obesity 0.0
Pedestrian Injuries 60.8
Physical Health Not Good 0.0
Stroke 0.0
Health Risk Behaviors—
502
17033 - Mid Valley Channel (Phase 2) Detailed Report, 5/19/2026 27 / 30
Binge Drinking 0.0
Current Smoker 0.0
No Leisure Time for Physical Activity 0.0
Climate Change Exposures —
Wildfire Risk 0.0
SLR Inundation Area 0.0
Children 68.4
Elderly 8.7
English Speaking 88.0
Foreign-born 32.0
Outdoor Workers 71.7
Climate Change Adaptive Capacity —
Impervious Surface Cover 67.9
Traffic Density 64.1
Traffic Access 23.0
Other Indices —
Hardship 17.6
Other Decision Support —
2016 Voting 84.3